KR101980866B1 - System and operation method for error restoration of distribution line - Google Patents

System and operation method for error restoration of distribution line Download PDF

Info

Publication number
KR101980866B1
KR101980866B1 KR1020120098112A KR20120098112A KR101980866B1 KR 101980866 B1 KR101980866 B1 KR 101980866B1 KR 1020120098112 A KR1020120098112 A KR 1020120098112A KR 20120098112 A KR20120098112 A KR 20120098112A KR 101980866 B1 KR101980866 B1 KR 101980866B1
Authority
KR
South Korea
Prior art keywords
substation
failure
feeder
power
capacity
Prior art date
Application number
KR1020120098112A
Other languages
Korean (ko)
Other versions
KR20140031604A (en
Inventor
이성우
하복남
서동완
안교상
서인용
김상옥
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR1020120098112A priority Critical patent/KR101980866B1/en
Publication of KR20140031604A publication Critical patent/KR20140031604A/en
Application granted granted Critical
Publication of KR101980866B1 publication Critical patent/KR101980866B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B15/00Supervisory desks or panels for centralised control or display
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

본 발명은 배전선로의 고장복구를 지원하는 배전선로 고장복구 시스템 및 이의 운용방법에 관한 것으로, 변전소에 설치되어, 상기 변전소 고장 발생시 상기 변전소의 상태정보 및 고장복구정보를 취득하여 최종 정전 피더(feeder)를 추출하는 배전 정보 취득부; 및 상기 추출된 최종 정전 피더(feeder)를 토대로 상기 배전선로의 상시 개방점 연결 또는 상시 연결점 분리를 통해 고장복구가 가능한지 여부를 판단하여 상기 변전소의 고장복구가 수행되도록 하는 배전 제어부;를 포함하고, 상기 배전 정보 취득부는, 상기 상태정보를 통해 고장 형태를 판단하고, 상기 고장복구정보를 통해 상기 변전소 내부에서 고장복구가 가능한지 여부를 판단하여 상기 변전소 내부에서 고장복구가 불가능하다고 판단되는 경우 상기 최종 정전 피더(feeder)를 추출하는 것을 특징으로 하는 배전선로 고장복구 시스템을 포함한다.The present invention relates to a distribution line fault recovery system for supporting fault recovery in a distribution line and a method of operating the same, and is provided with a substation installed in a substation to acquire status information and fault recovery information of the substation when the substation fails, A power distribution information acquisition unit for extracting power distribution information from the power distribution information; And a power distribution controller for determining whether or not a failure can be recovered through connection of a normally open point to a power line or a permanent connection point based on the extracted final power feeder and performing fault recovery of the substation, Wherein the power distribution information acquisition unit determines a failure type through the status information and determines whether failure recovery is possible within the substation through the failure recovery information and if it is determined that failure recovery is not possible within the substation, And a feeder failure recovery system characterized by extracting a feeder.

Description

배전선로 고장복구 시스템 및 이의 운용방법{SYSTEM AND OPERATION METHOD FOR ERROR RESTORATION OF DISTRIBUTION LINE}SYSTEM AND OPERATION METHOD FOR ERROR RESTORATION OF DISTRIBUTION LINE BACKGROUND OF THE INVENTION 1. Field of the Invention [

본 발명은 배전선로 고장복구 시스템 및 이의 운용방법에 관한 것으로, 보다 상세하게는 변전소 고장 발생 시 상태정보 및 고장복구정보를 실시간으로 취득하여 신속하고 정확한 배전선로의 고장복구를 지원하는 배전선로 고장복구 시스템 및 이의 운용방법에 관한 것이다.The present invention relates to a fault recovery system for a distribution line and a method of operating the same, and more particularly, to a fault recovery system for a distribution line that supports quick and accurate fault recovery by acquiring status information and fault recovery information in the event of a substation failure in real- System and a method of operating the same.

배전계통이란, 전기 에너지를 송전 중의 변압 위치 또는 총괄 전력 시스템으로부터 소비자에게 전달하는 전기 시스템의 일부분으로, 송전 선로에서 높은 전압으로 받은 전력을 낮은 전압으로 떨어뜨려 수요자에게 분배한다. 이러한 배전계통은 배전용 변전소, 고압배전선로, 배전용 변압기, 저압 배전선로 및 인입선으로 구성되며, 경우에 따라서는 1차 변전소에서 배전용 변전소까지의 선로 및 이에 관련된 기기 등도 포함될 수 있다.A distribution system is a part of an electrical system that transfers electric energy from a transformer position during transmission to a consumer from a general power system, and distributes the power received at a high voltage from a transmission line to a user at a low voltage. These distribution systems consist of distribution substations, high-voltage distribution lines, distribution transformers, low-voltage distribution lines, and lead-in lines. In some cases, lines from primary substations to distribution substations and related equipment may also be included.

이러한 배전계통은 매우 넓은 지역에 걸쳐 존재하므로 항상 모든 배전선로가 정상적으로 동작하기를 기대하는 것은 매우 어려운 일이다. 따라서, 방대한 배전선로의 어느 곳에서는 고장으로 인하여 전력의 공급이 중단될 위험이 항상 존재함을 인정하고, 만약 고장 발생시 전력의 공급이 중단되는 범위를 최소화하거나, 전력의 공급이 중단되는 시간을 최소화할 수 있도록 고장 발생 지점을 신속히, 정확히 판단하고, 고장 발생 부분 이외의 부분에는 전력이 계속 공급될 수 있도록 조치해야 한다.Since these distribution systems exist over a very large area, it is very difficult to always expect all distribution lines to operate normally. Therefore, it is recognized that there is always a risk that the supply of power will be stopped due to a failure at some place in a massive distribution line, and if the failure occurs, the range in which the supply of power is stopped is minimized, It is necessary to quickly and accurately determine the point of occurrence of the fault so that power can be continuously supplied to parts other than the faulty part.

이를 위해 종래에는 배전선로에 고장 전류가 발생하는 경우, 고장 전류가 발생한 고장점을 찾기 위하여 변전소 차단장치를 동작시켜 가면서 현장의 조작자와 변전소 관리자가 주로 통신 수단을 이용하여 사고 지점에 관한 정보를 서로 교환함으로써 고장점을 찾는 것이 보편화 된 방법이었다.For this purpose, when a fault current is generated in the distribution line in the past, the operator of the substation and the substation manager mainly use the communication means to operate the substation shutdown device to find out the faulty current, It was a common method to find out the merits by exchanging.

그러나, 상기와 같은 방법의 경우 많은 시간과 인력이 소모되며 복구 시간이 길어짐에 따라 고장 시간이 길어져, 전력 소비자의 큰 불편을 초래하는 문제점이 있었다. 이에 따라, 배선 선로의 사고 발생시 그 고장점의 위치를 신속히 파악하고 복구하여 고장 시간을 단축함으로써 전력 공급의 신뢰성과 수용가에 대한 서비스의 질을 향상시킬 수 있는 방법이 요구되어 왔다.However, in the case of the above method, much time and manpower are consumed and the recovery time becomes longer, so that the failure time becomes longer and the power consumer is inconvenienced. Accordingly, there has been a demand for a method of improving the reliability of the power supply and the quality of service for the customer by shortening the failure time by quickly grasping and recovering the position of the high advantage in the occurrence of an accident of the wiring line.

이를 위하여 한국등록출원 10-0920945의 '배전선로의 고장 발생 위치를 판단하는 시스템 및 그 방법'은 감지기를 통해 배전선로 상에 발생 된 고장의 감지 여부를 수신하여 이를 선로 개폐 제어기에 제공하여 배전선로의 개폐를 조작함으로써 변전소로부터 공급되는 전력을 차단하거나 공급하여 배전선로의 고장을 복구하는 방법을 제시하였다.To this end, a system and method for determining the fault occurrence position of a distribution line in Korean Registered Application No. 10-0920945 receives a fault detected on a distribution line through a detector and provides it to a line opening / closing controller, The power supply from the substation is cut off or supplied to restore the fault of the distribution line.

그러나. 상기와 같은 방법의 경우 수신된 고장 감지 여부에 기반하여 고장 발생 위치만을 판단하여 배선선로의 고장을 복구함으로써 고장복구 시 파급되는 배전선로에 대한 종합적인 고장 분석이 어렵다는 한계가 있었다.But. In the case of the above method, it is difficult to perform a comprehensive failure analysis on a distribution line that is spread in case of failure recovery by restoring the failure of the wiring line by determining only the failure occurrence position based on whether or not the received failure is detected.

상기와 같은 문제점을 해결하기 위해 발명된 것으로서, 변전소 고장 발생시 취득되는 상태정보 및 고장복구정보를 토대로 한 종합적인 분석을 통해 최종 정전 피더(feeder)를 추출함으로써, 신속하고 정확한 고장복구가 수행되도록 하는 배전선로 고장복구 시스템 및 이의 운용방법을 제공하는데 그 목적이 있다.The present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to extract a final power feeder through a comprehensive analysis based on state information and failure recovery information obtained when a substation failure occurs, And to provide a fault recovery system and a method of operating the same.

또한, 본 발명은 최종적으로 추출된 정전 피더(feeder)에 대한 정보를 토대로 배전선로의 상시 개방점의 연결 또는 상시 연결점의 분리를 판단하여 배전선로의 부하를 재분배함으로써, 고장복구 시스템의 성능을 향상시킬 수 있는 배전선로 고장복구 시스템 및 이의 운용방법을 제공하는데 그 목적이 있다.Further, the present invention improves the performance of the failure recovery system by determining the connection of the normally open points to the distribution line or the separation of the constant connection point based on the information about the finally extracted power feeder and redistributing the load to the distribution line. The present invention relates to a failure recovery system and a method of operating the same.

상기한 목적을 달성하기 위하여 본 발명의 실시예에 따른 본 발명은 배전선로의 고장복구를 지원하는 배전선로 고장복구 시스템에 있어서, 변전소에 설치되어, 상기 변전소 고장 발생시 상기 변전소의 상태정보 및 고장복구정보를 취득하여 최종 정전 피더(feeder)를 추출하는 배전 정보 취득부; 및 상기 추출된 최종 정전 피더(feeder)가 상기 배전선로의 상시 개방점 연결 또는 상시 연결점 분리를 통해 고장복구가 가능한지 여부를 판단하여 상기 변전소의 고장복구가 수행되도록 하는 배전 제어부;를 포함하고, 상기 배전 정보 취득부는, 상기 변전소의 상태정보를 통해 고장 형태를 판단하고, 상기 고장복구정보를 통해 상기 변전소 내부에서 고장복구가 가능한지를 판단하며, 상기 변전소 내부에서 고장복구가 가능하다고 판단되는 경우에 정전시키지 않고 상기 변전소의 고장을 복구하고, 상기 변전소 내부에서 고장복구가 불가능하다고 판단되는 경우에 최종 정전 피더를 추출하며, 상기 상시 개방점은, 배전선로에서 항상 오픈되어 있는 차단기 및 개폐기를 통칭하고, 상기 상시 연결점은, 배전선로에서 항상 오프되어 있는 차단기 및 개폐기를 통칭하는 것을 특징으로 한다.According to another aspect of the present invention, there is provided a distribution line fault recovery system for supporting fault recovery of a distribution line, the system comprising: a substation installed in a substation, A distribution information acquisition unit that acquires information and extracts a final static electricity feeder; And a power distribution controller for determining whether a failure can be recovered by connecting the extracted power transmission feeder to the power distribution line through a normally open point connection or a permanent connection point separation and performing fault recovery of the substation, The power distribution information acquisition unit determines a failure type through the status information of the substation and determines whether failure recovery is possible within the substation through the failure recovery information. If it is determined that failure recovery is possible within the substation, And extracts a final electrostatic feeder when it is judged that the failure can not be recovered in the substation. The normally open point collectively refers to a circuit breaker and a switch that are always open in the power distribution line, The permanent connection point includes a breaker which is always off in the distribution line, It characterized in that it collectively.

또한, 상기 배전 정보 취득부는, 상기 변전소의 고장 발생 직전의 상기 변전소 설비들의 전력 사용량, 피크용량을 포함하는 상기 상태정보 및 상기 변전소 고장 발생에 따른 정전 용량과 고장복구에 참여하는 건전한 상기 변전소 설비들의 전력 사용량과 피크용량을 합한 복구참여 용량, 상기 변전소에 구비된 배전 피더(feeder)들의 부하 용량, 상기 변전소에 구비된 주변압기(MTR)들의 부하 용량을 포함하는 상기 고장복구정보를 취득하는 것을 특징으로 한다.The power distribution information acquisition unit may be configured to calculate the power consumption of the substation facilities immediately before the occurrence of the failure of the substation, the state information including the peak capacity, the capacitance due to the occurrence of the substation failure, Recovery failure information including a recovery participation capacity that is a sum of a power usage amount and a peak capacity, a load capacity of power distribution feeders provided in the substation, and a load capacity of the main transformers (MTR) provided in the substation .

또한, 상기 배전 정보 취득부는, 상기 상태정보를 통해 상기 변전소에서 발생 된 고장이 상기 주변압기 또는 전력간선(BUS) 또는 상기 배전 피더(feeder) 관련 고장인지를 판단하는 고장 형태 판단부; 상기 정전 용량과 상기 복구참여 용량, 상기 배전 피더(feeder)들의 부하 용량 중 가장 낮은 최소 부하 용량을 각각 비교하여 상기 복구참여 용량 및 상기 최소부하 용량이 상기 정전 용량보다 작은 경우 상기 변전소 내부에서 고장복구가 불가능하다고 판단하는 고장복구 판단부; 및 상기 변전소 내부에서 고장복구가 불가능하다고 판단되는 경우, 상기 최종 정전 피더(feeder)를 추출하는 최종 정전 피더(feeder) 추출부;를 포함하는 것을 특징으로 한다.Also, the power distribution information acquisition unit may include a failure type determination unit that determines whether a failure occurring in the substation through the status information is a failure related to the main transformer, the power trunk line (BUS), or the power distribution feeder; And a minimum load capacity of the load capacity of the power distribution feeders is compared with each other, and if the recovery participation capacity and the minimum load capacity are smaller than the electrostatic capacity, A failure recovery determination unit determining that the failure is impossible; And a final electrostatic feeder extracting unit for extracting the final electrostatic feeder when it is determined that failure recovery is not possible within the substation.

또한, 상기 최종 정전 피더(feeder) 추출부는, 상기 주변압기들 중에서 두 개 이상의 주변압기에 정전 피더(feeder)가 존재하는지 여부를 확인하는 정전 피더(feeder) 존재 확인부; 상기 정전 피더(feeder)가 두 개 이상의 주변압기에 존재하는 경우, 이를 제외한 건전한 주변압기들의 복구참여 용량을 최소에서 최대 순으로 정렬하여 이를 상기 정전용량과 순차적으로 비교하는 제 1 비교부; 상기 정전 피더(feeder)가 한 개의 주변압기에 존재하는 경우 또는 상기 비교 결과 상기 주변압기들의 복구참여 용량이 상기 정전용량보다 크거나 같은 경우, 해당 주변압기 내의 배전 피더(feeder)들의 부하용량을 최소에서 최대 순으로 정렬하여 이를 상기 정전용량과 순차적으로 비교하는 제 2 비교부; 및 상기 비교 결과 상기 배전 피더(feeder) 부하용량이 상기 정전용량보다 크거나 같은 경우, 해당 배전 피더(feeder)를 최종적으로 정전된 상기 최종 정전 피더(feeder)로 선정하는 최종 정전 피더(feeder) 선정부;를 포함하는 것을 특징으로 한다.The final electrostatic feeder extracting unit may include an electrostatic feeder existence checking unit for checking whether or not an electrostatic feeder exists in at least two main transformers among the main transformers. A first comparator for sequentially arranging the recovery participation capacities of the sound main transformers other than the power mains feeder in at least two main transformers in order from minimum to maximum and sequentially comparing the restoration capacity with the electrostatic capacity; If the electrostatic feeder is present in one main transformer or if the recovery capacity of the main transformers is greater than or equal to the electrostatic capacity as a result of the comparison, the load capacity of power feeders in the main transformer is set to a minimum A second comparator for sequentially aligning the capacitors in order of the capacitors and sequentially comparing the capacitance with the capacitance; And, if the power feeder load capacity is greater than or equal to the electrostatic capacity as a result of the comparison, a final electrostatic feeder line for selecting the power feeder as the final electrostatic feeder A < / RTI >

또한, 상기 최종 정전용량은, 상기 변전소 고장 발생시 발생한 정전 용량에 이를 복구하기 위해 참여한 건전 설비의 복구참여 용량을 상쇄한 용량인 것을 특징으로 한다.In addition, the final electrostatic capacity is a capacity canceling the recovery participation capacity of the participating physical facilities to recover the electrostatic capacity generated when the substation failure occurs.

또한, 상기 배전 제어부는, 상기 배전 정보 취득부에서 취득되는 상기 변전소의 상태정보 및 고장복구정보 그리고 상기 최종 정전 피더(feeder)에 대한 정보를 전단처리기(front-end processor)를 통해 수신 받는 것을 특징으로 한다.In addition, the power distribution control unit receives the status information of the substation, the failure recovery information, and the information about the final power feeder obtained by the power distribution information acquisition unit through a front-end processor .

또한, 상기 배전 제어부는, 상기 최종 정전 피더(feeder)를 상시 개방점 연결을 통해 복구할 수 있는지 여부를 판단하는 개방점 연결판단부; 및 상기 상시 개방점 연결로 상기 최종 정전 피더(feeder)복구가 불가능하다고 판단되는 경우, 상기 최종 정전 피더(feeder)를 상시 연결점 분리를 통해 복구할 수 있는지 여부를 판단하는 연결점 분리판단부;를 포함하는 것을 특징으로 한다.The distribution control unit may further include an open point connection determination unit that determines whether or not the final static electricity feeder can be recovered through the connection of the normally open point. And a connection point separation determiner for determining whether or not the final electrostatic feeder can be recovered through continuous connection point separation when it is determined that restoration of the final electrostatic feeder by the connection of the normally open point is impossible .

또한, 상기 배전 제어부는, 상기 상시 연결점 분리로 상기 최종 정전 피더(feeder)의 복구가 가능하다고 판단되는 경우, 해당 배전선로의 부하분포를 파악하는 부하분포 파악부; 및 상기 파악된 부하분포를 토대로 상기 배전선로 부하의 재분배 여부를 판단하는 부하 재분배 판단부;를 포함하는 것을 특징으로 한다.
The distribution control unit may further include: a load distribution determination unit for determining a load distribution to the distribution line when it is determined that recovery of the final static electricity feeder is possible by the permanent connection point separation; And a load redistribution determining unit for determining whether the load is redistributed to the distribution line based on the detected load distribution.

한편, 상기한 목적을 달성하기 위하여 배전선로의 고장복구를 지원하는 배전선로 고장복구 시스템의 운용방법에 있어서, 변전소 고장 발생시 상기 변전소의 상태정보 및 고장복구정보를 취득하는 단계; 상기 상태정보를 통해 상기 변전소의 고장 형태를 판단하는 단계; 상기 고장복구정보를 통해 상기 변전소 내부에서 고장복구가 가능한지 여부를 판단하는 단계; 상기 변전소 내부에서 고장복구가 불가능하다고 판단되는 경우 최종 정전 피더(feeder)를 추출하는 단계; 및 상기 추출된 최종 정전 피더(feeder)가 상기 배전선로의 상시 개방점 연결 또는 상시 연결점 분리를 통해 고장복구가 가능한지 여부를 판단하여 상기 변전소의 고장복구가 수행되도록 하는 단계;를 포함하고, 상기 변전소 내부에서 고장복구가 가능한지 여부를 판단하는 단계는, 상기 변전소 내부에서 고장복구가 가능하다고 판단되는 경우에 정전시키지 않고 상기 변전소의 고장을 복구하고, 상기 상시 개방점은 배전선로에서 항상 오픈되어 있는 차단기 및 개폐기를 통칭하고, 상기 상시 연결점은 배전선로에서 항상 오프되어 있는 차단기 및 개폐기를 통칭하는 것을 특징으로 한다.In order to accomplish the above object, there is provided a method of operating a distribution line fault recovery system for supporting fault recovery of a distribution line, comprising the steps of: obtaining state information and fault recovery information of a substation when a substation failure occurs; Determining a failure mode of the substation through the status information; Determining whether fault recovery is possible in the substation through the fault recovery information; Extracting a final electrostatic feeder if it is determined that failure recovery is not possible within the substation; And a step of judging whether or not the extracted final electrostatic feeder is capable of recovering from a failure by always connecting an open point to the power line or separating the connecting point at all times so that fault recovery of the substation is performed, Wherein the step of determining whether or not a fault recovery is possible in the interior of the substation restores a failure of the substation without interruption when it is determined that fault recovery is possible within the substation, And the breaker and the breaker are collectively referred to as the breaker and the breaker which are always off in the power line.

또한, 상기 변전소의 상태정보 및 고장복구정보를 취득하는 단계는, 상기 변전소의 고장 발생 직전의 상기 변전소 설비들의 전력 사용량, 피크용량을 포함하는 상기 상태정보 및 상기 변전소 고장 발생에 따른 정전 용량과 고장복구에 참여하는 건전한 상기 변전소 설비들의 전력 사용량과 피크용량을 합한 복구참여 용량, 상기 변전소에 구비된 배전 피더(feeder)들의 부하 용량, 상기 변전소에 구비된 주변압기(MTR)들의 부하 용량을 포함하는 상기 고장복구정보를 취득하는 것을 특징으로 한다.The step of acquiring the state information and the failure recovery information of the substation may further include a step of acquiring the state information including the power usage amount of the substation facilities immediately before occurrence of the failure of the substation, the state information including the peak capacity, And a load capacity of power feeders provided in the substation, and a load capacity of the main transformers (MTRs) provided in the substation, And the failure recovery information is acquired.

또한, 상기 고장 형태를 판단하는 단계는, 상기 상태정보를 통해 상기 변전소에서 발생 된 고장이 상기 주변압기 또는 전력간선(BUS) 또는 상기 배전 피더(feeder) 관련 고장인지를 판단하는 것을 특징으로 한다.The determining of the failure mode may include determining whether the failure occurring in the substation is a failure related to the main transformer, the power mains (BUS), or the power distribution feeder through the status information.

또한, 상기 변전소 내부에서 고장복구가 가능한지 여부를 판단하는 단계는,상기 정전 용량과 상기 복구참여 용량, 상기 배전 피더(feeder)들의 부하 용량 중 가장 낮은 최소 부하 용량을 각각 비교하여 상기 복구참여 용량 및 상기 최소부하 용량이 상기 정전 용량보다 작은 경우 상기 변전소 내부에서 고장복구가 불가능하다고 판단하는 것을 특징으로 한다.The step of determining whether failure recovery is possible in the substation may include comparing the minimum capacity of the load among the capacitances, the recovery participation capacity, and the load capacities of the power distribution feeders, When the minimum load capacity is smaller than the electrostatic capacity, it is determined that failure recovery is not possible in the substation.

또한, 상기 최종 정전 피더(feeder)를 추출하는 단계는, 상기 변전소 내부에서 고장복구가 불가능하다고 판단되는 경우, 상기 주변압기들 중에서 두 개 이상의 주변압기에 정전 피더(feeder)가 존재하는지 여부를 확인하는 단계; 상기 정전 피더(feeder)가 두 개 이상의 주변압기에 존재하는 경우, 이를 제외한 건전한 주변압기들의 복구참여 용량을 최소에서 최대 순으로 정렬하여 이를 상기 정전용량과 순차적으로 비교하는 단계; 및 상기 정전 피더(feeder)가 한 개의 주변압기에 존재하는 경우 또는 상기 비교 결과 상기 주변압기들의 복구참여 용량이 상기 정전용량보다 크거나 같은 경우, 해당 주변압기 내의 배전 피더(feeder)들의 부하용량을 최소에서 최대 순으로 정렬하여 이를 정전용량과 순차적으로 비교하는 단계;를 포함하는 것을 특징으로 한다.In addition, the step of extracting the final electrostatic feeder may include determining whether or not an electrostatic feeder is present in at least two main transformers among the main transformers when it is determined that failure recovery is not possible within the substation ; If the power feeder is present in more than one main transformer, sorting the recovered capacity of the healthy main transformers except for the main transformer in order from minimum to maximum and sequentially comparing the recovered capacity with the capacitance; And when the electrostatic feeder is present in one main transformer or as a result of the comparison the recovery capacity of the main transformers is greater than or equal to the electrostatic capacity, the load capacity of the power feeders in the main transformer Sequentially arranging the electrodes in order from minimum to maximum, and sequentially comparing the capacitances with the capacitances.

또한, 상기 배전 피더(feeder)들의 부하용량을 최소에서 최대 순으로 정렬하여 이를 상기 정전용량과 순차적으로 비교하는 단계 이후에, 상기 배전 피더(feeder) 부하용량이 상기 정전용량보다 크거나 같은 경우, 해당 배전 피더(feeder)를 최종적으로 정전된 상기 최종 정전 피더(feeder)로 선정하는 단계;를 포함하는 것을 특징으로 한다.If the distribution loader capacity is greater than or equal to the electrostatic capacity after sequentially arranging the load capacities of the distribution feeders in order from minimum to maximum, And selecting the power feeder as the final electrostatic feeder that is finally charged.

또한, 상기 배전선로의 상시 개방점 연결 또는 상시 연결점 분리 여부를 판단하는 단계는, 상기 최종 정전 피더(feeder)를 상시 개방점 연결을 통해 복구할 수 있는지를 판단하는 단계; 상기 상시 개방점 연결로 상기 최종 정전 피더(feeder) 복구가 불가능하다고 판단되는 경우, 상기 최종 정전 피더(feeder)를 상시 연결점 분리를 통해 복구할 수 있는지 여부를 판단하는 단계;를 포함한다.In addition, the step of determining whether the normally open connection to the power line or the permanent connection point is disconnected may include determining whether the final electrostatic feeder can be recovered through the connection of the normally open point, And judging whether or not the final electrostatic feeder can be recovered through continuous connection point separation when it is determined that the final electrostatic feeder recovery is impossible with the normally open connection.

또한, 상기 최종 정전 피더(feeder)를 상시 연결점 분리를 통해 복구할 수 있는지 여부를 판단하는 단계 이후에, 상기 상시 연결점 분리로 상기 최종 정전 피더(feeder)의 복구가 가능하다고 판단되는 경우, 해당 배전선로의 부하분포를 파악하고 상기 배전선로 부하의 재분배 여부를 판단하는 단계;를 포함하는 것을 특징으로 한다.If it is determined that restoration of the final electrostatic feeder is possible by the continuous connection point separation after the step of determining whether or not the final electrostatic feeder can be recovered through continuous connection point separation, And determining whether the load is redistributed by the power distribution line.

상기와 같은 구성을 갖는 본 발명에 의한 배전선로 고장복구 시스템 및 이의 운용방법은 변전소 고장 발생시 취득되는 상태정보 및 고장복구정보를 토대로 한 종합적인 분석을 통해 최종 정전 피더(feeder)를 추출함으로써, 신속하고 정확한 고장복구가 가능하여 배전선로 운영의 효율성을 향상시키는 효과가 있다. The distribution line fault recovery system and its operation method according to the present invention having the above-described structure extracts a final static electricity feeder through a comprehensive analysis based on state information and failure recovery information obtained when a substation failure occurs, And accurate fault recovery is possible, which improves the efficiency of operation with a distribution line.

또한, 최종적으로 추출된 정전 피더(feeder)에 대한 정보를 토대로 배선선로의 상시 개방점 연결 또는 상시 연결점 분리를 판단하여 배전선로의 부하를 재분배함으로써, 고장 구간을 최소화하고 건전 구간을 최대한 확보하여 고장복구 시스템의 성능을 향상시키는 효과가 있다.In addition, based on the information about the finally extracted power feeder, it is judged whether the wiring line is always open or always disconnected, and the load on the distribution line is redistributed to minimize the fault section and maximize the sound section. Thereby improving the performance of the recovery system.

도 1은 본 발명의 실시에에 따른 배전선로 고장복구 시스템의 구성을 나타내는 도면이다.
도 2는 본 발명의 실시예에 따른 배전선로 고장복구 시스템에 채용되는 배전 정보 취득부의 세부 구성을 나타내는 도면이다.
도 3은 본 발명의 실시예에 따른 배전선로 고장복구 시스템의 배전 정보 취득부에 채용되는 최종 정전 피더(feeder) 추출부의 세부 구성을 나타내는 도면이다.
도 4는 본 발명의 실시예에 따른 배전선로 고장복구 시스템에 채용되는 배전 제어부의 세부 구성을 나타내는 도면이다.
도 5 및 도 6은 본 발명의 실시예에 따른 배전선로 고장복구 시스템의 운용방법에 대한 동작 흐름을 나타내는 순서도이다.
1 is a diagram showing a configuration of a distribution line fault recovery system according to an embodiment of the present invention.
2 is a diagram showing a detailed configuration of a distribution information acquiring unit employed in a distribution line fault recovery system according to an embodiment of the present invention.
3 is a diagram showing a detailed configuration of a final electrostatic feeder extracting unit employed in a distribution information obtaining unit of a distribution line fault recovery system according to an embodiment of the present invention.
4 is a view showing a detailed configuration of a power distribution control unit employed in a power line failure recovery system according to an embodiment of the present invention.
5 and 6 are flowcharts illustrating an operational flow for a method of operating a fault recovery system for a distribution line according to an embodiment of the present invention.

이하, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명의 기술적 사상을 용이하게 실시할 수 있을 정도로 상세히 설명하기 위하여, 본 발명의 가장 바람직한 실시예를 첨부 도면을 참조하여 설명하기로 한다. 우선, 각 도면의 구성요소들에 참조부호를 부가함에 있어서, 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한, 본 발명을 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings in order to facilitate a person skilled in the art to easily carry out the technical idea of the present invention. . First, in adding reference numerals to the constituents of the drawings, it is to be noted that the same constituents are denoted by the same reference symbols as possible even if they are displayed on different drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

이하에서는, 본 발명의 실시예에 따른 배전선로 고장복구 시스템 및 이의 운용방법에 대하여 첨부된 도면을 참고로 하여 상세히 설명한다.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a distribution line fault recovery system and a method of operating the same according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 실시에에 따른 배전선로 고장복구 시스템의 구성을 나타내는 도면이고, 도 2는 본 발명의 실시예에 따른 배전선로 고장복구 시스템에 채용되는 배전 정보 취득부의 세부 구성을 나타내는 도면이고, 도 3은 본 발명의 실시예에 따른 배전선로 고장복구 시스템의 배전 정보 취득부에 채용되는 최종 정전 피더(feeder) 추출부의 세부 구성을 나타내는 도면이고, 도 4는 본 발명의 실시예에 따른 배전선로 고장복구 시스템에 채용되는 배전 제어부의 세부 구성을 나타내는 도면이다.FIG. 1 is a view showing a configuration of a distribution line fault recovery system according to an embodiment of the present invention, FIG. 2 is a diagram showing a detailed configuration of a distribution information acquisition unit employed in a distribution line fault recovery system according to an embodiment of the present invention And FIG. 3 is a view showing a detailed configuration of a final electrostatic feeder extracting unit employed in a distribution information obtaining unit of a distribution line fault recovery system according to an embodiment of the present invention. FIG. Fig. 2 is a diagram showing the detailed configuration of a power distribution control unit employed in the fault recovery system.

도 1에 도시된 바와 같이, 본 발명에 따른 배전선로 고장복구 시스템(100)은 변전소(110)에 설치되는 배전 정보 취득부(120), 전단 처리기(130), 배전 제어부(140), 배전 스테이션(150)을 포함한다.1, the power line fault recovery system 100 according to the present invention includes a power distribution information acquisition unit 120, a front end processor 130, a power distribution control unit 140, a power distribution station 140 installed in a substation 110, (150).

배전 정보 취득부(120)는 각각의 변전소(110)에 설치되어, 변전소(110) 고장 발생시 변전소(110)의 상태정보 및 고장복구정보를 취득한다.The power distribution information acquisition unit 120 is installed in each substation 110 and acquires status information and failure recovery information of the substation 110 when a fault occurs in the substation 110. [

배전 정보 취득부(120)는 변전소(110) 고장 발생 직전 해당 변전소(110) 내 모든 설비들의 전력 사용량 및 피크용량을 포함하는 상태정보를 취득한다. 이때, 전력 사용량은 설비들의 실제 전력 사용용량이고, 피크용량은 설비들의 최대 전력 사용용량을 말한다.The power distribution information acquisition unit 120 acquires status information including power usage and peak capacity of all facilities in the corresponding substation 110 immediately before occurrence of a failure in the substation 110. [ At this time, the power consumption is the actual power usage capacity of the facilities, and the peak capacity is the maximum power usage capacity of the facilities.

배전 정보 취득부(120)는 변전소(110) 고장 발생에 따른 정전 용량과 고장복구에 참여하는 건전한 변전소(110) 설비들의 전력 사용량과 피크용량을 합한 복구참여 용량, 변전소(110)에 구비된 배전 피더(feeder)들의 부하 용량, 변전소(110)에 구비된 주변압기(MTR)들의 부하 용량을 포함하는 고장복구정보를 취득한다. 이때, 정전 용량은 변전소(110) 고장 발생시 고정설비에 의해 발생되는 용량이고, 복구참여 용량은 변전소(110) 고장 발생시 고장난 설비의 사용용량에 대하여 고장 복구 참여가 가능한 모든 건전한 설비의 개별 사용용량을 제외한 피크용량을 모두 합한 용량을 말한다.The power distribution information acquisition unit 120 acquires the capacity due to the failure of the substation 110 and the recovery participation capacity of the power usage and peak capacity of the healthy substation 110 facilities involved in the fault recovery, The load capacity of the feeders, and the load capacity of the main transformers (MTRs) provided in the substation 110 are obtained. In this case, the electrostatic capacity is the capacity generated by the fixed facilities in case of the failure of the substation 110, and the recovery participating capacity is the capacity of all the healthy facilities capable of participating in the failure recovery in the case of the failure of the substation 110 And the peak capacity excluding the peak capacity.

배전 정보 취득부(120)는 상기와 같이 취득된 상태정보를 통해 고장 형태를 판단하고, 고장복구정보를 통해 변전소(110) 내부에서 고장복구가 가능한지 여부를 판단하여 내부에서 고장복구가 불가능하다고 판단되는 경우 최종 정전 피더(feeder)를 추출한다.The power distribution information acquisition unit 120 determines the failure type through the acquired status information, determines whether or not the failure can be recovered in the substation 110 through the failure recovery information, The final electrostatic feeder is extracted.

이를 위해, 배전 정보 취득부는 도 2에 도시된 바와 같이 고장형태 판단부(121), 고장복구 판단부(123), 최종 정전 피더(feeder) 추출부(125)를 포함한다.2, the power distribution information acquisition unit includes a failure type determination unit 121, a failure recovery determination unit 123, and a final power supply feeder extraction unit 125. [

고장형태 판단부(121)는 상태정보를 통해 변전소(110)에서 발생 된 고장이 주변압기 또는 전력간선(BUS) 또는 배전 피더(feeder) 관련 고장인지를 판단한다. 이를 판단하는 이유는 이를 제외한 기타 정전사고는 변전소(110) 내부에서 모두 처리가 가능한 사고이기 때문이다.The fault type determination unit 121 determines whether the fault occurring in the substation 110 is a fault related to a main transformer, a power trunk line (BUS), or an electricity distribution feeder, based on the state information. The reason for judging this is that other power failure accidents other than the above can be handled in the substation 110.

고장복구 판단부(123)는 정전 용량과 복구참여 용량, 배전 피더(feeder)들의 부하 용량 중 가장 낮은 최소 부하 용량을 각각 비교하여 변전소(110) 내부에서의 고장복구 여부를 판단한다.The failure recovery determination unit 123 compares the electrostatic capacity, the recovery participation capacity, and the minimum load capacity of the load capacities of the power distribution feeders, respectively, to determine whether or not the failure is recovered in the substation 110.

즉, 고장복구 판단부(123)는 정전 용량과 복구참여 용량을 비교하여 복구참여 용량이 정전 용량보다 작은 경우 변전소(110) 내부에서 고장복구가 불가능하다고 판단하고, 정전 용량과 배전 피더(feeder) 최소 부하 용량을 비교하여 배전 피더(feeder) 최소 부하 용량이 정전 용량보다 작은 경우 변전소(110) 내부에서 고장복구가 불가능하다고 판단한다. 이때, 배전 피더(feeder) 최소 부하 용량이 정전 용량보다 큰 경우, 해당 배전 피더(feeder)를 정전시키지 않고서도 변전소(110)의 고장복구가 가능하다. That is, the failure recovery determination unit 123 compares the capacitance and the recovery participation capacity to determine that failure recovery is not possible in the substation 110 when the recovery participation capacity is smaller than the capacitance, If the minimum load capacity of the distribution feeder is smaller than the capacitance, it is judged that the failure can not be recovered in the substation 110. At this time, if the minimum load capacity of the distribution feeder is larger than the capacitance, it is possible to recover the fault of the substation 110 without powering off the distribution feeder.

최종 정전 피더(feeder) 추출부(125)는 변전소(110) 내부에서 고장복구가 불가능하다고 판단된 경우, 최종 정전 피더(feeder)를 추출한다.The final electrostatic feeder extracting unit 125 extracts a final electrostatic feeder when it is determined that failure recovery is not possible in the substation 110.

이를 위해, 최종 정전 피더(feeder) 추출부(125)는 도 3에 도시된 바와 같이 정전 피더(feeder) 존재 확인부(126), 제 1 비교부(127), 제 2 비교부(128), 최종 정전 피더(feeder) 선정부(129)를 포함한다.3, the final electrostatic feeder extracting unit 125 includes an electrostatic feeder existence checking unit 126, a first comparing unit 127, a second comparing unit 128, And a final electrostatic feeder selection unit 129. [

정전 피더(feeder) 존재 확인부(126)는 변전소(110) 내부의 모든 주변압기들 중에서 두 개 이상의 주변압기에 정전 피더(feeder)가 존재하는지 여부를 확인한다.The electrostatic feeder presence confirmation unit 126 confirms whether or not an electrostatic feeder exists in at least two main transformers among all the main transformers in the substation 110.

제 1 비교부(127)는 정전 피더(feeder)가 두 개 이상의 주변압기에 존재하는 경우, 이를 제외한 복구에 참여하는 건전한 주변압기들의 복구참여 용량을 최소에서 최대 순으로 정렬하여 이를 정전용량과 순차적으로 비교한다. 즉, 제 1 비교부(127)는 크기 순서대로 정렬된 주변압기들의 복구참여 용량이 정전용량보다 크거나 같은 값을 가질 때까지 비교한다.The first comparison unit 127 arranges the recovery participation capacities of the healthy main transformers participating in the recovery, excluding the power feeder in two or more main transformers, in order from minimum to maximum, . That is, the first comparator 127 compares the recovery capacity of the main transformers arranged in the order of size until the recovery capacity of the main transformers is equal to or greater than the capacitance.

제 2 비교부(128)는 정전 피더(feeder)가 한 개의 주변압기에 존재하는 경우 또는 상기 비교 결과 주변압기들의 복구참여 용량이 정전용량보다 크거나 같은 경우, 해당 주변압기 내의 배전 피더(feeder)들의 부하용량을 최소에서 최대 순으로 정렬하여 이를 최종정전용량과 순차적으로 비교한다. 즉, 제 2 비교부(128)는 크기 순서대로 정렬된 배전 피더(feeder)들의 부하용량이 최종 정전용량보다 크거나 같은 값을 가질 때까지 비교한다. 이때, 최종 정전용량은 변전소(110) 고장 발생시 발생한 정전 용량에 이를 복구하기 위해 참여한 건전 설비들의 복구참여 용량을 상쇄한 용량을 말한다.The second comparison unit 128 may be configured to determine whether the power feeder is present in one main transformer or if the recovery contribution capacity of the main transformers is greater than or equal to the capacitance, The load capacities of the capacitors are sorted in order from minimum to maximum and sequentially compared with the final capacitance. That is, the second comparator 128 compares the load capacities of the distribution feeders arranged in the order of magnitude until the load capacity of the distribution feeders is equal to or greater than the final capacitance. In this case, the final capacitance refers to a capacity that compensates for the capacity involved in the failure of the substation 110 to compensate for the recovered capacity of the participating electrical equipment.

최종 정전 피더(feeder) 선정부는 비교 결과 배전 피더(feeder) 부하용량이 정전용량보다 크거나 같은 경우, 해당 배전 피더(feeder)를 최종적으로 정전된 상기 최종 정전 피더(feeder)로 선정한다.The final electrostatic feeder selection unit selects the distribution feeder as the final electrostatic feeder that is finally charged if the comparison result indicates that the distribution feeder load capacity is greater than or equal to the capacitance.

전단 처리기(130)는 배전 정보 취득부(120)에서 취득되는 변전소(110)의 상태정보 및 고장복구정보 그리고 최종 정전 피더(feeder)에 대한 정보를 취합하여 배전 제어부(140)에 전달한다.The front end processor 130 collects the status information of the substation 110 acquired by the distribution information acquiring unit 120 and the failure recovery information and the information about the final power feeder and transmits the collected information to the distribution control unit 140. [

배전 제어부(140)는 추출된 최종 정전 피더(feeder)를 토대로 배전선로의 상시 개방점 연결 또는 상시 연결점 분리 여부를 판단하여 변전소(110)의 고장복구가 수행되도록 한다.Based on the extracted final power feeder, the power distribution control unit 140 determines whether the power supply line is always connected to the open point or disconnected at all times, and the failure recovery of the substation 110 is performed.

이를 위해, 배전 제어부(140)는 도 4에 도시된 바와 같이 개방점 연결판단부(141), 연결점 분리판단부(142), 부하분포 파악부(143), 부하 재분배 판단부(144)를 포함한다.4, the distribution control unit 140 includes an open-point connection determination unit 141, a connection point separation determination unit 142, a load distribution determination unit 143, and a load redistribution determination unit 144 do.

개방점 연결판단부(141)는 최종 정전 피더(feeder)를 상시 개방점 연결을 통해 복구할 수 있는지 여부를 판단한다. 즉, 개방점 연결판단부(141)는 배전선로에서 항상 오픈되어 있는 차단기 및 개폐기를 통칭하는 상시 개방점을 연결하여 최종 정전 피더(feeder)의 복구 여부를 판단한다. 이때, 상시 개방점 연결로 최종 정전 피더(feeder)의 복구가 가능하면 고장복구가 완료되고, 상시 개방점 연결로 최종 정전 피더(feeder)의 복구가 불가능하면 상시 연결점 분리 여부를 판단한다.The open-link connection determination unit 141 determines whether or not the final power-supply feeder can be recovered through the connection of the normal open-ended point. That is, the open-circuit connection determining unit 141 determines whether or not the final static electricity feeder is recovered by connecting the normally open ends collectively known as circuit breakers and switches that are always open in the distribution line. At this time, if recovery of the final power supply feeder is possible by recovery of the final power supply feeder, recovery of the final power supply feeder is completed, and if the final power supply feeder can not be recovered by the connection of the normally open point,

연결점 분리판단부(142)는 상시 개방점 연결로 최종 정전 피더(feeder)복구가 불가능하다고 판단되는 경우, 최종 정전 피더(feeder)를 상시 연결점 분리를 통해 복구할 수 있는지 여부를 판단한다. 즉, 연결점 분리판단부(142)는 배전선로에서 항상 오프되어 있는 차단기 및 개폐기를 통칭하는 상시 연결점을 분리하여 최종 정전 피더(feeder)의 복구 여부를 판단한다. 이때, 상시 연결점 분리로 최종 정전 피더(feeder)의 복구가 가능하면 해당 배전선로 부하의 재분배를 위해 부하분포를 판단하여 고장복구를 완료하고, 상시 연결점 분리로 최종 정전 피더(feeder)의 복구가 불가능하면 고장복구를 불가하다.The connection point separation determination unit 142 determines whether or not the final power feeder can be recovered through continuous connection point separation when it is determined that the final power failure feeder recovery is impossible due to the normally open connection. That is, the connection point separation determination unit 142 determines whether or not the final static electricity feeder is recovered by separating the constant connection points collectively referred to as breakers and switches that are always off in the distribution line. At this time, if it is possible to recover the final electrostatic feeder by disconnecting the constant connection point, it is necessary to complete the fault recovery by judging the load distribution for the redistribution of the load by the power distribution line and to recover the final static electricity feeder Failure recovery is impossible.

부하분포 파악부(143)는 상시 연결점 분리로 최종 정전 피더(feeder)의 복구가 가능하다고 판단되는 경우, 해당 배전선로의 부하분포를 파악한다.The load distribution determination unit 143 determines the distribution of the load on the distribution line when it is determined that it is possible to recover the final static electricity feeder by constant connection point separation.

부하 재분배 판단부(144)는 파악된 부하분포를 토대로 배전선로 부하의 재분배 여부를 판단하여, 재분배가 가능할 경우 고장복구가 완료되고 불가능할 경우 고장복구가 불가하다.The load redistribution judging unit 144 judges whether or not redistribution of the load to the distribution line is based on the detected load distribution. If the redistribution is possible, the failure recovery is completed. If the redistribution is impossible, the failure redemption is impossible.

그리고 본 발명은 정전 최소화와 신속한 고장 복구를 위해 전력 설비를 자동으로 종합 감시하는 배전 스테이션(150)을 더 구비할 수도 있다.
Further, the present invention may further include a power distribution station 150 for automatically monitoring the power facilities for minimizing power failure and promptly repairing faults.

도 5 및 도 6은 본 발명의 실시예에 따른 배전선로 고장복구 시스템의 운용방법에 대한 동작 흐름을 나타내는 순서도이다. 보다 자세하세 도 5는 본 발명의 실시예에 따른 배전선로 고장복구 시스템의 운용방법에 있어 최종 정전 피더(feeder)를 추출하는 동작의 흐름을 나타내고, 도 6은 본 발명의 실시예에 따른 배전선로 고장복구 시스템의 운용방법에 있어 추출된 최종 정전 피더(feeder)를 토대로 변전소의 고장복구가 수행되도록 하는 동작의 흐름을 나타낸다.5 and 6 are flowcharts illustrating an operational flow for a method of operating a fault recovery system for a distribution line according to an embodiment of the present invention. 5 is a flow chart illustrating an operation of extracting a final electrostatic feeder in a method of operating a fault recovery system for a distribution line according to an embodiment of the present invention. Fig. 3 shows the flow of operation for performing fault recovery of the substation based on the extracted final electrostatic feeder in the operation method of the fault recovery system.

도 5 및 도 6에 도시된 바와 같이, 변전소(110) 고장 발생시 변전소(110)의 상태정보 및 고장복구정보를 취득(S100)한다. 이때, 상태정보는 변전소(110)의 고장 발생 직전의 변전소(110) 설비들의 전력 사용량, 피크용량을 포함하는 정보이고. 고장복구정보는 변전소(110) 고장 발생에 따른 정전 용량과 고장복구에 참여하는 건전한 변전소(110) 설비들의 전력 사용량과 피크용량을 합한 복구참여 용량, 변전소(110)에 구비된 배전 피더(feeder)들의 부하 용량, 변전소(110)에 구비된 주변압기(MTR)들의 부하 용량을 포함하는 정보이다.As shown in FIGS. 5 and 6, when the substation 110 fails, status information and failure recovery information of the substation 110 are acquired (S100). At this time, the status information is information including power consumption and peak capacity of the substation 110 facilities just before the failure of the substation 110. The fault recovery information includes a capacitance due to the failure of the substation 110 and a recovery participation capacity that is a sum of the power consumption and the peak capacity of the healthy substation 110 facilities participating in the fault recovery and the distribution feeder provided in the substation 110, And the load capacity of the main transformers (MTRs) provided in the substation 110. The load capacity of the main transformers (MTRs)

다음으로, 상태정보를 통해 변전소(110)의 고장 형태를 판단(S110)한다. 즉, 상태정보를 통해 변전소(110)에서 발생 된 고장이 주변압기 또는 전력간선(BUS) 또는 상기 배전 피더(feeder) 관련 고장인지를 판단한다. 이는 이를 제외한 기타 정전사고는 변전소(110) 내부에서 모두 처리가 가능한 사고이기 때문이다.Next, the fault type of the substation 110 is determined through the state information (S110). That is, it is determined through the status information whether the failure occurring in the substation 110 is a main transformer, a power trunk line (BUS), or an electricity supply feeder related failure. This is because the other power failure accidents other than the above can be handled in the substation 110.

다음으로, 고장복구정보를 통해 변전소(110) 내부에서 고장복구가 가능한지 여부를 판단한다. Next, it is determined whether or not a fault can be recovered in the substation 110 through the fault recovery information.

우선, 정전 용량과 복구참여 용량을 비교(S120)하여 복구참여 용량이 정전 용량보다 큰 경우 다음 단계(S121)로 진행하고, 작은 경우 변전소(110) 내부에서 복구가 가능하므로 변전소(110) 내부에서 고장복구(S122)를 완료한다. If the recovery participation capacity is larger than the electrostatic capacity, the process proceeds to step S121. If the recovery participation capacity is smaller than the electrostatic capacity, the capacity can be recovered within the substation 110, The failure recovery (S122) is completed.

다음, 정전 용량과 배전 피더(feeder)들의 부하 용량 중 가장 낮은 최소 부하 용량을 비교(S121)하여 최소 부하 용량이 정전 용량보다 큰 경우 다음 단계(S130)로 진행하고, 작은 경우 변전소(110) 내부에서 복구가 가능하므로 변전소(110) 내부에서 고장복구(S122)를 완료한다.Next, if the minimum load capacity is larger than the electrostatic capacity, the process proceeds to the next step (S130). If the minimum load capacity is smaller than the electrostatic capacity, the smallest load capacity of the substation 110 It is possible to complete the failure recovery (S122) in the substation 110.

다음으로, 변전소(110) 내부에서 고장복구가 불가능하다고 판단되는 경우 최종 정전 피더(feeder)를 추출한다. Next, if it is determined that failure recovery is not possible within the substation 110, a final electrostatic feeder is extracted.

우선, 변전소(110)의 주변압기들 중에서 두 개 이상의 주변압기에 정전 피더(feeder)가 존재하는지 여부를 확인(S130)한다. First, it is determined whether or not an electrostatic feeder exists in at least two main transformers among the main transformers of the substation 110 (S130).

다음, 정전 피더(feeder)가 두 개 이상의 주변압기에 존재하는 경우, 이를 제외한 건전한 주변압기들의 부하용량을 최소에서 최대 순(M)으로 정렬(S131)하여 이를 정전용량과 순차적으로 비교(S132)한다. 이때, 주변압기들의 복구참여 용량이 정전용량보다 크거나 같은 경우 다음 단계(S133)로 진행하고, 그렇지 않은 경우에는 이전 단계(S131)로 돌아가 현재의 주변압기 복구참여 용량과 그 다음 순서의 주변압기 복구참여 용량을 합하여 현 단계(S132)를 다시 진행한다. Next, when the electrostatic feeder is present in two or more main transformers, the load capacities of the sound main transformers except for that are sorted from minimum to maximum order (M13) (S131) and sequentially compared with the electrostatic capacity (S132) do. If the recovery capacity of the main transformers is greater than or equal to the electrostatic capacity, the process proceeds to the next step S133. Otherwise, the process returns to the previous step S131 and the main transformer recovery- The recovery participating capacity is summed up and the present step (S132) is performed again.

다음, 정전 피더(feeder)가 한 개의 주변압기에 존재하는 경우 또는 비교 결과 주변압기들의 복구참여 용량이 정전용량보다 크거나 같은 경우, 해당 주변압기 내의 배전 피더(feeder)들의 부하용량을 최소에서 최대 순(F)으로 정렬(S133)하여 이를 최종정전용량과 순차적으로 비교(S134)한다. 이때, 해당 주변압기의 배전 피더(feeder) 부하용량이 최종 정전용량보다 크거나 같은 경우 다음 단계(S140)로 진행하고, 그렇지 않은 경우에는 이전 단계(S133)으로 돌아가 현재의 배전 피더(feeder) 부하용량에 그 다음 순서의 배전 피더(feeder) 부하용량을 합하여 현 단계(S134)를 다시 진행한다.Next, when the electrostatic feeder is present in one main transformer or, as a result of comparison, the recovery capacity of the main transformers is greater than or equal to the capacitance, the load capacity of the distribution feeders in the main transformer is set to a minimum (S133) and compares them sequentially with the final capacitance (S134). At this time, if the power feeder load capacity of the main transformer is equal to or greater than the final electrostatic capacity, the process proceeds to the next step S140. Otherwise, the process returns to the previous power feeder loader stage (S133) The capacity is then added to the distribution feeder load capacity in the next step and the present step (S134) is performed again.

다음으로, 이전 단계(S131)에서 해당 배전 피더(feeder)를 최종적으로 정전된 최종 정전 피더(feeder)로 선정(S140)한다.Next, in the previous step S131, the distribution feeder is finally selected as the final electrostatic feeder that has been subjected to the electric discharge (S140).

다음으로, 추출된 최종 정전 피더(feeder)를 토대로 배전선로의 상시 개방점 연결 또는 상시 연결점 분리 여부를 판단하여 변전소(110)의 고장복구가 수행되도록 한다.Next, based on the extracted final electrostatic feeder, it is judged whether or not the connection of the normally open point to the distribution line or the connection point is always disconnected, so that the failure recovery of the substation 110 is performed.

우선, 최종 정전 피더(feeder)를 상시 개방점 연결을 통해 복구할 수 있는지를 판단(S141)한다. 이때, 상시 개방점 연결을 통해 복구가 가능하면 고장복구를 완료(S260)하고 복구가 불가능하면 다음 단계(S142)로 진행한다. First, it is judged whether or not the final electrostatic feeder can be restored through the normally open connection (S141). At this time, if recovery is possible through the normally open connection, the fault recovery is completed (S260), and if recovery is not possible, the process proceeds to the next step (S142).

다음, 상시 개방점 연결로 최종 정전 피더(feeder) 복구가 불가능하다고 판단되는 경우, 최종 정전 피더(feeder)를 상시 연결점 분리를 통해 복구할 수 있는지 여부를 판단(S142)한다. 이때, 상기 연결점 분리를 통해 복구가 가능하면 해당 배전선로의 부하분포를 파악(S143)하고 배전선로 부하의 재분배 여부를 판단(S144)하여 고장복구를 완료(S160)하고 복구가 불가능하면 고장복구 불가로 완료(S150)한다.
Next, when it is determined that the final electrostatic feeder can not be restored by the normally open point connection, it is judged whether or not the final electrostatic feeder can be recovered through continuous connection point separation (S142). If it is possible to recover through the connection point separation, the distribution of the load to the distribution line is determined (S143), the redirection of the load to the distribution line is determined (S144) (S150).

이처럼, 본 발명에 따른 배전선로 고장복구 시스템 및 이의 운용방법은 변전소(110) 고장 발생시 취득되는 상태정보 및 고장복구정보를 토대로 종합적인 분석을 통해 정전 피더(feeder)를 추출함으로써, 신속하고 정확한 고장복구가 가능하여 배전선로 운영의 효율성을 향상시키고, 최종적으로 추출된 정전 피더(feeder)에 대한 정보를 토대로 배선선로의 상시 개방점 연결 또는 상시 연결점 분리를 판단하여 배전선로의 부하를 재분배함으로써, 고장 구간을 최소화하고 건전 구간을 최대한 확보하여 고장복구 시스템의 성능을 향상시킬 수 있다.
As described above, the distribution line fault recovery system and its operation method according to the present invention extracts an electrostatic feeder through a comprehensive analysis based on status information and failure recovery information obtained when a substation 110 fails, It is possible to improve the efficiency of the operation by the distribution line and to redistribute the load to the distribution line by judging whether the wiring line is always open or always connected based on the information about the extracted static electricity feeder, It is possible to improve the performance of the fault recovery system by minimizing the interval and ensuring the maximum electric field.

이상에서, 본 발명에 따른 바람직한 실시예에 대해 설명하였으나, 다양한 형태로 변형이 가능하며, 본 기술분야에서 통상의 지식을 가진자라면 본 발명의 특허청구범위를 벗어남이 없이 다양한 변형예 및 수정예를 실시할 수 있을 것으로 이해된다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is evident that many alternatives, modifications, and variations will be apparent to those skilled in the art without departing from the scope of the appended claims. As will be understood by those skilled in the art.

100 : 배전선로 고장복구 시스템.
110 : 변전소 120 : 배전 정보 취득부
130 : 전단 처리기 140 : 배전 제어부
150 : 배전 스테이션

100: Distribution line fault recovery system.
110: Substation 120: Distribution information acquisition unit
130: front end processor 140: distribution control unit
150: Distribution station

Claims (16)

배전선로의 고장복구를 지원하는 배전선로 고장복구 시스템에 있어서,
변전소에 설치되어, 상기 변전소 고장 발생시 상기 변전소의 상태정보 및 고장복구정보를 취득하여 최종 정전 피더(feeder)를 추출하는 배전 정보 취득부; 및
상기 추출된 최종 정전 피더(feeder)가 상기 배전선로의 상시 개방점 연결 또는 상시 연결점 분리를 통해 고장복구가 가능한지 여부를 판단하여 상기 변전소의 고장복구가 수행되도록 하는 배전 제어부;를 포함하고,
상기 배전 정보 취득부는, 상기 변전소의 상태정보를 통해 고장 형태를 판단하고, 상기 고장복구정보를 통해 상기 변전소 내부에서 고장복구가 가능한지를 판단하며, 상기 변전소 내부에서 고장복구가 가능하다고 판단되는 경우에 정전시키지 않고 상기 변전소의 고장을 복구하고, 상기 변전소 내부에서 고장복구가 불가능하다고 판단되는 경우에 최종 정전 피더를 추출하며,
상기 상시 개방점은, 배전선로에서 항상 오픈되어 있는 차단기 및 개폐기를 통칭하고, 상기 상시 연결점은, 배전선로에서 항상 오프되어 있는 차단기 및 개폐기를 통칭하는 것을 특징으로 하는 배전선로 고장복구 시스템.
In a distribution line fault recovery system supporting failure recovery of a distribution line,
A distribution information acquisition unit installed in a substation to acquire status information and failure recovery information of the substation when the substation fails and extract a final static electricity feeder; And
And a power distribution controller for determining whether or not the extracted final electrostatic feeder is capable of recovering from a fault through connection of a normally open point to the power line,
The power distribution information acquisition unit determines a failure type through the status information of the substation and determines whether failure recovery is possible within the substation through the failure recovery information. If it is determined that failure recovery is possible within the substation A failure of the substation is restored without causing a power failure, and when it is judged that failure recovery is impossible in the substation, a final electrostatic feeder is extracted,
Wherein said normally open point is collectively referred to as a breaker and an opener that are always open in the distribution line and said permanent connection is collectively referred to as a breaker and an opener that are always off in the distribution line.
제 1항에 있어서,
상기 배전 정보 취득부는,
상기 변전소의 고장 발생 직전의 상기 변전소 설비들의 전력 사용량, 피크용량을 포함하는 상기 상태정보 및 상기 변전소 고장 발생에 따른 정전 용량과 고장복구에 참여하는 건전한 상기 변전소 설비들의 전력 사용량과 피크용량을 합한 복구참여 용량, 상기 변전소에 구비된 배전 피더(feeder)들의 부하 용량, 상기 변전소에 구비된 주변압기(MTR)들의 부하 용량을 포함하는 상기 고장복구정보를 취득하는 것을 특징으로 하는 배전선로 고장복구 시스템.
The method according to claim 1,
The power distribution information acquisition unit
The state information including the power consumption of the substation facilities immediately before occurrence of the fault of the substation, the state information including the peak capacity, and the capacitance due to the occurrence of the substation failure and the recovery of the sum of the power usage and the peak capacity of the substation facilities, The failure recovery information including the capacity involved, the load capacity of power feeders provided in the substation, and the load capacity of the main transformers (MTR) provided in the substation.
제 2항에 있어서,
상기 배전 정보 취득부는,
상기 상태정보를 통해 상기 변전소에서 발생 된 고장이 상기 주변압기 또는 전력간선(BUS) 또는 상기 배전 피더(feeder) 관련 고장인지를 판단하는 고장 형태 판단부;
상기 정전 용량과 상기 복구참여 용량, 상기 배전 피더(feeder)들의 부하 용량 중 가장 낮은 최소 부하 용량을 각각 비교하여 상기 복구참여 용량 및 상기 최소부하 용량이 상기 정전 용량보다 작은 경우 상기 변전소 내부에서 고장복구가 불가능하다고 판단하는 고장복구 판단부; 및
상기 변전소 내부에서 고장복구가 불가능하다고 판단되는 경우, 상기 최종 정전 피더(feeder)를 추출하는 최종 정전 피더(feeder) 추출부;
를 포함하는 것을 특징으로 하는 배전선로 고장복구 시스템.
3. The method of claim 2,
The power distribution information acquisition unit
A failure type determination unit for determining whether a failure occurring in the substation is a fault related to the main transformer or the power mains (BUS) or the power distribution feeder through the status information;
And a minimum load capacity of the load capacity of the power distribution feeders is compared with each other, and if the recovery participation capacity and the minimum load capacity are smaller than the electrostatic capacity, A failure recovery determination unit determining that the failure is impossible; And
A final electrostatic feeder extracting unit for extracting the final electrostatic feeder when it is determined that failure recovery is not possible within the substation;
And a failure detection unit for detecting failure in the power line.
제 3항에 있어서,
상기 최종 정전 피더(feeder) 추출부는,
상기 주변압기들 중에서 두 개 이상의 주변압기에 정전 피더(feeder)가 존재하는지 여부를 확인하는 정전 피더(feeder) 존재 확인부;
상기 정전 피더(feeder)가 두 개 이상의 주변압기에 존재하는 경우, 이를 제외한 건전한 주변압기들의 복구참여 용량을 최소에서 최대 순으로 정렬하여 이를 상기 정전용량과 순차적으로 비교하는 제 1 비교부;
상기 정전 피더(feeder)가 한 개의 주변압기에 존재하는 경우 또는 상기 비교 결과 상기 주변압기들의 복구참여 용량이 상기 정전용량보다 크거나 같은 경우, 해당 주변압기 내의 배전 피더(feeder)들의 부하용량을 최소에서 최대 순으로 정렬하여 이를 최종 정전용량과 순차적으로 비교하는 제 2 비교부; 및
상기 비교 결과 상기 배전 피더(feeder) 부하용량이 상기 정전용량보다 크거나 같은 경우, 해당 배전 피더(feeder)를 최종적으로 정전된 상기 최종 정전 피더(feeder)로 선정하는 최종 정전 피더(feeder) 선정부;
를 포함하는 것을 특징으로 하는 배전선로 고장복구 시스템.
The method of claim 3,
Wherein the final electrostatic feeder extracting unit comprises:
An electrostatic feeder presence confirmation unit for confirming whether or not an electrostatic feeder is present in at least two main transformers among the main transformers;
A first comparator for sequentially arranging the recovery participation capacities of the sound main transformers other than the power mains feeder in at least two main transformers in order from minimum to maximum and sequentially comparing the restoration capacity with the electrostatic capacity;
If the electrostatic feeder is present in one main transformer or if the recovery capacity of the main transformers is greater than or equal to the electrostatic capacity as a result of the comparison, the load capacity of power feeders in the main transformer is set to a minimum A second comparing unit for sequentially aligning the electrodes in a sequential order with the final capacitance; And
And a final electrostatic feeder selecting unit for selecting the power feeder as the final electrostatic feeder finally charged if the power feeder load capacity of the power feeder is greater than or equal to the electrostatic capacity as a result of the comparison, ;
And a failure detection unit for detecting failure in the power line.
제 4항에 있어서,
상기 최종 정전용량은, 상기 변전소 고장 발생시 발생한 정전 용량에 이를 복구하기 위해 참여한 건전 설비의 복구참여 용량을 상쇄한 용량인 것을 특징으로 하는 배전선로 고장복구 시스템.
5. The method of claim 4,
Wherein the final electrostatic capacity is a capacity canceling the recovery participation capacity of the participating healthy facility to recover the electrostatic capacity generated when the substation failure occurs.
제 1항에 있어서,
상기 배전 제어부는 상기 배전 정보 취득부에서 취득되는 상기 변전소의 상태정보 및 고장복구정보 그리고 상기 최종 정전 피더(feeder)에 대한 정보를 전단처리기(front-end processor)를 통해 수신 받는 것을 특징으로 하는 배전선로 고장복구 시스템.
The method according to claim 1,
Wherein the power distribution control unit receives the status information of the substation and failure recovery information acquired by the power distribution information acquisition unit and information on the final power feeder through a front-end processor, Fault recovery system.
제 1항에 있어서,
상기 배전 제어부는,
상기 최종 정전 피더(feeder)를 상시 개방점 연결을 통해 복구할 수 있는지 여부를 판단하는 개방점 연결판단부; 및
상기 상시 개방점 연결로 상기 최종 정전 피더(feeder)복구가 불가능하다고 판단되는 경우, 상기 최종 정전 피더(feeder)를 상시 연결점 분리를 통해 복구할 수 있는지 여부를 판단하는 연결점 분리판단부;
를 포함하는 것을 특징으로 하는 배전선로 고장복구 시스템.
The method according to claim 1,
The power distribution control unit includes:
An open-point connection determining unit for determining whether or not the final electrostatic feeder can be recovered through the connection of the normally open end points; And
A connection point detachment judging unit for judging whether or not the final electrostatic feeder can be recovered through continuous connection point separation when it is determined that the final electrostatic feeder can not be restored by the connection of the normally open point;
And a failure detection unit for detecting failure in the power line.
제 7항에 있어서,
상기 배전 제어부는,
상기 상시 연결점 분리로 상기 최종 정전 피더(feeder)의 복구가 가능하다고 판단되는 경우, 해당 배전선로의 부하분포를 파악하는 부하분포 파악부; 및
상기 파악된 부하분포를 토대로 상기 배전선로 부하의 재분배 여부를 판단하는 부하 재분배 판단부;
를 포함하는 것을 특징으로 하는 배전선로 고장복구 시스템.
8. The method of claim 7,
The power distribution control unit includes:
A load distribution grasping unit for grasping a load distribution to the distribution line when it is determined that restoration of the final electrostatic feeder is possible by the permanent connection point separation; And
A load redistribution determining unit for determining whether the load is redistributed with the distribution line based on the identified load distribution;
And a failure detection unit for detecting failure in the power line.
배전선로의 고장복구를 지원하는 배전선로 고장복구 시스템의 운용방법에 있어서,
변전소 고장 발생시 상기 변전소의 상태정보 및 고장복구정보를 취득하는 단계;
상기 상태정보를 통해 상기 변전소의 고장 형태를 판단하는 단계;
상기 고장복구정보를 통해 상기 변전소 내부에서 고장복구가 가능한지 여부를 판단하는 단계;
상기 변전소 내부에서 고장복구가 불가능하다고 판단되는 경우 최종 정전 피더(feeder)를 추출하는 단계; 및
상기 추출된 최종 정전 피더(feeder)가 상기 배전선로의 상시 개방점 연결 또는 상시 연결점 분리를 통해 고장복구가 가능한지 여부를 판단하여 상기 변전소의 고장복구가 수행되도록 하는 단계;를 포함하고,
상기 변전소 내부에서 고장복구가 가능한지 여부를 판단하는 단계는,
상기 변전소 내부에서 고장복구가 가능하다고 판단되는 경우에 정전시키지 않고 상기 변전소의 고장을 복구하고,
상기 상시 개방점은 배전선로에서 항상 오픈되어 있는 차단기 및 개폐기를 통칭하고, 상기 상시 연결점은 배전선로에서 항상 오프되어 있는 차단기 및 개폐기를 통칭하는 것을 특징으로 하는 배전선로 고장복구 시스템의 운용방법.
In a method of operating a distribution line fault recovery system that supports fault recovery of a distribution line,
Obtaining status information and failure recovery information of the substation when a substation failure occurs;
Determining a failure mode of the substation through the status information;
Determining whether fault recovery is possible in the substation through the fault recovery information;
Extracting a final electrostatic feeder if it is determined that failure recovery is not possible within the substation; And
Determining whether fault recovery is possible through the connection of the extracted final static electricity feeder to the power line or by always disconnecting the power line, and performing fault recovery of the substation;
Wherein the step of determining whether fault recovery is possible within the substation comprises:
And when a failure is recoverable in the substation, it is possible to recover the failure of the substation without causing a power failure,
Wherein the normally open point is collectively referred to as a breaker and an opener that are always open in the distribution line and the always-connected point is a circuit breaker and an opener that are always off in the distribution line.
제 9항에 있어서,
상기 변전소의 상태정보 및 고장복구정보를 취득하는 단계는,
상기 변전소의 고장 발생 직전의 상기 변전소 설비들의 전력 사용량, 피크용량을 포함하는 상기 상태정보 및 상기 변전소 고장 발생에 따른 정전 용량과 고장복구에 참여하는 건전한 상기 변전소 설비들의 전력 사용량과 피크용량을 합한 복구참여 용량, 상기 변전소에 구비된 배전 피더(feeder)들의 부하 용량, 상기 변전소에 구비된 주변압기(MTR)들의 부하 용량을 포함하는 상기 고장복구정보를 취득하는 것을 특징으로 하는 배전선로 고장복구 시스템의 운용방법.
10. The method of claim 9,
Wherein the step of acquiring status information and failure recovery information of the substation comprises:
The state information including the power consumption of the substation facilities immediately before occurrence of the fault of the substation, the state information including the peak capacity, and the capacitance due to the occurrence of the substation failure and the recovery of the sum of the power usage and the peak capacity of the substation facilities, The failure recovery information including the capacity involved, the load capacity of distribution feeders provided in the substation, and the load capacity of the main transformers (MTR) provided in the substation. How to operate.
제 10항에 있어서,
상기 고장 형태를 판단하는 단계는,
상기 상태정보를 통해 상기 변전소에서 발생 된 고장이 상기 주변압기 또는 전력간선(BUS) 또는 상기 배전 피더(feeder) 관련 고장인지를 판단하는 것을 특징으로 하는 배전선로 고장복구 시스템의 운용방법.
11. The method of claim 10,
The method of claim 1,
And determines whether a failure occurring in the substation is a fault related to the main transformer, the power mains (BUS) or the power distribution feeder through the status information.
제 10항에 있어서,
상기 변전소 내부에서 고장복구가 가능한지 여부를 판단하는 단계는,
상기 정전 용량과 상기 복구참여 용량, 상기 배전 피더(feeder)들의 부하 용량 중 가장 낮은 최소 부하 용량을 각각 비교하여 상기 복구참여 용량 및 상기 최소부하 용량이 상기 정전 용량보다 작은 경우 상기 변전소 내부에서 고장복구가 불가능하다고 판단하는 것을 특징으로 하는 배전선로 고장복구 시스템의 운용방법.
11. The method of claim 10,
Wherein the step of determining whether fault recovery is possible within the substation comprises:
And a minimum load capacity of the load capacity of the power distribution feeders is compared with each other, and if the recovery participation capacity and the minimum load capacity are smaller than the electrostatic capacity, And the power supply line is connected to the power supply line.
제 10항에 있어서,
상기 최종 정전 피더(feeder)를 추출하는 단계는,
상기 변전소 내부에서 고장복구가 불가능하다고 판단되는 경우,
상기 주변압기들 중에서 두 개 이상의 주변압기에 정전 피더(feeder)가 존재하는지 여부를 확인하는 단계;
상기 정전 피더(feeder)가 두 개 이상의 주변압기에 존재하는 경우, 이를 제외한 건전한 주변압기들의 복구참여 용량을 최소에서 최대 순으로 정렬하여 이를 상기 정전용량과 순차적으로 비교하는 단계; 및
상기 정전 피더(feeder)가 한 개의 주변압기에 존재하는 경우 또는 상기 비교 결과 상기 주변압기들의 복구참여 용량이 상기 정전용량보다 크거나 같은 경우, 해당 주변압기 내의 배전 피더(feeder)들의 부하용량을 최소에서 최대 순으로 정렬하여 이를 최종 정전용량과 순차적으로 비교하는 단계;
를 포함하는 것을 특징으로 하는 배전선로 고장복구 시스템의 운용방법.
11. The method of claim 10,
The step of extracting the final electrostatic feeder comprises:
If it is determined that failure recovery is not possible within the substation,
Confirming whether or not an electrostatic feeder is present in at least two main transformers among the main transformers;
If the power feeder is present in more than one main transformer, sorting the recovered capacity of the healthy main transformers except for the main transformer in order from minimum to maximum and sequentially comparing the recovered capacity with the capacitance; And
If the electrostatic feeder is present in one main transformer or if the recovery capacity of the main transformers is greater than or equal to the electrostatic capacity as a result of the comparison, the load capacity of power feeders in the main transformer is set to a minimum And sequentially comparing the measured capacitance with the final capacitance;
Wherein the failure recovery system comprises:
제 13항에 있어서,
상기 배전 피더(feeder)들의 부하용량을 최소에서 최대 순으로 정렬하여 이를 상기 정전용량과 순차적으로 비교하는 단계 이후에,
상기 배전 피더(feeder) 부하용량이 상기 정전용량보다 크거나 같은 경우, 해당 배전 피더(feeder)를 최종적으로 정전된 상기 최종 정전 피더(feeder)로 선정하는 단계;
를 포함하는 것을 특징으로 하는 배전선로 고장복구 시스템의 운용방법.
14. The method of claim 13,
After arranging the load capacities of the distribution feeders in order from minimum to maximum and sequentially comparing it with the capacitance,
If the power feeder load capacity is greater than or equal to the electrostatic capacity, selecting the power feeder as the final electrostatic feeder that is finally electrified;
Wherein the failure recovery system comprises:
제 9항에 있어서,
상기 배전선로의 상시 개방점 연결 또는 상시 연결점 분리 여부를 판단하는 단계는,
상기 최종 정전 피더(feeder)를 상시 개방점 연결을 통해 복구할 수 있는지를 판단하는 단계; 및
상기 상시 개방점 연결로 상기 최종 정전 피더(feeder) 복구가 불가능하다고 판단되는 경우, 상기 최종 정전 피더(feeder)를 상시 연결점 분리를 통해 복구할 수 있는지 여부를 판단하는 단계;
를 포함하는 것을 특징으로 하는 배전선로 고장복구 시스템의 운용방법.
10. The method of claim 9,
Wherein the step of determining whether to connect the normally open point or the always connected point to the power distribution line comprises:
Determining whether the final electrostatic feeder can be restored via a normally open-ended connection; And
Determining whether the final electrostatic feeder can be recovered through continuous connection point separation if it is determined that the final electrostatic feeder recovery is not possible with the normally open connection;
Wherein the failure recovery system comprises:
제 15항에 있어서,
상기 최종 정전 피더(feeder)를 상시 연결점 분리를 통해 복구할 수 있는지 여부를 판단하는 단계 이후에,
상기 상시 연결점 분리로 상기 최종 정전 피더(feeder)의 복구가 가능하다고 판단되는 경우, 해당 배전선로의 부하분포를 파악하고 상기 배전선로 부하의 재분배 여부를 판단하는 단계;
를 포함하는 것을 특징으로 하는 배전선로 고장복구 시스템의 운용방법.

16. The method of claim 15,
After determining whether the final electrostatic feeder can be recovered through continuous connection separation,
Determining whether the final electrostatic feeder can be recovered by the continuous connection point separation, determining load distribution to the distribution line and determining whether the load is redistributed by the distribution line;
Wherein the failure recovery system comprises:

KR1020120098112A 2012-09-05 2012-09-05 System and operation method for error restoration of distribution line KR101980866B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120098112A KR101980866B1 (en) 2012-09-05 2012-09-05 System and operation method for error restoration of distribution line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120098112A KR101980866B1 (en) 2012-09-05 2012-09-05 System and operation method for error restoration of distribution line

Publications (2)

Publication Number Publication Date
KR20140031604A KR20140031604A (en) 2014-03-13
KR101980866B1 true KR101980866B1 (en) 2019-05-23

Family

ID=50643591

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120098112A KR101980866B1 (en) 2012-09-05 2012-09-05 System and operation method for error restoration of distribution line

Country Status (1)

Country Link
KR (1) KR101980866B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102336389B1 (en) 2021-04-12 2021-12-08 (주)진원엔지니어링 Distribution line failure recovery system equipped with a distribution station with fire protection
KR102465128B1 (en) * 2021-12-24 2022-11-10 유예림 Providing method for a distribution line fault recovery system

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102096468B1 (en) * 2018-10-05 2020-04-02 한국전력공사 Active load management method
CN113837899B (en) * 2021-09-28 2024-05-14 武汉理工大学 Optimal configuration method for feeder remote terminal unit
KR102399892B1 (en) * 2021-12-24 2022-05-19 전황현 Providing method for a distribution line fault recovery system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100380657B1 (en) 2000-05-10 2003-04-18 한국수력원자력 주식회사 Automatic Power Restoration Method
KR101132015B1 (en) * 2010-09-29 2012-04-02 한국전력공사 Automatic distribution server for supporting error restoration of distribution line and automatic distribution method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101266953B1 (en) * 2011-02-23 2013-05-30 한전케이디엔주식회사 Power supply system and method using distributed power system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100380657B1 (en) 2000-05-10 2003-04-18 한국수력원자력 주식회사 Automatic Power Restoration Method
KR101132015B1 (en) * 2010-09-29 2012-04-02 한국전력공사 Automatic distribution server for supporting error restoration of distribution line and automatic distribution method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102336389B1 (en) 2021-04-12 2021-12-08 (주)진원엔지니어링 Distribution line failure recovery system equipped with a distribution station with fire protection
KR102465128B1 (en) * 2021-12-24 2022-11-10 유예림 Providing method for a distribution line fault recovery system

Also Published As

Publication number Publication date
KR20140031604A (en) 2014-03-13

Similar Documents

Publication Publication Date Title
KR101980866B1 (en) System and operation method for error restoration of distribution line
KR100709980B1 (en) Method and apparatus for detecting a fault section using comparison of phase difference and magnitude difference bewteen zero phase currents in ungrounded distribution power systems
CN103688434B (en) Fault identification and location in a power supply line which is fed from one side
KR101943468B1 (en) MICROGRID SYSTEM and TROUBLE PROCESSING METHOD thereof
CN111373622A (en) Nested microgrid control system
US20080211511A1 (en) Method of Generating Fault Indication in Feeder Remote Terminal Unit for Power Distribution Automation System
KR101268620B1 (en) System and method for detecting the high impedence ground fault using distribution automation system
CN102709889A (en) Self-healing method and self-healing system for faults of power distribution network
JP2019537701A (en) Method and apparatus for detecting failure of distribution network with high reliability, and storage medium
KR101505176B1 (en) Apparatus and method for detecting failure of bus
CN103618377A (en) Automatic bus transfer equipment system and automatic bus transfer method used for transformer substation to which small power supply is connected
CN102621451A (en) Distribution line single-phase grounding fault detecting method and system based on instantaneous signal method
KR20180120112A (en) A method for identifying a fault event in an electric power distribution grid sector
CN104953705A (en) Inner bridge spare power automatic switching control method based on incomplete primary main wiring
CN108287295B (en) Power line ground fault position finding method and system
CN103280780B (en) A kind of system with non effectively earth ed neutral fault self-recovery method
CN101860004B (en) Power disconnect system and method
US20150288224A1 (en) Standby power supply system and methods for isolating a local power distribution network from a superordinate power supply network
CN104821655A (en) Fault positioning method for regional spare power automatic switching
AU2018363059B2 (en) Control system for and method of fault location, isolation and supply restoration
EP2834897B1 (en) Backup power system and grounding device for a backup power system
CN105514989A (en) Urban power network power supply recovery method based on backup automatic switching of 10kV special feed line
CN105067960A (en) Distribution network fault location system based on big data and method thereof
CN102694419A (en) Management system for integrated test and control
CN106340954A (en) Method for identifying line breaking of power supply line and switching to standby power supply

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right