KR102223055B1 - Built-in water service box and construction method thereof - Google Patents

Built-in water service box and construction method thereof Download PDF

Info

Publication number
KR102223055B1
KR102223055B1 KR1020190123847A KR20190123847A KR102223055B1 KR 102223055 B1 KR102223055 B1 KR 102223055B1 KR 1020190123847 A KR1020190123847 A KR 1020190123847A KR 20190123847 A KR20190123847 A KR 20190123847A KR 102223055 B1 KR102223055 B1 KR 102223055B1
Authority
KR
South Korea
Prior art keywords
small
hole
box
pipe
cover
Prior art date
Application number
KR1020190123847A
Other languages
Korean (ko)
Inventor
김정혁
Original Assignee
김정혁
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김정혁 filed Critical 김정혁
Priority to KR1020190123847A priority Critical patent/KR102223055B1/en
Application granted granted Critical
Publication of KR102223055B1 publication Critical patent/KR102223055B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C1/021Devices for positioning or connecting of water supply lines
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C2001/028Alignment aids for plumbing installations

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Domestic Plumbing Installations (AREA)

Abstract

The present invention relates to a double-faucet water service box having a pair of faucet exposure holes formed to be spaced apart from each other. According to the present invention, the double-faucet water service box is a wall-mounted water service box that can be converted into large and small sizes, and it is intended to be used for both a large water service box (10) having a large spacing faucet exposure hole (11) formed with a wide center interval of the pair of faucet exposure holes in order to expose a pair of faucets connected to general pipes other than a washbasin, and a small water service box (20) having a small spacing faucet exposure hole (21) formed with a narrow center interval between the pair of faucet exposure holes so that a pair of faucets coupled to the washbasin pipe are exposed. According to the present invention, storage, management, and construction of materials are convenient, and production and construction costs can be reduced.

Description

대소형 변환설치가 가능한 벽체 매립형 수전함 및 그 시공방법{BUILT-IN WATER SERVICE BOX AND CONSTRUCTION METHOD THEREOF}Wall-embedded power box and its construction method for large and small conversion and installation {BUILT-IN WATER SERVICE BOX AND CONSTRUCTION METHOD THEREOF}

본 발명은 건설 기술분야에 관한 것으로서, 상세하게는 벽체 매립형 수전함 및 그 시공방법에 관한 것이다.The present invention relates to the field of construction technology, and more particularly, to a wall-embedded power receiver and a construction method thereof.

건물의 벽체에 매립된 급수 파이프(배관)와, 물의 공급을 위해 노출된 수전(수도꼭지)을 결합하기 위하여, 수전함을 벽체에 매립하여 시공하는 방식이 일반적으로 사용된다.In order to combine the water supply pipe (pipe) buried in the wall of the building and the faucet (faucet) exposed to supply water, a method of embedding a faucet box in the wall is generally used.

도 1,2는 종래의 급수배관 매립 방식의 수전함의 구조 및 설치구조에 관한 구성도이다.1 and 2 are diagrams illustrating the structure and installation structure of a power receiver box of a conventional water supply pipe buried method.

수전함은 노출되는 수전의 수에 따라 단구형(하나의 수전이 노출됨)(1,2)과 쌍구형(두개의 수전이 노출됨)(10,20)으로 분류되고, 쌍구형 수전함은 다시 일반용 수전함(대형 수전함)(10)과 세면기용 수전함(소형 수전함)(20)으로 분류된다.Depending on the number of faucets exposed, the faucets are classified into a single sphere type (one faucet exposed) (1, 2) and a twin sphere type (two faucets exposed) (10, 20), and the dual sphere type faucet is again for general use. It is classified into a power receiver box (large power receiver box) 10 and a basin power receiver box (small power receiver box) 20.

수전함에 결합하는 급수배관 및 배수배관은 그 규격 및 설치간격 등이 정해져(통일되어) 있으므로, 수전함 또한 이들 기준에 맞는 것이 설치되어야 한다.The water supply and drainage pipes that are coupled to the power receiver box have their standard and installation intervals determined (unified), so the power receiver box must also be installed that meets these standards.

수전함은 세면기, 욕조, 샤워, 세탁기, 주방 등 다양한 시설에 대하여 용수를 공급하기 위하여 설치되는데, 세면기용 배관은 그 특성상 다른 용도(욕조, 샤워, 세탁기, 주방 등)의 배관과 설치구조가 다르게 정해져 있고, 이에 따라 쌍구형 수전함의 경우 수전이 노출되는 노출공의 중심간격이 다른 경우에 비해 작게 정해져 있다.The faucet box is installed to supply water to various facilities such as washbasins, bathtubs, showers, washing machines, and kitchens, but the pipes for washbasins differ from the pipes for different purposes (bathtubs, showers, washing machines, kitchens, etc.) due to their characteristics. Accordingly, in the case of the twin-spherical power receiver, the center spacing of the exposed hole to which the power receiver is exposed is set smaller than in other cases.

따라서, 일반용 수전함의 경우, 세면기 이외의 일반용 배관에 결합한 한 쌍의 수전이 노출되도록, 한 쌍의 수전 노출공의 중심간격이 넓게 형성된 대간격 수전 노출공(11)을 구비한 대형 수전함(10)을 사용함에 비해(일반적으로 중심간격이 150mm 정도), 세면기용 수전함의 경우에는, 세면기용 배관에 결합한 한 쌍의 수전이 노출되도록, 한 쌍의 수전 노출공의 중심간격이 좁게 형성된 소간격 수전 노출공(21)을 구비한 소형 수전함(20)을 사용한다(일반적으로 중심간격이 90 ~ 120mm 정도).Therefore, in the case of a general-purpose faucet box, a large faucet box having a large spacing faucet exposure hole 11 formed with a wide center spacing of the pair of faucet exposed holes so that a pair of faucets coupled to general pipes other than the wash basin are exposed ( 10), compared to the use of (generally, the center spacing is about 150mm), in the case of the faucet box for washbasin, the center spacing of the pair of faucet exposure holes is narrow so that the pair of faucets coupled to the washbasin pipe is exposed. A small power receiving box 20 having an interval receiving exposed hole 21 is used (generally, the center distance is about 90 to 120 mm).

도 3은 종래의 쌍구형 수전함 중 대형 수전함(10)과 소형 수전함(20)의 실제 제품의 사진이다.3 is a photograph of an actual product of a large power receiving box 10 and a small power receiving box 20 among the conventional twin-spherical power box.

그런데, 종래에는 이러한 두 종류의 수전함을 사용하므로(세면기용으로만 다른 종류의 수전함을 사용하므로), 다음과 같은 문제가 지적되었다.However, conventionally, since these two types of power box are used (because different types of power box are used only for a washbasin), the following problems have been pointed out.

즉, 하나의 건물이라 하더라도 많은 수의 수전함이 설치되는데, 서로 다른 두 종류를 정해진 위치에 설치해야 하므로, 두 종류의 자재의 보관, 관리가 불편하고, 시공이 불편하며, 생산 및 시공비용이 증가한다는 문제가 그것이다.In other words, even in one building, a large number of power cabinets are installed, but because two different types must be installed in a fixed location, storage and management of the two types of materials are inconvenient, construction is inconvenient, and production and construction costs are low That is the problem of increasing.

본 발명은 상기와 같은 문제점을 해결하기 위하여 도출된 것으로서, 자재의 보관, 관리 및 시공이 편리하고, 생산 및 시공비용을 절감할 수 있도록 하는 대소형 변환설치가 가능한 벽체 매립형 수전함 및 그 시공방법을 제시하는 것을 그 목적으로 한다.The present invention was derived in order to solve the above problems, and a wall-embedded power supply box capable of large and small conversion and installation enabling convenient storage, management and construction of materials, and reduction of production and construction costs, and a construction method thereof Its purpose is to present.

상기 과제의 해결을 위하여, 본 발명은 상호 이격되어 형성된 한 쌍의 수전 노출공을 구비한 쌍구형 수전함에 있어서, 세면기 이외의 일반용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 넓게 형성된 대간격 수전 노출공(11)을 구비한 대형 수전함(10)과, 세면기용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 좁게 형성된 소간격 수전 노출공(21)을 구비한 소형 수전함(20)의 겸용으로 사용되기 위한 대소형 변환설치가 가능한 벽체 매립형 수전함으로서, 측면에 배관 관통공(101)이 형성되고, 내부에 배관연결구가 수납되도록 수납공간(102)이 형성되고, 전방에 개방공(103)이 형성되고, 상하면 중 일면(a)에 상기 일반용 배관이 관통하기 위한 일반용 배관 관통공(110)이 형성되고, 상하면 중 타면(b)에 상기 세면기용 배관이 관통하기 위한 세면기용 배관 관통공(120)이 형성됨과 아울러, 벽체에 매설되도록 형성된 내함(100); 상기 내함(100)의 수납공간(102)에 인입가능하도록 전방에 대형 인입용 관통공(211)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 대형 속커버(210); 상기 대형 속커버(210)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 일반용 배관 관통공(110)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 대간격 수전 노출공(11)을 구비한 대형 오픈커버(310); 상기 대형 인입용 관통공(211)에 비해 작은 크기를 갖는 소형 인입용 관통공(221)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 소형 속커버(220); 상기 소형 속커버(220)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 세면기용 배관 관통공(120)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 소간격 수전 노출공(21)을 구비함과 아울러, 상기 대형 오픈커버(310)에 비해 작은 크기를 갖도록 형성된 소형 오픈커버(320);를 포함하고, 상기 대형 수전함(10)의 용도로 시공하는 경우, 상기 일면(a)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 대형 속커버(210) 및 대형 오픈커버(310)를 결합하고, 상기 소형 수전함(20)의 용도로 시공하는 경우, 상기 타면(b)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 소형 속커버(220) 및 소형 오픈커버(320)를 결합하는 것을 특징으로 하는 대소형 변환설치가 가능한 벽체 매립형 수전함을 제시한다.In order to solve the above problems, the present invention is a twin-spherical faucet having a pair of faucet exposed holes formed to be spaced apart from each other, so that a pair of faucets coupled to general pipes other than the wash basin are exposed, the pair of faucets The center spacing of the pair of faucet exposure holes so that the large-sized faucet box 10 having the large spacing faucet exposed hole 11 and the pair of faucets coupled to the pipe for the wash basin are exposed, with the central spacing of the exposed holes wide As a wall-embedded power receiving box capable of large-sized conversion and installation for use as a combination of the small power receiving box 20 having the narrowly formed small-space power receiving hole 21, the pipe through hole 101 is formed on the side, and the inside A storage space 102 is formed so that the pipe connector is accommodated in, an open hole 103 is formed in the front, and a general pipe through hole 110 for passing the general pipe is formed on one surface (a) of the upper and lower surfaces. , Inner box 100 formed so as to be buried in the wall while the other surface (b) of the upper and lower surfaces are formed with through-holes 120 for the washbasin through which the pipe for the washbasin passes; A large-sized through-hole 211 is formed in the front so as to be retractable into the storage space 102 of the inner box 100, and a large inner cover 210 installed in front of the inner box 100; In addition to being installed to open and close the large inner cover 210 as a whole, a pair of faucets coupled to a pipe connected through the general pipe through hole 110 is exposed, and a large spacing faucet exposure hole 11 is provided. Open cover 310; In addition to the formation of a small through-hole 221 for small inlet having a size smaller than that of the large-sized inlet through hole 211, a small inner cover 220 installed in front of the inner box 100; In addition to being installed to open and close the small inner cover 220 as a whole, the small spacing faucet exposure hole 21 is provided so that a pair of faucets coupled to the pipe connected through the pipe through hole 120 for the wash basin are exposed. In addition, a small open cover 320 formed to have a size smaller than that of the large open cover 310; and, when constructed for the use of the large power receiving box 10, the one side (a) is After constructing the inner box 100 so as to face, the large inner cover 210 and the large open cover 310 are combined, and when it is constructed for the purpose of the small power receiving box 20, the other surface (b) is After constructing the inner box 100 to face downward, a wall-embedded power receiver box capable of large and small conversion and installation is proposed, characterized in that the small inner cover 220 and the small open cover 320 are combined.

상기 일반용 배관 관통공(110)은, 상기 대간격 수전 노출공(11)의 중심간격과 동일한 중심간격을 갖도록 형성된 한 쌍의 외측 관통공(111); 상기 한 쌍의 외측 관통공(111)의 내측에 형성된 한 쌍의 내측 관통공(112);을 포함하는 것이 바람직하다.The general pipe through-hole 110 may include a pair of outer through-holes 111 formed to have the same center distance as the center distance of the large spacing receiving exposed hole 11; It is preferable to include; a pair of inner through-holes 112 formed on the inner side of the pair of outer through-holes 111.

상기 내함(100)의 일면(a)에는 고리 구조의 철근 걸림부(113)가 형성되고, 상기 내함(100)의 타면(b)에는 상기 철근 걸림부(113)가 형성되지 않은 것이 바람직하다.It is preferable that a reinforcing bar engaging portion 113 of a ring structure is formed on one surface (a) of the inner box 100, and the reinforcing bar engaging portion 113 is not formed on the other surface (b) of the inner box 100.

상기 세면기용 배관 관통공(120)은, 상기 소간격 수전 노출공(21)의 중심간격과 동일한 중심간격을 갖도록 형성된 세면기 냉수관 관통공(121) 및 세면기 온수관 관통공(122)인 것이 바람직하다.The wash basin pipe through hole 120 is preferably a wash basin cold water pipe through hole 121 and a wash basin hot water pipe through hole 122 formed to have the same central spacing as the center spacing of the small spacing faucet exposed hole 21 Do.

상기 내함(100)의 타면(b)의 세면기 냉수관 관통공(121)과 세면기 온수관 관통공(122)의 사이에는, 세면기의 배수배관(13)이 삽입되도록 배관 삽입홈(123)이 함몰구조로 형성된 것이 바람직하다.Between the wash basin cold water pipe through hole 121 and the wash basin hot water pipe through hole 122 on the other surface (b) of the inner box 100, the pipe insertion groove 123 is recessed so that the drain pipe 13 of the wash basin is inserted. It is preferably formed in a structure.

상기 벽체의 두께 변화에 대하여 대응하도록, 상기 내함(100)과 상기 대형 속커버(210)의 사이 또는 상기 내함(100)과 상기 소형 속커버(220)의 사이에 설치되는 연장관(150);을 더 포함하는 것이 바람직하다.An extension pipe 150 installed between the inner box 100 and the large inner cover 210 or between the inner box 100 and the small inner cover 220 to correspond to the change in the thickness of the wall; It is preferable to further include.

상기 벽체의 콘크리트 시공 시, 상기 내함(100)의 수납공간(102)을 보호하도록, 상기 내함(100)의 전방에 임시로 설치되는 내함 임시보호덮개(104);를 더 포함하는 것이 바람직하다.It is preferable to further include an inner box temporary protective cover 104 temporarily installed in front of the inner box 100 so as to protect the storage space 102 of the inner box 100 when constructing the concrete of the wall.

상기 대형 수전함(10)의 용도로 시공하는 경우의 마감시공 시, 상기 대형 속커버(210)의 대형 인입용 관통공(211)의 내부를 보호하도록, 상기 대형 속커버(210)의 대형 인입용 관통공(211)에 임시로 설치되는 대형 속커버 임시보호덮개(212); 상기 소형 수전함(20)의 용도로 시공하는 경우의 마감시공 시, 상기 소형 속커버(220)의 소형 인입용 관통공(221)의 내부를 보호하도록, 상기 소형 속커버(220)의 소형 인입용 관통공(221)에 임시로 설치되는 소형 속커버 임시보호덮개(222);를 더 포함하는 것이 바람직하다.In the case of construction for the use of the large power receiving box 10, during the finishing construction, the large inlet of the large inner cover 210 to protect the inside of the large inlet through hole 211 of the large inner cover 210 A large inner cover temporary protective cover 212 temporarily installed in the through hole 211 for; In the case of construction for the use of the small power receiving box 20, a small entry of the small inner cover 220 to protect the interior of the small entry through hole 221 of the small inner cover 220 It is preferable to further include a small inner cover temporary protective cover 222 temporarily installed in the through hole 221 for.

본 발명은 상기 수전함의 시공방법으로서, 상기 대형 수전함(10)의 용도로 시공하는 경우, 상기 벽체의 배근에 고정되도록 상기 내함(100)을 설치하되, 상기 일면(a)이 하방을 향하도록 하는 단계; 상기 일반용 배관 관통공(110)을 통해 일반용 배관을 설치하는 단계; 상기 내함(100)에 상기 내함 임시보호덮개(104)를 설치하고, 상기 벽체의 콘크리트를 타설하는 단계; 상기 내함 임시보호덮개(104)를 제거하고, 상기 대형 속커버(210)를 설치하는 단계; 상기 대형 속커버(210)의 외측에 상기 대형 오픈커버(310)를 설치하는 단계;를 포함하고, 상기 소형 수전함(20)의 용도로 시공하는 경우, 상기 벽체의 배근에 고정되도록 상기 내함(100)을 설치하되, 상기 타면(b)이 하방을 향하도록 하는 단계; 상기 세면기용 배관 관통공(120)을 통해 세면기용 배관을 설치하는 단계; 상기 내함(100)에 상기 내함 임시보호덮개(104)를 설치하고, 상기 벽체의 콘크리트를 타설하는 단계; 상기 내함 임시보호덮개(104)를 제거하고, 상기 소형 속커버(220)를 설치하는 단계; 상기 소형 속커버(220)의 외측에 상기 소형 오픈커버(320)를 설치하는 단계;를 포함하는 것을 특징으로 하는 벽체 매립형 수전함의 시공방법을 제시한다.The present invention is a construction method of the power receiving box, in the case of construction for the use of the large power receiving box 10, the inner box 100 is installed to be fixed to the reinforcement of the wall, but the one side (a) faces downward. A step to do; Installing a general pipe through the general pipe through hole (110); Installing the inner box temporary protective cover 104 on the inner box 100, and pouring the concrete of the wall; Removing the inner box temporary protective cover 104, and installing the large inner cover 210; Including; installing the large open cover 310 on the outside of the large inner cover 210; In the case of construction for the use of the small power box 20, the inner box to be fixed to the reinforcement of the wall ( Installing 100), but having the other surface (b) face downward; Installing a washbasin pipe through the washbasin pipe through hole 120; Installing the inner box temporary protective cover 104 on the inner box 100, and pouring the concrete of the wall; Removing the inner box temporary protective cover 104, and installing the small inner cover 220; It proposes a method of constructing a wall-embedded power supply box comprising; installing the small open cover 320 on the outside of the small inner cover 220.

본 발명은 상기 수전함의 시공방법으로서, 상기 대형 수전함(10)의 용도로 시공하는 경우, 상기 벽체의 배근에 고정되도록 상기 내함(100)을 설치하되, 상기 일면(a)이 하방을 향하도록 하는 단계; 상기 일반용 배관 관통공(110)을 통해 일반용 배관을 설치하는 단계; 상기 내함(100)에 상기 내함 임시보호덮개(104)를 설치하고, 상기 벽체의 콘크리트를 타설하는 단계; 상기 내함 임시보호덮개(104)를 제거하고, 상기 대형 속커버(210)를 설치하는 단계; 상기 대형 속커버(210)의 대형 인입용 관통공(211)에 임시로 대형 속커버 임시보호덮개(212)를 설치하고 마감작업을 하는 단계; 상기 대형 속커버 임시보호덮개(212)를 제거하고, 상기 대형 오픈커버(310)를 설치하는 단계;를 포함하고, 상기 소형 수전함(20)의 용도로 시공하는 경우, 상기 벽체의 배근에 고정되도록 상기 내함(100)을 설치하되, 상기 타면(b)이 하방을 향하도록 하는 단계; 상기 세면기용 배관 관통공(120)을 통해 세면기용 배관을 설치하는 단계; 상기 내함(100)에 상기 내함 임시보호덮개(104)를 설치하고, 상기 벽체의 콘크리트를 타설하는 단계; 상기 내함 임시보호덮개(104)를 제거하고, 상기 소형 속커버(220)를 설치하는 단계; 상기 소형 속커버(220)의 소형 인입용 관통공(221)에 임시로 소형 속커버 임시보호덮개(222)를 설치하고 마감작업을 하는 단계; 상기 소형 속커버 임시보호덮개(222)를 제거하고, 상기 소형 오픈커버(320)를 설치하는 단계;를 포함하는 것을 특징으로 하는 벽체 매립형 수전함의 시공방법을 제시한다.The present invention is a construction method of the power receiving box, in the case of construction for the use of the large power receiving box 10, the inner box 100 is installed to be fixed to the reinforcement of the wall, but the one side (a) faces downward. A step to do; Installing a general pipe through the general pipe through hole (110); Installing the inner box temporary protective cover 104 on the inner box 100 and pouring concrete of the wall; Removing the inner box temporary protective cover 104, and installing the large inner cover 210; Temporarily installing a large inner cover temporary protective cover 212 in the large inlet through hole 211 of the large inner cover 210 and performing a finishing operation; Removing the large inner cover temporary protective cover 212, and installing the large open cover 310; Including, in the case of construction for the use of the small power receiving box 20, fixed to the reinforcement of the wall Installing the inner box 100 so that the other surface (b) faces downward; Installing a washbasin pipe through the washbasin pipe through hole 120; Installing the inner box temporary protective cover 104 on the inner box 100 and pouring concrete of the wall; Removing the inner box temporary protective cover 104, and installing the small inner cover 220; Temporarily installing a small inner cover temporary protective cover 222 in the small inlet through hole 221 of the small inner cover 220 and performing a finishing operation; It proposes a method of constructing a wall-embedded power supply box comprising: removing the small inner cover temporary protective cover 222 and installing the small open cover 320.

본 발명은 자재의 보관, 관리 및 시공이 편리하고, 생산 및 시공비용을 절감할 수 있도록 하는 대소형 변환설치가 가능한 벽체 매립형 수전함 및 그 시공방법을 제시한다.The present invention proposes a wall-embedded power supply box capable of large and small conversion and installation and a construction method that facilitates storage, management and construction of materials, and reduces production and construction costs.

도 1,2은 종래의 수전함의 구조 및 설치구조에 관한 구성도
도 3은 종래의 수전함에 관한 다양한 제품의 구성도
도 4 이하는 본 발명의 실시예를 도시한 것으로서,
도 4는 제1 실시예의 분해사시도.
도 5는 제2 실시예의 분해사시도.
도 6은 내함의 정면도.
도 7은 내함의 저면도.
도 8은 내함의 평면도.
도 9는 내함의 측면도.
도 10은 대형 속커버의 정면도.
도 11은 대형 속커버 임시보호덮개의 정면도.
도 12는 대형 오픈커버의 정면도.
도 13은 소형 속커버의 정면도.
도 14는 소형 속커버 임시보호덮개의 정면도.
도 15는 소형 오픈커버의 정면도.
1 and 2 are configuration diagrams related to the structure and installation structure of a conventional power receiving box
3 is a configuration diagram of various products related to a conventional power receiver
4 or less shows an embodiment of the present invention,
4 is an exploded perspective view of the first embodiment.
5 is an exploded perspective view of a second embodiment.
6 is a front view of the inner box.
7 is a bottom view of the inner box.
8 is a plan view of the inner box.
9 is a side view of the inner box.
10 is a front view of a large inner cover.
11 is a front view of a large inner cover temporary protective cover.
12 is a front view of a large open cover.
13 is a front view of a small inner cover.
14 is a front view of a small inner cover temporary protective cover.
15 is a front view of a small open cover.

이하, 첨부도면을 참조하여 본 발명의 실시예에 관하여 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 4 이하에 도시된 바와 같이, 본 발명은 기본적으로 상호 이격되어 형성된 한 쌍의 수전 노출공(11,12)을 구비한 쌍구형 수전함에 관한 것이다.As shown in Figure 4 below, the present invention basically relates to a twin-spherical power receiving box having a pair of power receiving exposed holes 11 and 12 formed to be spaced apart from each other.

구체적으로는, 세면기 이외의 일반용 배관에 결합한 한 쌍의 수전이 노출되도록, 한 쌍의 수전 노출공의 중심간격이 넓게 형성된 대간격 수전 노출공(11)을 구비한 대형 수전함(10)과, 세면기용 배관에 결합한 한 쌍의 수전이 노출되도록, 한 쌍의 수전 노출공의 중심간격이 좁게 형성된 소간격 수전 노출공(21)을 구비한 소형 수전함(20)의 겸용으로 사용되기 위한 대소형 변환설치가 가능한 벽체 매립형 수전함에 관한 것이다.Specifically, a large power receiving box 10 having a large spacing faucet exposed hole 11 formed with a wide center spacing of the pair of faucet exposed holes so that the pair of faucets coupled to general pipes other than the wash basin is exposed, and Large and small to be used as a combined use of a small faucet box 20 having a small spacing faucet exposed hole 21 formed with a narrow center spacing of the pair of faucet exposed holes so that the pair of faucets coupled to the washbasin pipe is exposed. It relates to a wall-embedded power receiver that can be converted and installed.

이는 기본적으로, 대형 수전함(10)의 용도(욕조, 샤워, 세탁기, 주방 등 일반용)로 시공하는 경우, 일면(a)이 하방을 향하도록 내함(100)을 시공한 후, 대형 속커버(210) 및 대형 오픈커버(310)를 결합한다(도 4).This is basically, in the case of construction for the purpose of the large faucet box 10 (for general purposes such as bathtubs, showers, washing machines, kitchens, etc.), after the inner box 100 is constructed so that one side (a) faces downward, a large inner cover ( 210) and a large open cover 310 is combined (FIG. 4).

소형 수전함(20)의 용도(세면기용)로 시공하는 경우, 타면(b)이 하방을 향하도록 내함(100)을 뒤집어 시공한 후, 소형 속커버(220) 및 소형 오픈커버(320)를 결합한다(도 5).In the case of construction for the purpose of the small power receiver box 20 (for washbasin), the inner box 100 is turned over so that the other side (b) faces downward, and then the small inner cover 220 and the small open cover 320 are installed. Combine (Fig. 5).

내함(100)은 측면에 배관 관통공(101)이 형성되고, 내부에 배관연결구가 수납되도록 수납공간(102)이 형성되고, 전방에 개방공(103)이 형성되고, 상하면 중 일면(a)에 일반용 배관이 관통하기 위한 일반용 배관 관통공(110)이 형성되고, 상하면 중 타면(b)에 세면기용 배관이 관통하기 위한 세면기용 배관 관통공(120)이 형성됨과 아울러, 벽체에 매설되도록 형성된다(도 6 내지 9).Inner box 100 has a pipe through hole 101 formed on the side, a storage space 102 is formed so that the pipe connector is accommodated therein, an open hole 103 is formed in the front, and one of the upper and lower surfaces (a) The general pipe through-hole 110 is formed for the general pipe to pass through, and the wash-basin pipe through-hole 120 is formed on the other surface (b) of the upper and lower surfaces to penetrate the wash basin pipe, and is formed to be buried in the wall. Becomes (Figs. 6 to 9).

이러한 내함(100)은 기본적으로 종래의 대형(일반용) 수전함의 내함의 크기에 대응하는 것을 사용한다.This inner box 100 is basically used that corresponds to the size of the inner box of a conventional large (general purpose) power receiver.

대형 속커버(210)는 내함(100)의 수납공간(102)에 인입가능하도록 전방에 대형 인입용 관통공(211)이 형성됨과 아울러, 내함(100)의 전방에 설치된다(도 4).The large inner cover 210 is provided in front of the inner box 100 with a large through hole 211 formed in the front so as to be able to be inserted into the storage space 102 of the inner box 100 (FIG. 4).

대형 오픈커버(310)는 대형 속커버(210)를 전체적으로 개폐하도록 설치됨과 아울러, 일반용 배관 관통공(110)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 대간격 수전 노출공(11)을 구비한다(도 4).The large open cover 310 is installed to open and close the large inner cover 210 as a whole, and a pair of faucets coupled to the pipe connected through the general pipe through hole 110 is exposed, and the large interval faucet exposure hole 11 It is provided with (Fig. 4).

소형 속커버(220)는 대형 인입용 관통공(211)에 비해 작은 크기를 갖는 소형 인입용 관통공(221)이 형성됨과 아울러, 내함(100)의 전방에 설치된다(도 5).The small inner cover 220 is provided in front of the inner box 100 as well as the small entry through hole 221 having a smaller size than the large entry through hole 211 is formed (FIG. 5).

소형 오픈커버(320)는 소형 속커버(220)를 전체적으로 개폐하도록 설치됨과 아울러, 세면기용 배관 관통공(120)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 소간격 수전 노출공(21)을 구비함과 아울러, 대형 오픈커버(310)에 비해 작은 크기를 갖도록 형성된다(도 5).The small open cover 320 is installed to open and close the small inner cover 220 as a whole, and a pair of faucets coupled to the pipe connected through the pipe through hole 120 for the washbasin are exposed, so that the small spacing faucet exposure hole 21 ), and is formed to have a smaller size than the large open cover 310 (FIG. 5).

즉, 종래와 같이 대형과 소형 두 종류의 수전함을 시공하는 것이 아니라, 하나의 내함을 겸용으로 사용하고, 속커버, 오픈커버 등의 부품만을 용도에 따라 두 종류로 사용하도록 한 것이다.That is, instead of constructing two types of power receivers, such as large and small, as in the prior art, one inner box is used as a combination, and only parts such as an inner cover and an open cover are used in two types depending on the purpose.

비록, 속커버, 오픈커버 등의 부품은 두 종류를 사용하지만, 이는 보조적인 부품에 불과하고, 가장 중요하고 큰 부피를 차지하는 주된 부품인 내함은 한 종류를 사용하므로, 건물의 배관공사에 있어서 자재의 보관, 관리 및 시공이 편리해진다는 효과가 있다.Although two types of parts, such as inner cover and open cover, are used, these are only auxiliary parts, and the inner box, which is the most important and the main part occupying a large volume, uses one type. It has the effect that storage, management and construction of the product become convenient.

내함(100)의 일면(a)에 형성되는 일반용 배관 관통공(110)은 욕조, 샤워, 세탁기, 주방 등에 사용되는 다양한 배관이 연결되도록, 대간격 수전 노출공(11)의 중심간격과 동일한 중심간격을 갖도록 형성된 한 쌍의 외측 관통공(111); 한 쌍의 외측 관통공(111)의 내측에 형성된 한 쌍의 내측 관통공(112);을 포함하여 구성된다.The general pipe through-hole 110 formed on one side (a) of the inner box 100 is the same center as the center interval of the large interval faucet exposure hole 11 so that various pipes used for bathtubs, showers, washing machines, and kitchens are connected. A pair of outer through-holes 111 formed to have a gap; It is configured to include; a pair of inner through-holes 112 formed on the inner side of the pair of outer through-holes 111.

특히, 위 한 쌍의 외측 관통공(111)은 대간격 수전 노출공(11)의 중심간격과 동일한 중심간격을 갖도록 형성되므로, 종래의 일반용 수전함(대형 수전함(10))에 맞도록 설치된 배관과 안정적으로 결합할 수 있다.In particular, since the pair of outer through-holes 111 are formed to have the same central spacing as the central spacing of the large-sized faucet exposed holes 11, they are installed to fit into a conventional general-purpose power receiver (large power receiver box 10). It can be stably combined with piping.

시공 중 벽체의 철근에 대하여 내함(100)을 지지하기 위하여, 내함(100)의 측면에 철근 지지부(140)가 형성되는데, 내함(100)의 일면(a)에는 고리 구조의 철근 걸림부(113)가 형성되고, 내함(100)의 타면(b)에는 철근 걸림부(113)가 형성되지 않은 것이 바람직하다.In order to support the inner box 100 with respect to the reinforcement of the wall during construction, a reinforcing bar support 140 is formed on the side of the inner box 100, and a reinforcing bar hooking portion 113 having a ring structure on one side (a) of the inner box 100 ) Is formed, and it is preferable that the reinforcing bar engaging portion 113 is not formed on the other surface (b) of the inner box 100.

내함(100)의 하면에 철근 걸림부(113)가 형성되는 경우에는, 콘크리트 구조에서도 유리하고(타설되는 콘크리트에 의한 내함의 부상을 방지하므로), 조적 구조에서도 유리하다(벽돌은 내함의 상면에 축조되는 것이므로).When the reinforcing bar hooking portion 113 is formed on the lower surface of the inner box 100, it is advantageous in a concrete structure (since it prevents the injury of the inner box by pouring concrete), and it is also advantageous in a masonry structure (brick is on the upper surface of the inner box. Because it is built).

그런데, 내함(100)의 상면에 철근 걸림부(113)가 형성되는 경우, 콘크리트 구조에서는 유리하지만(철근에 의한 지지구조가 형성되므로), 조적 구조에서는 불리하다(내함의 상면에 대한 벽돌의 축조를 방해하므로).However, when the reinforcing bar engaging portion 113 is formed on the upper surface of the inner box 100, it is advantageous in a concrete structure (because a support structure is formed by reinforcing bars), but is disadvantageous in a masonry structure (building of bricks on the upper surface of the inner box) Because it interferes with).

또한, 본 발명에 의한 수전함은 일반용(타면(b)이 상측을 향하는 경우)으로 사용되는 경우가 세면기용(일면(a)이 상측을 향하는 경우)으로 사용되는 경우에 비해 훨씬 많다.In addition, the case where the power receiver according to the present invention is used for general use (when the other side (b) faces upward) is much more than that for a wash basin (when one side (a) faces upward).

따라서 일반용(타면(b)이 상측을 향하는 경우)으로 사용되는 경우를 기준으로 하여, 내함(100)의 하면에만 철근 걸림부(113)가 형성되고, 상면에는 철근 걸림부(113)가 형성되지 않도록 함으로써, 콘크리트 구조 및 조적 구조에서 시공의 편의성을 도모하도록 한 것이다.Therefore, based on the case where it is used for general purpose (when the other side (b) faces upward), the reinforcing bar locking part 113 is formed only on the lower surface of the inner box 100, and the reinforcing bar locking part 113 is not formed on the upper surface. By doing so, it is designed to promote the convenience of construction in concrete structures and masonry structures.

내함(100)의 타면(b)에 형성되는 세면기용 배관 관통공(120)은 세면기 냉수관 관통공(121) 및 세면기 온수관 관통공(122)으로 구성되는데, 이들은 소간격 수전 노출공(21)의 중심간격과 동일한 중심간격을 갖도록 형성되는 것이 바람직하다.The washbasin pipe through-hole 120 formed on the other surface (b) of the inner box 100 is composed of a washbasin cold water pipe through-hole 121 and a washbasin hot water pipe through-hole 122, which are small spacing faucet exposed holes 21 It is preferable that it is formed to have the same central spacing as the central spacing of ).

이는 종래의 세면기용 수전함(소형 수전함(20))에 맞도록 설치된 배관과 안정적으로 결합할 수 있기 때문이다.This is because it is possible to stably couple with a pipe installed to fit into a conventional faucet box for a wash basin (small faucet box 20).

본 발명에 의한 수전함의 내함(100)은 상술한 바와 같이 기본적으로 종래의 대형 수전함(10)의 내함의 크기로 제작되므로, 이것이 세면기용 수전함(소형 수전함(20))으로 사용되는 경우, 그 하부에 위치하는 세면기의 배수배관(13)과 저촉이 발생할 우려가 있다.As described above, the inner box 100 of the faucet box according to the present invention is basically manufactured in the size of the inner box of the conventional large faucet box 10, so it is used as a faucet box for a wash basin (small faucet box 20). In this case, there is a concern that a contact may occur with the drainage pipe 13 of the wash basin located below it.

이를 방지하기 위해서는, 내함(100)의 타면(b)의 세면기 냉수관 관통공(121)과 세면기 온수관 관통공(122)의 사이에, 세면기의 배수배관(13)이 삽입되도록 배관 삽입홈(123)이 함몰구조로 형성되는 것이 바람직하다.In order to prevent this, between the wash basin cold water pipe through hole 121 and the wash basin hot water pipe through hole 122 of the other surface (b) of the inner box 100, the pipe insertion groove ( 123) is preferably formed in a recessed structure.

벽체의 두께 변화에 대하여 대응하도록, 내함(100)과 대형 속커버(210)의 사이 또는 내함(100)과 소형 속커버(220)의 사이에 연장관(150)이 설치되는데, 이 연장관(150)에도 위 배관 삽입홈(123)과 대응하도록 배관 삽입연장홈(151)이 형성되는 것이 바람직하다(도 4).To cope with the change in the thickness of the wall, there is an extension pipe 150 is installed between the inner box 100 and the large inner cover 210 or between the inner box 100 and the small inner cover 220, the extension pipe 150 In addition, it is preferable that the pipe insertion extension groove 151 is formed to correspond to the pipe insertion groove 123 above (FIG. 4).

내함(100)의 전방에 임시로 설치되는 내함 임시보호덮개(104)는 벽체의 콘크리트 시공 시, 타설되는 콘크리트로부터 내함(100)의 수납공간(102)을 보호한다는 효과가 있다(도 4,5).The inner box temporary protective cover 104 temporarily installed in front of the inner box 100 has the effect of protecting the storage space 102 of the inner box 100 from the concrete being poured during the concrete construction of the wall (Figs. 4 and 5). ).

속커버(210,220)의 인입용 관통공(211,221)이 개방된 상태에서, 타일 등의 마감부재의 부착에 의한 마감시공을 하는 경우, 그 내부에 설치된 배관의 손상 및 오염의 우려가 있으므로, 별도의 속커버 임시보호덮개(212,222)를 설치하는 것이 바람직하다.When the through-holes 211 and 221 for inlet of the inner covers 210 and 220 are open, when finishing construction by attaching a finishing member such as a tile, there is a risk of damage and contamination of the pipe installed therein. It is preferable to install the inner cover temporary protective cover (212, 222).

즉, 대형 수전함(10)의 용도로 시공하는 경우의 마감시공 시, 대형 속커버(210)의 대형 인입용 관통공(211)의 내부를 보호하도록, 대형 속커버(210)의 대형 인입용 관통공(211)에 임시로 대형 속커버 임시보호덮개(212)를 설치하는 것이 바람직하다(도 4).That is, in the case of construction for the use of a large power receiving box 10, in order to protect the interior of the through hole 211 for large entry of the large inner cover 210, for large entry of the large inner cover 210 It is preferable to temporarily install a large inner cover temporary protective cover 212 in the through hole 211 (FIG. 4).

소형 수전함(20)의 용도로 시공하는 경우의 마감시공 시에는, 소형 속커버(220)의 소형 인입용 관통공(221)의 내부를 보호하도록, 소형 속커버(220)의 소형 인입용 관통공(221)에 임시로 소형 속커버 임시보호덮개(222)를 설치하는 것이 바람직하다(도 5).In the case of construction for the use of the small power box 20, in the case of finishing construction, the small inner cover 220 for the small entry penetration to protect the inside of the small inner cover 220 for the small entry through hole 221 It is preferable to temporarily install a small inner cover temporary protective cover 222 in the ball 221 (FIG. 5).

이하, 본 발명에 의한 수전함의 시공방법에 대하여 설명한다.Hereinafter, a method of constructing a power receiver according to the present invention will be described.

먼저, 대형 수전함(10)의 용도(일반용)로 시공하는 경우에 관하여 설명한다(도 4).First, a case of construction for the purpose (general use) of the large power receiving box 10 will be described (FIG. 4).

벽체의 배근에 고정되도록 내함(100)을 설치하되, 일면(a)이 하방을 향하도록 하고, 일반용 배관 관통공(110)을 통해 일반용 배관을 설치한다.The inner box 100 is installed to be fixed to the reinforcement of the wall, but one side (a) faces downward, and the general pipe is installed through the general pipe through hole 110.

내함(100)에 내함 임시보호덮개(104)를 설치하고, 벽체의 콘크리트를 타설 및 양생한 후, 내함 임시보호덮개(104)를 제거하고, 대형 속커버(210)를 설치한다.After installing the inner box temporary protective cover 104 in the inner box 100, pouring and curing the concrete of the wall, the inner box temporary protective cover 104 is removed, and a large inner cover 210 is installed.

타일 등 마감부재의 부착에 의해 마감하는 경우와 같이, 내함(100)이 개방된 채로 장시간 방치가 필요한 경우에는, 오염 방지를 위해 대형 속커버(210)의 대형 인입용 관통공(211)에 임시로 대형 속커버 임시보호덮개(212)를 설치하고 마감작업을 수행한다.In the case where the inner box 100 is left open for a long time, such as when finishing by attaching a finishing member such as tiles, a temporary through hole 211 for a large entry of the large inner cover 210 is provided to prevent contamination. A large inner cover temporary protective cover 212 is installed and the finishing work is performed.

이후, 대형 속커버 임시보호덮개(212)를 제거하고, 대형 오픈커버(310)를 설치한다.Thereafter, the large inner cover temporary protective cover 212 is removed, and a large open cover 310 is installed.

위와 같은 장시간 방치가 필요없는 경우에는, 대형 속커버 임시보호덮개(212)를 설치할 필요없이, 대형 오픈커버(310)를 설치하면 된다.When it is not necessary to be left for a long time as described above, there is no need to install a large inner cover temporary protective cover 212, and a large open cover 310 may be installed.

다음으로, 소형 수전함(20)의 용도(세면기용)로 시공하는 경우에 관하여 설명한다(도 5).Next, a description will be given of a case of construction for the purpose of the small power receiver box 20 (for a washbasin) (FIG. 5).

벽체의 배근에 고정되도록 내함(100)을 설치하되, 타면(b)이 하방을 향하도록 하고, 세면기용 배관 관통공(120)을 통해 세면기용 배관을 설치한다.The inner box 100 is installed to be fixed to the reinforcement of the wall, but the other side (b) faces downward, and the pipe for the wash basin is installed through the through hole 120 for the wash basin.

내함(100)에 내함 임시보호덮개(104)를 설치하고, 벽체의 콘크리트를 타설 및 양생한 후, 내함 임시보호덮개(104)를 제거하고, 소형 속커버(220)를 설치한다.After installing the inner box temporary protective cover 104 in the inner box 100, pouring and curing the concrete of the wall, the inner box temporary protective cover 104 is removed, and a small inner cover 220 is installed.

타일 등 마감부재의 부착에 의해 마감하는 경우와 같이, 내함(100)이 개방된 채로 장시간 방치가 필요한 경우에는, 오염 방지를 위해 소형 속커버(220)의 소형 인입용 관통공(221)에 임시로 소형 속커버 임시보호덮개(222)를 설치하고 마감작업을 수행한다.When the inner box 100 is left open for a long time, such as when finishing by attaching a finishing member such as a tile, in order to prevent contamination, the small penetration hole 221 of the small inner cover 220 is temporarily A small inner cover temporary protective cover 222 is installed and the finishing work is performed.

이후, 소형 속커버 임시보호덮개(222)를 제거하고, 소형 오픈커버(320)를 설치한다.Thereafter, the small inner cover temporary protective cover 222 is removed, and the small open cover 320 is installed.

위와 같은 장시간 방치가 필요없는 경우에는, 소형 속커버 임시보호덮개(222)를 설치할 필요없이, 소형 오픈커버(320)를 설치하면 된다.If it is not necessary to be left for a long time as described above, there is no need to install a small inner cover temporary protective cover 222, and a small open cover 320 may be installed.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.Since the above is only described with respect to some of the preferred embodiments that can be implemented by the present invention, the scope of the present invention, as well known, should not be limited to the above embodiments and should not be interpreted, It will be said that both the technical idea and the technical idea together with the fundamental are included in the scope of the present invention.

10 : 대형 수전함 11 : 대간격 수전 노출공
20 : 소형 수전함 21 : 소간격 수전 노출공
100 : 내함 101 : 배관 관통공
102 : 수납공간 103 : 개방공
104 : 내함 임시보호덮개 110 : 배관 관통공
111 : 외측 관통공 112 : 내측 관통공
113 : 철근 걸림부 121 : 세면기 냉수관 관통공
122 : 세면기 온수관 관통공 123 : 배관 삽입홈
150 : 연장관 210 : 대형 속커버
211 : 대형 인입용 관통공 212 : 대형 속커버 임시보호덮개
220 : 소형 속커버 221 : 소형 인입용 관통공
222 : 소형 속커버 임시보호덮개 310 : 대형 오픈커버
320 : 소형 오픈커버 a : 일면
b : 타면
10: large power receiver 11: large interval power receiver exposed hole
20: small power receiver 21: small spacing power receiver exposure hole
100: inner box 101: pipe through hole
102: storage space 103: open hole
104: inner box temporary protection cover 110: pipe through hole
111: outer through hole 112: inner through hole
113: reinforcing bar hooking portion 121: wash basin cold water pipe through hole
122: wash basin hot water pipe through hole 123: pipe insertion groove
150: extension tube 210: large inner cover
211: large through-hole for inlet 212: large inner cover temporary protective cover
220: small inner cover 221: through hole for small entry
222: small inner cover temporary protective cover 310: large open cover
320: small open cover a: one side
b: if you ride

Claims (10)

삭제delete 상호 이격되어 형성된 한 쌍의 수전 노출공을 구비한 쌍구형 수전함에 있어서,
세면기 이외의 일반용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 넓게 형성된 대간격 수전 노출공(11)을 구비한 대형 수전함(10)과, 세면기용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 좁게 형성된 소간격 수전 노출공(21)을 구비한 소형 수전함(20)의 겸용으로 사용되기 위한 대소형 변환설치가 가능한 벽체 매립형 수전함으로서,
측면에 배관 관통공(101)이 형성되고, 내부에 배관연결구가 수납되도록 수납공간(102)이 형성되고, 전방에 개방공(103)이 형성되고, 상하면 중 일면(a)에 상기 일반용 배관이 관통하기 위한 일반용 배관 관통공(110)이 형성되고, 상하면 중 타면(b)에 상기 세면기용 배관이 관통하기 위한 세면기용 배관 관통공(120)이 형성됨과 아울러, 벽체에 매설되도록 형성된 내함(100);
상기 내함(100)의 수납공간(102)에 인입가능하도록 전방에 대형 인입용 관통공(211)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 대형 속커버(210);
상기 대형 속커버(210)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 일반용 배관 관통공(110)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 대간격 수전 노출공(11)을 구비한 대형 오픈커버(310);
상기 대형 인입용 관통공(211)에 비해 작은 크기를 갖는 소형 인입용 관통공(221)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 소형 속커버(220);
상기 소형 속커버(220)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 세면기용 배관 관통공(120)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 소간격 수전 노출공(21)을 구비함과 아울러, 상기 대형 오픈커버(310)에 비해 작은 크기를 갖도록 형성된 소형 오픈커버(320);를 포함하고,
상기 대형 수전함(10)의 용도로 시공하는 경우, 상기 일면(a)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 대형 속커버(210) 및 대형 오픈커버(310)를 결합하고,
상기 소형 수전함(20)의 용도로 시공하는 경우, 상기 타면(b)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 소형 속커버(220) 및 소형 오픈커버(320)를 결합하고,
상기 일반용 배관 관통공(110)은,
상기 대간격 수전 노출공(11)의 중심간격과 동일한 중심간격을 갖도록 형성된 한 쌍의 외측 관통공(111);
상기 한 쌍의 외측 관통공(111)의 내측에 형성된 한 쌍의 내측 관통공(112);을
포함하는 것을 특징으로 하는 대소형 변환설치가 가능한 벽체 매립형 수전함.
In the twin-spherical power receiving box having a pair of power receiving exposed holes formed to be spaced apart from each other,
A large-sized faucet box 10 having a large spacing faucet exposed hole 11 formed with a wide center spacing of the pair of faucet exposed holes so that a pair of faucets coupled to general pipes other than the wash basin is exposed, and a wash basin pipe A large-sized conversion installation for use as a combined use of a small power receiver box 20 having a small spacing power receiver exposure hole 21 formed with a narrow center distance between the pair of power receiver exposure holes so that the pair of power receivers coupled to it are exposed. As a wall-mounted faucet box capable of
A pipe through hole 101 is formed on the side, a storage space 102 is formed so that the pipe connector is accommodated therein, an open hole 103 is formed in the front, and the general pipe is formed on one surface (a) of the upper and lower surfaces. General pipe through-holes 110 for penetrating are formed, and a pipe through-hole 120 for washbasin through which the pipe for the washbasin passes is formed on the other surface (b) of the upper and lower surfaces, and an inner box 100 formed to be buried in the wall. );
A large-sized through-hole 211 is formed in the front so as to be retractable into the storage space 102 of the inner box 100, and a large inner cover 210 installed in front of the inner box 100;
In addition to being installed to open and close the large inner cover 210 as a whole, a pair of faucets coupled to a pipe connected through the general pipe through hole 110 is exposed, and a large spacing faucet exposure hole 11 is provided. Open cover 310;
In addition to the formation of a small through-hole 221 for small inlet having a size smaller than that of the large-sized inlet through hole 211, a small inner cover 220 installed in front of the inner box 100;
In addition to being installed to open and close the small inner cover 220 as a whole, the small spacing faucet exposure hole 21 is provided so that a pair of faucets coupled to the pipe connected through the pipe through hole 120 for the wash basin are exposed. In addition, a small open cover 320 formed to have a size smaller than that of the large open cover 310; includes,
In the case of construction for the use of the large power receiving box 10, after the inner box 100 is constructed so that the one side (a) faces downward, the large inner cover 210 and the large open cover 310 are combined. and,
In the case of construction for the purpose of the small power receiving box 20, after the inner box 100 is constructed so that the other surface (b) faces downward, the small inner cover 220 and the small open cover 320 are combined. and,
The general pipe through-hole 110,
A pair of outer through-holes 111 formed to have the same central spacing as the central spacing of the large spacing receiving exposed holes 11;
A pair of inner through-holes 112 formed on the inside of the pair of outer through-holes 111;
A wall-embedded power supply box capable of large and small conversion and installation, characterized in that it includes.
상호 이격되어 형성된 한 쌍의 수전 노출공을 구비한 쌍구형 수전함에 있어서,
세면기 이외의 일반용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 넓게 형성된 대간격 수전 노출공(11)을 구비한 대형 수전함(10)과, 세면기용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 좁게 형성된 소간격 수전 노출공(21)을 구비한 소형 수전함(20)의 겸용으로 사용되기 위한 대소형 변환설치가 가능한 벽체 매립형 수전함으로서,
측면에 배관 관통공(101)이 형성되고, 내부에 배관연결구가 수납되도록 수납공간(102)이 형성되고, 전방에 개방공(103)이 형성되고, 상하면 중 일면(a)에 상기 일반용 배관이 관통하기 위한 일반용 배관 관통공(110)이 형성되고, 상하면 중 타면(b)에 상기 세면기용 배관이 관통하기 위한 세면기용 배관 관통공(120)이 형성됨과 아울러, 벽체에 매설되도록 형성된 내함(100);
상기 내함(100)의 수납공간(102)에 인입가능하도록 전방에 대형 인입용 관통공(211)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 대형 속커버(210);
상기 대형 속커버(210)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 일반용 배관 관통공(110)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 대간격 수전 노출공(11)을 구비한 대형 오픈커버(310);
상기 대형 인입용 관통공(211)에 비해 작은 크기를 갖는 소형 인입용 관통공(221)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 소형 속커버(220);
상기 소형 속커버(220)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 세면기용 배관 관통공(120)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 소간격 수전 노출공(21)을 구비함과 아울러, 상기 대형 오픈커버(310)에 비해 작은 크기를 갖도록 형성된 소형 오픈커버(320);를 포함하고,
상기 대형 수전함(10)의 용도로 시공하는 경우, 상기 일면(a)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 대형 속커버(210) 및 대형 오픈커버(310)를 결합하고,
상기 소형 수전함(20)의 용도로 시공하는 경우, 상기 타면(b)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 소형 속커버(220) 및 소형 오픈커버(320)를 결합하고,
상기 내함(100)의 일면(a)에는 고리 구조의 철근 걸림부(113)가 형성되고, 상기 내함(100)의 타면(b)에는 상기 철근 걸림부(113)가 형성되지 않은 것을 특징으로 하는 대소형 변환설치가 가능한 벽체 매립형 수전함.
In the twin-spherical power receiving box having a pair of power receiving exposed holes formed to be spaced apart from each other,
A large-sized faucet box 10 having a large spacing faucet exposed hole 11 formed with a wide center spacing of the pair of faucet exposed holes so that a pair of faucets coupled to general pipes other than the wash basin is exposed, and a wash basin pipe A large-sized conversion installation for use as a combined use of a small power receiver box 20 having a small spacing power receiver exposure hole 21 formed with a narrow center distance between the pair of power receiver exposure holes so that the pair of power receivers coupled to it are exposed. As a wall-mounted faucet box capable of
A pipe through hole 101 is formed on the side, a storage space 102 is formed so that the pipe connector is accommodated therein, an open hole 103 is formed in the front, and the general pipe is formed on one surface (a) of the upper and lower surfaces. General pipe through-holes 110 for penetrating are formed, and a pipe through-hole 120 for washbasin through which the pipe for the washbasin passes is formed on the other surface (b) of the upper and lower surfaces, and an inner box 100 formed to be buried in the wall. );
A large-sized through-hole 211 is formed in the front so as to be retractable into the storage space 102 of the inner box 100, and a large inner cover 210 installed in front of the inner box 100;
In addition to being installed to open and close the large inner cover 210 as a whole, a pair of faucets coupled to a pipe connected through the general pipe through hole 110 is exposed, and a large spacing faucet exposure hole 11 is provided. Open cover 310;
In addition to the formation of a small through-hole 221 for small inlet having a size smaller than that of the large-sized inlet through hole 211, a small inner cover 220 installed in front of the inner box 100;
In addition to being installed to open and close the small inner cover 220 as a whole, the small spacing faucet exposure hole 21 is provided so that a pair of faucets coupled to the pipe connected through the pipe through hole 120 for the wash basin are exposed. In addition, a small open cover 320 formed to have a size smaller than that of the large open cover 310; includes,
In the case of construction for the use of the large power receiving box 10, after the inner box 100 is constructed so that the one side (a) faces downward, the large inner cover 210 and the large open cover 310 are combined. and,
In the case of construction for the purpose of the small power receiving box 20, after the inner box 100 is constructed so that the other surface (b) faces downward, the small inner cover 220 and the small open cover 320 are combined. and,
One surface (a) of the inner box 100 is formed with a reinforcing bar engaging portion 113 having a ring structure, and the reinforcing bar engaging portion 113 is not formed on the other surface (b) of the inner box 100 A wall-mounted faucet box capable of converting and installing large and small sizes.
상호 이격되어 형성된 한 쌍의 수전 노출공을 구비한 쌍구형 수전함에 있어서,
세면기 이외의 일반용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 넓게 형성된 대간격 수전 노출공(11)을 구비한 대형 수전함(10)과, 세면기용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 좁게 형성된 소간격 수전 노출공(21)을 구비한 소형 수전함(20)의 겸용으로 사용되기 위한 대소형 변환설치가 가능한 벽체 매립형 수전함으로서,
측면에 배관 관통공(101)이 형성되고, 내부에 배관연결구가 수납되도록 수납공간(102)이 형성되고, 전방에 개방공(103)이 형성되고, 상하면 중 일면(a)에 상기 일반용 배관이 관통하기 위한 일반용 배관 관통공(110)이 형성되고, 상하면 중 타면(b)에 상기 세면기용 배관이 관통하기 위한 세면기용 배관 관통공(120)이 형성됨과 아울러, 벽체에 매설되도록 형성된 내함(100);
상기 내함(100)의 수납공간(102)에 인입가능하도록 전방에 대형 인입용 관통공(211)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 대형 속커버(210);
상기 대형 속커버(210)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 일반용 배관 관통공(110)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 대간격 수전 노출공(11)을 구비한 대형 오픈커버(310);
상기 대형 인입용 관통공(211)에 비해 작은 크기를 갖는 소형 인입용 관통공(221)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 소형 속커버(220);
상기 소형 속커버(220)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 세면기용 배관 관통공(120)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 소간격 수전 노출공(21)을 구비함과 아울러, 상기 대형 오픈커버(310)에 비해 작은 크기를 갖도록 형성된 소형 오픈커버(320);를 포함하고,
상기 대형 수전함(10)의 용도로 시공하는 경우, 상기 일면(a)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 대형 속커버(210) 및 대형 오픈커버(310)를 결합하고,
상기 소형 수전함(20)의 용도로 시공하는 경우, 상기 타면(b)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 소형 속커버(220) 및 소형 오픈커버(320)를 결합하고,
상기 세면기용 배관 관통공(120)은, 상기 소간격 수전 노출공(21)의 중심간격과 동일한 중심간격을 갖도록 형성된 세면기 냉수관 관통공(121) 및 세면기 온수관 관통공(122)인 것을 특징으로 하는 대소형 변환설치가 가능한 벽체 매립형 수전함.
In the twin-spherical power receiving box having a pair of power receiving exposed holes formed to be spaced apart from each other,
A large-sized faucet box 10 having a large spacing faucet exposed hole 11 formed with a wide center spacing of the pair of faucet exposed holes so that a pair of faucets coupled to general pipes other than the wash basin is exposed, and a wash basin pipe A large-sized conversion installation for use as a combined use of a small power receiver box 20 having a small spacing power receiver exposure hole 21 formed with a narrow center distance between the pair of power receiver exposure holes so that the pair of power receivers coupled to it are exposed. As a wall-mounted faucet box capable of
A pipe through hole 101 is formed on the side, a storage space 102 is formed so that the pipe connector is accommodated therein, an open hole 103 is formed in the front, and the general pipe is formed on one surface (a) of the upper and lower surfaces. General pipe through-holes 110 for penetrating are formed, and a pipe through-hole 120 for washbasin through which the pipe for the washbasin passes is formed on the other surface (b) of the upper and lower surfaces, and an inner box 100 formed to be buried in the wall. );
A large-sized through-hole 211 is formed in the front so as to be retractable into the storage space 102 of the inner box 100, and a large inner cover 210 installed in front of the inner box 100;
In addition to being installed to open and close the large inner cover 210 as a whole, a pair of faucets coupled to a pipe connected through the general pipe through hole 110 is exposed, and a large spacing faucet exposure hole 11 is provided. Open cover 310;
In addition to the formation of a small through-hole 221 for small inlet having a size smaller than that of the large-sized inlet through hole 211, a small inner cover 220 installed in front of the inner box 100;
In addition to being installed to open and close the small inner cover 220 as a whole, the small spacing faucet exposure hole 21 is provided so that a pair of faucets coupled to the pipe connected through the pipe through hole 120 for the wash basin are exposed. In addition, a small open cover 320 formed to have a size smaller than that of the large open cover 310; includes,
In the case of construction for the use of the large power receiving box 10, after the inner box 100 is constructed so that the one side (a) faces downward, the large inner cover 210 and the large open cover 310 are combined. and,
In the case of construction for the purpose of the small power receiving box 20, after the inner box 100 is constructed so that the other surface (b) faces downward, the small inner cover 220 and the small open cover 320 are combined. and,
The wash basin pipe through hole 120 is a wash basin cold water pipe through hole 121 and a wash basin hot water pipe through hole 122 formed to have the same central spacing as the center spacing of the small spacing faucet exposed hole 21 Wall-embedded power supply box that can be converted and installed in large and small sizes.
제4항에 있어서,
상기 내함(100)의 타면(b)의 세면기 냉수관 관통공(121)과 세면기 온수관 관통공(122)의 사이에는, 세면기의 배수배관(13)이 삽입되도록 배관 삽입홈(123)이 함몰구조로 형성된 것을 특징으로 하는 대소형 변환설치가 가능한 벽체 매립형 수전함.
The method of claim 4,
Between the wash basin cold water pipe through hole 121 and the wash basin hot water pipe through hole 122 on the other surface (b) of the inner box 100, the pipe insertion groove 123 is recessed so that the drain pipe 13 of the wash basin is inserted. An embedded wall faucet capable of converting and installing large and small sizes, characterized in that it is formed in a structure.
상호 이격되어 형성된 한 쌍의 수전 노출공을 구비한 쌍구형 수전함에 있어서,
세면기 이외의 일반용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 넓게 형성된 대간격 수전 노출공(11)을 구비한 대형 수전함(10)과, 세면기용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 좁게 형성된 소간격 수전 노출공(21)을 구비한 소형 수전함(20)의 겸용으로 사용되기 위한 대소형 변환설치가 가능한 벽체 매립형 수전함으로서,
측면에 배관 관통공(101)이 형성되고, 내부에 배관연결구가 수납되도록 수납공간(102)이 형성되고, 전방에 개방공(103)이 형성되고, 상하면 중 일면(a)에 상기 일반용 배관이 관통하기 위한 일반용 배관 관통공(110)이 형성되고, 상하면 중 타면(b)에 상기 세면기용 배관이 관통하기 위한 세면기용 배관 관통공(120)이 형성됨과 아울러, 벽체에 매설되도록 형성된 내함(100);
상기 내함(100)의 수납공간(102)에 인입가능하도록 전방에 대형 인입용 관통공(211)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 대형 속커버(210);
상기 대형 속커버(210)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 일반용 배관 관통공(110)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 대간격 수전 노출공(11)을 구비한 대형 오픈커버(310);
상기 대형 인입용 관통공(211)에 비해 작은 크기를 갖는 소형 인입용 관통공(221)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 소형 속커버(220);
상기 소형 속커버(220)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 세면기용 배관 관통공(120)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 소간격 수전 노출공(21)을 구비함과 아울러, 상기 대형 오픈커버(310)에 비해 작은 크기를 갖도록 형성된 소형 오픈커버(320);를 포함하고,
상기 대형 수전함(10)의 용도로 시공하는 경우, 상기 일면(a)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 대형 속커버(210) 및 대형 오픈커버(310)를 결합하고,
상기 소형 수전함(20)의 용도로 시공하는 경우, 상기 타면(b)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 소형 속커버(220) 및 소형 오픈커버(320)를 결합하고,
상기 벽체의 두께 변화에 대하여 대응하도록, 상기 내함(100)과 상기 대형 속커버(210)의 사이 또는 상기 내함(100)과 상기 소형 속커버(220)의 사이에 설치되는 연장관(150);을
더 포함하는 것을 특징으로 하는 대소형 변환설치가 가능한 벽체 매립형 수전함.
In the twin-spherical power receiving box having a pair of power receiving exposed holes formed to be spaced apart from each other,
A large-sized faucet box 10 having a large spacing faucet exposed hole 11 formed with a wide center spacing of the pair of faucet exposed holes so that a pair of faucets coupled to general pipes other than the wash basin is exposed, and a wash basin pipe A large-sized conversion installation for use as a combined use of a small power receiver box 20 having a small spacing power receiver exposure hole 21 formed with a narrow center distance between the pair of power receiver exposure holes so that the pair of power receivers coupled to it are exposed. As a wall-mounted faucet box capable of
A pipe through hole 101 is formed on the side, a storage space 102 is formed so that the pipe connector is accommodated therein, an open hole 103 is formed in the front, and the general pipe is formed on one surface (a) of the upper and lower surfaces. General pipe through-holes 110 for penetrating are formed, and a pipe through-hole 120 for washbasin through which the pipe for the washbasin passes is formed on the other surface (b) of the upper and lower surfaces, and an inner box 100 formed to be buried in the wall. );
A large-sized through-hole 211 is formed in the front so as to be retractable into the storage space 102 of the inner box 100, and a large inner cover 210 installed in front of the inner box 100;
In addition to being installed to open and close the large inner cover 210 as a whole, a pair of faucets coupled to a pipe connected through the general pipe through hole 110 is exposed, and a large spacing faucet exposure hole 11 is provided. Open cover 310;
In addition to the formation of a small through-hole 221 for small inlet having a size smaller than that of the large-sized inlet through hole 211, a small inner cover 220 installed in front of the inner box 100;
In addition to being installed to open and close the small inner cover 220 as a whole, the small spacing faucet exposure hole 21 is provided so that a pair of faucets coupled to the pipe connected through the pipe through hole 120 for the wash basin are exposed. In addition, a small open cover 320 formed to have a size smaller than that of the large open cover 310; includes,
In the case of construction for the use of the large power receiving box 10, after the inner box 100 is constructed so that the one side (a) faces downward, the large inner cover 210 and the large open cover 310 are combined. and,
In the case of construction for the purpose of the small power receiving box 20, after the inner box 100 is constructed so that the other surface (b) faces downward, the small inner cover 220 and the small open cover 320 are combined. and,
An extension pipe 150 installed between the inner box 100 and the large inner cover 210 or between the inner box 100 and the small inner cover 220 to correspond to the change in the thickness of the wall;
A wall-embedded power supply box capable of converting and installing large and small sizes, characterized in that it further comprises.
상호 이격되어 형성된 한 쌍의 수전 노출공을 구비한 쌍구형 수전함에 있어서,
세면기 이외의 일반용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 넓게 형성된 대간격 수전 노출공(11)을 구비한 대형 수전함(10)과, 세면기용 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 한 쌍의 수전 노출공의 중심간격이 좁게 형성된 소간격 수전 노출공(21)을 구비한 소형 수전함(20)의 겸용으로 사용되기 위한 대소형 변환설치가 가능한 벽체 매립형 수전함으로서,
측면에 배관 관통공(101)이 형성되고, 내부에 배관연결구가 수납되도록 수납공간(102)이 형성되고, 전방에 개방공(103)이 형성되고, 상하면 중 일면(a)에 상기 일반용 배관이 관통하기 위한 일반용 배관 관통공(110)이 형성되고, 상하면 중 타면(b)에 상기 세면기용 배관이 관통하기 위한 세면기용 배관 관통공(120)이 형성됨과 아울러, 벽체에 매설되도록 형성된 내함(100);
상기 내함(100)의 수납공간(102)에 인입가능하도록 전방에 대형 인입용 관통공(211)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 대형 속커버(210);
상기 대형 속커버(210)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 일반용 배관 관통공(110)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 대간격 수전 노출공(11)을 구비한 대형 오픈커버(310);
상기 대형 인입용 관통공(211)에 비해 작은 크기를 갖는 소형 인입용 관통공(221)이 형성됨과 아울러, 상기 내함(100)의 전방에 설치된 소형 속커버(220);
상기 소형 속커버(220)를 전체적으로 개폐하도록 설치됨과 아울러, 상기 세면기용 배관 관통공(120)을 통해 연결된 배관에 결합한 한 쌍의 수전이 노출되도록, 상기 소간격 수전 노출공(21)을 구비함과 아울러, 상기 대형 오픈커버(310)에 비해 작은 크기를 갖도록 형성된 소형 오픈커버(320);를 포함하고,
상기 대형 수전함(10)의 용도로 시공하는 경우, 상기 일면(a)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 대형 속커버(210) 및 대형 오픈커버(310)를 결합하고,
상기 소형 수전함(20)의 용도로 시공하는 경우, 상기 타면(b)이 하방을 향하도록 상기 내함(100)을 시공한 후, 상기 소형 속커버(220) 및 소형 오픈커버(320)를 결합하고,
상기 벽체의 콘크리트 시공 시, 상기 내함(100)의 수납공간(102)을 보호하도록, 상기 내함(100)의 전방에 임시로 설치되는 내함 임시보호덮개(104);를
더 포함하는 것을 특징으로 하는 대소형 변환설치가 가능한 벽체 매립형 수전함.
In the twin-spherical power receiving box having a pair of power receiving exposed holes formed to be spaced apart from each other,
A large-sized faucet box 10 having a large spacing faucet exposed hole 11 formed with a wide center spacing of the pair of faucet exposed holes so that a pair of faucets coupled to general pipes other than the wash basin is exposed, and a wash basin pipe A large-sized conversion installation for use as a combined use of a small power receiver box 20 having a small spacing power receiver exposure hole 21 formed with a narrow center distance between the pair of power receiver exposure holes so that the pair of power receivers coupled to it are exposed. As a wall-mounted faucet box capable of
A pipe through hole 101 is formed on the side, a storage space 102 is formed so that the pipe connector is accommodated therein, an open hole 103 is formed in the front, and the general pipe is formed on one surface (a) of the upper and lower surfaces. General pipe through-holes 110 for penetrating are formed, and a pipe through-hole 120 for washbasin through which the pipe for the washbasin passes is formed on the other surface (b) of the upper and lower surfaces, and an inner box 100 formed to be buried in the wall. );
A large-sized through-hole 211 is formed in the front so as to be retractable into the storage space 102 of the inner box 100, and a large inner cover 210 installed in front of the inner box 100;
In addition to being installed to open and close the large inner cover 210 as a whole, a pair of faucets coupled to a pipe connected through the general pipe through hole 110 is exposed, and a large spacing faucet exposure hole 11 is provided. Open cover 310;
In addition to the formation of a small through-hole 221 for small inlet having a size smaller than that of the large-sized inlet through hole 211, a small inner cover 220 installed in front of the inner box 100;
In addition to being installed to open and close the small inner cover 220 as a whole, the small spacing faucet exposure hole 21 is provided so that a pair of faucets coupled to the pipe connected through the pipe through hole 120 for the wash basin are exposed. In addition, a small open cover 320 formed to have a size smaller than that of the large open cover 310; includes,
In the case of construction for the use of the large power receiving box 10, after the inner box 100 is constructed so that the one side (a) faces downward, the large inner cover 210 and the large open cover 310 are combined. and,
In the case of construction for the purpose of the small power receiving box 20, after the inner box 100 is constructed so that the other surface (b) faces downward, the small inner cover 220 and the small open cover 320 are combined. and,
In the case of concrete construction of the wall, the inner box temporary protective cover 104 temporarily installed in front of the inner box 100 to protect the storage space 102 of the inner box 100;
A wall-embedded power supply box capable of large and small conversion and installation, characterized in that it further comprises.
제7항에 있어서,
상기 대형 수전함(10)의 용도로 시공하는 경우의 마감시공 시, 상기 대형 속커버(210)의 대형 인입용 관통공(211)의 내부를 보호하도록, 상기 대형 속커버(210)의 대형 인입용 관통공(211)에 임시로 설치되는 대형 속커버 임시보호덮개(212);
상기 소형 수전함(20)의 용도로 시공하는 경우의 마감시공 시, 상기 소형 속커버(220)의 소형 인입용 관통공(221)의 내부를 보호하도록, 상기 소형 속커버(220)의 소형 인입용 관통공(221)에 임시로 설치되는 소형 속커버 임시보호덮개(222);를
더 포함하는 것을 특징으로 하는 대소형 변환설치가 가능한 벽체 매립형 수전함.
The method of claim 7,
In the case of construction for the use of the large power receiving box 10, during the finishing construction, the large inlet of the large inner cover 210 to protect the inside of the large inlet through hole 211 of the large inner cover 210 A large inner cover temporary protective cover 212 temporarily installed in the through hole 211 for;
In the case of construction for the use of the small power receiving box 20, a small entry of the small inner cover 220 to protect the interior of the small entry through hole 221 of the small inner cover 220 Small inner cover temporary protective cover 222 temporarily installed in the through hole 221 for;
A wall-embedded power supply box capable of large and small conversion and installation, characterized in that it further comprises.
제7항의 수전함의 시공방법으로서,
상기 대형 수전함(10)의 용도로 시공하는 경우,
상기 벽체의 배근에 고정되도록 상기 내함(100)을 설치하되, 상기 일면(a)이 하방을 향하도록 하는 단계;
상기 일반용 배관 관통공(110)을 통해 일반용 배관을 설치하는 단계;
상기 내함(100)에 상기 내함 임시보호덮개(104)를 설치하고, 상기 벽체의 콘크리트를 타설하는 단계;
상기 내함 임시보호덮개(104)를 제거하고, 상기 대형 속커버(210)를 설치하는 단계;
상기 대형 속커버(210)의 외측에 상기 대형 오픈커버(310)를 설치하는 단계;를 포함하고,
상기 소형 수전함(20)의 용도로 시공하는 경우,
상기 벽체의 배근에 고정되도록 상기 내함(100)을 설치하되, 상기 타면(b)이 하방을 향하도록 하는 단계;
상기 세면기용 배관 관통공(120)을 통해 세면기용 배관을 설치하는 단계;
상기 내함(100)에 상기 내함 임시보호덮개(104)를 설치하고, 상기 벽체의 콘크리트를 타설하는 단계;
상기 내함 임시보호덮개(104)를 제거하고, 상기 소형 속커버(220)를 설치하는 단계;
상기 소형 속커버(220)의 외측에 상기 소형 오픈커버(320)를 설치하는 단계;를 포함하는 것을 특징으로 하는 벽체 매립형 수전함의 시공방법.
As the construction method of the power receiver box of Clause 7,
In the case of construction for the use of the large power storage box 10,
Installing the inner box 100 so as to be fixed to the reinforcement of the wall, but having the one side (a) facing downward;
Installing a general pipe through the general pipe through hole (110);
Installing the inner box temporary protective cover 104 on the inner box 100 and pouring concrete of the wall;
Removing the inner box temporary protective cover 104, and installing the large inner cover 210;
Including; installing the large open cover 310 on the outside of the large inner cover 210,
In the case of construction for the use of the small power box 20,
Installing the inner box (100) so as to be fixed to the reinforcement of the wall, but having the other surface (b) face downward;
Installing a washbasin pipe through the washbasin pipe through hole 120;
Installing the inner box temporary protective cover 104 on the inner box 100 and pouring concrete of the wall;
Removing the inner box temporary protection cover 104, and installing the small inner cover 220;
Installing the small open cover (320) on the outside of the small inner cover (220); Construction method of a wall-embedded power box comprising a.
제8항의 수전함의 시공방법으로서,
상기 대형 수전함(10)의 용도로 시공하는 경우,
상기 벽체의 배근에 고정되도록 상기 내함(100)을 설치하되, 상기 일면(a)이 하방을 향하도록 하는 단계;
상기 일반용 배관 관통공(110)을 통해 일반용 배관을 설치하는 단계;
상기 내함(100)에 상기 내함 임시보호덮개(104)를 설치하고, 상기 벽체의 콘크리트를 타설하는 단계;
상기 내함 임시보호덮개(104)를 제거하고, 상기 대형 속커버(210)를 설치하는 단계;
상기 대형 속커버(210)의 대형 인입용 관통공(211)에 임시로 대형 속커버 임시보호덮개(212)를 설치하고 마감작업을 하는 단계;
상기 대형 속커버 임시보호덮개(212)를 제거하고, 상기 대형 오픈커버(310)를 설치하는 단계;를 포함하고,
상기 소형 수전함(20)의 용도로 시공하는 경우,
상기 벽체의 배근에 고정되도록 상기 내함(100)을 설치하되, 상기 타면(b)이 하방을 향하도록 하는 단계;
상기 세면기용 배관 관통공(120)을 통해 세면기용 배관을 설치하는 단계;
상기 내함(100)에 상기 내함 임시보호덮개(104)를 설치하고, 상기 벽체의 콘크리트를 타설하는 단계;
상기 내함 임시보호덮개(104)를 제거하고, 상기 소형 속커버(220)를 설치하는 단계;
상기 소형 속커버(220)의 소형 인입용 관통공(221)에 임시로 소형 속커버 임시보호덮개(222)를 설치하고 마감작업을 하는 단계;
상기 소형 속커버 임시보호덮개(222)를 제거하고, 상기 소형 오픈커버(320)를 설치하는 단계;를 포함하는 것을 특징으로 하는 벽체 매립형 수전함의 시공방법.
As the construction method of the power receiver box of clause 8,
In the case of construction for the use of the large power storage box 10,
Installing the inner box 100 to be fixed to the reinforcement of the wall, but having the one side (a) facing downward;
Installing a general pipe through the general pipe through hole (110);
Installing the inner box temporary protective cover 104 on the inner box 100 and pouring concrete of the wall;
Removing the inner box temporary protective cover 104, and installing the large inner cover 210;
Temporarily installing a large inner cover temporary protective cover 212 in the large inlet through hole 211 of the large inner cover 210 and performing a finishing operation;
Including; removing the large inner cover temporary protective cover 212, and installing the large open cover 310,
In the case of construction for the use of the small power box 20,
Installing the inner box (100) so as to be fixed to the reinforcement of the wall, but having the other surface (b) face downward;
Installing a washbasin pipe through the washbasin pipe through hole 120;
Installing the inner box temporary protective cover 104 on the inner box 100 and pouring concrete of the wall;
Removing the inner box temporary protective cover 104, and installing the small inner cover 220;
Temporarily installing a small inner cover temporary protective cover 222 in the small inlet through hole 221 of the small inner cover 220 and performing a finishing operation;
Removing the small inner cover temporary protective cover (222), and installing the small open cover (320); Construction method of a wall-embedded power supply box comprising a.
KR1020190123847A 2019-10-07 2019-10-07 Built-in water service box and construction method thereof KR102223055B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190123847A KR102223055B1 (en) 2019-10-07 2019-10-07 Built-in water service box and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190123847A KR102223055B1 (en) 2019-10-07 2019-10-07 Built-in water service box and construction method thereof

Publications (1)

Publication Number Publication Date
KR102223055B1 true KR102223055B1 (en) 2021-03-03

Family

ID=75151030

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190123847A KR102223055B1 (en) 2019-10-07 2019-10-07 Built-in water service box and construction method thereof

Country Status (1)

Country Link
KR (1) KR102223055B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200417638Y1 (en) * 2006-03-21 2006-06-01 (주)남호건업 piping inspect of a wall reclamation style that insulation attached
KR100780798B1 (en) * 2006-03-13 2007-11-29 주식회사 국민에너지 That inspect piping of wall reclamation styleand form of double pipe
KR20080001977U (en) * 2007-05-23 2008-06-19 주식회사 피아이피 Open cover of wall reclaimed type water pipe distribution box used as fixing plate of member for accessory arrangement
KR100863155B1 (en) * 2007-06-14 2008-10-13 주식회사 피아이피 Built-in wall water service box for construction with iron reinforcing rod dodging groove and constructing method thereof
KR20090019960A (en) * 2007-08-22 2009-02-26 주식회사 피아이피 Built-in wall type water service box with a depth adjustable extension member
KR101954317B1 (en) * 2018-09-04 2019-06-11 서영호 Construction method of wall water panel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100780798B1 (en) * 2006-03-13 2007-11-29 주식회사 국민에너지 That inspect piping of wall reclamation styleand form of double pipe
KR200417638Y1 (en) * 2006-03-21 2006-06-01 (주)남호건업 piping inspect of a wall reclamation style that insulation attached
KR20080001977U (en) * 2007-05-23 2008-06-19 주식회사 피아이피 Open cover of wall reclaimed type water pipe distribution box used as fixing plate of member for accessory arrangement
KR100863155B1 (en) * 2007-06-14 2008-10-13 주식회사 피아이피 Built-in wall water service box for construction with iron reinforcing rod dodging groove and constructing method thereof
KR20090019960A (en) * 2007-08-22 2009-02-26 주식회사 피아이피 Built-in wall type water service box with a depth adjustable extension member
KR101954317B1 (en) * 2018-09-04 2019-06-11 서영호 Construction method of wall water panel

Similar Documents

Publication Publication Date Title
KR200417925Y1 (en) piping inspect of a wall reclamation style
KR101564993B1 (en) Drain Assembled Bathroom Floor Board
KR200408194Y1 (en) Hydrant housing of wall embedded type
KR101565457B1 (en) Guide box for water leakage of concrete floor
KR102223055B1 (en) Built-in water service box and construction method thereof
KR200394863Y1 (en) Connecting Flange for Manhole Drain Pipe
KR100877990B1 (en) Box buried in wall
KR100704659B1 (en) Non distribution box type water distribution system
KR100833570B1 (en) Built-in wall water service box for construction without iron reinforcing rod damage and constructing method thereof
KR100742352B1 (en) Water supply distributor box and pipe laying method using the same
KR20080017112A (en) Korea ko total toilet sleeve system (kkttss)
KR102351575B1 (en) Built-in water service box having pipeline assembly
KR102351576B1 (en) Built-in water service box having pipeline member
KR100780798B1 (en) That inspect piping of wall reclamation styleand form of double pipe
US7013927B2 (en) Sleeve for toilet flanges and drains
KR101313848B1 (en) Drainage System on Floor of Flat Slab Type and Toilet Stool Sleeve Using the Same
KR100918448B1 (en) Bathroom water valve box
KR100742403B1 (en) Water supply system having drainpipe
KR100918851B1 (en) Frame for Installing Drain Pipe on Floor
WO2019093516A1 (en) Bathroom unit drainage structure and construction method
KR200352175Y1 (en) Low noise drainage plumbing in bathroom
KR102229142B1 (en) On floor drainage pipe system of bathroom
KR200480115Y1 (en) Assembly of Flange, Socket and Drainpipe for Piping Above Slab of Toilet Bow
KR200338297Y1 (en) Water supply system having drainpipe
EP3399113A1 (en) Plumbing unit

Legal Events

Date Code Title Description
GRNT Written decision to grant