KR102454711B1 - Ground anchor re-tensioning device and method capable of checking and managing the tension of stranded wire using a load gauge - Google Patents

Ground anchor re-tensioning device and method capable of checking and managing the tension of stranded wire using a load gauge Download PDF

Info

Publication number
KR102454711B1
KR102454711B1 KR1020210030730A KR20210030730A KR102454711B1 KR 102454711 B1 KR102454711 B1 KR 102454711B1 KR 1020210030730 A KR1020210030730 A KR 1020210030730A KR 20210030730 A KR20210030730 A KR 20210030730A KR 102454711 B1 KR102454711 B1 KR 102454711B1
Authority
KR
South Korea
Prior art keywords
tension
strand
tensioning
ground anchor
holder
Prior art date
Application number
KR1020210030730A
Other languages
Korean (ko)
Other versions
KR20220126451A (en
Inventor
이홍규
박남순
안준형
Original Assignee
지오엔지니어링(주)
이홍규
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 지오엔지니어링(주), 이홍규 filed Critical 지오엔지니어링(주)
Priority to KR1020210030730A priority Critical patent/KR102454711B1/en
Publication of KR20220126451A publication Critical patent/KR20220126451A/en
Application granted granted Critical
Publication of KR102454711B1 publication Critical patent/KR102454711B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

본 발명은 기-시공된 그라운드 앵커에서 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치 및 방법에 관한 것이다.
본 발명은 기-시공된 그라운드 앵커의 강연선홀더에 재-인장유지유닛과 재-인장유닛을 연결 설치하여 강연선을 재-인장하고 이렇게 재-인장된 그라운드 앵커의 강연선에 인가되는 하중을 하중계를 통해 확인할 수 있으며, 이로 인하여 일정주기마다 그라운드 앵커의 재-인장상태를 체크함으로써 그라운드 앵커의 이상여부를 인지할 수 있음은 물론 그라운드 앵커의 지속적인 유지 및 관리가 가능한 강연선의 재-인장분야에 유용하게 이용할 수 있다.
The present invention relates to an apparatus and method for re-tensioning of a ground anchor for checking and managing tension of a strand using a load gauge in a pre-constructed ground anchor.
The present invention connects and installs a re-tension holding unit and a re-tension unit to the strand holder of the pre-constructed ground anchor to re-tension the strand, and the load applied to the strand of the re-tensioned ground anchor is applied to the strand through a load gauge. Therefore, it is possible to recognize the abnormality of the ground anchor by checking the re-tension state of the ground anchor at regular intervals, and it can be usefully used in the field of re-tensioning of the strand where the continuous maintenance and management of the ground anchor is possible. can

Description

하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치 및 방법{Ground anchor re-tensioning device and method capable of checking and managing the tension of stranded wire using a load gauge}Ground anchor re-tensioning device and method capable of checking and managing the tension of stranded wire using a load gauge}

본 발명은 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치 및 그 방법에 관한 것으로, 보다 상세하게는, 그라우팅 홀에 기-시공된 그라운드 앵커의 강연선을 재-인장유지유닛과 재-인장유닛으로 재-인장하고 이렇게 재-인장된 그라운드 앵커의 상태를 하중계를 통해 확인함은 물론 지속적인 관리를 수행할 수 있는 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치 및 방법에 관한 것이다.The present invention relates to a re-tensioning device and method for a ground anchor for checking and managing the tension of a strand, and more particularly, to a re-tension holding unit and a re-tensioning unit for a strand of a ground anchor pre-constructed in a grouting hole A re-tensioning device of the ground anchor for re-tensioning with a tension unit and checking and managing the tension of the strand using a load gauge that can perform continuous management as well as checking the state of the re-tensioned ground anchor through a load gauge; it's about how

일반적으로, 그라운드 앵커(ground anchor)는 토목공사나 건축공사시의 지반의 경사면이나 옹벽 등의 붕괴됨을 방지하도록 지중으로 소정깊이의 그라우팅 홀을 천공하고 그라우팅 홀에 적어도 하나이상의 강연선을 삽입한 다음, 그라우트를 주입하여 양생시킨 후 강연선을 인장하여 소정의 긴장력을 부여함으로써 지반의 안정화 및 보강을 꾀하고 있다.In general, a ground anchor drills a grouting hole of a predetermined depth into the ground to prevent collapse of a slope or retaining wall of the ground during civil engineering or construction work, inserts at least one strand into the grouting hole, and then grouts After curing, the strand is stretched and a predetermined tension is applied to stabilize and reinforce the ground.

이러한 그라운드 앵커는 그라우팅 홀에서 지상외측으로 연장된 강연선들의 끝단부분이 각각의 웨지유닛을 통해 파지되도록 강연선홀더에 의해 지지된다. 상기 강연선은 일종의 인장재인바 텐돈(tendon)이라 칭하기도 한다. This ground anchor is supported by a strand holder so that the ends of strands extending outward from the grouting hole are gripped through each wedge unit. The strand is a kind of tension member and is also referred to as a tendon.

이와 같이 시공된 그라운드 앵커의 재-인장은 시공초기엔 강연선을 인장하여 인장력을 부여한 상태그대로 유지되나, 시간이 경과함에 따라 지반침하나 토사의 유실은 물론 강연선의 신장 등으로 인하여 자연적으로 인장력이 저하되고, 심지어는 강연선홀더 부분의 강연선 및 웨지유닛이 부식 내지 손상되어 강연선에서 웨지유닛이 해체되는 등의 사례가 빈번하게 발생하였다. The re-tensioning of the ground anchor constructed in this way is maintained as it is in the state where the tensile force was applied by pulling the strand at the initial stage of construction. and even the strand and wedge unit of the strand holder were corroded or damaged, and the wedge unit was dismantled from the strand frequently occurred.

위와 같이 강연선의 인장력 저하 내지 웨지유닛이 해체되면 그라운드 앵커로서의 제-기능을 다하지 못하기 때문에 그라운드 앵커의 강연선을 재-인장하여 보완시공하고 있다. As above, if the tensile force of the strand is lowered or the wedge unit is dismantled, it cannot function as a ground anchor. Therefore, the strand of the ground anchor is re-tensioned and supplemented.

이러한 그라운드 앵커의 재-인장과 관련하여 강연선을 재-인장하기 위한 재-인장장치나 방법들이 개시되어 있으나, 이들 중에서 본원발명과 관련된 것이라 할 수 있는 재-인장장치를 발췌하여 간략하게 설명한다.Re-tensioning apparatus or methods for re-tensioning a strand in relation to re-tensioning of the ground anchor are disclosed, but among them, a re-tensioning apparatus, which can be said to be related to the present invention, is extracted and briefly described.

등록특허 제10-0949196호(이하, "문헌1"이라 함)에는 그라우팅 홀에서 그라우트에 의해 정착되어 그라우팅 홀의 입구를 통과하여 연장된 강연선의 끝단부분이 강연선홀더와 웨지유닛에 의해 파지되되 상기 강연선홀더의 외측 걸림-턱을 감쌈과 동시에 걸리도록 복수의 파지절편을 설치하고 상기 파지절편에 커넥터와 인장유도 봉을 체결한 다음, 파지절편의 외측에 받침판과 인장수단의 하나인 인장실린더를 올려놓고 인장유도 봉을 인장실린더로 인장함으로써 강연선홀더와 함께 강연선을 재-인장한 후 강연선홀더의 하면에 지지판재를 끼워 넣어 재-인장상태를 유지시키는 것이었다.In Patent Registration No. 10-0949196 (hereinafter referred to as "Document 1"), the end of a strand that is fixed by a grout in the grouting hole and extended through the entrance of the grouting hole is held by a strand holder and a wedge unit. A plurality of gripping fragments are installed so that they are caught at the same time as the outer hooking-jaw of the holder is wrapped, and a connector and a tensile induction rod are fastened to the gripping fragments. After re-tensioning the strand together with the strand holder by pulling the tension-inducing rod with the tension cylinder, the support plate was inserted into the lower surface of the strand holder to maintain the re-tension state.

등록특허 제10-0950265호(이하, "문헌2"라 함)에는 헤드와 로드 자체가 일종의 유압실린더이므로 헤드의 유압-공에 유압펌프를 연결 설치하고 헤드의 유압-실로 유체를 공급하는 만큼 로드가 상승하게 되고 이때 로드의 모노-콘과 웨지에 의해 파지된 강연선 또한 로드와 함께 상승되므로 강연선을 재-인장하는 것이었다.In Patent Registration No. 10-0950265 (hereinafter referred to as "Document 2"), since the head and the rod themselves are a kind of hydraulic cylinder, a hydraulic pump is connected to the hydraulic-ball of the head, and the load is as much as the hydraulic-supply of the head. is rising, and at this time, the strand held by the mono-cone and wedge of the rod also rises together with the rod, so the strand is re-tensioned.

그러나 상기와 같은 문헌1 및 2의 재-인장장치에 있어서는, 강연선의 재-인장하중이 인장실린더나 유압펌프에 걸리는 압력계를 통해서 지반안정에 적합하게 이루어진 것인지를 대략적으로 확인하는 것일 뿐, 강연선을 재-인장 후 재-인장시의 인장하중이 강연선에 그대로 인가되고 있는지 여부를 확인할 수 없는 것이었다. However, in the re-tensioning device of Documents 1 and 2 as described above, it is only to roughly confirm whether the re-tensile load of the strand is made suitable for ground stability through the pressure gauge applied to the tension cylinder or hydraulic pump, After re-tensioning, it was not possible to confirm whether the tensile load at the time of re-tensioning was applied to the strand as it is.

특히, 강연선의 재-인장상태를 지속적으로 관리하기 위한 어떠한 수단도 마련되어 있지 않기 때문에 단순히 강연선을 재-인장하는 것 외엔 강연선의 재-인장상태를 관리할 수 없다는 폐단이 있었다.In particular, since there is no means for continuously managing the re-tension state of the strand, there is a disadvantage that the re-tension state of the strand cannot be managed other than simply re-tensioning the strand.

(문헌1) KR 10-0949196B1 (2010.03.16.등록)(Document 1) KR 10-0949196B1 (Registered on March 16, 2010) (문헌2) KR 10-0950265B1 (2010.03.23.등록)(Document 2) KR 10-0950265B1 (Registered on March 23, 2010)

본 발명은 상기한 바와 같은 종래의 제반 폐단 및 문제점을 해결하기 위하여 연구개발한 것이다. The present invention has been researched and developed in order to solve the various disadvantages and problems of the prior art as described above.

본 발명의 목적은 기-시공된 그라운드 앵커의 강연선을 재-인장하고 이렇게 재-인장된 그라운드 앵커의 강연선에 인가되는 하중을 하중계를 통해 확인할 수 있으며, 이로 인하여 일정주기마다 그라운드 앵커의 재-인장상태를 체크함으로써 그라운드 앵커의 이상여부를 인지할 수 있음은 물론 그라운드 앵커의 지속적인 유지 및 관리가 가능하게 되는 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치 및 방법을 제공하는데 있다.An object of the present invention is to re-tension the strands of the pre-constructed ground anchors and check the load applied to the strands of the re-tensioned ground anchors through a load gauge, thereby re-tensioning the ground anchors at regular intervals. To provide a ground anchor re-tensioning device and method for checking and managing the tension of a stranded wire using a load gauge that enables continuous maintenance and management of the ground anchor as well as recognizing the abnormality of the ground anchor by checking the state. have.

상기한 바와 같은 과제를 해결하기 위한 본 발명에 따른 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치는, 그라운드 앵커의 강연선에 인장력을 부여한 상태로 유지되도록 그라우팅 홀 입구의 강연선의 끝단부분에 고정된 웨지 및 강연선홀더를 포함하는 그라운드 앵커와 관련된 것으로, The re-tensioning device of the ground anchor for checking and managing the tension of the strand using a load gauge according to the present invention for solving the above problems is the strand at the entrance of the grouting hole so as to maintain the tension applied to the strand of the ground anchor. It relates to a ground anchor including a wedge and a strand holder fixed to the end of the

상기 강연선홀더를 감싸면서 파지할 수 있는 홀더 캡에서 센터로드가 연장된 텐션 벨과, 상기 텐션 벨의 센터로드가 통과되도록 홀더 캡을 수용하는 컵 형상의 대좌와, 상기 대좌의 상면에 센터로드가 통과되게 설치되는 하중계와 지지판재, 상기 지지판재의 상면에 위치되게 센터로드에 체결되는 고정너트를 포함하는 재-인장유지유닛; 상기 센터로드의 단부에 체결되어 연장된 연장로드와, 상기 연장로드가 통과되게 지지판재의 상면에 설치되는 컵 형상의 재-인장대좌와, 상기 연장로드가 통과되게 재-인장대좌의 상면에 설치되는 중공형 인장실린더와 승강판재, 상기 승강판재의 상면에 위치되게 연장로드에 체결되는 잠금너트를 포함하는 재-인장유닛; 을 포함하여 구성됨을 특징으로 한다.A tension bell in which a center rod extends from a holder cap that can be gripped while enclosing the strand holder, a cup-shaped pedestal for accommodating the holder cap so that the center rod of the tension bell passes, and a center rod on the upper surface of the pedestal a re-tension holding unit including a load gauge installed to pass through, a support plate, and a fixing nut fastened to a center rod to be positioned on an upper surface of the support plate; An extension rod fastened to the end of the center rod and extended, a cup-shaped re-tensioning pedestal installed on an upper surface of a support plate to allow the extension rod to pass through, and a re-tensioning pedestal installed on the upper surface of the re-tensioning pedestal to allow the extension rod to pass therethrough a re-tensioning unit including a hollow tension cylinder, a lifting plate, and a lock nut fastened to an extension rod to be positioned on an upper surface of the lifting plate; It is characterized in that it comprises a.

본 발명에 따른 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장방법은, 기-시공된 강연선홀더를 감싸면서 파지하도록 홀더 캡을 씌워 텐션 벨을 설치하고 상기 텐션 벨의 센터로드가 통과됨과 아울러 소정높이만큼 홀더 캡의 상승을 허용하도록 컵 형상의 대좌를 설치한 다음, 상기 대좌의 상면에 센터로드가 통과되게 하중계와 지지판재를 가설하고 센터로드에 고정너트를 체결하여 재-인장유지유닛을 설치하는 단계; 상기 센터로드의 단부에 센터로드와 동심을 이루도록 연장로드를 체결하고 상기 지지판재의 상면에 연장로드가 통과되게 컵 형상의 재-인장대좌를 설치한 다음, 상기 재-인장대좌의 상면에 연장로드가 통과되게 중공형 인장실린더와 승강판재를 가설하고 상기 연장로드에 잠금너트를 체결하여 재-인장유닛을 설치하는 단계; 상기 인장실린더를 일시적으로 가동시켜 재-인장유지유닛의 하중계에 소정의 하중을 인가하여 초기치를 설정한 후 인장실린더를 지속적으로 가동시켜 하중계에 소정의 하중이 인가될 때 까지 재-인장을 실시하고 이러한 재-인장에 의해 강연선홀더와 함께 강연선이 늘어난 만큼 고정너트를 지지판재에 밀착되게 죄어서 재-인장을 실시하는 단계; 상기 단계에서 재-인장을 실시한 후 인장실린더의 가동을 중지시킴과 아울러 인장하중을 해제한 다음 연장로드, 재-인장대좌, 인장실린더, 승강판재 및 잠금너트를 분리 제거하는 재-인장유닛제거단계; 상기 단계에서 재-인장유닛을 제거한 후 재-인장유지유닛의 하중계에 인가되고 있는 하중을 일정주기마다 확인함으로써 그라운드 앵커의 이상여부를 관리하는 단계를 포함하는 것을 특징으로 한다. The re-tensioning method of the ground anchor for checking and managing the tension of the stranded wire using a load gauge according to the present invention is to install a tension bell by covering the holder cap so as to hold the pre-constructed strand holder while wrapping it, and the center rod of the tension bell A cup-shaped pedestal is installed to allow the holder cap to rise by a predetermined height while passing, and then a load gauge and a support plate are installed on the upper surface of the pedestal to allow the center rod to pass through, and fasten the fixing nut to the center rod to re- Installing a tension holding unit; The extension rod is fastened to the end of the center rod so as to be concentric with the center rod, and a cup-shaped re-tensioning pedestal is installed so that the extension rod passes through the upper surface of the support plate, and then the extension rod is placed on the upper surface of the re-tensioning pedestal. installing a re-tensioning unit by installing a hollow tension cylinder and a lifting plate to pass through, and fastening a lock nut to the extension rod; The tension cylinder is temporarily operated to apply a predetermined load to the load gauge of the re-tension holding unit to set the initial value, and then the tension cylinder is continuously operated to re-tension until a predetermined load is applied to the load gauge, performing re-tensioning by tightening the fixing nut to be in close contact with the support plate as much as the length of the strand together with the strand holder by this re-tensioning; After re-tensioning in the above step, the operation of the tension cylinder is stopped and the tension load is released, and then the extension rod, the re-tensioning pedestal, the tension cylinder, the lifting plate and the lock nut are separated and removed. ; After removing the re-tensioning unit in the above step, it is characterized in that it comprises the step of managing the abnormality of the ground anchor by checking the load applied to the load gauge of the re-tensioning unit at regular intervals.

본 발명의 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치 및 방법에 따르면, 그라운드 앵커의 강연선홀더에 재-인장유지유닛과 재-인장유닛을 연결하여 기-시공된 그라운드 앵커의 강연선을 재-인장하고 이렇게 재-인장된 그라운드 앵커의 강연선에 인가되는 하중을 하중계를 통해 확인할 수 있으며, 이로 인하여 일정주기마다 그라운드 앵커의 재-인장상태를 체크함으로써 그라운드 앵커의 이상여부를 인지할 수 있음은 물론 그라운드 앵커의 지속적인 유지 및 관리가 가능하게 되는 유용한 효과가 있다.According to the re-tensioning device and method of the ground anchor for checking and managing the tension of the strand using the load gauge of the present invention, the re-tension holding unit and the re-tensioning unit are connected to the strand holder of the ground anchor to connect the pre-constructed ground After re-tensioning the strand of the anchor, the load applied to the strand of the re-tensioned ground anchor can be checked through the load gauge. As well as being recognizable, there is a useful effect of enabling continuous maintenance and management of the ground anchor.

또한, 본 발명의 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치 및 방법에 따르면, 강연선을 재-인장한 후 재-인장유지유닛의 하중계가 손상되더라도 재-인장유닛을 이용하여 재차 강연선을 인장함 같이 텐션 벨을 당겨 고정너트를 느슨하게 푼 다음 재-인장유닛을 제거한 후 하중계를 간편하게 교체할 수 있으며, 이렇게 하중계를 교체한 후 재-인장유닛을 연결하여 초기의 재-인장상태로 그라운드 앵커의 강연선을 재-인장할 수 있는 유용한 효과가 있다. In addition, according to the re-tensioning device and method of the ground anchor for checking and managing the tension of the strand using the load gauge of the present invention, even if the load gauge of the re-tension holding unit is damaged after the strand is re-tensioned, the re-tensioning unit is After pulling the tension bell to loosen the fixing nut, remove the re-tensioning unit, and then replace the load gauge easily. There is a useful effect of re-tensioning the strands of the ground anchor in tension.

도 1은 본 발명의 일실시예에 따른 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치를 설명하기 위하여 나타낸 도면이다.
도 2는 도 1의 분해도이다.
도 3은 본 발명에 따른 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치 및 방법을 적용하여 재-인장하기 전의 그라운드 앵커를 나타낸 단면도이다.
도 4는 도 3의 그라운드 앵커를 나타낸 분해사시도이다.
도 5 내지 도 7은 본 발명에 따른 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장방법을 순차적으로 나타낸 도면이다.
1 is a view illustrating a re-tensioning apparatus of a ground anchor for checking and managing tension of a strand using a load gauge according to an embodiment of the present invention.
FIG. 2 is an exploded view of FIG. 1 ;
3 is a cross-sectional view showing the ground anchor before re-tension by applying the re-tensioning device and method of the ground anchor for checking and managing the tension of the stranded wire using the load gauge according to the present invention.
4 is an exploded perspective view showing the ground anchor of FIG. 3 .
5 to 7 are views sequentially showing a re-tensioning method of a ground anchor for checking and managing tension of a strand using a load gauge according to the present invention.

이하, 본 발명의 이점 및 특징, 그리고 그것들을 달성하는 방법은 첨부되는 도면과 함께 상세하게 후술되어 있는 실시 예들을 참조하면 명확해질 것이다. 그러나 본 발명은 이하에서 개시되는 실시 예들에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있으며, 단지 실시 예들은 본 발명의 개시가 완전하도록 하고, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 발명은 청구항의 범주에 의해 정의될 뿐이다. 명세서 전체에 걸쳐 동일 참조 부호는 동일 구성요소를 지칭한다. Hereinafter, the advantages and features of the present invention, and a method of achieving them will become clear with reference to the embodiments described below in detail in conjunction with the accompanying drawings. However, the present invention is not limited to the embodiments disclosed below, but may be implemented in various different forms, and only the embodiments allow the disclosure of the present invention to be complete, and those of ordinary skill in the art to which the present invention pertains. It is provided to fully inform the person of the scope of the invention, and the present invention is only defined by the scope of the claims. Like reference numerals refer to like elements throughout.

도 1 내지 도 4는 본 발명의 실시 예에 따른 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치를 설명하기 위하여 나타낸 도면들이다. 1 to 4 are views illustrating a re-tensioning device of a ground anchor for checking and managing tension of a strand using a load gauge according to an embodiment of the present invention.

본 발명에 따른 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치는, 도면에 나타낸 바와 같이, 그라운드 앵커(100)의 강연선(110)을 재-인장한 상태로 유지시키기 위한 재-인장유지유닛(200)과, 이 재-인장유지유닛(200)에 연결 설치되어 그라운드 앵커의 강연선을 간접적으로 인장하고 재-인장유지유닛(200)가 강연선의 재-인장상태를 유지하도록 세팅한 후 분리 해체하는 재-인장유닛(300)을 포함하여 구성된다.The re-tensioning device of the ground anchor for checking and managing the tension of the strand using a load gauge according to the present invention is, as shown in the drawing, for maintaining the strand 110 of the ground anchor 100 in a re-tensioned state. The re-tension holding unit 200 and the re-tension holding unit 200 are connected and installed to indirectly tension the strand of the ground anchor and the re-tension holding unit 200 maintains the re-tensioning state of the strand. It is configured to include a re-tensioning unit 300 that is separated and disassembled after setting.

상기 재-인장유지유닛(200)은 그라운드 앵커(100)의 강연선(110)을 인장시킨 상태로 그라우팅 홀(120)의 입구부분에서 강연선(110)의 끝단부분을 웨지(112)와 함께 고정된 강연선홀더(130)에 연결 설치된다. The re-tension holding unit 200 is fixed with a wedge 112 at the end of the strand 110 at the entrance of the grouting hole 120 in a state in which the strand 110 of the ground anchor 100 is tensioned. It is connected to the strand holder 130 and installed.

상기 강연선(110)은 지중의 그라우팅 홀(120)에 매설되되 한쪽끝단이 지상으로 돌출되게 연장된 것이며, 상기 강연선(110)의 끝단부분은 강연선홀더(130)가 지압판재(140)에 의해 지지되도록 각각의 웨지(112)로 파지되어 있다. 상기 웨지(112)는 강연선(110)을 인장한 상태로 유지되도록 강연선홀더(130)의 웨지 홀(131) 내에 안착된다. The strand 110 is embedded in the grouting hole 120 in the ground, and one end is extended to protrude to the ground, and the end of the strand 110 is supported by the strand holder 130 by the acupressure plate material 140 . It is gripped by each wedge 112 as much as possible. The wedge 112 is seated in the wedge hole 131 of the strand holder 130 to maintain the strand 110 in a tensioned state.

상기 강연선홀더(130)는 제조사마다 다르나, 통상 45㎜~55㎜의 두께로 마련되되 직경이 108㎜, 109㎜, 113㎜ 및 138㎜인 4종류의 원판형상으로 마련된다. 또한, 상기 강연선홀더(130)는 강연선(110)이 관통됨과 아울러 강연선(110)을 파지하도록 웨지(112)를 안착시키기 위한 수개의 웨지 홀(131)이 천공되고, 강연선홀더(130)의 외측주면에 수나사(132)가 마련된다.The strand holder 130 is different for each manufacturer, but is generally provided in a thickness of 45 mm to 55 mm, and has a diameter of 108 mm, 109 mm, 113 mm, and 138 mm in the shape of four discs. In addition, in the strand holder 130, the strand 110 is penetrated and several wedge holes 131 for seating the wedge 112 to hold the strand 110 are perforated, and the outside of the strand holder 130 is perforated. A male screw 132 is provided on the main surface.

상기 강연선홀더(130)의 외측주면은 수나사가 마련된 것으로만 도시하였으나, 외측주면이 원기둥형과 테이퍼형상, 그리고 원기둥형의 외측주면에 링 형상의 걸림 홈이나 걸림 돌기가 마련되는 등의 다양한 형상으로 마련될 수 있다.Although the outer circumferential surface of the strand holder 130 is illustrated only as having an external thread, the outer circumferential surface has a cylindrical shape and a tapered shape, and a ring-shaped locking groove or locking protrusion is provided on the cylindrical outer circumferential surface. can be provided.

상기 재-인장유지유닛(200)은 텐션 벨(210), 대좌(220), 하중계(230), 지지판재(240) 및 고정너트(250)를 포함하여 구성된다. The re-tension maintenance unit 200 is configured to include a tension bell 210 , a pedestal 220 , a load gauge 230 , a support plate 240 , and a fixing nut 250 .

상기 텐션 벨(210)은 강연선홀더(130)를 감싸면서 파지할 수 있는 홀더 캡(211)과, 이 홀더 캡(211)의 중앙에서 연장된 센터로드(215)로 마련된다. 상기 홀더 캡(211)은 강연선홀더(130)의 외측주면에 형성된 제1수나사(132)와 체결되는 제1암나사(212)가 내측주면에 마련된다. 상기 텐션 벨(210)은 홀더 캡(211)과 센터로드(215)가 일체로 마련될 수도 있고 각각 별개로 마련되어 조립된 것일 수도 있다.The tension bell 210 is provided with a holder cap 211 that can be gripped while surrounding the strand holder 130 , and a center rod 215 extending from the center of the holder cap 211 . The holder cap 211 has a first female screw 212 fastened to the first male screw 132 formed on the outer circumferential surface of the strand holder 130 is provided on the inner circumferential surface. The tension bell 210 may have the holder cap 211 and the center rod 215 integrally provided or may be separately provided and assembled.

또한, 상기 텐션 벨(210)의 홀더 캡(211)은 강연선홀더(130)의 외측주면형상과 상응하는 형상으로 마련됨과 아울러 강연선홀더(130)를 감싸면서 효과적으로 견고하게 파지할 수 있는 구조이면 충분하다. In addition, the holder cap 211 of the tension bell 210 is provided in a shape corresponding to the shape of the outer circumferential surface of the strand holder 130 and a structure that can effectively and firmly grip the strand holder 130 while surrounding it is sufficient. do.

좀 더 구체적으로 설명하면, 상기 홀더 캡(211)이 강연선홀더(130)를 감쌈은 물론 견고하게 파지 가능한 형상을 갖도록 홀더 캡(211)을 복수개로 분할하고 이렇게 분할된 홀더 캡을 조립한 후 고정가능하게 마련하거나, 일체형의 홀더 캡(211)에 강연선홀더(130)를 감쌈은 물론 견고하게 파지하기 위한 웨지 등과 같은 별도의 부속장치를 부가하여 마련할 수도 있다. More specifically, the holder cap 211 is divided into a plurality of pieces so that the holder cap 211 wraps around the strand holder 130 and has a shape that can be firmly gripped, and after assembling the divided holder cap, the holder cap is fixed. Alternatively, it may be provided by wrapping the stranded wire holder 130 on the integral holder cap 211 and adding a separate accessory such as a wedge for firmly gripping it.

상기 대좌(220)는 텐션 벨(210)의 센터로드(215)가 통과되면서 홀더 캡(211)을 수용하는 컵 형상으로 마련되며, 그라운드 앵커(100)의 강연선(110)을 재-인장할 때 강연선(110)이 신장됨을 고려하여 텐션 벨(210)의 홀더 캡(211)이 상승되더라도 충분히 수용할 수 있는 높이로 마련됨이 바람직하다. 또한, 상기 대좌(220)는 그 내부에 설치되는 텐션 벨(210)의 홀더 캡(211)이 들여다보이도록 절취 홈이나 구멍이 마련될 수 있다. The pedestal 220 is provided in a cup shape for accommodating the holder cap 211 while the center rod 215 of the tension bell 210 passes, and when the strand 110 of the ground anchor 100 is re-tensioned. Considering that the strand 110 is elongated, it is preferable that the holder cap 211 of the tension bell 210 is provided at a height that can be sufficiently accommodated even if it is raised. In addition, the pedestal 220 may be provided with a cut-out groove or hole so that the holder cap 211 of the tension bell 210 installed therein can be seen.

상기 텐션 벨(210)의 센터로드(215) 길이는 하중계(230)와 지지판재(240)가 삽입되는 길이와 강연선(110)이 재-인장되는 길이 또한 고려되어야 하며, 상기 센터로드(215)의 상부는 고정너트(250)가 체결되는 제2수나사(216)가 마련되되 상기 제2수나사(216)의 길이는 강연선(110)을 재-인장한 후 고정너트(250)를 죄어야 하므로 강연선(110)이 재-인장되는 길이를 고려하여 충분한 길이로 마련된다. For the length of the center rod 215 of the tension bell 210, the length at which the load gauge 230 and the support plate 240 are inserted and the length at which the strand 110 is re-tensioned must also be considered, and the center rod 215 A second male screw 216 to which the fixing nut 250 is fastened is provided on the upper portion of the second male screw 216, and the strand 110 is re-tensioned and then the fixing nut 250 must be tightened. It is provided with a sufficient length in consideration of the length at which 110 is re-tensioned.

상기 하중계(230)는 중앙에 텐션 벨(210)의 센터로드(215)가 관통되는 원통형으로 마련되며 통상의 로드 셀을 채택하여 적용함이 바람직하다. The load gauge 230 is provided in a cylindrical shape through which the center rod 215 of the tension bell 210 penetrates in the center, and it is preferable to adopt and apply a conventional load cell.

상기 지지판재(240)는 하중계(230)의 상면에 설치되는 것으로, 중앙에 텐션 벨(210)의 센터로드(215)가 관통되는 통공을 갖는 소정두께의 판재이다. The support plate 240 is installed on the upper surface of the load gauge 230 and is a plate of a predetermined thickness having a through hole through which the center rod 215 of the tension bell 210 passes in the center.

상기 고정너트(250)는 지지판재(240)의 상면에 위치되게 센터로드(215)에 체결되는 통상의 너트이다. The fixing nut 250 is a normal nut fastened to the center rod 215 to be positioned on the upper surface of the support plate 240 .

상기 재-인장유닛(300)은 연장로드(310), 재-인장대좌(320), 인장실린더(330), 승강판재(340) 및 잠금너트(350)를 포함하여 마련된다. The re-tension unit 300 is provided to include an extension rod 310 , a re-tension pedestal 320 , a tension cylinder 330 , a lifting plate 340 , and a lock nut 350 .

상기 연장로드(310)는 상기 센터로드(215) 단부의 제2수나사(216)에 체결되어 센터로드(215)와 동심을 이루고 연장되는 로드이며, 한쪽에 센터로드(215)의 제2수나사(216)와 체결되는 나사소켓(311)이 마련되고 다른 한쪽엔 제3수나사(312)가 마련된다. The extension rod 310 is a rod that is fastened to the second male screw 216 of the end of the center rod 215 and extends concentrically with the center rod 215, and has a second male screw ( A screw socket 311 fastened to the 216 is provided, and a third male screw 312 is provided on the other side.

상기 재-인장대좌(320)는 연장로드(310)가 통과되게 지지판재(240)의 상면에 설치되는 컵 형상으로 마련되고 그 내부의 센터로드(215)에 체결된 고정너트(250)를 죄일 수 있도록 측면에 적어도 하나이상의 절취 홈이나 구멍이 마련된다.The re-tensioning pedestal 320 is provided in the shape of a cup installed on the upper surface of the support plate 240 so that the extension rod 310 passes through and tightens the fixing nut 250 fastened to the center rod 215 therein. At least one cut-out groove or hole is provided on the side so as to be able to do so.

상기 인장실린더(330)는 연장로드(310)가 통과되게 재-인장대좌(320)의 상면에 설치되며, 원통형의 실린더 내에서 그 중심선방향으로 중공형의 피스톤이 출몰되는 중공형의 유압실린더이다. The tension cylinder 330 is a hollow hydraulic cylinder installed on the upper surface of the re-tensioning pedestal 320 so that the extension rod 310 passes, and the hollow piston protrudes and retracts in the centerline direction of the cylindrical cylinder. .

상기 승강판재(340)는 인장실린더(330)의 상면에 설치되는 것으로, 중앙에 연장로드(310)가 관통되는 통공을 갖는 소정두께의 판재이다.The lifting plate 340 is installed on the upper surface of the tension cylinder 330 , and is a plate having a predetermined thickness having a through hole through which the extension rod 310 passes in the center.

상기 잠금너트(350)는 승강판재(340)의 상면에 위치되게 연장로드(310)의 제3수나사(312)에 체결되는 통상의 너트이다.The lock nut 350 is a normal nut fastened to the third male screw 312 of the extension rod 310 to be positioned on the upper surface of the lifting plate 340 .

상기와 같이 구성된 본 발명에 따른 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치를 참고로 하여 그라운드 앵커의 강연선을 재-인장하는 방법을 상세하게 설명하고자 한다. A method of re-tensioning the strand of the ground anchor will be described in detail with reference to the re-tensioning device of the ground anchor for checking and managing the tension of the strand using the load gauge according to the present invention configured as described above.

먼저, 그라운드 앵커(100)가 도 3과 같이 토목공사나 건축공사시의 지반의 경사면이나 옹벽 등의 붕괴됨을 방지할 수 있도록 시공된 상태이다. First, as shown in FIG. 3 , the ground anchor 100 is constructed so as to prevent collapse of the slope of the ground or the retaining wall during civil engineering or construction work.

상기 그라운드 앵커(100)는 지중의 그라우팅 홀(120)에 강연선(110)을 설치하되 강연선(110)의 한쪽에 마련된 정착재인 지중앵커와 함께 매설되어 다른 한쪽끝단부분이 지상으로 돌출 연장되게 시공하고, 강연선(11)의 끝단부분이 관통되도록 지반의 경사면에 지압판재(140)와 강연선홀더(130)를 설치한다. The ground anchor 100 is constructed so that the strand 110 is installed in the grouting hole 120 in the ground, but is buried together with the underground anchor, which is a fixing material provided on one side of the strand 110, so that the other end protrudes to the ground, , Install the acupressure plate 140 and the strand holder 130 on the inclined surface of the ground so that the end of the strand 11 is penetrated.

이후에 인장실린더(도시되지 않음)로 강연선(110)을 당겨 그 인장상태가 유지되도록 한 상태에서 강연선홀더(130)의 웨지 홀(131)에 웨지(112)가 안착되게 삽입 설치한 후 인장실린더를 정지 및 분리시키면 강연선(110)의 끝단부분이 웨지(112)에 의해 파지되므로 그라운드 앵커(100)의 강연선(110)에 인장력이 부여된 상태로 유지되게 된다. After pulling the strand 110 with a tension cylinder (not shown) so that the tension state is maintained, the wedge 112 is inserted and installed to be seated in the wedge hole 131 of the strand holder 130, and then the tension cylinder When stopping and separating the strand 110 , the end portion of the strand 110 is held by the wedge 112 , so that the tension is maintained to the strand 110 of the ground anchor 100 .

이와 같이 그라운드 앵커의 시공이 완료된 이후에 강연선(110)에 부여하였던 인장력이 저하되어 재-인장이 요구될 때, 강연선을 재-인장하는 과정에 대하여 순차적으로 설명해본다. In this way, when the tensile force applied to the strand 110 is lowered and re-tension is required after the construction of the ground anchor is completed, the process of re-tensioning the strand will be sequentially described.

1) 재-인장유지유닛 설치단계1) Re-tension holding unit installation step

먼저, 도 5에 나타낸 바와 같이, 그라운드 앵커(100)의 강연선홀더(130)에 재-인장유지유닛(200)을 장착 내지 체결한다. First, as shown in FIG. 5 , the re-tension holding unit 200 is mounted or fastened to the strand holder 130 of the ground anchor 100 .

상기 강연선홀더(130)에 재-인장유지유닛(200)을 장착 내지 체결하는 과정은 그라운드 앵커(100)의 강연선홀더(130)에 재-인장유지유닛(200)의 텐션 벨(210)을 장착 내지 체결한다. 상기 텐션 벨(210)의 체결은 강연선홀더(130) 외측주면에 제1수나사(132)가 텐션 벨(210)의 홀더 캡(211)에 마련된 제1암나사(212)로 나사 결합되도록 체결한다. The process of mounting or fastening the re-tension holding unit 200 to the strand holder 130 is to mount the tension bell 210 of the re-tension holding unit 200 to the strand holder 130 of the ground anchor 100 . to contract The tension bell 210 is fastened so that the first male screw 132 is screwed to the outer peripheral surface of the strand holder 130 with the first female screw 212 provided in the holder cap 211 of the tension bell 210 .

이와 같이 텐션 벨(210)의 홀더 캡(211)을 강연선홀더(130)에 체결한 후 상기 텐션 벨(210)의 센터로드(215)가 통과됨과 아울러 소정높이만큼 홀더 캡(211)의 상승을 허용하는 컵 형상의 대좌(220)를 설치한다. As such, after fastening the holder cap 211 of the tension bell 210 to the strand holder 130, the center rod 215 of the tension bell 210 passes and the holder cap 211 rises by a predetermined height. An acceptable cup-shaped pedestal 220 is installed.

이와 같이 설치한 다음, 상기 대좌(220)의 상면에 센터로드(215)가 통과되게 하중계(230)와 지지판재240)를 가설하고 센터로드(215)의 제2수나사(216)에 고정너트(250)를 체결한다. 이때, 고정너트(250)의 체결은 하중계(230)와 지지판재(240)를 가압하는 정도로 체결할 필요는 없으나, 센터로드(215)의 제2수나사(216)에 재-인장유닛(300)의 연장로드(310)를 체결할 수 있도록 삽입 체결되어야 한다.After installing in this way, the load gauge 230 and the support plate 240 are installed on the upper surface of the pedestal 220 so that the center rod 215 passes, and a fixing nut ( 250) is fastened. At this time, the fastening of the fixing nut 250 does not need to be fastened to the extent of pressing the load gauge 230 and the support plate 240 , but re-tensioning unit 300 to the second male screw 216 of the center rod 215 . It should be inserted and fastened so as to fasten the extension rod 310 of the

2) 재-인장유닛 설치단계2) Re-tensioning unit installation step

도 6에 나타낸 바와 같이, 상기 재-인장유지유닛(200)에 재-인장유닛(300)을 연결 설치한다.As shown in FIG. 6 , the re-tensioning unit 300 is connected to the re-tensioning unit 200 and installed.

상기 재-인장유지유닛(200)에 재-인장유닛(300)을 연결 설치하는 과정은, 상기 재-인장유지유닛(200)의 센터로드(215)의 제2수나사(216) 단부에 센터로드(215)와 동심을 이루도록 연장로드(310)의 나사소켓(311)을 체결하고 상기 지지판재(240)의 상면에 연장로드(310)가 통과되게 컵 형상의 재-인장대좌(320)를 설치한다. The process of connecting and installing the re-tensioning unit 300 to the re-tension maintaining unit 200 is a center rod at the end of the second male screw 216 of the center rod 215 of the re-tension maintaining unit 200 . Fastening the screw socket 311 of the extension rod 310 so as to be concentric with the 215 and installing the cup-shaped re-tensioning pedestal 320 so that the extension rod 310 passes through the upper surface of the support plate 240 . do.

상기 재-인장대좌(320)의 상면에 연장로드(310)가 통과되게 중공형 인장실린더(330)와 승강판재(340)를 가설하고, 상기 연장로드(310)에서 중공형 인장실린더(330)와 승강판재(340)이 유동되지 않을 정도로 연장로드(310)의 제3수나사(312)에 잠금너트(350)를 체결한다.A hollow tension cylinder 330 and a lifting plate 340 are installed on the upper surface of the re-tensioning pedestal 320 so that the extension rod 310 passes, and the extension rod 310 has a hollow tension cylinder 330 . and the lock nut 350 is fastened to the third male screw 312 of the extension rod 310 to such an extent that the lifting plate 340 does not flow.

3) 재-인장 실시단계3) Re-tensioning step

먼저, 재-인장유지유닛(200)의 하중계(230)에 하중계 리더기(도시되지 않음)를 연결하고 재-인장유닛(300)의 인장실린더(330)에 유압펌프(도시되지 않음)을 연결 설치한다.First, a load gauge reader (not shown) is connected to the load gauge 230 of the re-tension holding unit 200, and a hydraulic pump (not shown) is connected and installed to the tension cylinder 330 of the re-tension unit 300. do.

이러한 상태에서 상기 인장실린더(330)를 일시적으로 가동시켜 재-인장유지유닛(200)의 하중계(230)에 소정의 하중을 인가하여 초기치를 설정한 후, 인장실린더(330)를 지속적으로 가동시켜 하중계(230)에 소정의 하중이 인가될 때 까지 재-인장을 실시한다(도 6 참조). In this state, the tension cylinder 330 is temporarily operated to apply a predetermined load to the load gauge 230 of the re-tension maintenance unit 200 to set an initial value, and then the tension cylinder 330 is continuously operated to Re-tension is performed until a predetermined load is applied to the load gauge 230 (see FIG. 6 ).

이렇게 강연선의 재-인장을 실시하면, 강연선홀더(130)와 함께 강연선(110)이 늘어난 만큼 재-인장유지유닛(200)을 이루는 텐션 벨(210)의 센터로드(215)가 대좌(220)에서 당겨지게 되므로 고정너트(250)를 지지판재(240)에 밀착되게 죄어서 재-인장의 실시를 완료한다.When the re-tensioning of the strand is performed in this way, the center rod 215 of the tension bell 210 constituting the re-tension maintaining unit 200 as much as the strand 110 is increased together with the strand holder 130 is the pedestal 220. Since it is pulled from the fixing nut 250 is tightened in close contact with the support plate member 240 to complete the re-tensioning.

4) 재-인장유닛 제거단계4) Re-tensioning unit removal step

도 7에 나타낸 바와 같이, 상기 재-인장유지유닛(200)에서 재-인장유닛(300)을 분리하여 제거한다.As shown in FIG. 7 , the re-tensioning unit 300 is separated and removed from the re-tensile holding unit 200 .

상기 재-인장유지유닛(200)에서 재-인장유닛(300)을 분리하여 제거하는 과정은, 상기 재-인장 실시단계에서 재-인장을 실시한 후, 유압펌프를 정지시켜 인장실린더(330)의 가동을 중지시킴과 아울러 인장하중을 해제한 다음 연장로드(310), 재-인장대좌(320), 인장실린더(330), 승강판재(340) 및 잠금너트(350) 등으로 된 재-인장유닛(300)을 분리 제거한다. 이때, 상기 재-인장유지유닛(200)의 하중계(230)에 연결된 하중계 리더기 또한 분리하여 제거한다.In the process of separating and removing the re-tensioning unit 300 from the re-tensile holding unit 200, the re-tensile is performed in the re-tensioning step, and then the hydraulic pump is stopped to remove the tension cylinder (330). After stopping the operation and releasing the tensile load, the re-tensioning unit made of an extension rod 310, a re-tensioning pedestal 320, a tensile cylinder 330, a lifting plate 340 and a lock nut 350, etc. (300) is separated and removed. At this time, the load gauge reader connected to the load gauge 230 of the re-tension holding unit 200 is also separated and removed.

5) 그라운드 앵커의 관리단계5) Ground anchor management stage

상기 재-인장유닛 제거단계에서 재-인장유닛을 제거한 후 그라운드 앵커(100)의 강연선홀더(130)에 연결 설치된 재-인장유지유닛(200)의 하중계(230)에다 일정주기마다 하중계 리더기를 연결하고 하중계(230)에 인가되고 있는 하중을 확인함으로써 그라운드 앵커의 이상여부를 관리할 수 있다. After removing the re-tensioning unit in the re-tensioning unit removal step, a load gauge reader is connected to the load gauge 230 of the re-tensile holding unit 200 connected to the strand holder 130 of the ground anchor 100 at regular intervals. And by checking the load being applied to the load gauge 230, it is possible to manage the abnormality of the ground anchor.

이와 같이 일정주기마다 그라운드 앵커(100)의 이상여무를 체크하여 그라운드 앵커(100)의 보수 내지 교환함 같이 지속적으로 관리함으로써 토목공사나 건축공사시의 지반의 경사면이나 옹벽 등의 붕괴됨을 방지할 수 있는 것이다.As such, by checking the abnormality of the ground anchor 100 at regular intervals and continuously managing it, such as repairing or replacing the ground anchor 100, it is possible to prevent the collapse of the slope or retaining wall of the ground during civil engineering or building construction. will be.

상기와 같이 본 발명에 따른 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치를 그라운드 앵커에 강연선의 재-인장을 실시한 후 관리하는 과정에서 재-인장유지유닛(200)을 이루는 하중계(230)가 고장 내지 파손되더라도 재-인장유지유닛(200)에 재-인장유닛(300)을 연결하여 간편하게 교환할 수 있다. As described above, in the process of managing the re-tensioning device of the ground anchor for checking and managing the tension of the strand using the load gauge according to the present invention after re-tensioning the strand to the ground anchor, the re-tension holding unit 200 Even if the load gauge 230 is broken or damaged, it can be easily replaced by connecting the re-tensioning unit 300 to the re-tensile holding unit 200 .

상기 하중계(230)의 교환하는 방법은 재-인장유지유닛(200)에 재-인장유닛(300)을 다시 연결한 후 재-인장유닛(300)의 인장실린더(330)를 가동시킨 상태에서 센터로드(215)의 고정너트(250)를 느슨하게 충분히 푼 다음, 인장실린더(330)의 가동을 중지시킴과 아울러 인장하중을 해제하고 연장로드(310), 재-인장대좌(320), 인장실린더(330), 승강판재(340) 및 잠금너트(350) 등으로 된 재-인장유닛을 분리 제거한다. 이후에, 텐션 벨(210)의 센터로드(215)로부터 하중계(230)를 빼내어 교체하고 센터로드(215)에 고정너트(250)를 체결한 다음 재-인장유지유닛(200)에 재-인장유닛(300)을 다시 연결하여 재-인장 실시단계와 재-인장유닛 제거단계를 수행하여 마무리하면 되는 것이다.The method of exchanging the load gauge 230 is to reconnect the re-tension unit 300 to the re-tension maintenance unit 200 and then operate the tension cylinder 330 of the re-tension unit 300 to the center After sufficiently loosening the fixing nut 250 of the rod 215, the operation of the tension cylinder 330 is stopped and the tension load is released, and the extension rod 310, the re-tensioning pedestal 320, the tension cylinder ( 330), the lifting plate 340 and the lock nut 350 are separated and removed from the re-tensioning unit. Thereafter, the load gauge 230 is removed from the center rod 215 of the tension bell 210 and replaced, and the fixing nut 250 is fastened to the center rod 215 and then re-tensioned to the re-tension holding unit 200 . By reconnecting the unit 300, the re-tensioning step and the re-tensioning unit removal step are performed to finish.

이상에서는 본 발명의 바람직한 실시 예에 대하여 나타내고 설명하였지만, 본 발명은 상술한 특정의 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남 없이 당해 발명이 속하는 기술 분야애서 통상의 지식을 가진 자에 의해 다양한 변형실시가 가능한 것은 물론이고, 이러한 변형실시들은 본 발명의 기술적 사상이나 전망으로부터 개별적으로 이해되어서는 아니 될 것이다.In the above, preferred embodiments of the present invention have been shown and described, but the present invention is not limited to the specific embodiments described above, and common knowledge in the technical field to which the present invention pertains without departing from the gist of the present invention as claimed in the claims Various modifications are possible by those having a

100: 그라운드 앵커 110: 강연선
120: 그라우팅 홀 130: 강연선홀더
200: 재-인장유지유닛 210: 텐션 벨
220: 대좌 230: 하중계
240: 지지판재 250: 고정너트
300: 재-인장유닛 310: 연장로드
320: 재-인장대좌 330: 인장실린더
340: 승강판재 350: 잠금너트
100: ground anchor 110: stranded wire
120: grouting hole 130: strand holder
200: re-tension maintenance unit 210: tension bell
220: pedestal 230: load gauge
240: support plate 250: fixing nut
300: re-tension unit 310: extension rod
320: re-tensile pedestal 330: tension cylinder
340: lifting plate 350: lock nut

Claims (3)

그라운드 앵커의 강연선에 인장력을 부여한 상태로 유지되도록 그라우팅 홀 입구의 강연선의 끝단부분에 고정된 웨지 및 강연선홀더를 포함하는 그라운드 앵커와 관련된 것으로,
상기 강연선홀더를 파지할 수 있는 홀더 캡에서 센터로드가 연장된 텐션 벨과, 상기 텐션 벨의 센터로드가 통과되도록 홀더 캡을 수용하는 컵 형상의 대좌와, 상기 대좌의 상면에 센터로드가 통과되게 설치되는 하중계와 지지판재, 상기 지지판재의 상면에 위치되게 센터로드에 체결되는 고정너트를 포함하는 재-인장유지유닛;
상기 센터로드의 단부에 체결되어 연장된 연장로드와, 상기 연장로드가 통과되게 지지판재의 상면에 설치되는 컵 형상의 재-인장대좌와, 상기 연장로드가 통과되게 재-인장대좌의 상면에 설치되는 중공형 인장실린더와 승강판재, 상기 승강판재의 상면에 위치되게 연장로드에 체결되는 잠금너트를 포함하는 재-인장유닛;
을 포함하여 구성됨을 특징으로 하는 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치.
It relates to a ground anchor including a wedge and a strand holder fixed to the end of the strand at the entrance of the grouting hole so as to maintain a tensile force applied to the strand of the ground anchor,
A tension bell with a center rod extending from the holder cap capable of holding the strand holder, a cup-shaped pedestal for accommodating the holder cap so that the center rod of the tension bell passes, and the center rod through the upper surface of the pedestal a re-tension holding unit including a load gauge and a support plate to be installed, and a fixing nut fastened to a center rod to be positioned on an upper surface of the support plate;
An extension rod fastened to the end of the center rod and extended, a cup-shaped re-tensioning pedestal installed on an upper surface of a support plate to allow the extension rod to pass through, and a re-tensioning pedestal installed on the upper surface of the re-tensioning pedestal to allow the extension rod to pass therethrough a re-tensioning unit including a hollow tension cylinder, a lifting plate, and a lock nut fastened to an extension rod to be positioned on an upper surface of the lifting plate;
Re-tensioning device of the ground anchor for checking and managing the tension of the stranded wire using a load gauge, characterized in that it comprises a.
제1항에 있어서,
상기 텐션 벨의 홀더 캡은 강연선홀더의 외측주면형상과 상응하는 형상으로 마련됨과 아울러 강연선홀더를 감싸면서 효과적으로 견고하게 파지할 수 있는 구조로 마련되는 것을 특징으로 하는 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장장치.
The method of claim 1,
The tension bell's holder cap is provided in a shape corresponding to the shape of the outer peripheral surface of the strand holder, and is provided in a structure that can be effectively and firmly gripped while surrounding the strand holder. Checking and managing the tension of the strand using a load gauge Ground anchor re-tensioning device for
기-시공된 강연선홀더를 감싸면서 파지하도록 홀더 캡을 씌워 텐션 벨을 설치하고 상기 텐션 벨의 센터로드가 통과됨과 아울러 소정높이만큼 홀더 캡의 상승을 허용하도록 컵 형상의 대좌를 설치한 다음, 상기 대좌의 상면에 센터로드가 통과되게 하중계와 지지판재를 가설하고 센터로드에 고정너트를 체결하여 재-인장유지유닛을 설치하는 단계;
상기 센터로드의 단부에 센터로드와 동심을 이루도록 연장로드를 체결하고 상기 지지판재의 상면에 연장로드가 통과되게 컵 형상의 재-인장대좌를 설치한 다음, 상기 재-인장대좌의 상면에 연장로드가 통과되게 중공형 인장실린더와 승강판재를 가설하고 상기 연장로드에 잠금너트를 체결하여 재-인장유닛을 설치하는 단계;
상기 인장실린더를 일시적으로 가동시켜 재-인장유지유닛의 하중계에 소정의 하중을 인가하여 초기치를 설정한 후 인장실린더를 지속적으로 가동시켜 하중계에 소정의 하중이 인가될 때 까지 재-인장을 실시하고 이러한 재-인장에 의해 강연선홀더와 함께 강연선이 늘어난 만큼 고정너트를 지지판재에 밀착되게 죄어서 재-인장을 실시하는 단계; 상기 단계에서 재-인장을 실시한 후 인장실린더의 가동을 중지시킴과 아울러 인장하중을 해제한 다음 연장로드, 재-인장대좌, 인장실린더, 승강판재 및 잠금너트를 분리 제거하는 재-인장유닛제거단계;
상기 단계에서 재-인장유닛을 제거한 후 재-인장유지유닛의 하중계에 인가되고 있는 하중을 일정주기마다 확인함으로써 그라운드 앵커의 이상여부를 관리하는 단계를 포함하는 것을 특징으로 하는 하중계를 이용한 강연선의 인장 확인과 관리를 위한 그라운드 앵커의 재-인장방법.
A tension bell is installed by covering the holder cap so as to be gripped while surrounding the pre-constructed strand holder, and a cup-shaped pedestal is installed to allow the center rod of the tension bell to pass and to allow the holder cap to rise by a predetermined height, and then Installing a load gauge and a support plate so that the center rod passes through the upper surface of the pedestal and fastening a fixing nut to the center rod to install a re-tension holding unit;
The extension rod is fastened to the end of the center rod so as to be concentric with the center rod, and a cup-shaped re-tensioning pedestal is installed so that the extension rod passes through the upper surface of the support plate, and then the extension rod is placed on the upper surface of the re-tensioning pedestal. installing a re-tensioning unit by installing a hollow tension cylinder and a lifting plate to pass through, and fastening a lock nut to the extension rod;
The tension cylinder is temporarily operated to apply a predetermined load to the load gauge of the re-tension holding unit to set the initial value, and then the tension cylinder is continuously operated to re-tension until a predetermined load is applied to the load gauge, performing re-tensioning by tightening the fixing nut to be in close contact with the support plate as much as the length of the strand together with the strand holder by this re-tensioning; After re-tensioning in the above step, the operation of the tension cylinder is stopped and the tension load is released, and then the extension rod, the re-tensioning pedestal, the tension cylinder, the lifting plate and the lock nut are separated and removed. ;
After removing the re-tensioning unit in the above step, by checking the load applied to the load system of the re-tension holding unit at regular intervals, the step of managing the abnormality of the ground anchor. A method of re-tensioning of the ground anchor for identification and maintenance.
KR1020210030730A 2021-03-09 2021-03-09 Ground anchor re-tensioning device and method capable of checking and managing the tension of stranded wire using a load gauge KR102454711B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210030730A KR102454711B1 (en) 2021-03-09 2021-03-09 Ground anchor re-tensioning device and method capable of checking and managing the tension of stranded wire using a load gauge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210030730A KR102454711B1 (en) 2021-03-09 2021-03-09 Ground anchor re-tensioning device and method capable of checking and managing the tension of stranded wire using a load gauge

Publications (2)

Publication Number Publication Date
KR20220126451A KR20220126451A (en) 2022-09-16
KR102454711B1 true KR102454711B1 (en) 2022-10-14

Family

ID=83445110

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210030730A KR102454711B1 (en) 2021-03-09 2021-03-09 Ground anchor re-tensioning device and method capable of checking and managing the tension of stranded wire using a load gauge

Country Status (1)

Country Link
KR (1) KR102454711B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004294235A (en) 2003-03-26 2004-10-21 Raito Kogyo Co Ltd Loading test method for ground anchor and testing apparatus therefor
KR101217285B1 (en) 2010-12-10 2013-02-07 이양기 Permanent anchor system, appartus of adjusting tension of earth anchor, and method thereof using same
KR101955573B1 (en) 2018-10-08 2019-03-08 주식회사 대성방재기술 Method and Apparatus for Re-Prestressing of Ground Anchor
KR102100387B1 (en) 2018-09-03 2020-04-13 주식회사 비엠테크 Method for re-tensioning anchor

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3983374B2 (en) * 1998-03-13 2007-09-26 株式会社三和技研 Anchor re-tension method and re-tension jig
KR100950265B1 (en) 2009-04-24 2010-03-31 이인귀 Retension cylinder
KR100949196B1 (en) 2009-08-11 2010-03-23 김성희 A apparatus for extensioning steel strand

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004294235A (en) 2003-03-26 2004-10-21 Raito Kogyo Co Ltd Loading test method for ground anchor and testing apparatus therefor
KR101217285B1 (en) 2010-12-10 2013-02-07 이양기 Permanent anchor system, appartus of adjusting tension of earth anchor, and method thereof using same
KR102100387B1 (en) 2018-09-03 2020-04-13 주식회사 비엠테크 Method for re-tensioning anchor
KR101955573B1 (en) 2018-10-08 2019-03-08 주식회사 대성방재기술 Method and Apparatus for Re-Prestressing of Ground Anchor

Also Published As

Publication number Publication date
KR20220126451A (en) 2022-09-16

Similar Documents

Publication Publication Date Title
KR101757713B1 (en) Multipurpose restrain apparatus improved in wedge assembly and constructing method using the same
JP6083702B2 (en) PC steel connection method and bridge widening method
KR102149489B1 (en) Wedge block for restrain apparatus and constructing method using the same
JP2009102928A (en) Ground anchor fixing head structure and tension releasing method
KR102454711B1 (en) Ground anchor re-tensioning device and method capable of checking and managing the tension of stranded wire using a load gauge
JP4311748B2 (en) Tension material fixing device and tension material fixing method
KR101097958B1 (en) Anchor bolt for fixing wire
CN110184954B (en) Bridge prestressed body outer cable dismantling method
JP3878616B2 (en) How to re-tension ground anchors
CN109853392B (en) Magnetic anchor releaser, anchor releasing equipment and using method thereof
KR100447967B1 (en) dismantling equipment of tension member for anchor method
CN109667386B (en) Anchoring wedge with separable bolt and method for anchoring tendon using the same
KR102198839B1 (en) Restrain apparatus and constructing method using the same
KR101055175B1 (en) Tensile cable retension structure and construction
US4345740A (en) Tensioning system for cables in prestressed concrete
KR102167163B1 (en) Restrain constructing method using reinforcement construction for ground anchor
KR102100387B1 (en) Method for re-tensioning anchor
JP2017193899A (en) Widening structure of existing PC floor slab
CN112900267A (en) Tensioning and anchoring system and method for carbon fiber plate bundles
KR102214174B1 (en) Anchor head unit for re-tensioning of strand wire and re-tensioning method of strand wire using the same
KR200372851Y1 (en) Strand wire re-prestressing structure
KR101074085B1 (en) A compressed and dispersed composite anchor removable the tension member and constructing method the same
JP2006112189A (en) Tensional material anchoring tool
KR100898012B1 (en) Anchor for a saftey net using under construction
KR100527389B1 (en) Rock Anchor

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant