KR102380136B1 - Visualization system and its method for transformer load monitoring information - Google Patents

Visualization system and its method for transformer load monitoring information Download PDF

Info

Publication number
KR102380136B1
KR102380136B1 KR1020200054469A KR20200054469A KR102380136B1 KR 102380136 B1 KR102380136 B1 KR 102380136B1 KR 1020200054469 A KR1020200054469 A KR 1020200054469A KR 20200054469 A KR20200054469 A KR 20200054469A KR 102380136 B1 KR102380136 B1 KR 102380136B1
Authority
KR
South Korea
Prior art keywords
color
processing unit
transformer
dcu
watt
Prior art date
Application number
KR1020200054469A
Other languages
Korean (ko)
Other versions
KR20210136351A (en
Inventor
정준홍
김현옥
Original Assignee
한전케이디엔주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한전케이디엔주식회사 filed Critical 한전케이디엔주식회사
Priority to KR1020200054469A priority Critical patent/KR102380136B1/en
Publication of KR20210136351A publication Critical patent/KR20210136351A/en
Application granted granted Critical
Publication of KR102380136B1 publication Critical patent/KR102380136B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/904Browsing; Visualisation therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/907Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually
    • G06F16/909Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually using geographical or spatial information, e.g. location
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/30Smart metering, e.g. specially adapted for remote reading
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Water Supply & Treatment (AREA)
  • Tourism & Hospitality (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Primary Health Care (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Library & Information Science (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

실시예에 따르면, AMI운영서버로부터 계량 데이터 및 설비 데이터를 수신하는 통신부; 상기 설비 데이터를 이용하여 지리 정보 시스템과 연계되어 있는 지도상의 DCU 실좌표에 도형을 표시하는 제1처리부; 상기 DCU에서 검침하는 전력량계의 개수에 따라 상기 도형의 크기를 조절하는 제2처리부; 및 상기 계량 데이터 및 설비 데이터를 이용하여 DCU별 수용가 인입선로의 전력 사용량, 수용가 인입선로의 역률, 변압기 이용률 및 변압기 불평형률을 계산하고 이들 중 적어도 하나를 이용하여 상기 도형의 색상을 조절하는 제3처리부를 포함하는 변압기 부하감시 정보 시각화 시스템 및 방법을 제공한다. According to an embodiment, a communication unit for receiving metering data and equipment data from the AMI operation server; a first processing unit for displaying a figure on the DCU real coordinates on a map linked to a geographic information system by using the facility data; a second processing unit that adjusts the size of the figure according to the number of watt-hour meters read by the DCU; and a third calculating the power consumption of the incoming line for each DCU, the power factor of the incoming line, the transformer utilization and the transformer unbalance ratio by using the metering data and the facility data, and using at least one of them to adjust the color of the figure It provides a transformer load monitoring information visualization system and method including a processing unit.

Description

변압기 부하감시 정보의 시각화 시스템 및 방법{Visualization system and its method for transformer load monitoring information} Visualization system and its method for transformer load monitoring information

본 발명의 일실시예는 변압기 부하감시 정보의 시각화 시스템과 그 방법에 관한 것이다.An embodiment of the present invention relates to a visualization system and method of transformer load monitoring information.

지난 10여년 전부터 전국의 한전 저압수용가를 대상으로 AMI(Advanced Metering Infrastructure, 지능형 전력계량 인프라) 구축 공사가 활발히 진행 중이다. AMI 구축에 있어 핵심 설비인 DCU(Data Concentration Unit, 데이터집중장치)는 현재 약 25만대가 수용가 인근 변대주에 설치되어 있으며, 지속적으로 그 수량이 늘어날 전망이다.For the past 10 years or so, the construction of AMI (Advanced Metering Infrastructure) has been actively underway for KEPCO low voltage consumers across the country. About 250,000 units of DCU (Data Concentration Unit), a key facility in AMI construction, are currently installed in Byeondaeju near the customer, and the number is expected to increase continuously.

DCU는 배전용 변압기의 2차측 즉, 배전용 변압기와 수용가를 연결하는 인입선로에서 동작에 필요한 전원을 공급받는다. 이 때문에, DCU는 개별 수용가의 전력 사용정보를 수집하는 본래 기능과 더불어, 수용가측에 공급되는 인입선로의 전류, 전압, 전력량, 역률을 주기적으로 계측하여 전송하는 변압기 부하감시 기능을 내장하고 있다.The DCU receives the power required for operation from the secondary side of the distribution transformer, that is, the incoming line connecting the distribution transformer and the customer. For this reason, the DCU has a built-in transformer load monitoring function that periodically measures and transmits the current, voltage, wattage, and power factor of the incoming line supplied to the customer in addition to the original function of collecting power usage information of individual customers.

본 발명이 이루고자 하는 기술적 과제는 수용가 인입선로의 전력 사용량, 역률, 변압기 이용률, 변압기 불평형 등을 시각화하여 제공할 수 있는 변압기 부하감시 정보의 시각화 시스템 및 그 방법을 제공하는데 있다.The technical problem to be achieved by the present invention is to provide a visualization system and method of transformer load monitoring information that can visualize and provide power usage, power factor, transformer utilization ratio, transformer imbalance, etc.

실시예에 따르면, AMI운영서버로부터 계량 데이터 및 설비 데이터를 수신하는 통신부; 상기 설비 데이터를 이용하여 지리 정보 시스템과 연계되어 있는 지도상의 DCU(Data Concentration Unit) 실좌표에 도형을 표시하는 제1처리부; 상기 DCU에서 검침하는 전력량계의 개수에 따라 상기 도형의 크기를 조절하는 제2처리부; 및 상기 계량 데이터 및 상기 설비 데이터를 이용하여 DCU별 수용가 인입선로의 전력 사용량, 수용가 인입선로의 역률, 변압기 이용률 및 변압기 불평형률을 계산하고 이들 중 적어도 하나를 이용하여 상기 도형의 색상을 조절하는 제3처리부를 포함하는 변압기 부하감시 정보 시각화 시스템을 제공한다.According to an embodiment, a communication unit for receiving metering data and equipment data from the AMI operation server; a first processing unit for displaying a figure in real coordinates of a DCU (Data Concentration Unit) on a map linked to a geographic information system by using the facility data; a second processing unit that adjusts the size of the figure according to the number of watt-hour meters read by the DCU; And using the metering data and the facility data to calculate the power consumption of the incoming line for each DCU, the power factor of the customer incoming line, the transformer utilization and the transformer unbalance factor, and using at least one of them to adjust the color of the figure 3 It provides a transformer load monitoring information visualization system including a processing unit.

상기 계량 데이터는 변압기 감시 정보를 포함하며, 상기 설비 데이터는 변대주 위치정보, 변압기 용량 정보 및 전력량계 개수 정보를 포함할 수 있다.The metering data may include transformer monitoring information, and the facility data may include variable pole location information, transformer capacity information, and watt-hour meter number information.

상기 제3처리부는 상기 수용가 인입선로의 각 상별 유효전력량의 평균값에 해당하는 특정 색을 선택하여 상기 도형의 색상을 표현하는 바, 0[kWh]는 제1 설정색으로 표현하고 유저(User)가 지정한 X[kWh]는 제2 설정색으로 표현하되 0[kWh] 내지 X[kWh] 사이의 값은 두 설정색 사이의 그라디에이션(Gradation) 변화값에 해당하는 색으로 표현할 수 있다The third processing unit expresses the color of the figure by selecting a specific color corresponding to the average value of the active power amount for each phase of the incoming line, 0 [kWh] is expressed as the first set color, and the user The specified X[kWh] is expressed as the second set color, but a value between 0[kWh] and X[kWh] can be expressed as a color corresponding to the gradation change value between the two set colors.

상기 제3처리부는 상기 수용가 인입선로의 각 상별 역률의 평균값에 해당하는 특정 색을 선택하여 상기 도형의 색상을 표현하는 바, 100[%]는 제1 설정색으로 표현하고 유저가 지정한 Y[%]는 제2 설정색으로 표현하되 100[%] 내지 Y[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 표현할 수 있다. The third processing unit expresses the color of the figure by selecting a specific color corresponding to the average value of the power factor for each phase of the incoming line to the customer, and 100 [%] is expressed as the first set color and Y [%] specified by the user ] is expressed as the second set color, but a value between 100 [%] and Y [%] can be expressed as a color corresponding to a gradation change value between the two set colors.

상기 제3처리부는 상기 변압기 각 상별 이용률의 평균값에 해당하는 특정 색을 선택하여 상기 도형의 색상을 표현하는 바, 0[%]는 제1 설정색으로 표현하고 100[%]는 제2 설정색으로 표현하되 0[%] 내지 100[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 표현할 수 있다. The third processing unit expresses the color of the figure by selecting a specific color corresponding to the average value of the utilization rate for each phase of the transformer, 0 [%] represents the first set color and 100 [%] represents the second set color However, a value between 0 [%] and 100 [%] can be expressed as a color corresponding to a gradient change value between two set colors.

상기 제3처리부는 상기 변압기 불평형률에 해당하는 특정 색을 선택하여 상기 도형의 색상을 표현하는 바, 0[%]는 제1 설정색으로 표현하고 유저가 지정한 Z[%]는 제2 설정색으로 표현하되 0[%] 내지 Z[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 표현할 수 있다.The third processing unit expresses the color of the figure by selecting a specific color corresponding to the transformer unbalance ratio, 0 [%] is expressed as the first set color, and Z [%] designated by the user is the second set color However, a value between 0 [%] and Z [%] can be expressed as a color corresponding to the gradient change value between the two set colors.

실시예에 따르면, AMI운영서버로부터 계량 데이터 및 설비 데이터를 수신하는 통신부; 제1처리부가 상기 설비 데이터를 이용하여 지리 정보 시스템과 연계되어 있는 지도상에 DCU의 실좌표에 도형을 표시하는 단계; 제2처리부가 상기 DCU에서 검침하는 전력량계의 개수에 따라 상기 도형의 크기를 조절하는 단계; 및 제3처리부가 상기 계량 데이터 및 설비 데이터를 이용하여 DCU별 수용가 인입선로의 전력 사용량, 수용가 인입선로의 역률, 변압기 이용률 및 변압기 불평형률을 계산하고 이들 중 적어도 하나를 이용하여 상기 도형의 색상을 조절하는 단계를 포함하는 변압기 부하감시 정보 시각화 방법을 제공한다.According to an embodiment, a communication unit for receiving metering data and equipment data from the AMI operation server; displaying, by a first processing unit, a figure in real coordinates of the DCU on a map linked to a geographic information system using the facility data; adjusting the size of the figure according to the number of watt-hour meters read by the DCU by a second processing unit; and a third processing unit calculates the power usage of the customer lead-in line for each DCU, the power factor of the customer lead-in line, the transformer utilization ratio, and the transformer unbalance ratio by using the metering data and the facility data, and using at least one of them, the color of the figure It provides a method of visualizing transformer load monitoring information, including the step of adjusting.

상기 도형의 색상을 조절하는 단계는, 상기 제3처리부가 상기 수용가 인입선로의 각 상별 유효전력량의 평균값을 특정 색으로 표시하기 위하여 0[kWh]는 제1 설정색으로 하고 유저가 지정한 X[kWh]는 제2 설정색으로 하되 0[kWh] 내지 X[kWh] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 상기 도형을 표현하는 단계를 포함한다.In the step of adjusting the color of the figure, 0 [kWh] is the first set color and X[kWh designated by the user in order for the third processing unit to display the average value of the active power amount for each phase of the incoming line to the customer in a specific color. ] is the second set color, but a value between 0 [kWh] and X [kWh] includes expressing the figure with a color corresponding to a gradient change value between the two set colors.

상기 도형의 색상을 조절하는 단계는, 상기 제3처리부가 상기 수용가 인입선로의 각 상별 역률의 평균값을 특정 색으로 표시하기 위하여 100[%]는 제1 설정색으로 하고 유저가 지정한 Y[%]는 제2 설정색으로 하되 100[%] 내지 Y[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 상기 도형을 표현하는 단계를 포함한다.In the step of adjusting the color of the figure, in order for the third processing unit to display the average value of the power factor for each phase of the incoming line to the customer in a specific color, 100 [%] is the first set color and Y [%] specified by the user is a second set color, but a value between 100 [%] and Y [%] includes expressing the figure with a color corresponding to a gradation change value between the two set colors.

상기 도형의 색상을 조절하는 단계는, 상기 제3처리부가 상기 변압기 각 상별 이용률의 평균값을 특정 색으로 표시하기 위하여 0[%]는 제1 설정색으로 하고 100[%]는 제2 설정색으로 하되 0[%] 내지 100[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 상기 도형을 표현하는 단계를 포함한다.In the step of adjusting the color of the figure, 0 [%] is the first set color and 100 [%] is the second set color so that the third processing unit displays the average value of the utilization rate for each phase of the transformer in a specific color. However, a value between 0 [%] and 100 [%] includes expressing the figure with a color corresponding to a gradient change value between two set colors.

상기 도형의 색상을 조절하는 단계는, 상기 제3처리부가 상기 변압기 불평형률을 특정 색으로 표시하기 위하여 0[%]는 제1 설정색으로 하고 유저가 지정한 Z[%]는 제2 설정색으로 하되 0[%] 내지 Z[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 상기 도형을 표현하는 단계를 포함한다.In the step of adjusting the color of the figure, 0 [%] is set as the first set color and Z [%] specified by the user is set as the second set color so that the third processing unit displays the transformer unbalance ratio as a specific color. However, a value between 0 [%] and Z [%] includes expressing the figure with a color corresponding to a gradient change value between two set colors.

실시예에 따르면, 전술한 변압기 부하감시 정보 시각화 방법을 컴퓨터에 실행시키기 위한 프로그램이 기록되어 있는 컴퓨터에서 판독 가능한 기록매체를 제공한다.According to the embodiment, there is provided a computer-readable recording medium in which a program for executing the above-described transformer load monitoring information visualization method in a computer is recorded.

본 발명인 변압기 부하감시 정보의 시각화 시스템 및 방법은 수용가 인입선로의 전력 사용량, 역률, 변압기 이용률, 변압기 불평형 등을 시각화하여 제공할 수 있다.The present invention's system and method for visualizing transformer load monitoring information can provide visualization of power usage, power factor, transformer utilization ratio, transformer imbalance, etc. of the incoming line to the customer.

또한, 다양한 시각화 정보를 기반으로 말단 수용가까지의 전력사용 패턴을 시간대별로 파악할 수 있다.In addition, based on various visualization information, it is possible to grasp the electricity usage pattern to the end consumers by time period.

또한, 배전변압기의 신설이나 용량증설 등의 판단 근거로 활용하거나 이를 통해 변압기 과부하로 인한 안전사고를 예방할 수 있다.In addition, it is possible to prevent safety accidents due to transformer overload by using it as a basis for judging the establishment of a distribution transformer or expansion of capacity.

또한, 변압기 상불평형 해소를 통해 전력 사용 효율의 재고가 가능하다.In addition, it is possible to rethink the power use efficiency by resolving the phase imbalance of the transformer.

또한, 해당 시각화 정보를 대국민에게 제공함으로써 변압기 부하감시 빅데이터를 활용한 전력 부가서비스 발굴에도 기여할 수 있다.In addition, by providing the visualization information to the public, it can contribute to discovering additional power services using transformer load monitoring big data.

도1은 실시예에 따른 변압기 부하감시 정보 시각화 시스템의 구성 블록도이다.
도2는 실시예에 따른 변압기 부하감시 정보 시각화 방법의 순서도이다.
1 is a block diagram of a transformer load monitoring information visualization system according to an embodiment.
2 is a flowchart of a method for visualizing transformer load monitoring information according to an embodiment.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

다만, 본 발명의 기술 사상은 설명되는 일부 실시 예에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있고, 본 발명의 기술 사상 범위 내에서라면, 실시 예들간 그 구성 요소들 중 하나 이상을 선택적으로 결합, 치환하여 사용할 수 있다.However, the technical spirit of the present invention is not limited to some embodiments described, but may be implemented in various different forms, and within the scope of the technical spirit of the present invention, one or more of the components may be selected between the embodiments. It can be used by combining or substituted with .

또한, 본 발명의 실시예에서 사용되는 용어(기술 및 과학적 용어를 포함)는, 명백하게 특별히 정의되어 기술되지 않는 한, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 일반적으로 이해될 수 있는 의미로 해석될 수 있으며, 사전에 정의된 용어와 같이 일반적으로 사용되는 용어들은 관련 기술의 문맥상의 의미를 고려하여 그 의미를 해석할 수 있을 것이다.In addition, terms (including technical and scientific terms) used in the embodiments of the present invention may be generally understood by those of ordinary skill in the art to which the present invention belongs, unless specifically defined and described explicitly. It may be interpreted as a meaning, and generally used terms such as terms defined in advance may be interpreted in consideration of the contextual meaning of the related art.

또한, 본 발명의 실시예에서 사용된 용어는 실시예들을 설명하기 위한 것이며 본 발명을 제한하고자 하는 것은 아니다.In addition, the terminology used in the embodiments of the present invention is for describing the embodiments and is not intended to limit the present invention.

본 명세서에서, 단수형은 문구에서 특별히 언급하지 않는 한 복수형도 포함할 수 있고, "A 및(와) B, C 중 적어도 하나(또는 한 개 이상)"로 기재되는 경우 A, B, C로 조합할 수 있는 모든 조합 중 하나 이상을 포함할 수 있다.In the present specification, the singular form may also include the plural form unless otherwise specified in the phrase, and when it is described as "at least one (or more than one) of A and (and) B, C", it is combined as A, B, C It may include one or more of all possible combinations.

또한, 본 발명의 실시 예의 구성 요소를 설명하는 데 있어서, 제1, 제2, A, B, (a), (b) 등의 용어를 사용할 수 있다.In addition, in describing the components of the embodiment of the present invention, terms such as first, second, A, B, (a), (b), etc. may be used.

이러한 용어는 그 구성 요소를 다른 구성 요소와 구별하기 위한 것일 뿐, 그 용어에 의해 해당 구성 요소의 본질이나 차례 또는 순서 등으로 한정되지 않는다.These terms are only for distinguishing the component from other components, and are not limited to the essence, order, or order of the component by the term.

그리고, 어떤 구성 요소가 다른 구성요소에 '연결', '결합' 또는 '접속'된다고 기재된 경우, 그 구성 요소는 그 다른 구성 요소에 직접적으로 연결, 결합 또는 접속되는 경우뿐만 아니라, 그 구성 요소와 그 다른 구성 요소 사이에 있는 또 다른 구성 요소로 인해 '연결', '결합' 또는 '접속' 되는 경우도 포함할 수 있다.And, when it is described that a component is 'connected', 'coupled' or 'connected' to another component, the component is not only directly connected, coupled or connected to the other component, but also with the component It may also include a case of 'connected', 'coupled' or 'connected' due to another element between the other elements.

또한, 각 구성 요소의 "상(위) 또는 하(아래)"에 형성 또는 배치되는 것으로 기재되는 경우, 상(위) 또는 하(아래)는 두 개의 구성 요소들이 서로 직접 접촉되는 경우뿐만 아니라 하나 이상의 또 다른 구성 요소가 두 개의 구성 요소들 사이에 형성 또는 배치되는 경우도 포함한다. 또한, "상(위) 또는 하(아래)"으로 표현되는 경우 하나의 구성 요소를 기준으로 위쪽 방향뿐만 아니라 아래쪽 방향의 의미도 포함할 수 있다.In addition, when it is described as being formed or disposed on "above (above) or under (below)" of each component, top (above) or under (below) is one as well as when two components are in direct contact with each other. Also includes a case in which another component as described above is formed or disposed between two components. In addition, when expressed as "upper (upper) or lower (lower)", the meaning of not only an upper direction but also a lower direction based on one component may be included.

이하, 첨부된 도면을 참조하여 실시예를 상세히 설명하되, 도면 부호에 관계없이 동일하거나 대응하는 구성 요소는 동일한 참조 번호를 부여하고 이에 대한 중복되는 설명은 생략하기로 한다.Hereinafter, the embodiment will be described in detail with reference to the accompanying drawings, but the same or corresponding components are given the same reference numerals regardless of reference numerals, and overlapping descriptions thereof will be omitted.

도1은 실시예에 따른 변압기 부하감시 정보 시각화 시스템의 구성 블록도이다. 도1을 참조하면, 실시예에 따른 변압기 부하감시 정보 시각화 시스템(10)은 통신부(11), 제1처리부(12), 제2처리부(13), 제3처리부(14), 표시부(15) 및 유저 인터페이스부(16)를 포함할 수 있다.1 is a block diagram of a transformer load monitoring information visualization system according to an embodiment. Referring to FIG. 1 , the transformer load monitoring information visualization system 10 according to the embodiment includes a communication unit 11 , a first processing unit 12 , a second processing unit 13 , a third processing unit 14 , and a display unit 15 . and a user interface unit 16 .

통신부(11)는 AMI운영서버로부터 계량 데이터 및 설비 데이터를 수신할 수 있다.The communication unit 11 may receive metering data and equipment data from the AMI operation server.

예를 들면, 통신부(11)는 무선랜(Wireless LAN: WLAN), 와이 파이(Wi-Fi), 와이브로(Wireless Broadband: Wibro), 와이맥스(World Interoperability for Microwave Access: Wimax), HSDPA(High Speed Downlink Packet AccESS), IEEE 802.16, 롱 텀 에볼루션(Long Term Evolution: LTE), 광대역 무선 이동 통신 서비스(Wireless(12) Mobile Broadband Service: WMBS) 등의 원거리 통신 기술을 사용하여 데이터 통신을 수행할 수 있다.For example, the communication unit 11 is a wireless LAN (Wireless LAN: WLAN), Wi-Fi (Wi-Fi), WiBro (Wireless Broadband: Wibro), Wimax (World Interoperability for Microwave Access: Wimax), HSDPA (High Speed Downlink) Packet AccESS), IEEE 802.16, Long Term Evolution (LTE), and a long-distance communication technology such as a wireless broadband mobile communication service (Wireless (12) Mobile Broadband Service: WMBS) can be used to perform data communication.

또는 통신부(11)는 블루투스, RFID(RadioFrequency Identification), 적외선 통신(Infrared Data Association: IrDA), UWB(Ultra Wideband), 지그비, 인접 자장 통신(NFC) 등이 포함될 수 있다. 또한, 유선 통신 기술로는, USB 통신, 이더넷(Ethernet), 시리얼 통신(Serial Communication), 광/동축 케이블 등의 근거리 통신 기술을 사용하여 데이터 통신을 수행할 수 있다.Alternatively, the communication unit 11 may include Bluetooth, Radio Frequency Identification (RFID), Infrared Data Association (IrDA), Ultra Wideband (UWB), Zigbee, and Near Field Communication (NFC). In addition, as the wired communication technology, data communication may be performed using a short-distance communication technology such as USB communication, Ethernet, serial communication, or an optical/coaxial cable.

통신부(11)는 AMI서버와 데이터 통신을 수행하며 주기적으로 계량 데이터 및 설비 데이터를 수신할 수 있다. 또한, 통신부(11)는 지리 정보 시스템과 통신하여 지리공간적으로 참조 가능한 형태의 데이터를 수신할 수 있다. The communication unit 11 may perform data communication with the AMI server and periodically receive metering data and equipment data. In addition, the communication unit 11 may communicate with the geographic information system to receive   data in a geospatially referable form.

실시예에서, AMI서버는 에너지 부하자원의 효율적인 관리와 에너지 소비의 절감을 위하여 에너지 공급자와 사용자간 양방향 정보교환을 위한 인프라로써, 에너지 사용정보를 측정·수집·저장·분석 하고 이를 활용하기 위한 총체적인 시스템을 의미할 수 있다.In the embodiment, the AMI server is an infrastructure for two-way information exchange between an energy provider and a user for efficient management of energy load resources and reduction of energy consumption. It can mean system.

실시예에서, 계량 데이터는 변압기 감시 정보를 포함하며, 설비 데이터는 변대주 위치정보, 변압기 용량 정보 및 전력량계 개수 정보를 포함할 수 있다.In an embodiment, the metering data may include transformer monitoring information, and the facility data may include variable pole location information, transformer capacity information, and watt-hour meter number information.

제1처리부(12)는 설비 데이터를 이용하여 지리 정보 시스템과 연계되어 있는 지도상의 DCU 실좌표에 도형을 표시할 수 있다. The first processing unit 12 may display the figure on the DCU real coordinates on the map linked with the geographic information system by using the facility data.

실시예에서 지리정보 시스템은 NDIS(New Distribution Information System)로 배전분야 전력설비 운영 및 유지보수를 효율적으로 수행하기 위해 구축된 정보 시스템으로써, 지리공간적으로 참조 가능한 형태의 정보를 수집, 저장, 갱신, 조정, 분석, 표현할 수 있도록 설계된 컴퓨터의 하드웨어와 소프트웨어 및 지리적 자료, 인적자원의 통합체계를 의미할 수 있다.In the embodiment, the geographic information system is a New Distribution Information System (NDIS), an information system built to efficiently perform operation and maintenance of electric power facilities in the distribution field. It collects, stores, updates, It can refer to an integrated system of computer hardware and software, geographic data, and human resources designed for coordination, analysis, and expression.

제1처리부(12)는 다각형, 원 등의 도형을 이용하여 지리 정보 시스템과 연계되어 있는 지도상의 실좌표에 DCU를 표시할 수 있다.The first processing unit 12 may display the DCU on real coordinates on a map linked with the geographic information system by using figures such as polygons and circles.

제2처리부(13)는 DCU에서 검침하는 전력량계의 개수에 따라 도형의 크기를 조절할 수 있다. 제2처리부(13)는 DCU의 설치개소를 중심축으로 하는 원을 지리정보시스템과 연계되어 있는 지도상의 실좌표 위치에 표시하되, 해당 DCU에서 검침하는 전력량계 수를 기준으로 원의 크기를 결정할 수 있다. 예를 들면, 제2처리부(13)는 검침하는 전력량계의 개수가 많을수록 이에 비례하여 도형의 크기를 크게 설정하고, 전력량계의 개수가 적을수록 이에 비례하여 도형의 크기를 작게 설정할 수 있다.The second processing unit 13 may adjust the size of the figure according to the number of watt-hour meters read by the DCU. The second processing unit 13 displays a circle with the installation location of the DCU as the central axis at the actual coordinate position on the map linked to the geographic information system, but the size of the circle can be determined based on the watt-hour coefficient read by the DCU. there is. For example, the second processing unit 13 may set the size of the figure to be larger in proportion to the larger number of watt-hour meters to be read, and set the size of the figure to be smaller in proportion to the smaller number of watt-hour meters.

이를 통하여 유저는 도형의 크기를 시각적으로 관찰한 후 검침하고 있는 전력량계의 개수를 직관적으로 파악할 수 있다.Through this, the user can intuitively grasp the number of watt-hour meters being read after visually observing the size of the figure.

제3처리부(14)는 계량 데이터 및 설비 데이터를 이용하여 DCU별 수용가 인입선로의 전력 사용량, 수용가 인입선로의 역률, 변압기 이용률 및 변압기 불평형률 중 적어도 하나의 값을 이용하여 도형의 색상을 조절할 수 있다.The third processing unit 14 can adjust the color of the figure using at least one value of the power consumption of the incoming line for each DCU, the power factor of the incoming line for each DCU, the transformer utilization rate, and the transformer unbalance ratio by using the metering data and the facility data. there is.

제3처리부(14)는 수용가 인입선로의 각 상별 유효전력량의 평균값에 해당하는 특정 색을 선택하여 도형의 색상을 표현하는 바, 0[kWh]는 제1 설정색으로 표현하고 유저(User)가 지정한 X[kWh]는 제2 설정색으로 표현하되 0[kWh] 내지 X[kWh] 사이의 값은 두 설정색 사이의 그라디에이션(Gradation) 변화값에 해당하는 색으로 표현할 수 있다.The third processing unit 14 expresses the color of the figure by selecting a specific color corresponding to the average value of the amount of active power for each phase of the lead-in line, 0 [kWh] is expressed as the first set color, and the user The specified X[kWh] may be expressed as the second set color, but a value between 0[kWh] and X[kWh] may be expressed as a color corresponding to a gradation change value between the two set colors.

실시예에서, 수용가 인입선로의 전력 사용량은 수용가 인입선로의 각 상별 유효 전력량의 평균값을 의미할 수 있다.In an embodiment, the power usage of the consumer lead-in line may mean an average value of the amount of active power for each phase of the consumer lead-in line.

예를 들어, 제3처리부(14)는 수용가 인입선로의 전력 사용량의 최솟값을 0[kWh]로 하고 이에 대응되는 제1 설정색은 청색으로 설정할 수 있다. 또한, 제3처리부(14)는 수용가 인입선로의 전력 사용량의 최댓값을 유저가 지정한 X[kWh]로 하고 이에 대응되는 제2 설정색은 적색으로 설정할 수 있다. 제3처리부(14)는 수신한 수용가 인입선로의 전력 사용량의 값과 0[kWh] 내지 X[kWh] 사이에서의 상대적인 비율을 판단하고, 제1 설정색과 제2 설정색 사이에서 이에 해당하는 그라디에이션 변화값을 판단할 수 있다. 예를 들어 수신한 수용가 인입선로의 전력 사용량의 값이 0[kWh]와 X[kWh]의 중간값이라고 한다면, 제3처리부(14)는 제1 설정색과 제2 설정색 사이에서 중간값의 색상으로 도형을 채울 수 있다.For example, the third processing unit 14 may set the minimum value of the electric power consumption of the customer lead-in line to 0 [kWh] and set the first set color corresponding thereto to blue. In addition, the third processing unit 14 may set the maximum value of the power consumption of the lead-in line to X [kWh] specified by the user, and set the second set color corresponding thereto to red. The third processing unit 14 determines the relative ratio between the received value of the power consumption of the incoming customer lead line and 0 [kWh] to X [kWh], and corresponds to this between the first set color and the second set color. The gradient change value can be determined. For example, if the value of the received electric power consumption of the incoming line is an intermediate value between 0 [kWh] and X [kWh], the third processing unit 14 sets the value of the intermediate value between the first set color and the second set color. You can fill the shape with color.

실시예에서, 제1 설정색과 제2 설정색 사이의 그라디에이션 변화값은 HSV색공간상에서 H좌표의 연속적인 변화를 의미할 수 있다. 즉, HSV색공간은 색상(Hue), 채도(Saturation), 명도(Brightness, Value)로 구성된 3차원 공간상에서 좌표를 이용하여 색을 지정할 수 있다. HSV좌표는 (색상(H), 채도(S), 명도(V))로 표현될 수 있다.In an embodiment, the gradation change value between the first set color and the second set color may mean a continuous change of the H coordinate in the HSV color space. That is, the HSV color space can designate a color using coordinates in a three-dimensional space consisting of hue, saturation, and brightness ( Value). HSV coordinates can be expressed as (hue (H), saturation (S), brightness (V)).

제3처리부(14)는 이러한 HSV공간에서 제1 설정색과 제2 설정색을 설정하고, 제1 설정색과 제2 설정색 사이에서 H값을 조절함으로써 그라디에이션 변화값을 조절할 수 있다.The third processing unit 14 may adjust the gradient change value by setting the first set color and the second set color in the HSV space, and adjust the H value between the first set color and the second set color.

HSV공간상에서 제2 설정색인 적색의 HSV좌표는 (0,100,100)이고, 제1 설정색인 청색의 HSV좌표는 (240, 100, 100)으로 표현될 수 있다. 따라서, 제3처리부(14)는 수신한 수용가 인입선로의 전력 사용량의 값이 0[kWh]와 X[kWh]의 중간값이라고 한다면, (120, 100, 100)의 HSV좌표값을 가지는 색으로 도형을 표현할 수 있다.In the HSV space, the HSV coordinates of the second set color, red, may be (0,100,100), and the HSV coordinates of the first set color, blue, may be expressed as (240, 100, 100). Therefore, if the value of the received power consumption of the incoming customer lead line is an intermediate value between 0 [kWh] and X [kWh], the third processing unit 14 is a color having an HSV coordinate value of (120, 100, 100). Can represent shapes.

이를 통하여 유저는 도형의 색상이 적색에 가까울수록 DCU의 설치 개소 인근의 전력 사용량이 많다는 것을 파악할 수 있으며, 부하 밀집개소를 파악할 수 있다. 또한, 해당 개소에 변압기 등을 신설하는 등의 조치를 수행할 수 있다Through this, the user can understand that the closer the color of the figure is to red, the greater the amount of power used near the installation location of the DCU, and the dense load location can be identified. In addition, measures such as installing a new transformer, etc. can be carried out in the relevant place.

또한, 제3처리부(14)는 해당 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색을 상이하게 설정할 수 있다.Also, the third processing unit 14 may set the second set color differently according to the number of watt-hour meters that the corresponding DCU reads.

예를 들면, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 채도를 상이하게 설정할 수 있다. 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 채도 좌표를 크게 설정할 수 있다. HSV좌표상에서 채도의 좌표값은 클수록 해당 색상의 채도가 증가하게 된다. 따라서, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV좌표상에서 채도의 좌표값을 크게 설정할 수 있다. 예를 들면, 검침하는 전력량계의 개수가 50개인 DCU의 HSV좌표값은 (0, 100, 100)으로 표시되는 반면에, 검침하는 전력량계의 개수가 10개인 DCU의 HSV좌표값은 (0, 20, 100)으로 표시될 수 있다. 이 때, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 채도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다. 이를 통하여 DCU에서 검침하는 전력량계의 개수가 많은 개소가 강조되어 표시될 수 있다.For example, the third processing unit 14 may set the saturation of the second set color differently according to the number of watt-hour meters that are read by the DCU. The third processing unit 14 may set the chroma coordinates of the second set color to be larger in the HSV space as the number of watt-hour meters read by the DCU increases. In the HSV coordinates, as the coordinate value of the saturation increases, the saturation of the corresponding color increases. Accordingly, the third processing unit 14 can set the coordinate value of the saturation on the HSV coordinate to be larger as the number of watt-hour meters read by the DCU increases. For example, the HSV coordinate value of a DCU with 50 watt-hour meters to be read is displayed as (0, 100, 100), whereas the HSV coordinate value of a DCU with 10 watt-hour meters to be read is (0, 20, 100) can be expressed as In this case, the third processing unit 14 may display by gradually adjusting the ratio of the chroma coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters. Through this, a point with a large number of watt-hour meters read by the DCU can be highlighted and displayed.

예를 들면, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 명도를 상이하게 설정할 수 있다. 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 명도 좌표를 작게 설정할 수 있다. HSV좌표상에서 명도의 좌표값은 작을 수록 해당 색상의 명도가 증가하게 된다. 따라서, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV좌표상에서 명도의 좌표값을 작게 설정할 수 있다. 예를 들면, 검침하는 전력량계의 개수가 50개인 DCU의 HSV좌표값은 (0, 100, 0)으로 표시되는 반면에, 검침하는 전력량계의 개수가 10개인 DCU의 HSV좌표값은 (0, 100, 80)으로 표시될 수 있다. 이 때, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 명도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다. 이를 통하여 DCU에서 검침하는 전력량계의 개수가 많은 개소가 강조되어 표시될 수 있다.For example, the third processing unit 14 may set the brightness of the second set color differently according to the number of watt-hour meters that the DCU reads. The third processing unit 14 may set the brightness coordinates of the second set color to be smaller in the HSV space as the number of watt-hour meters measured by the DCU increases. In the HSV coordinates, the smaller the coordinate value of the brightness, the greater the brightness of the corresponding color. Accordingly, the third processing unit 14 may set the coordinate value of the brightness on the HSV coordinate to be smaller as the number of watt-hour meters read by the DCU increases. For example, the HSV coordinate value of a DCU with 50 watt-hour meters to be read is displayed as (0, 100, 0), whereas the HSV coordinate value of a DCU with 10 watt-hour meters to be read is (0, 100, 80) can be shown. In this case, the third processing unit 14 may display by gradually adjusting the ratio of the brightness coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters. Through this, a point with a large number of watt-hour meters read by the DCU can be highlighted and displayed.

또한, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 채도 및 명도를 상이하게 설정할 수 있다. 이 경우에도, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 채도 및 명도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다.Also, the third processing unit 14 may differently set the saturation and brightness of the second set color according to the number of watt-hour meters that the DCU reads. Even in this case, the third processing unit 14 may display by gradually adjusting the ratio of the chroma and the brightness coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters.

제3처리부(14)는 수용가 인입선로의 각 상별 역률의 평균값에 해당하는 특정 색을 선택하여 도형의 색상을 표현하는 바, 100[%]는 제1 설정색으로 표현하고 유저가 지정한 Y[%]는 제2 설정색으로 표현하되 100[%] 내지 Y[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 표현할 수 있다.The third processing unit 14 expresses the color of the figure by selecting a specific color corresponding to the average value of the power factor for each phase of the incoming line to the customer, and 100 [%] is expressed as the first set color and Y [%] specified by the user ] is expressed as the second set color, but a value between 100 [%] and Y [%] can be expressed as a color corresponding to a gradation change value between the two set colors.

실시예에서, 수용가 인입선로의 역률은 수용가 인입선로의 각 상별 역률의 평균값을 의미할 수 있다.In an embodiment, the power factor of the consumer incoming line may mean an average value of the power factor for each phase of the consumer incoming line.

예를 들어, 제3처리부(14)는 수용가 인입선로의 역률의 최댓값을 100[%]로 하고 이에 대응되는 제1 설정색은 청색으로 설정할 수 있다. 또한 제3처리부(14)는 수용가 인입선로의 역률의 최솟값을 유저가 지정한 Y[%]로 하고 이에 대응되는 제2 설정색은 적색으로 설정할 수 있다. 제3처리부(14)는 수신한 수용가 인입선로의 역률과 100[%] 내지 Y[%] 사이에서의 상대적인 비율을 판단하고, 제1 설정색과 제2 설정색 사이에서 이에 해당하는 그라디에이션 변화값을 판단할 수 있다. 예를 들어 수신한 수용가 인입선로의 역률이 100[%]와 Y[%]의 중간값이라고 한다면, 제3처리부(14)는 제1 설정색과 제2 설정색 사이에서 중간값의 색상으로 도형을 채울 수 있다.For example, the third processing unit 14 may set the maximum value of the power factor of the lead-in line to 100 [%] and set the first set color corresponding thereto to blue. In addition, the third processing unit 14 may set the minimum value of the power factor of the lead-in line to the user as Y [%], and set the second set color corresponding thereto to red. The third processing unit 14 determines the relative ratio between the received power factor and 100 [%] to Y [%] of the incoming line, and the corresponding gradient between the first set color and the second set color. change value can be determined. For example, if the received power factor of the incoming line is an intermediate value between 100 [%] and Y [%], the third processing unit 14 converts the figure to a color intermediate between the first set color and the second set color. can be filled

이 때, 제3처리부(14)는 HSV공간에서 제1 설정색과 제2 설정색을 설정하고, 제1 설정색과 제2 설정색 사이에서 H값을 조절함으로써 그라디에이션 변화값을 조절할 수 있다.At this time, the third processing unit 14 may adjust the gradient change value by setting the first set color and the second set color in the HSV space, and adjust the H value between the first set color and the second set color. there is.

HSV공간상에서 제2 설정색인 적색의 HSV좌표는 (0,100,100)이고, 제1 설정색인 청색의 HSV좌표는 (240, 100, 100)으로 표현될 수 있다. 따라서, 제3처리부(14)는 수신한 수용가 인입선로의 역률이 100[%]와 Y[%]의 중간값이라고 한다면, (120, 100, 100)의 HSV좌표값을 가지는 색으로 도형을 표현할 수 있다.In the HSV space, the HSV coordinates of the second set color, red, may be (0,100,100), and the HSV coordinates of the first set color, blue, may be expressed as (240, 100, 100). Therefore, the third processing unit 14 expresses the figure with a color having an HSV coordinate value of (120, 100, 100), if the power factor of the received incoming line is an intermediate value between 100 [%] and Y [%]. can

이를 통하여 유저는 적색에 가까울수록 DCU 설치개소 인근의 역률이 저조하다고 판단할 수 있으며, 해당개소에 역률개선 등의 조치를 취할 수 있다.Through this, the user can determine that the closer the red color is, the lower the power factor near the DCU installation location, and the action can be taken to improve the power factor in the corresponding location.

또한, 제3처리부(14)는 해당 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색을 상이하게 설정할 수 있다.Also, the third processing unit 14 may set the second set color differently according to the number of watt-hour meters that the corresponding DCU reads.

또한, 제3처리부(14)는 해당 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색을 상이하게 설정할 수 있다.Also, the third processing unit 14 may set the second set color differently according to the number of watt-hour meters that the corresponding DCU reads.

예를 들면, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 채도를 상이하게 설정할 수 있다. 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 채도 좌표를 크게 설정할 수 있다. HSV좌표상에서 채도의 좌표값은 클수록 해당 색상의 채도가 증가하게 된다. 따라서, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV좌표상에서 채도의 좌표값을 크게 설정할 수 있다. 예를 들면, 검침하는 전력량계의 개수가 50개인 DCU의 HSV좌표값은 (0, 100, 100)으로 표시되는 반면에, 검침하는 전력량계의 개수가 10개인 DCU의 HSV좌표값은 (0, 20, 100)으로 표시될 수 있다. 이 때, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 채도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다. 이를 통하여 DCU에서 검침하는 전력량계의 개수가 많은 개소가 강조되어 표시될 수 있다.For example, the third processing unit 14 may set the saturation of the second set color differently according to the number of watt-hour meters that are read by the DCU. The third processing unit 14 may set the chroma coordinates of the second set color to be larger in the HSV space as the number of watt-hour meters read by the DCU increases. In the HSV coordinates, as the coordinate value of the saturation increases, the saturation of the corresponding color increases. Accordingly, the third processing unit 14 can set the coordinate value of the saturation on the HSV coordinate to be larger as the number of watt-hour meters read by the DCU increases. For example, the HSV coordinate value of a DCU with 50 watt-hour meters to be read is displayed as (0, 100, 100), whereas the HSV coordinate value of a DCU with 10 watt-hour meters to be read is (0, 20, 100) can be expressed as In this case, the third processing unit 14 may display by gradually adjusting the ratio of the chroma coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters. Through this, a point with a large number of watt-hour meters read by the DCU can be highlighted and displayed.

예를 들면, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 명도를 상이하게 설정할 수 있다. 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 명도 좌표를 작게 설정할 수 있다. HSV좌표상에서 명도의 좌표값은 작을 수록 해당 색상의 명도가 증가하게 된다. 따라서, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV좌표상에서 명도의 좌표값을 작게 설정할 수 있다. 예를 들면, 검침하는 전력량계의 개수가 50개인 DCU의 HSV좌표값은 (0, 100, 0)으로 표시되는 반면에, 검침하는 전력량계의 개수가 10개인 DCU의 HSV좌표값은 (0, 100, 80)으로 표시될 수 있다. 이 때, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 명도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다. 이를 통하여 DCU에서 검침하는 전력량계의 개수가 많은 개소가 강조되어 표시될 수 있다.For example, the third processing unit 14 may set the brightness of the second set color differently according to the number of watt-hour meters that the DCU reads. The third processing unit 14 may set the brightness coordinates of the second set color to be smaller in the HSV space as the number of watt-hour meters measured by the DCU increases. In the HSV coordinates, the smaller the coordinate value of the brightness, the greater the brightness of the corresponding color. Accordingly, the third processing unit 14 may set the coordinate value of the brightness on the HSV coordinate to be smaller as the number of watt-hour meters read by the DCU increases. For example, the HSV coordinate value of a DCU with 50 watt-hour meters to be read is displayed as (0, 100, 0), whereas the HSV coordinate value of a DCU with 10 watt-hour meters to be read is (0, 100, 80) can be shown. In this case, the third processing unit 14 may display by gradually adjusting the ratio of the brightness coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters. Through this, a point with a large number of watt-hour meters read by the DCU can be highlighted and displayed.

또한, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 채도 및 명도를 상이하게 설정할 수 있다. 이 경우에도, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 채도 및 명도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다.Also, the third processing unit 14 may differently set the saturation and brightness of the second set color according to the number of watt-hour meters that the DCU reads. Even in this case, the third processing unit 14 may display by gradually adjusting the ratio of the chroma and the brightness coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters.

제3처리부(14)는 변압기 각 상별 이용률의 평균값에 해당하는 특정 색을 선택하여 도형의 색상을 표현하는 바, 0[%]는 제1 설정색으로 표현하고 100[%]는 제2 설정색으로 표현하되 0[%] 내지 100[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 표현할 수 있다.The third processing unit 14 expresses the color of the figure by selecting a specific color corresponding to the average value of the utilization rate for each phase of the transformer, 0 [%] is expressed as the first set color and 100 [%] is the second set color However, a value between 0 [%] and 100 [%] can be expressed as a color corresponding to a gradient change value between two set colors.

실시예에서, 변압기 이용률은 변압기 각 상별 이용률의 평균값을 의미할 수있으며, 하기 수학식 1과 수학식 2에 따라 산출될 수 있다. In an embodiment, the transformer utilization rate may mean an average value of the utilization rates for each phase of the transformer, and may be calculated according to Equations 1 and 2 below.

Figure 112020046267775-pat00001
Figure 112020046267775-pat00001

Figure 112020046267775-pat00002
Figure 112020046267775-pat00002

수학식 1에서

Figure 112020046267775-pat00003
는 변압기 각 상별 이용률의 평균값이고,
Figure 112020046267775-pat00004
는 i상의 변압기 이용률이며, 수학식 2에서
Figure 112020046267775-pat00005
는 i상의 평균전압,
Figure 112020046267775-pat00006
는 i상의 평균전류를 의미할 수 있다(여기서, i=A, B, C).in Equation 1
Figure 112020046267775-pat00003
is the average value of the utilization rate for each phase of the transformer,
Figure 112020046267775-pat00004
is the transformer utilization rate of phase i, in Equation 2
Figure 112020046267775-pat00005
is the average voltage over i,
Figure 112020046267775-pat00006
may mean the average current of phase i (here, i = A, B, C).

예를 들어, 제3처리부(14)는 변압기 이용률의 최솟값을 0[%]로 하고 이에 대응되는 제1 설정색은 청색으로 설정할 수 있다. 또한, 제3처리부(14)는 변압기 이용률의 최댓값을 100[%]로 하고 이에 대응되는 제2 설정색은 적색으로 설정할 수 있다. 제3처리부(14)는 수신한 변압기 이용률과 0[%] 내지 100[%] 사이에서의 상대적인 비율을 판단하고, 제1 설정색과 제2 설정색 사이에서 이에 해당하는 그라디에이션 변화값을 판단할 수 있다. 예를 들어 수신한 변압기 이용률이 50[%]라고 한다면, 제3처리부(14)는 제1 설정색과 제2 설정색 사이에서 중간값의 색상으로 도형을 채울 수 있다.For example, the third processing unit 14 may set the minimum value of the transformer utilization rate to 0 [%] and set the first set color corresponding thereto to blue. In addition, the third processing unit 14 may set the maximum value of the transformer utilization rate to 100 [%] and set the second set color corresponding thereto to red. The third processing unit 14 determines the received transformer utilization rate and the relative ratio between 0 [%] and 100 [%], and calculates the corresponding gradient change value between the first set color and the second set color. can judge For example, if the received transformer utilization rate is 50 [%], the third processing unit 14 may fill the figure with a color intermediate between the first set color and the second set color.

이 때, 제3처리부(14)는 HSV공간에서 제1 설정색과 제2 설정색을 설정하고, 제1 설정색과 제2 설정색 사이에서 H값을 조절함으로써 그라디에이션 변화값을 조절할 수 있다.At this time, the third processing unit 14 may adjust the gradient change value by setting the first set color and the second set color in the HSV space, and adjust the H value between the first set color and the second set color. there is.

HSV공간상에서 제2 설정색인 적색의 HSV좌표는 (0,100,100)이고, 제1 설정색인 청색의 HSV좌표는 (240, 100, 100)으로 표현될 수 있다. 따라서, 제3처리부(14)는 수신한 변압기 이용률이 50[%]라고 한다면, (120, 100, 100)의 HSV좌표값을 가지는 색으로 도형을 표현할 수 있다. In the HSV space, the HSV coordinates of the second set color, red, may be (0,100,100), and the HSV coordinates of the first set color, blue, may be expressed as (240, 100, 100). Accordingly, if the received transformer utilization rate is 50 [%], the third processing unit 14 may express the figure with a color having an HSV coordinate value of (120, 100, 100).

이를 통하여 유저는 적색에 가까울수록 해당 개소에 설치된 변압기가 과부하 상태에서 동작하고 있음을 파악할 수 있고, 변압기 용량을 증설하거나 신설하는 등의 조치를 취할 수 있다.Through this, the user can grasp that the transformer installed in the corresponding location is operating in an overload state as the color is closer to red, and can take measures such as increasing or newly establishing the transformer capacity.

또한, 제3처리부(14)는 해당 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색을 상이하게 설정할 수 있다.Also, the third processing unit 14 may set the second set color differently according to the number of watt-hour meters that the corresponding DCU reads.

또한, 제3처리부(14)는 해당 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색을 상이하게 설정할 수 있다.Also, the third processing unit 14 may set the second set color differently according to the number of watt-hour meters that the corresponding DCU reads.

예를 들면, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 채도를 상이하게 설정할 수 있다. 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 채도 좌표를 크게 설정할 수 있다. HSV좌표상에서 채도의 좌표값은 클수록 해당 색상의 채도가 증가하게 된다. 따라서, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV좌표상에서 채도의 좌표값을 크게 설정할 수 있다. 예를 들면, 검침하는 전력량계의 개수가 50개인 DCU의 HSV좌표값은 (0, 100, 100)으로 표시되는 반면에, 검침하는 전력량계의 개수가 10개인 DCU의 HSV좌표값은 (0, 20, 100)으로 표시될 수 있다. 이 때, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 채도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다. 이를 통하여 DCU에서 검침하는 전력량계의 개수가 많은 개소가 강조되어 표시될 수 있다.For example, the third processing unit 14 may set the saturation of the second set color differently according to the number of watt-hour meters that are read by the DCU. The third processing unit 14 may set the chroma coordinates of the second set color to be larger in the HSV space as the number of watt-hour meters read by the DCU increases. In the HSV coordinates, as the coordinate value of the saturation increases, the saturation of the corresponding color increases. Accordingly, the third processing unit 14 can set the coordinate value of the saturation on the HSV coordinate to be larger as the number of watt-hour meters read by the DCU increases. For example, the HSV coordinate value of a DCU with 50 watt-hour meters to be read is displayed as (0, 100, 100), whereas the HSV coordinate value of a DCU with 10 watt-hour meters to be read is (0, 20, 100) can be expressed as In this case, the third processing unit 14 may display by gradually adjusting the ratio of the chroma coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters. Through this, a point with a large number of watt-hour meters read by the DCU can be highlighted and displayed.

예를 들면, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 명도를 상이하게 설정할 수 있다. 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 명도 좌표를 작게 설정할 수 있다. HSV좌표상에서 명도의 좌표값은 작을 수록 해당 색상의 명도가 증가하게 된다. 따라서, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV좌표상에서 명도의 좌표값을 작게 설정할 수 있다. 예를 들면, 검침하는 전력량계의 개수가 50개인 DCU의 HSV좌표값은 (0, 100, 0)으로 표시되는 반면에, 검침하는 전력량계의 개수가 10개인 DCU의 HSV좌표값은 (0, 100, 80)으로 표시될 수 있다. 이 때, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 명도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다. 이를 통하여 DCU에서 검침하는 전력량계의 개수가 많은 개소가 강조되어 표시될 수 있다.For example, the third processing unit 14 may set the brightness of the second set color differently according to the number of watt-hour meters that the DCU reads. The third processing unit 14 may set the brightness coordinates of the second set color to be smaller in the HSV space as the number of watt-hour meters measured by the DCU increases. In the HSV coordinates, the smaller the coordinate value of the brightness, the greater the brightness of the corresponding color. Accordingly, the third processing unit 14 may set the coordinate value of the brightness on the HSV coordinate to be smaller as the number of watt-hour meters read by the DCU increases. For example, the HSV coordinate value of a DCU with 50 watt-hour meters to be read is displayed as (0, 100, 0), whereas the HSV coordinate value of a DCU with 10 watt-hour meters to be read is (0, 100, 80) can be shown. In this case, the third processing unit 14 may display by gradually adjusting the ratio of the brightness coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters. Through this, a point with a large number of watt-hour meters read by the DCU can be highlighted and displayed.

또한, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 채도 및 명도를 상이하게 설정할 수 있다. 이 경우에도, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 채도 및 명도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다.Also, the third processing unit 14 may differently set the saturation and brightness of the second set color according to the number of watt-hour meters that the DCU reads. Even in this case, the third processing unit 14 may display by gradually adjusting the ratio of the chroma and the brightness coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters.

제3처리부(14)는 변압기 불평형률에 해당하는 특정 색을 선택하여 도형의 색상을 표현하는 바, 0[%]는 제1 설정색으로 표현하고 유저가 지정한 Z[%]는 제2 설정색으로 표현하되 0[%] 내지 Z[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 표현할 수 있다.The third processing unit 14 selects a specific color corresponding to the transformer unbalance ratio to express the color of the figure, 0 [%] is expressed as the first set color, and Z [%] designated by the user is the second set color However, a value between 0 [%] and Z [%] can be expressed as a color corresponding to the gradient change value between the two set colors.

실시예에서 변압기 불평형률은 하기 수학식 3에 따라 산출될 수 있다.In an embodiment, the transformer unbalance factor may be calculated according to Equation 3 below.

Figure 112020046267775-pat00007
Figure 112020046267775-pat00007

수학식 3에서, σ는 변압기 불평형률이고,

Figure 112020046267775-pat00008
는 변압기 각 상별 이용률의 평균,
Figure 112020046267775-pat00009
는 i상의 변압기 이용률이다.In Equation 3, σ is the transformer unbalance factor,
Figure 112020046267775-pat00008
is the average of the utilization rate for each phase of the transformer,
Figure 112020046267775-pat00009
is the transformer utilization in phase i.

예를 들어, 제3처리부(14)는 변압기 불평형률의 최솟값을 0[%]로 하고 이에 대응되는 제1 설정색은 청색으로 설정할 수 있다. 또한 제3처리부(14)는 변압기 불평형률의 최댓값을 유저가 지정한 Z[%]로 하고 이에 대응되는 제2 설정색은 적색으로 설정할 수 있다. 제3처리부(14)는 수신한 변압기 불평형률과 0[%] 내지 Z[%]사이에서의 상대적인 비율을 판단하고, 제1 설정색과 제2 설정색 사이에서 이에 해당하는 그라디에이션 변화값을 판단할 수 있다. 예를 들어 수신한 변압기 불평형률이 0[%]와 Z[%]의 중간값이라고 한다면, 제3처리부(14)는 제1 설정색과 제2 설정색 사이에서 중간값의 색상으로 도형을 채울 수 있다.For example, the third processing unit 14 may set the minimum value of the transformer unbalance ratio to 0 [%] and set the first set color corresponding thereto to blue. In addition, the third processing unit 14 may set the maximum value of the transformer unbalance factor to Z [%] specified by the user, and set the second set color corresponding thereto to red. The third processing unit 14 determines the received transformer unbalance ratio and the relative ratio between 0 [%] to Z [%], and a corresponding gradation change value between the first set color and the second set color. can be judged For example, if the received transformer unbalance ratio is an intermediate value between 0 [%] and Z [%], the third processing unit 14 fills the figure with a color intermediate between the first set color and the second set color. can

이 때, 제3처리부(14)는 HSV공간에서 제1 설정색과 제2 설정색을 설정하고, 제1 설정색과 제2 설정색 사이에서 H값을 조절함으로써 그라디에이션 변화값을 조절할 수 있다.At this time, the third processing unit 14 may adjust the gradient change value by setting the first set color and the second set color in the HSV space, and adjust the H value between the first set color and the second set color. there is.

HSV공간상에서 제2 설정색인 적색의 HSV좌표는 (0,100,100)이고, 제1 설정색인 청색의 HSV좌표는 (240, 100, 100)으로 표현될 수 있다. 따라서, 제3처리부(14)는 수신한 변압기 불평형률이 0[%]와 Z[%]의 중간값이라고 한다면, (120, 100, 100)의 HSV좌표값을 가지는 색으로 도형을 표현할 수 있다.In the HSV space, the HSV coordinates of the second set color, red, may be (0,100,100), and the HSV coordinates of the first set color, blue, may be expressed as (240, 100, 100). Accordingly, if the received transformer unbalance ratio is an intermediate value between 0 [%] and Z [%], the third processing unit 14 may express the figure with a color having an HSV coordinate value of (120, 100, 100). .

이를 통하여 유저는 적색에 가까울수록 해당 개소 변압기 간의 부하배분이 불평등하다는 것을 파악할 수 있으며, 인입선로 이설공사 등의 조치를 통해 상 불평형을 해소할 수 있다.Through this, the user can understand that the load distribution between the transformers is unequal as the color is closer to red, and the phase imbalance can be resolved through measures such as lead-in line relocation work.

또한, 제3처리부(14)는 해당 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색을 상이하게 설정할 수 있다.Also, the third processing unit 14 may set the second set color differently according to the number of watt-hour meters that the corresponding DCU reads.

또한, 제3처리부(14)는 해당 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색을 상이하게 설정할 수 있다.Also, the third processing unit 14 may set the second set color differently according to the number of watt-hour meters that the corresponding DCU reads.

예를 들면, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 채도를 상이하게 설정할 수 있다. 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 채도 좌표를 크게 설정할 수 있다. HSV좌표상에서 채도의 좌표값은 클수록 해당 색상의 채도가 증가하게 된다. 따라서, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV좌표상에서 채도의 좌표값을 크게 설정할 수 있다. 예를 들면, 검침하는 전력량계의 개수가 50개인 DCU의 HSV좌표값은 (0, 100, 100)으로 표시되는 반면에, 검침하는 전력량계의 개수가 10개인 DCU의 HSV좌표값은 (0, 20, 100)으로 표시될 수 있다. 이 때, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 채도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다. 이를 통하여 DCU에서 검침하는 전력량계의 개수가 많은 개소가 강조되어 표시될 수 있다.For example, the third processing unit 14 may set the saturation of the second set color differently according to the number of watt-hour meters that are read by the DCU. The third processing unit 14 may set the chroma coordinates of the second set color to be larger in the HSV space as the number of watt-hour meters read by the DCU increases. In the HSV coordinates, as the coordinate value of the saturation increases, the saturation of the corresponding color increases. Accordingly, the third processing unit 14 can set the coordinate value of the saturation on the HSV coordinate to be larger as the number of watt-hour meters read by the DCU increases. For example, the HSV coordinate value of a DCU with 50 watt-hour meters to be read is displayed as (0, 100, 100), whereas the HSV coordinate value of a DCU with 10 watt-hour meters to be read is (0, 20, 100) can be expressed as In this case, the third processing unit 14 may display by gradually adjusting the ratio of the chroma coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters. Through this, a point with a large number of watt-hour meters read by the DCU can be highlighted and displayed.

예를 들면, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 명도를 상이하게 설정할 수 있다. 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 명도 좌표를 작게 설정할 수 있다. HSV좌표상에서 명도의 좌표값은 작을 수록 해당 색상의 명도가 증가하게 된다. 따라서, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV좌표상에서 명도의 좌표값을 작게 설정할 수 있다. 예를 들면, 검침하는 전력량계의 개수가 50개인 DCU의 HSV좌표값은 (0, 100, 0)으로 표시되는 반면에, 검침하는 전력량계의 개수가 10개인 DCU의 HSV좌표값은 (0, 100, 80)으로 표시될 수 있다. 이 때, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 명도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다. 이를 통하여 DCU에서 검침하는 전력량계의 개수가 많은 개소가 강조되어 표시될 수 있다.For example, the third processing unit 14 may set the brightness of the second set color differently according to the number of watt-hour meters that the DCU reads. The third processing unit 14 may set the brightness coordinates of the second set color to be smaller in the HSV space as the number of watt-hour meters measured by the DCU increases. In the HSV coordinates, the smaller the coordinate value of the brightness, the greater the brightness of the corresponding color. Accordingly, the third processing unit 14 may set the coordinate value of the brightness on the HSV coordinate to be smaller as the number of watt-hour meters read by the DCU increases. For example, the HSV coordinate value of a DCU with 50 watt-hour meters to be read is displayed as (0, 100, 0), whereas the HSV coordinate value of a DCU with 10 watt-hour meters to be read is (0, 100, 80) can be shown. In this case, the third processing unit 14 may display by gradually adjusting the ratio of the brightness coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters. Through this, a point with a large number of watt-hour meters read by the DCU can be highlighted and displayed.

또한, 제3처리부(14)는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 채도 및 명도를 상이하게 설정할 수 있다. 이 경우에도, 제3처리부(14)는 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 채도 및 명도 좌표값의 비율을 점진적으로 조절하여 표시할 수 있다.Also, the third processing unit 14 may differently set the saturation and brightness of the second set color according to the number of watt-hour meters that the DCU reads. Even in this case, the third processing unit 14 may display by gradually adjusting the ratio of the chroma and the brightness coordinate values among the HSV coordinate values according to the ratio of the number of meter-reading watt-hour meters.

또한, 제3처리부(14)는 수용가 인입선로의 전력 사용량, 수용가 인입선로의 역률, 변압기 이용률 및 변압기 불평형률에서 선택된 복수개의 파라미터를 조합하여 도형의 색상을 조절할 수 있다. 이 때, 제3처리부(14)는 각각의 파라미터 값에 따른 도형 내 색상을 산출하고, 각각 산출된 색상을 혼합하여 혼합된 색상으로 도형 내 색상을 표시할 수 있다. In addition, the third processing unit 14 may adjust the color of the figure by combining a plurality of parameters selected from the power consumption of the consumer lead-in line, the power factor of the consumer lead-in line, the transformer utilization ratio, and the transformer unbalance factor. In this case, the third processing unit 14 may calculate a color in the figure according to each parameter value, mix the calculated colors, and display the color in the figure as the mixed color.

즉, 수용가 인입선로의 전력 사용량과 변압기 이용률을 동시에 표시하는 경우를 예로 들어 설명하기로 한다. 제3처리부(14)는 수용가 인입선로의 전력 사용량에 따라 산출된 제1색상과 변압기 이용률에 따라 산출된 제2색상을 혼합한 제3색상으로 DCU를 표현하는 도형 내 색상을 조절할 수 있다.That is, a case in which the power consumption and the transformer utilization rate of the incoming customer line are displayed at the same time will be described as an example. The third processing unit 14 may adjust the color in the figure expressing the DCU with a third color obtained by mixing the first color calculated according to the power consumption of the incoming line and the second color calculated according to the transformer utilization rate.

표시부(15)는 지리 정보 시스템과 연계되어 있는 지도상에 제1처리부(12), 제2처리부(13) 및 제3처리부(14)를 통하여 가공 처리된 도형을 표시할 수 있다. 표시부(15)는 액정 디스플레이(Liquid Crystal Display: LCD), 박막 트랜지스터 액정 디스플레이(Thin Film Transistor-Liquid Crystal Display: TFT LCD), 유기 발광 다이오드(Organic Light-Emitting Diode: OLED), 플렉시블 디스플레이(Flexible Display), 3차원 디스플레이(3D Display), 전자잉크 디스플레이(e-ink display) 중에서 적어도 하나를 포함할 수 있다.The display unit 15 may display a graphic processed through the first processing unit 12 , the second processing unit 13 , and the third processing unit 14 on a map linked with the geographic information system. The display unit 15 includes a liquid crystal display (LCD), a thin film transistor liquid crystal display (TFT LCD), an organic light-emitting diode (OLED), and a flexible display (Flexible Display). ), a three-dimensional display (3D display), may include at least one of an e-ink display (e-ink display).

또한, 표시부(15)는 다양한 사용자 인터페이스 또는 그래픽 사용자 인터페이스를 화면에 출력할 수 있다.Also, the display unit 15 may output various user interfaces or graphic user interfaces on the screen.

유저 인터페이스부(16)는 시스템(10)의 동작 제어를 위한 입력 데이터를 발생시킨다. 유저 인터페이스부(16)는 키 패드, 돔 스위치, 터치 패드, 조그 휠, 조그 스위치 등으로 구성될 수 있다. 표시부(15)와 터치패드가 상호 레이어 구조를 이루어 터치 스크린으로 구성되는 경우, 표시부(15)는 출력 장치 이외에 입력 장치로도 사용될 수 있다. The user interface unit 16 generates input data for controlling the operation of the system 10 . The user interface unit 16 may include a key pad, a dome switch, a touch pad, a jog wheel, a jog switch, and the like. When the display unit 15 and the touch pad form a layer structure to form a touch screen, the display unit 15 may be used as an input device in addition to an output device.

유저 인터페이스부(16)는 시스템(10)의 동작을 위한 다양한 명령을 입력받을 수 있는 바, 제3처리부의 도형의 색상을 조절하기 위한 유저 지정값인 X, Y, Z 값을 입력받을 수 있다.The user interface unit 16 may receive input of various commands for the operation of the system 10 , and may receive X, Y, and Z values, which are user-specified values for adjusting the color of the figure of the third processing unit. .

도2는 실시예에 따른 변압기 부하감시 정보 시각화 방법의 순서도이다. 도2를 참조하면, 통신부는 AMI운영서버로부터 계량 데이터 및 설비 데이터를 수신한다(S201).2 is a flowchart of a method for visualizing transformer load monitoring information according to an embodiment. Referring to Figure 2, the communication unit receives the metering data and equipment data from the AMI operation server (S201).

다음으로, 제1처리부는 설비 데이터를 이용하여 지리 정보 시스템과 연계되어 있는 지도상의 DCU 실좌표에 도형을 표시한다(S202). Next, the first processing unit displays the figure on the DCU real coordinates on the map linked with the geographic information system using the facility data (S202).

다음으로, 제2처리부는 DCU에서 검침하는 전력량계의 개수에 따라 도형의 크기를 조절한다(S203).Next, the second processing unit adjusts the size of the figure according to the number of watt-hour meters read by the DCU (S203).

다음으로, 제3처리부는 계량 데이터 및 설비 데이터를 이용하여 DCU별 수용가 인입선로의 전력 사용량, 수용가 인입선로의 역률, 변압기 이용률 및 변압기 불평형률을 계산하고 이들 중 적어도 하나를 이용하여 도형의 색상을 조절한다(S204). Next, the third processing unit uses the metering data and facility data to calculate the power consumption of the incoming line for each DCU, the power factor of the incoming line for the consumer, the transformer utilization rate, and the transformer unbalance factor, and use at least one of these to calculate the color of the figure. Adjust (S204).

예를 들면, 제3처리부는 수용가 인입선로의 전력 사용량의 최솟값을 제1 설정색으로 하고, 수용가 인입선로의 전력 사용량의 최댓값을 제2 설정색으로 하여, 제1 설정색과 제2 설정색 사이의 그라디에이션 변화값으로 수용가 인입선로의 전력 사용량을 도형에 표현할 수 있다.For example, the third processing unit makes the minimum value of the power consumption of the lead-in line into the first set color, and sets the maximum value of the power use of the lead-in line to the customer as the second set color, between the first set color and the second set color As the gradient change value of , the power consumption of the incoming customer line can be expressed in the figure.

예를 들면, 제3처리부는 수용가 인입선로의 역률의 최댓값을 제1 설정색으로 하고, 수용가 인입선로의 역률의 최솟값을 제2 설정색으로 하여, 제1 설정색과 제2 설정색 사이의 그라디에이션 변화값으로 수용가 인입선로의 역률을 도형에 표현할 수 있다.For example, the third processing unit sets the maximum value of the power factor of the incoming line to the customer as the first set color, and sets the minimum value of the power factor of the incoming line to the customer as the second set color, and is between the first set color and the second set color. The power factor of the incoming line to the customer can be expressed in the diagram as the value of the change in radiation.

예를 들면, 제3처리부는 변압기 이용률의 최솟값을 제1 설정색으로 하고, 변압기 이용률의 최댓값을 제2 설정색으로 하여, 제1 설정색과 제2 설정색 사이의 그라디에이션 변화값으로 변압기 이용률을 도형에 표현할 수 있다.For example, the third processing unit uses the minimum value of the transformer utilization rate as the first set color and the maximum value of the transformer utilization rate as the second set color, and converts the transformer to a gradation change value between the first set color and the second set color. The utilization rate can be expressed in a diagram.

예를 들면, 제3처리부는 변압기 불평형률의 최솟값을 제1 설정색으로 하고, 변압기 불평형률의 최댓값을 제2 설정색으로 하여, 제1 설정색과 제2 설정색 사이의 그라디에이션 변화값으로 변압기 불평형을 도형에 표현할 수 있다.For example, the third processing unit sets the minimum value of the transformer unbalance factor as the first set color, and sets the maximum value of the transformer unbalance factor as the second set color, and sets the gradation change value between the first set color and the second set color. Transformer unbalance can be expressed in the diagram.

이 때, 제3처리부는 DCU에서 검침하는 전력량계의 개수에 따라 제2 설정색의 채도 및 명도를 상이하게 설정할 수 있다.In this case, the third processing unit may differently set the saturation and brightness of the second set color according to the number of watt-hour meters that are read by the DCU.

실시예에 따른 방법은 다양한 컴퓨터 수단을 통하여 수행될 수 있는 프로그램 명령 형태로 구현되어 컴퓨터 판독 가능 기록 매체에 기록될 수 있다. 이때, 매체는 컴퓨터로 실행 가능한 프로그램을 계속 저장하거나, 실행 또는 다운로드를 위해 임시 저장하는 것일 수도 있다. 또한, 매체는 단일 또는 수 개의 하드웨어가 결합된 형태의 다양한 기록수단 또는 저장수단일 수 있는데, 어떤 컴퓨터 시스템에 직접 접속되는 매체에 한정되지 않고, 네트워크 상에 분산 존재하는 것일 수도 있다. 매체의 예시로는, 하드 디스크, 플로피 디스크 및 자기 테이프와 같은 자기 매체, CD-ROM 및 DVD와 같은 광기록 매체, 플롭티컬 디스크(floptical disk)와 같은 자기-광 매체(magneto-optical medium), 및 ROM, RAM, 플래시 메모리 등을 포함하여 프로그램 명령어가 저장되도록 구성된 것이 있을 수 있다. 또한, 다른 매체의 예시로, 어플리케이션을 유통하는 앱 스토어나 기타 다양한 소프트웨어를 공급 내지 유통하는 사이트, 서버 등에서 관리하는 기록매체 내지 저장매체도 들 수 있다.The method according to the embodiment may be implemented in the form of program instructions that can be executed through various computer means and recorded in a computer-readable recording medium. In this case, the medium may be to continuously store a program executable by a computer, or to temporarily store it for execution or download. In addition, the medium may be various recording means or storage means in the form of a single or several hardware combined, it is not limited to a medium directly connected to any computer system, and may exist distributed over a network. Examples of the medium include a hard disk, a magnetic medium such as a floppy disk and a magnetic tape, an optical recording medium such as CD-ROM and DVD, a magneto-optical medium such as a floppy disk, and those configured to store program instructions, including ROM, RAM, flash memory, and the like. In addition, examples of other media include an app store that distributes applications, and a recording medium or storage medium managed by a site or server that supplies or distributes other various software.

본 실시예에서 사용되는 '~부'라는 용어는 소프트웨어 또는 FPGA(field-programmable gate array) 또는 ASIC과 같은 하드웨어 구성요소를 의미하며, '~부'는 어떤 역할들을 수행한다. 그렇지만 '~부'는 소프트웨어 또는 하드웨어에 한정되는 의미는 아니다. '~부'는 어드레싱할 수 있는 저장 매체에 있도록 구성될 수도 있고 하나 또는 그 이상의 프로세서들을 재생시키도록 구성될 수도 있다. 따라서, 일 예로서 '~부'는 소프트웨어 구성요소들, 객체지향 소프트웨어 구성요소들, 클래스 구성요소들 및 태스크 구성요소들과 같은 구성요소들과, 프로세스들, 함수들, 속성들, 프로시저들, 서브루틴들, 프로그램 코드의 세그먼트들, 드라이버들, 펌웨어, 마이크로코드, 회로, 데이터, 데이터베이스, 데이터 구조들, 테이블들, 어레이들, 및 변수들을 포함한다. 구성요소들과 '~부'들 안에서 제공되는 기능은 더 작은 수의 구성요소들 및 '~부'들로 결합되거나 추가적인 구성요소들과 '~부'들로 더 분리될 수 있다. 뿐만 아니라, 구성요소들 및 '~부'들은 디바이스 또는 보안 멀티미디어카드 내의 하나 또는 그 이상의 CPU들을 재생시키도록 구현될 수도 있다.The term '~ unit' used in this embodiment means software or hardware components such as field-programmable gate array (FPGA) or ASIC, and '~ unit' performs certain roles. However, '-part' is not limited to software or hardware. '~' may be configured to reside on an addressable storage medium or may be configured to refresh one or more processors. Accordingly, as an example, '~' indicates components such as software components, object-oriented software components, class components, and task components, and processes, functions, properties, and procedures. , subroutines, segments of program code, drivers, firmware, microcode, circuitry, data, databases, data structures, tables, arrays, and variables. The functions provided in the components and '~ units' may be combined into a smaller number of components and '~ units' or further separated into additional components and '~ units'. In addition, components and '~ units' may be implemented to play one or more CPUs in a device or secure multimedia card.

상기에서는 본 발명의 바람직한 실시예를 참조하여 설명하였지만, 해당 기술 분야의 숙련된 당업자는 하기의 특허 청구의 범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다. Although the above has been described with reference to preferred embodiments of the present invention, those skilled in the art can variously modify and change the present invention within the scope without departing from the spirit and scope of the present invention as set forth in the claims below. You will understand that it can be done.

10: 변압기 부하감시 정보 시각화 시스템
11: 통신부
12: 제1처리부
13: 제2처리부
14: 제3처리부
15: 표시부
16: 유저 인터페이스부
10: Transformer load monitoring information visualization system
11: Ministry of Communications
12: first processing unit
13: second processing unit
14: third processing unit
15: display
16: user interface unit

Claims (12)

AMI운영서버로부터 계량 데이터 및 설비 데이터를 수신하는 통신부;
상기 설비 데이터를 이용하여 지리 정보 시스템과 연계되어 있는 지도상의 DCU(Data Concentration Unit) 실좌표에 도형을 표시하는 제1처리부;
상기 DCU에서 검침하는 전력량계의 개수에 따라 상기 도형의 크기를 조절하는 제2처리부; 및
상기 계량 데이터 및 상기 설비 데이터를 이용하여 DCU별 수용가 인입선로의 전력 사용량, 수용가 인입선로의 역률, 변압기 이용률 및 변압기 불평형률을 계산하고 이들 중 적어도 하나를 이용하여 상기 도형의 색상을 조절하는 제3처리부를 포함하며,
상기 설비 데이터는 변대주 위치정보, 변압기 용량 정보 및 전력량계 개수 정보를 포함하고,
상기 제2처리부는 상기 DCU의 설치개소를 중심축으로 하는 원을 상기 지리 정보 시스템과 연계되어 있는 지도상의 실좌표 위치에 표시하되, 해당 DCU에서 검침하는 전력량계 수를 기준으로 원의 크기를 결정하여, 검침하는 전력량계의 개수가 많을수록 이에 비례하여 도형의 크기를 크게 설정하고, 전력량계의 개수가 적을수록 도형의 크기를 작게 설정하며,
상기 제3처리부는 해당 DCU에서 검침하는 전력량계의 개수에 따라 상기 원의 채도 및 명도를 상이하게 설정하며,
상기 제3처리부는 HSV공간에서 (색상(H), 채도(S), 명도(V))로 표현되는 HSV 좌표를 산출하여 상기 도형을 표시하며,
상기 제3처리부는 상기 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 채도 좌표를 크게 설정하고,
상기 제3처리부는 상기 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 명도 좌표를 작게 설정하고,
상기 제3처리부는 상기 DCU에서 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 채도 및 명도 좌표값의 비율을 점진적으로 조절하여 표시하며,
상기 제3처리부는 상기 수용가 인입선로의 전력 사용량, 수용가 인입선로의 역률, 변압기 이용률 및 변압기 불평형률에서 선택된 복수개의 파라미터를 조합하여 도형의 색상을 조절하되, 각각의 파라미터 값에 따른 도형 내 색상을 산출하고, 각각 산출된 색상을 혼합하여 혼합된 색상으로 도형 내 색상을 표시하는 변압기 부하감시 정보 시각화 시스템.
a communication unit for receiving metering data and equipment data from the AMI operation server;
a first processing unit for displaying a figure in real coordinates of a DCU (Data Concentration Unit) on a map linked to a geographic information system by using the facility data;
a second processing unit for adjusting the size of the figure according to the number of watt-hour meters read by the DCU; and
A third that calculates the power consumption of the customer lead-in line for each DCU, the power factor of the consumer lead-in line, the transformer utilization ratio, and the transformer unbalance factor using the metering data and the facility data, and adjusts the color of the figure using at least one of them including a processing unit;
The facility data includes information on the location of the side pole, information on the capacity of the transformer, and information on the number of watt-hour meters,
The second processing unit displays a circle having the installation location of the DCU as the central axis at the actual coordinate position on the map linked to the geographic information system, and determines the size of the circle based on the watt-hour coefficient read by the DCU. , the larger the number of watt-hour meters read, the larger the size of the figure is set in proportion to it, and the smaller the number of watt-hour meters, the smaller the size of the figure.
The third processing unit sets the saturation and brightness of the circle differently according to the number of watt-hour meters read by the corresponding DCU,
The third processing unit displays the figure by calculating HSV coordinates expressed in (hue (H), saturation (S), and brightness (V)) in the HSV space,
The third processing unit sets the chroma coordinates of the second set color to be larger in the HSV space as the number of watt-hour meters read by the DCU increases,
The third processing unit sets the brightness coordinates of the second set color in the HSV space smaller as the number of watt-hour meters read by the DCU increases,
The third processing unit gradually adjusts and displays the ratio of the chroma and brightness coordinate values among the HSV coordinate values according to the ratio of the number of watt-hour meters read by the DCU,
The third processing unit adjusts the color of the figure by combining a plurality of parameters selected from the power consumption of the consumer lead-in line, the power factor of the consumer lead-in line, the transformer utilization ratio, and the transformer unbalance factor, but the color in the figure according to each parameter value Transformer load monitoring information visualization system that calculates, mixes each calculated color, and displays the color in the figure with the mixed color.
제1항에 있어서,
상기 계량 데이터는 변압기 감시 정보를 포함하는 변압기 부하감시 정보 시각화 시스템.
According to claim 1,
The measurement data is a transformer load monitoring information visualization system including transformer monitoring information.
제1항에 있어서,
상기 제3처리부는 상기 수용가 인입선로의 각 상별 유효전력량의 평균값에 해당하는 특정 색을 선택하여 상기 도형의 색상을 표현하되, 0[kWh]는 제1 설정색으로 표현하고 유저(User)가 지정한 X[kWh]는 제2 설정색으로 표현하며 0[kWh] 내지 X[kWh] 사이의 값은 두 설정색 사이의 그라디에이션(Gradation) 변화값에 해당하는 색으로 표현하는 변압기 부하감시 정보 시각화 시스템
According to claim 1,
The third processing unit expresses the color of the figure by selecting a specific color corresponding to the average value of the active power amount for each phase of the incoming line, 0 [kWh] is expressed as the first set color, and the user designated X[kWh] is expressed as the second set color, and the value between 0[kWh] and X[kWh] is expressed as a color corresponding to the gradation change between the two set colors. Transformer load monitoring information visualization system
제1항에 있어서,
상기 제3처리부는 상기 수용가 인입선로의 각 상별 역률의 평균값에 해당하는 특정 색을 선택하여 상기 도형의 색상을 표현하되, 100[%]는 제1 설정색으로 표현하고 유저가 지정한 Y[%]는 제2 설정색으로 표현하며 100[%] 내지 Y[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 표현하는 변압기 부하감시 정보 시각화 시스템
According to claim 1,
The third processing unit expresses the color of the figure by selecting a specific color corresponding to the average value of the power factor for each phase of the incoming line to the customer, 100 [%] is expressed as the first set color, and Y [%] specified by the user is expressed as the second set color, and the value between 100 [%] and Y [%] is expressed as a color corresponding to the gradient change between the two set colors. Transformer load monitoring information visualization system
제1항에 있어서,
상기 제3처리부는 상기 변압기 각 상별 이용률의 평균값에 해당하는 특정 색을 선택하여 상기 도형의 색상을 표현하되, 0[%]는 제1 설정색으로 표현하고 100[%]는 제2 설정색으로 표현하며 0[%] 내지 100[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 표현하는 변압기 부하감시 정보 시각화 시스템
According to claim 1,
The third processing unit expresses the color of the figure by selecting a specific color corresponding to the average value of the utilization rate for each phase of the transformer, 0 [%] is expressed as the first set color and 100 [%] is the second set color Transformer load monitoring information visualization system that expresses the value between 0[%] and 100[%] with a color corresponding to the gradient change value between the two set colors
제1항에 있어서,
상기 제3처리부는 상기 변압기 불평형률에 해당하는 특정 색을 선택하여 상기 도형의 색상을 표현하되, 0[%]는 제1 설정색으로 표현하고 유저가 지정한 Z[%]는 제2 설정색으로 표현하며 0[%] 내지 Z[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 표현하는 변압기 부하감시 정보 시각화 시스템
According to claim 1,
The third processing unit selects a specific color corresponding to the transformer unbalance ratio to express the color of the figure, 0 [%] is expressed as the first set color, and Z [%] specified by the user is the second set color. Transformer load monitoring information visualization system that expresses the value between 0[%] and Z[%] with a color corresponding to the gradient change value between the two set colors
통신부가 AMI운영서버로부터 계량 데이터 및 설비 데이터를 수신하는 단계;
제1처리부가 상기 설비 데이터를 이용하여 지리 정보 시스템과 연계되어 있는 지도상의 DCU 실좌표에 도형을 표시하는 단계;
제2처리부가 상기 DCU에서 검침하는 전력량계의 개수에 따라 상기 도형의 크기를 조절하는 단계; 및
제3처리부가 상기 계량 데이터 및 설비 데이터를 이용하여 DCU별 수용가 인입선로의 전력 사용량, 수용가 인입선로의 역률, 변압기 이용률 및 변압기 불평형률을 계산하고 이들 중 적어도 하나를 이용하여 상기 도형의 색상을 조절하는 단계를 포함하며,
상기 설비 데이터는 변대주 위치정보, 변압기 용량 정보 및 전력량계 개수 정보를 포함하고,
상기 도형의 크기를 조절하는 단계는, 상기 제2처리부가 상기 DCU의 설치개소를 중심축으로 하는 원을 상기 지리 정보 시스템과 연계되어 있는 지도상의 실좌표 위치에 표시하되, 해당 DCU에서 검침하는 전력량계 수를 기준으로 원의 크기를 결정하여, 검침하는 전력량계의 개수가 많을수록 이에 비례하여 도형의 크기를 크게 설정하고, 전력량계의 개수가 적을수록 도형의 크기를 작게 설정하는 단계를 포함하며,
상기 도형의 색상을 조절하는 단계는, 상기 제3처리부가 해당 DCU에서 검침하는 전력량계의 개수에 따라 상기 원의 채도 및 명도를 상이하게 설정하는 단계를 포함하며,
상기 제3처리부는 HSV공간에서 (색상(H), 채도(S), 명도(V))로 표현되는 HSV 좌표를 산출하여 상기 도형을 표시하며,
상기 제3처리부는 상기 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 채도 좌표를 크게 설정하고,
상기 제3처리부는 상기 DCU에서 검침하는 전력량계의 개수가 많을수록 HSV공간에서 제2 설정색의 명도 좌표를 작게 설정하고,
상기 제3처리부는 상기 DCU에서 검침하는 전력량계의 개수의 비율에 따라 HSV좌표값 중 채도 및 명도 좌표값의 비율을 점진적으로 조절하여 표시하며,
상기 제3처리부는 상기 수용가 인입선로의 전력 사용량, 수용가 인입선로의 역률, 변압기 이용률 및 변압기 불평형률에서 선택된 복수개의 파라미터를 조합하여 도형의 색상을 조절하되, 각각의 파라미터 값에 따른 도형 내 색상을 산출하고, 각각 산출된 색상을 혼합하여 혼합된 색상으로 도형 내 색상을 표시하는 변압기 부하감시 정보 시각화 방법.
Receiving the measurement data and equipment data from the communication unit AMI operation server;
displaying, by a first processing unit, a figure on the real coordinates of a DCU on a map linked to a geographic information system using the facility data;
adjusting the size of the figure according to the number of watt-hour meters read by the DCU by a second processing unit; and
A third processing unit uses the metering data and facility data to calculate the power usage of the incoming line for each DCU, the power factor of the incoming line for the customer, the transformer utilization ratio, and the transformer unbalance factor, and adjust the color of the figure using at least one of them comprising the steps of
The facility data includes information on the location of the side pole, information on the capacity of the transformer, and information on the number of watt-hour meters,
In the step of adjusting the size of the figure, the second processing unit displays a circle having the installation location of the DCU as a central axis at an actual coordinate position on a map linked to the geographic information system, but a watt-hour meter read by the DCU Determining the size of the circle based on the number, setting the size of the figure to be larger in proportion to the larger number of watt-hour meters to be read, and setting the size of the figure to be smaller as the number of watt-hour meters is smaller,
The step of adjusting the color of the figure includes setting the saturation and brightness of the circle differently according to the number of watt-hour meters that the third processing unit reads in the corresponding DCU,
The third processing unit displays the figure by calculating HSV coordinates expressed in (hue (H), saturation (S), and brightness (V)) in the HSV space,
The third processing unit sets the chroma coordinates of the second set color to be larger in the HSV space as the number of watt-hour meters read by the DCU increases,
The third processing unit sets the brightness coordinates of the second set color in the HSV space smaller as the number of watt-hour meters read by the DCU increases,
The third processing unit gradually adjusts and displays the ratio of the chroma and brightness coordinate values among the HSV coordinate values according to the ratio of the number of watt-hour meters read by the DCU,
The third processing unit adjusts the color of the figure by combining a plurality of parameters selected from the power consumption of the consumer lead-in line, the power factor of the consumer lead-in line, the transformer utilization ratio, and the transformer unbalance factor, but the color in the figure according to each parameter value Transformer load monitoring information visualization method that calculates, mixes each calculated color, and displays the color in the figure with the mixed color.
제7항에 있어서, 상기 도형의 색상을 조절하는 단계는,
상기 제3처리부가 상기 수용가 인입선로의 각 상별 유효전력량의 평균값을 특정 색으로 표시하기 위하여 0[kWh]는 제1 설정색으로 하고, 유저가 지정한 X[kWh]는 제2 설정색으로 하되, 0[kWh] 내지 X[kWh] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 상기 전력 사용량을 상기 도형에 표현하는 단계를 포함하는 변압기 부하감시 정보 시각화 방법.
The method of claim 7, wherein adjusting the color of the figure comprises:
In order for the third processing unit to display the average value of the active power amount for each phase of the incoming line to the customer in a specific color, 0 [kWh] is the first set color, and X[kWh] specified by the user is the second set color, A value between 0 [kWh] and X [kWh] is a color corresponding to a gradient change value between two set colors, and the method of visualizing transformer load monitoring information comprising the step of expressing the power consumption in the figure.
제7항에 있어서, 상기 도형의 색상을 조절하는 단계는,
상기 제3처리부가 상기 수용가 인입선로의 각 상별 역률의 평균값을 특정 색으로 표시하기 위하여 100[%]는 제1 설정색으로 하고, 유저가 지정한 Y[%]는 제2 설정색으로 하되, 100[%] 내지 Y[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 상기 역률을 상기 도형에 표현하는 단계를 포함하는 변압기 부하감시 정보 시각화 방법.
The method of claim 7, wherein adjusting the color of the figure comprises:
In order for the third processing unit to display the average value of the power factor for each phase of the incoming line to the customer in a specific color, 100 [%] is the first set color, and Y [%] specified by the user is the second set color, but 100 A value between [%] and Y [%] is a color corresponding to a gradation change value between two set colors, and the method of visualizing transformer load monitoring information comprising the step of expressing the power factor in the figure.
제7항에 있어서, 상기 도형의 색상을 조절하는 단계는,
상기 제3처리부가 상기 변압기 각 상별 이용률의 평균값을 특정 색으로 표시하기 위하여 0[%]는 제1 설정색으로 하고, 100[%]는 제2 설정색으로 하되, 0[%] 내지 100[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 상기 변압기 이용률을 상기 도형에 표현하는 단계를 포함하는 변압기 부하감시 정보 시각화 방법.
The method of claim 7, wherein adjusting the color of the figure comprises:
In order for the third processing unit to display the average value of the utilization rate for each phase of the transformer in a specific color, 0 [%] is the first set color and 100 [%] is the second set color, but 0 [%] to 100 [ %] is a color corresponding to a gradation change value between two set colors, and the transformer load monitoring information visualization method comprising the step of expressing the transformer utilization rate in the figure.
제7항에 있어서, 상기 도형의 색상을 조절하는 단계는,
상기 제3처리부가 상기 변압기 불평형률을 특정 색으로 표시하기 위하여 0[%]는 제1 설정색으로 하고 유저가 지정한 Z[%]는 제2 설정색으로 하되 0[%] 내지 Z[%] 사이의 값은 두 설정색 사이의 그라디에이션 변화값에 해당하는 색으로 상기 변압기 불평형률을 상기 도형에 표현하는 단계를 포함하는 변압기 부하감시 정보 시각화 방법.
The method of claim 7, wherein adjusting the color of the figure comprises:
In order for the third processing unit to display the transformer unbalance factor in a specific color, 0 [%] is the first set color and Z[%] specified by the user is the second set color, but 0 [%] to Z [%] Transformer load monitoring information visualization method comprising the step of expressing the transformer unbalance factor in the figure as a color corresponding to a gradation change value between two set colors.
제7항 내지 제11항 중 어느 한 항의 변압기 부하감시 정보 시각화 방법을 컴퓨터에 실행시키기 위한 프로그램이 기록되어 있는 컴퓨터에서 판독 가능한 기록매체. A computer-readable recording medium in which a program for executing the transformer load monitoring information visualization method of any one of claims 7 to 11 is recorded on a computer.
KR1020200054469A 2020-05-07 2020-05-07 Visualization system and its method for transformer load monitoring information KR102380136B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200054469A KR102380136B1 (en) 2020-05-07 2020-05-07 Visualization system and its method for transformer load monitoring information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200054469A KR102380136B1 (en) 2020-05-07 2020-05-07 Visualization system and its method for transformer load monitoring information

Publications (2)

Publication Number Publication Date
KR20210136351A KR20210136351A (en) 2021-11-17
KR102380136B1 true KR102380136B1 (en) 2022-03-29

Family

ID=78702827

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200054469A KR102380136B1 (en) 2020-05-07 2020-05-07 Visualization system and its method for transformer load monitoring information

Country Status (1)

Country Link
KR (1) KR102380136B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102645196B1 (en) 2022-01-14 2024-03-06 한전케이디엔주식회사 A method and apparatus for AMI facility anomaly detection using AI
CN114781177A (en) * 2022-05-10 2022-07-22 云南电网有限责任公司瑞丽供电局 Business expansion simulation system and method based on platform area load monitoring

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100685704B1 (en) * 2005-01-22 2007-02-23 (주)케이디티 A method for calculating power parameters using fuzzy algorithm technology for information visualization of power-receiving/switching boards
KR101109187B1 (en) * 2010-05-18 2012-02-24 주식회사 효성 Operation method for power system using real-time power information
KR102115827B1 (en) * 2018-08-08 2020-05-27 허길수 Method for platform analyzing energy based on collection of energy big data and suggesting solutions

Also Published As

Publication number Publication date
KR20210136351A (en) 2021-11-17

Similar Documents

Publication Publication Date Title
KR102380136B1 (en) Visualization system and its method for transformer load monitoring information
CA2771010C (en) Electrical distribution network improvement for plug-in electric vehicles
KR101776641B1 (en) Realtime power consumption monitoring system of power consumer for saving electric charge and method thereof
Personal et al. Key performance indicators: A useful tool to assess Smart Grid goals
AU2012201828B2 (en) Method, system and device of phase identification using a smart meter
EP2515085A2 (en) Systems and method for transmitting data in an advanced metering infrastructure
Kabalcı et al. Design and implementation of a smart metering infrastructure for low voltage microgrids
Aalamifar et al. Cost-efficient data aggregation point placement for advanced metering infrastructure
Nama et al. Real-time monitoring system of electrical quantities on ICT Centre building University of Lampung based on Embedded Single Board Computer BCM2835
KR101720431B1 (en) System and method for saving electric charge
CN107682862A (en) A kind of TD LTE230 electric power communication networks Cell Site Placement method
CN102891449A (en) Power grid operating data display and analysis system
CN105023415A (en) Electric energy meter system utilizing mobile terminal communication and multi-communication channel electric energy meter system
Strbac et al. Strategies for reducing losses in distribution networks
CN107333278A (en) A kind of public mobile communication signal covers the Visual Implementation method
Aguirre et al. A low cost smart metering infrastructure with centralized demand response management
US11012868B1 (en) Indoor planning for densifying mobility networks
TWI756914B (en) Equipment plan evaluation device and equipment plan evaluation method
Vizzotto et al. Advanced metering infraestructure case study in federal university of santa maria
CN109857918B (en) Planning system for power distribution network
AU2021100214A4 (en) IoT and Machine Learning based Building Energy Management System (iBEMS)
Rodrigues et al. Case studies in saving electricity in Brazil
CN105530662A (en) Credible wireless communication network selection method based on transformer substation business preference
CN113935599A (en) Visual electric energy quality evaluation method
Vukojevic et al. Distribution transformer loading with deferred loads

Legal Events

Date Code Title Description
AMND Amendment
E601 Decision to refuse application
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant