KR102413369B1 - Distribution line grounding method system and its operation method - Google Patents
Distribution line grounding method system and its operation method Download PDFInfo
- Publication number
- KR102413369B1 KR102413369B1 KR1020220011520A KR20220011520A KR102413369B1 KR 102413369 B1 KR102413369 B1 KR 102413369B1 KR 1020220011520 A KR1020220011520 A KR 1020220011520A KR 20220011520 A KR20220011520 A KR 20220011520A KR 102413369 B1 KR102413369 B1 KR 102413369B1
- Authority
- KR
- South Korea
- Prior art keywords
- module
- distribution line
- manhole
- plate panel
- connection system
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G13/00—Installations of lightning conductors; Fastening thereof to supporting structure
- H02G13/40—Connection to earth
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R4/00—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
- H01R4/58—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation characterised by the form or material of the contacting members
- H01R4/66—Connections with the terrestrial mass, e.g. earth plate, earth pin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/10—Installations of electric cables or lines in or on the ground or water in cable chambers, e.g. in manhole or in handhole
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
본 발명은 매설형 지중 배전선로의 접지선 연결시스템 운용방법으로서, 매설형 지중 배전선로의 접지선 연결시스템이 준비되는 단계; 상기 매설형 지중 배전선로의 접지선 연결시스템이 공사현장에 이송되는 단계; 및 상기 매설형 지중 배전선로의 접지선 연결시스템이 공사현장에 설치되는 단계를 포함하고, 상기 매설형 지중 배전선로의 접지선 연결시스템은 관리유닛에 의하여 설치과정이 모니터링되되, 상기 관리유닛은 상기 배전선로 주변의 접근인원과 자재운용 상황을 모니터링하되, 상기 매설형 지중 배전선로의 접지선 연결시스템은, 관 형태로 이루어져 맨홀의 상부를 형성하는 동시에 상단은 지면에 노출되어 해당 맨홀에 대한 출입구를 형성하는 맨홀 목과, 상기 맨홀 목의 하단과 연결되는 개방홀이 상면에 형성되고 배전선로의 통과를 위한 복수의 전선홀이 측면에 형성되며 하부를 개방한 형태로 이루어져 지중에 매설되는 상부 맨홀 블록을 포함하는 배전선로의 접지시스템을 제공한다.The present invention provides a method for operating a grounding line connection system of a buried type underground distribution line, comprising the steps of: preparing a grounding line connection system of a buried type underground distribution line; transferring the ground wire connection system of the buried underground distribution line to a construction site; and installing the ground wire connection system of the buried underground distribution line at a construction site, wherein the installation process of the ground wire connection system of the buried underground distribution line is monitored by a management unit, and the management unit is the distribution line A manhole that monitors the number of people approaching and the situation of material operation in the vicinity, but the ground wire connection system of the buried underground distribution line is in the form of a tube and forms the upper part of the manhole, and at the same time, the upper part is exposed to the ground to form an entrance to the manhole A distribution line comprising a neck and an upper manhole block having an open hole connected to the lower end of the manhole neck formed on the upper surface, a plurality of wire holes for the passage of the distribution line formed on the side, and an upper manhole block having an open lower portion and buried underground Provides a grounding system for the furnace.
Description
본 발명은 매설형 지중 배전선로의 접지선 연결시스템 및 그 운용방법에 관한 것으로 보다 상세하게는 지중 배전선로의 접지를 위한 접지봉들이 맨홀을 매개로 보다 간편하게 설치되어 접지 시공시간이 단축되어 유지보수 관리가 용이한 매설형 지중 배전선로의 접지선 연결시스템 및 그 운용방법에 관한 것이다.The present invention relates to a grounding wire connection system for a buried underground distribution line and an operating method thereof, and more particularly, the grounding rods for grounding the underground distribution line are installed more conveniently through a manhole, thereby reducing the grounding construction time, so that maintenance management is possible It relates to a ground wire connection system of an easy buried underground distribution line and a method for operating the same.
지중 배전선로의 경우 차로나 보도 등을 따라 매설되는 경우도 많고, 따라서 접지봉을 교체하여 매설하는 등 접지 시설의 유지보수 작업 시 차로나 보도의 땅을 파헤치게 되어 해당 작업시간이 길어지는 동시에 그에 따른 비교적 긴 시간 동안 차량 통행이나 보행에 불편함을 주는 것이었다. In the case of underground distribution lines, they are often buried along lanes or sidewalks. Therefore, during maintenance work of grounding facilities such as replacing grounding rods and burying, digging up the ground in lanes or sidewalks increases the working time and consequently It was to cause inconvenience to vehicle traffic or walking for a relatively long time.
맨홀은 지중에 매설한 수도관, 하수관, 배선(配線) 따위를 검사하거나 수리, 청소 등을 위해 해당 작업자가 드나들 수 있게 만든 구멍 내지 그 시설물을 말하는 것이며, 지중 배전선로 역시 이러한 맨홀을 통과하면서 매설됨이 일반적이다. A manhole refers to a hole or facility that a worker can enter and exit for inspection, repair, cleaning, etc. of water pipes, sewage pipes, and wiring buried underground. It is common to be
이러한 실정속에 배전선로의 접지시스템의 신뢰성 있닌 구축과 운영 방안은 부재하다.Under these circumstances, there is no reliable construction and operation plan for the grounding system of distribution lines.
본 발명이 해결하고자 하는 과제는 배전선로의 접지를 위한 접지봉들이 맨홀을 매개로 보다 용이하게 설치될 수 있는 동시에 유지보수도 쉽게 이루어질 수 있게 하여 지중 배전선로의 접지를 위한 기존의 번거롭고 많은 시간을 요구하는 접지봉 매설 과정을 생략할 수 있도록 하는 매설형 지중 배전선로의 접지선 연결시스템을 제공하는 것이다.The problem to be solved by the present invention is that the earthing rods for the grounding of the distribution line can be installed more easily through a manhole, and at the same time, maintenance can be made easily, so that the existing cumbersome and time-consuming for the grounding of the underground distribution line is required. It is to provide a grounding wire connection system of a buried type underground distribution line that can omit the grounding rod burial process.
또한 본 발명의 실시 예는 맨홀 내 지중 배전선로의 설치 상태에 이상이 생기거나 이상 정도가 심하여 지락, 단락 등의 사고 발생 시 해당 상황을 실시간으로 정확히 파악하여 관련 조치가 신속히 취해질 수 있도록 하는 매설형 지중 배전선로의 접지선 연결시스템을 제공하는 것이다. In addition, an embodiment of the present invention is a buried type in which an abnormality occurs in the installation state of an underground distribution line in a manhole or the degree of abnormality is severe so that when an accident such as a ground fault or short circuit occurs, the situation can be accurately identified in real time and related measures can be taken promptly It is to provide a ground wire connection system of an underground distribution line.
또한, 매설형 지중 배전선로의 접지선 연결시스템 운용방법에 신뢰성을 부여하고 검증이 가능하도록 하여 품질관리가 가능하도록 하는 것이다.In addition, it is to give reliability to the operation method of the ground wire connection system of the buried underground distribution line and to enable quality control by enabling verification.
또한, 매설형 지중 배전선로의 접지선 연결시스템의 준비, 설치 운영 등에 대한 관리수단이 갖춰져 시스템에 대한 안정적 취급을 위한 실시간 감시와 대응을 가능하도록 하는 것이다.In addition, management means for the preparation, installation and operation of the grounding connection system of the buried underground distribution line are provided to enable real-time monitoring and response for stable handling of the system.
또한, 이러한 관리수단을 통해 시스템은 물론 이러한 시스템 주변 현장에 관련된 인원, 비인가 인원 등의 관리와 통제를 가능케 하여 시스템 품질에 영향을 주는 다양항 상황을 복합적으로 관리하도록 하는 것이다.In addition, through these management means, it is possible to manage and control the system as well as personnel related to the site around the system, unauthorized personnel, etc., so that various situations affecting the system quality can be managed complexly.
또한, 시공현장 주변에 시스템과 함께 설치되는 부수적인 별도의 시공보조물(예: 자재 이송수단, 위치이동수단, 운송차량, 작업자 냉난방용기, 컨테이너 등)에 대해서도 함께 모니터링을 수행하도록 하는 것이다.In addition, additional additional construction aids installed together with the system around the construction site (eg, material transfer means, location transfer means, transportation vehicles, workers' heating and cooling containers, containers, etc.) are to be monitored together.
또한 이러한 관리수단이 최소한도로 구비되어 다수의 시공대상들을 효과적이고 효율적으로 모니터 관리할 수 있도록 하는 것이다..In addition, these management means are provided to a minimum so that a large number of construction objects can be monitored and managed effectively and efficiently.
또한 이러한 관리수단의 동작 전환에 따라 발생될 수 있는 부하와 딜레이를 억제하고 외부 환경에 대한 능동적인 대응을 통해 설치 운용상태를 최적화 시킬 수 있도록 하는 것이다.In addition, it is to suppress the load and delay that may occur due to the operation change of these management means and to optimize the installation and operation status through active response to the external environment.
본 발명은 매설형 지중 배전선로의 접지선 연결시스템 운용방법으로서, 매설형 지중 배전선로의 접지선 연결시스템이 준비되는 단계; 상기 매설형 지중 배전선로의 접지선 연결시스템이 공사현장에 이송되는 단계; 및 상기 매설형 지중 배전선로의 접지선 연결시스템이 공사현장에 설치되는 단계를 포함하고, 상기 매설형 지중 배전선로의 접지선 연결시스템은 관리유닛에 의하여 설치과정이 모니터링되되, 상기 관리유닛은 상기 배전선로 주변의 접근인원과 자재운용 상황을 모니터링하되, 상기 매설형 지중 배전선로의 접지선 연결시스템은, 관 형태로 이루어져 맨홀의 상부를 형성하는 동시에 상단은 지면에 노출되어 해당 맨홀에 대한 출입구를 형성하는 맨홀 목과, 상기 맨홀 목의 하단과 연결되는 개방홀이 상면에 형성되고 배전선로의 통과를 위한 복수의 전선홀이 측면에 형성되며 하부를 개방한 형태로 이루어져 지중에 매설되는 상부 맨홀 블록을 포함하는 매설형 지중 배전선로의 접지선 연결시스템 운용방법을 제공한다. The present invention provides a method for operating a grounding line connection system of a buried type underground distribution line, comprising the steps of: preparing a grounding line connection system of a buried type underground distribution line; transferring the ground wire connection system of the buried underground distribution line to a construction site; and installing the ground wire connection system of the buried underground distribution line at a construction site, wherein the installation process of the ground wire connection system of the buried underground distribution line is monitored by a management unit, and the management unit is the distribution line A manhole that monitors the number of people approaching and the situation of material operation in the vicinity, but the ground wire connection system of the buried underground distribution line is in the form of a tube and forms the upper part of the manhole, and at the same time, the upper part is exposed to the ground to form an entrance to the manhole A neck and an open hole connected to the lower end of the manhole neck is formed on the upper surface, a plurality of wire holes for the passage of the distribution line are formed on the side surface, and the lower part is opened. It provides a method of operating a ground wire connection system of a type underground distribution line.
상기와 같은 본 발명에 따르면 다음과 같은 효과가 하나 혹은 그 이상이 있다.According to the present invention as described above, there are one or more of the following effects.
본 발명은 배전선로의 접지를 위한 접지봉들이 맨홀을 매개로 보다 용이하게 설치될 수 있는 동시에 유지보수도 쉽게 이루어질 수 있게 하여 지중 배전선로의 접지를 위한 기존의 번거롭고 많은 시간을 요구하는 접지봉 매설 과정을 생략할 수 있도록 하는 매설형 지중 배전선로의 접지선 연결시스템을 제공할 수 있다.The present invention enables the earthing rods for the grounding of the distribution line to be installed more easily through a manhole and at the same time to be easily maintained, so that the existing cumbersome and time-consuming earthing rod burial process for grounding the underground distribution line is performed. It is possible to provide a ground wire connection system of a buried underground distribution line that can be omitted.
또한 맨홀 내 지중 배전선로의 설치 상태에 이상이 생기거나 이상 정도가 심하여 지락, 단락 등의 사고 발생 시 해당 상황을 실시간으로 정확히 파악하여 관련 조치가 신속히 취해질 수 있도록 하는 매설형 지중 배전선로의 접지선 연결시스템을 제공할 수 있다.In addition, in the event of an accident such as a ground fault or short circuit due to an abnormality or severe abnormality in the installation status of the underground distribution line in the manhole, the situation is accurately identified in real time and related measures can be taken quickly. system can be provided.
또한 매설형 지중 배전선로의 접지선 연결시스템의 제공과정을 신뢰성을 부여하고 검증이 가능하도록 하여 품질관리가 가능하도록 할 수 있다.In addition, the process of providing the ground wire connection system of the buried underground distribution line can be provided with reliability and can be verified, thereby enabling quality control.
또한 매설형 지중 배전선로의 접지선 연결시스템의 준비, 설치 운영 등에 대한 관리수단이 갖춰져 시스템에 대한 안정적 취급을 위한 실시간 감시와 대응을 가능하도록 할 수 있다.In addition, management means for the preparation, installation and operation of the grounding connection system of the buried underground distribution line are provided, enabling real-time monitoring and response for stable handling of the system.
또한 이러한 관리수단을 통해 시스템은 물론 이러한 시스템에 주변현장에 관련된 인원, 비인가 인원 등의 관리와 통제를 가능케 하여 시스템 품질에 영향을 주는 다양항 상황을 복합적으로 관리하도록 할 수 있다.In addition, through these management means, it is possible to manage and control not only the system but also the personnel related to the surrounding field and the unauthorized personnel, so that various situations affecting the system quality can be managed in a complex manner.
또한 시공현장 주변에 시스템과 함께 설치되는 부수적인 별도의 시공보조물(예: 자재 이송수단, 위치이동수단, 운송차량, 작업자 냉난방용기, 컨테이너 등)에 대해서도 함께 모니터링을 수행하도록 할 수 있다.In addition, additional additional construction aids (eg, material transfer means, location transfer means, transportation vehicles, workers' heating and cooling containers, containers, etc.) that are installed together with the system around the construction site can be monitored together.
또한 이러한 관리수단이 최소한도로 구비되어 다수의 시공대상들을 효과적이고 효율적으로 모니터 관리할 수 있도록 할 수 있다.In addition, it is possible to effectively and efficiently monitor and manage a number of construction objects by providing a minimum of such management means.
또한 이러한 관리수단의 동작 전환에 따라 발생될 수 있는 부하와 딜레이를 억제하고 외부 환경에 대한 능동적인 대응을 통해 설치 운용상태를 최적화 시킬 수 있도록 할 수 있다.In addition, it is possible to suppress the load and delay that may occur according to the operation change of these management means and to optimize the installation and operation state through active response to the external environment.
도 1은 본 발명의 일 실시 예에 따른 매설형 지중 배전선로의 접지선 연결시스템의 외형적 구성을 분리된 상태로 보인 사시도
도 2는 본 발명의 일 실시 예에 따른 매설형 지중 배전선로의 접지선 연결시스템의 내부 구성을 보인 단면도
도 3은 본 발명의 일 실시 예에 따른 매설형 지중 배전선로의 접지선 연결시스템의 전기적 구성을 보인 블록도
도 4 내지 도 9는 도 1에 따른 주요구성을 도시한 도면들이다.1 is a perspective view showing the external configuration of a ground wire connection system of a buried underground distribution line in a separated state according to an embodiment of the present invention;
2 is a cross-sectional view showing the internal configuration of a ground wire connection system of a buried underground distribution line according to an embodiment of the present invention;
3 is a block diagram showing an electrical configuration of a ground wire connection system of a buried underground distribution line according to an embodiment of the present invention;
4 to 9 are views showing the main configuration according to FIG.
이하의 본 발명에 대한 상세한 설명들은 본 발명이 실시될 수 있는 실시 예이고 해당 실시 예에 대한 예시로써 도시된 첨부 도면을 참조한다. 이들 실시 예는 당업자가 본 발명을 실시하기에 충분하도록 상세히 설명된다. 본 발명의 다양한 실시 예는 서로 다르지만 상호 배타적일 필요는 없음이 이해되어야 한다. 예를 들어, 여기에 기재되어 있는 특정 형상, 구조 및 특성은 일 실시 예에 관련하여 본 발명의 사상 및 범위를 벗어나지 않으면서 다른 실시 예로 구현될 수 있다. 또한 각각의 기재된 실시 예 내의 개별 구성요소의 위치 또는 배치는 본 발명의 사상 및 범위를 벗어나지 않으면서 변경될 수 있음이 이해되어야 한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The following detailed description of the present invention is an embodiment in which the present invention may be practiced, and reference is made to the accompanying drawings shown by way of example for the embodiment. These embodiments are described in sufficient detail to enable those skilled in the art to practice the present invention. It should be understood that various embodiments of the present invention are different but need not be mutually exclusive. For example, specific shapes, structures, and characteristics described herein may be implemented in other embodiments without departing from the spirit and scope of the present invention in relation to one embodiment. It should also be understood that the position or arrangement of individual components in each described embodiment may be changed without departing from the spirit and scope of the present invention.
따라서 후술되는 상세한 설명은 한정적인 의미로서 취하려는 것이 아니며, 본 발명의 범위는 적절하게 설명된다면 그 청구항들이 주장하는 것과 균등한 모든 범위와 더불어 첨부된 청구항에 의해서만 한정된다. 도면에서 유사한 참조부호는 여러 측면에 걸쳐서 동일하거나 유사한 기능을 지칭한다.Accordingly, the detailed description set forth below is not intended to be taken in a limiting sense, and the scope of the present invention, if properly described, is limited only by the appended claims, along with all scopes equivalent to those claimed by the claims. Like reference numerals in the drawings refer to the same or similar functions throughout the various aspects.
도 1 내지 도 3을 참조하여 본 발명의 실시 예에 따른 배전선로의 접지시스템에 대해 설명한다. 도 1은 본 발명의 일 실시 예에 따른 매설형 지중 배전선로의 접지선 연결시스템의 외형적 구성을 분리된 상태로 보인 사시도이고, 도 2는 본 발명의 일 실시 예에 따른 매설형 지중 배전선로의 접지선 연결시스템의 내부 구성을 보인 단면도이며, 도 3은 본 발명의 일 실시 예에 따른 매설형 지중 배전선로의 접지선 연결시스템의 전기적 구성을 보인 블록도이다. A grounding system of a distribution line according to an embodiment of the present invention will be described with reference to FIGS. 1 to 3 . 1 is a perspective view showing the external configuration of a ground wire connection system of a buried underground distribution line in a separated state according to an embodiment of the present invention, and FIG. 2 is a buried underground distribution line according to an embodiment of the present invention. It is a cross-sectional view showing the internal configuration of a grounding line connection system, and FIG. 3 is a block diagram showing the electrical configuration of a grounding line connection system of a buried underground distribution line according to an embodiment of the present invention.
도시된 바와 같이, 본 발명의 일 실시 예에 따른 배전선로의 접지시스템은 맨홀 목, 상부 맨홀 블록, 하부 맨홀 블록, 복수의 접지부재, 절연 플레이트, 카메라, 무선통신모듈, 맨홀 덮개, 태양전지판, 이차전지, 제1 커넥터, 제2 커넥터를 포함하여 구성된다.As shown, the grounding system of the distribution line according to an embodiment of the present invention includes a manhole neck, an upper manhole block, a lower manhole block, a plurality of grounding members, an insulating plate, a camera, a wireless communication module, a manhole cover, a solar panel, It is configured to include a secondary battery, a first connector, and a second connector.
목(10)은 상하 방향으로 관통된 관 형태로 이루어져 상단의 관통 영역을 지면과 연결하는 상태로 지중에 매설된다. 즉, 맨홀 목(10)은 맨홀의 상부를 형성하는 동시에 지상과 맨홀 내부의 지중을 연결하는 기능을 가져, 작업자는 이러한 맨홀 목(10)을 통해 맨홀 내부에 대한 출입을 하게 된다.The
상부 맨홀 블록(20) 및 하부 맨홀 블록(30)은 내부 공간이 서로 통하는 상태로 결합되어 맨홀의 본체를 형성하는 것으로서, 즉, 상부 맨홀 블록(20)의 상부에 맨홀 목(10)이 결합된다. 이러한 상부 맨홀 블록(20)과 하부 맨홀 블록(30)의 각 구성에 대해 설명한다.The
상부 맨홀 블록(20)은 맨홀 목(10)의 하단과 연결되는 개방홀(21)이 상면에 형성되고, 배전선로(200)의 통과를 위한 복수의 전선홀(22)이 측면에 형성된다. 이러한 상부 맨홀 블록(20)은 하부를 개방한 형태로 이루어진다.The
하부 맨홀 블록(30)은 상부 맨홀 블록(20)의 내부와 통하도록 상부를 개방한 형태로 이루어져 상단이 상부 맨홀 블록(20)의 하단과 결합되며, 배전선로(200)의 통과를 위한 복수의 전선홀(31)이 측면에 형성된다. 또한 하부 맨홀 블록(30)은 하면에 복수의 접지홀(32)이 형성된다.The
그리고 상술한 바와 같이 상부 맨홀 블록(20) 및 하부 맨홀 블록(30)은 내부 공간을 서로 통하는 상태로 결합되어 지중에 매설되며, 이렇게 지중에 매설된 상부 맨홀 블록(20) 및 하부 맨홀 블록(30)의 연결된 내부 공간에 대해 작업자는 맨홀 목(10)을 통해 출입하게 된다.And as described above, the
접지부재(40)는 접지봉부(41) 및 머리부(42)를 포함하여 구성되는 것으로서, 접지봉부 및 머리부의 구성에 대해 각각 설명하면 다음과 같다. 접지봉부(41)는 하부 맨홀 블록(30)의 접지홀(32)을 통해 지중에 꽂히는 방식으로 매설되는 것으로서, 이를 위해 접지봉부(41)의 길이방향 하단은 지중에 보다 용이하게 꽂혀질 수 있도록 뾰족한 첨단의 형태를 가진다.The
머리부(42)는 접지봉부(41)의 길이방향 상단에 접지홀(32)의 내경보다 큰 넓이로 형성되어 하부 맨홀 블록(30) 내면의 접지홀(32) 주변 영역에 거치되며, 이러한 머리부(42)는 상반되는 방향의 양측면에 결합돌기(42a) 및 결합홈(42b)이 각각 형성된다. 머리부(42)의 결합돌기(42a) 및 결합홈(42b)은 접지부재(40)들의 머리부(42)간 상호 결합을 위한 것으로서, 다시 말해 복수의 접지부재(40)는 그 머리부(42)에 형성된 결합돌기(42a) 및 결합홈(42b) 간의 상호 결합을 통해 일렬로 연결될 수 있다.The
절연 플레이트(50)는 접지부재(40)들을 하부 맨홀 블록(30)의 내부와 절연시키는 상태로 하부 맨홀 블록(30)의 내측 하부에 설치되며, 이러한 절연 플레이트(50)는 접지부재(40)들의 머리부(42)와 각각 대응되는 복수의 접지선홀(51)을 형성하고 있다.The
각 접지선홀(51)에는 대응되는 크기의 접지선마개(52)가 절연플레이트(50)와 동일한 재질로 준비되어 접지선홀(51)이 사용되지 않을 경우 또는 접지부재(40)와 맨홀 내부와의 절연을 유지할 필요가 있을 경우에 사용된다.In each
접지선홀(51)의 내주면과 접지선마개(52)의 외주면에는 각각 대응되는 나사산이 각각 형성되어 나사결합되도록 구성될 수 있다. 상술한 접지부재(40) 및 절연 플레이트(50)의 구성에 의해서, 배전선로(200)의 접지 구조가 맨홀의 매설 과정에서 해당 맨홀을 매개로 함께 시공될 수 있는 동시에 그 시공 과정이 비교적 용이하게 진행될 수 있다. The inner circumferential surface of the
또한 접지봉부(41)에 부식이나 열화 현상이 발생한 접지부재(40)의 발생 시 맨홀 내부에서 접지부재(40)들에 대한 절연 플레이트(50)의 커버 상태를 해제시킨 후 부식이나 열화 현상이 발생한 해당 접지부재(40)만을 교체하면 된다. In addition, when the grounding
따라서 배전선로에 대한 접지 구조의 유지보수 및 관리가 매우 용이하고 효율적인 작업을 통해 수행될 수 있게 된다. 그리고 접지부재(40)을 통해 상부 맨홀 블록(20) 또는 하부 맨홀 블록(30)의 전선홀(22,31)을 통과하는 배전선로(200)가 접지되는 구성에 대해 간략하게 설명하면, 배전선로(200)별로 중선선(310)이 연결되고, 이러한 복수의 중선선(310)이 중성선 접속점(320)을 공통 접속되며, 중성선 접속점(320)에 접지리드선(330)이 연결되어 이러한 접지리드선(330)의 일단이 절연 플레이트(50)의 접지선홀(51)을 통해 접지부재(40)의 접지봉부(41)에 접속됨으로써, 상부 맨홀 블록(20) 또는 하부 맨홀 블록(30)의 전선홀(22,31)을 통과하는 복수의 배전선로(200)들은 지중에 접지된다.Therefore, maintenance and management of the grounding structure for the distribution line can be performed through very easy and efficient work. And briefly describing the configuration in which the
카메라(60)는 상부 맨홀 블록(20) 또는 하부 맨홀 블록(30)의 내부에 설치되어 상부 맨홀 블록(20)의 전선홀(22) 또는 하부 맨홀 블록(30)의 전선홀(31)로 통과되는 배전선로(200) 및 각 배전선로(200)의 접지부재(40)에 대한 접지 상태를 사전 설정된 주기에 따라 촬영 후 촬영된 영상데이터를 실시간 출력한다.The
이때, 카메라(60)는 맨홀 목(10), 상부 맨홀 블록(20), 하부 맨홀 블록(30)을 포함하는 맨홀의 부여된 식별정보를 영상데이터에 동기화하여 출력한다. 무선통신모듈(70)은 카메라(60)로부터 출력되는 영상데이터를 실시간으로 배전선로를 관리하는 상황실에 전송한다.At this time, the
이러한 카메라(60) 및 무선통신모듈(70)에 의해서, 배전선로(200)를 관리하는 상황실의 관리자는 맨홀별로 식별번호가 함께 표시되는 상태의 디스플레이 영상을 시각적으로 확인하면서 해당 맨홀별 배전선로(200)의 상태 및 접지 상태를 확인할 수 있다.By means of the
맨홀 덮개는 맨홀 목의 지면에 노출되는 상단을 덮으며, 이러한 맨홀 덮개는 투명 소재로 형성된다. 태양전지판은 맨홀 덮개의 하면에 결합되어 맨홀 덮개를 투과하는 광을 이용하여 전기를 생성한다.The manhole cover covers the top exposed to the ground of the manhole neck, and this manhole cover is formed of a transparent material. The solar panel is coupled to the lower surface of the manhole cover to generate electricity using light passing through the manhole cover.
이차전지는 태양전지판을 통해 생성되는 전기를 저장하는 상태로 맨홀 덮개 또는 태양전지판에 결합된다. 제1 커넥터는 이차전지와 전기적인 접속이 이루어지며, 제2 커넥터는 카메라 및 무선통신모듈과 전기적인 접속이 이루어지는 동시에 제1 커넥터와 탈착이 가능하여 제1 커넥터와 결합된 상태에서 이차전지의 전원을 카메라 및 무선통신모듈에 인가한다.The secondary battery is coupled to the manhole cover or solar panel in a state of storing electricity generated through the solar panel. The first connector is electrically connected to the secondary battery, and the second connector is electrically connected to the camera and wireless communication module, and at the same time is detachable from the first connector. is applied to the camera and wireless communication module.
다시 말해, 제1 커넥터 및 제2 커넥터의 기구적인 동시에 전기적인 접속을 통해 이차전지의 전원이 카메라 및 무선통신모듈에 인가된다. 상술한 도 1 내지 도 3의 설명을 통하여 알 수 있는 바와 같이, 본 발명에 따른 매설형 지중 배전선로의 접지선 연결시스템은 지중 배전선로의 접지를 위한 접지봉들이 맨홀을 매개로 보다 용이하게 설치될 수 있게 하는 동시에 유지보수도 쉽게 이루어질 수 있게 하고, 따라서 지중 배전선로의 접지를 위한 기존의 번거롭고 많은 시간을 요구하는 접지봉 매설 과정을 생략할 수 있게 한다.In other words, the power of the secondary battery is applied to the camera and the wireless communication module through the mechanical and electrical connection of the first connector and the second connector. As can be seen through the description of FIGS. 1 to 3 above, in the grounding line connection system of the buried underground distribution line according to the present invention, the grounding rods for grounding the underground distribution line can be installed more easily through a manhole. At the same time, it enables easy maintenance and, therefore, makes it possible to omit the conventional cumbersome and time-consuming grounding rod burial process for grounding the underground distribution line.
또한 맨홀 내 지중 배전선로의 설치 상태에 이상이 생기거나 이상 정도가 심하여 지락, 단락 등의 사고 발생 시 해당 상황을 실시간으로 정확히 파악하여 관련 조치가 신속히 취해질 수 있게 한다.In addition, in the event of an accident such as a ground fault or short circuit due to an abnormality or a severe degree of abnormality in the installation of the underground distribution line in the manhole, the situation can be accurately identified in real time so that relevant measures can be taken quickly.
전술한 내용에 기반하여 도 4 내지 도 9를 참조하면 매설형 지중 배전선로의 접지선 연결시스템 운용방법으로서, 매설형 지중 배전선로의 접지선 연결시스템이 준비되는 단계; 상기 매설형 지중 배전선로의 접지선 연결시스템이 공사현장에 이송되는 단계; 및 상기 매설형 지중 배전선로의 접지선 연결시스템이 공사현장에 설치되는 단계를 포함하고, 상기 매설형 지중 배전선로의 접지선 연결시스템은 관리유닛에 의하여 설치과정이 모니터링되되, 상기 관리유닛은 상기 배전선로 주변의 접근인원과 자재운용 상황을 모니터링한다.Referring to FIGS. 4 to 9 based on the above description, there is provided a method for operating a grounding line connection system of a buried type underground distribution line, the method comprising: preparing a grounding line connection system of a buried type underground distribution line; transferring the ground wire connection system of the buried underground distribution line to a construction site; and installing the ground wire connection system of the buried underground distribution line at a construction site, wherein the installation process of the ground wire connection system of the buried underground distribution line is monitored by a management unit, and the management unit is the distribution line Monitor the number of people approaching and the situation of material operation in the vicinity.
아울러 상기 매설형 지중 배전선로의 접지선 연결시스템은, 관 형태로 이루어져 맨홀의 상부를 형성하는 동시에 상단은 지면에 노출되어 해당 맨홀에 대한 출입구를 형성하는 맨홀 목과, 상기 맨홀 목의 하단과 연결되는 개방홀이 상면에 형성되고 배전선로의 통과를 위한 복수의 전선홀이 측면에 형성되며 하부를 개방한 형태로 이루어져 지중에 매설되는 상부 맨홀 블록을 포함한다.In addition, the ground wire connection system of the buried underground distribution line is made in the form of a tube to form the upper part of the manhole, and at the same time, the upper end is exposed to the ground to form a doorway to the manhole neck, and the opening connected to the lower end of the manhole neck A hole is formed on the upper surface, a plurality of wire holes for the passage of the distribution line are formed on the side, and the lower part is made in an open form and includes an upper manhole block buried in the ground.
상기 관리유닛는 현장에 위치되는 하방몸체유닛(10'); 상기 하방몸체유닛(10')의 상부 중앙에 구비되어 회전방식으로 주변을 촬영하는 중앙감시유닛(20'); 상기 하방몸체유닛(10')에서 슬라이딩방식으로 좌우 위치이동되고, 상기 중앙감시유닛(20') 일측에 구비되어 주변을 촬영하는 제1사이드감시유닛(30'); 및 상기 하방몸체유닛(10')에서 슬라이딩방식으로 좌우 위치이동되고, 상기 중앙감시유닛(20') 타측에 구비되어 주변을 촬영하는 제2사이드감시유닛(40')을 포함한다.The management unit includes a lower body unit (10') located in the field; a central monitoring unit (20') provided in the upper center of the lower body unit (10') to photograph the surroundings in a rotational manner; a first side monitoring unit 30' which is moved left and right in a sliding manner in the lower body unit 10', and is provided on one side of the central monitoring unit 20' to photograph the surroundings; and a second side monitoring unit 40' which is moved left and right in a sliding manner in the lower body unit 10', and is provided on the other side of the central monitoring unit 20' to photograph the surroundings.
여기서 상기 중앙감시유닛(20')은, 상기 하방몸체유닛(10')에 설치되는 구동모듈(21')과, 상기 구동모듈(21')의 상부로 설치되는 연결봉모듈(22')과, 상기 연결봉모듈(22')의 상부에 구비되는 플레이트패널모듈(23')과, 상기 플레이트패널모듈(23') 둘레부를 따라 상호 이격되어 설치되는 다수의 촬영모듈(24')과, 상기 플레이트패널모듈(23') 둘레부를 따라 상기 촬영모듈(24')들 사이에 배치되어 조명을 제공하는 조명모듈(25')을 포함한다.Here, the central monitoring unit 20' includes a drive module 21' installed on the lower body unit 10', and a connecting rod module 22' installed on the upper part of the drive module 21', A plate panel module 23' provided on the connecting rod module 22', a plurality of photographing modules 24' installed to be spaced apart from each other along the circumference of the plate panel module 23', and the plate panel It includes a lighting module 25' disposed between the photographing modules 24' along the periphery of the module 23' to provide illumination.
상기 촬영모듈(25')은, 상기 플레이트패널모듈(23')이 상기 구동모듈(21')이 제공하는 구동력을 상기 연결봉모듈(22')을 매개로 전달받아 회전되는 상태에서 촬영을 수행한다.The photographing module 25' performs photographing in a state in which the plate panel module 23' is rotated by receiving the driving force provided by the driving module 21' through the connecting rod module 22'. .
상기 제1사이드감시유닛(30')은, 상기 플레이트패널모듈(23') 일측과 연동되어 상기 플레이트패널모듈(23')을 고정시키거나, 상기 플레이트패널모듈(23')이 회전되는 상태를 정지시킨다.The first side monitoring unit 30' is interlocked with one side of the plate panel module 23' to fix the plate panel module 23' or to detect a state in which the plate panel module 23' is rotated. stop
여기서 상기 제2사이드감시유닛(40')은 상기 플레이트패널모듈(23') 타측과 연동되어 상기 플레이트패널모듈(23')을 고정시키거나, 상기 플레이트패널모듈(23')이 회전되는 상태를 정지시킨다.Here, the second side monitoring unit 40' is interlocked with the other side of the plate panel module 23' to fix the plate panel module 23', or to detect a state in which the plate panel module 23' is rotated. stop
상기 제1사이드감시유닛(30')은, 상기 하방몸체유닛(10')에 구비되는 제1사이드구동모듈(31’)과, 상기 제1사이드구동모듈(31’) 상부에 구비되는 제1플랜지모듈(32')과, 상기 제1플랜지모듈(32')과, 상부로 대향하도록 구비되는 제2플랜지모듈(33')과, 상기 제1플랜지모듈(32')과 상기 제2플랜지모듈(33') 사이에 구비되는 제1사이드촬영모듈(34’)을 포함한다.The first side monitoring unit 30' includes a first
아울러 상기 제2사이드감시유닛(40')은, 상기 하방몸체유닛(10')에 구비되는 제2사이드구동모듈(41’)과, 상기 제2사이드구동모듈(41’) 상부에 구비되는 제3플랜지모듈(42')과, 상기 제2플랜지모듈(33')과, 상부로 대향하도록 구비되는 제4플랜지모듈(43')과, 상기 제3플랜지모듈(42')과 상기 제4플랜지모듈(43') 사이에 구비되는 제2사이드촬영모듈(44’)을 포함한다.
상기 제1사이드감시유닛(30')의 상기 제1플랜지모듈(32')은, 상기 플레이트패널모듈(23') 상부로 접촉되는 제1연결모듈(71')과, 상기 플레이트패널모듈(23') 하부로 접촉되는 제2연결모듈(72')이 구비되며 상기 제2사이드감시유닛(40')의 상기 제2플랜지모듈(33')은, 상기 플레이트패널모듈(23') 상부로 접촉되는 제3연결모듈(73')과, 상기 플레이트패널모듈(23') 하부로 접촉되는 제4연결모듈(74')이 구비된다.
상기 제1연결모듈(71')은 제1상방연결대(711')와, 상기 제1상방연결대(711')의 하부로 구비되는 제1자력고정체(712')가 구비되며, 상기 제2연결모듈(72')은 제2하방연결대(721')와, 상기 제2하방연결대(721')의 상부로 구비되는 제2자력고정체(722')가 구비되며, 상기 제3연결모듈(73')은 제3상방연결대(73')와, 상기 제3상방연결대(73')의 하부로 구비되는 제3자력고정체(731')가 구비된다.
이러한 상기 제4연결모듈(74')은 제4하방연결대(741')와, 상기 제4하방연결대(741')의 상부로 구비되는 제4자력고정체(742')가 구비되며, 상기 제1자력고정체(712') 내지 상기 제4자력고정체(742')는 상기 플레이트패널모듈(23')의 회전상태 혹은 무회전상태에서 자력흡착방식으로 상기 플레이트패널모듈(23')을 1차 고정시킨다.
상기 제1자력고정체(712')는 내부에서 외부로 제1연동체(713')가 출몰되며, 상기 제2자력고정체(722')는 내부에서 외부로 제2연동체(723')가 출몰되며, 상기 제3자력고정체(731')는 내부에서 외부로 제3연동체(733')가 출몰되며, 상기 제4자력고정체(742')는 내부에서 외부로 제4연동체(743')가 출몰되며, 상기 제1연동체(713') 내지 상기 제4연동체(743')는 각기 상기 플레이트패널모듈(23') 내부로 삽입장착되어 상기 플레이트패널모듈(23')을 2차고정시킨다.
여기서 상기 하방몸체유닛(10')은, 상기 제1사이드구동모듈(31')과 상기 구동모듈(21') 사이에 위치되어 상기 제1사이드구동모듈(31')과 상기 구동모듈(21') 사이의 간격을 확보하는 제1간격유지모듈과, 상기 하방몸체유닛(10')에서 상기 제2사이드구동모듈(41')과 상기 구동모듈(21') 사이에 위치되어 상기 제2사이드구동모듈(41')과 상기 구동모듈(21') 사이의 간격을 확보하는 제2간격유지모듈이 구비된다.In addition, the second side monitoring unit 40' includes a second side driving module 41' provided in the lower body unit 10', and a second side driving module 41' provided on the second side driving module 41'. A third flange module 42', the
The
The
The fourth connection module 74' is provided with a fourth lower connecting rod 741' and a fourth magnetic fixing body 742' provided above the fourth lower connecting rod 741'. The first
The first magnetically fixed body 712' has a first interlocking body 713' protruding from the inside to the outside, and the second magnetically holding body 722' is a second interlocking body 723' from the inside to the outside. appears, and the third magnetic fixing
Here, the lower body unit 10' is positioned between the first
이러한 상기 제1간격유지모듈은 상기 하방몸체유닛(10') 상부로 설치되는 제1상방몸체(81')와, 상기 제1상방몸체(81') 상부로 설치되는 제1상방구동체(82')와, 제1상방구동체(82')의 일측으로 출몰되어 상기 제1사이드구동모듈(31')에 접하는 제1접촉체(83')와, 제1상방구동체(82')의 타측으로 출몰되어 상기 구동모듈(21')에 접하는 제2접촉체(84')를 포함한다.The first gap maintaining module includes a first upper body 81' installed above the lower body unit 10', and a first
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
상기 제2간격유지모듈은, 상기 하방몸체유닛(10') 상부로 설치되는 제2상방몸체(91')와, 상기 제2상방몸체(91') 상부로 설치되는 제2상방구동(92')체와, 제2상방구동(92')체의 일측으로 출몰되어 상기 제2사이드구동모듈(41’)에 접하는 제3접촉체(94')와, 제2상방구동(92')체의 타측으로 출몰되어 상기 구동모듈(21')에 접하는 제4접촉체(95')를 포함한다.The second gap maintaining module includes a second upper body 91' installed above the lower body unit 10', and a second upper drive 92' installed above the second upper body 91'. ) body, the third contact body 94' protruding from one side of the second upward driving module 41' and coming into contact with the second side driving module 41', and the second upward driving unit 92'. and a fourth contact body 95' protruding to the other side and in contact with the driving module 21'.
한편 상기 제1접촉체(83') 내지 상기 제2접촉체(84')는, 상기 제1사이드구동모듈(31’)이 상기 구동모듈(21') 측으로 위치이동되면, 상기 제1사이드구동모듈(31’)이 상기 구동모듈(21')에 각각 접하여 위치이동에 따른 충격의 완충을 수행하되, 상기 제1접촉체(83') 내지 상기 제2접촉체(84')는, 충격의 완충을 위하여 상기 제1사이드구동모듈(31’)의 상기 구동모듈(21') 측으로 위치이동에 따른 충격에 대응하여 상기 제1상방구동체(82') 내부로 일정범위 유동된다.On the other hand, the
여기서 상기 제3접촉체(94') 내지 상기 제4접촉체(95')는, 상기 제2사이드구동모듈(41’)이 상기 구동모듈(21') 측으로 위치이동되면, 상기 제2사이드구동모듈(41’)이 상기 구동모듈(21')에 각각 접하여 위치이동에 따른 충격의 완충을 수행하되, 상기 제3접촉체(94') 내지 상기 제4접촉체(95')는, 충격의 완충을 위하여 상기 제2사이드구동모듈(41’)의 상기 구동모듈(21') 측으로 위치이동에 따른 충격에 대응하여 상기 제2상방구동(92')체 내부로 일정범위 유동된다.Here, the third contact body 94 ′ to the fourth contact body 95 ′ is activated when the second
아울러 상기 제1사이드구동모듈(31’)과 상기 제2사이드구동모듈(41’)은, 상기 구동모듈(21')로부터 외측으로 이격을 위한 위치이동이 되는 경우, 상기 제1상방구동체(82')와 상기 제2상방구동(92')체의 회전을 통하여 외측으로 이격을 위한 위치이동이 가속되도록 보조한다.In addition, when the first
상기 하방몸체유닛(10')은, 상기 제1사이드구동모듈(31’) 외측으로 상기 제1사이드감시유닛(30')의 고정, 온도조절을 포함하는 취급동작을 수행하기 위한 제1취급유닛(50')과, 상기 제2사이드구동모듈(41’) 외측으로 상기 제2사이드감시유닛(40')의 고정, 온도조절을 포함하는 취급동작을 수행하기 위한 제2취급유닛(60')이 구비된다.The lower body unit 10' is a first handling unit for performing handling operations including fixing the first side monitoring unit 30' to the outside of the first
이러한 상기 제1취급유닛(50')은, 상기 하방몸체유닛(10')상에서 상부로 설치되는 제1패널부(51')와, 상기 제1패널부(51')의 내측으로 위치되어 상하이동 가능하게 구비되고 내부에 제1배터리모듈(53')이 구비되는 제1가동몸체(52')와, 상기 제1가동몸체(52')의 전면부로 설치되어 상기 제1사이드촬영모듈(34’)에 접촉하며 상기 제1배터리모듈(53')의 전력을 비상용으로 상기 제1사이드촬영모듈(34’)로 공급하는 제1상부접속체(54')와, 상기 제1가동몸체(52')의 전면부로 설치되어 상기 제1사이드촬영모듈(34’)에 접촉하며 상기 제1배터리모듈(53')의 전력을 비상용으로 상기 제1사이드촬영모듈(34’)로 공급하는 제1하부접속체(55')가 구비된다.The
상기 제2취급유닛(60')은, 상기 하방몸체유닛(10')상에서 상부로 설치되는 제2패널부(61')와, 상기 제2패널부(61')의 내측으로 위치되어 상하이동 가능하게 구비되고 내부에 제2배터리모듈이 구비되는 제2가동몸체(62')와, 상기 제2가동몸체(62')의 전면부로 설치되어 상기 제2사이드촬영모듈(44’)에 접촉하며 상기 제2배터리모듈의 전력을 비상용으로 상기 제2사이드촬영모듈(44’)로 공급하는 제2상부접속체(64’)와, 상기 제2가동몸체(62')의 전면부로 설치되어 상기 제2사이드촬영모듈(44’)에 접촉하며 상기 제2배터리모듈의 전력을 비상용으로 상기 제2사이드촬영모듈(44’)로 공급하는 제2하부접속체(65’)가 구비된다.The second handling unit 60' includes a second panel part 61' installed upwardly on the lower body unit 10', and positioned inside the second panel part 61' to move vertically. A second movable body 62' provided as possible and having a second battery module therein, and installed as a front part of the second movable body 62' to contact the second side photographing module 44' A second upper connection body 64' for supplying the power of the second battery module to the second side photographing module 44' for an emergency, and a front part of the second movable body 62', installed as the first A second lower connection body 65' is provided in contact with the second side photographing module 44' and for supplying the power of the second battery module to the second side photographing module 44' for an emergency.
상기 제1취급유닛(50')은 상기 제1가동몸체(52')의 중앙에 구비되어 상기 제1사이드촬영모듈(34’)측을 향하여 히팅 혹은 냉각을 위한 유체를 분사하는 제1유체취급부(56')를 더 포함하고, 상기 제2취급유닛(60')의 상기 제2가동몸체(62')의 중앙에 구비되어 상기 제2사이드촬영모듈(44’)측을 향하여 히팅 혹은 냉각을 위한 유체를 분사하는 제2유체취급부(66')를 더 포함한다.The first handling unit 50' is provided in the center of the first movable body 52' and handles the first fluid for spraying a fluid for heating or cooling toward the first
상기 제1유체취급부(56')와 상기 제2유체취급부(66')는 각기 상기 제1사이드촬영모듈(34’)과 상기 제2사이드촬영모듈(44’)측에 접하여 흡기모드 동작을 수행하여 상기 제1사이드촬영모듈(34’)과 상기 제2사이드촬영모듈(44')을 고정시키며, 상기 제1상부접속체(54')와 상기 제1하부접속체(55')는 상호 이격되는 동작을 통해 상기 제1플랜지모듈(32')과 상기 제2플랜지모듈(33')을 눌러 고정시킨다.The first
상기 제2상부접속체(64’)와 상기 제2하부접속체(65’)는 상호 이격되는 동작을 통해 상기 제3플랜지모듈(42')과 상기 제4플랜지모듈(43')을 눌러 고정시킨다. The second upper connector 64' and the second lower connector 65' are fixed by pressing the third flange module 42' and the fourth flange module 43' through an operation to be spaced apart from each other. make it
이상에서 전술한 물리적 구성들의 구동방식은 모터, 엑츄에이터 등을 기반으로 전후유동, 회전이동이 이루어지며 각 구성부의 형상과 크기는 설치 현장과 구현하고자하는 자재들에 따라 다양하게 선택되어 구비될 수 있다. The driving method of the physical components described above is based on a motor, an actuator, etc., and the forward and backward movement and rotational movement are made, and the shape and size of each component can be variously selected and provided according to the installation site and materials to be implemented. .
본 발명은 도면에 도시된 실시예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 다른 실시예가 가능하다는 점을 이해할 것이다. Although the present invention has been described with reference to the embodiment shown in the drawings, which is merely exemplary, it will be understood by those skilled in the art that various modifications and equivalent other embodiments are possible therefrom.
따라서, 본 발명의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의하여 정해져야 할 것이다.Accordingly, the true technical protection scope of the present invention should be determined by the technical spirit of the appended claims.
100 : 맨홀 목 20 : 상부 맨홀 블록
21 : 개방홀 22 : 전선홀
30 : 하부 맨홀 블록 31 : 전선홀
32 : 접지홀 40 : 접지부재100: manhole neck 20: upper manhole block
21: open hole 22: wire hole
30: lower manhole block 31: wire hole
32: grounding hole 40: grounding member
Claims (2)
매설형 지중 배전선로의 접지선 연결시스템이 준비되는 단계;
상기 매설형 지중 배전선로의 접지선 연결시스템이 공사현장에 이송되는 단계; 및
상기 매설형 지중 배전선로의 접지선 연결시스템이 공사현장에 설치되는 단계를 포함하고,
상기 매설형 지중 배전선로의 접지선 연결시스템은 관리유닛에 의하여 설치과정이 모니터링되되,
상기 관리유닛은 상기 배전선로 주변의 접근인원과 자재운용 상황을 모니터링하되,
상기 매설형 지중 배전선로의 접지선 연결시스템은,
관 형태로 이루어져 맨홀의 상부를 형성하는 동시에 상단은 지면에 노출되어 해당 맨홀에 대한 출입구를 형성하는 맨홀 목과,
상기 맨홀 목의 하단과 연결되는 개방홀이 상면에 형성되고 배전선로의 통과를 위한 복수의 전선홀이 측면에 형성되며 하부를 개방한 형태로 이루어져 지중에 매설되는 상부 맨홀 블록을 포함하며,
상기 관리유닛은,
현장에 위치되는 하방몸체유닛(10');
상기 하방몸체유닛(10')의 상부 중앙에 구비되어 회전방식으로 주변을 촬영하는 중앙감시유닛(20');
상기 하방몸체유닛(10')에서 슬라이딩방식으로 좌우 위치이동되고, 상기 중앙감시유닛(20') 일측에 구비되어 주변을 촬영하는 제1사이드감시유닛(30'); 및
상기 하방몸체유닛(10')에서 슬라이딩방식으로 좌우 위치이동되고, 상기 중앙감시유닛(20') 타측에 구비되어 주변을 촬영하는 제2사이드감시유닛(40')을 포함하되,
상기 중앙감시유닛(20')은,
상기 하방몸체유닛(10')에 설치되는 구동모듈(21')과, 상기 구동모듈(21')의 상부로 설치되는 연결봉모듈(22')과, 상기 연결봉모듈(22')의 상부에 구비되는 플레이트패널모듈(23')과, 상기 플레이트패널모듈(23') 둘레부를 따라 상호 이격되어 설치되는 다수의 촬영모듈(24')과, 상기 플레이트패널모듈(23') 둘레부를 따라 상기 촬영모듈(24')들 사이에 배치되어 조명을 제공하는 조명모듈(25')을 포함하고,
상기 촬영모듈(25')은,
상기 플레이트패널모듈(23')이 상기 구동모듈(21')이 제공하는 구동력을 상기 연결봉모듈(22')을 매개로 전달받아 회전되는 상태에서 촬영을 수행하고,
상기 제1사이드감시유닛(30')은,
상기 플레이트패널모듈(23') 일측과 연동되어 상기 플레이트패널모듈(23')을 고정시키거나, 상기 플레이트패널모듈(23')이 회전되는 상태를 정지시키며,
상기 제2사이드감시유닛(40')은 상기 플레이트패널모듈(23') 타측과 연동되어 상기 플레이트패널모듈(23')을 고정시키거나, 상기 플레이트패널모듈(23')이 회전되는 상태를 정지시키고,
상기 제1사이드감시유닛(30')은,
상기 하방몸체유닛(10')에 구비되는 제1사이드구동모듈(31’)과, 상기 제1사이드구동모듈(31’) 상부에 구비되는 제1플랜지모듈(32')과, 상기 제1플랜지모듈(32')과, 상부로 대향하도록 구비되는 제2플랜지모듈(33')과, 상기 제1플랜지모듈(32')과 상기 제2플랜지모듈(33') 사이에 구비되는 제1사이드촬영모듈(34’)을 포함하고,
상기 제2사이드감시유닛(40')은,
상기 하방몸체유닛(10')에 구비되는 제2사이드구동모듈(41’)과, 상기 제2사이드구동모듈(41’) 상부에 구비되는 제3플랜지모듈(42')과, 상기 제2플랜지모듈(33')과, 상부로 대향하도록 구비되는 제4플랜지모듈(43')과, 상기 제3플랜지모듈(42')과 상기 제4플랜지모듈(43') 사이에 구비되는 제2사이드촬영모듈(44’)을 포함하며,
상기 제1사이드감시유닛(30')의 상기 제1플랜지모듈(32')은,
상기 플레이트패널모듈(23') 하부로 접촉되는 제1연결모듈(71')과, 상기 플레이트패널모듈(23') 상부로 접촉되는 제2연결모듈이 구비되며 상기 제2사이드감시유닛(40')의 상기 제2플랜지모듈(33')은, 상기 플레이트패널모듈(23') 하부로 접촉되는 제3연결모듈과, 상기 플레이트패널모듈(23') 상부로 접촉되는 제4연결모듈이 구비되는, 매설형 지중 배전선로의 접지선 연결시스템 운용방법.A method of operating a ground wire connection system of a buried underground distribution line, the method comprising:
Preparing a ground wire connection system of a buried underground distribution line;
transferring the ground wire connection system of the buried underground distribution line to a construction site; and
Including the step of installing the ground wire connection system of the buried underground distribution line at a construction site,
The installation process of the ground wire connection system of the buried underground distribution line is monitored by a management unit,
The management unit monitors the number of people approaching and the material operation situation around the distribution line,
The ground wire connection system of the buried underground distribution line,
A manhole neck that is made in the form of a tube to form the upper part of the manhole, and at the same time, the upper part is exposed to the ground to form an entrance to the manhole;
An open hole connected to the lower end of the manhole neck is formed on the upper surface, a plurality of wire holes for the passage of distribution lines are formed on the side, and an upper manhole block is formed with an open lower portion and is embedded in the ground.
The management unit is
a lower body unit (10') located in the field;
a central monitoring unit (20') provided in the upper center of the lower body unit (10') to photograph the surroundings in a rotational manner;
a first side monitoring unit 30' which is moved left and right in a sliding manner in the lower body unit 10', and is provided on one side of the central monitoring unit 20' to photograph the surroundings; and
A second side monitoring unit 40' which is moved left and right in a sliding manner in the lower body unit 10' and is provided on the other side of the central monitoring unit 20' to photograph the surroundings,
The central monitoring unit 20 'is,
A driving module 21' installed on the lower body unit 10', a connecting rod module 22' installed on the upper part of the driving module 21', and an upper portion of the connecting rod module 22' A plate panel module 23', a plurality of photographing modules 24' installed to be spaced apart from each other along the circumference of the plate panel module 23', and the photographing module along the circumference of the plate panel module 23' It includes a lighting module (25') disposed between the (24') to provide lighting,
The photographing module 25 'is,
The plate panel module 23 ′ receives the driving force provided by the driving module 21 ′ through the connecting rod module 22 ′ and performs photographing in a rotating state,
The first side monitoring unit 30',
Interlocking with one side of the plate panel module 23' to fix the plate panel module 23' or stop the rotational state of the plate panel module 23',
The second side monitoring unit 40' is interlocked with the other side of the plate panel module 23' to fix the plate panel module 23' or stop the rotation of the plate panel module 23' make it,
The first side monitoring unit 30',
A first side driving module 31 ′ provided in the lower body unit 10 ′, a first flange module 32 ′ provided on an upper portion of the first side driving module 31 ′, and the first flange A module 32', a second flange module 33' provided to face upward, and a first side shot provided between the first flange module 32' and the second flange module 33' a module 34';
The second side monitoring unit 40',
A second side drive module 41' provided in the lower body unit 10', a third flange module 42' provided on the second side drive module 41', and the second flange Module 33', a fourth flange module 43' provided to face upwardly, and a second side shot provided between the third flange module 42' and the fourth flange module 43' a module 44';
The first flange module 32' of the first side monitoring unit 30' is,
A first connection module 71' contacting a lower portion of the plate panel module 23' and a second connection module contacting an upper portion of the plate panel module 23' are provided, and the second side monitoring unit 40' ), the second flange module 33' of the plate panel module 23' includes a third connection module contacting a lower portion and a fourth connection module contacting an upper portion of the plate panel module 23'. , How to operate a grounding connection system of a buried underground distribution line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220011520A KR102413369B1 (en) | 2022-01-26 | 2022-01-26 | Distribution line grounding method system and its operation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220011520A KR102413369B1 (en) | 2022-01-26 | 2022-01-26 | Distribution line grounding method system and its operation method |
Publications (1)
Publication Number | Publication Date |
---|---|
KR102413369B1 true KR102413369B1 (en) | 2022-06-29 |
Family
ID=82270306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020220011520A KR102413369B1 (en) | 2022-01-26 | 2022-01-26 | Distribution line grounding method system and its operation method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102413369B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102541243B1 (en) * | 2022-08-16 | 2023-06-13 | 주식회사 한진엔지니어링 | Operating method for a power supply control system for distribution lines |
KR102574861B1 (en) * | 2022-08-31 | 2023-09-06 | (주)재원엔지니어링 | Construction method of apartment house electric safety system using artificial intelligence big data |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101612747B1 (en) * | 2015-08-20 | 2016-04-15 | (주)대광 | Ground system for electric supply line |
KR102133524B1 (en) | 2020-02-14 | 2020-07-13 | (주)케이디엔지니어링건축사사무소 | Earth structure earth of under ground cables |
KR102299878B1 (en) * | 2021-03-03 | 2021-09-08 | 홍현자 | System and method for detecting danger |
KR102352541B1 (en) * | 2021-03-03 | 2022-01-19 | 장덕혜 | power distribution line fixing system and construction method thereof |
-
2022
- 2022-01-26 KR KR1020220011520A patent/KR102413369B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101612747B1 (en) * | 2015-08-20 | 2016-04-15 | (주)대광 | Ground system for electric supply line |
KR102133524B1 (en) | 2020-02-14 | 2020-07-13 | (주)케이디엔지니어링건축사사무소 | Earth structure earth of under ground cables |
KR102299878B1 (en) * | 2021-03-03 | 2021-09-08 | 홍현자 | System and method for detecting danger |
KR102352541B1 (en) * | 2021-03-03 | 2022-01-19 | 장덕혜 | power distribution line fixing system and construction method thereof |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102541243B1 (en) * | 2022-08-16 | 2023-06-13 | 주식회사 한진엔지니어링 | Operating method for a power supply control system for distribution lines |
KR102574861B1 (en) * | 2022-08-31 | 2023-09-06 | (주)재원엔지니어링 | Construction method of apartment house electric safety system using artificial intelligence big data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102413369B1 (en) | Distribution line grounding method system and its operation method | |
KR101612747B1 (en) | Ground system for electric supply line | |
KR102221709B1 (en) | Integrated management system of distribution line | |
EP3917834B1 (en) | Device, system and method for installing an object on a power line | |
US20110196535A1 (en) | Line inspection robot and system | |
USRE40228E1 (en) | Mast-type outdoor lighting system | |
CN102239612B (en) | Cable pusher guiding system, method and device | |
CN109911735A (en) | Elevator examination and maintenance system | |
US9608500B2 (en) | Portable generator system for providing temporary power to an electrical-distribution system | |
KR102084137B1 (en) | System for detecting cable failure section in | |
CN105098695B (en) | A kind of intelligently realizing explosion-proof system and control method | |
CN110034517A (en) | Distribution network line connects drainage thread device and method | |
CN208400194U (en) | The entrance guard device and apparatus for examination and repair of inspection platform | |
CN203772306U (en) | Cable terminal integrated monitoring device | |
KR102468546B1 (en) | Electric power supply apparatus management system for telegraph pole using IoT | |
CN107769070A (en) | A kind of power transmission line inspection device and method based on unmanned plane | |
CN111882077A (en) | Method and system for establishing defense space of transformer substation | |
EP4265504A1 (en) | Independent system for inspection, monitoring and surveillance of long infrastructure and the environment thereof | |
KR102221708B1 (en) | Tracking system failure in distribution lines | |
CA2745815C (en) | Line inspection robot and system | |
CN106322124A (en) | Underground pipeline system with optical fibers for early warning and failure checking | |
JP3923875B2 (en) | Connected device | |
KR20150077230A (en) | System for monitoring cable installation and cable installation method | |
KR20160027459A (en) | TRAM safe driving system | |
CN214042401U (en) | Green sign indicating number face identification banister of stroke |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |