KR102437261B1 - Cable sag prevention system for underground distribution - Google Patents

Cable sag prevention system for underground distribution Download PDF

Info

Publication number
KR102437261B1
KR102437261B1 KR1020210140973A KR20210140973A KR102437261B1 KR 102437261 B1 KR102437261 B1 KR 102437261B1 KR 1020210140973 A KR1020210140973 A KR 1020210140973A KR 20210140973 A KR20210140973 A KR 20210140973A KR 102437261 B1 KR102437261 B1 KR 102437261B1
Authority
KR
South Korea
Prior art keywords
photographing
cable
connector
central body
cleaning
Prior art date
Application number
KR1020210140973A
Other languages
Korean (ko)
Inventor
오복근
Original Assignee
주식회사 태화엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 태화엔지니어링 filed Critical 주식회사 태화엔지니어링
Priority to KR1020210140973A priority Critical patent/KR102437261B1/en
Application granted granted Critical
Publication of KR102437261B1 publication Critical patent/KR102437261B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/02Devices for adjusting or maintaining mechanical tension, e.g. take-up device
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16HGEARING
    • F16H1/00Toothed gearings for conveying rotary motion
    • F16H1/003Monodirectionally torque-transmitting toothed gearing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/14Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for weighing suspended loads
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K7/00Arrangements for handling mechanical energy structurally associated with dynamo-electric machines, e.g. structural association with mechanical driving motors or auxiliary dynamo-electric machines
    • H02K7/10Structural association with clutches, brakes, gears, pulleys or mechanical starters
    • H02K7/116Structural association with clutches, brakes, gears, pulleys or mechanical starters with gears
    • H04N5/2257
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Power Engineering (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Studio Devices (AREA)

Abstract

The present invention relates to a system for preventing sagging of a cable for underground distribution connected to a transformer. The system for preventing sagging of a cable, according to the present invention, comprises: a sensing means (110); a pinion gear (121); a rack bar (130); a front clamp (140); a rear clamp (150); and a situation management unit. According to the present invention, it is possible to quickly correct sagging of a distribution line caused by a wind load.

Description

변압기에 접속된 지중 배전용 케이블 처짐방지 시스템{Cable sag prevention system for underground distribution} Cable sag prevention system for underground distribution connected to transformer

본 발명은 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템에 관한 것으로서, 더욱 상세하게는 배전선로의 장력변화로 인한처짐이 발생시 고압선의 장력을 간편하게 조절하여 배전선로가 하부로 처지는 것을 방지할 수 있는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템에 관한 것이다. The present invention relates to a system for preventing cable sagging for underground distribution connected to a transformer, and more particularly, when sagging due to a change in tension of the distribution line occurs, the tension of the high-voltage line can be easily adjusted to prevent the distribution line from sagging downward. It relates to a cable sag prevention system for underground distribution connected to a transformer.

전력은 발전소로부터 선로를 통해 변전소로 전송되고 변압기를 통하여 여러 단계의 변압과정을 거친 후 다시 전주의 변압기에 접속되어 변압되고 해당 배전선로를 따라 일반 수용가 또는 건물로 공급하게 된다. Electric power is transmitted from the power plant to the substation through the line, and after going through several stages of transformation through the transformer, it is connected to the transformer of the pole again to be transformed and supplied to the general consumer or the building along the distribution line.

이때, 다수의 전주 중 어느 하나의 전주에는 변압기가 설치되어 있으며 이러한 변압기에 연결 접속되어 설치된 배전선로에는 뇌(雷), 써지(surge) 등 이상전압에 의한 기기보호와 누전으로 인한 각종 전기재해 방지를 위하여 배전선에서의 물질확보 및 양호한 접지가 필요하고, 이러한 접지는 전력이나 낙뢰로부터 인명 및 전력설비 보호기능을 갖는다. At this time, a transformer is installed on any one of the plurality of poles, and the distribution line connected to and installed with such a transformer protects equipment from abnormal voltages such as lightning and surge and prevents various electric disasters due to short circuit For this, it is necessary to secure materials and good grounding in the distribution line, and this grounding has a function of protecting human life and power equipment from electric power or lightning.

종래 기술에 의하여 전기를 전송하는 선로는 지중이나 공중에 설치되는 데, 공중에 설치될 경우 전주(철탑) 등의 지지물을 이용하여 가공 설치하게 된다. 상기 지지물 중 전주에 설치되는 선로는 3상 4선식, 3상 3선식 또는 단상 2 선식으로 전주 1 본에 주로 3 선 1 조로 하여 전주의 상하단으로 설치된다. 하나의 단위 전주(철탑) 당 최대 2 회선으로 제한되는 것이 일반적이며 큰 전력을 전송하는 선로일 경우에는 3회선 이상이 설치되기도 한다. A line for transmitting electricity according to the prior art is installed underground or in the air. When installed in the air, it is processed and installed using a support such as an electric pole (pylon). Of the above supports, the lines installed on the poles are three-phase, four-wire, three-phase, three-wire, or single-phase, two-wire systems, and are installed at the upper and lower ends of the poles in one set of three wires. It is generally limited to a maximum of 2 lines per unit pole (pylon), and in the case of a line that transmits a large amount of power, 3 or more lines are sometimes installed.

이와 같이 기존의 가공 케이블을 이용할 경우에는 1 회선당 3 - 4 선 1 조로 하여 전선로가 구성됨에 따라 전주의 설치 공간과 전주의 길이 등의 요인에 따라 전주 1 본에 설치할 수 있는 회선이 2 회선 이하로 제한되어 있었다. In this way, when using an existing overhead cable, the number of lines that can be installed in one pole is 2 or less depending on factors such as the installation space of the pole and the length of the pole as the wire path is composed of a set of 3-4 wires per line. was limited to

여기서, 수용가 측 각 전주의 전선은 전주 상단으로 횡설되는 상부지지대(완금)에 팽팽한 긴장력을 갖도록 배선되고, 상부 지지대에 고정된 라인 포스트 애자(Line post : 핀애자)를 통해 점퍼선과 상향 또는 하향으로 연결되게 된다.Here, the electric wire of each electric pole on the consumer side is wired to have a tight tension on the upper support (Wanggeum) that is gibbed to the top of the electric pole, and upwards or downwards with the jumper wire through the line post insulator (Line post: pin insulator) fixed to the upper support. will be connected

이러한 송배전 전선은 자체 하중과 외기의 영향에 의해 일정 기간이 경과하면 늘어지는 현상이 초래되므로 고압선 처짐 방지장치에 의해 처짐을 방지하고 있다. These transmission and distribution wires are prevented from sagging by a high-voltage cable sag prevention device because a phenomenon of sagging occurs after a certain period of time has elapsed due to the influence of its own load and external air.

도 1에서 보는 바와 같이 종래기술 1 에서 전선의 처짐방지 시설물은 활형 형상을 이루고 있되, 외측 중앙부위에는 마감 너트캡을 이용한 전선(2)의 잠금 설치를 이룰 수 있도록 절개홈이 중앙에 일체로 형성되어 있는 고정구(30)가 일체로 돌출 형성되어 있고, 양측에는 수직으로 관통된 연결공이 일체로 형성되어 있는활형 판 스프링(10)과, 절첩 개폐가 가능한 2 조 한 쌍의 부재로 이루어져 있되, 외주연 중앙 부위에는 전방으로연장 돌출되어 있는 연결구(22)가 형성되어 있으며, 상기 연결구(22)의 전방에는 수직 관통된 구멍이 각각 형성되어 있어, 상기 활형 판 스프링(10)의 양측에 형성되어 있는 연결공에 고정볼트를 이용한 연결 고정이 가능한형상을 이루고 있는 반호형 절첩 연결구(20)를 일체로 포함하여 구성되어 있다.As shown in Fig. 1, in the prior art 1, the wire sagging prevention facility has a bow-shaped shape, and in the outer central part, a cut-out groove is integrally formed in the center so that the lock installation of the wire 2 using a closing nut cap can be achieved. It consists of a bow-type leaf spring 10 in which a fastener 30 is integrally protruded, and a vertically penetrating connection hole is integrally formed on both sides, and two pairs of members that can be opened and closed by folding, the outer periphery A connector 22 that protrudes forward is formed in the central portion, and a vertical through hole is formed in front of the connector 22, respectively, so that the connection formed on both sides of the bow-type leaf spring 10 It is configured to integrally include a semi-arc-shaped folding connector 20 having a shape that can be fixedly connected to the ball using a fixing bolt.

그러나 종래기술 1에 의한 전선의 처짐방지 시설물은 전선의 처짐 발생시 전선 처짐에 대한 조정 범위가 미약하여 설치 후, 그 설치로 인한 실효성이 현저히 저하되는 문제점이 있었다. However, the wire sag prevention facility according to the prior art 1 has a weak adjustment range for the wire sag when the wire sag occurs, so there is a problem in that the effectiveness due to the installation is significantly reduced after installation.

처짐방지장치는 좌우측으로 양분되어 전후방측으로 연장된 직사각형상의 판체로 상하단에는 내측으로 수직절곡된 상하단돌부가 각각 형성되고, 전후방선단면에는 볼트공이 각각 형성되며, 중심측에는 일정간격을 가지고 상하부로 연장되는 수직장공이 형성되고,다수 개의 통공이 형성되는 좌우측지지틀과; 중심측에 전후방향으로 고압선이 관통되는 관통공을 갖고 관통공을 중심으로 상하로 양분되는 직육면체로 좌우측선단면에는 상기 좌우측지지틀의 볼트공을 각각 관통하여 너트에 의해 체결 고정되는 앵커볼트가 각각 형성되는 전후방측고정틀과; 상기 좌우측지지틀의 수직장공 전후방측 하단돌부에 억지 끼움으로 각각 고정되되 상단부에 축공을 갖는 전후방하단고정구가 각각 형성되고, 중심측이 좌우측 돌출되는 축바에 의해 관통되어 축결합되되 축바 양단은 상기 수직장공에 슬라이딩되게 위치되며 축돌부와 축요부를 각각 갖고 중심측에는 관통홀을 각각 갖으며 하단부 좌우측단에는 상기 전후방하단고정구의 축공에 각각 삽입되는 축 핀을 갖는 전후방승강판이 형성되며, 호형상으로 양단은 전후방승강판 내측에서 관통홀을 각각관통하여 너트에 의해 이탈이 방지되는 호형안내바가 형성되고, 상기 호형안내바에 감겨져 양단이 전후방승강판에 각각 용접고정되는 인장스프링이 형성되어 인장스프링의 수축력으로 상측으로 이동되면서 고압선을 상부로미는 상승탄성틀과; 상기 상승탄성틀 사이에 설치되되 상기 좌우측지지틀의 수직장공 전후방측 상단돌부에 억지끼움으로 각각 고정되되 하단부에 축공을 갖는 전후방상단고정구가 형성되고, 중심측이 좌우측 돌출되는 축바에의해 축결합되되 축바 양단은 상기 수직장공에 슬라이딩되게 위치되며 축돌부와 축요부를 각각 갖고 중심측에는 관통홀을 갖으며 상단부 좌우측단에는 상기 전후방상단고정구의 축공에 각각 삽입되는 축핀을 갖는 전후방승강판이 형성되며, 호형상으로 양단은 전후방승강판 내측에서 관통홀을 각각 관통하여 너트에 의해 이탈이 방지되는 호형안내바가 형성되고, 상기 호형안내바에 감겨져 양단이 전후방승강판에 용접고정되는 인장스프링이 형성되어 인장스프링의 수축력으로 하측으로 이동되면서 고압선을 하부로 미는 하강탄성틀을 구비한다.The anti-sag device is a rectangular plate that is divided into left and right and extends in the front and rear sides, with upper and lower protrusions vertically bent inward at the upper and lower ends, respectively, bolt holes are formed on the front and rear end faces, respectively, and the center side has a certain interval and extends up and down A vertical long hole is formed, and a left and right support frame in which a plurality of through holes are formed; It is a rectangular parallelepiped having a through hole through which the high-voltage wire passes in the front-rear direction at the center side, and is bisected up and down around the through hole. And the front and rear side fixing frame is formed; The front and rear lower end fixtures each having a shaft hole at the upper end are respectively fixed to the lower protrusions on the front and rear sides of the vertical long hole of the left and right support frames, and the center side is penetrated by the shaft bar protruding from the left and right and shaft-coupled, but both ends of the shaft bar are the vertical It is slidably positioned in the long hole, has a shaft protrusion and a shaft recess, respectively, a through hole in the center side, and a front and rear elevation plate having shaft pins inserted into the shaft holes of the front and rear lower end fixtures at the left and right ends of the lower end, respectively, in an arc shape at both ends is formed by penetrating through holes inside the front and rear elevating plates, respectively, to form an arc-shaped guide bar that is prevented from being separated by a nut, and a tensile spring wound around the arc-shaped guide bar and fixed by welding at both ends to the front and rear elevating plates is formed by the contractile force of the tensile spring. An ascending elastic frame for pushing the high-voltage line upward while moving upward; Installed between the lifting elastic frames and fixed to the upper protrusions on the front and rear sides of the vertical long holes of the left and right support frames, respectively, the front and rear upper end fixtures having shaft holes are formed at the lower end, and the center side is shaft-coupled by the shaft bars protruding from the left and right Both ends of the shaft bar are slidably positioned in the vertical long hole, have shaft protrusions and shaft recesses, respectively, have through holes on the center side, and the left and right ends of the upper end have shaft pins inserted into shaft holes of the front and rear upper end fixtures respectively. In shape, both ends penetrate through holes inside the front and rear elevating plates, respectively, an arc-shaped guide bar that prevents separation by a nut is formed, and a tensile spring that is wound around the arc-shaped guide bar and both ends are welded and fixed to the front and rear elevating plates is formed. It is provided with a descending elastic frame that pushes the high-voltage cable downward while moving downward by the contracting force.

그러므로 종래기술과 같이 전선에 처짐 발생시 전선 처짐에 대한 조정 범위가 미약하지 않도록 하고, 설치 후 실효성이 현저히 저하되는 문제를 해소하는 기술의 개발 필요가 있었다. Therefore, there was a need to develop a technology to prevent a weak adjustment range for wire sag when sagging occurs in the wire as in the prior art, and to solve the problem of remarkably lowered effectiveness after installation.

본 발명은 상기한 문제점을 해결하기 위하여 발명한 것으로서, 그 목적은 전주의 상부에 설치된 배전선을 안정적으로 지지함은 물론, 전주에 전달되는 풍하중 에 의하여 발생되는 배전선의 처짐을 신속하게 보정할 수 있는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템을 제공하는 것이다.The present invention was invented to solve the above problems, and its purpose is to stably support the distribution line installed on the upper part of the pole, as well as to quickly correct the deflection of the distribution line caused by the wind load transmitted to the pole. To provide an anti-sag system for cables for underground distribution connected to a transformer.

또한, 시스템상에 발생되는 다양한 상황을 감시관리하고, 특정된 위치로의 접근을 감시하며 이상상황을 실시간 감지하도록 하여 즉각적인 대처가 가능하도록 하는 관리수단이 구비되는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템를 제공하는 것이다.In addition, the cable for underground distribution connected to the transformer is provided with a management means to monitor and manage various situations occurring on the system, monitor the access to a specified location, and detect an abnormal situation in real time to enable an immediate response. to provide a preventive system.

또한, 시스템이 다수로 제작 설치 운용되는 과정을 감시관리하도록 다양한 촬영체들을 기반으로 안정적인 동작이 가능하고, 제착, 설치, 동작의 실시간검증과 후속검증이 가능하도록 하는 관리수단이 구비되는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템를 제공하는 것이다.In addition, stable operation is possible based on various photographic objects to monitor and manage the process of production, installation, and operation of multiple systems, and it is connected to a transformer equipped with management means to enable real-time verification and follow-up verification of attachment, installation, and operation. It is to provide a cable sag prevention system for underground distribution.

또한, 시스템의 구축과 운용에 있어 초기 관리와 이후의 지속적 관리를 다양한 구도와 형태로 가능하도록 구축하 다양한 구조적 환경에서도 유연하게 대처하며 검증 및 유지관리를 할 수 있는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템를 제공하는 것이다.In addition, the underground distribution cable connected to the transformer that can flexibly cope with various structural environments and perform verification and maintenance in various structures and forms for initial management and subsequent continuous management in the construction and operation of the system. To provide an anti-sag system.

또한, 시스템의 구축과 운용에 있어 다양한 형태로 촬영 관련구성의 설치 운용 관리 등의 조건, 효율성 및 필요성 등을 고려하여 선택적으로 외부 노출이 되도록 운용하며, 외부의 오염원과 충격 등으로부터 보호되도록 하며 촬영을 수행하도록 할 수 있는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템를 제공하는 것이다.In addition, in the construction and operation of the system, in consideration of the conditions, efficiency, and necessity of installation, operation and management of shooting-related components in various forms, it is operated to be selectively exposed to the outside, protected from external pollution sources and impacts, etc. It is to provide a cable sag prevention system for underground distribution connected to a transformer that can perform

또한, 시스템의 구축과 운용에 있어 다양한 형태로서, 촬영 관련구성이 거치되는 상태를 보다 안정적으로 구현하여 진동과 떨림 파손 등으로부터 보호되도록 하는 구조적 특징을 가지는 관리유닛을 가지는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템를 제공하는 것이다.In addition, as various forms in the construction and operation of the system, it is for underground distribution connected to a transformer having a management unit having a structural feature to more stably implement the state in which the photographing-related configuration is mounted and to protect it from vibration and vibration damage, etc. To provide a cable sagging prevention system.

본 발명의 과제들은 이상에서 언급한 과제로 제한되지 않으며, 언급되지 않은 또 다른 과제들은 아래의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다. The problems of the present invention are not limited to the problems mentioned above, and other problems not mentioned will be clearly understood by those skilled in the art from the following description.

본 발명은 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템에 있어서, 지면에 설정 간격을 두고 매립된 전주(100)의 상부에 완철(101)을 매개로 설치되는 케이블(C)의 처짐 상태를 감지하도록 전주(100)의 상단에 설치된 감지수단(110); 전주(100)의 상부에 설치된 구동모터(120)에 의해서 회전 가능하게 설치된 피니언 기어(121); 피니언기어(121)에 기어 결합된 랙기어(131)가 일면에 길이 방향으로 형성된 랙바(130); 랙바(130)의 단부에 설치되어 전방 실린더(141)의 작동에 의해서 개폐되는 것으로서 케이블(C)의 둘레면을 견고히 고정하여 미끄럼이 방지도록 늘어짐 방향인 일단은 낮고 보정되는 방향인 타단으로 향할 수록 점점 높아지는톱니 형상으로 형성된 지지돌기(142)가 형성되어 케이블(C)을 고정 또는 분리시키는 전방 클램프(140); 전주(100)의 상단 일측에 설치되어 후방 실린더(151)의 작동에 의해서 개폐되는 것으로서 케이블(C)의 둘레면을 견고히 고정하여 미끄럼이 방지되도록 늘어짐 방향인 일단은 낮고 보정되는 방향인 타단으로 향할 수록 점점 높아지는 톱니 형상으로 형성된 지지돌기(152)가 형성되어 케이블(C)을 고정 또는 분리시키는 후방 클램프(150); 및 상기 전주의 주변부에 설치되어 상기 전주에 상기 케이블 쳐짐방지 시스템이 설치되는 과정과, 상기 전주에 상기 케이블 쳐짐방지 시스템이 설치된 이후의 주변상황을 촬영하여 각종 이벤트상황을 관리하기 위한 상황관리유닛을 포함한다. The present invention detects the sagging state of the cable (C) installed in the upper part of the electric pole 100 buried at a set interval in the ground through the armrest 101 in the system for preventing sagging of the cable for underground distribution connected to the transformer Sensing means 110 installed on the upper end of the electric pole 100 so as to; a pinion gear 121 rotatably installed by the driving motor 120 installed on the electric pole 100; The rack gear 131 gear-coupled to the pinion gear 121 is formed in the longitudinal direction on one surface of the rack bar 130; Installed at the end of the rack bar 130 and opened and closed by the operation of the front cylinder 141, one end in the sagging direction is low and the other end in the direction to be corrected so as to firmly fix the circumferential surface of the cable (C) to prevent slipping. The front clamp 140 for fixing or separating the cable (C) is formed with a support protrusion 142 formed in a gradually increasing sawtooth shape; Installed on one side of the upper end of the electric pole 100 and opened and closed by the operation of the rear cylinder 151, one end in the sagging direction is low and the other end in the direction to be corrected so that the circumferential surface of the cable (C) is firmly fixed to prevent slipping. The rear clamp 150 for fixing or separating the cable (C) is formed with a support protrusion 152 formed in a sawtooth shape that gradually increases as the number increases; And it is installed in the periphery of the electric pole and the process of installing the cable sag prevention system on the electric pole, and the situation management unit for managing various event situations by photographing the surrounding situation after the cable sagging prevention system is installed on the electric pole include

상기와 같은 본 발명에 따르면 다음과 같은 효과가 하나 혹은 그 이상이 있다.According to the present invention as described above, there are one or more of the following effects.

본 발명은 전주의 상부에 설치된 배전선을 안정적으로 지지함은 물론, 전주에 전달되는 풍하중 에 의하여 발생되는 배전선의 처짐을 신속하게 보정할 수 있는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템을 제공할 수 있다.The present invention provides a system for preventing sagging of a cable for underground distribution connected to a transformer that can stably support the distribution line installed on the upper part of the pole, as well as quickly correct the deflection of the distribution line caused by the wind load transmitted to the electric pole. can

또한, 시스템상에 발생되는 다양한 상황을 감시관리하고, 특정된 위치로의 접근을 감시하며 이상상황을 실시간 감지하도록 하여 즉각적인 대처가 가능하도록 하는 관리수단이 구비되는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템을 제공할 수 있다.In addition, the cable for underground distribution connected to the transformer is provided with a management means to monitor and manage various situations occurring on the system, monitor the access to a specified location, and detect an abnormal situation in real time to enable an immediate response. A preventive system can be provided.

또한, 시스템이 다수로 제작 설치 운용되는 과정을 감시관리하도록 다양한 촬영체들을 기반으로 안정적인 동작이 가능하고, 제착, 설치, 동작의 실시간 검증과 후속검증이 가능하도록 하는 관리수단이 구비되는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템을 제공할 수 있다.In addition, stable operation is possible based on various photographic objects to monitor and manage the process of production, installation, and operation of multiple systems, and it is connected to a transformer equipped with management means that enables real-time verification and follow-up verification of attachment, installation, and operation. It is possible to provide a cable sag prevention system for underground distribution.

또한, 시스템의 구축과 운용에 있어 초기 관리와 이후의 지속적 관리를 다양한 구도와 형태로 가능하도록 구축하 다양한 구조적 환경에서도 유연하게 대처하며 검증 및 유지관리를 할 수 있는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템을 제공할 수 있다.In addition, the underground distribution cable connected to the transformer that can flexibly cope with various structural environments and perform verification and maintenance in various structures and forms for initial management and subsequent continuous management in the construction and operation of the system. An anti-sag system may be provided.

또한, 시스템의 구축과 운용에 있어 다양한 형태로 촬영 관련구성의 설치 운용 관리 등의 조건, 효율성 및 필요성 등을 고려하여 선택적으로 외부 노출이 되도록 운용하며, 외부의 오염원과 충격 등으로부터 보호되도록 하며 촬영을 수행하도록 할 수 있는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템을 제공할 수 있다.In addition, in the construction and operation of the system, in consideration of the conditions, efficiency, and necessity of installation, operation and management of shooting-related components in various forms, it is operated to be selectively exposed to the outside, protected from external pollution sources and impacts, etc. It is possible to provide a cable sag prevention system for underground distribution connected to a transformer that can perform

또한, 시스템의 구축과 운용에 있어 다양한 형태로서, 촬영 관련구성이 거치되는 상태를 보다 안정적으로 구현하여 진동과 떨림 파손 등으로부터 보호되도록 하는 구조적 특징을 가지는 관리유닛을 가지는 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템을 제공할 수 있다. In addition, as various forms in the construction and operation of the system, it is for underground distribution connected to a transformer having a management unit having a structural feature to more stably implement the state in which the photographing-related configuration is mounted and to protect it from vibration and vibration damage, etc. A cable sagging prevention system can be provided.

도 1은 종래기술 1에 따른 송배전 전선의 처짐방지 시설물을 설명하기 위한 평면도.
도 2는 본 발명에 따른 처짐방지 시스템을 나타낸 블록 구성도.
도 3은 본 발명에 따른 처짐방지 시스템이 전주에 설치된 상태를 나타낸 측면도.
도 4 및 도 5는 본 발명에 따른 처짐방지 시스템의 작동상태를 나타낸 측면도.
그리고
도 6 내지 도 11는 본 발명의 주요 구성들을 도시한 도면들이다.
1 is a plan view for explaining a sagging prevention facility of a transmission/distribution wire according to prior art 1.
Figure 2 is a block diagram showing the anti-sag system according to the present invention.
Figure 3 is a side view showing a state in which the anti-sag system according to the present invention is installed on the pole.
4 and 5 are side views showing the operating state of the anti-sag system according to the present invention.
and
6 to 11 are views showing the main components of the present invention.

이하 본 발명의 실시 예를 첨부된 도면을 참조해서 상세히 설명하면 다음과 같다. Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명에 따른 처짐방지 시스템을 나타낸 블록 구성도이고, 도 3은 본 발명에 따른 처짐방지 시스템이전주에 설치된 상태를 나타낸 측면도이며, 도 4 및 도 5는 본 발명에 따른 처짐방지 시스템의 작동상태를 나타낸 측면도이다. 본 발명 설명에 앞서, 이하의 특정한 구조 내지 기능적 설명들은 단지 본 발명의 개념에 따른 실시예를 설명하기 위한 목적으로 예시된 것으로서, 본 발명의 개념에 따른 실시예들은 다양한 형태로 실시될 수 있으며, 본 명세서에 설명된 실시예들에 한정되는 것으로 해석되어서는 아니 된다. 또한, 본 발명의 개념에 따른 실시예는 다양한 변경을 가할 수 있고 여러 가지 형태를 가질 수 있으므로, 특정실시예들은 도면에 예시하고 본 명세서에 상세하게 설명하고자 한다.Figure 2 is a block diagram showing the anti-sag system according to the present invention, Fig. 3 is a side view showing the state installed on the previous pole of the anti-sag system according to the present invention, Figures 4 and 5 are the anti-sagging system according to the present invention It is a side view showing the operating state of Prior to the description of the present invention, the following specific structural or functional descriptions are only exemplified for the purpose of describing embodiments according to the concept of the present invention, and embodiments according to the concept of the present invention may be implemented in various forms, It should not be construed as limited to the embodiments described herein. In addition, since the embodiment according to the concept of the present invention may have various changes and may have various forms, specific embodiments are illustrated in the drawings and described in detail herein.

여기에서 참조되는 바와 같이 본 발명은 지면에 설정 간격을 두고 매립된 전주(100)의 상부에 완철(101)을 매개로 케이블(C)이 설치되어 있되, 상기 전주(100)의 상단에는 케이블(C)의 처짐 상태를 감지하기 위한 감지수단(110)이 설치되어 있다.As referenced here, in the present invention, the cable (C) is installed on the upper part of the electric pole 100 buried at a set interval in the ground through the armrest 101, and the cable (C) is installed at the upper end of the electric pole 100 ( A sensing means 110 for detecting the sagging state of C) is installed.

그리고, 상기 전주(100)의 상부에는 구동모터(120)가 설치되어 있되, 상기 구동모터(120)에는 피니언 기어(121)가 회전 가능하게 설치되어 있다. 또한 상기 피니언 기어(121)에는 랙기어(131)가 기어 결합되어 있고, 상기 랙기어(131)는 케이블(C)이 설치된방향과 평행한 방향으로 설치된 랙바(130)의 일면에 길이 방향으로 형성되어 있다. In addition, the driving motor 120 is installed on the upper portion of the electric pole 100 , and a pinion gear 121 is rotatably installed in the driving motor 120 . In addition, a rack gear 131 is gear-coupled to the pinion gear 121, and the rack gear 131 is formed on one surface of the rack bar 130 installed in a direction parallel to the direction in which the cable C is installed in the longitudinal direction. has been

상기 랙바(130)의 단부에는 케이블(C)의 외측 둘레면을 선택적으로 고정하는 전방 클램프(140)가 설치되어있되, 상기 전방 클램프(140)는 랙바(130)의 단부에 설치된 전방 실린더(141)에 의해서 작동되어 개방 또는 닫혀지는 것으로서, 케이블(C)을 고정 또는 분리 시키는 것이다. A front clamp 140 for selectively fixing the outer circumferential surface of the cable C is installed at the end of the rack bar 130 , and the front clamp 140 is a front cylinder 141 installed at the end of the rack bar 130 . ) to open or close, fixing or separating the cable (C).

그리고, 상기 전주(100)의 상단 일측에는 케이블(C)의 외측 둘레면을 선택적으로 고정하는 후방 클램프(150)가설치되어 있되, 상기 후방 클램프(150)는 전주(100)의 상단 일 측에 설치된 후방 실린더(151)에 의해서 작동되어 개방 또는 닫혀지는 것으로서, 케이블(C)을 고정 또는 분리 시키는 것이다.And, the rear clamp 150 for selectively fixing the outer circumferential surface of the cable (C) is installed on one upper end side of the electric pole 100, the rear clamp 150 is the upper end side of the electric pole 100 It is operated by the installed rear cylinder 151 to open or close, and to fix or separate the cable (C).

한편, 상기 전방 클램프(140)와 후방 클램프(150)의 내측 둘레면에는 케이블(C)을 고정할 때 미끄럼이 발생되지않고, 견고히 고정할 수 있는 지지돌기(142,152)가 돌출되게 형성되어 있되, 상기 지지돌기(142,152)는 케이블(C)의 둘레면을 견고히 고정하여 미끄럼이 방지되도록 늘어짐 방향인 일단은 낮고 보정되는 방향인 타단으로 향할 수록 점점 높아지는 톱니 형상으로 형성되어 있다. On the other hand, on the inner circumferential surfaces of the front clamp 140 and the rear clamp 150, the support protrusions 142 and 152 that can be firmly fixed are formed to protrude without slipping when the cable C is fixed, The support protrusions 142 and 152 are formed in a sawtooth shape, one end in the sagging direction is low and the other end in the direction to be corrected so as to firmly fix the circumferential surface of the cable C to prevent sliding.

또한, 상기 감지수단(110)으로부터 전송되는 감지값이 사전에 설정된 정상범위에 해당하는 케이블의 처짐상태이상일 경우 구동모터(120), 전방 클램프(140) 및 후방 클램프(150)를 작동시켜 케이블의 처짐을 제거하는 제어부(160)가 마련되어 있다.In addition, when the detection value transmitted from the detection means 110 is greater than or equal to the drooping state of the cable corresponding to the preset normal range, the drive motor 120, the front clamp 140 and the rear clamp 150 are operated to reduce the length of the cable. A control unit 160 for removing sagging is provided.

이와 같이 구성된 본 발명을 상세히 설명하면 다음과 같다. 먼저, 정상상태 즉, 케이블(C)에 처짐이 발생되지 않은 경우에는 후방 클램프(150)가 케이블(C)의 외측 둘레면을 견고히 감사여진 상태가 유지되게 후방 실린더(151)를 작동시키는 것으로서, 케이블(C)을 견고히 고정하는것이다. 이러한 상태에서 케이블(C)에 처짐이 발생되면, 감지수단(110)에 의해서 상기 케이블(C)의 처짐이 감지되고, 상기 감지수단(110)의 감지값은 제어부(160)로 전송된다. The present invention configured as described above will be described in detail as follows. First, in a normal state, that is, when sagging of the cable (C) does not occur, the rear clamp 150 operates the rear cylinder 151 so that the external circumferential surface of the cable C is firmly tightened. It is to fix the cable (C) firmly. When sagging of the cable (C) occurs in this state, the sagging of the cable (C) is detected by the sensing means ( 110 ), and the sensed value of the sensing means ( 110 ) is transmitted to the controller ( 160 ).

이와 같이 전송된 감지값이 사전에 설정된 케이블(C)의 정상범위 처짐량 보다 클 경우(케이블의 처짐량이 정상범위 이상으로 발생한 경우)에는 케이블(C)의 처짐량을 보정하게 된다.If the sensed value transmitted in this way is larger than the pre-set amount of deflection in the normal range of the cable (C) (when the amount of deflection of the cable is greater than the normal range), the amount of deflection of the cable (C) is corrected.

이때에는 전방 실린더(141)를 구동시켜 전방 클램프(140)를 작동시키는 것으로서, 상기 전방 클램프(140)는 케이블(C)의 외측 둘레면을 견고히 고정하게 된다. At this time, the front cylinder 141 is driven to operate the front clamp 140 , and the front clamp 140 firmly fixes the outer circumferential surface of the cable (C).

상기 전방 클램프(140)에 형성된 전방 지지돌기(142)는 케이블(C)의 외측 둘레면에 긴밀히 접촉된다.The front support protrusion 142 formed on the front clamp 140 is in close contact with the outer circumferential surface of the cable (C).

상기 전방 지지돌기(142)는 일단은 낮고 타단으로 향할 수록 점점 높아지는 톱니 형상으로 형성되어 있으므로케이블(C)의 미끄럼이 방지되는 것이다. 그리고, 후방 클램프(150)가 개방되게 후방 실린더(151)가 역 방향으로 작동된다. The front support protrusion 142 is formed in a sawtooth shape having one end low and gradually increasing toward the other end, so that the cable C is prevented from sliding. Then, the rear cylinder 151 is operated in the reverse direction so that the rear clamp 150 is opened.

이러한 상태에서 구동모터(120)가 작동되면 피니언 기어(121)는 정 방향으로 작동되고, 상기 피니언 기어(121)에 기어 결합되어 있는 랙기어(131)가 이동하게 된다. 상기 랙기어(131)가 형성된 랙바(130)는 도 5에 나타낸 화살표 방향으로 이동되는 것이고, 상기 랙바(130)가 이동 될 때 전방 클램프(140)는 케이블(C)을 고정시킨 상태에서 이동하는 것으로서 케이블(C)의 당겨지는 것이다. In this state, when the driving motor 120 is operated, the pinion gear 121 operates in the forward direction, and the rack gear 131 gear-coupled to the pinion gear 121 moves. The rack bar 130 on which the rack gear 131 is formed is moved in the direction of the arrow shown in FIG. 5, and when the rack bar 130 is moved, the front clamp 140 moves while the cable C is fixed. As a result, the cable (C) is pulled.

상기와 같이 랙바(130)가 이동되면, 케이블(C)이 당겨진 상태를 유지할 수 있도록 후방 실린더(151)가작동되고, 후방 클램프(150)는 케이블(C)의 외측 둘레면을 견고히 고정하게 된다. 상기 후방 클램프(150)에 형성된 후방 지지돌기(152)는 케이블(C)의 외측 둘레면에 긴밀히 접촉된다. When the rack bar 130 is moved as described above, the rear cylinder 151 is operated to maintain the pulled state of the cable C, and the rear clamp 150 firmly fixes the outer circumferential surface of the cable C. . The rear support protrusion 152 formed on the rear clamp 150 is in close contact with the outer circumferential surface of the cable (C).

상기 후방 지지돌기(152)는 일단은 낮고 타단으로 향할 수록 점점 높아지는 톱니 형상으로 형성되어 있므로로,케이블(C)의 미끄럼이 방지되는 것이다. 그리고, 상기 전방 실린더(141)가 작동되어 전방 클램프(140)가 케이블(C)의 외측 둘레면에서 분리되면, 구동모터(120)가 역방향으로 구동되어 전방 클램프(140)는 초기 상태로 복귀 하는 것이다. Since the rear support protrusion 152 is formed in a sawtooth shape having one end low and gradually increasing toward the other end, sliding of the cable C is prevented. And, when the front cylinder 141 is operated and the front clamp 140 is separated from the outer circumferential surface of the cable C, the driving motor 120 is driven in the reverse direction to return the front clamp 140 to its initial state. will be.

상술한 바와 같은 본 발명에 의하면 전주(100)의 사이에 설치된 케이블(C)에 처짐이 발생할 경우 랙바(130)가 이동되어 케이블(C)을 이동시키는 것으로서, 처짐을 보정하는 한편, 전방 클램프(140)와 후방 클램프(150)가 순차적으로 개방 및 고정되어 케이블(C)의 처짐이 보상된 상태를 유지하게 되는 것이다.According to the present invention as described above, when sagging occurs in the cable (C) installed between the electric poles 100, the rack bar 130 is moved to move the cable (C), thereby correcting the sagging, while the front clamp ( 140) and the rear clamp 150 are sequentially opened and fixed to maintain the state in which the sagging of the cable (C) is compensated.

전술한 내용과 함께 도 6 내지 도 11를 참조하면 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템에 있어서, 지면에 설정 간격을 두고 매립된 전주(100)의 상부에 완철(101)을 매개로 설치되는 케이블(C)의 처짐 상태를 감지하도록 전주(100)의 상단에 설치된 감지수단(110); 전주(100)의 상부에 설치된 구동모터(120)에 의해서 회전 가능하게 설치된 피니언 기어(121); 피니언 기어(121)에 기어 결합된 랙기어(131)가 일면에 길이 방향으로 형성된 랙바(130); 랙바(130)의 단부에 설치되어 전방 실린더(141)의 작동에 의해서 개폐되는 것으로서 케이블(C)의 둘레면을 견고히 고정하여 미끄럼이 방지도록 늘어짐 방향인 일단은 낮고 보정되는 방향인 타단으로 향할 수록 점점 높아지는톱니 형상으로 형성된 지지돌기(142)가 형성되어 케이블(C)을 고정 또는 분리시키는 전방 클램프(140); 전주(100)의 상단 일측에 설치되어 후방 실린더(151)의 작동에 의해서 개폐되는 것으로서 케이블(C)의 둘레면을 견고히 고정하여 미끄럼이 방지되도록 늘어짐 방향인 일단은 낮고 보정되는 방향인 타단으로 향할 수록 점점 높아지는 톱니 형상으로 형성된 지지돌기(152)가 형성되어 케이블(C)을 고정 또는 분리시키는 후방 클램프(150); 및 상기 전주의 주변부에 설치되어 상기 전주에 상기 케이블 쳐짐방지 시스템이 설치되는 과정과, 상기 전주에 상기 케이블 쳐짐방지 시스템이 설치된 이후의 주변상황을 촬영하여 각종 이벤트상황을 관리하기 위한 상황관리유닛을 포함한다.6 to 11 together with the above content, in the cable sag prevention system for underground distribution connected to the transformer, installed in the upper part of the electric pole 100 buried at a set interval in the ground through the armrest 101 Sensing means 110 installed at the top of the electric pole 100 to detect the sagging state of the cable (C); a pinion gear 121 rotatably installed by the driving motor 120 installed on the electric pole 100; The rack gear 131 gear-coupled to the pinion gear 121 is formed in the longitudinal direction on one surface of the rack bar 130; Installed at the end of the rack bar 130 and opened and closed by the operation of the front cylinder 141, one end in the sagging direction is low and the other end in the direction to be corrected so as to firmly fix the circumferential surface of the cable (C) to prevent slipping. The front clamp 140 for fixing or separating the cable (C) is formed with a support protrusion 142 formed in a gradually increasing sawtooth shape; Installed on one side of the upper end of the electric pole 100 and opened and closed by the operation of the rear cylinder 151, one end in the sagging direction is low and the other end in the direction to be corrected so that the circumferential surface of the cable (C) is firmly fixed to prevent slipping. The rear clamp 150 for fixing or separating the cable (C) is formed with a support protrusion 152 formed in a sawtooth shape that gradually increases as the number increases; And it is installed in the periphery of the electric pole and the process of installing the cable sag prevention system on the electric pole, and the situation management unit for managing various event situations by photographing the surrounding situation after the cable sagging prevention system is installed on the electric pole include

여기서 상기 상황관리유닛은, 중앙몸체(110’)와, 상기 중앙몸체(110’)의 하부로 설치되는 지지연결체(121’)와, 상기 지지연결체(121’)를 매개로 상기 중앙몸체(110’)의 하부에 설치되며 상기 중앙몸체(110’)를 지지하는 지지패널(122’)과, 상기 지지연결체(121’)의 일측면으로 위치되도록 설치되는 다수의 일측촬영체(123’)와, 상기 좌측연결체(131’)의 타측면으로 위치되며 상기 일측촬영체(123’)와 반전되도록 설치되는 다수의 타측촬영체(124’)를 포함하는 하부감시파츠(120’)를 포함한다.Here, the situation management unit includes a central body 110 ′, a support connection body 121 ′ installed under the central body 110 ′, and the central body through the support connection body 121 ′. A support panel 122' which is installed under the 110' and supports the central body 110', and a plurality of one-side photographing bodies 123 installed to be positioned on one side of the support connection body 121'. ') and the lower monitoring parts 120' including a plurality of other imaging bodies 124' located on the other side of the left connector 131' and installed to be reversed from the one side imaging body 123') includes

또한 상기 중앙몸체(110’)의 좌측으로 설치되는 좌측연결체(131’)와, 상기 좌측연결체(131’)의 상부면으로 위치되도록 설치되는 다수의 제1-1촬영체(133’)와, 상기 좌측연결체(131’)의 하부면으로 위치되며 상기 제1-1촬영체(133’)와 반전되도록 설치되는 다수의 제1-2촬영체(134’)와, 상기 좌측연결체(131’)를 매개로 상기 중앙몸체(110’)의 좌측에 설치되는 제1유동체(132’)를 포함하는 제1감시파츠(130’)를 포함한다.In addition, a left connector 131' installed on the left side of the central body 110', and a plurality of first-first photographing bodies 133' installed to be positioned on the upper surface of the left connector 131' and a plurality of first-second photographing bodies 134' positioned on the lower surface of the left connector 131' and installed to be inverted from the first-first photographing body 133', and the left connector It includes a first monitoring part 130' including a first fluid 132' installed on the left side of the central body 110' via (131').

또한, 상기 중앙몸체(110’)의 우측으로 설치되는 우측 연결체(141’)와, 상기 우측 연결체(141’)의 상부면으로 위치되도록 설치되는 다수의 제2-1촬영체(143’)와, 상기 우측 연결체(141’)의 하부면으로 위치되며 상기 제2-1촬영체(143’)와 반전되도록 설치되는 다수의 제2-2촬영체(144’)와, 상기 우측 연결체(141’)를 매개로 상기 중앙몸체(110’)의 우측에 설치되는 제2유동체(142’)를 포함하는 제2감시파츠(140’)를 포함한다.In addition, the right connector 141' installed on the right side of the central body 110', and a plurality of second-first photographing bodies 143' installed to be positioned on the upper surface of the right connector 141' ), and a plurality of second-second photographing bodies 144' that are located on the lower surface of the right connecting body 141' and installed to be reversed from the second-first photographing body 143', and the right connection It includes a second monitoring part 140' including a second fluid 142' installed on the right side of the central body 110' via the sieve 141'.

아울러 상기 중앙몸체(110’)의 상측으로 설치되는 상측 연결체(151’)와, 상기 상측 연결체(151’)의 일측면으로 위치되도록 설치되는 다수의 제3-1촬영체(153’)와, 상기 상측 연결체(151’)의 타측면으로 위치되며 상기 제3-1촬영체(153’)와 반전되도록 설치되는 다수의 제3-2촬영체(154’)와, 상기 상측 연결체(151’)를 매개로 상기 중앙몸체(110’)의 상측에 설치되는 제3유동체(152’)를 포함하는 제3감시파츠(150’)를 포함한다.In addition, an upper connector 151' installed above the central body 110', and a plurality of 3-1 photographing bodies 153' installed to be positioned on one side of the upper connector 151' and a plurality of 3-2 photographing bodies 154' located on the other side of the upper connector 151' and installed to be reversed from the 3-1 photographing body 153', and the upper connector It includes a third monitoring part 150' including a third fluid 152' installed on the upper side of the central body 110' via (151').

이러한 상기 좌측연결체(131’)는 상기 중앙몸체(110’) 내부로 진입하거나 외부로 노출되는 제1출몰동작이 수행되며, 상기 우측연결체(141’)는 상기 중앙몸체(110’) 내부로 진입하거나 외부로 노출되는 제2출몰동작이 수행되며 상기 상측연결체(151’)는 상기 중앙몸체(110’) 내부로 진입하거나 외부로 노출되는 제3출몰동작이 수행된다.The left connecting body 131 ′ is subjected to a first protruding operation of entering or exposing to the inside of the central body 110 ′, and the right connecting body 141 ′ is inside the central body 110 ′. A second appearance/disappearance operation of entering into or exposed to the outside is performed, and a third appearance/disappearance operation of the upper connection body 151 ′ entering or exposing to the inside of the central body 110 ′ is performed.

여기서 상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)는, 상기 제1출몰동작 내지 상기 제3출몰동작에 기반하여 상기 중앙몸체(110’)의 내부로 수용되어 외부로부터 보호되도록 보관가능하며, 상기 상황관리유닛은, 상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)들 중 상기 제1-1촬영체(133’), 상기 제1-2촬영체(134’)가 상기 중앙몸체(110’)의 외부로 노출되어 촬영을 수행하는 제1동작모드와, 상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)들 중 상기 제2-1촬영체(143’), 상기 제2-2촬영체(144’)가 상기 중앙몸체(110’)의 외부로 노출되어 촬영을 수행하는 제2동작모드와, 상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)들 중 상기 제3-1촬영체(153’), 상기 제3-2촬영체(154’)가 상기 중앙몸체(110’)의 외부로 노출되어 촬영을 수행하는 제3동작모드로 동작 가능하다.Here, the first 1 - 1 photographing body 133' to the 3 - 2 photographing body 154' are moved to the inside of the central body 110' based on the first appearing/extending motion to the third appearing/disappearing motion. It can be accommodated and stored to be protected from the outside, and the situation management unit includes the first-first photographing body 133 among the first-first photographing body 133' to the third-second photographing body 154'. '), a first operation mode in which the first and second photographing bodies 134' are exposed to the outside of the central body 110' to perform photographing, and the 1-1 photographing bodies 133' to the Of the 3-2 photographing bodies 154', the 2-1 photographing body 143' and the 2-2 photographing object 144' are exposed to the outside of the central body 110' to perform photographing. A second operation mode to be performed, and the 3-1 photographing body 153' and the 3-2 photographing body 153' among the first-first photographing body 133' to the 3-2 photographing object 154' It is possible to operate in the third operation mode in which the photographing body 154' is exposed to the outside of the central body 110' to perform photographing.

상기 상황관리유닛은, 중앙몸체(110’)와, 상기 중앙몸체(110’)의 하부로 설치되는 지지연결체(121’)와, 상기 지지연결체(121’)를 매개로 상기 중앙몸체(110’)의 하부에 설치되며 상기 중앙몸체(110’)를 지지하는 지지패널(122’)과, 상기 지지연결체(121’)의 일측면으로 위치되도록 설치되는 다수의 일측촬영체(123’)와, 상기 지지연결체(121’)의 타측면으로 위치되며 상기 일측촬영체(123’)와 반전되도록 설치되는 다수의 타측촬영체(124’)를 포함하는 하부감시파츠(120’)를 포함한다.The situation management unit includes a central body 110 ′, a support connector 121 ′ installed under the central body 110 ′, and the central body 121 ′ through the support connector 121 ′. 110') and a support panel 122' for supporting the central body 110', and a plurality of one-side photographing bodies 123' installed to be positioned on one side of the support connection body 121'. ) and the lower monitoring parts 120' including a plurality of other imaging bodies 124', which are located on the other side of the support connection body 121' and are installed to be reversed with the one side imaging body 123'. include

또한 상기 중앙몸체(110’)의 좌측으로 설치되는 좌측연결체(131’)와, 상기 좌측연결체(131’)의 상부면으로 위치되도록 설치되는 다수의 제1-1촬영체(133’)와, 상기 좌측연결체(131’)의 하부면으로 위치되며 상기 제1-1촬영체(133’)와 반전되도록 설치되는 다수의 제1-2촬영체(134’)와, 상기 좌측연결체(131’)를 매개로 상기 중앙몸체(110’)의 좌측에 설치되는 제1유동체(132’)를 포함하는 제1감시파츠(130’)를 포함한다.In addition, a left connector 131' installed on the left side of the central body 110', and a plurality of first-first photographing bodies 133' installed to be positioned on the upper surface of the left connector 131' and a plurality of first-second photographing bodies 134' positioned on the lower surface of the left connector 131' and installed to be inverted from the first-first photographing body 133', and the left connector It includes a first monitoring part 130' including a first fluid 132' installed on the left side of the central body 110' via (131').

또한 상기 중앙몸체(110’)의 우측으로 설치되는 우측 연결체(141’)와, 상기 우측 연결체(141’)의 상부면으로 위치되도록 설치되는 다수의 제2-1촬영체(143’)와, 상기 우측 연결체(141’)의 하부면으로 위치되며 상기 제2-1촬영체(143’)와 반전되도록 설치되는 다수의 제2-2촬영체(144’)와, 상기 우측 연결체(141’)를 매개로 상기 중앙몸체(110’)의 우측에 설치되는 제2유동체(142’)를 포함하는 제2감시파츠(140’)를 포함한다.In addition, the right connector 141' installed to the right of the central body 110', and a plurality of second-first photographing bodies 143' installed to be positioned on the upper surface of the right connector 141' and a plurality of second-second photographing bodies 144' that are positioned on the lower surface of the right connector 141' and installed to be reversed from the second-first photographing body 143', and the right connector It includes a second monitoring part 140' including a second fluid 142' installed on the right side of the central body 110' via (141').

또한 상기 중앙몸체(110’)의 상측으로 설치되는 상측 연결체(151’)와, 상기 상측 연결체(151’)의 일측면으로 위치되도록 설치되는 다수의 제3-1촬영체(153’)와, 상기 상측 연결체(151’)의 타측면으로 위치되며 상기 제3-1촬영체(153’)와 반전되도록 설치되는 다수의 제3-2촬영체(154’)와, 상기 상측 연결체(151’)를 매개로 상기 중앙몸체(110’)의 상측에 설치되는 제3유동체(152’)를 포함하는 제3감시파츠(150’)를 포함한다.In addition, an upper connector 151' installed above the central body 110', and a plurality of 3-1 photographing bodies 153' installed to be positioned on one side of the upper connector 151' and a plurality of 3-2 photographing bodies 154' located on the other side of the upper connector 151' and installed to be reversed from the 3-1 photographing body 153', and the upper connector It includes a third monitoring part 150' including a third fluid 152' installed on the upper side of the central body 110' via (151').

여기서 상기 좌측연결체(131’)는 상기 중앙몸체(110’) 내부로 진입하거나 외부로 노출되는 제1출몰동작이 수행되며, 상기 우측연결체(141’)는 상기 중앙몸체(110’) 내부로 진입하거나 외부로 노출되는 제2출몰동작이 수행되며 상기 상측연결체(151’)는 상기 중앙몸체(110’) 내부로 진입하거나 외부로 노출되는 제3출몰동작이 수행된다.Here, the left connecting body 131 ′ performs a first protruding operation of entering or exposing to the inside of the central body 110 ′, and the right connecting body 141 ′ is inside the central body 110 ′. A second appearance/disappearance operation of entering into or exposed to the outside is performed, and a third appearance/disappearance operation of the upper connection body 151 ′ entering or exposing to the inside of the central body 110 ′ is performed.

아울러 상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)는, 상기 제1출몰동작 내지 상기 제3출몰동작에 기반하여 상기 중앙몸체(110’)의 내부로 수용되어 외부로부터 보호되도록 보관가능하다.In addition, the first 1 - 1 photographing body 133' to the 3 - 2 photographing body 154' are moved to the inside of the central body 110 ' based on the first appearing/disappearing operation to the third appearing/disappearing operation. It can be accommodated and stored to be protected from the outside.

상기 상황관리유닛은, 상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)들 중 상기 제1-1촬영체(133’), 상기 제1-2촬영체(134’)가 상기 중앙몸체(110’)의 외부로 노출되어 촬영을 수행하는 제1동작모드와, 상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)들 중 상기 제2-1촬영체(143’), 상기 제2-2촬영체(144’)가 상기 중앙몸체(110’)의 외부로 노출되어 촬영을 수행하는 제2동작모드와, 상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)들 중 상기 제3-1촬영체(153’), 상기 제3-2촬영체(154’)가 상기 중앙몸체(110’)의 외부로 노출되어 촬영을 수행하는 제3동작모드로 동작 가능하다.The situation management unit may include, among the first-first photographing body 133' to the third-second photographing body 154', the first-first photographing body 133' and the first-second photographing body 154'. A first operation mode in which a 134' is exposed to the outside of the central body 110' to perform photographing, and the 1-1 photographing body 133' to the 3-2 photographing body 154' a second operation mode in which the second-first photographing body 143' and the second-second photographing object 144' are exposed to the outside of the central body 110' to perform photographing; Among the 1-1 photographing body 133' to the 3-2 photographing body 154', the 3-1 photographing body 153' and the 3-2 photographing body 154' are the central body It is possible to operate in the third operation mode in which photographing is performed by being exposed to the outside of 110'.

이러한 상기 상황관리유닛은 상기 제1감시파츠(130’)와 상기 제2감시파츠(140’) 및 상기 제3감시파츠(150’)에 대한 지지고정과 오염관리동작을 수행하기 위한 복합관리모듈을 더 포함한다.The situation management unit is a complex management module for performing a contamination control operation and support fixing for the first monitoring parts 130 ′, the second monitoring parts 140 ′, and the third monitoring parts 150 ′. further includes

아울러 상기 복합관리모듈은 최하부의 하부몸체(210’)와, 상기 하부몸체(210’)의 상부 일측에 수직으로 설치되는 일측수직패널부(211’)와, 상기 일측수직패널부(211’)상에 수평으로 설치되는 제1-1일측수평체(212’)와, 상기 제1-1일측수평체(212’)의 단부에 구비되어 상기 일측촬영체(123’)에 대한 세정액을 토출하여 클리닝을 수행하는 제1-1일측세정체(213’)와, 상기 제1-1일측수평체(212’)와 상기 제1-1일측세정체(213’) 사이에 구비되고 상부로 위치하는 상기 제1-2촬영체(134’)에 대한 세정액을 토출하여 클리닝을 수행하는 제1-1보조세정체(214’)와, 상기 일측수직패널부(211’)상에 수평으로 설치되며 상기 제1-1일측수평체(212’)의 상부에 위치되는 제1-2일측수평체(215’)와, 상기 제1-2일측수평체(215’)의 단부에 구비되어 상기 제3-1촬영체(153’)에 대한 세정액을 토출하여 클리닝을 수행하는 제1-2일측세정체(216’)와, 상기 제1-2일측수평체(215’)와 상기 제1-2일측세정체(216’) 사이에 구비되고 하부로 위치하는 상기 제1-1촬영체(133’)에 대한 세정액을 토출하여 클리닝을 수행하는 제1-2보조세정체(217’)를 포함한다.In addition, the complex management module includes a lower body 210' of the lowermost portion, a one-side vertical panel part 211' that is vertically installed on an upper side of the lower body 210', and the one-side vertical panel part 211') The first 1-1 side horizontal body 212 ′ installed horizontally on the top and the 1-1 side horizontal body 212 ′ are provided at the end of the first side horizontal body 212 ′ to discharge the cleaning solution for the one side photographing body 123 ′. The 1-1 side cleaning body 213' for cleaning, the 1-1 side horizontal body 212' and the 1-1 side cleaning body 213' are provided between the cleaning body 213' and positioned upward. The first-first auxiliary cleaner 214' for cleaning by discharging the cleaning liquid for the second-second photographing body 134', is installed horizontally on the one-side vertical panel part 211', and the 1 - 1 - 1 - 1 - 1 - sided horizontal body (215') located on the upper side of the horizontal body (212'), and is provided at the end of the 1 - 2 - 1 - side horizontal body 215' The first 1-2 side cleaning body 216 ′ for performing cleaning by discharging the cleaning solution for the first photographing body 153 ′, the 1-2 day side horizontal body 215 ′ and the 1-2 day side cleaning body 215 ′ and a 1-2 auxiliary cleaning body 217' provided between the stagnants 216' and performing cleaning by discharging a cleaning solution for the first-first photographing body 133' positioned downward.

또한, 상기 하부몸체(210’)의 상부 타측에 수직으로 설치되는 타측수직패널부(221’)와, 상기 타측수직패널부(221’)상에 수평으로 설치되는 제2-1일측수평체(222’)와, 상기 제2-1일측수평체(222’)의 단부에 구비되어 상기 타측촬영체(124’)에 대한 세정액을 토출하여 클리닝을 수행하는 제2-1일측세정체(223’)와, 상기 제2-1일측수평체(222’)와 상기 제2-1일측세정체(223’) 사이에 구비되고 상부로 위치하는 상기 제2-2촬영체(144’)에 대한 세정액을 토출하여 클리닝을 수행하는 제2-1보조세정체(224’)와, 상기 타측수직패널부(221’)상에 수평으로 설치되며 상기 제2-1일측수평체(222’)의 상부에 위치되는 제2-2일측수평체(225’)와, 상기 제1-2일측수평체(215’)의 단부에 구비되어 상기 제3-2촬영체(154’)에 대한 세정액을 토출하여 클리닝을 수행하는 제2-2일측세정체(226’)와, 상기 제2-2일측수평체(225’)와 상기 제2-2일측세정체(226’) 사이에 구비되고 하부로 위치하는 상기 제2-1촬영체(143’)에 대한 세정액을 토출하여 클리닝을 수행하는 제2-2보조세정체(227’)를 포함한다.In addition, the other side vertical panel part 221' vertically installed on the other upper side of the lower body 210', and the 2-1 one side horizontal body horizontally installed on the other side vertical panel part 221' ( 222') and the 2-1 one-side cleaning body 223', which is provided at the end of the 2-1 one-side horizontal body 222' and discharges a cleaning solution for the other side photographing body 124' to perform cleaning. ), and the 2-1 one-side horizontal body 222' and the 2-1 one-side cleaning body 223' and a cleaning solution for the 2-2 photographing body 144' positioned upwards. A 2-1 auxiliary cleaning body 224' for cleaning by discharging and horizontally installed on the other side vertical panel part 221', on top of the 2-1 first side horizontal body 222' The 2-2 one-sided horizontal body 225', which is provided at the end of the 1-2 one-sided horizontal body 215', is provided at the end of the 3-2 one-side horizontal body 215', and is cleaned by discharging a cleaning solution for the 3-2 photographing body 154'. The 2-2 one-side cleaning body 226 ′ for performing and a second-second auxiliary cleaning body 227' for performing cleaning by discharging a cleaning solution for the second-first photographing body 143'.

이때 상기 복합관리모듈은, 상기 하부몸체(210’)의 상부에서 상기 일측수직패널부(211’)와 상기 타측수직패널부(221’) 사이에 위치되어 상기 중앙몸체(110’)를 거치고정시키는 중앙고정부(310’)와, 상기 하부몸체(210’)의 상부에서 상기 일측수직패널부(211’)의 외곽으로 설치되며 상기 일측수직패널부(211’)을 지지고정시키는 제1외곽고정부(411’)와, 상기 하부몸체(210’)의 상부에서 상기 타측수직패널부(221’)의 외곽으로 설치되며 상기 타측수직패널부(221’)을 지지고정시키는 제2외곽고정부(511’)를 더 포함한다.At this time, the complex management module is positioned between the one side vertical panel part 211' and the other side vertical panel part 221' on the upper part of the lower body 210' and is fixed through the central body 110'. The central fixing part 310', which is installed to the outside of the one-side vertical panel part 211' from the upper part of the lower body 210', and the first external height for supporting and fixing the one-side vertical panel part 211' A second outer fixing part ( 511').

상기 중앙고정부(310’)는, 상기 하부몸체(210’)의 상부에 구비되고 상부에 상기 지지패널(122’)이 거치되면 상부에 구비된 한 쌍의 이동형고정체(3111’,3112’)로 상기 지지패널(122’)의 양측을 가압 고정시키는 중앙고정모듈(311’)과, 상기 하부몸체(210’)의 좌측상부에 구비되고 제1연동체(312’)를 통해 상기 중앙고정모듈(311’)과 연결되며 상기 일측수직패널부(211’)를 눌러 고정시키는 일측고정모듈(313’)과, 상기 하부몸체(210’)의 우측상부에 구비되고 제2연동체(314’)를 통해 상기 중앙고정모듈(311’)과 연결되며 상기 타측수직패널부(221’)를 눌러 고정시키는 타측고정모듈(315’)을 더 포함한다.The central fixing part 310' is provided on the upper part of the lower body 210', and when the support panel 122' is mounted on the upper part, a pair of movable fixing bodies 3111' and 3112' provided on the upper part are provided. A central fixing module 311 ′ for pressing and fixing both sides of the support panel 122 ′ with a furnace, and the central fixing module 311 ′ provided on the upper left side of the lower body 210 ′ and through the first interlocking body 312 ′ (311') and one side fixing module (313') for pressing and fixing the one side vertical panel part (211'), and is provided on the upper right side of the lower body (210') and a second interlocking body (314') It is connected to the central fixing module 311 ′ through the other side fixing module 315 ′ for pressing and fixing the other side vertical panel part 221 ′.

여기서 상기 제1외곽고정부(411’)는,상기 하부몸체(210’)에 일부가 삽입장착되는 제1삽입몸체(4111’)와, 상기 제1삽입몸체(4111’)의 상부로 설치되며 상기 일측수직패널부(211’)와 대향하여 접하는 제1대향몸체(4112’)와, 상기 제1대향몸체(4112’)의 상부에 구비되고 저면부로 상기 일측수직패널부(211’)의 상방에 접하는 제1상방패널(4113’)을 포함한다.Here, the first outer fixing part 411' is installed as an upper portion of the first inserting body 4111', which is partially inserted and mounted on the lower body 210', and the first inserting body 4111', and A first opposing body 4112' facing and in contact with the one-side vertical panel part 211' is provided on an upper portion of the first opposing body 4112' and is a bottom surface of the one-side vertical panel part 211'. and a first upper panel 4113' in contact with the .

이러한 상기 제1삽입몸체(4111’)는 상기 일측고정모듈(313’)에 의하여 가압되는 상기 일측수직패널부(211’)을 반대방향에서 지지고정시키며, 상기 제1대향몸체(4112’)는 높이방향상에 다수로 구비되는 다수의 제1진입구조체(P11’)를 매개로 상기 일측수직패널부(211’)에 장착고정되며, 상기 제1상방패널(4113’)은 하부에 구비되는 제1하방진입구조체(P12’)를 매개로 상기 일측수직패널부(211’)의 상방으로 장착고정된다.The first insertion body 4111' supports and fixes the one-side vertical panel part 211' pressed by the one-side fixing module 313' in the opposite direction, and the first opposed body 4112' It is mounted and fixed to the one side vertical panel part 211' through a plurality of first entry structures P11' provided in a plurality in the height direction, and the first upper panel 4113' is the first provided in the lower part. 1 The lower entry structure (P12') is fixed to the upper side of the vertical panel part 211' through the medium.

아울러 상기 제2외곽고정부(511’)는, 상기 하부몸체(210’)에 일부가 삽입장착되는 제2삽입몸체(5111’)와, 상기 제2삽입몸체(5111’)의 상부로 설치되며 상기 타측수직패널부(221’)와 대향하여 접하는 제2대향몸체(5112’)와, 상기 제2대향몸체(5112’)의 상부에 구비되고 저면부로 상기 타측수직패널부(221’)의 상방에 접하는 제2상방패널(5113’)을 포함한다. 상기 제2삽입몸체(5111’)는 상기 타측고정모듈(315’)에 의하여 가압되는 상기 타측수직패널부(221’)을 반대방향에서 지지고정시키며, 상기 제2대향몸체(5112’)는 높이방향상에 다수로 구비되는 다수의 제2진입구조체(P12’)를 매개로 상기 타측수직패널부(221’)에 장착고정되며, 상기 제2상방패널(5113’)은 하부에 구비되는 제2하방진입구조체(P22’)를 매개로 상기 타측수직패널부(221’)의 상방으로 장착고정된다. 또한 상기 제1진입구조체(P11’), 상기 제2진입구조체(P12’), 상기 제1하방진입구조체(P12’) 및 상기 제2하방진입구조체(P22’)는 각각 장착고정된 상태에서 정방향 혹은 역방향 회전방식을 기반으로 각기 상기 일측수직패널부(211’)와 상기 타측수직패널부(221’)에 대한 고정력을 재차 가한다.In addition, the second outer fixing part 511' is installed in the upper part of the second inserting body 5111' and the second inserting body 5111', a part of which is inserted and mounted in the lower body 210'. A second opposing body 5112' facing and in contact with the other side vertical panel unit 221' is provided on an upper portion of the second opposing body 5112' and is a bottom surface portion above the other side vertical panel unit 221'. and a second upper panel 5113' in contact with the . The second insertion body 5111' supports and fixes the other side vertical panel part 221' pressed by the other side fixing module 315' in the opposite direction, and the second opposing body 5112' has a height A plurality of second entry structures (P12') provided in plurality in the direction are mounted and fixed to the other side vertical panel part 221' via a medium, and the second upper panel 5113' is a second It is mounted and fixed upward of the other side vertical panel part 221' via the downward entry structure P22'. In addition, the first entry structure (P11'), the second entry structure (P12'), the first downward entry structure (P12'), and the second downward entry structure (P22') are respectively mounted and fixed in the forward direction. Alternatively, the fixing force to the one side vertical panel part 211' and the other side vertical panel part 221' is applied again based on the reverse rotation method, respectively.

한편 상기 상황관리유닛은, 소정의 설치대상부상에서 상하로 대칭으로 다수 설치되는 제1설치모드와, 좌우 대칭으로 다수 설치되는 제2설치모드와, 상하좌우 대칭으로 다수 설치되는 제3설치모드로 각기 설치 가능하다. On the other hand, the situation management unit, a first installation mode in which a plurality of symmetrically installed up and down on a predetermined installation target portion, a second installation mode in which a plurality of symmetrical installations are installed, and a third installation mode in which a plurality of symmetrical installations are vertically and horizontally installed. Each can be installed.

이러한 상기 일측수직패널부(211’)와 상기 타측패널부(221’)는, 상기 좌측열결체(131’)와 상기 우측연결체(141’) 상기 상측연결체(151’)가 상부 중앙몸체(110’)로 후퇴하고, 상기 지지연결체(121’)상에 상기 일측촬영체(123’)와 상기 타측촬영체(124’)가 제거된 상태에서, 상기 제1-1일측수평체(212’)와 상기 제2-1일측수평체(222’)를 통해 상기 지지연결체(121’)를 각각 가압고정하며, 상기 제1-2일측수평체(215’)와 상기 제2-2일측수평체(225’)를 통해 상기 제3유동체(152’)의 양측을 각각 가압고정한다. The one side vertical panel part 211' and the other side panel part 221' have the left heat coupling body 131', the right side coupling body 141', and the upper side coupling body 151' being an upper central body. In a state in which the one side photographing body 123' and the other side photographing body 124' are removed on the support connecting body 121', the 1-1 side horizontal body ( 212') and the 2-1 one-side horizontal body 222' to press and fix the support connector 121', respectively, and the 1-2 one-side horizontal body 215' and the 2-2 Both sides of the third fluid 152' are pressed and fixed through one horizontal body 225', respectively.

이상에서 전술한 물리적 구성들의 구동방식은 모터, 엑츄에이터 등을 기반으로 전후유동, 회전이동이 이루어지며 각 구성부의 형상과 크기는 설치 현장과 구현하고자하는 자재들에 따라 다양하게 선택되어 구비될 수 있다. In the above-described driving method of the physical components described above, forward and backward flow and rotational movement are made based on a motor, an actuator, etc., and the shape and size of each component may be variously selected and provided according to the installation site and materials to be implemented. .

본 발명은 도면에 도시된 실시예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 다른 실시예가 가능하다는 점을 이해할 것이다. 따라서, 본 발명의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의하여 정해져야 할 것이다.Although the present invention has been described with reference to the embodiment shown in the drawings, which is merely exemplary, it will be understood by those skilled in the art that various modifications and equivalent other embodiments are possible therefrom. Accordingly, the true technical protection scope of the present invention should be defined by the technical spirit of the appended claims.

C : 케이블 100 : 전주
101 : 완철 110 : 감지수단
120 : 구동모터 130 : 랙바
140 : 전방 클램프
C: cable 100: electric pole
101: Wancheol 110: sensing means
120: drive motor 130: rack bar
140: front clamp

Claims (2)

변압기에 접속된 지중 배전용 케이블 처짐방지 시스템에 있어서,
지면에 설정 간격을 두고 매립된 전주(100)의 상부에 완철(101)을 매개로 설치되는 케이블(C)의 처짐 상태를 감지하도록 전주(100)의 상단에 설치된 감지수단(110);
전주(100)의 상부에 설치된 구동모터(120)에 의해서 회전 가능하게 설치된 피니언 기어(121);
피니언 기어(121)에 기어 결합된 랙기어(131)가 일면에 길이 방향으로 형성된 랙바(130);
랙바(130)의 단부에 설치되어 전방 실린더(141)의 작동에 의해서 개폐되는 것으로서 케이블(C)의 둘레면을 견고히 고정하여 미끄럼이 방지도록 늘어짐 방향인 일단은 낮고 보정되는 방향인 타단으로 향할 수록 점점 높아지는톱니 형상으로 형성된 지지돌기(142)가 형성되어 케이블(C)을 고정 또는 분리시키는 전방 클램프(140);
전주(100)의 상단 일측에 설치되어 후방 실린더(151)의 작동에 의해서 개폐되는 것으로서 케이블(C)의 둘레면을 견고히 고정하여 미끄럼이 방지되도록 늘어짐 방향인 일단은 낮고 보정되는 방향인 타단으로 향할 수록 점점 높아지는 톱니 형상으로 형성된 지지돌기(152)가 형성되어 케이블(C)을 고정 또는 분리시키는 후방 클램프(150); 및
상기 전주의 주변부에 설치되어 상기 전주에 상기 케이블 쳐짐방지 시스템이 설치되는 과정과, 상기 전주에 상기 케이블 쳐짐방지 시스템이 설치된 이후의 주변상황을 촬영하여 각종 이벤트상황을 관리하기 위한 상황관리유닛을 포함하는, 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템.
상기 상황관리유닛은
중앙몸체(110’)와,
상기 중앙몸체(110’)의 하부로 설치되는 지지연결체(121’)와, 상기 지지연결체(121’)를 매개로 상기 중앙몸체(110’)의 하부에 설치되며 상기 중앙몸체(110’)를 지지하는 지지패널(122’)과, 상기 지지연결체(121’)의 일측면으로 위치되도록 설치되는 다수의 일측촬영체(123’)와, 상기 지지연결체(121’)의 타측면으로 위치되며 상기 일측촬영체(123’)와 반전되도록 설치되는 다수의 타측촬영체(124’)를 포함하는 하부감시파츠(120’)와,
상기 중앙몸체(110’)의 좌측으로 설치되는 좌측연결체(131’)와, 상기 좌측연결체(131’)의 상부면으로 위치되도록 설치되는 다수의 제1-1촬영체(133’)와, 상기 좌측연결체(131’)의 하부면으로 위치되며 상기 제1-1촬영체(133’)와 반전되도록 설치되는 다수의 제1-2촬영체(134’)와, 상기 좌측연결체(131’)를 매개로 상기 중앙몸체(110’)의 좌측에 설치되는 제1유동체(132’)를 포함하는 제1감시파츠(130’)와,
상기 중앙몸체(110’)의 우측으로 설치되는 우측 연결체(141’)와, 상기 우측 연결체(141’)의 상부면으로 위치되도록 설치되는 다수의 제2-1촬영체(143’)와, 상기 우측 연결체(141’)의 하부면으로 위치되며 상기 제2-1촬영체(143’)와 반전되도록 설치되는 다수의 제2-2촬영체(144’)와, 상기 우측 연결체(141’)를 매개로 상기 중앙몸체(110’)의 우측에 설치되는 제2유동체(142’)를 포함하는 제2감시파츠(140’)와,
상기 중앙몸체(110’)의 상측으로 설치되는 상측 연결체(151’)와, 상기 상측 연결체(151’)의 일측면으로 위치되도록 설치되는 다수의 제3-1촬영체(153’)와, 상기 상측 연결체(151’)의 타측면으로 위치되며 상기 제3-1촬영체(153’)와 반전되도록 설치되는 다수의 제3-2촬영체(154’)와, 상기 상측 연결체(151’)를 매개로 상기 중앙몸체(110’)의 상측에 설치되는 제3유동체(152’)를 포함하는 제3감시파츠(150’)를 포함하며,
상기 좌측연결체(131’)는 상기 중앙몸체(110’) 내부로 진입하거나 외부로 노출되는 제1출몰동작이 수행되며,
상기 우측연결체(141’)는 상기 중앙몸체(110’) 내부로 진입하거나 외부로 노출되는 제2출몰동작이 수행되며
상기 상측연결체(151’)는 상기 중앙몸체(110’) 내부로 진입하거나 외부로 노출되는 제3출몰동작이 수행되며
상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)는,
상기 제1출몰동작 내지 상기 제3출몰동작에 기반하여 상기 중앙몸체(110’)의 내부로 수용되어 외부로부터 보호되도록 보관가능하며,
상기 상황관리유닛은,
상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)들 중 상기 제1-1촬영체(133’), 상기 제1-2촬영체(134’)가 상기 중앙몸체(110’)의 외부로 노출되어 촬영을 수행하는 제1동작모드와,
상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)들 중 상기 제2-1촬영체(143’), 상기 제2-2촬영체(144’)가 상기 중앙몸체(110’)의 외부로 노출되어 촬영을 수행하는 제2동작모드와,
상기 제1-1촬영체(133’) 내지 상기 제3-2촬영체(154’)들 중 상기 제3-1촬영체(153’), 상기 제3-2촬영체(154’)가 상기 중앙몸체(110’)의 외부로 노출되어 촬영을 수행하는 제3동작모드로 동작 가능하되,
상기 상황관리유닛은
상기 제1감시파츠(130’)와 상기 제2감시파츠(140’) 및 상기 제3감시파츠(150’)에 대한 지지고정과 오염관리동작을 수행하기 위한 복합관리모듈을 더 포함하며,
상기 복합관리모듈은,
최하부의 하부몸체(210’)와, 상기 하부몸체(210’)의 상부 일측에 수직으로 설치되는 일측수직패널부(211’)와, 상기 일측수직패널부(211’)상에 수평으로 설치되는 제1-1일측수평체(212’)와, 상기 제1-1일측수평체(212’)의 단부에 구비되어 상기 일측촬영체(123’)에 대한 세정액을 토출하여 클리닝을 수행하는 제1-1일측세정체(213’)와, 상기 제1-1일측수평체(212’)와 상기 제1-1일측세정체(213’) 사이에 구비되고 상부로 위치하는 상기 제1-2촬영체(134’)에 대한 세정액을 토출하여 클리닝을 수행하는 제1-1보조세정체(214’)와, 상기 일측수직패널부(211’)상에 수평으로 설치되며 상기 제1-1일측수평체(212’)의 상부에 위치되는 제1-2일측수평체(215’)와, 상기 제1-2일측수평체(215’)의 단부에 구비되어 상기 제3-1촬영체(153’)에 대한 세정액을 토출하여 클리닝을 수행하는 제1-2일측세정체(216’)와, 상기 제1-2일측수평체(215’)와 상기 제1-2일측세정체(216’) 사이에 구비되고 하부로 위치하는 상기 제1-1촬영체(133’)에 대한 세정액을 토출하여 클리닝을 수행하는 제1-2보조세정체(217’)를 포함하는, 변압기에 접속된 지중 배전용 케이블 처짐방지 시스템.
In the cable sag prevention system for underground distribution connected to a transformer,
Sensing means 110 installed at the top of the electric pole 100 to detect the sagging state of the cable (C) installed via the arm-cheol 101 on the upper part of the electric pole 100 buried at a set interval in the ground;
a pinion gear 121 rotatably installed by the driving motor 120 installed on the electric pole 100;
The rack gear 131 gear-coupled to the pinion gear 121 is formed in the longitudinal direction on one surface of the rack bar 130;
Installed at the end of the rack bar 130 and opened and closed by the operation of the front cylinder 141, one end in the sagging direction is low and the other end in the direction to be corrected so as to firmly fix the circumferential surface of the cable (C) to prevent slipping. The front clamp 140 for fixing or separating the cable (C) is formed with a support protrusion 142 formed in a gradually increasing sawtooth shape;
Installed on one side of the upper end of the electric pole 100 and opened and closed by the operation of the rear cylinder 151, one end in the sagging direction is low and the other end in the direction to be corrected so that the circumferential surface of the cable (C) is firmly fixed to prevent slipping. The rear clamp 150 for fixing or separating the cable (C) is formed with a support protrusion 152 formed in a sawtooth shape that gradually increases as the number increases; and
It is installed in the periphery of the electric pole, and the process of installing the cable sagging prevention system on the electric pole, and a situation management unit for managing various event situations by photographing the surrounding situation after the cable sagging prevention system is installed on the electric pole A cable sag prevention system for underground distribution connected to a transformer.
The situation management unit
The central body 110 'and,
A support connector 121' installed under the central body 110', and the support connector 121' are installed at the lower portion of the central body 110' via the support connector 121', and the central body 110' ), a support panel 122' for supporting the support connector 121', a plurality of one-side photographing bodies 123' installed to be positioned on one side of the support connector 121', and the other side of the support connector 121' and lower monitoring parts 120' including a plurality of other side photographing bodies 124' which are positioned as and are installed to be reversed from the one side photographing body 123';
A left connector 131 ′ installed on the left side of the central body 110 ′, and a plurality of 1-1 photographing bodies 133 ′ installed to be positioned on the upper surface of the left connector 131 ′; , a plurality of first-second photographing bodies 134' located on the lower surface of the left connector 131' and installed to be reversed from the first-first photographing body 133', and the left connector ( 131') and a first monitoring part 130' including a first fluid 132' installed on the left side of the central body 110',
A right connector 141' installed on the right side of the central body 110', and a plurality of second-first photographing bodies 143' installed to be positioned on the upper surface of the right connector 141'; , a plurality of second-second photographing bodies 144' that are positioned on the lower surface of the right connector 141' and installed to be reversed from the second-first photographing body 143', and the right connector ( 141') and a second monitoring part 140' including a second fluid 142' installed on the right side of the central body 110',
An upper connector 151' installed above the central body 110', and a plurality of 3-1 photographing bodies 153' installed to be positioned on one side of the upper connector 151'; , a plurality of 3-2 photographing bodies 154' located on the other side of the upper connector 151' and installed to be reversed from the 3-1 photographing body 153', and the upper connector ( 151') including a third monitoring part 150' including a third fluid 152' installed on the upper side of the central body 110' through the medium,
The left connector 131 'is the central body 110', the first intrusion operation of entering or exposed to the outside is performed,
The right connecting body 141 'is the central body 110', the inside of the inside or exposed to the outside, the second appearance and exit operation is performed,
The upper connecting body 151 'is the central body 110', a third intrusion operation is performed to enter or to be exposed to the outside,
The 1-1 photographing body 133' to the 3-2 photographing body 154' are,
It can be stored so as to be accommodated inside the central body 110 ′ and protected from the outside based on the first appearance and withdrawal operation to the third appearance and withdrawal operation,
The situation management unit,
Among the first-first photographing body 133' to the third-second photographing body 154', the first-first photographing body 133' and the first-second photographing object 134' are the A first operation mode for performing photographing by being exposed to the outside of the central body 110';
Among the first-first photographing body 133' to the third-second photographing body 154', the second-first photographing body 143' and the second-second photographing object 144' are the A second operation mode in which the photographing is performed by being exposed to the outside of the central body 110';
The 3-1 photographing body 153' and the 3-2 photographing body 154' among the first-first photographing body 133' to the 3-2 photographing object 154' are the It is possible to operate in the third operation mode, which is exposed to the outside of the central body 110' and performs photography,
The situation management unit
The first monitoring part 130', the second monitoring part 140', and the third monitoring part 150' further include a complex management module for fixing the support and performing the pollution control operation,
The complex management module,
The lower body 210 ′ of the lowermost portion, one side vertical panel part 211 ′ vertically installed on one side of the upper side of the lower body 210 ′, and horizontally installed on the one side vertical panel part 211 ′ The first 1-1 side horizontal body 212' and the first 1-1 side horizontal body 212' are provided at an end of the first side horizontal body 212' to discharge a cleaning solution for the one-sided photographing body 123' to perform cleaning. -One-sided cleaning body 213', the 1-1 side horizontal body 212' and the 1-1 side cleaning body 213' are provided between the first-day side cleaning body 213' and the 1-2 shooting A 1-1 auxiliary cleaning body 214' for performing cleaning by discharging a cleaning solution to the sieve 134', is installed horizontally on the one-side vertical panel unit 211', and the 1-1 side horizontal The first 1-2 one-sided horizontal body 215' located on the upper part of the sieve 212', and the 1-2 one-side horizontal body 215' are provided at the end of the 3-1 photographing body 153' ) between the first 1-2 side cleaning body 216 ′ for performing cleaning by discharging the cleaning solution for the For underground distribution connected to a transformer, including a 1-2 auxiliary cleaning body 217 ′ provided in and for performing cleaning by discharging a cleaning solution for the first 1-1 photographing body 133 ′ located below Cable anti-sag system.
삭제delete
KR1020210140973A 2021-10-21 2021-10-21 Cable sag prevention system for underground distribution KR102437261B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210140973A KR102437261B1 (en) 2021-10-21 2021-10-21 Cable sag prevention system for underground distribution

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210140973A KR102437261B1 (en) 2021-10-21 2021-10-21 Cable sag prevention system for underground distribution

Publications (1)

Publication Number Publication Date
KR102437261B1 true KR102437261B1 (en) 2022-08-29

Family

ID=83113699

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210140973A KR102437261B1 (en) 2021-10-21 2021-10-21 Cable sag prevention system for underground distribution

Country Status (1)

Country Link
KR (1) KR102437261B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117200119A (en) * 2023-10-26 2023-12-08 南通特尔瓦高绝缘材料有限公司 Power tower protector for power engineering
KR102617211B1 (en) * 2023-03-07 2023-12-27 주식회사 테라 Distribution line telephone pole system and setup method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102293382B1 (en) * 2020-08-31 2021-08-26 이은영 Preventing droop system for power transmission/power distribution cable line
KR102298156B1 (en) * 2021-02-01 2021-09-07 (주)대주기술 Monitoring system of underground distribution line
KR102308527B1 (en) * 2021-03-03 2021-10-06 주식회사 태화 System for adjusting position of electric pole

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102293382B1 (en) * 2020-08-31 2021-08-26 이은영 Preventing droop system for power transmission/power distribution cable line
KR102298156B1 (en) * 2021-02-01 2021-09-07 (주)대주기술 Monitoring system of underground distribution line
KR102308527B1 (en) * 2021-03-03 2021-10-06 주식회사 태화 System for adjusting position of electric pole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102617211B1 (en) * 2023-03-07 2023-12-27 주식회사 테라 Distribution line telephone pole system and setup method thereof
CN117200119A (en) * 2023-10-26 2023-12-08 南通特尔瓦高绝缘材料有限公司 Power tower protector for power engineering
CN117200119B (en) * 2023-10-26 2024-04-26 广东顺峰电力科技有限公司 Power tower protector for power engineering

Similar Documents

Publication Publication Date Title
KR102437261B1 (en) Cable sag prevention system for underground distribution
KR100932187B1 (en) Apparatus and method for monitering error of distributing board by detecting a partial discharge of high-voltage electicity furniture
KR101422743B1 (en) Supporter for cable of electric power line
DK2923015T3 (en) TRANSFER STATION FOR INTRODUCING ELECTRIC ENERGY AND WINDOW ENERGY PARK WITH SUCH A TRANSFER STATION
KR102002813B1 (en) Fault section detecting apparatus of underground distribution line with earthquake-proof function
KR102112560B1 (en) Distributing board
KR101455281B1 (en) Apparatus for fixing bundled cable of electric power transmission lines
KR101416847B1 (en) Insulator of electric power line for preventing electric shock
KR102293382B1 (en) Preventing droop system for power transmission/power distribution cable line
KR100746787B1 (en) Plug-in box having safety locking apparatus
CN209963490U (en) High-voltage draw-out type switch cabinet convenient to walk line
KR20200006777A (en) Switchboard having earthquake-proof device
CN114188827A (en) High-voltage distribution box with good stability and easy maintenance
KR101475264B1 (en) Power transmission cable insulation support
EP2876660A1 (en) Circuit breaker with low-clearance connections
KR101557722B1 (en) Panel structure assembly of power facilities for substation
KR102442245B1 (en) Providing method for utility pole protection system with distribution transformar and insulator
JP3237305U (en) High voltage power receiving device
CN110416894A (en) Outdoor mobile exchange emergency power distribution equipment
EP4046250A1 (en) Tower, particularly for a high-voltage overhead electric transmission line, equipped with switchgear unit and related protection, command and control system
CN105356306A (en) Mounting structure for grouping automatic switching compensation cabinet
CN218667651U (en) Prevent subsiding cable shaft suitable for cable duct bank
CN2865083Y (en) Railway integration power distribution station
CN2882077Y (en) High-voltage series capacitor compensator
CN209844248U (en) Floor type high-voltage isolation switch cabinet

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant