KR102501608B1 - Integrated operation method for distributed energy resource - Google Patents

Integrated operation method for distributed energy resource Download PDF

Info

Publication number
KR102501608B1
KR102501608B1 KR1020200117730A KR20200117730A KR102501608B1 KR 102501608 B1 KR102501608 B1 KR 102501608B1 KR 1020200117730 A KR1020200117730 A KR 1020200117730A KR 20200117730 A KR20200117730 A KR 20200117730A KR 102501608 B1 KR102501608 B1 KR 102501608B1
Authority
KR
South Korea
Prior art keywords
distributed resource
distribution system
server
distributed
power
Prior art date
Application number
KR1020200117730A
Other languages
Korean (ko)
Other versions
KR20220035688A (en
Inventor
박중성
권성철
배문성
김동주
신창훈
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR1020200117730A priority Critical patent/KR102501608B1/en
Publication of KR20220035688A publication Critical patent/KR20220035688A/en
Application granted granted Critical
Publication of KR102501608B1 publication Critical patent/KR102501608B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/008Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Power Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Public Health (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

An integrated distribution resource operation method is disclosed. According to the present invention, the integrated distribution resource operation method comprises the following steps of: allowing a power distribution system operation server to perform power distribution network analysis for a power distribution system based on bidding data for power market participation from a distribution resource provider server before a power market date and reviewing whether the bidding data violates distribution network operation constraints; and allowing a power transaction management server to approve bidding of a power market participant of a distribution resource provider according to a review result of the power distribution system operation server to make a contract.

Description

분산자원 통합 운영 방법{INTEGRATED OPERATION METHOD FOR DISTRIBUTED ENERGY RESOURCE}Distributed resource integrated operation method {INTEGRATED OPERATION METHOD FOR DISTRIBUTED ENERGY RESOURCE}

본 발명은 분산자원 통합 운영 방법에 관한 것으로서, 더욱 상세하게는 신재생에너지를 포함한 분산자원을 효과적으로 운영하는 분산자원 통합 운영 방법에 관한 것이다. The present invention relates to an integrated management method for distributed resources, and more particularly, to an integrated management method for distributed resources that effectively manages distributed resources including renewable energy.

분산자원 보급률이 낮았던 시기에는 전력계통에 미치는 영향이 미미하여 마이너스부하 정도의 인식에서 전력계통에 안정적으로 연계하는 것이 최대의 목적이었다. 하지만 분산자원의 보급률이 그냥 무시하기에는 전력계통에 미치는 영향이 커져 있는 현재의 상태(mid)에서는 더 이상 마이너스 부하로만은 볼 수 없고 전력계통의 신뢰도를 유지하기 위해 분산자원의 출력을 조정(제어)해야 하는 단계에 이르렀으며, 앞으로는 보다더 체계적으로 운영을 해야 할 것이다. 이렇게 전력산업에 커다란 변화를 가지고 온 신재생 기반 분산전원과 여러 분산자원을 통제할 수 있는 개기는 에너지저장장치(ESS), 수요자원 관리(DR) 등 전력산업 분야의 ICT 발전이다.In the period when the distribution rate of distributed resources was low, the impact on the power system was insignificant, so the maximum purpose was to stably connect to the power system from the recognition of the degree of negative load. However, in the current state (mid), when the distribution rate of distributed resources has a large impact on the power system to be ignored, it is no longer possible to see only negative loads, and the output of distributed resources is adjusted (controlled) to maintain the reliability of the power system. We have reached a stage where we need to do it, and we will have to operate it more systematically in the future. The key to controlling the new and renewable distributed power generation and various distributed resources that has brought about a great change in the electric power industry is the development of ICT in the electric power industry, such as energy storage system (ESS) and demand resource management (DR).

발전자원과 수요반응 자원등 전력산업의 모든 참여자는 전력시장에 참여하여 관리를 하는 것이 가장 효율적이지만, 소규모 분산자원의 발전 출력은 전력시장에서 거래하기에는 부족하여 시장내 거래 자체가 무의미 한 일이었다. 따라서 소규모 분산전원들을 모아 전력시장에 참여할 수 있는 중간 사업자를 두거나, 아니면 생산한 전기를 자급자족하는 형태로 머물 수밖에 없었다. 하지만 전술한 바와 같이 전력 ICT의 발전으로 다양한 에너지 서비스와 운영전략이 가능해졌다. 분산전원의 소유자 대신 설비의 운전과 유지보수를 수행해주고, 잉여분은 판매를 하고 모자라는 에너지는 다른 자원을 통해 구매할 수 있게 되었다. It is most efficient for all participants in the electricity industry, such as power generation resources and demand response resources, to participate in and manage the electricity market. Therefore, there was no choice but to gather small-scale distributed power sources and establish an intermediary operator that could participate in the electricity market, or to remain self-sufficient in the generated electricity. However, as mentioned above, the development of electric power ICT has made various energy services and operation strategies possible. Instead of the owner of the distributed power source, the operation and maintenance of the facility is performed, the surplus is sold, and the energy lacking can be purchased through other resources.

분산전원을 소유한 시장 참여자나 그렇지 않은 참여자(단순 부하) 모두 에너지 서비스를 제공하는 에너지 신산업 사업자를 통해 자신의 에너지 발전 및 소비패턴에 따라 수익을 최대화하고 비용을 절감할 수 있는 서비스를 받을 수 있다. 이제는 스마트그리드 기술을 통해 분산전원 소유 유무, 설비의 운영 및 유지보수와 같은 번거로움없이 사업자를 통해 에너지 비용을 줄일 수 있는 서비스 구현이 가능해졌다. 하지만 이러한 분산자원 확대의 이면에는 전력계통, 특히 이중에서도 주로 분산자원이 연계된 배전계통의 환경변화와 문제점들이 속출하고 있다.Both market participants who own distributed power sources and participants who do not (simple loads) can receive services that maximize profits and reduce costs according to their own energy generation and consumption patterns through new energy industry operators that provide energy services. . Now, through smart grid technology, it is possible to implement services that can reduce energy costs through operators without hassles such as ownership of distributed power sources, operation and maintenance of facilities. However, on the other side of the expansion of these distributed resources, environmental changes and problems in the power system, especially in the distribution system in which distributed resources are mainly connected, are appearing one after another.

에너지신산업 출현에 따른 분산자원들의 다양한 사업형태와 큰 폭으로 오를 보급률을 예상하면, 더 이상은 전력 ICT를 통한 일방적인 통제나 관리가 어려워진 상태이다. 특히 분산자원과 신사업이 이루어지는 배전계통에는 과거 단순한 일방향 배전 제어만 있었던 운영모델을 분산자원 참여자와의 양방향 운영계획과 실행, 다양한 계약을 통한 신뢰도 유지가 가장 큰 도전과제로 떠올랐다.Given the diversified business types of distributed resources following the emergence of the new energy industry and the rapid rise in the penetration rate, unilateral control or management through power ICT is no longer difficult. In particular, in the distribution system where distributed resources and new businesses are implemented, the operation model, which had only simple one-way distribution control in the past, has emerged as the biggest challenge to maintain reliability through two-way operation planning and execution with distributed resource participants and various contracts.

이러한 당면한 문제들을 해결하기 위해 전력시스템을 운영하는 ISO와 협력관계를 가지고 배전계통을 운영할 새로운 주체인 DSO(Distribution Systme Operator)의 필요성이 대두되고 있다. 즉, 지금까지의 전력산업 기술을 통해 ISO가 전체 계통을 운영하는 모습에서, 아주 복잡해진 배전계통에 계통운영을 담당할 DSO를 두고 송전계통과 협력 운영을 통해 국지적인 배전지역의 문제를 사전에 차단하고, 나아가 송전계통 전체의 문제를 해결 할 수 있는 고도의 운영 모델과 시스템이 필요하다.In order to solve these immediate problems, the need for a new entity, DSO (Distribution System Operator), to operate the distribution system in cooperation with ISO, which operates the power system, is emerging. In other words, in the form of ISO operating the entire system through the power industry technology so far, a DSO to be in charge of system operation in a very complex distribution system is placed, and problems in the local distribution area are solved in advance through cooperative operation with the transmission system. A sophisticated operating model and system that can block and further solve the problem of the entire transmission system is needed.

본 발명의 배경기술은 대한민국 공개특허공보 10-2018-0074179호(2018.07.03)의 '소규모 분산자원 전력거래 활성화를 위한 중개시스템'에 개시되어 있다.The background art of the present invention is disclosed in Korean Patent Publication No. 10-2018-0074179 (July 3, 2018) 'Mediation System for Activating Small-scale Distributed Resource Electricity Transaction'.

전 세계적으로 출력 예측과 조정이 어려운 신재생에너지기반 분산발전기의 증가로 전력계통에 야기되는 불안정성은 더이상 간과하기가 어려운 상태이다. 전력계통 운영의 안정성과 신뢰성을 담보하기 위해서는 전력계통에 연계된 모든 참여자들을 전력시장에 참여하도록 하는 것이다. 전력시장 운영자가 입찰된 정보들을 통해 시장 당일인 내일의 전력계통 부하 예측치를 가지고 수요과 공급의 적정성을 사전에 검열하여 낙찰을 진행시키기 때문이다. 즉 전력시장에서 전기를 판매하는 주체와 구매하는 주체가 시장 전일에 서로의 입찰을 통해 낙찰받은 결과대로 시장 당일에 자신의 설비를 운영한다면 전력계통 운영상에 많은 문제들을 미연에 방지할 수 있기 때문이다.Instability caused by the power system due to the increase of renewable energy-based distributed generators, which are difficult to predict and adjust output worldwide, is difficult to overlook any longer. In order to ensure the stability and reliability of power system operation, all participants connected to the power system must participate in the power market. This is because the power market operator proceeds with the successful bidding by inspecting the appropriateness of supply and demand in advance with the predicted power system load for tomorrow, the day of the market, through bidding information. In other words, if the entity that sells electricity and the entity that purchases electricity in the electricity market operates their own facilities on the day of the market according to the results of winning bids through mutual bidding on the day before the market, many problems in the operation of the power system can be prevented in advance. .

하지만 종래 기술에서는 주로 배전계통에 연계 되고있는 많은 소규모 분산자원을 전력시장운영자가 효과적으로 모두 관리하기에는 어려운 문제점이 있었다.However, in the prior art, there was a problem in that it was difficult for the electric power market operator to effectively manage all of the many small-scale distributed resources mainly connected to the distribution system.

본 발명은 전술한 문제점을 개선하기 위해 창안된 것으로서, 본 발명의 일 측면에 따른 목적은 배전계통에 연계되는 분산자원 중 전력시장에 참여하는 자원이 배전계통에 물리적인 문제를 일으키는지를 시장 전일 사전에 검토하여 전력거래 사업자의 계약에 반영될 수 있도록 한 분산자원 통합 운영 방법을 제공하는 데 있다. The present invention has been devised to improve the above-mentioned problems, and an object according to one aspect of the present invention is to check whether resources participating in the electricity market among distributed resources linked to the distribution system cause physical problems in the distribution system in advance before the market. It is to provide an integrated operation method for distributed resources that can be reviewed and reflected in the contract of the electricity trading business operator.

본 발명의 일 측면에 따른 분산자원 통합 운영 방법은 전력시장 전일에, 배전계통 운영 서버가 분산자원 사업자 서버로부터의 전력시장 참여를 위한 입찰 데이터를 기준으로 배전계통에 대한 배전망 해석을 수행하여 상기 입찰 데이터가 배전망 운영 제약에 위배되는지를 검토하는 단계; 및 전력거래 관리 서버가 상기 배전계통 운영 서버의 검토 결과에 따라 분산자원 사업자의 전력시장 참여자의 입찰을 승인하여 계약하는 단계를 포함하는 것을 특징으로 한다.In an integrated distributed resource operation method according to an aspect of the present invention, on the day before the power market, the distribution system operation server performs distribution network analysis for the distribution system based on bidding data for participation in the electricity market from the distributed resource provider server. reviewing whether the bidding data violates the distribution network operation restrictions; and a power transaction management server approving and contracting bids of electricity market participants of distributed resource providers according to a review result of the distribution system operation server.

본 발명의 상기 입찰 데이터가 배전망 운영 제약에 위배되는지를 검토하는 단계는, 상기 배전계통 운영 서버가 상기 전력거래 관리 서버로부터 상기 입찰 데이터를 수령하는 단계; 및 상기 배전계통 운영 서버가 상기 배전망 해석을 수행하여 전력시장 당일의 배전계통의 신재생 발전과 부하 예측을 수행하여 예측 데이터를 생성하고, 상기 예측 데이터를 토대로 상기 입찰 데이터가 상기 배전망 운영 제약에 위배되는지를 검토하는 단계를 포함하는 것을 특징으로 한다.The step of examining whether the bidding data violates the distribution network operation constraints of the present invention may include: receiving the bidding data from the power transaction management server by the distribution system operation server; and the distribution system operating server performs the distribution network analysis to predict new and renewable generation and load of the distribution system on the same day of the electricity market to generate forecast data, and based on the forecast data, the bidding data is applied to the distribution network operation constraints. It is characterized in that it includes the step of reviewing whether it violates.

본 발명은 상기 입찰 데이터가 상기 배전망 운영 제약에 위배되는 것으로 판단되면, 상기 배전계통 운영 서버가 상기 전력거래 관리 서버를 통해 분산자원의 출력을 조정하는 단계를 더 포함하는 것을 특징으로 한다.The present invention may further include, when it is determined that the bidding data violates the distribution network operation constraints, the distribution system operation server adjusting the output of distributed resources through the power transaction management server.

본 발명의 상기 분산자원의 출력을 조정하는 단계는, 상기 배전계통 운영 서버가 입찰 조정량을 계산하여 상기 전력거래 관리 서버에 입찰 정정을 요청하고, 상기 전력거래 관리 서버가 상기 입찰 조정량을 상기 분산자원 사업자 서버에 전달하여 상기 분산자원 사업자 서버로부터 정정 입찰을 받는 것을 특징으로 한다.In the step of adjusting the output of the distributed resources of the present invention, the distribution system operation server calculates a bid adjustment amount and requests a bid correction to the power transaction management server, and the power transaction management server determines the bid adjustment amount. It is characterized in that the correction bid is received from the distributed resource provider server by transmitting to the distributed resource provider server.

본 발명의 상기 입찰 조정량은 전력시장 당일의 상기 분산자원 사업자 각각의 시간대별 출력량을 포함하는 것을 특징으로 한다.The bid adjustment amount of the present invention is characterized in that it includes the amount of output for each time slot of each of the distributed resource providers on the day of the electricity market.

본 발명은 상기 배전계통 운영 서버가 전력시장 당일에 계약에 따른 시장 참여가 상기 계약에 따른 전력시장 참여가 이루어지고 있는지를 감시하여 분산자원의 출력을 조정하는 단계를 더 포함하는 것을 특징으로 한다.The present invention is characterized in that the distribution system operation server further comprises the step of adjusting the output of distributed resources by monitoring whether participation in the electricity market according to the contract is being made on the day of the electricity market.

본 발명의 상기 분산자원의 출력을 조정하는 단계는 상기 배전계통 운영 서버가 상기 분산자원 사업자 서버에 계약 내용 이행을 요청하는 것을 특징으로 한다.The step of adjusting the output of the distributed resources of the present invention is characterized in that the distribution system operating server requests the distributed resource provider server to fulfill contract details.

본 발명의 상기 분산자원의 출력을 조정하는 단계는 상기 배전계통 운영 서버가 상기 전력거래 관리 서버로부터의 요청에 따라 상기 분산자원 사업자의 분산자원의 출력을 제어하는 것을 특징으로 한다.In the step of adjusting the output of the distributed resource of the present invention, the distribution system operation server controls the output of the distributed resource of the distributed resource provider according to a request from the power transaction management server.

본 발명의 상기 분산자원의 출력을 조정하는 단계는 상기 배전계통 운영 서버가 상기 분산자원 사업자 서버에 분산자원의 출력 조정을 요청하는 것을 특징으로 한다.The step of adjusting the output of the distributed resources of the present invention is characterized in that the distribution system operating server requests the distributed resource provider server to adjust the output of the distributed resources.

본 발명의 상기 분산자원의 출력을 조정하는 단계는 상기 배전계통 운영 서버가 상기 분산자원 사업자의 분산자원에 연계된 스마트미터 게이트웨이를 통해 분산자원의 출력을 조정하는 것을 특징으로 한다.The step of adjusting the output of the distributed resources of the present invention is characterized in that the distribution system operating server adjusts the output of the distributed resources through a smart meter gateway linked to the distributed resources of the distributed resource provider.

본 발명의 상기 분산자원의 출력을 조정하는 단계에서, 상기 배전계통 운영 서버는 송전계통과 배전계통 각각을 독립적으로 제어하여 송전망 또는 배전망의 제약을 해소하는 것을 특징으로 한다. In the step of adjusting the output of the distributed resources of the present invention, the distribution system operating server may independently control each of the power transmission system and the distribution system to solve the constraints of the power transmission network or distribution network.

본 발명의 일 측면에 따른 분산자원 통합 운영 방법은 배전계통에 연계되는 분산자원 중 전력시장에 참여하는 자원이 배전계통에 물리적인 문제를 일으키는지를 시장 전일 사전에 검토하여 전력거래 사업자의 계약에 반영될 수 있도록 함으로로써 전력계통의 안정성과 신뢰성을 확보할 수 있도록 한다.Distributed resource integrated operation method according to one aspect of the present invention is to review in advance whether resources participating in the electricity market among distributed resources linked to the distribution system cause physical problems in the distribution system, and reflect them in the contract of the power trading business operator. By doing so, it is possible to secure the stability and reliability of the power system.

본 발명의 다른 측면에 따른 분산자원 통합 운영 방법은 전력계통 운영에 있어 개별 운영이 어려운 신재생에너지를 포함한 분산자원을 효과적으로 운영할 수 있도록 한다.Distributed resource integrated operation method according to another aspect of the present invention enables effective operation of distributed resources, including new and renewable energy, which are difficult to individually operate in power system operation.

도 1 은 본 발명의 일 실시예에 따른 분산자원 통합 운영 장치를 나타낸 도면이다.
도 2 는 본 발명의 일 실시예에 따른 배전계통 운영 서버의 블럭 구성도이다.
도 3 은 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법의 순서도이다.
도 4 는 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법의 세부 과정을 나타낸 순서도이다.
도 5 는 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법의 세부 과정을 나타낸 순서도이다.
도 6 은 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법의 세부 과정을 나타낸 순서도이다.
1 is a diagram showing an apparatus for integrated management of distributed resources according to an embodiment of the present invention.
2 is a block diagram of a distribution system operating server according to an embodiment of the present invention.
3 is a flowchart of a distributed resource integrated management method according to an embodiment of the present invention.
4 is a flowchart illustrating detailed processes of a distributed resource integration management method according to an embodiment of the present invention.
5 is a flowchart illustrating detailed processes of a distributed resource integration management method according to an embodiment of the present invention.
6 is a flowchart illustrating detailed processes of a distributed resource integrated operation method according to an embodiment of the present invention.

이하에서는 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법을 첨부된 도면들을 참조하여 상세하게 설명한다. 이러한 과정에서 도면에 도시된 선들의 두께나 구성요소의 크기 등은 설명의 명료성과 편의상 과장되게 도시되어 있을 수 있다. 또한 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서, 이는 이용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다. 그러므로 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야할 것이다. Hereinafter, a distributed resource integrated operation method according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings. In this process, the thickness of lines or the size of components shown in the drawings may be exaggerated for clarity and convenience of explanation. In addition, terms to be described later are terms defined in consideration of functions in the present invention, which may vary according to the intention or custom of a user or operator. Therefore, definitions of these terms will have to be made based on the content throughout this specification.

도 1 은 본 발명의 일 실시예에 따른 분산자원 통합 운영 장치를 나타낸 도면이고, 도 2 는 본 발명의 일 실시예에 따른 배전계통 운영 서버의 블럭 구성도이다.FIG. 1 is a diagram showing an apparatus for integrated management of distributed resources according to an embodiment of the present invention, and FIG. 2 is a block diagram of a distribution system operation server according to an embodiment of the present invention.

도 1 및 도 2 를 참조하면, 본 발명의 일 실시예에 따른 분산자원 통합 운영 장치는 분산자원 사업자 서버(10), 전력거래 관리 서버(30) 및 배전계통 운영 서버(40)를 포함한다.Referring to FIGS. 1 and 2 , the apparatus for integrated operation of distributed resources according to an embodiment of the present invention includes a distributed resource provider server 10, a power transaction management server 30, and a distribution system operation server 40.

분산자원 사업자 서버(10)는 전력시장에 참여하는 분산자원 사업자의 분산자원에 대한 출력을 관리하고 전력시장 입찰을 위한 입찰 데이터를 전력거래 관리 서버(30)에 전달한다. The distributed resource provider server 10 manages the output of distributed resources of distributed resource providers participating in the electricity market and transmits bidding data for electricity market bidding to the electricity transaction management server 30 .

분산자원 사업자에는 개별 분산자원 사업자 및 분산자원 중개사업자가 포함될 수 있다. Distributed resource providers may include individual distributed resource providers and distributed resource brokerage providers.

개별 분산자원 사업자는 개별 분산전원 또는 수요자원을 구성하고 전력시장에 참여한다. 개별 분산자원 사업자는 민간의 분산자원을 운영할 수 있는 사업자일 수 있다. Individual distributed resource operators form individual distributed power sources or demand resources and participate in the electricity market. Individual distributed resource operators may be operators capable of operating private distributed resources.

분산자원 중개사업자는 개별 분산전원 또는 복합 에너지 자원을 구성하고 개별 분산자원 사업자의 전력시장 참여를 중개한다. The distributed resource brokerage business organizes individual distributed power sources or complex energy resources and mediates the participation of individual distributed resource business operators in the electricity market.

개별 분산자원 사업자 서버(11)는 개별 분산자원 사업자의 요청에 따라 전력시장에 참여한다. 개별 분산자원 사업자 서버(11)는 전력시장 전일(D-1일)에 전력시장 입찰을 위한 입찰 데이터를 전력거래 관리 서버(30)에 전달하며, 이후 전력시장 전일에 전력거래 관리 서버(30)로부터 입찰 조정량이 전달되면 해당 입찰 조정량에 따라 정정 입찰을 수행한다. 입찰 조정량은 배전망 제약 검토 기준에 따른 발전계획 정정 요청 정보이다. 이에 대해서는 후술한다. The individual distributed resource provider server 11 participates in the electricity market according to the request of the individual distributed resource provider. The individual distributed resource provider server 11 transfers bidding data for electricity market bidding to the electricity transaction management server 30 on the day before the electricity market (Day D-1), and then transfers the electricity transaction management server 30 on the day before the electricity market. When the bid adjustment amount is transmitted from the bid adjustment amount, corrective bidding is performed according to the corresponding bid adjustment amount. The amount of bid adjustment is information requested for correction of the power generation plan according to the criteria for reviewing distribution network constraints. This will be described later.

또한, 개별 분산자원 사업자 서버(11)는 전력시장 당일(D-0일)에 배전계통 운영 서버(40)로부터 전력시장 참여가 계약 내용에 따라 정상적으로 이루어지는지에 따른 계약 내용 이행을 요청받을 수 있으며, 이러한 계약 내용 이행 요청에 따라 분산자원의 출력을 조정할 수 있다. In addition, the individual distributed resource provider server 11 may receive a request from the distribution system operation server 40 on the day of the electricity market (Day D-0) to fulfill the contents of the contract according to whether participation in the electricity market is normally performed according to the contents of the contract, The output of distributed resources can be adjusted according to the request for fulfillment of these contract details.

또한, 개별 분산자원 사업자 서버(11)는 전력시장 당일(D-0일)에 배전계통 운영 서버(40)로부터 분산자원의 출력 조정을 요청받을 수 있다. 개별 분산자원 사업자 서버(11)는 분산자원의 출력 요청에 따라 분산자원의 출력을 조정한다. In addition, the individual distributed resource provider server 11 may receive a request for adjusting the output of distributed resources from the distribution system operation server 40 on the day of the electricity market (day D-0). The individual distributed resource provider server 11 adjusts the output of the distributed resources according to the output request of the distributed resources.

분산자원 중개사업자 서버(12)는 분산자원 중개사업자의 요청에 따라 전력시장에 참여한다. 분산자원 중개사업자 서버(12)는 전력시장 전일에 전력시장 입찰을 위한 입찰 데이터를 전력거래 관리 서버(30)에 전달하며, 이후 전력시장 전일에 전력거래 관리 서버(30)로부터 입찰 조정량이 전달되면 해당 입찰 조정량에 따라 정정 입찰을 수행한다. The distributed resource brokerage service provider server 12 participates in the electricity market at the request of the distributed resource brokerage service provider. The distributed resource brokerage service provider server 12 transmits bidding data for electricity market bidding to the electricity transaction management server 30 on the day before the electricity market, and then, when the bid adjustment amount is transmitted from the electricity transaction management server 30 on the day before the electricity market Corrective bidding is performed according to the bid adjustment amount.

분산자원 중개사업자 서버(12)는 전력시장 당일(D-0일)에 배전계통 운영 서버(40)로부터 전력시장 참여가 계약 내용에 따라 정상적으로 이루어지는지에 따른 계약 내용 이행을 요청받을 수 있으며, 이러한 계약 내용 이행 요청에 따라 분산자원 사업자 서버(10)에 분산자원의 출력 조정을 요청할 수 있다. The distributed resource brokerage service provider server 12 may receive a request from the distribution system operation server 40 on the day of the electricity market (Day D-0) to fulfill the contents of the contract according to whether the participation in the electricity market is normally performed according to the contents of the contract, and such contract According to the content implementation request, the distributed resource provider server 10 may be requested to adjust the output of the distributed resources.

전력거래 관리 서버(30)는 전력시장 운영자(ISO) 또는 전력거래 운영자(DSO) 등에 구비될 수 있다. The power transaction management server 30 may be provided in a power market operator (ISO) or a power transaction operator (DSO).

전력거래 관리 서버(30)는 전력시장 전일에 분산자원 사업자 서버(10)로부터 입찰 데이터를 수집하고 수집된 입찰 데이터를 배전계통 운영 서버(40)에 전달하고, 분산자원 사업자의 입찰을 승인하여 계약할 수 있다. 이와 같은 분산자원 사업자와의 계약에 따라, 분산자원 사업자에 의해 발전이 이루어지면, 전력거래 관리 서버(30)는 전력시장 익일(D+1일)부터 분산자원 사업자의 계량 이력을 확인하고 정산금을 지급한다. The power transaction management server 30 collects bidding data from the distributed resource provider server 10 on the day before the power market, delivers the collected bidding data to the distribution system operation server 40, approves the bid of the distributed resource provider, and signs a contract. can do. According to the contract with the distributed resource provider, when power generation is made by the distributed resource provider, the power transaction management server 30 checks the metering history of the distributed resource provider from the next day of the electricity market (D+1 day) and pays the settlement amount. give.

또한, 전력거래 관리 서버(30)는 입찰 데이터가 배전망 운영 제약에 위배되는지를 검토한 결과에 따라 입찰 조정량을 전달받으면 이 입찰 조정량을 분산자원 사업자 서버(10)에 전달한다. 이후 전력거래 관리 서버(30)는 분산자원 사업자 서버(10)로부터 정정 입찰을 받는다. In addition, the power transaction management server 30 transmits the bid adjustment amount to the distributed resource provider server 10 upon receiving the bid adjustment amount according to the result of examining whether the bid data violates the distribution network operation constraints. Thereafter, the power transaction management server 30 receives a corrected bid from the distributed resource provider server 10 .

게다가, 전력거래 관리 서버(30)는 송전계통에 전력 부족 등의 비상상황 발생시 전력공급 또는 출력을 조정할 수 있는 보조서비스 자원, 예컨대 분산자원 사업자를 사전에 등록한다. 이후, 전력거래 관리 서버(30)는 송전계통에 비상운전이 필요한 경우 배전계통 운영 서버(40)에 송전계통에 대한 보조서비스를 요청할 수 있다. In addition, the power transaction management server 30 pre-registers an auxiliary service resource capable of adjusting power supply or output when an emergency such as power shortage occurs in the transmission system, for example, a distributed resource provider. Thereafter, the power transaction management server 30 may request an auxiliary service for the power transmission system from the distribution system operation server 40 when an emergency operation is required for the power transmission system.

배전계통 운영 서버(40)는 전력시장 전일에, 전력거래 관리 서버(30)로부터 전력시장 참여를 위한 입찰 데이터를 전달받고 이 입찰 데이터를 기준으로 배전계통에 대한 배전망 해석을 수행하여 입찰 데이터가 배전망 운영 제약에 위배되는지를 검토한다. 이 경우, 배전계통 운영 서버(40)는 배전망 해석을 수행하여 전력시장 당일의 배전계통의 신재생 발전과 부하 예측을 수행하여 예측 데이터를 생성하고, 예측 데이터를 토대로 입찰 데이터가 배전망 운영 제약에 위배되는지를 검토할 수 있다.The distribution system operation server 40 receives bidding data for participating in the electricity market from the electricity transaction management server 30 on the day before the electricity market, and performs distribution network analysis for the distribution system based on the bidding data, so that the bidding data is Examine whether the distribution network operation restrictions are violated. In this case, the distribution system operation server 40 performs distribution network analysis to predict new and renewable generation and load of the distribution system on the day of the electricity market to generate forecast data, and based on the forecast data, the bidding data is applied to distribution network operation constraints. may be reviewed for violations.

배전계통 운영 서버(40)는 입찰 데이터가 배전망 운영 제약에 위배되는 것으로 판단되면, 배전계통 운영 서버(40)가 전력거래 관리 서버(30)를 통해 분산자원의 출력을 조정할 수 있다. 예를 들어, 배전계통 운영 서버(40)는 입찰 조정량, 예컨대 분산자원 사업자 각각의 시간대별 출력량을 계산하여 전력거래 관리 서버(30)에 전달한다. When the distribution system operation server 40 determines that the bidding data violates the distribution network operation restrictions, the distribution system operation server 40 may adjust the output of distributed resources through the power transaction management server 30 . For example, the distribution system operation server 40 calculates a bid adjustment amount, for example, an output amount for each time slot of each distributed resource provider, and transmits the calculation to the power transaction management server 30 .

배전계통 운영 서버(40)는 분산자원 사업자의 분산자원 및 부하 연계장치(111)의 스마트 미터 인프라, 예컨데 스마트미터 게이트웨이 또는 스마트미터로부터 분산자원의 운영정보를 전달받을 수 있다. The distribution system operation server 40 may receive operation information of distributed resources from the smart meter infrastructure of the distributed resource and load linking device 111 of the distributed resource provider, for example, a smart meter gateway or a smart meter.

이에, 배전계통 운영 서버(40)는 전력시장 당일에 계약 내용에 따라 전력시장 참여가 정상적으로 이루어지고 있는지를 감시하여 분산자원의 출력을 조정할 수 있다. 이 경우, 배전계통 운영 서버(40)는 분산자원 사업자 서버(10)에 계약 내용에 따라 전력시장에 참여하도록 하는 메시지를 분산저원 사업자 서버(10)에 전달할 수 있다. 이 경우, 분산자원 사업자 서버(10)는 해당 메세지를 출력하여 분산자원 사업자가 계약 내용에 따라 발전할 수 있도록 한다.Accordingly, the distribution system operation server 40 may adjust the output of distributed resources by monitoring whether participation in the electricity market is normally performed according to the details of the contract on the day of the electricity market. In this case, the distribution system operation server 40 may transmit a message to the distributed resource provider server 10 to allow the distributed resource provider server 10 to participate in the electricity market according to the contract details to the distributed storage provider server 10 . In this case, the distributed resource provider server 10 outputs a corresponding message so that the distributed resource provider can develop according to the contents of the contract.

한편, 배전계통 운영 서버(40)는 분산자원 사업자 서버(10)에 계약 내용 이행을 요청할 수 있다. 또한, 배전계통 운영 서버(40)는 분산자원 사업자 서버에 분산자원의 출력 조정을 요청할 수 있다. 이 경우, 배전계통 운영 서버(40)는 분산자원 사업자의 분산자원 및 부하 연계장치(111)의 스마트미터를 통해 분산자원의 출력을 직접 조정할 수 있다. Meanwhile, the distribution system operation server 40 may request the distributed resource provider server 10 to fulfill contract details. In addition, the distribution system operation server 40 may request the distributed resource provider server to adjust the output of distributed resources. In this case, the distribution system operation server 40 may directly adjust the output of the distributed resources through the smart meter of the distributed resource and load linking device 111 of the distributed resource provider.

배전계통 운영 서버(40)는 배전계통에 전력 부족 등의 비상상황 발생시 전력공급 또는 출력을 조정할 수 있는 보조서비스 자원, 예컨대 분산자원 사업자를 사전에 등록한다. 이후, 배전계통 운영 서버(40)는 배전계통에 비상운전이 필요한 경우 분산자원 사업자 서버(10)에 출력 조정을 요청할 수 있다. The distribution system operation server 40 pre-registers auxiliary service resources capable of adjusting power supply or output when an emergency such as power shortage occurs in the distribution system, for example, a distributed resource provider. Thereafter, the distribution system operation server 40 may request output adjustment from the distributed resource provider server 10 when an emergency operation is required for the distribution system.

또한, 배전계통 운영 서버(40)는 송전계통에 비상운전이 필요한 경우 분산자원 사업자 서버(10)에 출력 조정을 요청할 수 있다. In addition, the distribution system operation server 40 may request output adjustment from the distributed resource provider server 10 when an emergency operation is required for the power transmission system.

이하, 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법을 도 3 내지 도 6 을 참조하여 상세하게 설명한다.Hereinafter, a distributed resource integrated management method according to an embodiment of the present invention will be described in detail with reference to FIGS. 3 to 6 .

도 3 은 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법의 순서도이고, 도 4 는 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법의 세부 과정을 나타낸 순서도이며, 도 5 는 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법의 세부 과정을 나타낸 순서도이며, 도 6 은 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법의 세부 과정을 나타낸 순서도이다.Figure 3 is a flow chart of a distributed resource integrated operation method according to an embodiment of the present invention, Figure 4 is a flow chart showing the detailed process of the distributed resource integrated operation method according to an embodiment of the present invention, Figure 5 is a flow chart of the present invention It is a flowchart showing detailed processes of a method for integrated operation of distributed resources according to an embodiment, and FIG. 6 is a flowchart showing detailed processes of a method for integrated operation of distributed resources according to an embodiment of the present invention.

도 3 을 참조하면, 먼저, 전력시장 전일에는, 분산자원 사업자 서버(10)가 전력거래 관리 서버(30)에 입찰 데이터를 전달하고 개별 분산자원(개별 분산자원 사업자) 또는 집합 분산자원(분산자원 중개사업자) 발전을 입찰한다(S100).Referring to FIG. 3, first, on the day before the power market, the distributed resource provider server 10 transfers bidding data to the power transaction management server 30, and individual distributed resources (individual distributed resource operators) or collective distributed resources (distributed resources) Brokerage operator) bids for power generation (S100).

전력거래 관리 서버(30)는 해당 입찰 데이터를 배전계통 운영 서버(40)에 전달하고 입찰 데이터 기준 배전계통 제약에 대한 검토를 요청한다(S102). The power transaction management server 30 transfers the corresponding bidding data to the distribution system operation server 40 and requests a review of distribution system constraints based on the bidding data (S102).

이에 따라, 배전계통 운영 서버(40)는 전력거래 관리 서버(30)로부터 전달받은 입찰 데이터를 기준으로 배전망 해석을 수행하여 전력시장 당일의 배전계통의 신재생 발전과 부하 예측을 수행함으로써 예측 데이터를 생성하고, 예측 데이터를 토대로 입찰 데이터가 배전망 운영 제약에 위배되는지를 검토한다. 이 경우, 배전계통 운영 서버(40)는 배전망 운영 제약에 위배되면 입찰 조정량을 생성하여 전력거래 관리 서버(30)에 전달한다(S104).Accordingly, the distribution system operation server 40 analyzes the distribution network based on the bidding data transmitted from the power transaction management server 30 and predicts the new and renewable generation and load of the distribution system on the day of the power market, thereby predicting data. is generated, and based on the forecast data, it is reviewed whether the bidding data violates the distribution network operation constraints. In this case, the distribution system operation server 40 generates a bid adjustment amount and transmits it to the power transaction management server 30 when the distribution network operation restrictions are violated (S104).

전력거래 관리 서버(30)는 입찰 조정량을 분산자원 사업자 서버(10)에 입찰 조정량을 전달하고 수정 입찰을 요청하고(S106), 분산자원 사업자 서버(10)는 입찰 조정량에 따라 정정 입찰, 즉 분산자원 발전에 대한 재입찰을 수행한다(S108). The power transaction management server 30 transmits the bid adjustment amount to the distributed resource provider server 10 and requests a modified bid (S106), and the distributed resource provider server 10 corrects the bid according to the bid adjusted amount. , That is, re-bidding for distributed resource generation is performed (S108).

이에 따라, 전력거래 관리 서버(30)는 해당 정정 입찰데이터를 배전계통 운영 서버(40)에 전달하여 배전계통 제약 검토를 재요청하고(S110), 배전계통 운영 서버(40)는 해당 정정 입찰데이터를 토대로 배전망 해석을 수행하여 전력시장 당일의 배전계통의 신재생 발전과 부하 예측을 수행하여 예측 데이터를 생성하고, 예측 데이터를 토대로 입찰 데이터가 배전망 운영 제약에 위배되는지를 검토한다. 이 경우, 배전계통 운영 서버(40)는 검토 결과에 따라 상기한 바와 같이 재입찰을 요청할 수 있다(S112). 이러한 과정은 배전계통 제약이 해소될 때까지 반복적으로 수행된다.Accordingly, the power transaction management server 30 transfers the corrected bidding data to the distribution system operating server 40 to request a review of the distribution system constraints again (S110), and the distribution system operating server 40 transmits the corrected bidding data Based on the distribution network analysis, new and renewable generation and load prediction of the distribution system on the day of the power market are performed to generate forecast data, and based on the forecast data, whether the bidding data violates the distribution network operation constraints is reviewed. In this case, the distribution system operation server 40 may request re-bidding as described above according to the review result (S112). This process is repeatedly performed until the distribution system constraints are resolved.

한편, 배전계통 운영 서버(40)는 상기한 검토 결과 배전망 운영 제약에 위배되지 않으면, 그 검토 결과를 전력거래 관리 서버(30)에 전달하고, 전력거래 관리 서버(30)는 분산자원 사업자 서버(10)에 낙찰을 통보하고 계약한다(S114). On the other hand, if the distribution system operation server 40 does not violate the distribution network operation restrictions as a result of the above review, it transfers the review result to the power transaction management server 30, and the power transaction management server 30 is a distributed resource provider server. (10) is notified of the successful bid and a contract is signed (S114).

이후, 전력시장 당일에는, 분산자원 사업자는 발전을 수행하고(S116), 이때 배전계통 운영 서버(40)는 전력시장 당일에 계약에 따른 시장 참여가 계약에 따른 전력시장 참여가 이루어지고 있는지를 감시하여 계약 내용이 미이행되고 있는지 또는 배전계통에 비상상황이 발생하는지를 판단하여 판단 결과에 따라 분산자원의 출력을 조정한다(S118).Then, on the day of the electricity market, the distributed resource business operator performs power generation (S116), and at this time, the distribution system operation server 40 monitors whether participation in the market according to the contract or participation in the electricity market according to the contract is being made on the day of the electricity market. Accordingly, it is determined whether the contents of the contract have not been fulfilled or an emergency situation has occurred in the distribution system, and the output of the distributed resources is adjusted according to the determination result (S118).

이후, 전력시장 익일에는, 전력거래 관리 서버(30)가 분산자원 사업자의 계량 이력을 확인하고 정산금을 지급한다(S120). Thereafter, on the next day of the electricity market, the electricity transaction management server 30 checks the metering history of the distributed resource provider and pays the settlement money (S120).

상기한 배전계통 통합 운영 방법에 있어서, 배전계통 운영 서버(40)를 중심으로 좀 더 구체적으로 설명한다. In the above described distribution system integrated operation method, the distribution system operation server 40 will be described in more detail.

도 4 를 참조하면, 먼저 전력시장 전일에, 배전계통 운영 서버(40)는 전력거래 관리 서버(30)로부터 전력시장 참여를 위한 입찰 데이터를 전달받는다(S200).Referring to FIG. 4 , first, on the day before the electricity market, the distribution system operation server 40 receives bidding data for participation in the electricity market from the electricity transaction management server 30 (S200).

배전계통 운영 서버(40)는 전력거래 관리 서버(30)로부터 전달받은 입찰 데이터를 기준으로 배전망 해석을 수행하여 전력시장 당일의 배전계통의 신재생 발전과 부하 예측을 수행하여 예측 데이터를 생성하고, 예측 데이터를 토대로 입찰 데이터가 배전망 운영 제약에 위배되는지를 검토한다(S202, S204).The distribution system operation server 40 analyzes the distribution network based on the bidding data transmitted from the power transaction management server 30, and predicts new and renewable generation and load of the distribution system on the day of the power market to generate predicted data, , Based on the predicted data, it is reviewed whether the bidding data violates the distribution network operation restrictions (S202, S204).

이 경우, 입찰 데이터가 배전망 운영 제약에 위배되는 것으로 판단되면, 배전계통 운영 서버(40)는 최적화 모형, 즉 최적 발전 계획을 실시간 계산하고, 분산자원 사업자 각각의 시간대별 출력량을 포함하는 입찰 조정량을 계산하여 전력거래 관리 서버(30)에 전달한다(S210,S212).In this case, if it is determined that the bidding data violates the distribution network operation constraints, the distribution system operation server 40 calculates an optimization model, that is, an optimal power generation plan in real time, and adjusts the bid including the output amount for each time slot of each distributed resource provider. The amount is calculated and transmitted to the power transaction management server 30 (S210, S212).

한편, 입찰 데이터가 배전망 운영 제약에 위배되지 않는 것으로 판단되면, 전력거래 관리 서버(30)가 입찰을 승인한다(S208).Meanwhile, when it is determined that the bidding data does not violate the distribution network operation restrictions, the power transaction management server 30 approves the bidding (S208).

전력시장 당일에, 배전계통 운영 서버(40)는 스마트미터 게이트웨이 또는 스마트미터로부터 분산자원의 운영정보를 전달받고, 이를 토대로 계약 내용에 따른 전력시장 참여, 즉 계약에 따른 발전이 이루어지고 있는지를 판단한다(S214). On the day of the power market, the distribution system operation server 40 receives operation information of distributed resources from the smart meter gateway or smart meter, and based on this, determines whether participation in the power market according to the contract details, that is, power generation according to the contract is being made. Do (S214).

이 경우, 계약 내용에 위배되면, 배전계통 운영 서버(40)는 분산자원 사업자가 출력을 조정할 수 있도록, 최적화 모형, 즉 최적 발전 계획을 실시간 계산하고 이를 기초로 전력거래 관리 서버(30)를 통해 분산자원 사업자 서버(10)에 계약 내용 이행을 요청한다(S216). In this case, if the contract is violated, the distribution system operation server 40 calculates an optimization model, that is, an optimal power generation plan in real time so that the distributed resource operator can adjust the output, and based on this, through the power transaction management server 30 The distributed resource provider server 10 requests execution of contract details (S216).

이후, 전력거래 관리 서버(30)는 분산자원 사업자의 계량 이력을 확인하고 정산금을 지급한다(S218).Thereafter, the power transaction management server 30 checks the metering history of the distributed resource provider and pays the settlement money (S218).

한편, 전력시장 당일에는 전력계통에 비상상황이 발생될 수 있다. 이에, 분산자원 사업자 각각은 자신을 보조서비스 자원으로 등록하여 비상상황에 대비할 수 있다. 이를 도 5 를 참조하여 설명한다.Meanwhile, on the day of the power market, an emergency situation may occur in the power system. Accordingly, each distributed resource provider can prepare for an emergency by registering himself as an auxiliary service resource. This will be described with reference to FIG. 5 .

먼저, 전력시장 전일에, 분산자원 사업자 서버(10)는 배전계통 운영 서버(40)에 송배전계통 보조서비스 자원으로 등록을 요청하고(S300), 배전계통 운영 서버(40)는 송전계통 보조서비스 자원 등록 요청이 있음을 전력거래 관리 서버(30)에 전달하고, 이에 전력거래 관리 서버(30)는 해당 분산자원 사업자를 송전계통 보조서비스 자원 등록을 승인한다(S302). 또한, 배전계통 운영 서버(40)는 분산자원 사업자의 배전계통 보조서비스 자원 등록을 승인한다(S304).First, on the day before the power market, the distributed resource provider server 10 requests the distribution system operation server 40 to register as a transmission and distribution system auxiliary service resource (S300), and the distribution system operation server 40 requests the transmission system auxiliary service resource The existence of the registration request is transmitted to the power transaction management server 30, and accordingly, the power transaction management server 30 approves the registration of the transmission system auxiliary service resource of the corresponding distributed resource operator (S302). In addition, the distribution system operation server 40 approves the distribution system auxiliary service resource registration of the distributed resource provider (S304).

이후, 전력시작 당일에 송전계통에 비상상황이 발생시, 예컨대 송전계통의 전력량이 부족할 경우, 전력거래 관리 서버(30)는 배전계통 운영 서버(40)에 송전계통 보조서비스를 요청하고(S306), 배전계통 운영 서버(40)는 해당 분산자원 사업자의 분산자원 사업자 서버에 송전계통 보조서비스를 요청한다(S308).Subsequently, when an emergency occurs in the power transmission system on the day of power start, for example, when the amount of power in the power transmission system is insufficient, the power transaction management server 30 requests the power transmission system operation server 40 for auxiliary power transmission service (S306), The distribution system operation server 40 requests a transmission system auxiliary service from the distributed resource provider server of the corresponding distributed resource provider (S308).

아울러, 배전계통 운영 서버(40)는 해당 분산자원 사업자의 분산자원 사업자 서버에 배전계통 보조서비스를 요청한다(S310). In addition, the distribution system operation server 40 requests a distribution system auxiliary service from the distributed resource provider server of the corresponding distributed resource provider (S310).

이에 따라, 분산자원 사업자 서버는 전력량을 조정함으로써 송배전계통의 출력을 조정한다. Accordingly, the distributed resource provider server adjusts the output of the transmission and distribution system by adjusting the amount of power.

이러한 과정은 송배전계통의 비상상황이 해소될 때까지 반복될 수 있다. This process may be repeated until the emergency situation of the transmission and distribution system is resolved.

이후, 전력시작 익일에는 전력거래 관리 서버(30)가 배전계통 운영 서버(40)에 송전계통 보조서비스 계량 이력을 확인하고 실적 정산금을 지급한다(S312). Thereafter, on the next day after power start, the power transaction management server 30 checks the measurement history of the power transmission system auxiliary service to the distribution system operation server 40 and pays a performance settlement (S312).

이어, 배전계통 운영 서버(40)는 송배전계통 보소저시브 계량 이력을 확인하고, 해당 분산자원 사업자에게 송배전계통 보조서비스에 대한 실적 정산금을 지급한다(S314,S316).Subsequently, the distribution system operation server 40 checks the transmission and distribution system supervisory passive metering history, and pays a performance settlement for the transmission and distribution system auxiliary service to the corresponding distributed resource operator (S314 and S316).

한편, 상기한 보조서비스 제공 과정을 배전계통 운영 서버(40)를 중심으로 좀 더 구체적으로 설명한다. Meanwhile, the process of providing the above auxiliary service will be described in more detail, focusing on the distribution system operating server 40 .

도 6 을 참조하면, 먼저 전력시장 전일에, 배전계통 운영 서버(40)는 분산자원 사업자의 배전계통 보조서비스 자원 참여 정보를 저장한다(S400). Referring to FIG. 6 , first, on the day before the electricity market, the distribution system operation server 40 stores resource participation information of distribution system auxiliary service of a distributed resource provider (S400).

이 상태에서, 전력시작 당일에 송전계통에 비상상황이 발생(S402)하면, 전력거래 관리 서버(30)가 배전계통 운영 서버(40)에 송전계통 보조서비스를 요청하고(S404), 이에 배전계통 운영 서버(40)는 송전계통의 비상상황에 따라 분산자원 사업자의 스마트미터를 직접 제어하여 분산자원 비상상황을 제어한다(S406). In this state, when an emergency occurs in the power transmission system on the day of power start (S402), the power transaction management server 30 requests the distribution system operation server 40 for an auxiliary transmission system service (S404), and thus the distribution system The operation server 40 controls the distributed resource emergency situation by directly controlling the smart meter of the distributed resource provider according to the emergency situation of the power transmission system (S406).

즉, 배전계통 운영 서버(40)는 스마트미터 게이트웨이 또는 스마트미터로부터 분산자원의 운영정보를 전달받고, 이를 토대로 분산자원 사업자의 분산자원 및 부하 연계장치(111)의 스마트미터를 통해 분산자원의 출력을 직접 조정할 수 있다. That is, the distribution system operation server 40 receives operation information of the distributed resources from the smart meter gateway or smart meter, and outputs the distributed resources through the smart meter of the distributed resource and load linking device 111 based on this. can be adjusted directly.

한편, 배전계통 운영 서버(40)는 송전계통에 대한 송전망 해석을 수행하여 송전망 제약을 해소한 지를 판단하고(S408), 판단 결과에 따라 단계 S406으로 리턴한다. On the other hand, the distribution system operation server 40 performs a transmission network analysis on the transmission system to determine whether the transmission network restrictions are resolved (S408), and returns to step S406 according to the determination result.

반면에, S408 단계의 판단 결과 송전망 제약이 해소되면, 배전계통 운영 서버(40)는 송전계통 보조서비스 계량 이력을 확인하고 실적 정산금을 지급한다(S410).On the other hand, as a result of the determination in step S408, when the transmission network constraints are resolved, the distribution system operation server 40 checks the history of metering of auxiliary services of the transmission system and pays a performance settlement (S410).

한편, 배전계통에 비상상황이 발생되면, 배전계통 운영 서버(40)는 배전계통의 비상상황에 따라 분산자원 사업자의 스마트미터를 직접 제어하여 분산자원 비상상황을 제어한다(S412). On the other hand, when an emergency occurs in the distribution system, the distribution system operation server 40 directly controls the smart meter of the distributed resource operator according to the emergency situation of the distribution system to control the distributed resource emergency (S412).

즉, 배전계통 운영 서버(40)는 스마트미터 게이트웨이 또는 스마트미터로부터 분산자원의 운영정보를 전달받고, 이를 토대로 분산자원 사업자의 분산자원 및 부하 연계장치(111)의 스마트미터를 통해 분산자원의 출력을 직접 조정할 수 있다. That is, the distribution system operation server 40 receives operation information of the distributed resources from the smart meter gateway or smart meter, and outputs the distributed resources through the smart meter of the distributed resource and load linking device 111 based on this. can be adjusted directly.

한편, 배전계통 운영 서버(40)는 배전계통에 대한 배전망 해석을 수행하여 배전망 제약을 해소한 지를 판단하고(S414), 판단 결과에 따라 단계 S412으로 리턴한다. Meanwhile, the distribution system operation server 40 performs distribution network analysis on the distribution system to determine whether distribution network restrictions are resolved (S414), and returns to step S412 according to the determination result.

한편, 단계 S414 단계의 판단 결과 배전망 제약이 해소되면, 배전계통 운영 서버(40)는 배전계통 보조서비스 계량 이력을 확인하고 실적 정산금을 지급한다(S416).Meanwhile, as a result of the determination in step S414, when the distribution network constraints are resolved, the distribution system operation server 40 checks the distribution system auxiliary service metering history and pays a performance settlement (S416).

본 실시예에 따른 분산자원 통합 운영 방법은 분산자원의 연계된 배전계통 운영시스템에 적용하기 위한 목적으로 설계될 수 있다. 따라서 유사한 구조 및 목적의 마이크로그리드 운영시스템, 구역전기사업자 운영시스템, 배전계통을 소유한전력재판매사업자 운영시스템, 분산자원 중개거래 사업자 운영시스템 등의 넓은 활용범위를 가지고 있다.The distributed resource integrated operation method according to this embodiment may be designed for the purpose of being applied to a distribution system operating system linked to distributed resources. Therefore, it has a wide range of applications, such as a microgrid operating system with a similar structure and purpose, a district electric operator operating system, a power resale operator operating system that owns a distribution system, and a distributed resource brokerage transaction operator operating system.

한편, 마이크로그리드는 통상적으로 계통연계형과 독립형으로 나누어지는데, 본 실시예는 마이크로그리드 내부 전력계통에 적용될 수 있다. 즉, 본 실시예에 따른 분산자원 통합 운영 방법은 발전 전일과 당일로 나누어 계획 운영의 관점에서 배전계통운영자(DSO)의 운영시스템으로 마이크로그리드 운영시스템에 응용할 수 있다. On the other hand, microgrids are usually divided into grid-connected and independent types, and this embodiment can be applied to the internal power system of the microgrid. That is, the distributed resource integrated operation method according to this embodiment can be applied to the microgrid operating system as an operating system of a distribution system operator (DSO) from the viewpoint of plan operation by dividing it into the day before and the day of power generation.

또한, 구역전기사업자나 전력재판매사업자의 모델에서는 전력도매시장으로부터 구매해야 할 전력 또는 사업자 소유의 분산자원 운영 계획 수립에도 적용될 수 있다.In addition, in the model of a district electric business operator or power resale business operator, it can be applied to the establishment of an operation plan for power to be purchased from the electricity wholesale market or distributed resources owned by the business operator.

이와 같이 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법은 배전계통에 연계되는 분산자원 중 전력시장에 참여하는 자원이 배전계통에 물리적인 문제를 일으키는지를 시장 전일 사전에 검토하여 전력거래 사업자의 계약에 반영될 수 있도록 함으로로써 전력계통의 안정성과 신뢰성을 확보할 수 있도록 한다.In this way, the distributed resource integrated operation method according to an embodiment of the present invention examines in advance whether resources participating in the electricity market among the distributed resources linked to the distribution system cause physical problems in the distribution system, the day before the market, By allowing it to be reflected in the contract, it is possible to secure the stability and reliability of the power system.

또한, 본 발명의 일 실시예에 따른 분산자원 통합 운영 방법은 전력계통 운영에 있어 개별 운영이 어려운 신재생에너지를 포함한 분산자원을 효과적으로 운영할 수 있도록 한다.In addition, the method for integrated management of distributed resources according to an embodiment of the present invention enables effective management of distributed resources, including new and renewable energy, which are difficult to individually operate in power system operation.

본 명세서에서 설명된 구현은, 예컨대, 방법 또는 프로세스, 장치, 소프트웨어 프로그램, 데이터 스트림 또는 신호로 구현될 수 있다. 단일 형태의 구현의 맥락에서만 논의(예컨대, 방법으로서만 논의)되었더라도, 논의된 특징의 구현은 또한 다른 형태(예컨대, 장치 또는 프로그램)로도 구현될 수 있다. 장치는 적절한 하드웨어, 소프트웨어 및 펌웨어 등으로 구현될 수 있다. 방법은, 예컨대, 컴퓨터, 마이크로프로세서, 집적 회로 또는 프로그래밍가능한 로직 디바이스 등을 포함하는 프로세싱 디바이스를 일반적으로 지칭하는 프로세서 등과 같은 장치에서 구현될 수 있다. 프로세서는 또한 최종-사용자 사이에 정보의 통신을 용이하게 하는 컴퓨터, 셀 폰, 휴대용/개인용 정보 단말기(personal digital assistant: "PDA") 및 다른 디바이스 등과 같은 통신 디바이스를 포함한다.Implementations described herein may be embodied in, for example, a method or process, an apparatus, a software program, a data stream, or a signal. Even if only discussed in the context of a single form of implementation (eg, discussed only as a method), the implementation of features discussed may also be implemented in other forms (eg, an apparatus or program). The device may be implemented in suitable hardware, software and firmware. The method may be implemented in an apparatus such as a processor, which is generally referred to as a processing device including, for example, a computer, microprocessor, integrated circuit or programmable logic device or the like. Processors also include communication devices such as computers, cell phones, personal digital assistants ("PDAs") and other devices that facilitate communication of information between end-users.

본 발명은 도면에 도시된 실시예를 참고로 하여 설명되었으나, 이는 예시적인 것에 불과하며 당해 기술이 속하는 기술분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다. 따라서, 본 발명의 진정한 기술적 보호범위는 아래의 특허청구범위에 의하여 정해져야할 것이다.Although the present invention has been described with reference to the embodiments shown in the drawings, it should be noted that this is only exemplary and various modifications and equivalent other embodiments are possible from those skilled in the art to which the technology pertains. will understand Therefore, the true technical protection scope of the present invention will be defined by the claims below.

10: 분산자원 사업자 서버
11: 개별 분산자원 사업자 서버
111: 분산자원 및 부하 연계장치
12: 분산자원 중개사업자 서버
30: 전력거래 관리 서버
40: 배전계통 운영 서버
10: Distributed resource provider server
11: Individual distributed resource provider server
111: Distributed resource and load linkage device
12: Distributed resource mediator server
30: Power transaction management server
40: distribution system operation server

Claims (11)

전력시장 전일에, 배전계통 운영 서버가 분산자원 사업자 서버로부터의 전력시장 참여를 위한 입찰 데이터를 기준으로 배전계통에 대한 배전망 해석을 수행하여 상기 입찰 데이터가 배전망 운영 제약에 위배되는지를 검토하는 단계; 및
전력시장 전일에, 상기 배전계통 운영 서버의 검토 결과 상기 입찰 데이터가 배전망 운영 계약에 위배되지 않으면, 전력거래 관리 서버가 전력시장 참여를 위한 분산자원 사업자의 입찰을 승인하여 계약하고, 상기 입찰 데이터가 배전망 운영 계약에 위배되면 상기 배전계통 운영 서버가 입찰 조정량을 계산하여 상기 전력거래 관리 서버에 입찰 정정을 요청하고, 상기 전력거래 관리 서버가 상기 입찰 조정량을 상기 분산자원 사업자 서버에 전달하여 상기 분산자원 사업자 서버로부터 정정 입찰을 받는 단계를 포함하고,
상기 입찰 데이터가 배전망 운영 제약에 위배되는지를 검토하는 단계는, 상기 배전계통 운영 서버가 상기 전력거래 관리 서버로부터 상기 입찰 데이터를 수령하는 단계; 및 상기 배전계통 운영 서버가 상기 배전망 해석을 수행하여 전력시장 당일의 배전계통의 신재생 발전과 부하 예측을 수행하여 예측 데이터를 생성하고, 상기 예측 데이터를 토대로 상기 입찰 데이터가 상기 배전망 운영 제약에 위배되는지를 검토하는 단계를 포함하며,
상기 배전계통 운영 서버가 전력시장 당일에 계약에 따른 시장 참여가 이루어지고 있는지를 감시하여 분산자원의 출력을 조정하는 단계를 더 포함하며,
상기 분산자원의 출력을 조정하는 단계는, 상기 배전계통 운영 서버가 배전계통의 전력 부족시 전력공급 또는 출력을 조정할 수 있는 분산자원 사업자를 사전에 등록하여 분산자원의 출력을 조정하며,
상기 분산자원의 출력을 조정하는 단계는, 상기 배전계통 운영 서버가 송전계통의 전력량이 부족하여 상기 전력거래 관리 서버로부터 송전 계통 보조서비스를 요청받으면, 상기 분산자원 사업자 서버에 송전계통 보조서비스를 요청하고, 상기 분산자원 사업자 서버가 전력량을 보정하며,
상기 분산자원의 출력을 조정하는 단계는 상기 배전계통 운영 서버가 상기 전력거래 관리 서버로부터의 요청에 따라 상기 분산자원 사업자의 분산자원의 출력을 제어하며,
상기 분산자원의 출력을 조정하는 단계는, 상기 배전계통 운영 서버가 상기 분산자원 사업자의 분산자원에 연계된 스마트미터 게이트웨이를 통해 분산자원의 출력을 직접 조정하는 것을 특징으로 하는 분산자원 통합 운영 방법.
On the day before the electricity market, the distribution system operation server performs distribution network analysis for the distribution system based on the bidding data for participation in the electricity market from the distributed resource provider server to review whether the bidding data violates the distribution network operation constraints. step; and
On the day before the electricity market, as a result of review by the distribution system operation server, if the bidding data does not violate the distribution network operation contract, the electricity transaction management server approves and contracts the bid of the distributed resource business operator for participation in the electricity market, and the bidding data If the distribution network operation contract is violated, the distribution system operation server calculates a bid adjustment amount and requests a bid correction to the power transaction management server, and the power transaction management server transmits the bid adjustment amount to the distributed resource provider server and receiving a corrected bid from the distributed resource provider server,
The step of reviewing whether the bidding data violates distribution network operation restrictions may include: receiving, by the distribution system operation server, the bidding data from the power transaction management server; and the distribution system operating server performs the distribution network analysis to predict new and renewable generation and load of the distribution system on the same day of the electricity market to generate forecast data, and based on the forecast data, the bidding data is applied to the distribution network operation constraints. Including the step of reviewing whether it violates the
Further comprising the step of adjusting the output of distributed resources by the distribution system operation server monitoring whether market participation is being made according to the contract on the day of the electricity market,
In the step of adjusting the output of the distributed resources, the distribution system operation server adjusts the output of the distributed resources by pre-registering a distributed resource operator capable of adjusting power supply or output when the power is insufficient in the distribution system,
In the step of adjusting the output of the distributed resources, when the distribution system operation server receives a request for an auxiliary power transmission system service from the power transaction management server due to an insufficient amount of power in the transmission system, it requests an auxiliary power transmission system service from the distributed resource provider server. And the distributed resource provider server corrects the amount of power,
In the step of adjusting the output of the distributed resource, the distribution system operation server controls the output of the distributed resource of the distributed resource provider according to a request from the power transaction management server,
In the step of adjusting the output of the distributed resource, the distribution system operation server directly adjusts the output of the distributed resource through a smart meter gateway linked to the distributed resource of the distributed resource operator.
삭제delete 삭제delete 삭제delete 제 1 항에 있어서, 상기 입찰 조정량은
전력시장 당일의 상기 분산자원 사업자 각각의 시간대별 출력량을 포함하는 것을 특징으로 하는 분산자원 통합 운영 방법.
The method of claim 1, wherein the bid adjustment amount is
Distributed resource integrated operation method, characterized in that it includes the amount of output for each time slot of each of the distributed resource providers on the day of the electricity market.
삭제delete 제 1 항에 있어서, 상기 분산자원의 출력을 조정하는 단계는
상기 배전계통 운영 서버가 상기 분산자원 사업자 서버에 계약 내용 이행을 요청하는 것을 특징으로 하는 분산자원 통합 운영 방법.
The method of claim 1, wherein adjusting the output of the distributed resource
Distributed resource integrated operation method, characterized in that the distribution system operation server requests the distributed resource provider server to fulfill the contract.
삭제delete 제 1 항에 있어서, 상기 분산자원의 출력을 조정하는 단계는
상기 배전계통 운영 서버가 상기 분산자원 사업자 서버에 분산자원의 출력 조정을 요청하는 것을 특징으로 하는 분산자원 통합 운영 방법.
The method of claim 1, wherein adjusting the output of the distributed resource
Distributed resource integrated operation method, characterized in that the distribution system operating server requests the distributed resource provider server to adjust the output of the distributed resources.
삭제delete 제 1 항에 있어서, 상기 분산자원의 출력을 조정하는 단계에서,
상기 배전계통 운영 서버는 송전계통과 배전계통 각각을 독립적으로 제어하여 송전망 또는 배전망의 제약을 해소하는 것을 특징으로 하는 분산자원 통합 운영 방법.
The method of claim 1, wherein in the step of adjusting the output of the distributed resource,
Distributed resource integrated operation method, characterized in that the distribution system operating server independently controls each of the power transmission system and the distribution system to solve the constraints of the power transmission network or distribution network.
KR1020200117730A 2020-09-14 2020-09-14 Integrated operation method for distributed energy resource KR102501608B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200117730A KR102501608B1 (en) 2020-09-14 2020-09-14 Integrated operation method for distributed energy resource

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200117730A KR102501608B1 (en) 2020-09-14 2020-09-14 Integrated operation method for distributed energy resource

Publications (2)

Publication Number Publication Date
KR20220035688A KR20220035688A (en) 2022-03-22
KR102501608B1 true KR102501608B1 (en) 2023-02-21

Family

ID=80988245

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200117730A KR102501608B1 (en) 2020-09-14 2020-09-14 Integrated operation method for distributed energy resource

Country Status (1)

Country Link
KR (1) KR102501608B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016017424A1 (en) * 2014-07-31 2016-02-04 日本電気株式会社 Control device, apparatus control device, reporting method, and recording medium
JP2016156532A (en) 2015-02-23 2016-09-01 パナソニックIpマネジメント株式会社 Power feeding planning device, power feeding planning method, and program
JP2018077573A (en) 2016-11-07 2018-05-17 株式会社オプティマイザー Electric power demand procurement support system, information processing device, information processing method and information processing program

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101976401B1 (en) * 2017-08-17 2019-05-09 한국전력공사 Block-Chain based Electricity power trading system, Method thereof, and Computer readable Storage medium having the method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016017424A1 (en) * 2014-07-31 2016-02-04 日本電気株式会社 Control device, apparatus control device, reporting method, and recording medium
JP2016156532A (en) 2015-02-23 2016-09-01 パナソニックIpマネジメント株式会社 Power feeding planning device, power feeding planning method, and program
JP2018077573A (en) 2016-11-07 2018-05-17 株式会社オプティマイザー Electric power demand procurement support system, information processing device, information processing method and information processing program

Also Published As

Publication number Publication date
KR20220035688A (en) 2022-03-22

Similar Documents

Publication Publication Date Title
Logenthiran et al. Multi-agent system for energy resource scheduling of integrated microgrids in a distributed system
Qiu et al. Optimal scheduling of distributed energy resources as a virtual power plant in a transactive energy framework
He et al. Joint operation mechanism of distributed photovoltaic power generation market and carbon market based on cross-chain trading technology
CN111563786B (en) Virtual power plant regulation and control platform based on block chain and operation method
Wang et al. Design of integrated energy market cloud service platform based on blockchain smart contract
Suthar et al. Peer-to-peer energy trading in smart grid: Frameworks, implementation methodologies, and demonstration projects
CN111178682A (en) Control method of demand response management platform based on block chain technology
JP2014531658A (en) An extensible web-based DR platform that communicates DR signals using a network server
Ping et al. Coordinating EV charging via blockchain
Zhou et al. Bilateral electricity trade between smart grids and green datacenters: Pricing models and performance evaluation
US20150286973A1 (en) Multi-modal network and method for distributing resources in a multi-modal network
Saxena et al. Blockchain based transactive energy systems for voltage regulation in active distribution networks
Gao et al. FogChain: A blockchain-based peer-to-peer solar power trading system powered by fog AI
CN113364831A (en) Multi-domain heterogeneous computing network resource credible cooperation method based on block chain
US20200175617A1 (en) Distributed and decentralized ders system optimizations
CN114358929A (en) Distributed energy centralized transaction method and system based on block chain
Song et al. A blockchain and internet of things based architecture design for energy transaction
CN113626876B (en) Consensus method based on power grid block chain
Yan et al. Blockchain‐based framework of power demand response in China
Guo et al. Energy management of Internet data centers in multiple local energy markets
KR102501608B1 (en) Integrated operation method for distributed energy resource
CN112001793A (en) Financial data management method and system based on block chain
Melo et al. Co-simulation platform for the assessment of transactive energy systems
Song et al. A blockchain-based fog-enabled energy cloud in internet of things
Guo et al. Transactive operational framework for Internet data centers in geo-distributed local energy markets

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant