Bridge pier and the construction method using maintained concrete mold Download PDF

Info

Publication number
KR102477955B1
KR102477955B1 KR1020220004236A KR20220004236A KR102477955B1 KR 102477955 B1 KR102477955 B1 KR 102477955B1 KR 1020220004236 A KR1020220004236 A KR 1020220004236A KR 20220004236 A KR20220004236 A KR 20220004236A KR 102477955 B1 KR102477955 B1 KR 102477955B1
Authority
KR
South Korea
Prior art keywords
formwork
precast
pier
concrete
central
Prior art date
Application number
KR1020220004236A
Other languages
Korean (ko)
Inventor
박창섭
Original Assignee
주식회사 케이씨산업
주식회사 휘테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 케이씨산업, 주식회사 휘테크 filed Critical 주식회사 케이씨산업
Priority to KR1020220004236A priority Critical patent/KR102477955B1/en
Application granted granted Critical
Publication of KR102477955B1 publication Critical patent/KR102477955B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/36Columns; Pillars; Struts of materials not covered by groups E04C3/32 or E04C3/34; of a combination of two or more materials
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Disclosed is a pier using a concrete retaining formwork. The pier using the concrete retaining formwork according to the present invention comprises: a precast central formwork; a precast side surface formwork; and a connection unit provided to connect the precast central formwork and the precast side surface formwork. A coping unit of the pier using the concrete retaining formwork is formed by pouring and curing a concrete in an interior space of a formwork assembly surrounded by the precast central formwork and the precast side surface formwork. Provided are the pier using the concrete retaining formwork, which can omit formwork dismantlement and reflect even level difference of the bridge surface, and a construction method thereof.

Description

콘크리트 존치거푸집을 이용한 교각 및 그 시공방법{BRIDGE PIER AND THE CONSTRUCTION METHOD USING MAINTAINED CONCRETE MOLD}Bridge pier and its construction method using concrete formwork {BRIDGE PIER AND THE CONSTRUCTION METHOD USING MAINTAINED CONCRETE MOLD}

본 발명은 콘크리트 존치거푸집을 이용한 교각 및 그 시공방법체 관한 것으로, 거푸집을 해체할 필요 없이 연속적으로 교각을 시공할 수 있는, 콘크리트 존치거푸집을 이용한 교각 및 그 시공방법에 관한 발명이다.The present invention relates to a pier using a concrete formwork and a construction method thereof, and relates to a pier using a concrete formwork and a method for constructing the same, which can continuously construct the pier without dismantling the formwork.

일반적으로 교량을 지탱하는 교각은 기둥의 최종 세그먼트(Segment) 상에 코핑부(coping)를 형성한 다음 교량 상판을 떠받치도록 되어 있다. 이와 같은 교각 코핑부를 시공하는 종래의 방식은 교각 기둥의 최종 세그먼트를 완성하고, 교각의 기둥 철근이 노출된 상태에서 크레인이 계속적으로 작업대기하면서, 크레인으로 코핑 부에 사용될 철근과 거푸집을 기둥 상부로 인양하여 고공에서 철근 및 거푸집 조립을 실시하게 된다.In general, the pier supporting the bridge is designed to support the bridge deck after forming a coping on the final segment of the column. In the conventional method of constructing the coping part of the pier, the final segment of the pier column is completed, and the crane is continuously waiting for work while the reinforcing bar of the pier is exposed, and the reinforcing bar and formwork to be used for the coping are moved to the top of the column by the crane. It is lifted and assembled at high altitude to perform reinforcement and formwork assembly.

교량의 보(거더)나 슬래브 등의 상부구조물을 떠받쳐주도록 그 하부에 설치되는 교각을 건설하기 위해서는 연직상으로 다수의 철근을 배근한 후 콘크리트를 타설하여 양생하는 과정을 거쳐야 하므로 교각의 외부 둘레에 가설거푸집을 설치하는 과정이 필연적으로 수반된다.In order to construct a pier installed at the lower part to support the upper structure such as a beam (girder) or slab of a bridge, it is necessary to place a number of reinforcing bars vertically and then pour concrete and then go through the process of curing. The process of installing temporary formwork is inevitably accompanied.

현재까지의 교각의 시공방법으로는, 도 1a와 같이 교각기둥의 상부에 프리캐스트로 마련되는 코핑부(12)를 조립하여 시공하고 있으나 코핑부(11, 12)의 이동이 용이하지 않을 뿐만 아니라 설치를 위해 많은 비용이 소요된다는 문제점이 있었다.In the construction method of the piers up to now, as shown in FIG. 1A, copings 12 are assembled and constructed by precasting on the upper part of the piers, but it is not easy to move the copings 11 and 12, and There was a problem that a lot of money was required for installation.

특히 종래기술의 경우 일정한 높이의 콘크리트 교각을 시공할 때에는 지상에서 조립되어 기둥 위에 거치된 강재거푸집이 마련되고, 작업을 위해 작업자가 디디고 올라서서 작업하는 고층 작업대, 소위 비계틀을 시공되는 교각 주위에 직립 설치하고, 비계틀 위에 여러 명의 작업자가 올라선 상태에서 타워 크레인 등으로 이동시킨 철근 또는 거푸집 등과 같은 자재를 좌우측에서 손으로 잡고 설치하거나 조립·해체하여 작업을 하였다. In particular, in the case of the prior art, when constructing concrete piers of a certain height, a steel formwork assembled on the ground and mounted on a pillar is provided, and a high-rise workbench on which workers step on and work for work, so-called scaffolding around the piers to be constructed It was installed upright, and while several workers were standing on the scaffold, materials such as reinforcing bars or formwork moved by a tower crane were held by hand from the left and right, and installation or assembly/disassembly was carried out.

종래의 교각기둥의 시공방법에서는 도 1b와 같이 거푸집 해체하는 해체 작업 중 거푸집 세그먼트를 결속하고 있는 수평볼트의 해체에 의해 강재거푸집 사이가 벌어지며 추락하는 사고가 빈번하게 발생되고 있었다.In the conventional method of constructing pier columns, as shown in FIG. 1B, during the disassembly of the formwork, horizontal bolts binding the formwork segments are dismantled, resulting in a gap between the steel formwork and a fall accident frequently occurring.

이에 생산 및 설치가 용이하면서 거푸집 해체작업이 생략되어 안전사고의 방생을 미연에 방지할 수 있는 교각 시공방법이 필요한 실정이다.Accordingly, there is a need for a pier construction method that is easy to produce and install and that can prevent the occurrence of safety accidents by omitting formwork disassembly.

한편 종래기술에 따른 교각의 코핑부는 도 1c와 같이 교량상부 구조물의 경사를 반영하기 위해 교좌면의 단차가 필요한 경우, 단차를 형성하기 위해 추가적인 구조물을 교좌면에 부착 설치하여야 하고 각 단차에 맞게 받침블럭을 개별적으로 시공해야 하는 등 시공성면에서 매우 불리하다는 문제점이 있었다. On the other hand, if the coping part of the pier according to the prior art needs a step on the bridge surface to reflect the slope of the upper bridge structure as shown in FIG. 1c, an additional structure must be attached to the bridge surface to form a step There was a problem that it was very disadvantageous in terms of workability, such as the need to construct blocks individually.

본 발명은 전술한 종래기술의 문제점을 해소하기 위해 안출된 것으로, 프리캐스트로 마련되는 존치거푸집 내측에 현장타설로 코핑부를 형성함으로써 거푸집 해체작업이 생략될 수 있고 교좌면의 단차까지 반영될 수 있는, 콘크리트 존치거푸집을 이용한 교각 및 그 시공방법을 제공하기 위한 것이다.The present invention was made to solve the above-mentioned problems of the prior art, and by forming a coping part by casting on the inside of the precast formwork, the dismantling work of the formwork can be omitted and the level difference of the bearing surface can be reflected. , It is to provide a pier using concrete formwork and its construction method.

전술한 기술적 과제를 해결하기 위한 본 발명의 일 실시예에 따른 콘크리트 존치 거푸집을 이용한 교각은, 하부판에 교각기둥 삽입공이 마련되고, 상기 하부판으로부터 연장되는 경사판과 상기 경사판으로부터 연장되는 수직판을 포함하는 프리캐스트 중앙 거푸집; 판형으로 마련되되 상기 프리캐스트 중앙 거푸집의 양 측에 결합하며 교좌면의 단차가 반영되도록 마련되는 프리캐스트 측면 거푸집; 및 상기 프리캐스트 중앙 거푸집과 상기 프리캐스트 측면 거푸집을 연결하고, 한 쌍의 프리캐스트 측면 거푸집을 연결하도록 마련되는 연결부;를 포함하며, 상기 프리캐스트 중앙 거푸집과 상기 프리캐스트 측면 거푸집으로 둘러 싸인 거푸집 조립체 내부 공간에 콘크리트가 타설 및 양생되어 형성되는 것을 특징으로 한다.In order to solve the above-described technical problem, the pier using a concrete standing formwork according to an embodiment of the present invention is provided with a pier insertion hole in the lower plate, and includes an inclined plate extending from the lower plate and a vertical plate extending from the inclined plate. precast central formwork; A precast side formwork provided in a plate shape but coupled to both sides of the precast central formwork and provided to reflect the step difference of the seat surface; and a connection portion provided to connect the precast central formwork and the precast side forms and to connect the pair of precast side forms, wherein the formwork assembly is surrounded by the precast central formwork and the precast side forms. It is characterized by being formed by pouring and curing concrete in the internal space.

상기 연결부는, 상기 프리캐스트 중앙 거푸집의 양 측면에 상기 하부판, 상기 경사판 및 상기 수직판을 따라 다수 개 마련되는 인서트; 상기 인서트의 형성 위치에 대응하도록 마련되며 상기 프리캐스트 측면 거푸집의 둘레를 따라 다수 개 마련되는 제1 볼트홀;을 포함하는 것을 특징으로 한다.The connecting portion may include a plurality of inserts provided along both sides of the precast central formwork along the lower plate, the inclined plate, and the vertical plate; It is provided to correspond to the forming position of the insert and a plurality of first bolt holes provided along the circumference of the precast side formwork; characterized in that it comprises a.

상기 인서트가 마련되는 상기 프리캐스트 중앙 거푸집의 양 측면과 상기 제1 볼트홀이 마련되는 상기 프리캐스트 측면 거푸집의 둘레 부분에는 콘크리트 접착제를 미리 도포한 후 미리 설정된 압력의 압축력을 추가 도입하여 연결하는 것을 특징으로 한다.After pre-applying concrete adhesive to both sides of the precast central formwork where the insert is provided and the peripheral portion of the precast side formwork where the first bolt hole is provided, compressive force of a preset pressure is additionally introduced to connect them. to be characterized

상기 연결부는, 상기 프리캐스트 측면 거푸집의 중앙부에 다수 개로 마련되는 제2 볼트홀; 및 양 단이 상기 제2 볼트홀을 관통하도록 형성되고 한 쌍의 상기 프리캐스트 측면 거푸집을 수평으로 연결하는 연결봉;을 포함하는 것을 특징으로 한다.The connection part, second bolt holes provided in plurality in the central portion of the precast side formwork; and a connecting rod having both ends passing through the second bolt hole and horizontally connecting the pair of precast side forms.

상기 연결봉은 상기 프리캐스트 측면 거푸집의 측면으로부터 미리 설정된 길이로 돌출되어 작업발판 또는 점검시설의 설치가 가능하도록 하는 연결봉 본체를 포함하는 것을 특징으로 한다.The connecting rod is characterized in that it includes a connecting rod main body protruding from the side of the precast side formwork in a predetermined length to enable installation of a working platform or inspection facility.

상기 프리캐스트 측면 거푸집의 사이에는 내부 지지용 파이프가 마련되고 연결봉은 상기 내부 지지용 파이프 내부를 관통하도록 마련되며, 상기 내부 지지용 파이프의 양 단부에는 길이조절부가 마련된 것을 특징으로 한다.An internal support pipe is provided between the precast side forms, a connecting rod is provided to penetrate the inside of the internal support pipe, and length adjusting parts are provided at both ends of the internal support pipe.

상기 프리캐스트 측면 거푸집에는 상하방향으로 마련되는 다수 개의 파형철선이 설치되어 상기 프리캐스트 측면 거푸집의 내부면으로부터 상기 파형철선의 철부가 미리 설정된 간격 만큼 이격되어 돌출되는 것을 특징으로 한다.It is characterized in that a plurality of corrugated iron wires provided in the vertical direction are installed in the precast side formwork, and the convex part of the corrugated iron wire protrudes from the inner surface of the precast side formwork at a predetermined interval.

상기 프리캐스트 중앙 거푸집과 상기 프리캐스트 측면 거푸집 조립체의 하부는 상기 교각기둥의 상단부에 마련된 강봉 설치홀을 관통하는 강봉 설치 파이프를 통해 상기 교각기둥으로부터 돌출된 강봉의 단부에 마련된 브라켓에 안착되는 것을 특징으로 한다.The lower part of the precast central formwork and the precast side formwork assembly is seated on a bracket provided at the end of the steel rod protruding from the pier pillar through a steel rod installation pipe passing through a steel rod installation hole provided at the upper end of the pier pillar. to be

전술한 기술적 과제를 해결하기 위한 본 발명의 일 실시예에 따른 콘크리트 존치 거푸집을 이용한 교각 시공방법은, 하부판에 교각기둥 삽입공이 마련되고, 상기 하부판으로부터 연장되는 경사판과 상기 경사판으로부터 연장되는 수직판을 포함하는 프리캐스트 중앙 거푸집과 판형으로 마련되되 상기 프리캐스트 중앙 거푸집의 양 측에 결합하며 교좌면의 단차가 반영되도록 마련되는 프리캐스트 측면 거푸집을 포함하는 거푸집 조립체를 미리 마련하는 단계; 상기 교각기둥 상단부에 강봉 설치홀을 관통하는 강봉 설치 파이프를 통해 상기 교각기둥으로부터 돌출되도록 마련된 강봉의 단부에 브라켓을 마련하는 단계; 상기 브라켓에 상기 거푸집 조립체의 하부를 거치하고 전도방지공을 설치하는 단계; 및 상기 거푸집 조립체 내부에 내부철근을 배치하고 콘크리트를 타설하는 단계;를 포함한다.In order to solve the above-mentioned technical problem, a pier construction method using a concrete standing formwork according to an embodiment of the present invention is provided with a pier insertion hole in the lower plate, and an inclined plate extending from the lower plate and a vertical plate extending from the inclined plate. Preparing in advance a formwork assembly including a precast central formwork and a precast side formwork provided in a plate shape and coupled to both sides of the precast center formwork and reflecting a step difference of a seat surface; Providing a bracket at an end of a steel bar provided to protrude from the pier column through a steel bar installation pipe passing through a steel bar installation hole at an upper end of the pier column; Mounting the lower portion of the formwork assembly on the bracket and installing a fall prevention hole; and arranging internal reinforcing bars inside the formwork assembly and pouring concrete.

상기 콘크리트 타설 전에 프리캐스트로 마련된 받침블록을 미리 설정된 위치에 매립하고, 상기 받침블록은 정착철근, 앵커 설치홀 및 무수축 몰탈 설치홈이 미리 마련되는 것을 특징으로 한다.The support block prepared by precast is embedded in a preset position before the concrete pouring, and the support block is characterized in that a fixing bar, an anchor installation hole, and a non-shrink mortar installation groove are provided in advance.

본 발명에 따르면, 프리캐스트로 거푸집 조립체를 형성하고 거푸집 조립체는 존치거푸집으로 형성됨에 따라 교각 형성 후 해체가 필요없어 교각의 시공성이 획기적으로 개선되고 해체에 따른 안전사고를 미연에 방지할 수 있다.According to the present invention, since the formwork assembly is formed by precasting and the formwork assembly is formed as a remaining formwork, there is no need to dismantle after forming the piers, so the workability of the piers is dramatically improved and safety accidents due to disassembly can be prevented in advance.

또한 본 발명에 따르면 코핑부 형성시 교좌면의 단차가 선반영되도록 하여 교좌면의 단차를 반영하기 위한 추가적인 시공이 필요없어 시공성이 추가적으로 개선된다.In addition, according to the present invention, when the coping portion is formed, the step of the bridge surface is reflected in advance, so that additional construction to reflect the step of the bridge seat is not required, and workability is further improved.

도 1a는 종래기술에 따른 교각기둥의 상부에 프리캐스트로 마련되는 코핑부(를 조립하여 시공하는 것을 나타내는 개념도,
도 1b는 종래기술에 따른 거푸집 해체하는 해체 작업 중 일어날 수 있는 사고를 나타내는 개념도,
도 1c는 종래기술에 따른 교좌면의 단차를 반영하는 방법을 나타내는 개념도,
도 2는 본 발명의 실시예에 따른 콘크리트 존치거푸집을 이용한 교각이 반영된 교량의 횡단면도,
도 3은 본 발명의 실시예에 따른 프리캐스트 중앙 거푸집과 프리캐스트 측면 거푸집을 나타내는 사시도,
도 4a 및 도 4b는 본 발명의 실시예에 따른 프리캐스트 중앙 거푸집과 프리캐스트 측면 거푸집을 연결을 위한 연결부를 나타내는 개념도,
도 5는 본 발명의 실시예에 따른 프리캐스트 측면 거푸집에 파형 철선이 마련된 것을 나타내는 개념도,
도 6은 본 발명의 실시예에 따른 교각기둥 상단부를 나타내는 개념도,
도 7은 본 발명의 실시예에 따른 교각기둥의 상단부에 코핑부가 조립된 것을 나타내는 개념도이다.
Figure 1a is a conceptual diagram showing the construction by assembling the coping (precast) provided on the upper part of the pier pillar according to the prior art;
Figure 1b is a conceptual diagram showing accidents that may occur during dismantling work of dismantling formwork according to the prior art;
Figure 1c is a conceptual diagram showing a method of reflecting the step of the seat surface according to the prior art;
Figure 2 is a cross-sectional view of a bridge reflecting a pier using a concrete formwork according to an embodiment of the present invention;
3 is a perspective view showing a precast central formwork and a precast side formwork according to an embodiment of the present invention;
4a and 4b are conceptual views showing a connection part for connecting a precast central formwork and a precast side formwork according to an embodiment of the present invention;
5 is a conceptual diagram showing that corrugated wire is provided in a precast side formwork according to an embodiment of the present invention;
6 is a conceptual diagram showing the upper end of a pier column according to an embodiment of the present invention;
7 is a conceptual view showing that a coping unit is assembled at an upper end of a pier column according to an embodiment of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.Hereinafter, embodiments of the present invention will be described in detail so that those skilled in the art can easily practice with reference to the accompanying drawings. However, the present invention may be embodied in many different forms and is not limited to the embodiments described herein. And in order to clearly explain the present invention in the drawings, parts irrelevant to the description are omitted, and similar reference numerals are attached to similar parts throughout the specification.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.Throughout the specification, when a certain component is said to "include", it means that it may further include other components without excluding other components unless otherwise stated.

이하, 도면을 참조하여 본 발명에 따른 콘크리트 존치거푸집을 이용한 교각을 상세하게 설명한다.Hereinafter, with reference to the drawings, a pier using a concrete retaining formwork according to the present invention will be described in detail.

도 2는 본 발명의 실시예에 따른 콘크리트 존치거푸집을 이용한 교각이 반영된 교량의 횡단면도이고, 도 3은 본 발명의 실시예에 따른 프리캐스트 중앙 거푸집과 프리캐스트 측면 거푸집을 나타내는 사시도이며, 도 4a 및 도 4b는 본 발명의 실시예에 따른 프리캐스트 중앙 거푸집과 프리캐스트 측면 거푸집을 연결을 위한 연결부를 나타내는 개념도이고, 도 5는 본 발명의 실시예에 따른 프리캐스트 측면 거푸집에 파형 철선이 마련된 것을 나타내는 개념도이며, 도 6은 본 발명의 실시예에 따른 교각기둥 상단부를 나타내는 개념도이고, 도 7은 본 발명의 실시예에 따른 교각기둥의 상단부에 코핑부가 조립된 것을 나타내는 개념도이다. Figure 2 is a cross-sectional view of a bridge reflecting a pier using a concrete existing formwork according to an embodiment of the present invention, Figure 3 is a perspective view showing a precast central formwork and a precast side formwork according to an embodiment of the present invention, Figures 4a and 4B is a conceptual diagram showing a connection portion for connecting a precast central formwork and a precast side formwork according to an embodiment of the present invention, and FIG. 5 shows that a corrugated wire is provided in a precast side formwork according to an embodiment of the present invention. 6 is a conceptual diagram showing upper ends of piers according to an embodiment of the present invention, and FIG. 7 is a conceptual diagram showing coping parts assembled at the upper ends of piers according to an embodiment of the present invention.

본 발명에 따른 콘크리트 존치거푸집을 이용한 교각은 프리캐스트로 마련되는 거푸집들이 교각기둥에 거치되고 조립된 상태에서 거푸집 조립체 내부에 콘크리트가 타설되어 양생됨으로써 코핑부가 형성되며, 미리 마련된 받침블록 역시 타설되는 콘크리트에 의해 고정결합됨으로써 형성된다. 이때 프리캐스트로 마련되는 거푸집은 존치거푸집으로써 거푸집 조립체 내부에 콘크리트가 타설되고 양생되도록 함은 물론 제거되지 않고 그 자체로 교각의 코핑부의 일부분으로서 구조적으로 기능을 발휘하는 구조이다.In the pier using the concrete formwork according to the present invention, the concrete is poured and cured inside the formwork assembly in a state in which the forms prepared by precast are mounted on the pier pillars and assembled, and the coping part is formed, and the pre-prepared support block is also poured. It is formed by being fixedly coupled by. At this time, the formwork provided as a precast is a structure in which concrete is poured and cured inside the formwork assembly as a remaining formwork, and is not removed as well as structurally functional as a part of the coping portion of the pier itself.

본 발명에 따른 콘크리트 존치거푸집을 이용한 교각은 프리캐스트 측면 거푸집(110a, 110b), 프리캐스트 중앙 거푸집(120), 연결부(J)를 포함하며, 이들은 교각기둥(30)의 상단부에 결합하는 코핑부(100)를 형성하기 위한 것이다.The pier using the concrete formwork according to the present invention includes a precast side formwork (110a, 110b), a precast central formwork 120, and a connection portion (J), which are copings coupled to the upper end of the pier column (30). (100).

프리캐스트 중앙 거푸집(120)은 양 측면에 프리캐스트 측면 거푸집(110a, 110b)이 결합하는 것으로 전체적으로 U자형으로 형성되는 거푸집이다. 프리캐스트 중앙 거푸집(120)은 하부판(121), 경사판(125), 수직판(127)을 포함하며, 하부판(121), 경사판(125) 및 수직판(127)은 일체로 형성되고 재질은 콘크리트로 형성되는 것이 바람직하다.The precast central formwork 120 is formed in a U-shape as a whole by combining the precast side forms 110a and 110b on both sides. The precast central formwork 120 includes a lower plate 121, an inclined plate 125, and a vertical plate 127, and the lower plate 121, the inclined plate 125, and the vertical plate 127 are integrally formed and the material is concrete. It is preferable to form.

하부판(121)에는 교각기둥(30)이 삽입될 수 있도록 삽입공(123)이 마련되는 것으로, 하부판(121)은 교각기둥(30)의 상단부에 마련되는 브라켓((B1, B2, B3)에 안착되도록 형성된다.An insertion hole 123 is provided in the lower plate 121 so that the pier 30 can be inserted, and the lower plate 121 is attached to the bracket ((B1, B2, B3) provided at the upper end of the pier 30. formed to settle in.

경사판(125)은 하부판(121)으로부터 미리 설정된 경사를 가지도록 연장되어 수직판(127)에 연결되는 것이다.The inclined plate 125 extends from the lower plate 121 to have a predetermined inclination and is connected to the vertical plate 127 .

프리캐스트 측면 거푸집(110a, 110b)는 프리캐스트 중앙 거푸집(120)의 양 측에 결합하는 것으로, 판형으로 형성되고 재질은 콘크리트로 형성되는 것이 바람직하다.The precast side forms 110a and 110b are coupled to both sides of the precast central formwork 120, and are preferably formed in a plate shape and made of concrete.

프리캐스트 측면 거푸집(110a, 110b)에는 상하방향으로 마련되는 다수 개의 파형철선(S)이 설치되어 프리캐스트 측면 거푸집 본체(111a, 111b)의 내부면으로부터 파형철선(S)의 철부가 미리 설정된 간격 만큼 이격되어 돌출되도록 마련된다.A plurality of corrugated iron wires (S) provided in the vertical direction are installed in the precast side forms (110a, 110b), and the iron part of the corrugated iron wires (S) from the inner surface of the precast side formwork bodies (111a, 111b) is preset at a predetermined interval. It is provided so that it protrudes apart from each other as much as possible.

파형철선(S)은 프리캐스트 측면 거푸집(110a, 110b)과 타설될 콘크리트와의 결합을 용이하게 하기 위한 것이다.The corrugated wire (S) is to facilitate the coupling between the precast side forms (110a, 110b) and the concrete to be poured.

프리캐스트 측면 거푸집(110a, 110b)의 상부는 교좌면의 상부에 교량상부 구조물의 경사를 반영하기 위한 단차가 필요할 경우 그 단차를 반영하기 위한 단차부(113a, 113b)가 마련될 수 있다.In the upper part of the precast side forms 110a and 110b, if a step to reflect the inclination of the upper bridge structure is necessary, a step portion 113a and 113b to reflect the step may be provided on the upper part of the bridge seat surface.

단차부(113a, 113b)는 계단형으로 마련될 수 있으며, 단차부(113a, 113b)에는 받침블록(55)이 각각 형성될 수 있다.The stepped portions 113a and 113b may be provided in a stepped shape, and support blocks 55 may be formed on the stepped portions 113a and 113b, respectively.

도 2를 참조하면, 교각기둥(30)의 상부에 코핑부(100)가 마련되며, 코핑부(100)에 마련된 교량받침부(50)의 상부에 거더(60)가 거치되며, 거치된 거더(60)의 상부에 교량상부 구조물(70, 80)이 마련된다.Referring to FIG. 2, the coping part 100 is provided on the upper part of the pier pillar 30, and the girder 60 is mounted on the upper part of the bridge support part 50 provided on the coping part 100, and the mounted girder Bridge superstructures 70 and 80 are provided on top of (60).

교량받침부(50)는 거더(60)와 교량상부 구조물(70, 80)에 발생하는 하중을 코핑부(100)와 교각기둥(30)에 전달하기 위한 구성으로, 코핑부(100)에 인입되는 정착철근(57), 정착철근에 의해 지지되는 받침블럭(55), 받침블럭(55)에 교량 받침 앵커(53)와 무수축 몰탈(52)에 의해 교량받침부(50)가 마련되며 상부에 거더(60)의 하면에 거치되는 솔플레이트(51)가 형성된다.The bridge support part 50 is configured to transfer the load generated in the girder 60 and the upper bridge structures 70 and 80 to the coping part 100 and the pier 30, and is drawn into the coping part 100. The bridge supporting portion 50 is provided by the anchoring reinforcement 57, the supporting block 55 supported by the anchoring reinforcing bar, and the bridge supporting anchor 53 and the non-shrinkable mortar 52 on the supporting block 55, and the upper A sole plate 51 mounted on the lower surface of the girder 60 is formed.

받침블럭(55)은 거푸집 조립체에 콘크리트가 타설되기 전에 프리캐스트로 사전 제작되어 거푸집 조립체에 사전 매립되고, 받침블럭(55)의 하부에 정착철근(57)이 사전 부착될 수 있다. The support block 55 may be pre-fabricated as a precast before concrete is poured into the formwork assembly, pre-embedded in the formwork assembly, and anchoring bars 57 may be pre-attached to the lower portion of the support block 55.

종래의 경우 코핑부(100)의 교좌면(코핑부의 최상부면)의 경사를 위해 단차를 형성할 필요가 있을 경우, 수평으로 마련되는 교좌면에 단차를 형성하기 위한 블럭을 추가로 결합하고 그 블럭에 받침블럭을 설치해야만 하여 시공성 및 경제성이 저하되었다.In the case of the prior art, when it is necessary to form a step difference for the inclination of the bridge seat surface (top surface of the coping section) of the coping portion 100, a block for forming a step difference is additionally coupled to the bridge seat surface provided horizontally, and the block Since a support block had to be installed on the wall, workability and economic feasibility were reduced.

본 발명의 경우 코핑부를 형성하면서 교좌면에 단차가 미리 반영됨으로써 교각 형성시 시공성이 획기적으로 개선된다.In the case of the present invention, workability at the time of forming the piers is drastically improved by reflecting the level difference on the bridge seat surface in advance while forming the coping part.

연결부(J)는 프리캐스트 중앙 거푸집(120)과 프리캐스트 측면 거푸집(110a, 110b)을 연결하고, 한 쌍의 프리캐스트 측면 거푸집(110a, 110b)을 연결하도록 마련되는 것이다.The connecting portion J is provided to connect the precast central formwork 120 and the precast side forms 110a and 110b and to connect the pair of precast side forms 110a and 110b.

프리캐스트 중앙 거푸집(120)과 프리캐스트 측면 거푸집(110a, 110b)을 연결하기 위해, 프리캐스트 중앙 거푸집(120)의 양 측면에 하부판(121), 경사판(125) 및 수직판(127)의 측면(121', 125', 127')을 따라 인서트(121a, 125, 127a)가 각각 다수 개 마련된다.In order to connect the precast central formwork 120 and the precast side forms 110a and 110b, the sides of the lower plate 121, the inclined plate 125 and the vertical plate 127 are placed on both sides of the precast central formwork 120. A plurality of inserts 121a, 125, and 127a are respectively provided along portions 121', 125', and 127'.

인서트(121a, 125, 127a)는 너트형으로 마련되는 것으로, 인서트(121a, 125, 127a)의 형성 위치에 대응하도록 마련되며 프리캐스트 측면 거푸집(110a, 110b)의 둘레를 따라 다수 개 마련되는 제1 볼트홀(h1)에 삽입되어 프리캐스트 중앙 거푸집(120)과 프리캐스트 측면 거푸집(110a, 110b)을 연결한다.The inserts 121a, 125, and 127a are provided in a nut shape, and are provided to correspond to the formation positions of the inserts 121a, 125, and 127a, and are provided in plurality along the circumferences of the precast side forms 110a and 110b. It is inserted into the 1 bolt hole h1 to connect the precast central formwork 120 and the precast side forms 110a and 110b.

인서트(121a, 125, 127a)가 마련되는 프리캐스트 중앙 거푸집(120)의 양 측면(121', 125', 127')과 제1 볼트홀(h1)이 마련되는 프리캐스트 측면 거푸집(110a, 110b)의 둘레 부분에는 콘크리트 접착제를 미리 도포한 후 미리 설정된 압력의 압축력을 추가 도입하여 연결할 수 있다. 여기서 콘크리트 접착제는 에폭시 계열이 사용될 수 있다.Both side surfaces 121', 125', 127' of the precast central formwork 120 provided with inserts 121a, 125, 127a and precast side forms 110a, 110b provided with a first bolt hole h1 ) can be connected by pre-applying concrete adhesive to the circumferential portion and then introducing additional compressive force of a preset pressure. Here, an epoxy-based adhesive may be used as the concrete adhesive.

여기서 미리 설정된 압력의 압축력은 0.3MPa 이상의 압력으로 도입되되, 접합부 인근에 통공(미도시)이 형성되고 접합면에 콘크리트 접착제가 도포된 후 통공에 강봉(미도시) 혹은 결합용 볼트(미도시)를 체결하고 직각방향의 압축력이 도입되어, 프리캐스트 중앙 거푸집(120)과 프리캐스트 측면 거푸집(110a, 110b)을 결합한다. Here, the compressive force of the preset pressure is introduced at a pressure of 0.3 MPa or more, and a through hole (not shown) is formed near the joint, and after applying concrete adhesive to the joint surface, a steel rod (not shown) or a bolt for joining (not shown) is applied to the through hole. is fastened and a compressive force in a right angle direction is introduced to couple the precast central formwork 120 and the precast side forms 110a and 110b.

한 쌍의 프리캐스트 측면 거푸집(110a, 110b)을 연결하기 위해, 연결부(J)는 프리캐스트 측면 거푸집 본체(111a, 111b)의 중앙부에 다수 개로 마련되는 제2 볼트홀(h2, h3)과 양 단이 제2 볼트홀(h2, h3)을 관통하도록 형성되고 한 쌍의 프리캐스트 측면 거푸집(110a, 110b)을 수평으로 연결하는 연결봉(130)을 포함한다.In order to connect the pair of precast side forms 110a and 110b, the connection part J is provided with a plurality of second bolt holes h2 and h3 provided in the center of the precast side formwork main body 111a and 111b and both A stage is formed to pass through the second bolt holes h2 and h3 and includes a connecting rod 130 horizontally connecting the pair of precast side molds 110a and 110b.

프리캐스트 측면 거푸집 본체(111a, 111b)에 마련되는 제2 볼트홀(h2, h3)은 연결봉(130)을 삽입하여 거푸집 조립체에 타설되는 콘크리트의 타설압에 저항하기 위한 용도뿐만 아니라 프리캐스트 측면 거푸집(110a, 110b)을 운반하기 위한 고정스트럿(미도시)이 삽입되도록 할 수 있으며, 작업발판 또는 작업발판 해체 후 영구점검 시설로 기능할 수 있다.The second bolt holes h2 and h3 provided in the precast side formwork bodies 111a and 111b are used to resist the pouring pressure of the concrete poured into the formwork assembly by inserting the connecting rod 130, as well as the precast side formwork A fixed strut (not shown) for transporting (110a, 110b) can be inserted, and it can function as a permanent inspection facility after disassembling the scaffolding or scaffolding.

연결봉(130)은 도 4b의 (c)와 같이 제1 실시예로 연결봉 본체(131), 측면 거푸집 본체(111a, 111b)의 내부에서 연결봉 본체(131)를 고정하기 위한 고정 볼트(134), 측면 거푸집 본체(111a, 111b)의 외부에서 연결봉 본체(131)를 고정하기 위한 고정 볼트(133)를 포함하고 고정용 플레이트(135)가 더 마련될 수 있다.The connecting rod 130 is a connecting rod body 131 in the first embodiment as shown in (c) of FIG. 4B, a fixing bolt 134 for fixing the connecting rod body 131 inside the side formwork bodies 111a and 111b, A fixing bolt 133 for fixing the connecting rod body 131 outside the side formwork bodies 111a and 111b may be provided, and a fixing plate 135 may be further provided.

연결봉(130)은 도 4b의 (d)와 같이 제2 실시예로 제1 실시예의 구성에 추가하여, 연결봉 본체(131)가 관통할 수 있도록 프리캐스트 측면 거푸집(110a, 110b)의 사이에는 내부 지지용 파이프(137)가 마련되고, 내부 지지용 파이프(137)의 양 단부에는 길이조절부(139)가 마련될 수 있다.The connecting rod 130 is a second embodiment as shown in (d) of FIG. 4B, in addition to the configuration of the first embodiment, between the precast side molds 110a and 110b so that the connecting rod body 131 can pass through, there is an internal A pipe 137 for support is provided, and length adjusting parts 139 may be provided at both ends of the pipe 137 for internal support.

내부 지지용 파이프(137)는 다수 개의 구멍이 뚫려있는 유공관으로 마련될 수 있으며, 유공관으로 마련될 경우 거푸집 조립체에 콘크리트 타설 시 동시에 속채움되어 콘크리트와의 결합강도를 높일 뿐만 아니라 강성을 증가시킬 수 있다.The pipe 137 for internal support may be provided as a perforated pipe having a plurality of holes, and when provided as a perforated pipe, it may be simultaneously filled when concrete is poured into the formwork assembly to increase the bonding strength with the concrete as well as increase the rigidity. there is.

본 발명의 실시예에 따른 콘크리트 존치거푸집을 이용한 교각 시공방법은, 프리캐스트 중앙 거푸집(120)과 프리캐스트 측면 거푸집(110a, 110b)을 연결하여 거푸집 조립체를 미리 마련하는 단계, 교각기둥(30)의 상단부에 강봉 설치홀(h4)을 관통하는 강봉 설치 파이프(P)를 통해 교각기둥(30)으로부터 돌출되도록 마련된 강봉(33)의 단부에 브라켓(B)을 마련하는 단계, 브라켓(B)에 거푸집 조립체의 하부를 거치하고 전도방지공을 설치하는 단계, 거푸집 조립체 내부에 내부철근(미도시)을 배치하고 콘크리트를 타설하는 단계를 포함한다.A pier construction method using a concrete formwork according to an embodiment of the present invention includes the steps of preparing a formwork assembly in advance by connecting the precast central formwork 120 and the precast side formwork 110a, 110b, the pier pillar 30 Providing a bracket (B) at the end of the steel bar 33 provided to protrude from the pier 30 through the steel bar installation pipe (P) penetrating the steel bar installation hole (h4) at the upper end of the, to the bracket (B) Mounting the lower part of the formwork assembly and installing a fall prevention hole, arranging internal reinforcing bars (not shown) inside the formwork assembly and pouring concrete.

도 6과 도 7을 참조하면, 강봉 설치홀(h4)은 교각기둥(30)의 최상단부에 마련되며, 이 강봉 설치홀(h4)을 통해 강봉 설치 파이프(P)가 미리 마련되고 강봉(33)은 강봉 설치 파이프(P)를 관통한다. 강봉(33)의 단부에는 브라켓(B)이 마련된다. 강봉 설치 파이프(P)는 X자형으로 1열 또는 여러 개의 열로 마련될 수 있다.6 and 7, the steel bar installation hole h4 is provided at the uppermost end of the pier 30, and the steel bar installation pipe P is prepared in advance through the steel bar installation hole h4, and the steel bar 33 ) penetrates the steel bar installation pipe (P). A bracket (B) is provided at the end of the steel bar (33). The steel bar installation pipe (P) may be provided in one row or several rows in an X shape.

브라켓(B)은 강봉(33)의 단부가 결합하는 결합본체(B2), 결합본체(B2)의 상단에 마련되는 안착부(B1)를 포함하며, 도 7과 같이 안착부(B1)의 상부에 받침부(B3)가 마련되어 거푸집 조립체의 하부가 거치될 수 있다.The bracket (B) includes a coupling body (B2) to which the end of the steel rod 33 is coupled, and a seating portion (B1) provided on the upper end of the coupling body (B2), and the upper portion of the seating portion (B1) as shown in FIG. A support portion B3 is provided to allow the lower portion of the formwork assembly to be mounted.

교각기둥(31)의 상단으로 다수 개의 결합철근(31)이 돌출되도록 마련되어, 이 결합철근(31)은 거푸집 조립체의 내부로 삽입되어 타설되는 콘크리트와 결합한다.A plurality of coupling reinforcing bars 31 are provided to protrude from the top of the pier pillar 31, and the coupling reinforcing bars 31 are inserted into the formwork assembly and combined with concrete to be poured.

본 발명에 따르면, 프리캐스트로 거푸집 조립체를 형성하고 거푸집 조립체는 존치거푸집으로 형성됨에 따라 교각 형성 후 해체가 필요없어 교각의 시공성이 획기적으로 개선되고 해체에 따른 안전사고를 미연에 방지할 수 있다.According to the present invention, since the formwork assembly is formed by precasting and the formwork assembly is formed as a remaining formwork, there is no need to dismantle after forming the piers, so the workability of the piers is dramatically improved and safety accidents due to disassembly can be prevented in advance.

또한 본 발명에 따르면 코핑부 형성시 교좌면의 단차가 선반영되도록 하여 교좌면의 단차를 반영하기 위한 추가적인 시공이 필요없어 시공성이 추가적으로 개선된다.In addition, according to the present invention, when the coping portion is formed, the step of the bridge surface is reflected in advance, so that additional construction to reflect the step of the bridge seat is not required, and workability is further improved.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.The above description of the present invention is for illustrative purposes, and those skilled in the art can understand that it can be easily modified into other specific forms without changing the technical spirit or essential features of the present invention. will be. Therefore, the embodiments described above should be understood as illustrative in all respects and not limiting. For example, each component described as a single type may be implemented in a distributed manner, and similarly, components described as distributed may be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is indicated by the following claims rather than the detailed description above, and all changes or modifications derived from the meaning and scope of the claims and equivalent concepts should be construed as being included in the scope of the present invention. do.

30: 교각기둥
50: 교량 받침부
60: 거더
100: 코핑부
110a, 110b: 프리캐스트 측면 거푸집
120: 프리캐스트 중앙 거푸집
J: 연결부
S: 파형철선
30: pier
50: bridge support
60: girder
100: coping part
110a, 110b: precast side formwork
120: precast central formwork
J: connection
S: corrugated wire

Claims (10)

삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 하부판에 교각기둥 삽입공이 마련되고, 상기 하부판으로부터 연장되는 경사판과 상기 경사판으로부터 연장되는 수직판을 포함하는 프리캐스트 중앙 거푸집과 판형으로 마련되되 상기 프리캐스트 중앙 거푸집의 양 측에 결합하며 교좌면의 단차가 반영되도록 마련되는 프리캐스트 측면 거푸집을 포함하는 거푸집 조립체를 미리 마련하는 단계;
상기 교각기둥 상단부에 강봉 설치홀을 관통하는 강봉 설치 파이프를 통해 상기 교각기둥으로부터 돌출되도록 마련된 강봉의 단부에 브라켓을 마련하는 단계;
상기 브라켓에 상기 거푸집 조립체의 하부를 거치하고 전도방지공을 설치하는 단계; 및
상기 거푸집 조립체 내부에 내부철근을 배치하고 콘크리트를 타설하는 단계;를 포함하며,
상기 프리캐스트 중앙 거푸집과 상기 프리캐스트 측면 거푸집을 연결하고, 한 쌍의 프리캐스트 측면 거푸집을 연결하도록 마련되는 연결부;를 포함하며, 상기 연결부는, 상기 프리캐스트 중앙 거푸집의 양 측면에 상기 하부판, 상기 경사판 및 상기 수직판을 따라 다수 개 마련되는 인서트; 상기 인서트의 형성 위치에 대응하도록 마련되며 상기 프리캐스트 측면 거푸집의 둘레를 따라 다수 개 마련되는 제1 볼트홀;을 포함하며,
상기 인서트가 마련되는 상기 프리캐스트 중앙 거푸집의 양 측면과 상기 제1 볼트홀이 마련되는 상기 프리캐스트 측면 거푸집의 둘레 부분에는 콘크리트 접착제를 미리 도포한 후 미리 설정된 압력의 압축력을 추가 도입하여 연결하며,
상기 연결부는, 상기 프리캐스트 측면 거푸집의 중앙부에 다수 개로 마련되는 제2 볼트홀; 및 양 단이 상기 제2 볼트홀을 관통하도록 형성되고 한 쌍의 상기 프리캐스트 측면 거푸집을 수평으로 연결하는 연결봉;을 포함하고,
상기 연결봉은 상기 프리캐스트 측면 거푸집의 측면으로부터 미리 설정된 길이로 돌출되어 작업발판 또는 점검시설의 설치가 가능하도록 하는 연결봉 본체를 포함하고, 상기 프리캐스트 측면 거푸집에는 상하방향으로 마련되는 다수 개의 파형철선이 설치되어 상기 프리캐스트 측면 거푸집의 내부면으로부터 상기 파형철선의 철부가 미리 설정된 간격 만큼 이격되어 돌출되는 것을 특징으로 하며,
상기 콘크리트 타설 전에 프리캐스트로 마련된 받침블록을 미리 설정된 위치에 매립하고, 상기 받침블록은 정착철근, 앵커 설치홀 및 무수축 몰탈 설치홈이 미리 마련되는 것을 특징으로 하는 콘크리트 존치거푸집을 이용한 교각 시공방법.
A pier insertion hole is provided in the lower plate, and it is provided in a plate shape with a precast central formwork including an inclined plate extending from the lower plate and a vertical plate extending from the inclined plate, but coupled to both sides of the precast central formwork, and the step of the bridge seat surface Preparing in advance a formwork assembly including a precast side formwork provided to reflect the;
Providing a bracket at an end of a steel bar provided to protrude from the pier column through a steel bar installation pipe passing through a steel bar installation hole at an upper end of the pier column;
Mounting the lower portion of the formwork assembly on the bracket and installing a fall prevention hole; and
Including; arranging internal reinforcing bars inside the formwork assembly and pouring concrete;
A connection portion provided to connect the precast central formwork and the precast side formwork and to connect a pair of precast side forms, wherein the connection portion includes the lower plate and the a plurality of inserts provided along the inclined plate and the vertical plate; A first bolt hole provided to correspond to the formation position of the insert and provided in plurality along the circumference of the precast side formwork; includes,
Concrete adhesive is pre-applied to both sides of the precast central formwork where the insert is provided and the circumferential portion of the precast side formwork where the first bolt hole is provided, and then a compression force of a preset pressure is additionally introduced to connect them,
The connection part, second bolt holes provided in plurality in the central portion of the precast side formwork; And a connecting rod having both ends formed to pass through the second bolt hole and horizontally connecting the pair of the precast side forms,
The connecting rod includes a connecting rod body protruding from the side of the precast side formwork to a predetermined length to enable installation of a scaffold or inspection facility, and a plurality of corrugated wires provided in the vertical direction on the precast side formwork. It is installed and characterized in that the convex part of the corrugated wire protrudes from the inner surface of the precast side formwork by a predetermined interval,
Before the concrete pouring, the support block prepared by precast is buried in a preset position, and the support block is provided with a fixing bar, an anchor installation hole, and a non-shrinkage mortar installation groove. A pier construction method using concrete formwork, characterized in that .
삭제delete
KR1020220004236A 2022-01-11 2022-01-11 Bridge pier and the construction method using maintained concrete mold KR102477955B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220004236A KR102477955B1 (en) 2022-01-11 2022-01-11 Bridge pier and the construction method using maintained concrete mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220004236A KR102477955B1 (en) 2022-01-11 2022-01-11 Bridge pier and the construction method using maintained concrete mold

Publications (1)

Publication Number Publication Date
KR102477955B1 true KR102477955B1 (en) 2022-12-15

Family

ID=84439706

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220004236A KR102477955B1 (en) 2022-01-11 2022-01-11 Bridge pier and the construction method using maintained concrete mold

Country Status (1)

Country Link
KR (1) KR102477955B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102521105B1 (en) * 2022-12-15 2023-04-12 에스비엔지니어링 주식회사 Connected Structure of Column and Precast Coping and its Construction Method
KR102664955B1 (en) * 2023-06-22 2024-05-10 (주)렉스코 Steel composite precast piers in which concrete is synthesized on box-shaped steel coping and circular steel pipe columns, and their construction methods

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050076059A (en) * 2004-01-19 2005-07-26 최규석 Form for using construction of a pier
KR20060093092A (en) * 2006-07-31 2006-08-23 주식회사 신화 엠앤씨 The use of the bearing installation is involved the precast block and it for construction method of the bearing installation and the replacing methodof bearing installation
JP2006265992A (en) * 2005-03-25 2006-10-05 Chiyoda Engineering Consultants Co Ltd Replacing construction method to multi-functional support in existing bridge
KR200431156Y1 (en) * 2006-08-30 2006-11-15 차진이 Concrete Pier having Copping
KR20070107250A (en) * 2006-05-02 2007-11-07 한성산업(주) Coping form system and method for constructing bridge pier using thereof
KR20100070975A (en) * 2008-12-18 2010-06-28 (주)한맥기술 Assembly cross beam structure for multigirder concrete bridge and method of construction thereof
KR20110115349A (en) * 2010-04-15 2011-10-21 삼성물산 주식회사 Pier cap installation structure using precast concrete shell and construction method thereof
KR20120046424A (en) * 2010-11-02 2012-05-10 김진권 Bridge bearing for bridges and this construction technique
KR20130119699A (en) * 2012-04-24 2013-11-01 (주)대우건설 Assembly mould for modular coping
KR20150005301A (en) * 2013-07-05 2015-01-14 지에스건설 주식회사 Permanent form and construction method for coping
JP2019138004A (en) * 2018-02-07 2019-08-22 三井住友建設株式会社 Manufacturing method of precast segment
KR102187993B1 (en) * 2019-08-27 2020-12-07 에스비엔지니어링 주식회사 Prefabricated Bridge Structure and Construction Method

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050076059A (en) * 2004-01-19 2005-07-26 최규석 Form for using construction of a pier
JP2006265992A (en) * 2005-03-25 2006-10-05 Chiyoda Engineering Consultants Co Ltd Replacing construction method to multi-functional support in existing bridge
KR20070107250A (en) * 2006-05-02 2007-11-07 한성산업(주) Coping form system and method for constructing bridge pier using thereof
KR20060093092A (en) * 2006-07-31 2006-08-23 주식회사 신화 엠앤씨 The use of the bearing installation is involved the precast block and it for construction method of the bearing installation and the replacing methodof bearing installation
KR20080012122A (en) * 2006-07-31 2008-02-11 주식회사 신화 엠앤씨 The use of the bearing installation is involved the precast block and it for construction method of the bearing installation and the replacing methodof bearing installation
KR200431156Y1 (en) * 2006-08-30 2006-11-15 차진이 Concrete Pier having Copping
KR20100070975A (en) * 2008-12-18 2010-06-28 (주)한맥기술 Assembly cross beam structure for multigirder concrete bridge and method of construction thereof
KR20110115349A (en) * 2010-04-15 2011-10-21 삼성물산 주식회사 Pier cap installation structure using precast concrete shell and construction method thereof
KR20120046424A (en) * 2010-11-02 2012-05-10 김진권 Bridge bearing for bridges and this construction technique
KR20130119699A (en) * 2012-04-24 2013-11-01 (주)대우건설 Assembly mould for modular coping
KR20150005301A (en) * 2013-07-05 2015-01-14 지에스건설 주식회사 Permanent form and construction method for coping
JP2019138004A (en) * 2018-02-07 2019-08-22 三井住友建設株式会社 Manufacturing method of precast segment
KR102187993B1 (en) * 2019-08-27 2020-12-07 에스비엔지니어링 주식회사 Prefabricated Bridge Structure and Construction Method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102521105B1 (en) * 2022-12-15 2023-04-12 에스비엔지니어링 주식회사 Connected Structure of Column and Precast Coping and its Construction Method
KR102664955B1 (en) * 2023-06-22 2024-05-10 (주)렉스코 Steel composite precast piers in which concrete is synthesized on box-shaped steel coping and circular steel pipe columns, and their construction methods

Similar Documents

Publication Publication Date Title
KR102187993B1 (en) Prefabricated Bridge Structure and Construction Method
KR102477955B1 (en) Bridge pier and the construction method using maintained concrete mold
KR101810203B1 (en) Method for manufacturing of steel girder coupled with precast-concrete parts on upper flange of steel girder
KR101766807B1 (en) the rigid connection structure between precast concrete column and precast concrete girder and the rigid connection structure between precast concrete girder and precast concrete beam using the plate, the modular system using the same
KR100543969B1 (en) Composite rigid-frame bridge installing prestressed compound beam to the contral point of the slab of rigid-frame bridge and connecting the beam to the steel member installed in the upper of pole, and construction method thereof
JP2006090026A (en) Repairing/reinforcing structure of existing steel member arch bridge
JP3844743B2 (en) Box girder bridge structure and its construction method
KR101242395B1 (en) Construction method for rhamen bridge
KR101705002B1 (en) Prefabricated double composite plate girder bridge and its construction method
KR100894650B1 (en) Rahmen bridge with preflexion load and manufacturing method the same
CN113668370A (en) Prefabricated pier and construction method thereof
KR102568950B1 (en) Prefabricated Coping Structure using a Steel-Box and its Construction Method
JP3877995B2 (en) How to build a string string bridge
JPH07310304A (en) Erection method of concrete arch
KR100540625B1 (en) Constructing Method of Composite Beam Stiffened with In-Situ Concrete Panel Having Embedded Lower Flange
KR100377868B1 (en) pier construction method using Pier scaffolding
KR200343468Y1 (en) Composite rigid-frame bridge installing prestressed compound beam to the contral point of the slab of rigid-frame bridge and connecting the beam to the steel member installed in the upper of pole
JP7134133B2 (en) Bridge railing construction method
JPH07300817A (en) Concrete-filled steel pipe truss pier and construction method
JPH0434161A (en) Centrifugally molded hollow pc concrete column and column construction method
JP6710064B2 (en) Seismic isolation retrofit construction method and building construction
KR20210004289A (en) Transfer Structure Construction Method Using U-shaped Steel Girder
KR102585728B1 (en) Prestressed precast module with integrated girder and column and construction method using the same
KR100507597B1 (en) Formwork supporting apparatus for hanging type formwork system and formwork using the same
KR100588350B1 (en) Bridge slab construction method for the median strip side end of the slab and upper part bracket applied therein

Legal Events

Date Code Title Description
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant