KR102266931B1 - steel pipe butt joint for construction of underground earth film - Google Patents
steel pipe butt joint for construction of underground earth film Download PDFInfo
- Publication number
- KR102266931B1 KR102266931B1 KR1020200138691A KR20200138691A KR102266931B1 KR 102266931 B1 KR102266931 B1 KR 102266931B1 KR 1020200138691 A KR1020200138691 A KR 1020200138691A KR 20200138691 A KR20200138691 A KR 20200138691A KR 102266931 B1 KR102266931 B1 KR 102266931B1
- Authority
- KR
- South Korea
- Prior art keywords
- steel pipe
- fastening
- brace
- pipe brace
- joint
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
- E02D17/083—Shoring struts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/14—Geometrical or physical properties resilient or elastic
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1628—Shapes rectangular
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2220/00—Temporary installations or constructions
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/40—Miscellaneous comprising stabilising elements
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
본 발명은 지하 흙막이 공사용 강관 버팀보 이음장치에 관한 것으로서, 보다 상세하게는, 지하 흙막이 공사에서 토류벽의 하중을 지지하는 가시설재로 사용되는 띠장-버팀보 구조체에서 버팀보로 사용되는 강관(즉, 강관 버팀보)과 그 강관과 띠장 사이에 비스듬하게 연결하여 강관 버팀보를 지지하는 가새로서 역할하는 강관(즉, 가새강관)을 연결하고, 강관 버팀보와 가새강관을 연결하는 부위에 복수 개의 체결돌기를 형성하여 다수 개의 체결돌기를 동시에 구속하면서 원터치 방식으로 강관 버팀보와 가새강관을 손쉽게 연결할 수 있어 강관 버팀보와 가새강관의 연결작업 또는 해체작업에 소요되는 시간 및 비용을 절감할 수 있는 지하 흙막이 공사용 강관 버팀보 이음장치에 관한 것이다.The present invention relates to a steel pipe brace joint device for underground retaining construction, and more particularly, a steel pipe used as a brace in a wale-bracing structure used as a temporary material to support the load of an earth wall in an underground retaining construction (i.e., a steel pipe brace) It connects the steel pipe (ie, braced steel pipe) that serves as a brace to support the steel pipe brace by connecting it obliquely between the steel pipe and the wale, and forms a plurality of fastening protrusions at the part connecting the steel pipe brace and the braced steel pipe. It relates to a steel pipe brace joint for underground retaining construction that can easily connect a steel pipe brace and a braced steel pipe in a one-touch method while simultaneously restraining the fastening protrusion, thereby reducing the time and cost required for the connection or dismantling of the steel pipe brace and the braced steel pipe will be.
최근 사회 간접시설에 대한 확충의 필요성이 증대됨에 따라 도심내에 많은 지하 굴착공사가 진행되고 있다.Recently, as the need for expansion of social indirect facilities increases, many underground excavation works are being carried out in the city center.
이러한 지하 굴착공사의 특징은 지하철, 고가도로, 지하구조물, 사무공간 및 주거공간을 위한 지상구조물 등이 근접하여 있는 근접시공과 제한된 지하공간을 최대한으로 활용하기 위한 최대공간 굴착 및 대심도 굴착이라 할 수 있다.The characteristics of these underground excavation works are the proximity construction in which subways, overpasses, underground structures, and above-ground structures for office and residential spaces are in close proximity, and maximum space excavation and deep excavation to make the most of the limited underground space. have.
특히 도심지의 제한된 공간에서 대형 건축 지하구조물을 축조하기 위한 지하굴토공사는 주변지반의 안정이 최우선되어야 하므로, 주변지반 안정유지에 필요한 흙막이 공사가 필수적으로 검토되어야 하며, 공사계획에서도 흙막이 공법선정이 상당히 중요한 부분을 차지하고 있다. 흙막이 공법은 가설 흙막이 구조를 활용하는 방법과 본 구조체가 토압, 수압에 대응하여 흙막이벽 역할을 하며 굴토공사와 병행하여 지하구조물을 축조하는 방법으로 크게 2가지 방법으로 구분할 수 있다.In particular, in the underground excavation work for constructing large-scale underground structures in a limited space in the downtown area, the stability of the surrounding ground must be prioritized. occupies an important part. The retaining method can be broadly divided into two methods: a method using a temporary retaining structure, and a method in which the main structure acts as a retaining wall in response to earth and water pressure and constructs an underground structure in parallel with excavation work.
가설 흙막이 구조는 민원유발의 가능성과 주변 지반의 안정성 문제에 따른 흙막이 구조의 붕괴 위험이 있으며, 실제로 붕괴된 사례도 상당수 있다. 또한, 주변 지반의 변위로 인하여 민원이 발생되어 공사중단 또는 민원보상을 하는 사례도 다수 있다.The hypothetical retaining structure has a risk of collapse due to the possibility of civil complaints and the stability of the surrounding ground, and there are many cases of actual collapse. In addition, there are many cases in which civil complaints arise due to the displacement of the surrounding ground, and thus construction is stopped or civil complaints are compensated.
현행 토공사에 흙막이를 위해 사용되는 가시설은, 강재 파일과 토류판을 사용하거나, CIP(Cast in Place Wall), SCW(Soil Cement Wall) 등이 사용되며, 흙막이를 지지하는 형식은 재래의 가설 Strut로 지지하는 방식과 Earth Anchor, Soil Nailing, Rock Bolt 그리고 Top-Down 공법으로 지지하는 방식 등이 있다.Temporary facilities used for retaining earth work in current earthworks use steel piles and earth plates, or CIP (Cast in Place Wall), SCW (Soil Cement Wall), etc. There are methods such as earth anchor, soil nailing, rock bolt and top-down method to support.
이중에서 가설 Strut를 사용하는 경우는 가설재의 설치 및 해체 공정에 따른 공기의 증대와 해체시 주변지반의 변경을 유발할 가능성이 높으나 상대적으로 Top-Down 공법에 비하여 지하공사시의 작업환경이 양호하고, 슬래브의 단면을 감소시킬 수 있는 장점이 있어 현재 널리 사용되고 있다.Among them, when a temporary strut is used, there is a high possibility of causing an increase in air due to the installation and dismantling process of temporary materials and a change of the surrounding ground during dismantling, but the working environment for underground construction is relatively good compared to the top-down method, It has the advantage of reducing the cross section of the slab and is currently widely used.
한편, 위와 같은 가설 Strut를 사용하는 경우에는 토류벽의 횡압을 지지하기 위하여 H-Pile 말뚝을 서로 마주보는 토류벽에 수직으로 설치한 후 위 H-Pile 말뚝과 직교하는 방향으로 다수의 종방향 띠장을 배열하게 된다.On the other hand, in the case of using the above-mentioned temporary strut, in order to support the lateral pressure of the earth wall, H-Pile piles are installed vertically on the earth wall facing each other, and then a plurality of longitudinal bands are arranged in the direction perpendicular to the above H-Pile pile. will do
또한, 띠장과 띠장 사이에 버팀보를 설치하고, 결국, 토류벽의 횡압은 H-Pile 말뚝 -> 띠장 -> 버팀보의 순서로 전달되는 것이다.In addition, a brace is installed between the band and the band, and eventually, the lateral pressure of the earth wall is transmitted in the order of H-Pile pile -> band girder -> brace.
한편, 띠장과 띠장 사이의 버팀보는 띠장의 지점으로서 역할하는 것이며, 결국 상기 버팀보와 버팀보 사이에서 띠장은 말뚝으로부터 전달되는 하중에 대하여 휨거동을 한다.On the other hand, the brace between the band and the band is to serve as a point of the band, and eventually, the band between the brace and the beam performs a bending behavior with respect to the load transmitted from the pile.
그런데, 부재의 휨변형은 지점의 지지조건에 따라서 상이하기는 하지만, 일반적으로 띠장의 스팬에 비례하여 휨 변형이 증가하며, 등분포 하중이 재하되는 단순보의 경우를 예를 들어 설명하면, 스팬의 제곱에 비례하여 증가한다.By the way, although the bending deformation of the member is different depending on the supporting condition of the point, the bending deformation is generally increased in proportion to the span of the wale, and when explaining the case of a simple beam loaded with an evenly distributed load, the span increases in proportion to the square of
이 때문에, 띠장의 휨변형을 방지하기 위하여 지점으로서 역할하는 버팀보를 안정적으로 지지하는 것이 중요하다.For this reason, it is important to stably support the brace that serves as a point in order to prevent bending deformation of the wale.
한편, 띠장에 대하여 지점 역할을 하는 버팀보의 수평간격을 넓게 하거나, 모서리 띠장의 버팀 또는 띠장을 보강할 목적으로 띠장(수평 부재)과 버팀보(띠장에 대한 수직 부재) 사이에 사보강재(까치발)을 사용할 수 있다.On the other hand, for the purpose of widening the horizontal spacing of the braces acting as a point with respect to the wale or to reinforce the braces or wales of the corner wale, a saber steel material (bracket) is installed between the wale (horizontal member) and the brace (vertical member to the wale). Can be used.
일반적으로 띠장의 휨모멘트 값이 크거나, 좌굴의 발생이 예상될 경우 버팀대 설치 지점에 까치발(사보강재)을 설치하여 띠장을 보강한다.In general, if the bending moment value of the wale is large or buckling is expected, the wale is reinforced by installing a crutch foot (saber steel) at the point where the brace is installed.
그런데 버팀보로서 강관을 사용하는 경우라도 사보강재로서 H-파일을 사용하는 경우에는 강관의 곡면과 H-파일의 평면을 결합하는 것은 매우 어렵기 때문에, 사보강재와 연결되는 지점과 띠장 사이는 H-파일을 강관 대신에 시공하고 위 H-파일과 강관 버팀보를 위 그림에서와 같이 별도의 연결재를 이용하여 연결하는 방식을 채용할 수밖에 없었다.However, even when a steel pipe is used as a brace, it is very difficult to combine the curved surface of the steel pipe and the flat surface of the H-pillar in the case of using an H-pillar as a yarn reinforcement. The pile was constructed instead of the steel pipe, and the method of connecting the above H-pile and the steel pipe brace using a separate connecting material as shown in the figure above had to be adopted.
하지만 수직부재인 버팀보를 스팬의 위치에 따라서 강관과 H파일의 서로 다른 단면을 혼용 사용하는 것은 양 부재의 강성 차이 등으로 좌굴 설계 등이 복잡해지고, 서로 다른 단면의 부재의 설계와 시공으로 인한 공정 증가와 원가 상승의 문제점이 발생하였다.However, using the vertical member, the brace, with different cross sections of steel pipe and H-pillar depending on the span position, complicates the buckling design due to the difference in stiffness between the two members, and the process due to the design and construction of members with different cross sections. There were problems of increase and cost increase.
다른 한편으로는, 사보강재를 설치하는 경우 띠장에 가해지는 횡압(토압, 수압 등)이 사보강재를 통하여 버팀보로 전달되어 사보강재와 버팀보 사이의 연결부에서 버팀보가 버팀보의 길이방향으로 변위가 발생되는 문제가 생기는데, 이는 압축재로 작용하는 버팀보의 구조적 안정성(편심에 의한 좌굴의 발생)을 크게 손상할 수 있는 바 사보강재 사용시 버팀보의 밀림으로 인한 길이방향 변위를 억제할 수 있는 수단이 강구되어야 한다.On the other hand, in the case of installing a yarn reinforcement, the lateral pressure (earth pressure, water pressure, etc.) applied to the wale is transmitted to the brace through the yarn reinforcement, so that the brace is displaced in the longitudinal direction of the brace at the connection between the yarn reinforcement and the brace. There is a problem, which can greatly impair the structural stability (buckling caused by eccentricity) of the brace acting as a compression material. .
또한, 띠장-버팀보 구조체 자체가 지하흙막이 공사용 가시설재이므로, 본질적으로 설치와 해체가 반복되므로, 설치와 해체의 반복으로 인한 부재의 단면 훼손을 최소화할 수 있는 강관 버팀보-사보강재의 연결구조가 필요하게 된다.In addition, since the wale-bearing structure itself is a temporary material for basement retaining construction, installation and dismantling are essentially repeated, so a connection structure of steel pipe brace-saber steel that can minimize damage to the cross section of members due to repeated installation and dismantling is required. will do
상기한 문제점을 해결하기 위해 지하 흙막이 공사용 띠장-강관 버팀보-강관 사보강재 구조체가 개발되었으며, 종래기술에 따른 지하 흙막이 공사용 띠장-강관 버팀보-강관 사보강재 구조체는, 지하 흙막이 공사 현장에서 토류벽면에 좌우로 수평방향으로 설치되는 띠장, 좌우의 띠장들 사이에 띠장과 직교하게 설치되는 강관 버팀보, 강관 버팀보의 좌우로 대칭으로 띠장과 강관 버팀보의 사이에서 배치되는 가새강관, 및 강관 버팀보와 가새강관을 서로 연결하기 위한 이음장치로 구성된다.In order to solve the above problems, the wale-steel pipe brace-steel pipe saber structure for underground retaining construction has been developed, and the wale-steel pipe brace-steel pipe saber reinforcement structure for underground retaining construction according to the prior art is left and right on the earth wall surface at the underground retaining construction site. A wale installed in the horizontal direction with a wale, a steel pipe brace installed orthogonally to the wale between the left and right ribs, a braced steel pipe disposed between the wale and a steel pipe brace symmetrically to the left and right of the steel pipe brace, and a steel pipe brace and a braced steel pipe to each other It consists of a joint device for connection.
본 발명의 배경기술은 대한민국 등록특허공보 제10-2133053호(2020년 07월 13일 공고, 발명의 명칭 : 지하 흙막이 공사용 강관 버팀보의 이음장치 및 이를 이용한 따장-강관 버팀보 연결구조체)에 개시되어 있다.The background technology of the present invention is disclosed in Republic of Korea Patent Publication No. 10-2133053 (announced on July 13, 2020, title of invention: joint device of steel pipe brace for underground retaining construction and Dajang-steel pipe brace connection structure using the same) .
종래기술에 따른 이음장치는, 다수 개의 체결부재를 사용하여 가개강관의 경사면과 측면연결구의 수직면을 단계적으로 체결작업을 진행하여 연결하기 때문에 가새강관과 강관 버팀보를 연결하는데 소요되는 시간 및 비용을 절감하기 어렵고, 체결작업이 개시되어 종료될 때까지 가새강관과 강관 버팀보를 지지하여야 하기 때문에 작업자의 편의를 도모하기 어렵고, 가새강관 및 강관 버팀보를 지지하기 위한 별도의 중장비가 요구되므로 가새강관과 강관 버팀버 연결작업을 간소화하기 어려운 문제점이 있다.The joint device according to the prior art uses a plurality of fastening members to connect the sloped surface of the braced steel pipe and the vertical surface of the side connector in stages, thereby reducing the time and cost required for connecting the braced steel pipe and the steel pipe brace. It is difficult to do this, and since the braced steel pipe and steel pipe brace must be supported from the start of the fastening operation to the end, it is difficult to promote the convenience of the operator, and separate heavy equipment is required to support the braced steel pipe and the steel pipe brace. There is a problem in that it is difficult to simplify the timbre connection work.
따라서 이를 개선할 필요성이 요청된다.Therefore, there is a need to improve it.
본 발명은 지하 흙막이 공사에서 토류벽의 하중을 지지하는 가시설재로 사용되는 띠장-버팀보 구조체에서 버팀보로 사용되는 강관(즉, 강관 버팀보)과 그 강관과 띠장 사이에 비스듬하게 연결하여 강관 버팀보를 지지하는 가새로서 역할하는 강관(즉, 가새강관)을 연결하고, 강관 버팀보와 가새강관을 연결하는 부위에 복수 개의 체결돌기를 형성하여 다수 개의 체결돌기를 동시에 구속하면서 원터치 방식으로 강관 버팀보와 가새강관을 손쉽게 연결할 수 있어 강관 버팀보와 가새강관의 연결작업 또는 해체작업에 소요되는 시간 및 비용을 절감할 수 있는 지하 흙막이 공사용 강관 버팀보 이음장치를 제공하는데 그 목적이 있다.The present invention relates to a steel pipe (i.e., a steel pipe brace) used as a brace in a band-bearing structure used as a temporary material to support the load of an earth wall in an underground retaining construction, and an oblique connection between the steel pipe and the band to support a steel pipe brace. It connects the steel pipe (ie, braced steel pipe) that acts as a brace, and forms a plurality of fastening protrusions at the part connecting the steel pipe brace and the braced steel pipe, thereby restraining multiple fastening protrusions at the same time and easily connecting the steel pipe brace and the braced steel pipe in a one-touch method. An object of the present invention is to provide a steel pipe brace joint for underground retaining construction that can be connected, thereby reducing the time and cost required for the connection or dismantling of the steel pipe brace and the braced steel pipe.
본 발명은, 지하 흙막이 공사 현장에서 토류벽면에 좌우로 수평방향으로 설치되는 띠장, 상기 좌우의 띠장들 사이에 상기 띠장과 직교하게 설치되는 강관 버팀보, 상기 강관 버팀보의 좌우로 대칭으로 상기 띠장과 상기 강관 버팀보의 사이에서 배치되는 사보강재(강관으로 형성), 및 상기 강관 버팀보와 상기 사보강재를 서로 연결하기 위한 지하 흙막이 공사용 강관 버팀보 이음장치에 있어서, 상기 이음장치는, 소정 길이로 상기 강관 버팀보의 길이방향을 따라서 연장되어 상기 강관 버팀보의 둘레 전체를 밀착하여 덮을 수 있도록 좌우의 반고리형 연결부재 2개가 연결된 일체형 부재로 이뤄지되 상부와 하부가 분리가능하게 개방되어 있는 고리형 플레이트; 및 상기 2개의 반고리형 연결부재의 각각의 외측의 원주면에 각각 연결되어 상기 사보강재를 각각 직접적 또는 간접적으로 연결하는 측면연결구를 포함하고, 상기 측면연결구의 수직면에는 다수의 체결공이 형성되고, 상기 사보강재의 경사면과 상기 측면연결구의 수직면을 원터치 방식으로 다수 개의 연결부위를 동시에 연결하여 상기 강관 버팀보와 상기 사보강재를 연결하는 체결부; 및 복수 개의 상기 체결부가 작업자 또는 구동장치의 동작에 의해 동시에 체결되는 해제되도록 복수 개의 상기 체결부에 작동을 동시에 전달하는 연동부를 더 포함하는 것을 특징으로 한다.The present invention provides a wale installed in the horizontal direction from left to right on the earth wall surface at an underground retaining construction site, a steel pipe brace installed orthogonally to the wale between the left and right bands, and the steel pipe brace symmetrically to the left and right of the wale and the wale In the steel pipe brace joint device for underground retaining construction for connecting the steel pipe brace (formed by a steel pipe) and the steel pipe brace to each other, the joint device has a predetermined length of the steel pipe brace to be disposed between the steel pipe braces. An annular plate extending along the longitudinal direction and consisting of an integral member in which two semi-annular connecting members on the left and right are connected so as to cover the entire circumference of the steel pipe brace in close contact with the upper part and the lower part are detachably open; and a side connector respectively connected to the outer circumferential surface of each of the two semi-annular connecting members to directly or indirectly connect the yarn reinforcing material, wherein a plurality of fastening holes are formed on the vertical surface of the side connector, and the A fastening part for connecting a plurality of connecting parts simultaneously to the inclined surface of the yarn reinforcement and the vertical surface of the side connector in a one-touch manner to connect the steel pipe brace and the yarn reinforcement; And it characterized in that it further comprises a linkage for simultaneously transmitting the operation to the plurality of fastening parts so that the plurality of fastening parts are released at the same time by the operation of the operator or the driving device.
또한, 본 발명의 상기 체결부는, 상기 사보강재의 경사면에 복수 개가 일정한 간격을 유지하며 복수 개의 상기 체결공에 대향되게 돌출되게 형성되는 체결돌기; 및 상기 체결돌기가 상기 체결공 내부로 삽입되면 상기 체결돌기와 결합되어 상기 체결돌기가 상기 체결공 외부로 배출되는 것을 방지하는 착탈부를 포함하는 것것을 특징으로 한다.In addition, the fastening portion of the present invention, a plurality of fastening protrusions formed to protrude to face the plurality of fastening holes while maintaining a constant interval on the inclined surface of the yarn reinforcement; And when the fastening protrusion is inserted into the fastening hole, it is coupled to the fastening protrusion and characterized in that it comprises a detachable portion for preventing the fastening protrusion from being discharged to the outside of the fastening hole.
또한, 본 발명의 상기 착탈부는, 상기 체결공 내부에 일측 또는 타측으로 슬라이딩 가능하게 배치되고, 상기 체결공 내부로 삽입되는 체결돌기의 결합홀부에 삽입되어 상기 체결돌기를 구속하는 결합돌기; 및 상기 결합돌기를 상기 체결공 측으로 가압하도록 상기 결합돌기와 상기 측면연결구의 구획격벽 사이에 개재되는 제1탄성부재를 포함하는 것을 특징으로 한다.In addition, the detachable portion of the present invention, a coupling protrusion that is slidably disposed to one side or the other side inside the fastening hole, is inserted into the coupling hole of the fastening protrusion inserted into the fastening hole to constrain the fastening protrusion; and a first elastic member interposed between the coupling protrusion and the partition wall of the side connector to press the coupling protrusion toward the coupling hole.
또한, 본 발명은, 복수 개의 상기 체결돌기가 상기 체결공에 각각 삽입될 때에 복수 개의 상기 체결돌기와 복수 개의 상기 체결공이 동시에 연결되어 상기 사보강재를 상기 강관 버팀보에 연결하는 연동부를 더 포함하고, 상기 연동부는, 복수 개의 상기 결합돌기를 일체로 연결하고, 상기 측면연결구 외측으로 연장되는 연결수평대; 상기 측면연결구 외측으로 연장되는 복수 개의 상기 연결수평대를 서로 연결하는 연결수직대; 및 상기 연결수직대에 형성되어 작업자가 손으로 잡고 당기거나 밀면서 복수 개의 상기 결합돌기를 잠금상태 또는 해제상태로 이동시키는 레버부재를 포함하는 것을 특징으로 한다.In addition, the present invention further comprises an interlocking part for connecting the plurality of fastening protrusions to the steel pipe brace by connecting the plurality of fastening protrusions and the plurality of fastening holes at the same time when the plurality of fastening protrusions are respectively inserted into the fastening holes, The linkage unit includes: a connecting horizontal bar that integrally connects the plurality of coupling protrusions and extends outside the side connector; a connecting vertical bar connecting a plurality of the connecting horizontal bars extending outside the side connector; and a lever member formed on the connecting vertical stand to move the plurality of coupling protrusions to the locked or unlocked state while pulling or pushing by the operator.
본 발명에 따른 지하 흙막이 공사용 강관 버팀보 이음장치는, 버팀보와 사보강재(까치발) 사이의 연결이 간단해져서 공정 단축 및 원가 절감의 효과를 얻을 수 있고, 무엇보다도 버팀보와 사보강재(까치발)를 모두 강관으로 사용하더라도 이들 사이를 용접할 필요가 없어서 용이하게 해체 및 재결합이 가능하며 가시설재로서의 부재 회수율이 증가될 수 있고, 부재 단면 훼손이 최소화되는 이점이 있다.The steel pipe brace joint device for underground retaining construction according to the present invention can achieve the effect of shortening the process and reducing the cost by simplifying the connection between the brace and the saber steel (bracket), and above all, use both the brace and the saber steel (bracket) in a steel pipe There is no need to weld between them, even if used as a metal, so it can be easily dismantled and recombined, the recovery rate of the member as a temporary member can be increased, and the damage to the member cross section is minimized.
또한, 본 발명에 따른 지하 흙막이 공사용 강관 버팀보 이음장치는, 이음장치 자체가 좌우 또는 상하로 [0043] 분리가능하거나, 좌우에서 또는 상하에서 개방될 수 있기 때문에 강관 버팀보의 어느 일 지점에 사보강재(까치발)를 연결하여 사용하는데 매우 편리하고, 뿐만 아니라 서로 분리된 두 개의 강관 버팀보-강관 버팀보 사이의 연결부뿐만 아니라 별도의 연결부가 없는 하나의 연속된 강관 버팀보에서도 사용할 수 있게 되므로 사보강재 설치를 위하여 띠장과 버팀보 지점 사이에서 불필요하게 강관 버팀보 연결부위를 형성할 필요, 즉 강관 버팀보를 일부러 두 개의 작은 스팬으로 분리하여 연결부위를 형성할 필요가 없어지는 이점이 있다.In addition, in the steel pipe brace joint for underground retaining construction according to the present invention, since the joint device itself is separable from left to right or up and down, or can be opened from left to right or up and down, it can be opened at any one point of the steel pipe brace ( It is very convenient to connect and use, and it can be used not only in the connection part between two steel pipe braces and steel pipe braces separated from each other, but also in one continuous steel pipe brace without a separate connection part. There is an advantage in that there is no need to unnecessarily form a steel pipe strut joint between the and the strut point, that is, there is no need to intentionally separate the steel pipe strut into two small spans to form the joint.
또한, 본 발명에 따른 지하 흙막이 공사용 강관 버팀보 이음장치는, 사보강재가 강관이 사용됨으로써 강관 자체의 대칭단면으로 인하여 강관 버팀보에 띠장의 하중이 좌우의 사보강재를 통하여 보다 균일하게 전달되어 버팀보에 편심하중으로 인한 휨모멘트 발생이 최소화될 수 있는 이점이 있다.In addition, in the steel pipe brace joint device for underground retaining construction according to the present invention, the load on the steel pipe brace is more uniformly transmitted through the left and right yarn reinforcement materials due to the symmetrical cross section of the steel pipe itself by using the steel pipe as the yarn reinforcement, so that the eccentricity to the brace There is an advantage that the generation of bending moment due to the load can be minimized.
또한, 본 발명에 따른 지하 흙막이 공사용 강관 버팀보 이음장치는, 밀림방지턱을 포함한 이음장치를 사용하므로 흙막이 벽체 -> 띠장 -> 사보강재(까치발) -> 강관 버팀보로 전달되는 토압으로 인해 사보강재(까치발)에 대하여 강관 버팀보가 밀리는 것을 방지할 수 있고 이러한 강관 버팀보의 밀림변위로 인한 부재 안정성이 저하되는 것을 방지할 수 있는 이점이 있다.In addition, since the steel pipe brace joint device for underground retaining construction according to the present invention uses a joint device including a push sill, the retaining wall -> wale -> saber steel (bracket) -> due to the earth pressure transmitted to the steel pipe brace ), there is an advantage in that it can prevent the steel pipe brace from being pushed and the member stability can be prevented from being lowered due to the sliding displacement of the steel pipe brace.
또한, 본 발명에 따른 지하 흙막이 공사용 강관 버팀보 이음장치는, 강관 버팀보와 가새강관을 원터치 방식으로 연결하는 체결부가 구비되므로 별도의 체결부재 없이 강관 버팀보와 가새강관을 한 번의 체결작업에 의해 다수 부위를 동시에 연결할 수 있어 강관 버팀보와 가새강관을 연결하는데 소요되는 시간 및 비용을 절감할 수 있는 이점이 있다.In addition, the steel pipe brace joint device for underground retaining construction according to the present invention is provided with a fastening part for connecting the steel pipe brace and the braced steel pipe in a one-touch method, so that a plurality of parts are connected by a single fastening operation of the steel pipe brace and the braced steel pipe without a separate fastening member. Since they can be connected at the same time, there is an advantage in that the time and cost required to connect the steel pipe brace and the braced steel pipe can be reduced.
도 1은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치가 도시된 구성도이다.
도 2는 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위가 도시된 사시도이다.
도 3은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위가 도시된 정면도, 평면도 및 측면도이다.
도 4는 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위 연결구조가 도시된 사시도이다.
도 5는 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위 연결구조가 도시된 분해 사시도이다.
도 6은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위 연결구조가 도시된 분해 평면도이다.
도 7은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위 연결구조가 도시된 평면도이다.
도 8은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 강관 버팀보 연결 및 분해 상태의 도면이다.
도 9는 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 사보강재와 띠장 사이의 연결구조가 도시된 도면이다.
도 10은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 체결부가 도시된 분해 사시도이다.
도 11은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 착탈부가 도시된 도면이다.
도 12는 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 착탈부 및 연동부가 도시된 도면이다.
도 13은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 고정수납부가 도시된 도면이다.1 is a configuration diagram showing a steel pipe brace joint for underground retaining construction according to an embodiment of the present invention.
Figure 2 is a perspective view showing the joint portion of the steel pipe brace joint for underground retaining construction according to an embodiment of the present invention.
3 is a front view, a plan view, and a side view showing the joint portion of the steel pipe brace joint device for underground retaining construction according to an embodiment of the present invention.
Figure 4 is a perspective view showing the connection structure of the joint portion of the steel pipe brace joint for underground retaining construction according to an embodiment of the present invention.
5 is an exploded perspective view showing a joint connection structure of a steel pipe brace joint device for underground retaining construction according to an embodiment of the present invention.
6 is an exploded plan view showing the joint connection structure of the steel pipe brace joint device for underground retaining construction according to an embodiment of the present invention.
7 is a plan view showing a joint connection structure of a steel pipe brace joint device for underground retaining construction according to an embodiment of the present invention.
8 is a view of a steel pipe brace connection and disassembly state of a steel pipe brace joint device for underground retaining construction according to an embodiment of the present invention.
9 is a view showing the connection structure between the saber steel and the wale of the steel pipe brace joint for underground retaining construction according to an embodiment of the present invention.
10 is an exploded perspective view showing the fastening part of the steel pipe brace joint for underground retaining construction according to an embodiment of the present invention.
11 is a view showing a detachable part of a steel pipe brace joint for underground retaining construction according to an embodiment of the present invention.
12 is a view showing a detachable part and a linkage of a steel pipe brace joint for underground retaining construction according to an embodiment of the present invention.
13 is a view showing a fixed storage unit of the steel pipe brace joint for underground retaining construction according to an embodiment of the present invention.
이하, 첨부된 도면들을 참조하여 본 발명에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 일 실시예를 설명한다.Hereinafter, with reference to the accompanying drawings, an embodiment of a steel pipe brace joint device for underground retaining construction according to the present invention will be described.
이러한 과정에서 도면에 도시된 선들의 두께나 구성요소의 크기 등은 설명의 명료성과 편의상 과장되게 도시되어 있을 수 있다.In this process, the thickness of the lines or the size of the components shown in the drawings may be exaggerated for clarity and convenience of explanation.
또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로써, 이는 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다.In addition, the terms to be described later are terms defined in consideration of functions in the present invention, which may vary according to intentions or customs of users and operators.
그러므로 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Therefore, definitions of these terms should be made based on the content throughout this specification.
도 1은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치가 도시된 구성도이고, 도 2는 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위가 도시된 사시도이고, 도 3은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위가 도시된 정면도, 평면도 및 측면도이다.1 is a configuration diagram showing a steel pipe retaining joint for underground retaining construction according to an embodiment of the present invention, and FIG. 2 is a perspective view showing a joint portion of a steel pipe retaining joint for underground retaining construction according to an embodiment of the
또한, 도 4는 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위 연결구조가 도시된 사시도이고, 도 5는 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위 연결구조가 도시된 분해 사시도이고, 도 6은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위 연결구조가 도시된 분해 평면도이다.In addition, Figure 4 is a perspective view showing the joint part connection structure of the steel pipe retaining joint for underground retaining construction according to an embodiment of the present invention, Figure 5 is a steel pipe retaining joint for underground retaining construction according to an embodiment of the present invention It is an exploded perspective view showing the joint connection structure, and FIG. 6 is an exploded plan view showing the joint connection structure of the steel pipe brace joint for underground retaining construction according to an embodiment of the present invention.
또한, 도 7은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 이음부위 연결구조가 도시된 평면도이고, 도 8은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 강관 버팀보 연결 및 분해 상태의 도면이고, 도 9는 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 사보강재와 띠장 사이의 연결구조가 도시된 도면이다.In addition, FIG. 7 is a plan view showing the joint connection structure of the steel pipe retaining joint for underground retaining construction according to an embodiment of the present invention, and FIG. 8 is a steel pipe retaining joint for underground retaining construction according to an embodiment of the present invention. It is a view of the steel pipe brace connection and disassembly state, and FIG. 9 is a view showing the connection structure between the saber steel material and the wale of the steel pipe brace joint device for underground retaining construction according to an embodiment of the present invention.
또한, 도 10은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 체결부가 도시된 분해 사시도이고, 도 11은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 착탈부가 도시된 도면이고, 도 12는 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 착탈부 및 연동부가 도시된 도면이고, 도 13은 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치의 고정수납부가 도시된 도면이다.In addition, Figure 10 is an exploded perspective view showing the fastening part of the steel pipe retaining joint for underground retaining construction according to an embodiment of the present invention, Figure 11 is a detachable part of the steel pipe retaining joint for underground retaining construction according to an embodiment of the
도 1 내지 도 13을 참조하면, 본 발명의 일 실시예에 따른 지하 흙막이 공사용 강관 버팀보 이음장치는, 띠장(2)에 연결되는 강관 버팀보(1, 1')와, 강관 버팀보(1, 1')와 띠장(2) 사이에 대체적으로 대각선 방향으로 연결되고 강관으로 형성되는 좌우 대칭의 사보강재(3) 사이를 연결하기 위하여 이음장치(100)을 사용한다.1 to 13, the steel pipe brace joint device for underground retaining construction according to an embodiment of the present invention, the steel pipe braces (1, 1') connected to the wale (2), and the steel pipe braces (1, 1') ) and the wale (2) is generally connected in a diagonal direction and uses a joint device (100) to connect between the left and right symmetrical yarn reinforcing materials (3) formed of a steel pipe.
사보강재(3)는 까치발이라고 호칭되며, 본 발명에서는 강관으로 구성되는 강관 사보강재, 또는 가새강관으로 호칭되기도 한다.The
강관 버팀보를 두 개의 도면부호(1, 1')로 표현한 것은 이음장치(100)를 기준으로 띠장(2)에 연결된 강관 버팀보(1')와 이음장치(100)를 기준으로 그 반대편의 강관 버팀보(1)를 구별하기 위한 것일 뿐, 도 8의 왼쪽 그림에서 볼 수 있는 바와 같이 본 발명에 있어서 강관 버팀보(1, 1')는 이음장치(100)를 관통하여 연속적으로 형성될 수도 있고(이 경우 1, 1'는 동일한 강관 버팀보), 도 8의 오른쪽 그림에서 볼 수 있는 바와 같이 절단된 2개의 강관 버팀보(1, 1')가 이음장치(100)를 통하여 전후로 연결될 수도 있다.The steel pipe braces are expressed by two reference numerals (1, 1'), which are the steel pipe braces (1') connected to the wale (2) based on the
한편 이음장치(100)는 도 2 내지 도 3에서 볼 수 있는 것과 같이 원형 단면의 강관의 둘레를 감싸면서 강관에 대하여 밀착되어 강관을 죄일 수 있도록 형성되는데, 좌우 또는 상하의 반고리형 밴드 또는 연결부재(10, 11)가 사용될 수 있다.On the other hand, the
도 2 내지 3 등에서는 좌우로 분할되는 반고리형 연결부재(10, 11)를 도시하였으나, 필요에 따라서는 상하로 분리되는 반고리형 연결부재(10, 11)를 사용할 수도 있다.Although the
일반적으로 상하로 분리되는 반고리형 연결부재(10, 11)를 사용한다면, 하부 연결부재에 강관 버팀보(1, 1')가 거치되는 효과가 있어서, 서로 절단된 강관 버팀보(1, 1')를 연결하는 데 시공상 보다 안정적일 수 있는데, 그 이유는 무거운 강관을 일단 중력방향으로 아래에 있는 하부 연결부재에 거치한 후 강관 버팀보(1, 1')의 나머지 반구를 상부 연결부재로 덮는 방식으로 시공할 수 있기 때문이다.In general, if you use the
그런데 강관 버팀보(1)가 일체로 되어서 강관 버팀보(1)와 강관 버팀보(1')가 구별되지 않는 경우에는 좌우로 분리된 반고리형 연결부재(10, 11)도 무난히 사용가능하며, 이하에서는 본 발명은 주로 좌우로 분리된 반고리형 연결부재(10, 11)를 기준으로 설명하나 본 발명이 반드시 좌우 분리형 반고리형 연결부재(10, 11)로 한정되는 것은 아니며 본 발명에서 설명하는 기술적 구성을 채용하는 경우라면 좌우 또는 상하 분리형 반고리형 연결부재를 구별하지 않고 본 발명의 권리범위에 속해야 한다.However, when the
단, 본 발명의 일 실시예에서는 도 2 내지 도 3에서 볼 수 있는 바와 같이 좌우로 분리된 반고리형 연결부재(10, 11)가 서로 완전히 분리되어 있는 것이 아니라 하부에서는 서로 연속적으로 연결되고 상부의 볼트 연결부(12)에서만 후술하는 바와 같이 볼트(14)로 체결될 수 있도록 하는 구성일 수 있다. 이와 같은 세미분리형 반고리형 연결부재(10, 11)를 사용하는 경우에는 좌우로 분리된 경우라고 하더라도 실질적으로 그 연속된 하부면에 강관 버팀보(1, 1')를 삽입하고서 거치한 후 반고리형 연결부재(10, 11)의 상부를 고정하는 방식으로 시공이 가능하기 때문에 시공의 안정성과 편의성을 모두 달성할 수 있으며, 무엇보다도 연결부재(10, 11)의 결합부가 2개가 아닌 1개만 형성되므로 연결 시공이 단순해지고, 또한 결합부(시공 후에는 해체할 부분)가 줄어드는 만큼 부재의 강성 저하나 변형가능성은 그 만큼 감소하는 효과가 있어 유리하다.However, in one embodiment of the present invention, as can be seen in FIGS. 2 to 3 , the
즉, 위 서로 대칭인 2개의 반고리형 연결부재(10, 11)는 소정 길이로 상기 강관 버팀보(1)의 길이방향을 따라서 연장되어 강관(1)의 둘레 전체를 밀착하여 덮을 수 있도록 형성된 고리형 플레이트를 형성하고, 좌우의 반고리형 연결부재(10, 11) 2개가 연결되어 형성된 고리형 플레이트는 그 상부만이 도 2 등에서 볼 수 있는 바와 같이 분리될 수 있고 개방되어 있다. 물론 상기 고리형 플레이트가 하부에서 분리될 수 있고 개방될 수도 있겠으나 일반적으로 중력방향으로 하중이 흐르는 강관 버팀보(1, 1)와 같은 부재를 연결하는 이음장치(100)와 같은 부재에서는 도 2에서와 같이 그 중력방향 반대의 상부를 개방하는 것이 바람직하다.That is, the two
본 발명에서 반고리형 연결부재(10, 11)는 이들이 상하에서 모두 분리되어 있는 형태, 좌우에서 모두 분리되어 있는 형태, 또는 도 2에서와 같이 상부에서만 분리되어 있는 형태, 또는 하부에서만 분리되어 있는 형태, 또는 좌측 또는 우측 중 어느 한 부분에서만 분리되어 있는 형태의 이음장치(100)를 모두 포괄하는 의미로 사용되며 이하에서는 주로 도 2에서와 같은 형태를 기준으로 예시적으로 설명한다.In the present invention, the
한편, 본 발명에서 설명되는 모든 구성요소, 예를 들어서, 띠장(2), 강관 버팀보(1), 이음장치(100) 등은 모두 강재에 해당하기 때문에 용접 등의 반영구적 결합방식과 자유롭게 분리가 가능한 볼트-너트 결합이 모두 가능하다.On the other hand, since all components described in the present invention, for example, the
단, 본 발명에서는 부재 회수율을 높이기 위하여 가급적 볼트-너트 결합을 사용하는 것이 바람직하고 본 명세서의 설명도 볼트-너트 결합을 기준으로 설명을 하나 이것이 용접이 불가능하다는 의미는 아니다.However, in the present invention, it is preferable to use a bolt-nut combination as much as possible in order to increase the member recovery rate, and although the description of the present specification is also based on the bolt-nut combination, this does not mean that welding is impossible.
또한, 예를 들어서 후술하는 측면연결구(20)는 사보강재연결구(30)의 볼트 결합을 위하여 그 수직면(201)에 다수의 체결공(25)이 형성되고 그 체결공을 통하여 볼트 결합이 가능하도록 측면연결구(20)는 도 2에서와 같은 중공(26)을 형성한다.In addition, for example, in the
하지만 측면연결구(20)와 사보강재연결구(30)를 용접하는 경우라면 도 10에서와 같이 별도의 중공(26)이 필요 없게 된다.However, in the case of welding the
반고리형 연결부재(10, 11)는 도면에서 보는 바와 같이 좌우로 분할되어 있고 이들 사이를 볼트결합하기 위하여 볼트 연결부(12)가 예시적으로 이음장치(100)의 상부에 형성되어 있다. 물론 상기 볼트 연결부(12)는 이음장치(100)의 하부에 하나 더 형성되어 있을 수도 있고, 상부 대신에 하부에 형성되어 있을 수도 있으며, 상하 분리형의 경우에는 좌우의 위치 모두 또는 그 중 한 위치에 형성될 수도 있다.The
또한 앞서와 같이 세미분리형 반고리형 연결부재의 경우에는 상부 또는 하부 중 하나, 또는 좌측 또는 우측 중 하나에 볼트 연결부(12)가 형성되게 된다.In addition, in the case of the semi-detachable semi-annular connection member as described above, the
볼트 연결부(12)는 도 2 등에서 볼 수 있는 바와 같이 강관 버팀보(1)의 길이방향으로 상기 이음장치(100)의 길이방향을 따라서 반고리형 연결부재(10, 11)의 원주면으로부터 각각 돌출된 2개의 연결판(120)이 연장되며 그 연결판(120)을 소정의 간격으로 분할하는 리브(13)가 상기 연결판(120)으로부터 상기 반고리형 연결부재(10, 11)의 곡면을 따라서 아래로 연장되어 형성되게 되며 상기 리브(13)와 리브(13) 사이에 한 개 이상의 볼트(14)가 체결되고, 볼트(14)를 조임으로써 연결판(120)이 강관 버팀보(1)에 대하여 밀착되어 반고리형 연결부재(10, 11)가 강관 버팀보(1)에 단단하게 고정된다.The
이러한 이음장치(100)를 사용하면 강관 버팀보(1, 1')를 안정적으로 연결할 수 있게 된다.By using such a
이하에서는 사보강재(3)와 강관 버팀보(1)를 안정적으로 연결할 수 있는 방법에 대하여 설명한다.Hereinafter, a method for stably connecting the
이음장치(100)의 좌우의 반고리형 연결부재(10, 11)에는 각각 사보강재(3)가 결합될 수 있는 측면연결구(20)가 형성되고, 측면연결구(20)는 도 2에서 보았을 때 대체적으로 직육면체와 같은 형상이되 도 3에서 볼 수 있는 바와 같이 강관 버팀보(1)와 맞닿는 일측에서 강관 버팀보(1)의 곡면에 따라서 절삭된 형상으로 형성된다.A
따라서 도 3에서 볼 수 있는 바와 같이 강관 버팀보(1)와 연결되는 일측에서는 측면연결구(20)의 모서리가 반고리형 연결부재(10, 11)의 원주를 따라서 연장된다. 도 4 등에서 볼 수 있는 바와 같이 측면연결구(20)는 이음장치(100)의 뒤쪽 끝에서 띠장쪽으로 강관 버팀보(1)의 길이방향으로 연장되어 형성되고 이음장치(100)의 강관 버팀보(1)의 길이방향 전체에 걸쳐서 형성될 수 있어서 사보강재(3)의 하중이 최대한 넓은 면적의 측면연결구(20)에 분포된 후 다시 이음장치(100)의 반고리형 연결부재(10, 11))에 골고루 분산되어 부재 변형이나 불필요한 응력 집중이 발생되지 않도록 한다.Therefore, as can be seen in FIG. 3 , the edge of the
본 실시예는, 사보강재의 경사면(301)과 측면연결구의 수직면(201)을 원터치 방식으로 다수 개의 연결부위를 동시에 연결하여 강관 버팀보(1)와 사보강재(3)를 연결하는 체결부(500)와, 복수 개의 체결부(500)가 작업자 또는 구동장치의 동작에 의해 동시에 체결되는 해제되도록 복수 개의 체결부(500)에 작동을 동시에 전달하는 연동부(550)를 더 포함한다.In this embodiment, a plurality of connecting parts are simultaneously connected to the
측면연결구(20)의 좌우방향 수직면, 즉 상기 사보강재(3)를 바라보는 수직면(201)에는 다수의 체결공(25)이 형성되어 후술하는 사보강재연결구(30)의 경사면(301)과 체결부(500)에 의해 결합된다.A plurality of fastening holes 25 are formed on the left and right vertical surface of the
또한, 위와 같은 체결공(25)을 통하여 사보강재연결구(30)와 측면연결구(20)를 결합하는 경우에는 측면연결구(20)가 폐합단면(closed section)이면 안되고, 도 2에 도시된 바와 같이 측면연결구(20)에 체결부(500)가 설치될 수 있는 중공(26)이 형성되어야 한다.In addition, in the case of coupling the
사보강재연결구(30)는 이음장치(100)에 사보강재(3)를 연결하는 것으로서 도 1에서와 같이 사보강재(3)가 띠장(2)으로부터 대체적으로 대각선 방향으로 연장되는 부재이므로, 사보강재(3)와 이음장치(100) 사이를 연결하기 위하여 사보강재연결구(30)는 도 4 등에서와 같이 대체적으로 사다리꼴 단면을 가지게 된다.The
도 5에서와 같이 사보강재연결구(30)의 경사면(301)은 측면연결구(20)의 수직면(201)에 연결되고 사보강재연결구(30)의 수직면(302)은 사보강재(3)와 연결된 보강구(260)에 연결되고 보강구(260)는 일반적으로 두 개의 좌우 강판(261, 262) 사이에 십자형(+) 보강철물(263)이 연결되어 형성되며, 보강구(260)는 도 5에서 좌측 강판(261)이 사보강재(3)에 연결된 관형연결재(27)에 연결되고 우측 강판(262)이 사보강재연결구(30)의 수직면(302)에 연결된다.As shown in FIG. 5, the
물론 강판(261)은 관형연결재(27)의 일부로서 형성될 수 있고 강판(262)은 사보강재연결구(30)의 일부로서 형성될 수 있다.Of course, the
상기와 같은 형태의 십자형 보강판(262)이 중간에 삽입된 보강구(260)를 사용하는 경우 십자형 보강판(262)과 좌우 강판(261, 262)에 의하여 형성된 공간 사이에 작업자가 손을 넣고서 강판(262)과 사보강재연결구(30) 사이를 체결부(500)에 의해 연결하고 강판(261)과 관형연결재(27) 사이를 볼트 연결하기가 편리하다.When the cross-shaped reinforcing
사보강재연결구(30)의 수직면(302)은 강판(262)에 연결될 수 있고, 앞서 설명한 바와 같이 수직면(302)과 강판(262)은 하나의 부재로 형성될 수도 있다.The
사보강재(3)가 강관 버팀보(1)에 경사져서 위치하기 때문에 사보강재연결구(30)의 경사면(301)은 사보강재연결구(30)와 수직면(201)이 밀착될 수 있는 경사로 형성된다.Since the
한편, 사보강재연결구(30)를 통하여 앞서 설명한 바와 같이 토류벽으로부터 띠장(2)으로 전달된 횡압이 사보강재(3)를 통하여 강관 버팀보(1)의 측면연결구(20)에 전달되는데 이때 전달되는 횡압의 축이 강관 버팀보(1)의 길이 방향 축에 대해서 경사지기 때문에 도 6에서와 같이 상기 좌우의 두 사보강재(3)와 그 사보강재연결구(30)가 도 6에서 화살표 방향으로 이음장치(100)에 연결되어 강관 버팀보(1)와 그 이음장치(100)를 중심으로 서로 대칭으로 시공되어야 강관 버팀보(1)에 편심이 걸리지 않을 수 있다.On the other hand, as described above through the
강관 버팀보(1)는 버팀보라고 호칭되지만 실제는 수평부재(보, 거더)로서 거동하기 보다는 압축재(기둥)로서 거동하고 그렇기 때문에 편심이 걸리는 경우 좌굴 등의 발생으로 부재의 안정성이 크게 훼손될 수 있다.Although the steel pipe brace (1) is called a brace, it actually behaves as a compression member (column) rather than as a horizontal member (beam, girder). have.
한편으로는 사보강재(3)를 통하여 전달되는 횡압으로 인하여 사보강재(3)와 강관 버팀보(1) 사이에 밀림현상이 발생될 수 있는데 이를 해결하기 위하여 본 발명에서는 측면연결구(20)의 수직면(201)의 가장자리에 수직면(201)으로 부터 소정 높이로 돌출되는 형태로서 밀림방지턱(40)을 형성한다.On the other hand, due to the lateral pressure transmitted through the yarn reinforcing material (3), a pushing phenomenon may occur between the yarn reinforcing material (3) and the steel pipe brace (1). In order to solve this, in the present invention, the vertical surface of the side connector (20) ( At the edge of the 201), a sliding
밀림방지턱(40)은 수직면(201)에 직교하는 방향으로 기립된 철판이나 "ㄱ" 형강 (일예로 ㄱ-90x90x10 또는 ㄱ-100x100x10) 또는 "ㄷ" 형강 (일예로 ㄷ-380x100x10.5x16)등으로 형성하고 상기 밀림방지턱(40)을 넘어서 상기 사보강재연결구(30)가 이동할 수 없는 스톱퍼로서 역할할 수 있다.The
도 5에서와 같이 상기 밀림방지턱(40)은 이음장치(100)의 띠장(2) 반대편 끝단에서 측면연결구(20)의 일단에서 돌출되는 형상이다.As shown in FIG. 5 , the
상기와 같은 밀림방지턱(40)을 설치하는 경우 위와 같은 사보강재(3)와 강관 버팀보(1) 사이의 밀림을 방지하는 효과 이외에도 강관 버팀보(1)에 대하여 상기 사보강재(3)의 위치를 대칭되게 잡는데 있어서도 유리한데, 그 이유는 상기 밀림방지턱(40)이 하중 재하시에 뿐만 아니라 시공 과정에서도 사보강재(3)의 밀림을 방지할 수 있기 때문이다.In addition to the effect of preventing the sliding between the
또한, 사보강재(3)의 밀림을 보다 효과적으로 방지하여 종국에 강관 버팀보(1)의 밀림을 보다 효과적으로 보다 본질적으로 감소시키기 위하여 도 9에서 보는 바와 같이 띠장(2)과 사보강재(3) 사이의 연결구조물(60)에도 밀림방지턱(41)이 설치될 수 있다(도 9에서 원으로 표시한 부분).In addition, in order to more effectively prevent the pushing of the
연결구조물(60)은 도 9에서 볼 있는 바와 같이 사보강재(3)에 삽입되는 관형연결재(61), 상기 관형연결재(61)에 연결되는 십자형 보강판(63), 십자형 보강판(63)에 연결되는 에어잭과 같은 연결잭(62), 연결잭(62)을 띠장(2)에 연결하는 연결구(64)(사보강재연결구와 비슷하게 일면은 수직면, 타면은 경사면으로 형성)로 구성된다.As shown in FIG. 9, the
본 발명에 있어서 에어잭과 같은 연결잭(62)은 띠장(2)과 강관 버팀보(1) 사이, 또는 띠장(2)과 사보강재(3) 사이에 설치되고, 경우에 따라서 강관 버팀보(1)와 강관 버팀보(1') 사이에도 설치될 수 있는데, 이는 시공 현장에 따라서 부재 사이의 간극이 발생하는 경우 이를 유동적으로 조절하기 위한 것이다. 단, 도 1에서 볼 수 있는 바와 같이 연결잭(62)은 띠장(2)에 모두 설치되는 것이 아니며, 띠장(2)의 어느 일측에만 설치되면 충분할 수 있고, 그렇기 때문에 본 발명에 있어서, 띠장(2)과 강관 버팀보(1), 띠장(2)과 사보강재(3), 강관 버팀보(1)와 강관 버팀보(1')를 연결하는 데 있어서 연결잭(62)이 포함된 경우와 그렇지 않은 경우 모두 본 발명의 권리범위에 속하게 된다.In the present invention, the connecting
위와 같은 띠장(2)과 연결구조물(60) 사이, 구체적으로는 상기 띠장(2)과 상기 연결구(64) 사이에 설치되는 밀림방지턱(41)은 띠장(2)으로 전달되는 횡압(도 9에서 화살표로 표시한 부분)이 사보강재(3)에 연결구조물(60)을 통하여 전달되는 과정에서 그 반력으로 연결구조물(60)이 띠장(2)에 대하여 밀리는 것을 방지할 수 있는 역할을 하며, 결과적으로 사보강재(3)와 강관 버팀보(1)의 밀림을 방지할 수 있다.As above, between the
밀림방지턱(40)과 밀림방지턱(41)은 함께 사용될 수도 있고 밀림방지턱([0087] 40)만이 사용될 수도 있다.[0087] The
도 9는 밀림방지턱(40)이 "ㄷ"형강으로 (b)는 "ㄱ"형강으로 형성된 것을 보여준다.9 shows that the
한편 도 7에서 보는 바와 같이 사보강재(3)와 강관 버팀보(1)를 연결하는 데 있어서 상기 사보강재(3)와 사보강재연결구(30) 사이에 관형연결재(27)를 매개하지 않고 강관인 사보강재(3)의 끝과 상기 사보강재연결구(30) 사이를 플랜지 접합, 예를 들어서 사보강재(3)의 끝과 상기 사보강재연결구(30)의 끝에 직각으로 납작한 날개(70, 71)를 달고 그 날개(70, 71)에 구멍을 뚫은 후 그 구멍을 통해서 상기 사보강재연결구(30)와 사보강재(3)를 볼트(73) 연결하고 이에 추가로 날개(70, 71)로 된 플랜지에 별도의 리브(72)를 형성한 후 그 리브와 상기 사보강재연결구(30)를 용접할 수 있다.On the other hand, as shown in FIG. 7, in connecting the
본 실시예의 체결부(500)는, 사보강재의 경사면에 복수 개가 일정한 간격을 유지하며 복수 개의 체결공(25)에 대향되게 돌출되게 형성되는 체결돌기(512)와, 체결돌기(512)가 체결공(25) 내부로 삽입되면 체결돌기(512)와 결합되어 체결돌기(512)가 체결공(25) 외부로 배출되는 것을 방지하는 착탈부(530)를 포함한다.The fastening part 500 of this embodiment is a plurality of
따라서 강관 버팀보와 사보강재를 연결할 때에는 작업자가 직접 연동부(550)를 당기거나 중장비를 사용하여 연동부(550)를 후퇴시키면 다수 개의 체결공(25)이 동시에 개방되고, 다수 개의 체결공(25)에 체결돌기(512)가 삽입되도록 사보강재의 경사면을 측면연결구의 수직면에 밀착시키면 체결돌기(512)가 체결공(25) 내부로 삽입되고, 후퇴시켰던 연동부(550)를 원상태로 복귀시키면 착탈부(530)의 작동에 의해 다수 개의 체결돌기(512)가 각각의 체결공(25) 내부에서 구속되면서 사보강재와 강관 버팀보의 결합이 한 번의 작업에 의해 이루어지게 된다.Therefore, when connecting the steel pipe brace and the saber steel, if the operator pulls the
본 실시예의 착탈부(530)는, 체결공(25) 내부에 일측 또는 타측으로 슬라이딩 가능하게 배치되고, 체결공(25) 내부로 삽입되는 체결돌기(512)의 결합홀부(514)에 삽입되어 체결돌기(512)를 구속하는 결합돌기(532)와, 결합돌기(532)를 체결공(25) 측으로 가압하도록 결합돌기(532)와 측면연결구의 구획격벽(538) 사이에 개재되는 제1탄성부재(534)와, 복수 개의 체결돌기(512)가 체결공(25)에 각각 삽입될 때에 복수 개의 체결돌기(512)와 복수 개의 체결공(25)이 동시에 연결되어 사보강재를 강관 버팀보에 연결하는 연동부(550)를 포함한다.The detachable part 530 of this embodiment is slidably disposed to one side or the other side inside the
결합돌기(532)는 체결공(25) 내부에 좌우방향으로 슬라이딩 가능하게 배치되고, 결합돌기(532)의 일단부는 하측 방향으로 굴곡되어 연동부(550)에 일체로 연결된다.The
따라서 작업자 또는 중장비에 의해 연동부(550)가 측면연결구 외측 방향으로 당겨지면 다수 개의 결합돌기(532)가 동시에 측 방향으로 슬라이딩되면서 다수 개의 체결공(25)이 모두 개방된다.Therefore, when the
체결공(25) 내부로 결합돌기(532)가 삽입된 후에는 연동부(550)를 측면연결구 외측으로 당기는 외력을 해제시키고, 이때, 제1탄성부재(534)의 복원력에 의해 결합돌기(532)가 체결공(25) 측으로 이동되면서 체결돌기(512)의 결합홀부(514)에 삽입되면서 체결돌기(512)가 구속되므로 사보강재와 강관 버팀보의 결합이 이루어지게 된다.After the engaging
본 실시예의 연동부(550)는, 복수 개의 결합돌기(532)를 일체로 연결하고, 측면연결구 외측으로 연장되는 연결수평대(554)와, 측면연결구 외측으로 연장되는 복수 개의 연결수평대(554)를 서로 연결하는 연결수직대(552)와, 연결수직대(552)에 형성되어 작업자가 손으로 잡고 당기거나 밀면서 복수 개의 결합돌기(532)를 잠금상태 또는 해제상태로 이동시키는 레버부재(556)를 포함한다.The
따라서 작업자나 중장비의 작동에 의해 레버부재(556)가 측면연결구 외측 방향으로 당겨지면 연결수평대(554)가 측면연결구 외측 방향으로 당겨지면서 다수 개의 연결수직대(552)를 측 방향으로 이동시키므로 연결수직대(552)에 연결되는 다수 개의 결합돌기(532)가 동시에 당겨지게 된다.Therefore, when the
또한, 본 실시예는, 체결돌기(512)의 구속상태를 유지시키는 고정수납부(570)를 더 포함하고, 본 실시예의 고정수납부(570)는, 측면연결구 외측으로 연장되게 배치되는 연결수평대(554)의 단부를 회전 가능하게 연결하는 힌지부(572)와, 힌지부(572)를 중심으로 연결수평대(554)가 일측 방향으로 회전될 때에 레버부재(556)가 안착되어 수납되도록 측면연결구에 일체로 형성되는 수납대(574)와, 수납대(574)에 삽입되는 레버부재(556)가 외력에 의해 분리되는 것을 방지하도록 수납대(574)에 설치되는 탄성지지부(576)를 포함한다.In addition, the present embodiment further includes a fixed
따라서 체결돌기(512)와 결합돌기(532)의 결합작동이 완료된 후에 작업자가 레버부재(556)를 잡고 힌지부(572)를 중심으로 레버부재(556)를 수납대(574) 측으로 회전시키면 레버부재(556)가 수납대(574) 내부로 삽입되고, 탄성지지부(576)에 의해 레버부재(556)가 구속되므로 작업자의 의도와 다르게 레버부재(556)가 수납대(574) 외측으로 분리되어 오작동되는 것을 방지할 수 있게 된다.Therefore, after the coupling operation of the
본 실시예에 따른 탄성지지부(576)는, 수납대(574) 양측부로부터 수납대(574) 내측 방향으로 돌출 가능하게 설치되는 한 쌍의 걸림돌기(577)와, 걸림돌기(577)와 수납대(574) 내벽 사이에 개재되어 걸림돌기(577)를 수납대(574) 내측 방향으로 가압하는 제2탄성부재(578)를 포함한다.The
따라서 작업자가 레버부재(556)를 수납대(574) 내부로 삽입하면 제2탄성부재(578)가 압축되면서 걸림돌기(577)가 수납대(574) 내부 공간으로 삽입되고, 레버부재(556)가 수납대(574) 내부로 완전히 삽입되면 제2탄성부재(578)의 복원력에 의해 걸림돌기(577)가 수납대(574) 내측 방향으로 돌출되면서 한 쌍의 걸림돌기(577)가 레버부재(556)의 양측부에 걸림결합되어 레버부재(556)가 수납대(574) 외부로 분리되는 오작동을 방지하게 된다.Therefore, when the operator inserts the
이로써, 지하 흙막이 공사에서 토류벽의 하중을 지지하는 가시설재로 사용되는 띠장-버팀보 구조체에서 버팀보로 사용되는 강관(즉, 강관 버팀보)과 그 강관과 띠장 사이에 비스듬하게 연결하여 강관 버팀보를 지지하는 가새로서 역할하는 강관(즉, 가새강관)을 연결하고, 강관 버팀보와 가새강관을 연결하는 부위에 복수 개의 체결돌기를 형성하여 다수 개의 체결돌기를 동시에 구속하면서 원터치 방식으로 강관 버팀보와 가새강관을 손쉽게 연결할 수 있어 강관 버팀보와 가새강관의 연결작업 또는 해체작업에 소요되는 시간 및 비용을 절감할 수 있는 지하 흙막이 공사용 강관 버팀보 이음장치를 제공할 수 있게 된다.As a result, a steel pipe used as a brace (ie, a steel pipe brace) as a brace in a band-bearing structure used as a temporary material to support the load of an earth wall in an underground retaining construction, and a brace that is connected at an angle between the steel pipe and the band to support the steel pipe brace It connects the steel pipe (i.e., braced steel pipe) that serves as the Therefore, it is possible to provide a steel pipe brace joint for underground retaining construction that can reduce the time and cost required for the connection or dismantling of the steel pipe brace and the braced steel pipe.
본 발명은 도면에 도시되는 일 실시예를 참고로 하여 설명되었으나, 이는 예시적인 것에 불과하며, 당해 기술이 속하는 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다.Although the present invention has been described with reference to one embodiment shown in the drawings, this is merely exemplary, and various modifications and equivalent other embodiments are possible by those skilled in the art to which the art pertains. will understand
또한, 지하 흙막이 공사용 강관 버팀보 이음장치를 예로 들어 설명하였으나, 이는 예시적인 것에 불과하며, 지하 흙막이 공사용 강관 버팀보 이음장치가 아닌 다른 제품에도 본 발명의 이음장치가 사용될 수 있다.In addition, although the description has been given by taking the steel pipe retaining joint for underground retaining construction as an example, this is only exemplary, and the joint device of the present invention may be used for products other than the steel pipe retaining joint for underground retaining construction.
따라서 본 발명의 진정한 기술적 보호범위는 아래의 특허청구범위에 의해서 정하여져야 할 것이다.Therefore, the true technical protection scope of the present invention should be defined by the following claims.
1, 1': 강관 버팀보 2: 띠장
3: 사보강재, 가새강관, 까치발
10, 11: 반고리형 연결부재(10과 11이 결합되면 고리형 플레이트)
12: 볼트 연결부
13: 볼트 연결부의 연결판에 부착되는 리브
14: 볼트 연결부의 연결판에 체결되는 볼트
20: 측면연결구 25: 측면연결구의 체결공
26: 측면연결구에 형성되는 중공 27: 관형연결재
30: 사보강재연결구 40: 밀림방지턱
100: 강관 버팀보 이음장치 120: 볼트 연결부의 연결판
201: 측면연결구의 수직면(체결공이 형성)
260: 보강구 262: 십자형 보강철물
301: 사보강재의 경사면 302: 사보강재의 수직면
500 : 체결부 512 : 체결돌기
514 : 결합홀부 530 : 착탈부
532 : 결합돌기 534 : 제1탄성부재
536 : 스토퍼 538 : 구획격벽
550 : 연동부 552 : 연결수직대
554 : 연결수평대 556 : 레버부재
570 : 고정수납부 572 : 힌지부
574 : 수납대 576 : 탄성지지부
577 : 걸림돌기 578 : 제2탄성부재1, 1': steel pipe brace 2: braid
3: Saber steel, braced steel pipe, bracket
10, 11: Semi-annular connecting member (annular plate when 10 and 11 are combined)
12: bolt connection
13: Rib attached to the connecting plate of the bolted connection
14: bolts fastened to the connection plate of the bolt connection part
20: side connector 25: fastening hole of the side connector
26: hollow formed in the side connector 27: tubular connector
30: reinforcing steel connector 40: push sill
100: steel pipe brace joint 120: connecting plate of the bolt connection
201: the vertical surface of the side connector (fastening hole is formed)
260: reinforcing port 262: cross-shaped reinforcing steel
301: inclined surface of the yarn reinforcement 302: the vertical surface of the yarn reinforcement
500: fastening part 512: fastening protrusion
514: coupling hole 530: detachable part
532: coupling protrusion 534: first elastic member
536: stopper 538: partition bulkhead
550: linkage 552: connecting vertical band
554: connecting horizontal bar 556: lever member
570: fixed storage 572: hinge
574: storage stand 576: elastic support part
577: locking projection 578: second elastic member
Claims (4)
상기 이음장치는,
소정 길이로 상기 강관 버팀보의 길이방향을 따라서 연장되어 상기 강관 버팀보의 둘레 전체를 밀착하여 덮을 수 있도록 좌우의 반고리형 연결부재 2개가 연결된 일체형 부재로 이뤄지되 상부와 하부가 분리가능하게 개방되어 있는 고리형 플레이트; 및
상기 2개의 반고리형 연결부재의 각각의 외측의 원주면에 각각 연결되어 상기 사보강재를 각각 직접적 또는 간접적으로 연결하는 측면연결구를 포함하고,
상기 측면연결구의 수직면에는 다수의 체결공이 형성되고,
상기 사보강재의 경사면과 상기 측면연결구의 수직면을 원터치 방식으로 다수 개의 연결부위를 동시에 연결하여 상기 강관 버팀보와 상기 사보강재를 연결하는 체결부; 및
복수 개의 상기 체결부가 작업자 또는 구동장치의 동작에 의해 동시에 체결되는 해제되도록 복수 개의 상기 체결부에 작동을 동시에 전달하는 연동부를 더 포함하고,
상기 체결부는,
상기 사보강재의 경사면에 복수 개가 일정한 간격을 유지하며 복수 개의 상기 체결공에 대향되게 돌출되게 형성되는 체결돌기; 및
상기 체결돌기가 상기 체결공 내부로 삽입되면 상기 체결돌기와 결합되어 상기 체결돌기가 상기 체결공 외부로 배출되는 것을 방지하는 착탈부를 포함하고,
상기 착탈부는,
상기 체결공 내부에 일측 또는 타측으로 슬라이딩 가능하게 배치되고, 상기 체결공 내부로 삽입되는 체결돌기의 결합홀부에 삽입되어 상기 체결돌기를 구속하는 결합돌기; 및
상기 결합돌기를 상기 체결공 측으로 가압하도록 상기 결합돌기와 상기 측면연결구의 구획격벽 사이에 개재되는 제1탄성부재를 포함하는 것을 특징으로 하는 지하 흙막이 공사용 강관 버팀보 이음장치.
At the underground retaining construction site, a wale installed horizontally on the earth wall surface in the left and right direction, a steel pipe brace installed orthogonally to the wale between the left and right bands, and symmetrically between the wale and the steel pipe brace In the steel pipe brace joint for underground retaining construction for connecting the yarn reinforcement (formed by a steel pipe), and the steel pipe brace and the yarn reinforcement to each other,
The joint device is
A ring in which two semi-annular connecting members on the left and right are connected so as to extend along the longitudinal direction of the steel pipe brace to a predetermined length and cover the entire circumference of the steel pipe brace, the upper part and the lower part are detachably open mold plate; and
Each of the two semi-annular connecting members is connected to the outer circumferential surface of each and includes a side connector for directly or indirectly connecting the yarn reinforcing material, respectively,
A plurality of fastening holes are formed on the vertical surface of the side connector,
a fastening part for connecting a plurality of connecting parts simultaneously to the inclined surface of the saber reinforcement and the vertical surface of the side connector in a one-touch manner to connect the steel pipe brace and the saber reinforcement; and
Further comprising a linkage that simultaneously transmits an operation to the plurality of the fastening parts so that the plurality of fastening parts are released at the same time as being fastened by the operation of an operator or a driving device,
The fastening part,
a plurality of fastening protrusions formed to protrude opposite to the plurality of fastening holes while maintaining a constant interval on the inclined surface of the yarn reinforcement; and
When the fastening protrusion is inserted into the fastening hole, it is coupled to the fastening protrusion and includes a detachable part for preventing the fastening protrusion from being discharged to the outside of the fastening hole,
The detachable part,
a coupling protrusion which is slidably disposed in the fastening hole to one side or the other side and is inserted into the coupling hole of the fastening protrusion inserted into the fastening hole to constrain the fastening protrusion; and
A steel pipe brace joint for underground retaining construction, characterized in that it comprises a first elastic member interposed between the partition wall of the coupling protrusion and the side connector so as to press the coupling protrusion toward the coupling hole.
복수 개의 상기 체결돌기가 상기 체결공에 각각 삽입될 때에 복수 개의 상기 체결돌기와 복수 개의 상기 체결공이 동시에 연결되어 상기 사보강재를 상기 강관 버팀보에 연결하는 연동부를 더 포함하고,
상기 연동부는,
복수 개의 상기 결합돌기를 일체로 연결하고, 상기 측면연결구 외측으로 연장되는 연결수평대;
상기 측면연결구 외측으로 연장되는 복수 개의 상기 연결수평대를 서로 연결하는 연결수직대; 및
상기 연결수직대에 형성되어 작업자가 손으로 잡고 당기거나 밀면서 복수 개의 상기 결합돌기를 잠금상태 또는 해제상태로 이동시키는 레버부재를 포함하는 것을 특징으로 하는 지하 흙막이 공사용 강관 버팀보 이음장치.
According to claim 1,
When the plurality of fastening protrusions are respectively inserted into the fastening holes, the plurality of fastening protrusions and the plurality of fastening holes are connected at the same time, further comprising an interlocking part for connecting the saber steel to the steel pipe brace,
The linkage is
a connecting horizontal bar that integrally connects the plurality of coupling protrusions and extends outside the side connector;
a connecting vertical bar connecting a plurality of the connecting horizontal bars extending to the outside of the side connector; and
A steel pipe brace joint for underground retaining construction, characterized in that it includes a lever member that is formed on the connecting vertical stand and moves the plurality of coupling protrusions to the locked or unlocked state while pulling or pushing the worker by hand.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020200138691A KR102266931B1 (en) | 2020-10-23 | 2020-10-23 | steel pipe butt joint for construction of underground earth film |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020200138691A KR102266931B1 (en) | 2020-10-23 | 2020-10-23 | steel pipe butt joint for construction of underground earth film |
Publications (1)
Publication Number | Publication Date |
---|---|
KR102266931B1 true KR102266931B1 (en) | 2021-06-18 |
Family
ID=76623668
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020200138691A KR102266931B1 (en) | 2020-10-23 | 2020-10-23 | steel pipe butt joint for construction of underground earth film |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102266931B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102607865B1 (en) * | 2023-05-23 | 2023-11-29 | 주식회사 다온에스티 | Brackets for underground earth retaining work having cast-integrated preload jacks and underground earth retaining construction method using the brackets |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59116436U (en) * | 1982-06-30 | 1984-08-06 | 日鐵建材工業株式会社 | Earth retaining device for excavated trenches |
KR20190051615A (en) * | 2017-11-07 | 2019-05-15 | 주식회사 엠스틸인터내셔널 | CONNECTOR ASSEMBLY FOR STEEL PIPE STRUT and CONNECTING SYSTEM OF STEEL PIPE STRUT-STRIP FOR UNDERGROUND RETAINING WALL USING the CONNECTOR ASSEMBLY |
-
2020
- 2020-10-23 KR KR1020200138691A patent/KR102266931B1/en active IP Right Grant
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59116436U (en) * | 1982-06-30 | 1984-08-06 | 日鐵建材工業株式会社 | Earth retaining device for excavated trenches |
KR20190051615A (en) * | 2017-11-07 | 2019-05-15 | 주식회사 엠스틸인터내셔널 | CONNECTOR ASSEMBLY FOR STEEL PIPE STRUT and CONNECTING SYSTEM OF STEEL PIPE STRUT-STRIP FOR UNDERGROUND RETAINING WALL USING the CONNECTOR ASSEMBLY |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102607865B1 (en) * | 2023-05-23 | 2023-11-29 | 주식회사 다온에스티 | Brackets for underground earth retaining work having cast-integrated preload jacks and underground earth retaining construction method using the brackets |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101324173B1 (en) | Construction method for underground tunnel using guiding shape steel | |
KR101308575B1 (en) | Integral segment of steel strip and steel strut | |
US7537417B2 (en) | Corner connection for temporary shoring | |
KR100698878B1 (en) | Y Type Connecting Structure of Steel Pipe Struts | |
KR101221970B1 (en) | Construction Method for Basement Structure without Temporary Structure | |
KR100777212B1 (en) | A h-beam joint | |
KR101289149B1 (en) | Structure and apparatus for connecting steel pipe struts | |
KR101352146B1 (en) | Wale and strut integrated and separated temporary earth retaining wall, and construction method | |
KR102266931B1 (en) | steel pipe butt joint for construction of underground earth film | |
KR100916546B1 (en) | Underground temporary structure and constructing method thereof | |
KR101337001B1 (en) | Connector assembly for steel pipe strut | |
KR102133053B1 (en) | CONNECTOR ASSEMBLY FOR STEEL PIPE STRUT and CONNECTING SYSTEM OF STEEL PIPE STRUT-STRIP FOR UNDERGROUND RETAINING WALL USING the CONNECTOR ASSEMBLY | |
KR200414056Y1 (en) | Connecting Structure of Steel Pipe Strut | |
KR100584701B1 (en) | A method of construction for temporary retaining wall | |
KR100958426B1 (en) | Fixing device for support beam | |
KR101941818B1 (en) | Connection and junction structure of steel pipe for strut | |
KR101026583B1 (en) | A wale system for supporting earth retaining wall | |
KR100648409B1 (en) | A method of construction for temporary retaining wall | |
KR200212743Y1 (en) | Reinforcement structure for a foundation pile | |
KR19980043585A (en) | Prestress earthenware method and its layered cladding | |
KR100323112B1 (en) | Reinforcement structure for a foundation pile | |
KR102353188B1 (en) | Fixed structure of support beams and soil barrier structure using them | |
KR101958768B1 (en) | Structure for Constructing the Lagging Board using Strut Beam having Reinforcement Bar | |
KR100733718B1 (en) | Connecting structure in between two steel pipe struts | |
KR102307510B1 (en) | Temporary earth retaining structure and Construction method using the same |