KR102408861B1 - Building piping replacement construction method - Google Patents

Building piping replacement construction method Download PDF

Info

Publication number
KR102408861B1
KR102408861B1 KR1020200065667A KR20200065667A KR102408861B1 KR 102408861 B1 KR102408861 B1 KR 102408861B1 KR 1020200065667 A KR1020200065667 A KR 1020200065667A KR 20200065667 A KR20200065667 A KR 20200065667A KR 102408861 B1 KR102408861 B1 KR 102408861B1
Authority
KR
South Korea
Prior art keywords
pipe
floor
mortar
cutting
groove
Prior art date
Application number
KR1020200065667A
Other languages
Korean (ko)
Other versions
KR20210148604A (en
Inventor
김근수
김대건
Original Assignee
김근수
김대건
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김근수, 김대건 filed Critical 김근수
Priority to KR1020200065667A priority Critical patent/KR102408861B1/en
Publication of KR20210148604A publication Critical patent/KR20210148604A/en
Application granted granted Critical
Publication of KR102408861B1 publication Critical patent/KR102408861B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/12Tube and panel arrangements for ceiling, wall, or underfloor heating
    • F24D3/14Tube and panel arrangements for ceiling, wall, or underfloor heating incorporated in a ceiling, wall or floor
    • F24D3/149Tube-laying devices
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B41/00After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone
    • C04B41/0018Coating or impregnating "in situ", e.g. impregnating of artificial stone by subsequent melting of a compound added to the artificial stone composition
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/48Special adaptations of floors for incorporating ducts, e.g. for heating or ventilating
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2290/00Specially adapted covering, lining or flooring elements not otherwise provided for
    • E04F2290/02Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets
    • E04F2290/023Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets for heating
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Civil Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Thermal Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Electromagnetism (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

본 발명은 건축물의 바닥면에 설치되어 있는 기존의 낡은 온돌파이프를 새로운 온돌파이프로 교체하는 건축물 배관 교체 시공방법에 관한 것으로, 난방수 제거공정과; 배관위치표시공정과; 상기 배관위치표시공정에서 배관하고자 하는 기존의 바닥면에 배관파이프의 외경보다 1mm 이상 큰 폭과, 배관파이프의 외경보다 1.5~2.5배의 깊이로 절단하는 바닥절단공정과; 상기 바닥절단공정에서 절단작업이 끝나면 절단작업시 공급된 물과 절단시 발생한 시멘트슬러지로 오염된 바닥면에 목재를 가공할 때 발생 되는 톱밥을 뿌려서 절단수와 시멘트슬러지를 흡착시킨 다음 수거하는 방법으로 바닥면을 청소하는 톱밥청소공정과; 배관 홈 형성공정과; 배관 홈 청소공정과; 수분이탈방지처리공정과; 배관공정과; 상기 배관공정에서 배관 홈에 깔린 배관파이프를 바닥면에 닿게 눌러서 일정한 간격으로 배관파이프와 배관 홈 사이에 홈파기 작업시 발생한 파편이나 모래를 끼워서 배관파이프의 바닥면이 배관 홈 바닥면으로부터 떨어지지 않도록 고정하는 배관고정공정과; 겔상태로 묽게 희석한 몰타르를 부어서 몰타르가 배관파이프 아래측에 채워주는 몰타르충진공정과; 바닥면마감공정으로 이루어지는 건축물 배관 교체 시공방법이다.The present invention relates to a building pipe replacement construction method for replacing an existing old ondol pipe installed on the floor of a building with a new ondol pipe, comprising: a heating water removal process; a pipe position display process; a bottom cutting step of cutting the existing floor to be piped in the pipe position display step to a width of 1 mm or more larger than the outer diameter of the pipe pipe and to a depth of 1.5 to 2.5 times the outer diameter of the pipe pipe; When the cutting operation in the floor cutting process is finished, the cutting water and cement sludge are absorbed by spraying the sawdust generated during wood processing on the floor surface contaminated with the water supplied during the cutting operation and the cement sludge generated during the cutting. a sawdust cleaning process for cleaning the floor; a pipe groove forming process; a pipe groove cleaning process; a moisture escape prevention treatment process; piping process; In the above piping process, the pipe laid in the pipe groove is pressed to touch the bottom surface, and debris or sand generated during the digging operation is inserted between the pipe pipe and the pipe groove at regular intervals so that the bottom surface of the pipe pipe does not fall from the bottom surface of the pipe groove. a pipe fixing process; A mortar filling process in which the mortar diluted in a gel state is poured and the mortar is filled in the lower part of the pipe; This is a construction method for replacing pipes in a building that consists of a floor finishing process.

Description

건축물 배관 교체 시공방법{Building piping replacement construction method}Building piping replacement construction method

본 발명은 건축물의 바닥면에 설치되어 있는 기존의 낡은 온돌파이프를 새로운 온돌파이프로 교체하는 건축물 배관 교체 시공방법에 관한 것으로, 더욱 상세하게는 낡은 온돌파이프가 설치된 기존의 미장몰탈층을 전부 들어내지 않고 콘크리트절단기를 사용하여 기존몰탈층에 온돌파이프의 배관에 알맞은 깊이와 넓이를 갖는 요홈을 형성할 때, 절단작업시 발생하는 작업수와 절단 분말 등의 작업슬러지를 톱밥을 이용하여 깨끗하게 청소하여 작업 현장의 분진발생을 억제하도록 한 건축물 배관 교체 시공방법에 관한 것이다.The present invention relates to a building pipe replacement construction method for replacing an existing old ondol pipe installed on the floor of a building with a new ondol pipe, and more specifically, to a construction method for replacing an existing ondol pipe installed on the floor of a building. When forming a groove with a depth and width suitable for the piping of an ondol pipe in the existing mortar layer using a concrete cutter without It relates to a construction method for replacing the piping in a building to suppress the generation of dust on the site.

일반적으로 우리나라는 온돌문화권에 속하기 때문에 주거용 건축물의 바닥면에는 거의 모두가 보일러와 연결된 온돌파이프를 깔아서 온돌바닥을 시공하였는바, 이와 같은 온돌바닥은 세월이 흐르면 온돌파이프가 노후 되어 새로운 온돌파이프로 교체하여야만 한다.In general, since Korea belongs to the ondol culture zone, almost all of the residential buildings have ondol floors installed by laying ondol pipes connected to the boilers. must be replaced

이에 기존의 온돌파이프교체방법을 살펴보면, 대개는 온돌 바닥을 깨서 들어낸 다음 새로운 온돌파이프를 배열하고, 그 상면에 미장몰탈층을 형성하거나, 낡은 온돌파이프가 설치된 기존의 바닥을 원형 그대로 둔 상태에서 그 위에 다시 새로운 온돌파이프 깔아서 시공하는 방법을 실시하였는바, 바닥을 깨 낼 시는 작업 중 소음과 먼지가 발생하고, 무엇보다 실내의 가재도구를 들어내야 하며, 시공이 끝날 때까지 실내 사용을 하지 못하는 불편함과 많은 량의 건축 폐기물이 발생하며 시공비가 많이 소용되는 문제가 있었다.Therefore, if you look at the existing ondol pipe replacement method, usually, after breaking the ondol floor and lifting it, a new ondol pipe is arranged, a plaster mortar layer is formed on the top surface, or the existing floor where the old ondol pipe is installed is left in its original state. A new ondol pipe was laid on top of it and the construction method was carried out. When the floor is broken, noise and dust are generated during the work, and above all, household items must be lifted, and do not use indoors until the construction is finished. There were problems in that it was inconvenient to not be able to do so, a large amount of construction waste was generated, and construction cost was high.

그리고 기존의 바닥 위에 새로이 배관을 하고 몰탈로 덮는 경우에는 낡은 온돌파이프가 설치된 기존의 미장몰탈층 위에 새로운 배관층을 형성하는 관계로 바닥층이 두꺼워져 공간 높이가 줄어들며 중량의 부가로 건축물에 실리는 하중이 증가하며, 이 또한 실내의 가재도구를 모두 들어내고 시공이 바닥몰탈이 응고될 때까지 실내를 사용하지 못하며 시공비가 많이 소용되는 문제점이 있었다.And, when new piping is installed on the existing floor and covered with mortar, a new piping layer is formed on top of the existing plaster mortar layer where the old ondol pipe is installed, so the floor layer becomes thicker, reducing the height of the space, and the load on the building is added to the weight. This increases, and this also has a problem that the interior can not be used until the floor mortar is solidified after removing all the household items in the room, and there is a problem that the construction cost is high.

이에 상기한 문제점을 해결하고자 본 발명인이 개발하여 가업으로 실시하는 방법으로, 기존의 배관을 폐쇄하고 바닥면에 파이프를 배관하는 배관홈을 새로이 파서 새로운 온돌파이프를 시공하는 홈파기 온돌배관 시공방법이 있는바, 이에 대한 특허문헌을 살펴보면 다음과 같다.Therefore, in order to solve the above problems, the inventor developed and carried out as a family business. The groove digging ondol pipe construction method is to close the existing pipe and newly dig a pipe groove for piping the pipe on the floor to construct a new ondol pipe. As a result, a look at the patent literature on this is as follows.

특허출원 제10-1999-0030668호(1999.07.27)는 건축물의 바닥면에 설치되어 있는 기존의 낡은 온돌파이프를 새로운 온돌파이프로 교체하고자 할 때, 낡은 온돌파이프가 설치된 기존몰탈층을 전부 들어내지 않고 콘크리트절단기를 사용하여 기존몰탈층에 온돌파이프의 직경에 알맞도록 적당한 깊이와 넓이를 갖는 요홈을 형성한 다음, 이에 새로운 온돌파이프를 삽입한 후에 기존몰탈층의 상면에 적당한 두께로 마감몰탈층을 형성하는 아주 간단한 방법으로 온돌파이프를 교체하도록 한 홈파기공법에 의한 온돌파이프 교체방법및 그로부터 얻어진 온돌바닥구조에 관한 것으로, 온돌파이프의 교체작업시 기존몰탈층을 깨내는 것이 아니라 요홈부분만 절단함으로 해서 건축물의 바닥에 심한 충격을 주지 않아도 되므로 충격으로 인한 건물의 균열등이 발생할 염려가 전혀 없음은 물론 충격소음을 줄여 주며, 온돌파이프의 교체작업을 신속하면서도 건축물에도 무리한 하중을 주지 않도록 함은 물론 교체비용 또한 줄여준다.Patent application No. 10-1999-0030668 (July 27, 1999) states that when replacing the old ondol pipe installed on the floor of a building with a new ondol pipe, the entire mortar layer installed with the old ondol pipe is not removed. Instead, use a concrete cutter to form a groove with an appropriate depth and width to match the diameter of the ondol pipe in the existing mortar layer, and then insert a new ondol pipe into it and then apply a finishing mortar layer to the upper surface of the existing mortar layer with an appropriate thickness. It relates to a method of replacing an ondol pipe by a grooving method that replaces an ondol pipe in a very simple way of forming, and the ondol floor structure obtained therefrom. Therefore, there is no need to give a severe impact to the floor of the building, so there is no risk of cracks in the building due to the impact, as well as reducing the impact noise, and it makes the replacement work of the ondol pipe quick and does not put an excessive load on the building, of course. It also reduces replacement costs. 특허출원 제10-2001-0020046호(2001.04.14)는, 홈파기공법에 의한 홈파기공법 배관파이프 교체방법 및 그 방법으로 시공된 온돌바닥구조에 관한 것으로, 배관하고자하는 건물바닥면 몰탈층에 배관을 하기에 알맞게 폭은 배관파이프의 외경보다 크고 깊이는 배관파이프가 매몰되고 그 위에 마감층을 형성할 수 있도록 홈을파는 배관홈파기공정과; 상기한 공정에서 적당한 폭과 깊이로 형성된 배관홈에 설비하고자하는 배관파이프를 깊숙히 끼워넣어서 설치하는 배관파이프 설치공정과, 바닥몰탈층에 물을뿌려 수분을 보강하고 배관홈 내면에 수용액을 발라주어 기존의 몰탈층의 모세공을 막아서 새로운 마감재의 수분이 기존의 몰탈층으로 흡수되지 않게 하는 수분이탈방지처리공정과; 상기 배관파이프가 배관된 배관홈에 몰탈 등의 마감재를 채워서 충진하는 몰탈충진공정과; 상기한 방법으로 배관홈에 충진된 몰탈의 표면을 기존의몰탈층과 일치하도록 매끄럽게 마감하는 마감처리공정으로 이루어지므로서, 배관파이프가 고장나거나 낡아서 교체하고자 할 때 기존의 미장몰탈층을 전부 들어내지 않고 배관파이프가 배관되는 부위만을 배관파이프의 배관에 알맞도록 적당한 깊이와 넓이를 갖는 요홈으로 파내고, 새로운 배관을 하고서 새로운 몰탈과 기존의 몰탈 사이가 갈라지지 않도록 처리한후, 시멘트로 배관파이프가 배관된 배관홈을 충진하여 시공을 마감함으로서 신속한 배관작업이 이루어져 공사기간이 기존의 공법으로 7일 정도 걸려야 하는 것이 단 하루 만에 끝나는 것은 물론이고, 작업시 먼지나 소음발생을 최소화하며, 작업이 간단하여 신속하면서도 견고하게 온돌파이프의 교체작업을 할 수 있음은 물론 시공비용이 절감되며 건축물자체에도 과중한 하중을 주지 않게 된다.Patent Application No. 10-2001-0020046 (April 14, 2001) relates to a method for replacing a pipe pipe in a grooving method according to the grooving method and an ondol floor structure constructed by the method, A pipe groove digging process of digging a groove so that the width is greater than the outer diameter of the pipe pipe and the depth is greater than the outer diameter of the pipe pipe to fit the pipe and the pipe pipe is buried and a finishing layer is formed thereon; In the above process, the pipe installation process of inserting the pipe to be installed into the pipe groove formed with an appropriate width and depth and installing it, and reinforcing moisture by spraying water on the floor mortar layer, and applying an aqueous solution to the inner surface of the pipe groove. a moisture escape prevention treatment process of blocking the pores of the mortar layer of the mortar layer so that the moisture of the new finishing material is not absorbed into the existing mortar layer; a mortar filling process of filling the pipe grooves in which the pipe pipes are piped with a finishing material such as mortar; Since it is a finishing process that smoothly finishes the surface of the mortar filled in the pipe grooves with the existing mortar layer by the above method, when the pipe pipe is broken or worn out and you want to replace it, do not remove all of the existing plastering mortar layer. Excavate only the part where the piping pipe is being piped with a groove having an appropriate depth and width to fit the piping of the piping pipe. By filling the piped grooves and finishing the construction, the piping work is done quickly, and the construction period, which takes about 7 days with the existing method, is finished in just one day. As it is simple, it is possible to replace the ondol pipe quickly and reliably, as well as reducing the construction cost and not putting an excessive load on the building itself. 특허출원 제10-2001-0020047호(2001.04.14)는 홈파기 공법에 의한 홈파기 공법 배관파이프 교체방법 및 그 방법으로 배관된 온돌바닥구조에 관한 것으로, 시공하고자 하는 배관위치를 정확하게 선정하여 먹줄 등으로 표시함으로서 배관의 간격이 일정하게 시공하도록 표시하는 배관위치표시공정과; 배관하고자하는 건물바닥면 몰탈층에 배관을 하기에 알맞게 폭은 배관파이프의 외경보다 1~3mm 크고 깊이는 배관파이프가 매몰되고 그 위에 몰탈층을 형성할 수 있도록 배관파이프의 외경보다 1~3cm 깊게 홈을 파는 배관홈파기공정과; 상기한 공정에서 적당한 폭과 깊이로 형성된 배관홈에 설비하고자하는 배관파이프를 깊숙이 끼워 넣어서 설치하는 배관파이프설치공정과; 바닥몰탈층에 물을 붓으로 뿌리거나 발라서 절단홈 주변을 꼼꼼하게 젖게 하여 수분을 보강하고 배관홈 내면에 수용액을 발라주어 기존의 몰탈층의 모세공을 막아서 새로운 몰탈의 수분이 기존의 몰탈층으로 흡수되지 않게 하는 수분이탈방지처리공정과; 상기 배관파이프가 배관된 배관홈에 몰탈을 채워서 충진하는 몰탈충진공정과; 상기한 방법으로 배관홈에 충진된 몰탈의 표면을 기존의 몰탈층과 일치하도록 매끄럽게 마감하는 마감처리공정으로 이루어지거나, 상기한 공법에서 기존에 배관된 관로에 뜨거운 물을 넣어 열감지로 관로를 탐지하거나 배관이 동 파이프등 금속일 때는 금속탐지기를 이용하여 기존배관의 위치를 정확하게 찾아내는 기존배관관로 탐사공정을 더 포함하여 이루어지거나, 이와 같이 찾아낸 기존의 배관에 잔여하는 물을 콤프레샤를 이용한 고압의 에어로 불어서 제거하거나, 진공펌프를 이용하여 고압으로 흡입하여 제거하는 공정을 더포함하거나, 스펀지나 부직포에 적당량의 물을 먹여서 만든 습식포를 시공하고자 하는 바닥면의 커팅날이 지나가는 부위에 깔아주는 습식포설치공정을 더 포함하는 방법으로, 기존의 노후된 배관에는 수분이 제거되고 건축물 바닥층에 형성한 배관파이프 매몰홈에 설치된 배관파이프 위에 기존의 바닥몰탈층과 일치하도록 새로운 몰탈층이 형성되어 배관을 매몰하게 구성한 온돌바닥구조로서, 배관파이프가 고장나거나 낡아서 교체하고자 할 때 기존의 미장몰탈층을 전부 들어내지 않고 배관파이프가 배관되는 부위만을 배관파이프의 시공에 알맞도록 폭을 배관파이프의 외경보다 1~3mm 크고 깊이는 배관파이프의 외경보다 1~3cm 깊게 요홈을 파내고, 새로운 배관을 하고서 새로운 몰탈과 기존의 몰탈 사이가 갈라지지 않도록 처리한 후, 시멘트로 배관파이프가 배관된 배관홈을 충진하여 시공을 마감함으로서 신속한 배관작업이 이루어져 공사기간이 기존의 공법으로 7일정도 걸려야 하는 것이 단 하루 만에 끝나는 것은 물론이고, 작업시 먼지나 소음발생을 최소화하여 기타 작업이 보다 아주 간단한 방법으로 신속하면서도 견고하게 온돌파이프의 교체작업을 할 수 있음은 물론 시공비용이 절감되며 건축물자체에도 과중한 하중을 주지 않게 된다.Patent Application No. 10-2001-0020047 (April 14, 2001) relates to a method for replacing a pipe pipe in a grooving method according to the grooving method and an ondol floor structure piped by the method. a pipe position display step of displaying such that the intervals between pipes are uniformly constructed; The width is 1-3 mm larger than the outer diameter of the pipe pipe and the depth is 1-3 cm deeper than the outer diameter of the pipe pipe so that the pipe pipe is buried and a mortar layer is formed on it. a pipe groove digging process for digging a groove; a piping pipe installation step of deeply inserting a pipe to be installed into a pipe groove formed with an appropriate width and depth in the above process; Sprinkle or apply water on the floor mortar layer with a brush to meticulously wet the area around the cutting groove to reinforce moisture, and apply an aqueous solution to the inner surface of the pipe groove to block the pores of the existing mortar layer so that the moisture of the new mortar is absorbed into the existing mortar layer. a water escape prevention treatment process to prevent it from happening; a mortar filling process of filling the pipe grooves in which the pipe pipes are piped with mortar; It consists of a finishing process of smoothing the surface of the mortar filled in the pipe grooves with the above method to match the existing mortar layer, or by putting hot water into the previously piped pipe in the above method to detect the pipe by heat sensing, or When the pipe is made of metal such as copper pipe, it is made by using a metal detector to accurately find the position of the existing pipe by further including the exploration process of the existing pipe, or by blowing the water remaining in the existing pipe found in this way with high-pressure air using a compressor. Installation of wet cloth that removes or removes by suction at high pressure using a vacuum pump, or spreads wet cloth made by feeding an appropriate amount of water to a sponge or nonwoven fabric over the area where the cutting blade passes on the floor to be constructed As a method that further includes a process, moisture is removed from the existing old pipe, and a new mortar layer is formed to match the existing floor mortar layer on the pipe pipe installed in the pipe pipe buried groove formed on the floor layer of the building to bury the pipe. As an ondol floor structure, when the pipe pipe is broken or worn out and you want to replace it, the width is 1-3 mm larger than the outside diameter of the pipe pipe so that only the part where the pipe pipe is piped is suitable for the construction of the pipe pipe without removing the entire plastering mortar layer. Dig a groove 1~3cm deeper than the outer diameter of the pipe pipe, make a new pipe, treat the new mortar and the existing mortar so that it does not split, and then fill the pipe groove where the pipe pipe is piped with cement to finish the construction. As a result, the piping work is done quickly and the construction period, which takes about 7 days with the conventional method, can be completed in just one day. It is possible to replace the pipe, as well as reducing the construction cost and not giving an excessive load to the building itself. 특허출원 제10-2001-0020048호(2001.04.14)는, 홈파기공법에 의한 홈파기공법 배관파이프 교체방법 및 그 방법으로 시공된 배관구조에 관한 것으로, 더욱 상세하게는 온돌파이프나 수도관, 배수관등을 고장으로 교체하여야 하거나 이들 배관이 노후되어서 전면적으로 교체하여야 할때 기존의 미장몰탈층에 새로운 배관파이프를 배관할 부분만을 콘크리트절단기로 배관파이프의 시공에 알맞도록 폭은 배관파이프의 외경보다 1~3mm 크고 깊이는 배관파이프의 외경보다 1~3cm 깊게 절단하고 파내어서 요홈을 형성한 후, 여기에 새로운 배관파이프를 삽입하여 배관하고 급결 시멘트를 이용하여 기존의 미장몰탈층의 상면과 일치하도록 배관된 요홈을 메워서 단시간 내에 마감몰탈하는 아주 간단한 방법으로 배관파이프를 교체하도록 한 홈파기 공법 배관파이프 교체방법 및 그 방법으로 시공된 배관구조에 관한 것이다.Patent Application No. 10-2001-0020048 (April 14, 2001) relates to a method for replacing a pipe pipe in a grooving method by a grooving method and a piping structure constructed by the method, and more specifically, an ondol pipe, a water pipe, and a drain pipe. When replacement is required due to malfunction or when these pipes are old and need to be replaced entirely, use a concrete cutter only for the part where the new pipe pipe is to be piped on the existing plastering mortar layer. It is ~3mm large and 1-3cm deeper than the outer diameter of the piping pipe, dug out to form a groove, and then insert a new piping pipe here for piping. The present invention relates to a method for replacing a piping pipe with a groove digging method that allows replacement of a piping pipe in a very simple way of filling in the grooves and finishing mortar in a short time, and to a piping structure constructed by the method. 특허출원 제10-2009-0054502호(2009.06.18)는 온돌 바닥의 배관파이프를 홈파기 공법에 의해 교체할 때 교체 방법을 단순하게 하고 교체 비용을 절감할 수 있도록 한 온돌바닥 배관파이프 교체 방법 및 이에 적합한 교체 구조에 관한 것으로, 기존 몰탈층에 홈을 판 후 여기에 새로운 배관파이프를 설치하고 몰탈을 충진할 때 기존 몰탈과 새롭게 충진한 몰탈이 별도의 마감 공정을 하지 않아도 편평하게 되도록 구성한 온돌바닥 배관파이프 교체 방법 및 이에 적합한 교체 구조를 제공하기 위하여, 바닥면의 기존 몰탈을 절단하여 일정폭의 홈을 형성하고 여기에 새로운 배관파이프를 설치함과 아울러 몰탈을 충진하여 이루어지는 온돌바닥 배관파이프 교체 방법에 있어서, 상기한 홈을 형성할 때 홈에 충진되어 굳는 몰탈이 굳으면서 걸려 상부로 돌출되지 않도록 홈 내부에 걸림부를 형성하는 단계를 포함하는 것으로, 기존 몰탈에 일정 폭으로 절단 형성된 홈과, 상기한 홈에 삽입 설치되는 배관파이프와, 상기한 배관파이프를 덮도록 홈에 충진되는 몰탈로 구성한 온돌 바닥 배관 파이프교체 구조에 있어서, 상기한 홈의 내측면에 형성되어 홈에 충진된 몰탈이 굳으면서 팽창할 때 외부로 빠져나오면서 돌출되지 않도록 형성된 걸림부를 포함한다.Patent Application No. 10-2009-0054502 (June 18, 2009) discloses a method for replacing an ondol floor piping pipe and It relates to a replacement structure suitable for this, and when a new piping pipe is installed here after a groove is made in the existing mortar layer and filled with mortar, the ondol floor is constructed so that the existing mortar and the newly filled mortar are flat without a separate finishing process In order to provide a pipe pipe replacement method and a replacement structure suitable therefor, the ondol floor pipe pipe replacement method is made by cutting the existing mortar on the floor to form a groove of a certain width, installing a new pipe pipe there, and filling the mortar In the above, to include the step of forming a locking portion inside the groove so that the mortar filled and hardened in the groove does not protrude upward while being caught while forming the groove, the groove cut to a predetermined width in the existing mortar; In the ondol floor piping pipe replacement structure composed of a piping pipe inserted into one groove and mortar filled in the groove to cover the piping pipe, the mortar formed on the inner surface of the groove and filled in the groove hardens It includes a locking portion formed so as not to protrude while protruding to the outside when inflated.

그러나 지금까지의 배관교체 방법을 실시함에 있어서는 배관에 알맞은 깊이와 넓이를 갖는 요홈을 형성할 때, 절단작업시 발생하는 작업수와 절단 분말 등의 작업슬러지가 바닥면에 묻어서 마르게 되어 작업하는 동안 계속해서 먼지를 일으켜 작업환경을 오염시키고 작업이 끝난 후에도 미세분말이 실내로 분출되어 오염시키는 문제점이 있었다. 이에 본 발명은 톱밥을 이용하여 절단작업시 작업수와 함께 발생한 작업 슬러지를 깨끗하게 청소하여 작업 현장의 분진발생을 억제하도록 함에 그 목적을 둔 것이다. However, in carrying out the pipe replacement method so far, when a groove having a suitable depth and width is formed in the pipe, the work water generated during the cutting operation and the working sludge such as the cutting powder are buried on the floor and dried, so that it continues while working. This causes dust to contaminate the working environment, and there is a problem in that fine powder is sprayed into the room even after work is finished, contaminating it. Accordingly, an object of the present invention is to use sawdust to cleanly clean the work sludge generated together with the work water during cutting to suppress the generation of dust at the work site.

상기한 문제점을 해결하기 위한 본 발명은, 시공 현장의 기존배관파이프를 난방수 분배기나 보일러로부터 분리하고 기존배관파이프 내에 잔류하는 물을 콤프레샤를 이용한 고압의 에어로 불어서 제거하거나, 진공펌프를 이용하여 고압으로 흡입하는 방법으로 제거하는 기존배관파이프 난방수 제거공정과; 시공하고자 하는 기존바닥면 표면에 배관위치를 선정하고 먹줄이나 기타 표시방법으로 표시하여 배관 홈을 일정한 간격으로 구성하도록 표시하는 배관위치표시공정과; 상기 배관위치표시공정에서 배관하고자 하는 기존의 바닥면에 배관파이프의 외경보다 1mm 이상 큰 폭과, 배관파이프의 외경보다 1.5~2.5배의 깊이로 절단하는 바닥절단공정과; 상기 바닥절단공정에서 절단작업이 끝나면 절단작업시 공급된 물과 절단시 발생한 시멘트슬러지로 오염된 바닥면에 목재를 가공할 때 발생 되는 톱밥을 뿌려서 절단수와 시멘트슬러지를 흡착시킨 다음 수거하는 방법으로 바닥면을 청소하는 톱밥청소공정과; 상기 바닥절단공정에서 절단날이 배관 홈의 크기로 절단한 사이에 남은 바닥재를 전동헤머로 두드려서 파내는 작업으로 배관이 설치될 배관 홈을 형성하는 배관 홈 형성공정과; 상기 배관 홈 형성공정에서 전동헤머로 절단부 사이를 파내서 형성한 배관 홈을 깨끗이 청소하고 이때 발생한 부산물을 수거하는 배관 홈 청소공정과; 상기 배관 홈 청소 공정에서 청소한 배관 홈 내부벽면의 모세공을 막아서 새로운 몰타르의 수분이 기존의 몰타르층으로 흡수되지 않도록 하는 수분이탈방지처리공정과; 상기 수분이탈방지처리공정에서 내부벽면에 수용액을 도포한 배관 홈에 새로운 배관파이프를 깔아주는 배관공정과; 상기 배관공정에서 배관 홈에 깔린 배관파이프를 바닥면에 닿게 눌러서 일정한 간격으로 배관파이프와 배관 홈 사이에 홈파기 작업시 발생한 파편이나 모래를 끼워서 배관파이프의 바닥면이 배관 홈 바닥면으로부터 떨어지지 않도록 고정하는 배관고정공정과; 상기 배관고정공정에서 배관 홈 바닥면에 닿도록 일정한 간격으로 고정한 배관에 겔상태로 묽게 희석한 몰타르를 부어서 몰타르가 배관파이프 아래측에 채워주는 몰타르충진공정과; 상기 몰타르충진공정에서 배관파이프 아래측에 몰타르가 충진된 상태에서 바닥마감용 몰타르를 배관 홈의 배관 위에 충진하고 바닥면과 일치하게 미장마감하는 바닥면마감공정으로 이루어지는 건축물 배관 교체 시공방법이다.The present invention for solving the above problems is to separate an existing piping pipe at a construction site from a heating water distributor or a boiler and remove the water remaining in the existing piping pipe by blowing it with high-pressure air using a compressor, or using a vacuum pump to remove high pressure Existing pipe pipe heating water removal process to remove by suction method; a pipe position display step of selecting a pipe position on the surface of the existing floor to be constructed and displaying it with an ink line or other display method to configure the pipe grooves at regular intervals; a bottom cutting step of cutting the existing floor to be piped in the pipe position display step to a width of 1 mm or more larger than the outer diameter of the pipe pipe and to a depth of 1.5 to 2.5 times the outer diameter of the pipe pipe; When the cutting operation in the floor cutting process is finished, the cutting water and cement sludge are absorbed by spraying the sawdust generated during wood processing on the floor surface contaminated with the water supplied during the cutting operation and the cement sludge generated during the cutting. a sawdust cleaning process for cleaning the floor; a pipe groove forming step of forming a pipe groove in which a pipe is to be installed by tapping the remaining flooring material with an electric hammer while the cutting blade is cut to the size of the pipe groove in the floor cutting step; a pipe groove cleaning process of thoroughly cleaning the pipe groove formed by digging between the cut parts with an electric hammer in the pipe groove forming process, and collecting by-products generated at this time; a water escape prevention treatment process of blocking the capillaries of the inner wall surface of the pipe grooves cleaned in the pipe groove cleaning process so that the moisture of the new mortar is not absorbed into the existing mortar layer; a piping process of laying a new piping pipe in the piping groove where the aqueous solution is applied to the inner wall surface in the moisture escape prevention treatment process; In the above piping process, the pipe laid in the pipe groove is pressed to touch the bottom surface, and debris or sand generated during the digging operation is inserted between the pipe pipe and the pipe groove at regular intervals so that the bottom surface of the pipe pipe does not fall from the bottom surface of the pipe groove. a pipe fixing process; a mortar filling step of pouring mortar diluted in a gel state into the pipe fixed at regular intervals so as to touch the bottom surface of the pipe groove in the pipe fixing step and filling the mortar under the pipe pipe; In the mortar filling process, in a state in which mortar is filled on the lower side of the pipe pipe, the mortar for floor finishing is filled on the pipe of the pipe groove, and it is a building pipe replacement construction method consisting of a floor finishing process of plastering and finishing in accordance with the floor surface.

이상에서 살펴본 바와 같이 본 발명은 배관파이프가 낡아서 교체하고자 할 때, 기존의몰탈층을 전부 들어내지 않고 배관파이프가 배관되는 부위만을 배관파이프의 시공에 알맞도록 요홈을 파내고, 새로운 배관을 하고서 마감함으로서 신속한 배관작업이 이루어져 공사기간을 대폭 줄이도록 함에있어서, 배관교체 방법을 실시함에 있어서는 배관에 알맞은 깊이와 넓이를 갖는 요홈을 형성할 때, 절단작업시 발생하는 작업수와 절단 분말 등의 작업슬러지가 바닥면에 묻어서 마르게 되어 작업하는 동안 계속해서 먼지를 일으켜 작업환경을 오염시키고 작업이 끝난 후에도 미세분말이 실내로 분출되어 오염시키는 문제점을, 톱밥을 이용하여 절단작업시 작업수와 함께 발생한 작업 슬러지를 깨끗하게 청소하여 작업 현장의 분진발생을 억제하여 작업환경을 쾌적하게 하는 신규한 효과를 갖는다.As described above, in the present invention, when a pipe pipe is old and wants to be replaced, only the part where the pipe pipe is piped is dug out to fit the construction of the pipe pipe without removing all the existing mortar layer, and a new pipe is finished In order to achieve rapid piping work by doing this and greatly reduce the construction period, when performing the pipe replacement method, when a groove having a suitable depth and width is formed for the pipe, the number of works generated during cutting and work sludge such as cutting powder Work sludge generated together with work water when cutting using sawdust is a problem that causes dust to be continuously generated during work and pollutes the work environment. It has a novel effect of making the work environment pleasant by suppressing the generation of dust at the work site by thoroughly cleaning it.

도 1은 본 발명을 실시하는데 따른 공정 예시도.
도 2는 본 발명의 다른 실시예를 나타낸 공정 예시도.
1 is a diagram illustrating a process according to the practice of the present invention.
Figure 2 is a process illustration showing another embodiment of the present invention.

상기한 문제점을 해결하기 위한 본 발명을 실시예에 따라 그 시공방법을 공정별로 살펴보면 다음과 같다.The construction method of the present invention for solving the above problems according to the embodiment will be described for each process as follows.

실시예1Example 1

기존배관파이프 난방수 제거공정;Existing pipe pipe heating water removal process;

시공 현장의 기존배관파이프를 난방수 분배기나 보일러로부터 분리하고 기존배관파이프 내에 잔류하는 물을 콤프레샤를 이용한 고압의 에어로 불어서 제거하거나, 진공펌프를 이용하여 고압으로 흡입하는 방법으로 제거한다.Remove the existing piping at the construction site from the heating water distributor or boiler, and remove the remaining water in the existing piping by blowing it with high-pressure air using a compressor or by suctioning it at high pressure using a vacuum pump.

이와 같이 하는 데에는 시공중 기존의 배관파이프에 들어있는 많은 양의 물이 누수 되어 작업환경이나 실내환경을 더럽히는 것은 물론, 바닥면으로 스며들어 누수되어서 아래층의 천장을 더럽히는 문제점을 방지하고, 물이 바닥면 전체에 스며들어 서서히 증발하면서 방바닥에 습기가 차는 원인이 되거나 시공후 기존의 파이프에 남아있는 잔여 수분이 증발하여 습기를 생성하는 문제점을 방지하기 위함이다.To do this, a large amount of water in the existing piping pipe leaks during construction, polluting the working environment or indoor environment, as well as preventing the problem that it seeps into the floor and leaks and pollutes the ceiling of the lower floor. This is to prevent the problem that it permeates the entire surface and evaporates slowly, causing moisture to build up on the floor or generating moisture by evaporating the residual moisture remaining in the existing pipe after construction.

배관위치표시공정;pipe position indication process;

시공하고자 하는 기존바닥면 표면에 배관위치를 선정하고 먹줄이나 기타 표시방법으로 표시하여 배관홈을 일정한 간격으로 구성하도록 표시한다.Select the location of the piping on the surface of the existing floor to be constructed, and mark it with an ink line or other marking method to configure the piping grooves at regular intervals.

이와 같이 배관위치를 표시함은 기존바닥면에 배관설계를 하는 것과 동일한 효과를 갖는다.In this way, indicating the location of the pipe has the same effect as designing the pipe on the existing floor.

바닥절단공정;floor cutting process;

상기 배관위치표시공정에서 배관하고자 하는 기존의 바닥면에 배관파이프의 외경보다 1mm 이상 큰 폭과, 배관파이프의 외경보다 1.5~2.5배의 깊이로 절단한다.In the pipe position display process, a width of 1 mm or more larger than the outer diameter of the pipe pipe and a depth of 1.5 to 2.5 times the outer diameter of the pipe pipe are cut on the existing floor surface to be piped.

이와 같은 절단홈은 보편적으로 배관파이프의 외경이 20mm 일 때, 폭이 21mm 이상이어야 하며 깊이는 30~50mm로 할 것인바, 가장 이상적인 것은 폭 22mm 깊이 40mm일 때이다.In general, when the outer diameter of the pipe pipe is 20mm, the cut groove should be 21mm or more in width and 30-50mm in depth, and the most ideal is when it is 22mm in width and 40mm in depth.

여기서 폭이 너무 좁으면 파이프를 삽입하거나 파이프 아래 측에 몰타르를 채우는 작업이 난해하며, 폭이 너무 넓으면 파이프고정이 어렵고 몰타르가 많이 소요되어 작업시간이 길어지고 작업원가가 상승하는 문제가 따른다.Here, if the width is too narrow, it is difficult to insert the pipe or to fill the mortar under the pipe.

그리고 깊이를 너무 얕게 하면 작업 후 시공된 몰타르가 배관 홈으로부터 이탈하여 배관전체가 이탈할 염려가 있고 너무 깊으면 배관위에 덮히는 몰타르 층이 두꺼워 난발열의 발산률이 떨어지고 몰타르가 많이 소요되어 작업시간이 길어지고 작업원가가 상승하는 문제가 따른다. Also, if the depth is too shallow, the installed mortar may separate from the pipe groove after work and the entire pipe may come off. This lengthens and increases the working cost.

이때 사용되는 절단기는 이동바퀴가 구성된 일반적인 시멘트 절단기에, 본 발명인이 개발한 2개의 절단 날이 한 조를 이루도록 배관 홈의 폭으로 세팅하여 구성한 칼날을 장착하여 사용한다. The cutter used at this time is used by mounting a blade configured by setting the width of the pipe groove so that the two cutting blades developed by the present inventors form a set on a general cement cutter having a moving wheel.

톱밥청소공정;sawdust cleaning process;

상기 바닥절단공정에서 절단작업이 끝나면 절단작업시 공급된 물과 절단시 발생한 시멘트슬러지로 오염된 바닥면에 목재를 가공할 때 발생 되는 톱밥을 뿌려서 절단수와 시멘트슬러지를 흡착시킨 다음 수거하는 방법으로 바닥면을 청소한다. When the cutting operation in the floor cutting process is finished, the cutting water and cement sludge are absorbed by spraying the sawdust generated during wood processing on the floor surface contaminated with the water supplied during the cutting operation and the cement sludge generated during the cutting. Clean the floor.

이와 같이 톱밥 청소를 하는 것은 작업환경이 청결하고 바닥면 절단 시 발생한 시멘트슬러지를 깨끝하게 수거하여 작업후 시멘트슬러지가 말라서 먼지로 되어 실내를 오염시키는 것을 방지하기 위함이다. The purpose of cleaning sawdust in this way is to ensure that the working environment is clean, and the cement sludge generated during floor cutting is carefully collected to prevent the cement sludge from drying out and polluting the room after work.

배관 홈 형성공정;pipe groove forming process;

상기 바닥절단공정에서 절단날이 배관 홈의 크기로 절단한 사이에 남은 바닥재를 전동헤머로 두드려서 파내는 작업으로 배관이 설치될 배관 홈을 형성한다.In the floor cutting process, a pipe groove in which a pipe is to be installed is formed by tapping the remaining flooring material with an electric hammer while the cutting blade is cut to the size of the pipe groove.

이와 같은 작업은 바닥면을 파내는 별도의 스크래이퍼를 제작하여 실시할 수도 있으나 이때는 별도의 스크레이퍼를 제작하여야 하는 등 시공비 상승의 원인이 된다.Such work may be performed by manufacturing a separate scraper that digs out the floor, but in this case, a separate scraper must be manufactured, which causes an increase in construction cost.

배관 홈 청소공정;pipe groove cleaning process;

상기 배관 홈 형성공정에서 전동헤머로 절단부 사이를 파내서 형성한 배관 홈을 깨끗이 청소하고 이때 발생한 부산물을 수거하는 청소를 한다.In the pipe groove forming process, the pipe grooves formed by digging between the cut parts with an electric hammer are thoroughly cleaned and the by-products generated at this time are collected.

수분이탈방지처리공정;moisture escape prevention treatment process;

상기 배관 홈 청소 공정에서 청소한 배관 홈 내부벽면의 모세공을 막아서 새로운 몰타르의 수분이 기존의 몰타르층으로 흡수되지 않도록 한다.The capillary pores on the inner wall surface of the pipe groove cleaned in the pipe groove cleaning process are blocked so that the moisture of the new mortar is not absorbed into the existing mortar layer.

이때 사용되는 것은 수용액으로 발수제나 방수제 중 어느 하나 또는 이들을 혼합한 것에 경화제를 첨가하여 분무기로 분사하거나 붓으로 발라주는 방법으로 도포작업한다. At this time, an aqueous solution is used, and a curing agent is added to any one of a water repellent agent, a waterproofing agent, or a mixture thereof, and the application is performed by spraying with a sprayer or applying with a brush.

이때 사용되는 수용액은 기존의 바닥면을 형성한 몰타르에 형성되어있는 미세한 모세공을 막아줄 수 있는 수용성 수용액이나 기타기존의 몰타르와 화합할 수 있는 수용성 화합물이면 모두 사용할 수 있으며, 여기에 접착제를 섞어서 처리하면 기존의 몰타르와 새로운 몰타르가 보다 완벽하게 접착된다.The aqueous solution used at this time can be any water-soluble aqueous solution that can block the micropores formed in the mortar that has formed the existing bottom surface or a water-soluble compound that can be compatible with other existing mortars. When treated, the old mortar and the new mortar bond more perfectly.

이와 같이 기존 바닥면을 형성한 몰타르의 배관 홈 내면에 수용액을 도포하는 것은 기존의 몰타르에 미세한 모세공이 막혀서 새로운 몰타르를 충진시 모세관 현상으로 새로운 몰타르의 수분이 기존의 몰타르에 형성된 모세공을 통하여 흡수되어 새로운 몰타르의 미세량이 이탈되면서 급격히 수축되어서 기존의 몰타르와 새로운 몰타르 사이에 틈새가 발생하는 것을 미연에 방지하므로 기존의 몰타르와 새로운 몰타르가 서로 일체가 되어 하나가 되게 하는 것이다.In this way, the application of aqueous solution to the inner surface of the pipe groove of the mortar that has formed the existing floor surface is a capillary phenomenon when the existing mortar is filled with new mortar because fine pores are clogged. This is to prevent the gap between the existing mortar and the new mortar from being rapidly contracted as the fine amount of the new mortar is released, so that the existing mortar and the new mortar become one with each other.

배관공정;piping process;

상기 수분이탈방지처리공정에서 내부벽면에 수용액을 도포한 배관 홈에 새로운 배관파이프를 깔아준다.In the moisture escape prevention treatment process, a new pipe pipe is laid in the pipe groove where the aqueous solution is applied to the inner wall surface.

배관파이프 고정공정;pipe fixing process;

상기 배관공정에서 배관 홈에 깔린 배관파이프를 바닥면에 닿게 눌러서 일정한 간격으로 배관파이프와 배관 홈 사이에 홈파기 작업시 발생한 파편이나 모래를 끼워서 배관파이프의 바닥면이 배관 홈 바닥면으로부터 떨어지지 않도록 고정한다.In the above piping process, the pipe laid in the pipe groove is pressed to touch the bottom surface, and debris or sand generated during the digging operation is inserted between the pipe pipe and the pipe groove at regular intervals so that the bottom surface of the pipe pipe does not fall from the bottom surface of the pipe groove. do.

이때 배관파이프 전체를 고정하지 않고 일정한 간격을 두고 고정하는 것은 배관파이프 아래로 몰타르를 충진하기 위함이다.At this time, not fixing the entire pipe pipe, but fixing it at regular intervals is to fill the mortar under the pipe pipe.

그리고 본 공정을 실시하여야 하는 필수적인 이유는 본 공정을 실시하지 않을 시 배관파이프의 아래로 몰타르를 충진시 배관파이프가 부유하여 배관파이프의 아래측에 몰타르가 충진되지 않아 공간이 발생하는 문제가 생겨서 난방열 전도율을 급격히 떨어뜨릴 우려가 있기 때문이다. And the essential reason to carry out this process is that when this process is not carried out, the piping pipe floats when filling the mortar under the piping pipe, and there is a problem that space is generated because the mortar is not filled in the lower part of the piping pipe. This is because there is a risk that the conductivity may drop sharply.

몰타르충진공정; mortar filling process;

상기 배관파이프 고정공정에서 배관 홈 바닥면에 닿도록 일정한 간격으로 고정한 배관에 겔상태로 묽게 희석한 몰타르를 부어서 몰타르가 배관파이프 아래 측에 채워지도록 한다.In the pipe fixing process, mortar diluted in a gel state is poured into the pipe fixed at regular intervals so as to touch the bottom of the pipe groove so that the mortar is filled at the bottom of the pipe pipe.

이와 같은 작업은 배관파이프와 배관 홈 사이에 공간이 생기지 않도록 하여 열전달이 용이하도록 하기 위함이다.This operation is to facilitate heat transfer by preventing a space from being formed between the pipe pipe and the pipe groove.

바닥면마감공정;floor finishing process;

상기 몰타르충진공정에서 배관파이프 아래측에 몰타르가 충진된 상태에서 바닥마감용 몰타르를 배관 홈의 배관 위에 충진하고 바닥면과 일치하게 미장마감한다.In the mortar filling process, in a state in which the mortar is filled on the lower side of the pipe pipe, the mortar for floor finishing is filled on the pipe of the pipe groove, and the mortar is finished in conformity with the floor surface.

이때, 배관 홈에 충진된 몰타르가 완전히 경화가 되기 전에 금속 미장칼이나 헤라 등을 이용하여 표면을 매끄럽게 마감하고, 그래도 표면의 거친 부분이 있으면, 완전히 경화된 이후에 연마석이나 기타 연마제로 표면을 갈아 내어서 마감처리를 한다. At this time, before the mortar filled in the pipe groove is completely hardened, use a metal plastering knife or a spatula to finish the surface smoothly. Take out and finish.

실시예 2Example 2

기존배관파이프 난방수 제거공정;Existing pipe pipe heating water removal process;

시공 현장의 기존배관파이프를 난방수 분배기나 보일러로부터 분리하고 기존배관파이프 내에 잔류하는 물을 콤프레샤를 이용한 고압의 에어로 불어서 제거하거나, 진공펌프를 이용하여 고압으로 흡입하는 방법으로 제거한다.Remove the existing piping at the construction site from the heating water distributor or boiler, and remove the remaining water in the existing piping by blowing it with high-pressure air using a compressor or by suctioning it at high pressure using a vacuum pump.

이와 같이 하는 데에는 시공중 기존의 배관파이프에 들어있는 많은 양의 물이 누수 되어 작업환경이나 실내환경을 더럽히는 것은 물론, 바닥면으로 스며들어 누수되어서 아래층의 천장을 더럽히는 문제점을 방지하고, 물이 바닥면 전체에 스며들어 서서히 증발하면서 방바닥에 습기가 차는 원인이 되거나 시공 후 기존의 파이프에 남아있는 잔여 수분이 증발하여 습기를 생성하는 문제점을 방지하기 위함이다.To do this, a large amount of water in the existing piping pipe leaks during construction, polluting the working environment or indoor environment, as well as preventing the problem that it seeps into the floor and leaks and pollutes the ceiling of the lower floor. This is to prevent the problem that it permeates the entire surface and evaporates slowly, causing moisture to build up on the floor or generating moisture by evaporating the residual moisture remaining in the existing pipe after construction.

기존배관파이프 입구 밀폐공정;Existing pipe inlet sealing process;

상기 기존배관파이프 난방수 제거공정에서 내부의 난방수가 제거된 상태에서 기존배관을 최대한 노출되지 않도록 절단한 다음, 입구에 폼을 쏘아 넣어서 외부와 통하지 않도록 밀폐시킨다.In the heating water removal process of the existing pipe pipe, the existing pipe is cut so as not to be exposed as much as possible while the internal heating water is removed, and then, foam is injected into the inlet to seal it so as not to communicate with the outside.

이와 같이 기존 배관을 밀폐함은 실내의 난방 열기가 기존의 빈 파이프를 타고 외부로 방출되거나 외부의 습기나 냉기가 배관을 타고 실내로 전달되는 등 열 효율을 떨어뜨리는 것을 미연에 방지하기 위함이다.In this way, the sealing of the existing pipe is to prevent in advance that the thermal efficiency of the room is lowered, such as heat from indoor heating is discharged to the outside through the existing empty pipe, or external moisture or cold air is transmitted to the room through the pipe.

배관위치표시공정;pipe position indication process;

시공하고자 하는 기존바닥면 표면에 배관위치를 선정하고 먹줄이나 기타 표시방법으로 표시하여 배관 홈을 일정한 간격으로 구성하도록 표시한다.Select the location of the piping on the surface of the existing floor to be constructed, and mark it with ink lines or other marking methods to compose the piping grooves at regular intervals.

이와 같이 배관위치를 표시함은 기존바닥면에 배관설계를 하는 것과 동일한 효과를 갖는다.In this way, indicating the location of the pipe has the same effect as designing the pipe on the existing floor.

바닥절단공정;floor cutting process;

상기 배관위치표시공정에서 배관하고자 하는 기존의 바닥면에 배관파이프의 외경보다 1mm 이상 큰 폭과, 배관파이프의 외경보다 1.5~2.5배의 깊이로 절단한다.In the pipe position display process, a width of 1 mm or more larger than the outer diameter of the pipe pipe and a depth of 1.5 to 2.5 times the outer diameter of the pipe pipe are cut on the existing floor surface to be piped.

이와 같은 절단홈은 보편적으로 배관파이프의 외경이 20mm 일 때, 폭이 21mm 이상이어야 하며 깊이는 30~50mm로 할 것인바, 가장 이상적인 것은 폭 22mm 깊이 40mm일 때이다.In general, when the outer diameter of the pipe pipe is 20mm, the cut groove should be 21mm or more in width and 30-50mm in depth, and the most ideal is when it is 22mm in width and 40mm in depth.

여기서 폭이 너무 좁으면 파이프를 삽입하거나 파이프 아래 측에 몰타르를 채우는 작업이 난해하며, 폭이 너무 넓으면 파이프고정이 어렵고 몰타르가 많이 소요되어 작업시간이 길어지고 작업원가가 상승하는 문제가 따른다.Here, if the width is too narrow, it is difficult to insert the pipe or to fill the mortar under the pipe.

그리고 깊이를 너무 얕게 하면 작업 후 시공된 몰타르가 배관 홈으로부터 이탈하여 배관전체가 이탈할 염려가 있고 너무 깊으면 배관위에 덮히는 몰타르 층이 두꺼워 난발열의 발산률이 떨어지고 몰타르가 많이 소요되어 작업시간이 길어지고 작업원가가 상승하는 문제가 따른다. Also, if the depth is too shallow, the installed mortar may separate from the pipe groove after work and the entire pipe may come off. This lengthens and increases the working cost.

이때 사용되는 절단기는 이동바퀴가 구성된 일반적인 시멘트 절단기에, 본 발명인이 개발한 2개의 절단 날이 한 조를 이루도록 배관 홈의 폭으로 세팅하여 구성한 칼날을 장착하여 사용한다. The cutter used at this time is used by mounting a blade configured by setting the width of the pipe groove so that the two cutting blades developed by the present inventors form a set on a general cement cutter having a moving wheel.

톱밥청소공정;sawdust cleaning process;

상기 바닥절단공정에서 절단작업이 끝나면 절단작업시 공급된 물과 절단시 발생한 시멘트슬러지로 오염된 바닥면에 목재를 가공할 때 발생 되는 톱밥을 뿌려서 절단수와 시멘트슬러지를 흡착시킨 다음 수거하는 방법으로 바닥면을 청소한다. When the cutting operation in the floor cutting process is finished, the cutting water and cement sludge are absorbed by spraying the sawdust generated during wood processing on the floor surface contaminated with the water supplied during the cutting operation and the cement sludge generated during the cutting. Clean the floor.

이와 같이 톱밥 청소를 하는 것은 작업환경이 청결하고 바닥면 절단 시 발생한 시멘트슬러지를 깨끝하게 수거하여 작업후 시멘트슬러지가 말라서 먼지로 되어 실내를 오염시키는 것을 방지하기 위함이다. The purpose of cleaning sawdust in this way is to ensure that the working environment is clean, and the cement sludge generated during floor cutting is carefully collected to prevent the cement sludge from drying out and polluting the room after work.

배관 홈 형성공정;pipe groove forming process;

상기 바닥절단공정에서 절단날이 배관 홈의 크기로 절단한 사이에 남은 바닥재를 전동헤머로 두드려서 파내는 작업으로 배관이 설치될 배관 홈을 형성한다.In the floor cutting process, a pipe groove in which a pipe is to be installed is formed by tapping the remaining flooring material with an electric hammer while the cutting blade is cut to the size of the pipe groove.

이와 같은 작업은 바닥면을 파내는 별도의 스크래이퍼를 제작하여 실시할 수도 있으나 이때는 별도의 스크레이퍼를 제작하여야 하는 등 시공비 상승의 원인이 된다.Such work may be performed by manufacturing a separate scraper that digs out the floor, but in this case, a separate scraper must be manufactured, which causes an increase in construction cost.

배관 홈 청소공정;pipe groove cleaning process;

상기 배관 홈 형성공정에서 전동헤머로 절단부 사이를 파내서 형성한 배관 홈을 깨끗이 청소하고 이때 발생한 부산물을 수거하는 청소를 한다.In the pipe groove forming process, the pipe grooves formed by digging between the cut parts with an electric hammer are thoroughly cleaned and the by-products generated at this time are collected.

수분이탈방지처리공정;moisture escape prevention treatment process;

상기 배관 홈 청소 공정에서 청소한 배관 홈 내부벽면의 모세공을 막아서 새로운 몰타르의 수분이 기존의 몰타르층으로 흡수되지 않도록 한다.The capillary pores on the inner wall surface of the pipe groove cleaned in the pipe groove cleaning process are blocked so that the moisture of the new mortar is not absorbed into the existing mortar layer.

이때 사용되는 것은 수용액으로 발수제나 방수제 중 어느 하나 또는 이들을 혼합한 것에 경화제를 첨가하여 분무기로 분사하거나 붓으로 발라주는 방법으로 도포작업한다. At this time, an aqueous solution is used, and a curing agent is added to any one of a water repellent agent, a waterproofing agent, or a mixture thereof, and the application is performed by spraying with a sprayer or applying with a brush.

이때 사용되는 수용액은 기존의 바닥면을 형성한 몰타르에 형성되어있는 미세한 모세공을 막아줄 수 있는 수용성 수용액이나 기타기존의 몰타르와 화합할 수 있는 수용성 화합물이면 모두 사용할 수 있으며, 여기에 접착제를 섞어서 처리하면 기존의 몰타르와 새로운 몰타르가 보다 완벽하게 접착된다.The aqueous solution used at this time can be any water-soluble aqueous solution that can block the micropores formed in the mortar that has formed the existing bottom surface or a water-soluble compound that can be compatible with other existing mortars. When treated, the old mortar and the new mortar bond more perfectly.

이와 같이 기존 바닥면을 형성한 몰타르의 배관 홈 내면에 수용액을 도포하는 것은 기존의 몰타르에 미세한 모세공이 막혀서 새로운 몰타르를 충진시 모세관 현상으로 새로운 몰타르의 수분이 기존의 몰타르에 형성된 모세공을 통하여 흡수되어 새로운 몰타르의 미세량이 이탈되면서 급격히 수축되어서 기존의 몰타르와 새로운 몰타르 사이에 틈새가 발생하는 것을 미연에 방지하므로 기존의 몰타르와 새로운 몰타르가 서로 일체가 되어 하나가 되게 하는 것이다.In this way, the application of aqueous solution to the inner surface of the pipe groove of the mortar that has formed the existing floor surface is a capillary phenomenon when the existing mortar is filled with new mortar because fine pores are clogged. This is to prevent the gap between the existing mortar and the new mortar from being rapidly contracted as the fine amount of the new mortar is released, so that the existing mortar and the new mortar become one with each other.

배관공정;piping process;

상기 수분이탈방지처리공정에서 내부벽면에 수용액을 도포한 배관 홈에 새로운 배관파이프를 깔아준다.In the moisture escape prevention treatment process, a new pipe pipe is laid in the pipe groove where the aqueous solution is applied to the inner wall surface.

배관고정공정;pipe fixing process;

상기 배관공정에서 배관 홈에 깔린 배관파이프를 바닥면에 닿게 눌러서 일정한 간격으로 배관파이프와 배관 홈 사이에 홈파기 작업시 발생한 파편이나 모래를 끼워서 배관파이프의 바닥면이 배관 홈 바닥면으로부터 떨어지지 않도록 고정한다.In the above piping process, the pipe laid in the pipe groove is pressed to touch the bottom surface, and debris or sand generated during the digging operation is inserted between the pipe pipe and the pipe groove at regular intervals so that the bottom surface of the pipe pipe does not fall from the bottom surface of the pipe groove. do.

이때 배관파이프 전체를 고정하지 않고 일정한 간격을 두고 고정하는 것은 배관파이프 아래로 몰타르를 충진하기 위함이다.At this time, not fixing the entire pipe pipe, but fixing it at regular intervals is to fill the mortar under the pipe pipe.

그리고 본 공정을 실시하여야 하는 필수적인 이유는 본 공정을 실시하지 않을 시 배관파이프의 아래로 몰타르를 충진시 배관파이프가 부유하여 배관파이프의 아래측에 몰타르가 충진되지 않아 공간이 발생하는 문제가 생겨서 난방열 전도율을 급격히 떨어뜨릴 우려가 있기 때문이다. And the essential reason to carry out this process is that when this process is not carried out, the piping pipe floats when filling the mortar under the piping pipe, and there is a problem that space is generated because the mortar is not filled in the lower part of the piping pipe. This is because there is a risk that the conductivity may drop sharply.

몰타르충진공정; mortar filling process;

상기 배관고정공정에서 배관 홈 바닥면에 닿도록 일정한 간격으로 고정한 배관에 겔상태로 묽게 희석한 몰타르를 부어서 몰타르가 배관파이프 아래측에 채워지도록 한다.In the pipe fixing process, mortar diluted in a gel state is poured into the pipe fixed at regular intervals so as to touch the bottom of the pipe groove so that the mortar is filled at the bottom of the pipe pipe.

이와 같은 작업은 배관파이프와 배관 홈 사이에 공간이 생기지 않도록 하여 열전달이 용이하도록 하기 위함이다.This operation is to facilitate heat transfer by preventing a space from being formed between the pipe pipe and the pipe groove.

바닥면마감공정;floor finishing process;

상기 몰타르충진공정에서 배관파이프 아래측에 몰타르가 충진된 상태에서 바닥마감용 몰타르를 배관 홈의 배관 위에 충진하고 바닥면과 일치하게 미장마감한다.In the mortar filling process, in a state in which the mortar is filled on the lower side of the pipe pipe, the mortar for floor finishing is filled on the pipe of the pipe groove, and the mortar is finished in conformity with the floor surface.

이때, 배관 홈에 충진된 몰타르가 완전히 경화가 되기 전에 금속 미장칼이나 헤라 등을 이용하여 표면을 매끄럽게 마감하고, 그래도 표면의 거친 부분이 있으면, 완전히 경화된 이후에 연마석이나 기타 연마제로 표면을 갈아 내어서 마감처리를 한다. At this time, before the mortar filled in the pipe groove is completely hardened, use a metal plastering knife or a spatula to finish the surface smoothly. Take out and finish.

실시예3Example 3

상기 실시예 1 또는 실시예 2에서 상기 수분이탈방지처리공정이 끝나면 몰타르충진공정을 실시하여 배관홈에 몰타르를 충진하고 상기 배관홈에 충진된 몰타르위에 배관파이프를 올려서 눌러 배관홈에 충진된 몰타르가 배관파이프에 밀려 배관파이프 아래 측을 채우고 위로 넘칠 때 배관파이프을 고정하는 배관파이프를 고정공정을 실시하도록 몰타르 충진공정을 배관공정보나 먼저 실시한다.When the moisture escape prevention treatment process is finished in Example 1 or Example 2, the mortar filling process is performed to fill the pipe groove with mortar, and press the pipe pipe on the mortar filled in the pipe groove. The mortar filled in the pipe groove is The mortar filling process is performed first with the plumbing process information so that the piping pipe is pushed to the pipe pipe, filling the lower side of the pipe pipe and performing the fixing process of the pipe pipe fixing the pipe pipe when it overflows.

이와 같은 건축물 배관 교체 시공방법을 실시하면 몰타르 충진 작업이 용이할 뿐만아니라, 몰타르가 배관파이프 아래측에 완벽하게 충진되어 열전도성이 뛰ㄹ어나다 할 것이다.If such a building pipe replacement construction method is implemented, not only will the mortar filling work be easy, but the mortar will be completely filled in the lower part of the pipe pipe, and the thermal conductivity will be excellent.

Claims (3)

기존배관파이프 난방수 제거공정과; 배관위치표시공정과; 바닥절단공정과; 배관 홈 형성공정과; 배관 홈 청소공정과; 수분이탈방지처리공정과; 배관공정과;
배관파이프 고정공정과; 바닥면마감공정으로 이루어지는 건축물 배관 교체 시공방법에 있어서,
상기 바닥절단공정은, 배관하고자 하는 기존의 바닥면에 배관파이프의 외경보다 1mm 이상 큰 폭과, 배관파이프의 외경보다 1.5~2.5배의 깊이로 절단하는 것과;
상기 기존배관파이프 난방수 제거공정에서 내부의 난방수가 제거된 상태에서 기존배관을 최대한 노출되지 않도록 절단한 다음, 입구에 폼을 쏘아 넣어서 외부와 통하지 않도록 밀폐시키는 기존배관파이프 입구 밀폐공정을 실시한 것과;
상기 바닥절단공정에서 절단작업이 끝나면 절단작업시 공급된 물과 절단시 발생한 시멘트슬러지로 오염된 바닥면에 목재를 가공할 때 발생 되는 톱밥을 뿌려서 절단수와 시멘트슬러지를 흡착시킨 다음 수거하는 방법으로 바닥면을 청소하는 톱밥청소공정을 실시한 것과;
상기 배관파이프 고정공정에서 배관 홈 바닥면에 닿도록 일정한 간격으로 고정한 배관에 겔 상태로 묽게 희석한 몰타르를 부어서 몰타르가 배관파이프 아래측에 채워주는 몰타르충진공정을 더 포함하여 이루어짐을 특징으로 하는 건축물 배관 교체 시공방법.
Existing pipe pipe heating water removal process; a pipe position display process; floor cutting process; a pipe groove forming process; a pipe groove cleaning process; a moisture escape prevention treatment process; piping process;
piping and pipe fixing process; In the construction method of pipe replacement in a building consisting of a floor surface finishing process,
The bottom cutting step includes cutting the existing floor surface to be piped to a width of 1 mm or more larger than the outer diameter of the pipe pipe and to a depth of 1.5 to 2.5 times than the outer diameter of the pipe pipe;
In the existing pipe pipe heating water removal process, the existing pipe is cut so that the existing pipe is not exposed as much as possible while the internal heating water is removed, and then the existing pipe pipe inlet sealing process is performed to seal it so as not to communicate with the outside by injecting foam into the inlet;
When the cutting operation in the floor cutting process is finished, the cutting water and cement sludge are absorbed by spraying the sawdust generated during wood processing on the floor surface contaminated with the water supplied during the cutting operation and the cement sludge generated during the cutting. and performing a sawdust cleaning process to clean the floor;
In the pipe fixing process, the pipe fixed at regular intervals so as to touch the bottom of the pipe groove is poured with a gel-diluted mortar and the mortar is filled under the pipe pipe. Pipe replacement construction method.
삭제delete 삭제delete
KR1020200065667A 2020-06-01 2020-06-01 Building piping replacement construction method KR102408861B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200065667A KR102408861B1 (en) 2020-06-01 2020-06-01 Building piping replacement construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200065667A KR102408861B1 (en) 2020-06-01 2020-06-01 Building piping replacement construction method

Publications (2)

Publication Number Publication Date
KR20210148604A KR20210148604A (en) 2021-12-08
KR102408861B1 true KR102408861B1 (en) 2022-06-15

Family

ID=78867762

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200065667A KR102408861B1 (en) 2020-06-01 2020-06-01 Building piping replacement construction method

Country Status (1)

Country Link
KR (1) KR102408861B1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101096620B1 (en) 2010-11-02 2011-12-21 박정호 Emergency rehabilitation of concrete road

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100240228B1 (en) 1997-10-02 2000-01-15 이해규 A burner`s flame monitor and diagnosis apparatus for a thermal power plant using a h.s.i color model
KR20010020046A (en) 1999-08-31 2001-03-15 구자홍 Method of Realizing Gray Level of Plasma Display Panel
KR20010020048A (en) 1999-08-31 2001-03-15 구자홍 Active Plasma Display Panel Using High Frequency and Method for Driving the same
KR100414802B1 (en) * 2001-04-14 2004-01-14 김근수 a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit
KR100414801B1 (en) * 2001-04-14 2004-01-16 김근수 a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit
KR20090054502A (en) 2007-11-27 2009-06-01 주식회사 지케이파워 Sheet for metal card and metal card using the same
KR101091797B1 (en) * 2009-06-18 2011-12-08 김희순 Exchanging method of bottom pipe and thereof structure
KR20150009325A (en) * 2013-07-16 2015-01-26 한국도로공사 Road Repairing Method Using Composition Of Road Repairs

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101096620B1 (en) 2010-11-02 2011-12-21 박정호 Emergency rehabilitation of concrete road

Also Published As

Publication number Publication date
KR20210148604A (en) 2021-12-08

Similar Documents

Publication Publication Date Title
CN108755983B (en) Waterproof process
CN108947456B (en) Permeable waterproof agent for preventing leakage of bricks without smashing and preparation method thereof
CN104763111B (en) A kind of construction technology of waterproof and insulation integrated system
CN113323440A (en) Concrete gap repairing and anti-seepage treatment method
CN102776897A (en) Wash apron anti-settling anti-cracking construction method and structure
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
KR102408861B1 (en) Building piping replacement construction method
KR102391541B1 (en) Building piping replacement construction method
CN105442861A (en) Method for restoring water leakage air face of toilet drainage pipeline
CN107975651A (en) A kind of method of floor pipeline quick blocking
CN110735493B (en) Anti-leakage composite waterproof method for flat roof
CN109779287A (en) Microdilatancy water-proof emulsion construction technology
KR101039842B1 (en) Method for paving dry soil road
KR100414802B1 (en) a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit
CN114109064A (en) Construction method for plugging screw hole of outer wall by polyurethane foaming agent
CN210658741U (en) Indoor waterproof structure
CN204571204U (en) A kind of modified waterproofing and leakage-stopping structure for the tile floor that leaks
CN109537926B (en) Waterproof and leaking stoppage construction method for building area
KR100414801B1 (en) a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit
CN109457925B (en) Veneer paving method and paving structure for wet area
CN219033600U (en) Infusion cementation structure of outer wall heat insulation layer
CN105780819A (en) Basement waterproof construction method
CN206667498U (en) Improve the construction of the concrete dry wall metope accumulation of salt in the surface soil using polypropylene breather pipe
KR100397138B1 (en) Repair material and method for repair, restoration and thin overlay traffic topping of concrete structures or bridge decks, and method for thin overlay traffic topping of concrete structures or bridge decks
CN214994894U (en) Long-acting alkali-removing and anti-permeability structure for building wall surface

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right