KR102098187B1 - Precast concrete slab partially of non-composite continuous girder bridge and construction method thereof - Google Patents

Precast concrete slab partially of non-composite continuous girder bridge and construction method thereof Download PDF

Info

Publication number
KR102098187B1
KR102098187B1 KR1020180029843A KR20180029843A KR102098187B1 KR 102098187 B1 KR102098187 B1 KR 102098187B1 KR 1020180029843 A KR1020180029843 A KR 1020180029843A KR 20180029843 A KR20180029843 A KR 20180029843A KR 102098187 B1 KR102098187 B1 KR 102098187B1
Authority
KR
South Korea
Prior art keywords
panel
bridge
girder
slab
synthetic
Prior art date
Application number
KR1020180029843A
Other languages
Korean (ko)
Other versions
KR20180033470A (en
Inventor
연정흠
Original Assignee
인하대학교 산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 인하대학교 산학협력단 filed Critical 인하대학교 산학협력단
Priority to KR1020180029843A priority Critical patent/KR102098187B1/en
Publication of KR20180033470A publication Critical patent/KR20180033470A/en
Application granted granted Critical
Publication of KR102098187B1 publication Critical patent/KR102098187B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Abstract

부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법이 제시된다. 일 실시예에 따른 부분 비합성 연속교량의 조립식 콘크리트 슬래브의 시공방법은, 교량의 거더 상부의 내부 지점에 슬래브의 고정 패널을 설치하는 단계; 상기 고정 패널의 양측에 대칭으로 각각 적어도 하나 이상의 비합성 패널을 설치하는 단계; 및 상기 교량의 거더 상부에서 상기 고정 패널 및 상기 비합성 패널이 설치되지 않은 부분에 복수의 조립식 슬래브들을 설치하는 단계를 포함하여 이루어질 수 있다. A prefabricated concrete slab of partially non-synthetic continuous bridge and its construction method are presented. A method for constructing a prefabricated concrete slab of a partial non-synthetic continuous bridge according to an embodiment includes the steps of installing a fixed panel of a slab at an internal point on the top of a girder of a bridge; Installing at least one non-synthetic panel on each side of the fixed panel symmetrically; And installing a plurality of prefabricated slabs on a portion where the fixed panel and the non-composite panel are not installed on the girder of the bridge.

Description

부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법{PRECAST CONCRETE SLAB PARTIALLY OF NON-COMPOSITE CONTINUOUS GIRDER BRIDGE AND CONSTRUCTION METHOD THEREOF}Prefabricated concrete slab of partial non-synthetic continuous bridge and its construction method {PRECAST CONCRETE SLAB PARTIALLY OF NON-COMPOSITE CONTINUOUS GIRDER BRIDGE AND CONSTRUCTION METHOD THEREOF}

본 발명은 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법에 관한 것으로, 더욱 상세하게는 연속 거더(girder) 교량의 부모멘트가 발생하는 구간에 설치되는 조립(precast) 프리스트레스트(PS) 콘크리트 슬래브를 교축 방향 변형이 자유롭도록 설치하는 시공방법에 관한 것이다.The present invention relates to a prefabricated concrete slab of a partially non-synthetic continuous bridge and a construction method thereof, and more specifically, a precast prestress (PS) concrete installed in a section where a parent moment of the continuous girder bridge occurs. It relates to a construction method of installing the slab so that the deformation in the direction of the shaft is free.

도 1은 종래의 조립식 슬래브와 거더의 합성화 공법을 설명하기 위한 도면이다. 1 is a view for explaining a synthesis method of a conventional prefabricated slab and girder.

도 1을 참조하면, 합성 거더 교량(composite girder bridge)에서 콘크리트 슬래브(slab)는 프리스트레스트(prestressed, PS) 콘크리트 거더(girder)의 전단 연결재(shear connector) 또는 강거더(steel girder)에 용접된 스터드(stud)를 조립식 콘크리트 슬래브(21)의 타설구(22, 23)를 통해 콘크리트를 현장 타설하는 방법으로 거더와 합성단면을 형성한다.Referring to FIG. 1, a concrete slab in a composite girder bridge is welded to a shear connector or steel girder of a prestressed (PS) concrete girder. A girder and a synthetic cross-section are formed by a method of pouring concrete on-site through pour holes 22 and 23 of a prefabricated concrete slab 21.

정모멘트(Positive Moment)가 작용하는 경우, 거더와 슬래브의 합성단면은 개별 단면으로 작용할 때보다 효율적으로 외부하중을 지지할 수 있다. 한편, 비합성화 조립식 슬래브가 적용된 경우에는 시공 및 유지보수를 목적으로 정모멘트 구간의 일반 콘크리트 슬래브에 사용되기 때문에 소규모 거더 교량에만 적용된다. When a positive moment acts, the composite section of the girder and the slab can support the external load more efficiently than when acting as an individual section. On the other hand, when a non-synthetic prefabricated slab is applied, it is applied only to small girder bridges because it is used for general concrete slabs in the positive moment section for construction and maintenance purposes.

연속교량의 내부 지점 주변에 발생하는 부모멘트(Negative Moment)는 합성단면의 슬래브에 균열의 원인이 되는 인장 응력을 발생시킨다. 부모멘트에 의해 인장 응력이 발생하는 콘크리트 슬래브는 합성된 단면 특성에 고려되지 않기 때문에 국토해양부의 도로교설계기준에서는 정모멘트 구간보다 매우 작은 합성단면의 효과를 적용하도록 규정하고 있다.Negative moments that occur around the inner point of the continuous bridge generate tensile stress that causes cracks in the slab of the composite section. The concrete slab, which generates tensile stress due to the parent moment, is not considered in the synthesized section characteristics.

연속교의 부모멘트 구간에서 슬래브의 균열 발생을 방지하기 위해 슬래브에 프리스트레스트(PS) 긴장력(tendon force)을 도입하는 경우에도 슬래브 콘크리트의 크리프(creep)와 건조수축에 의한 장기 압축변형이 거더에 의해 구속되면서 슬래브에 잔류 인장 응력이 발생하고, 슬래브에 도입된 압축 응력의 대부분은 손실된다. 이로 인해 슬래브에 도입된 긴장력은 장기적으로 슬래브 균열 억제의 효과를 기대할 수 없다.Long-term compression deformation due to creep and dry shrinkage of the slab concrete is applied by the girder even when prestress (PS) tendon force is introduced to the slab to prevent cracking of the slab in the parental section of the continuous bridge. As it is constrained, residual tensile stress occurs in the slab, and most of the compressive stress introduced into the slab is lost. Due to this, the tension introduced into the slab cannot expect the effect of slab crack suppression in the long term.

한국공개특허 10-2003-0036823호는 이러한 프리캐스트 바닥판과 프리스트레스트 콘크리트 거더와의연결구조 및 그 연결시공방법에 관한 것으로, 스터드 형식의 개선된 조립식 전단연결재를 이용함으로써 프리캐스트 바닥판과 프리스트레스트 콘크리트 거더를 견고하게 연결하여 구조적으로 일체화시킬 수 있는 기술에 관하여 기재하고 있다. Korean Patent Publication No. 10-2003-0036823 relates to a connection structure between a precast floor plate and a prestressed concrete girder and a method of connecting the same, and by using an improved prefabricated shear connection material of a stud type, the precast floor plate and the prestress It describes a technology that can be structurally integrated by firmly connecting a concrete girder.

한국공개특허 10-2003-0036823호Korean Patent Publication No. 10-2003-0036823

연정흠, 김현진, "콘크리트 장기변형의 내ㆍ외부 구속에 의한 응력 손실률 및 수정계수 평가의 전산구조해석", 한국콘크리트학회 논문집, 제25권, 제4호, 2013, pp. 429~438. Yeon Jeong-Hum, Kim Hyun-Jin, "Computational Structural Analysis of Stress Loss Rate and Correction Factor Evaluation by Internal and External Constraints of Long-term Deformation of Concrete," Journal of the Korea Concrete Institute, Vol. 429-438.

본 발명은 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법에 관하여 기술하며, 보다 구체적으로 연속 거더(girder) 교량의 부모멘트가 발생하는 구간에 설치되는 조립(precast) 프리스트레스트(PS) 콘크리트 슬래브를 교축 방향 변형이 자유롭도록 설치하는 시공방법에 관한 기술을 제공한다. The present invention describes a prefabricated concrete slab of a partial non-synthetic continuous bridge and a construction method thereof, and more specifically, a precast prestress (PS) concrete installed in a section where a parent moment of a continuous girder bridge occurs Provides a technique for a construction method in which a slab is installed to freely deform the axial direction.

또한, 본 발명은 연속교량의 부모멘트 구간에서 프리스트레스트(PS) 긴장력에 의해 프리스트레스트(PS) 콘크리트 슬래브에 도입된 압축 응력을 최대한 유지하여 균열의 발생하지 않도록 하는 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법을 제공하는데 있다. In addition, the present invention prefabricated concrete of a partial non-synthetic continuous bridge to maintain the maximum compressive stress introduced into the prestressed (PS) concrete slab by the prestressed (PS) tension in the parental section of the continuous bridge to prevent cracking It is to provide a slab and its construction method.

일 실시예에 따른 부분 비합성 연속교량의 조립식 콘크리트 슬래브의 시공방법은, 교량의 거더 상부의 내부 지점에 슬래브의 고정 패널을 설치하는 단계; 상기 고정 패널의 양측에 대칭으로 각각 적어도 하나 이상의 비합성 패널을 설치하는 단계; 및 상기 교량의 거더 상부에서 상기 고정 패널 및 상기 비합성 패널이 설치되지 않은 부분에 복수의 조립식 슬래브들을 설치하는 단계를 포함하여 이루어질 수 있다. A method for constructing a prefabricated concrete slab of a partial non-synthetic continuous bridge according to an embodiment includes the steps of installing a fixed panel of a slab at an internal point on the top of a girder of a bridge; Installing at least one non-synthetic panel on each side of the fixed panel symmetrically; And installing a plurality of prefabricated slabs on a portion where the fixed panel and the non-composite panel are not installed on the girder of the bridge.

여기서, 상기 교량의 거더 상부의 내부 지점에 슬래브의 고정 패널을 설치하는 단계는, 부모멘트 구간의 중심인 상기 교량의 거더의 내부 지점에 프리스트레스트(PS) 콘크리트 슬래브의 상기 고정 패널을 설치하는 단계; 및 상기 고정 패널에 구성된 복수의 고정구를 통해 앵커 볼트를 이용하여 상기 고정 패널을 상기 거더에 고정하는 단계를 포함할 수 있다. Here, the step of installing the fixed panel of the slab at the inner point of the upper girder of the bridge, the step of installing the fixed panel of the prestressed (PS) concrete slab at the inner point of the girder of the bridge that is the center of the parent section. ; And fixing the fixing panel to the girder using an anchor bolt through a plurality of fixtures configured on the fixing panel.

또한, 상기 고정 패널의 양측에 대칭으로 각각 적어도 하나 이상의 비합성 패널을 설치하는 단계는, 상기 교량의 부모멘트 구간인 상기 고정 패널의 양측에 대칭으로 프리스트레스트(PS) 콘크리트 슬래브의 상기 비합성 패널을 각각 적어도 하나 이상 설치하는 단계; 및 상기 비합성 패널에 구성된 복수의 긴장재 정착구를 이용하여 긴장력(tendon force)을 도입하는 단계를 포함할 수 있다. In addition, the step of installing at least one non-synthetic panel symmetrically on both sides of the fixed panel, the non-composite panel of the prestressed (PS) concrete slab symmetrically on both sides of the fixed panel, the parent section of the bridge Installing at least one of each; And introducing a tension force using a plurality of tension member anchorages configured in the non-synthetic panel.

그리고, 상기 교량의 거더 상부에서 상기 고정 패널 및 상기 비합성 패널이 설치되지 않은 부분에 복수의 조립식 슬래브들을 설치하는 단계는, 상기 교량의 거더 상부에서 상기 고정 패널 및 상기 비합성 패널이 설치되지 않은 부분인 상기 교량의 정모멘트 구간에 상기 복수의 조립식 슬래브들을 설치하는 단계; 및 상기 복수의 조립식 슬래브들 사이에 형성되는 타설구를 통해 콘크리트의 현장 타설로 상기 복수의 조립식 슬래브들을 합성하고, 신축이음장치를 설치하는 단계를 포함할 수 있다. In addition, the step of installing a plurality of prefabricated slabs in the portion where the fixed panel and the non-composite panel are not installed on the girder of the bridge is the fixed panel and the non-composite panel are not installed on the girder of the bridge. Installing the plurality of prefabricated slabs in the positive moment section of the bridge which is a part; And it may include the step of synthesizing the plurality of prefabricated slabs by pouring the concrete on-site through a pour hole formed between the plurality of prefabricated slabs, and installing a expansion joint.

다른 실시예에 따른 부분 비합성 연속교량의 조립식 콘크리트 슬래브는, 교량의 거더 상부의 내부 지점에 설치되는 슬래브의 고정 패널; 상기 고정 패널의 양측에 대칭으로 각각 적어도 하나 이상 설치되는 비합성 패널; 및 상기 교량의 거더 상부에서 상기 고정 패널 및 상기 비합성 패널이 설치되지 않은 부분에 설치되는 복수의 조립식 슬래브들을 포함하여 이루어질 수 있다. 여기서, 상기 복수의 조립식 슬래브들 사이에는, 타설구가 형성되어 콘크리트의 현장 타설로 상기 복수의 조립식 슬래브들을 합성할 수 있다. The prefabricated concrete slab of a partially non-synthetic continuous bridge according to another embodiment includes a fixed panel of a slab installed at an internal point on the top of a girder of the bridge; At least one non-synthetic panel symmetrically installed on both sides of the fixed panel; And it may be made of a plurality of prefabricated slabs are installed on the fixed panel and the non-synthetic panel is installed in the upper portion of the girder of the bridge. Here, between the plurality of prefabricated slabs, pour holes are formed to synthesize the plurality of prefabricated slabs by in-situ pouring of concrete.

본 발명에 따르면 연속교량의 부모멘트 구간에서 프리스트레스트(PS) 긴장력에 의해 프리스트레스트(PS) 콘크리트 슬래브에 도입된 압축 응력을 최대한 유지하여 균열의 발생하지 않도록 하는 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법을 제공할 수 있다.According to the present invention, the prestressed concrete slab of a partial non-synthetic continuous bridge prevents cracking by maximally maintaining the compressive stress introduced into the prestressed (PS) concrete slab by the prestress (PS) tension in the parental section of the continuous bridge And it can provide a construction method.

또한, 본 발명에 따르면 정모멘트 구간의 합성 효과를 유지하면서도 부모멘트 구간의 프리스트레스트(PS) 슬래브에 긴장력에 의해 도입된 압축 응력이 손실되지 않기 때문에 균열 발생을 제어할 수 있는 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법을 제공할 수 있다. In addition, according to the present invention, a partial non-synthetic continuous bridge capable of controlling crack generation because the compressive stress introduced by the tension force is not lost in the prestress (PS) slab of the parent moment section while maintaining the synthesis effect of the positive moment section. It can provide a prefabricated concrete slab and its construction method.

또한, 본 발명에 따르면 슬래브와 거더의 합성 과정이 없어 시공이 간편할 뿐 아니라, 사용 중 부모멘트 구간의 프리스트레스트(PS) 콘크리트 슬래브의 교체가 가능한 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법을 제공할 수 있다.In addition, according to the present invention, there is no construction process of the slab and the girder, so the construction is not only convenient, but also the prefabricated concrete slab of the non-synthetic continuous bridge and the construction of the prestressed (PS) concrete slab that can be replaced during use Can provide a method.

도 1은 종래의 조립식 슬래브와 거더의 합성화 공법을 설명하기 위한 도면이다.
도 2는 본 발명에 따른 내부 지점에서 프리스트레스트(PS) 슬래브 고정 패널의 설치 및 앵커 볼트 고정 단계를 설명하기 위한 도면이다.
도 3은 본 발명에 따른 부모멘트 구간에서 비합성 프리스트레스트(PS) 슬래브의 설치 및 긴장력의 도입 단계를 설명하기 위한 도면이다.
도 4는 본 발명에 따른 정모멘트 구간에서 합성 슬래브의 설치 및 신축이음장치 설치 단계를 설명하기 위한 도면이다.
도 5는 본 발명에 따른 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법을 나타내는 흐름도이다.
1 is a view for explaining a synthesis method of a conventional prefabricated slab and girder.
2 is a view for explaining the installation of the prestressing (PS) slab fixing panel and anchor bolt fixing step at an internal point according to the present invention.
3 is a view for explaining the steps of the installation of the non-synthetic prestress (PS) slab and the introduction of tension in the parental section according to the present invention.
4 is a view for explaining the steps of installing the synthetic slab and the installation of the expansion joint in the positive moment section according to the present invention.
5 is a flow chart showing a prefabricated concrete slab of a partial non-synthetic continuous bridge and a construction method thereof according to the present invention.

이하, 첨부된 도면을 참조하여 실시예들을 설명한다. 그러나, 기술되는 실시예들은 여러 가지 다른 형태로 변형될 수 있으며, 본 발명의 범위가 이하 설명되는 실시예들에 의하여 한정되는 것은 아니다. 또한, 여러 실시예들은 당해 기술분야에서 평균적인 지식을 가진 자에게 본 발명을 더욱 완전하게 설명하기 위해서 제공되는 것이다. 도면에서 요소들의 형상 및 크기 등은 보다 명확한 설명을 위해 과장될 수 있다.Hereinafter, embodiments will be described with reference to the accompanying drawings. However, the described embodiments may be modified in various other forms, and the scope of the present invention is not limited by the embodiments described below. In addition, various embodiments are provided to more fully describe the present invention to those skilled in the art. The shape and size of elements in the drawings may be exaggerated for a more clear description.

본 발명은 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법에 관한 것으로, 연속 거더(girder) 교량의 부모멘트(Negative Moment)가 발생하는 구간에 설치되는 조립(precast) 프리스트레스트(prestressed, PS) 콘크리트 슬래브(slab)를 교축 방향 변형이 자유롭도록 설치하는 공법에 관한 것이다. 보다 상세하게는, 연속 교량의 내부 지점의 슬래브 패널만 거더에 고정하고, 내부 지점 주변 부모멘트 구간의 조립식 프리스트레스트(PS) 콘크리트 슬래브 패널은 긴장력(tendon force)이 도입된 후 거더와 합성하지 않는 방법으로 크리프와 건조수축에 의한 장기 수축변형을 자유롭도록 하며, 정모멘트(Positive Moment) 구간에는 기존의 방법으로 슬래브와 거더를 합성하는 시공방법을 제공할 수 있다.The present invention relates to a prefabricated concrete slab of a partial non-synthetic continuous bridge and a construction method thereof, which is installed in a section where a negative moment of a continuous girder bridge occurs (precast), PS ) It relates to a method of installing a concrete slab so that the deformation in the direction of the shaft is free. More specifically, only the slab panel of the inner point of the continuous bridge is fixed to the girder, and the prefabricated prestressed concrete slab panel of the parental section around the inner point does not synthesize with the girder after the tendon force is introduced. As a method, long-term contraction deformation due to creep and dry shrinkage can be freed, and a construction method for synthesizing slabs and girders in a conventional manner can be provided in the positive moment section.

한편, 부모멘트가 작용하는 연속교량의 내부 지점에 설치되는 조립식 프리스트레스트(PS) 슬래브에는 긴장력으로 콘크리트 단면에 도입된 압축 응력에 의한 크리프와 콘크리트의 건조수축으로 장기변형이 발생한다. 이 장기변형이 거더에 의해 구속되면 슬래브 단면에 잔류 인장 응력을 발생시키고, 슬래브 콘크리트 단면에 도입된 대부분의 압축 응력이 손실되어서 슬래브 균열의 원인이 된다. On the other hand, a preformed prestress (PS) slab installed at an internal point of a continuous bridge acting as a parental force causes long-term deformation due to creep caused by compressive stress introduced into the concrete section and dry shrinkage of concrete. When this long-term deformation is constrained by the girder, residual tensile stress is generated in the slab section, and most of the compressive stress introduced in the slab concrete section is lost, causing slab cracking.

교량의 콘크리트 슬래브에 균열이 발생하지 않도록 하는 것이 중요한 경우, 슬래브 콘크리트의 장기변형을 자유롭도록 하면 슬래브의 잔류 인장 응력의 발생을 최소화하여, 프리스트레스트(PS) 긴장력에 의해 콘크리트 슬래브에 도입된 압축 응력의 손실을 줄일 수 있다.When it is important to prevent cracks in the concrete slab of the bridge, freeing the long-term deformation of the slab concrete minimizes the occurrence of residual tensile stress in the slab, and compressive stress introduced into the concrete slab by prestress (PS) tension. To reduce the loss.

아래에서는 연속교량의 부모멘트 구간에서 프리스트레스트(PS) 긴장력에 의해 프리스트레스트(PS) 콘크리트 슬래브에 도입된 압축 응력을 최대한 유지하여 균열의 발생하지 않도록 하는 설치공법을 제공한다.The following provides an installation method that prevents cracking by maximally maintaining the compressive stress introduced into the prestressed (PS) concrete slab by the prestressed (PS) tension in the parental section of the continuous bridge.

도 2 내지 도 4는 본 발명의 부분 비합성 연속교량의 조립식 콘크리트 슬래브를 개략적으로 나타내는 도면이다. 2 to 4 are views schematically showing a prefabricated concrete slab of a partially non-synthetic continuous bridge of the present invention.

도 2 내지 도 4를 참조하면, 부분 비합성 연속교량의 조립식 콘크리트 슬래브는 고정 패널(31), 비합성 패널(33) 및 복수의 조립식 슬래브들(21)을 포함하여 이루어질 수 있다. 2 to 4, the partially non-synthetic continuous bridge prefabricated concrete slab may include a fixed panel 31, a non-synthetic panel 33, and a plurality of prefabricated slabs 21.

고정 패널(31)은 교량의 거더(12) 상부의 내부 지점에 설치될 수 있다. 이 때, 거더(12)는 프리스트레스트(PS) 콘크리트 또는 강판(steel plate) 거더일 수 있으며, 복수의 거더(12)가 가로보(13)에 의해 소정 간격 이격되어 설치될 수 있다. The fixed panel 31 may be installed at an internal point above the girder 12 of the bridge. At this time, the girders 12 may be prestressed (PS) concrete or steel plate girders, and a plurality of girders 12 may be installed spaced apart by predetermined distances by the crossbeams 13.

이러한 고정 패널(31)은 부모멘트 구간의 중심인 교량의 거더(12)의 내부 지점에 설치될 수 있다. 이 때, 고정 패널(31)에는 복수의 고정구(32)들이 구성되어 앵커 볼트 등의 고정 장치를 이용하여 고정 패널(31)을 거더(12)에 고정시킬 수 있다. 예컨대, 복수의 고정구(32)들은 홈으로 구성될 수 있으며, 이러한 홈에 앵커 볼트를 이용하여 고정 패널(31)과 거더(12)를 결합 고정시킬 수 있다. The fixing panel 31 may be installed at an internal point of the girder 12 of the bridge that is the center of the parental section. At this time, a plurality of fasteners 32 are configured in the fixing panel 31 to fix the fixing panel 31 to the girder 12 using a fixing device such as an anchor bolt. For example, the plurality of fasteners 32 may be configured as grooves, and the anchor panel 31 and the girder 12 may be fixedly coupled to the grooves using anchor bolts.

비합성 패널(33)은 고정 패널(31)의 양측에 대칭으로 각각 적어도 하나 이상 설치될 수 있다. 이러한 비합성 패널(33)은 교량의 부모멘트 구간인 고정 패널(31)의 양측에 대칭으로 설치될 수 있다. 그리고 비합성 패널(33)에는 복수의 긴장재 정착구(34)가 구성되어 긴장력(tendon force)을 도입할 수 있다. The non-synthetic panel 33 may be installed symmetrically at least on each side of the fixed panel 31, respectively. The non-synthetic panel 33 may be installed symmetrically on both sides of the fixed panel 31, which is a parental section of the bridge. In addition, the non-synthetic panel 33 may include a plurality of tension member anchorages 34 to introduce a tendon force.

복수의 조립식 슬래브들(21)은 교량의 거더(12) 상부에서 고정 패널(31) 및 비합성 패널(33)이 설치되지 않은 부분에 설치될 수 있다. 이러한 복수의 조립식 슬래브들(21)은 거더(12)와 합성되는 조립식 콘크리트 슬래브로, 교량의 거더(12) 상부에서 고정 패널(31) 및 비합성 패널(33)이 설치되지 않은 부분인 교량의 정모멘트 구간에 설치될 수 있다. The plurality of prefabricated slabs 21 may be installed in a portion where the fixed panel 31 and the non-composite panel 33 are not installed on the girder 12 of the bridge. The plurality of prefabricated slabs (21) is a prefabricated concrete slab that is synthesized with a girder (12), a fixed panel 31 and a non-composite panel (33) is not installed on the bridge girders (12) of the bridge It can be installed in the positive moment section.

복수의 조립식 슬래브들(21) 사이에는 타설구(22, 23)가 형성되어 콘크리트의 현장 타설로 복수의 조립식 슬래브들(21)을 합성할 수 있다. 이 때, 타설구(22, 23)는 거더(12)와 합성되기 위한 제1 현장 콘크리트 타설구(22) 및 횡방향 마감과 거더(12)에 합성되기 위한 제2 현장 콘크리트 타설구(23)를 포함할 수 있다. Pour holes 22 and 23 may be formed between the plurality of prefabricated slabs 21 to synthesize a plurality of prefabricated slabs 21 by pouring concrete on-site. At this time, the pour holes 22 and 23 are the first on-site concrete pour holes 22 for synthesis with the girder 12 and the second on-site concrete pour holes 23 for synthesis on the lateral finish and the girder 12. It may include.

그리고, 정모멘트와 부모멘트의 경계에는 신축이음장치(35)를 설치하여 교축 방향 조립식 프리스트레스트(PS) 콘크리트 슬래브의 이동을 흡수시킬 수 있다.In addition, a movable joint 35 is installed at the boundary between the positive moment and the parent moment to absorb the movement of the prefabricated prestressed (PS) concrete slab in the throttling direction.

이와 같이, 프리스트레스트(PS) 콘크리트 슬래브를 거더(12)와 합성하지 않는 경우, 긴장력에 의해 도입된 압축 응력에 의한 크리프와 콘크리트의 건조수축의 장기변형이 자유롭게 되어 콘크리트 슬래브 단면에 잔류 인장 응력이 발생하지 않는다. In this way, when the prestressed (PS) concrete slab is not synthesized with the girder 12, creep and long-term deformation of the dry shrinkage of the concrete due to compressive stress introduced by the tension force are free, and residual tensile stress on the concrete slab cross-section is free. Does not occur.

아래에서 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법을 하나의 예를 들어 보다 구체적으로 설명한다. Hereinafter, a prefabricated concrete slab of a partial non-synthetic continuous bridge and its construction method will be described in more detail with an example.

도 2는 본 발명에 따른 내부 지점에서 프리스트레스트(PS) 슬래브 고정 패널(31)의 설치 및 앵커 볼트 고정 단계를 설명하기 위한 도면이다. 2 is a view for explaining the steps of installation and anchor bolt fixing of the prestressed (PS) slab fixing panel 31 at an internal point according to the present invention.

도 2를 참조하면, 부모멘트 구간의 중심인 내부 지점에 설치되는 슬래브의 고정 패널(31)을 앵커 볼트로 거더(12)에 고정함으로써 장기변형에 의한 조립식 프리스트레스트(PS) 콘크리트 슬래브의 교축 방향 위치 이동을 최소화할 수 있다. 여기서, 부모멘트 구간의 중심인 내부 지점은 교각(11)이 설치되는 부분이 될 수 있다. Referring to Figure 2, by fixing the fixing panel 31 of the slab installed at the inner point, which is the center of the parental section, to the girder 12 with anchor bolts, the axis direction of the prefabricated prestressed (PS) concrete slab by long-term deformation Position movement can be minimized. Here, the inner point that is the center of the parental section may be a portion where the pier 11 is installed.

도 3은 본 발명에 따른 부모멘트 구간에서 비합성 프리스트레스트(PS) 슬래브의 설치 및 긴장력의 도입 단계를 설명하기 위한 도면이다. 3 is a view for explaining the steps of the installation of the non-synthetic prestress (PS) slab and the introduction of the tension in the parental section according to the present invention.

도 3을 참조하면, 내부 지점 양측의 부모멘트 구간에 프리스트레스트(PS) 슬래브(33)를 설치한 후, 긴장력을 도입하여 내부 지점 슬래브의 고정 패널(31)에 고정할 수 있다.Referring to FIG. 3, after the prestress (PS) slab 33 is installed in the parental section on both sides of the inner point, tension can be introduced and fixed to the fixing panel 31 of the inner point slab.

도 4는 본 발명에 따른 정모멘트 구간에서 합성 슬래브의 설치 및 신축이음장치(35) 설치 단계를 설명하기 위한 도면이다. 4 is a view for explaining the steps of installing the synthetic slab and the expansion joint 35 in the positive moment section according to the present invention.

도 4를 참조하면, 긴장력이 도입되지 않는 정모멘트 구간에는 거더(12) 위에 복수의 조립식 슬래브들(21)을 설치한 후 타설구(22, 23)에 현장 콘크리트를 타설하는 기존의 방법으로 복수의 조립식 슬래브들(21)을 거더(12)에 합성시킬 수 있다.Referring to FIG. 4, a plurality of prefabricated slabs 21 are installed on the girder 12 in the positive moment section where tension is not introduced, and then a plurality of existing methods are used to pour concrete on the pour holes 22 and 23. Prefabricated slabs (21) of the can be synthesized on the girder (12).

그리고, 정모멘트와 부모멘트의 경계에는 신축이음장치(35)를 설치하여 교축 방향 조립식 프리스트레스트(PS) 콘크리트 슬래브의 이동을 흡수시킬 수 있다.In addition, a movable joint 35 is installed at the boundary between the positive moment and the parent moment to absorb the movement of the prefabricated prestressed (PS) concrete slab in the throttling direction.

이와 같이, 본 발명에 따른 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법은 연속 거더 교량에서 정모멘트가 발생하는 경간 중심부보다 부모멘트가 발생하는 내부 지점에서 상대적으로 비효율적인 조립식 프리스트레스트(PS) 콘크리트 슬래브의 사용을 개선하기 위한 것이다. 교량의 부모멘트 구간 프리스트레스트(PS) 슬래브의 긴장으로 도입되는 압축 응력은 수축 크리프 변형을 발생시킨다. 그러나 크리프와 건조수축에 의한 장기 수축변형이 거더(12)에 의해 구속되면 슬래브 단면에 발생하는 잔류 인장 응력 때문에 긴장력에 의해 도입된 압축 응력은 급격히 감소하고 슬래브에 균열을 발생시킨다.As described above, the prefabricated concrete slab of the partial non-synthetic continuous bridge according to the present invention and its construction method are relatively inefficient prefabricated prestress (PS) at the inner point where the parent moment occurs than the center of the span where the positive moment occurs in the continuous girder bridge. ) To improve the use of concrete slabs. The compressive stress introduced by the tension of the prestressed (PS) slab in the parental section of the bridge causes shrinkage creep deformation. However, when the long-term shrinkage strain due to creep and dry shrinkage is constrained by the girder 12, the compressive stress introduced by the tension force is rapidly reduced due to the residual tensile stress generated in the slab cross section and causes cracks in the slab.

이에, 본 발명에서는 부모멘트 구간의 조립식 프리스트레스트(PS) 콘크리트 슬래브에 긴장력을 도입한 후 거더(12)와 합성하지 않는 방법으로 교축 방향으로 변형을 자유롭게 하여 슬래브에 잔류 인장 응력이 발생하지 않도록 할 수 있다. 슬래브의 안정을 위해서 내부 지점의 슬래브 패널을 거더(12)에 고정하여 내부지점 양쪽의 장기변형에 의한 슬래브의 이동을 최소가 되도록 할 수 있다. 정모멘트 구간에서 기존의 긴장력이 도입되지 않는 조립식 슬래브는 거더(12)와 합성될 수 있으며, 정모멘트와 부모멘트의 경계에는 신축이음장치(35)를 설치하여 비합성 슬래브의 장기변형에 의한 이동을 흡수할 수 있다. Accordingly, in the present invention, after introducing the tension in the prefabricated prestressed (PS) concrete slab of the parent cement section, the strain is free from deformation in the throttle direction by a method that is not synthesized with the girder 12 so that residual tensile stress does not occur in the slab. You can. In order to stabilize the slab, the slab panel of the inner point can be fixed to the girder 12 to minimize the movement of the slab due to the long-term deformation of both sides of the inner point. The prefabricated slab in which the existing tension is not introduced in the positive moment section can be synthesized with the girder 12, and the expansion joint 35 is installed at the boundary between the positive moment and the parent moment to move due to the long-term deformation of the non-synthetic slab. Can absorb.

따라서, 상기와 같이 부모멘트 구간에서 조립식 프리스트레스트(PS) 콘크리트 슬래브가 거더(12)와 합성되지 않기 때문에 설치 및 교체가 용이하면서도 슬래브에 도입된 압축 응력을 유지시켜 슬래브의 균열 발생을 제어할 수 있다. Therefore, as described above, since the prefabricated prestressed (PS) concrete slab is not synthesized with the girder 12 in the parental section, it is easy to install and replace, while maintaining the compressive stress introduced into the slab to control crack generation of the slab. have.

본 발명에 따른 부분 비합성 연속교량의 조립식 콘크리트 슬래브의 시공방법은 다음의 과정으로 실행될 수 있다.The construction method of the prefabricated concrete slab of the partial non-synthetic continuous bridge according to the present invention can be carried out in the following process.

도 5는 본 발명에 따른 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법을 나타내는 흐름도이다. 5 is a flow chart showing a prefabricated concrete slab of a partial non-synthetic continuous bridge and a construction method thereof according to the present invention.

도 5를 참조하면, 부분 비합성 연속교량의 조립식 콘크리트 슬래브의 시공방법은 교량의 거더(12) 상부의 내부 지점에 슬래브의 고정 패널(31)을 설치하는 단계(510), 고정 패널(31)의 양측에 대칭으로 각각 적어도 하나 이상의 비합성 패널(33)을 설치하는 단계(520) 및 교량의 거더(12) 상부에서 고정 패널(31) 및 비합성 패널(33)이 설치되지 않은 부분에 복수의 조립식 슬래브들(21)을 설치하는 단계(530)를 포함하여 이루어질 수 있다. Referring to Figure 5, the construction method of the prefabricated concrete slab of a partial non-synthetic continuous bridge is a step 510 of installing the fixed panel 31 of the slab at the inner point above the girder 12 of the bridge (510), the fixed panel 31 Step 520 of installing at least one or more non-synthetic panels 33 symmetrically on both sides of the plurality of fixed panels 31 and non-composite panels 33 are not installed on the girder 12 of the bridge. It may be made, including the step 530 of installing the prefabricated slabs (21).

본 발명에 따른 부분 비합성 연속교량의 조립식 콘크리트 슬래브 및 그 시공방법의 각 단계에 대해 보다 구체적으로 설명한다. Each step of the prefabricated concrete slab of the partial non-synthetic continuous bridge according to the present invention and its construction method will be described in more detail.

아래는 조립식 콘크리트 슬래브가 사용되는 연속 거더 교량의 상부구조 시공을 설명하는 것으로, 교량의 거더(12)가 미리 설치되어 있다고 가정하고 그 상부에 설치되는 부분 비합성 연속교량의 조립식 콘크리트 슬래브의 시공방법에 대해 설명한다.The following describes the superstructure construction of a continuous girder bridge in which a prefabricated concrete slab is used, assuming that the girder 12 of the bridge is pre-installed, and a construction method of a partially non-synthetic continuous bridge prefabricated concrete slab installed thereon. Explain.

단계(510)에서, 미리 설치된 교량의 거더(12) 상부의 내부 지점에 슬래브의 고정 패널(31)을 설치할 수 있다. In step 510, a fixed panel 31 of the slab may be installed at an internal point above the girder 12 of the pre-installed bridge.

보다 구체적으로, 부모멘트 구간의 중심인 교량의 거더(12)의 내부 지점에 프리스트레스트(PS) 콘크리트 슬래브의 고정 패널(31)을 설치할 수 있다. 이후, 고정 패널(31)에 구성된 복수의 고정구(32)를 통해 앵커 볼트 또는 스터드(stud)를 이용하여 고정 패널(31)을 거더(12)에 고정할 수 있다. More specifically, the fixed panel 31 of the prestressed (PS) concrete slab may be installed at the inner point of the girder 12 of the bridge that is the center of the parental section. Thereafter, the fixing panel 31 may be fixed to the girder 12 using anchor bolts or studs through a plurality of fixtures 32 configured in the fixing panel 31.

단계(520)에서, 고정 패널(31)의 양측에 대칭으로 각각 적어도 하나 이상의 비합성 패널(33)을 설치할 수 있다. In step 520, at least one non-synthetic panel 33 may be installed symmetrically on both sides of the fixed panel 31, respectively.

보다 구체적으로, 교량의 부모멘트 구간인 고정 패널(31)의 양측에 대칭으로 프리스트레스트(PS) 콘크리트 슬래브의 비합성 패널(33)을 각각 적어도 하나 이상 설치할 수 있다. 이후, 비합성 패널(33)에 구성된 복수의 긴장재 정착구(34)를 이용하여 긴장력(tendon force)을 도입할 수 있다. 즉, 긴장재 정착구(34)를 통해 긴장력을 가하여 비합성 패널(33)에 압축 응력을 도입하고, 비합성 패널(33)을 고정 패널(31)에 연결할 수 있다.More specifically, at least one non-synthetic panel 33 of the prestressed (PS) concrete slab may be installed symmetrically on both sides of the fixed panel 31 which is a parental section of the bridge. Thereafter, a tension force may be introduced using a plurality of tension member anchors 34 configured in the non-synthetic panel 33. That is, a compressive stress may be introduced into the non-synthetic panel 33 by applying a tension force through the tension member anchorage 34, and the non-synthetic panel 33 may be connected to the fixed panel 31.

단계(530)에서, 교량의 거더(12) 상부에서 고정 패널(31) 및 비합성 패널(33)이 설치되지 않은 부분에 복수의 조립식 슬래브들(21)을 설치할 수 있다. In step 530, a plurality of prefabricated slabs 21 may be installed in a portion where the fixed panel 31 and the non-synthetic panel 33 are not installed on the girder 12 of the bridge.

보다 구체적으로, 교량의 거더(12) 상부에서 고정 패널(31) 및 비합성 패널(33)이 설치되지 않은 부분인 교량의 정모멘트 구간에 복수의 조립식 슬래브들(21)을 설치할 수 있다. 여기서, 복수의 조립식 슬래브들(21)은 도 1에서 설명한 기존에 사용되는 조립식 슬래브가 될 수 있다. More specifically, a plurality of prefabricated slabs 21 may be installed in a constant moment section of the bridge, which is a portion where the fixed panel 31 and the non-synthetic panel 33 are not installed above the girder 12 of the bridge. Here, the plurality of prefabricated slabs 21 may be a prefabricated slab used in the prior art illustrated in FIG. 1.

이후, 복수의 조립식 슬래브들(21) 사이에 형성되는 타설구(22, 23)를 통해 콘크리트의 현장 타설로 복수의 조립식 슬래브들(21)을 거더(12)와 합성할 수 있다. 그리고, 복수의 조립식 슬래브들(21)과 합성 슬래브의 경계에 신축이음장치(35)를 설치할 수 있다. Subsequently, a plurality of prefabricated slabs 21 may be synthesized with the girders 12 by in-situ pouring of concrete through pour holes 22 and 23 formed between the plurality of prefabricated slabs 21. Then, the expansion and contraction device 35 may be installed at a boundary between the plurality of prefabricated slabs 21 and the composite slab.

이와 같이, 본 발명에 따르면 부모멘트가 발생하는 연속 거더 교량의 부모멘트 구간에 설치되는 조립식 프리스트레스트(PS) 콘크리트 슬래브는 거더(12)와 합성되지 않고, 정모멘트 구간의 콘크리트 슬래브만 합성됨으로써, 부분 합성 슬래브 연속 거더 교량이 구성되어 기존의 모든 슬래브가 합성되는 연속 거더 교량에 비해 균열이 발생되는 것을 방지할 수 있다. As described above, according to the present invention, the prefabricated prestressed (PS) concrete slab installed in the parental section of the continuous girder bridge where the parental moment occurs is not synthesized with the girder 12, and only the concrete slab of the positive moment section is synthesized, Partially composite slab continuous girder bridges can be constructed to prevent cracking compared to continuous girder bridges where all existing slabs are synthesized.

이에 따라 정모멘트 구간의 합성 효과를 유지하면서도 부모멘트 구간의 프리스트레스트(PS) 슬래브에 긴장력에 의해 도입된 압축 응력이 손실되지 않기 때문에 균열 발생을 제어할 수 있다. 더욱이, 슬래브와 거더(12)의 합성 과정이 없어 시공이 간편하고, 사용 중 부모멘트 구간의 프리스트레스트(PS) 콘크리트 슬래브의 교체가 가능하다. Accordingly, it is possible to control crack generation because the compressive stress introduced by the tension force is not lost to the prestress (PS) slab of the parent moment section while maintaining the synthesis effect of the positive moment section. Moreover, since there is no synthesis process of the slab and the girder 12, construction is easy, and it is possible to replace the prestressed (PS) concrete slab in the parent section during use.

어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다거나 "직접 접속되어" 있다고 언급된 때에는, 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다.When an element is said to be "connected" or "connected" to another component, it is understood that other components may be directly connected to or connected to the other component, but other components may exist in the middle. It should be. On the other hand, when a component is said to be "directly connected" or "directly connected" to another component, it should be understood that no other component exists in the middle.

이상에서, 본 명세서에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 명세서에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.In the above, the terms used herein are only used to describe specific embodiments, and are not intended to limit the present invention. Singular expressions include plural expressions unless the context clearly indicates otherwise. In this specification, terms such as “include” or “have” are intended to indicate that a feature, number, step, operation, component, part, or combination thereof described in the specification exists, and that one or more other features are present. It should be understood that the existence or addition possibilities of fields or numbers, steps, operations, components, parts or combinations thereof are not excluded in advance.

제1, 제2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안 된다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다.Terms such as first and second may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from other components.

또한, 명세서에 기재된 "…부", "…모듈" 등의 용어는 적어도 하나의 기능이나 동작을 처리하는 단위를 의미하며, 이는 하드웨어나 소프트웨어 또는 하드웨어 및 소프트웨어의 결합으로 구현될 수 있다.In addition, terms such as “… unit” and “… module” described in the specification mean a unit that processes at least one function or operation, and may be implemented by hardware or software or a combination of hardware and software.

또한, 각 도면을 참조하여 설명하는 실시예의 구성 요소가 해당 실시예에만 제한적으로 적용되는 것은 아니며, 본 발명의 기술적 사상이 유지되는 범위 내에서 다른 실시예에 포함되도록 구현될 수 있으며, 또한 별도의 설명이 생략될지라도 복수의 실시예가 통합된 하나의 실시예로 다시 구현될 수도 있음은 당연하다.In addition, the components of the embodiments described with reference to the drawings are not limited to those embodiments, and may be implemented to be included in other embodiments within the scope of maintaining the technical spirit of the present invention. Although the description is omitted, it is natural that a plurality of embodiments may be reimplemented as one integrated embodiment.

또한, 첨부 도면을 참조하여 설명함에 있어, 도면 부호에 관계없이 동일한 구성 요소는 동일하거나 관련된 참조 부호를 부여하고 이에 대한 중복되는 설명은 생략하기로 한다. 본 발명을 설명함에 있어서 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명을 생략한다. In addition, in the description with reference to the accompanying drawings, the same components are given the same or related reference numerals irrespective of the reference numerals, and redundant descriptions thereof will be omitted. In the description of the present invention, when it is determined that detailed descriptions of related known technologies may unnecessarily obscure the subject matter of the present invention, detailed descriptions thereof will be omitted.

이상과 같이 실시예들이 비록 한정된 실시예와 도면에 의해 설명되었으나, 해당 기술분야에서 통상의 지식을 가진 자라면 상기의 기재로부터 다양한 수정 및 변형이 가능하다. 예를 들어, 설명된 기술들이 설명된 방법과 다른 순서로 수행되거나, 및/또는 설명된 시스템, 구조, 장치, 회로 등의 구성요소들이 설명된 방법과 다른 형태로 결합 또는 조합되거나, 다른 구성요소 또는 균등물에 의하여 대치되거나 치환되더라도 적절한 결과가 달성될 수 있다.As described above, although the embodiments have been described by a limited embodiment and drawings, those skilled in the art can make various modifications and variations from the above description. For example, the described techniques are performed in a different order than the described method, and / or the components of the described system, structure, device, circuit, etc. are combined or combined in a different form from the described method, or other components Alternatively, even if replaced or substituted by equivalents, appropriate results can be achieved.

그러므로, 다른 구현들, 다른 실시예들 및 특허청구범위와 균등한 것들도 후술하는 특허청구범위의 범위에 속한다.Therefore, other implementations, other embodiments, and equivalents to the claims are also within the scope of the following claims.

11 교각
12 거더
13 가로보
21 복수의 조립식 슬래브들
22, 23 타설구
31 고정 패널
32 고정구
33 비합성 패널
34 긴장재 정착구
35 신축이음장치
11 pier
12 girders
13 Crossbeam
21 Multiple prefabricated slabs
Pour 22, 23
31 fixed panel
32 fixture
33 Non-synthetic panels
34 tension fixture
35 Expansion joint

Claims (5)

교량의 거더(girder) 상부의 내부 지점에 슬래브(slab)의 고정 패널을 설치하는 단계;
상기 고정 패널의 양측에 대칭으로 각각 적어도 하나 이상의 비합성 패널을 설치하는 단계; 및
상기 교량의 거더 상부에서 상기 고정 패널 및 상기 비합성 패널이 설치되지 않은 부분에 복수의 조립식 슬래브들을 설치하는 단계
를 포함하고,
상기 교량의 거더 상부의 내부 지점에 슬래브의 고정 패널을 설치하는 단계는,
부모멘트(Negative Moment) 구간의 중심인 상기 교량의 거더의 내부 지점에 프리스트레스트(prestressed, PS) 콘크리트 슬래브의 상기 고정 패널을 설치하는 단계; 및
상기 고정 패널에 구성된 복수의 고정구를 통해 앵커 볼트를 이용하여 상기 고정 패널을 상기 거더에 고정하는 단계
를 포함하며,
상기 고정 패널의 양측에 대칭으로 각각 적어도 하나 이상의 비합성 패널을 설치하는 단계는,
상기 교량의 부모멘트 구간인 상기 고정 패널의 양측에 대칭으로 프리스트레스트(PS) 콘크리트 슬래브의 상기 비합성 패널을 각각 적어도 하나 이상 설치하는 단계; 및
상기 비합성 패널에 구성된 복수의 긴장재 정착구를 이용하여 긴장력(tendon force)을 도입하는 단계
를 포함하고,
상기 교량의 거더 상부에서 상기 고정 패널 및 상기 비합성 패널이 설치되지 않은 부분에 복수의 조립식 슬래브들을 설치하는 단계는,
상기 교량의 거더 상부에서 상기 고정 패널 및 상기 비합성 패널이 설치되지 않은 부분인 상기 교량의 정모멘트(Positive Moment) 구간에 상기 복수의 조립식 슬래브들을 설치하는 단계; 및
상기 복수의 조립식 슬래브들 사이에 형성되는 타설구를 통해 콘크리트의 현장 타설로 상기 복수의 조립식 슬래브들을 합성하고, 신축이음장치를 설치하는 단계
를 포함하며,
상기 부모멘트 구간에서는 내부 지점의 프리스트레스트(PS) 콘크리트 슬래브의 상기 고정 패널을 상기 교량의 거더에 고정하여 내부 지점 양쪽의 장기변형에 의한 슬래브의 이동을 최소화하고, 프리스트레스트(PS) 콘크리트 슬래브의 상기 비합성 패널에 긴장력이 도입된 후 상기 교량의 거더와 합성하지 않음에 따라 교축 방향으로 변형을 자유롭게 하고, 상기 정모멘트 구간에서는 상기 교량의 거더와 합성하며 상기 정모멘트와 상기 부모멘트의 경계에 상기 신축이음장치를 설치하여 상기 비합성 패널의 장기변형에 의한 이동을 흡수하는 것
을 특징으로 하는, 부분 비합성 연속교량의 조립식 콘크리트 슬래브의 시공방법.
Installing a fixing panel of a slab at an internal point on the upper part of the girder of the bridge;
Installing at least one non-synthetic panel on each side of the fixed panel symmetrically; And
Installing a plurality of prefabricated slabs on a portion where the fixed panel and the non-synthetic panel are not installed on the girder of the bridge.
Including,
The step of installing the fixed panel of the slab at the inner point of the upper girder of the bridge,
Installing the fixing panel of a prestressed (PS) concrete slab at an inner point of the girder of the bridge which is the center of a negative moment section; And
Fixing the fixing panel to the girder using an anchor bolt through a plurality of fixtures configured on the fixing panel.
It includes,
The step of installing at least one non-synthetic panel on each side of the fixed panel symmetrically,
Installing at least one of the non-composite panels of prestressed (PS) concrete slabs symmetrically on both sides of the fixed panel, which is a parental section of the bridge; And
Introducing a tension force by using a plurality of tension member anchorages configured in the non-synthetic panel
Including,
The step of installing a plurality of prefabricated slabs on the fixed panel and the non-composite panel is not installed on the girder of the bridge,
Installing the plurality of prefabricated slabs in a positive moment section of the bridge, which is a portion where the fixed panel and the non-composite panel are not installed on the girder of the bridge; And
Synthesizing the plurality of prefabricated slabs by pouring concrete on-site through pour holes formed between the plurality of prefabricated slabs, and installing a telescopic joint device
It includes,
In the parental section, the fixing panel of the prestressed (PS) concrete slab of the inner point is fixed to the girder of the bridge to minimize the movement of the slab due to long-term deformation of both sides of the inner point, and the prestressed (PS) concrete slab After the tension force is introduced to the non-synthetic panel, it is free to deform in the axis direction as it is not synthesized with the girder of the bridge. By installing the expansion joint device to absorb movement due to the long-term deformation of the non-synthetic panel
Characterized in that, the construction method of the prefabricated concrete slab of a non-synthetic continuous bridge.
삭제delete 삭제delete 삭제delete 교량의 거더(girder) 상부의 내부 지점에 설치되는 슬래브(slab)의 고정 패널;
상기 고정 패널의 양측에 대칭으로 각각 적어도 하나 이상 설치되는 비합성 패널; 및
상기 교량의 거더 상부에서 상기 고정 패널 및 상기 비합성 패널이 설치되지 않은 부분에 설치되는 복수의 조립식 슬래브들
을 포함하고,
프리스트레스트(prestressed, PS) 콘크리트 슬래브의 상기 고정 패널은, 부모멘트(Negative Moment) 구간의 중심인 상기 교량의 거더의 내부 지점에 설치하며, 상기 고정 패널에 구성된 복수의 고정구를 통해 앵커 볼트를 이용하여 상기 고정 패널을 상기 거더에 고정하고,
프리스트레스트(PS) 콘크리트 슬래브의 상기 비합성 패널은, 상기 교량의 부모멘트 구간인 상기 고정 패널의 양측에 대칭으로 각각 적어도 하나 이상 설치하며, 상기 비합성 패널에 구성된 복수의 긴장재 정착구를 이용하여 긴장력(tendon force)을 도입하고,
상기 복수의 조립식 슬래브들은, 상기 교량의 거더 상부에서 상기 고정 패널 및 상기 비합성 패널이 설치되지 않은 부분인 상기 교량의 정모멘트(Positive Moment) 구간에 설치하며, 상기 복수의 조립식 슬래브들 사이에 형성되는 타설구를 통해 콘크리트의 현장 타설로 상기 복수의 조립식 슬래브들을 합성하고, 신축이음장치를 설치하며,
상기 부모멘트 구간에서는 내부 지점의 프리스트레스트(PS) 콘크리트 슬래브의 상기 고정 패널을 상기 교량의 거더에 고정하여 내부 지점 양쪽의 장기변형에 의한 슬래브의 이동을 최소화하고, 프리스트레스트(PS) 콘크리트 슬래브의 상기 비합성 패널에 긴장력이 도입된 후 상기 교량의 거더와 합성하지 않음에 따라 교축 방향으로 변형을 자유롭게 하고, 상기 정모멘트 구간에서는 상기 교량의 거더와 합성하며 상기 정모멘트와 상기 부모멘트의 경계에 상기 신축이음장치를 설치하여 상기 비합성 패널의 장기변형에 의한 이동을 흡수하는 것
을 특징으로 하는, 부분 비합성 연속교량의 조립식 콘크리트 슬래브.
A fixed panel of a slab installed at an internal point above the bridge's girder;
At least one non-synthetic panel symmetrically installed on both sides of the fixed panel; And
A plurality of prefabricated slabs installed on a portion where the fixed panel and the non-synthetic panel are not installed on the girder of the bridge
Including,
The fixing panel of a prestressed (PS) concrete slab is installed at an internal point of the girder of the bridge, which is the center of a negative moment section, and uses anchor bolts through a plurality of fixtures configured in the fixing panel. To fix the fixing panel to the girder,
The non-synthetic panel of the prestressed (PS) concrete slab is installed at least one symmetrically on both sides of the fixed panel, which is a parental section of the bridge, and the tension is applied using a plurality of tension member anchorages configured in the non-synthetic panel. (tendon force),
The plurality of prefabricated slabs are installed in the positive moment section of the bridge, which is a portion where the fixed panel and the non-synthetic panel are not installed on the girder of the bridge, and formed between the plurality of prefabricated slabs. Synthesizing the plurality of prefabricated slabs by placing the concrete in place through the pouring pour, and installing a new joint,
In the parental section, the fixing panel of the prestressed (PS) concrete slab of the inner point is fixed to the girder of the bridge to minimize the movement of the slab due to long-term deformation of both sides of the inner point, and the prestressed (PS) concrete slab After the tension force is introduced to the non-synthetic panel, it is free to deform in the axis direction as it is not synthesized with the girder of the bridge, and in the positive moment section, it is synthesized with the girder of the bridge and at the boundary between the positive moment and the parent moment. By installing the expansion joint device to absorb movement due to the long-term deformation of the non-synthetic panel
Prefabricated concrete slab of non-synthetic continuous bridge, characterized by.
KR1020180029843A 2018-03-14 2018-03-14 Precast concrete slab partially of non-composite continuous girder bridge and construction method thereof KR102098187B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180029843A KR102098187B1 (en) 2018-03-14 2018-03-14 Precast concrete slab partially of non-composite continuous girder bridge and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180029843A KR102098187B1 (en) 2018-03-14 2018-03-14 Precast concrete slab partially of non-composite continuous girder bridge and construction method thereof

Publications (2)

Publication Number Publication Date
KR20180033470A KR20180033470A (en) 2018-04-03
KR102098187B1 true KR102098187B1 (en) 2020-04-07

Family

ID=61973326

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180029843A KR102098187B1 (en) 2018-03-14 2018-03-14 Precast concrete slab partially of non-composite continuous girder bridge and construction method thereof

Country Status (1)

Country Link
KR (1) KR102098187B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100720996B1 (en) * 2006-07-18 2007-05-23 삼표이앤씨 주식회사 Continuous bridge construction method using precast slab
KR101043710B1 (en) * 2011-03-10 2011-06-24 브릿지테크놀러지(주) Through bridge construction method by side beam and slab by box structure without lateral prestressing
KR101104298B1 (en) * 2011-01-11 2012-01-11 브릿지테크놀러지(주) Through bridge construction method by side beam and slab by box structure without lateral prestressing
KR101358739B1 (en) * 2012-02-02 2014-02-07 인하대학교 산학협력단 Strengthening Method of a Continuous Bridge by Using Parabolic Tendons on Slab Plane

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE517229C2 (en) 2000-09-25 2002-05-14 Microdrug Ag Continuous dry powder inhaler
KR20020082966A (en) * 2001-04-24 2002-11-01 손석환 The construction method and device for slab panel which can instal psc bridge beam
KR100535157B1 (en) * 2003-06-09 2005-12-07 (주)대우건설 Structures and Methods for Connection between Precast Decks and Prestressed Concrete Girders

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100720996B1 (en) * 2006-07-18 2007-05-23 삼표이앤씨 주식회사 Continuous bridge construction method using precast slab
KR101104298B1 (en) * 2011-01-11 2012-01-11 브릿지테크놀러지(주) Through bridge construction method by side beam and slab by box structure without lateral prestressing
KR101043710B1 (en) * 2011-03-10 2011-06-24 브릿지테크놀러지(주) Through bridge construction method by side beam and slab by box structure without lateral prestressing
KR101358739B1 (en) * 2012-02-02 2014-02-07 인하대학교 산학협력단 Strengthening Method of a Continuous Bridge by Using Parabolic Tendons on Slab Plane

Also Published As

Publication number Publication date
KR20180033470A (en) 2018-04-03

Similar Documents

Publication Publication Date Title
US8266751B2 (en) Method to compress prefabricated deck units by tensioning supporting girders
US8316495B2 (en) Method to compress prefabricated deck units with external tensioned structural elements
Loqman et al. Structural behavior of steel-concrete composite beam using bolted shear connectors: A review
KR101251118B1 (en) A manufacturing method of a composite steel box girder using prestressed concrete for a positive moment area of a bridge
KR101013009B1 (en) Apparatus having a girder connection anchor plate and the continuous construction method for a psc girder bridge by using the same apparatus
KR102098187B1 (en) Precast concrete slab partially of non-composite continuous girder bridge and construction method thereof
CN110185179B (en) Assembly type suspended floor self-resetting building structure and construction method
KR101664997B1 (en) Constructing method of precast T type modular composite rahmen bridge and composite rahmen bridge constructed by the same, and construction thing therefor
JP2967874B1 (en) How to build an overhead suspension bridge
KR20130120096A (en) Girder bridge for pre-tention
KR100506572B1 (en) Steel beam constructed prestressing segmental component and construction method thereof
JP2744955B2 (en) Reinforcement structure and reinforcement method of hinge part of gel bar bridge
Qing et al. Experimental study on a dry-assembled precast concrete frame with buckling-restrained braces
JP3877995B2 (en) How to build a string string bridge
KR101001443B1 (en) A continuity method of the composite bridges using reusable anchorage devices
KR100696646B1 (en) External prestressing method of ps concrete composite girder bridge by tendon anchored/supported to prefabricated cross beam
KR100440802B1 (en) Retrofitting Method of Bridges Using Thermal Prestressing Members
Lárusson et al. Prefabricated floor panels composed of fiber reinforced concrete and a steel substructure
KR200439750Y1 (en) Anchor for psc beam
KR100554533B1 (en) Construction method for rhamen type hybrid bridge using the post rigid system
Vinutha et al. Seismic performance of precast slab to beam connection: an overview
KR20230174791A (en) Bridge having static moment reducing device
KR100437258B1 (en) Rehabilitating method of rahman hinged-joint bridge
CN219825835U (en) Concrete character shape combination beam structure
KR200428360Y1 (en) Pre-stressed beam

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant