KR102013387B1 - Geogrid fixing device and the method of constructing block for wall using this - Google Patents

Geogrid fixing device and the method of constructing block for wall using this Download PDF

Info

Publication number
KR102013387B1
KR102013387B1 KR1020170079364A KR20170079364A KR102013387B1 KR 102013387 B1 KR102013387 B1 KR 102013387B1 KR 1020170079364 A KR1020170079364 A KR 1020170079364A KR 20170079364 A KR20170079364 A KR 20170079364A KR 102013387 B1 KR102013387 B1 KR 102013387B1
Authority
KR
South Korea
Prior art keywords
geogrid
drum
receiving groove
retaining wall
reinforcing bar
Prior art date
Application number
KR1020170079364A
Other languages
Korean (ko)
Other versions
KR20190000257A (en
Inventor
고세영
Original Assignee
고세영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 고세영 filed Critical 고세영
Priority to KR1020170079364A priority Critical patent/KR102013387B1/en
Publication of KR20190000257A publication Critical patent/KR20190000257A/en
Application granted granted Critical
Publication of KR102013387B1 publication Critical patent/KR102013387B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

채움 골재의 층 사이에 포설되는 지오그리드를 견고하게 고정할 수 있게 구성되어, 지오그리드의 구속력이 강화되고 보강토 옹벽의 안정성을 확보할 수 있는 지오그리드 고정구 및 이를 이용한 절토 사면의 보강토 옹벽블록 시공방법이 개시된다.The geogrid fixture is configured to firmly fix the geogrid installed between the layers of the filling aggregate, and the geogrid fixture that can strengthen the geogrid restraint and ensure the stability of the retaining wall retaining wall and a method of constructing the reinforcement soil retaining wall block of the cut slope using the same are disclosed. .

Description

지오그리드 고정구 및 이를 이용한 절토 사면의 보강토 옹벽블록 시공방법{GEOGRID FIXING DEVICE AND THE METHOD OF CONSTRUCTING BLOCK FOR WALL USING THIS}Geogrid Fixture and Construction Method of Reinforced Retaining Wall Retaining Wall Block Using Cut Surface {GEOGRID FIXING DEVICE AND THE METHOD OF CONSTRUCTING BLOCK FOR WALL USING THIS}

본 발명은 지오그리드 고정구 및 이를 이용한 절토 사면의 보강토 옹벽블록 시공방법에 관한 것으로, 보다 상세하게는 뒷채움 골재의 층 사이에 포설되는 지오그리드를 견고하게 고정할 수 있게 구성되어, 지오그리드의 구속력이 강화되고 보강토 옹벽의 안정성을 확보할 수 있는 지오그리드 고정구 및 이를 이용한 절토 사면의 보강토 옹벽블록 시공방법에 관한 것이다.The present invention relates to a geogrid fixture and a method for constructing a reinforcement soil retaining wall block construction of a cut slope using the same, and more particularly, it is configured to firmly fix the geogrid installed between the layers of the backfill aggregate, so that the constraint of the geogrid is reinforced and reinforced earth The present invention relates to a geogrid fixture capable of securing the stability of a retaining wall, and a method of constructing a retaining wall retaining wall block of a cut slope using the same.

도로, 철도 등의 사회기간시설 공사를 위해 절토(切土) 또는 성토(盛土)에 의해 지형을 변경시키는 경우가 많다. 절토 또는 성토 지반을 그대로 방치하면 우천, 태풍 등에 의해 노출면의 토양이 외부로 유실되거나 지반이 붕괴될 우려가 크다. 따라서 절토 또는 성토에 의해 형성된 사면에 대해서는 제반 조건에 따라 소일네일링, 어스앵커링, 락볼팅 등의 여러 가지 보강 공법을 선택적으로 적용할 수 있다.For the construction of social infrastructure such as roads and railways, the terrain is often changed by cutting or filling. If the soil is left uncut or filled, the soil on the exposed surface may be lost to the outside or the ground may collapse due to rain or typhoons. Therefore, various reinforcement methods such as soil nailing, earth anchoring, and rock bolting can be selectively applied to slopes formed by cutting or fill.

그리고 상기 사면의 표면도 철근콘크리트 구조, 보강토 옹벽 구조 등으로 보강한다. 이중 보강토 옹벽 구조는 원 경사지반 앞에 옹벽블록, 옹벽패널 등을 쌓아 올리는 것인데, 옹벽블록(옹벽패널 포함, 이하 동일)과 원 경사지반 사이에는 뒷채움 골재를 층층이 채워 다진다. 상기 뒷채움 골재에 의한 성토부의 안정성 강화를 위해서 뒷채움 골재의 층 사이에 지오그리드를 포설하여 뒷채움 골재의 층간 마찰력을 높이는 방법이 통상적으로 많이 이용되고 있다.And the surface of the slope is also reinforced with reinforced concrete structure, reinforced earth retaining wall structure. The double reinforcement retaining wall structure is to stack retaining wall block, retaining wall panel, etc. in front of the original inclined ground, and the backfill aggregate is filled between the retaining wall block (including the retaining wall panel). In order to strengthen the stability of the fill portion by the backfill aggregate, a method of increasing the interlayer friction force of the backfill aggregate is commonly used by laying a geogrid between the layers of the backfill aggregate.

상술한 보강토 옹벽 구조에 관한 종래 기술로는 실용신안등록 제223114호의 "암 절취사면용 옹벽 보강구조"가 개시되어 있다. 상기 종래의 기술은 절취사면이나 뒷길이가 짧은 구간에 지오그리드를 포설할 수 있는 암 절취사면용 옹벽보강구조를 제공하나, 사면에 지오그리드가 고정되어 있지 않기 때문에 옹벽의 안정성이 확보되지 않고, 고정장치가 없어 지오그리드의 구속력이 약한 문제점이 있었다.As a related art related to the above-mentioned reinforced soil retaining wall structure, "Retaining wall reinforcing structure for cancer cut slope" of Utility Model Registration No. 223114 is disclosed. The prior art provides a retaining wall reinforcement structure for a female cut slope that can install a geogrid on a cut slope or a short rear section, but the stability of the retaining wall is not secured because the geogrid is not fixed to the slope. There was a problem that the geogrid's binding force is weak.

본 발명은 상기 문제점을 해결하기 위해 안출된 것으로, 본 발명의 목적은 뒷채움 골재의 층 사이에 포설되는 지오그리드를 견고하게 고정할 수 있게 구성되어, 지오그리드의 구속력이 강화되고 보강토 옹벽의 안정성을 확보할 수 있게 한 지오그리드 고정구 및 이를 이용한 절토 사면의 보강토 옹벽블록 시공방법을 제공하는 것이다.The present invention has been made to solve the above problems, an object of the present invention is to be able to securely fix the geogrid that is installed between the layers of the backfill aggregate, to strengthen the binding force of the geogrid and ensure the stability of the reinforced earth retaining wall It is to provide a geogrid fixture and a method for constructing a reinforced soil retaining wall block of the cut slope using the same.

상기 본 발명의 목적은 절토 사면과 상기 절토 사면에서 일정거리를 두고 적층되는 옹벽블록의 사이에 채움되는 뒷채움 골재의 층 사이에 포설되어 뒷채움 골재의 층간 마찰력을 높이고 옹벽블록의 안정성을 강화하는 지오그리드에 있어서, 상기 절토 사면에 좌우방향으로 소정간격으로 설치되고, 뒷채움 골재의 층에 대응되는 높이에 순차적으로 설치되되, 중앙에 관통공이 형성되는 지압판과, 상기 지압판의 관통공을 관통하여 절토 사면에 삽입 고정되는 락볼트와, 상기 락볼트에 채워져 상기 지압판을 가압하여 절토 사면에 밀착 고정시키는 고정너트와, 중앙에 상기 락볼트에 체결되는 체결공이 형성되어 락볼트를 따라 높이 조절가능하게 체결 결합되는 몸체와, 상기 몸체의 좌우 측면 및 전후 측면으로 돌출 형성되되 내측에 수용홈이 형성된 지지부로 구성되는 철근지지구와, 지오그리드의 후단부가 감겨 결합되고 상기 수용홈에 수용되어 지지부에 지지되는 연결철근과, 중앙에 상기 락볼트에 결합되는 체결부가 형성되어 상기 락볼트에 결합되면 상기 지지부의 수용홈에 수용된 연결철근을 가압하여 연결철근을 수용홈 내에 고정시키는 철근고정구를 포함하여 구성된 것을 특징으로 하는 지오그리드 고정구를 제공함으로써 달성될 수 있다.The object of the present invention is installed between the cut slope and the layer of backfill aggregate filled between the retaining wall blocks stacked at a certain distance from the cut slope to increase the inter-layer friction of the backfill aggregate and to strengthen the stability of the retaining wall block In the cut slope, the cut slope is installed at a predetermined interval in the left and right directions, and is sequentially installed at a height corresponding to the layer of the backfill aggregate, and the pressure plate has a through hole formed at the center thereof, and is inserted into the cut slope through the through hole of the pressure plate. The lock bolt is fixed, the lock nut is filled in the lock bolt and presses the pressure plate to securely close to the cut slope, and a fastening hole is fastened to the lock bolt is formed in the center of the body is fastened to the adjustable adjustable coupling along the lock bolt And, protruding to the left and right side and front and rear side of the body is formed in the receiving groove on the inside Reinforcing bar support consisting of a portion, the rear end of the geogrid is coupled to the reinforcing bar is received in the receiving groove is supported in the receiving groove, and a fastening portion is formed in the center is coupled to the lock bolt is coupled to the lock bolt to accommodate the support It can be achieved by providing a geogrid fixture characterized in that it comprises a reinforcing bar fastening to secure the connecting reinforcement in the receiving groove by pressing the connecting reinforcing bar accommodated in the groove.

또한, 본 발명의 목적은 절토 사면에 뒷채움 골재의 층에 대응되는 높이 맞게 락볼트를 순차적으로 삽입하여 설치하는 락볼트 설치 단계; 상기 락볼트에 지압판을 끼워 절토 사면에 밀착시키고, 고정너트를 락볼트에 체결시켜 지압판을 절토 사면에 고정시키는 지압판 고정 단계; 몸체의 좌우 측면 및 전후 측면으로 수용홈이 형성된 지지구가 돌출 형성되는 철근지지구를 절토 사면의 표면 높이에 맞게 락볼트에 체결 결합시키는 철근지지구 설치 단계; 옹벽을 형성하는 옹벽블록을 지지하기 위한 기초부를 형성하는 기초형성 단계; 상기 기초부에 뒷채움 골재의 층에 대응되는 높이로 옹벽블록을 적층하는 옹벽블록 적층 단계; 상기 옹벽블록과 상기 절토 사면 사이의 공간을 뒷채움 골재으로 메우고 뒷채움 골재의 층을 다지는 성토 단계; 상기 뒷채움 골재의 층 상면에 지오그리드를 포설하되, 상기 지오그리드 전단은 상기 적층되는 옹벽블록의 사이에 끼움 결합하고, 상기 지오그리드의 후단은 연결철근에 감아 결합시킨 다음 연결철근을 철근지지구의 수용홈에 끼움 결합시키게 구성되는 지오그리드 포설 단계; 상기 락볼트에 철근고정구를 체결시켜 철근지지구의 수용홈에 수용된 연결철근을 가압하여 지오그리드의 후단부가 감겨진 연결철근을 수용홈 내에 고정시키는 연결철근 고정 단계를 포함하되, 상기 옹벽블록 적층 단계, 성토 단계, 지오그리드 포설 단계 및 연결철근 고정 단계를 순차적으로 반복 수행함으로써 절토사면에 설정된 높이의 보강토 옹벽블록을 형성하게 구성된 것을 특징으로 하는 절토 사면의 보강토 옹벽블록 시공방법을 제공함으로써 달성될 수 있다.In addition, an object of the present invention is the rock bolt installation step of sequentially inserting the rock bolt to the height corresponding to the layer of the backfill aggregate on the cut slope; Acupressure plate fixing step of attaching the pressure plate to the rock bolts to closely contact the cut slopes, and fastening the fixing nut to the rock bolts to fix the pressure plate to the cut slopes; Reinforcing bar installation step of fastening and coupling the reinforcing bar supporting the support groove is formed in the left and right sides and front and rear sides of the body to the rock bolt according to the surface height of the cut slope; A foundation forming step of forming a foundation for supporting the retaining wall block forming the retaining wall; A retaining wall block stacking step of stacking the retaining wall blocks at a height corresponding to the layer of backfill aggregate on the base portion; Filling step of filling the space between the retaining wall block and the cut slope with a backfill aggregate and a layer of backfill aggregate; Geogrid is installed on the layer upper surface of the backfill aggregate, wherein the front end of the geogrid is sandwiched between the retaining wall blocks to be laminated, and the rear end of the geogrid is wound around the connecting reinforcing bar, and then the connecting reinforcing bar is fitted into the receiving groove of the reinforcing bar. Geogrid laying step configured to engage; And fastening the connecting reinforcing bars accommodated in the receiving grooves of the reinforcing bar by fastening the reinforcing bars to the rock bolts, and fixing the connecting reinforcing bars connected to the rear end of the geogrid in the receiving grooves. It can be achieved by providing a method for constructing a reinforced soil retaining wall block of cut slope, characterized in that to form a reinforcement earth retaining wall block of the height set on the cut slope by sequentially repeating the step, geogrid laying step and connecting reinforcing bar fixing step.

본 발명에 따른 지오그리드 고정구 및 이를 이용한 절토 사면의 보강토 옹벽블록 시공방법은 뒷채움 골재의 층 사이에 포설되는 지오그리드를 견고하게 고정할 수 있게 구성되어, 지오그리드의 구속력이 강화되고 보강토 옹벽의 안정성을 확보할 수 있다는 효과가 있다.Geogrid fixture according to the present invention and reinforcement soil retaining wall block construction method of the cut slope using the same is configured to firmly fix the geogrid installed between the layers of the backfill aggregate, the binding strength of the geogrid is reinforced and to ensure the stability of the reinforced soil retaining wall It can be effective.

도1은 본 발명에 따른 지오그리드 고정구가 적용된 절토 사면의 보강토 옹벽블록 구조를 도시한 도면,
도2는 본 발명에 따른 지오그리드 고정구의 분리사시도,
도3은 본 발명에 따른 지오그리드 고정구가 절토 사면에 설치된 것을 도시한 단면도,
도4 및 5는 본 발명에 따른 지오그리드 고정구의 바람직한 다른 실시예를 설명하기 위한 도면,
도6 및 도7은 본 발명에서 연결철근에 감겨진 지오그리드를 고정하기 위한 고정클립을 설명하기 위한 도면,
도8 내지 도 12는 본 발명에 따른 절토 사면의 보강토 옹벽블록 시공방법을 설명하기 위한 도면.
1 is a view showing a reinforced soil retaining wall block structure of a cut slope to which a geogrid fixture according to the present invention is applied;
2 is an exploded perspective view of a geogrid fixture according to the present invention;
3 is a cross-sectional view showing that the geogrid fixture according to the present invention is installed on the cut slope,
4 and 5 are views for explaining another preferred embodiment of the geogrid fixture according to the present invention;
6 and 7 are views for explaining a fixing clip for fixing the geogrid wound on the connecting bar in the present invention,
8 to 12 are views for explaining the construction method of the reinforced soil retaining wall block of the cut slope according to the present invention.

이하, 첨부된 도면을 참고하여 본 발명에 따른 지오그리드 고정구 및 이를 이용한 절토 사면의 보강토 옹벽블록 시공방법을 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail the geogrid fixture and the method of constructing a reinforced soil retaining wall block of the cut slope using the same.

도1은 본 발명에 따른 지오그리드 고정구가 적용된 절토 사면의 보강토 옹벽블록 구조를 도시한 도면이고, 도2는 본 발명에 따른 지오그리드 고정구의 분리사시도이며, 도3은 본 발명에 따른 지오그리드 고정구가 절토 사면에 설치된 것을 도시한 단면도이다.1 is a view showing a reinforced soil retaining wall block structure of the cut slope to which the geogrid fixture according to the present invention is applied, Figure 2 is an exploded perspective view of the geogrid fixture according to the present invention, Figure 3 is a geogrid fixture according to the present invention cut slope It is a cross-sectional view showing that installed in.

첨부된 도면을 참조하면, 본 발명에 따른 지오그리드 고정구(100)는 절토 사면과 상기 절토 사면(C)에서 일정거리를 두고 적층되는 옹벽블록(B)의 사이에 채움되는 뒷채움 골재(10)의 층(F) 사이에 포설되어 뒷채움 골재(10)의 층간 마찰력을 높이고 옹벽블록(B)의 안정성을 강화하는 지오그리드의 후단부를 견고하게 고정할 수 있도록 절토 사면(C)에 설치되는 것으로, 지압판(110), 락볼트(120), 고정너트(130), 철근지지구(140), 연결철근(150) 및 철근고정구(160)를 포함하여 구성된다.Referring to the accompanying drawings, the geogrid fixture 100 according to the present invention is a layer of backfill aggregate (10) is filled between the cut slope and the retaining wall block (B) stacked at a predetermined distance from the cut slope (C) (F) is installed between the cut slope (C) to be firmly fixed to the rear end of the geogrid that is installed between (F) to increase the inter-layer friction of the backfill aggregate (10) and enhance the stability of the retaining wall block (B), acupressure plate 110 ), The lock bolt 120, the fixing nut 130, the reinforcing bar 140, the connecting reinforcement 150 and the reinforcing bars 160 is configured.

상기 지압판(110)은 상기 절토 사면(C)에 좌우방향으로 소정간격으로 설치되고, 뒷채움 골재(10)의 층(F)에 대응되는 높이에 순차적으로 설치된다. 좀 구체적으로 지압판(110)은 사각 또는 원형의 판 모양으로 마련되어 중앙에 관통공(111)이 형성된다. 여기서, 상기 관통공(111)의 주위는 상측으로 볼록하게 돌출되어 이 관통홀(110)의 내부로는 후술하는 락볼트(120)가 삽입되고, 관통홀(111)의 상면에는 후술하는 고정너트(130)가 안착되어 지지되게 구성된다. 따라서, 상기 지압판(110)은 락볼트(120)에 고정너트(130)가 결합될 때, 고정너트에 의해 가압되어 절토 사면(C)에 견고하게 설치될 수 있다.The pressure plate 110 is installed at a predetermined interval in the left and right directions on the cut slope (C), are sequentially installed at a height corresponding to the layer (F) of the backfill aggregate (10). More specifically, the pressure plate 110 is provided in the shape of a square or circular plate through-hole 111 is formed in the center. Here, the periphery of the through hole 111 is convexly protruded upwards, and the lock bolt 120 to be described later is inserted into the inside of the through hole 110, and a fixing nut to be described later on the upper surface of the through hole 111. 130 is configured to be seated and supported. Therefore, when the fixing nut 130 is coupled to the lock bolt 120, the pressure plate 110 may be firmly installed on the cut slope C by being pressed by the fixing nut.

상기 락볼트(120)는 상기 지압판(100)의 관통공을 관통하여 절토 사면에 고정된다. 여기서, 상기 락볼트(120)는 후술하는 고정너트(130), 철근지지구(140) 및 철근고정구(160)가 체결 결합되는 지주 역활을 하는 것으로, 상기 지압판(110)이 설치되는 지점의 절토 사면(C)에 순차적으로 삽입되어 상단부가 절토 사면(C)의 표면으로 일부 노출된 상태로 설치된다. 그리고 상기 락볼트(120)는 절토 사면에 천공홀을 뚫어 천공홀(20)에 삽입된 상태에서 천공홀(20)을 그라우팅(21)을 통해 마감하여 절토 사면(C)에 락볼트(120)가 견고하게 고정되도록 구성되는 것이 바람직하다.The lock bolt 120 is fixed to the cut slope through the through hole of the pressure plate 100. Here, the lock bolt 120 serves to support the fastening nut 130, the reinforcing bar support 140 and the reinforcing bar fastener 160 is to be described later, the cut of the point where the pressure plate 110 is installed. Inserted into the slope (C) sequentially and the upper end is installed in a state partially exposed to the surface of the cut slope (C). In addition, the lock bolt 120 drills a drilled hole in the cut slope to finish the drilled hole 20 through the grouting 21 in the state inserted into the drilled hole 20 to lock the bolt 120 on the cut slope C. Is preferably configured to be firmly fixed.

상기 고정너트(130)는 상기 락볼트(120)에 채워져 상기 지압판(110)을 가압하여 절토 사면(C)에 밀착 고정시키게 구성된다. 여기서 고정너트(130)의 하단부는 반구 형상으로 형성되어, 고정너트(130)의 하단부가 상기 관통공(111)에 수용되면서 지압판(110)을 가압하게 구성됨으로써, 고정너트에 대한 지지판의 가압이 더욱 이루어질 수 있도록 구성되는 것이 바람직하다.The fixing nut 130 is filled in the lock bolt 120 is configured to press the pressure plate 110 to be fixed in close contact with the cut slope (C). Here, the lower end of the fixing nut 130 is formed in a hemispherical shape, the lower end of the fixing nut 130 is configured to press the pressure plate 110 while being accommodated in the through-hole 111, thereby pressing the support plate against the fixing nut It is desirable to be configured so that more can be made.

상기 철근지지구(140)는 상기 락볼트(120)에 결합되어 후술하는 지오그리드(G)의 후단부가 감겨진 연결철근(150)이 결합되는 부재로서, 좀 구체적으로, 중앙에 상기 락볼트(120)에 체결되는 체결공(141a)이 형성되어 락볼트를 따라 높이 조절가능하게 체결 결합되는 몸체(141)와, 상기 몸체(141)의 좌우 측면 및 전후 측면으로 돌출 형성되되 내측에 수용홈(142b)이 형성된 지지부(142)로 구성된다.The reinforcing support 140 is a member to which the connecting reinforcing rod 150 wound on the rear end of the geogrid G, which is coupled to the lock bolt 120 and described later, is more specifically, the lock bolt 120 at the center thereof. The fastening hole 141a is fastened to the body is formed and the body 141 is fastened and coupled to the adjustable height along the lock bolt, protruding to the left and right sides and front and rear sides of the body 141, but the receiving groove (142b) inside It is composed of a support portion 142 is formed.

여기서, 상기 철근지지구(140)는 몸체(141)가 락볼트(120)를 따라 체결 결합되게 구성되기 때문에, 절토 사면(C)의 표면이 평평하지 못하고 높이 차를 가지더라도, 락볼트(120)에 몸체(141)를 체결하는 정도를 조절하여 절토 사면(C)의 표면 높이에 맞게 락볼트(120)에 그 높이를 조절하여 설치할 수 있다. 또한, 상기 철근지지구(140)는 몸체(141)의 외면에 좌우 측면 및 전후 측면으로 지지부(142)가 돌출 형성되기 때문에, 철근지지구(140)의 높이조절을 위해 몸체가 락볼트(120)에 체결되면서 상하로 이동되더라도, 몸체(141)의 외면에 형성된 어느 하나의 지지부(142)는 연결철근(150)을 삽입할 수 있게 항상 수평으로 위치된다.Here, since the reinforcing support 140 is configured such that the body 141 is fastened and coupled along the lock bolt 120, even if the surface of the cut slope C is not flat and has a height difference, the lock bolt 120 By adjusting the degree of fastening the body 141 to the) can be installed by adjusting the height of the lock bolt 120 to match the surface height of the cut slope (C). In addition, since the reinforcing support 140 is formed to protrude from the left and right sides and the front and rear sides on the outer surface of the body 141, the body is a lock bolt 120 for height adjustment of the reinforcing support 140. Even if it is fastened to the up and down), any one support portion 142 formed on the outer surface of the body 141 is always horizontally positioned to insert the connecting reinforcement 150.

상기 연결철근(150)은 지오그리드(G)의 후단부가 감겨 결합되고 상기 수용홈(142a)에 수용되어 지지부(142)에 지지되게 구성된다. 즉, 상기 연결철근(152)은 지오그리드(G)의 후단부가 감겨진 상태에서 철근지지구(140)에 결합되어 지오그리드(G)의 후단부가 절토 사면(C)에 설치된 철근지지구(140)에 지지될 수 있게 구성된다.The connecting reinforcing rod 150 is configured to be coupled to the rear end of the geogrid (G) is received in the receiving groove 142a is supported by the support portion 142. That is, the connecting reinforcing bar 152 is coupled to the reinforcing bar 140 in a state in which the rear end of the geogrid G is wound, so that the rear end of the geogrid G is installed on the reinforcing bar 140 installed on the cut slope C. It is configured to be supported.

상기 철근고정구(160)는 상기 지지부의 수용홈(142a)에 수용되고 지오그리드(G)의 후단부가 감겨진 연결철근(150)이 수용홈(142a)에서 빠지지 않게 고정시키는 부분으로, 구체적으로, 중앙에 상기 락볼트(120)에 결합되는 체결부(161)이 형성되어 상기 락볼트(120)에 결합되면 상기 지지부의 수용홈(142a)에 수용된 연결철근(150)을 가압하여 연결철근을 수용홈(142a) 내에 고정시키게 구성된다. 좀 더 구체적으로, 상기 철근고정구(160)은 중앙에 환형으로 돌출되어 내부에 통공(161a)이 형성되되 통공의 내주면에는 상기 락볼트(130)에 체결되는 나사산(161b)이 형성되는 체결부(161)와, 상기 체결부(161)의 외측으로 확개 형성되는 확개부(162)와, 상기 확개부(162)에서 하측으로 돌출되어 환형으로 형성되되 상기 체결부(161)가 락볼트(120)에 체결되면 지지부의 수용홈(142a) 방향으로 투입되면서 연결철근(150)의 상면을 가압하여 고정시키는 가압돌편(163)을 포함하여 구성된다. 여기서, 상기 가압돌편(163)의 직경은 상기 수용홈(142a) 내부로 투입될 수 있는 크기로 구성되되, 가압돌편(163)의 측방으로 수용홈(142a) 내에 수용된 연결철근(150)이 배출되지 않게 적절한 사이즈로 구성되는 것이 바람직하다.The reinforcing bar 160 is a portion that is fixed in the receiving groove 142a of the support portion and the connecting reinforcing bar 150 wound around the rear end of the geogrid (G) does not fall out of the receiving groove 142a, specifically, the center When the fastening part 161 coupled to the lock bolt 120 is formed in the lock bolt 120, the connection reinforcing groove is accommodated by pressing the connection reinforcement 150 accommodated in the receiving groove 142a of the support part. It is configured to be fixed in 142a. More specifically, the reinforcing bar 160 is protruded in the center in the annular through-hole (161a) is formed in the inner circumferential surface of the through-hole fastening portion (161b) is formed to be fastened to the lock bolt (130) ( 161, the expansion portion 162 is formed to extend to the outside of the fastening portion 161, and protrudes downward from the expansion portion 162 is formed in an annular shape, the fastening portion 161 is a lock bolt 120 When fastened to the receiving groove 142a in the direction of the support is configured to include a pressing stone piece 163 for pressing and fixing the upper surface of the connecting reinforcement 150. Here, the diameter of the pressing stone piece 163 is configured to have a size that can be introduced into the receiving groove (142a), the discharge of the connecting reinforcing bar 150 accommodated in the receiving groove (142a) to the side of the pressing stone piece (163) It is preferable that it is configured with an appropriate size so that it may

한편, 도4 및 도5에 도시된 바와 같이, 상기 철근지지구(140)에는 연결철근(150)이 수용홈(142a)에 수용되었을 때 수용홈 내에서 연결철근(150)이 이탈되지 않게 잡아주는 고정부재(200)가 더 구성되는 데, 상기 고정부재(200)는 챔버(210), 고정드럼(220), 드럼파지구(230) 및 드럼스프링(240)을 포함하여 구성된다.On the other hand, as shown in Figures 4 and 5, when the connecting reinforcing bar 150 is accommodated in the receiving groove 142a in the reinforcing bar 140 to hold the connecting reinforcement 150 in the receiving groove does not escape The main fixing member 200 is further configured, and the fixing member 200 includes a chamber 210, a fixing drum 220, a drum holding hole 230, and a drum spring 240.

상기 챔버(210)는 사각 형상을 갖되, 몸체(141) 및 지지부(142)에 설치되고 수용홈(142a)과 연통되는 개구부(211)가 형성되며 개구부의 내측으로 드럼조립공간(212)이 형성된다. 그리고 상기 개구부(211)는 수평으로 긴 장공의 형상을 갖도록 하여 연결철근(150)이 수용홈(142a)으로 삽입될 때, 후술하는 고정드럼(220)의 중앙뿐만 아니라 양측 단부에 걸림될 수 있도록 구성하는 것이 바람직하다.The chamber 210 has a rectangular shape, an opening 211 is formed in the body 141 and the support part 142 and communicates with the receiving groove 142a, and a drum assembly space 212 is formed inside the opening. do. In addition, the opening 211 has a horizontally long hole shape so that when the connecting reinforcing bar 150 is inserted into the receiving groove 142a, the opening 211 may be caught at both ends as well as the center of the fixed drum 220 to be described later. It is preferable to construct.

상기 고정드럼(220)은 상기 드럼조립공간(212)에 설치되어 한 쌍이 수용홈(142a)의 중앙을 기준으로 서로 이격된 상태로 서로 마주보고 설치되는 데, 이 고정드럼(220)은 가까워지거나 멀어지는 방향으로 이동 가능하게 설치된다. 그리고 고정드럼(220)은 회전 가능하게 설치된다.The fixed drum 220 is installed in the drum assembly space 212 is installed facing each other in a state in which the pair is spaced from each other relative to the center of the receiving groove (142a), the fixed drum 220 is closer or It is installed to be movable in a direction away from it. And the fixed drum 220 is rotatably installed.

상기 드럼파지구(230)는 상기 드럼조립공간(212)에 설치되어 고정드럼(220)을 회전 가능하게 파지하는 것으로, 전방에 반구 형상의 홈이 형성되어 이 홈에 고정드럼(230)이 삽입된 상태로 고정드럼(220)을 파지하게 구성된다.The drum gripper 230 is installed in the drum assembly space 212 to grip the fixed drum 220 to be rotatable, and a hemispherical groove is formed in the front, and the fixed drum 230 is inserted into the groove. It is configured to hold the fixed drum 220 in the state.

상기 드럼스프링(240)은 드럼조립공간(212) 내에서 드럼파지구(230)를 탄성 가압하게 설치되어 고정드럼(220)이 서로 가까워지는 방향으로 탄성력을 제공하게 구성된다. 여기서, 상기 드럼스프링(240)은 드럼파지구(230)의 중앙을 가압하게 설치되는 중앙스프링(241) 및 중앙스프링(241)을 기준으로 양측에 드럼파지구(230)의 양측 단부를 탄성 가압하게 보조스프링(242)으로 구성되는 것이 바람직하다.The drum spring 240 is configured to elastically press the drum gripper 230 in the drum assembly space 212 to provide an elastic force in a direction in which the fixed drum 220 is close to each other. Here, the drum spring 240 elastically presses both ends of the drum gripper 230 on both sides with respect to the central spring 241 and the central spring 241 installed to press the center of the drum gripper 230. It is preferable that the auxiliary spring 242 is configured.

이와 같이 구성된 본 발명에 따른 고정부재(200)를 통해, 철근지지구의 수용홈(142a)으로 연결철근(150)이 끼워지면, 고정드럼(220)이 회전하면서 드럼파지구(230)가 후측으로 이동되고 고정드럼(220)의 사이로 연결철근(150)이 삽입된다. 그리고 연결철근(150)이 수용홈(142a)으로 수용되면, 드럼스프링(240)의 탄성에 의해 드럼파지구(230)가 전측으로 이동되고 고정드럼(220)이 서로 가까워지면서, 수용홈(142a) 내의 연결철근(150)이 일탈되지 않게 연결철근의 상측에서 잡아주게 구성된다. 따라서, 철근지지구의 수용홈(142a)에 끼워진 연결철근(150)을 고정하기 위해 철근고정구(160)를 락볼트(120)에 체결하기 전, 고정부재(200)를 통해 연결철근을 수용홈 내에서 이탈되지 않게 잡아 주기 때문에, 수용홈 내에서 연결철근이 견고하게 고정될 뿐만 아니라 철근고정구의 체결 작업을 용이하게 할 수 있다는 잇점이 있다.When the connecting reinforcement 150 is fitted into the receiving groove 142a of the reinforcing bar support through the fixing member 200 according to the present invention configured as described above, the drum holding port 230 rotates backward while the fixing drum 220 rotates. The connecting rod 150 is inserted between the fixed drum 220 and moved. And when the connecting reinforcing bar 150 is accommodated in the receiving groove 142a, the drum gripping port 230 is moved to the front side by the elasticity of the drum spring 240 and the fixing drum 220 is close to each other, the receiving groove 142a It is configured to hold the connecting reinforcing bar 150 in the upper side of the connecting bar so as not to deviate. Accordingly, before fastening the reinforcing bar 160 to the lock bolt 120 to fix the connecting bar 150 fitted in the receiving groove 142a of the reinforcing bar, the connecting bar is received in the receiving groove through the fixing member 200. Since it does not deviate from, the connection reinforcement in the receiving groove is not only firmly fixed but also has the advantage of facilitating the fastening operation of the reinforcing bar fixture.

나아가, 본 발명에 따르면, 상기 지오그리드(G)의 후단부가 감겨 결합된 연결철근(150)의 외면에는 고정클립(300)이 결합되어 연결철근에서 지오그리드가 풀리는 것을 방지하게 구성되는 것이 바람직하다.Furthermore, according to the present invention, it is preferable that the fixing clip 300 is coupled to the outer surface of the connecting reinforcing bar 150 wound around the rear end of the geogrid G to be configured to prevent the geogrid from being released from the connecting reinforcing bar.

구체적으로, 상기 도6에 도시된 바와 같이, 고정클립(300)은 반원의 띠모양으로 형성된 제1몸체(310) 및 제2몸체(320)로 구성되고, 상기 제1몸체 및 제2몸체는 힌지부(330)를 통해 연결되어 접힘과 펼쳐짐의 작동이 가능한 구조로 구성되어 있으며, 상기 제1몸체(310)의 끝단 내면에는 다수개의 제1결합치(311)가 형성되고, 상기 제2몸체(320)의 외주면에는 원주방향을 따라 상기 제1결합치(311)와 이빨물림이 가능한 제2결합치(321)가 형성되는 것이 바람직하다. 이와 같이 구성되는 고정클립은 도7에 도시된 바와 같이, 지오그리드(G)의 후단부가 감겨 결합된 연결철근(150)의 외면을 감싸면서 결합되어 연결철근에서 지오그리드가 풀리지 않게 고정시켜줌으써, 지오그리드의 결합력을 월등히 향상시켜 주는 잇점이 있다. Specifically, as shown in Figure 6, the fixing clip 300 is composed of a first body 310 and the second body 320 formed in a semi-circular band shape, the first body and the second body Is connected through the hinge portion 330 is composed of a structure that can be folded and expanded operation, a plurality of first coupling teeth 311 is formed on the inner surface of the end of the first body 310, the second body On the outer circumferential surface of the 320, the first coupling teeth 311 and the second coupling teeth 321 capable of teeth can be formed along the circumferential direction. The fixed clip is configured as shown in Figure 7, the rear end of the geogrid (G) is wound around the outer surface of the connecting reinforcing bar 150 is coupled to combine to fix the geogrid in the connection reinforcement, so that the geogrid This has the advantage of greatly improving the cohesion.

이하, 도8 내지 도12를 참조하여 상기와 같이 구성된 지오그리드 고정구를 이용한 절토 사면의 보강토 옹벽블록 시공방법에 대해 설명한다.Hereinafter, a method of constructing a reinforcement soil retaining wall block for a cut slope using a geogrid fixture configured as described above with reference to FIGS. 8 to 12 will be described.

도8에 도시된 바와 같이, 본 발명에 따른 절토 사면의 보강토 옹벽블록 시공방법은 락볼트 설치 단계(S10), 지압판 고정 단계(S20), 철근지지구 설치 단계(S30), 기초형성 단계(S40), 옹벽블록 적층 단계(S50), 성토 단계(S60), 지오그리드 포설 단계(S70) 및 연결철근 고정 단계(S80)를 포함하여 구성된다.As shown in Figure 8, the reinforced soil retaining wall block construction method of the cut slope according to the present invention is a rock bolt installation step (S10), acupressure plate fixing step (S20), reinforcing bar support installation step (S30), foundation forming step (S40) ), Retaining wall block stacking step (S50), fill step (S60), geogrid laying step (S70) and connecting reinforcing bar fixing step (S80) is configured.

상기 락볼트 설치 단계(S10)는 도9에 도시된 바와 같이, 절토 사면(C)에 뒷채움 골재의 층(F)에 대응되는 높이 맞게 락볼트(120)를 순차적으로 삽입하여 설치하는 것으로, 뒷채움 골재의 층(F)의 표면에 각각 대응되는 지점의 절토 사면(C)순차적으로 락볼트(120)를 삽입하여 설치한다. 여기서, 상기 락볼트는 그라우팅을 통해 마감하여 절토 사면에 락볼트가 견고하게 고정되도록 구성되는 것이 바람직하다. The rock bolt installation step (S10) is, as shown in Figure 9, by inserting the rock bolt 120 in sequence to the height corresponding to the layer (F) of the backfill aggregate on the cut slope (C), backfill The rock bolts 120 are inserted and installed sequentially in the cut slopes C at points corresponding to the surfaces of the layer F of the aggregate. Here, the lock bolt is preferably configured to be firmly fixed to the rock bolt to the cut surface by finishing through the grouting.

상기 지압판 고정 단계(S20)는 상기 락볼트(120)에 지압판(110)을 끼워 절토 사면에 밀착시키고, 고정너트(130)를 락볼트에 체결시켜 지압판을 절토 사면(C)에 고정시키는 것으로, 고정너트(310)의 하단부는 반구 형상으로 형성되어, 지압판의 관통공(111)에 수용되면서 지압판을 가압하게 구성됨으로써, 고정너트에 대한 지지판의 가압이 더욱 이루어질 수 있도록 구성된다.The acupressure plate fixing step (S20) is to insert the acupressure plate 110 to the lock bolt 120 in close contact with the cut slope, and to fasten the fixing nut 130 to the lock bolt to fix the pressure plate to the cut slope (C), The lower end of the fixing nut 310 is formed in a hemispherical shape, and is configured to press the pressure plate while being accommodated in the through hole 111 of the pressure plate, it is configured to further press the support plate against the fixing nut.

상기 철근지지구 설치 단계(S30)는 철근지지구(140)를 절토 사면(C)의 표면 높이에 맞게 락볼트(12)에 체결 결합시키는 것으로, 철근지지구(140)는 락볼트에 체결 방식으로 결합되게 구성되어 락볼트(120)를 따라 상하 높이 조절 가능하게 결합되게 구성된다. 여기서, 상기 철근지지구(140)는 후술하는 지오그리드(G)의 후단부가 감겨진 연결철근(150)이 결합되는 부분으로, 중앙에 상기 락볼트(120)에 체결되는 체결공이 형성되어 락볼트를 따라 높이 조절가능하게 체결 결합되는 몸체(141)와, 상기 몸체의 좌우 측면 및 전후 측면으로 돌출 형성되되 내측에 수용홈이 형성된 지지부(142)로 구성된다.The reinforcing supporter installation step (S30) is to fasten and couple the reinforcing supporter 140 to the lock bolt 12 according to the surface height of the cut slope (C), the reinforcing supporter 140 is fastened to the lock bolt It is configured to be coupled to the lock bolt 120 is configured to be coupled to adjust the height up and down. Here, the reinforcing bar 140 is a portion to which the connecting reinforcing bar 150 wound around the rear end of the geogrid (G), which will be described later, is coupled, the fastening hole is fastened to the lock bolt 120 is formed in the center of the lock bolt The body 141 is fastened and coupled to the adjustable height, and the support 142 is formed to protrude to the left and right and front and rear sides of the body, the receiving groove is formed inside.

여기서, 상기 철근지지구(140)에는 후술하는 연결철근(150)이 수용홈(142)에 수용되었을 때 수용홈 내에서 연결철근이 이탈되지 않게 잡아주는 고정부재(200)가 더 구성되는 것이 바람직하다. 구체적으로, 상기 고정부재(200)는 몸체(141) 및 지지부(142)에 형성되고 수용홈과 연통되는 개구부(211)가 형성되며 개구부의 내측으로 드럼조립공간(212)이 형성된 챔버(210)와, 상기 드럼조립공간(212)에 설치되어 한 쌍이 수용홈의 중앙을 기준으로 서로 이격된 상태로 서로 마주보고 가까워지거나 멀어지는 방향으로 이동 가능하게 설치되는 고정드럼(220)과, 상기 드럼조립공간(212)에 설치되어 고정드럼(220)을 회전 가능하게 파지하는 드럼파지구(230)와, 상기 드럼조립공간(212)에 설치되고 드럼파지구(230)를 탄성 가압하게 설치되어 상기 고정드럼(220)이 서로 가까워지는 방향으로 탄성력을 제공하게 구성되되, 드럼파지구(230)의 중앙을 가압하게 설치되는 중앙스프링(241) 및 중앙스프링을 기준으로 양측에 드럼파지구(230)의 양측 단부를 탄성 가압하게 보조스프링(242)으로 구성되는 드럼스프링(240)으로 구성된다.Here, the reinforcing member 140 is preferably configured to further secure the fixing member 200 to hold the connecting reinforcement in the receiving groove when the connecting reinforcing bar 150 to be described later is accommodated in the receiving groove 142. Do. Specifically, the fixing member 200 is formed in the body 141 and the support 142, the opening 211 is formed in communication with the receiving groove and the chamber 210, the drum assembly space 212 is formed inside the opening And a fixed drum 220 installed in the drum assembly space 212 so as to move in a direction closer to or farther from each other in a state spaced apart from each other based on the center of the receiving groove, and the drum assembly space. A drum gripper 230 installed at the 212 to rotatably grip the fixed drum 220, and installed at the drum assembly space 212 to elastically press the drum gripper 230 to fix the drum; 220 is configured to provide an elastic force in a direction closer to each other, both sides of the drum gripper 230 on both sides based on the central spring 241 and the central spring is installed to press the center of the drum gripper 230 Assist elasticity to press the end It is composed of a drum spring 240 consisting of a spring (242).

상기 기초형성 단계(S40)는 도10에 도시된 바와 같이, 옹벽을 형성하는 옹벽블록(B)을 지지하기 위한 기초부(S)를 형성하기 위해 시행하는 것으로, 절토 사면의 하측 면상을 천공하는 단계, 천공된 홀에 지중앵커를 삽입하여 고정하는 단계, 및 콘크리트몰탈에 의해 기초콘크리트층을 형성하는 단계를 포함할 수 있다.The foundation forming step S40 is performed to form a foundation S for supporting the retaining wall block B that forms the retaining wall, as shown in FIG. 10, which drills the lower surface of the cut slope. The method may include inserting and fixing the underground anchor in the perforated hole, and forming the foundation concrete layer by the concrete mortar.

상기 옹벽블록 적층 단계(S50)는 상기 기초부에 뒷채움 골재의 층(F)에 대응되는 높이로 옹벽블록을 적층하는 것으로, 기초부(S)상에 옹벽블록(B)을 이용하여 기초 블록열을 형성하는 기초 블록열 형성단계를 시행하고, 후술하는 이 기초 블록열의 후면과 절토 사면 사이에 충진물을 메우고 다지는 뒤채움 단계를 시행한 후, 다시 옹벽블록을 적층하여 블록열을 형성하고 이 블록열에 뒤채움 작업을 시행하는 방식으로 반복적으로 수행한다The retaining wall block stacking step (S50) is to laminate the retaining wall block to a height corresponding to the layer (F) of the backfill aggregate on the foundation portion, the foundation block row using the retaining wall block (B) on the foundation portion (S) After performing the basic block string forming step of forming a step, and filling the filling between the back surface and the cut slope of the foundation block row which will be described later, and then the retaining wall blocks are laminated again to form a block row and the block row Perform iteratively repeatedly

상기 성토 단계(S60)은 도11에 도시된 바와 같이 상기 옹벽블록(B)과 상기 절토 사면(C) 사이의 공간을 뒷채움 골재(10)으로 메우고 뒷채움 골재의 층(F)을 다지는 것으로, 블록열의 후면과 절토 사면 사이에 충진물을 메우고 다지는 뒤채움 단계를 시행한 후, 다시 옹벽블록을 적층하여 블록열을 형성하고 이 블록열에 뒤채움 작업을 시행하는 방식으로 반복적으로 수행하여 성토부를 형성한다.The fill step (S60) is to fill the space between the retaining wall block (B) and the cut slope (C) with a backfill aggregate (10) and to compact the layer (F) of the backfill aggregate, as shown in FIG. Fill the filling between the back of the row and the cut slope and backfilling step, and then the retaining wall blocks are stacked again to form a block row, and the block row is repeatedly performed to form a fill section.

상기 지오그리드 포설 단계(S70)는 상기 뒷채움 골재의 층(F) 상면에 지오그리드(G)를 포설하되, 상기 지오그리드(G)의 전단은 상기 적층되는 옹벽블록(B)의 사이에 끼움 결합하고, 상기 지오그리드(G)의 후단은 연결철근(150)에 감아 결합시킨 다음 연결철근(150)을 철근지지구의 수용홈(142a)에 끼움 결합시키게 구성된다. 여기서, 지오그리드 포설 단계(S70)는 옹벽블록의 사이에 채움되는 뒷채움 골재의 층(F) 사이에 지오그리드(G)를 포설시키고, 지오그리드(G)의 전단 및 후단을 옹벽블록(B)과 절토 사면(C)에 고정시키는 것으로, 지오그리드(G)의 전단 및 후단가 견고하게 고정되기 때문에 뒷채움 골재의 층(F)간 마찰력을 높이고 옹벽블록(B)의 안정성을 월등히 강화시킬 수 있게 된다.The geogrid laying step (S70) is to install the geogrid (G) on the upper surface of the layer (F) of the backfill aggregate, the front end of the geogrid (G) is sandwiched between the laminated retaining wall block (B), the The rear end of the geogrid (G) is configured to couple to the connecting reinforcing rod 150, and then to connect the connecting reinforcing rod 150 to the receiving groove 142a of the reinforcing bar support. Here, the geogrid laying step (S70) is to install the geogrid (G) between the layer (F) of the backfill aggregate filled between the retaining wall block, the front and rear ends of the geogrid (G) to the retaining wall block (B) and cut slope By fixing to (C), since the front and rear ends of the geogrid (G) is firmly fixed, it is possible to increase the friction between the layers (F) of the backfill aggregate and to significantly enhance the stability of the retaining wall block (B).

여기서, 상기 지오그리드(G)의 후단부가 감겨 결합된 연결철근의 외면에는 고정클립(300)이 결합되어 연결철근(150)에서 지오그리드가 풀리는 것을 방지하게 구성되는 것이 바람직하다. 구체적으로, 상기 고정클립(300)은 반원의 띠모양으로 형성된 제1몸체(310) 및 제2몸체(320)로 구성되고, 상기 제1몸체(310) 및 제2몸체(320)는 힌지부(330)를 통해 연결되어 접힘과 펼쳐짐의 작동이 가능한 구조로 구성되어 있으며, 상기 제1몸체(310)의 끝단 내면에는 다수개의 제1결합치(311)가 형성되고, 상기 제2몸체(320)의 외주면에는 원주방향을 따라 상기 제1결합치(311)와 이빨물림이 가능한 제2결합치(321)가 형성된다.Here, it is preferable that the fixing clip 300 is coupled to the outer surface of the connecting rebar wound around the rear end of the geogrid G to prevent the geogrid from being released from the connecting rebar 150. Specifically, the fixing clip 300 is composed of a first body 310 and the second body 320 formed in a semi-circular band shape, the first body 310 and the second body 320 is a hinge portion It is connected to the 330 is configured in a structure capable of operation of folding and unfolding, a plurality of first coupling teeth 311 is formed on the inner surface of the end of the first body 310, the second body 320 In the outer circumferential surface of the) is formed a second coupling teeth 321 that can be teethed with the first coupling teeth 311 in the circumferential direction.

상기 연결철근 고정 단계(S80)는 상기 락볼트(120)에 철근고정구(160)를 체결시켜 철근지지구의 수용홈(142a)에 수용된 연결철근(150)을 가압하여 지오그리드(G)의 후단부가 감겨진 연결철근(150)을 수용홈(142a) 내에 고정시키게 구성된다.The fixing reinforcing step (S80) is to fasten the reinforcing bar 160 to the lock bolt 120 to press the connecting reinforcement 150 accommodated in the receiving groove 142a of the reinforcing bar wound around the rear end of the geogrid (G) It is configured to fix the connection connecting bar 150 in the receiving groove (142a).

그리고, 본 발명에 따르면 상기 옹벽블록 적층 단계(S50), 성토 단계(S60), 지오그리드 포설 단계(S70) 및 연결철근 고정 단계(S80)를 순차적으로 반복 수행함으로써 도12에 도시된 바와 같이, 절토사면에 설정된 높이의 보강토 옹벽블록을 형성하게 된다.And, according to the present invention by sequentially repeating the retaining wall block stacking step (S50), fill step (S60), geogrid laying step (S70) and connecting reinforcing bar fixing step (S80) as shown in Figure 12, cut Reinforcement earth retaining wall block of the height set on the slope is formed.

G: 지오그리드 100: 지오그리드 고정구
110: 지압판 120: 락볼트
130: 고정너트 140: 철근지지구
150: 연결철근 160: 철근고정구
G: Geogrid 100: Geogrid Fixture
110: acupressure plate 120: rock bolt
130: fixing nut 140: reinforcing bar support
150: connecting rod 160: reinforcing bar fixture

Claims (5)

절토 사면과 상기 절토 사면에서 일정거리를 두고 적층되는 옹벽블록의 사이에 채움되는 뒷채움 골재의 층 사이에 포설되어 뒷채움 골재의 층간 마찰력을 높이고 옹벽블록의 안정성을 강화하는 지오그리드에 있어서,
상기 절토 사면에 좌우방향으로 소정간격으로 설치되고, 뒷채움 골재의 층에 대응되는 높이에 순차적으로 설치되되, 중앙에 관통공이 형성되는 지압판과, 상기 지압판의 관통공을 관통하여 절토 사면에 삽입 고정되는 락볼트와, 상기 락볼트에 채워져 상기 지압판을 가압하여 절토 사면에 밀착 고정시키는 고정너트와, 중앙에 상기 락볼트에 체결되는 체결공이 형성되어 락볼트를 따라 높이 조절가능하게 체결 결합되는 몸체와, 상기 몸체의 좌우 측면 및 전후 측면으로 돌출 형성되되 내측에 수용홈이 형성된 지지부로 구성되는 철근지지구와, 지오그리드의 후단부가 감겨 결합되고 상기 수용홈에 수용되어 지지부에 지지되는 연결철근과, 중앙에 상기 락볼트에 결합되는 체결부가 형성되어 상기 락볼트에 결합되면 상기 지지부의 수용홈에 수용된 연결철근을 가압하여 연결철근을 수용홈 내에 고정시키는 철근고정구를 포함하여 구성되고,
상기 철근지지구에는 연결철근이 수용홈에 수용되었을 때 수용홈 내에서 연결철근이 이탈되지 않게 잡아주는 고정부재가 더 구성되되, 상기 고정부재는 몸체 및 지지부에 설치되고 수용홈과 연통되는 개구부가 형성되며 개구부의 내측으로 드럼조립공간이 형성된 챔버와, 상기 드럼조립공간에 설치되어 한 쌍이 수용홈의 중앙을 기준으로 서로 이격된 상태로 서로 마주보고 가까워지거나 멀어지는 방향으로 이동 가능하게 설치되는 고정드럼과, 상기 드럼조립공간에 설치되어 고정드럼을 회전 가능하게 파지하는 드럼파지구와, 상기 드럼조립공간에 설치되고 드럼파지구를 탄성 가압하게 설치되어 상기 고정드럼이 서로 가까워지는 방향으로 탄성력을 제공하게 구성되되, 드럼파지구의 중앙을 가압하게 설치되는 중앙스프링 및 중앙스프링을 기준으로 양측에 드럼파지구의 양측 단부를 탄성 가압하게 보조스프링으로 구성되는 드럼스프링으로 구성되며,
상기 지오그리드의 후단부가 감겨 결합된 연결철근의 외면에는 고정클립이 결합되어 연결철근에서 지오그리드가 풀리는 것을 방지하게 구성되되, 상기 고정클립은 반원의 띠모양으로 형성된 제1몸체 및 제2몸체로 구성되고, 상기 제1몸체 및 제2몸체는 힌지부를 통해 연결되어 접힘과 펼쳐짐의 작동이 가능한 구조로 구성되어 있으며, 상기 제1몸체의 끝단 내면에는 다수개의 제1결합치가 형성되고, 상기 제2몸체의 외주면에는 원주방향을 따라 상기 제1결합치와 이빨물림이 가능한 제2결합치가 형성된 것을 특징으로 하는 지오그리드 고정구.
In the geogrid which is installed between the cut slope and the layer of backfill aggregate filled between the retaining wall blocks stacked at a certain distance from the cut slope to increase the inter-layer friction of the backfill aggregate and enhance the stability of the retaining wall block,
It is installed at a predetermined interval in the left and right directions on the cut slope, and sequentially installed at a height corresponding to the layer of the backfill aggregate, the pressure plate having a through hole formed in the center, and inserted into and fixed to the cut slope through the through hole of the pressure plate. A lock bolt, a fixing nut which is filled in the rock bolt and presses the pressure plate to fix the cut surface tightly to the cut slope, and a fastening hole fastened to the lock bolt in the center thereof to be fastened and adjustable to be adjusted along the lock bolt; Reinforcing bar supporting the left and right and front and rear sides of the body and consisting of a support portion formed with a receiving groove therein, the rear end of the geogrid is coupled to the reinforcement is received in the receiving groove and supported by the support groove, and the center When the fastening portion is formed to be coupled to the rock bolt is coupled to the lock bolt is received in the receiving groove of the support Comprising: a reinforced fastener to secure the connection reinforcement is pressed into the receiving groove a reinforcement,
The reinforcing bar support further comprises a fixing member for holding the connecting reinforcement in the receiving groove so that the connecting reinforcement is not separated from the receiving groove when the connecting bar is received in the receiving groove, the fixing member is installed in the body and the support and the opening communicating with the receiving groove A fixed drum which is formed and has a chamber in which a drum assembly space is formed inside the opening, and is installed in the drum assembly space so that a pair of the pair is spaced apart from each other with respect to each other with respect to the center of the receiving groove. And a drum gripping hole installed in the drum assembly space to grip the fixed drum rotatably, and installed in the drum assembly space and elastically pressing the drum gripping hole to provide elastic force in a direction in which the fixed drum is close to each other. The central spring and the central spring are installed so as to press the center of the drum gripper. It consists of a drum spring consisting of auxiliary springs to elastically press both ends of the drum gripper on both sides of the furnace,
The rear end of the geogrid is wound on the outer surface of the connecting reinforcement coupled to the coupling clip is configured to prevent the geogrid from loosening from the connecting reinforcement, the fixed clip is composed of a first body and a second body formed in a semi-circular band shape The first body and the second body are connected to each other via a hinge and configured to be folded and unfolded. A plurality of first coupling teeth are formed on an inner surface of the end of the first body, and the second body Geogrid fixture, characterized in that formed on the outer circumferential direction, the second coupling teeth and the second coupling teeth that can be teethed.
삭제delete 삭제delete 절토 사면에 뒷채움 골재의 층에 대응되는 높이 맞게 락볼트를 순차적으로 삽입하여 설치하는 락볼트 설치 단계; 상기 락볼트에 지압판을 끼워 절토 사면에 밀착시키고, 고정너트를 락볼트에 체결시켜 지압판을 절토 사면에 고정시키는 지압판 고정 단계; 몸체의 좌우 측면 및 전후 측면으로 수용홈이 형성된 지지구가 돌출 형성되는 철근지지구를 절토 사면의 표면 높이에 맞게 락볼트에 체결 결합시키는 철근지지구 설치 단계; 옹벽을 형성하는 옹벽블록을 지지하기 위한 기초부를 형성하는 기초형성 단계; 상기 기초부에 뒷채움 골재의 층에 대응되는 높이로 옹벽블록을 적층하는 옹벽블록 적층 단계; 상기 옹벽블록과 상기 절토 사면 사이의 공간을 뒷채움 골재으로 메우고 뒷채움 골재의 층을 다지는 성토 단계; 상기 뒷채움 골재의 층 상면에 지오그리드를 포설하되, 상기 지오그리드 전단은 상기 적층되는 옹벽블록의 사이에 끼움 결합하고, 상기 지오그리드의 후단은 연결철근에 감아 결합시킨 다음 연결철근을 철근지지구의 수용홈에 끼움 결합시키게 구성되는 지오그리드 포설 단계; 상기 락볼트에 철근고정구를 체결시켜 철근지지구의 수용홈에 수용된 연결철근을 가압하여 지오그리드의 후단부가 감겨진 연결철근을 수용홈 내에 고정시키는 연결철근 고정 단계를 포함하되,
상기 옹벽블록 적층 단계, 성토 단계, 지오그리드 포설 단계 및 연결철근 고정 단계를 순차적으로 반복 수행함으로써 절토사면에 설정된 높이의 보강토 옹벽블록을 형성하게 구성되고,
상기 철근지지구에는 연결철근이 수용홈에 수용되었을 때 수용홈 내에서 연결철근이 이탈되지 않게 잡아주는 고정부재가 더 구성되되, 상기 고정부재는 몸체 및 지지부에 형성되고 수용홈과 연통되는 개구부가 형성되며 개구부의 내측으로 드럼조립공간이 형성된 챔버와, 상기 드럼조립공간에 설치되어 한 쌍이 수용홈의 중앙을 기준으로 서로 이격된 상태로 서로 마주보고 가까워지거나 멀어지는 방향으로 이동 가능하게 설치되는 고정드럼과, 상기 드럼조립공간에 설치되어 고정드럼을 회전 가능하게 파지하는 드럼파지구와, 상기 드럼조립공간에 설치되고 드럼파지구를 탄성 가압하게 설치되어 상기 고정드럼이 서로 가까워지는 방향으로 탄성력을 제공하게 구성되되, 드럼파지구의 중앙을 가압하게 설치되는 중앙스프링 및 중앙스프링을 기준으로 양측에 드럼파지구의 양측 단부를 탄성 가압하게 보조스프링으로 구성되는 드럼스프링으로 구성되고,
상기 지오그리드의 후단부가 감겨 결합된 연결철근의 외면에는 고정클립이 결합되어 연결철근에서 지오그리드가 풀리는 것을 방지하게 구성되되, 상기 고정클립은 반원의 띠모양으로 형성된 제1몸체 및 제2몸체로 구성되고, 상기 제1몸체 및 제2몸체는 힌지부를 통해 연결되어 접힘과 펼쳐짐의 작동이 가능한 구조로 구성되어 있으며, 상기 제1몸체의 끝단 내면에는 다수개의 제1결합치가 형성되고, 상기 제2몸체의 외주면에는 원주방향을 따라 상기 제1결합치와 이빨물림이 가능한 제2결합치가 형성된 것을 특징으로 하는 절토 사면의 보강토 옹벽블록 시공방법.
A rock bolt installation step of sequentially inserting rock bolts to a height corresponding to a layer of backfill aggregate on the cut slope; Acupressure plate fixing step of attaching the pressure plate to the rock bolts to closely contact the cut slopes, and fastening the fixing nut to the rock bolts to fix the pressure plate to the cut slopes; Reinforcing bar installation step of fastening and coupling the reinforcing bar supporting the support groove is formed in the left and right sides and front and rear sides of the body to the rock bolt according to the surface height of the cut slope; A foundation forming step of forming a foundation for supporting the retaining wall block forming the retaining wall; A retaining wall block stacking step of stacking the retaining wall blocks at a height corresponding to the layer of backfill aggregate on the base portion; Filling step of filling the space between the retaining wall block and the cut slope with a backfill aggregate and a layer of backfill aggregate; Geogrid is installed on the layer upper surface of the backfill aggregate, wherein the front end of the geogrid is sandwiched between the retaining wall blocks to be laminated, and the rear end of the geogrid is wound around the connecting reinforcing bar, and then the connecting reinforcing bar is fitted into the receiving groove of the reinforcing bar. Geogrid laying step configured to engage; Including a connection reinforcing step of fastening the reinforcing bars to the lock bolt to press the connecting reinforcing bar accommodated in the receiving groove of the reinforcing bar to secure the connecting reinforcing wire wound on the rear end of the geogrid in the receiving groove,
It is configured to form a reinforcement earth retaining wall block of the height set on the cut slope by sequentially repeating the retaining wall block stacking step, fill step, geogrid laying step and connecting reinforcing step,
The reinforcing bar support further comprises a fixing member for holding the connecting reinforcement in the receiving groove so that the connecting reinforcement in the receiving groove is not received, the fixing member is formed in the body and the support and the opening is in communication with the receiving groove A fixed drum which is formed and has a chamber in which a drum assembly space is formed inside the opening, and is installed in the drum assembly space so that a pair of the pair is spaced apart from each other with respect to each other with respect to the center of the receiving groove. And a drum gripping hole installed in the drum assembly space to grip the fixed drum rotatably, and installed in the drum assembly space and elastically pressing the drum gripping hole to provide elastic force in a direction in which the fixed drum is close to each other. The central spring and the central spring are installed so as to press the center of the drum gripper. It consists of a drum spring consisting of auxiliary springs to elastically press both ends of the drum gripper on both sides of the furnace,
The rear end of the geogrid is wound on the outer surface of the connecting reinforcement coupled to the coupling clip is configured to prevent the geogrid from loosening from the connecting reinforcement, the fixed clip is composed of a first body and a second body formed in a semi-circular band shape The first body and the second body are connected to each other via a hinge and configured to be folded and unfolded. A plurality of first coupling teeth are formed on an inner surface of the end of the first body, and the second body Reinforcing soil retaining wall block construction method of the cut slope characterized in that the outer peripheral surface is formed with a second coupling teeth capable of teeth and the first coupling teeth in the circumferential direction.
삭제delete
KR1020170079364A 2017-06-22 2017-06-22 Geogrid fixing device and the method of constructing block for wall using this KR102013387B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170079364A KR102013387B1 (en) 2017-06-22 2017-06-22 Geogrid fixing device and the method of constructing block for wall using this

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170079364A KR102013387B1 (en) 2017-06-22 2017-06-22 Geogrid fixing device and the method of constructing block for wall using this

Publications (2)

Publication Number Publication Date
KR20190000257A KR20190000257A (en) 2019-01-02
KR102013387B1 true KR102013387B1 (en) 2019-08-22

Family

ID=65021478

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170079364A KR102013387B1 (en) 2017-06-22 2017-06-22 Geogrid fixing device and the method of constructing block for wall using this

Country Status (1)

Country Link
KR (1) KR102013387B1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102275672B1 (en) 2019-04-19 2021-07-09 장맥건설(주) Method for building retaining wall of slope, using a light weight foam cement mixed material
CN111236473A (en) * 2020-02-26 2020-06-05 山西省农业科学院园艺研究所 Mountain land energy-saving sunlight greenhouse wall and manufacturing method thereof
KR102376019B1 (en) * 2020-03-18 2022-03-18 이석호 Corrugated steel wall
CN115369811B (en) * 2022-07-02 2024-02-02 中国建筑一局(集团)有限公司 Geotechnical grid and embankment protection construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200155197Y1 (en) * 1994-08-16 1999-08-16 정몽규 Wiring fastening clip
KR101654350B1 (en) * 2016-01-29 2016-09-05 만성건설 주식회사 Wire rope fixing device for prevention rockslide of cutting slope and constructing method of rockslide preventing net using this
KR101738584B1 (en) * 2016-02-15 2017-05-22 유권식 Door stopper with shock absorber

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140013497A (en) * 2012-07-24 2014-02-05 성도건설산업(주) Method for constructing block type reinforced retaining wall in cut site

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200155197Y1 (en) * 1994-08-16 1999-08-16 정몽규 Wiring fastening clip
KR101654350B1 (en) * 2016-01-29 2016-09-05 만성건설 주식회사 Wire rope fixing device for prevention rockslide of cutting slope and constructing method of rockslide preventing net using this
KR101738584B1 (en) * 2016-02-15 2017-05-22 유권식 Door stopper with shock absorber

Also Published As

Publication number Publication date
KR20190000257A (en) 2019-01-02

Similar Documents

Publication Publication Date Title
KR102013387B1 (en) Geogrid fixing device and the method of constructing block for wall using this
KR101785677B1 (en) Construction method of retaining wall using precast slope panel
KR100930829B1 (en) Pannel have rockbolt coupler
KR101378793B1 (en) Retaining wall system for planting and the construction method
KR101203627B1 (en) Composite pile connected inner connecting member and composite construction method using the same
KR101169732B1 (en) Earth anchor and retaining wall using it
KR101799398B1 (en) Precast self-supported wall structure using pile and perforated connection pipe and the construction method therefor
KR101101927B1 (en) Construction method of basement wall using the precast concrete member
KR102088161B1 (en) Structure of self-stand retaining wall
KR101007566B1 (en) Structure of reinforcing cut-slope using nailing and anchoring device and the method of constructing the same
KR100980760B1 (en) The front block of rock bolt union structure and construction work method
KR101365061B1 (en) Apparatus to set up giogrid for raising the ground
KR20180129150A (en) Block type reinforcement retaining wall structure and it's construction method
KR20020043506A (en) Process for constructing retaining wall safely by natural stones
KR102209982B1 (en) Freestanding retaining wall structure
KR101147334B1 (en) earth anchor bracket
KR100891507B1 (en) Apparatus for fixing landscape architecture stones, landscape architecture stones assembly and wire fixing apparatus thereof
KR101394315B1 (en) Vegetation wall
KR20090020082A (en) Tension soil nail for slope stability and construction method of precast concrete block using the same
KR101623342B1 (en) Earth retaining structure utilizing in-situ soil and earth retaining structure construction Method
KR200378292Y1 (en) Strengthened Implement of Tension type Soil Nail
KR101527703B1 (en) Revetment Block and Installation Method Thereof
KR102062534B1 (en) Structure for grid join
KR100462129B1 (en) fix a device for reinforcing rod of the surface reinforcement
KR101339571B1 (en) Steel jointing structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right