KR102274663B1 KR1020190157961A KR20190157961A KR102274663B1 KR 102274663 B1 KR102274663 B1 KR 102274663B1 KR 1020190157961 A KR1020190157961 A KR 1020190157961A KR 20190157961 A KR20190157961 A KR 20190157961A KR 102274663 B1 KR102274663 B1 KR 102274663B1
Authority
KR
South Korea
Prior art keywords
reinforcing bar
base plate
punching shear
reinforcement
toothed
Prior art date
Application number
KR1020190157961A
Other languages
Korean (ko)
Other versions
KR20210068678A (en
Inventor
이상섭
배규웅
박금성
Original Assignee
한국건설기술연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국건설기술연구원 filed Critical 한국건설기술연구원
Priority to KR1020190157961A priority Critical patent/KR102274663B1/en
Publication of KR20210068678A publication Critical patent/KR20210068678A/en
Application granted granted Critical
Publication of KR102274663B1 publication Critical patent/KR102274663B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0645Shear reinforcements, e.g. shearheads for floor slabs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/08Reinforcements for flat foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

기초판의 펀칭전단내력을 구성하는 콘크리트 기여분은 펀칭전단보강재에 의하여 부담하도록 하되, 부족한 펀칭전단내력을 보완하면서 펀칭전단보강재를 용이하게 설치할 수 있는 펀칭전단보강철근을 제공함으로서, 기초판의 전단파괴 시 발생하는 펀칭전단파괴를 보다 효과적으로 제어할 수 있어 강화된 기초판의 펀칭전단내력을 제어할 수 있는 펀칭전단보강철근 및 이를 이용한 기초판 시공방법이 개시된다.The concrete contribution constituting the punching shear strength of the base plate is to be borne by the punching shear reinforcement, but by providing a punching shear reinforcement that can easily install the punching shear reinforcement while supplementing the insufficient punching shear strength, shear destruction of the foundation plate Disclosed are a punching shear reinforcing bar that can more effectively control the punching shear failure that occurs during the time and thereby control the punching shear strength of a reinforced base plate, and a base plate construction method using the same.

Description

펀칭전단보강철근 및 이를 이용한 기초판 시공방법 {PUNCHING SHEAR REINFORCING-BAR AND FOUNDATION STRUCTURE CONSTRUCTION METHOD THEREWITH}{PUNCHING SHEAR REINFORCING-BAR AND FOUNDATION STRUCTURE CONSTRUCTION METHOD THEREWITH}

본 발명은 펀칭전단보강철근 및 이를 이용한 기초판 시공방법에 관한 것이다. 더욱 구체적으로 기초판의 펀칭전단내력에 있어 콘크리트 기여분은 펀칭전단보강재가 부담하도록 하되, 부족한 펀칭전단내력을 보완할 수 있도록 하면서 펀칭전단보강재를 용이하게 설치할 수 있는 펀칭전단보강철근을 제공함으로서, 기초판의 전단파괴 시 발생하는 펀칭전단파괴를 보다 효과적으로 제어할 수 있는 펀칭전단보강철근 및 이를 이용한 기초판 시공방법에 관한 것이다.The present invention relates to a punching shear reinforcing bar and a method of constructing a base plate using the same. More specifically, the contribution of concrete to the punching shear strength of the base plate is to be borne by the punching shear reinforcement, but by providing a punching shear reinforcement that can easily install the punching shear reinforcement while compensating for the insufficient punching shear strength, the foundation It relates to a punching shear reinforcing bar that can more effectively control punching shear fracture occurring during shear fracture of a plate, and a method for constructing a base plate using the same.

일반적으로 철근 콘크리트 구조물의 경우 각 층의 바닥을 형성하면서 일정한 면적을 제공하는 기초판과 상기 기초판을 지지하며 구조물의 자중 및 각 층에서 발생하는 사용 하중을 기초판으로 전달하는 기둥부를 포함하여 구성되는 것이 일반적인 형태이다. In general, in the case of a reinforced concrete structure, it includes a base plate that provides a certain area while forming the floor of each floor, and a column that supports the base plate and transmits the structure's own weight and the working load generated on each floor to the base plate. It is a common form to be

이와 같은 철근 콘크리트 구조물에서 예컨대, 슬래브(바닥)와 기둥부(지상), 기초판과 기둥부(지하)가 만나는 접합부의 경우 기둥부 주변을 따라 전단력이 작용하는바, 이에 대한 내력이 충분치 못할 경우 전단파괴가 발생할 수 있다.In such a reinforced concrete structure, for example, in the case of a junction where a slab (floor) and a column part (ground), a base plate and a column part (underground) meet, a shear force acts along the periphery of the column part. Shear failure may occur.

이에 상기 바닥판 또는 기초판에는 역사다리꼴, 사다리꼴 형태의 펀칭전단파괴를 유발하게 되는데, 이러한 펀칭전단파괴는 다른 형태의 파괴양상과 달리 취성적이어서 슬래브-기둥 접합부의 안정성에 치명적이라고 알려져 있다.Accordingly, inverted trapezoidal or trapezoidal type of punching shear fracture is induced in the bottom plate or base plate, and this punching shear fracture is brittle unlike other types of fracture, and it is known that it is fatal to the stability of the slab-column junction.

도 1a는 슬래브-기둥 접합부의 안정성을 확보하기 위한 종래 기초판-기둥부 접합부에 발생하는 펀칭전단파괴에 대한 전단보강수단을 소개한 것이다.Figure 1a is an introduction to the shear reinforcement means for the punching shear failure occurring in the conventional base plate-column joint for securing the stability of the slab-column joint.

즉, 철근콘크리트 기초판(10)의 내력은 일반적으로 전단성능으로 결정되며, 특히 펀칭전단으로 알려진 이방향 전단거동에 의하여 지배된다.That is, the yield strength of the reinforced concrete base plate 10 is generally determined by shear performance, and in particular is dominated by a two-way shear behavior known as punching shear.

이에, 도 1a와 같이 펀칭전단파괴가 발생하는 임의의 역사다리꼴 형태의 펀칭전단파괴 영역(A)의 전단전단내력 확보를 위하여 기초판 콘크리트의 두께만으로 전단내력이 부족할 경우 전단보강근(21, 스터럽 또는 수직후크)을 배근하는 방법이 사용되고 있음을 알 수 있다.Accordingly, when the shear strength is insufficient only with the thickness of the base plate concrete in order to secure the shear shear strength of the punching shear fracture region (A) of any inverted trapezoidal shape in which the punching shear fracture occurs as shown in FIG. 1A, the shear reinforcement reinforcement (21, stirrup or It can be seen that the method of arranging vertical hooks) is used.

하지만 이러한 전단보강근(21)은 기초판 철근(미도시)과 간섭되기 때문에 작업성과 시공이 저하될 수밖에 없다는 한계가 있게 된다.However, since the shear reinforcing bar 21 interferes with the base plate reinforcing bar (not shown), there is a limit in that workability and construction are deteriorated.

이에 상기 기초판(40)과 기둥부(30)가 만나는 접합부의 펀칭전단파괴 영역(A)의 전단내력을 확보하기 위하여 도 1b 및 도 1c와 같이, 전단보강근(20)을 대체할 수 있는 펀칭전단보강재(20)를 설치하게 된다.Accordingly, in order to secure the shear strength of the punching shear fracture region A of the junction where the base plate 40 and the column part 30 meet, as shown in FIGS. 1b and 1c, punching that can replace the shear reinforcement 20 The shear reinforcement 20 is installed.

즉, 작용하중에 의하여 기초판(40)에 휨 균열이 발생하고, 이러한 휨 균열이 사인장 균열로 전환되면서 기초판 상부의 압축 영역에서 펀칭균열이 발생하기에 앞서 기초판 하부면에서 기둥에 가까운 첫 번째 압축 스트럿이 인장으로 전환되는 순간 발생하는 인장균열이 위험전단균열과 연결되어 펀칭파괴가 일어난다고 알려져 있으며 이러한 펀칭파괴를 초래하는 인장균열은 기둥 표면에서 일정 거리가 떨어진 위치에서 발생하게 된다.That is, bending cracks occur in the base plate 40 due to the applied load, and as these bending cracks are converted into sinusoidal cracks, before punching cracks occur in the compression region of the upper part of the base plate, it is close to the column on the lower surface of the base plate. It is known that the tensile crack that occurs at the moment when the first compression strut is converted to tension is connected with the dangerous shear crack to cause punching failure, and the tensile crack that causes such punching failure occurs at a location a certain distance away from the surface of the column.

이에 이러한 기둥 표면에서 일정 거리가 떨어진 위치에서 발생하는 펀칭파괴를 초래하는 인장균열을 억제하게 되면 급작스러운 펀칭파괴가 아닌 사인장-휨 파괴, 휨 파괴모드로 전환되어 기초판의 연성능력을 증가시킬 수 있도록 한 것이 펀칭전단보강재(20)이다.Therefore, if the tensile crack that causes punching failure occurring at a certain distance from the surface of the column is suppressed, it is converted into a sinusoidal-flexural failure and flexural failure mode rather than abrupt punching failure, thereby increasing the ductility of the base plate. It is the punching shear reinforcement 20 that is made possible.

이러한 종래 펀칭전단보강재(20, MSP,CMSP를 도시한 것이 도 1b 및 도 1c이다.1b and 1c show the conventional punching shear reinforcement (20, MSP, CMSP).

먼저 도 1b에 의하면, 펀칭전단보강재(20)는 MSP(MULTIPLE SHESR PREVENTOR, 잘린 역원뿔형 펀칭전단보강재를 이용한 기초보강공법)공법에 사용되는 것으로서,First, according to FIG. 1b, the punching shear reinforcement 20 is used in the MSP (MULTIPLE SHESR PREVENTOR, basic reinforcement method using a cut inverted conical punching shear reinforcement) method,

기초판(40)에 형성된 기둥부(30)의 접합부 주위에 다수가 설치되고 있음을 알 수 있으며, 직경이 큰 부분이 상향으로 직경이 작은 부분이 하향되도록 하고, 기둥부(30)의 하부측 가장자리에 접하여 기초판(40) 상부의 기초판 상부철근(42)의 바로 밑에 설치되도록 하고,It can be seen that many are installed around the junction of the pillar part 30 formed on the base plate 40 , so that the large diameter part is upward and the small diameter part is downward, and the lower side of the pillar part 30 . to be installed directly under the upper reinforcing bar 42 of the base plate 40 on the upper part of the base plate 40 in contact with the edge,

기초판(40) 콘크리트가 타설 양생되어 펀칭전단 균열의 차단과 동시에 콘크리트가 3축 압축이 일어나도록 펀칭전단보강재(20)의 내외부로 콘크리트가 충진되도록 하고 있음을 알 수 있다.It can be seen that the concrete is filled into and out of the punching shear reinforcement 20 so that the concrete of the base plate 40 is cast and cured to block the punching shear cracks and at the same time the concrete undergoes triaxial compression.

상기 펀칭전단보강재(20)는 일정 두께의 강판으로 제작된 일정 높이를 갖고 예각의 측면 경사각도에 의해 원추형태를 이루는 스커트부(24)가 구비되고,The punching shear reinforcement 20 has a predetermined height made of a steel plate of a certain thickness and is provided with a skirt portion 24 forming a cone shape by an acute side inclination angle,

스커트부(24)의 일부분이 절단, 절취되어 기둥 표면에 펀칭전단보강재(20)가 근접 위치되도록 하는 1개소 또는 2개소에 기둥 근접용 절단면이 형성되어 있는 구조를 가지고, 펀칭 전단에 취약한 기둥부(30) 주변 기초판(40) 상부의 응력분포를 3축 압축상태로 유지하고 균열이 발생하더라도 스커트부(24)가 차단함으로써 전단내력을 증가하도록 한 것이다.A portion of the skirt portion 24 is cut and cut, so that the punching shear reinforcement 20 is located close to the surface of the column. It has a structure in which a cut surface for column proximity is formed in one or two places, and the column portion vulnerable to punching shear (30) The shear strength is increased by maintaining the stress distribution in the upper part of the peripheral base plate 40 in a triaxial compression state and blocking the skirt part 24 even if cracks occur.

다음으로, 도 1c에 의하면, 종래 내부 이음쇠를 갖는 펀칭전단보강재(20, CMSP)가 소개되어 있다.Next, according to Figure 1c, the conventional punching shear reinforcement having an inner fitting (20, CMSP) is introduced.

종래 기초판의 펀칭 전단방지용 보강재로서 강판을 콘 롤링하여 잘린 펀칭전단보강재를 기초판 상부의 기둥 주철근 둘레에 받침대(철근고임대, 미도시)를 설치하여, 기초판 상부영역을 3축 압축상태가 되도록 보강하고, 위험전단균열이 발생하기 직전에 발생하는 인장균열을 억제할 수 있게 된다.The punching shear reinforcement cut by cone rolling the steel plate as a reinforcement for preventing shearing from punching of the conventional base plate is installed around the main reinforcing bar on the upper part of the base plate (reinforcing bar high rental, not shown), and the upper area of the base plate is in a 3-axis compression state. It is reinforced as much as possible, and it is possible to suppress tensile cracks that occur just before dangerous shear cracks occur.

이때 상기 펀칭전단보강재를 사용하는 이유는 간단한 강판의 롤링작업으로 제작이 가능하고, 자중이 크지 않아 작업자가 간단하게 설치할 수 있다는 장점이 있기 때문이다.At this time, the reason for using the punching shear reinforcement material is that it can be manufactured by a simple rolling operation of a steel plate, and has an advantage that an operator can install it simply because its own weight is not large.

이러한 펀칭전단보강재는 상부직경을 포함한 단면 설계 시 기둥부의 단변방향 길이에 비례하도록 제작하게 되는데, 기초판이 2000mm 이상의 두께가 되면 기둥부 단변방향 길이도 커지게 되고, These punching shear reinforcements are manufactured to be proportional to the length of the short side of the column when designing the cross-section including the upper diameter. When the base plate has a thickness of 2000 mm or more, the length of the short side of the column also increases,

이에 따라 콘 롤링으로 제작된 펀칭전단보강재의 크기도 커질 수밖에 없게 된다.Accordingly, the size of the punching shear reinforcement manufactured by cone rolling is inevitably increased.

결국, 펀칭전단보강재가 커지게 되면 그 내부에 타설되는 콘크리트량이 커지게 되고 이에 따라 콘크리트 내부 단면도 커지기 때문에 3축 압축상태를 유지하면서 인장균열을 억제하기가 매우 어렵게 된다.As a result, when the punching shear reinforcement increases, the amount of concrete poured therein increases, and accordingly, the internal cross section of the concrete increases, so that it is very difficult to suppress tensile cracking while maintaining the triaxial compression state.

이에 펀칭전단보강재의 강판두께를 두껍게 하는 방법도 생각할 수 있지만 실험결과에 의하면 이러한 두께 조정으로는 3축 압축상태를 유지하면서 인장균열을 억제하는 효과를 가지도록 공장에서 몸통부(24,스커트부)의 내측면에 레일부(23)가 형성된 상태로 하여 현장에 반입하고, 상기 레일부(23)에 원통형 내부이음쇠(25)를 끼워 고정 설치하도록 하는 내부 이음쇠를 갖는 펀칭전단보강재(CMSP 공법)를 이용하게 된다.Therefore, a method of thickening the thickness of the punching shear reinforcement material can be considered, but according to the experimental results, the body part (24, skirt part) in the factory to have the effect of suppressing tensile cracking while maintaining the triaxial compression state with this thickness adjustment A punching shear reinforcement (CMSP method) having an inner fitting that is brought into the field with the rail section 23 formed on the inner surface of the rail section 23 and fixed and installed by inserting the cylindrical inner fitting 25 into the rail section 23. will use

이로서 상기 내부이음쇠로 제작된 펀칭전단보강재에 의하여 두께가 커진 기초판에도 크기를 최소화하면서도 펀칭전단을 억제할 수 있는 펀칭전단보강재를 설치할 수 있어 보다 효율적이고 경제적인 펀칭전단보강재 및 이를 이용한 펀칭전단보강공법 제공이 가능하게 된다.As a result, a punching shear reinforcement capable of suppressing punching shear while minimizing the size can be installed even on the base plate, which has increased in thickness by the punching shear reinforcement manufactured with the inner fitting, and thus more efficient and economical punching shear reinforcement and punching shear reinforcement using the same It is possible to provide a technique.

이에, 도 1c에 의하면, 내부이음쇠로 제작된 펀칭전단보강재(20, CMSP)는 기초판 상부철근(42)에 결속선(44)를 이용하여 구속되어 있고, 레일부(23)와 원통형 내부이음쇠(25)가 몸통부(24, 스커트부)의 내측면에 형성된 것임을 알 수 있다.Accordingly, according to Figure 1c, the punching shear reinforcement (20, CMSP) manufactured as an inner fitting is constrained using a binding line 44 to the upper reinforcing bar 42 of the base plate, and the rail portion 23 and the cylindrical inner fitting. It can be seen that (25) is formed on the inner surface of the body portion (24, skirt portion).

또한, 상기 기초판(40)은 기초판 하부철근(41), 기초판 상부철근(42)이 배근되고, 기초판(40) 중앙부에는 다웰바철근(43)이 역시 배근되어 있음을 알 수 있다.In addition, it can be seen that the base plate 40 has a base plate lower reinforcing bar 41 and an upper base plate upper reinforcing bar 42 reinforced, and a dowel bar reinforcing bar 43 is also reinforced in the central part of the base plate 40 .

이에 종래 MSP 및 CMSP 공법의 경우 기초판의 압축영역에 설치되어 기둥으로부터 축하중이 전달될 때 3축 상태를 더욱 공고히 하여 콘크리트의 압축강도를 설계기준강도 이상으로 향상시키고, MSP 및 CMSP를 벗어난 외연에 위험(펀칭전단)균열이 형성되도록 하여 위험둘레길이(bo)를 확대하는 등의 효과가 있기때문에,Therefore, in the case of the conventional MSP and CMSP method, it is installed in the compression area of the base plate and when the axial load is transmitted from the column, the three-axis state is further consolidated to improve the compressive strength of the concrete above the design standard strength, and the outer edge beyond the MSP and CMSP Because it has the effect of expanding the dangerous circumferential length (bo) by allowing dangerous (punching shear) cracks to form in the

종래 MSP 및 CMSP는 기초의 펀칭전단내력을 구성하는 콘크리트의 기여분을 향상시키는 역할을 하게 됨을 알 수 있다.It can be seen that the conventional MSP and CMSP play a role in improving the contribution of concrete constituting the punching shear strength of the foundation.

하지만 현장 여건으로 기초판의 두께를 증가시킬 수 없는 조건에서 MSP 및 CMSP의 보강으로도 내력이 조금 부족하여 추가적인 보강이 필요한 경우가 있으므로, 이것은 철근의 기여분인

Figure 112019123995070-pat00001
를 이용하는 것이 바람직하게 되며, However, under the condition that the thickness of the base plate cannot be increased due to the site conditions, even with the reinforcement of MSP and CMSP, the bearing capacity is slightly insufficient and additional reinforcement is sometimes required.
Figure 112019123995070-pat00001
It is preferable to use

또한 MSP 및 CMSP를 상부 철근에 결속하여 설치하는 방법은 기둥 다웰바철근 주변에 임시 적치한 후 상부 철근의 배근 완료 시까지 시간적 차이가 발생하여 2차례에 걸친 현장 작업이 필요하다는 문제가 있었다.In addition, the method of attaching MSP and CMSP to the upper reinforcing bar has a problem in that it requires two on-site work because there is a time difference from temporarily placing it around the column dowel bar until the reinforcement of the upper reinforcing bar is completed.

나아가, 도 1d는 종래 기초판(또는 플랫슬래브)의 펀칭전단 설계기준의 설명도이다.Furthermore, Figure 1d is an explanatory view of the design criteria for punching shear of a conventional base plate (or flat slab).

즉, 기초판(10)의 펀칭전단내력은 콘크리트의 기여분과 전단보강철근의 기여분을 더해 평가(

Figure 112019123995070-pat00002
)하도록 규정되어 있다.That is, the punching shear strength of the base plate 10 is evaluated by adding the contribution of concrete and the contribution of shear reinforcement (
Figure 112019123995070-pat00002
) is prescribed.

하지만 최근 건축구조기준인 KBC2009에서 KBC2016로 개정되면서 콘크리트의 기여분에 대한 설계기준과 개념이 크게 바뀌게 되었다.However, with the recent revision from KBC2009, the building structure standard, to KBC2016, the design standards and concepts for the contribution of concrete have changed significantly.

즉, KBC2009 및 ACI 318-14는 역사다리꼴 형태의 펀칭전단파괴 영역(A, 붉은색)을 계산 편의를 위해 유효높이(d)의 수직면으로 가정하고, 기둥표면에서 0.5d 떨어진 위치의 위험둘레길이(bo)를 곱한 면적(bo×d)에 대해 콘크리트의 기여분(

Figure 112019123995070-pat00003
(
Figure 112019123995070-pat00004
))을 평가하였다.That is, KBC2009 and ACI 318-14 assume the inverted trapezoidal punching shear fracture area (A, red) as the vertical plane of the effective height (d) for convenience of calculation, and the dangerous circumferential length at a location 0.5d away from the surface of the column. Contribution of concrete to area (bo × d) multiplied by (bo) (
Figure 112019123995070-pat00003
(
Figure 112019123995070-pat00004
)) was evaluated.

그러나 KBC2016은 휨 균열 영역을 제외한 비균열 압축대(깊이 cu)만 펀칭전단에 저항하는 것으로 간주하였기 때문에 사실상 축소된 저항 가능 면적(bo×cu)에 대해 콘크리트이 기여분을 평가하도록 규정을 강화하였다.(

Figure 112019123995070-pat00005
(
Figure 112019123995070-pat00006
)→
Figure 112019123995070-pat00007
)However, since KBC2016 considered that only the non-cracked compression zone (depth cu), excluding the flexural crack region, was considered to resist punching shear, the regulations were strengthened to evaluate the contribution of concrete to the practically reduced resistable area (bo × cu).
Figure 112019123995070-pat00005
(
Figure 112019123995070-pat00006
)→
Figure 112019123995070-pat00007
)

이에 종래 기초판의 펀칭전단내력에 있어 콘크리트의 기여분을 보완하는 것이 펀칭전단보강재(20)인데, Therefore, it is the punching shear reinforcement 20 that supplements the contribution of concrete in the punching shear strength of the conventional base plate,

이러한 펀칭전단보강재(20)를 도 1b 및 도 1c와 같이, 현장에서 기초판-기둥부의 접합부 주위에 다수를 설치함에 있어 공간 확보에 한계가 있게 되고, 펀칭전단보강재를 기둥부 주위에 내려놓은 상태에서, 상부철근을 배근하고, 상기 펀칭전단보강재를 상부철근에 결속시키기 때문에, 펀칭전단보강재를 기초판 상부철근(42)에 고정 배근하기 위한 작업 대기시간(상부철근 배근 시까지의 대기시간)이 소요 된다는 문제점이 있었다.As shown in FIGS. 1b and 1c, there is a limit to securing space in installing a large number of these punching shear reinforcements 20 around the junction of the base plate-pillar in the field, and the punching shear reinforcements are laid down around the pillars In, since the upper reinforcing bar is reinforced and the punching shear reinforcing material is bound to the upper reinforcing bar, it takes a waiting time (waiting time until upper reinforcing reinforcement) for fixing the punching shear reinforcing material to the upper reinforcing bar 42 of the base plate. There was a problem that

대한민국 특허 제 10-1750177호(발명의 명칭: 절단 브리지형 펀칭전단 보강재 및 이를 이용한 기초판의 시공방법, 공고일자: 2017년06월22일)Republic of Korea Patent No. 10-1750177 (Title of the invention: cut bridge type punching shear reinforcement and construction method of base plate using the same, announcement date: June 22, 2017) 대한민국 특허 제 10-1875846호(발명의 명칭: 내부이음쇠로 제작된 펀칭전단보강재 및 이를 이용한 펀칭전단보강공법, 2018년07월09일)Republic of Korea Patent No. 10-1875846 (Title of the invention: Punching shear reinforcement made with inner fittings and punching shear reinforcement method using the same, July 09, 2018) 대한민국 특허 제 10-1378663호(발명의 명칭: 삿갓형 펀칭 전단방지용 보강재, 2014년03월26일)Republic of Korea Patent No. 10-1378663 (Title of the invention: reinforcing material for preventing shearing of hat-shaped punching, March 26, 2014) 대한민국 특허 제 10-1378628호(발명의 명칭: 돔형 펀칭 전단방지용 보강재, 2014년03월26일)Republic of Korea Patent No. 10-1378628 (Title of the invention: Dome-type punching reinforcement for preventing shear, March 26, 2014) 대한민국 특허 제 10-1247201호(발명의 명칭: 펀칭전단 방지용 보강재 및 이를 이용한 기초판 시공 방법, 2013년03월25일)Republic of Korea Patent No. 10-1247201 (Title of the invention: Punching shear prevention reinforcement and base plate construction method using the same, March 25, 2013)

이에 본 발명은 기초판의 펀칭전단내력에 있어 콘크리트의 기여분으로 기능하는 펀칭전단보강재(MSP,CMSP)를 그대로 사용하되, 부족한 펀칭전단내력을 보완하기 위하여 철근의 기여분에 해당하는 펀칭전단보강철근을 추가로 사용함으로서 최근의 펀칭전단 설계기준에 효과적으로 대응할 수 있는 펀칭전단보강철근 및 이를 이용한 기초판 시공방법 제공을 해결하고자 하는 기술적 과제로 한다.Therefore, the present invention uses punching shear reinforcing materials (MSP, CMSP) that function as a contribution of concrete in the punching shear strength of the base plate as it is, but in order to compensate for the insufficient punching shear strength, punching shear reinforcing reinforcing bars corresponding to the contribution of reinforcing bars By additional use, it is a technical task to solve the provision of punching shear reinforcing bars that can effectively respond to the latest punching shear design standards and a method for constructing a base plate using the same.

또한 본 발명은 펀칭전단보강철근을 펀칭전단보강재의 고정수단으로서 이용함으로서 현장에서 펀칭전단보강철근과 펀칭전단보강재를 보다 효율적으로 고정 설치할 수 있어 시공성 및 작업성을 확보할 수 있는 펀칭전단보강철근 및 이를 이용한 기초판 시공방법 제공을 해결하고자 하는 기술적 과제로 한다.In addition, the present invention uses punching shear reinforcement as a fixing means of punching shear reinforcement, so that punching shear reinforcement and punching shear reinforcement can be more efficiently fixed and installed in the field, so that workability and workability can be secured; and It is a technical task to solve the provision of the foundation plate construction method using this.

상기 과제를 달성하기 위해 본 발명의 펀칭전단보강철근은 In order to achieve the above object, the punching shear reinforcing bar of the present invention is

기초판에 설치되는 기둥부의 다웰브철근에 고정되는 상단부; 기초판의 기초판 하부철근과 고정되는 하단부; 상기 상단부와 하단부 사이에 일체화된 것으로서, 기초판의 사다리꼴 형태의 펀칭전단파괴 영역(A)의 위험균열면(G)을 다수 교차하여 설치되는 중간교차철근부;을 포함하는 톱니철근을 포함하며, 상기 상단부는 기둥부 주위의 기초판 상부에 설치되는 펀칭전단보강재에 구속되도록 하여 톱니철근을 펀칭전단보강재를 고정 설치하는데 이용함과 더불어, 상기 펀칭전단보강재는 기초판의 펀칭전단내력의 콘크리트 기여분으로서 이용되도록 하고, 상기 톱니철근은 기초판의 펀칭전단내력의 철근 기여분으로서 이용되도록 하며, 상기 펀칭전단보강재는 기초판 하부철근 상면에 톱니철근을 세팅한 후, 펀칭전단보강재를 톱니철근에 고정 설치하고, 톱니철근이 기초판의 기초판 상부철근의 저면을 지지하는 역할을 하도록 하여, 펀칭전단보강재와 기초판 상부철근의 연속적인 시공작업이 가능하도록 하게 된다.The upper part fixed to the dowel reinforcing bar of the column part installed on the base plate; The lower part fixed to the base plate lower reinforcing bar of the base plate; As integrated between the upper end and the lower end, the intermediate intersecting reinforcing bars installed by crossing a plurality of dangerous cracking surfaces (G) of the punching shear fracture area (A) of the trapezoidal shape of the base plate; including toothed reinforcing bars, The upper end is constrained to the punching shear reinforcement installed on the upper part of the base plate around the column so that the toothed reinforcing bar is used to fix the punching shear reinforcement, and the punching shear reinforcement is used as a concrete contribution of the punching shear strength of the foundation plate The toothed reinforcing bar is used as a reinforcing bar contribution of the punching shear strength of the base plate, and the punching shear reinforcement is fixed to the toothed reinforcing bar after setting the toothed reinforcing bar on the upper surface of the lower reinforcing bar of the base plate, The toothed reinforcing bar serves to support the bottom surface of the upper reinforcing bar of the base plate of the base plate, so that the continuous construction work of the punching shear reinforcement and the upper reinforcing bar of the base plate is possible.

또한 본 발명의 펀칭전단보강철근을 이용한 기초판 시공방법은In addition, the base plate construction method using the punching shear reinforcing bar of the present invention is

(a) 기초판에 설치되는 기둥부의 다웰바철근에 고정되는 상단부; 기초판의 기초판 하부철근과 고정되는 하단부; 및 상기 상단부와 하단부 사이에 일체화된 것으로서, 기초판의 사다리꼴 형태의 펀칭전단파괴 영역(A)의 위험균열면(G)을 다수 교차하여 설치되는 중간교차철근부;을 포함하는 톱니철근을 준비하는 단계; (b) 기초판 하부철근에 상기 톱니철근을 서로 수평으로 이격시켜 기둥부 다웰바철근 주위에 방사형태로 배근하되, 톱니철근의 하단부는 기초판 하부철근에 고정 설치하고, 상단부는 기초판 하부철근에 설치된 다웰바철근의 고정띠철근에 걸치도록 하는 단계; (c) 펀칭전단보강재의 결속공과 상기 톱니철근의 상단부를 서로 결속선을 이용하여 고정하는 단계; 및 (d) 상기 톱니철근의 상단부를 철근고임대로 이용하여 기초판 상부철근을 배근하는 단계;를 포함하며,
상기 (c) 단계의 펀칭전단보강재는, 기초판 하부철근 상면에 톱니철근을 세팅한 후, 펀칭전단보강재를 톱니철근에 고정 설치하고, 톱니철근이 기초판의 기초판 상부철근의 저면을 지지하는 역할을 하도록 하여, 펀칭전단보강재와 기초판 상부철근의 연속적인 시공작업이 가능하도록 하게 된다.
(a) the upper part fixed to the dowel bar reinforcement of the column part installed on the base plate; The lower part fixed to the base plate lower reinforcing bar of the base plate; And as integrated between the upper end and the lower end, intermediate intersecting reinforcing bars installed by crossing a plurality of dangerous cracking surfaces (G) of the punching shear fracture area (A) of the trapezoidal shape of the base plate; step; (b) The toothed reinforcing bars are horizontally spaced apart from each other in the lower reinforcing bar of the base plate and radially reinforced around the dowel bar of the column part, but the lower end of the toothed reinforcing bar is fixed to the lower reinforcing bar of the base plate, and the upper end is the lower reinforcing bar Step to span the fixed band reinforcement of the dowel bar reinforcement installed in the; (c) fixing the binding hole of the punching shear reinforcement and the upper end of the toothed reinforcing bar to each other using a binding line; and (d) reinforcing the upper reinforcing bar of the base plate by using the upper end of the toothed reinforcing bar as a reinforcing bar high rental.
The punching shear reinforcement of step (c) is, after setting the toothed reinforcement on the upper surface of the lower reinforcement of the base plate, the punching shear reinforcement is fixed to the toothed reinforcement, and the toothed reinforcement supports the bottom of the upper reinforcement of the base plate of the base plate By playing a role, the continuous construction work of the punching shear reinforcement and the upper reinforcing bar of the base plate is possible.

본 발명에 의한 펀칭전단보강철근은 펀칭전단보강재의 고정 설치를 위한 수단으로 이용함으로서 철근고임대에 의하여 기초판 상부철근 아래에 결속선등을 이용하여 고정하는 종래 설치방법과 대비하여 간섭이 적고, 작업성이 뛰어나기 때문에 현장 적용에 매우 유리한 펀칭전단보강철근 및 이를 이용한 펀칭전단보강공법 제공이 가능하게 된다.The punching shear reinforcing bar according to the present invention is used as a means for fixed installation of the punching shear reinforcing material. Because of its excellent performance, it is possible to provide punching shear reinforcement rebar, which is very advantageous for field application, and a punching shear reinforcement method using the same.

또한 펀칭전단보강재로서 내부이음쇠로 제작된 펀칭전단보강재를 이용할 경우 두께가 커진 기초판에도 크기를 최소화하면서도 펀칭전단을 억제할 수 있어 보다 효율적이고 경제적인 펀칭전단 보강철근 및 이를 이용한 펀칭전단보강공법 제공이 가능하게 된다. In addition, when a punching shear reinforcement manufactured with an inner fitting is used as a punching shear reinforcement, it is possible to suppress punching shear while minimizing the size of a thick base plate, providing a more efficient and economical punching shear reinforcement and a punching shear reinforcement method using the same This becomes possible.

또한 본 발명에 의한 펀칭전단보강철근은 강화된 펀칭전단 설계기준에 대응을 위하여 기초판의 펀칭전단내력의 콘크리트의 기여분과 전단보강철근의 기여분을 보다 이용하기 때문에 최근 강화된 펀칭전단 설계기준에 의한 기초판 설계 및 시공에 매우 효과적인 펀칭전단보강철근 및 이를 이용한 펀칭전단보강공법 제공이 가능하게 된다.In addition, the punching shear reinforcing bar according to the present invention uses more the contribution of concrete and shear reinforcing bars to the punching shear strength of the base plate in order to respond to the reinforced punching shear design standards. It is possible to provide a punching shear reinforcement rebar and a punching shear reinforcement method using the same, which is very effective for the design and construction of the base plate.

도 1a는 종래 기초판의 위험전단균열 이론도,
도 1b 및 도 1c는 종래 펀칭 전단방지용 보강재 설치도,
도 1d는 종래 기초판의 펀칭전단 설계기준의 설명도,
도 2a 및 도 2b는 본 발명의 펀칭전단보강철근의 구성사시도 및 시공사시도,
도 3a, 도 3b 및 도 3c는 본 발명의 펀칭전단보강철근을 이용한 기초판 시공방법의 시공순서도이다.
1a is a theoretical diagram of dangerous shear cracking of a conventional base plate;
Figures 1b and 1c is a conventional punching shear prevention reinforcement installation view,
1d is an explanatory view of the design criteria for punching shear of a conventional base plate;
2a and 2b are a perspective view and a construction perspective view of the punching shear reinforcing bar of the present invention;
3a, 3b and 3c are construction flow charts of the base plate construction method using the punching shear reinforcing bar of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art can easily implement them. However, the present invention may be embodied in many different forms and is not limited to the embodiments described herein. And in order to clearly explain the present invention in the drawings, parts irrelevant to the description are omitted, and similar reference numerals are attached to similar parts throughout the specification.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.Throughout the specification, when a part "includes" a certain element, it means that other elements may be further included, rather than excluding other elements, unless otherwise stated.

[본 발명의 펀칭전단보강철근(100)][Punching shear reinforcing bar (100) of the present invention]

도 2a 및 도 2b는 본 발명의 펀칭전단보강철근(100)의 구성사시도 및 시공사시도를 도시한 것이다.2a and 2b show a perspective view and a construction perspective view of the punching shear reinforcing bar 100 of the present invention.

기초판(400)의 펀칭전단내력은 콘크리트의 기여분과 전단보강철근의 기여분으로 구분되는데 콘크리트의 기여분을 보완하기 위한 것이 펀칭전단보강재(200)이고, 펀칭전단보강재(200)을 보완할 수 있도록 한 것이 철근의 기여분에 해당하는 펀칭전단보강철근(100)이다.The punching shear strength of the base plate 400 is divided into the contribution of concrete and the contribution of the shear reinforcing bar. The punching shear reinforcement 200 is to supplement the contribution of the concrete, and the punching shear reinforcement 200 can be supplemented. It is the punching shear reinforcing bar 100 corresponding to the contribution of the reinforcing bar.

이에 본 발명의 펀칭전단보강철근(100)은 펀칭전단보강재(200)와 함께 사용되며, 펀칭전단보강재(200)를 사용함에 따른 종래 고정 설치의 시공성과 작업성이 저하되는 문제를 해결할 수 있는 기능을 가지게 된다.Accordingly, the punching shear reinforcement reinforcing bar 100 of the present invention is used together with the punching shear reinforcement 200, and the workability and constructability of the conventional fixed installation caused by using the punching shear reinforcement 200 A function that can solve the problem of deterioration will have

상기 기초판(400)은 2000mm이상으로 시공됨에 있어서 펀칭전단보강재(200)는 내부이음쇠로 제작된 펀칭전단보강재를 이용할 수 있으며, 내부이음쇠가 제작되지 않은 것도 사용할 수 있다.Since the base plate 400 is constructed to be 2000 mm or more, the punching shear reinforcement 200 may use a punching shear reinforcement manufactured with an inner fitting, and a material without an inner fitting may also be used.

이에 상기 본 발명의 펀칭전단보강철근(100)은 도 2a 및 도 2b와 같이, 톱니철근(110), 각도고정장치(120)을 포함하게 된다.Accordingly, the punching shear reinforcing bar 100 of the present invention includes a toothed reinforcing bar 110 and an angle fixing device 120 as shown in FIGS. 2A and 2B .

상기 톱니철근(110)은 도 3c를 참조하면 사다리꼴 형태의 펀칭전단파괴 영역(A)에서 펀칭전단을 발생시키는 위험균열면(G)을 중간교차철근부(113)가 교차하도록 하면서, 상단부(111)는 기둥부(300)의 다웰바철근(310)에 고정되도록 형성되고, 하단부(112)는 기초판(400)의 기초판 하부철근(410)과 고정되도록 형성시키게 된다.The sawtooth reinforcing bar 110 is, referring to FIG. 3c , the intermediate cross reinforcing bar 113 intersects the dangerous cracking surface G that generates punching shear in the punching shear destruction region A of the trapezoidal shape, while the upper end 111 ) is formed to be fixed to the dowel bar reinforcing bar 310 of the column part 300 , and the lower end 112 is formed to be fixed to the base plate lower reinforcing bar 410 of the base plate 400 .

이에 상기 상단부(111)는 도 2a와 같이, 기둥부(300)의 다웰바철근(310)을 수평으로 감싸도록 설치된 고정띠철근(320)에 걸치도록 단부걸림부(111b)가 형성된 수평철근부(111a)로 형성된 것이다.Accordingly, as shown in FIG. 2a, the upper end 111 is a horizontal reinforcing bar in which an end locking part 111b is formed so as to span the fixed band reinforcing bar 320 installed to horizontally surround the dowel bar reinforcing bar 310 of the column part 300, as shown in FIG. 2a. (111a) is formed.

이에 상기 수평철근부(111a)는 기초판(400)의 기초판 상부철근(420)의 저면을 지지하는 종래 철근고임대 역할을 할 수 있어, 기초판(400)의 기초판 상부철근(420) 배근도 용이하고, 기둥부(300) 주위에 설치되는 종래 철근고임대도 일부 배제할 수 있게 되므로 시공성과 작업성이 증진될 수 있게 된다.Accordingly, the horizontal reinforcing bar portion 111a can serve as a conventional rebar high rental for supporting the bottom surface of the base plate upper reinforcing bar 420 of the base plate 400, and the base plate upper reinforcing bar 420 of the base plate 400. Reinforcement is also easy, and since it is possible to exclude some of the conventional high-reinforcement rebar installed around the column part 300, constructability and workability can be improved.

또한 고정띠철근(320)은 도 2a와 같이, 기둥부(300)의 다웰바철근(310)의 외주면을 감싸도록 배근하여 톱니철근(110)의 상단부(111)를 고정시키기 위한 기능을 가지게 되므로 위치는 변동이 가능하며, 위치 선정이 어려움이 없다면 기둥부(300)의 다웰바철근(310)을 그대로 이용해도 상관은 없다.In addition, the fixed band reinforcement 320 is reinforced to surround the outer peripheral surface of the dowel bar reinforcement 310 of the column part 300, as shown in FIG. 2a, so as to have a function for fixing the upper end 111 of the toothed reinforcement 110. The position is variable, and if there is no difficulty in selecting a position, it does not matter if the dowel bar reinforcing bar 310 of the column part 300 is used as it is.

다음으로 상기 하단부(112)도 도 2a와 같이, 상단부(111)와 같이 수평철근부(112a)로 형성되며 단부걸림부는 형성되지 않고 수평철근부(112a)가 기초판 하부철근(410)에 고정되어 펀칭전단보강철근(100)의 위치를 고정하게 된다.Next, the lower end 112 is also formed of a horizontal reinforcing bar 112a like the upper end 111, as shown in FIG. 2A, and the end locking portion is not formed and the horizontal reinforcing bar 112a is fixed to the lower reinforcing bar 410 of the base plate. is to fix the position of the punching shear reinforcing bar 100.

다음으로 상기 중간교차철근부(113)는 도 2a와 같이, 상단부(111)와 하단부(112) 사이에 형성된 것으로서 펀칭전단을 발생시키는 상기 위험균열면(G)을 교차하도록 형성시킨 것이다.Next, the intermediate intersecting reinforcing bar 113 is formed between the upper end 111 and the lower end 112 as shown in FIG. 2A to intersect the dangerous crack surface G that generates punching shear.

통상 건축구조기준에서 피라미드 형태의 펀칭전단 파괴면에 배근되는 전단보강철근의 기여도는 사다리꼴 형태의 펀칭전단파괴 영역(A)의 유효깊이(d)에 해당하는 거리에 배치되는 전단보강철근의 개수가 지배하게 되며, 종래 전단보강철근을 수직전단철근으로 배근하는 경우와 대비하여 경사전단철근으로 배근하는 경우 아래와 같이 전단보강효과가 커지게 된다.In general, the contribution of shear reinforcing bars to the pyramid-shaped punching shear fracture surface in the standard building structure is determined by the number of shear reinforcing bars arranged at a distance corresponding to the effective depth (d) of the trapezoidal punching shear fracture area (A). In contrast to the case of reinforcing the conventional shear reinforcing bar with vertical shear reinforcing bars, when reinforcing with inclined shear reinforcing bars, the shear reinforcing effect increases as follows.

수직전단철근 :

Figure 112019123995070-pat00008
(
Figure 112019123995070-pat00009
: 전단보강철근의 배근 간격)Vertical shear reinforcement:
Figure 112019123995070-pat00008
(
Figure 112019123995070-pat00009
: Reinforcement spacing of shear reinforcing bars)

경사전단철근 :

Figure 112019123995070-pat00010
(
Figure 112019123995070-pat00011
: 전단보강철근의 각도)Inclined shear reinforcement:
Figure 112019123995070-pat00010
(
Figure 112019123995070-pat00011
: Angle of shear reinforcing bar)

즉, 본 발명의 전단보강근은 상기 유효깊이(d)의 거리 내에서 펀칭전단을 발생시키는 위험균열면(G, 약 45도로 가정)과 5차례 교차하게 하면서 이 가운데 각도가 30도 이상인 경우는 3차례 정도로 전단철근에 의한 보강 효과를 극대화할 수 있으며 이는 유효깊이(d)의 거리 내에 3개의 수직전단철근으로 보강하는 경우에 비해 전단강도는 약 40%가 향상되는 효과가 있으며, 물량은 약 30% 감소하는 효과가 있게 된다.That is, the shear reinforcing bar of the present invention intersects the dangerous cracking surface (G, assumed about 45 degrees) that generates punching shear within the distance of the effective depth (d) 5 times, and among them, the angle is 3 It is possible to maximize the reinforcing effect of the shear reinforcing bar in turn, and this has the effect of increasing the shear strength by about 40% compared to the case of reinforcing with three vertical shear rebars within the distance of the effective depth (d), and the quantity is about 30 % reduction effect.

이에 상기 중간교차철근부(113)는 도 2a와 같이, 펀칭전단을 발생시키는 위험균열면(G)을 일정 각도로 다수 교차하면서 상단은 상단부(111)와 일체화시키고, 하단은 하단부(112)와 일체화시키게 형성되며, 상단부와 하단부 사이의 중간교차철근부(113)은 톱니 형태로 절곡 형성됨을 알 수 있으며 기초판(400)의 크기, 사다리꼴 형태의 펀칭전단파괴 영역(A)의 크기에 따라 위험균열면(G)을 교차하는 횟수와 형성높이는 변경가능하게 된다.Accordingly, the intermediate intersecting reinforcing bar 113 is integrated with the upper end 111 while crossing a number of dangerous cracking surfaces G that generate punching shear at a certain angle as shown in FIG. 2A, and the lower end is the lower end 112 and It is formed to be integrated, and it can be seen that the intermediate cross reinforcing bar 113 between the upper end and the lower end is bent in a sawtooth shape, and depending on the size of the base plate 400 and the size of the trapezoidal punching shear fracture area (A), risk The number of crossings of the crack surface G and the formation height can be changed.

상기 각도고정장치(120)는 도 2a 및 도 2b와 같이, 각각의 톱니철근(110)이 수직평면상으로 형성되기 때문에 기둥부(300) 주위에 서로 수평으로 일정한 간격을 가지도록 세팅시키기 위한 것이다.The angle fixing device 120, as shown in FIGS. 2A and 2B, since each toothed reinforcing bar 110 is formed on a vertical plane, it is intended to set the column part 300 around the column part 300 so as to have a constant distance horizontally from each other. .

또한 각도고정장치(120)는 도 2a 및 도 2b와 같이, 톱니철근(110)의 상단부(111)가 펀칭전단보강재(200)의 상면을 따라 위치하는 결속공(210)에 결속되도록 하기 위한 위치로 세팅되도록 하는 역할을 하게 된다.In addition, the angle fixing device 120 is a position for binding the upper end 111 of the toothed reinforcing bar 110 to the binding hole 210 located along the upper surface of the punching shear reinforcement 200, as shown in FIGS. 2a and 2b. It plays a role in setting it to .

이에 상기 각도고정장치(120)는 중간교차철근부(113)의 하부에 위치하는 고정부(121)와 고정부 사이에 설치되는 연결부(122)로 형성된다.Accordingly, the angle fixing device 120 is formed of a fixing part 121 positioned under the intermediate cross reinforcement part 113 and a connection part 122 installed between the fixing part.

상기 고정부(121)는 예컨대 2개의 중간교차철근부(113)의 하부 외주면에 커플러를 고정시키고, 연결부(122)는 수평철근의 양 절곡단부를 커플러에 체결시키는 방식으로 연결부의 연장길이에 의하여 톱니철근(110)의 수평 간격이 정해지도록 하게 된다.The fixing part 121 fixes the coupler to the lower outer circumferential surface of the two intermediate intersecting reinforcing bars 113, for example, and the connecting part 122 fastens both bent ends of the horizontal reinforcing bars to the coupler by the extension length of the connection part. The horizontal spacing of the toothed reinforcing bars 110 is determined.

이에 톱니철근(110)의 상단부(111)가 펀칭전단보강재(200)의 상면을 따라 위치하는 결속공(210)의 주위에 위치하도록 하여 결속선을 결속공(210)을 관통하도록 하면서 톱니철근(110)의 상단부(111)와 연결시켜 톱니철근(110)의 상단부(111)를 펀칭전단보강재(200)에 구속되도록 하고, 각도고정장치(120)는 다수의 2개의 톱니철근(110) 사이에 설치되도록 함으로서 펀칭전단보강재(200)에 톱니철근(110)이 구속되는 위치를 세팅 시킬 수 있도록 하게 된다.Accordingly, the upper end 111 of the toothed reinforcing bar 110 is positioned around the binding hole 210 located along the upper surface of the punching shear reinforcement 200 so that the binding line passes through the binding hole 210 while the toothed reinforcement ( The upper end 111 of the toothed reinforcing bar 110 is bound to the punching shear reinforcement 200 by connecting it with the upper end 111 of 110), and the angle fixing device 120 is between a plurality of two toothed reinforcing bars 110. By installing it, it is possible to set a position at which the toothed reinforcing bar 110 is restrained in the punching shear reinforcement 200 .

이에 각도고정장치(120)를 이용하여 톱니철근(110)은 기둥부(300) 주위에 방사형으로 다수가 배치되도록 할 수 있게 된다.Accordingly, by using the angle fixing device 120 , the toothed reinforcing bar 110 can be arranged radially around the column part 300 .

다음으로 상기 펀칭전단보강재(200)는 도 2a 및 도 2b와 같이 역원뿔형 펀칭전단보강재를 사용함으로서 간단한 강판의 콘 롤링작업으로 제작이 가능하고, 자중이 크지 않아 작업자가 간단하게 설치할 수 있다는 장점을 가질 수 있도록 하게 된다.Next, the punching shear reinforcement 200 can be manufactured by a simple cone rolling operation of a steel plate by using an inverted cone-type punching shear reinforcement as shown in FIGS. 2A and 2B, and its own weight is not large, so an operator can easily install it. to be able to have

도 2a와 도 2b에 의하면 기둥부(300)를 기준으로 서로 대향되도록 배치되며 상단은 결속공(210)이 형성된 스커트부(220)로 형성되고, 상부로부터 하부로 갈수록 직경이 작아져 테이퍼링 되어 있으며 상부도 개방되고 하부도 일정한 직경의 홀이 형성되어 내부로 기초판(400)용 콘크리트가 타설되게 된다.According to Figures 2a and 2b, it is arranged to face each other with respect to the pillar portion 300, and the upper end is formed of a skirt portion 220 having a binding hole 210, and the diameter decreases from the top to the bottom and is tapered. The upper part is opened and the lower part is also formed with a hole of a certain diameter, so that the concrete for the base plate 400 is poured inside.

이러한 펀칭전단보강재(200)는 기초판(400) 상면 주위에 배치되므로 종래에는 기초판 하부철근(410) 상면에 스트럽철근등 내부철근을 배근하고, 내부철근 상면에 펀칭전단보강재(200)를 세팅시킨 후, 기초판 상부철근(420)을 배근하고, 기초판 상부철근(420)에 펀칭전단보강재(200)를 결속선을 이용하여 고정 설치했는데, 시공 공정에 시간 차이가 있어 펀칭전단보강재(200)과 기초판 상부철근(420)의 연속 배근이 어렵다는 문제점이 있었다.Since this punching shear reinforcement 200 is disposed around the upper surface of the base plate 400, conventionally, internal reinforcement such as stirrup reinforcement is reinforced on the upper surface of the lower reinforcement 410 of the foundation plate, and the punching shear reinforcement 200 is placed on the top surface of the internal reinforcement After setting, the upper reinforcing bar 420 of the base plate was reinforced, and the punching shear reinforcement 200 was fixed and installed on the upper reinforcing bar 420 of the base plate using a binding line, but there is a time difference in the construction process, so the punching shear reinforcement ( 200) and the upper reinforcing bar 420 of the base plate was difficult to continuously reinforce.

하지만 본 발명은 펀칭전단보강재(200)를 톱니철근(110)를 이용하여 먼저 고정 설치할 수 있어, 기초판 하부철근(410) 상면에 스트럽철근등 내부철근을 배근하고, 톱니철근(110)을 세팅한 후, 펀칭전단보강재(200)를 톱니철근(110)에 고정 설치하고, 톱니철근(110)을 철근고임대로 이용하여 기초판 상부철근(420)을 배근함으로서 대기시간 없이 연속적인 시공작업이 가능하도록 하게 된다.However, in the present invention, the punching shear reinforcement 200 can be fixed and installed first using the toothed reinforcing bar 110, and internal reinforcing bars such as stirrup reinforcing bars are reinforced on the upper surface of the base plate lower reinforcing bar 410, and the toothed reinforcing bars 110 After setting, the punching shear reinforcement 200 is fixed to the toothed reinforcing bar 110, and the toothed reinforcing bar 110 is used as a reinforcing bar high rental to reinforce the upper reinforcing bar 420 of the base plate, so that continuous construction work without waiting time makes this possible

이러한 펀칭전단보강재(200)는 레일부(250)가 원통형 내부이음쇠(240)의 측면지지부)가 내측면에 용이하게 장착될 수 있는 가이드부 역할을 하게 되며 측면지지부가 끼워지도록 홈이 형성될 수 있는 이격된 가이드 블록으로 형성된 것을 이용하여 현장에서 원통형 내부이음쇠(240)를 레일부(250)에 끼워지도록 한 후, 원통형 내부이음쇠(240)의 상단을 역원뿔형 몸통부인 스커트부(220)의 내측면에 점용접으로 고정 설치할 수 있도록 할 수도 있으며, This punching shear reinforcement 200 serves as a guide part in which the rail part 250 can be easily mounted on the inner surface of the side support part of the cylindrical inner fitting 240), and a groove can be formed so that the side support part is fitted. After fitting the cylindrical inner fitting 240 to the rail part 250 in the field using what is formed as a spaced apart guide block, the upper end of the cylindrical inner fitting 240 is placed inside the skirt 220, which is an inverted conical body. It can be fixed and installed on the side by spot welding,

레일부(250)와 원통형 내부이음쇠(240)를 이용하지 않고 스커트부만 형성된 것을 이용해도 된다.Instead of using the rail part 250 and the cylindrical inner fitting 240, a skirt part formed only may be used.

다음으로 상기 기초판(400)은 도 3c를 참조하면 기초판 터파기 후, 기초판 하부철근(410)을 터파기 면에 배근하고, 기둥부 다웰바철근(310)을 배근한 후, 톱니철근(110)을 기초판 하부철근(410)에 고정 설치하고, 펀칭전단보강재(200)를 톱니철근(110)에 고정 설치하고, 기초판 상부철근(420)을 배근한 후, 기초판 콘크리트(C)를 타설함으로서 일정한 두께로 형성시키게 된다.Next, referring to FIG. 3C , the base plate 400 is after the excavation of the base plate, the lower reinforcing bar 410 of the base plate is reinforced on the excavation surface, the dowel bar reinforcement 310 of the column part is reinforced, and the toothed reinforcing bar (110) is fixed to the lower reinforcing bar 410 of the base plate, the punching shear reinforcement 200 is fixed to the toothed reinforcing bar 110, and the upper reinforcing bar 420 of the base plate is reinforced, and then the base plate concrete (C) ) to form a constant thickness by pouring.

이에 상기 기초판 하부철근(410), 기초판 상부철근(420), 기둥부 다웰바철근(310), 펀칭전단보강재(200), 톱니철근(110)은 기초판 콘크리트(C)에 매립되게 된다.Accordingly, the base plate lower reinforcing bar 410, the base plate upper reinforcing bar 420, the column dowel bar reinforcing bar 310, the punching shear reinforcement 200, and the toothed reinforcing bar 110 are embedded in the base plate concrete (C). .

[ 본 발명의 펀칭전단보강철근(100)을 이용한 기초판(400) 시공방법 ][ Construction method of the base plate 400 using the punching shear reinforcing bar 100 of the present invention ]

도 3a, 도 3b 및 도 3c는 본 발명의 펀칭전단보강철근(100)을 이용한 기초판(400) 시공방법의 순서도를 도시한 것이다.Figures 3a, 3b and 3c shows a flow chart of the construction method of the base plate 400 using the punching shear reinforcing bar 100 of the present invention.

상기 기초판(400) 시공방법은 앞서 살펴본 것과 같이, 기초판 터파기 후, 기초판 하부철근(410)을 터파기 면에 배근하고, 기둥부 다웰바철근(310)을 배근한 후, 톱니철근(110)을 기초판 하부철근(410)에 고정 설치하고, 펀칭전단보강재(200)를 톱니철근(110)에 고정 설치하고, 기초판 상부철근(420)을 배근한 후, 기초판 콘크리트(C)를 타설함으로서 일정한 두께로 형성시키고, 상기 기둥부 다웰바철근(310)의 상단은 기초판(400) 상면으로부터 상방으로 돌출되어 기둥부(300) 철근을 연결 배근하고 기둥부 콘크리트를 타설함으로서 완성시키는 방법이다.As described above, in the method of constructing the base plate 400, after excavating the base plate, reinforcing the lower reinforcing bar 410 of the base plate on the excavation surface, and reinforcing the dowel bar reinforcing bar 310 in the column part, and then reinforcing the toothed reinforcing bar (110) is fixed to the lower reinforcing bar 410 of the base plate, the punching shear reinforcement 200 is fixed to the toothed reinforcing bar 110, and the upper reinforcing bar 420 of the base plate is reinforced, and then the base plate concrete (C) ), and the upper end of the column dowel bar reinforcement 310 protrudes upward from the upper surface of the base plate 400 to connect and reinforce the column portion 300 reinforcing bars, and is completed by pouring the column concrete. way to do it

이에 도 3a와 같이 기초판(400)를 시공하기 위하여 지반을 일정 깊이로 터파기 하게 되며, 이러한 터파기 바닥면에 기초판 하부철근(410)을 격자 형태로 배근하게 된다.Accordingly, the ground is excavated to a certain depth in order to construct the base plate 400 as shown in FIG. 3A , and the lower reinforcing bars 410 of the base plate are reinforced in the form of a grid on the bottom of the excavation.

이러한 기초판 하부철근(410)에 기둥부 다웰바철근(310)을 배근하게 되며 기둥부(400)의 형태에 대응하여 수직철근을 다수를 다수 배근하고, 고정띠철근(320)을 이용하여 서로를 구속시키게 된다. 이때 고정띠철근(320)외에 수평띠철근을 함께 설치해도 된다. 또한 기둥부 다웰바철근(310)이 하단은 수평으로 절곡시켜 기초판 하부철근(410)에 결속선을 이용하여 고정 설치하게 된다.The column dowel bar reinforcing bar 310 is reinforced on the lower reinforcing bar 410 of the base plate, and a plurality of vertical reinforcing bars are reinforced in correspondence to the shape of the column 400 , and each other using the fixed band reinforcing bar 320 . will be imprisoned In this case, in addition to the fixed band reinforcement 320, a horizontal band reinforcement may be installed together. In addition, the lower end of the column dowel bar reinforcing bar 310 is horizontally bent and fixed to the base plate lower reinforcing bar 410 using a binding line.

다음으로 도 3b와 같이, 기초판 하부철근(410)에 톱니철근(110)을 각도고정장치(120)를 이용하여 서로 수평으로 이격시켜 기둥부 다웰바철근(310) 주위에 방사형태로 배근하게 된다.Next, as shown in Figure 3b, the toothed reinforcing bar 110 on the base plate lower reinforcing bar 410 is horizontally spaced apart from each other using the angle fixing device 120, and radially around the column dowel bar reinforcing bar 310. do.

이때 톱니철근(110)의 하단부(112)는 역시 기초판 하부철근(410)에 결속선을 이용하여 고정 설치하고, 상단부(111)는 고정띠철근(320)에 걸치도록 하게 된다.At this time, the lower end 112 of the toothed reinforcing bar 110 is also fixedly installed using a binding line to the base plate lower reinforcing bar 410 , and the upper end 111 is made to span the fixed band reinforcing bar 320 .

또한 펀칭전단보강재(200)의 결속공(210)과 톱니철근(110)의 상단부(111)를 서로 결속선을 이용하여 역시 설치하게 된다.In addition, the binding hole 210 of the punching shear reinforcement 200 and the upper end 111 of the toothed reinforcing bar 110 are also installed using a binding line to each other.

또한 상기 톱니철근(110)의 상단부(111)를 철근고임대로 이용하여 기초판 상부철근(420)을 역시 배근하게 됨을 알 수 있다.In addition, it can be seen that the upper reinforcing bar 420 of the base plate is also reinforced by using the upper end 111 of the toothed reinforcing bar 110 as a reinforcing bar high rental.

다음으로는 도 3c와 같이, 상기 기초판 하부철근(410), 기초판 상부철근(420), 기둥부 다웰바철근(310), 펀칭전단보강재(200), 톱니철근(110)은 기초판 콘크리트(C)에 매립되도록 하여 기초판(400)을 완성시키게 된다.Next, as shown in Figure 3c, the base plate lower reinforcement 410, the base plate upper reinforcement 420, the column dowel bar reinforcement 310, the punching shear reinforcement 200, the toothed reinforcement 110 is the base plate concrete (C) to be embedded in the base plate 400 is completed.

이로서 톱니철근은 종래 펀칭전단보강재(200, MSP, CMSP 공법에 사용)의 보강으로 부족한 기초판의 펀칭전단내력 등의 구조성능을 향상시키고, 펀칭전단보강재의 시공 대기시간 감소 등의 시공성을 개선하는 효과가 있게 된다.As a result, toothed reinforcing bars improve structural performance such as punching shear strength of the base plate, which is insufficient due to reinforcement of conventional punching shear reinforcement (200, MSP, CMSP method), and improve workability such as reducing the construction waiting time of punching shear reinforcement. it will work

즉, 기초판의 펀칭전단내력은 콘크리트와 철근의 기여 부분으로 구성되며 펀칭전단보강재(200)는 콘크리트 부분의 기여도 향상에 역할을 하며, 톱니철근(110)은 철근 부분의 기여도 향상을 역할을 할 수 있게 된다.That is, the punching shear strength of the base plate consists of the contribution of concrete and reinforcing bars, and the punching shear reinforcement 200 plays a role in improving the contribution of the concrete part, and the toothed reinforcing bar 110 serves to improve the contribution of the reinforcing bar. be able to

톱니철근(110)은 유효깊이(d)에서 펀칭전단균열을 가로지르도록 절곡되어 일반 수직철근으로 보강되었을 때보다 강도는 약 40% 증가 효과를 가지며, 투입 물량은 약 30% 절약 효과가 있게 된다.The toothed reinforcing bar 110 is bent to cross the punching shear crack at the effective depth (d), and the strength is increased by about 40% compared to when reinforced with general vertical reinforcing bars, and the input amount is reduced by about 30%. .

또한 톱니철근에 펀칭전단보강재(200)를 바로 결속하여 설치할 수 있어, 기존 기초판 상부철근에 결속할 때 기초판 상부철근의 배근 완료 때까지 기다리는 대기 시간이 없어져 설치 시간을 대폭 단축할 수 있게 된다.In addition, since the punching shear reinforcement 200 can be directly attached to the toothed reinforcing bar and installed, the waiting time for waiting until the reinforcement of the upper reinforcing bar of the base plate is completed when binding to the upper reinforcing bar of the existing base plate is eliminated, thereby significantly reducing the installation time. .

또한 톱니철근은 기초판 상부철근 바로 하부에 위치하기 때문에 기초판 상부철근을 배근하기 위해 기둥 주변에 설치하였던 철근고임대 역할을 겸할 수 있어, 펀칭전단보강재(200)의 설치 시 철근고임대와의 간섭을 최소화할 수 있게 된다.In addition, since the toothed reinforcing bar is located just below the upper reinforcing bar of the base plate, it can serve as a high-rent rebar installed around the column to reinforce the upper reinforcing bar of the base plate. interference can be minimized.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.The above description of the present invention is for illustration, and those of ordinary skill in the art to which the present invention pertains can understand that it can be easily modified into other specific forms without changing the technical spirit or essential features of the present invention. will be. Therefore, it should be understood that the embodiments described above are illustrative in all respects and not restrictive. For example, each component described as a single type may be implemented in a distributed manner, and likewise components described as distributed may be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is indicated by the following claims rather than the above detailed description, and all changes or modifications derived from the meaning and scope of the claims and their equivalent concepts should be interpreted as being included in the scope of the present invention. do.

100: 펀칭전단보강철근 110: 톱니철근
111: 상단부 111a: 수평철근부
111b: 단부걸림부 112: 하단부
112a: 수평철근부 113: 중간교차철근부
120: 각도고정장치 121: 고정부
122: 연결부 200: 펀칭전단보강재
210: 결속공
240: 원통형 내부이음쇄 250: 레일부
300: 기둥부 310: 다웰바철근
320: 고정띠철근 400: 기초판
410: 기초판 하부철근 420: 기초판 상부철근
100: punching shear reinforcing bar 110: toothed reinforcing bar
111: upper part 111a: horizontal reinforcing bar
111b: end stopper 112: lower end
112a: horizontal reinforcing bar 113: intermediate intersecting reinforcing bar
120: angle fixing device 121: fixing part
122: connection part 200: punching shear reinforcement
210: binding ball
240: cylindrical inner joint 250: rail part
300: column 310: dowel bar reinforcement
320: fixed band reinforcement 400: base plate
410: base plate lower reinforcing bar 420: base plate upper reinforcing bar

Claims (12)

기초판(400)에 설치되는 기둥부(300)의 고정띠철근(320)에 고정되는 상단부(111);
기초판(400)의 기초판 하부철근(410)과 고정되는 하단부(112);
상기 상단부(111)와 하단부(112) 사이에 일체화된 것으로서, 기초판(400)의 사다리꼴 형태의 펀칭전단파괴 영역(A)의 위험균열면(G)을 다수 교차하여 설치되는 중간교차철근부(113);을 포함하는 톱니철근(110)을 포함하며,
상기 상단부(111)는 기둥부(300) 주위의 기초판 상부에 설치되는 펀칭전단보강재(200)에 구속되도록 하여 톱니철근(110)을 펀칭전단보강재(200)를 고정 설치하는데 이용함과 더불어, 상기 펀칭전단보강재(200)는 기초판(400)의 펀칭전단내력의 콘크리트 기여분으로서 이용되도록 하고, 상기 톱니철근(110)은 기초판(400)의 펀칭전단내력의 철근 기여분으로서 이용되도록 하며,
상기 펀칭전단보강재(200)는, 기초판 하부철근(410) 상면에 톱니철근(110)을 세팅한 후, 펀칭전단보강재(200)를 톱니철근(110)에 고정 설치하고, 톱니철근(110)이 기초판(400)의 기초판 상부철근(420)의 저면을 지지하는 역할을 하도록 하여, 펀칭전단보강재(200)와 기초판 상부철근(420)의 연속적인 시공작업이 가능하도록 하는 펀칭전단보강철근.
an upper end portion 111 fixed to the fixing band reinforcement 320 of the pillar portion 300 installed on the base plate 400;
a lower end 112 fixed to the base plate lower reinforcing bar 410 of the base plate 400;
As integrated between the upper end 111 and the lower end 112, intersecting reinforcing bars installed by crossing a number of dangerous crack surfaces (G) of the trapezoidal punching shear fracture area (A) of the base plate 400 ( 113); including a toothed reinforcing bar 110 including;
The upper part 111 is constrained to the punching shear reinforcement 200 installed on the upper part of the base plate around the column part 300, so that the toothed reinforcing bar 110 is used to fix the punching shear reinforcement 200. Punching shear reinforcement 200 is used as a concrete contribution of the punching shear strength of the base plate 400, and the toothed reinforcing bar 110 is used as a reinforcement contribution of the punching shear strength of the base plate 400,
The punching shear reinforcement 200 is, after setting the toothed reinforcement 110 on the upper surface of the base plate lower reinforcement 410, the punching shear reinforcement 200 is fixed to the toothed reinforcement 110, and the toothed reinforcement 110 Punching shear reinforcement to serve to support the bottom surface of the upper reinforcing bar 420 of the base plate 400 of the base plate 400, so that the continuous construction work of the punching shear reinforcement 200 and the upper reinforcement 420 of the base plate is possible rebar.
제 1항에 있어서,
상기 상단부(111)는
기둥부(300)의 다웰바철근(310)을 수평으로 감싸도록 설치된 고정띠철근(320)에 걸치도록 단부걸림부(111b)가 형성된 수평철근부(111a)로 형성된 것으로서,
상기 수평철근부(111a)는 기초판(400)의 기초판 상부철근(420)의 저면을 지지하는 역할을 하도록 하는 펀칭전단보강철근.
The method of claim 1,
The upper part 111 is
As formed of a horizontal reinforcing bar portion (111a) having an end locking portion (111b) formed so as to span a fixed band reinforcing bar 320 installed to horizontally surround the dowel bar reinforcing bar 310 of the column part 300,
The horizontal reinforcing bar portion (111a) is a punching shear reinforcing bar to serve to support the bottom surface of the base plate upper reinforcing bar 420 of the base plate 400.
제 1항에 있어서,
상기 하단부(112)는 수평철근부(112a)가 기초판 하부철근(410)에 고정되어 펀칭전단보강철근(100)의 위치를 고정하도록 하는 펀칭전단보강철근.
The method of claim 1,
The lower end 112 is a punching shear reinforcing bar so that the horizontal reinforcing bar part 112a is fixed to the base plate lower reinforcing bar 410 to fix the position of the punching shear reinforcing bar 100.
제 1항에 있어서,
상기 중간교차철근부(113)는
톱니 형태로 절곡 형성됨을 알 수 있으며 기초판(400)의 크기, 사다리꼴 형태의 펀칭전단파괴 영역(A)의 크기에 따라 위험균열면(G)을 교차하는 횟수와 형성높이는 변경가능하도록 형성되는 펀칭전단보강철근.
The method of claim 1,
The intermediate cross reinforcing bar 113 is
It can be seen that bending is formed in a sawtooth shape, and the number of crossings and the formation height of the dangerous crack surface G according to the size of the base plate 400 and the size of the trapezoidal punching shear fracture area A are changeable. Shear reinforcing bars.
제 1항에 있어서,
톱니철근(110)의 상단부(111)가 펀칭전단보강재(200)의 상면을 따라 위치하는 결속공(210)의 주위에 위치하도록 하여 결속선을 결속공(210)을 관통하도록 하면서 톱니철근(110)의 상단부(111)와 연결시켜 톱니철근(110)의 상단부(111)를 펀칭전단보강재(200)에 구속되도록 하는 펀칭전단보강철근.
The method of claim 1,
The upper end 111 of the toothed reinforcing bar 110 is positioned around the binding hole 210 positioned along the upper surface of the punching shear reinforcement 200 so that the binding line passes through the binding hole 210 while the toothed reinforcing bar 110 ) by connecting with the upper end 111 of the punching shear reinforcing bar to constrain the upper end 111 of the toothed reinforcing bar 110 to the punching shear reinforcing material 200.
제 1항에 있어서,
상기 톱니철근(110)의 상단부(111)가 펀칭전단보강재(200)의 상면을 따라 위치하는 결속공(210)에 결속되도록 하기 위한 위치로 세팅되도록 하는 역할을 하는 각도고정장치(120)가 더 설치되며,
상기 각도고정장치(120)는 중간교차철근부(113)의 하부에 위치하는 고정부(121)와 고정부 사이에 설치되는 연결부(122)로 형성되어, 2개의 중간교차철근부(113)의 하부 외주면에 커플러인 고정부(121)를 고정시키고, 연결부(122)는 수평철근의 양 절곡단부를 커플러인 고정부(121)에 체결시키는 방식으로 연결부의 연장길이에 의하여 톱니철근(110)의 수평 간격이 정해지도록 하는 펀칭전단보강철근.
The method of claim 1,
An angle fixing device 120 that serves to set the upper end 111 of the toothed reinforcing bar 110 to a position to be bound to the binding hole 210 located along the upper surface of the punching shear reinforcement 200 is more installed,
The angle fixing device 120 is formed of a fixing part 121 located at the lower part of the intermediate intersecting reinforcing bar 113 and a connecting part 122 installed between the fixing parts, and the two intersecting reinforcing bars 113 of the The fixing part 121, which is a coupler, is fixed to the lower outer circumferential surface, and the connection part 122 is a method of fastening both bent ends of the horizontal reinforcement to the fixing part 121, which is a coupler, by the extension length of the connection part of the toothed reinforcement 110. Punching shear reinforcing bars that allow horizontal spacing to be determined.
삭제delete 제 1항에 있어서,
상기 펀칭전단보강재(200)는
레일부(250)가 원통형 내부이음쇠(240)의 측면지지부가 내측면에 용이하게 장착될 수 있는 가이드부 역할을 하게 되며 측면지지부가 끼워지도록 홈이 형성될 수 있는 이격된 가이드 블록으로 형성된 것을 이용하여 현장에서 원통형 내부이음쇠(240)를 레일부(250)에 끼워지도록 한 후, 원통형 내부이음쇠(240)의 상단을 역원뿔형 몸통부인 스커트부(220)의 내측면에 고정 설치할 수 있도록 형성된 것을 이용하는 펀칭전단보강철근.
The method of claim 1,
The punching shear reinforcement 200 is
The rail part 250 serves as a guide part that can be easily mounted on the inner surface of the side support part of the cylindrical inner fitting 240, and is formed as a spaced guide block in which a groove can be formed so that the side support part can be fitted. Then, after fitting the cylindrical inner fitting 240 to the rail unit 250 in the field, the upper end of the cylindrical inner fitting 240 is fixedly installed on the inner surface of the skirt 220, which is an inverted conical body. Punching shear reinforcement rebar.
제 1항에 있어서,
상기 펀칭전단보강재(200)는
현장에서 역원뿔형 몸통부인 스커트부(220)로 형성된 것을 이용하는 펀칭전단보강철근.
The method of claim 1,
The punching shear reinforcement 200 is
Punching shear reinforcing bars using those formed in the field with the skirt 220, which is an inverted conical body.
(a) 기초판(400)에 설치되는 기둥부(300)의 고정띠철근(320)에 고정되는 상단부(111); 기초판(400)의 기초판 하부철근(410)과 고정되는 하단부(112); 및 상기 상단부(111)와 하단부(112) 사이에 일체화된 것으로서, 기초판(400)의 역사다리꼴 형태의 펀칭전단파괴 영역(A)의 위험균열면(G)을 다수 교차하여 설치되는 중간교차철근부(113);을 포함하는 톱니철근(110)을 준비하는 단계;
(b) 기초판 하부철근(410)에 상기 톱니철근(110)을 서로 수평으로 이격시켜 기둥부 다웰바철근(310) 주위에 방사형태로 배근하되, 톱니철근(110)의 하단부(112)는 기초판 하부철근(410)에 고정 설치하고, 상단부(111)는 기초판 하부철근(410)에 설치된 다웰바철근(310)의 고정띠철근(320)에 걸치도록 하는 단계;
(c) 펀칭전단보강재(200)의 결속공(210)과 상기 톱니철근(110)의 상단부(111)를 서로 결속선을 이용하여 고정하는 단계; 및
(d) 상기 톱니철근(110)의 상단부(111)를 철근고임대로 이용하여 기초판 상부철근(420)을 배근하는 단계;를 포함하며,
상기 (c) 단계의 펀칭전단보강재(200)는, 기초판 하부철근(410) 상면에 톱니철근(110)을 세팅한 후, 펀칭전단보강재(200)를 톱니철근(110)에 고정 설치하고, 톱니철근(110)이 기초판(400)의 기초판 상부철근(420)의 저면을 지지하는 역할을 하도록 하여, 펀칭전단보강재(200)와 기초판 상부철근(420)의 연속적인 시공작업이 가능하도록 하는 펀칭전단보강철근을 이용한 기초판 시공방법.
(a) the upper end 111 fixed to the fixing band reinforcement 320 of the pillar portion 300 installed on the base plate 400; a lower end 112 fixed to the base plate lower reinforcing bar 410 of the base plate 400; And as integrated between the upper end 111 and the lower end 112, the intersecting reinforcing bar installed by crossing a number of the dangerous cracking surfaces (G) of the inverted trapezoidal punching shear fracture area (A) of the base plate (400) Part 113; preparing a toothed reinforcing bar 110 comprising;
(b) The toothed reinforcing bars 110 are horizontally spaced apart from each other on the lower reinforcing bar 410 of the base plate and radially reinforced around the column dowel bar reinforcing bars 310, but the lower end 112 of the toothed reinforcing bars 110 is The step of installing fixed to the base plate lower reinforcing bar 410, and the upper end 111 spanning the fixed band reinforcing bar 320 of the dowel bar reinforcing bar 310 installed in the base plate lower reinforcing bar 410;
(c) fixing the binding hole 210 of the punching shear reinforcement 200 and the upper end 111 of the toothed reinforcing bar 110 to each other using a binding line; and
(d) reinforcing the upper reinforcing bar 420 of the base plate by using the upper end 111 of the toothed reinforcing bar 110 as a reinforcing bar high rental;
The punching shear reinforcement 200 of step (c) is, after setting the toothed reinforcement 110 on the upper surface of the base plate lower reinforcement 410, the punching shear reinforcement 200 is fixed to the toothed reinforcement 110, The toothed reinforcing bar 110 serves to support the bottom surface of the upper reinforcing bar 420 of the base plate of the base plate 400, so that the continuous construction work of the punching shear reinforcement 200 and the upper reinforcing bar 420 of the base plate is possible. A method of constructing a base plate using punching shear reinforcing bars.
제 10항에 있어서,
상기 (a)단계의 상단부(111)는 기둥부(300)의 다웰바철근(310)을 수평으로 감싸도록 설치된 고정띠철근(320)에 걸치도록 단부걸림부(111b)가 형성된 수평철근부(111a)로 형성된 것으로서, 상기 수평철근부(111a)는 기초판(400)의 기초판 상부철근(420)의 저면을 지지하는 역할을 하도록 하며,
상기 (a)단계의 하단부(112)는 수평철근부(112a)가 기초판 하부철근(410)에 고정되어 펀칭전단보강철근(100)의 위치를 고정하도록 하는 펀칭전단보강철근을 이용한 기초판 시공방법.
11. The method of claim 10,
The upper end 111 of the step (a) is a horizontal reinforcing bar in which an end stopping portion 111b is formed so as to span the fixed band reinforcing bar 320 installed to horizontally surround the dowel bar reinforcing bar 310 of the column part 300 ( 111a), and the horizontal reinforcing bar portion 111a serves to support the bottom surface of the base plate upper reinforcing bar 420 of the base plate 400,
The lower end 112 of the step (a) has a horizontal reinforcing bar 112a fixed to the base plate lower reinforcing bar 410 to fix the position of the punching shear reinforcing bar 100. Base plate construction using punching shear reinforcing bars Way.
제 10항에 있어서,
상기 (a)단계의 기초판(400)은
기초판 터파기 후, 기초판 하부철근(410)을 터파기 면에 배근하고, 기둥부 다웰바철근(310)을 배근한 후, 톱니철근(110)을 기초판 하부철근(410)에 고정 설치하고, 펀칭전단보강재(200)를 톱니철근(110)에 고정 설치하고, 기초판 상부철근(420)을 배근한 후, 기초판 콘크리트(C)를 타설함으로서 일정한 두께로 형성되도록 하는 펀칭전단보강철근을 이용한 기초판 시공방법.
11. The method of claim 10,
The base plate 400 of step (a) is
After excavating the base plate, the base plate lower reinforcing bar 410 is reinforced on the excavation surface, the column dowel bar reinforcing bar 310 is reinforced, and the toothed reinforcing bar 110 is fixed and installed to the base plate lower reinforcing bar 410 After fixing the punching shear reinforcement 200 to the toothed reinforcement 110, reinforcing the upper reinforcement 420 of the foundation plate, and pouring the foundation plate concrete (C) to form a punching shear reinforcement reinforcement to a certain thickness A method of constructing a base plate using
KR1020190157961A 2019-12-02 2019-12-02 Punching shear reinforcing-bar and foundation structure construction method therewith KR102274663B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190157961A KR102274663B1 (en) 2019-12-02 2019-12-02 Punching shear reinforcing-bar and foundation structure construction method therewith

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190157961A KR102274663B1 (en) 2019-12-02 2019-12-02 Punching shear reinforcing-bar and foundation structure construction method therewith

Publications (2)

Publication Number Publication Date
KR20210068678A KR20210068678A (en) 2021-06-10
KR102274663B1 true KR102274663B1 (en) 2021-07-09

Family

ID=76378265

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190157961A KR102274663B1 (en) 2019-12-02 2019-12-02 Punching shear reinforcing-bar and foundation structure construction method therewith

Country Status (1)

Country Link
KR (1) KR102274663B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102654273B1 (en) * 2023-05-16 2024-04-03 (주)렉스코 Steel composite precast piers with shear reinforcement bars connected to steel columns and construction method of the same

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100947340B1 (en) * 2007-10-01 2010-03-15 우종열 Shear reinforcement device for junctional region of slab and column, and manufacturing mathod of it
KR101038057B1 (en) * 2008-11-06 2011-06-01 명성철강 주식회사 Shear reinforcing bar assembly and construction structure thereof
KR101875846B1 (en) * 2016-12-08 2018-07-09 한국건설기술연구원 Punching shear stiffening member with inter confine connecting member and punching shear trotection method therewith

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120074387A (en) * 2010-12-28 2012-07-06 주식회사 포스코 Structure connecting column-flat plate
KR101378628B1 (en) 2013-03-18 2014-03-26 신세계건설(주) Dome type reinforcement member for preventing punching shear
KR101378663B1 (en) 2013-03-18 2014-03-26 신세계건설(주) Satgat type reinforcement member for preventing punching shear
KR101247201B1 (en) 2012-09-05 2013-03-25 신세계건설(주) Reinforcement member for preventing punching shear and construction method using the same
KR101750177B1 (en) 2015-11-16 2017-06-22 한국건설기술연구원 Punching shear stiffening member of cutting bridge type and method for constructing footing using of the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100947340B1 (en) * 2007-10-01 2010-03-15 우종열 Shear reinforcement device for junctional region of slab and column, and manufacturing mathod of it
KR101038057B1 (en) * 2008-11-06 2011-06-01 명성철강 주식회사 Shear reinforcing bar assembly and construction structure thereof
KR101875846B1 (en) * 2016-12-08 2018-07-09 한국건설기술연구원 Punching shear stiffening member with inter confine connecting member and punching shear trotection method therewith

Also Published As

Publication number Publication date
KR20210068678A (en) 2021-06-10

Similar Documents

Publication Publication Date Title
KR101570484B1 (en) Half-PC Column using lightweight Encased Inner Form And Manufacturing Method Thereof, And Construction Method Using The Same
KR100662811B1 (en) Non-synthetic complex steel pipe columm having tie ends for filling a steel soncrete and construction method thereof
JP2012522913A (en) Truss type shear reinforcement with double anchorage function on both top and bottom
KR20090094971A (en) Under ground top-down method
KR101548114B1 (en) Steel concrete composite beam having increased composite effect of connecting part at the cross-section change part
JP5607892B2 (en) Reinforcement method for reinforced concrete column beam joints
KR101183785B1 (en) Fixing structure for column to footing and column-footing connecting structure using the same
KR102274663B1 (en) Punching shear reinforcing-bar and foundation structure construction method therewith
KR101750177B1 (en) Punching shear stiffening member of cutting bridge type and method for constructing footing using of the same
CN113863495A (en) Pretensioned prestressing frame beam column connection node
KR101521946B1 (en) Enlarged capital of steel framed reinforced concrete column
KR100949828B1 (en) Steel beam and hybrid beam of steel concrete for slim floor
KR100653283B1 (en) Method for connecting reinforced concrete structures
KR101458435B1 (en) Half precast concrete column manufacturing method using saddle-type ties and dual hoops and constructing method using the same
JP2011231574A (en) Attachment structure of seismic isolator
JP7194531B2 (en) Seismic isolation upper foundation structure and manufacturing method thereof, footing structure, and seismic isolation foundation construction method
KR20170139186A (en) Connecting structure between column and footing structure
KR101875846B1 (en) Punching shear stiffening member with inter confine connecting member and punching shear trotection method therewith
KR20120025945A (en) Reinforcement assembly of concrete file and building foundation
KR101050291B1 (en) Head reinforce structure of a steel pipe pile for construction
KR101126131B1 (en) Structure for reinforcing head of a steel pipe pile for a construction
JPH09296456A (en) Steel frame column base using reinforcing metal net
KR20080103260A (en) Reinforcing bar assembly for separate concrete pours and strut system method utilizing the same
CN210767248U (en) Connecting structure of steel plate concrete composite shear wall and concrete floor wrapped outside
KR101304501B1 (en) Steel Pipe Pile head reinforcement device

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right