KR102507299B1 - The construction method precast prestressed concrete parking buildings with precast concrete wall panels - Google Patents

The construction method precast prestressed concrete parking buildings with precast concrete wall panels Download PDF

Info

Publication number
KR102507299B1
KR102507299B1 KR1020160038058A KR20160038058A KR102507299B1 KR 102507299 B1 KR102507299 B1 KR 102507299B1 KR 1020160038058 A KR1020160038058 A KR 1020160038058A KR 20160038058 A KR20160038058 A KR 20160038058A KR 102507299 B1 KR102507299 B1 KR 102507299B1
Authority
KR
South Korea
Prior art keywords
wall panel
panel member
parking lot
wall
slab
Prior art date
Application number
KR1020160038058A
Other languages
Korean (ko)
Other versions
KR20170111858A (en
Inventor
유승룡
Original Assignee
동국대학교 산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 동국대학교 산학협력단 filed Critical 동국대학교 산학협력단
Priority to KR1020160038058A priority Critical patent/KR102507299B1/en
Publication of KR20170111858A publication Critical patent/KR20170111858A/en
Application granted granted Critical
Publication of KR102507299B1 publication Critical patent/KR102507299B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/08Garages for many vehicles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34321Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34384Assembling details for foldable, separable, collapsible or retractable structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block

Abstract

본 발명은 보와 기둥을 일체형으로 하나의 PC벽 패널부재로 제작하여 지상 PC 주차장을 시공할 수 있도록 함으로서, 보와 기둥이 일체형으로 된 PC 벽 패널부재와; 상기 바닥에 설치되어 PC 벽 패널부재를 고정할 수 있도록 된 받침부재와; 상기 PC 벽 패널부재에 일체로 형성된 상단 보 양측에 다수의 슬래브가 설치되도록 형성된 걸림부를 구성한 것으로 본 발명은 주차장 건물 시공시 PC 부재의 개수를 최소화하고 공기를 단축하여 최소한의 공사비용으로 PC 주차장을 시공할 수 있도록 하는 동시에 지진에 대한 횡 지지능력을 증가시킬 수 있도록 하여 내진설계가 적용되도록 한 프리캐스트 프리스트레스 콘크리트 벽 패널을 이용한 지상 PC 주차장 및 그 시공방법에 관한 것이다.The present invention makes it possible to construct a ground PC parking lot by manufacturing a PC wall panel member integrally with a beam and a column, and a PC wall panel member in which a beam and a column are integrally formed; a support member installed on the floor to fix the PC wall panel member; The present invention consists of a hanging portion formed so that a plurality of slabs are installed on both sides of the upper beam integrally formed on the PC wall panel member, and the present invention minimizes the number of PC members and shortens the period during construction of a parking lot building, thereby constructing a PC parking lot at minimal construction cost. It relates to a ground PC parking lot using a precast prestressed concrete wall panel and a method of constructing the same so that the seismic design can be applied by increasing the lateral support capacity against the earthquake at the same time as it can be constructed.

Description

프리캐스트 프리스트레스 콘크리트 벽 패널을 이용한 지상 PC 주차장 및 그 시공방법{ THE CONSTRUCTION METHOD PRECAST PRESTRESSED CONCRETE PARKING BUILDINGS WITH PRECAST CONCRETE WALL PANELS} Ground PC parking lot using precast prestressed concrete wall panels and its construction method

본 발명은 보와 기둥을 일체형으로 하나의 PC 벽 패널부재로 제작하여 지상 PC 주차장을 시공할 수 있도록 함으로서, 주차장 건물 시공시 PC 부재의 개수를 최소화하고 공기를 단축하여 최소한의 공사비용으로 PC 주차장을 시공할 수 있도록 하고, 지진에 대한 횡 지지능력을 증가시킬 수 있도록 하여 내진설계가 적용되도록 한 프리캐스트 프리스트레스 콘크리트 벽 패널을 활용한 지상 PC 주차장 및 그 시공방법에 관한 것이다.The present invention makes it possible to construct a ground PC parking lot by manufacturing a beam and a pillar integrally into one PC wall panel member, thereby minimizing the number of PC members and shortening the period during construction of a parking lot building, thereby minimizing construction costs. It relates to a ground PC parking lot using a precast prestressed concrete wall panel and a construction method thereof to enable the construction of a precast prestressed concrete wall panel so that the seismic design can be applied by increasing the lateral bearing capacity against an earthquake.

일반적인 지상 주차장은 철골 빔을 이용하여 타공된 철판을 슬래브로 설치하여 사용함으로 차량 운행시 시끄러운 소음이 발생되고, 장기간 사용시 용접부위가 노출된 상태이므로 녹이나 부식이 발생되고, 우천시 누수가 발생되어 주기적으로 보수 공사가 필요할 뿐만 아니라 외관상 고급스럽지 못한 문제점이 있다.In general ground parking lots, a perforated steel plate is installed as a slab using a steel beam, so loud noise is generated during vehicle operation, and rust or corrosion occurs because the welded part is exposed during long-term use, and water leakage occurs periodically in case of rain. Not only does it require repair work, but it also has a problem that is not luxurious in appearance.

또한 콘크리트 구조물의 지상 주차장은 진동을 방지하고, 누수가 없으며, 주기적으로 보수공사가 필요 없으나, 공사기간이 많이 소요되고 공사비용이 상승되는 문제점이 있다. In addition, the ground parking lot of the concrete structure prevents vibration, does not leak, and does not require periodic repair work, but there is a problem in that a lot of construction period is required and construction cost is increased.

상기와 같은 철골 빔과 철판을 이용한 지상주차장의 문제점과 콘크리트를 이용한 지상주차장의 문제점을 해소하기 위해 최근에는 PC 패널을 이용한 지상구조물을 시공함으로써 공사기간을 단축하고 공사비용을 줄이는 사례가 많아지고 있다. In order to solve the above-mentioned problems of ground parking lots using steel beams and steel plates and problems of ground parking lots using concrete, recently, there are many cases of shortening the construction period and reducing construction costs by constructing ground structures using PC panels. .

공장에서 제작되는 콘크리트 부재 중 프리스트레스를 도입한 콘크리트를 PS콘크리트 또는 PSC라 하고, 보통 콘크리트로 하는 것을 PC콘크리트라 하는데, 본 명세서에서는 이들을 통칭하여 PC(Precast Concrete)라 한다.Among the concrete members produced in the factory, the prestressed concrete is referred to as PS concrete or PSC, and the ordinary concrete is referred to as PC concrete. In this specification, they are collectively referred to as PC (Precast Concrete).

따라서 공장에서 제작하고 현장 조립 시공하는 PC 제품은 구조물의 품질이 좋고 시공이 간편하며, 공사를 조기에 완료할 수 있어 공사기간이 단축되며, 특히 인력 및 가설재 투입이 적어 재해 발생 우려가 적은 장점이 있다.Therefore, PC products manufactured at the factory and assembled on site have good structure quality, easy construction, and can be completed early, shortening the construction period. there is.

이 분야의 선행기술을 살펴 보면 공개특허공보 제10-2005-0090970호(이하 "선행기술 1"이라 한다)의 조립식 주차장치는 상하 좌우로 조립이 가능한 주차블럭(100)과, 상기 대향하는 주차블럭(100)에 지지되어 차량(C)의 통로 기능을 하는 판상의 슬래브(200)를 철근콘크리트로 구성하여, 다양한 크기와 디자인의 주차장치의 시공이 가능하고, 부식에 의한 고장이나 내구력 상실의 문제가 발생하지 않아 안정성이 확보되고, 공기가 짧고, 시공비가 적게 소요되며, 분리한 후 이송하여 재활용이 가능하도록된 구성이 개시되었다 .Looking at the prior art in this field, the prefabricated parking device of Laid-Open Patent Publication No. 10-2005-0090970 (hereinafter referred to as "Prior Art 1") includes a parking block 100 that can be assembled vertically and horizontally, and the opposing parking block The plate-shaped slab 200, which is supported by the 100 and functions as a passage for the vehicle C, is composed of reinforced concrete, and it is possible to construct parking devices of various sizes and designs, and the problem of failure due to corrosion or loss of durability A configuration has been disclosed in which stability is ensured without occurrence, the period is short, the construction cost is low, and the configuration is possible to be recycled by transferring after separation.

또 다른 선행기술로는 등록특허공보 제10-1385556호(이하 "선행기술 2"이라한다) PC를 이용한 지하구조물 및 그 조립공법 지하구조물이 시공될 바닥에 타설되어서 지하구조물의 베이스를 이루는 기초콘크리트(10); 직사각형을 이루도록 기초콘크리트(10)의 상부면에 배열되고 지하구조물의 네 측벽을 이루며 내부에 철근(28)이 배근되고 철근(28)의 상하단이 상하부에 노출되며 지하구조물의 중량에 의한 수직압 및 토압의 수평압을 지지하는 다수의 외부벽체(20);다수 배열된 외부벽체들 중 최외측의 외부벽체에 결합되고 지하구조물의 측벽 모서리의 한 부분을 이루며 내부에 철근(38)이 배근되며 철근(38)의 상하단이 상하부에 노출되고 지하구조물의 중량에 의한 수직압 및 토압의 수평압을 지지하는 제1코너벽체(30); 외부벽체 및 제1코너벽체 사이에 결합되고 지하구조물의 측벽 모서리의 나머지 부분을 이루며 내부에 철근(48)이 배근되고 철근(48)의 상하단이 상하부에 노출되며 지하구조물의 중량에 의한 수직압 및 토압의 수평압을 지지하는 제2코너벽체(40); 외부벽체(20) 및 제1코너벽체(30), 제2코너벽체(40)의 하부에 노출된 철근에 연결되는 바닥철근(50); 바닥철근(50)의 상부의 기초콘크리트(10) 상부면에 타설되어서 지하구조물의 바닥을 이루는 바닥콘크리트(60); 외부벽체(20) 및 제1코너벽체(30), 제2코너벽체(40)의 상부면에 안착되고 외부벽체(20) 및 제1코너벽체(30), 제2코너벽체(40)의 상부로 노출된 철근(28)(38)(48)에 연결되는 하프슬라브(70); 하프슬라브(70)의 상부에 타설되는 토핑콘크리트(80)를 포함하여 이루어지고; 외부벽체(20)는, 기초콘크리트(10)의 상부면에 안착되고 지하구조물의 벽체 두께보다 더 두꺼운 수평폭을 가지며 지하구조물의 벽체보다 더 내측으로 돌출되어 있고 토압의 수평압을 지지하는 수평압지지부(21)와, 수평압지지부(21)의 외측단부에 수직으로 형성되어 있어 수평압지지부(21)와 함께 ㄴ자 형태를 이루고 상부에 하프슬라브(70) 단부가 안착되도록 상부단턱(24)이 형성되어 있으며 일측면에 측면결합홈(25)이 형성되어 있고 타측면에 측면결합돌기(26)가 돌출되어 있으며 지하구조물의 수직하중을 지지하는 수직압지지부(22)와, 수평압지지부(21) 및 수직압지지부(22)의 이음부위에 형성되어서 이음부위에 집중되는 응력을 분산시키는 보강부(23)로 이루어지며;Another prior art is Registered Patent Publication No. 10-1385556 (hereinafter referred to as "Prior Art 2") Underground structure using PC and its assembly method Foundation concrete that forms the base of the underground structure by being poured on the floor where the underground structure is to be constructed (10); Arranged on the upper surface of the foundation concrete 10 to form a rectangle, forming the four side walls of the underground structure, reinforcing bars 28 are placed inside, and the upper and lower ends of the reinforcing bars 28 are exposed to the upper and lower parts, and the vertical pressure and A plurality of outer walls 20 supporting the horizontal pressure of the earth pressure; It is coupled to the outermost outer wall of the plurality of arranged outer walls and forms a part of the edge of the side wall of the underground structure, and reinforcing bars 38 are placed inside and reinforcing bars A first corner wall (30) whose upper and lower ends of (38) are exposed to the upper and lower portions and support the vertical pressure due to the weight of the underground structure and the horizontal pressure of the earth pressure; It is coupled between the outer wall and the first corner wall and forms the rest of the corner of the side wall of the underground structure, and the reinforcing bars 48 are placed inside, and the upper and lower ends of the reinforcing bars 48 are exposed to the upper and lower parts, and the vertical pressure due to the weight of the underground structure and A second corner wall 40 supporting the horizontal pressure of earth pressure; The outer wall 20 and the first corner wall 30, the floor reinforcement connected to the reinforcement exposed to the lower portion of the second corner wall 40 (50); Floor concrete 60, which is poured on the upper surface of the foundation concrete 10 above the floor reinforcement 50 and forms the bottom of the underground structure; It is seated on the upper surface of the outer wall 20 and the first corner wall 30 and the second corner wall 40 and the top of the outer wall 20 and the first corner wall 30 and the second corner wall 40 A half slab 70 connected to the exposed reinforcing bars 28, 38, and 48; It is made including topping concrete 80 poured on top of the half slab 70; The outer wall 20 is seated on the upper surface of the foundation concrete 10, has a horizontal width thicker than the wall thickness of the underground structure, protrudes more inward than the wall of the underground structure, and is a horizontal pressure sheet that supports the horizontal pressure of the earth pressure. It is formed vertically at the outer end of the branch 21 and the horizontal pressure support portion 21, so that it forms an L shape together with the horizontal pressure support portion 21, and the upper step 24 so that the end of the half slab 70 is seated on the top It is formed with a side coupling groove 25 formed on one side and a side coupling protrusion 26 protruding on the other side, and a vertical pressure support 22 supporting the vertical load of the underground structure, and a horizontal pressure support 21 ) and a reinforcing part 23 formed at the joint of the vertical pressure support part 22 to disperse stress concentrated in the joint;

제1코너벽체(30)는, 기초콘크리트(10)의 상부면에 안착되고 지하구조물의 벽체 두께보다 더 두꺼운 수평폭을 가지며 지하구조물의 벽체보다 더 내측으로 돌출되어 있고 토압의 수평압을 지지하는 제1코너수평압지지부(31)와, 제1코너수평압지지부(31)의 외측 단부에 수직으로 형성되어 있어 제1코너수평압지지부(31)와 함께 ㄴ자 형태를 이루고 상부에 하프슬라브(70) 단부가 안착되도록 제1 코너 상부단턱(34)이 형성되어 있으며 일측면에 외부벽체(20)의 측면결합돌기(26)가 삽입되도록 외부벽체결합홈(35)이 형성되어 있고 타측면에 코너벽체결합돌기(36)가 형성되어 있으며지하구조물의 수직하중을 지지하는 제1코너수직압지지부(32)와, 제1코너수평압지지부(31) 및 제1코너수직압지지부(32)의 이음부위에 형성되어서 이음부위에 집중되는 응력을 분산시키는 제1코너보강부(33)로 이루어지고;The first corner wall 30 is seated on the upper surface of the foundation concrete 10, has a horizontal width thicker than the wall thickness of the underground structure, protrudes more inward than the wall of the underground structure, and supports the horizontal pressure of earth pressure It is formed vertically on the outer end of the first corner horizontal pressure support portion 31 and the first corner horizontal pressure support portion 31 to form an L-shape together with the first corner horizontal pressure support portion 31, and a half slab 70 at the top. ) The first corner upper step 34 is formed so that the end is seated, and the outer wall coupling groove 35 is formed on one side so that the side coupling protrusion 26 of the outer wall 20 is inserted, and the corner on the other side The joint between the first corner vertical pressure support part 32, the first corner horizontal pressure support part 31 and the first corner vertical pressure support part 32 in which the wall coupling protrusion 36 is formed and supports the vertical load of the underground structure. It consists of a first corner reinforcing part 33 formed in the area to disperse stress concentrated in the joint area;

제2코너벽체(40)는, 기초콘크리트(10)의 상부면에 안착되고 지하구조물의 벽체 두께보다 더 두꺼운 수평폭을 가지며 지하구조물의 벽체보다 더 내측으로 돌출되어 있고 토압의 수평압을 지지하는 제2코너수평압지지부(41)와, 제2코너수평압지지The second corner wall 40 is seated on the upper surface of the foundation concrete 10, has a horizontal width thicker than the wall thickness of the underground structure, protrudes more inward than the wall of the underground structure, and supports the horizontal pressure of earth pressure The second corner horizontal pressure support 41 and the second corner horizontal pressure support

부(41)의 외측 단부에 수직으로 형성되어 있어 제2코너수평압지지부(41)와 함께 ㄴ자 형태를 이루고 상부에 하프슬라브(70) 단부가 안착되도록 제2코너상부단턱(44)이 형성되어 있으며 일측면에 코너벽체결합홈(45)이 형성되어 있고 타측면에 외부벽체(20)의 측면결합홈(25)에 삽입되도록 외부벽체결합돌기(46)가 형성되어 있으며 지하구조물의 수직하중을 지지하는 제2코너수직압지지부(42)와, 제2코너수평압지지부(41) 및 제2코너수직압지지부(42)의 이음부위에 형성되어서 이음부위에 집중되는 응력을 분산시키는 제2코너보강부(43)로 이루어지고; 외부벽체(20), 제1코너벽체(30), 제2코너벽체(40)에는, 각각 강선홀(27)(37)(47)이 형성되되,It is formed vertically at the outer end of the portion 41 to form an L shape together with the second corner horizontal pressure support portion 41, and the second corner upper step 44 is formed so that the end of the half slab 70 is seated on the top A corner wall coupling groove 45 is formed on one side and an external wall coupling protrusion 46 is formed on the other side to be inserted into the side coupling groove 25 of the outer wall 20, and the vertical load of the underground structure is formed. The second corner formed at the joint of the supporting second corner vertical pressure support portion 42, the second corner horizontal pressure support portion 41, and the second corner vertical pressure support portion 42 to disperse stress concentrated in the joint portion. made of a reinforcement part 43; Steel wire holes 27, 37, and 47 are formed in the outer wall 20, the first corner wall 30, and the second corner wall 40, respectively.

외부벽체(20), 제1코너벽체(30), 제2코너벽체(40)를 직사각틀 형태로 배열시킬 시, 건축구조물의 각 벽면에 형성된 강선홀(27)(37)(47)들이 동일 수평선상에 위치되고, 동일 수평선상에 위치된 강선홀(27)(37)(47)들에는 강선(90)이 통과되며, 강선(90)의 양단을 인장시켜서 각 벽면들을 이루는 외부벽체(20)들, 제1코너벽체(30), 제2코너벽체(40)를 하나의 블록으로 결속시키도록 된 것을 특징으로 하는 PC를 이용한 지하구조물이 개시되었다.When the outer wall 20, the first corner wall 30, and the second corner wall 40 are arranged in a rectangular frame, the steel wire holes 27, 37, and 47 formed on each wall of the building structure are the same. The steel wire 90 is passed through the steel wire holes 27, 37, 47 located on the horizontal line, and both ends of the steel wire 90 are tensioned to form the outer walls 20 ), a first corner wall (30), and a second corner wall (40) are bound together as one block. An underground structure using a PC has been disclosed.

상기 선행기술 1은 ∩자 형의 암거형태로 주차블럭(100)을 형성하고 주차블럭과 주차블럭 사이에 슬래부(200)설치하여 이루어진 구성으로서, 이러한 구성은 건축형태의 주차장이 아니라 차량 1대만 주차할 수 있는 공간부를 형성활 수 있도록된 구조물로서 다수의 주차블럭을 븍럭 쌓듯이 적층하는 것으로 주차공간을 형성한다 하더라도 각각의 주차블럭 측벽이 겹쳐 설치됨으로 필요 이상의 공간부를 차지하게 됨으로 공간활용을 효율적으로 하지 못화는 문제점이 있다.The prior art 1 is a configuration made by forming a parking block 100 in the form of a ∩-shaped culvert and installing a slab 200 between the parking block and the parking block, and this configuration is not an architectural parking lot, but only one vehicle. As a structure capable of forming a space that can be parked, even if a parking space is formed by stacking a number of parking blocks in a stacked manner, the side walls of each parking block are overlapped to occupy more space than necessary, so space utilization is efficient There is a problem with not being able to do it.

또한 상기 선행기술 2는 PC를 이용한 지하구조물은, 기초콘크리트(10), 외부벽체(20), 제1코너벽체(30), 제2코너벽체(40), 바닥철근(50), 바닥콘크리트(60), 하프슬라브(70), 토핑콘크리트(80)로 형화된 PC를 이용하여서 우수저류조, 지하주차장 등의 지하구조물의 조립공수를 단축시킬 수 있도록 한 PC를 이용한 지하구조물에 관한 것으로 자하의 토압을 지지하도록 구성된 것으로 선행기술 2는 바닥에 콘크리트 타설작업을 시행하여야 하는 점과 상부 주차장을 형성하기 위한 연속적인 구성이 없는 것으로 지하 주차장에 한정된 구성으로 지상주차장으로는 시공할 수 없는 구조로 이루어진 문제점이 있다. In addition, in the prior art 2, the underground structure using the PC includes the foundation concrete 10, the outer wall 20, the first corner wall 30, the second corner wall 40, the floor reinforcement 50, and the floor concrete ( 60), half slab (70), and topping concrete (80) by using PC, which can reduce the assembly man-hours of underground structures such as rainwater storage tanks and underground parking lots. It relates to an underground structure using a PC. It is configured to support, and the prior art 2 has a problem in that the concrete pouring work must be performed on the floor and there is no continuous configuration for forming an upper parking lot, and the structure is limited to the underground parking lot and cannot be constructed as a ground parking lot. there is

대한민국 공개특허공보 제10-2005-0090970호Republic of Korea Patent Publication No. 10-2005-0090970 대한민국 등록특허공보 제10-1385556호Republic of Korea Patent Registration No. 10-1385556

본 발명은 보와 기둥을 일체형으로 하나의 PC벽 패널부재로 제작하여 지상 PC 주차장의 시공할 수 있도록 한 것으로 주차장 건물 시공시 PC 부재의 개수를 최소화하고 공기를 단축하여 최소한의 공사비용으로 PC 주차장을 시공할 수 있도록 하는 목적과, 또 다른 목적으로는 보와 기둥을 일체형으로 하나의 PC벽 패널부재를 사용함으로 수직선상 층간을 연속적으로 조림시공 함으로 협소한 면적에서 다수의 지상 주차장 공간을 제공할 수 있도록 한 목적과, 또한 본 발명은 지진에 대한 횡 지지능력을 증가시킬 수 있도록 하여 내진설계가 적용되도록 한 프리캐스트 프리스트레스 콘크리트 벽 패널을 활용한 지상 PC 주차장 및 그 시공방법에 관한 것이다.The present invention is to manufacture a PC wall panel member integrally with a beam and a column to enable the construction of a PC parking lot on the ground, minimizing the number of PC members and shortening the period during construction of a parking lot building, thereby minimizing the construction cost. For the purpose of enabling construction, and another purpose is to provide multiple ground parking spaces in a small area by continuously planting between floors on a vertical line by using one PC wall panel member with beams and columns integrally. The present invention also relates to a ground PC parking lot using a precast prestressed concrete wall panel and a construction method thereof to apply an earthquake-resistant design by increasing the lateral bearing capacity against an earthquake.

본 발명은 상기와 같은 목적을 달성하기 위한 해결 수단으로서, 조립식 PC 주차장에 있어서,The present invention is a solution to achieve the above object, in a prefabricated PC parking lot,

보와 기둥이 일체형으로 이루어지며 높이보다 횡 방향의 길이가 더 길게 제작된 PC 벽 패널부재와; A PC wall panel member in which the beam and the column are integrally made and the length in the transverse direction is longer than the height;

상기 바닥에 설치되어 PC 벽 패널부재를 고정할 수 있도록 된 받침부재와;a support member installed on the floor to fix the PC wall panel member;

상기 PC 벽 패널부재에 일체로 형성된 상단 보 양측에 다수의 슬래브가 설치되도록 형성된 걸림부를 구성하는 것을 특징으로 한다.It is characterized in that the engaging portion is formed so that a plurality of slabs are installed on both sides of the upper beam integrally formed in the PC wall panel member.

상기 PC 벽 패널부재는 상단과 하단에 일체로 상부보와 하부보를 구성하고, 상부보와 하부보 사이에 소정의 간격으로 패널형 기둥이 일체로 형성된 것을 특징으로 한다.The PC wall panel member is characterized in that the upper beam and the lower beam are integrally formed at the upper and lower ends, and panel-type pillars are integrally formed at predetermined intervals between the upper beam and the lower beam.

상기 PC 벽 패널부재 상단에 일체로 형성된 상부 보는 양측에 걸림부가 형성되어 다수의 슬래브가 설치될 수 있도록 된 것을 특징으로 한다.The upper beam integrally formed on the upper end of the PC wall panel member is characterized in that a locking portion is formed on both sides so that a plurality of slabs can be installed.

상기 PC 벽 패널부재 하단에 일체로 형성된 하부 보는 양측에 소정의 간격으로 다수의 요홈이 형성되고, 상부보 상면과 양측단부 및 하부보 양측 단부에 철근이 돌출되어 PC 벽 패널부재을 상하 복수 고정할 수 있도록 된 것을 특징으로 한다.A plurality of grooves are formed at predetermined intervals on both sides of the lower beam integrally formed at the bottom of the PC wall panel member, and reinforcing bars protrude from the upper surface and both ends of the upper beam and at both ends of the lower beam to fix a plurality of PC wall panel members up and down. It is characterized by having.

상기 슬래브는 다수의 중공부가 형성되어 PC 벽 패널부재에 설치시 PC강선이 끼워져 고정할 수 있도록 된 것을 특징으로 한다.The slab is characterized in that a plurality of hollow parts are formed so that the PC steel wire can be inserted and fixed when installed on the PC wall panel member.

상기 PC 벽 패널부재는 다수의 층을 형성할 수 있는 길이로 형성하고 층간을 형성하는 슬래브가 설치되는 위치에 걸림부가 소정의 간격으로 다수 형성된 것을 특징으로 한다.The PC wall panel member is formed to a length capable of forming a plurality of layers and is characterized in that a plurality of hooking parts are formed at predetermined intervals at positions where slabs forming between layers are installed.

상기 PC 벽 패널부재를 고정할 수 있도록 된 받침부재는 PC 벽 패널부재의 하단 보에 형성된 요홈과 대응되는 위치에 철근이 돌출되도록 형성된 것을 특징으로 한다.The support member capable of fixing the PC wall panel member is characterized in that the reinforcing bar is formed to protrude at a position corresponding to the groove formed in the lower beam of the PC wall panel member.

본 발명은 보와 기둥을 일체형으로 하나의 PC벽 패널부재로 제작하여 지상 PC 주차장을 시공할 수 있도록 함으로서, 첫째, 주차장 건물 시공시 PC 부재의 개수를 PC벽 패널부재와 슬래브 만으로 구성 함으로 건축부재를 최소화할 수 있으며,The present invention makes it possible to construct a ground PC parking lot by manufacturing a beam and a pillar as one PC wall panel member integrally. can be minimized,

둘째, PC 부재를 이용하여 시공함으로 별도의 콘크리트 타설 시간, 콘크리트 양생시간이 요구되지 않으므로 공기를 단축하는 효과를 가지며,Second, since it is constructed using PC members, it does not require additional concrete pouring time and concrete curing time, so it has the effect of shortening the period,

셋째, 지장 주차장을 최소한의 건축부재와 최소한의 공사기간에 시공이 완료됨으로 공사비용을 줄일 수 있는 효과를 가지며,Third, it has the effect of reducing the construction cost by completing the construction of the parking lot with the minimum number of building members and the minimum construction period,

넷째, 보와 기둥이 일체형으로 이루어지며 높이보다 횡 방향의 길이가 더 길게 PC 벽 패널부재가 제작 설치됨으로 지진에 대한 횡 지지능력을 증가시킬 수 있도록 하여 내진설계가 적용되도록 한 프리캐스트 프리스트레스 콘크리트 벽 패널을 활용한 지상 PC 주차장 및 그 시공방법에 관한 것이다.Fourth, beams and columns are integrally formed, and PC wall panel members are manufactured and installed with a length in the transverse direction longer than the height, so that the lateral support capacity against earthquakes can be increased, so that the seismic design is applied. Precast prestressed concrete wall It is about a ground PC parking lot using a panel and its construction method.

도1은 종래의 PC 주차블럭을 이용하여 조립된 주차장의 조립도를 나타낸 것이며,
도2는 종래의 PC를 이용한 지하 구조물의 조립도를 나타낸 것이며,
도3은 본 발명에 PC 벽 패널부재로서 상부 보와 하부보 및 기둥이 일체화 된 것을 나타낸 것이며,
도4는 본 발명의 PC 벽 패널부재 상단에 설치되는 PC 슬래브를 나타낸 것이며,
도5는 본 발명의 PC 벽 패널부재를 소정의 간격으로 배열된 받침부재에 설치한 상태를 나타낸 것이며,
도6은 본 발명의 PC 벽 패널부재를 소정의 간격으로 배열된 받침부재에 설치하고 상단부에 PC슬래부를 설치한 상태를 나타낸 것이며,
도7은 상기 도6을 사공한 후 2층 주차장을 조립하기 위해 PC 벽 패널부재를 수직으로 설치한 상태를 나타낸 것이며,
도8은 상기 도7과 같이 PC 벽 패널부재를 설치한 후 PC 벽 패널부재와 PC 벽 패널부재 사이에 PC 슬래브를 설치한 상태를 나타낸 것이며,
도9는 도7 및 도8의 시공 방법으로 3층 주차장을 시공한 상태를 나타낸 것이며,
도10은 본 발명의 다른 실시례로서 PC 벽 패널부재를 상부보와 기둥을호 만 이루어진 상태 를 나타낸 것이며,
도11은 본 발명의 시공방법에 따른 시공순서를 나타낸 것이다.
1 shows an assembly view of a parking lot assembled using a conventional PC parking block,
Figure 2 shows an assembly view of an underground structure using a conventional PC,
Figure 3 shows that the upper beam, the lower beam and the column are integrated as a PC wall panel member in the present invention,
Figure 4 shows a PC slab installed on top of the PC wall panel member of the present invention,
5 shows a state in which the PC wall panel member of the present invention is installed on supporting members arranged at predetermined intervals,
6 shows a state in which the PC wall panel member of the present invention is installed on supporting members arranged at predetermined intervals and the PC slab is installed at the upper end,
Figure 7 shows a state in which the PC wall panel member is installed vertically to assemble the second floor parking lot after drilling the above Figure 6,
8 shows a state in which a PC slab is installed between the PC wall panel members and the PC wall panel members after installing the PC wall panel members as shown in FIG. 7,
9 shows a state in which a three-story parking lot is constructed by the construction method of FIGS. 7 and 8,
10 shows a state in which the PC wall panel member is made of only upper beams and pillars as another embodiment of the present invention,
11 shows the construction sequence according to the construction method of the present invention.

이하 본 발명을 첨부 도면에 의거하여 시공방법을 상세히 설명하면 다음과 같다Hereinafter, the construction method of the present invention will be described in detail based on the accompanying drawings.

도3은 본 발명에 PC 벽 패널부재로서 상부 보와 하부보 및 기둥이 일체화 된 것을 나타낸 것으로서, PC 벽 패널부재(10)는 상 하부 보(11)(12)와 기둥(13)이 일체형으로 형성된다.Figure 3 shows that the upper beam, the lower beam and the pillar are integrated as a PC wall panel member in the present invention, and the PC wall panel member 10 has the upper and lower beams 11, 12 and the pillar 13 integrally is formed

상기 PC 벽 패널부재(10)는 상부 보(11)와 하부 보(12) 사이에 일체로 형성되는 패널 형태의 기둥(13)과 기둥(13)이 소정의 간격으로 이격되도록 형성되고 기둥과 기둥 사이에는 공간부(16)가 형성된다.The PC wall panel member 10 is formed so that the panel-type pillars 13 integrally formed between the upper beam 11 and the lower beam 12 and the pillar 13 are spaced apart at predetermined intervals, and the pillars and pillars A space portion 16 is formed between them.

또한 PC 벽 패널부재(10)의 상부 보(11) 양 측면에는 PC 슬래브(30)가 걸쳐지도록 단턱으로 된 걸림부(14)가 형성된다.In addition, on both sides of the upper beam 11 of the PC wall panel member 10, a stepped hooking portion 14 is formed to span the PC slab 30.

상기 PC 벽 패널부재(10)의 상부 보(11) 양측 단부 및 상부에 다수의 철근(40)이 돌출되도록 하고, 하부 보(12) 양측 단부에 철근(40)이 돌출되도록 형성된다.A plurality of reinforcing bars 40 protrude from both ends and the top of the upper beam 11 of the PC wall panel member 10, and the reinforcing bars 40 protrude from both ends of the lower beam 12.

상기 상부 보(11)와 하부 보(12)에 돌출되도록 형성되는 철근(40)에 PC 벽 패널부재(10)의 강도를 증진시키기 위해 매설되는 철근(40) 단부가 돌출되도록 한 것이다.In order to enhance the strength of the PC wall panel member 10 in the reinforcing bar 40 formed to protrude from the upper beam 11 and the lower beam 12, the end of the reinforcing bar 40 buried to protrude.

또한 PC 벽 패널부재(10)의 하부 보(12) 양측면에는 소정의 간격으로 다수의 요홈(15)이 형성되어 차 후 시공시 접합부를 형성하게 된다.In addition, a plurality of grooves 15 are formed at predetermined intervals on both sides of the lower beam 12 of the PC wall panel member 10 to form a junction during subsequent construction.

본 발명의 PC 벽 패널부재는 보와 기둥이 일체형으로 이루어지며 높이보다 횡 방향의 길이가 더 길게 PC 벽 패널부재가 제작 설치됨으로 지진에 대한 횡 지지능력을 증가시킬 수 있도록 하여 내진설계가 적용되도록 한 것이다.The PC wall panel member of the present invention is made of a beam and a pillar integrally, and the length in the transverse direction is longer than the height, so that the PC wall panel member is manufactured and installed to increase the lateral support capacity for earthquakes, so that the earthquake-resistant design is applied it did

도4는 본 발명의 PC 벽 패널부재 상단에 설치되는 PC 슬래브를 나타낸 것으로서 주차장 시공시 PC 벽 패널부재와 PC 벽 패널부재의 상단에 걸쳐지도록 설치된다.Figure 4 shows a PC slab installed on top of the PC wall panel member of the present invention, which is installed to span the top of the PC wall panel member and the PC wall panel member during parking lot construction.

상기 PC 벽 패널부재(10)와 PC 벽 패널부재(10)의 상단 상이에 설치되는 PC 슬래브(30)는 단부가 PC 벽 패널부재(10)의 상부 보(11) 양측에 형성된 단턱의 걸림부(14)에 걸쳐지도록 설치된다.The PC wall panel member 10 and the PC slab 30 installed on the upper end of the PC wall panel member 10 have ends formed on both sides of the upper beam 11 of the PC wall panel member 10. It is installed so that it spans (14).

또한 상기 PC 슬래브(30)는 길이 방향으로 양측에 제1연결부(33)와 제2연결부(34)가 형성되어 PC 슬래브(30)가 맞물림으로 수평연결되도록 구성된다.In addition, the PC slab 30 is configured such that the first connection part 33 and the second connection part 34 are formed on both sides in the longitudinal direction so that the PC slab 30 is horizontally connected by interlocking.

즉, PC 슬래브(30)의 제1연결부(33)는 오목부로 형성하고 제2 연결부(34)는 볼록부로 형성할 수 있으며, 또는 제1 연결부(33)는 볼록부로 형성하고 제2 연결부(34)는 오목부로 형성하여 PC 슬래브(30)와 PC 슬래브(30)가 수평적으로 맞물려 밀착 설치되도록 한 것이다. That is, the first connection part 33 of the PC slab 30 may be formed as a concave part and the second connection part 34 may be formed as a convex part, or the first connection part 33 may be formed as a convex part and the second connection part 34 ) is formed as a concave portion so that the PC slab 30 and the PC slab 30 are horizontally engaged and installed in close contact.

도5는 본 발명의 PC 벽 패널부재를 소정의 간격으로 배열된 받침부재에 설치한 상태를 나타낸 것으로서, 바닥에 받침부재(20)를 설치하여 PC 벽 패널부재(10)를 기둥 역할 을 할 수 있도록 받침부재(20) 위에 세워 설치하게 된다.Figure 5 shows a state in which the PC wall panel member of the present invention is installed on supporting members arranged at predetermined intervals, by installing the supporting member 20 on the floor, the PC wall panel member 10 can serve as a pillar It is erected and installed on the support member 20 so as to be.

본 발명의 받침부재(20)는 지면에 PC 슬래브(30)의 길이 간격으로 설치하게 되는데 지면은 받침부재(20)를 고정할 수 있는 수단으로 형성된다.The support member 20 of the present invention is installed on the ground at intervals of the length of the PC slab 30, but the ground is formed as a means capable of fixing the support member 20.

즉, 주차장으로 사용될 장소의 지면에 콘크리트를 타설하여 받침부재(20)를 고정할 수 있고, 지반을 판판하게 다짐을 한 후 받침부재(20)를 기타 도구를 이용하여 고정할 수 있다.That is, the support member 20 can be fixed by pouring concrete on the ground of a place to be used as a parking lot, and after compacting the ground, the support member 20 can be fixed using other tools.

상기 받침부재(20)는 상부에 PC 벽 패널부재(10)가 올려져 고정될 수 있도록 PC 벽 패널부재(10)의 저면과 대응 밀착된 구조로 이루어졌다.The support member 20 has a structure closely adhered to the bottom surface of the PC wall panel member 10 so that the PC wall panel member 10 can be lifted and fixed thereon.

또한 받침부재(20)는 강도를 높이기 위해 내부에 철근이 매설되며 수직철근 단부는 받침부재 상부로 돌출되어 상부에 설치되는 PC 벽 패널부재(10)의 하부 보(12) 양측에 형성된 요홈(15)에 끼워져 접합부를 구성할 수 있다.In addition, the support member 20 has reinforcing bars embedded inside to increase strength, and the end of the vertical reinforcing bar protrudes to the upper part of the supporting member and is installed on the PC wall panel member 10. Grooves 15 formed on both sides of the lower beam 12 ) to form a junction.

또한 본 발명의 받침부재(20)는 철근(40)이 돌출되지 않도록 형성한 후 받침부재(20)와 PC 벽 패널부재(10)의 하부 보(12) 양측에 형성된 요홈(15)을 이용하여 앵커볼트로 접합부를 구성할 수 있다.In addition, the supporting member 20 of the present invention is formed so that the reinforcing bar 40 does not protrude, and then using the groove 15 formed on both sides of the supporting member 20 and the lower beam 12 of the PC wall panel member 10 Connections can be made with anchor bolts.

상기 받침부재(20)의 요홈(15)은 ∪자형 금속금구를 설치하되 금속금구 바닥의 외측방향으로 볼트 또는 철근이 인입출되도록 개구부를 형성하여 설치하여 앵커볼트를 설치하거나 받침부재(20)에서 돌출되어 금속금구에 끼워진 철근(40)을 용접하여 접합부를 형성할 수 있다.The groove 15 of the supporting member 20 is installed with a ∪-shaped metal fitting, but an opening is formed to allow bolts or reinforcing bars to be pulled out in the outer direction of the bottom of the metal fitting, so that anchor bolts are installed or from the supporting member 20 A junction can be formed by welding the reinforcing bar 40 protruding and inserted into the metal fitting.

본 발명의 받침부재(20)는 시공되는 주차장의 부지 면적에 따라서 일정한 간격으로 설치하여 PC 벽 패널부재(10)를 도5와 같이 설치할 수 있다.The support member 20 of the present invention can be installed at regular intervals according to the site area of the parking lot to be constructed, and the PC wall panel member 10 can be installed as shown in FIG.

도6은 본 발명의 PC 벽 패널부재를 소정의 간격으로 배열된 받침부재에 설치하고 상단부에 PC슬래브를 설치한 상태를 나타낸 것으로서, 지면에 배열된 받침부재(20)를 고정하고 그 상면에 PC 벽 패널부재(10)를 설치한 후 PC 벽 패널부재(10)와 PC 벽 패널부재(10) 사이의 상단에 PC 슬래브(30)를 설치 한다.6 shows a state in which the PC wall panel member of the present invention is installed on supporting members arranged at predetermined intervals and a PC slab is installed on the upper end, fixing the supporting member 20 arranged on the ground and PC on the upper surface After installing the wall panel member 10, install the PC slab 30 on the top between the PC wall panel member 10 and the PC wall panel member 10.

상기 PC 슬래브(30)는 PC 벽 패널부재(10)의 상단에 형성된 상부 보(11) 양측 길이방향으로 형성된 걸림부(14)에 PC 슬래부(30) 양단부가 걸쳐지도록 설치된다.The PC slab 30 is installed so that both ends of the PC slab portion 30 span the hanging portion 14 formed in the longitudinal direction on both sides of the upper beam 11 formed at the top of the PC wall panel member 10.

상기 걸림부(14)는 도3에 도시된 바와 같이 PC 벽 패널부재(10)의 상부 보(11) 양측에 단턱이 형성되어 PC 슬래브(30)가 걸쳐지도록 할 수 있다.As shown in FIG. 3, the hooking part 14 has steps formed on both sides of the upper beam 11 of the PC wall panel member 10 so that the PC slab 30 can be straddled.

상기 걸림부(14)에 걸쳐진 PC 슬래브(30)의 양단부는 앵커볼트, ㄱ자형 앵글, 기타 고정부재로 고정할 수 있다. Both ends of the PC slab 30 spanning the clasp 14 may be fixed with anchor bolts, L-shaped angles, or other fixing members.

또한 PC 슬래브(30)는 주차장의 바닥으로 사용될 수 있도록 하중에 대한 인장강도와 압축강도는 사전에 계산되어 PC 슬래브(30)가 제작된다.In addition, the PC slab 30 is manufactured by calculating the tensile strength and compressive strength for the load in advance so that the PC slab 30 can be used as the floor of the parking lot.

상기 PC 슬래브는 내부에 가로세로로 철근(40)이 배열되어 매설된 상태이며 필요에 따라서 도4와 같이 길이 발향으로 다수의 중공부(31)를 형성하고 이의 중공부(31)에 강선을 끼워 PC 슬래브(30)가 상부 보(11)의 걸림부(14)에 걸쳐진 후 양측에서 강선을 당겨 고정할 수 있다.The PC slab is in a state in which reinforcing bars 40 are arranged horizontally and vertically therein, and if necessary, a plurality of hollow parts 31 are formed in a longitudinal direction as shown in FIG. 4, and steel wires are inserted into the hollow parts 31. After the PC slab 30 spans the hooking portion 14 of the upper beam 11, it can be fixed by pulling the steel wire from both sides.

상기 PC 슬래브(30)는 길이 방향으로 양측에 제1연결부(33)와 제2연결부(34)가 형성되어 PC 슬래브(30)가 좌우에서 맞물림으로 수평 연결되도록 형성된다.The PC slab 30 is formed so that the first connection part 33 and the second connection part 34 are formed on both sides in the longitudinal direction so that the PC slab 30 is horizontally connected by engagement from left and right.

상기 PC 슬래브(30)의 제1연결부(33)와 제2 연결부(34)는 볼록부 또는 오목부로 형성되어 서로 대응되는 측면이 맞물림으로 밀착 결합 될 수 있도록 구성한다.The first connection part 33 and the second connection part 34 of the PC slab 30 are formed as convex or concave parts so that their corresponding side surfaces can be tightly coupled by engagement.

도7은 상기 도6을 사공한 후 2층 주차장을 조립하기 위해 PC 벽 패널부재를 수직으로 설치한 상태를 나타낸 것이고, 도8은 상기 도7과 같이 PC 벽 패널부재를 설치한 후 PC 벽 패널부재와 PC 벽 패널부재 사이에 PC 슬래브를 설치한 상태를 나타낸 것이다.Figure 7 shows a state in which the PC wall panel member is installed vertically to assemble the second floor parking lot after drilling the above Figure 6, Figure 8 is the PC wall panel after the PC wall panel member is installed as shown in Figure 7 It shows the state in which the PC slab is installed between the member and the PC wall panel member.

상기 도5와 도6과 같이 받침부재(20)와 PC 벽 패널부재(10) 및 PC 슬래브(30) 를 이용하여 1층 주차장을 시공한 후에는 설치된 PC 벽 패널부재(10)의 상부 보(11) 상면에 PC 벽 패널부재(10)를 좌우 연속적으로 설치한다.As shown in FIGS. 5 and 6, after constructing the first floor parking lot using the support member 20, the PC wall panel member 10 and the PC slab 30, the upper beam of the installed PC wall panel member 10 ( 11) Install the PC wall panel member 10 on the upper surface continuously left and right.

이때 PC 벽 패널부재(10)의 상부 보(11) 상면에 설치되는 PC 벽 패널부재(10)의 하부 보(12) 양측에 형성된 요홈(15)에 하부에 위치한 PC 벽 패널부재(10)의 상부 보(11) 상면으로 돌출된 철근(40)이 끼워져 접합부를 구성하여 도7과 같이 2층을 형성하기 위한 PC 벽 패널부재(10)를 설치하여 기둥과 보 역활을 할 수 있도록 한다.At this time, the PC wall panel member 10 located at the bottom of the groove 15 formed on both sides of the lower beam 12 of the PC wall panel member 10 installed on the upper surface of the upper beam 11 of the PC wall panel member 10 The reinforcing bar 40 protruding to the upper surface of the upper beam 11 is inserted to form a junction so that the PC wall panel member 10 for forming the second floor is installed as shown in FIG. 7 to act as a pillar and a beam.

상기와 같이 PC 벽 패널부재(10)의 상부 보(11) 상면에 PC 벽 패널부재(10)를 설치한 후에는 도8과 같이 PC 벽 패널부재(10)와 PC 벽 패널부재(10) 사이의 상단 걸림부(14)에 PC 슬래브(30)를 걸쳐지도록 설치하면 2층 주차장이 시공된다.As described above, after installing the PC wall panel member 10 on the upper surface of the upper beam 11 of the PC wall panel member 10, as shown in FIG. 8, between the PC wall panel member 10 and the PC wall panel member 10 When the PC slab 30 is installed so as to span the upper hanging part 14 of the second floor parking lot is constructed.

도9는 도7 및 도8의 시공 방법으로 3층 주차장을 시공한 상태를 나타낸 것이다. 도9는 상기 2층 주차장 시공 방법과 동일한 시공방법으로 3층 주차장을 시공한다.9 shows a state in which a three-story parking lot is constructed by the construction method of FIGS. 7 and 8. 9 constructs a three-story parking lot in the same construction method as the two-story parking lot construction method.

본 발명에서는 받침부재(20)와, PC 벽 패널부재(10), PC 슬래브(30)를 이용하여 지상주차장을 PC로 조립 건축시공하는 것을 설명한 것이며, 1층에서 2층, 2츨에서 3층으로 올라가거나 내려오는 주차로는 층간 사이에 경사로를 설치하여 차량이 이동될 수 있도록 하는 것으로 이는 통상의 다양한 방법으로 설치될 수 있는 것으로 본 발명에서는 발명의 요지가 아니므로 이의 설명을 생략한다.In the present invention, it is explained that the ground parking lot is assembled and built using a PC using the support member 20, the PC wall panel member 10, and the PC slab 30, from the first floor to the second floor and from the second floor to the third floor. The parking road going up or down is to install a ramp between the floors so that the vehicle can be moved, which can be installed in a variety of conventional ways, and is not the subject of the invention in the present invention, so the description thereof will be omitted.

도10은 본 발명의 다른 실시 예로서 PC 벽 패널부재를 상부보와 기둥으로 만 이루어진 상태를 나타낸 것으로서, PC 벽 패널부재(10a) 제작시 걸림부를 갖는 상부 보(11)와 기둥(13) 만을 일체 형으로 형성하고 하부 보(12)는 생략하였다.Figure 10 shows a state in which the PC wall panel member is made up of only the upper beam and the column as another embodiment of the present invention. It is formed as an integral type and the lower beam 12 is omitted.

따라서 도10의 PC벽 패널부재(10a)는 기둥(13) 하단부 모서리 4곳에 요홈(15)를 형성하여 바닥에 설치된 받침부재(20) 또는 PC 벽 패널부재(10a)의 상부 보(11) 상면에 돌출된 철근(40)이 연결되어 접합부를 구성할 수 있도록 하였다.Therefore, the PC wall panel member 10a of FIG. 10 forms a groove 15 at four lower corners of the pillar 13, and the upper surface of the support member 20 installed on the floor or the upper beam 11 of the PC wall panel member 10a The protruding reinforcing bars 40 are connected to form a junction.

즉, 상기 도10은 하부 보를 생략한 대신에 기둥(13)의 하단부가 받침부재(20)에 올려져 고정되거나 또는 PC 벽 패널부재(10a) 상단면과 연결되도록 구성된다.That is, instead of omitting the lower beam in FIG. 10, the lower end of the pillar 13 is mounted on and fixed to the support member 20 or is configured to be connected to the upper surface of the PC wall panel member 10a.

이상에서 설명된 본 발명은 PC 부재를 이용하여 지상 주차장을 간단 용이하게 조립 시공할 수 있도록 한 것으로서, 받침부재(20), PC 벽 패널부재(10)(10a) PC 슬래브(30)를 조립하여 시공되는 것으로 설명하였으나, 접합부는 용접, 앵커볼트, 기타 방법으로 접합부를 구성할 수 있으며, PC와 PC가 연결되는 부분은 콘크리트 또는 마감재로 시공할 수 있다. The present invention described above makes it possible to simply and easily assemble and construct a ground parking lot using a PC member, by assembling the support member 20, the PC wall panel member 10 (10a) and the PC slab 30 Although described as being constructed, the joint can be configured by welding, anchor bolts, or other methods, and the part where PCs are connected can be constructed with concrete or finishing materials.

도 11은 본 발명의 시공방법에 따른 시공순서를 나타낸 것으로서, PC 주차장으로 시공되는 바닥의 지반공사 후 PC 슬래브(30)가 설치되는 길이 간격으로 받침부재(20)를 설치하는 단계와,Figure 11 shows the construction sequence according to the construction method of the present invention, the step of installing the support member 20 at a length interval at which the PC slab 30 is installed after the ground construction of the floor constructed as a PC parking lot,

상기 설치된 받침부재(20)의 돌출된 철근(40)이 PC 벽 패널부재(10)의 하부 보(12)에 형성된 요홈(15)에 끼워지도록 PC 벽 패널부재(10)를 다수 세워 설치하는 단계와,Installing and erecting a plurality of PC wall panel members 10 so that the protruding reinforcing bars 40 of the installed support member 20 fit into the groove 15 formed in the lower beam 12 of the PC wall panel member 10 and,

상기 PC 벽 패널부재(10)를 받침부재(20)에 설치한 후에는 PC 벽 패널부재(10)와 PC 벽 패널부재(10) 사이의 상부 보에 형성된 걸림부(14)에 단부가 걸쳐지도록 PC 슬래브(30)를 설치하는 단계와,After the PC wall panel member 10 is installed on the support member 20, the PC wall panel member 10 and the PC wall panel member 10 are formed on the upper beam between Installing the PC slab 30;

상기 받침부재(20)에 설치된 PC 벽 패널부재(10)의 상부 보(11)에 다른 PC 벽 패널부재(10)를 2단으로 설치하는 단계와, Installing another PC wall panel member 10 in two stages on the upper beam 11 of the PC wall panel member 10 installed on the support member 20;

상기 2단으로 설치된 PC 벽 패널부재(10)와 PC 벽 패널부재(10) 사이에 PC 슬래브(30)를 설치하여 2층 주차장을 시공하는 단계와,Installing a PC slab 30 between the two-stage PC wall panel member 10 and the PC wall panel member 10 to construct a two-story parking lot;

상기 2층 주차장 시공 단계 방법으로 3층 주차장을 시공하는 단계로 프리캐스트 프리스트레스 콘크리트 벽 패널을 이용한 지상 PC 주차장 시공방법이 이루어진다.In the step of constructing a 3-story parking lot in the 2-story parking lot construction step method, a ground PC parking lot construction method using a precast prestressed concrete wall panel is made.

또한 본 발명의 첨부도면 11을 간략히 설명하면 ① 받침부재 설치→ ② 받침부재에 PC 벽 패널부재 설치 → ③ PC 벽 패널부재와 PC 벽 패널부재 사이에 PC 슬래브설치 → ④ 1층 주차장 완성 → ⑤ PC 슬래브가 설치된 PC 벽 패널부 상부에 PC 벽 패널부재 설치 ⑥ PC 벽 패널부재와 PC 벽 패널부재 상단 사이에 PC 슬래브 설치 → ⑦ 2층 주차장 완성 → ⑧ 완성된 2층 주차장의 PC 벽 패널부재 상단에 다른 PC 벽 패널부재를 각각 설치한 후 PC 슬래브를 설치 → ⑨ 3층 주차장 완성의 순서로 PC 벽 패널부재를 이용한 주차장 건축물 시공이 완료된다. In addition, briefly explaining the attached drawing 11 of the present invention ① installation of the support member → ② installation of the PC wall panel member on the support member → ③ installation of the PC slab between the PC wall panel member and the PC wall panel member → ④ completion of the parking lot on the first floor → ⑤ PC PC wall panel member installed on top of PC wall panel where slab is installed ⑥ PC slab installed between PC wall panel member and the top of PC wall panel member → ⑦ 2nd floor parking lot completion → ⑧ PC wall panel member on top of completed 2nd floor parking lot After installing the other PC wall panel members, install the PC slab → ⑨ Parking lot construction using the PC wall panel member is completed in the order of completion of the 3rd floor parking lot.

이와 같이 된 본 발명은 보와 기둥을 일체형으로 하나의 PC 벽 패널부재로 구성하되 전체의 크기가 높이보다 횡 방향의 길이가 더 길게 PC 벽 패널부재를 제작함으로서 내진 설계되도록한 것이다.The present invention thus constituted a PC wall panel member integrally with beams and pillars, but the overall size is longer in the transverse direction than the height, so that the earthquake-resistant design is made by manufacturing the PC wall panel member.

즉, 지진은 횡방향으로 지진파가 전해지므로 PC 벽 패널부재를 높이보다 길이를 더 길게 형성함으로 지진의 횡 지지능력을 증가시킬 수 있도록 하여 내진설계가 적용되도록 한 것이다. In other words, since seismic waves are transmitted in the lateral direction in an earthquake, the PC wall panel member is formed longer than the height to increase the lateral support capacity of the earthquake, so that the seismic design is applied.

이와 같이 된 본 발명의 PC 벽 패널부재를 이용하여 지상 PC 주차장을 시공할 수 있도록 함으로서, ①주차장 건물 시공시 건축부재를 최소화할 수 있으며, ②시공시 별도의 콘크리트 타설 시간, 콘크리트 양생 시간이 요구되지 않으므로 공기를 단축하는 이점이 있으며, ③지장 주차장 시공시 최소한의 부재와 최소한의 공사기간에 시공이 완료됨으로 공사비용을 줄일 수 있는 이점이 있으며, ④주변의 환경조건에 따라 디자인의 변화를 줄 수 있으며, 특히 콘크리트 건물 주차장과 같은 견고함과 외견상 미려함을 제공할 수 있는 이점이 있다.By using the PC wall panel member of the present invention as described above to construct a ground PC parking lot, ① it is possible to minimize construction members during construction of a parking lot building, and ② separate concrete pouring time and concrete curing time are required during construction. ③ It has the advantage of reducing the construction cost as the construction is completed in the minimum number of members and the minimum construction period during the construction of the parking lot, ④ There is an advantage in reducing the design change according to the surrounding environmental conditions In particular, it has the advantage of providing solidity and external appearance like a concrete building parking lot.

10:PC 벽 패널부재 11:상부 보
12:하부 보 13: 기둥
14:걸림부 15:요홈
16:공간부 17: 걸림공
20:받침부재 30: PC 슬래브
31: 중공부
33: 제1 연결부 34:제2 연결부
40:철근
10: PC wall panel member 11: upper beam
12: lower beam 13: pillar
14: hanging part 15: groove
16: space part 17: hanging hole
20: supporting member 30: PC slab
31: hollow part
33: first connection part 34: second connection part
40: rebar

Claims (10)

상단과 하단에 일체로 상부 보(11)와 하부 보(12)를 구성하고, 상부 보(11)와 하부 보(12) 사이에 소정의 간격으로 패널형 기둥(13)이 일체로 형성되며 높이보다 횡 방향의 길이가 더 길게 제작된 PC 벽 패널부재(10)와;
바닥에 설치되어 PC 벽 패널부재(10)를 고정할 수 있도록 된 받침부재(20)와;
상기 PC 벽 패널부재(10)에 일체로 형성된 상단 보(11) 양측에 다수의 PC 슬래브(30)가 설치되도록 단턱으로 형성된 걸림부(14)를 포함하고, 상기 PC 벽 패널부재(10)의 하부 보(12) 양측면에는 소정의 간격으로 다수의 요홈(15)이 형성되며, 상부 보(11) 상면과 양측 단부 및 하부보(12) 양측 단부에 철근(40)이 돌출되어 PC 벽 패널부재(10)을 상하 복수 고정할 수 있도록 되고,
상기 받침부재(20)는 상부에 PC 벽 패널부재(10)가 올려져 고정될 수 있도록 PC 벽 패널부재(10)의 저면과 대응 밀착된 구조로 이루어지며, 강도를 높이기 위해 내부에 철근이 매설되며 수직철근 단부는 받침부재 상부로 돌출되어 상부에 설치되는 PC 벽 패널부재(10)의 하부 보(12) 양측에 형성된 요홈(15)에 끼워져 접합부를 구성하며,
상기 PC 슬래브(30)의 제1연결부(33)와 제2 연결부(34)는 볼록부 또는 오목부로 형성되어 서로 대응되는 측면이 맞물림으로 밀착 결합될 수 있도록 구성되는 것을 특징으로 하는 프리캐스트 프리스트레스 콘크리트 벽 패널을 이용한 지상 PC 주차장.
The upper beam 11 and the lower beam 12 are integrally formed at the top and bottom, and the panel-type columns 13 are integrally formed at predetermined intervals between the upper beam 11 and the lower beam 12, and the height A PC wall panel member 10 manufactured with a longer length in the transverse direction than;
A support member 20 installed on the floor to fix the PC wall panel member 10;
It includes a hooking portion 14 formed with a step so that a plurality of PC slabs 30 are installed on both sides of the upper beam 11 integrally formed with the PC wall panel member 10, and the PC wall panel member 10 A plurality of grooves 15 are formed on both sides of the lower beam 12 at predetermined intervals, and reinforcing bars 40 protrude from the upper surface and both ends of the upper beam 11 and both ends of the lower beam 12 to form a PC wall panel member. It is possible to fix a plurality of (10) up and down,
The support member 20 is made of a structure in close contact with the bottom surface of the PC wall panel member 10 so that the PC wall panel member 10 can be lifted and fixed on the top, and reinforcing bars are embedded inside to increase strength And the end of the vertical reinforcing bar protrudes to the top of the support member and is inserted into the groove 15 formed on both sides of the lower beam 12 of the PC wall panel member 10 installed on the top to form a junction,
Precast prestressed concrete, characterized in that the first connection portion 33 and the second connection portion 34 of the PC slab 30 are formed as convex portions or concave portions so that the side surfaces corresponding to each other can be tightly coupled by interlocking Ground level PC parking using wall panels.
삭제delete 삭제delete 삭제delete 제1항에 있어서,
상기 PC 슬래브는 다수의 중공부(31)가 형성되어 PC 벽 패널부재(10)에 설치시 PC 강선이 끼워져 고정할 수 있도록 된 것을 특징으로 하는 프리캐스트 프리스트레스 콘크리트 벽 패널을 이용한 지상 PC 주차장.
According to claim 1,
The PC slab is formed with a plurality of hollow parts (31) so that the PC steel wire can be inserted and fixed when installed in the PC wall panel member (10) Ground PC parking lot using a precast prestressed concrete wall panel.
삭제delete 삭제delete 삭제delete 제1항에 있어서,
상기 받침부재는 PC 받침부재 또는 금속 받침부재로 형성된 것을 특징으로 하는 프리캐스트 프리스트레스 콘크리트 벽 패널을 이용한 지상 PC 주차장.
According to claim 1,
The supporting member is a ground PC parking lot using a precast prestressed concrete wall panel, characterized in that formed of a PC supporting member or a metal supporting member.
삭제delete
KR1020160038058A 2016-03-30 2016-03-30 The construction method precast prestressed concrete parking buildings with precast concrete wall panels KR102507299B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160038058A KR102507299B1 (en) 2016-03-30 2016-03-30 The construction method precast prestressed concrete parking buildings with precast concrete wall panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160038058A KR102507299B1 (en) 2016-03-30 2016-03-30 The construction method precast prestressed concrete parking buildings with precast concrete wall panels

Publications (2)

Publication Number Publication Date
KR20170111858A KR20170111858A (en) 2017-10-12
KR102507299B1 true KR102507299B1 (en) 2023-03-08

Family

ID=60140490

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160038058A KR102507299B1 (en) 2016-03-30 2016-03-30 The construction method precast prestressed concrete parking buildings with precast concrete wall panels

Country Status (1)

Country Link
KR (1) KR102507299B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220133627A (en) 2021-03-25 2022-10-05 주식회사 신장흥 Culvert-type parking structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101041229B1 (en) * 2011-01-03 2011-06-13 주식회사 한국그린피아 Toilet wall constructing structure using precast concrete panel
KR101389203B1 (en) * 2013-03-06 2014-04-24 도시구조안전(주) Method for constructing residential building using precast concrete and modular unit

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050090970A (en) 2005-08-25 2005-09-14 김연진 A sectional parking lot installation
KR101285487B1 (en) * 2011-06-07 2013-07-12 한국건설기술연구원 none module correspondence and horizontal shear performance enhanced hollow core slab and construction method using the same
KR101385556B1 (en) 2012-05-21 2014-04-15 김현욱 Ground structure and the built-up construction method that use precast concrete

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101041229B1 (en) * 2011-01-03 2011-06-13 주식회사 한국그린피아 Toilet wall constructing structure using precast concrete panel
KR101389203B1 (en) * 2013-03-06 2014-04-24 도시구조안전(주) Method for constructing residential building using precast concrete and modular unit

Also Published As

Publication number Publication date
KR20170111858A (en) 2017-10-12

Similar Documents

Publication Publication Date Title
KR101389203B1 (en) Method for constructing residential building using precast concrete and modular unit
KR102197689B1 (en) Vertical core structure horizontally assembled and construction method therewith
KR102154095B1 (en) Modular prefabricated house using precast concrete segment and construction method thereof
CN104763085A (en) Assembled integral type pre-stress double-T floor framework structure and construction method thereof
JP2005155139A (en) Seismic reinforcing external frame construction method of existing building
KR101329443B1 (en) Precast concrete frame and its construction method for buildings using precast concrete slab continued by post tensioning
KR101385558B1 (en) Prefabricated construction using half slab
KR200414349Y1 (en) Connection structure of precast concrete structure
KR102507299B1 (en) The construction method precast prestressed concrete parking buildings with precast concrete wall panels
KR101036177B1 (en) Method for constructing building using PRC integrating method
KR101105883B1 (en) Basic mat constructing method of high rise concrete structure
JP2005155137A (en) Earthquake resistant reinforced external frame structure of existing building and construction method
KR101324884B1 (en) Hybrid building construction method combining dry type and wet type
KR101576215B1 (en) Prefabricated precast concrete girder for building construction
JP2001262586A (en) Foundation structure of dwelling house
JP4757590B2 (en) Seismic reinforcement method for existing reinforced concrete structures
KR101385554B1 (en) Prefabricated construction using half slab
KR100456192B1 (en) Composition of precast concrete wall and precast concrete column for outdoor to sustain external force
KR102289243B1 (en) Underground Parking Lot Construction Method Using Pre-assembled bar column, U-shaped beam, Corrugated deck
KR102217153B1 (en) Efficient Steel Composite Girder System with Minimized height
KR100977279B1 (en) Underground parking lot modular system
KR101576224B1 (en) Prefabricated precast concrete girder for building construction
KR101386415B1 (en) Floor structure and modular unit of modular building and method for manufacturing the same
CN220433898U (en) Assembled rib lattice building structure and building
JP2005155138A (en) Seismic reinforced external frame construction method of existing building

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant