KR102477912B1 - AI-based monitoring system for electric switchboards in apartment houses - Google Patents

AI-based monitoring system for electric switchboards in apartment houses Download PDF

Info

Publication number
KR102477912B1
KR102477912B1 KR1020220034649A KR20220034649A KR102477912B1 KR 102477912 B1 KR102477912 B1 KR 102477912B1 KR 1020220034649 A KR1020220034649 A KR 1020220034649A KR 20220034649 A KR20220034649 A KR 20220034649A KR 102477912 B1 KR102477912 B1 KR 102477912B1
Authority
KR
South Korea
Prior art keywords
door
switchboard
work
latch
operating state
Prior art date
Application number
KR1020220034649A
Other languages
Korean (ko)
Inventor
손봉상
Original Assignee
부흥감리이엔지 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 부흥감리이엔지 주식회사 filed Critical 부흥감리이엔지 주식회사
Priority to KR1020220034649A priority Critical patent/KR102477912B1/en
Application granted granted Critical
Publication of KR102477912B1 publication Critical patent/KR102477912B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R29/00Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
    • G01R29/12Measuring electrostatic fields or voltage-potential
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/52Testing for short-circuits, leakage current or ground faults
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K19/00Record carriers for use with machines and with at least a part designed to carry digital markings
    • G06K19/06Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code
    • G06K19/06009Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code with optically detectable marking
    • G06K19/06037Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code with optically detectable marking multi-dimensional coding
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K7/00Methods or arrangements for sensing record carriers, e.g. for reading patterns
    • G06K7/10Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation
    • G06K7/14Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation using light without selection of wavelength, e.g. sensing reflected white light
    • G06K7/1404Methods for optical code recognition
    • G06K7/1408Methods for optical code recognition the method being specifically adapted for the type of code
    • G06K7/14172D bar codes
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B5/00Visible signalling systems, e.g. personal calling systems, remote indication of seats occupied
    • G08B5/22Visible signalling systems, e.g. personal calling systems, remote indication of seats occupied using electric transmission; using electromagnetic transmission
    • G08B5/36Visible signalling systems, e.g. personal calling systems, remote indication of seats occupied using electric transmission; using electromagnetic transmission using visible light sources

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Electromagnetism (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Toxicology (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Emergency Management (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Patch Boards (AREA)

Abstract

The present invention relates to an artificial intelligence-based system for monitoring an electric switchboard in an apartment house, which is configured to detect and transmit an operation state of a distribution panel, including current leakage and abnormal potential, so that a manager can recognize and respond to an accident by checking the operation state via a main management system and a manager terminal, which is configured to detect and transmit an operation state of a distribution board, including current leakage and abnormal potential, and turn on and off light on the outside of a door according to the operation state, thereby allowing whether the distribution board is normal or abnormal and a state of the distribution board to be intuitively identified, and which includes a work control means to allow maintenance and repair work on the distribution board to be performed only by an approved work from an approved company, thereby preventing an unauthorized worker from arbitrarily working on the distribution board, and thus, the distribution board can be more safely maintained and managed.

Description

인공지능을 이용한 공동주택 전기 배전반 감시 시스템{AI-based monitoring system for electric switchboards in apartment houses}AI-based monitoring system for electric switchboards in apartment houses}

본 발명은 공동주택 전기 분야 기술 중에서, 인공지능을 이용한 공동주택 전기 배전반 감시 시스템에 관한 것으로, 더욱 구체적으로는 누설전류 및 이상전위를 포함한 분전반의 동작상태를 감지하여 전달하고, 이를 주관리시스템과 관리자단말에서 확인하여 관리자가 사고의 인지 및 대처가 가능하도록 하며, 누설전류 및 이상전위를 포함한 분전반의 동작상태를 감지하고 이를 도어 외측에 점등되도록 하여, 분전반 이상 여부 및 상태의 직관적인 확인 가능하도록 하고, 분전반의 유지, 보수 작업을 승인 업체의 승인 작업자만이 수행할 수 있게 하여, 비승인 작업자가 임의로 분전반에 대한 작업을 할 수 없게 함으로써 분전반을 보다 안전하게 유지, 관리할 수 있도록 한 인공지능을 이용한 공동주택 전기 배전반 감시 시스템에 관한 것이다.The present invention relates to an apartment house electric switchboard monitoring system using artificial intelligence among apartment house electric field technologies, and more specifically, detects and transmits the operating state of a distribution board including leakage current and abnormal potential, and transmits it to the main management system and It is checked on the manager terminal so that the manager can recognize and cope with the accident, and detect the operating state of the distribution panel, including leakage current and abnormal potential, and turn it on on the outside of the door to intuitively check whether there is an abnormality in the distribution panel and the status. Artificial intelligence that enables maintenance and repair of distribution panels to be carried out by approved workers only from approved companies so that non-approved workers cannot arbitrarily work on distribution panels so that the distribution panels can be maintained and managed more safely. It relates to an electrical switchboard monitoring system for multi-unit dwellings.

배전반은 전력회사, 발전소 등으로부터 전력을 공급받아 수용가 또는 부차적인 배전반에 공급하는 역할을 한다.The switchboard plays a role in receiving power from electric power companies and power plants and supplying it to customers or secondary switchboards.

이러한 배전반은 전력의 변환 및 분배를 수행하며, 각종 계측기, 변성기, 차단기, 퓨즈와 같은 설비들이 시설된다. 또한, 배전반에서 공급되는 전력은 분전반을 통해 개별 수용가 또는 분기회로로 공급되며, 이런 의미에서 분전반도 배전반에 포함된다.These switchboards convert and distribute power, and are equipped with facilities such as various instruments, transformers, breakers, and fuses. In addition, the power supplied from the switchboard is supplied to individual customers or branch circuits through the switchboard, and in this sense, the switchboard is also included in the switchboard.

분전반은 모선 또는 간선으로부터 각 분기회로가 분기되는 곳에, 각 분기회로별 스위치를 구성하여 이용된다.The distribution panel is used by configuring a switch for each branch circuit where each branch circuit is branched off from the bus or main line.

이러한 분전반은 분기회로 별, 모선 용량별, 간선 용량별로 내부 구성이 상이해지지만, 일반적으로 모선 또는 간선에 연결되는 주차단기, 주차단기의 출력단에 연결되는 버스바, 버스바에 분기 연결되는 차단기, 차단기와 각각 연결되는 분기회로로 구성된다.These distribution panels have different internal configurations for each branch circuit, bus line capacity, and main line capacity, but in general, a main circuit breaker connected to a bus or trunk line, a bus bar connected to the output terminal of the main circuit breaker, a circuit breaker branched to the bus bar, and a circuit breaker It is composed of branch circuits connected to each other.

이와 같은 분전반에는 모선 또는 간선(이하 '모선'이라 함)에서 공급되는 전력을 분배하여 공급하기 위한 회로 및 장치 외에도 각 분기회로에 접지를 제공하기 위한 접지단자가 구비된다. 이러한 접지단자는 감전 등에 의해 사고가 발생하는 것을 방지하고, 공급되는 전력의 안정된 기준을 얻고 이를 통해 전력을 효율적으로 이용할 수 있게 하는 중요한 목적으로 제공된다.In addition to circuits and devices for distributing and supplying power supplied from bus lines or main lines (hereinafter referred to as 'bus lines'), such a distribution panel is provided with ground terminals for providing ground to each branch circuit. Such a grounding terminal is provided for the important purpose of preventing an accident due to electric shock or the like, obtaining a stable standard of supplied power, and enabling efficient use of power through this.

하지만, 이러한 접지의 중요한 용도에도 불구하고 종래의 분전반 및 분기회로에서는 단순히 규정에 의해 필요한 설비로 인식하여, 회로 구성 및 이용이 이루어지고 있다. 이로 인해 접지측에 누전, 지락, 단선 사고 발생시 감지가 이루어지지 않고 있어, 사고 발생의 대처 및 방지가 곤란한 실정이다.However, in spite of the important use of such grounding, conventional distribution boards and branch circuits are simply recognized as necessary equipment by regulations, and circuit configuration and use are made. As a result, when an electric leakage, ground fault, or disconnection accident occurs on the ground side, detection is not performed, and it is difficult to cope with and prevent the occurrence of an accident.

더욱이, 각 배전반은 전력의 분배를 담당하는 주요한 시설로써, 이들의 유지 관리는 전력의 공급 및 이용에 있어서 매우 중요한 부분이 된다. 특히, 분전반, 배전반은 특정 시설물에서 설치 위치, 수량, 커버 범위가 넓은 만큼 관리의 중요도와 함께 어려움이 크게 증가한다. 때문에 분전반의 접지 사고 발생, 누전, 지락, 단선 사고 발생을 효과적으로 인지하고, 빠른 대처를 수행할 수 있는 방법의 모색이 필요한 실정이다.Moreover, each switchboard is a major facility in charge of distribution of electric power, and their maintenance becomes a very important part in supplying and using electric power. In particular, as the distribution board and switchboard have a wide installation location, quantity, and coverage in a specific facility, difficulties greatly increase along with the importance of management. Therefore, it is necessary to find a method capable of effectively recognizing the occurrence of a grounding accident, short circuit, ground fault, or disconnection accident in a distribution panel, and performing quick countermeasures.

이와 관련한 선행기술로서 대한민국 등록특허 제10-1208579호(2012.11.29.)는 "배전반 감시 및 알림 시스템과 이를 이용한 감시 및 알림 방법"은 하나 이상의 배전반으로 구성되며, 배전반 각각이 자신의 상태를 감시하여 작성된 감지값에 의해 동작상태정보를 작성하고, 상기 동작상태정보에 의해 동작상태를 판단하여 상태표시등을 통해 출력하는 배전반그룹; 상기 배전반 그룹의 배전반 각각으로부터 배전반 ID, 상기 동작상태정보 및 상기 감지값을 전달받아 출력하는 주관리시스템과 관리자단말을 포함하는 관리리스템을 포함하여 접지회로의 누설전류 및 이상전위를 감지하여 이를 관리자의 단말이나 외부 시스템에 전달함으로써, 사고의 감지 및 대처가 가능하게 한 기술을 개시하고 있다.As a prior art related to this, Korean Patent Registration No. 10-1208579 (November 29, 2012) discloses "Distribution panel monitoring and notification system and monitoring and notification method using the same" is composed of one or more switchboards, and each switchboard monitors its own state. a switchboard group that creates operating state information based on the sensed values created by doing so, determines an operating state based on the operating state information, and outputs the result through a status indicator light; A management system including a main management system that receives and outputs the switchboard ID, the operation state information, and the detected value from each switchboard of the switchboard group and a management system including a manager terminal detects the leakage current and abnormal potential of the grounding circuit and manages the leakage current Disclosed is a technique enabling detection and coping with an accident by transmitting it to a terminal or an external system.

그러나 대한민국 등록특허 제10-1208579호는 배전반의 누설전류와 이상전위를 감지하여 사고 감시 및 대처가 가능하기는 하지만 비승인 업체의 비승인 작업자가 분전반에 무단으로 접근하여 작업을 진행하는 것을 방지할 수 없어 분전함을 안전하게 유지, 관리하는 데에 미흡한 문제가 있다.However, Korean Patent Registration No. 10-1208579 detects the leakage current and abnormal potential of the switchboard to monitor and cope with accidents, but prevents unauthorized workers from unauthorized companies from accessing the switchboard without permission and proceeding with work. There is an insufficient problem in maintaining and managing the distribution box safely.

대한민국 등록특허 제10-1208579호(2012.11.29.)는 "배전반 감시 및 알림 시스템과 이를 이용한 감시 및 알림 방법"Republic of Korea Patent Registration No. 10-1208579 (2012.11.29.) "Switchboard monitoring and notification system and monitoring and notification method using the same"

따라서 본 발명의 목적은 누설전류 및 이상전위를 포함한 분전반의 동작상태를 감지하여 전달하고, 이를 주관리시스템과 관리자단말에서 확인하여 관리자가 사고의 인지 및 대처가 가능하도록 한 인공지능을 이용한 공동주택 전기 배전반 감시 시스템을 제공하려는 것이다.Therefore, an object of the present invention is to detect and transmit the operating state of the distribution board, including leakage current and abnormal potential, and confirm it in the main management system and manager terminal so that the manager can recognize and deal with accidents. It is intended to provide an electrical switchboard monitoring system.

본 발명의 다른 목적은 누설전류 및 이상전위를 포함한 분전반의 동작상태를 감지하고 이를 도어 외측에 점등되도록 하여, 분전반 이상 여부 및 상태의 직관적인 확인 가능하도록 한 인공지능을 이용한 공동주택 전기 배전반 감시 시스템을 제공하는 것이다.Another object of the present invention is to detect the operating state of the distribution panel, including leakage current and abnormal potential, and turn it on on the outside of the door, enabling intuitive confirmation of abnormality and status of the distribution panel. An electrical distribution panel monitoring system for apartment houses using artificial intelligence. is to provide

본 발명의 또 다른 목적은 분전반의 유지, 보수 작업을 승인 업체의 승인 작업자만이 수행할 수 있게 하여, 비승인 작업자가 임의로 분전반에 대한 작업을 할 수 없게 함으로써 분전반을 보다 안전하게 유지, 관리할 수 있도록 한 인공지능을 이용한 공동주택 전기 배전반 감시 시스템을 제공하려는 것이다.Another object of the present invention is to enable only approved workers of approved companies to perform maintenance and repair work on the distribution panel, so that non-approved workers cannot arbitrarily work on the distribution panel, so that the distribution panel can be more safely maintained and managed. It is intended to provide an apartment house electrical switchboard monitoring system using artificial intelligence.

본 발명은 상기와 같은 목적을 달성하기 위하여 하나 이상의 배전반으로 구성되며, 배전반 각각이 자신의 상태를 감시하여 작성된 감지값에 의해 동작상태정보를 작성하고, 상기 동작상태정보에 의해 동작상태를 판단하여 상태표시등을 통해 출력하는 배전반그룹; 상기 배전반 그룹의 배전반 각각으로부터 배전반 ID, 상기 동작상태정보 및 상기 감지값을 전달받아 출력하는 주관리시스템과 관리자단말을 포함하며, 사전에 승인된 업체의 작업자에 대해서만 작업을 허용하는 작업통제수단을 더 포함하고, 작업통제수단은 도어의 가장자리에서 후방으로 절곡되어 본체의 상하좌우면을 감싸는 절곡부와, 도어를 지지함과 아울러 개폐하는 도어개폐기구와, 도어를 잠금 및 해제하는 도어잠금기구와, 도어의 전면에 부착된 QR코드태그와, 작업통제 애플리케이션이 설치되어 도어 전면에 부착된 QR코드태그를 스캐닝하면 날짜와 업체ID를 포함하는 작업승인요청 신호가 전송되는 작업자단말과, 작업통제 애플리케이션이 설치되고 작업일자와 업체ID가 저장되어 작업자단말에서 전송된 날짜와 업체ID를 포함하는 작업승인요청 신호를 수신하여 작업승인요청 수신화면이 표시되고, 수신된 업체ID가 저장된 업체ID와 일치하면 작업승인화면이 표시됨과 아울러 작업승인신호가 전송되는 관리자단말과, 관리자단말에서 전송된 작업승인 신호를 수신하는 수신부와, 수신부에 수신된 작업승인 신호를 전달받아 도어개폐기구와 도어잠금기구를 제어하여 도어의 잠금이 해제됨과 아울러 개방되게 하는 작업통제제어부를 포함하여 구성됨을 특징으로 하는 인공지능을 이용한 공동주택 전기 배전반 감시 시스템을 제공한다.The present invention consists of one or more switchboards in order to achieve the above object. A switchboard group that outputs through a status indicator light; Work control means including a main management system and a manager terminal for receiving and outputting the switchboard ID, the operation state information, and the detection value from each switchboard of the switchboard group, and allowing work only for workers of previously approved companies Further, the operation control means includes a bent portion that is bent backward from the edge of the door and surrounds the upper, lower, left and right surfaces of the main body, a door opening and closing mechanism that supports and opens and closes the door, a door locking mechanism that locks and unlocks the door, and When the QR code tag attached to the front of the door and the work control application are installed and the QR code tag attached to the front of the door is scanned, a worker terminal that transmits a work approval request signal including the date and company ID, and the work control application is installed, the work date and company ID are stored, and the work approval request signal including the date and company ID transmitted from the worker terminal is received, and the work approval request reception screen is displayed, and if the received company ID matches the stored company ID The work approval screen is displayed, and the manager terminal to which the work approval signal is transmitted, the receiver to receive the work approval signal transmitted from the manager terminal, and the door opening/closing mechanism and the door locking mechanism are controlled by receiving the work approval signal received by the receiver. Provided is an apartment house electrical switchboard monitoring system using artificial intelligence, characterized in that it includes a work control unit that allows the door to be unlocked and opened as well.

본 발명의 인공지능을 이용한 공동주택 전기 배전반 감시 시스템에 의하면, 누설전류 및 이상전위를 포함한 분전반의 동작상태를 감지하여 전달하고, 이를 주관리시스템과 관리자단말에서 확인하여 관리자가 사고의 인지 및 대처가 가능하게 된다.According to the electrical switchboard monitoring system for apartment houses using artificial intelligence of the present invention, the operating state of the distribution board, including leakage current and abnormal potential, is detected and transmitted, and it is confirmed in the main management system and manager terminal so that the manager recognizes and copes with the accident. becomes possible

또한 본 발명의 인공지능을 이용한 공동주택 전기 배전반 감시 시스템에 의하면, 누설전류 및 이상전위를 포함한 분전반의 동작상태를 감지하고 이를 도어 외측에 점등되도록 하여, 분전반 이상 여부 및 상태의 직관적인 확인 가능하게 된다.In addition, according to the apartment house electric switchboard monitoring system using artificial intelligence of the present invention, the operating state of the distribution board including leakage current and abnormal potential is detected and turned on on the outside of the door, enabling intuitive confirmation of abnormality and status of the distribution board. do.

또한 본 발명의 인공지능을 이용한 공동주택 전기 배전반 감시 시스템에 의하면, 작업통제수단을 구비하여, 분전반의 유지, 보수 작업을 승인 업체의 승인 작업자만이 수행할 수 있게 하여, 비승인 작업자가 임의로 분전반에 대한 작업을 할 수 없게 함으로써 분전반을 보다 안전하게 유지, 관리할 수 있게 된다.In addition, according to the electric switchboard monitoring system for apartment complexes using artificial intelligence of the present invention, a work control means is provided so that only approved workers of approved companies can perform maintenance and repair work of the switchboard, so that non-approved workers can arbitrarily control the switchboard. It is possible to maintain and manage the distribution panel more safely by making it impossible to work on it.

도 1 내지 도 5는 본 발명에 의한 인공지능을 이용한 공동주택 전기 배전반 감시 시스템의 바람직한 제1 실시예를 보인 것으로,
도 1은 본 실시예에 따른 배전반 감시 및 알림 시스템의 구성을 도시한 구성예시도,
도 2는 본 실시예에 따른 개별 분전반의 구성을 도시한 구성예시도,
도 3은 본 실시예에 따른 분전반의 외부형태를 도시한 사시도,
도 4는 본 실시예에 따른 분전반 감시 및 알림 방법을 설명하기 위한 순서도,
도 5는 배전반 각각의 동작상태 감지 및 알림 방법을 설명하기 위한 도면이고,
도 6 내지 도 12는 본 발명에 의한 인공지능을 이용한 공동주택 전기 배전반 감시 시스템의 바람직한 제2 실시예를 보인 것으로,
도 6은 본 실시예에 따른 배전반 감시 및 알림 시스템의 구성을 도시한 구성예시도,
도 7은 본 실시예에 따른 개별 분전반의 구성을 도시한 구성예시도,
도 8은 본 실시예에 따른 분전반의 외부형태를 도시한 예시도,
도 9는 도어개폐기구와 도어잠금기구의 분해사시도,
도 10은 도어의 닫힘 및 잠금 상태를 보인 횡단 평면도,
도 11은 도어의 잠금해제 및 열림위치로 이동 상태를 보인 횡단 평면도,
도 12는 도어가 열린 상태를 보인 횡단면도이다.
1 to 5 show a first preferred embodiment of an apartment house electric switchboard monitoring system using artificial intelligence according to the present invention,
1 is a configuration example showing the configuration of a switchboard monitoring and notification system according to this embodiment;
2 is a configuration example showing the configuration of an individual distribution board according to this embodiment;
3 is a perspective view showing an external form of a distribution board according to this embodiment;
4 is a flowchart for explaining a distribution board monitoring and notification method according to this embodiment;
5 is a diagram for explaining a method of detecting and notifying an operating state of each switchboard;
6 to 12 show a preferred second embodiment of the apartment house electrical switchboard monitoring system using artificial intelligence according to the present invention,
6 is a configuration example showing the configuration of a switchboard monitoring and notification system according to this embodiment;
7 is a configuration example showing the configuration of an individual distribution board according to this embodiment;
8 is an exemplary view showing an external form of a distribution board according to this embodiment;
9 is an exploded perspective view of a door opening and closing mechanism and a door locking mechanism;
10 is a transverse plan view showing a closed and locked state of the door;
11 is a transverse plan view showing a state in which the door is unlocked and moved to an open position;
12 is a cross-sectional view showing a door in an open state;

이하, 본 발명에 의한 인공지능을 이용한 공동주택 전기 배전반 감시 시스템을 첨부도면에 예시한 바람직한 실시예에 따라서 상세히 설명한다.Hereinafter, an apartment house electric switchboard monitoring system using artificial intelligence according to the present invention will be described in detail according to preferred embodiments illustrated in the accompanying drawings.

도 1 내지 도 5는 본 발명에 의한 인공지능을 이용한 공동주택 전기 배전반 감시 시스템의 바람직한 제1 실시예를 보인 것이다.1 to 5 show a first preferred embodiment of the electric switchboard monitoring system for apartment houses using artificial intelligence according to the present invention.

본 실시예에 따른 인공지능을 이용한 공동주택 전기 배전반 감시 시스템은 배전반그룹(1501)과 관리시스템(1502)을 포함하여 구성되고, 관리시스템(1502)은 주관리시스템(1503)과 관리자단말(1504)을 포함하여 구성된다.The apartment house electric switchboard monitoring system using artificial intelligence according to this embodiment is composed of a switchboard group 1501 and a management system 1502, and the management system 1502 includes a main management system 1503 and a manager terminal 1504 ) is composed of.

배전반그룹(1501)은 외부에서 공급되는 전력을 수용측에 공급하는 역할을 한다. 이 배전반그룹(1501)은 한국전력과 같은 외부 전력 공급원으로부터 공급되는 전력을 변환 및 분배하여 수용측에 공급한다.The switchboard group 1501 serves to supply power supplied from the outside to the receiving side. The switchboard group 1501 converts and distributes power supplied from an external power supply source such as Korea Electric Power Corporation (KEPCO) and supplies it to the receiving side.

이를 위해 배전반그룹(1501)은 도시된 바와 같이 수배전반(1530), 배전반(1520) 및 분전반(1510)을 포함하여 구성된다.To this end, the switchboard group 1501 includes a switchboard receiving switchboard 1530, a switchboard 1520, and a switchboard 1510, as shown.

여기서, 수배전반(1530), 배전반(1520) 및 분전반(1510) 중 일부는 생략되어 구성될 수도 있다.Here, some of the switchboard 1530, the switchboard 1520, and the switchboard 1510 may be omitted.

수배전반(1530)은 외주 전력 공급원으로부터 공급되는 전력을 변환하여 배전반(1520)에 분배한다. 배전반(1520)은 수배전반(1530)으로부터 공급되는 전력을 할당된 분전반(1510)에 분배하여 공급한다.The switchboard 1530 converts power supplied from an external power supply source and distributes it to the switchboard 1520 . The switchboard 1520 distributes and supplies the power supplied from the switchboard 1530 to the assigned switchboard 1510 .

분전반(1510)은 각 배전반(1520)을 통해 공급되는 전력을 복수의 분기회로에 공급하는 역할을 한다.The distribution board 1510 serves to supply power supplied through each distribution board 1520 to a plurality of branch circuits.

이러한 배전반그룹(1501)은 도시된 바와 같이 복수로 구성될 수 있으며, 하나의 시설물 또는 단지에 광범위하게 분산되어 설치될 수 있다. 여기서, 본 실시예에서는 배전반그룹(1501)이 하나의 건물에 설치된 예를 도시하였으나, 이로써 본 발명을 한정하는 것은 아니다.As illustrated, a plurality of switchboard groups 1501 may be configured, and may be widely distributed and installed in one facility or complex. Here, in this embodiment, an example in which the switchboard group 1501 is installed in one building is illustrated, but this is not intended to limit the present invention.

이하에서는 배전반그룹(1501)의 수배전반(1530), 배전반(1520) 및 분전반(1510) 각각을 지칭함에 있어서 "배전반(1520)"이라고 통칭되기도 할 것이다.Hereinafter, in referring to each of the switchboard 1530, the switchboard 1520, and the switchboard 1510 of the switchboard group 1501, it will be collectively referred to as "the switchboard 1520".

이와 같은 배전반그룹(1501)은 배전반그룹(1501)에 속한 수배전반(1530), 배전반(1520) 및 분전반(1510) 각각은 통작상태를 감지하고, 감지결과를 통해 동작상태를 판단하여 상태표시등(641)을 통해 표시함과 아울러 배전반 각각의 ID와 각각의 동작상태 정보를 감지값과 함께 관리시스템(1502)에 전달한다.In such a switchboard group 1501, each of the switchboard receiving switchboard 1530, the switchboard 1520, and the switchboard 1510 belonging to the switchboard group 1501 detects the operation state, and determines the operation state through the detection result, and displays the status indicator ( 641) and transmits each ID of the switchboard and each operation state information together with the detected values to the management system 1502.

이러한 배전반그룹(1501)의 배전반들은 각각의 동작상태, 온도, 전위차(또는 전압차), 누설전류, 차단기 트립여부, 전력량 사용에 따른 동작상태를 개별적으로 판단하여 표시함과 아울러 표시결과를 감지값과 함께 관리시스템(1502)에 전달하게 된다.The switchboards of the switchboard group 1501 individually determine and display the operating state according to each operating state, temperature, potential difference (or voltage difference), leakage current, whether the circuit breaker is tripped, and the amount of power used, and displays the display result as a detected value. It is transmitted to the management system 1502 together with.

특히, 배전반그룹(1501)의 각 배전반은 전력이 도통되는 배선부와 접지단자의 전위차를 비교하여 동작상태를 판단하게 된다. 특히, 각 배전반은 배선부 중 중성선과 접지단자의 전위차를 비교하여 동작상태를 판단한다. 이러한 배선부와 중성선의 비교에 대해서는 분전반의 예를 통해 하기에서 후술하기로 한다.In particular, each switchboard of the switchboard group 1501 determines an operating state by comparing a potential difference between a wiring part through which electric power is conducted and a ground terminal. In particular, each switchboard determines an operating state by comparing a potential difference between a neutral wire and a ground terminal among wiring units. A comparison between the wiring unit and the neutral wire will be described below through an example of a distribution panel.

관리시스템(1502)은 배전반그룹(1501) 각각의 배전반들로부터 전달받는 배전반 ID, 동작상태 정보 및 감지값을 출력하여, 사용자에게 각 배전반들의 동작상태를 제공한다.The management system 1502 outputs the switchboard ID, operating state information, and detected values received from each switchboard in the switchboard group 1501, and provides the user with the operating state of each switchboard.

특히, 관리시스템(1502)은 표시장치를 통해 각 배전반들이 상태표시등(641)을 통해 표시하는 것과 같은 이미지를 제공하며, 각 배전반의 실제 위치를 반영하여 동작상태를 표시하게 된다.In particular, the management system 1502 provides the same image that each switchboard displays through the status indicator lamp 641 through the display device, and reflects the actual position of each switchboard to display the operating state.

아울러 관리자가 각 배전반을 선택하는 경우 관리시스템(1502)은 전달받은 감지값을 출력하여, 관리자가 배전반의 정확한 상태정보를 확인할 수 있게 한다. In addition, when the manager selects each switchboard, the management system 1502 outputs the received sensing value so that the manager can check the accurate state information of the switchboard.

관리시스템(1502)은 주관리시스템(1503)과 관리자단말(1504)을 포함하여 구성된다. The management system 1502 includes a main management system 1503 and a manager terminal 1504.

주관리시스템(1503)은 컴퓨터 단말과 같이 일정 장소에 설치되는 시스템일 수 있으며, 관리자단말(1504)은 스마트폰 또는 피디에이와 같은 휴대용 단말일 수 있다.The main management system 1503 may be a system installed in a certain place, such as a computer terminal, and the manager terminal 1504 may be a portable terminal such as a smart phone or a PDA.

도 2는 본 실시예에 따른 개별 배전반의 구성을 도시한 구성예시도이다.2 is a configuration example showing the configuration of an individual switchboard according to the present embodiment.

도 2를 참조하면, 본 실시예에 따른 배전반은 배전부(10), 감시부(60) 및 케이스(미도시)를 포함하여 구성된다.Referring to FIG. 2 , the switchboard according to the present embodiment includes a power distribution unit 10, a monitoring unit 60, and a case (not shown).

여기서, 케이스는 하기의 도 3을 참조하여 좀 더 상세히 설명하기로 한다.Here, the case will be described in more detail with reference to FIG. 3 below.

배전부(10)는 모배선(111)을 통해 공급되는 전력을 분기회로에 공급하기 위한 복수의 차단기(120), 복수의 부스바(130) 및 부스바 지지대(140)를 포함하여 구성된다. 모배선(111)은 케이스를 관통하여 내부로 인입되며, 주차단기(121)의 입력측(121i)에 연결된다. 그리고 주차단기(121)의 출력측(121e)에는 모선부스바(131)가 구성된다.The power distribution unit 10 includes a plurality of circuit breakers 120 for supplying power supplied through the main wire 111 to a branch circuit, a plurality of busbars 130, and a busbar support 140. The mother wire 111 passes through the case and is led inside, and is connected to the input side 121i of the main circuit breaker 121. In addition, a bus bar 131 is formed on the output side 121e of the main circuit breaker 121.

여기서 본 실시예에서는 차단기(120)의 부스바(130)로 구성된 소형 배전반 또는 분전반을 예로 들어 설명하지만, 대형 배전반에서도 동일하게 적용될 수 있다. 이 경우 차단기(120), 부스바(130) 외에도 계기용 변성기, 전력용 퓨즈, 연결 케이블, 계측기 등이 더 구성될 수 있으나, 본 실시예에서는 설명의 편의를 위해 도 2의 소형 배전반을 예로 들어 설명한다.Here, in this embodiment, a small switchboard or distribution board composed of the busbar 130 of the circuit breaker 120 is described as an example, but the same can be applied to a large switchboard. In this case, in addition to the circuit breaker 120 and the bus bar 130, an instrument transformer, a power fuse, a connecting cable, and a measuring instrument may be further configured. However, in this embodiment, for convenience of explanation, the small switchboard of FIG. Explain.

또한 본 실시예에서 배전반은 외부 또는 전력 공급측에서 공급되는 전력을 변환 또는 무변환하여 하나 이상의 수용측에 전달하는 시설을 의미하며, 수배전반, 배전반, 분전반, 모터제어반 및 옥내 차단기함을 포함한다.In addition, in this embodiment, the switchboard refers to a facility that converts or does not convert power supplied from the outside or the power supply side and transmits it to one or more receiving sides, and includes a switchboard, a switchboard, a switchboard, a motor control panel, and an indoor circuit breaker box.

모선부스바(131)에는 모선부스바(131)와 교차하도록 자선부스바(132)가 결합되며, 자선부스바(132)의 종단은 분기차단기(122)의 입력측(122i)에 연결된다. 아울러 모선부스바(131)는 일측 종단이 주차단기(121)의 출력측(121e)에 연결되고, 타측 종단이 부스바 지지대(140)에 결합된다.The bus bar 132 is coupled to the bus bar 131 so as to cross the bus bar 131, and the end of the bus bar 132 is connected to the input side 122i of the branch circuit breaker 122. In addition, one end of the bus bar 131 is connected to the output side 121e of the main breaker 121, and the other end is coupled to the bus bar support 140.

이러한 배전부(10)의 모배선(111)은 3상 4선(Y) 전력이 각 상(R,S,T,N) 별로 각각의 모배선(111)을 통해 공급된다. 이로 인해 모선부스바(131)는 각 상(R,S,T,N) 별로 구성된다.In the main wiring 111 of the power distribution unit 10, 3-phase 4-line (Y) power is supplied through each of the main wirings 111 for each phase (R, S, T, N). As a result, the bus bar 131 is configured for each phase (R, S, T, N).

분기차단기(122) 및 분기선로(112)는 자선부스바(132)에 의해 각 상(R,S,T,N) 별 모선부스바(131) 중 두 개 또는 세 개의 모선부스바(131)에 선택적으로 연결된다. 한편, N상(중성선) 모선부스바(131)에는 중성단자(150)가 연결된다.The branch breaker 122 and the branch line 112 are two or three busbars 131 among the busbars 131 for each phase (R, S, T, N) by the charity busbar 132 optionally connected to Meanwhile, the neutral terminal 150 is connected to the N-phase (neutral line) busbar 131.

또한 케이스 내부에는 접지단자(160)가 별도로 마련되며, 접지단자(160)는 케이스 또는 별도의 연결수단에 의해 대지와 연결된다. 아울러 접지단자(160)는 분기회로의 접지선로(미도시)와 연결된다.In addition, a ground terminal 160 is separately provided inside the case, and the ground terminal 160 is connected to the ground by a case or a separate connection means. In addition, the ground terminal 160 is connected to a ground line (not shown) of the branch circuit.

여기서, 본 실시예의 상세한 설명에서는 옥내형 소형 분전반을 위주로 설명을 진행하지만, 이로써 본 발명을 한정하는 것은 아니다. 전술한 바와 같이 본 발명에서 분전반은 옥내용, 옥외요 분전반 외에도, 배전반, 배전반에 포함되는 분전반을 모두 포함하는 의미로 사용된다.Here, in the detailed description of the present embodiment, the description is conducted mainly on the indoor type small distribution board, but this does not limit the present invention. As described above, in the present invention, the distribution board is used in the sense of including all of the distribution boards included in the distribution board, in addition to the indoor and outdoor distribution boards.

감지부(60)는 배전부(10)의 상태를 감시하고, 감시결과에 따라 동작상태를 판단하며, 판단결과에 따라 표시부 또는 통신부(650)를 통해 사용자에게 동작상태를 알리는 역할을 한다.The sensing unit 60 monitors the state of the power distribution unit 10, determines the operating state according to the monitoring result, and informs the user of the operating state through the display unit or the communication unit 650 according to the determination result.

구체적으로, 감시부(60)는 배전부(10)와 접지(GND) 간의 전위차, 온도를 감지하며, 누설전류, 차단기의 트립 여부 및 활선부, 특히 모선부스바(131)에 의해 공급되는 전력량을 감지한다.Specifically, the monitoring unit 60 detects the potential difference between the power distribution unit 10 and the ground (GND), the temperature, leakage current, whether or not the circuit breaker is tripped, and the amount of power supplied by the live part, particularly the bus bar 131. detect

그리고 감지결과를 이용하여 동작상태를 판단하고, 판단된 동작상태를 표시부(640)를 통해 표시함과 아울러 관리시스템(1502)에 전달한다. 이때, 감시부(60)는 배전부(10)에 부여된 ID와 함께 감지값과 동작상태정보를 관리시스템(1502)에 함께 전달하게 된다.Then, the operating state is determined using the detection result, and the determined operating state is displayed through the display unit 640 and transmitted to the management system 1502. At this time, the monitoring unit 60 transmits the ID assigned to the power distribution unit 10 together with the detected value and operation status information to the management system 1502 .

이를 위해 감시부(60)는 감지부(610), 비교부(620), 제어부(630), 표시부(640) 및 통신부(650)를 포함하여 구성된다.To this end, the monitoring unit 60 includes a detection unit 610, a comparison unit 620, a control unit 630, a display unit 640, and a communication unit 650.

접지단자(160)와 모선부스바(131) 중 N상 모선부스바(131N) 각각과 연결되어 접지단자(160)와 N상 모선부스바(131N)의 전위를 감지하고, 감지된 전위값을 비교부(620)에 전달한다.It is connected to each of the N-phase busbars 131N of the ground terminal 160 and the busbar 131 to sense the potential of the ground terminal 160 and the N-phase busbar 131N, and the detected potential value It is transmitted to the comparator 620.

감지부(610)는 온도센서(611)와 연결되어 온도센서(611)를 통해 측정된 분전반 내부의 온도, 활선부를 구성하는 차단기(120), 선로(110 : 111, 112), 부스바(130)의 온도값을 전달받아 비교부(620)에 제공한다.The sensing unit 610 is connected to the temperature sensor 611 and includes the temperature inside the distribution panel measured through the temperature sensor 611, the circuit breaker 120 constituting the live part, the lines 110: 111, 112, and the bus bar 130. ) is received and provided to the comparator 620 .

이외에도 감지부(610)는 누설전류 감지센서를 통해 누설전류를 감지하거나 차단기(120)의 트립을 감지하여 감지결과를 비교부(620)에 전달한다.In addition, the detection unit 610 detects leakage current through a leakage current detection sensor or tripping of the circuit breaker 120 and transmits a detection result to the comparator 620 .

여기서 감지부(610)는 접지단자(160)와 N상 모선부스바(131N) 뿐만 아니라 R상, S상, T상 모선부스바(131R, 131S, 131T)의 전위값도 감지하여 비교부(620)에 전달할 수 있다.Here, the sensing unit 610 detects potential values of not only the ground terminal 160 and the N-phase busbar 131N but also the R-phase, S-phase, and T-phase busbars 131R, 131S, and 131T, and the comparison unit ( 620) can be forwarded.

이를 위해 감지부(610)는 점선 표시와 같이 R상, S상, T상 모선부스바(131R, 131S, 131T)와 연결될 수 있으나, 이로써 본 발명을 한정하는 것은 아니다. 아울러 감지부(610)는 상별 순시전력을 측정하여 비교부(620)에 전달할 수 있다.To this end, the sensing unit 610 may be connected to the R-phase, S-phase, and T-phase busbars 131R, 131S, and 131T as indicated by the dotted line, but this is not intended to limit the present invention. In addition, the sensing unit 610 may measure the instantaneous power for each phase and transmit it to the comparator 620 .

비교부(620)는 감지부(610)로부터 전달되는 감지값과 미리 정해진 임계값을 비교하여 비교결과를 제어부(630)에 전달한다.The comparison unit 620 compares the detected value transmitted from the detection unit 610 with a predetermined threshold value and transmits the comparison result to the control unit 630 .

여기서 감지값은 모선부스바(131)와 접지단자(160)의 전위값(또는 전압), 측정온도, 누설전류 여부 및 누설전류 값, 차단기(120) 트립 여부 및 트립된 차단기 정보와 상별 순시전력을 포함한다.Here, the detected value is the potential value (or voltage) of the bus bar 131 and the ground terminal 160, the measured temperature, leakage current and leakage current value, whether the circuit breaker 120 is tripped, tripped circuit breaker information, and instantaneous power for each phase. includes

이와 같이 감지값이 전달되면 비교부(620)는 각각의 감지값을 대응되는 임계값과 비교한다.When the detected values are transmitted in this way, the comparator 620 compares each detected value with a corresponding threshold value.

구체적으로, 비교부(620)는 접지단자(160)와 N상 모선부스바(131N)의 측정전압 또는 전위값을 비교하여, 접지단자(160)와 N상 모선부스바(131N) 간의 전위차를 산출하고, 산출된 전위차가 임계값에서 지정한 범위 이내인지의 여부를 판단한다.Specifically, the comparator 620 compares the measured voltage or potential value between the ground terminal 160 and the N-phase bus bar 131N to determine the potential difference between the ground terminal 160 and the N-phase bus bar 131N. It is calculated, and it is determined whether or not the calculated potential difference is within the range specified by the threshold value.

일예로, 본 실시예에서는 접지단자(160)와 N상 모선부스바(131N) 간의 전위차가 30V 이상인 경우 위험상황인 것으로 판단하여, 표시부(640), 통신부(650)를 통해 공지된다.For example, in this embodiment, when the potential difference between the ground terminal 160 and the N-phase busbar 131N is 30V or more, it is determined that the situation is dangerous and is notified through the display unit 640 and the communication unit 650.

즉, 30V가 접지단자(160)와 N상 모선부스바(131N) 간 전위차의 임계값이 된다.That is, 30V becomes the threshold of the potential difference between the ground terminal 160 and the N-phase busbar 131N.

마찬가지로, 접지단자(160)와 R상, S상, T상 모선부스바(131R, 131S, 131T) 간의 전위차를 비교할 수 있다. 다만, 차이점은 N상 모선부스바(131N)의 경우 정상상황에서는 전압이 0인 상이기 때문에 접지단자(160)와 미리 설정된 값, 예를 들어 30V의 차이 유무를 판단하지만, R상, S상, T상 모선부스바(131R, 131S, 131T)의 경우 교류전압이 인가되고 있으므로 이때의 임계값은 상전압+설정값, 즉 220V 또는 120V ㅁ 30V가 된다.Similarly, potential differences between the ground terminal 160 and the R, S, and T phase busbars 131R, 131S, and 131T can be compared. However, the difference is that in the case of the N-phase busbar 131N, since the voltage is 0 in normal circumstances, it is determined whether there is a difference between the ground terminal 160 and a preset value, for example, 30V, but the R phase and the S phase , In the case of T-phase busbars 131R, 131S, and 131T, AC voltage is applied, so the threshold at this time is phase voltage + set value, that is, 220V or 120V ㅁ 30V.

이와 같은 방법으로 비교부(620)는 모선부스바(131)와 접지단자(160), 온도, 전력량을 미리 정해진 임계값과 비교하고, 비교결과를 제어부(630)에 전달하게 된다. 여기서 임계값은 구간별로 지정될 수 있으며, 정상, 주의, 위험을 나타내도록 사용자에 의해 적절히 구분될 수 있다.In this way, the comparison unit 620 compares the bus bar 131, the ground terminal 160, the temperature, and the amount of power with a predetermined threshold value, and transmits the comparison result to the control unit 630. Here, the threshold may be designated for each section, and may be appropriately classified by the user to indicate normal, caution, and danger.

일예로, 전위차는 0V 내지 5V미만은 정상, 5V 이상 20V 미만은 주의, 20V 이상이면 위험으로 인식하도록 할 수 있다. 전력량이나 온도의 경우 임계값의 60% 미만이면 정상, 60% 이상 80% 미만이면 주의, 80% 이상이면 위험으로 구분할 수 있다. 또한 온도의 경우도 전위차와 마찬가지로 임계값을 여러 개의 온도구간으로 구분할 수 있다.For example, a potential difference between 0V and less than 5V may be recognized as normal, 5V or more and less than 20V as caution, and more than 20V as danger. In the case of power consumption or temperature, if less than 60% of the critical value is normal, if it is more than 60% and less than 80%, it can be classified as caution, and if it is more than 80%, it can be classified as dangerous. Also, in the case of temperature, the threshold value can be divided into several temperature ranges like the potential difference.

이러한 구간의 구분은 일예로 제시된 것이며, 사용자에 의해 변경될 수 있다.The division of this section is presented as an example, and may be changed by the user.

제어부(630)는 비교부(620)를 통해 전달되는 감지값과 임계값의 비교결과에 따라 배전반의 상태를 판단하고, 판단결과에 따라 표시부(640) 및 통신부(650)를 제어하여, 배전반의 상태를 표시하게 된다.The control unit 630 determines the state of the switchboard according to the comparison result of the detected value and the threshold value transmitted through the comparator 620, and controls the display unit 640 and the communication unit 650 according to the determination result, status will be displayed.

이러한 제어부(630)는 미리 정해진 임계값에 따른 구간별로 표시부(640)와 통신부(650)를 제어하게 된다.The control unit 630 controls the display unit 640 and the communication unit 650 for each section according to a predetermined threshold value.

구체적으로, 제어부(630)는 표시부(640)의 점등색, 점멸, 밝기를 조절하여 상태에 따른 직관적인 확인이 가능하게 하며, 통신부(650)를 통해 문자서비스, 비상신호 전송, 감지값 전송과 같은 지능을 수행하게 된다.Specifically, the control unit 630 adjusts the lighting color, blinking, and brightness of the display unit 640 to enable intuitive confirmation according to the state, and through the communication unit 650, text service, emergency signal transmission, detection value transmission and perform the same intelligence.

표시부(640)는 제어부(630)의 제어에 의해 점등하여 배전반의 상태를 표시하게 된다. 이 표시부(640)는 케이스에 설치되어 외부로는 점등, 점멸, 색조절 및 밝기 조절에 의해 배전반의 상태를 표시한다.The display unit 640 is turned on under the control of the control unit 630 to display the state of the switchboard. This display unit 640 is installed in the case and displays the state of the switchboard externally by turning on, blinking, adjusting color and adjusting brightness.

구체적으로, 표시부(640)는 정상, 주의 및 위험에 따라 색을 구분하여 점등되거나 점멸 기능을 부가하여 배전반의 상태를 표시하게 된다.Specifically, the display unit 640 lights up by classifying colors according to normal, caution, and danger, or displays the state of the switchboard by adding a blinking function.

표시부(640)의 제어를 위해 제어부(630)는 상술한 감지값, 즉 접지단자(160)와 N상 모선부스바(131N)의 전위차, 접지단자(160)와 R상, S상, T상 모선부스바(131R, 131S, 131T)의 전위차, 배전반 내부 온도, 누설전류 여부, 전력량에 따라 점등색, 점멸, 밝기를 조절하게 된다.To control the display unit 640, the control unit 630 controls the above-mentioned sensed values, that is, the potential difference between the ground terminal 160 and the N-phase bus bar 131N, the ground terminal 160 and the R-phase, S-phase, and T-phase. The lighting color, blinking, and brightness are adjusted according to the potential difference of the busbars 131R, 131S, and 131T, the internal temperature of the switchboard, leakage current, and the amount of power.

구체적으로, 감지값이 미리 정해진 각 구간, 즉 정상, 주의 및 위험에 따라 각각 녹색, 황색 및 적색으로 점등되게 하고, 그 정도에 따라 점멸을 부가하여 상태를 비교적 정교하면서 직관적 인식이 가능하게 표시할 수 있다.Specifically, the detection value is turned on in green, yellow, and red according to each predetermined section, that is, normal, caution, and danger, respectively, and blinking is added according to the degree to display the state relatively sophisticatedly and intuitively. can

통신부(650)는 제어부(630)의 제어에 따라 관리시스템(1502)과 통신채널을 형성하고, 통신채널을 통해 배전반의 감지결과를 전송한다.The communication unit 650 establishes a communication channel with the management system 1502 under the control of the control unit 630 and transmits the detection result of the switchboard through the communication channel.

구체적으로, 통신부(650)는 유무선 인터넷 망, 이동통신 전화망, 전력선 통신, 유무선 데이터 통신망을 이용하여 관리시스템(1502)과 통신채널을 형성한다.Specifically, the communication unit 650 forms a communication channel with the management system 1502 using a wired/wireless internet network, a mobile communication/telephone network, a power line communication, or a wire/wireless data communication network.

그리고 통신부(650)는 통신채널을 통해 배전반의 ID, 배전반의 동작상태 및 감지값을 전달한다.And the communication unit 650 transmits the ID of the switchboard, the operating state of the switchboard, and the detected values through a communication channel.

여기서 배전반의 동작상태를 전달하는 이유는 배전반 별로 용량, 구성 등이 상이할 수 있기 때문에 동일한 감지값을 가지더라도 각 배전반 별로 다른 상태일 수 있기 때문이다.Here, the reason why the operation state of the switchboard is transmitted is that each switchboard may be in a different state even if it has the same detected value because the capacity, configuration, etc. may be different for each switchboard.

따라서 이러한 각 배전반의 상태는 각 배전반에서 판단하여 관리시스템(1502)에는 배전반의 동작상태와 ID, 부가적으로 감지값을 전달하게 된다.Therefore, the state of each switchboard is determined by each switchboard, and the operating state, ID, and additionally detected values of the switchboard are transmitted to the management system 1502.

아울러 통신부(650)는 관리시스템(1502)과 별도로 문자를 전송하거나, 상태를 알리는 각종 정보를 미리 정해진 방식, 예를 들어 문자메시지 등을 이용하여 미리 정해진 수순에 의해 관리자의 단말에 전달할 수 있으나, 이로써 본 발명이 한정하는 것은 아니다.In addition, the communication unit 650 may transmit text messages separately from the management system 1502 or transmit various types of information informing the status to the manager's terminal according to a predetermined procedure using a predetermined method, for example, a text message. The present invention is not limited thereto.

도 3은 본 실시예에 따른 배전반의 외부형태를 도시한 예시도이다.3 is an exemplary view showing the external shape of the switchboard according to the present embodiment.

도 3을 참조하면, 본 실시예에 따른 배전반은 폐쇄형 박스 형태의 케이스(90)를 이용하여 내부 활선부를 외부와 격리하고, 내부에 배전부(10) 및 감시부(60)를 설치하는 데에 이용된다.Referring to FIG. 3 , the switchboard according to the present embodiment uses a case 90 in the form of a closed box to isolate an internal live wire from the outside and install a power distribution unit 10 and a monitoring unit 60 therein. is used for

이러한 배전반의 케이스(90)는 본체(91)와 도어(92)로 구성되며, 도어(92)를 통해 정비, 점검시 케이스(90)를 개방하여 내부 구성물을 관리자가 직접 접할 수 있도록 구성된다.The case 90 of this switchboard is composed of a main body 91 and a door 92, and is configured so that a manager can directly access the internal components by opening the case 90 through the door 92 during maintenance and inspection.

케이스(90)의 본체(91)에는 차단기(120), 선로(110), 부스바(130)가 설치되며, 감시부(60)가 설치될 수 있다.A circuit breaker 120, a line 110, and a bus bar 130 may be installed in the main body 91 of the case 90, and a monitoring unit 60 may be installed.

여기서 감시부(60)는 도어(92)에 설치될 수 있으며, 설치 위치에 의해 본 발명을 한정하는 것은 아니다.Here, the monitoring unit 60 may be installed on the door 92, and the present invention is not limited by the installation location.

본체(91)에는 도시된 바와 같이 모배선(111)을 케이스(90) 내부로 인입하기 위한 인입구(94)가 형성된다. 인입구(94)를 통해 인입된 모배선(111)은 주차단기(121)에 연결된다. 여기서 인입구(94)의 형태 및 위치는 도시된 바에 의해 한정되는 것은 아니며, 모배선(111)의 수, 규격, 용량, 시공 방향, 분기선로(112)의 수, 위치 등에 따라 상이해질 수 있다. 아울러 인입구(94)만이 도시되어 있으나, 분기선로(112)의 인출을 위한 인출구(미도시)가 별도로 형성될 수 있다.As shown in the main body 91, an inlet 94 for introducing the bus wire 111 into the case 90 is formed. The main wire 111 introduced through the inlet 94 is connected to the main circuit breaker 121. Here, the shape and location of the inlet 94 is not limited to the one shown, and may vary depending on the number, standard, capacity, construction direction, number and location of the branch lines 112, and the like of the mother wires 111. In addition, although only the inlet 94 is shown, an outlet (not shown) for withdrawing the branch line 112 may be formed separately.

아울러 이러한 본체(91)는 내부의 차단기(120), 부스바(130)를 고정하기 위한 지지대의 역할을 하며, 이를 위한 별도의 플레이트를 더 포함하여 구성될 수 있다.In addition, the main body 91 serves as a support for fixing the circuit breaker 120 and the bus bar 130 therein, and may further include a separate plate for this purpose.

그리고 도어(92)에는 감시부(60)가 설치될 수 있으며, 특히 표시부(640)가 설치될 수 있다. 이 표시부(640)는 도어(92)의 외측에 구성되는 상태표시등(641)과, 내측에 설치되는 점검등에 의해 구성될 수 있으며,도어(92)의 내측 또는 본체(91)에 설치되는 감시부(60)의 제어부(630)와 연결된다. 이러한 표시부(640)에 대해서는 하기에서 좀 더 상세히 설명하기로 한다.In addition, a monitoring unit 60 may be installed in the door 92, and in particular, a display unit 640 may be installed. This display unit 640 may be composed of a status indicator lamp 641 configured on the outside of the door 92 and an inspection lamp installed on the inside, and a monitor installed on the inside of the door 92 or the main body 91. It is connected to the control unit 630 of the unit 60. The display unit 640 will be described in more detail below.

표시부(640)는 분전반(1510)의 상태를 외부에서 직관적으로 확인할 수 있도록 하기 위한 상태표시등(641)과 작업자가 분전반(1510) 내부를 별도의 점검등 없이도 확인할 수 있도록 조명 역할을 하는 점검등(642) 및 인체감지센서(643)를 포함하여 구성된다.The display unit 640 includes a status indicator light 641 for intuitively checking the state of the distribution board 1510 from the outside and an inspection light serving as lighting so that a worker can check the inside of the distribution board 1510 without a separate inspection light. 642 and a human body sensor 643.

이 표시부(640)는 제어부(630)의 제어에 의해 배전반의 상태에 따라 상태표시등(641)이 다른 색으로 점등되어 외부에서 분전반(1510)의 상태를 직관적으로 확인할 수 있게 한다. In this display unit 640, the status indicator lamp 641 is turned on in different colors according to the state of the switchboard under the control of the control unit 630 so that the state of the switchboard 1510 can be intuitively checked from the outside.

또한 인체감지센서(643)가 구성될 수 있으며, 인체감지센서(643)에 의해 관리자의 배전반 접근 여부를 감지하고, 감지결과를 제어부(630)에 전달하여 표시부(640)의 점등을 제어할 수 있게 한다. 그리고 도어(92)의 개폐에 따라 제어부(630)의 제어에 의해 점검등(642)을 점등 또는 소등하게 된다.In addition, a human body sensor 643 may be configured, and by the human body sensor 643, it is possible to detect whether a manager is approaching a switchboard, and transmit the detection result to the control unit 630 to control the lighting of the display unit 640. let it be In addition, the inspection light 642 is turned on or off by the control of the control unit 630 according to the opening and closing of the door 92 .

이러한 표시부(640)는 제어부(630)의 제어에 따라 경고음을 출려하는 스피커(미도시)를 포함하여 구성될 수 있다. The display unit 640 may include a speaker (not shown) for outputting a warning sound under the control of the control unit 630 .

인체감지센서(643)는 인체로부터 나오는 적외선 파장, 동작에 따른 반향 등을 감지하여 설정 거리 내에 작업자 또는 관리자가 감지되는지를 감지하여 동작 감지정보를 작성하고, 작성된 정보를 제어부(630)에 전달한다. 이러한 인체감지센서(643)는 PIR(Passive Infrared Sensor) 또는 모션센서일 수 있으나, 이로써 본 발명을 한정하는 것은 아니다.The human body detection sensor 643 detects infrared wavelengths emitted from the human body, echoes according to motions, and the like, detects whether a worker or manager is detected within a set distance, creates motion detection information, and transmits the created information to the control unit 630. . The human body sensor 643 may be a PIR (Passive Infrared Sensor) or a motion sensor, but the present invention is not limited thereto.

한편, 표시부(640)는 상태표시등(641)과 점검등(642)이 도어(92) 또는 본체(91)의 벽면을 관통하여 서로 다른 면에 노출되도록 설치된다.Meanwhile, the display unit 640 is installed so that the status indicator light 641 and the inspection light 642 pass through the door 92 or the wall surface of the main body 91 and are exposed on different surfaces.

상태표시등(641)과 점검등(642)은 서로 다른 면에 노출되도록 일체형으로 구성되는데 상태표시등(641)은 케이스(90)의 외부에서 확인이 용이하도록 설치되고, 점검등(642)은 분전반(1510)의 내부를 조명할 수 있게 분전반(1510) 내부를 향하여 설치된다.The status indicator light 641 and the inspection light 642 are integrally configured to be exposed on different sides. The status indicator light 641 is installed to facilitate confirmation from the outside of the case 90, and the inspection light 642 is It is installed toward the inside of the distribution board 1510 so that the interior of the distribution board 1510 can be illuminated.

여기서 상태표시등(641)의 램프는 다색 광을 발광할 수 있는 소자로 구성된다.Here, the lamp of the status indicator light 641 is composed of an element capable of emitting multi-color light.

일예로, 상태표시등(641)의 램프는 적, 녹, 청의 삼색 엘이디로 구성될 수 있다. 이 상태표시등(641)은 제어부(630)의 제어에 따라 삼색 엘이디의 광을 조합하여 상태에 따라 적색으로부터 황색, 황색으로부터 청색으로 변화하는 조명을 연출하게 된다.For example, the lamp of the status indicator light 641 may be composed of red, green, and blue three-color LEDs. The status indicator light 641 combines the light of the three-color LED under the control of the control unit 630 to produce lighting that changes from red to yellow and from yellow to blue according to the state.

점검등(642)은 도어(92)가 개방되면 이를 감지한 제어부(630)의 제어에 의해 점등되어 작업자 또는 관리자가 야간에도 분전반(1510) 내부를 용이하게 확인할 수 있게 한다.When the door 92 is opened, the inspection light 642 is turned on under the control of the control unit 630 that detects the door 92 being opened so that a worker or manager can easily check the inside of the distribution panel 1510 even at night.

도 4는 본 실시예에 따른 배전반 감시 및 알림 방법을 설명하기 위한 순서도이다.4 is a flowchart for explaining a method for monitoring and notifying a switchboard according to the present embodiment.

도 4를 참조하면, 본 실시예에 따른 배전반 감시 및 알림 방법은 동작상태 감지단계(S10), 동작상태 결정단계(S20), 정보전달단계(S30) 및 전달정보 출력단계(S40)를 포함하여 구성된다.Referring to FIG. 4, the switchboard monitoring and notification method according to the present embodiment includes an operating state detection step (S10), an operating state determination step (S20), an information transmission step (S30), and a transmission information output step (S40). It consists of

동작상태 감지단계(S10)는 각각의 배전반에서 수행되며, 배전반의 감시부(60)가 배전부(10)의 동작상태를 감지하여 감지값을 획득하는 단계이다.The operating state detection step (S10) is performed in each switchboard, and is a step in which the monitor 60 of the switchboard detects the operating state of the switchboard 10 and obtains a detected value.

이 동작상태 감지단계(S10)에서 감시부(60)는 배전부(10)의 온도, 모선부스바(131)를 흐르는 전력량, 접지단자(160)와 모선부스바(131) 간의 전위차, 차단기 트립 여부, 트립된 차단기, 누설전류를 감지하게 된다.In this operation state detection step (S10), the monitoring unit 60 measures the temperature of the power distribution unit 10, the amount of power flowing through the bus bar 131, the potential difference between the ground terminal 160 and the bus bar 131, and the circuit breaker trip. It detects whether or not, tripped breaker, and leakage current.

동작상태 결정단계(S20)에서 감시부(60)는 감지값과 미리 정해진 임계값을 비교하여 배전반의 동작상태를 정상, 주의, 위험으로 구분하게 된다.In the operation state determination step (S20), the monitoring unit 60 compares the detected value with a predetermined threshold value and classifies the operation state of the switchboard into normal, caution, and danger.

이때 임계값은 온도, 전력량, 전위차, 누설전류, 트립 여부에 따라 각각 정해지게 되며, 감시부(60)는 임계값과 감지값을 비교하여 동작상태를 결정하게 된다. 예를 들어 전위차는 전압 구간을 나누고, 온도나 전력량은 최대 전력 대비 현재 온도의 비율로, 누설전류는 누설전류의 유무를 통해, 차단기 트립 여부는 트립된 차단기의 수를 통해 동작상태를 결정하게 된다.At this time, the threshold value is determined according to the temperature, the amount of power, the potential difference, the leakage current, and tripping, and the monitoring unit 60 compares the threshold value with the detected value to determine the operating state. For example, the potential difference divides the voltage interval, the temperature or power amount is the ratio of the current temperature to the maximum power, the leakage current is determined by the presence or absence of leakage current, and the circuit breaker trip is determined by the number of tripped circuit breakers. .

정보전달단계(S30)에서는 각 배전반은 관리시스템(1502)과 통신채널을 형성하고, 통신채널을 통해 동작상태 결정단계(S20)에서 결정된 동작상태 정보를 배전반이 구분을 위한 ID 정보와 함께 전달하게 되며, 부가적으로 감지값을 전달하게 된다.In the information transmission step (S30), each switchboard forms a communication channel with the management system 1502, and the switchboard transmits the operation state information determined in the operation state determination step (S20) together with ID information for classification through the communication channel. and additionally transmits the sensed value.

전달정보 출력단계(S40)는 배전반 ID, 동작상태 정보 및 감지값을 전달받은 관리시스템(1502)이 각 ID 별로 동작상태를 출력하여 관리자에게 제공하는 단계이다.The transmission information output step (S40) is a step in which the management system 1502, which has received the switchboard ID, operation state information, and detected value, outputs the operation state for each ID and provides the information to the manager.

이 전달정보 출력단계(S40)에서 관리시스템(1502)은 배전반 각각으로부터 제공받은 동작상태 정보를 통해 동일한 동작상태를 표시하게 된다. 이를 통해 배전반 각각에서 출력되는 정보와 관리시스템(1502)에 출력되는 정보가 달라지는 것을 방지하며, 여러 종류의 분전반(1510), 배전반(1520)을 구성함에 있어서의 정보처리 혼선을 최소화하기 위한 방법이다.In this transmission information output step (S40), the management system 1502 displays the same operating state through the operating state information provided from each switchboard. This prevents the information output from each switchboard from being different from the information output to the management system 1502, and is a method for minimizing information processing confusion in configuring various types of switchboards 1510 and 1520. .

또한 전달정보 출력단계(S40)에서는 관리시스템(1502)은 각 배전반의 위치를 실제 위치에 근사화하고, 이에 따라 배전반 ID를 적용하여 표시하게 함으로써 관리자가 이상이 발생한 배전반을 쉽게 발견하여 조치할 수 있도록 하게 된다. 아울러 정보전달 출력단계(S40)에서 관리시스템(1502)에 전달되는 정보는 주관리시스템(1503)과 관리자단말(1504)에 전단되게 된다.In addition, in the step of outputting the delivery information (S40), the management system 1502 approximates the location of each switchboard to the actual location, and displays the switchboard ID by applying the switchboard ID accordingly, so that the manager can easily find and take action on the switchboard with an error. will do In addition, the information transmitted to the management system 1502 in the information transmission output step (S40) is sheared to the main management system 1503 and the manager terminal 1504.

도 5는 배전반 각각의 동작상태 감지 및 알림 방법을 설명하기 위한 도면이다.5 is a diagram for explaining a method of detecting and notifying an operating state of each switchboard.

도 5는 참조하면, 배전반 각각의 동작상태 감지 및 알림 방법은 동작상태 감지 단계(S100), 동작상태 판단단계(S200), 동작상태 표시단계(S300) 및 정보전달단계(S400)를 포함하여 구성된다.Referring to FIG. 5, the method for detecting and notifying the operating state of each switchboard includes an operating state detection step (S100), an operating state determination step (S200), an operating state display step (S300), and an information transmission step (S400). do.

동작상태 감지단계(S100)에서 배전반은 감시부(60)가 배전부(10)의 동작상태를 감지하여 감지값을 획득하는 단계이다.In the operating state detection step (S100), the switchboard is a step in which the monitoring unit 60 detects the operating state of the power distribution unit 10 and obtains a detected value.

이 동작상태 감지단계(S100)에서 감시부(60)는 배전부(10)의 온도, 모선부스바(131)를 흐르는 전력량, 접지단자(160)와 모선부스바(131) 간의 전위차, 차단기 트립 여부, 트립된 차단기, 누설전류를 감지하게 된다.In this operation state detection step (S100), the monitoring unit 60 measures the temperature of the power distribution unit 10, the amount of power flowing through the bus bar 131, the potential difference between the ground terminal 160 and the bus bar 131, and the circuit breaker trip. It detects whether or not, tripped breaker, and leakage current.

동작상태 판단단계(S200)에서는 감지값과 미리 정해진 임계값을 비교하여 배전반의 동작상태를 정상, 주의 및 위험으로 구분하게 된다.In the operating state determination step (S200), the operating state of the switchboard is classified into normal, caution, and danger by comparing the detected value with a predetermined threshold value.

이때 임계값은 온도, 전력량, 전위차, 누설전류, 트립 여부에 따라 각각 정해지게 되며, 감시부(60)는 임계값과 감지값을 비교하여 동작상태를 결정하게 된다. 구체적으로 전위차를 이용하여 동작상태를 판단하는 경우 감시부(10)는 감지값이 임계값의 60%이상 인지의 여부를 판단하는 단계(S211), 감지값이 임계값의 80% 이상인지를 판단하는 단계(S212)를 수행한다. 이를 통해, 감시부(10)는 임계값과 감지값의 비교를 통해 정상, 주의 및 위험단계를 구분하여 동작상태를 판단하게 된다.At this time, the threshold value is determined according to the temperature, the amount of power, the potential difference, the leakage current, and tripping, and the monitoring unit 60 compares the threshold value with the detected value to determine the operating state. Specifically, when determining the operating state using the potential difference, the monitoring unit 10 determines whether the detected value is 60% or more of the threshold value (S211), and determines whether the detected value is 80% or more of the threshold value The step (S212) is performed. Through this, the monitoring unit 10 determines the operating state by dividing the normal, caution, and dangerous stages through comparison between the threshold value and the detected value.

그리고 동작상태 표시단계(S300)에서 판단된 동작상태에 따라 감시부(60)가 표시부(640)를 제어하여 점등 색, 점멸, 밝기를 조절하여 동작상태를 표시하게 된다.In addition, the monitoring unit 60 controls the display unit 640 according to the operating state determined in the operating state display step (S300) to display the operating state by adjusting the lighting color, blinking, and brightness.

정보전달단계(S400)에서 감시부(60)는 관리자단말(1504) 및 주관리시스템(1503)과 통신채널을 형성하여 배전반 ID, 동작상태 정보 및 감지값을 전달하게 되고, 주관리시스템(1503)과 관리자단말(1504)은 전달받은 정보를 출력하여 관리자에게 제공하게 된다.In the information transmission step (S400), the monitoring unit 60 forms a communication channel with the manager terminal 1504 and the main management system 1503 to transmit the switchboard ID, operation state information, and detected values, and the main management system 1503 ) and the manager terminal 1504 output the received information and provide it to the manager.

도 6 내지 도 13은 본 발명에 의한 인공지능을 이용한 공동주택 전기 배전반 감시 시스템의 바람직한 제2 실시예를 보인 것이다.6 to 13 show a preferred second embodiment of the electric switchboard monitoring system for apartment houses using artificial intelligence according to the present invention.

도 6을 참조하면, 본 실시예에 따른 인공지능을 이용한 공동주택 전기 배전반 감시 시스템은 상술한 제1 실시예의 배전반그룹(1501), 관리시스템(1502), 배전부(10)와 감시부(60)를 포함하며, 이에 더하여 사전에 승인된 업체의 작업자에 대해서만 작업을 허용하는 작업통제수단(700)을 더 포함한다.Referring to FIG. 6 , the electric switchboard monitoring system for an apartment house using artificial intelligence according to this embodiment includes the switchboard group 1501, the management system 1502, the power distribution unit 10, and the monitoring unit 60 of the first embodiment described above. ), and, in addition to this, further includes a work control means 700 that allows work only for workers of approved companies in advance.

배전반그룹(1501), 관리시스템(1502), 배전부(10)와 감시부(60)는 상술한 제1 실시예에서와 동일하므로 이하의 설명에서 제1 실시예를 참조하기로 한다.Since the switchboard group 1501, the management system 1502, the power distribution unit 10, and the monitoring unit 60 are the same as in the above-described first embodiment, the first embodiment will be referred to in the following description.

작업통제수단(700)은 도어(92)가 관리자단말(1504)에서의 신호에 의해서만 잠금해제 및 개방이 가능하게 하여 사전 승인 업체의 작업자에 대해서는 작업을 허용하고, 비승인 업체의 작업자에 대해서는 작업을 허용하지 않는 것이다.The work control means 700 allows the door 92 to be unlocked and opened only by a signal from the manager terminal 1504, allowing work for workers of pre-approved companies, and working for workers of non-approved companies. is to not allow

작업통제수단(700)은 도어(92)의 가장자리에서 후방으로 절곡되어 본체(91)의 상하좌우면을 감싸는 절곡부(710)와, 도어(92)를 지지함과 아울러 개폐하는 도어개폐기구(720)와, 도어(92)를 잠금 및 해제하는 도어잠금기구(730)와, 도어(92)의 전면에 부착된 QR코드태그(740)와, 작업통제 애플리케이션이 설치되어 도어(92) 전면에 부착된 QR코드태그(740)를 스캐닝하면 날짜와 업체ID를 포함하는 작업승인요청 신호가 전송되는 작업자단말(750)과, 작업통제 애플리케이션이 설치되고 작업일자와 업체ID가 저장되어 작업자단말(750)에서 전송된 날짜와 업체ID를 포함하는 작업승인요청 신호를 수신하여 작업승인요청 수신화면이 표시되고, 수신된 업체ID가 저장된 업체ID와 일치하면 작업승인화면이 표시됨과 아울러 작업승인신호가 전송되는 관리자단말(1504)과, 관리자단말(1504)에서 전송된 작업승인 신호를 수신하는 수신부(760)와, 수신부(760)에 수신된 작업승인 신호를 전달받아 도어개폐기구(720)와 도어잠금기구(730)를 제어하여 도어의 잠금이 해제됨과 아울러 개방되게 하는 작업통제제어부(770)를 포함한다.The operation control means 700 includes a bent portion 710 that is bent backward from the edge of the door 92 and wraps around the top, bottom, left and right surfaces of the main body 91, and a door opening and closing mechanism that supports and opens and closes the door 92 ( 720), a door locking mechanism 730 for locking and unlocking the door 92, a QR code tag 740 attached to the front of the door 92, and a work control application installed on the front of the door 92 When the attached QR code tag 740 is scanned, a worker terminal 750 to which a work approval request signal including a date and a company ID is transmitted, and a work control application are installed, and the work date and company ID are stored, and the worker terminal 750 ) receives the work approval request signal including the date and company ID sent from ), the work approval request reception screen is displayed, and if the received company ID matches the stored company ID, the work approval screen is displayed and the work approval signal is transmitted A manager terminal 1504, a receiving unit 760 receiving the work approval signal transmitted from the manager terminal 1504, and receiving the work approval signal received by the receiving unit 760, the door opening/closing mechanism 720 and the door lock It includes an operation control unit 770 that controls the mechanism 730 to unlock and open the door.

도어(92)는 절곡부(710)가 본체(91)의 상하좌우면을 감싸게 되어 있으므로 닫힌 상태에서는 절곡부(710)가 본체(91)에 걸리게 되므로 여닫이식으로 열리지 않게 된다.Since the bent part 710 of the door 92 surrounds the upper, lower, left, and right surfaces of the body 91, in the closed state, the bent part 710 is caught by the body 91, so that it cannot be opened in a casement manner.

도 6에서는 도시하지는 않았으나 도어(92)의 전면에는 상태표시등(641)이 설치되고, 안쪽 면에는 점검등(642)이 설치됨은 물론이다.Although not shown in FIG. 6 , a status indicator light 641 is installed on the front surface of the door 92 and an inspection light 642 is installed on the inner surface.

도어개폐기구(720)는 본체(91)의 내부 일측에 전후방향으로 이동 가능하게 설치되는 도어지지대(721)와, 도어지지대(721)와 도어(92)의 일측 사이에 부착되는 경첩(723)과, 도어지지대(721)를 절곡부(710)가 본체(91)의 전면보다 전방에 위치하는 열림위치와, 절곡부(710)가 본체(91)의 상하좌우면을 감싸는 닫힘위치로 이동시키는 솔레노이드(725)를 포함한다.The door opening/closing mechanism 720 includes a door support 721 installed to be movable forward and backward on one side of the body 91, and a hinge 723 attached between the door support 721 and one side of the door 92. And, the door support 721 is moved to an open position in which the bent part 710 is located in front of the front of the main body 91 and a closed position in which the bent part 710 surrounds the upper, lower, left and right surfaces of the main body 91 Solenoid 725 is included.

도어지지대(721)를 전후방향으로 이동 가능하게 설치하기 위하여 본체(91)의 내부 상하측에 형성된 레일편(722)을 용접에 의해 고정 설치하여 본체(91)의 측벽과 레일편(722) 사이에 형성되는 안내홈에 도어지지대(721)의 상하단부를 삽입할 수 있다.In order to install the door support 721 to be movable in the forward and backward directions, rail pieces 722 formed on the inside of the main body 91 are fixed by welding and installed between the side wall of the main body 91 and the rail piece 722. It is possible to insert the upper and lower ends of the door support 721 into the guide groove formed therein.

경첩(723)은 두 개의 경첩편이 경첩핀으로 연결된 통상적인 경첩이 사용되며, 한쪽 경첩편이 도어지지대(721)에 고정되고 다른 쪽 경첩편이 도어(92)에 고정된다.As the hinge 723, a conventional hinge having two hinge pieces connected by a hinge pin is used, and one hinge piece is fixed to the door support 721 and the other hinge piece is fixed to the door 92.

경첩(723)은 도어(92)에 고정함에 있어서는 직접 도어(92)에 고정할 수도 있으나, 보강을 위하여 도어(92)에 경첩고정편(724)을 용접으로 고정하고, 이 경첩고정편(724)에 경첩(723)을 고정할 수 있다.The hinge 723 may be directly fixed to the door 92 when fixed to the door 92, but for reinforcement, the hinge fixing piece 724 is fixed to the door 92 by welding, and the hinge fixing piece 724 ) can be fixed to the hinge 723.

여기서 도시예에서는 도어지지대(721)는 본체(91)의 내부 우측에 설치하고, 경첩(723)을 도어지지대(721)와 도어(92)의 우측에 고정하여 도어(92)가 우측으로 열리는 경우에 대하여 도시하고 있으나, 도어(92)가 좌측으로 열리는 경우, 도어지지대(721)는 본체(91)의 내부 좌측에 설치하고, 경첩(723)을 도어지지대(721)와 도어(92)의 좌측에 고정하면 된다.In the illustrated example, the door support 721 is installed on the inside right side of the main body 91, and the hinge 723 is fixed to the door support 721 and the right side of the door 92 to open the door 92 to the right. , but when the door 92 is opened to the left, the door support 721 is installed on the inside left side of the main body 91, and the hinge 723 is installed between the door support 721 and the left side of the door 92. should be fixed to

솔레노이드(725)는 전원이 인가되지 않으면 작동봉(726)이 자체 내장된 스프링에 의해 후방으로 후퇴하고, 전원이 인가되면 영구자석과 전자석의 자력에 의해 전방으로 전진하는 형식의 것을 사용한다.The solenoid 725 uses a type in which the actuating rod 726 retreats backwards by a built-in spring when power is not applied, and moves forward by the magnetic force of a permanent magnet and an electromagnet when power is applied.

작동봉(726)은 도어지지대(721)에서 절곡된 연결편(727)에 결합할 수 있다.The operating rod 726 may be coupled to the connecting piece 727 bent in the door support 721 .

작동봉(726)과 연결편(727)은 나사에 의해 결합될 수 있는바 이에 대해서는 도시를 생략한다.The operating rod 726 and the connection piece 727 may be coupled by screws, and illustration is omitted for this.

도어잠금기구(730)는 본체(91)의 내부 타측(도어지지대와 반대측)에 고정되는 래치모터(731)와, 래치모터축(732)에 고정되는 래치(733)와, 래치(733)에 대응하여 도어(92)에 설치되며 래치(733)가 끼워져 걸리는 래치홈(736)을 가지는 래치걸이(735)를 포함한다.The door locking mechanism 730 includes a latch motor 731 fixed to the other inner side of the main body 91 (opposite to the door support), a latch 733 fixed to the latch motor shaft 732, and a latch 733. Correspondingly, it includes a latch holder 735 installed on the door 92 and having a latch groove 736 into which the latch 733 is fitted.

래치(733)에는 래치모터축(732)에 결합하기 위한 보스부(734)가 형성된다.A boss portion 734 for coupling to the latch motor shaft 732 is formed on the latch 733 .

래치모터축(732)과 보스부(734)는 래치모터축(732)과 보스부(734)의 보스공을 반달형 단면으로 형성하고, 보스공의 평면부 측에서 보스부(734)에 형성된 나사홀에 셋스크루(미도시)를 체결하여 래치모터축(732)의 평면부에 조여지게 하는 것에 의하여 헛돌지 않게 하게 결합할 수 있다.In the latch motor shaft 732 and the boss portion 734, the boss hole of the latch motor shaft 732 and the boss portion 734 is formed in a half-moon cross-section, and a screw formed on the boss portion 734 at the flat side of the boss hole. By fastening a set screw (not shown) to the hole and tightening the flat part of the latch motor shaft 732, it can be coupled so that it does not spin.

래치걸이(735)에는 래치(733)가 끼워져 걸리는 래치홈(736)이 형성된다.A latch groove 736 in which the latch 733 is inserted is formed in the latch holder 735 .

래치모터(731)는 본체(91)의 내부 측면에 직접 고정할 수 있으나, 보강을 위하여 본체(91)의 내부 측면에 모터장착판(737)을 용접으로 고정하고, 이 모터장착판(737)에 래치모터(731)를 고정할 수 있다.The latch motor 731 can be directly fixed to the inner side of the main body 91, but for reinforcement, a motor mounting plate 737 is fixed to the inner side of the main body 91 by welding, and the motor mounting plate 737 The latch motor 731 may be fixed to

QR코드테그(740)는 배전반그룹(1501)이 광범위하게 분사되어 복수로 설치된 경우 각 지역의 배전반그룹ID가 포함되어 작업자단말(750)에서 작업승인요청 신호가 전송되어 관리자단말(1504)에서 수신하였을 때 지역별 배전반그룹(1501)을 구분할 수 있게 된다.The QR code tag 740 includes the switchboard group ID of each region when a plurality of switchboard groups 1501 are widely distributed and installed, and a work approval request signal is transmitted from the worker terminal 750 and received by the manager terminal 1504 When this is done, the switchboard group 1501 for each region can be distinguished.

작업통제 애플리케이션은 사전에 작업자단말(750)과 관리자단말(1504)에 설치할 수 있으며, 작업자단말(750)의 경우 QR코드테그(740)를 스캐닝하였을 때 설치되도록 할 수도 있다.The task control application may be installed in the worker terminal 750 and the manager terminal 1504 in advance, and in the case of the worker terminal 750, it may be installed when the QR code tag 740 is scanned.

작업자단말(750)에 설치되는 작업통제 애플리케이션은 실행되었을 때 QR코드테그(740)를 스캐닝할 수 있는 화면이 표시되고 별도의 터치 조작 없이도 곧바로 스캐닝이 진행되도록 할 수 있다.When the job control application installed on the worker terminal 750 is executed, a screen capable of scanning the QR code tag 740 is displayed, and scanning can proceed immediately without a separate touch manipulation.

관리자단말(1504)에 설치되는 작업통제 애플리케이션은 직접 실행시킬 수도 있으며, 작업자단말(750)로부터 작업승인요청 신호가 수신되었을 때 실행되어 관리자단말(1504)에 작업승인요청 알림화면이 표시될 수 있다.The job control application installed in the manager terminal 1504 may be directly executed, and may be executed when a job approval request signal is received from the worker terminal 750, and a job approval request notification screen may be displayed on the manager terminal 1504. .

이때, 작업승인요청 알림화면에는 날짜와 업체ID를 포함하는 작업승인요청 정보가 표시되어 작업정보가 확인되게 할 수 있다.At this time, work approval request information including a date and a company ID is displayed on the work approval request notification screen, so that work information can be confirmed.

아울러 알림화면에는 작업승인버튼이 함께 표시되어 작업승인버튼이 터치되면 작업승인 신호가 송출된다.In addition, a work approval button is displayed on the notification screen, and a work approval signal is transmitted when the work approval button is touched.

또한 작업승인요청 신호와 함께 배전반그룹ID가 함께 수신되는 경우, 관리자가 배전반그룹(1501)도 함께 확인할 수 있게 된다.In addition, when the switchboard group ID is received together with the work approval request signal, the manager can also check the switchboard group 1501 together.

또한 관리자단말(1504)에서 전송되는 작업승인 신호는 통신부(650)를 통해 주관리시스템(1503)에도 전달되어 주관리시스템(1503)의 데이터가 경신되게 할 수 있다.In addition, the work approval signal transmitted from the manager terminal 1504 is transmitted to the main management system 1503 through the communication unit 650 so that the data of the main management system 1503 can be updated.

수신부(760)는 이동통신 전화망, 무선 인터넷 망, 무선 데이터 통신망을 이용하여 관리자단말(1504)과 통신채널을 형성한다.The receiver 760 forms a communication channel with the manager terminal 1504 using a mobile communication telephone network, a wireless Internet network, and a wireless data communication network.

수신부(760)는 작업통제제어부(770)와 유선으로 연결되며, 작업통제제어부(770)는 솔레노이드(725)와 래치모터(731)에 유선으로 연결된다.The receiving unit 760 is connected to the operation control unit 770 by wire, and the operation control unit 770 is connected to the solenoid 725 and the latch motor 731 by wire.

작업통제제어부(770)는 수신부(760)에서 전달받은 작업승인 신호에 따라 솔레노이드(725)와 래치모터(731)를 제어한다.The operation control unit 770 controls the solenoid 725 and the latch motor 731 according to the operation approval signal transmitted from the receiver 760 .

작업통제제어부(770)는 작업승인 신호가 전달되지 않은 상태에서는 닫힘명령을 출력하고, 솔레노이드(725)가 후퇴작동하여 작동봉(726)에 연결된 도어지지대(721)와, 경첩(723)에 의해 도어지지대(721)에 연결된 도어(92)가 닫힘방향(후방)으로 이동하여 닫힌 상태를 유지하게 된다(도 10 참조).The operation control unit 770 outputs a closing command in a state in which the operation approval signal is not transmitted, and the solenoid 725 operates backward to operate the door support 721 connected to the operating rod 726 and the hinge 723. The door 92 connected to the door support 721 moves in the closing direction (rearward) and maintains the closed state (see FIG. 10).

이때, 절곡부(710)가 본체(91)의 상하좌우면을 감싸고 있어 절곡부(710)가 본체(91)에 걸리게 되므로 여닫이식으로 열리지 않게 된다.At this time, since the bent part 710 covers the top, bottom, left and right surfaces of the main body 91, the bent part 710 is caught on the main body 91, so that it does not open in a casement manner.

작업통제제어부(770)는 작업승인 신호가 전달되면 열림명령을 출력하고, 솔레노이드(725)가 전진작동하여 작동봉(726)에 연결된 도어지지대(721)와, 경첩(723)에 의해 도어지지대(721)에 연결된 도어(92)가 열림방향(전방)으로 이동하여 도어(92)의 절곡부(710)가 본체(91)의 전단부로부터 벗어난 상태로 유지된다(도 11 참조).The work control unit 770 outputs an open command when a work approval signal is transmitted, and the solenoid 725 moves forward so that the door support 721 connected to the operating rod 726 and the door support 723 are connected to the door support ( The door 92 connected to 721 is moved in the opening direction (forward) so that the bent portion 710 of the door 92 is maintained away from the front end of the main body 91 (see FIG. 11).

또한 작업통제제어부(770)는 작업승인 신호가 전달되지 않은 상태에서는 잠금명령을 출력하고, 래치모터(731)가 잠금방향으로 회전하여 래치모터축(732)에 결합된 래치(733)가 도어(92)에 고정된 걸쇠래치걸이(735)의 래치홈(736)에 삽입되어 도어(92)가 잠기게 된다(도 10 참조).In addition, the operation control unit 770 outputs a locking command in a state in which the operation approval signal is not transmitted, and the latch motor 731 rotates in the locking direction so that the latch 733 coupled to the latch motor shaft 732 opens the door ( 92), the door 92 is locked by being inserted into the latch groove 736 of the latch latch hook 735 fixed to (see FIG. 10).

작업통제제어부(770)는 작업승인 신호가 전달되면 해제명령을 출력하고, 래치모터(731)가 해제방향으로 회전하여 래치모터축(732)에 결합된 래치(733)가 도어(92)에 고정된 걸쇠래치걸이(735)의 래치홈(736)에서 빠져나와 잠금이 해제된다(도 11 참조).When the operation approval signal is transmitted, the operation control unit 770 outputs a release command, and the latch motor 731 rotates in the release direction so that the latch 733 coupled to the latch motor shaft 732 is fixed to the door 92. It comes out of the latch groove 736 of the latch latch hook 735 and is unlocked (see FIG. 11).

이 상태에서 절곡부(710)가 본체(91)의 전단부에서 벗어나 있으므로 작업승인을 받은 작업자가 도어(92)를 손으로 잡아당기면 완전히 열 수 있게 된다(도 12 참조).In this state, since the bent part 710 is out of the front end of the main body 91, when a worker who has received work approval pulls the door 92 by hand, it can be completely opened (see FIG. 12).

한편, 본 실시예에서의 배전반 감시 과정은 상술한 제1 실시예에서와 동일하므로 이에 대한 설명은 생략한다.Meanwhile, the switchboard monitoring process in the present embodiment is the same as in the first embodiment described above, so a description thereof is omitted.

이상에서는 본 발명을 바람직한 실시예로서 예시한 도면을 참조로 하여 설명하였으나, 본 발명은 예시된 실시예와 도면에 의해 한정되는 것이 아니며, 본 발명의 기술적 고유사상의 범위 내에서 이 분야의 통상의 기술자에 의해 다양한 변형이 이루어질 수 있음은 물론이다.In the above, the present invention has been described with reference to the drawings exemplified as preferred embodiments, but the present invention is not limited by the illustrated embodiments and drawings, and within the scope of the technical idea of the present invention, conventional techniques in this field Of course, various modifications may be made by a technician.

10 : 배선부 60 : 감시부
91 : 본체 92 : 도어
111 : 모배선 112 : 분기선로
121 : 주차단기 122 : 분기차단기
131 : 모선부스바 132 : 자선부스바
140 : 모선부스바 지지대 150 : 중성단자
160 : 접지단자 610 : 감지부
611 : 온도센서 620 : 비교부
630 : 제어부 640 : 표시부
650 : 통신부 641 : 상태표시등
1501 : 배전반 그룹 1502 : 관리시스템
1503 : 주관리시스템 1504 : 관리자단말
1510 : 분전반 1520 : 배전반
1530 : 수배전반 700 : 작업통제수단
710 : 절곡부 720 : 도어개폐기구
730 : 도어잠금기구 740 : QR코드테그
750 : 작업자단말 760 : 수신부
770 : 작업통제제어부
10: wiring unit 60: monitoring unit
91: body 92: door
111: mother wire 112: branch line
121: parking breaker 122: branch breaker
131: mother bus bar 132: charity bus bar
140: bus bar support 150: neutral terminal
160: ground terminal 610: sensing unit
611: temperature sensor 620: comparison unit
630: control unit 640: display unit
650: communication unit 641: status indicator
1501: switchboard group 1502: management system
1503: main management system 1504: manager terminal
1510: distribution board 1520: distribution board
1530: switchgear 700: work control means
710: bending part 720: door opening and closing mechanism
730: door lock mechanism 740: QR code tag
750: worker terminal 760: receiver
770: work control unit

Claims (1)

하나 이상의 배전반으로 구성되며, 배전반 각각이 자신의 상태를 감시하여 작성된 감지값에 의해 동작상태 정보를 작성하고, 상기 동작상태정보에 의해 동작상태를 판단하여 상태표시등을 통해 출력하는 배전반그룹; 상기 배전반 그룹의 배전반 각각으로부터 배전반 ID, 상기 동작상태정보 및 상기 감지값을 전달받아 출력하는 주관리시스템과 관리자단말을 포함하며, 도어를 지지함과 아울러 개폐하는 도어개폐기구와, 도어를 잠금 및 해제하는 도어잠금기구와, 도어의 전면에 부착된 QR코드태그와, 작업통제 애플리케이션이 설치되어 도어 전면에 부착된 QR코드태그를 스캐닝하면 날짜와 업체ID를 포함하는 작업승인요청 신호가 전송되는 작업자단말과, 작업통제 애플리케이션이 설치되고 작업일자와 업체ID가 저장되어 작업자단말에서 전송된 날짜와 업체ID를 포함하는 작업승인요청 신호를 수신하여 작업승인요청 수신화면이 표시되고, 수신된 업체ID가 저장된 업체ID와 일치하면 작업승인화면이 표시됨과 아울러 작업승인신호가 전송되는 관리자단말과, 관리자단말에서 전송된 작업승인 신호를 수신하는 수신부와, 수신부에 수신된 작업승인 신호를 전달받아 도어개폐기구와 도어잠금기구를 제어하여 도어의 잠금이 해제됨과 아울러 개방되게 하고, 작업승인 신호가 전달되지 않은 상태에서는 도어개폐기구와 도어잠금기구를 제어하여 도어가 닫힘 상태로 유지되게 하는 작업통제제어부가 포함된 작업통제수단을 포함하여, 사전에 승인된 업체의 작업자에 대해서만 작업을 허용하는 공지의 인공지능을 이용한 공동주택 전기 배전반 감시 시스템에 있어서,
작업통제수단은 도어의 가장자리에서 후방으로 절곡되어 도어가 닫힌 상태에서는 절곡부가 본체의 상하좌우면을 감싸서 도어가 여닫이식으로 열릴 수 없게 하고, 도어가 전방으로 이동하여 절곡부가 본체의 전단부로부터 벗어난 상태에서는 도어가 여닫이식으로 열릴 수 있게 하는 절곡부를 더 포함하며,
도어개폐기구는 본체의 내부 일측에 전후방향으로 이동 가능하게 설치되는 도어지지대와, 도어지지대와 도어의 일측 사이에 부착되는 경첩과, 도어지지대를 절곡부가 본체의 전면보다 전방에 위치하는 열림위치와, 절곡부가 본체의 상하좌우면을 감싸는 닫힘위치로 이동시키는 솔레노이드를 포함하여 구성되고,
도어잠금기구는 본체의 내부 타측에 고정되는 래치모터와, 래치모터축에 고정되는 래치와, 래치에 대응하여 도어에 설치되며 래치가 끼워져 걸리는 래치홈을 가지는 래치걸이를 포함하여 구성됨을 특징으로 하는 인공지능을 이용한 공동주택 전기 배전반 감시 시스템.
A switchboard group composed of one or more switchboards, in which each switchboard monitors its own state, creates operating state information based on the generated detected values, determines the operating state based on the operating state information, and outputs the output through a status indicator light; A door opening/closing mechanism including a main management system and a manager terminal for receiving and outputting the switchboard ID, the operation state information, and the detection value from each switchboard of the switchboard group, and supporting and opening/closing the door; locking and opening the door; A worker who scans the unlocking door lock mechanism, the QR code tag attached to the front of the door, and the QR code tag attached to the front of the door with the work control application installed to send a work approval request signal including the date and company ID The terminal and the work control application are installed, and the work date and company ID are stored, and the work approval request signal including the date and company ID transmitted from the worker terminal is received, and the work approval request reception screen is displayed, and the received company ID is displayed. If it matches the stored company ID, the work approval screen is displayed, the manager terminal to which the work approval signal is transmitted, the receiver to receive the work approval signal transmitted from the manager terminal, and the door opening and closing mechanism by receiving the work approval signal received from the receiver Includes an operation control unit that controls the door locking mechanism and the door locking mechanism to unlock and open the door, and controls the door opening/closing mechanism and door locking mechanism to keep the door closed in the state where the work approval signal is not transmitted In the apartment house electrical switchboard monitoring system using a known artificial intelligence that allows work only for workers of previously approved companies, including the work control means,
The operation control means is bent backward from the edge of the door, so that the bent part covers the top, bottom, left and right surfaces of the main body in a closed state so that the door cannot be opened and closed, and the door moves forward so that the bent part is freed from the front end of the main body. In the state, the door further includes a bent portion that allows the door to be opened in a casement manner,
The door opening and closing mechanism includes a door support installed on one side of the body to be movable in the forward and backward direction, a hinge attached between the door support and one side of the door, and an open position in which the bent portion of the door support is located in front of the front of the body and , It is configured to include a solenoid for moving the bent part to a closed position surrounding the upper, lower, left and right surfaces of the main body,
The door locking mechanism includes a latch motor fixed to the other side inside the main body, a latch fixed to the latch motor shaft, and a latch holder installed on the door corresponding to the latch and having a latch groove into which the latch is inserted. A monitoring system for electrical switchboards in apartment complexes using artificial intelligence.
KR1020220034649A 2022-03-21 2022-03-21 AI-based monitoring system for electric switchboards in apartment houses KR102477912B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220034649A KR102477912B1 (en) 2022-03-21 2022-03-21 AI-based monitoring system for electric switchboards in apartment houses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220034649A KR102477912B1 (en) 2022-03-21 2022-03-21 AI-based monitoring system for electric switchboards in apartment houses

Publications (1)

Publication Number Publication Date
KR102477912B1 true KR102477912B1 (en) 2022-12-15

Family

ID=84439629

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220034649A KR102477912B1 (en) 2022-03-21 2022-03-21 AI-based monitoring system for electric switchboards in apartment houses

Country Status (1)

Country Link
KR (1) KR102477912B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200302982Y1 (en) * 2002-11-05 2003-02-05 안석곤 Water-proof controlboard
KR101208579B1 (en) 2012-08-21 2012-12-06 주식회사 에너솔라 Distributing board with detection and notification status and method for using the same
KR101614713B1 (en) * 2014-05-23 2016-04-22 양찬웅 System and method for controlling entrance and exit
KR101621928B1 (en) * 2015-07-20 2016-05-17 (주)케이엔 Power distributor based on QR code and managing method thereof
KR20170000517A (en) * 2015-06-24 2017-01-03 (주) 보람케메탈 quartz crucible inner pore imaging system using auto-rotation device and camera

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200302982Y1 (en) * 2002-11-05 2003-02-05 안석곤 Water-proof controlboard
KR101208579B1 (en) 2012-08-21 2012-12-06 주식회사 에너솔라 Distributing board with detection and notification status and method for using the same
KR101614713B1 (en) * 2014-05-23 2016-04-22 양찬웅 System and method for controlling entrance and exit
KR20170000517A (en) * 2015-06-24 2017-01-03 (주) 보람케메탈 quartz crucible inner pore imaging system using auto-rotation device and camera
KR101621928B1 (en) * 2015-07-20 2016-05-17 (주)케이엔 Power distributor based on QR code and managing method thereof

Similar Documents

Publication Publication Date Title
US6956733B2 (en) Device and method for providing electric service
US20050174708A1 (en) Device and method for providing electric service
KR101752219B1 (en) Monitoring system of distribution panel
KR20160005480A (en) door opening and closing apparatus of switchboard
US9111707B2 (en) Installation switching device with a current sensing unit
US10755549B2 (en) High voltage safety system and method for electrical cabinetry
KR20080098950A (en) Fire sensing system for distributing electric power
KR101208579B1 (en) Distributing board with detection and notification status and method for using the same
KR102176617B1 (en) Sequrity checking system of power substation using voice recognition
KR101584553B1 (en) Switch board having door locking device and improved ground structure as safety control administrative device
KR101018865B1 (en) Detecting control device
KR102477912B1 (en) AI-based monitoring system for electric switchboards in apartment houses
KR20030003786A (en) Digital power distribution panel
KR20080092718A (en) Separation curcuit box for power distributing panel of circuit breaker
KR100358002B1 (en) all competent composition electric panel
CN1226634C (en) Method and apparatus for testing wiring
KR101900308B1 (en) Digital electricity measuring device for indicating amount of electricity by controlling flashing speed and direction of led lamps
US10212839B2 (en) Risk reduction of electrical hazards
KR101018863B1 (en) Detecting control device
KR101303316B1 (en) Multi-dsiplay Detector For Power Equipment
KR101706622B1 (en) Distributing board having a function of sensing gas generated by creeping discharge or arc discharge
US11211776B2 (en) Risk reduction of electrical hazards
KR102217550B1 (en) Remote electric power control system
US10530133B2 (en) Risk reduction of electrical hazards
KR20180085959A (en) Safety management apparatus for power receiving and distributing panel

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant