KR102295251B1 - Mound Leveling Method for Oceanic Construction - Google Patents

Mound Leveling Method for Oceanic Construction Download PDF

Info

Publication number
KR102295251B1
KR102295251B1 KR1020210044222A KR20210044222A KR102295251B1 KR 102295251 B1 KR102295251 B1 KR 102295251B1 KR 1020210044222 A KR1020210044222 A KR 1020210044222A KR 20210044222 A KR20210044222 A KR 20210044222A KR 102295251 B1 KR102295251 B1 KR 102295251B1
Authority
KR
South Korea
Prior art keywords
mound
moving device
blade
body frame
rail
Prior art date
Application number
KR1020210044222A
Other languages
Korean (ko)
Inventor
윤태영
Original Assignee
윤태영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 윤태영 filed Critical 윤태영
Priority to KR1020210044222A priority Critical patent/KR102295251B1/en
Priority to KR1020210111260A priority patent/KR20220138320A/en
Application granted granted Critical
Publication of KR102295251B1 publication Critical patent/KR102295251B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/08Structures of loose stones with or without piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/046Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
    • E02D3/068Vibrating apparatus operating with systems involving reciprocating masses
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • Ocean & Marine Engineering (AREA)
  • Soil Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The present invention relates to a construction method of a mound constructed on the seabed for construction of an oceanic structure such as a breakwater. A mound leveling device capable of automating a leveling operation is used for the construction. The mound leveling device comprises: a body frame (10) extending long in a front-rear direction; an outrigger (60) and a rail member (19) installed on the body frame (10); a moving device (30) installed on the rail member (19); a power generating device (35) for driving the moving device (30); a blade (40) installed in front of the moving device (30); a hydraulic cylinder for driving the expansion and contraction of the outrigger (60); and an elevating driving unit (44) for adjusting the relative height of the blade (40) with respect to the moving device (1). The construction is performed by the steps of: dropping ripraps lower than a reference level in a section to generate a foundation riprap layer; temporarily mounting the mound leveling device (1); adjusting the deployment length of the outrigger (60) to stationarily mount the rail member (19) of the temporarily mounted mound leveling device (1) so as to be horizontal; dropping the ripraps higher than the reference level in front of the mobile device (1); moving the moving device (1) to level the riprap to the reference level; and repeating the operation by moving the mound leveling device (1) to a next working section.

Description

해양구조물 구축을 위한 기초사석층의 시공 및 고르기 방법{Mound Leveling Method for Oceanic Construction}Construction and leveling method of foundation sandstone layer for offshore structure construction {Mound Leveling Method for Oceanic Construction}

본 발명은 방파제와 같은 해양구조물의 시공을 위해 해저면에 구축되는 마운드의 평탄화 작업을 자동화한 기초사석층의 시공방법에 관한 것이다.The present invention relates to a construction method of a foundation rock layer that automates the flattening operation of a mound built on the seabed for construction of an offshore structure such as a breakwater.

케이슨이나 잠제와 같은 해양구조물은 해저면에 구축된 기초사석층 위에 시공된다. 해저면에 구축되는 기초사석층은, 사석을 골라 평탄화한 구조물이다.Offshore structures such as caisson and jamje are constructed on the foundation sandstone layer built on the seabed. The foundation sandstone layer built on the seabed is a structure that is flattened by selecting sandstone.

종래 기초사석층을 구축하는 작업은, 해저면에 사석을 투하하고, 잠수부가 직접 사석을 골라 평탄화하는 방식으로 진행되었다. 기초사석을 고르는 작업이 이루어지는 수심은 20m 내외이다. 이러한 수심에서는 잠수병으로 인해 잠수부가 실제 작업할 수 있는 시간이 짧기 때문에, 마운드를 구축하기 위해서는 많은 수의 잠수부 인력이 요구된다. 또한 잠수부가 인력으로 사석을 고르는 작업을 하기 때문에, 작업 속도 역시 더딜 수밖에 없었다.Conventionally, the work of constructing the foundation rock layer was carried out in a way that the rock was dropped on the seabed, and the diver directly picked the rock and flattened it. The depth of the water for selecting the foundation stone is about 20m. Since the time that divers can actually work is short at these depths due to divers, a large number of divers personnel are required to build a mound. In addition, since the diver selects rocks by hand, the speed of the work was also slow.

육상에서의 토목 공사는 중장비들이 담당할 수 있다. 하지만 해당 중장비들은 해저 환경에서 사용할 수 없다는 문제가 있다.Civil engineering works on land can be handled by heavy equipment. However, there is a problem that these heavy equipment cannot be used in the submarine environment.

본 발명은 상술한 문제점을 해결하기 위해 안출된 것으로, 기초사석층의 평탄화 작업을 인력이 아닌 자동화 장비로 해낼 수 있는 마운드 평탄화 시공 방법을 제공하는 것을 목적으로 한다.The present invention has been devised to solve the above-described problems, and an object of the present invention is to provide a mound flattening construction method that can perform the flattening work of the foundation sandstone layer with automated equipment rather than manpower.

상술한 과제를 해결하기 위해 본 발명은, 전후방향으로 길게 연장되는 바디프레임(10); 상기 바디프레임(10)의 하부 양측에 마련되고, 전후방향으로 연장되는 한 쌍의 레일부재(19); 상기 레일부재(19)를 따라 전후 방향으로 이동 가능하도록 상기 한 쌍의 레일부재(19)에 설치되는 이동장치(30); 상기 이동장치(30)가 상기 레일부재(19)를 따라 전후 방향으로 이동할 수 있는 구동력을 제공하는 동력발생장치(35); 및 상기 이동장치(30)의 전방에 설치되어 상기 이동장치(30)와 함께 전후 방향으로 이동하는 블레이드(40);를 포함하는 마운드 평탄화 장치(1)와, 바지선과, 크레인(8)을 이용한 기초사석층의 시공방법을 제공한다.In order to solve the above problems, the present invention includes a body frame 10 extending long in the front-rear direction; a pair of rail members 19 provided on both lower sides of the body frame 10 and extending in the front-rear direction; a moving device 30 installed on the pair of rail members 19 so as to be movable in the front-rear direction along the rail member 19; a power generating device (35) for providing a driving force for the moving device (30) to move in the front-rear direction along the rail member (19); and a blade 40 that is installed in front of the moving device 30 and moves in the front-rear direction together with the moving device 30; using a mound flattening device 1 including; A method of constructing a foundation sandstone layer is provided.

상기 블레이드(40)는 상기 이동장치(30)와 함께 전방으로 이동하며 상기 블레이드(40)의 전방에 투하된 사석을 밀어 평탄하게 고른다. 즉 상기 마운드 평탄화 장치는, 종래 잠수부가 수작업으로 진행하던 마운드 사석의 평탄화 작업을 자동화한다.The blade 40 moves forward together with the moving device 30 and flattens the sandstone dropped in front of the blade 40 . That is, the mound flattening device automates the flattening work of the mound rock, which the conventional divers manually proceeded with.

상기 바디프레임(10)은: 상기 바디프레임(10)의 상부 양측에 마련되고, 전후방향으로 연장되는 한 쌍의 상부연장부재(11); 상기 바디프레임(10)의 하부 양측에 마련되고, 전후방향으로 연장되는 하부연장부재(12); 전후 방향으로 이격 배치되고 폭방향으로 연장되어, 상기 한 쌍의 상부연장부재(11)를 연결하는 복수 개의 상부크로스부재(14); 전후 방향으로 이격 배치되고, 상하방향으로 연장되어 상기 상부연장부재(11)와 하부연장부재(12)를 연결하는 복수 개의 기둥부재(17); 및 전후 방향으로 이격 배치되고, 폭방향으로 연장되어 상기 한 쌍의 하부연장부재(12)를 연결하는 복수 개의 하부크로스부재(15);를 포함할 수 있다.The body frame 10 includes: a pair of upper extension members 11 provided on both upper sides of the body frame 10 and extending in the front-rear direction; a lower extension member 12 provided on both lower sides of the body frame 10 and extending in the front-rear direction; a plurality of upper cross members 14 spaced apart in the front and rear directions and extending in the width direction to connect the pair of upper extension members 11; A plurality of column members (17) spaced apart in the front-rear direction and extending in the vertical direction to connect the upper extension member (11) and the lower extension member (12); and a plurality of lower cross members 15 spaced apart from each other in the front and rear directions and extending in the width direction to connect the pair of lower extension members 12 to each other.

상기 바디프레임(10)은 긴 빔 형태의 뼈대들로만 구성되어, 해류가 발생하는 해저 환경에서 해류에 의해 바디프레임(10)이 밀리거나 들리는 현상을 최소화할 수 있다.The body frame 10 is composed of only long beam-shaped skeletons, so that it is possible to minimize the phenomenon that the body frame 10 is pushed or lifted by the current in the seabed environment where the current occurs.

상기 레일부재(19)는 상기 하부크로스부재(15) 상에 설치될 수 있다.The rail member 19 may be installed on the lower cross member 15 .

상기 하부크로스부재(15)는: 상기 하부연장부재(12)에 연결되고, 상기 레일부재(19)를 지지하는 한 쌍의 레일지지부재(151); 및 상기 한 쌍의 레일지지부재(151) 사이에 배치되고, 상기 한 쌍의 레일지지부재(151)에 탈착 가능하게 연결되는 연결부재(153);를 포함할 수 있다.The lower cross member 15 includes: a pair of rail support members 151 connected to the lower extension member 12 and supporting the rail member 19; and a connection member 153 disposed between the pair of rail support members 151 and detachably connected to the pair of rail support members 151 .

사석을 평탄화하는 과정에서, 하부크로스부재(15)는 평탄화 작업을 하는 사석에 놓이고 그 일부 구간은 사석에 묻힐 수 있다. 한 쌍의 레일부재(19)는 상당한 하중이 가해지는 이동장치(30)를 지지하고 이동장치(30)의 이동을 안내하므로, 상기 하부크로스부재(15) 상에 설치됨이 바람직하다.In the process of flattening the gravel, the lower cross member 15 is placed on the gravel to be flattened, and a portion thereof may be buried in the gravel. The pair of rail members 19 support the moving device 30 to which a significant load is applied and guide the movement of the moving device 30 , so it is preferable to be installed on the lower cross member 15 .

또한 마운드 평탄화 장치를 이용하여 사석 평탄화 작업을 진행하는 과정에서 사석과 마찰을 일으킬 염려가 있는 하부크로스부재(15)의 중앙부가 마모될 가능성을 감안하여, 상기 하부크로스부재(15)의 연결부재(153)를 교체 가능하도록 구성할 수 있다.In addition, in consideration of the possibility of wear of the central part of the lower cross member 15, which is likely to cause friction with the gravel in the process of flattening the gravel using the mound flattening device, the connecting member of the lower cross member 15 ( 153) can be configured to be replaceable.

상기 연결부재(153)는, 중공의 원형관(154)과, 상기 원형관(154)의 양단에 마련된 플랜지(155)를 포함할 수 있다.The connecting member 153 may include a hollow circular tube 154 and flanges 155 provided at both ends of the circular tube 154 .

원형관(154)은, 사석에 파묻혀 있던 하부크로스부재(15)를 들어올리는 과정에서, 평탄화가 진행된 사석을 다시 흐트러지지 않도록 해주고, 사석과의 마찰력도 최소화해준다.The circular tube 154, in the process of lifting the lower cross member 15 buried in the gravel, prevents the flattened gravel from being disturbed again, and also minimizes the frictional force with the gravel.

상기 복수 개의 기둥부재(17) 중 2 이상의 개소에는 아우트리거(60)가 설치될 수 있다. 전후방향으로 긴 바디프레임(10)을 해저면에 거치함에 있어서, 높낮이의 차이가 있고 굴곡이 있는 해저면에 바디프레임(10)을 거치할 때, 복수 개의 기둥부재(17)가 놓여지는 개소의 해저면의 높이 차이가 있더라도, 아우트리거(60)를 사용하여 하방으로 기둥부재(17)의 길이를 조절하는 것과 같은 기능을 발휘하면, 바디프레임(10)을 안정적으로 거치할 수 있다. 상기 아우트리거(60)의 길이 조절은 유압실린더에 의해 이루어질 수 있다.Outriggers 60 may be installed at two or more locations among the plurality of pillar members 17 . In mounting the long body frame 10 on the sea floor in the front-rear direction, when the body frame 10 is mounted on the sea floor with a difference in height and curve, the position where the plurality of pillar members 17 are placed Even if there is a difference in the height of the seabed, if the function such as adjusting the length of the column member 17 downward using the outrigger 60 is exerted, the body frame 10 can be stably mounted. The length adjustment of the outrigger 60 may be performed by a hydraulic cylinder.

상기 아우트리거(60)는, 상기 기둥부재(17)에 고정되고 상하방향으로 연장되는 아우터커버(61); 상기 아우터커버(61)에 내삽되고, 상하방향으로 연장되며, 상기 아우터커버(61)에 의해 안내되어 상하로 슬라이드 이동하는 이너커버(62); 상단부가 실린더 힌지(631h)를 통해 상기 아우터커버(61)에 연결되는 포스트실린더(631); 상기 포스트실린더(631)에 내삽되되 유압에 의해 상기 포스트실린더(631)로부터 하방으로 출몰하는 포스트피스톤(632); 및 상기 이너커버(62)의 하부로 노출되고, 상기 포스트피스톤(632)의 하단부와 피스톤 힌지(632h)를 통해 연결된 하부받침(64);을 포함한다.The outrigger 60 includes an outer cover 61 fixed to the pillar member 17 and extending in the vertical direction; an inner cover (62) inserted into the outer cover (61), extending in the vertical direction, and guided by the outer cover (61) to slide up and down; a post cylinder (631) whose upper end is connected to the outer cover (61) through a cylinder hinge (631h); a post piston 632 inserted into the post cylinder 631 and protruding downward from the post cylinder 631 by hydraulic pressure; and a lower support 64 exposed under the inner cover 62 and connected to the lower end of the post piston 632 through a piston hinge 632h.

아우터커버(61)와 이너커버(62)는 상하방향의 신축을 안내하고, 유압에 의해 작동하는 포스트실린더(631)와 포스트피스톤(632)을 보호할 수 있다. 또한 실린더 힌지(631h)와 피스톤 힌지(632h)는, 사석으로 이루어져 평탄하지 않은 해저면에 하부받침(64)을 받칠 때, 하부받침(64)이 스스로 안정적인 위치에 자리잡을 수 있도록 유도해줄 수 있다.The outer cover 61 and the inner cover 62 guide the expansion and contraction in the vertical direction, and can protect the post cylinder 631 and the post piston 632 operated by hydraulic pressure. In addition, the cylinder hinge (631h) and the piston hinge (632h) are made of sandstone and when the lower support 64 is supported on an uneven seabed, the lower support 64 can be guided so that it can be positioned in a stable position by itself. .

상기 아우트리거(60)의 작동은 각 아우트리거(60)에 설치된 제어부를 조작하여 이루어질 수 있다.The operation of the outriggers 60 may be performed by manipulating a control unit installed on each outrigger 60 .

상기 제어부는 상기 아우트리거(60) 부근에 설치된 밸브 레버일 수 있다. 상기 밸브 레버는 아우트리거(60)의 포스트실린더(631)에 공급되는 유압유의 흐름을 제어할 수 있다. 상기 밸브 레버는 잠수부에 의해 조작될 수 있다.The control unit may be a valve lever installed near the outrigger 60 . The valve lever may control the flow of hydraulic oil supplied to the post cylinder 631 of the outrigger 60 . The valve lever may be operated by a diver.

상기 이동장치(30)는 유압에 의해 이동할 수 있고, 이를 위해 상기 이동장치(30)에는 유압호스(H)가 연결될 수 있다.The moving device 30 may be moved by hydraulic pressure, and for this purpose, a hydraulic hose H may be connected to the moving device 30 .

이를 위해 상기 바디프레임(10)은, 복수 개의 상기 상부크로스부재(14)의 하부에 연결되고, 전후방향으로 연장된 커튼레일(113); 상기 커튼레일(113)에 삽입되고 상기 커튼레일(113)의 길이방향을 따라 이동하는 복수 개의 롤러(114); 및 상기 롤러(114)에 연결되고, 상기 이동장치(30)에 연결되는 유압호스(H)를 지지하는 호스고정구(115);를 더 포함할 수 있다.To this end, the body frame 10 includes: a curtain rail 113 connected to the lower portion of the plurality of upper cross members 14 and extending in the front-rear direction; a plurality of rollers 114 inserted into the curtain rail 113 and moving along the longitudinal direction of the curtain rail 113; and a hose fixture 115 connected to the roller 114 and supporting the hydraulic hose H connected to the moving device 30 .

한편, 상기 레일부재(19)에는 그 길이방향을 따라 랙(191)이 설치될 수 있다.Meanwhile, a rack 191 may be installed on the rail member 19 along its longitudinal direction.

상기 레일부재(19)는 그 개방부위가 외측방을 향하도록 배치된 C형강일 수 있고, 랙(191)은 상기 C형강의 내부공간에서 천정면에 설치될 수 있다. 이에 따라 사석 고르기 과정에서 사석이 레일부재(19)의 내부공간이나 랙(191) 부분에 굴러 들어갈 수 있는 가능성을 최소화할 수 있다.The rail member 19 may be a C-shaped steel whose open portion faces outward, and the rack 191 may be installed on the ceiling surface in the inner space of the C-shaped steel. Accordingly, it is possible to minimize the possibility that the rubble may roll into the inner space of the rail member 19 or the rack 191 portion in the course of picking up the rubble.

상기 이동장치(30)는: 한 쌍의 상기 레일부재(19)에 다다르도록 폭방향으로 연장되는 크로스빔(31); 상기 크로스빔(31)의 양단부에 회전 가능하게 설치되고, 상기 이동장치(30)가 상기 레일부재(19)를 따라 전후 방향으로 이동 가능하도록 상기 레일부재(19) 상에 구름 가능하게 거치되는 전방휠(341)과 후방휠(342); 및 상기 랙(191)과 맞물리는 피니언(382);을 구비할 수 있다.The moving device 30 includes: a cross beam 31 extending in the width direction to reach the pair of rail members 19; A front that is rotatably installed at both ends of the crossbeam 31 , and is rollably mounted on the rail member 19 so that the moving device 30 can move in the front and rear directions along the rail member 19 . a wheel 341 and a rear wheel 342; and a pinion 382 engaged with the rack 191 .

이동장치(30)는 전후방향으로 이격 배치된 전방휠(341)과 후방휠(342)에 의해 지지되므로, 전후방향으로 안정적인 자체를 유지할 수 있다.Since the moving device 30 is supported by the front wheel 341 and the rear wheel 342 spaced apart in the front-rear direction, it can maintain itself stable in the front-rear direction.

상기 동력발생장치(35)는 상기 피니언(382)을 회전시키기 위한 구동력을 제공하며, 유압에 의해 작동하는 유압모터(35)일 수 있다.The power generator 35 provides a driving force for rotating the pinion 382 , and may be a hydraulic motor 35 operated by hydraulic pressure.

상기 이동장치(30)는: 한 쌍의 상기 레일부재(19)에 다다르도록 폭방향으로 연장되고, 상기 이동장치(30)에 회전 가능하게 설치되는 제1샤프트(36); 상기 유압모터(35)에 의해 회전하도록 상기 유압모터(35)에 축설된 제1구동스프라켓(351); 상기 제1샤프트(36)와 함께 회전하도록 상기 제1샤프트(36)에 축설된 제1종동스프라켓(361); 상기 제1구동스프라켓(351)과 제2구동스프라켓(362)을 연결하는 제1체인(352); 상기 제1샤프트(36)와 함께 회전하도록 상기 제1샤프트(36)의 양단부에 각각 축설된 한 쌍의 제2구동스프라켓(362); 상기 제1샤프트(36)와 평행하게 배치되고, 상기 이동장치(30)의 양단부에 각각 회전 가능하게 설치되는 한 쌍의 제2샤프트(38); 상기 제2샤프트(38)에 축설된 제2종동스프라켓(381); 및 상기 제2구동스프라켓(362)과 상기 제2종동스프라켓(381)을 연결하는 제2체인(363);을 구비하는 구동계를 더 포함할 수 있다.The moving device 30 includes: a first shaft 36 extending in the width direction to reach the pair of rail members 19 and rotatably installed in the moving device 30 ; a first driving sprocket 351 axially installed on the hydraulic motor 35 to rotate by the hydraulic motor 35; a first driven sprocket (361) axially installed on the first shaft (36) to rotate together with the first shaft (36); a first chain (352) connecting the first driving sprocket (351) and the second driving sprocket (362); a pair of second driving sprockets 362 axially installed at both ends of the first shaft 36 to rotate together with the first shaft 36; a pair of second shafts (38) arranged parallel to the first shaft (36) and rotatably installed at both ends of the moving device (30); a second driven sprocket 381 axially installed on the second shaft 38; and a second chain 363 connecting the second driving sprocket 362 and the second driven sprocket 381 to each other.

상기 유압모터(35)가 회전하면, 제1구동스프라켓(351)이 회전하고, 그 회전력은 제1체인(352)을 통해 제1종동스프라켓(361)에 전달된다. 그러면 제1종동스프라켓(361)과 일체로 회전하는 제1샤프트(36)의 양단에 있는 제2구동스프라켓(362)도 일체로 회전하고, 그 회전력은 제2체인(363)을 통해 제2종동스프라켓(381)에 전달된다.When the hydraulic motor 35 rotates, the first driving sprocket 351 rotates, and the rotational force is transmitted to the first driven sprocket 361 through the first chain 352 . Then, the second driving sprocket 362 at both ends of the first shaft 36 that rotates integrally with the first driven sprocket 361 also rotates integrally, and the rotational force of the second driven sprocket 363 is the second driven through the second chain 363 . It is transmitted to the sprocket (381).

상기 피니언(382)은 상기 제2샤프트(38)에 축설되어 상기 제2종동스프라켓(381)과 함께 회전한다. 피니언(382)은 랙(191)의 하부에서 랙(191)과 맞물려 있으므로, 피니언(382)이 회전하면 이동장치(30)가 전방 또는 후방으로 이동하게 된다.The pinion 382 is installed on the second shaft 38 and rotates together with the second driven sprocket 381 . Since the pinion 382 is engaged with the rack 191 at the lower portion of the rack 191 , when the pinion 382 rotates, the moving device 30 moves forward or backward.

사석의 높이를 고르는 과정에서 블레이드(40)의 높이를 조절하면 구동계에 무리를 주지 않으면서 사석을 효율적으로 고를 수 있다. 이에 이동장치(30)에 대해 상기 블레이드(40)의 높이를 조절하는 것이 더욱 유리할 수 있다.If the height of the blade 40 is adjusted in the process of selecting the height of the gravel, it is possible to efficiently select the gravel without straining the drive system. Accordingly, it may be more advantageous to adjust the height of the blade 40 with respect to the moving device 30 .

이를 위해 상기 이동장치(30)는 상하방향으로 연장되는 전방승강가이드부재(311)를 구비하고, 상기 블레이드(40)는 상기 전방승강가이드부재(311)에 의해 안내되며 상하방향으로 이동 가능한 승강부재(41)를 구비하며, 상기 승강부재(41)는 승강구동부(44)에 의해 전방승강가이드부재(311)에 대해 상대적으로 승강 이동하도록 구성할 수 있다.To this end, the moving device 30 includes a front elevation guide member 311 extending in the vertical direction, and the blade 40 is guided by the front elevation guide member 311 and is a vertically movable elevation member. (41), wherein the lifting member 41 can be configured to move up and down relative to the front elevating guide member 311 by the elevating driving unit 44.

상기 승강구동부(44)는, 유압실린더로 구성될 수 있다.The elevating driving unit 44 may be configured as a hydraulic cylinder.

구체적으로 상기 승강구동부(44)는, 상기 전방승강가이드부재(311) 측에 연결된 블레이드실린더(45); 및 상기 블레이드(40) 측에 연결되고, 상기 블레이드실린더(45)에 내삽되되 유압에 의해 상기 블레이드실린더(45)로부터 상방으로 출몰하는 블레이드피스톤(46);을 구비할 수 있다.Specifically, the elevating drive unit 44 includes a blade cylinder 45 connected to the front elevating guide member 311; and a blade piston 46 connected to the side of the blade 40 and inserted into the blade cylinder 45 to protrude upward from the blade cylinder 45 by hydraulic pressure.

상기 마운드 평탄화 장치(1)는 바지선으로 작업 현장까지 이송될 수 있다.The mound flattening device 1 may be transported to the job site by barge.

마운드 조성 작업을 위해, 먼저 유압발생장치(유압펌프)(P)와 크레인(8)과 마운드 평탄화 장치(1)를 실은 제1바지선(71)을 기초사석 고르기 작업 구간에 접근시킨 후, 해저면에 와이어 앵커(A)를 박아 바지선을 정박한다.For the mound creation work, first approach the first barge 71 carrying the hydraulic generator (hydraulic pump) (P), the crane 8 and the mound flattening device 1 to the section of the foundation sand leveling work section, and then Anchor the barge by driving the wire anchor (A) to the

그리고 사석을 실은 제2바지선(72)을 제1바지선(71)에 접안한다. And the second barge (72) loaded with sandstone is docked with the first barge (71).

사석을 평탄화하는 과정에서 유압발생장치(P)를 실은 제1바지선(71)은 작업 현장에 체류해야 한다. 따라서 사석은 제1바지선(71)과 별도의 바지선인 제2바지선(72)으로 이송하여, 제1바지선(71)이 작업현장(S)에 체류중인 동안에도, 사석이 지속적으로 원활하게 공급될 수 있도록 한다. 가령 제2바지선(72)이 사석을 추가 공급하기 위해 되돌아갈 때, 작업에 사용될 사석을 제1바지선(71)에 옮겨 놓은 후 이동할 수 있을 것이다.The first barge 71 loaded with the hydraulic pressure generator P in the process of flattening the sandstone must stay at the work site. Therefore, the rubble is transferred to the second barge 72, which is a separate barge from the first barge 71, so that while the first barge 71 is staying at the work site (S), the rubble can be continuously and smoothly supplied. make it possible For example, when the second barge 72 returns to supply additional rubble, it will be able to move after moving the rubble to be used for work to the first barge 71 .

다음으로, 접안한 제2바지선(72)의 사석을 크레인(8)의 버켓으로 인양하여, 작업현장(S)에서 마운드를 조정하고자 하는 구간에, 목표 레벨(기준 레벨)보다 낮은 높이까지 사석을 투하한다. 상기 사석의 투하 위치는 가령 위성을 이용한 포지셔닝 시스템(가령, GPS)을 이용하여 확인할 수 있다.Next, the gravestone of the berthed second barge 72 is lifted with the bucket of the crane 8, and in the section where the mound is to be adjusted at the work site (S), the gravel is lifted to a height lower than the target level (reference level). drop it The dropping position of the stone may be confirmed using, for example, a positioning system using a satellite (eg, GPS).

목표 레벨보다 낮은 레벨까지 사석을 포설한 후, 마운드 평탄화 장치(1)의 인양고리부재(111)에 크레인(8)의 인양로프를 걸어, 마운드 평탄화 장치(1)를 시공하고자 하는 위치로 인양 하강시킨다.After laying the gravel to a level lower than the target level, the lifting rope of the crane 8 is hung on the lifting ring member 111 of the mound flattening device 1, and the mound flattening device 1 is lifted and lowered to the desired position to be constructed. make it

이때, 마운드 평탄화 장치(1)의 위치는, 가령 GPS로 측량하여 위치 선정하고 가거치할 수 있다.At this time, the location of the mound flattening device 1 may be temporarily placed after selecting a location by surveying, for example, by GPS.

마운드 평탄화 장치(1)를 작업 위치에 가거치한 상태에서, 잠수부가 제1바지선(71)의 유압펌프(P)에 연결된 유압라인(L)을 해저면에 거치된 마운드 평탄화 장치(1)에 연결한다.In a state where the mound flattening device (1) is temporarily mounted in the working position, the diver connects the hydraulic line (L) connected to the hydraulic pump (P) of the first barge (71) to the mound flattening device (1) mounted on the seabed do.

마운드 평탄화 장치(1)에는 유압호스(H)가 배설되어 있다. 상기 유압호스(H)는 커튼레일(113)을 통해 이동장치(1)에 연결된 유압호스(H)와, 바디프레임(10)에 고정되고 복수 개의 아우트리거(60)에 병렬로 연결된 유압호스(H)를 포함한다.A hydraulic hose H is disposed in the mound flattening device 1 . The hydraulic hose (H) includes a hydraulic hose (H) connected to the moving device (1) through a curtain rail (113), a hydraulic hose fixed to the body frame (10) and connected in parallel to a plurality of outriggers (60) ( H).

상기 유압라인(L)은 4가닥, 필요에 따라서는 예비라인 하나를 더 포함하여 5가닥 구비될 수 있다. 상기 유압라인(L) 중 두 라인은 상기 아우트리거(60)에 연결되는 유압호스(H)에 연결되고, 다른 두 라인은 상기 이동장치(1)에 연결되는 유압호스(H)에 연결될 수 있다.The hydraulic line (L) may be provided with 4 strands, and 5 further including one preliminary line if necessary. Two of the hydraulic lines (L) may be connected to a hydraulic hose (H) connected to the outrigger (60), and the other two lines may be connected to a hydraulic hose (H) connected to the moving device (1). .

제1바지선(71)의 유압라인(L)이 마운드 평탄화 장치(1)의 유압호스(H)에 연결된 후, 잠수부는 수압을 이용하여 수심을 확인하는 뉴머게이지(G)를 이용하여 각 아우트리거 포인트에서 바디프레임(10)의 레벨을 조절함으로써 바디프레임(10)을 정위치에 수평레벨로 거치한다. After the hydraulic line (L) of the first barge (71) is connected to the hydraulic hose (H) of the mound flattening device (1), the diver uses a pneumatic gauge (G) to check the water depth using water pressure to each outrigger By adjusting the level of the body frame 10 at the point, the body frame 10 is mounted at a horizontal level in the correct position.

각 아우트리거(60)에는, 밸브 레버가 설치될 수 있다. 상기 밸브 레버는 중립 위치와, 상승 위치와, 하강 위치로 조작될 수 있다. 가령 레버가 중간에 있을 때에는 중립 위치, 중간에서 우측으로 회전 조작되면 상승 위치, 중간에서 좌측으로 회전 조작되면 하강 위치일 수 있다.Each outrigger 60 may be provided with a valve lever. The valve lever can be operated into a neutral position, a raised position, and a lowered position. For example, when the lever is in the middle, it may be in a neutral position, if it is rotated from the middle to the right, it may be in an up position, and if it is rotated from the middle to the left, it may be in a lowered position.

잠수부는, 아우트리거(60) 위치에 뉴머게이지(G)를 두어 해당 위치의 바디프레임(10) 레벨을 확인하고, 밸브 레버를 조작하여 해당 위치에서 아우트리거(60)의 하향 돌출 길이를 조절한다.The diver places the pneumatic gauge (G) at the position of the outrigger 60 to check the level of the body frame 10 at the position, and adjusts the downward protrusion length of the outrigger 60 at the position by manipulating the valve lever .

잠수부가 각 아우트리거(60) 위치에서 이러한 레벨링 작업을 완료하면, 마운드 평탄화 장치(1)는 수평으로 거치된다.When the diver completes this leveling operation at each outrigger 60 position, the mound leveling device 1 is mounted horizontally.

마운드 평탄화 장치(1)가 정위치에 거치 완료되면, 유압모터(35)를 작동시켜 이동장치(1)를 가장 후방으로 이동시킨다. 그리고, 뉴머게이지와 승강구동부(44)를 사용하여 이동장치(1)에 설치된 블레이드(40)를 목표 레벨에 대응하도록 레벨링한다.When the mounting of the mound flattening device 1 is completed in place, the hydraulic motor 35 is operated to move the moving device 1 to the rearmost position. Then, the blade 40 installed in the moving device 1 is leveled so as to correspond to the target level by using the pneumatic gauge and the lift driving unit 44 .

다음으로, 제2바지선(72) 등에 실려 있는 사석을 크레인(8)과 버켓으로 인양하여 바디프레임(10)의 내부 공간으로 투하한다. 이때, 버켓은 바디프레임(10)의 두 상부연장부재(11) 사이, 그리고 이웃하는 두 상부크로스부재(14) 사이에 마련된 공간을 통해 사석을 바디프레임(10) 내부 공간으로 투하하게 된다. 상기 사석은, 목표 레벨보다 약간 높은 위치까지 투하된다.Next, the rubble stones mounted on the second barge 72 and the like are lifted with the crane 8 and the bucket and dropped into the inner space of the body frame 10 . At this time, the bucket is dropped into the inner space of the body frame 10 through the space provided between the two upper extension members 11 of the body frame 10 and between the two adjacent upper cross members 14 . The rocks are dropped to a position slightly higher than the target level.

사석이 투하된 후, 유압펌프(P)와 유압모터(35)를 작동시켜 이동장치(1)를 전방으로 이동시키며 블레이드(40)로 사석을 전방으로 밀어, 목표 레벨보다 높게 튀어나와 있는 사석을 전방으로 밀어낸다. 이때. 사석은 전방으로 밀리면서 약간 측방으로 밀려날 수 있다. After the gravel is dropped, the hydraulic pump (P) and the hydraulic motor 35 are operated to move the moving device (1) forward, and the blade (40) pushes the gravel forward to remove the gravel that protrudes higher than the target level. push forward. At this time. The stone may be pushed slightly laterally while being pushed forward.

사석을 전방으로 밀어낼 때, 목표 레벨보다 사석이 너무 높이 쌓인 구간에서는 블레이드의 높이를 올려 수회에 나누어 사석을 전방으로 밀어 내어 사석의 높이를 목표 레벨로 맞출 수 있다.When pushing the rocks forward, in the section where the rocks are piled up too high than the target level, the height of the blade can be raised and divided into several times to push the rocks forward to set the height of the rocks to the target level.

이렇게 마운드 평탄화 장치(1)가 거치된 위치에서 이동장치(1)가 이동하는 면적 구간에 대해 사석의 평탄화 작업이 완료되면, 마운드 평탄화 장치(1)를 다음 작업 위치로 이동시키는 작업을 수행한다.In this way, when the leveling operation of the gravel for the area in which the moving device 1 moves from the position where the mound flattening device 1 is mounted is completed, the operation of moving the mound flattening device 1 to the next working position is performed.

이때 필요에 따라, 잠수부가 유압라인(L)을 마운드 평탄화 장치(1)로부터 분리할 수 있다.At this time, if necessary, the diver may separate the hydraulic line (L) from the mound flattening device (1).

또한 필요에 따라, 제1바지선과 제2바지선을 이동시켜 다음 작업 위치에 대응하도록 다시 자리잡을 수 있다.In addition, if necessary, by moving the first barge and the second barge can be re-positioned to correspond to the next working position.

잠수부가 크레인(8)의 인양로프를 마운드 평탄화 장치(1)의 인양고리부재(111)에 걸면, 크레인(8)을 이용하여 마운드 평탄화 장치(1)를 목표 레벨보다 위로 들어올린 후, 인접한 시공 위치로 이동 후 다시 거치한다.When the diver hangs the lifting rope of the crane 8 on the lifting ring member 111 of the mound flattening device 1, the mound flattening device 1 is lifted above the target level using the crane 8, and then the adjacent construction Move to position and mount again.

이때, 하부크로스부재(15)의 연결부재(153)는 원형관(154) 형태이므로, 레벨링된 사석에 파묻혀 있던 하부크로스부재(15)가 사석을 가르며 상승하더라도, 레벨링된 사석에 거의 영향을 미치지 않는다.At this time, since the connection member 153 of the lower cross member 15 is in the form of a circular tube 154, even if the lower cross member 15 buried in the leveled gravel rises through the leveled gravel, it hardly affects the leveled gravel. does not

또한 측방으로 인접한 시공 위치에 마운드 평탄화 장치(1)를 이동시킬 때, 종전 시공 위치와 소정의 간격(0.8~1미터) 정도 이격된 위치에 마운드 평탄화 장치(1)를 거치한다.In addition, when moving the mound flattening device 1 to a laterally adjacent construction location, the mound flattening device 1 is mounted at a location spaced apart by a predetermined distance (0.8 to 1 meter) from the previous construction location.

그리고, 만약 잠수부가 마운드 평탄화 장치(1)를 이동시키기 위해 유압라인(L)을 분리하였었다면, 잠수부가 유압라인(L)을 다시 마운드 평탄화 장치(1)에 연결하도록 한다.And, if the diver has separated the hydraulic line (L) to move the mound flattening device (1), the diver is to connect the hydraulic line (L) to the mound flattening device (1) again.

그리고 상기 마운드 평탄화 장치(1)의 정위치 거치 작업부터 사석 레벨링 작업을 반복한다.Then, the leveling operation is repeated from the in-place installation operation of the mound flattening device (1).

이렇게 작업이 마무리된 두 구간 사이의 이격 공간은, 두 작업 구간에서 옆으로 밀려나온 사석이 어느 정도 채워 목표 레벨에 거의 근사하게 되지만, 약간의 오차가 있을 수 있으며, 이러한 레벨 오차는 잠수부가 수작업으로 조절할 수 있다.The space between the two sections where the work has been completed is filled to some extent with the rocks protruding from the two sections to a certain extent and approximates the target level, but there may be some errors. can be adjusted

본 발명의 마운드 평탄화 장치에 따르면, 해저 환경에서 이루어지는 마운드 평탄화 작업을 기계장치로 진행할 수 있어, 작업 속도가 빠르고 시공비를 절약할 수 있다.According to the mound flattening apparatus of the present invention, the mound flattening operation performed in the seabed environment can be performed with a mechanical device, so that the operation speed is fast and the construction cost can be saved.

본 발명의 마운드 평탄화 장치를 이용한 마운드 조성 시공방법에 따르면, 종래 잠수부에 의해 수작업으로 이루어지던 마운드 조성 작업에 비해 작업 속도가 훨씬 효율적이고, 시공 비용도 크게 절감된다.According to the mound composition construction method using the mound flattening device of the present invention, the work speed is much more efficient than the mound composition work done manually by a conventional diver, and the construction cost is greatly reduced.

상술한 효과와 더불어 본 발명의 구체적인 효과는 이하 발명을 실시하기 위한 구체적인 사항을 설명하면서 함께 기술한다.In addition to the above-described effects, the specific effects of the present invention will be described together while describing specific details for carrying out the invention below.

도 1은 실시예의 마운드 평탄화 장치를 간략히 나타낸 사시도이다.
도 2는 도 1의 마운드 평탄화 장치의 평면도이다.
도 3은 도 1의 마운드 평탄화 장치의 측면도이다.
도 4는 도 1의 마운드 평탄화 장치의 정면도이다.
도 5는 실시예의 마운드 평탄화 장치의 이동장치를 간략히 나타낸 측면도이다.
도 6은 레일부재와 유압호스를 표현한 도 1의 마운드 평탄화 장치의 정면도이다.
도 7은 이동장치의 이동과정을 나타낸 마운드 평탄화 장치의 측면도이다.
도 8은 실시예의 마운드 평탄화 장치의 아우트리거의 평면도와 측면도이다.
도 9는 이동장치와 블레이드의 평면도이다.
도 10은 블레이드의 승강을 나타낸 도 9의 이동장치와 블레이드의 측면도이다.
도 11은 실시예의 마운드 평탄화 장치를 이용한 마운드 조성 공법의 플로우차트이다.
도 12는 바지선이 작업 영역에 기준레벨보다 낮은 높이까지 사석을 투하하는 작업을 나타낸 평면도이다.
도 13은 작업영역에 마운드 평탄화 장치를 가거치하는 과정을 나타낸 평면도이다.
도 14와 도 15는 가거치된 마운드 평탄화 장치에 유압발생장치의 유압라인을 연결한 상태를 나타낸 평면도와 측면도이다.
도 16과 도 17은 가거치된 마운드 평탄화 장치의 수평을 레벨링하여 마운드 평탄화 장치를 정거치하는 작업을 나타낸 평면도와 측면도이다.
도 18은 마운드 평탄화 장치가 사석 평탄화 작업을 하고자 하는 영역에 사석을 투하하는 작업을 나타낸 평면도이다.
도 19는 마운드 평탄화 장치의 작업 영역에 기준레벨보다 높게 사석이 투하된 상태를 나타낸 평면도와 측면도이다.
도 20은 마운드 평탄화 장치로 사석을 기준레벨의 수준으로 평탄화하는 과정을 나타낸 평면도와 측면도이다.
도 21은 평탄화 작업을 마친 마운드 평탄화 장치를 이웃하는 다음 작업 영역으로 이동시킨 상태를 나타낸 평면도이다.
도 22는 마운드 상에 마운드 평탄화 장치가 거치되는 위치를 모두 한꺼번에 나타낸 평면도이다.
1 is a perspective view schematically illustrating a mound planarization apparatus according to an embodiment.
FIG. 2 is a plan view of the mound planarization apparatus of FIG. 1 .
3 is a side view of the mound planarization apparatus of FIG. 1 ;
4 is a front view of the mound planarization apparatus of FIG. 1 .
5 is a side view schematically showing the moving device of the mound flattening device of the embodiment.
Figure 6 is a front view of the mound flattening device of Figure 1 expressing the rail member and the hydraulic hose.
7 is a side view of the mound flattening device showing the moving process of the moving device.
8 is a plan view and a side view of an outrigger of the mound flattening device of the embodiment.
9 is a plan view of the moving device and the blade.
Figure 10 is a side view of the moving device and the blade of Figure 9 showing the elevation of the blade.
11 is a flowchart of a mound composition method using the mound planarization apparatus of the embodiment.
12 is a plan view showing the operation of the barge dropping rocks to a height lower than the reference level in the work area.
13 is a plan view showing a process of temporarily mounting a mound flattening device in a work area.
14 and 15 are a plan view and a side view showing a state in which the hydraulic line of the hydraulic pressure generating device is connected to the temporarily mounted mound flattening device.
16 and 17 are a plan view and a side view illustrating an operation of leveling the temporarily mounted mound planarizing device to stop the mound planarizing device.
18 is a plan view showing the operation of the mound flattening device to drop the gravel on the area to be flattened gravel.
19 is a plan view and a side view showing a state in which the gravel is dropped higher than the reference level on the working area of the mound flattening device.
20 is a plan view and a side view showing the process of leveling the rock to the level of the reference level with the mound flattening device.
21 is a plan view illustrating a state in which the mound flattening device having completed the planarization operation is moved to the next neighboring work area.
22 is a plan view illustrating all positions at which the mound flattening device is mounted on the mound.

이하, 본 발명의 바람직한 실시예를 첨부한 도면을 참조로 하여 상세히 설명한다. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 이하에서 개시되는 실시 예에 한정되는 것이 아니라 다양한 변경을 가할 수 있고 서로 다른 다양한 형태로 구현될 수 있다. 단지 본 실시 예는 본 발명의 개시가 완전하도록 하며 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위하여 제공되는 것이다. 따라서 본 발명은 이하에서 개시되는 실시예에 한정되는 것이 아니라, 어느 하나의 실시예의 구성과 다른 실시예의 구성을 서로 치환하거나 부가하는 것은 물론 본 발명의 기술적 사상과 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. The present invention is not limited to the embodiments disclosed below, and various changes may be made and may be implemented in various different forms. Only the present embodiment is provided to complete the disclosure of the present invention and to fully inform those of ordinary skill in the scope of the invention. Therefore, the present invention is not limited to the embodiments disclosed below, and all changes and equivalents included in the technical spirit and scope of the present invention as well as substituting or adding the configuration of any one embodiment and the configuration of other embodiments to each other or substitutes.

첨부된 도면은 본 명세서에 개시된 실시 예를 쉽게 이해할 수 있도록 하기 위한 것일 뿐, 첨부된 도면에 의해 본 명세서에 개시된 기술적 사상이 제한되지 않으며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 도면에서 구성요소들은 이해의 편의 등을 고려하여 크기나 두께가 과장되게 크거나 작게 표현될 수 있으나, 이로 인해 본 발명의 보호범위가 제한적으로 해석되어서는 아니 될 것이다.The accompanying drawings are only for easy understanding of the embodiments disclosed in the present specification, and the technical spirit disclosed in the present specification is not limited by the accompanying drawings, and all changes and equivalents included in the spirit and scope of the present invention It should be understood to include water or substitutes. In the drawings, in consideration of the convenience of understanding, the size or thickness may be exaggeratedly large or small, but the protection scope of the present invention should not be construed as being limited thereto.

본 명세서에서 사용한 용어는 단지 특정한 구현예나 실시예를 설명하기 위해 사용되는 것으로, 본 발명을 한정하려는 의도가 아니다. 그리고 단수의 표현은, 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 명세서에서 ~포함하다, ~이루어진다 등의 용어는 명세서 상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이다. 즉 명세서에서 ~포함하다, ~이루어진다 등의 용어는. 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들이 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terms used herein are used only to describe specific embodiments or examples, and are not intended to limit the present invention. And singular expressions include plural expressions unless the context clearly dictates otherwise. In the specification, terms such as includes, consists of, etc. are intended to designate that the features, numbers, steps, operations, components, parts, or combinations thereof described in the specification exist. That is, in the specification, terms such as include and consist of. It should be understood that this does not preclude the possibility of addition or existence of one or more other features or numbers, steps, operations, components, parts, or combinations thereof.

제1, 제2 등과 같이 서수를 포함하는 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되지는 않는다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다.Terms including an ordinal number, such as first, second, etc., may be used to describe various elements, but the elements are not limited by the terms. The above terms are used only for the purpose of distinguishing one component from another.

어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다거나 "직접 접속되어" 있다고 언급된 때에는, 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다.When a component is referred to as being “connected” or “connected” to another component, it is understood that the other component may be directly connected or connected to the other component, but other components may exist in between. it should be On the other hand, when it is said that a certain element is "directly connected" or "directly connected" to another element, it should be understood that no other element is present in the middle.

어떤 구성요소가 다른 구성요소의 "상부에 있다"거나 "하부에 있다"고 언급된 때에는, 그 다른 구성요소의 바로 위에 배치되어 있는 것뿐만 아니라 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다.When an element is referred to as being "on" or "below" another element, it should be understood that other elements may be present in the middle as well as disposed directly on the other element. .

다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥 상 가지는 의미와 일치하는 의미를 가지는 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.Unless defined otherwise, all terms used herein, including technical and scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. Terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with the meaning in the context of the related art, and should not be interpreted in an ideal or excessively formal meaning unless explicitly defined in the present application. does not

실시예를 설명함에 있어서 전방이라 함은, 사석을 고르게 하기 위해 블레이드가 이동하여 나아가는 방향을 의미한다.In describing the embodiment, the front refers to the direction in which the blade moves and advances in order to level the sandstone.

[마운드 평탄화 장치][Mound leveling device]

이하 도 1 내지 도 10을 참조하여 실시예의 마운드 평탄화 장치의 구조에 대해 설명한다.Hereinafter, the structure of the mound planarization apparatus of the embodiment will be described with reference to FIGS. 1 to 10 .

실시예의 마운드 평탄화 장치는, 마운드 상에 거치되는 바디프레임(10)과, 상기 바디프레임(10)의 길이방향을 따라 이동하며 마운드 상에 투하된 사석들을 밀어내며 레벨링을 진행하는 블레이드(40)와, 상기 블레이드(40)의 이동력을 제공하는 동력발생장치(35)를 포함한다.The mound flattening device of the embodiment includes a body frame 10 mounted on a mound, and a blade 40 that moves along the longitudinal direction of the body frame 10 and pushes out rocks dropped on the mound to progress leveling and , and a power generating device 35 that provides a moving force of the blade 40 .

바디프레임(10)은 전후방향으로 소정의 길이(L)만큼 길게 연장되고 소정의 폭(W)을 가지는 직육면체의 뼈대 형태일 수 있다. 바디프레임(10)은, 좌측뼈대와 우측뼈대를 포함하고, 좌측뼈대와 우측뼈대의 상부를 연결하는 상부 연결부재와 하부를 연결하는 하부 연결부재를 포함한다.The body frame 10 may be in the form of a rectangular parallelepiped skeleton extending as long as a predetermined length L in the front-rear direction and having a predetermined width W. The body frame 10 includes a left skeleton and a right skeleton, and an upper connecting member connecting the upper portions of the left and right skeletons, and a lower connecting member connecting the lower portions.

좌측뼈대와 우측뼈대는 대칭 형상일 수 있다. 좌측뼈대와 우측뼈대는 각각, 상부에 마련되고 전후방향으로 연장되는 상부연장부재(11), 하부에 마련되고 전후방향으로 연장되는 하부연장부재(12), 및 상기 상부연장부재(11)와 하부연장부재(12)를 연결하도록 상하방향으로 연장되는 복수 개의 기둥부재(17)를 포함한다.The left skeleton and the right skeleton may have a symmetrical shape. The left skeleton and the right skeleton, respectively, are an upper extension member 11 provided on the upper portion and extending in the front-rear direction, a lower extension member 12 provided on the lower portion and extending in the front-rear direction, and the upper extension member 11 and the lower portion, respectively. It includes a plurality of column members 17 extending in the vertical direction to connect the extension member (12).

상부연장부재(11)와 하부연장부재(12)는 평행하게 배치될 수 있고, 복수 개의 기둥부재(17)는 전후방향으로 이격 배치될 수 있다. 복수 개의 기둥부재(17)는 서로 평행하게 배치될 수 있다. 바디프레임(10)은 기둥부재(17)와 상부연장부재(11)의 교차부위 및 기둥부재(17)와 하부연장부재(12)의 교차부위를 잇는 트러스부재(171)를 더 포함할 수 있다.The upper extension member 11 and the lower extension member 12 may be arranged in parallel, and the plurality of pillar members 17 may be spaced apart from each other in the front-rear direction. The plurality of pillar members 17 may be disposed parallel to each other. The body frame 10 may further include a truss member 171 connecting the intersection of the column member 17 and the upper extension member 11 and the intersection of the column member 17 and the lower extension member 12 . .

상기 좌측뼈대와 우측뼈대를 잇는 상부 연결부재는, 전후 방향으로 이격 배치되고 폭방향으로 연장되어, 상기 한 쌍의 상부연장부재(11)를 연결하는 복수 개의 상부크로스부재(14)일 수 있다.The upper connecting member connecting the left skeleton and the right skeleton may be a plurality of upper cross members 14 that are spaced apart from each other in the front-rear direction and extend in the width direction to connect the pair of upper extension members 11 .

상기 좌측뼈대와 우측뼈대를 잇는 하부 연결부재는, 전후 방향으로 이격 배치되고, 폭방향으로 연장되어 상기 한 쌍의 하부연장부재(12)를 연결하는 복수 개의 하부크로스부재(15)일 수 있다.The lower connecting member connecting the left and right skeletons may be a plurality of lower cross members 15 that are spaced apart from each other in the front-rear direction and extend in the width direction to connect the pair of lower extension members 12 .

상부크로스부재(14)와 하부크로스부재(15)는, 기둥부재(17)와도 연결될 수 있다.The upper cross member 14 and the lower cross member 15 may also be connected to the column member 17 .

상부크로스부재(14)와 기둥부재(17) 사이에는 이들을 대각선으로 연결하는 버팀대(141)가 연결될 수 있다.Between the upper cross member 14 and the pillar member 17, a brace 141 for diagonally connecting them may be connected.

상기 바디프레임(10)은 변형을 방지할 수 있을 정도의 범위에서, 긴 빔 형태의 뼈대들로만 구성되어, 해류가 발생하는 해저 환경에서 해류에 의해 바디프레임(10)이 밀리거나 들리는 현상을 최소화할 수 있다.The body frame 10 is composed of only long beam-shaped skeletons in a range that can prevent deformation, so as to minimize the phenomenon that the body frame 10 is pushed or lifted by ocean currents in a seabed environment where ocean currents occur. can

상기 상부연장부재(11), 하부연장부재(12), 상부크로스부재(14), 하부크로스부재(15) 및 기둥부재(17) 등은 H형강으로 제작될 수 있으나, 반드시 이에 한정되는 것은 아니다.The upper extension member 11 , the lower extension member 12 , the upper cross member 14 , the lower cross member 15 , and the column member 17 may be made of H-shaped steel, but are not necessarily limited thereto. .

상기 상부연장부재(11)에는 바디프레임(10)을 크레인으로 인양할 수 있도록 하는 인용고리부재(111)가 설치된다.The upper extension member 11 is provided with a ring member 111 for lifting the body frame 10 with a crane.

레일부재(19)는 전후 방향으로 연장되고, 좌측과 우측에 하나씩 한 쌍 제공된다. 전후로 길게 연장된 레일부재(19)는, 복수 개의 하부크로스부재(15) 상에 설치될 수 있다.The rail members 19 extend in the front-rear direction, and are provided in pairs, one on the left and one on the right. The rail member 19 extending back and forth long may be installed on the plurality of lower cross members 15 .

레일부재(19)는 C형강으로 제작될 수 있다. C형강의 하부에 마련된 수평한 부위는 하부크로스부재(15) 상에 고정될 수 있다. C형강의 상부에 마련된 수평한 부위의 저면에는 랙(191)이 설치될 수 있다. 랙(191)의 이빨은 하방을 향할 수 있다.The rail member 19 may be made of C-shaped steel. A horizontal portion provided at the lower portion of the C-beam may be fixed on the lower cross member 15 . A rack 191 may be installed on the bottom of the horizontal portion provided on the top of the C-beam. The teeth of the rack 191 may face downward.

C형강의 수직한 부위는 폭방향의 내측에 배치될 수 있다. 즉 C형강의 개방된 부위는 외측 방향을 향하도록 배치될 수 있다. 이로써 C형강 내부에 사석이 굴러들어가는 현상을 방지할 수 있다.The vertical portion of the C-beam may be disposed on the inside in the width direction. That is, the open portion of the C-beam may be disposed to face outward. In this way, it is possible to prevent the occurrence of burrs rolling into the inside of the C-beam.

레일부재(19) 상에는 이동장치(30)가 놓이고, 상기 레일부재(19)는 상기 이동장치(30)의 전후방향 이동을 안내한다.A moving device 30 is placed on the rail member 19 , and the rail member 19 guides the forward and backward movement of the moving device 30 .

한 쌍의 레일부재(19)는 상당한 하중이 가해지는 이동장치(30)를 지지하고 이동장치(30)의 이동을 안내하므로, 상기 하부크로스부재(15) 상에 설치됨이 바람직하다.The pair of rail members 19 support the moving device 30 to which a significant load is applied and guide the movement of the moving device 30 , so it is preferable to be installed on the lower cross member 15 .

하나의 상기 하부크로스부재(15)는 연결부재(153) 및 상기 연결부재(153)의 양단부에 각각 연결되는 레일지지부재(151)를 포함한다. 상기 레일부재(19)는 상기 레일지지부재(151) 상에 설치되고, 레일지지부재(151)는 강도 확보를 위해 H형강으로 제작될 수 있다. 이에 반해 연결부재(153)는 그 길이방향으로의 인장력과 압축력이 주로 작용하는 반면, 사석과 마찰이 일어나는 부재로서, 중공의 원형 관 형태일 수 있다. 연결부재(153)가 원형 관 형태로 이루어지면, 사석과의 마찰을 줄일 수 있다. 상기 연결부재(153)는 작업 진행 과정에서 사석에 파묻히고 그로부터 들어올려지는 환경에 놓이므로, 마모가 진행되었을 때 교체할 필요성이 있다. 이에 따라 상기 연결부재(153)를 구성하는 원형 관의 양단에는, 상기 레일지지부재(151)와 볼트/너트 등의 수단으로 분리 가능하게 체결될 수 있도록, 플랜지(155)가 마련될 수 있다.One of the lower cross members 15 includes a connecting member 153 and a rail support member 151 connected to both ends of the connecting member 153 , respectively. The rail member 19 is installed on the rail support member 151, and the rail support member 151 may be made of H-shaped steel to secure strength. On the other hand, the connecting member 153 is a member in which the tensile force and the compressive force in the longitudinal direction mainly act, while friction occurs with the sandstone, and may be in the form of a hollow circular tube. When the connecting member 153 is formed in a circular tube shape, it is possible to reduce friction with the sandstone. Since the connecting member 153 is placed in an environment where it is buried in a rock and lifted from it in the course of the work, it is necessary to replace it when the wear progresses. Accordingly, flanges 155 may be provided at both ends of the circular tube constituting the connection member 153 to be detachably fastened to the rail support member 151 by means such as bolts/nuts.

상기 상부크로스부재(14)의 저면에는 전후방향으로 연장된 커튼레일(113)이 설치된다. 커튼레일(113)은 복수 개의 상기 상부크로스부재(14)의 하부에 연결된다.A curtain rail 113 extending in the front-rear direction is installed on the bottom surface of the upper cross member 14 . The curtain rail 113 is connected to the lower portion of the plurality of upper cross members 14 .

그리고 상기 커튼레일(113)에는 복수 개의 롤러(114)가 삽입된다. 상기 롤러(114)는 상기 커튼레일(113)의 길이방향을 따라 구름 이동할 수 있다. 그리고 상기 각각의 롤러(114)에는 상기 이동장치(30)에 연결되는 유압호스(H)를 지지하는 호스고정구(115)가 연결된다. A plurality of rollers 114 are inserted into the curtain rail 113 . The roller 114 may roll in a longitudinal direction of the curtain rail 113 . And a hose fixture 115 for supporting the hydraulic hose H connected to the moving device 30 is connected to each of the rollers 114 .

이동장치(30)는 상기 레일부재(19)를 따라 전후 방향으로 이동 가능하도록 상기 한 쌍의 레일부재(19)에 설치된다.The moving device 30 is installed on the pair of rail members 19 so as to be movable in the front-rear direction along the rail member 19 .

상기 이동장치(30)는 폭방향으로 연장되는 크로스빔(31)을 구비한다. 상기 크로스빔(31)은 H형강일 수 있다. 상기 크로스빔(31)은 전후로 이격되어 2개 구비될 수 있다. 상기 크로스빔(31)은 상기 레일부재(19) 상부까지 연장될 수 있다. 2개의 크로스빔(31)의 양단부의 하부에는 휠이 마련될 수 있다. 전방에 배치된 크로스빔(31)에는 전방휠(341)이, 후방에 배치된 크로스빔(31)에는 후방휠(342)이 각각 회전 가능하게 설치될 수 있다.The moving device 30 includes a cross beam 31 extending in the width direction. The cross beam 31 may be an H-shaped steel. Two crossbeams 31 may be provided with a front and rear spaced apart from each other. The cross beam 31 may extend to an upper portion of the rail member 19 . Wheels may be provided at lower portions of both ends of the two crossbeams 31 . A front wheel 341 may be rotatably installed on the crossbeam 31 disposed in the front, and a rear wheel 342 may be rotatably installed on the crossbeam 31 disposed at the rear.

상기 전방휠(341)과 후방휠(342)은 전후 방향으로 구를 수 있도록 상기 레일부재(19) 상에 놓여질 수 있다. 구체적으로, 상기 전방휠(341)과 후방휠(342)은 그 폭방향의 중앙부가 양단부보다 직경이 작아 오목한 홈을 구성할 수 있고, 상기 레일부재(19)의 상부에 마련된 부재가 상기 홈에 수용될 수 있다. 이에 따라 상기 전방휠(341)과 후방휠(342)은, 레일부재(19) 상에서 전후 방향으로의 구름은 자유롭게 이루어지지만, 레일부재(19)로부터 측방으로 이탈하는 것은 구조적으로 방지된다.The front wheel 341 and the rear wheel 342 may be placed on the rail member 19 so as to be rolled in the front-rear direction. Specifically, the front wheel 341 and the rear wheel 342 may constitute a concave groove with a central portion having a diameter smaller than that of both ends in the width direction, and the member provided on the rail member 19 is located in the groove. can be accepted. Accordingly, the front wheel 341 and the rear wheel 342 can freely roll in the front-rear direction on the rail member 19 , but are structurally prevented from leaving the rail member 19 laterally.

상기 전방휠(341)과 후방휠(342)은, 두 크로스빔(31)의 단부를 전후방향으로 연결하는 휠하우징(34)에 축설된다. 상기 휠하우징(34)은, 전후방향으로 연장되고 하방으로 개방된 "∩"자 형강일 수 있다. 상기 휠하우징(34)의 전방과 후방은 각각 전방과 후방에 배치된 두 크로스빔(31)에 연결될 수 있다.The front wheel 341 and the rear wheel 342 are axially installed on a wheel housing 34 connecting the ends of the two cross beams 31 in the front-rear direction. The wheel housing 34 may be a “∩”-shaped steel extending in the front-rear direction and opened downward. The front and rear sides of the wheel housing 34 may be connected to two crossbeams 31 disposed at the front and rear, respectively.

상기 이동장치(30)는 그 양단부에서 전후 방향으로 이격 배치된 전방휠(341)과 후방휠(342)에 의해 4점 지지되므로, 안정적인 자세를 유지할 수 있다.Since the moving device 30 is supported at four points by the front wheel 341 and the rear wheel 342 spaced apart from each other in the front-rear direction at both ends, it is possible to maintain a stable posture.

상기 한 쌍의 크로스빔(31) 상에는 동력발생장치로서 유압모터(35)가 설치될 수 있다. 상기 유압모터(35)는 상기 크로스빔(31)의 폭의 중간 부분에 배치되도록 설치될 수 있다.A hydraulic motor 35 as a power generating device may be installed on the pair of cross beams 31 . The hydraulic motor 35 may be installed to be disposed in the middle of the width of the cross beam 31 .

상기 유압모터(35)의 회전축에는 제1구동스프라켓(351)이 축설된다. 즉 상기 유압모터(35)가 회전력을 발생시키면, 상기 제1구동스프라켓(351)이 회전축과 함께 회전한다.A first driving sprocket 351 is installed on the rotating shaft of the hydraulic motor 35 . That is, when the hydraulic motor 35 generates rotational force, the first driving sprocket 351 rotates together with the rotation shaft.

전후에 배치되는 상기 두 크로스빔(31) 사이에는 제1샤프트(36)가 설치된다. 제1샤프트(36)는 좌우방향으로 연장되고, 그 양단부 부근이 베어링(37)에 의해 지지된다. 상기 베어링(37)은 두 크로스빔(31) 사이로 노출되는 상기 휠하우징(34)의 상부면에 고정될 수 있다.A first shaft 36 is installed between the two crossbeams 31 disposed before and after. The first shaft 36 extends in the left-right direction, and the vicinity of both ends thereof is supported by a bearing 37 . The bearing 37 may be fixed to the upper surface of the wheel housing 34 exposed between the two crossbeams 31 .

상기 제1샤프트(36)에서 상기 제1구동스프라켓(351)과 마주하는 부위에는, 제1종동스프라켓(361)이 축설된다. 상기 제1종동스프라켓(361)은 상기 제1샤프트(36)와 일체로 회전하도록 상기 제1샤프트(36)에 고정된다.A first driven sprocket 361 is axially installed in a portion of the first shaft 36 facing the first driving sprocket 351 . The first driven sprocket 361 is fixed to the first shaft 36 so as to rotate integrally with the first shaft 36 .

상기 제1구동스프라켓(351)과 제1종동스프라켓(361)은 제1체인(352)에 감겨 있다. 따라서 상기 제1구동스프라켓(351)의 회전력은 제1체인(352)을 통해 제1종동스프라켓(361)에 전달될 수 있다.The first driving sprocket 351 and the first driven sprocket 361 are wound around the first chain 352 . Accordingly, the rotational force of the first driving sprocket 351 may be transmitted to the first driven sprocket 361 through the first chain 352 .

상기 제1샤프트(36)의 양단부에는 제2구동스프라켓(362)이 축설될 수 있다. 상기 제2구동스프라켓(362)은 상기 제1샤프트(36)와 일체로 회전하도록 상기 제1샤프트(36)에 고정되어 있다. 상기 제2구동스프라켓(362)은 상기 베어링(37)과 인접하여 배치되고, 상기 베어링(37)보다 측방으로 더 바깥쪽에 배치된다.Second driving sprockets 362 may be axially installed at both ends of the first shaft 36 . The second driving sprocket 362 is fixed to the first shaft 36 so as to rotate integrally with the first shaft 36 . The second driving sprocket 362 is disposed adjacent to the bearing 37 , and disposed laterally outward from the bearing 37 .

상기 이동장치(30)는 이동장치(30)의 구동을 위한 상기 구성들을 내부에 수용하여 보호하는 하우징(32)을 구비한다. 가령 상기 하우징(32)은, 상기 한 쌍의 크로스빔(31), 유압모터(35), 제1샤프트(36) 등을 커버할 수 있다. The moving device 30 includes a housing 32 for accommodating and protecting the components for driving the moving device 30 therein. For example, the housing 32 may cover the pair of crossbeams 31 , the hydraulic motor 35 , the first shaft 36 , and the like.

상기 하우징(32)의 양단에는 상기 크로스빔(31)보다 더 하방으로 연장되되 상기 하부크로스부재(15)의 레일지지부재(151)와는 간섭되지 않는 사이드플레이트(33)를 구비한다. 그리고 상기 사이드플레이트(33)의 하부에는 제2샤프트(38)가 설치된다. 상기 제2샤프트(38)가 설치된 높이는, 대략 상기 레일부재(19)의 C형강의 내부에 대응하는 높이일 수 있다.At both ends of the housing 32, side plates 33 extending further downward than the cross beam 31 and not interfering with the rail support member 151 of the lower cross member 15 are provided. And a second shaft 38 is installed under the side plate 33 . The height at which the second shaft 38 is installed may be about a height corresponding to the inside of the C-shaped steel of the rail member 19 .

상기 제2샤프트(38)에서 상기 제2구동스프라켓(362)의 위치와 대응하는 위치에는 제2종동스프라켓(381)이 설치된다. 상기 제2종동스프라켓(381)은 상기 제2구동스프라켓(362)과 제2체인(363)으로 연결된다. 따라서 제2구동스프라켓(362)의 회전력은 제2종동스프라켓(381)으로 전달된다.A second driven sprocket 381 is installed at a position corresponding to the position of the second driving sprocket 362 in the second shaft 38 . The second driven sprocket 381 is connected to the second driving sprocket 362 with a second chain 363 . Accordingly, the rotational force of the second driving sprocket 362 is transmitted to the second driven sprocket 381 .

상기 제2샤프트(38)에는 피니언(382)이 설치된다. 상기 피니언(382)은 상기 레일부재(19)의 내부에 수용되고, 상기 랙(191)과 맞물린다. A pinion 382 is installed on the second shaft 38 . The pinion 382 is accommodated in the rail member 19 and is engaged with the rack 191 .

상기 피니언(382)은 상기 제2종동스프라켓(381)과 일체로 회전할 수 있다. 일 예로서, 이를 위해 상기 피니언(382)은 상기 제2종동스프라켓(381)과 직접 연결되어 고정될 수 있다. 이러한 실시예에서는 피니언(382)과 제2종동스프라켓(381)이 제2샤프트(38)에 대해 회전 자유롭게 축설되거나, 제2샤프트(38)에 대해 회전 구속되도록 축설될 수 있다.The pinion 382 may rotate integrally with the second driven sprocket 381 . As an example, for this, the pinion 382 may be directly connected to the second driven sprocket 381 and fixed. In this embodiment, the pinion 382 and the second driven sprocket 381 may be rotatably rotatably installed with respect to the second shaft 38 or may be rotatably constrained with respect to the second shaft 38 .

다른 예로서, 상기 피니언(382)은 상기 제2샤프트(38)를 통해 상기 제2종동스프라켓(381)에 연결될 수 있다. 이러한 실시예에서는 제2종동스프라켓(381)이 제2샤프트(38)를 통해 피니언(382)에 전달되어야 하므로, 피니언(382)과 제2종동스프라켓(381)이 제2샤프트(38)에 대해 회전 구속되도록 축설된다.As another example, the pinion 382 may be connected to the second driven sprocket 381 through the second shaft 38 . In this embodiment, since the second driven sprocket 381 must be delivered to the pinion 382 through the second shaft 38 , the pinion 382 and the second driven sprocket 381 are positioned relative to the second shaft 38 . It is pivoted so as to be rotationally constrained.

상기 레일부재(19)의 상부는 상기 전방휠(341)과 후방휠(342), 그리고 상기 피니언(382) 사이에 개재된다. 이에 따라 상기 이동장치(30)는 상기 레일부재(19)에 적절히 구속되어, 상기 레일부재(19)로부터 이탈하는 현상이 방지될 수 있다.An upper portion of the rail member 19 is interposed between the front wheel 341 , the rear wheel 342 , and the pinion 382 . Accordingly, the moving device 30 is properly constrained to the rail member 19 , so that a phenomenon of separation from the rail member 19 can be prevented.

상기 하우징(32)의 사이드플레이트(33)는 상기 제1샤프트(36), 제2샤프트(38), 제2구동스프라켓(362), 제2종동스프라켓(381) 및 제2체인(363)을 내부에 수용하며 보호하고, 상기 레일부재(19)의 내부가 외측방으로 노출되지 않도록 덮어준다.The side plate 33 of the housing 32 includes the first shaft 36 , the second shaft 38 , the second driving sprocket 362 , the second driven sprocket 381 , and the second chain 363 . It accommodates and protects the inside, and covers the inside of the rail member 19 so as not to be exposed to the outside.

이에 따라, 이동장치(30)를 전진시키기 위해 상기 유압모터(35)가 일방향으로 회전하면, 제1구동스프라켓(351)이 일방향으로 회전하고, 그 회전력은 제1체인(352)을 통해 제1종동스프라켓(361)에 전달된다. 그러면 제1종동스프라켓(361)과 일체로 회전하는 제1샤프트(36)의 양단에 있는 제2구동스프라켓(362)도 일체로 일방향으로 회전하고, 그 회전력은 제2체인(363)을 통해 제2종동스프라켓(381)에 전달되고, 피니언(382) 역시 일방향으로 회전한다. Accordingly, when the hydraulic motor 35 rotates in one direction to advance the moving device 30 , the first driving sprocket 351 rotates in one direction, and the rotational force is applied to the first through the first chain 352 . It is transmitted to the driven sprocket (361). Then, the second driving sprocket 362 at both ends of the first shaft 36 that rotates integrally with the first driven sprocket 361 also rotates in one direction, and the rotational force is generated through the second chain 363. It is transmitted to the two driven sprocket 381, and the pinion 382 also rotates in one direction.

마찬가지로, 이동장치(30)를 후진시키기 위해 상기 유압모터(35)가 타방향으로 회전하면, 결과적으로 피니언(382) 역시 타방향으로 회전하여 이동장치(30)가 후진하게 된다.Similarly, when the hydraulic motor 35 rotates in the other direction to move the moving device 30 backward, as a result, the pinion 382 also rotates in the other direction so that the moving device 30 moves backward.

상기 크로스빔(31)의 전방에는 블레이드(40)가 배치된다. 상기 블레이드(40)는 중앙부가 더 전방으로 돌출된 ">"자 형상을 가진다. 이동장치(30)가 그 전방에 쌓여 있는 사석들을 밀면서 평탄화할 때, 사석이 많이 쌓여 있으면 구동계에 큰 부하로 작용할 수 있다. 이러한 작업환경에서는, 높이 쌓여 있는 사석의 윗부분을 먼저 밀어내면서 평탄화하고, 다시 그보다 밑부분을 추가적으로 밀어내면서 평탄화하는 방식으로, 평탄화 작업을 2 이상의 단계로 나누어 진행할 수 있다.A blade 40 is disposed in front of the crossbeam 31 . The blade 40 has a “>” shape in which the central portion protrudes further forward. When the moving device 30 is flattened while pushing the rubble piled up in front of it, if a lot of rubble is piled up, it can act as a large load on the drive system. In such a working environment, flattening while pushing the upper part of the piled high stones first, and flattening while pushing the lower part further than that, the planarization operation can be divided into two or more steps.

이를 위해 상기 블레이드(40)는 상기 이동장치(30)에 대해 상하로 승강할 수 있도록 상기 이동장치(30)에 설치될 수 있다. 이에, 상기 이동장치(30)의 전방에 마련된 크로스빔(31)의 전면에는, 상하방향으로 연장되는 전방승강가이드부재(311)가 설치된다. 상기 전방승강가이드부재(311)는 복수 개 마련될 수 있으며, 복수 개의 전방승강가이드부재(311)는 폭방향으로 이격 배치된다.To this end, the blade 40 may be installed in the moving device 30 so as to be able to move up and down with respect to the moving device 30 . Accordingly, a front elevation guide member 311 extending in the vertical direction is installed on the front surface of the cross beam 31 provided in front of the moving device 30 . A plurality of the front elevation guide members 311 may be provided, and the plurality of front elevation guide members 311 are spaced apart from each other in the width direction.

또한 상기 블레이드(40)에는, 그 상부와 하부에서 각각 후방으로 연장되는 상부서포트(42)와 하부서포트(43)를 구비한다. 상기 상부서포트(42)와 하부서포트(43) 역시 폭방향으로 복수 개 이격 배치될 수 있다. 상기 상부서포트(42)와 하부서포트(43)의 후방 단부에는, 상기 상부서포트(42)와 하부서포트(43)를 연결하도록 상하방향으로 연장되는 승강부재(41)를 구비할 수 있다. 블레이드(40)의 전방 돌출 정도에 따라, 상기 상부서포트(42)와 하부서포트(43)의 길이 역시 달라질 수 있다. 즉 폭방향의 가장자리에서 중앙부로 갈수록 상부서포트(42)와 하부서포트(43)가 더 전방으로 길게 연장될 수 있다.In addition, the blade 40 is provided with an upper support 42 and a lower support 43 extending rearward from the upper and lower portions, respectively. A plurality of the upper support 42 and the lower support 43 may also be spaced apart from each other in the width direction. A lifting member 41 extending in the vertical direction to connect the upper support 42 and the lower support 43 may be provided at rear ends of the upper support 42 and the lower support 43 . The lengths of the upper support 42 and the lower support 43 may also vary according to the degree of the front protrusion of the blade 40 . That is, the upper support 42 and the lower support 43 may extend further forward from the edge in the width direction toward the center.

상기 블레이드(40), 복수 개의 상부서포트(42), 하부서포트(43) 및 승강부재(41)는 일체로 거동할 수 있다.The blade 40, the plurality of upper supports 42, the lower support 43, and the elevating member 41 may act integrally.

상기 승강부재(41)의 상하방향 길이는, 상기 전방승강가이드부재(311)의 상하방향 길이보다 더 길 수 있다. 상기 전방승강가이드부재(311)는 대략 정사각형의 각관 형태이고, 상기 승강부재(41)는 도시된 바와 같이 상기 전방승강가이드부재(311)보다 단면이 작은 H빔 형상일 수 있다. 다만 이들의 단면이 이에 한정되는 것은 아니며, 승강부재(41)가 전방승강가이드부재(311)의 내주면에 의해 상하방향으로 가이드될 수 있는 형상이면 다른 다양한 단면 형태로 변경할 수 있음은 물론이다.The vertical length of the elevating member 41 may be longer than the vertical length of the front elevating guide member 311 . The front elevating guide member 311 may have a substantially square square tube shape, and the elevating member 41 may have an H-beam shape having a smaller cross section than the front elevating guide member 311 as shown. However, their cross-sections are not limited thereto, and as long as the elevating member 41 has a shape that can be guided in the vertical direction by the inner circumferential surface of the front elevating guide member 311, it can be changed to various other cross-sectional shapes.

상기 전방승강가이드부재(311)의 전방에는 승강서포트부재(312)가 고정 연결된다. 상기 승강서포트부재(312)는 상기 상부서포트(42)의 하부에 이격 배치된다. 상기 블레이드(40)를 승강시키기 위한 승강구동부(44)는 유압 실린더일 수 있다. 상기 유압 실린더는, 블레이드실린더(45)와 블레이드피스톤(46)을 구비할 수 있다. 상기 블레이드실린더(45)는 상기 승강서포트부재(312)의 상부에 힌지 연결되고, 상기 블레이드피스톤(46)은 상기 상부서포트(42)의 하부에 힌지 연결될 수 있다.An elevation support member 312 is fixedly connected to the front of the front elevation guide member 311 . The lifting support member 312 is spaced apart from the lower portion of the upper support 42 . The lift driving unit 44 for elevating the blade 40 may be a hydraulic cylinder. The hydraulic cylinder may include a blade cylinder 45 and a blade piston 46 . The blade cylinder 45 may be hingedly connected to an upper portion of the elevating support member 312 , and the blade piston 46 may be hingedly connected to a lower portion of the upper support 42 .

이에 따라 상기 유압실린더가 신장되면 상기 블레이드(40)는 상승하고, 상기 유압실린더가 수축되면 상기 블레이드(40)는 하강한다.Accordingly, when the hydraulic cylinder is extended, the blade 40 rises, and when the hydraulic cylinder is contracted, the blade 40 descends.

상기 승강구동부(44)와 동력발생장치(35)에 유압을 인가하기 위해, 상기 이동장치(30)에는 유압호스(H)가 연결될 수 있다. 바디프레임(10)에 대해 이동장치(30)는 상대적으로 전후 이동하므로, 상기 유압호스(H)는 상기 커튼레일(113)을 따라 이동할 수 있는 복수 개의 호스고정구(115)에 고정되어, 도시된 바와 같이 커튼을 걷거나 치듯이 이동장치(30)를 따라 이동할 수 있다.In order to apply hydraulic pressure to the lift driving unit 44 and the power generating device 35 , a hydraulic hose H may be connected to the moving device 30 . Since the moving device 30 moves relatively back and forth with respect to the body frame 10, the hydraulic hose H is fixed to a plurality of hose fixtures 115 that can move along the curtain rail 113, As shown, it can move along the moving device 30 as if walking or hitting a curtain.

한편, 상기 바디프레임(10)은 해저면에 조성된 마운드 상에 거치되어 사석을 고르는 작업을 수행한다. 아직 사석을 평탄화하는 작업을 진행하기 전에 먼저 바디프레임(10)이 마운드 상에 거치되기에, 바디프레임(10)이 거치되는 표면은 평탄도가 좋지 않다. 따라서 소정의 폭을 가지고 그보다 더욱 긴 전후방향 길이를 가지는 바디프레임(10)이 먼저 마운드 상에 수평하게 놓여져야 한다.On the other hand, the body frame 10 is mounted on a mound formed on the bottom of the sea to perform the work of selecting a gravel. Since the body frame 10 is mounted on the mound before proceeding with the work of flattening the stone yet, the surface on which the body frame 10 is mounted has poor flatness. Therefore, the body frame 10 having a predetermined width and a length in the front-rear direction longer than that must first be placed horizontally on the mound.

이에 실시예의 마운드 평탄화 장치는, 상기 바디프레임(10)이 마운드 상에 수평으로 거치될 수 있도록 하기 위해, 복수 개의 아우트리거(60)를 구비한다.Accordingly, the mound flattening device of the embodiment includes a plurality of outriggers 60 so that the body frame 10 can be horizontally mounted on the mound.

바디프레임(10)은 그 좌측과 우측에서 전후방향으로 복수 개 이격 배치된 복수 개의 기둥부재(17)를 구비한다. 아우트리거(60)는 이러한 기둥부재(17)에 모두 설치되거나, 균일한 개소에 설치될 수 있다. 실시예에서는 하나 건너 하나씩 기둥부재(17)에 아우트리거(60)가 설치된 구조가 예시된다.The body frame 10 is provided with a plurality of column members 17 spaced apart from the left and right in the front-rear direction. The outriggers 60 may be installed in all of these pillar members 17 or may be installed in uniform locations. In the embodiment, the structure in which the outriggers 60 are installed on the pillar members 17 one by one is illustrated.

전후방향으로 긴 바디프레임(10)을 해저면에 거치함에 있어서, 높낮이의 차이가 있고 굴곡이 있는 해저면에 바디프레임(10)을 거치할 때, 복수 개의 기둥부재(17)가 놓여지는 개소의 해저면의 높이 차이가 있더라도, 아우트리거(60)를 사용하면, 바디프레임(10)을 수평하게 거치하는 것이 가능하다. In mounting the long body frame 10 on the sea floor in the front-rear direction, when the body frame 10 is mounted on the sea floor with a difference in height and curve, the position where the plurality of pillar members 17 are placed Even if there is a difference in height of the seabed, it is possible to horizontally mount the body frame 10 by using the outrigger 60 .

상기 아우트리거(60)의 길이 조절은 유압실린더에 의해 이루어질 수 있다.The length adjustment of the outrigger 60 may be performed by a hydraulic cylinder.

상기 아우트리거(60)는, 상기 기둥부재(17)에 고정되고 상하방향으로 연장되는 아우터커버(61)와, 상기 아우터커버(61)에 내삽되고, 상하방향으로 연장되며, 상기 아우터커버(61)에 의해 안내되어 상하로 슬라이드 이동하는 이너커버(62)를 포함한다.The outrigger 60 includes an outer cover 61 fixed to the pillar member 17 and extending in the vertical direction, interpolated into the outer cover 61 and extended in the vertical direction, and the outer cover 61 ) guides and includes an inner cover 62 that slides up and down.

상기 아우터커버(61)는 상기 기둥부재(17) 측면에 고정될 수 있다. 그리고 이너커버(62)는 상기 아우터커버(61)보다 더 하방으로 출몰하게 된다.The outer cover 61 may be fixed to the side of the pillar member 17 . And the inner cover 62 protrudes further downward than the outer cover 61 .

상기 유압실린더는, 상단부가 실린더 힌지(631h)를 통해 상기 아우터커버(61)에 연결되는 포스트실린더(631)와, 상기 포스트실린더(631)에 내삽되되 유압에 의해 상기 포스트실린더(631)로부터 하방으로 출몰하는 포스트피스톤(632)을 포함한다.The hydraulic cylinder includes a post cylinder 631 having an upper end connected to the outer cover 61 through a cylinder hinge 631h, and being inserted into the post cylinder 631 downward from the post cylinder 631 by hydraulic pressure. Includes a post piston (632) protruding to.

일 예로서, 포스트피스톤(632)은 상기 이너커버(62)에 힌지 결합되고, 이너커버(62)의 하단부에 하부받침(64)을 연결할 수 있다.As an example, the post piston 632 may be hinged to the inner cover 62 , and the lower support 64 may be connected to the lower end of the inner cover 62 .

이와 달리 포스트피스톤(632)은 이너커버(62)의 하단부로 노출되는 하부받침(64)에 힌지 연결되고, 이너커버(62)는 자중에 의해 아우터커버(61)로부터 하강하며, 이너커버(62)의 하단부가 상기 하부받침(64) 상에 놓여지도록 할 수 있다. 이때, 상기 이너커버(62)의 하단부와 하부받침(64)이 상호 고정되도록 구성할 수도 있다.Contrary to this, the post piston 632 is hinged to the lower support 64 exposed to the lower end of the inner cover 62, and the inner cover 62 descends from the outer cover 61 by its own weight, and the inner cover 62 ) can be placed on the lower end of the lower support (64). At this time, the lower end of the inner cover 62 and the lower support 64 may be configured to be fixed to each other.

아우터커버(61)와 이너커버(62)는 유압에 의해 작동하는 포스트실린더(631)와 포스트피스톤(632)을 보호하고 상하방향의 신축을 안내한다. 유압실린더에 어느 정도 자유도를 부가하면, 사석으로 이루어져 평탄하지 않은 해저면에 하부받침(64)을 받칠 때, 하부받침(64)이 스스로 안정적인 위치에 자리잡을 수 있도록 유도해줄 수 있다.The outer cover 61 and the inner cover 62 protect the post cylinder 631 and the post piston 632 operated by hydraulic pressure and guide the expansion and contraction in the vertical direction. By adding a certain degree of freedom to the hydraulic cylinder, when the lower support 64 is supported on an uneven seabed made of sandstone, it can be guided so that the lower support 64 can be positioned in a stable position by itself.

상기 하부받침(64)은 수평으로 연장되는 바닥면(641)과, 상기 바닥면(641)의 가장자리에서 상향 경사지도록 연장되는 제1챔퍼면(642)과 제2챔퍼면(643)을 포함할 수 있다. 이러한 하부받침(64)의 형상은, 굴곡이 있는 사석 바닥에 아우트리거(60)가 안정적으로 거치되도록 해준다.The lower support 64 may include a bottom surface 641 extending horizontally, and a first chamfer surface 642 and a second chamfer surface 643 extending upwardly from the edge of the bottom surface 641 . can The shape of the lower support 64 allows the outrigger 60 to be stably mounted on the curved stone floor.

마운드 평탄화 장치의 작동을 위한 구동력은 유압으로써 제공될 수 있다.The driving force for the operation of the mound leveling device may be provided by hydraulic pressure.

상기 유압은 유압호스(H)에 의해 제공될 수 있다. 유압 발생 장치는 바지선에 설치되고, 유압 발생 장치로부터 연장되는 유압호스(H)는 상기 마운드 평탄화 장치에 연결될 수 있다.The hydraulic pressure may be provided by a hydraulic hose (H). The hydraulic pressure generating device is installed on the barge, and a hydraulic hose (H) extending from the hydraulic pressure generating device may be connected to the mound flattening device.

상기 유압호스(H)는 상기 이동장치(30)에 연결될 수 있다. 이는 상기 이동장치(30)의 이동을 위한 동력발생장치인 유압모터(35)와, 상기 블레이드(40)의 높낮이를 조절하기 위한 승강구동부(44)의 유압실린더에 연결될 수 있다. 이동하는 장치에 유압호스(H)가 연결되므로, 유압호스(H)의 파손을 방지하기 위해, 상기 유압호스(H)는 마치 커튼처럼 상기 커튼레일(113)의 호스고정구(115)에 연결될 수 있다.The hydraulic hose (H) may be connected to the moving device (30). This may be connected to a hydraulic motor 35 which is a power generating device for moving the moving device 30 and a hydraulic cylinder of the lift driving unit 44 for adjusting the height of the blade 40 . Since the hydraulic hose (H) is connected to the moving device, in order to prevent damage to the hydraulic hose (H), the hydraulic hose (H) can be connected to the hose fixture 115 of the curtain rail 113 like a curtain. have.

상기 유압호스(H)는, 상기 아우트리거(60)의 유압실린더에도 연결될 수 있다. 상기 아우트리거(60)는 정 위치에 고정되어 있는 구성이므로, 유압호스(H)는 바디프레임(10)에 고정 배선될 수 있다.The hydraulic hose (H) may also be connected to the hydraulic cylinder of the outrigger (60). Since the outrigger 60 is configured to be fixed in a fixed position, the hydraulic hose H may be fixedly wired to the body frame 10 .

상기 아우트리거(60)의 유압실린더는, 아우트리거(60)마다 개별적으로 작동 제어될 수 있다. 이에 따라, 아우트리거(60)가 전개되는 위치마다 다른 바닥의 레벨링을 원활하게 할 수 있다.The hydraulic cylinder of the outrigger 60 may be individually operated and controlled for each outrigger 60 . Accordingly, it is possible to smoothly level the different floors for each deployed position of the outrigger 60 .

[마운드 평탄화 장치를 이용한 기초사석층 조성 공법][Basic sandstone layer composition method using a mound planarization device]

이하 도 11 내지 도 22를 참조하여, 상술한 마운드 평탄화 장치를 이용하여 기초사석층을 조성하는 방법에 대해 살펴본다.Hereinafter, with reference to FIGS. 11 to 22, a method of forming a basic sandstone layer using the above-described mound planarization apparatus will be described.

도 12를 참조하면, 상기 마운드 평탄화 장치(1)는 제1바지선(71)으로 작업 현장까지 이송될 수 있다.Referring to FIG. 12 , the mound flattening device 1 may be transported to a work site by a first barge 71 .

제1바지선(71)은, 상기 마운드 평탄화 장치(1), 상기 마운드 평탄화 장치(1)를 인양하기 위한 크레인(8), 상기 마운드 평탄화 장치(1)에 유압을 공급하기 위한 유압발생장치(P), 및 상기 마운드 평탄화 장치(1)의 수평 거치를 위한 수심을 측정할 수 있는 뉴머게이지(G)를 싣고, 작업 현장까지 이동한다.The first barge 71 is a hydraulic pressure generator (P) for supplying hydraulic pressure to the mound flattening device (1), the crane (8) for lifting the mound flattening device (1), and the mound flattening device (1) ), and a pneumatic gauge (G) capable of measuring the water depth for horizontal mounting of the mound flattening device (1), and moves to the work site.

마운드 조성 작업을 위해, 상기 제1바지선(71)을 기초사석 고르기 작업 구간에 접근시킨 후, 해저면에 와이어 앵커(A)를 박아 제1바지선(71)을 정박한다.For the mound formation work, after the first barge 71 is approached to the basic sandstone leveling work section, the first barge 71 is anchored by driving the wire anchor (A) into the seabed.

제1바지선(71)은, 그 일측에 현장이 위치하도록 정박한다. 그리고 사석을 실은 제2바지선(72)을 제1바지선(71)에 접안한다. 제2바지선(72)은 상기 제1바지선(71)의 타측에 접안한다.The first barge 71 is anchored so that the site is located on one side thereof. And the second barge (72) loaded with sandstone is docked with the first barge (71). The second barge 72 is docked on the other side of the first barge 71 .

유압발생장치(P)와 뉴머게이지(G)를 싣고 있는 제1바지선(71)은 마운드 조성 작업을 하는 동안 마운드 평탄화 장치(1) 근방에서 작업 현장에 체류해야 한다.The first barge 71 carrying the hydraulic generator (P) and the pneumatic gauge (G) must stay at the job site in the vicinity of the mound flattening device (1) during the mound composition work.

이에 따라 마운드를 조성하기 위한 사석은 제1바지선(71)과 별도의 바지선인 제2바지선(72)으로 이송한다. 그러면, 제1바지선(71)이 작업현장(S)에 체류중인 동안에도, 제2바지선(72)으로 사석을 지속적이고 원활하게 공급할 수 있다. Accordingly, the sandstone for forming the mound is transferred to the first barge 71 and the second barge 72, which is a separate barge. Then, even while the first barge 71 is staying at the work site (S), it is possible to continuously and smoothly supply sandstone to the second barge 72 .

가령 제2바지선(72)에 싣고 온 사석을 모두 사용한 뒤, 제1바지선(71)과 마운드 평탄화 장치(1)를 이용하여 마운드 평탄화 작업을 하는 동안, 제2바지선(72)은 사석을 추가 공급하기 위해 잠시 현장을 떠날 수 있다. 물론 사석을 모두 사용하기 전이라도, 제2바지선(72)에 남아 있는 사석을 일단 제1바지선에 옮겨 놓은 후, 미리 이동할 수 있다.For example, after using all the rubble loaded on the second barge 72, the second barge 72 additionally supplies rubble during the mound flattening work using the first barge 71 and the mound flattening device 1 You can leave the site for a while to do this. Of course, even before all the rocks are used, after moving the rocks remaining in the second barge 72 to the first barge, it can be moved in advance.

이러한 작업 운용 방식에 따르면, 모든 장비를 효율적으로 사용할 수 있기 때문에 장비 운용 비용을 절감할 수 있게 된다.According to this work operation method, since all equipment can be used efficiently, equipment operation costs can be reduced.

이어서 설명하면, 마운드 평탄화 장치(1)를 현장에 거치하기 전에, 먼저 접안한 제2바지선(72)의 사석을 제1바지선(71)의 크레인(8)의 버켓으로 인양하여, 작업현장(S)에서 마운드를 조정하고자 하는 구간에 투하한다.Next, before the mound flattening device 1 is mounted on the site, the rock of the second barge 72 berthed first is lifted with the bucket of the crane 8 of the first barge 71, and the work site (S) ), drop the mound to the area you want to adjust.

이 투하 작업에서는, 사석을 목표 레벨(기준 레벨)보다 낮은 높이까지 투하한다. In this dropping operation, the gravel is dropped to a height lower than the target level (reference level).

상기 제1바지선(71)의 위치 선정이나 상기 사석의 투하 위치는 가령 위성을 이용한 포지셔닝 시스템(가령, GPS)을 이용하여 확인할 수 있다.The selection of the position of the first barge 71 or the dropping position of the stone can be confirmed using, for example, a positioning system using a satellite (eg, GPS).

이처럼 목표 레벨보다 낮은 레벨까지 사석을 투하하여 포설한 후, 도 13에 도시된 바와 같이 마운드 평탄화 장치(1)의 인양고리부재(111)에 크레인(8)의 인양로프를 걸어, 마운드 평탄화 장치(1)를 시공하고자 하는 위치로 인양 하강시킨다.After dropping and laying the gravel to a level lower than the target level in this way, as shown in FIG. 13, the lifting rope of the crane 8 is hung on the lifting ring member 111 of the mound flattening device 1, and the mound flattening device ( 1) is lifted and lowered to the desired location.

이때, 마운드 평탄화 장치(1)의 위치는, 가령 GPS로 측량하여 위치 선정하고 가거치할 수 있다.At this time, the location of the mound flattening device 1 may be temporarily placed after selecting a location by surveying, for example, by GPS.

마운드 평탄화 장치(1)를 작업 위치에 가거치한 상태에서, 도 14와 도 15에 도시된 바와 같이 잠수부가 제1바지선(71)의 유압펌프(P)에 연결된 유압라인(L)을 해저면에 거치된 마운드 평탄화 장치(1)에 연결한다.In a state in which the mound flattening device 1 is temporarily mounted at the working position, as shown in FIGS. 14 and 15, the diver connects the hydraulic line (L) connected to the hydraulic pump (P) of the first barge 71 to the seabed. It is connected to the mounted mound leveling device (1).

마운드 평탄화 장치(1)에는 유압호스(H)가 배설되어 있다. 상기 유압호스(H)는 커튼레일(113)을 통해 이동장치(1)에 연결된 유압호스(H)와, 바디프레임(10)에 고정되고 복수 개의 아우트리거(60)에 병렬로 연결된 유압호스(H)를 포함한다. 각 유압호스(H)는 유압 유체의 유입과 유출을 위해 각각 한 쌍씩 구비된다.A hydraulic hose H is disposed in the mound flattening device 1 . The hydraulic hose (H) includes a hydraulic hose (H) connected to the moving device (1) through a curtain rail (113), a hydraulic hose fixed to the body frame (10) and connected in parallel to a plurality of outriggers (60) ( H). Each hydraulic hose (H) is provided in pairs for inflow and outflow of hydraulic fluid, respectively.

상기 유압라인(L)은 상기 유압호스(H)에 대응하여 4개 구비된다. 필요에 따라서는 예비라인 하나를 더 포함할 수도 있다. The hydraulic line (L) is provided with four corresponding to the hydraulic hose (H). If necessary, it may further include one spare line.

상기 4개의 유압라인(L) 중 두 라인은 상기 아우트리거(60)에 연결되는 유압호스(H)의 한 쌍의 호스에 각각 연결될 수 있다. Two of the four hydraulic lines L may be respectively connected to a pair of hoses of the hydraulic hose H connected to the outrigger 60 .

각 아우트리거(60)에는, 3개의 위치로 이동하며 유체의 유동 방향과 유동 허용 여부를 결정할 수 있는 밸브 레버가 설치될 수 있다. 상기 밸브 레버는 잠금위치와, 제1위치와, 제2위치로 조작될 수 있다. 가령 밸브 레버가 3개의 위치 중 중간에 있을 때에는 유압의 흐름을 막고 허용하지 않는다. 가령 밸브 레버가 잠금위치로부터 일측에 있는 제1위치로 회전 조작되면, 한 쌍의 유압호스(H)중 어느 하나에는 유체가 유입되고 다른 하나에는 유체가 유출되어 아우트리거(60)의 유압실린더의 길이가 줄어들 수 있다. 가령 밸브 레버가 잠금위치로부터 타측에 있는 제2위치로 회전 조작되면, 한 쌍의 유압호스(H) 중 어느 하나에는 유체가 유출되고 다른 하나에는 유체가 유입되어 아우트리거(60)의 유압실린더의 길이가 늘어날 수 있다.Each of the outriggers 60 may be provided with a valve lever that moves to three positions and can determine the flow direction of the fluid and whether to allow the flow. The valve lever may be operated in a locked position, a first position, and a second position. For example, when the valve lever is in the middle of the three positions, it blocks and disallows the flow of hydraulic pressure. For example, when the valve lever is rotated from the locking position to the first position on one side, fluid flows into one of the pair of hydraulic hoses (H) and the fluid flows out into the other one of the pair of hydraulic hoses (H). length may be reduced. For example, when the valve lever is rotated from the locked position to the second position on the other side, fluid flows out of one of the pair of hydraulic hoses (H) and fluid flows into the other of the pair of hydraulic hoses (H). length can be increased.

상기 밸브 레버는 잠수부가 조절할 수 있다.The valve lever can be adjusted by a diver.

상기 4개의 유압라인(L) 중 다른 두 라인은, 상기 이동장치(1)의 유압모터(35)의 유압호스(H)에 연결될 수 있다.The other two lines among the four hydraulic lines (L) may be connected to the hydraulic hose (H) of the hydraulic motor (35) of the moving device (1).

이렇게 제1바지선(71)의 유압펌프(P)의 유압라인(L)을 마운드 평탄화 장치(1)의 유압호스(H)에 연결한 뒤에는, 도 16과 도 17에 도시된 바와 같이 마운드 평탄화 장치 수평 조절 작업을 실시한다. 엄밀하게 상기 마운드 평탄화 장치의 수평은 거기에 설치된 레일부재(19)의 수평을 맞추는 것으로 이해할 수 있다.After connecting the hydraulic line (L) of the hydraulic pump (P) of the first barge (71) to the hydraulic hose (H) of the mound flattening device (1), as shown in FIGS. 16 and 17, the mound flattening device Perform horizontal adjustment. Strictly speaking, the leveling of the mound leveling device can be understood as leveling the rail member 19 installed therein.

수압을 이용하여 수심을 확인할 수 있는 뉴머게이지(G)라는 장비가, 이러한 마운드 평탄화 장치의 수평 조절을 위해 사용될 수 있다.A device called a pneumatic gauge (G) that can check the water depth using water pressure may be used for horizontal adjustment of such a mound flattening device.

잠수부는, 가거치된 마운드 평탄화 장치(1)의 복수 개의 아우트리거(60)로 이동하며 각 아우트리거(60) 설치 위치에서 해당 위치의 마운드 평탄화 장치(1)의 수심 위치, 보다 엄밀하게는 레일부재(19)의 수심을 측정한다. The diver moves to the plurality of outriggers 60 of the tentatively mounted mound flattening device 1, and at each outrigger 60 installation position, the water depth position of the mound flattening device 1 at the corresponding position, more precisely the rail Measure the depth of the member (19).

이때, 레일부재(19)의 각 위치들에서의 절대적인 수심을 모두 맞출 필요는 없으며, 각 위치들에서의 수심의 편차가 없도록만 아우트리거(60)의 길이를 조절하면 족하다. 왜냐하면, 실시예의 마운드 평탄화 장치(1)에 따르면, 이동장치(30)에 대한 블레이드(40)의 높이를 상대적으로 조정할 수 있기 때문이다.At this time, it is not necessary to match the absolute water depth at each position of the rail member 19, and it is sufficient to adjust the length of the outrigger 60 only so that there is no deviation of the water depth at each position. This is because, according to the mound flattening device 1 of the embodiment, the height of the blade 40 with respect to the moving device 30 can be adjusted relatively.

잠수부는 수압을 뉴머게이지(G)를 이용하여 각 아우트리거 포인트에서 바디프레임(10)의 수심 레벨의 편차가 없어지도록 아우트리거를 조절하여, 바디프레임(10)의 레일부재(19)가 수평하게 설치되도록 한다.The diver adjusts the outrigger so that there is no deviation of the water depth level of the body frame 10 at each outrigger point using the pneumatic gauge (G) for water pressure, so that the rail member 19 of the body frame 10 is horizontally to have it installed.

구체적으로, 잠수부는, 아우트리거(60) 위치에 뉴머게이지(G)를 두어 해당 위치의 바디프레임(10) 레벨을 확인하고, 밸브 레버를 조작하여 해당 위치에서 아우트리거(60)의 하향 돌출 길이를 조절할 수 있다.Specifically, the diver puts the pneumatic gauge (G) at the position of the outrigger 60 to check the level of the body frame 10 at the position, and operates the valve lever to protrude the length of the downward protrusion of the outrigger 60 at the position can be adjusted.

잠수부가 각 아우트리거(60) 위치에서 이러한 레벨링 작업을 완료하면, 마운드 평탄화 장치(1)가 수평으로 거치된다. 이에 따라 레일부재(19)는 수평하게 배치된다.When the diver completes this leveling operation at each outrigger 60 position, the mound leveling device 1 is mounted horizontally. Accordingly, the rail member 19 is arranged horizontally.

이처럼 마운드 평탄화 장치(1)가 정위치에 거치 완료되면, 유압모터(35)를 작동시켜 이동장치(1)를 레일부재(19)를 따라 가장 후방으로 이동시킨다. 그리고, 뉴머게이지(G)와 승강구동부(44)를 사용하여 이동장치(1)에 설치된 블레이드(40)를 목표 레벨에 대응하도록 레벨링한다.As such, when the mounting of the mound flattening device 1 is completed in place, the hydraulic motor 35 is operated to move the moving device 1 along the rail member 19 to the rearmost position. Then, the blade 40 installed in the moving device 1 is leveled so as to correspond to the target level using the pneumatic gauge G and the lift driving unit 44 .

다음으로, 도 18과 도 19에 제2바지선(72) 등에 실려 있는 사석을 제1바지선(71)의 크레인(8)과 버켓으로 인양하여 바디프레임(10)의 내부 공간으로 투하한다. 이때, 버켓은 바디프레임(10)의 두 상부연장부재(11) 사이, 그리고 이웃하는 두 상부크로스부재(14) 사이에 마련된 공간을 통해 사석을 바디프레임(10) 내부 공간으로 투하하게 된다. 상기 두 상부연장부재(11)의 간격과, 상부크로스부재(14)들 간의 간격은, 이러한 사석의 투하 작업을 감안하여 설정될 수 있다. 투하되는 상기 사석의 양은, 목표 레벨보다 약간 높은 위치까지 사석이 포설될 수 있도록 하는 정도일 수 있다.Next, in FIGS. 18 and 19 , the rubble stones mounted on the second barge 72 , etc. are lifted with the crane 8 and bucket of the first barge 71 and dropped into the inner space of the body frame 10 . At this time, the bucket is dropped into the inner space of the body frame 10 through the space provided between the two upper extension members 11 of the body frame 10 and between the two adjacent upper cross members 14 . The distance between the two upper extension members 11 and the distance between the upper cross members 14 may be set in consideration of the dropping operation of the sandstone. The amount of the rubble to be dropped may be such that the rubble can be laid to a position slightly higher than the target level.

사석이 투하된 후, 제1바지선(71)의 유압펌프(P)를 작동시키면, 유압모터(35)에 유압이 공급되어 유압모터(35)가 회전하게 된다. 그러면 상기 구동계를 통해 이동장치(1)가 도 20에 도시된 바와 같이 전방으로 이동하게 된다.After the sandstone is dropped, when the hydraulic pump P of the first barge 71 is operated, hydraulic pressure is supplied to the hydraulic motor 35 and the hydraulic motor 35 rotates. Then, the moving device 1 moves forward as shown in FIG. 20 through the drive system.

이동장치(1)가 전방으로 이동함에 따라, 이동장치(1)의 전방에 설치된 블레이드(40)는 기준레벨보다 높은 사석을 전방으로 밀어내게 된다. 이때 사석의 일부는 경사진 블레이드(40)에 의해 측방으로 밀려날 수 있다. As the moving device 1 moves forward, the blade 40 installed in the front of the moving device 1 pushes the sandstone higher than the reference level forward. At this time, a portion of the sandstone may be pushed to the side by the inclined blade (40).

한편, 포설된 사석의 양 조절을 실패하여, 사석이 기준레벨보다 너무 높게 포설되면, 사석을 전방으로 밀어낼 때, 목표 레벨보다 사석이 너무 높이 쌓인 구간에서는 블레이드의 높이를 기준레벨보다 더 올린 상태로 이동장치(1)를 전방으로 이동시키고, 다시 블레이드의 높이를 기준레벨까지 1회 내지 수회에 걸쳐 낮추어 가며 이동장치(1)를 전방으로 이동시키어, 장비에 무리가 가지 않도록 하면서 사석의 높이를 목표 레벨로 맞출 수 있다.On the other hand, if it fails to control the amount of rubble placed and the rubble is installed too high than the reference level, when the rubble is pushed forward, the blade height is raised higher than the reference level in the section where the rubble is piled up too high than the target level Move the moving device (1) forward by using the You can hit the target level.

이렇게 마운드 평탄화 장치(1)가 거치된 위치에서 이동장치(1)가 이동하는 면적 구간에 대해 사석의 평탄화 작업이 완료되면, 도 21에 도시된 바와 같이 마운드 평탄화 장치(1)를 다음 작업 위치로 이동시키는 작업을 수행한다.In this way, when the leveling operation of the gravel is completed for the area in which the moving device 1 moves in the position where the mound flattening device 1 is mounted, the mound flattening device 1 is moved to the next working position as shown in FIG. carry out the moving task.

다음 작업구간으로 마운드 평탄화 장치(1)를 인용하여 이동시킬 때, 유압라인(L)의 파손을 방지하기 위해, 잠수부가 유압라인(L)을 마운드 평탄화 장치(1)로부터 분리하도록 할 수 있다. 물론 다음 작업구간을 마운드 평탄화 장치(1)를 이동시킨 뒤에는, 상기 유압라인(L)을 다시 마운드 평탄화 장치(1)에 연결될 수 있다.In order to prevent damage to the hydraulic line (L) when citing and moving the mound flattening device (1) to the next working section, the diver may separate the hydraulic line (L) from the mound flattening device (1). Of course, after moving the mound flattening device 1 to the next working section, the hydraulic line L may be connected to the mound flattening device 1 again.

또한 다음 작업 구간에 크레인의 작업 반경이 미치지 못할 때에는, 제1바지선과 제2바지선을 이동시켜 다음 작업 위치에 대응하도록 다시 자리잡을 수 있을 것이다.In addition, when the working radius of the crane does not reach the next working section, the first barge and the second barge may be moved to be re-positioned to correspond to the next working position.

잠수부가 크레인(8)의 인양로프를 마운드 평탄화 장치(1)의 인양고리부재(111)에 걸면, 제1바지선(71) 위에 있는 작업자는 크레인(8)을 이용하여 마운드 평탄화 장치(1)를 목표 레벨보다 위로 들어올린 후, 해당 마운드 평탄화 장치(1)를 인접한 시공 위치로 이동 후 다시 거치한다. 마운드 평탄화 장치(1)는 굳이 수면 위에까지 인양해 올릴 필요는 없고, 단지 마운드 평탄화 장치(1)의 하단부가 목표 레벨보다 위쪽으로 노출되도록 할 정도의 범위 내에서, 들어올려질 수 있다.When the diver hangs the lifting rope of the crane 8 on the lifting ring member 111 of the mound flattening device 1, the operator on the first barge 71 uses the crane 8 to operate the mound flattening device 1 After lifting above the target level, the mound leveling device (1) is moved to an adjacent construction location and mounted again. The mound flattening device 1 does not need to be lifted up to the surface of the water surface, but may be lifted within a range such that the lower end of the mound flattening device 1 is exposed above the target level.

이때, 하부크로스부재(15)의 연결부재(153)는 원형관(154) 형태이므로, 레벨링된 사석에 파묻혀 있던 하부크로스부재(15)가 사석을 가르며 상승하더라도, 레벨링된 사석에 거의 영향을 미치지 않는다.At this time, since the connection member 153 of the lower cross member 15 is in the form of a circular tube 154, even if the lower cross member 15 buried in the leveled gravel rises through the leveled gravel, it hardly affects the leveled gravel. does not

또한 측방으로 인접한 시공 위치에 마운드 평탄화 장치(1)를 이동시킬 때, 종전 시공 위치와 소정의 간격(g)(0.6~1미터) 정도 이격된 위치에 마운드 평탄화 장치(1)를 거치한다.In addition, when moving the mound flattening device 1 to a laterally adjacent construction location, the mound flattening device 1 is mounted at a location spaced apart by a predetermined distance g (0.6 to 1 meter) from the previous construction location.

그러면 작업자와 잠수부는, 앞서 설명한, 상기 마운드 평탄화 장치(1)의 정위치 거치 작업부터 사석 고르기 작업을 반복한다.Then, the operator and the diver, the above-described, the mound flattening device (1) from the in-situ mounting operation to repeat the sandstone picking operation.

이렇게 작업이 마무리된 두 구간 사이의 이격 공간은, 두 작업 구간에서 옆으로 밀려나온 사석이 어느 정도 채워 목표 레벨에 거의 근사하게 되지만, 약간의 오차가 있을 수 있으며, 이러한 레벨 오차는 잠수부가 수작업으로 조절할 수 있다.The space between the two sections where the work has been completed is filled to some extent with the rocks protruding from the two sections to a certain extent and approximates the target level, but there may be some errors. can be adjusted

상술한 마운드 평탄화 장치를 이용한 마운드 평탄화 공법에 따르면, 마운드의 사석 고르기 작업을 매우 빠르게, 그리고 저가로 진행할 수 있다. 특히 인력의 활용을 최소화하여 인사사고의 발생을 줄일 수 있다.According to the mound planarization method using the above-described mound planarization device, the mound roughing operation can be performed very quickly and at low cost. In particular, the occurrence of personnel accidents can be reduced by minimizing the use of manpower.

이상과 같이 본 발명에 대해서 예시한 도면을 참조로 하여 설명하였으나, 본 명세서에 개시된 실시예와 도면에 의해 본 발명이 한정되는 것은 아니며, 본 발명의 기술사상의 범위 내에서 통상의 기술자에 의해 다양한 변형이 이루어질 수 있음은 자명하다. 아울러 앞서 본 발명의 실시예를 설명하면서 본 발명의 구성에 따른 작용 효과를 명시적으로 기재하여 설명하지 않았을 지라도, 해당 구성에 의해 예측 가능한 효과 또한 인정되어야 함은 당연하다.As described above, the present invention has been described with reference to the illustrated drawings, but the present invention is not limited by the embodiments and drawings disclosed in the present specification. It is obvious that variations can be made. In addition, although the effects of the configuration of the present invention are not explicitly described and described while describing the embodiments of the present invention, it is natural that the effects predictable by the configuration should also be recognized.

1: 마운드 평탄화 장치
10: 바디프레임
11: 상부연장부재
111: 인양고리부재
113: 커튼레일
114: 롤러
115: 호스고정구
12: 하부연장부재
14: 상부크로스부재
141: 버팀대
15: 하부크로스부재
151: 레일지지부재
153: 연결부재
154: 원형관
155: 플랜지
17: 기둥부재
171: 트러스부재
19: 레일부재
191: 랙
30: 이동장치
31: 크로스빔
311: 전방승강가이드부재
312: 승강서포트부재
32: 하우징
33: 사이드플레이트
34: 휠하우징
341: 전방휠
342: 후방휠
35: 동력발생장치(유압모터)
351: 제1구동스프라켓
352: 제1체인
36: 제1샤프트
361: 제1종동스프라켓
362: 제2구동스프라켓
363: 제2체인
37: 베어링
38: 제2샤프트
381: 제2종동스프라켓
382: 피니언
40: 블레이드
41: 승강부재
42: 상부서포트
43: 하부서포트
44: 승강구동부
45: 블레이드실린더
46: 블레이드피스톤
60: 아우트리거
61: 아우터커버
62: 이너커버
631: 포스트실린더
631h: 실린더 힌지
632: 포스트피스톤
632h: 피스톤 힌지
64: 하부받침
641: 바닥면
642: 제1챔퍼면
643: 제2챔퍼면
71: 제1바지선
72: 제2바지선
8: 크레인
L: 유압라인
P: 유압발생장치(유압펌프)
G: 뉴머게이지
S: 작업구간, 작업현장(S)
H: 유압호스
A: 와이어앵커
g: 간격
W: 폭
L: 길이
1: Mound leveling device
10: body frame
11: Upper extension member
111: lifting ring member
113: curtain rail
114: roller
115: hose fixture
12: lower extension member
14: upper cross member
141: brace
15: lower cross member
151: rail support member
153: connection member
154: round tube
155: flange
17: column member
171: truss member
19: rail member
191: rack
30: mobile device
31: cross beam
311: front elevating guide member
312: elevating support member
32: housing
33: side plate
34: wheel housing
341: front wheel
342: rear wheel
35: power generator (hydraulic motor)
351: first drive sprocket
352: first chain
36: first shaft
361: first driven sprocket
362: second drive sprocket
363: second chain
37: bearing
38: second shaft
381: second driven sprocket
382: pinion
40: blade
41: elevating member
42: upper support
43: lower support
44: elevator shaft
45: blade cylinder
46: blade piston
60: outrigger
61: outer cover
62: inner cover
631: post cylinder
631h: cylinder hinge
632: post piston
632h: piston hinge
64: lower support
641: bottom surface
642: first chamfer surface
643: second chamfer surface
71: first barge
72: second barge
8: Crane
L: hydraulic line
P: Hydraulic generator (hydraulic pump)
G: New Mage
S: work section, work site (S)
H: hydraulic hose
A: Wire anchor
g: thickness
W: width
L: length

Claims (10)

전후방향으로 길게 연장되는 바디프레임(10);
상기 바디프레임(10)에서 2 이상의 서로 다른 개소에 설치되는 아우트리거(60);
상기 바디프레임(10)의 하부 양측에 마련되고, 전후방향으로 연장되는 한 쌍의 레일부재(19);
상기 레일부재(19)를 따라 전후 방향으로 이동 가능하도록 상기 한 쌍의 레일부재(19)에 설치되는 이동장치(30);
상기 이동장치(30)가 상기 레일부재(19)를 따라 전후 방향으로 이동할 수 있는 구동력을 제공하는 동력발생장치(35); 및
상기 이동장치(30)의 전방에 설치되어 상기 이동장치(30)와 함께 전후 방향으로 이동하는 블레이드(40);를 포함하고,
상기 바디프레임(10)은, 전후 방향으로 이격 배치되고 폭방향으로 상기 바디프레임(10)의 양단부까지 연장되는 복수 개의 하부크로스부재(15);를 포함하고,
상기 하부크로스부재(15)는:
상기 레일부재(19)를 지지하는 한 쌍의 레일지지부재(151); 및
상기 한 쌍의 레일지지부재(151) 사이에 배치되고, 상기 한 쌍의 레일지지부재(151)에 탈착 가능하게 연결되는 연결부재(153);를 포함하며,
상기 이동장치(30)와 블레이드(40)는 상기 하부크로스부재(15)보다 상부에 배치되고,
상기 연결부재(153)는, 상기 한 쌍의 레일지지부재(151) 사이에서 폭방향으로 연장되는 중공의 원형관(154)을 포함하는, 마운드 평탄화 장치.
a body frame 10 extending long in the front-rear direction;
Outriggers (60) installed at two or more different places in the body frame (10);
a pair of rail members 19 provided on both lower sides of the body frame 10 and extending in the front-rear direction;
a moving device 30 installed on the pair of rail members 19 so as to be movable in the front-rear direction along the rail member 19;
a power generating device (35) for providing a driving force for the moving device (30) to move in the front-rear direction along the rail member (19); and
The blade 40 is installed in front of the moving device 30 and moves in the front-rear direction together with the moving device 30;
The body frame 10 includes a plurality of lower cross members 15 spaced apart in the front-rear direction and extending to both ends of the body frame 10 in the width direction;
The lower cross member 15 includes:
a pair of rail support members 151 supporting the rail member 19; and
A connecting member 153 disposed between the pair of rail support members 151 and detachably connected to the pair of rail support members 151;
The moving device 30 and the blade 40 are disposed above the lower cross member 15,
The connecting member (153) includes a hollow circular tube (154) extending in the width direction between the pair of rail support members (151), a mound flattening device.
청구항 1에 있어서,
상기 아우트리거(60)의 신축을 구동하는 유압실린더를 더 포함하는, 마운드 평탄화 장치.
The method according to claim 1,
The mound flattening device further comprising a hydraulic cylinder for driving the expansion and contraction of the outrigger (60).
청구항 1에 있어서,
상기 이동장치(30)에 대해 상기 블레이드(40)의 상대적인 높이를 조절하는 승강구동부(44)를 더 포함하는, 마운드 평탄화 장치.
The method according to claim 1,
The mound flattening device, further comprising a lift driving unit (44) for adjusting the relative height of the blade (40) with respect to the moving device (30).
청구항 1 내지 청구항 3 중 어느 한 항의 마운드 평탄화 장치를 이용한 기초사석층 조성 공법으로서,
기초사석층을 조성하기 위한 구간에 기준레벨보다 낮게 사석을 투하하는 제1단계 ;
제1단계 후, 바디프레임(10)을 크레인(8)으로 인양하여, 기준레벨보다 낮은 상기 기초사석층 상에서 사석 고르기 작업을 하고자 하는 구간에 상기 마운드 평탄화 장치(1)를 가거치하는 제2단계;
제2단계 후, 상기 아우트리거(60)의 전개 길이를 조절하여, 가거치된 마운드 평탄화 장치(1)의 레일부재(19)가 수평을 이루도록 정거치하는 제3단계;
상기 이동장치(30)가 상기 레일부재(19)의 후방 단부에 위치하도록 한 상태에서, 제3단계 후, 상기 이동장치(30)의 전방에 기준레벨보다 높게 사석을 투하하는 제4단계;
제4단계 후, 상기 이동장치(30)가 상기 레일부재(19)의 안내를 받으며 전방으로 이동하도록 동력발생장치(P)를 작동시키어, 사석을 평탄화 하는 제5단계; 및
제5단계 후, 마운드 평탄화 장치(1)를 들어올려 다음 작업 구간으로 인양하는 제6단계;를 포함하는, 기초사석층 조성 공법.
As a basic sandstone layer composition method using the mound planarization device of any one of claims 1 to 3,
A first step of dropping the sandstone lower than the reference level in the section for forming the basic sandstone layer;
After the first step, the body frame 10 is lifted with the crane 8, and the mound leveling device 1 is temporarily held in the section where the leveling work is to be done on the foundation gravel layer lower than the reference level. ;
After the second step, a third step of adjusting the deployment length of the outrigger 60 so that the rail member 19 of the tentatively mounted mound flattening device 1 is horizontal;
a fourth step of dropping the rock to the front of the moving device 30 higher than the reference level after the third step in a state where the moving device 30 is positioned at the rear end of the rail member 19;
After the fourth step, a fifth step of leveling the rock by operating the power generating device (P) so that the moving device (30) moves forward while being guided by the rail member (19); and
After the fifth step, a sixth step of lifting the mound leveling device (1) and hoisting it to the next working section; including, a basic sandstone layer composition method.
청구항 4에 있어서,
상기 제6단계 후, 상기 제2단계 내지 제5단계를 반복하는, 기초사석층 조성 공법.
5. The method according to claim 4,
After the sixth step, repeating the second to fifth steps, the basic sandstone layer composition method.
청구항 5에 있어서,
기존 작업 구간과 다음 작업 구간 사이에 소정의 간격이 존재하도록, 제6단계를 수행하고,
다음 작업 구간의 평탄화 작업이 완료된 후, 상기 소정의 간격에 해당하는 영역의 사석을 고르는, 기초사석층 조성 공법.
6. The method of claim 5,
Step 6 is performed so that a predetermined interval exists between the existing work section and the next work section,
After the planarization operation of the next working section is completed, the foundation sandstone layer composition method of selecting the gravel in the area corresponding to the predetermined interval.
청구항 4에 있어서,
상기 제3단계 이후, 제5단계 전에, 블레이드(40)의 높이를 기준레벨에 맞추기 위해 상기 이동장치(30)에 대한 상기 블레이드(40)의 상대적인 높이를 조절하는 블레이드 높이 조절 단계;를 더 포함하는, 기초사석층 조성 공법.
5. The method according to claim 4,
After the third step, before the fifth step, a blade height adjustment step of adjusting the relative height of the blade 40 with respect to the moving device 30 to adjust the height of the blade 40 to the reference level; further comprising , a basic sandstone layer composition method.
청구항 4에 있어서,
상기 제5단계에서, 블레이드(40)의 높이를 기준레벨보다 더 높게 조정하여 상기 이동장치(30)를 전방으로 1차 이동시키고, 다시 이동장치(30)를 후방으로 이동시키며,
블레이드(40)의 높이를 기준레벨에 맞게 조정하여 상기 이동장치(30)를 전방으로 2차 이동시키는, 기초사석층 조성 공법.
5. The method according to claim 4,
In the fifth step, by adjusting the height of the blade 40 to be higher than the reference level, the moving device 30 is first moved forward, and the moving device 30 is moved backward again,
By adjusting the height of the blade 40 to match the reference level, the second movement of the moving device 30 forward is a basic sandstone formation method.
청구항 4에 있어서,
상기 제2단계 이후, 제3단계 전에, 바지선의 유압발생장치(P)의 유압라인(L)을 상기 마운드 평탄화 장치의 동력발생장치(P)와 아우트리거(60)에 연결하는 유압라인 연결 단계;를 더 포함하는, 기초사석층 조성 공법.
5. The method according to claim 4,
After the second step, before the third step, the hydraulic line connecting step of connecting the hydraulic line (L) of the hydraulic pressure generating device (P) of the barge to the power generating device (P) and the outrigger (60) of the mound flattening device ; further comprising, the basic sandstone layer composition method.
청구항 4에 있어서,
상기 제3단계에서, 잠수부가 뉴머게이지(G)로 각 아우트리거(60) 설치 위치의 수심을 측정한 뒤 상기 아우트리거(60)의 전개 길이를 조절하는, 기초사석층 조성 공법.
5. The method according to claim 4,
In the third step, the diver measures the depth of each outrigger 60 installation position with a pneumatic gauge (G) and then adjusts the deployment length of the outrigger 60, a basic rock formation method.
KR1020210044222A 2021-04-05 2021-04-05 Mound Leveling Method for Oceanic Construction KR102295251B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020210044222A KR102295251B1 (en) 2021-04-05 2021-04-05 Mound Leveling Method for Oceanic Construction
KR1020210111260A KR20220138320A (en) 2021-04-05 2021-08-23 Mound Leveling Method for Oceanic Construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210044222A KR102295251B1 (en) 2021-04-05 2021-04-05 Mound Leveling Method for Oceanic Construction

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020210111260A Division KR20220138320A (en) 2021-04-05 2021-08-23 Mound Leveling Method for Oceanic Construction

Publications (1)

Publication Number Publication Date
KR102295251B1 true KR102295251B1 (en) 2021-08-27

Family

ID=77504378

Family Applications (2)

Application Number Title Priority Date Filing Date
KR1020210044222A KR102295251B1 (en) 2021-04-05 2021-04-05 Mound Leveling Method for Oceanic Construction
KR1020210111260A KR20220138320A (en) 2021-04-05 2021-08-23 Mound Leveling Method for Oceanic Construction

Family Applications After (1)

Application Number Title Priority Date Filing Date
KR1020210111260A KR20220138320A (en) 2021-04-05 2021-08-23 Mound Leveling Method for Oceanic Construction

Country Status (1)

Country Link
KR (2) KR102295251B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010036580A (en) * 1999-10-09 2001-05-07 장동립 Remote control submerged finisher and method for the same
KR20010064693A (en) * 1999-12-18 2001-07-11 오재영 Planing machine of bridge building
JP2008280711A (en) * 2007-05-09 2008-11-20 Taisei Corp Leveling apparatus
KR20090108197A (en) * 2008-04-11 2009-10-15 홍기표 Seafloor or riverfloor leveling device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010036580A (en) * 1999-10-09 2001-05-07 장동립 Remote control submerged finisher and method for the same
KR20010064693A (en) * 1999-12-18 2001-07-11 오재영 Planing machine of bridge building
JP2008280711A (en) * 2007-05-09 2008-11-20 Taisei Corp Leveling apparatus
KR20090108197A (en) * 2008-04-11 2009-10-15 홍기표 Seafloor or riverfloor leveling device

Also Published As

Publication number Publication date
KR20220138320A (en) 2022-10-12

Similar Documents

Publication Publication Date Title
US9222233B2 (en) Method and device for creating an underwater foundation of a building
CN102720140B (en) Large-span prestress concrete continuous beam deepwater pier construction process
CN110952561A (en) Working method of riprap leveling ship
CN109797749B (en) Underwater foundation pit construction device and construction method
KR20160095569A (en) Slime disposal device and method of construction for large caliber Basic file construction
US3783626A (en) Structure, and method and apparatus for founding a structure
CN110847185B (en) Stone throwing and tamping integrated ship
US20220162828A1 (en) Trench wall cutting device and method for cutting a cut trench in the ground
CN112573113A (en) Riprap leveling ship
JP5686649B2 (en) Ultra-low head drilling device, kelly rod used for the drill, its drilling reaction force acquisition method and its moving device
CN107663859B (en) pile driver
KR102295251B1 (en) Mound Leveling Method for Oceanic Construction
CN111042173B (en) Quicksand layer open caisson construction method
CN110805044B (en) Working method for stone throwing and tamping integrated ship
KR102319678B1 (en) Mound Leveling Apparatus
CN206753488U (en) A kind of artificial digging pile reaming auxiliary equipment
JP2023544796A (en) Earthmoving machinery and methods for removing soil
JP2010053548A (en) Pile construction equipment and method for constructing cast-in-place concrete pile
CN213323580U (en) Posture adjusting device of leveling frame device of riprap leveling ship
JP2009203750A (en) Excavating machine and excavation method
CN211494398U (en) Stone sliding pipe device of riprap leveling ship
CN213324785U (en) Hopper device of riprap leveling ship
JP5865760B2 (en) Steel pipe press-fitting device moving device and steel pipe press-fitting device installation method
CN104047277B (en) A kind of lattice steel sheet pile large cylinder nominative sheet pile combination free combat method
RU2783828C1 (en) Device for strengthening earth structures

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant