KR101975763B1 - Precast Concrete Culvert and Method for Constructing the Same - Google Patents
Precast Concrete Culvert and Method for Constructing the Same Download PDFInfo
- Publication number
- KR101975763B1 KR101975763B1 KR1020180138641A KR20180138641A KR101975763B1 KR 101975763 B1 KR101975763 B1 KR 101975763B1 KR 1020180138641 A KR1020180138641 A KR 1020180138641A KR 20180138641 A KR20180138641 A KR 20180138641A KR 101975763 B1 KR101975763 B1 KR 101975763B1
- Authority
- KR
- South Korea
- Prior art keywords
- hole
- mounting hole
- mounting
- mortar
- strand
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/14—Geometrical or physical properties resilient or elastic
- E02D2200/146—Springs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/0021—Mortar
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Sewage (AREA)
Abstract
Description
본 발명은 단위형 암거 박스가 PC(Precast concrete)로 제작되도록 하되, 개구된 방향 단부 양측에는 수밀 확보용 속채움 몰탈 정착홈이 4각 두께면(양 벽면, 하면, 상면)에 대하여 일체의 라인으로 성형되도록 형성되고, 상기 몰탈 정착홈 중 각 모서리 부분에는 단위형 암거 박스의 구간 길이에 대응되면서 분할된 각 강연선이 연속적으로 연결될 수 있도록 양방향 정착 커플러가 형성되도록 하되, 상기 양방향 정착 커플러는 획기적인 조립성과 작업성이 확보되면서 견고한 장착성이 보장되는 바, 이는 공기단축과 함께 시공성 및 생산성이 크게 개선되도록 하는 것을 특징으로 하는 양방향 정착 커플러와 인서트 고정장치 및 고점착 유연성 겔 방수재를 이용한 암거 구조물 시공방법에 관한 것이다.In the present invention, the unit type culvert box is made of PC (Precast concrete), and on both sides of the opened direction end portion, an in-line filling mortar fixing groove for ensuring watertightness is formed on the four-thickness surface (both walls, Directional fixing coupler is formed at each corner of the mortar fixing grooves so that each divided strand corresponding to the length of the unit type cage box can be continuously connected to each other, The method of manufacturing a culvert structure using a bidirectional fixing coupler, an insert fixing device, and a high-adhesion flexible gel-like waterproofing material, characterized in that the installation workability is ensured and the mounting workability is ensured, .
또한, 본 발명은 PC(Precast concrete)로 제작된 단위형 암거 박스가 연속 조립되면서 일체의 암거 구조물을 시공하도록 하는 것으로, 상기 암거 박스의 개구된 방향 단부 양측에는 고점착 유연성 겔 방수재가 충진되도록 형성되어 획기적인 방수성능이 보장되도록 하되, 상기 고점착 유연성 겔 방수재는 공급관을 통해 충진(채움)시 방수재 이동홈에 의해 방수재의 막힘 현상이 방지되도록 형성되고, 상기 암거 박스의 내부 공간부 중 천정부에는 인서트 고정장치가 구비되도록 하되, 상기 인서트 고정장치는 장착레일을 통해 길이방향 유동구간 내에서 고정철물의 설치 구간이 가변될 수 있도록 형성되어 종전 시설물의 고정을 위해 시공 완료후 밀페된 공간안에서 별도의 정밀 고난이도 작업으로 공사기간 및 공기,기존 철근 간섭 등 구조물의 안전성을 위해하는 천공작업을 원천적으로 배제할 수 있는 바, 이는 작업성과 공기단축,구조물 안전성,경제성 등 현저하게 개선하고, 특히 단위형 암거 박스는 분할된 각 강연선이 연속적으로 연결될 수 있도록 양방향 정착 커플러가 형성되어 조립성과 작업성이 향상됨은 물론 견고한 장착성과 함께 공기단축이 이루어져 생산성이 크게 개선되도록 하는 것을 특징으로 하는 인서트 고정장치 및 고점착 유연성 겔 방수재를 이용한 암거 구조물 시공방법에 관한 것이다.In addition, the present invention allows a unit culvert box made of PC (Precast concrete) to be continuously assembled to construct an integral culvert structure, and both sides of the culvert box in the opened direction are filled with a high- Wherein the highly adhesive and flexible gel-like waterproofing material is formed to prevent clogging of the waterproofing material by a waterproof material moving groove when filling (filling) through a supply pipe, and the ceiling portion of the cowl box is provided with an insert The insert fixing device is formed so that the installation section of the fixed hardware can be changed in the longitudinal direction flow section through the mounting rail, and in order to fix the previous facility, For the safety of structures such as construction period and air, existing reinforced concrete interference by high-level work A bimetallic fixing coupler is formed in the unit type cage box so that each divided strand can be continuously connected to each other. And a method of constructing a culvert structure using the insert fixing device and the high-adhesion flexible gel-like waterproofing material.
일반적으로 상하수도, 전력구, 통신구, 공동구 등의 시설물은 프리캐스트 콘크리트 암거(Precast Concrete Culvert 이하 "PC 암거"라고 칭한다)를 각 단위 별로 제작하고, 단위별로 제작된 PC 암거의 연속적인 조립을 통해 구성된다.In general, facilities such as water supply and drainage, electric power, communication area, and communal area are manufactured by Precast Concrete Culvert (hereinafter referred to as "PC culvert") for each unit and by continuous assembly of PC culvert .
이와 같이 조립되는 PC 암거들은 PC 암거 간 연결 강도가 매우 취약하기 때문에 PC암거들 사이의 접합 연결부가 벌어지게 되고, 그에 따라 수밀성이 저하된다.The PC cages assembled in this way are very weak in the connection strength between the PC cages, so that the junctions between the PC cages are widened and the water tightness is lowered accordingly.
이러한 접합 연결 강도의 저하를 해소하기 위하여 긴장재가 각 PC 암거에 형성되는 통과공을 통과하는 상태로 긴장되고, 그 양끝 부분을 PC 암거에 정착시키는 구조가 도입되고 있다.In order to overcome the deterioration of the joining connection strength, a structure has been introduced in which the tension members are tensed in a state of passing through the through holes formed in the respective PC troughs, and the both end portions are fixed to the PC troughs.
그런데, PC 암거를 연결하는 긴장재의 길이가 길어질수록 상호 연속배치된 PC 암거에 설치하기가 어렵고, 상호 연속결합된 PC 암거의 하중이나 부등 침하 등의 외력 등에 의해 긴장재가 변형되어 암거 간의 체결력이 약해지거나, 긴장재의 절단에 의한 접합영역의 균열이 발생될 우려가 크다는 문제가 있었다.However, as the length of the tensioning material connecting the PC culverts becomes longer, it is difficult to install them on the PC culvert which are arranged in mutually continuous, and the tensile strength is weakened due to the external force such as load or uneven settlement of the PC culver There is a problem that cracks in the joint region due to cutting of the tensile material are likely to occur.
이러한 문제를 해결하기 위한 다른 방법으로 PC 암거의 접합 단부에 고리상의 연결지지부재를 설치하여 상기 PC 암거의 접합 단부를 서로 밀착 결합시켜 상기 고리상의 연결지지부재에 강봉을 삽입하여 결합시키거나, 강봉 없이 서로 결합시키고, 모르타르를 충진하여 PC 암거를 연결시키는 방법이 있다.Another method for solving such a problem is to provide a connecting support member in the form of a ring at the joining end of the PC culvert so that the joining ends of the PC cullet are closely contacted to each other to insert a steel bar into the connecting supporting member on the ring, There is a way to connect the PC culvert by filling the mortar with it.
그런데, 강봉을 삽입하여 결합시키는 방법은, 내구성 및 결합성 등의 이유로 고리상의 연결지지부재의 설치 위치가 제한되거나 여유 굴착폭원이 확보되지 않으면 거의 결합이 어려운 문제점이 있었으며, 고리상의 연결지지부재 끼리 서로 결합시키는 기존 방법은 PC 암거의 자중으로 인하여 그 결합이 용이하지 않거나 상호 접촉된 암거 간의 체결력을 지속적으로 유지시킬 수 없는 문제가 있었다.However, in the method of inserting and joining the steel rods, there is a problem that, if the installation position of the connecting support member on the ring is limited or the free excavation width is not secured due to the durability and the coupling property, Conventional methods of joining together have problems in that the joining is not easy due to the weight of the PC culvert or the culmination force between the culverts can not be maintained continuously.
한편, 종래의 암거 방수구조는 암거가 설치되는 지하 바닥면에는 바닥기초 콘크리트판넬을 설치하고, 상기 바닥기초 콘크리트판넬의 상면에 설치되는 암거의 사방둘레에는 방수시트커버와 방수시트 보호용 커버를 순차적으로 감싸 설치함에 따라 바닥기초 콘크리트판넬과 방수시트커버와 방수시트 보호용 커버로 인하여 암거 내부에 누수현상이 생기는 것을 방지할 수 있는 이점이 있다.In the conventional culvert and waterproof structure, a floor-based concrete panel is installed on a basement floor where a culvert is installed, and a waterproof sheet cover and a waterproof sheet protection cover are sequentially placed on the four sides of a culvert It is advantageous to prevent water leakage inside the culvert due to the base foundation concrete panel, the waterproof sheet cover and the waterproof sheet protection cover.
그러나, 종래와 같이 지하 건축구조물의 지하암거를 방수시트나 방수제 등만을 이용하여 방수처리를 하게 되면 지하암거를 방수하기 위하여 마련되어 있는 방수시트나 방수제에 토사가 그대로 접촉하게 되어 토사에 함유되어 있는 물이나 습기 등에 항상 노출되어 있는 상태가 되므로 그 수명이 단축될 수 있다. However, when the underground culvert of an underground construction structure is only waterproofed by using only a waterproof sheet or a waterproofing agent, the waterproof sheet or the waterproofing agent provided for waterproofing the underground culvert, Or moisture, and thus the service life thereof can be shortened.
즉, 방수시트나 방수제가 오랜 시간 물이나 습기에 노출되어 있으면 방수 효과가 현저하게 저하되어 수직구 및 암거의 벽체 내부로 물이 침투하게 되는 문제가 발생될 수 있다.That is, if the waterproof sheet or the waterproofing agent is exposed to water or moisture for a long time, the waterproof effect is remarkably lowered, and water may be infiltrated into the waterproof walls and the walls of the culvert.
더욱이, 벽체의 내부로 물이 침투되면, 미관상 보기 좋지 않을 뿐만 아니라,물의 침투로 인하여 벽면에 크랙이 발생하여 암거 구조물의 안전에 치명적인 영향을 줄 수 있다.Furthermore, if water penetrates into the interior of the wall, it is not only aesthetically pleasing but also cracks on the wall due to water penetration, which can have a serious effect on the safety of the culvert.
또한, 종래의 암거는 시설물의 고정시 시공이 완료된 후 밀페된 구조물내에서 수직,수평 천공 작업을 해야 하는데 이는 구조물내에 철근과의 간섭을 피하고 천공을 하여야 하는 고난이도 작업이며 제한된 공간에서 하늘을 향해 작업도구를 들어올려야 하는 난이도가 높은작업으로 번거롭고 어려운 작업으로서 안전사고 위험과 비산먼지 축척으로 위험에 노출되기도 하고 생산성 저하와 함께 공기지연과 구조물의 안정성까지 위해를 주는 작업의 현실이 계속 되고 있는 실정이다.In the conventional culvert, vertical and horizontal drilling work should be performed in the hollowed structure after completion of the installation of the facility, which is a high-level work to avoid interference with the reinforcing bars in the structure and to work in the limited space It is a difficult and difficult task to lift the tool and it is exposed to danger due to the risk of safety accidents and scattered dust, and the reality of the work that gives the risk of air delay and stability of the structure with productivity decrease continues .
본 발명은 상술한 문제점을 해결하기 위한 것으로, 그 기술적 요지는 단위형 암거 박스의 개구된 방향 단부 양측에 수밀 확보용 속채움 몰탈 정착홈이 4각 두께면(양 벽면, 하면, 상면)에 대하여 일체의 라인으로 성형되도록 형성되고, 상기 몰탈 정착홈 중 각 모서리 부분에는 단위형 암거 박스의 구간 길이에 대응되면서 분할된 각 강연선이 연속적으로 연결될 수 있도록 양방향 정착 커플러가 형성되도록 하되, 상기 양방향 정착 커플러는 획기적인 조립성과 작업성이 확보되면서 견고한 장착성이 보장되는 바, 이는 공기단축과 함께 생산성이 크게 개선되도록 하는 것을 제공함에 그 목적이 있다.SUMMARY OF THE INVENTION The present invention has been made in order to solve the above problems, and it is a technical object of the present invention to provide a method of manufacturing a multi-wall type culvert box, in which a fastening mortar fixing groove for securing watertightness is formed on both sides Directional fixing coupler is formed at each corner of the mortar fixing grooves so that each divided strand corresponding to the length of the unit type cigarette box can be continuously connected to each other, The present invention aims to provide a method for manufacturing an air conditioner,
이에 본 발명은 몰탈 정착홈의 일면에 몰탈 이동홈이 더 성형되어 몰탈 채움시 막힘 현상이 방지되도록 하는 것을 제공함에 그 목적이 있다.Accordingly, it is an object of the present invention to provide a mortar moving groove formed on one surface of a mortar fixing groove to prevent clogging during mortar filling.
한편, 본 발명은 암거 박스의 개구된 방향 단부 양측에 고점착 유연성 겔 방수재가 충진되도록 형성되어 획기적인 방수성능이 보장되도록 하되, 상기 고점착 유연성 겔 방수재는 공급관을 통해 충진(채움)시 방수재 이동홈에 의해 방수재의 막힘 현상이 방지되도록 하는 것을 제공함에 그 목적이 있다.According to another aspect of the present invention, there is provided a high-adhesion flexible gel-type waterproofing material, which is formed to fill a high-adhesion flexible gel-type waterproofing material on both sides of an opening end of a cowl box, Thereby preventing clogging of the waterproofing material.
또한, 본 발명은 암거 박스의 내부 공간부 중 천정부에 인서트 고정장치가 구비되도록 하되, 상기 인서트 고정장치는 장착레일을 통해 길이방향(횡방향) 유동구간 내에서 고정철물의 설치 구간이 가변될 수 있도록 형성되어 종전 시설물의 고정을 위해 시공 완료후 별도로 작업해야 하는 천공작업을 원천적으로 배제할 수 있는 바, 이는 경제성, 작업성, 품질확보, 공기단축,안전사고 배제 등을 현저하게 개선하도록 하는 것을 제공함에 그 목적이 있다.In the present invention, an insert fixing device is provided on a ceiling of an inner space of a cowl box, wherein the installation securing device is capable of changing an installation interval of the fixed hardware in a longitudinal (transverse) It is possible to exclude the drilling operation which is required to be separately performed after completion of the construction in order to fix the old facilities, which can remarkably improve the economic efficiency, workability, quality assurance, shortening of the construction time and safety accident exclusion The purpose is to provide.
이러한 목적을 달성하기 위해 본 발명은 단위형 암거 박스(10)가 PC(Precast concrete)로 제작되도록 하되, 개구된 방향 단부 양측에는 수밀 확보용 몰탈 정착홈(20)이 4각 두께면(양 벽면, 하면, 상면)에 대하여 일체의 라인으로 성형되도록 형성되고, 상기 몰탈 정착홈(20) 중 각 모서리 부분에는 강연선 장착공(11)이 형성되어 단위형 암거 박스(10)의 구간 길이에 대응되면서 분할된 각 강연선(30)이 연속적으로 연결될 수 있도록 양방향 정착 커플러(100)가 형성되도록 하되, 상기 양방향 정착 커플러(100)는 암수 나사체결 구조를 갖는 복수의 원통 하우징(110)이 서로 대칭되도록 형성되고, 상기 복수의 원통 하우징(110)은 일측에 각각 암나사 또는 숫나사가 구비된 체결구(111)가 각각 형성되며, 복수의 원통 하우징(110)의 타측에는 관통공(112)이 형성되고, 복수의 원통 하우징(110)의 내부에는 체결구(111)로부터 인접한 중공관(113)과 관통공(112)으로부터 인접한 꼬깔 형태의 삽입공(114)이 형성되며, 상기 꼬깔 형태의 삽입공(114)에는 콘 형태의 장착구(120)가 삽입되도록 하되, 상기 장착구(120)는 내주면에 나사체결공(121)이 형성되면서 중심축을 기준으로 3등분 된 쐐기형 바이트로서, 나사체결공(121)으로 인입된 강연선(30)이 좁은 직경측으로 당겨지면 장착구(120)가 꼬깔 형태의 삽입공(114)의 외주면에 밀착 가압되면서 조임이 이루어지도록 형성되고, 상기 강연선(30)은 내입된 길이방향 종단부가 중공관(113)의 바깥측 단부에 나사 체결된 지지판(130)의 통공(131)을 관통하면 중공관(113)의 외주면에 형성된 몰탈 투입공(115)을 통해 유입된 몰탈이 지지판(130)과 장착구(120)의 넓은 직경 단부 사이 합성구간에서 채워져 강연선(30)의 삽입측 선상과 함께 양생되도록 형성된다.In order to achieve the above object, the present invention provides a unit type cage box (10) to be made of PC (Precast concrete), wherein molar fixing grooves (20) for ensuring watertightness are formed on both sides of the opened direction, The upper and lower surfaces, the lower surface, and the upper surface) of the unit
이에, 상기 원통 하우징(110), 장착구(120), 지지판(130)을 포함한 양방향 정착 커플러(100)은 몰탈 정착홈(20) 중 양생홈(40)에 내입되어 서로 마주보는 강연선(30)의 종단부가 간섭없이 돌출되지 않도록 하되, 상기 양생홈(40)의 단면은 입구가 좁고 내측 공간부가 넓은 역쐐기 형태를 갖도록 형성된다.The
이때, 상기 지지판(130)과 장착구(120)의 넓은 직경 단부 사이인 합성구간에는 강연선(30)의 외주면으로 탄성스프링(140)이 내장되어 몰탈 양생 구간의 유격을 상시 확보할 수 있도록 형성된다.At this time, an
이에, 상기 장착구(120)는 외주면에 요홈(122)이 형성되어 밀착 보강용 고무링(123)이 삽입될 수 있도록 형성되고, 상기 고무링(123)은 장착구(120)가 꼬깔 형태의 삽입공(114)에 대하여 장착시 밀착 성능이 배가되도록 형성된다.The
이때, 상기 몰탈 정착홈(20) 중 4면 두께측 면상에는 각각 요철식 끼움턱(50)과 끼움홈(60)이 형성되도록 하되, 상기 끼움턱(50)과 끼움홈(60)이 서로 대응되는 면상에는 각각 대칭되는 형태로 몰탈 이동홈(70)이 더 성형되어 몰탈 채움시 막힘 현상이 방지되도록 하는 것이 바람직하다.At this time, a concave-
한편, 본 발명은 PC(Precast concrete)로 제작된 단위형 암거 박스(10)의 개구된 방향 단부 양측에 고점착 유연성 겔 방수재가 충진되도록 정착홈(20)과 정착턱(80)이 4각 두께면(양 벽면, 하면, 상면)에 대하여 일체의 라인으로 성형되도록 형성되고, 상기 암거 박스(10)의 개구된 방향 단부 중 각 모서리 부분에는 강연선 장착공(11)이 형성되어 단위형 암거 박스(10)의 구간 길이에 대응되면서 분할된 각 강연선(30)이 연속적으로 연결될 수 있도록 양방향 정착 커플러(100)가 형성되며, 상기 정착홈(20)과 정착턱(80)이 맞닿아 서로 대응되는 면상에는 각각 대칭되는 형태로 방수재 이동홈(70)이 더 성형되어 고점착 유연성 겔 방수재 채움시 막힘 현상이 방지되도록 형성되고, 상기 정착홈(20)과 정착턱(80)이 조립된 부분 양측 면상에는 요철식 끼움턱(50)과 끼움홈(60)이 형성되어 누수 방지를 보완하도록 형성되며, 상기 암거 박스(10)는 내부 공간 중 천정부에 대하여 인서트 고정장치(200)가 구비되도록 형성된다.In the meantime, according to the present invention, the
이에, 상기 인서트 고정장치(200)는 천정부에 기 매립된 장착레일(210)과 상기 장착레일(210)에 조립되는 고정철물(220)로 구성되고, 상기 장착레일(210)은 개구된 하부에 슬라이딩 리브(211)를 갖는 이송공(212)이 형성되며, 상기 이송공(212)의 상측에는 공간부(213)가 형성되어 길이방향 유동구간 내에서 고정철물(220)의 설치 구간이 가변될 수 있도록 형성되고, 상기 이송공(212)의 선상 일측에는 이송공(212)의 직경보다 소폭 넓은 직경을 갖는 장착홈(214)이 형성되어 고정철물(220)의 헤드장착구(221)가 슬라이딩 리브(211)에 간섭없이 삽입될 수 있도록 형성되며, 상기 고정철물(220)은 체결너트(222)를 갖는 전산볼트 형태의 축샤프트(223) 상측에 걸침턱(224)을 갖는 헤드장착구(221)가 결합되어 장착홈(214)을 통해 헤드장착구(221)가 삽입되면 슬라이딩 리브(211)를 통해 걸침턱(224)이 대응되면서 슬라이딩되거나 결속되도록 형성된다.The
이때, 상기 양방향 정착 커플러(100)는 암수 나사체결 구조를 갖는 복수의 원통 하우징(110)이 서로 대칭되도록 형성되고, 상기 복수의 원통 하우징(110)은 일측에 각각 암나사 또는 숫나사가 구비된 체결구(111)가 각각 형성되며, 복수의 원통 하우징(110)의 타측에는 관통공(112)이 형성되고, 복수의 원통 하우징(110)의 내부에는 체결구(111)로부터 인접한 중공관(113)과 관통공(112)으로부터 인접한 꼬깔 형태의 삽입공(114)이 형성되며, 상기 꼬깔 형태의 삽입공(114)에는 콘 형태의 장착구(120)가 삽입되도록 하되, 상기 장착구(120)는 내주면에 나사체결공(121)이 형성되면서 중심축을 기준으로 3등분 된 쐐기형 바이트로서, 나사체결공(121)으로 인입된 강연선(30)이 좁은 직경측으로 당겨지면 장착구(120)가 꼬깔 형태의 삽입공(114)의 외주면에 밀착 가압되면서 조임이 이루어지도록 형성되고, 상기 강연선(30)은 내입된 길이방향 종단부가 중공관(113)의 바깥측 단부에 나사 체결된 지지판(130)의 통공(131)을 관통하면 중공관(113)의 외주면에 형성된 방수재 투입공(115)을 통해 유입된 방수재이 지지판(130)과 장착구(120)의 넓은 직경 단부 사이 합성구간에서 채워져 강연선(30)의 삽입측 선상과 함께 양생되도록 형성된다.In this case, the
이에, 상기 원통 하우징(110), 장착구(120), 지지판(130)을 포함한 양방향 정착 커플러(100)는 정착홈(20) 중 양생홈(40)에 내입되어 서로 마주보는 강연선(30)의 종단부가 간섭없이 돌출되지 않도록 하되, 상기 양생홈(40)의 단면은 입구가 좁고 내측 공간부가 넓은 역쐐기 형태를 갖도록 형성된다.The
이때, 상기 지지판(130)과 장착구(120)의 넓은 직경 단부 사이인 합성구간에는 강연선(30)의 외주면으로 탄성스프링(140)이 내장되어 방수재 양생 구간의 유격을 상시 확보할 수 있도록 형성된다.At this time, the
이에, 상기 장착구(120)는 외주면에 요홈(122)이 형성되어 밀착 보강용 고무링(123)이 삽입될 수 있도록 형성되고, 상기 고무링(123)은 장착구(120)가 꼬깔 형태의 삽입공(114)에 대하여 장착시 밀착 성능이 배가되도록 형성된다.The
이와 같이, 본 발명은 단위형 암거 박스가 PC(Precast concrete)로 제작되도록 하되, 개구된 방향 단부 양측에는 수밀 확보용 속채움 몰탈 정착홈이 4각 두께면(양 벽면, 하면, 상면)에 대하여 일체의 라인으로 성형되도록 형성되고, 상기 몰탈 정착홈 중 각 모서리 부분에는 단위형 암거 박스의 구간 길이에 대응되면서 분할된 각 강연선이 연속적으로 연결될 수 있도록 양방향 정착 커플러가 형성되도록 하되, 상기 양방향 정착 커플러는 획기적인 조립성과 작업성이 확보되면서 견고한 장착성이 보장되는 바, 이는 공기단축과 함께 생산성이 크게 개선되도록 하는 효과가 있다.As described above, in the present invention, the unit type cage box is made of PC (Precast concrete), and on both sides of the opened direction end portion, a fastening mortar fixing groove for securing watertightness is formed on the quadrangular- Directional fixing coupler is formed at each corner of the mortar fixing grooves so that each divided strand corresponding to the length of the unit type cigarette box can be continuously connected to each other, Is securely assembled and workability is ensured so that the mounting performance is ensured, which has the effect of greatly shortening the air flow and greatly improving the productivity.
이러한 본 발명은 몰탈 정착홈의 일면에 몰탈 이동홈이 더 성형되어 몰탈 채움시 막힘 현상이 방지되도록 하는 효과가 있다.According to the present invention, the mortar moving groove is further formed on one surface of the mortar fixing groove, thereby preventing clogging when filling mortar.
또한, 본 발명은 신속하고 정밀하게 암거 박스의 강연선 배근 연결을 정렬시킬 수 있도록 함은 물론 높낮이 레벨도 용이하게 설정할 수 있도록 형성되고, 특히 연결 이음부에는 몰탈의 원활한 이동이 가능하도록 몰탈 이동홈이 형성되어 누수방지에 따른 누수문제가 원천적으로 해결되도록 하는 효과가 있다.In addition, the present invention is capable of quickly and precisely aligning the connection of the stiffening line of the culvert box and of setting the level of the elevator easily. Particularly, in the connecting joint, So that the problem of leakage due to the prevention of leakage can be solved at the source.
한편, 본 발명은 PC(Precast concrete)로 제작된 단위형 암거 박스가 연속 조립되면서 일체의 암거 구조물을 시공하도록 하는 것으로, 상기 암거 박스의 개구된 방향 단부 양측에는 고점착 유연성 겔 방수재가 충진되도록 형성되어 획기적인 방수성능이 보장되도록 하되, 상기 고점착 유연성 겔 방수재는 공급관을 통해 충진(채움)시 방수재 이동홈에 의해 방수재의 막힘 현상이 방지되도록 형성되고, 상기 암거 박스의 내부 공간부 중 천정부에는 인서트 고정장치가 구비되도록 하되, 상기 인서트 고정장치는 장착레일을 통해 길이방향 유동구간 내에서 고정철물의 설치 구간이 가변될 수 있도록 형성되어 종전 시설물의 고정을 위해 시공 완료후 별도로 작업해야 하는 천공작업을 원천적으로 배제할 수 있는 바, 이는 작업성과 공기단축을 현저하게 개선되도록 하는 효과가 있다.In the meantime, according to the present invention, a unit culvert box made of PC (Precast concrete) is continuously assembled to construct an integral culvert structure, and both sides of the culvert box in the opened direction are filled with a high- Wherein the highly adhesive and flexible gel-like waterproofing material is formed to prevent clogging of the waterproofing material by a waterproof material moving groove when filling (filling) through a supply pipe, and the ceiling portion of the cowl box is provided with an insert The insert fixing device is formed so that the mounting section of the fixed hardware can be changed in the longitudinal direction flow section through the mounting rail, so that a drilling operation to be separately performed after the completion of the construction for fixing the previous facility As a rule of thumb, this can be achieved by significantly improving workability and air shortening This has the effect of.
또한, 본 발명은 암거 박스의 내부 공간부 중 천정부에 인서트 고정장치가 구비되도록 하되, 상기 인서트 고정장치는 장착레일을 통해 길이방향 유동구간 내에서 고정철물의 설치 구간이 가변될 수 있도록 형성되어 종전 시설물의 고정을 위해 시공 완료후 별도로 작업해야 하는 천공작업을 원천적으로 배제할 수 있는 바, 이는 작업성과 공기단축을 현저하게 개선하도록 하는 효과가 있다.In addition, the present invention provides an insert fixing device in a ceiling of an inner space of a cowl box, wherein the insert fixing device is formed so that an installation section of the fixed hardware can be varied in a longitudinal direction flow passage through a mounting rail, In order to fix the facility, it is possible to omit the drilling operation which must be separately performed after the completion of the construction, which has the effect of remarkably improving workability and shortening of construction time.
이에, 본 발명은 단위형 암거 박스에 따라 분할된 각 강연선이 연속적으로 연결될 수 있도록 양방향 정착 커플러가 형성되어 조립성과 작업성이 향상됨은 물론 견고한 장착성과 함께 공기단축이 이루어지며 내장부품의 개선으로 구조물 안정성,품질,수밀성,공기단축,경제성,안전사고 미연방지 등 크게 개선되도록 하는 효과가 있다.Accordingly, the bidirectional fixing coupler is formed so that the divided strands can be continuously connected to each other according to the unit type cage box, thereby improving the assembling performance and workability. In addition, Stability, quality, watertightness, air shortening, economic efficiency, prevention of safety accident and the like.
도 1은 본 발명에 따른 암거 구조물의 시공 상태를 나타낸 예시도,
도 2는 도 1에 따른 암거 구조물의 평면 또는 측면 예시도,
도 3은 본 발명에 따른 양방향 정착 커플러를 나타낸 예시도,
도 4는 도 3에 따른 양방향 정착 커플러의 결합상태를 나타낸 예시도,
도 5는 도 3에 따른 양방향 정착 커플러의 장착상태를 나타낸 예시도,
도 6은 본 발명에 따른 암거 구조물의 시공 상태를 나타낸 예시도,
도 7은 본 발명에 따른 인서트 고정장치를 나타낸 예시도,
도 8은 본 발명에 따른 강재몰드 고정용 인서트 고정장치를 나타낸 예시도,
도 9는 본 발명과 종전 발명의 대비를 나타낸 예시도이다.1 is an exemplary view showing a construction of a culvert structure according to the present invention,
Fig. 2 is a plan view or side view of the culvert structure according to Fig. 1,
3 is an exemplary view showing a bidirectional fixing coupler according to the present invention,
FIG. 4 is an exemplary view showing a coupled state of the bidirectional fixing coupler according to FIG. 3;
FIG. 5 is an exemplary view showing a mounting state of the bidirectional fixing coupler according to FIG. 3,
6 is a view showing an installation state of a culvert structure according to the present invention,
7 is an exemplary view showing an insert fixing apparatus according to the present invention,
8 is an exemplary view showing an insert fixing apparatus for fixing a steel mold according to the present invention,
9 is an exemplary view showing the contrast between the present invention and the prior art.
다음은 첨부된 도면을 참조하며 본 발명을 보다 상세히 설명하겠다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the accompanying drawings.
도 1 내지 도 5에 도시된 바와 같이, 본 발명은 단위형 암거 박스(10)가 PC(Precast concrete)로 제작되도록 하되, 개구된 방향 단부 양측에는 수밀 확보용 몰탈 정착홈(20)이 4각 두께면(양 벽면, 하면, 상면)에 대하여 일체의 라인으로 성형되도록 형성된다.As shown in FIGS. 1 to 5, in the present invention, the unit
이에, 상기 몰탈 정착홈(20) 중 각 모서리 부분에는 강연선 장착공(11)이 형성되어 단위형 암거 박스(10)의 구간 길이에 대응되면서 분할된 각 강연선(30)이 연속적으로 연결될 수 있도록 양방향 정착 커플러(100)가 형성된다.A stranded
이때, 상기 양방향 정착 커플러(100)는 암수 나사체결 구조를 갖는 복수의 원통 하우징(110)이 서로 대칭되도록 형성된다.At this time, the
이에, 상기 복수의 원통 하우징(110)은 일측에 각각 암나사 또는 숫나사가 구비된 체결구(111)가 각각 형성되고, 상기 복수의 원통 하우징(110)의 타측에는 관통공(112)이 형성된다.The plurality of
이때, 상기 복수의 원통 하우징(110)의 내부에는 체결구(111)로부터 인접한 중공관(113)과 관통공(112)으로부터 인접한 꼬깔 형태의 삽입공(114)이 형성된다.At this time, in the inside of the plurality of
이에, 상기 꼬깔 형태의 삽입공(114)에는 콘 형태의 장착구(120)가 삽입되도록 하되, 상기 장착구(120)는 내주면에 나사체결공(121)이 형성되면서 중심축을 기준으로 3등분 된 쐐기형 바이트로 형성된다.In this case, the cone-
이때, 상기 나사체결공(121)으로 인입된 강연선(30)이 좁은 직경측으로 당겨지면 장착구(120)가 꼬깔 형태의 삽입공(114)의 외주면에 밀착 가압되면서 조임이 이루어지도록 형성된다.At this time, when the
이에, 상기 강연선(30)은 내입된 길이방향 종단부가 중공관(113)의 바깥측 단부에 나사 체결된 지지판(130)의 통공(131)을 관통하면 중공관(113)의 외주면에 형성된 몰탈 투입공(115)을 통해 유입된 몰탈이 지지판(130)과 장착구(120)의 넓은 직경 단부 사이 합성구간에서 채워져 강연선(30)의 삽입측 선상과 함께 양생되도록 형성된다.The stranded
또한, 상기 원통 하우징(110), 장착구(120), 지지판(130)을 포함한 양방향 정착 커플러(100)은 몰탈 정착홈(20) 중 양생홈(40)에 내입되어 서로 마주보는 강연선(30)의 종단부가 간섭없이 돌출되지 않도록 하되, 상기 양생홈(40)의 단면은 입구가 좁고 내측 공간부가 넓은 역쐐기 형태를 갖도록 형성된다.The
이때, 상기 지지판(130)과 장착구(120)의 넓은 직경 단부 사이인 합성구간에는 강연선(30)의 외주면으로 탄성스프링(140)이 내장되어 몰탈 양생 구간의 유격을 상시 확보할 수 있도록 형성된다.At this time, an
이에, 상기 장착구(120)는 외주면에 요홈(122)이 형성되어 밀착 보강용 고무링(123)이 삽입될 수 있도록 형성되고, 상기 고무링(123)은 장착구(120)가 꼬깔 형태의 삽입공(114)에 대하여 장착시 밀착 성능이 배가되도록 형성된다.The mounting
이때, 상기 몰탈 정착홈(20) 중 4면 두께측 면상에는 각각 요철식 끼움턱(50)과 끼움홈(60)이 형성되도록 하되, 상기 끼움턱(50)과 끼움홈(60)이 서로 대응되는 면상에는 각각 대칭되는 형태로 몰탈 이동홈(70)이 더 성형되어 몰탈 채움시 막힘 현상이 방지되도록 하는 것이 바람직하다.At this time, a concave-convex
한편, 상기 양방향 정착 커플러는 장착시 원통 하우징 중 암나사 또는 숫나사가 구비된 원통 하우징(이하, '기준 원통 하우징' 이라 한다)이 양생홈에 삽입된 상태에서 강연선의 종단부가 관통공으로 내입된 후 중공관을 지나 지지판의 통공에 끼워지도록 형성된다.In the meantime, when the bidirectional fixing coupler is inserted, the end of the strand is inserted into the through hole in a state where the cylindrical housing (hereinafter, referred to as a 'reference cylindrical housing') having a female screw or a male screw in the cylindrical housing is inserted into the curing groove, And is inserted into the through hole of the support plate.
이때, 삽입된 강연선은 당겨지면서 장착구와 원통 하우징의 삽입공 간 밀착이 이루어지면 이후 몰탈 투입공을 통해 몰탈이 유입되면서 지지판(130)과 장착구(120)의 넓은 직경 단부 사이 합성구간에서 채워져 강연선(30)의 삽입측 선상과 함께 양생되도록 형성된다.At this time, when the inserted strand is pulled, the mortar is introduced into the insertion hole of the cylindrical housing through the mortar input hole when the installation hole is closely contacted with the insertion hole of the cylindrical housing. The mortar is then filled in the synthetic zone between the
이후 연속 조립을 위해 대기 중인 또 다른 암거 박스는 최초 준비된 양방향 정착 커플러의 기준 원통 하우징과 대칭되는 형태로 반대측 원통 하우징이 대응되도록 형성된다.Another cask box waiting for subsequent assembly is formed so that the opposite cylindrical housing is mated in a symmetrical manner with the reference cylindrical housing of the initially prepared bidirectional fixation coupler.
즉, 상기 반대측 원통 하우징은 기준 원통 하우징의 암나사 또는 숫나사와 대응되도록 암나사 또는 숫나사가 형성되어 나사체결되도록 형성된다.That is, the opposite-side cylindrical housing is formed such that a female screw or a male screw is formed to correspond to a female screw or a male screw of the reference cylindrical housing and screwed together.
이때, 상기 반대측 원통 하우징에는 기준 원통 하우징에 삽입된 장착구 및 지지판이 형성되어 강연선이 위에서 언급한 동일한 방식으로 고정되도록 한 뒤 분할된 강연선으로 하여금 몰탈이 양생되지 않은 상태에서 잡아당겨 기준 원통 하우징과 반대측 원통 하우징이 일체화로 나사 체결되면 한 번에 잡아당겨 강연선 일체화를 이루도록 형성된다.At this time, the opposite cylindrical housing is provided with a mounting hole and a support plate inserted in the reference cylindrical housing so that the strand is fixed in the same manner as described above. Then, the divided strand is pulled in a state where the mortar is not cured, When the opposite side cylindrical housing is screwed together, it is pulled at once to form a stranded wire integral.
다시 말해, 단위형 암거 박스의 장착공을 관통한 강연선의 타측단(양방향 정착 커플러가 있는 양생홈의 반대측)은 유압장치에 의해 당겨지도록 하면서 나란히 연결된 강연선이 당겨지면서 텐션이 확보되도록 형성된다.In other words, the other side of the strand through the mounting hole of the unitary cage box (the opposite side of the cured grooves with the bidirectional fixing coupler) is pulled by the hydraulic device so that the strand connected in parallel is pulled to secure the tension.
아울러, 도 6 내지 도 9에 도시된 바와 같이, 본 발명은 PC(Precast concrete)로 제작된 단위형 암거 박스(10)의 개구된 방향 단부 양측에 고점착 유연성 겔 방수재가 충진되도록 정착홈(20)과 정착턱(80)이 4각 두께면(양 벽면, 하면, 상면)에 대하여 일체의 라인으로 성형되도록 형성된다.6 to 9, the present invention is characterized in that the
이에, 상기 암거 박스(10)의 개구된 방향 단부 중 각 모서리 부분에는 강연선 장착공(11)이 형성되어 단위형 암거 박스(10)의 구간 길이에 대응되면서 분할된 각 강연선(30)이 연속적으로 연결될 수 있도록 양방향 정착 커플러(100)가 형성된다.A stranded
이때, 상기 정착홈(20)과 정착턱(80)이 맞닿아 서로 대응되는 면상에는 각각 대칭되는 형태로 방수재 이동홈(70)이 더 성형되어 고점착 유연성 겔 방수재 채움시 막힘 현상이 방지되도록 형성된다.At this time, the waterproofing
이에, 상기 정착홈(20)과 정착턱(80)이 조립된 부분 양측 면상에는 요철식 끼움턱(50)과 끼움홈(60)이 형성되어 누수 방지를 보완하도록 형성되며, 상기 암거 박스(10)는 내부 공간 중 천정부에 대하여 인서트 고정장치(200)가 구비되도록 형성된다.The
이때, 상기 인서트 고정장치(200)는 천정부에 기 매립된 장착레일(210)과 상기 장착레일(210)에 조립되는 고정철물(220)로 구성된다.The
이에, 상기 장착레일(210)은 개구된 하부에 슬라이딩 리브(211)를 갖는 이송공(212)이 형성되며, 상기 이송공(212)의 상측에는 공간부(213)가 형성되어 길이방향 유동구간 내에서 고정철물(220)의 설치 구간이 가변될 수 있도록 형성된다.The mounting
이때, 상기 이송공(212)의 선상 일측에는 이송공(212)의 직경보다 소폭 넓은 직경을 갖는 장착홈(214)이 형성되어 고정철물(220)의 헤드장착구(221)가 슬라이딩 리브(211)에 간섭없이 삽입될 수 있도록 형성된다.At this time, a mounting
이에, 상기 고정철물(220)은 체결너트(222)를 갖는 전산볼트 형태의 축샤프트(223) 상측에 걸침턱(224)을 갖는 헤드장착구(221)가 결합되어 장착홈(214)을 통해 헤드장착구(221)가 삽입되면 슬라이딩 리브(211)를 통해 걸침턱(224)이 대응되면서 슬라이딩되거나 결속되도록 형성된다.The fixed
참고로, 상기 장착레일은 상부에 갈고리 형태의 걸고리 철물이 형성되어 주철근에 걸어 고정시킬 수 있는 것으로 이는 직하 방향 하중에 대하여 보강을 하기 위함이다.For reference, the mounting rail has a hook-shaped hook-and-hook structure formed at an upper portion thereof so as to be able to be fixed by being hooked to a cast iron root, so as to reinforce the load in a downward direction.
이때, 상기 걸고리 철물은 장착레일에 대하여 나사체결되면서 용이한 결합구조를 갖도록 하는 것이 바람직하다.At this time, it is preferable that the hook hardware is screwed to the mounting rail to have an easy coupling structure.
또한, 본 발명의 인서트 고정장치는 도 7에 도시된 바와 같이 강재몰드를 조어할 경우에도 변형 실시할 수 있는 것으로, 이는 고동구 제작을 위한 강재몰드 중 콘크리트 타설측에 인서트용 고정철물이 부착되고, 그 반대 측에는 결합용 체결볼트가 형성되어 양 부품은 암거를 제작하기 위해 거푸집 형태로 지지되는 강재몰트의 결합 지지를 보다 강력하게 유도하도록 하되, 차후 양생이 완료되면 강재몰드의 탈거가 용이하도록 형성된다.In addition, the insert fixing apparatus of the present invention can be deformed even when a steel mold is tightened as shown in FIG. 7, because a fixing steel for inserts is attached to the concrete tread side of a steel mold for high- , And the coupling bolts for coupling are formed on the opposite side so that both parts can induce the strong support of the steel malts supported in the form of molds in order to manufacture the culvert. When the curing is completed in the future, do.
본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 고안이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the present invention as defined by the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.
10 ... 암거 박스 11 ... 장착공
20 ... 몰탈 정착홈 30 ... 강연선
40 ... 양생홈 50 ... 끼움턱
60 ... 끼움홈 70 ... 몰탈 이동홈
100 ... 양방향 정착 커플러 110 ... 원통 하우징
111 ... 체결구 112 ... 관통공
113 ... 중공관 114 ... 삽입공
115 ... 몰탈 투입공 120 ... 장착구
121 ... 삽입공 122 ... 요홈
123 ... 고무링 130 ... 지지판
131 ... 통공 140 ... 탄성스프링
200 ... 인서트 고정장치 210 ... 장착레일
211 ... 슬라이딩 리브 212 ... 이송공
213 ... 공간부 214 ... 장착홈
220 ... 고정철물
221 ... 헤드장착구 222 ... 체결너트
223 ... 축샤프트 224 ... 걸침턱10 ...
20 ...
40 ... curing
60 ... fitting
100 ... bidirectional fixing
111 ...
113 ...
115 ...
121 ...
123 ...
131 ... through
200 ... insert fixing
211 ... Sliding
213 ...
220 ... Fixed hardware
221 ...
223 ...
Claims (5)
상기 원통 하우징(110), 장착구(120), 지지판(130)을 포함한 양방향 정착 커플러(100)은 몰탈 정착홈(20) 중 양생홈(40)에 내입되어 서로 마주보는 강연선(30)의 종단부가 간섭없이 돌출되지 않도록 하되, 상기 양생홈(40)의 단면은 입구가 좁고 내측 공간부가 넓은 역쐐기 형태를 갖도록 형성되고, 상기 지지판(130)과 장착구(120)의 넓은 직경 단부 사이인 합성구간에는 강연선(30)의 외주면으로 탄성스프링(140)이 내장되어 몰탈 양생 구간의 유격을 상시 확보할 수 있도록 형성되며, 상기 장착구(120)는 외주면에 요홈(122)이 형성되어 밀착 보강용 고무링(123)이 삽입될 수 있도록 형성되고, 상기 고무링(123)은 장착구(120)가 꼬깔 형태의 삽입공(114)에 대하여 장착시 밀착 성능이 배가되도록 형성되며, 상기 몰탈 정착홈(20) 중 4면 두께측 면상에는 각각 요철식 끼움턱(50)과 끼움홈(60)이 형성되도록 하되, 상기 끼움턱(50)과 끼움홈(60)이 서로 대응되는 면상에는 각각 대칭되는 형태로 몰탈 이동홈(70)이 더 성형되어 몰탈 채움시 막힘 현상이 방지되도록 형성되고, 상기 암거 박스(10)는 내부 공간 중 천정부에 인서트 고정장치(200)가 구비되도록 하되, 상기 인서트 고정장치(200)는 천정부에 기 매립된 장착레일(210)과 상기 장착레일(210)에 조립되는 고정철물(220)로 구성되고, 상기 장착레일(210)은 개구된 하부에 슬라이딩 리브(211)를 갖는 이송공(212)이 형성되며, 상기 이송공(212)의 상측에는 공간부(213)가 형성되어 길이방향 유동구간 내에서 고정철물(220)의 설치 구간이 가변될 수 있도록 형성되고, 상기 이송공(212)의 선상 일측에는 이송공(212)의 직경보다 소폭 넓은 직경을 갖는 장착홈(214)이 형성되어 고정철물(220)의 헤드장착구(221)가 슬라이딩 리브(211)에 간섭없이 삽입될 수 있도록 형성되며, 상기 고정철물(220)은 체결너트(222)를 갖는 전산볼트 형태의 축샤프트(223) 상측에 걸침턱(224)을 갖는 헤드장착구(221)가 결합되어 장착홈(214)을 통해 헤드장착구(221)가 삽입되면 슬라이딩 리브(211)를 통해 걸침턱(224)이 대응되면서 슬라이딩되거나 결속되도록 하는 것을 특징으로 하는 양방향 정착 커플러와 인서트 고정장치 및 고점착 유연성 겔 방수재를 이용한 암거 구조물 시공방법.
The mortar fixing grooves 20 for securing the watertightness are formed on both sides of the opened direction end portion of the unit type cage box 10 so as to be integrally formed with respect to the quadrangular thickness surfaces (both wall surfaces, lower surface and upper surface) And the stranded wire mounting holes 11 are formed at the respective corners of the mortar fixing grooves 20 so that each of the divided stranded wires 30 corresponds to the length of the unitary cage box 10, Directional fixing coupler 100 is formed such that a plurality of cylindrical housings 110 having a female and male threaded fastening structure are formed to be symmetrical to each other, and the plurality of cylindrical housings 110 Through holes 112 are formed in the other side of the plurality of cylindrical housings 110 and a plurality of through holes 112 are formed in the plurality of cylindrical housings 110 From the fastener 111 A cone-shaped insertion hole 114 is formed adjacent to the hollow tube 113 and the through hole 112 and a cone-shaped mounting hole 120 is inserted into the coupling hole 114 of the coiled shape, When the strand 30 drawn into the threaded hole 121 is pulled toward the narrow diameter side, the mounting hole 120 is a wedge-shaped bite having a threaded hole 121 formed in its inner circumferential surface and divided into three by a center axis. And the strand 30 is formed such that the longitudinal end of the strand 30 is screwed to the outer end of the hollow tube 113, The molten metal introduced through the mortar input hole 115 formed on the outer peripheral surface of the hollow tube 113 passes through the through hole 131 of the support plate 130 and the molten metal introduced into the synthesis zone B between the support plate 130 and the wide diameter end of the mounting hole 120 To be cured together with the insertion side line of the strand 30, In the structure construction method,
The bidirectional fixing coupler 100 including the cylindrical housing 110, the mounting hole 120 and the support plate 130 is inserted into the curing grooves 40 of the mortar fixing grooves 20, The cross section of the curing groove 40 is formed to have a narrow entrance and a wide inverted wedge shape of the inner space portion and to prevent the interference between the support plate 130 and the wide diameter end of the mounting hole 120 The elastic springs 140 are built in the outer circumferential surface of the strand 30 so as to ensure a clearance of the mortar curing section at all times. The mounting hole 120 is formed with a groove 122 on the outer circumferential surface thereof, Wherein the rubber ring 123 is formed such that the rubber ring 123 is configured to double the adhesion performance when the mounting hole 120 is fitted to the insertion hole 114 of the coiled shape, (50) on the four-sided-thickness side surface of the base plate (20) The mortar grooves 70 are further formed in a symmetrical shape on the surfaces of the fitting jaws 50 and the fitting grooves 60 corresponding to each other so that clogging is prevented And the insert fixing device 200 includes a mounting rail 210 embedded in the ceiling and a mounting rail 210 mounted on the mounting rail 200. The mounting rail 200 is installed in the ceiling of the cage box 10, The mounting rail 210 is formed with a transporting hole 212 having a sliding rib 211 at a lower portion of the mounting rail 210. The transporting hole 212 is formed above the transporting hole 212, A space section 213 is formed in the longitudinal direction to allow the stationary metal piece 220 to be installed in a variable section and is formed on one side of the transfer hole 212 to be wider than the diameter of the transfer hole 212 A mounting groove 214 having a diameter is formed and the head mounting hole 221 of the fixed hardware 220 The fixed metal piece 220 is formed such that it can be inserted into the sliding rib 211 without interference with the sliding rib 211. The fixed metal piece 220 is fixed to the head 221 having a bolt 224 on the upper side of a shaft bolt 223 having a bolt- Wherein when the head mounting hole 221 is inserted through the mounting hole 214 and the mounting hole 221 is inserted into the mounting hole 221, the mounting hole 221 is slidably coupled with the corresponding slot 224 through the sliding rib 211. [ A method of constructing a culvert structure using a coupler, an insert fixture and a high - adhesion flexible gel sealant.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020180138641A KR101975763B1 (en) | 2018-11-13 | 2018-11-13 | Precast Concrete Culvert and Method for Constructing the Same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020180138641A KR101975763B1 (en) | 2018-11-13 | 2018-11-13 | Precast Concrete Culvert and Method for Constructing the Same |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101975763B1 true KR101975763B1 (en) | 2019-05-07 |
Family
ID=66656353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020180138641A KR101975763B1 (en) | 2018-11-13 | 2018-11-13 | Precast Concrete Culvert and Method for Constructing the Same |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101975763B1 (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409508A (en) * | 2019-07-05 | 2019-11-05 | 东莞市建安集团有限公司 | A kind of post-cast strip waterproof construction and its construction method |
CN110747762A (en) * | 2019-08-13 | 2020-02-04 | 贾殿录 | Cement member crossing highway and its installation method |
KR102092646B1 (en) * | 2019-07-15 | 2020-03-24 | 장명희 | Soundproofing wall foundation and method for constructing this same |
KR102092644B1 (en) * | 2019-07-25 | 2020-03-24 | 장명희 | Construction method of culvert structure using tunnel type molding device |
KR102092647B1 (en) * | 2019-07-15 | 2020-03-24 | 장명희 | Soundproofing wall foundation and method for constructing this same |
CN112681394A (en) * | 2021-03-15 | 2021-04-20 | 中铁建设集团华北工程有限公司 | Crack prevention device for deformation joint of communication port of basement |
CN114215529A (en) * | 2021-11-17 | 2022-03-22 | 江苏雷威建设工程有限公司 | Multi-span large-section box culvert inter-junction jacking construction monitoring system |
CN114277838A (en) * | 2021-12-20 | 2022-04-05 | 中铁二十五局集团第二工程有限公司 | Comprehensive pipe gallery structure crossing underground shallow-buried buildings and construction process thereof |
KR102591846B1 (en) * | 2023-05-02 | 2023-10-23 | (주)에코이노텍 | Curve section adaptive two-way strand fixing device |
KR102677471B1 (en) * | 2023-05-22 | 2024-06-20 | 김정애 | Wire connection device of fence for guarding against falling rocks |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100789697B1 (en) * | 2007-04-03 | 2008-01-03 | 주식회사 지구코퍼레이션 | Interlocking socket typed concrete conduit |
KR100912929B1 (en) * | 2009-03-24 | 2009-08-20 | 주식회사 케이씨산업개발 | Two-way coupler, concrete box culvert having such two-way coupler and connecting structure of concrete box culvert unit |
KR200457831Y1 (en) * | 2009-07-02 | 2012-01-05 | 양학래 | anchorage device |
KR101461009B1 (en) * | 2014-07-02 | 2014-11-12 | 신안콘크리트공업주식회사 | Prestressed Concrete Culvert |
-
2018
- 2018-11-13 KR KR1020180138641A patent/KR101975763B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100789697B1 (en) * | 2007-04-03 | 2008-01-03 | 주식회사 지구코퍼레이션 | Interlocking socket typed concrete conduit |
KR100912929B1 (en) * | 2009-03-24 | 2009-08-20 | 주식회사 케이씨산업개발 | Two-way coupler, concrete box culvert having such two-way coupler and connecting structure of concrete box culvert unit |
KR200457831Y1 (en) * | 2009-07-02 | 2012-01-05 | 양학래 | anchorage device |
KR101461009B1 (en) * | 2014-07-02 | 2014-11-12 | 신안콘크리트공업주식회사 | Prestressed Concrete Culvert |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409508B (en) * | 2019-07-05 | 2021-04-27 | 东莞市建安集团有限公司 | Post-cast strip waterproof structure and construction method thereof |
CN110409508A (en) * | 2019-07-05 | 2019-11-05 | 东莞市建安集团有限公司 | A kind of post-cast strip waterproof construction and its construction method |
KR102092647B1 (en) * | 2019-07-15 | 2020-03-24 | 장명희 | Soundproofing wall foundation and method for constructing this same |
KR102092646B1 (en) * | 2019-07-15 | 2020-03-24 | 장명희 | Soundproofing wall foundation and method for constructing this same |
KR102092644B1 (en) * | 2019-07-25 | 2020-03-24 | 장명희 | Construction method of culvert structure using tunnel type molding device |
CN110747762A (en) * | 2019-08-13 | 2020-02-04 | 贾殿录 | Cement member crossing highway and its installation method |
CN112681394A (en) * | 2021-03-15 | 2021-04-20 | 中铁建设集团华北工程有限公司 | Crack prevention device for deformation joint of communication port of basement |
CN112681394B (en) * | 2021-03-15 | 2021-07-09 | 中铁建设集团华北工程有限公司 | Crack prevention device for deformation joint of communication port of basement |
CN114215529A (en) * | 2021-11-17 | 2022-03-22 | 江苏雷威建设工程有限公司 | Multi-span large-section box culvert inter-junction jacking construction monitoring system |
CN114215529B (en) * | 2021-11-17 | 2024-03-19 | 江苏雷威建设工程有限公司 | Jacking construction monitoring system between multi-span large-section box culvert relays |
CN114277838A (en) * | 2021-12-20 | 2022-04-05 | 中铁二十五局集团第二工程有限公司 | Comprehensive pipe gallery structure crossing underground shallow-buried buildings and construction process thereof |
KR102591846B1 (en) * | 2023-05-02 | 2023-10-23 | (주)에코이노텍 | Curve section adaptive two-way strand fixing device |
KR102677471B1 (en) * | 2023-05-22 | 2024-06-20 | 김정애 | Wire connection device of fence for guarding against falling rocks |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101975763B1 (en) | Precast Concrete Culvert and Method for Constructing the Same | |
KR101809032B1 (en) | A precast arc segment and a connection structure and a method for engaging the segments each other | |
CN202391019U (en) | End part thickened grouting connector of steel bar | |
KR101711202B1 (en) | Prefabricated precast concrete bridge deck | |
KR101890860B1 (en) | Double PC wall assembly and construction method of composite wall structure using the same | |
KR101732669B1 (en) | Reinforcement member, concrete box reinforced with the same and the construction method thereof | |
KR100892593B1 (en) | Assembly manhole | |
KR20190012801A (en) | Formwork for tunnel lining and forming method for precast concrete bracket for supporting airpit slab | |
KR20060069419A (en) | This install structure and carrying out method with the watertight and flexible of the precast reinforced concrete box culverts | |
KR20080004691U (en) | Mold for manufacturing U-type side gutter | |
KR20180120552A (en) | Steel wire joint for installing pc box culvert and pc box culvert using the same | |
JP2634381B2 (en) | Split type box culvert and method of assembling the same | |
KR20150131904A (en) | Tension for both steel and precast concrete structures and its production and construction methods | |
KR100773773B1 (en) | An anchor for installing a chaining | |
KR100639153B1 (en) | Slab Structure using Precast Concrete Slab Panel with Lateral Load Resistancy | |
KR200407613Y1 (en) | Precast concrete box with bolt connecting structure | |
CN210421155U (en) | Precast concrete base of corrugated steel plate comprehensive pipe gallery | |
KR20070106410A (en) | The Assembled Precast Reinforced Concrete Culverts of Connectting with Steel Bar. | |
KR200274837Y1 (en) | Hume pipe mounting structure using concrete board without form | |
KR101957455B1 (en) | PC labyrinth weir structure and construction method thereof | |
KR100820331B1 (en) | Method of repairing manhole and material for repairing manhole | |
KR200420494Y1 (en) | precast concrete culvert block | |
WO2005106136A1 (en) | Fabricated breast walls in which a pre-stress is induced in steel strands installed in a body and a construction method thereof | |
JP4469058B2 (en) | Connection method of precast concrete members | |
KR200286055Y1 (en) | Anchor bolt fastener and spacer for reinforcement bar arrangement of building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GRNT | Written decision to grant |