KR101989543B1 - Method for constructing a corner bead for building corner finish - Google Patents

Method for constructing a corner bead for building corner finish Download PDF

Info

Publication number
KR101989543B1
KR101989543B1 KR1020180054040A KR20180054040A KR101989543B1 KR 101989543 B1 KR101989543 B1 KR 101989543B1 KR 1020180054040 A KR1020180054040 A KR 1020180054040A KR 20180054040 A KR20180054040 A KR 20180054040A KR 101989543 B1 KR101989543 B1 KR 101989543B1
Authority
KR
South Korea
Prior art keywords
corner
wall surface
bead
wall
building
Prior art date
Application number
KR1020180054040A
Other languages
Korean (ko)
Inventor
김태원
Original Assignee
(주)우림엔지니어링건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)우림엔지니어링건축사사무소 filed Critical (주)우림엔지니어링건축사사무소
Priority to KR1020180054040A priority Critical patent/KR101989543B1/en
Application granted granted Critical
Publication of KR101989543B1 publication Critical patent/KR101989543B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/022Borders; Finishing strips, e.g. beadings; Light coves for use at vertical intersections of walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

Provided is a method for constructing a corner bead for a corner of walls of a building, which can be accurately positioned at a corner even if the surface of the corner of concrete walls is formed to be inclined. The method for constructing a corner bead for a corner of walls of a building, which is a method for installing the corner bead on the surface of the corner where a first wall surface and a second wall surface intersect, comprises: a step of applying cement paste to the first wall surface (210) and a second wall surface (220); a step of adhering the corner bead (100) to the first wall surface (210) and the second wall surface (220) to which the cement paste has been applied; and a step of securing the corner bead (100) to the first wall surface (210) and the second wall surface (220) with fixing nails (300). When inclined surfaces are formed on the first wall surface (210) and the second wall surface (220), first, second, third, and fourth rotating wing portions are rotated to be closely attached to the inclined surfaces and, at the same time, a bead portion of the corner bead is arranged and installed at the corner.

Description

건축물의 벽면 모서리용 코너비드 시공방법{Method for constructing a corner bead for building corner finish}FIELD OF THE INVENTION [0001] The present invention relates to a method of constructing a corner bead for a wall edge of a building,

본 발명은 건축물의 벽면 모서리용 코너비드 시공방법에 관한 것으로써, 특히 건축물의 콘크리트 벽체 모서리부분의 벽면에 경사면이 있더라도 코너비드 부분이 콘크리트 벽체의 모서리부분 중심부에 위치될 수 있도록 한 건축물의 벽면 모서리용 코너비드 시공방법에 관한 것이다.The present invention relates to a method of constructing a corner bead for a corner of a wall of a building, and more particularly, to a method of constructing a corner bead for a corner of a building, in which a corner bead portion can be positioned at the center portion of a corner portion of a concrete wall, The present invention relates to a method of constructing a corner bead.

일반적으로 콘크리트 구조물 공사 현장에서 구조물의 코너면을 마무리하는 경우 거푸집 형틀 정밀도의 저하와 콘크리트 타설시 과도한 진동기 사용으로 콘크리트 면이 평활하지 못하여 마감성이 크게 저하되는 문제가 있었다.In general, when the corner surface of the structure is finished at the construction site of the concrete structure, there is a problem that the precision of the formwork is lowered and the concrete surface is not smooth due to the use of an excessive vibrator when the concrete is cast.

또한, 콘크리트 타설 후 거푸집을 분리한 다음 벽체 코너를 시공할 때에는 형성된 콘크리트 면중에 거푸집 조인트 부위를 중심으로 10cm 내외의 폭을 시멘트 풀칠에 의한 면처리 공사를 시행하고 있으며, 코너시공은 미장공정에서 면각을 조성하여 주고 면처리 공사에서 시멘트 풀칠로 마감을 하는 시공방식을 사용하고 있다.In addition, when the concrete is placed after the concrete is laid and the wall corner is constructed, the cement paste is applied to the formed concrete surface with a width of about 10 cm around the joint of the formwork. And the cement paste finish is used in the surface treatment construction.

이러한 마감 시공방식의 번거로운 문제를 해결하기 위해 시멘트 풀칠에 의해 콘크리트 벽체의 코너 부위를 마무리할 때 면각을 정확하고 미려하게 조성하기 위해 코너 비드가 사용되고 있다.In order to solve the troublesome problem of the finishing method, the corner bead is used to precisely and smoothly make the surface angle when the corner portion of the concrete wall is finished by the cement pasting.

이러한 종래의 코너 비드 중 일 예가 한국실용신안등록 제20-0201311호에 개시되고, 도 1 및 도 2에 도시되어 있다.An example of such a conventional corner bead is disclosed in Korean Utility Model Registration No. 20-0201311, and is shown in Figs. 1 and 2. Fig.

이 코너비드는 제1부재(31)와 제2부재(32) 및 돌출부(20)로 이루어지며, 제1부재(31)와 제2부재(32)는 직각을 이루도록 일체로 형성되고 양측면에 다수의 요철부가 형성되어 있다.The corner bead is composed of a first member 31, a second member 32 and a protruding portion 20. The first member 31 and the second member 32 are integrally formed at right angles, As shown in Fig.

상기 제1 및 제2 부재(31,32)의 양 측면에 형성된 요철 중 콘크리트 벽체와 맞닿는 면의 요철은 콘크리트벽체 코너부(40)에 시멘트 풀칠을 통해 견고하게 부착, 고정되도록 형성된 것이고, 반대 면의 요철은 그 위에 도포되는 마감층(30)과 견고하게 고정된다.The irregularities of the irregularities formed on both side surfaces of the first and second members 31 and 32 are firmly attached and fixed to the concrete wall corners 40 through the cement paste, Is firmly fixed to the finish layer 30 applied thereon.

상기 돌출부(20)는 상기 제1부재(31)와 제2부재(32)의 접점 부위 외측으로 돌출·형성되되, 그 바깥면이 벽체의 코너로서 노출되도록 코너 각 형상을 가진다.The protrusion 20 protrudes outward from the contact point between the first member 31 and the second member 32 and has a corner angular shape such that its outer surface is exposed as a corner of the wall.

그러나, 이와 같은 양날개 형태의 종래 코너비드는 기울기를 보정할 수 없도록 되어 있었기 때문에 시공오차에 의해 콘크리트 벽체의 외측모서리가 평면에서 볼 때 직각을 이루지 못하고 예각 또는 둔각을 이루는 경우를 많이 볼 수 있는데, 이 경우 상기 제1부재(31) 또는 제2부재(32)가 콘크리트 벽체로부터 들떠서 불완전하게 설치되는 문제점이 있다.However, since the conventional corner bead in the form of a double wing has been designed so that it can not correct the inclination, the outer edge of the concrete wall can not be perpendicular to the concrete wall due to the construction error, and many acute angles or obtuse angles can be seen In this case, the first member 31 or the second member 32 may be installed incompletely from the concrete wall.

다른 예의 코너비드가 한국특허등록 제10-1512750호에 개시되고 도 3에 도시되어 있다. 이는 고정앵글(30)에 설치된 코너비드(40)가 기울어진 경우 비드전진볼트(50)와 비드후진볼트(60)(62)를 상호 풀고 조이는 것에 의해 코너비드(40)의 상부와 하부를 고정앵글(30)에 가깝게 하거나 멀게 조정함으로써 코너비드(40)의 기울기를 보정할 수 있는 효과가 있으나, 상기 실용신안등록과 마찬가지로 콘크리트 벽면 자체가 기울어진 경우에는 고정앵클(30)이 콘크리트 벽체로부터 들떠서 불완전하게 설치되는 문제점이 있다.Another example corner bead is disclosed in Korean Patent Registration No. 10-1512750 and shown in Fig. This is because when the corner bead 40 installed on the fixed angle 30 is tilted, the upper and lower portions of the corner bead 40 are fixed by fixing the bead advance bolt 50 and the bead reverse bolts 60, It is possible to correct the inclination of the corner bead 40 by adjusting the angle close to or away from the angle 30. However, when the concrete wall itself is inclined as in the case of the utility model registration, the fixed anchor 30 is excited from the concrete wall There is a problem that it is installed incompletely.

상기와 같은 선행기술의 문제점을 해결하는 코너비드 고정장치가 한국특허등록 제10-1604114호에 개시되고 도 4 및 도 5에 도시되어 있다.A corner bead fixing apparatus for solving the problems of the prior art described above is disclosed in Korean Patent Registration No. 10-1604114 and shown in FIGS. 4 and 5. FIG.

이는 상호 교차이동 가능하게 결합되는 조정브래킷(30)과 슬라이드브래킷(70)을 구비하여서, 조정볼트(62a)(62b)(62c)에 의해 조정브래킷(30)의 기울기를 조정하여 코너비드(20)를 기울어진 벽면에서 수직으로 정밀하게 시공할 수 있게 하고, 슬라이드브래킷(70)의 탄성후크(72a)(72b)를 걸림편(32a)(32b)에 건 상태에서 슬라이드브래킷(70)을 벽면의 기울기에 따라 기울여서 타측벽면(24)에 밀착시킬 수 있기 때문에 슬라이드브래킷(70)을 타측벽면(24)에 견고하게 설치할 수 있는 효과가 있는 것이다.This includes an adjusting bracket 30 and a slide bracket 70 that are coupled to each other so as to be capable of mutually intersecting and moving so that the inclination of the adjusting bracket 30 is adjusted by the adjusting bolts 62a, 62b, So that the slide bracket 70 can be precisely installed vertically on the inclined wall surface while the elastic hooks 72a and 72b of the slide bracket 70 are engaged with the retaining pieces 32a and 32b, The slide bracket 70 can be firmly attached to the other side wall surface 24 because the slant bracket 70 can be tilted with respect to the other side wall surface 24 in accordance with the inclination of the slide bracket 70. [

그런데, 상기와 같은 코너비드 고정장치는 조정브래킷(30)과 슬라이드브래킷(70) 및 코너비드(20)를 별도의 부품으로서 구비하여야 하므로 보관 및 운반이 번거롭고, 각각 별도로 고정작업을 하여야 하므로 시공시간이 길어지는 문제점이 있다.However, since the corner bead fixing device as described above requires the adjustment bracket 30, the slide bracket 70, and the corner bead 20 as separate components, it is cumbersome to store and transport them, There is a problem that this becomes longer.

한국실용신안등록 제20-0201311호Korean Utility Model Registration No. 20-0201311 한국특허등록 제10-1512750호Korea Patent No. 10-1512750 한국특허등록 제10-1604114호Korean Patent No. 10-1604114

본 발명은 상기와 같은 문제점을 해결하기 위하여 창출된 것으로써, 콘크리트 벽체의 모서리부분 벽면에 경사면이 형성되어 있더라도 코너비드가 정확하게 모서리부분에 위치될 수 있도록 한 건축물의 벽면 모서리용 코너비드 시공방법을 제공하는 데 그 목적이 있다. The present invention has been made to solve the above problems and it is an object of the present invention to provide a method of constructing a corner bead for a corner of a wall of a building in which a corner bead can be accurately positioned at an edge portion even if an inclined surface is formed on a wall portion of a corner portion of a concrete wall The purpose is to provide.

특히, 본 발명은 건축물의 콘크리트 벽체 모서리부분이 들쭉날쭉하더라도 코너비드가 모서리 부분에 정확하게 위치될 수 있도록 한 건축물의 벽면 모서리용 코너비드 시공방법을 제공하는 데 그 목적이 있다. In particular, it is an object of the present invention to provide a method of constructing a corner bead for a corner of a wall of a building, in which a corner bead can be precisely positioned at a corner even if corner portions of a concrete wall of a building are jagged.

상기 목적을 달성하는 본 발명은 제1벽면과 제2벽면이 만나는 건축물의 벽면 모서리부에 코너비드를 시공하는 건축물의 코너비드 시공방법에 있어서,According to another aspect of the present invention, there is provided a method of constructing a corner bead of a building for constructing a corner bead on an edge of a wall of a building where a first wall surface and a second wall face meet,

상기 제1벽면과 제2벽면에 시멘트 풀칠을 하는 단계와;Cementing the first wall surface and the second wall surface;

상기 시멘트 풀칠된 상기 제1벽면과 제2벽면에 상기 코너비드를 밀착하여 부착시키는 단계와;Adhering the corner beads in close contact with the cement-coated first wall surface and the second wall surface;

상기 코너비드를 고정못으로 상기 제1벽면과 제2벽면에 고정시키는 단계;를 포함하되,And fixing the corner bead to the first wall surface and the second wall surface with a fixing nail,

상기 코너비드는 상기 제1벽면측에 수평으로 그리고 수직으로 뻗은 제1고정날개부와, 상기 제1고정날개부와 연결되며 상기 제2벽면측에 수평으로 그리고 수직으로 뻗은 제2고정날개부와, 상기 제1고정날개부와 제2고정날개부의 경계부에 형성되어 상기 모서리부에 배치되는 비드부로 이루어지는 비드몸체와; 각 일단이 상기 제1고정날개부와 회동가능하게 연결되며 상하로 배치되는 복수의 제1회동날개부와;The corner bead includes a first fixed wing portion extending horizontally and vertically to the first wall surface side, a second fixed wing portion connected to the first fixed wing portion and extending horizontally and vertically on the second wall surface side, A bead body formed at a boundary portion between the first fixed wing portion and the second fixed wing portion and disposed at the corner portion; A plurality of first rotating wings each having one end rotatably connected to the first stationary wing portion and arranged vertically;

상기 제1고정날개부와 상기 각 제1회동날개부를 동축으로 회동가능하게 연결하는 제1회동축과; 각 일단이 상기 각 제1회동날개부에 각각 대응하여 회동가능하게 연결되고 상하로 배치되는 복수의 제2회동날개부와; 상기 각 제1회동날개부에 대응되는 상기 각 제2회동날개부를 회동가능하게 연결하는 복수의 제2회동축과; 각 일단이 상기 제2고정날개부와 회동가능하게 연결되며 상하로 배치되는 복수의 제3회동날개부와; 상기 제2고정날개부와 제3회동날개부를 동축으로 회동가능하게 연결하는 제3회동축과; 각 일단이 상기 각 제3회동날개부에 각각 대응하여 회동가능하게 연결되고 상하로 배치되는 복수의 제4회동날개부와; 상기 각 제3회동날개부에 대응되는 상기 각 제4회동날개부를 회동가능하게 연결하는 복수의 제4회동축;을 구비하여서,A first pivot shaft for pivotally connecting the first fixed blade and each of the first pivot blades in a coaxial manner; A plurality of second turning blades each having one end rotatably connected to each of the first rotating blades and vertically disposed; A plurality of second pivot shafts rotatably connecting the respective second pivot blades corresponding to the first pivot blades; A plurality of third rotating blades each having one end rotatably connected to the second stationary wing portion and arranged vertically; A third rotating shaft for rotatably connecting the second fixed blade portion and the third rotating blade portion in a coaxial manner; A plurality of fourth rotating blades each having one end rotatably connected to each of the third rotating blades and arranged vertically; And a plurality of fourth rotating shafts rotatably connecting the respective fourth rotating blades corresponding to the respective third rotating blades,

상기 제1벽면 및 제2벽면에 경사면이 형성된 경우 상기 각 제1,제2,제3 및 제4회동날개부가 회동되면서 상기 경사면에 밀착되고, 동시에 상기 비드부를 상기 모서리부에 배치하여 시공하는 것을 특징으로 한다.When the first wall surface and the second wall surface are formed with inclined surfaces, the first, second, third, and fourth turnable blades are rotated while being closely contacted with the inclined surface, and the bead is disposed at the corner portion .

또한, 본 발명 코너비드 시공방법에 있어서, 상기 제1고정날개부와 제2고정날개부의 경계부분 위치에서 상기 비드부 측으로 오목하게 형성되는 여유홈이 형성된 것을 특징으로 한다.In the method of constructing a corner bead of the present invention, a clearance groove formed concavely toward the bead side is formed at a boundary position between the first fixed blade and the second fixed blade.

또한, 본 발명 코너비드 시공방법에 있어서, 상기 각 제1,제2,제3 및 제4회동날개부에 각각 고정못이 통과되는 관통공이 형성된 것을 특징으로 한다.In addition, in the method of constructing a corner bead of the present invention, each of the first, second, third, and fourth turning blades is provided with a through hole through which a fixing nail passes.

첫째, 코너비드(100)가 상호 굴절 회동가능하게 복수의 회동날개부로 구성됨으로써 벽면에 경사면(211)(212)(221)이 형성되어 있더라도 비드부(103)가 벽체 모서리 위치에 정확하게 배치되어 시공될 수 있도록 한다.First, since the corner beads 100 are formed by a plurality of turning blades so as to be able to bend and rotate mutually, even if the slopes 211, 212, and 221 are formed on the wall surface, the beads 103 are accurately positioned at the edge of the wall, .

둘째, 비드몸체(110)의 내측에 여유홈(103a)이 형성됨으로써, 거푸집의 제거시 시멘트가 들쭉날쭉하게 돌출 형성된 부분은 상기 여유홈(103a)에 진입되게 되므로, 비드부(103)가 벽체의 모서리부(215)에 수직으로 기립된 상태로 정확한 위치에 배치될 수 있게 한다.Secondly, since the clearance groove 103a is formed on the inner side of the bead body 110, the portion where the cement is jagged protruded when the form is removed enters the clearance groove 103a, So that it can be disposed at the correct position while standing vertically to the corner portion 215.

도 1 및 도 2는 종래 코너비드를 나타낸 개략도,
도 3은 종래 다른 코너비드를 나타낸 단면도,
도 4 및 도 5는 종래 또 다른 코너비드를 나타낸 개략도,
도 6은 본 발명 실시예의 시공방법에 적용되는 코너비드를 나타낸 사시도,
도 7은 본 발명 실시예의 시공방법에 적용되는 코너비드를 나타낸 다면도,
도 8은 본 발명 실시예의 시공방법에 적용되는 코너비드를 나타낸 사시도이다.
Figures 1 and 2 are schematic diagrams showing conventional corner beads,
3 is a cross-sectional view showing another conventional corner bead,
Figures 4 and 5 are schematic diagrams of another conventional corner bead,
6 is a perspective view showing a corner bead applied to the construction method of the embodiment of the present invention,
7 is a perspective view of a corner bead applied to a construction method of an embodiment of the present invention,
8 is a perspective view showing a corner bead applied to the construction method of the embodiment of the present invention.

본 발명 실시예의 건축물의 코너비드 시공방법은 콘크리트 벽체의 모서리부분 벽면에 경사면이 형성되어 있더라도 코너비드가 정확하게 모서리부분에 위치될 수 있도록 하고, 또한 건축물의 콘크리트 벽체 모서리부분이 들쭉날쭉하더라도 코너비드가 모서리 부분에 정확하게 위치될 수 있도록 한다.The method of constructing the corner bead of the building of the embodiment of the present invention allows the corner bead to be accurately located at the edge portion even if the inclined surface is formed on the wall portion of the edge portion of the concrete wall and even if the corner portion of the concrete wall of the building is jagged, So that it can be accurately positioned.

건축물의 제1벽면과 제2벽면이 만나는 모서리부에 설치되는 본 발명 실시예의 코너비드 구조체를 나타낸 도 6 내지 도 8을 참조하면, 이는 비드몸체(110) 및 제1 내지 제4회동날개부(120,130,140,150)로 이루어지며, 고정못(300)에 의해서 제1벽면(210) 및 제2벽면(220)에 고정되어진다.6 to 8 showing a corner bead structure according to an embodiment of the present invention, which is installed at an edge portion where a first wall surface and a second wall surface of a building meet, the bead body 110 and the first to fourth rotation wings 120, 130, 140, 150, and is fixed to the first wall surface 210 and the second wall surface 220 by the fixing nails 300.

상기 비드몸체(110)는 상기 제1벽면(210)측에 수평으로 그리고 수직으로 뻗은 제1고정날개부(101)와, 상기 제1고정날개부(101)와 연결되며 상기 제2벽면(220)측에 수평으로 그리고 수직으로 뻗은 제2고정날개부(102)와, 상기 제1고정날개부(101)와 제2고정날개부(102)의 경계부에 형성되어 상기 모서리부(215)에 배치되는 비드부(103)로 이루어진다.The bead body 110 includes a first fixed wing portion 101 extending horizontally and vertically on the first wall surface 210 side and a second fixed wing portion 102 connected to the first fixed wing portion 101, The second fixed wing portion 102 is formed at a boundary portion between the first fixed wing portion 101 and the second fixed wing portion 102 and is disposed at the corner portion 215 And a bead portion 103 which is made of a metal.

상기 비드부(103)는 콘크리트 벽체의 코너 부위를 마무리할 때 면각을 정확하고 미려하게 조성하기 위해 벽체의 모서리부(215)에 정확하게 배치되어야 한다.The bead portion 103 must be accurately positioned at the corner portion 215 of the wall to accurately and beautifully form the surface angle when finishing the corner portion of the concrete wall.

상기 제1회동날개부(120)는 상하로 배치되어 복수 마련되며, 상기 제1회동날개부(120)의 각 일단들은 상기 제1고정날개부(101)와 하나의 제1회동축(161)에 의해서 각각 회동가능하게 연결된다.One end of each of the first rotation wings 120 is connected to the first rotation wing part 101 and one of the first rotation axes 161, Respectively.

상기 제2회동날개부(130)는 상하로 배치되어 복수 마련되며, 각 제2회동날개부(130)들은 상기 각 제1회동날개부(120)와 나란히 배치되고, 제2회동날개부(130)의 각 일단들은 상기 각 제1회동날개부(120)에 각각 제2회동축(162)들에 의해서 각각 회동가능하게 연결된다.The second rotary wings 130 are arranged vertically and a plurality of the second rotary wings 130 are disposed in parallel to the first rotary wings 120 and the second rotary wings 130 Are rotatably connected to the respective first rotary wings 120 by the second rotary shafts 162, respectively.

상기 제3회동날개부(140)는 상하로 배치되어 복수 마련되며, 상기 제3회동날개부(140)의 각 일단들은 상기 제2고정날개부(102)와 하나의 제3회동축(163)에 의해서 각각 회동가능하게 연결된다.One end of the third rotation wing portion 140 is connected to the second rotation wing portion 102 and one third rotation shaft 163, Respectively.

상기 제4회동날개부(150)는 상하로 배치되어 복수 마련되며, 각 제4회동날개부(150)들은 상기 각 제3회동날개부(140)와 나란히 배치되고, 제4회동날개부(150)의 각 일단들은 상기 각 제3회동날개부(140)에 각각 제4회동축(164)들에 의해서 각각 회동가능하게 연결된다.The fourth rotating blades 150 are arranged vertically and a plurality of the fourth rotating blades 150 are disposed in parallel to the respective third rotating blades 140. The fourth rotating blades 150 Are rotatably connected to the respective third rotary wings 140 by the fourth rotary shafts 164, respectively.

상기 비드부(103)에는 상기 제1고정날개부(101)와 제2고정날개부(102)의 경계부분 위치에서 오목하게 여유홈(103a)이 형성된다.The bead portion 103 is formed with a clearance groove 103a concaved at a boundary portion between the first fixed blade portion 101 and the second fixed blade portion 102. [

한편, 상기 여유홈(103a)에는 상기 제1벽면(210)과 제2벽면(220)의 경계부분인 모서리부(215)에 거푸집의 제거시 형성되는 시멘트가 들쭉날쭉하게 돌출되는 부분이 진입되며, 이로써 비드부(103)가 벽체의 모서리부(215)에 정확한 위치에 배치될 수 있도록 한다.The jagged protrusions of the cement formed at the time of removal of the form are entered into the edge 215 which is a boundary portion between the first wall surface 210 and the second wall surface 220 in the clearance groove 103a, This allows the bead 103 to be positioned at the correct position on the corner 215 of the wall.

또한, 상기 각 제1,제2,제3 및 제4회동날개부(120,130,140,150)에는 각각 고정못(300)이 통과되는 관통공(121,131,141,151)이 형성된다.The through holes 121, 131, 141 and 151 through which the fixing nails 300 pass are formed in the first, second, third and fourth rotating wings 120, 130, 140 and 150, respectively.

상기 각 제1,제2,제3 및 제4회동날개부(120,130,140,150)는 각각 고정못(300)에 의해서 상기 제1벽면(210) 또는 제2벽면(220)에 고정된다.The first, second, third, and fourth rotating wings 120, 130, 140, and 150 are fixed to the first wall surface 210 or the second wall surface 220 by the fixing nails 300, respectively.

상기와 같은 구성을 가지는 코너비드(100)는 다음과 같이 건축물의 벽체 모서리부(215)에 시공된다.The corner bead 100 having the above-described construction is applied to the wall edge portion 215 of the building as follows.

콘크리트 구조물 공사 현장에서 구조물 벽체 코너면을 마무리하는 경우 거푸집 형틀 정밀도의 저하와 콘크리트 타설시 과도한 진동기 사용으로 콘크리트 벽면이 평활하지 못하게 형성된다.Concrete structures When the wall surface of a building is finished, the precision of the formwork frame is lowered and the concrete wall is not smooth due to the use of excessive vibrator when pouring concrete.

즉, 도 7에 도시된 바와 같이, 벽체 모서리부(215)에 경사면(211)(212)(221)이 형성되게 된다. That is, as shown in FIG. 7, the inclined surfaces 211, 212, and 221 are formed in the wall edge portion 215.

본 발명 실시예의 코너비드(100)는 비드몸체(110)에 대해 제1 및 제2회동날개부(120)(130)가 회동가능하게 연결되고, 또한 제3 및 제4회동날개부(140)(150)가 회동가능하게 연결되므로, 제1 및 제2회동날개부(120)(130)가 굴절되면서 경사면(211)(212)에 밀착되고 제4회동날개부(150)가 굴절되면서 경사면(221)에 밀착될 수 있게 된다.The corner bead 100 of the embodiment of the present invention is constructed such that the first and second rotary wings 120 and 130 are rotatably connected to the bead body 110 and the third and fourth rotary wings 140, The first and second rotary wings 120 and 130 are bent so that the first and second rotary wings 120 and 130 are brought into close contact with the inclined surfaces 211 and 212 and the fourth rotary wing 150 is bent, 221, respectively.

이때 비드몸체(110)에 대해 제1회동날개부(120)와 제3회동날개부(140)가 회동가능하므로, 경사면(211)(212)(221)이 형성되어 있음에도 불구하고 비드부(103)는 벽체 모서리에 정확하게 배치될 수 있게 조정가능하다.Since the first rotating wing 120 and the third rotating wing 140 are rotatable with respect to the bead body 110 at this time, even though the inclined surfaces 211, 212, and 221 are formed, ) Is adjustable to be precisely positioned on the wall edge.

상기와 같은 구성의 코너비드(100)를 콘크리트 벽체 모서리부에 고정시키는 공정은 다음과 같다.The process of fixing the corner bead 100 to the edge of the concrete wall is as follows.

먼저, 제1벽면(210)과 제2벽면(220)에 시멘트 풀칠을 하고, 상기 비드부(103)가 벽체 모서리부(215)에 정확하게 배치된 상태에서 제1 및 제2회동날개부(120)(130)를 굴절시키면서 경사면(211)(212)에 밀착하여 시멘트 풀에 부착시킨 후 고정못(300)으로 제1벽면(210)에 고정시키고, 제4회동날개부(150)를 굴절시면서 경사면(221)에 밀착하여 시멘트 풀에 부착시킨 후 고정못(300)으로 제2벽면(220)에 고정시킨다.First, the first wall surface 210 and the second wall surface 220 are cement-pasted and the first and second rotation wings 120 (120) are cemented with the bead 103 positioned accurately at the wall edge 215 And then adhered to the cement pools while being fixed to the first wall surface 210 with the fixing nails 300. While refracting the fourth rotation wing portion 150, And is fixed to the second wall surface 220 with the fixing nails 300. [

이때 상기 제1벽면(210)과 제2벽면(220)의 경계부분인 모서리부(215)에 거푸집의 제거시 시멘트가 들쭉날쭉하게 돌출 형성된 부분은 상기 여유홈(103a)에 진입되게 되므로, 비드부(103)가 벽체의 모서리부(215)에 정확한 위치에 배치될 수 있게 한다.At this time, the portion of the edge 215 which is the boundary between the first wall surface 210 and the second wall surface 220, where the cement is jagged when the form is removed, enters the clearance groove 103a, (103) to be positioned at the corner portion (215) of the wall in the correct position.

상기와 같이 코너비드(100)가 고정된 후 마감층(400)으로 덮어서 콘트리트 벽체를 마감한다.After the corner bead 100 is fixed as described above, it is covered with the finish layer 400 to finish the concrete wall.

상술한 바와 같은 본 발명은 코너비드(100)가 상호 굴절 회동가능하게 복수의 회동날개부로 구성됨으로써 벽면에 경사면(211)(212)(221)이 형성되어 있더라도 비드부(103)가 벽체 모서리 위치에 정확하게 배치되어 시공될 수 있도록 한다.The present invention as described above is characterized in that the corner beads 100 are constituted by a plurality of turning blades so that the corner beads 100 can be bent and refracted so that the bead portion 103 is positioned at the corner edge of the wall even if the slopes 211, So that it can be installed.

또한, 비드몸체(110)의 내측에 여유홈(103a)이 형성됨으로써, 거푸집의 제거시 시멘트가 들쭉날쭉하게 돌출 형성된 부분은 상기 여유홈(103a)에 진입되게 되므로, 비드부(103)가 벽체의 모서리부(215)에 수직으로 기립된 상태로 정확한 위치에 배치될 수 있게 한다.Since the clearance groove 103a is formed on the inner side of the bead body 110, the portion where the cement is jagged when the form is removed enters the clearance groove 103a, So that it can be disposed at the correct position while standing vertically to the corner portion 215.

100...코너비드 110...비드몸체
101...제1고정날개부 102...제2고정날개부
103...비드부 103a...여유홈
120...제1회동날개부 130...제2회동날개부
140...제3회동날개부 150...제4회동날개부
100 ... corner bead 110 ... bead body
101 ... first fixed wing part 102 ... second fixed wing part
103 ... bead portion 103a ... clearance groove
120 ... first rotating wing 130 ... second rotating wing
140 ... Third rotating wing 150 ... Fourth rotating wing

Claims (3)

제1벽면과 제2벽면이 만나는 건축물의 벽면 모서리부에 코너비드를 시공하는 건축물의 벽면 모서리용 코너비드 시공방법에 있어서,
상기 제1벽면(210)과 제2벽면(220)에 시멘트 풀칠을 하는 단계와;
상기 시멘트 풀칠된 상기 제1벽면(210)과 제2벽면(220)에 상기 코너비드(100)를 밀착하여 부착시키는 단계와;
상기 코너비드(100)를 고정못(300)으로 상기 제1벽면(210)과 제2벽면(220)에 고정시키는 단계;를 포함하되,
상기 코너비드(100)는 상기 제1벽면(210)측에 수평으로 그리고 수직으로 뻗은 제1고정날개부(101)와, 상기 제1고정날개부(101)와 연결되며 상기 제2벽면(220)측에 수평으로 그리고 수직으로 뻗은 제2고정날개부(102)와, 상기 제1고정날개부(101)와 제2고정날개부(102)의 경계부에 형성되어 상기 모서리부(215)에 배치되는 비드부(103)로 이루어지는 비드몸체(110)와; 각 일단이 상기 제1고정날개부(101)와 회동가능하게 연결되며 상하로 배치되는 복수의 제1회동날개부(120)와; 상기 제1고정날개부(101)와 상기 각 제1회동날개부(120)를 동축으로 회동가능하게 연결하는 제1회동축(161)과; 각 일단이 상기 각 제1회동날개부(120)에 각각 대응하여 회동가능하게 연결되고 상하로 배치되는 복수의 제2회동날개부(130)와; 상기 각 제1회동날개부(120)에 대응되는 상기 각 제2회동날개부(130)를 회동가능하게 연결하는 복수의 제2회동축(162)과; 각 일단이 상기 제2고정날개부(102)와 회동가능하게 연결되며 상하로 배치되는 복수의 제3회동날개부(140)와; 상기 제2고정날개부(102)와 제3회동날개부(140)를 동축으로 회동가능하게 연결하는 제3회동축(163)과; 각 일단이 상기 각 제3회동날개부(140)에 각각 대응하여 회동가능하게 연결되고 상하로 배치되는 복수의 제4회동날개부(150)와; 상기 각 제3회동날개부(140)에 대응되는 상기 각 제4회동날개부(150)를 회동가능하게 연결하는 복수의 제4회동축(164);을 구비하여서,
상기 제1벽면(210) 및 제2벽면(220)에 경사면(211,212)(221)이 형성된 경우 상기 각 제1,제2,제3 및 제4회동날개부(120,130,140,150)가 회동되면서 상기 경사면(211,212)(221)에 밀착되고, 동시에 상기 비드부(103)를 상기 모서리부(215)에 배치하여 시공하는 것을 특징으로 하는 건축물의 벽면 모서리용 코너비드 시공방법.
A method of constructing a corner bead for a wall edge of a building that constructs a corner bead at an edge of a wall of a building where a first wall surface and a second wall face meet,
Cementing the first wall surface (210) and the second wall surface (220);
Adhering the corner bead (100) to the first wall surface (210) and the second wall surface (220) with the cement paste adhered thereto;
Securing the corner bead (100) to the first wall surface (210) and the second wall surface (220) with a fixing nail (300)
The corner bead 100 includes a first fixed wing portion 101 extending horizontally and vertically on the first wall surface 210 side and a second fixed wing portion 101 connected to the first fixed wing portion 101, The second fixed wing portion 102 is formed at a boundary portion between the first fixed wing portion 101 and the second fixed wing portion 102 and is disposed at the corner portion 215 A bead body 110 comprising a bead portion 103 to be formed; A plurality of first rotary wings 120 each having one end rotatably connected to the first stationary wing 101 and arranged vertically; A first pivot shaft (161) for pivotally connecting the first fixed blade (101) and each of the first rotating blades (120) in a coaxial manner; A plurality of second rotary wings 130 each having one end connected to the first rotary wings 120 so as to be rotatable and disposed in the vertical direction; A plurality of second pivot shafts (162) rotatably connecting the respective second pivot blades (130) corresponding to the first pivot blades (120); A plurality of third rotary wings 140 each having one end rotatably connected to the second stationary wing 102 and arranged vertically; A third rotating shaft 163 rotatably connecting the second fixed blade portion 102 and the third rotating blade portion 140 in a coaxial manner; A plurality of fourth rotating blades 150 each having one end rotatably connected to the third rotating blades 140 in a corresponding manner; And a plurality of fourth rotating shafts (164) rotatably connecting the respective fourth rotating blades (150) corresponding to the respective third rotating blades (140)
When the first wall surface 210 and the second wall surface 220 are formed with the inclined surfaces 211, 212 and 221, the first, second, third and fourth turning blades 120, 130, 140 and 150 are rotated, 211, 212), and at the same time, the bead (103) is disposed on the corner portion (215), thereby constructing the corner bead for a wall edge of a building.
청구항 1에 있어서, 상기 제1고정날개부(101)와 제2고정날개부(102)의 경계부분 위치에서 상기 비드부(103) 측으로 오목하게 형성되는 여유홈(103a)이 형성된 것을 특징으로 하는 건축물의 벽면 모서리용 코너비드 시공방법.The airbag device according to claim 1, wherein a clearance groove (103a) formed concavely toward the bead portion (103) is formed at a boundary position between the first fixed blade portion (101) and the second fixed blade portion Construction method of corner bead for wall edge of building. 청구항 1 또는 청구항 2에 있어서, 상기 각 제1,제2,제3 및 제4회동날개부에 각각 상기 고정못(300)이 통과되는 관통공이 형성된 것을 특징으로 하는 건축물의 벽면 모서리용 코너비드 시공방법.The method of claim 1 or 2, wherein the through holes are formed in the first, second, third, and fourth rotating blades to allow the fixing nails (300) to pass through the corner beads Way.
KR1020180054040A 2018-05-11 2018-05-11 Method for constructing a corner bead for building corner finish KR101989543B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180054040A KR101989543B1 (en) 2018-05-11 2018-05-11 Method for constructing a corner bead for building corner finish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180054040A KR101989543B1 (en) 2018-05-11 2018-05-11 Method for constructing a corner bead for building corner finish

Publications (1)

Publication Number Publication Date
KR101989543B1 true KR101989543B1 (en) 2019-06-14

Family

ID=66846528

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180054040A KR101989543B1 (en) 2018-05-11 2018-05-11 Method for constructing a corner bead for building corner finish

Country Status (1)

Country Link
KR (1) KR101989543B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200201311Y1 (en) 2000-05-31 2000-11-01 주식회사종합건축사무소 동일건축 Corner sheet bead for levelling inequalities in the surface of concrete walls
JP2006177114A (en) * 2004-12-24 2006-07-06 Toli Corp Corner part protecting member
KR101512750B1 (en) 2014-12-11 2015-04-16 (주)서한종합건축사사무소 Corner Bead Structure for Apartment house
KR101604114B1 (en) 2015-10-21 2016-03-17 (주)청우종합건축사사무소 Corner Bead Fastening Device for Construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200201311Y1 (en) 2000-05-31 2000-11-01 주식회사종합건축사무소 동일건축 Corner sheet bead for levelling inequalities in the surface of concrete walls
JP2006177114A (en) * 2004-12-24 2006-07-06 Toli Corp Corner part protecting member
KR101512750B1 (en) 2014-12-11 2015-04-16 (주)서한종합건축사사무소 Corner Bead Structure for Apartment house
KR101604114B1 (en) 2015-10-21 2016-03-17 (주)청우종합건축사사무소 Corner Bead Fastening Device for Construction

Similar Documents

Publication Publication Date Title
US4021989A (en) Rotatably pivotal stone anchor and stone anchor construction system
US10202760B1 (en) Self-aligning, double wire corner bead for fireproofing structural steel member and method of using same
US4722153A (en) Cover joints for masonry and sheet material structures
US8069622B2 (en) Systems and methods for finishing a penetration in a concrete structure during construction
US9140005B2 (en) Self-aligning corner bead for fireproofing structural steel member and method of using same
CA3068904C (en) Method for producing a ceiling element and ceiling formwork
KR101989543B1 (en) Method for constructing a corner bead for building corner finish
CN110670741A (en) Method for processing deformation joint of building wall body
US10415237B1 (en) Self-aligning corner bead for fireproofing structural steel member and method of using same
US20160281374A1 (en) Joint compound spreading tool for drywall joint finishing
JPH0125872B2 (en)
CN108396914B (en) Roof arc flashing construction mould
AU2015305322B2 (en) Self-aligning, double wire corner bead for fireproofing structural steel member and method of using same
KR100609081B1 (en) leveler for a smoothing of floor concrete and retaining wall formwork installation
JPH04155058A (en) Construction and frame for placing joint of concrete floor
JP2002356853A (en) Anchor bolt location setting jig
KR200201311Y1 (en) Corner sheet bead for levelling inequalities in the surface of concrete walls
TWM416674U (en) Improved door frame structure with adjustment device
JP2003206613A (en) Expansion-joint structure of tiling finishing and building method
JPH07286439A (en) Method for mounting opening part frame
KR200348703Y1 (en) Concrete finisher disk
EP1992763A2 (en) Bead alignment means
JP2000008658A (en) Fitting structure of coping for block
BR202021025899U2 (en) SPACING AND LEVELING DEVICE FOR CERAMIC FLOORING
KR200349968Y1 (en) leveler for a smoothing of floor concrete and retaining wall formwork installation

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant