KR102200927B1 - connection structure of composite rahmen bridge using steel brackets for fall prevention and composite rahmen bridge method using the same - Google Patents

connection structure of composite rahmen bridge using steel brackets for fall prevention and composite rahmen bridge method using the same Download PDF

Info

Publication number
KR102200927B1
KR102200927B1 KR1020200030142A KR20200030142A KR102200927B1 KR 102200927 B1 KR102200927 B1 KR 102200927B1 KR 1020200030142 A KR1020200030142 A KR 1020200030142A KR 20200030142 A KR20200030142 A KR 20200030142A KR 102200927 B1 KR102200927 B1 KR 102200927B1
Authority
KR
South Korea
Prior art keywords
girder
steel
pier
payment
bridge
Prior art date
Application number
KR1020200030142A
Other languages
Korean (ko)
Inventor
이두성
김영진
Original Assignee
(주)주성이앤씨
이두성
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)주성이앤씨, 이두성 filed Critical (주)주성이앤씨
Priority to KR1020200030142A priority Critical patent/KR102200927B1/en
Application granted granted Critical
Publication of KR102200927B1 publication Critical patent/KR102200927B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a connection structure of a composite Rahman bridge using steel brackets for fall prevention and a construction method for a composite Rahman bridge using the same, by which steel brackets are provided on the lower surface of a PC girder and the upper surfaces of piers, which face each other, in the construction of a composite Rahman bridge and are strongly coupled by a high-tensile bolted connection, thereby stably seating the PC girder and preventing the same from overturning in a temporary construction stage during bridge construction, and providing an excellent Rahman structure against horizontal force during earthquakes. More specifically, the connection structure of a composite Rahman bridge for strongly coupling corner parts between a pair of piers distanced from each other and a PC girder seated on the upper parts of the pair of piers, comprises: first strong coupling members installed on the upper surfaces of the piers; and second strong coupling members installed on the lower surface of the PC girder facing the first strong coupling members of the piers to be fastened to the first strong coupling members in a temporary construction step.

Description

전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조 및 이를 이용한 합성형 라멘교의 공법{connection structure of composite rahmen bridge using steel brackets for fall prevention and composite rahmen bridge method using the same}Connection structure of composite rahmen bridge using steel brackets for fall prevention and composite rahmen bridge method using the same}

본 발명은 합성형 라멘교를 시공함에 있어 상호 대면하는 PC거더의 하부면과 교각의 상부면에 각각 강재브라켓을 마련하고 고장력 볼트 이음을 통해 강결시켜 교량 시공 시 가설 단계에서 안정적인 PC거더의 안치와 전도를 방지할 뿐 아니라, 내진 시 수평력에 대해서 우수한 라멘구조를 제공할 수 있는 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조 및 이를 이용한 합성형 라멘교의 공법에 관한 것이다.In the present invention, in the construction of a composite ramen bridge, steel brackets are provided on the lower surface of the PC girder and the upper surface of the pier facing each other, and are tightened through high-tension bolt joints, so that stable PC girders are secured during the construction phase. The present invention relates to a fastening structure of a composite ramen bridge using a steel bracket for preventing fall that can provide an excellent ramen structure against horizontal force during seismic resistance as well as preventing overturning, and a construction method of the composite ramen bridge using the same.

기존 소하천 횡단용으로 주로 적용되어 왔던 RC라멘교는 교량의 상부구조와 하부구조를 강결로 연결하여 전체 구조계의 강성을 높임과 동시에 지간 내에 발생하는 휨에 의한 정 모멘트의 크기를 줄이는 대신 이를 교대나 교각 연결부에서 부담하게 하는 구조형식이다. RC ramen bridges, which have been mainly applied for crossing small rivers, increase the stiffness of the entire structural system by connecting the upper structure and the lower structure of the bridge by rigid condensation, and at the same time reduce the size of the static moment due to the deflection occurring within the span. It is a structural type that is burdened by the pier connection.

일반적으로 라멘교는 교대나 교각의 높이가 높지 않고 단경간의 교량에 사용하는 것이 경제적이며 국내와 같이 소하천 및 소로의 횡단교량에서 많이 볼 수 있다. 특히 RC라멘교는 신축이음이나 교량받침이 불필요하게 되어 유지관리측면에서 장점을 보유한 교량공법이다. In general, ramen bridges are not high in heights of bridges or bridges, and are economical to use for short-span bridges, and are often found in crossings of small rivers and lanes like in Korea. In particular, RC ramen bridges are a bridge construction method that possesses advantages in terms of maintenance as extension joints or bridge supports become unnecessary.

그러나 단위면적당 고정하중이 크므로 장지간(15m 이상)계획이 어렵고 교량의 연장이 길어지는 경우 우각부 및 헌치부 그리고 하부구조의 규모증가로 초기건설비용 측면에서 경제성이 떨어진다. However, since the fixed load per unit area is large, it is difficult to plan long-distance (more than 15m) length and if the extension of the bridge is lengthened, the economic feasibility in terms of initial construction cost decreases due to the increase in the size of the right leg, heonchi and substructure.

또한 전 구간에 동바리를 이용해 거푸집을 형성하여 시공되므로 시공성의 한계와 현장타설 콘크리트로 품질관리의 어려움이 있고, 동바리와 거푸집 설치에 의한 안전사고가 최근 빈번히 발생하고 있어 시공 상의 문제점으로 대두되고 있다. 이러한 문제점으로 인해 RC라멘교는 그 적용성이 떨어지게 되었으며, 이에 대한 대안으로 거더교와 RC라멘교의 장점을 취한 형태의 합성형 라멘교가 개발되었다.In addition, since the formwork is formed using copper bars in all sections, there are limitations in workability and difficulty in quality control with cast-in-place concrete, and safety accidents due to installation of copper bars and formwork are frequently occurring in recent years, which is a problem in construction. Due to this problem, the RC ramen bridge has become less applicable, and as an alternative, a composite ramen bridge in the form of taking advantage of the girder bridge and RC ramen bridge has been developed.

교대에 거더를 거치한 후 바닥판과 우각부를 합성한 합성라멘 공법은 장지간의 경간장을 확보하여 하천 내에 위치하는 하부구조를 최소화 할 수 있고, 일반 조인트 거더교와 달리 주기적으로 교체가 요구되는 교량받침이나 신축이음장치가 배제되어 초기건설비용 및 유지관리비의 감소, 주행성의 향상 등의 장점을 보유하게 된다. The synthetic ramen construction method that combines the bottom plate and the right leg after mounting the girder on the aft can minimize the substructure located in the river by securing the span between the long ridges, and, unlike general joint girder bridges, bridge supports or bridges that require periodic replacement Since the expansion joint is excluded, it has advantages such as reduction of initial construction cost and maintenance cost, and improvement of drivability.

초기에 개발된 합성형 라멘공법은 강재거더를 이용한 강합성 라멘공법과 프리플렉션이 도입된 PF거더를 이용한 강합성 라멘공법으로 개발되어 다수의 교량에 활발하게 적용되고 있다.The synthetic ramen construction method developed in the early stages was developed as a steel composite ramen construction method using a steel girder and a steel composite ramen construction method using a PF girder introduced with pre-flexion, and is actively applied to a number of bridges.

통수 단면적 확보를 위한 장경간 및 저형고의 교량형식으로 기존의 RC라멘구조를 대체하기 위해 개발된 합성라멘구조는 상,하부의 일체화 방법으로 보편화된 연결방식인 앵커시스템과 고장력볼트 이음을 기술적으로 선택할 수밖에 없었기 때문에 강구조시스템으로 개발되었다. The composite ramen structure developed to replace the existing RC ramen structure as a bridge type of long span and low height for securing water passage area is a method of unifying the upper and lower parts. It was developed as a steel structure system because there was no choice but to choose.

그러나 이 같은 강재거더 합성라멘공법은 경제성, 시공의 어려움 등 다양한 문제점이 발생되어 실무 현장에서는 강합성 라멘구조보다 공사비가 저렴하고, 상부구조와 하부구조의 연결부를 일체화하는 공정이 보다 용이한 프리캐스트 거더와 하부기둥벽체를 일체화하는 기술개발에 대한 수요가 증대되어 왔다.However, such a steel girder composite ramen construction method has various problems such as economic feasibility and construction difficulties, so the construction cost is lower than that of the steel composite ramen structure in the practical field, and the process of integrating the connection between the upper structure and the lower structure is easier. There has been an increasing demand for technology development to integrate the girder and the lower column wall.

이러한 프리캐스트 거더를 이용한 라멘구조에서는 연결부의 부재간 연결이 어렵고 충분한 성능이 발휘되지 않으면 많은 문제점이 발생될 수 있다. 따라서 프리캐스트 PSC 거더를 적용한 라멘공법이 적용되기 위해서는 연결부에 대한 안전성 확보가 가장 중요시 되고 있다.In the ramen structure using such a precast girder, it is difficult to connect between members of the connecting portion and if sufficient performance is not exhibited, many problems may occur. Therefore, in order to apply the ramen method using the precast PSC girder, securing the safety of the connection is the most important.

대한민국 등록특허 제10-1586320호Korean Patent Registration No. 10-1586320

따라서 본 발명의 목적은 합성형 라멘교를 시공함에 있어 상호 대면하는 PC거더의 하부면과 교각의 상부면에 각각 강재브라켓을 마련하고 고장력 볼트 이음을 통해 강결시켜 교량 시공 시 가설 단계에서 안정적인 PC거더의 안치와 전도를 방지할 뿐 아니라, PC거더를 구조적으로 일체화시켜 내진 시 수평력에 대해서 우수한 라멘구조를 제공할 수 있는 강재브라켓을 이용한 합성형 라멘교의 체결구조 및 이를 이용한 합성형 라멘교의 시공방법을 제공하는 것이다.Therefore, the object of the present invention is to provide a steel bracket on the lower surface of the PC girder and the upper surface of the pier, which face each other in constructing a composite ramen bridge, and secure it through high-tension bolt joints to ensure a stable PC girder at the temporary stage of the bridge construction. In addition to preventing the settling and overturning, the joint structure of the composite ramen bridge using steel brackets that can provide an excellent ramen structure against horizontal force during earthquake resistance by structurally integrated PC girders and the construction method of the composite ramen bridge using the same. To provide.

상술한 문제점들을 해결하기 위한 수단으로서 본 발명의 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조(이하 '본 발명의 체결구조'라 함)는, 이격된 한 쌍의 교각과 상기 한 쌍의 교각 상부에 안치되는 PC거더 간 우각부를 강결시키기 위한 합성형 라멘교의 체결구조에 있어서, 상기 교각의 상부면에 설치되는 제 1강결재; 및 상기 교각의 제 1강결재와 대면하는 PC거더의 하부면에 설치되어 가설 과정에서 상기 제 1강결재와 상호 체결되는 제 2강결재;를 포함하는 것이 특징이다.As a means for solving the above-described problems, the fastening structure of the composite ramen bridge using the steel bracket for preventing the fall of the present invention (hereinafter referred to as the'fastening structure of the present invention') includes a pair of spaced piers and the pair of piers What is claimed is: 1. A fastening structure of a composite ramen bridge for tightening right leg portions between PC girders placed on top, comprising: a first steel settlement material installed on an upper surface of the pier; And a second steel payment material installed on a lower surface of the PC girder facing the first steel payment material of the pier and mutually fastened with the first steel payment material during a construction process.

하나의 예로써, 상기 제 1강결재는, 한 쌍이 상기 PC거더의 단면폭보다 상대적으로 긴 길이를 갖도록 이격 설치되며 상기 교각의 상부면에서 상기 PC거더를 향하여 안치면이 마련되고, 상기 제 2강결재는, 상기 PC거더의 단면폭 방향으로 매립되고 양단에서 상기 제 1강결재에 대면하도록 각각 연장되어 상기 제 1강결재에 안치되는 체결면이 마련되는 것이 특징이다.As an example, the first steel payment material is spaced apart so that a pair has a length relatively longer than the cross-sectional width of the PC girder, and a seating surface is provided from the upper surface of the pier toward the PC girder, and the second steel The payment is characterized in that a fastening surface is provided which is buried in the cross-sectional width direction of the PC girder and extends to face the first steel payment material at both ends thereof, and is placed in the first steel payment material.

하나의 예로써, 상기 제 1강결재는, 상부플랜지와 하부플랜지 및 이들을 연결하는 웨브로 구성되는 'I'자 형태를 가지고, 하부플랜지와 웨브의 일부가 상기 교각에 매립되며, 상부플랜지가 상기 PC거더를 향하여 교각의 상부면에서 노출되어 안치면이 마련되면서 하나 이상의 제 1체결홀이 관통 형성되는 것이 특징이다.As an example, the first steel payment material has an'I' shape consisting of an upper flange and a lower flange and a web connecting them, and a portion of the lower flange and the web is buried in the pier, and the upper flange is the It is characterized in that at least one first fastening hole is formed through the PC girder as it is exposed from the upper surface of the pier to provide a seating surface.

하나의 예로써, 상기 제 1강결재는, 상기 교각 내부에 매립되는 웨브에 하나 이상 관통 형성되어 상기 교각을 구성하는 보강철근 중 선택된 하나 이상의 보강철근이 각각 관통 및 결속되게 하는 하나 이상의 제 1결속홀 을 더 포함하는 것이 특징이다.As an example, the first steel bond is formed through at least one of the webs buried inside the pier to allow at least one selected reinforcing bar to penetrate and bind to each of the reinforcing bars constituting the pier. It is characterized by further including a hole.

하나의 예로써, 상기 제 1강결재는, 상기 교각에 매립되는 웨브에 관통 형성되어 상기 교각을 구성하는 콘크리트가 합성되게 하는 하나 이상의 제 1관통홀을 더 포함하는 것이 특징이다.As an example, the first steel payment material is characterized in that it further comprises one or more first through-holes formed through the web embedded in the pier to allow the concrete constituting the pier to be synthesized.

하나의 예로써, 상기 제 1강결재는, 상부플랜지와 하부플랜지 및 이들을 연결하는 웨브로 구성되는 'I'자 형태로 하부플랜지의 저면에 복수의 전단연결재가 상기 교각에 매립되게 장착되며, 상부플랜지가 상기 PC거더를 향하여 교각의 상부면에서 노출되어 안치면이 마련되면서 하나 이상의 제 1결속홀이 관통 형성되는 것이 특징이다.As an example, the first steel payment material has a'I' shape consisting of an upper flange, a lower flange, and a web connecting them, and a plurality of shear connectors are mounted on the bottom of the lower flange to be embedded in the pier, and the upper The flange is exposed from the upper surface of the pier toward the PC girder to provide a seating surface, and at least one first binding hole is formed through.

하나의 예로써, 상기 제 1체결홀은, 교축의 직각 방향으로 긴 길이를 갖도록 구성되는 것이 특징이다.As an example, the first fastening hole is characterized in that it is configured to have a long length in a direction perpendicular to the bridge shaft.

하나의 예로써, 상기 상부플랜지는, 상기 제 2강결재에 안치되는 상기 PC거더의 경사도에 대응하여 상기 웨브로부터 각도가 선택적으로 조정되는 것이 특징이다.As an example, the upper flange is characterized in that the angle is selectively adjusted from the web in response to the inclination of the PC girder placed in the second steel payment material.

하나의 예로써, 상기 제 2강결재는, 수평판과 상기 수평판의 상부면에 길이방향을 따라 수직되게 연결되는 수직판으로 구성되는 'ㅗ'자 형태를 가지고, 상기 PC거더의 단면폭 방향으로 PC거더의 하부면에 매립되며, 한 쌍의 제 1강결재 간 이격 거리에 대응하여 양단이 각각 매립 위치로부터 연장 및 노출되어 각 수평판에 체결면이 마련되면서 상기 제 1체결홀에 각각 대면하는 위치에 제 2체결홀이 관통 형성되는 것이 특징이다.As an example, the second steel payment material has a'ㅗ' shape consisting of a horizontal plate and a vertical plate vertically connected to the upper surface of the horizontal plate along the length direction, and in the cross-sectional width direction of the PC girder. It is buried in the lower surface of the PC girder, and both ends are extended and exposed from the buried position to correspond to the separation distance between the pair of first steel fasteners, so that the fastening surfaces are provided on each horizontal plate and face each of the first fastening holes. It is characterized in that the second fastening hole is formed through the position.

하나의 예로써, 상기 제 2강결재는, 상기 PC거더 내부에 매립되는 수평판에 일정 간격을 따라 상기 수직판과 직각되게 장착되는 복수의 보강판과, 상기 PC거더 내부에 매립되는 각 보강판에 동일 선상으로 하나 이상 관통 형성되어 상기 PC거더를 구성하는 스트럽철근 중 선택된 하나 이상의 스트럽철근이 각각 관통 및 결속되게 하는 하나 이상의 제 2결속홀을 더 포함하는 것이 특징이다.As an example, the second steel payment material includes a plurality of reinforcing plates mounted to be perpendicular to the vertical plate along a predetermined interval on a horizontal plate embedded in the PC girder, and each reinforcing plate embedded in the PC girder. It is characterized in that it further comprises one or more second binding holes through which one or more stirrup reinforcements selected from among stirrup reinforcing bars constituting the PC girder are respectively penetrated and bonded in the same line.

하나의 예로써, 상기 제 2강결재는, 상기 PC거더의 내부에 매립되는 수직판에 관통 형성되어 상기 PC거더를 구성하는 콘크리트가 합성되게 하는 하나 이상의 제 2관통홀을 더 포함하는 것이 특징이다.As an example, the second steel payment material is characterized in that it further comprises one or more second through-holes formed through the vertical plate embedded in the PC girder so that the concrete constituting the PC girder is synthesized. .

하나의 예로써, 상기 제 2체결홀은, 교축 방향으로 긴 길이를 갖도록 구성되는 것이 특징이다.As an example, the second fastening hole is characterized in that it is configured to have a long length in the orthogonal axis direction.

한편 본 발명의 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조를 이용한 합성형 라멘교의 공법(이하 '본 발명의 시공방법'이라 함)은, a) 상술한 제 1강결재가 교각의 상부면에 마련되도록 시공하는 단계; b) 상술한 제 2강결재가 하부면에 마련된 PC거더를 상기 제 1강결재에 제 2강결재가 대면하도록 안치시키는 단계; c) 상기 제 1강결재와 제 2강결재를 볼트 체결하여 교각과 PC거더 간의 우각부를 강결시키는 단계; 및 d) 상기 c)단계 강결된 우각부와 PC거더의 상부에 콘크리트를 타설하여 상기 교각에 PC거더를 합성 시공하는 단계;를 포함하는 것이 특징이다.On the other hand, the construction method of the composite ramen bridge using the fastening structure of the composite ramen bridge using the steel bracket for fall prevention of the present invention (hereinafter referred to as the'construction method of the present invention') is: a) The first steel payment material described above is the upper surface of the pier Constructing to be provided in the; b) placing the PC girder provided on the lower surface of the second steel payment material so that the second steel payment material faces the first steel payment material; c) tightening the right leg portion between the pier and the PC girder by bolting the first steel payment material and the second steel payment material; And d) synthesizing a PC girder on the pier by pouring concrete on the upper part of the right leg portion and the PC girder stiffened in step c).

상술한 바와 같이 본 발명의 체결구조와 시공방법에 의하면, 합성형 라멘교를 시공함에 있어 상호 대면하는 PC거더의 하부면과 교각의 상부면에 각각 강재브라켓을 마련하고 고장력 볼트 이음을 통해 강결시켜 교량 시공 시 가설 단계나 상부 슬래브 시공을 위한 콘크리트 타설의 충격에서도 안정적인 PC거더의 안치와 전도를 방지할 수 있게 된다.As described above, according to the fastening structure and construction method of the present invention, in the construction of the composite ramen bridge, steel brackets are provided on the lower surface of the PC girder and the upper surface of the pier facing each other, and tightened through high tension bolt joints. It is possible to prevent the PC girder from stabilizing and overturning even in the impact of the temporary installation stage or concrete placement for upper slab construction during bridge construction.

이에 PC거더와 교각 간의 우각부가 간소화된 볼트 체결만으로 강결되어 시공의 편의성이 향상됨은 물론 가설 후 상단에 가로보나 상부 슬래브의 시공 전까지 추가적인 전도방지장치의 설치가 불필요하여 시공 비용의 절감과 시공 속도가 향상될 수 있는 효과가 있다.Accordingly, the right leg between the PC girder and the pier is tightened with only simplified bolting, improving the convenience of construction, as well as reducing the construction cost and speed of construction as it is not necessary to install an additional fall prevention device before the construction of the crossbeam or upper slab after installation. There is an effect that can be improved.

또한 PC거더 단부의 매립 강재브라켓과 교각의 상부면에 기설치된 강재브라켓 사이에 고장력 볼트 체결로 인해 마찰 이음으로 외력에 의한 우각부 수평력에 대해 지지가 가능하고, 특히 PC거더 단부와 교각 사이에 강재브라켓으로 인한 충분한 공간이 확보됨으로써 콘크리트 충진이 용이하고 계면이 발생되지 않으며, PC거더를 구조적으로 일체화시켜 내진 시 수평력에 대해서 더욱 우수한 라멘구조를 제공할 수 있게 되는 효과가 있다.In addition, it is possible to support the horizontal force of the right leg due to external force through friction joint by fastening high tension bolts between the embedded steel bracket at the end of the PC girder and the steel bracket already installed on the upper side of the pier. As sufficient space is secured due to the bracket, it is easy to fill concrete and no interface occurs, and by structurally integrated PC girders, there is an effect that it is possible to provide a more excellent ramen structure against horizontal force during seismic resistance.

도 1은 본 발명의 체결구조에 따른 PC거더와 교각 간 우각부를 나타내는 도면.
도 2는 본 발명의 일 실시 예에 따른 제 2강결재의 구조를 나타내는 도면.
도 3a은 본 발명의 일 실시 예에 따른 제 1강결재의 구조를 나타내는 도면.
도 3b는 본 발명의 다른 실시 예에 따른 제 1강결재의 구조를 나타내는 도면.
도 4는 본 발명의 일 실시 예에 따른 제 1강결재와 제 2강결재의 상호 체결 구조를 나타내는 도면.
도 5는 본 발명의 일 실시 예에 따른 제 1강결재의 상부플랜지 경사도를 나타내는 도면.
도 6a 내지 도 6d는 본 발명의 시공방법을 나타내는 도면.
1 is a view showing a right leg between a PC girder and a pier according to the fastening structure of the present invention.
2 is a view showing the structure of a second steel payment according to an embodiment of the present invention.
Figure 3a is a view showing the structure of the first steel payment according to an embodiment of the present invention.
Figure 3b is a view showing the structure of the first steel payment according to another embodiment of the present invention.
4 is a view showing a mutual fastening structure of a first steel payment and a second steel payment according to an embodiment of the present invention.
5 is a view showing the slope of the upper flange of the first steel payment according to an embodiment of the present invention.
6A to 6D are views showing the construction method of the present invention.

이하, 본 발명의 구성 및 작용을 첨부된 도면에 의거하여 좀 더 구체적으로 설명한다. 본 발명을 설명함에 있어서, 본 명세서 및 청구범위에 사용된 용어나 단어는 발명자가 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.Hereinafter, the configuration and operation of the present invention will be described in more detail based on the accompanying drawings. In describing the present invention, terms or words used in the present specification and claims are the present invention based on the principle that the inventor can appropriately define the concept of terms in order to explain his or her invention in the best way. It must be interpreted as a meaning and concept consistent with the technical idea of

본 발명의 체결구조는 이격된 한 쌍의 교각 또는 교대(이하 '교각(10)'이라 통칭함)과 상기 한 쌍의 교각(10) 상부에 안치되는 PC거더(20) 간 우각부를 강결시켜 상부슬래브에 대한 합성 이전 가설 단계에서 전도가 방지될 수 있도록 함은 물론 교각(10) 및 PC거더(20) 간 충분한 이격 공간을 확보함으로써 콘크리트 충진이 용이해질 수 있도록 한다.The fastening structure of the present invention strengthens the right leg portion between a pair of spaced piers or alternations (hereinafter collectively referred to as'piers 10') and the PC girders 20 placed on the top of the pair of piers 10 In addition to preventing overturning in the hypothesis stage prior to the synthesis of the slab, it is possible to facilitate concrete filling by securing a sufficient space between the pier 10 and the PC girder 20.

도 1을 참조하면 본 발명의 체결구조는 상기 교각(10)에 설치되는 제 1강결재(30)와 상기 제 1강결재(30)에 대응하여 상기 PC거더(20)에 설치되는 제 2강결재(40)를 포함하여 구성된다.Referring to Figure 1, the fastening structure of the present invention is a first steel payment 30 installed on the pier 10 and a second steel installed on the PC girder 20 corresponding to the first steel payment 30 It is configured to include the payment (40).

상기 제 1강결재(30)는 상기 PC거더(20)가 안착되는 교각(10)의 상부면에 설치되는 것으로, 한 쌍이 상기 PC거더(20)의 단면폭보다 상대적으로 긴 길이를 갖도록 이격 설치되며 상기 교각(10)의 상부면에서 상기 PC거더(20)를 향하여 안치면이 마련된다.The first steel payment material 30 is installed on the upper surface of the pier 10 on which the PC girder 20 is seated, and a pair is spaced apart to have a length relatively longer than the cross-sectional width of the PC girder 20 A mounting surface is provided from the upper surface of the pier 10 toward the PC girder 20.

이때 상기 PC거더(20)의 단면폭은 교축의 직각방향에 대한 폭을 의미한다.At this time, the cross-sectional width of the PC girder 20 refers to the width in the perpendicular direction of the bridge shaft.

상기 제 1강결재(30)는 상기 교각(10)의 현장 제작 과정에서 상기 교각(10)의 상부면에 기시공 되며, 앞서 언급한 바와 같이 안치면이 마련됨으로써 PC거더(20)의 안정적인 안치와 함께 강결이 이루어지도록 한다.The first steel payment material 30 is pre-formed on the upper surface of the pier 10 in the on-site manufacturing process of the pier 10, and as mentioned above, a seating surface is provided, so that the PC girder 20 is stable. Let the strength come together.

상기 제 2강결재(40)는 상기 교각(10)의 제 1강결재(30)와 대면하는 PC거더(20)의 하부면에 설치되어 가설 과정에서 상기 제 1강결재(30)와 상호 체결된다.The second steel payment material 40 is installed on the lower surface of the PC girder 20 that faces the first steel payment material 30 of the pier 10, and is mutually fastened with the first steel payment material 30 during the construction process. do.

이러한 제 2강결재(40)는 상기 제 1강결재(30)의 안치면에 안치될 수 있도록 상기 PC거더(20)의 단면폭 방향으로 매립되고, 양단에서 상기 제 1강결재(30)에 대면하도록 각각 연장되어 상기 제 1강결재(30)에 안치되는 체결면이 마련되어 있다.The second steel payment material 40 is buried in the cross-sectional width direction of the PC girder 20 so that it can be placed on the mounting surface of the first steel payment material 30, and faces the first steel payment material 30 at both ends. Each extending so as to be provided with a fastening surface to be placed in the first steel payment (30).

상기 제 1강결재(30)와 제 2강결재(40)는 상호 대면하는 위치에 각각 체결홀이 형성되어 고장력 볼트(50) 등을 포함한 체결수단을 통해 체결되게 함으로써, 상부슬래브와 합성 전까지 풍하중과 같은 외부 하중에 PC거더(20)가 교축에 대해 회전하지 못하도록 전도 방지 기능을 수행하게 된다.The first steel payment material 30 and the second steel payment material 40 are each formed with fastening holes at positions facing each other to be fastened through fastening means including high tension bolts 50, etc., so that the wind load before synthesis with the upper slab The PC girder 20 performs a fall prevention function so that the PC girder 20 does not rotate with respect to the throttle under external loads such as.

이하에서는 도 3a 및 도 3b를 참조하여 상기 제 1강결재(30)에 대한 실시 예들을 설명한다.Hereinafter, embodiments of the first steel payment material 30 will be described with reference to FIGS. 3A and 3B.

먼저 본 발명의 일 실시 예에 따른 제 1강결재(30-1)는 상기 교각(10)의 현장 제작 과정에서 선시공되는 구조를 가질 수 있다.First, the first steel payment material 30-1 according to an embodiment of the present invention may have a structure that is pre-construction during the on-site manufacturing process of the pier 10.

본 실시 예의 제 1강결재(30-1)를 설명하면, 도 3a에 도시된 바와 같이 상기 제 1강결재(30-1)는 상부플랜지(300)와 하부플랜지(310) 및 이들을 연결하는 웨브(320)로 구성되는 'I'자 형태의 강재일 수 있다.Referring to the first steel payment material 30-1 of this embodiment, as shown in FIG. 3A, the first steel payment material 30-1 includes an upper flange 300 and a lower flange 310, and a web connecting them. It may be a'I'-shaped steel material composed of (320).

그리고 제 1강결재(30-1)는 하부플랜지(310)와 웨브(320)의 일부가 상기 교각(10)에 매립되며, 상부플랜지(300)가 상기 PC거더(20)를 향하여 교각(10)의 상부면에서 노출되어 안치면이 마련되면서 하나 이상의 제 1체결홀(301)이 관통 형성된다.In addition, in the first steel payment material 30-1, a portion of the lower flange 310 and the web 320 is embedded in the pier 10, and the upper flange 300 faces the PC girder 20. ), one or more first fastening holes 301 are formed therethrough while being exposed from the upper surface of the inner tooth surface to be provided.

여기서 상기 제 1강결재(30-1)는 교각(10)을 구성하는 철근의 배근 과정에서 선택된 철근과 결속됨으로써 위치의 고정과 함께 교각(10)과 일체 거동할 수 있도록 구성됨이 바람직하다.Here, it is preferable that the first steel payment material 30-1 is configured to be able to move integrally with the pier 10 while fixing the position by being bound with the selected reinforcing bar during the reinforcement process of the reinforcing bar constituting the pier 10.

즉 상기 제 1강결재(30-1)는 상기 교각(10) 내부에 매립되는 웨브(320)가 교축방향을 향하도록 배치되며 이러한 웨브(320)에 하나 이상의 제 1결속홀(330)이 관통 형성되어, 상기 교각(10)을 구성하면서 교축방향으로 내부에 배근되는 보강철근(13) 중 선택된 하나 이상의 보강철근(13)이 각각 관통 및 결속되게 하는 것이다.That is, the first steel settlement material 30-1 is disposed so that the web 320 buried in the pier 10 faces the axle direction, and at least one first binding hole 330 penetrates the web 320 It is formed, while constituting the pier 10, one or more selected of the reinforcement reinforcement bar 13 reinforced inside the bridge axis direction is to penetrate and bind, respectively.

뿐만 아니라 상기 제 1강결재(30-1)는 상기 교각(10)에 매립되는 웨브(320)에 상기 제 1결속홀(330)에 더하여 적어도 하나 이상의 제 1관통홀(340)이 더 구성되게 하여 상기 교각(10)을 구성함에 있어 타설되는 콘크리트가 상기 제 1관통홀(340)을 통해 용이하게 합성되게 할 수 있다.In addition, in addition to the first binding hole 330 in the web 320 embedded in the pier 10, the first steel payment material 30-1 may further include at least one first through hole 340. Thus, in constructing the pier 10, the concrete to be poured can be easily synthesized through the first through hole 340.

한편 본 발명의 다른 실시 예에 따른 제 1강결재(30-2)는 교각(10)의 현장 제작 이후 상부면의 일부를 제거한 후 해당 위치에 정착되도록 설치될 수 있다.Meanwhile, the first steel payment material 30-2 according to another embodiment of the present invention may be installed to be fixed at a corresponding position after removing a part of the upper surface after on-site manufacturing of the pier 10.

도 3b를 참조한 본 실시 예의 제 1강결재(30-2)는 그 형상에 있어서 앞서 실시 예의 제 1강결재(30-1)와 마찬가지로 상부플랜지(300)와 하부플랜지(310) 및 이들을 연결하는 웨브(320)로 구성되는 'I'자 형태를 가질 수 있는 바 도 3b에서 동일한 도면 부호를 부여하였으며 그 상세 설명은 생략한다.In the shape of the first steel payment material 30-2 of this embodiment with reference to FIG. 3B, the upper flange 300 and the lower flange 310 and connecting them are similar in shape to the first steel payment material 30-1 of the previous embodiment. A bar that may have an'I' shape composed of the web 320 is denoted by the same reference numerals in FIG. 3B and a detailed description thereof is omitted.

다만 본 실시 예의 제 1강결재(30-2)는 하부플랜지(310)의 저면에서 연직방향으로 돌출되는 복수의 전단연결재(350)가 장착되어 있다.However, the first steel payment material 30-2 of the present embodiment is equipped with a plurality of shear connectors 350 protruding in a vertical direction from the bottom surface of the lower flange 310.

상기 전단연결재(350)는 기시공된 교각(10)의 상부면에 정착함에 있어 접착력을 강화하기 위한 부재로 교각(10) 상부면의 일부가 제거된 영역에 모르타르 등의 덧 씌움을 통해 매립되어 제 1강결재(30-2)가 고정될 수 있도록 한다.The shear connector 350 is a member for reinforcing adhesive strength when fixing the upper surface of the previously constructed pier 10, and is buried in an area from which a part of the upper surface of the pier 10 has been removed through an overcoat such as mortar. The first steel payment (30-2) is to be fixed.

또한 본 실시 예의 제 1강결재(30-2)는 상기 전단연결재(350)가 상기 교각(10)의 상부면에 매립되게 장착됨으로서 상기 상부플랜지(300)가 상기 PC거더(20)를 향하여 교각(10)의 상부면에서 노출되어 안치면이 마련될 수 있으며, 이렇게 노출된 안치면 즉 상부플랜지(300)에는 적어도 하나 이상의 제 1결속홀(330)이 관통 형성되어 있다.In addition, in the first steel settlement material 30-2 of this embodiment, the shear connector 350 is mounted to be embedded in the upper surface of the pier 10, so that the upper flange 300 faces the PC girder 20 A seating surface may be provided by being exposed from the upper surface of (10), and at least one first binding hole 330 is formed through the exposed seating surface, that is, the upper flange 300.

여기서 상기 전단연결재(350)는 통상 전단키로 활용되는 스터드볼트(stud bolt)로 구성될 수 있다.Here, the shear connector 350 may be composed of a stud bolt that is commonly used as a shear key.

앞서 두 가지 실시 예에서 제시되는 제 1체결홀(301)은 슬릿홀 구조를 가짐으로써 체결홀 간 오차에 유동적으로 대응하여 볼트 체결이 가능하다.The first fastening hole 301 presented in the above two embodiments has a slit hole structure, so that it is possible to fasten bolts in response to errors between fastening holes flexibly.

이때 상기 제 1체결홀(301)은 교축의 직각 방향으로 긴 길이를 갖도록 구성되는 것이 바람직하다.At this time, the first fastening hole 301 is preferably configured to have a long length in the direction perpendicular to the bridge axis.

한편 교량 설계에서 있어 종단 경사가 크거나 PC거더(20)에 프리스트레스(prestress)가 도입되는 경우, 구조적으로 PC거더(20)에 발생하는 솟음에 의한 단부의 회전에 따른 처짐각이 발생할 수 있는 바, 본 발명의 체결구조에 있어 상기 제 1강결재(30)는 도 5에 도시된 바와 같이 상기 상부플랜지(300)가 상기 제 2강결재(40)에 안치되는 상기 PC거더(20)의 경사도에 대응하여 상기 웨브(320)로부터 선택적으로 각도 조정이 가능할 수 있도록 구성됨이 바람직하다.On the other hand, in the bridge design, when the longitudinal slope is large or a prestress is introduced into the PC girder 20, structurally, a deflection angle may occur due to the rotation of the end due to the rise occurring in the PC girder 20. , In the fastening structure of the present invention, the first steel plate 30 is the slope of the PC girder 20 in which the upper flange 300 is placed in the second steel plate 40 as shown in FIG. 5 In response to the web 320, it is preferable to be configured to enable selective angle adjustment.

예를 들면 상기 제 1강결재(30)의 상부플랜지(300)는 기설계된 종단 경사에 대응하여 상기 상부플랜지(300)의 각도가 사전 결정된 상태에서 제작되는 것이거나, 또는 PC거더(20)의 안치 과정에서 PC거더(20)의 솟음 정도를 파악하고 현장에서 직접 상기 상부플랜지(300)를 가공하여 그 각도를 조정하는 것일 수 있다.For example, the upper flange 300 of the first steel payment material 30 is manufactured in a state in which the angle of the upper flange 300 is predetermined in response to a pre-designed longitudinal slope, or the PC girder 20 It may be to grasp the degree of rising of the PC girder 20 in the process of placing and adjust the angle by directly processing the upper flange 300 in the field.

이와 같은 각도 조정은 상기 상부플랜지(300)의 각도를 조정하는 방법 외에도 GAP PLATE를 활용하여 우각부의 고장력 볼트(50) 이음을 현장에서 원활하게 체결할 수도 있다.In addition to the method of adjusting the angle of the upper flange 300, such an angle adjustment may smoothly fasten the joint of the high-tension bolt 50 of the right leg portion in the field by using a GAP PLATE.

한편 본 발명의 일 실시 예에 따른 상기 제 2강결재(40)는 도 2에 도시된 바와 같이 수평판(400)과 상기 수평판(400)의 상부면에 길이방향을 따라 수직되게 연결되는 수직판(410)으로 구성되는 'ㅗ'자 형태의 강재일 수 있다.Meanwhile, as shown in FIG. 2, the second steel payment material 40 according to an embodiment of the present invention is vertically connected to the horizontal plate 400 and the upper surface of the horizontal plate 400 in the longitudinal direction. It may be a'ㅗ' shaped steel made of a direct plate 410.

그리고 상기 제 2강결재(40)는 상기 PC거더(20)의 단면폭 방향으로 PC거더(20)의 하부면에 매립되고, 한 쌍의 제 1강결재(30) 간 이격 거리에 대응하여 양단이 각각 매립 위치로부터 연장 및 노출될 수 있으며, 양단에서 각각 노출되는 수평판(400)에 체결면이 마련되면서 상기 제 1체결홀(301)에 각각 대면하는 위치에는 제 2체결홀(401)이 관통 형성되어 있다. And the second steel payment material 40 is buried in the lower surface of the PC girder 20 in the cross-sectional width direction of the PC girder 20, the two ends corresponding to the separation distance between the pair of first steel payment materials 30 Each can be extended and exposed from the buried position, and a second fastening hole 401 penetrates at a position facing each of the first fastening hole 301 while a fastening surface is provided on the horizontal plate 400 exposed at both ends. Is formed.

또한 상기 제 2강결재(40)는 상기 PC거더(20) 내부에 매립되는 수평판(400)에 일정 간격을 따라 상기 수직판(410)과 직각되게 장착되는 복수의 보강판(420)을 더 포함하는 바, 이러한 보강판(420)은 상기 제 2강결재(40)가 PC거더(20)를 구성하는 콘크리트에 일체화될 수 있도록 하는 전단키로서의 기능과 함께 PC거더(20)의 회전모멘트에 저항하는 보강재로서의 기능을 병행하게 된다.In addition, the second steel payment material 40 further includes a plurality of reinforcing plates 420 mounted perpendicularly to the vertical plate 410 along a predetermined interval on the horizontal plate 400 buried in the PC girder 20 Included, such a reinforcing plate 420 is resistant to the rotational moment of the PC girder 20 along with the function as a shear key that enables the second steel payment material 40 to be integrated with the concrete constituting the PC girder 20 It functions as a reinforcing material.

여기서 상기 제 2강결재(40)는 PC거더(20)를 구성하는 철근의 배근 과정에서 선택된 전단 철근과 결속됨으로써 PC거더(20)에 견고하게 매립될 수 있도록 구성됨이 바람직하다.Here, the second steel payment material 40 is preferably configured to be firmly embedded in the PC girder 20 by binding with the shear reinforcing bar selected in the reinforcing process of the reinforcing bar constituting the PC girder 20.

즉 상기 제 2강결재(40)는 도 2에 도시된 바와 같이 상기 PC거더(20) 내부에 매립되는 복수의 보강판(420)이 교축의 직각방향으로 배치되어 있으며, 각 보강판(420)에 동일 선상으로 하나 이상의 제 2결속홀(430)이 관통 형성되어, 상기 PC거더(20)를 구성하면서 교축의 직각방향으로 내부에 배근되는 전단철근(22) 중 선택된 하나 이상의 전단철근(22)이 각각 관통 및 결속되게 하는 것이다.That is, the second steel payment material 40 is a plurality of reinforcing plates 420 buried in the PC girder 20 as shown in FIG. 2 are disposed in a direction perpendicular to the bridge shaft, and each reinforcing plate 420 In the same line, at least one second binding hole 430 is formed through, forming the PC girder 20, and at least one shear reinforcing bar 22 selected from among shear reinforcing bars 22 that are laid inside in a perpendicular direction of the bridge shaft. Each of these is to penetrate and bind.

이때 상기 PC거더(20)의 전단철근은 스트럽 철근일 수 있다.At this time, the shear reinforcement of the PC girder 20 may be a stirrup reinforcement.

상기 제 2강결재(40)는 상기 제 2결속홀(430)에 더하여 상기 PC거더(20)의 내부에 매립되는 수직판(410)에 적어도 하나 이상의 제 2관통홀(440)이 더 구성되게 하여 상기 PC거더(20)를 구성함에 있어 타설되는 콘트리트가 상기 제 2관통홀(440)을 통해 용이하게 합성되게 할 수 있다.In addition to the second binding hole 430, the second steel payment material 40 may further include at least one second through hole 440 in the vertical plate 410 buried in the PC girder 20. Thus, in configuring the PC girder 20, the concrete to be poured may be easily synthesized through the second through hole 440.

그리고 상기 제 2강결재(40)의 제 2체결홀(401) 역시 슬릿홀 구조를 가짐으로써 체결홀 간 오차에 유동적으로 대응하여 볼트 체결이 가능하며, 이때 상기 제 2체결홀(401)은 제 1체결홀(301)과 직교하는 방향 즉 교축 방향으로 긴 길이를 갖도록 구성되고, 슬릿홀 구조를 갖는 상기 제 1강결재(30)와 연계되어 좌우 및 상하로 체결 범위가 더욱 확대될 수 있도록 한다.In addition, the second fastening hole 401 of the second steel fastening material 40 also has a slit hole structure, so that the bolt can be fastened flexibly to the error between fastening holes. At this time, the second fastening hole 401 is 1 It is configured to have a long length in the direction perpendicular to the fastening hole 301, that is, in the cross-axis direction, and is connected with the first steel fastener 30 having a slit hole structure so that the fastening range can be further expanded left and right and up and down. .

이처럼 본 발명의 체결구조에 의하면, 합성형 라멘교에 있어 PC거더(20)와 교각(10) 간 우각부에서 초기 PC거더(20)의 하중에 의한 안정적인 가설이 가능하게 되며, PC거더(20)의 안치가 보다 용이하도록 하여 공종을 간단하게 하면서도 PC거더(20)를 서로 구조적으로 일체화시켜 상부 슬래브 시공에 따른 콘크리트 타설의 충격 등으로 인하여 위치 변동을 방지할 수 있어 보다 효과적이고 경제적으로 합성형 라멘교를 강결 및 시공할 수 있게 된다.As described above, according to the fastening structure of the present invention, in the composite ramen bridge, it is possible to stably hypothesize by the load of the initial PC girder 20 at the right leg portion between the PC girder 20 and the pier 10, and the PC girder 20 ) To be placed more easily to simplify the work type, but by structurally uniting the PC girders (20) to each other, it is possible to prevent the position change due to the impact of concrete placement caused by the upper slab construction, so it is more effective and economically synthesized. Ramen bridge can be strengthened and constructed.

이하 도 6a 내지 도 6d를 참조하여 본 발명의 시공방법을 설명한다.Hereinafter, a construction method of the present invention will be described with reference to FIGS. 6A to 6D.

먼저 상술한 제 1강결재(30)가 교각(10)의 상부면에 마련되도록 시공하는 단계를 갖는다.First, a step of constructing the first steel payment material 30 described above is provided on the upper surface of the pier 10.

이 과정에서는 상기 본 발명의 체결구조에서 설명한 바와 같이 제 1강결재(30)의 설치는 교각(10)의 시공 과정 중 함께 설치되는 것이거나, 교각(10)의 시공 이후 상부면에 정착되도록 설치되는 것 중 어느 하나일 수 있다.In this process, as described in the fastening structure of the present invention, the installation of the first steel payment material 30 is either installed together during the construction process of the pier 10, or is installed to be settled on the upper surface after the construction of the pier 10 It can be any one of being.

또한 일반적인 합성형 라멘교에서는 상기 교각(10)과 PC거더(20) 간의 우각부를 강결시킨 후 철근의 배근과 콘크리트 타설을 통해 상부 슬래브, 헌치, 벽체 등을 시공하게 되는데, 상기 교각(10)의 시공 과정에서 복수의 수평전단철근(11)의 노출과 함께 내부철근으로부터 커플러 등에 의하여 연결된 강결철근(12)이 상부면에 돌출되도록 시공하여 향후 콘크리트 타설을 통해 PC거더(20)와 일체화될 수 있도록 한다.In addition, in a general composite ramen bridge, the right leg between the pier 10 and the PC girder 20 is stiffened, and then the upper slab, heonchi, and wall are constructed through reinforcement of reinforcing bars and concrete pouring. During the construction process, the steel-gathered reinforcing bar 12 connected by a coupler, etc. from the internal reinforcing bar together with the exposure of the plurality of horizontal shearing reinforcing bars 11 is constructed so that it protrudes from the upper surface so that it can be integrated with the PC girder 20 through concrete pouring in the future. do.

여기서 상기 교각(10)뿐 아니라 상기 PC거더(20) 역시 그 상부면에 복수의 수평전단철근(21)이 노출되게 사전 시공되어 콘크리트 타설에 따른 접착력이 상기 교각(10)과 동일하게 작용할 수 있도록 한다.Here, not only the piers 10 but also the PC girders 20 are pre-installed so that a plurality of horizontal shearing reinforcing bars 21 are exposed on the upper surface thereof, so that the adhesive force according to concrete pouring can act the same as the piers 10. do.

그리고 도 6b에 도시된 바와 같이 상술한 제 2강결재(40)가 하부면에 사전 제작을 통해 마련된 PC거더(20)를 상기 제 1강결재(30)에 제 2강결재(40)가 대면하도록 안치시키는 단계를 수행하게 되며, 이후 도 6c에 도시된 바와 같이 상기 제 1강결재(30)와 제 2강결재(40)를 고장력 볼트(50) 등을 통해 체결시켜 교각(10)과 PC거더(20) 간의 우각부를 강결시키는 단계를 수행함으로써 합성형 라멘교의 가설 과정 중에 외력에 의한 전도가 방지될 수 있도록 한다.And as shown in Fig. 6b, the second steel payment material 40 faces the PC girder 20 provided through pre-production on the lower surface of the first steel payment material 30 and the second steel payment material 40 Then, as shown in Fig. 6c, the first steel payment material 30 and the second steel payment material 40 are fastened through a high-tension bolt 50, and the pier 10 and the PC By performing the step of tightening the right leg portions between the girders 20, conduction due to external force can be prevented during the construction process of the composite ramen bridge.

마지막으로 강결된 우각부와 PC거더(20)의 상부에 콘크리트를 타설하여 상기 교각(10)에 PC거더(20)를 합성 시공하는 단계를 수행한다.Finally, a step of synthesizing the PC girder 20 to the pier 10 by pouring concrete on the upper part of the hardened right leg and the PC girder 20 is performed.

이 과정에서는 콘크리트의 타설 이전에 거푸집의 시공과 철근의 배근 및 연결 등이 요구되는 바, 이는 공지기술을 통해 다양하게 실시될 수 있으므로 구체적인 설명은 생략한다.In this process, the construction of the formwork and the reinforcement and connection of reinforcing bars are required before the concrete is poured, and since this can be variously performed through known techniques, a detailed description will be omitted.

다만, 앞서 설명한 바와 같이 상기 교각(10)은 그 제작 과정에서 내부철근으로부터 커플러 등에 의하여 연결된 강결철근(12)이 상부면에 돌출되도록 시공되어 있으며, 이를 PC거더(20) 상부로 절곡되도록 하여 PC거더(20) 상부와 교각(10)의 상부에 타설되는 슬래브 콘크리트에 의하여 PC거더(20)와 교각(10)이 상호 강결되게 시공할 수 있음은 당연하다.However, as described above, the pier 10 is constructed so that the steel-gathered reinforcing bar 12 connected by a coupler or the like from the internal reinforcing bar protrudes from the inner reinforcing bar during the manufacturing process, and it is bent to the top of the PC girder 20 It is natural that the PC girder 20 and the pier 10 can be constructed to be mutually rigid by the slab concrete poured on the upper part of the girder 20 and the upper part of the pier 10.

이상 설명한 내용을 통해 당업자라면 본 발명의 기술사상을 일탈하지 아니하는 범위에서 다양한 변경 및 수정 가능함을 알 수 있을 것이다. 따라서, 본 발명의 기술적 범위는 명세서의 상세한 설명에 기재된 내용으로 한정되는 것이 아니라 특허청구범위에 의해 정해져야만 할 것이다.It will be appreciated by those skilled in the art through the above description that various changes and modifications can be made without departing from the technical idea of the present invention. Therefore, the technical scope of the present invention is not limited to the contents described in the detailed description of the specification, but should be determined by the claims.

10 : 교각(교대) 20 : PC거더
30 : 제 1강결재 40 : 제 2강결재
50 : 고장력 볼트
10: pier (alternation) 20: PC girder
30: 1st strong payment 40: 2nd strong approval
50: high tension bolt

Claims (13)

이격된 한 쌍의 교각과 상기 한 쌍의 교각 상부에 안치되는 PC거더 간 우각부를 강결시키기 위한 합성형 라멘교의 체결구조에 있어서,
한 쌍이 상기 PC거더의 단면폭보다 상대적으로 긴 길이를 갖도록 이격되며 일부가 상기 교각에 매입되면서 상기 교각의 상부면에서 상기 PC거더를 향하여 안치면이 마련되도록 설치되는 제 1강결재; 및
상기 PC거더의 단면폭 방향으로 매립되고 양단에서 상기 제 1강결재에 대면하도록 각각 연장되어 상기 제 1강결재에 안치되는 체결면이 마련되도록 설치되며 가설 과정에서 상기 제 1강결재와 상호 체결되는 제 2강결재;를 포함하되,
상기 제 1강결재는,
상부플랜지와 하부플랜지 및 이들을 연결하는 웨브로 구성되는 'I'자 형태를 가지고, 상부플랜지가 상기 PC거더를 향하여 교각의 상부면에서 노출되어 안치면이 마련되면서 하나 이상의 제 1체결홀이 관통 형성되며,
상기 제 2강결재는,
수평판과 상기 수평판의 상부면에 길이방향을 따라 수직되게 연결되는 수직판으로 구성되는 'ㅗ'자 형태를 가지고, 상기 PC거더의 단면폭 방향으로 PC거더의 하부면에 매립되며, 한 쌍의 제 1강결재 간 이격 거리에 대응하여 양단이 각각 매립 위치로부터 연장 및 노출되어 각 수평판에 체결면이 마련되면서 상기 제 1체결홀에 각각 대면하는 위치에 제 2체결홀이 관통 형성되고,
상기 PC거더 내부에 매립되는 수평판에 일정 간격을 따라 상기 수직판과 직각되게 장착되는 복수의 보강판이 구성되고, 상기 PC거더 내부에 매립되는 각 보강판에 동일 선상으로 하나 이상의 제 2결속홀이 관통 형성되어 상기 PC거더를 구성하기 위하여 내부에 교축의 직각방향으로 배근되는 스트럽철근 중 선택된 하나 이상의 스트럽철근이 각각 상기 제 2결속홀에 관통 및 결속되며,
상기 PC거더의 내부에 매립되는 수직판에 하나 이상의 제 2관통홀이 관통 형성되어 상기 PC거더를 구성함에 있어 타설되는 콘크리트가 상기 제 2관통홀을 통해 합성되게 하는 것을 특징으로 하는 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조.
In the fastening structure of a composite ramen bridge for tightening a right leg portion between a pair of spaced piers and a PC girder placed on the top of the pair of piers,
A first steel payment material that is spaced apart so that a pair has a length relatively longer than the cross-sectional width of the PC girder, and is partially embedded in the pier to provide a seating surface from the upper surface of the pier toward the PC girder; And
The PC girder is buried in the cross-sectional width direction and extended to face the first steel payment material at both ends, and is installed to provide a fastening surface placed on the first steel payment material, and is mutually fastened with the first steel payment material during the construction process. 2 strong approval; including,
The first strong payment,
It has an'I' shape consisting of an upper flange, a lower flange, and a web connecting them, and the upper flange is exposed from the upper surface of the pier toward the PC girder to provide a seating surface to form one or more first fastening holes through. And
The second strong payment,
It has a'ㅗ' shape consisting of a horizontal plate and a vertical plate vertically connected in the longitudinal direction to the upper surface of the horizontal plate, and is buried in the lower surface of the PC girder in the cross-sectional width direction of the PC girder. In response to the separation distance between the first steel fasteners, both ends are respectively extended and exposed from the buried position to provide a fastening surface on each horizontal plate, and a second fastening hole is formed through each of the positions facing the first fastening hole,
A plurality of reinforcing plates mounted to be perpendicular to the vertical plate at regular intervals on a horizontal plate buried inside the PC girder, and at least one second binding hole in the same line in each reinforcing plate buried in the PC girder One or more stirrup reinforcing bars selected from among stirrup reinforcing bars that are formed through and reinforced in a direction perpendicular to the bridge shaft to constitute the PC girder are respectively penetrated and bound through the second binding holes,
A steel bracket for fall prevention, characterized in that at least one second through hole is formed through the vertical plate buried in the inside of the PC girder so that the concrete to be poured in the PC girder is synthesized through the second through hole The fastening structure of the composite ramen bridge using
삭제delete 제 1항에 있어서,
상기 제 1강결재는,
상기 하부플랜지와 웨브의 일부가 상기 교각에 매립되며, 상부플랜지가 상기 PC거더를 향하여 교각의 상부면에서 노출되어 안치면이 마련되면서 하나 이상의 제 1체결홀이 관통 형성되는 것을 특징으로 하는 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조.
The method of claim 1,
The first strong payment,
Part of the lower flange and the web are buried in the pier, and the upper flange is exposed from the upper surface of the pier toward the PC girder to provide a seating surface, and at least one first fastening hole is formed through it. The fastening structure of a composite ramen bridge using a steel bracket.
제 3항에 있어서,
상기 제 1강결재는,
상기 교각 내부에 매립되는 웨브에 하나 이상 관통 형성되어 상기 교각을 구성하는 보강철근 중 선택된 하나 이상의 보강철근이 각각 관통 및 결속되게 하는 하나 이상의 제 1결속홀을 더 포함하는 것을 특징으로 하는 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조.
The method of claim 3,
The first strong payment,
The steel material for fall prevention, characterized in that it further comprises at least one first binding hole formed through at least one of the webs buried in the pier to allow at least one selected reinforcing bar to pass through and bind each of the reinforcing bars constituting the pier Synthetic ramen bridge fastening structure using brackets.
제 3항에 있어서,
상기 제 1강결재는,
상기 교각에 매립되는 웨브에 관통 형성되어 상기 교각을 구성하는 콘크리트가 합성되게 하는 하나 이상의 제 1관통홀을 더 포함하는 것을 특징으로 하는 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조.
The method of claim 3,
The first strong payment,
The fastening structure of a composite ramen bridge using a steel bracket for fall prevention, characterized in that it further comprises at least one first through hole formed through the web buried in the pier to allow the concrete constituting the pier to be synthesized.
제 1항에 있어서,
상기 제 1강결재는,
상기 하부플랜지의 저면에 복수의 전단연결재가 구비되어 상기 전단연결재를 통해 상기 교각에 매립되게 장착되며, 상부플랜지가 상기 PC거더를 향하여 교각의 상부면에서 노출되어 안치면이 마련되면서 하나 이상의 제 1결속홀이 관통 형성되는 것을 특징으로 하는 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조.
The method of claim 1,
The first strong payment,
A plurality of shear connectors are provided on the bottom of the lower flange and mounted to be embedded in the pier through the shear connector, and the upper flange is exposed from the upper surface of the pier toward the PC girder to provide a seating surface. A fastening structure of a composite ramen bridge using a steel bracket for preventing fall, characterized in that a binding hole is formed through it.
제 1항에 있어서,
상기 제 1체결홀은,
교축의 직각 방향으로 긴 길이를 갖도록 구성되는 것을 특징으로 하는 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조.
The method of claim 1,
The first fastening hole,
A fastening structure of a composite ramen bridge using a steel bracket for preventing fall, characterized in that it is configured to have a long length in a direction perpendicular to the bridge shaft.
제 1항에 있어서,
상기 상부플랜지는,
상기 제 2강결재에 안치되는 상기 PC거더의 경사도에 대응하여 상기 웨브로부터 각도가 선택적으로 조정되는 것을 특징으로 하는 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조.
The method of claim 1,
The upper flange,
The fastening structure of a composite ramen bridge using a steel bracket for fall prevention, characterized in that the angle from the web is selectively adjusted in response to the inclination of the PC girder placed in the second steel payment material.
삭제delete 삭제delete 삭제delete 제 1항에 있어서,
상기 제 2체결홀은,
교축 방향으로 긴 길이를 갖도록 구성되는 것을 특징으로 하는 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조.
The method of claim 1,
The second fastening hole,
A fastening structure of a composite ramen bridge using a steel bracket for preventing fall, characterized in that it is configured to have a long length in the throttling direction.
a) 상기 제 1항, 제 3항 내지 제 8항, 제 12항 중 어느 한 항의 제 1강결재가 교각의 상부면에 마련되도록 시공하는 단계;
b) 상기 제 1항, 제 3항 내지 제 8항, 제 12항 중 어느 한 항의 제 2강결재가 하부면에 마련된 PC거더를 상기 제 1강결재에 제 2강결재가 대면하도록 안치시키는 단계;
c) 상기 제 1강결재와 제 2강결재를 볼트 체결하여 교각과 PC거더 간의 우각부를 강결시키는 단계; 및
d) 상기 c)단계 강결된 우각부와 PC거더의 상부에 콘크리트를 타설하여 상기 교각에 PC거더를 합성 시공하는 단계;를 포함하는 것을 특징으로 하는 전도방지용 강재브라켓을 이용한 합성형 라멘교의 체결구조를 이용한 합성형 라멘교의 공법.
a) constructing the first steel payment material of any one of claims 1, 3 to 8, and 12 to be provided on the upper surface of the pier;
b) placing the PC girder provided on the lower surface of the second steel approval according to any one of items 1, 3 to 8, and 12 so that the second steel payment material faces the first steel payment material. ;
c) tightening the right leg portion between the pier and the PC girder by bolting the first steel payment material and the second steel payment material; And
d) the step of synthesizing a PC girder on the pier by pouring concrete on the right leg portion and the PC girder strengthened in step c), and the fastening structure of the composite ramen bridge using a steel bracket for fall prevention, comprising: Synthetic ramen bridge method using
KR1020200030142A 2020-03-11 2020-03-11 connection structure of composite rahmen bridge using steel brackets for fall prevention and composite rahmen bridge method using the same KR102200927B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200030142A KR102200927B1 (en) 2020-03-11 2020-03-11 connection structure of composite rahmen bridge using steel brackets for fall prevention and composite rahmen bridge method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200030142A KR102200927B1 (en) 2020-03-11 2020-03-11 connection structure of composite rahmen bridge using steel brackets for fall prevention and composite rahmen bridge method using the same

Publications (1)

Publication Number Publication Date
KR102200927B1 true KR102200927B1 (en) 2021-01-12

Family

ID=74129415

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200030142A KR102200927B1 (en) 2020-03-11 2020-03-11 connection structure of composite rahmen bridge using steel brackets for fall prevention and composite rahmen bridge method using the same

Country Status (1)

Country Link
KR (1) KR102200927B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102433658B1 (en) * 2021-10-06 2022-08-18 (주) 대현이엔씨 Hinge-type Point Connector and Construction method of Composite Frame Bridge

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101580273B1 (en) * 2015-03-19 2015-12-28 에스원건설 주식회사 Apparatus for connecting composite girders and abutments of Rahmen bridge and Rahmen bridge construction method using the same
KR101586320B1 (en) 2015-09-10 2016-01-18 오종훈 Psc girder rahmen bridge and construction method thereof
KR101826915B1 (en) * 2017-05-23 2018-02-07 김영태 Steel composite girder and construction method thereof
KR101861968B1 (en) * 2017-08-11 2018-05-28 오종훈 Rigid-frame bridge

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101580273B1 (en) * 2015-03-19 2015-12-28 에스원건설 주식회사 Apparatus for connecting composite girders and abutments of Rahmen bridge and Rahmen bridge construction method using the same
KR101586320B1 (en) 2015-09-10 2016-01-18 오종훈 Psc girder rahmen bridge and construction method thereof
KR101826915B1 (en) * 2017-05-23 2018-02-07 김영태 Steel composite girder and construction method thereof
KR101861968B1 (en) * 2017-08-11 2018-05-28 오종훈 Rigid-frame bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102433658B1 (en) * 2021-10-06 2022-08-18 (주) 대현이엔씨 Hinge-type Point Connector and Construction method of Composite Frame Bridge

Similar Documents

Publication Publication Date Title
KR101797988B1 (en) Truss through bridge and the construction method thereof
KR101881578B1 (en) Bridge comprising monolithic structure of girder and pier and construction method for the same
KR102597084B1 (en) Steel Ccomposite Rahmen Bridge Structure and its Construction Method
JP2000319816A (en) Rigid connection structure of upper and lower composite members
KR100839439B1 (en) Moment connection structure combining a superstructure with substructure in the prefabricated rahmen bridge and method constructing rahmen bridge with the structure
JP3844743B2 (en) Box girder bridge structure and its construction method
KR102200927B1 (en) connection structure of composite rahmen bridge using steel brackets for fall prevention and composite rahmen bridge method using the same
JP5997010B2 (en) Widening structure of upper edge of bridge pier and widening method of upper edge
JP2003253621A (en) Continuous beam structure for continuing existing simple beam bridge
KR101881580B1 (en) Bridge comprising monolithic structure of girder and pier and construction method for the same
JP3737475B2 (en) Box girder bridge structure and construction method
KR100756517B1 (en) Hollow type composite pier
KR101472027B1 (en) Method of building concrete structure using attachment plates adjoining ends of concrete beam with walls of abutments
JP4901178B2 (en) Steel / concrete composite rigid frame bridge construction method
KR101082765B1 (en) Method of the bridge construction which connects the steel pipe pile of abutment substituion and the precast girder with a fixation
JP2941632B2 (en) Joint structure between floor slab and steel girder in precast concrete slab composite girder bridge
KR102244029B1 (en) Rahmen bridge without abuttment and construction method thereof
JP6536895B2 (en) Concrete wall structure and construction method for reinforced embankment integrated bridge
KR20190007790A (en) Arch Type Bridgr Using Correction Device
JP2006112086A (en) Structure of bridge and method for rebuilding bridge
JP2006307473A (en) Design method for extended floor slab
JP5860723B2 (en) Floor slab bridge using square steel pipe and its construction method.
KR102033052B1 (en) Method for constructing truss bridge support with infilled tube using src girder
JPH108422A (en) Reinforcement structure of bridge pier
KR100499976B1 (en) Prestressed reinforced concrete using prestressed concrete wire and T-shaped steel plate and method for constructing bridge using the same

Legal Events

Date Code Title Description
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant