KR101922032B1 - DCM soft ground improved apparatus and method using a ground rig - Google Patents

DCM soft ground improved apparatus and method using a ground rig Download PDF

Info

Publication number
KR101922032B1
KR101922032B1 KR1020160104052A KR20160104052A KR101922032B1 KR 101922032 B1 KR101922032 B1 KR 101922032B1 KR 1020160104052 A KR1020160104052 A KR 1020160104052A KR 20160104052 A KR20160104052 A KR 20160104052A KR 101922032 B1 KR101922032 B1 KR 101922032B1
Authority
KR
South Korea
Prior art keywords
supply passage
cement paste
cement
stirring
ground
Prior art date
Application number
KR1020160104052A
Other languages
Korean (ko)
Other versions
KR20180019849A (en
Inventor
신영철
신창헌
Original Assignee
주식회사 대창중기계
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 대창중기계 filed Critical 주식회사 대창중기계
Priority to KR1020160104052A priority Critical patent/KR101922032B1/en
Publication of KR20180019849A publication Critical patent/KR20180019849A/en
Application granted granted Critical
Publication of KR101922032B1 publication Critical patent/KR101922032B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • E02D3/126Consolidating by placing solidifying or pore-filling substances in the soil and mixing by rotating blades
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/16Machines for digging other holes in the soil
    • E02F5/20Machines for digging other holes in the soil for vertical holes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/027Drills for drilling shallow holes, e.g. for taking soil samples or for drilling postholes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Agronomy & Crop Science (AREA)
  • Soil Sciences (AREA)
  • Paleontology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

본 발명은 지반굴착장치를 이용한 연약지반개량 DCM 장치 및 공법에 관한 것으로, 모터를 동력원으로 하여 구동하는 오거드라이브유닛과, 상기 오거드라이브유닛의 하단에 형성되어 오거드라이브유닛으로부터 동력을 전달받아 하향을 향해 복수단으로 연결 조립되는 복수의 연결로드를 회전시킬 수 있도록 구성되어 있는 기어박스와, 상기 복수의 연결로드 각각의 하단에 연결 조립되는 복수의 교반로드와, 상기 복수의 교반로드 각각의 하단에 연결 조립되어 지반을 굴착하는 복수의 오거헤드를 구비하고 있는 지반굴착장치를 이용하여 연약지반 개량공사를 시공하도록 구성되는 연약지반개량 DCM 장치 및 공법에 있어서,
상기 기어박스의 상측에 고정 설치되어 있으며, 상기 복수의 연결로드 및 복수의 교반로드 각각의 중심에 형성되는 중심공급통로와, 상기 중심공급통로를 감싸도록 2중관 구조로 형성되는 2중관공급통로를 구비하고 있는 구성으로 외부로부터 공급되는 시멘트풀을 상기 중심공급통로 및 상기 2중관공급통로 각각에 선택적으로 공급할 수 있도록 구성되어 있는 투웨이 스위벨을 구비하고 있으며,
상기 투웨이 스위벨을 이용하여 상기 복수의 연결로드 및 교반로드 각각의 중심에 형성되어 있는 중심공급통로로 시멘트풀을 공급하게 될 때에는 상기 교반로드의 하단측에 형성되어 있는 하단 토출구를 통해 시멘트풀이 토출되도록 하며, 상기 복수의 연결로드 및 교반로드 각각에 형성되어 있는 2중관공급통로로 시멘트풀을 공급하게 될 때에는 상기 교반로드의 상단측에 형성되어 있는 상단 토출구를 통해 시멘트풀이 토출되도록 구성하여서 된 것을 특징으로 하며,
또한 연약지반을 설정된 깊이까지 굴착하는 굴착단계에서부터 교반로드를 지상으로 인발하는 인발단계에 이르기까지 교반로드를 멈추지 않고 계속해서 정회전 방향으로 회전시키는 방법으로 굴착단계 및 인발단계를 진행하며, 연약지반을 굴착하는 굴착단계에서는 교반로드 하단측에서 시멘트풀이 토출되도록 하며, 교반로드를 지상으로 상승시키는 인발단계에서는 교반로드의 상단측에서 시멘트풀이 토출되도록 함으로써 시멘트풀을 토사에 고르게 혼합시킬 수 있도록 하는 것을 특징으로 하는 발명이다.
The present invention relates to a soft ground improvement DCM apparatus and method using a ground excavation apparatus, and more particularly to a soft ground improvement DCM apparatus and method using a ground excavation apparatus, comprising an auger drive unit driven by a motor as a power source, A plurality of stirring rods connected to a lower end of each of the plurality of connecting rods, and a plurality of stirring rods connected to a lower end of each of the plurality of stirring rods, The method of claim 1, wherein the ground excavation apparatus comprises a plurality of augers connected to each other and excavating the ground,
A central supply passage formed at the center of each of the plurality of connecting rods and the plurality of stirring rods fixedly mounted on the gear box and a double pipe supply passage formed in a double pipe structure so as to surround the central supply passage, And a two-way swivel configured to selectively supply a cement paste supplied from the outside to the central supply passage and the double-pipe supply passage, respectively,
When the cement paste is supplied to the central supply passage formed at the center of each of the plurality of connecting rods and the stirring rod using the two-way swivel, the cement paste is discharged through the lower discharge port formed at the lower end of the stirring rod And the cement pool is discharged through the upper discharge port formed at the upper end of the stirring rod when supplying the cement pool with the double pipe supply passage formed in each of the connecting rods and the stirring rods And,
Further, the excavation step and the drawing step are carried out by rotating the stirring rod continuously in the normal rotation direction from the excavation step of excavating the soft ground to the set depth to the drawing step of drawing the stirring rod to the ground, The cement paste is discharged from the lower end of the stirring rod while the cement paste is discharged from the upper end of the stirring rod in the drawing step of raising the stirring rod to the ground so that the cement paste can be uniformly mixed with the gravel Which is a feature of the invention.

Description

지반굴착장치를 이용한 연약지반개량 DCM 장치 및 공법{DCM soft ground improved apparatus and method using a ground rig}Technical Field [0001] The present invention relates to a DCM soft ground improved apparatus and method using a ground excavation apparatus,

본 발명은 지반굴착장치를 이용한 연약지반개량 DCM 장치 및 공법에 관한 것으로, 더욱 상세하게는 지반굴착장치의 교반로드를 사용하여 연약지반을 굴착 및 교반할 때에는 상기 교반로드의 하단을 통해 시멘트를 토출시키면서 교반하도록 하며, 상기 교반로드를 인발할 때에는 교반로드의 상부에서 시멘트를 토출시키면서 교반토록 하여 연약지층에 시멘트가 골고루 혼합되는 상태로 개량될 수 있도록 하며, 또한 상기 지반굴착장치는 교반로드를 사용하여 지반을 굴착할 때나 인발할 때에도 항시 한 방향(예를 들면, 정회전 방향)으로만 상기 교반로드를 회전시키면서 연약지반을 개량할 수 있도록 하는 연약지반개량 DCM(Deep Cement Mixing) 장치 및 공법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a soft ground improvement DCM apparatus and method using a ground excavation apparatus, and more particularly to a soft ground improvement DCM apparatus and method using a ground excavation apparatus, And the cement is stirred while being discharged from the upper part of the stirring rod at the time of drawing out the stirring rod so that the cement can be improved to be mixed with the cement layer evenly, A DCM (Deep Cement Mixing) device and a construction method in which the soft ground can be improved while rotating the stirring rod in only one direction (for example, normal rotation direction) at all times even when excavating the ground or pulling out the ground .

일반적으로 연약지반 개량공사 및 지중 물막이 연속 차수벽 구축공사를 시공할 때에는 지반을 굴착하면서 굴착되는 지층의 토사 속으로 시멘트풀을 주입시키거나 또는 시멘트풀과 함께 급결제와 같은 약품을 주입시키는 방법으로 연약지반을 개량하거나 지하에 지중 물막이 연속 차수벽을 구축할 수 있도록 구성되어 있는 지반굴착장치를 이용하고 있다.Generally, when constructing the soft ground improvement work and the continuous water wall construction work, the cement paste is injected into the earth soil excavated while excavating the ground, or the chemical such as the quick-setting agent is injected together with the cement paste, The ground excavation system is constructed to improve the ground or to construct a continuous water wall underground in the underground.

종래의 지반굴착장치는 오거드라이브유닛와, 이의 하단에 위치하도록 설치되어 상기 오거드라이브유닛으로부터 전달되는 회전동력으로 굴착로드를 회전시키도록 구성되는 기어박스와, 상기 기어박스에 착탈가능하도록 하향을 향해 다단상으로 연결 조립되는 복수의 연결로드와, 상기 복수의 연결로드 각각에 복수단으로 연결 조립되어 굴착된 토사를 교반하는 복수의 교반로드 및 상기 복수의 교반로드 각각의 하단에 하나씩 연결되어 지반을 굴착하도록 구성된 복수의 오거헤드 등이 구성되어 있다.A conventional ground excavation apparatus includes an auger drive unit, a gear box installed to be positioned at a lower end of the auger drive unit, and configured to rotate the excavation rod by rotational power transmitted from the auger drive unit, A plurality of connecting rods connected and assembled in a single phase, a plurality of stirring rods connected to each of the plurality of connecting rods by a plurality of stages to stir the excavated soil, and a plurality of stirring rods connected to the lower ends of the plurality of stirring rods, And a plurality of auger heads configured to form a plurality of auger heads.

또한 종래의 지반굴착장치에는 외부로부터 공급되는 시멘트풀을 굴착되는 토사층에 토출시킬 수 있도록 하는 로터리 스위벨(Rotary swivel)이 구비되어 있으며, 상기한 로터리 스위벨은 본 발명의 발명자가 선출원으로 제안하여 실용신안으로 등록된 발명이 공고번호 실1996-6344호로 소개된 바 있다.The conventional ground excavation apparatus is provided with a rotary swivel for discharging the cement paste supplied from the outside to the excavated soil layer. The rotary swivel described above is proposed by the inventor of the present invention as a prior application, Has been introduced as Announcement No. 1996-6344.

또한 상기한 로터리 스위벨은 기어박스의 상측에 고정 설치되어 외부로부터 공급되는 시멘트풀을 상기 기어박스에 연결되어 있는 복수의 연결로드 및 교반로드가 회전하게 되더라도 상기 복수의 연결로드 및 교반로드 각각의 중심에 형성되어 있는 시멘트풀 공급통로로 공급할 수 있도록 구성되어 있다.Further, the rotary swivel may be fixed to the upper portion of the gear box, so that a plurality of connecting rods connected to the gear box and a plurality of connecting rods connected to the gear box may be connected to the center of each of the plurality of connecting rods and the stirring rods, To the cement pool supply passage formed in the cement paste supply passage.

따라서 종래의 지반굴착장치는 지반굴착작동을 진행하면서 굴착되는 토사층으로 시멘트풀을 토출시킬 수 있게 되므로 굴착되는 토사와 토출되는 시멘트풀을 고르게 교반할 수 있으므로써 연약지반을 개량할 수 있게 되는 것이다.Therefore, in the conventional ground excavation apparatus, since the cement pool can be discharged to the excavated soil layer while the ground excavation operation is being performed, the excavated soil and the discharged cement pool can be uniformly stirred, thereby improving the soft ground.

그리고, 종래의 지반굴착장치를 이용하여 연약지반을 개량공사를 진행하고자 할 때에는 통상적으로 지반을 굴착할 때에는 연결로드 및 교반로드를 정회전 방향으로 회전시키면서 하강시키는 작동으로 지반을 굴착하게 되며, 이와는 달리 상기 연결로드 및 교반로드를 설정된 깊이까지 하강시킨 다음, 연결로드 및 교반로드를 상향으로 상승작동시켜서 인발하고자 할 때에는 상기 연결로드 및 교반로드를 역회전 방향으로 회전시키면서 상승시키는 방법으로 연약지반을 개량하도록 구성되어 있다.When the ground improvement is to be carried out by using a conventional ground excavation apparatus, when excavating the ground, the ground is excavated by an operation of rotating the connecting rod and the stirring rod in the normal rotation direction while lowering the ground. The connecting rod and the stirring rod may be lowered to a predetermined depth and then the connection rod and the stirring rod may be upwardly moved upward to pull out the connecting rod and the stirring rod. .

상기와 같은 종래의 지반굴착장치는 로터리 스위벨을 통해 굴착되는 토사층으로 시멘트풀을 토출시키기 위한 시멘트풀 토출구를 연결로드에 연결 조립되는 교반로드의 하단에 형성하는 구조로 구성되어 있다.The conventional ground excavation apparatus has a construction in which a cement pool discharge port for discharging a cement paste to a soil layer excavated through a rotary swivel is formed at a lower end of a stirring rod connected to a connecting rod.

따라서 종래의 지반굴착장치를 이용하여 연약지반 개량공사를 진행할 때에는 상기한 복수의 연결로드 및 교반로드를 정회전 방향으로 회전작동시키면서 지반을 굴착함과 동시에 시멘트풀을 굴착되는 토사층으로 시멘트풀을 토출시키면서 상기한 교반로드에 형성되어 있는 복수의 교반날개가 오거헤드에 의해 굴착되는 토사와 시멘트풀 토출구로부터 토출되는 시멘트풀을 교반하는 방법으로 연약지반을 개량하도록 구성되어 있다.Therefore, when the soft ground improvement work is carried out using the conventional ground excavation apparatus, the plurality of connection rods and the stirring rods are rotated and operated in the normal rotation direction while excavating the ground, and at the same time, the cement paste is discharged And the cement paste discharged from the cement paste discharge port is agitated while the plurality of stirring blades formed on the stirring rod are excavated by the auger head.

그런데, 상기와 같이 교반로드의 하단에 연결 조립되어 있는 오거헤드로 연약지반을 굴착하면서 상기 교반로드를 하강시킴과 동시에 상기 교반로드의 하단에 형성되어 있는 시멘트풀 토출구를 통해 시멘트풀을 토출시키면서 연약지반을 굴착하게 될 때에는 상기 시멘트풀 토출구의 상측에 형성되어 있는 복수의 교반날개들이 상기 오거헤드에 의해 굴착되는 토사와 상기 시멘트풀 토출구로 토출되는 시멘트풀을 교반하게 되므로 토사와 시멘트풀의 혼합이 잘 이루어질 수는 있겠지만, 이와는 달리 굴착작동을 완료한 후 상기 교반로드를 상승시키면서 상기 교반로드의 하단에 형성되어 있는 시멘트풀 토출구를 통해 시멘트풀을 토출시킬 때에는 토사와 시멘트풀이 잘 혼합되지 않게 된다. 왜냐하면, 상기 교반로드의 하단에 형성되어 있는 시멘트풀 토출구는 교반로드에 형성된 복수의 교반날개들 보다 밑(하측)에 형성되어 있기 때문에 상승하는 상기 교반로드의 하단에 형성된 시멘트풀 토출구를 통해 토출되는 시멘트풀은 복수의 교반날개 밑에서 토출되는 상태가 됨과 동시에 상기 복수의 교반날개들은 상승하는 상태이므로 상기 시멘트풀 토출구에서 토출되는 시멘트풀을 복수의 교반날개들의 회전작동 범위에서 벗어난 상태가 되므로 토사와 혼합될 수 없게 되는 것이다.As described above, the agitation rod is lowered while the soft ground is excavated with the auger head connected to the lower end of the stirring rod, and the cement paste is discharged through the cement pool discharge port formed at the lower end of the stirring rod, When the ground is excavated, a plurality of agitating blades formed on the upper side of the cement pool discharge port agitates the soil material excavated by the auger head and the cement pool discharged to the cement pool discharge port, so that the mixture of the soil and the cement pool However, when the cement paste is discharged through the cement paste outlet formed at the lower end of the stirring rod while raising the stirring rod after completing the excavation operation, the soil and the cement paste are not mixed well. Because the cement paste outlet formed at the lower end of the stirring rod is formed below (lower) than the plurality of stirring vanes formed in the stirring rod, the cement paste discharged through the cement pool outlet formed at the lower end of the stirring rod The cement pool is discharged under a plurality of stirring vanes and the plurality of stirring vanes are in an elevated state, so that the cement pool discharged from the cement pool discharge outlet is out of the rotation operation range of the plurality of stirring vanes, It will not be possible.

상기와 같은 종래 지반굴착장치에서 나타나는 제반 문제를 해결하기 위하여 본 발명의 발명자는 특허 제142486호 및 특허 제451962호를 제안한 바 있다.In order to solve all the problems of the conventional ground drilling apparatus, the inventors of the present invention have proposed Japanese Patent No. 142486 and Japanese Patent No. 451962.

상기한 전자의 선행기술(특허 제142486호)은 지반을 굴착할 때에는 굴착로드의 하단부분에서 시멘트풀이 배출되도록 하고, 굴착작업을 완료한 후 굴착로드를 인발할 때에는 굴착로드의 중간부분에서 시멘트풀이 배출되도록 함으로써 상기 굴착로드의 중간부분에서 시멘트풀을 배출시키는 시멘트풀 배출공의 하측에서 회전하는 복수의 교반날개가 상기한 시멘트풀 배출공에서 배출되는 시멘트풀을 토사와 함께 교반하도록 하면서 연약지반 개량공사를 진행하도록 구성되어 있으나, 상기한 전자의 선행기술(특허 제142486호)은 굴착로드를 상,하측 로드로 분리 형성한 다음 상기한 상측 로드와 하측 로드 사이에 2중관 구조로 된 배출장치를 용접하여 연결하는 구조로 되어 있으며, 2중관 구조로 된 배출장치는 굴착로드의 상측 로드 하단에 용접된 삽입로드가 굴착로드의 하단 로드 상단에 용접된 괘지로드에 상,하로 이동가능하게 끼워진 상태로 조립되어 있으며, 상기 굴착로드를 하강시켜서 지반을 굴착하게 될 때에는 배출장치의 삽입로드를 감싸고 있는 괘지로드가 상승이동되어 굴착로드의 상측 로드 및 하측 로드 각각의 중심에 형성된 상,하측 안내통로를 연결시키도록 함으로써 상기한 상측 로드의 중심에 형성된 상측 안내통로로 공급되는 시멘트풀이 하측 로드의 중심에 형성된 하측 안내통로를 통해 굴착로드의 하단에서 배출되도록 하면서 굴착작동이 진행되도록 하는 한편, 굴착작동을 완료한 후 굴착로드를 지상으로 인발하기 위해 상승시킬 때에는 삽입로드를 감싼 상태로 상승시킴과 동시에 상기한 괘지로드의 외주에 형성된 시멘트풀 배출공을 통해 상측 로드의 상측 안내통로로 공급되는 시멘트풀이 배출되도록 구성되어 있다.In the above-mentioned prior art (Patent No. 142486), when the ground is excavated, the cement paste is discharged from the lower end portion of the excavation rod. When the excavation rod is pulled out after completion of the excavation work, A plurality of stirring blades rotating at a lower side of the cement pool discharge hole for discharging the cement paste at the middle portion of the excavation rod are allowed to stir the cement paste discharged from the cement pool discharge hole together with the gravel, However, in the prior art of the above-mentioned electron (Patent No. 142486), the excavation rod is divided into upper and lower rods, and then a discharge device having a double pipe structure is formed between the upper and lower rods And a discharge device having a double pipe structure is provided with an insertion hole welded to the lower end of the upper rod of the excavation rod Is mounted on a hanging rod welded to the upper end of the lower rod of the excavation rod so as to be movable up and down. When the excavating rod is lowered to excavate the ground, the hanging rod surrounding the insertion rod of the discharging device rises And the upper and lower guide passages formed at the centers of the upper rod and the lower rod of the excavation rod are connected to each other so that the cement solution supplied to the upper guide passage formed at the center of the upper rod is guided to the lower guide passage While the excavating operation is completed. When the excavating rod is lifted to withdraw the excavation rod to the ground after the excavation operation is completed, the excavating rod is lifted up in a state of wrapping the insertion rod, and at the same time, Is supplied to the upper guide passage of the upper rod through the cement pool discharge hole formed in the outer periphery Cement pool is configured to be discharged.

그러나, 상기한 전자의 선행기술(특허 제142486호)은 굴착로드의 상측 로드와 하측 로드를 연결하는 배출장치의 삽입로드를 감싸도록 조립되어 있는 괘지로드가 상,하로 이동하게 될 때 삽입로드의 외면과 괘지로드의 내면 사이에 토사가 끼이게 되는 현상이 나타난 괘지로드의 상,하 이동이 원활하지 목하게 되는 현상이 나타나 지반을 굴착하게 될 때나 지상으로 인발하게 될 때 시멘트풀이 제대로 배출되지 않게 되는 문제점이 자주 발생되고 있으며, 또한 상기 굴착로드를 지상으로 인발하기 위해 상승시킬 때 배출장치의 괘지로드 외주에 형성된 배출공으로배출되는 시멘트풀은 굴착로드의 외주로 넓게 퍼지는 상태로 배출되지 않고 상기한 괘지로드의 외면을 따라 흘러내리는 상태로 배출되기 때문에 상기 배출장치의 하측에서 회전하는 교반날개들의 교반작동에 의해서도 시멘트풀이 굴착로드 주위로 넓게 퍼지지 않게 되어 상기 배출장치를 통해 배출되는 시멘트풀을 토사에 고르게 혼합 교반하지 못하게 된다는 것이 단점으로 지적되고 있다.However, the above-mentioned prior art (Japanese Patent No. 142486) discloses that when a hanging rod, which is assembled to enclose an insertion rod of a discharge device connecting an upper rod and a lower rod of a drilling rod, moves up and down, When the soil is excavated or pulled out to the ground, the cement paste can not be properly discharged because of the phenomenon that the upper and lower movements of the loader rod, which is a phenomenon in which the soil is caught between the outer surface and the inner surface of the loader rod, The cement paste discharged to the discharge hole formed on the outer periphery of the hanging rod of the discharging device is not discharged in the state of being widely spread to the outer circumference of the excavation rod, And is discharged in a state of flowing down along the outer surface of the hanging rod so that the stirring blade There is no spread to a wider around the rod cement pool excavation by the stirring operation that prevents the cement paste were stirred and mixed evenly discharged to the earth and sand through the discharge device is pointed out as a disadvantage.

또한 상기한 후자의 선행기술(특허 제451962호)는 전자의 선행기술(특허 제 142486호)에서 나타나는 문제점을 해결하기 위하여 제안된 것으로, 굴착로드의 중심에는 시멘트풀을 배출시키기 위한 1개의 시멘트풀 유출통로가 형성되고, 하단에는 상기한 시멘트풀 유출통로를 통해 공급되는 시멘트풀을 배출시키기 위한 시멘트풀 배출공이 형성되어 있으며, 상기 굴착로드의 하단에 사방을 향해 돌출된 복수의 굴착비트 중 대칭하는 방향으로 돌출된 2개의 굴착비트 각각에는 공압 배출공과 약품 배출공이 형성되어 있고, 상기 굴착로드 내부에는 상기한 공압 배출공 및 약품 배출공 각각에 연결되는 공압 유출통로 및 약춤 유출통로를 형성하여 굴착로드로 지반을 굴착할 때와 굴착로드를 지상으로 인발할 때 굴착 및 교반되고 있는 토사층에 시멘트풀과 공압 및 약품(급결제 등)을 동시에 주입할 수 있도록 구성되어 있다.Also, the latter prior art (Patent No. 451962) is proposed in order to solve the problem indicated in the prior art (Patent No. 142486). In the center of the excavation rod, one cement pool A cement pool discharge hole for discharging the cement paste supplied through the cement pool outflow passage is formed at a lower end of the excavation rod, and a plurality of excavation bits protruding toward all directions A pneumatic discharge hole and a medicine discharge hole are formed in each of the two excavating bits protruding in the direction of the axis of the excavator, and a pneumatic discharge passage and a weak discharge passage connected to the pneumatic discharge hole and the medicine discharge hole are formed in the excavation rod, And when excavating the excavation rod to the ground, the excavated and agitated soil layer is cemented with a cement paste and pneumatic And chemicals (quick-setting, etc.) can be injected at the same time.

그러나, 상기한 후자의 선행기술(특허 제451962호)은 굴착 및 교반되고 있는 토사층에 강한 분사압력으로 주입되는 공압으로는 토사덩어리의 응집력을 약화시켜서 잘게 부서지도록 함으로써 시멘트풀과의 교반이 잘 이루어지게 하는 장점은 기대할 수 있겠지만, 상기한 시멘트풀은 굴착로드의 하단에 형성된 시멘트풀 배출공을 통해서만 배출되고, 공압 및 약품은 상기 굴착로드의 하단에서 사방으로 돌출되어 있는 복수의 굴착비트 중 서로 대칭하는 위치에 있는 2개의 굴착비트에 형성된 공압 배출공 및 약품 배출공을 통해서만 배출되기 때문에 굴착로드를 지상으로 인발하기 위해 상승이동시킬 때 굴착로드의 하단에서 배출되는 시멘트풀이나 공압 및 약품 등이 토사에 잘 섞이지 않게 된다는 것이 문제점으로 지적되고 있다.However, the above-mentioned prior art (Patent No. 451962) shows that the pneumatic pressure injected to the excavated and tossed soil layer at a strong injection pressure weakens the cohesive force of the clay so that the agglomeration with the cement paste is well performed However, the cement pool is discharged only through the cement pool discharge hole formed at the lower end of the excavation rod, and the pneumatic pressure and the chemicals are symmetric to each other among the plurality of excavation bits projecting from the lower end of the excavation rod in all directions The cement paste discharged from the lower end of the excavation rod when the excavation rod is moved upward to withdraw the excavation rod to the ground is discharged only through the pneumatic discharge hole and the medicine discharge hole formed in the two excavation bits at the position It is pointed out that it is not mixed well with the water.

한편, 종래의 지반굴착장치를 이용하여 연약지반 개량공사를 진행하기 위하여 연약지반을 굴착할 때에는 굴착로드를 정회전 방향으로 회전시킴과 동시에 시멘트풀을 시키면서 연약지반을 굴착하게 되며, 연약지반을 설정된 깊이로 굴착작동을 완료한 후 굴착로드를 지상으로 인발하고자 할 때에는 역회전방향으로 회전시키면서 상승시키게 되는데, 이와 같이 정회전하면서 연약지반을 굴착하던 굴착로드를 역회전 방향으로 회전시키기 위해서는 반드시 굴착로드를 완전히 정지시킨 상태에서 역회전시켜야 하는데, 이때 정회전 방향으로 회전하면서 연약지반을 굴착하던 굴착로드를 지하에서 일단 정지시킨 후 다시 굴착로드를 역회전 또는 정회전 방향으로 시키기 위해서는 지상에서 연약지반을 굴착하기 위해 굴착로드를 회전시킬 때 소요되는 동력에 비하여 1.5배 이상의 동력이 필요하게 되기 때문에 오거드라이브유닛에 설치되는 모터의 용량(마력)을 충분히 큰 것을 사용하여야 하므로 오거드라이브유닛의 제조비가 비싸지게 될 뿐 아니라 연료의 소모량이 많아지게 된다는 것이 문제점으로 지적되고 있다.Meanwhile, when excavating the soft ground using the conventional ground excavation apparatus, the excavation rod is rotated in the normal rotation direction and the soft ground is excavated while the cement paste is being applied. When the excavation rod is to be pulled out to the ground after completion of the excavation operation at a depth, the excavation rod is raised while being rotated in the reverse rotation direction. In order to rotate the excavation rod in the reverse rotation direction, In order to make the excavation rod to rotate in the reverse direction or in the normal rotation direction after stopping the excavation rod which is excavating the soft ground while it is rotating in the forward rotation direction under the ground, it is necessary to excavate the soft ground The excavation load, , It is necessary to use a motor having a sufficiently large capacity (horse power) to be installed in the auger drive unit, so that the manufacturing cost of the auger drive unit is not only expensive but also consumes a large amount of fuel. .

또한 선행기술로 제안된 특허 제451962호 및 특허 제 491876호에 기재되어 있는 복합형 스위벨 및 멀티 스위벨은 굴착로드의 중심에 형성된 시멘트풀 공급통로의 주위에 별도로 형성된 유체통로를 통해 공압이나 약품(급결제 등) 등은 공급할 수 있겠지만, 시멘트풀을 공급할 수 없는 구조로 구성되어 있기 때문에 시멘트풀을 공급하는 용도로는 사용되지 못하고 있는 실정이다. 왜냐하면, 상기한 복합형 스위벨 및 멀티 스위벨은 교반로드 및 굴착로드 위에 연결 조립되어 외부에서 공급되는 공압이나 약품의 경우에는 기밀구조(seal 구조)에 아주 작은 소량이 스며들게 되더라고 상기한 기밀구조(seal 구조)가 쉽게 손상되지 않지만, 시멘트풀이 상기한 기밀구조(seal 구조)에 극소량으로 스며들게 되더라도 기밀구조(seal 구조)가 쉽게 손상되어 고장을 일으키기 때문이다.The composite swivel and multi-swivel described in the prior art patents 451962 and 491876 can also be used for pneumatic or chemical pneumatic conveyance through a fluid passage formed separately around the cement pool feed passage formed at the center of the excavation rod Etc.) can be supplied but it is not used for supplying cement paste because it is composed of structure that can not supply cement paste. This is because the hybrid swivel and the multiswitch described above are assembled on the stirring rod and the excavating rod so that a very small amount of impregnation is applied to the airtight structure or the seal structure in the case of chemicals supplied from the outside, Structure) is not easily damaged, but even if the cement paste is impregnated in the above-mentioned seal structure in a very small amount, the seal structure is easily damaged and causes a failure.

또한 종래 지반굴착장치를 이용하여 연약지반 개량공사를 진행하게 될 때 하나의 로터리 스위벨과 교반로드의 중심에 형성되어 있는 하나의 공급통로를 통해서는 교반로드의 상,하단에 형성되어 있는 상,하측 토출공을 선택하여 시멘트풀이 토출되도록 제어할 수는 없다. 왜냐하면, 상기한 교반로드에 형성되어 있는 상,하측 토출공은 단순히 뚫려있는 상태에서 시멘트풀을 토출시키도록 구성되어 있으므로 굴착작동 중에는 지하에 박혀 있는 관계로 육안으로는 볼 수 없을 뿐 아니라 상기한 상,하측 토출공이 토사나 돌멩이 등에 의해 막히게 되는 등 저항이 적게 걸리는 토출공 측으로 세멘트풀이 토출되기 때문에 상기한 상,하측 토출공 중 어느 쪽을 선택하여 시멘트풀이 토출되도록 제어할 수 없기 때문에 연약지반의 개량공사를 효율적으로 진행할 수 없게 되는 것이다.In addition, when the soft ground improvement work is carried out using the conventional ground excavation apparatus, one rotary sweeper and one supply passage formed at the center of the stirring rod are used to move the upper and lower It is not possible to control the discharge of the cement paste by selecting the discharge hole. Because the upper and lower discharge holes formed in the stirring rod are configured to discharge the cement paste in a state where they are simply pierced, they are not visible to the naked eye because they are embedded in the ground during the excavation operation, , The lower side discharge hole is clogged by the soil or the stones, and the cement paste is discharged to the discharging hole side where the resistance is low. Therefore, it is not possible to control to discharge the cement paste by selecting either of the upper and lower discharge holes, The construction can not be efficiently carried out.

실용신안공보 공고번호 실1996-0006344호(1996. 07. 23. 공고)Utility Model Notification Bulletin No. 1996-0006344 (Notice of June 23, 1996) 등록특허공보 제10-0142486호(1996. 11. 19. 공개)Patent Registration No. 10-0142486 (published Nov. 19, 1996) 등록특허공보 제10-0451962호(2004. 10. 08. 공고)Patent Registration No. 10-0451962 (October 10, 2004 announcement) 등록특허공보 제10-0491876호(2005. 05. 30. 공고)Registered Patent Publication No. 10-0491876 (2005. 05. 30. Announcement) 등록특허공보 제10-0512095호(2005. 09. 02. 공고)Registered Patent Publication No. 10-0512095 (2005. 09. 02. Announcement) 등록특허공보 제10-0472795호(2005. 02. 14. 공고)Registered Patent Publication No. 10-0472795 (2005. 02. 14. Announcement) 등록특허공보 제10-1170656호(2012. 07. 27. 공고)Patent Registration No. 10-1170656 (2012. 07. 27. Announcement) 등록특허공보 제10-1219377호(2013. 01. 02. 공고)Patent Registration No. 10-1219377 (Bulletin of Mar. 01, 02, 2013)

본 발명은 상기와 같은 종래 기술에서 나타나는 제반 문제를 해결하기 위하여 제안된 것으로, 연약지반을 굴착할 때에는 교반로드의 하단측에서 시멘트풀이 토출되도록 하여 하강하는 교반날개에 의하여 굴착되는 토사와 토출되는 시멘트풀의 혼합이 잘 이루어지도록 하는 한편, 상기 교반로드를 인발할 때에는 교반로드의 상단측에서 시멘트풀이 토출되도록 하여 상승하는 교반날개가 토출되는 시멘트풀이 토사에 잘 혼합될 수 있도록 하며, 이를 위해 시멘트풀이 교반로드의 하단측 및 상단측으로의 공급되도록 하는 것을 제어할 수 있도록 하며, 또한 연약지반을 굴착할 때에나 굴착작동을 완료한 후 교반로드를 인발할 때에도 상기 교반로드를 항시 한 방향(예를 들면, 정회전 방향)으로만 회전작동시키면서 굴착작동 및 인발작동을 진행할 수 있도록 함으로써 오거드라이브유닛을 구동시키기 위한 모터의 용량을 줄일 수 있도록 함으로써 연약지반 개량공사를 효율적으로 시공할 수 있도록 하는 DCM 장치 및 공법을 제공하는데 목적을 두고 발명한 것이다.The present invention has been proposed in order to solve all the problems of the conventional art as described above. When excavating the soft ground, the cement paste is discharged from the lower end of the stirring rod, The cement paste discharged from the agitating rod may be mixed with the gypsum so that the cement paste discharged from the upper end of the agitating rod can be well mixed with the gypsum. It is possible to control the supply to the lower end side and the upper end side of the stirring rod, and also when the soft ground is excavated or after the excavation operation is completed, the stirring rod is pulled out, , The direction of forward rotation), the drilling operation and the pulling operation can be performed The present invention has been made to provide a DCM apparatus and a method for efficiently performing a soft ground improvement work by reducing the capacity of a motor for driving an auger drive unit.

본 발명은 상기와 같은 목적을 추구하기 위한 수단으로서,The present invention, as a means for pursuing the above object,

본 발명의 연약지반개량 DCM 장치는,In the soft ground improvement DCM apparatus of the present invention,

모터를 동력원으로 하여 구동하는 오거드라이브유닛과, 상기 오거드라이브유닛의 하단에 형성되어 오거드라이브유닛으로부터 동력을 전달받아 하향을 향해 복수단으로 연결 조립되는 복수의 연결로드를 회전시킬 수 있도록 구성되어 있는 기어박스와, 상기 복수의 연결로드 각각의 하단에 연결 조립되는 복수의 교반로드와, 상기 복수의 교반로드 각각의 하단에 연결 조립되어 지반을 굴착하는 복수의 오거헤드를 구비하고 있는 지반굴착장치를 이용하여 연약지반 개량공사를 시공하도록 구성되는 연약지반개량 DCM 장치에 있어서,And a plurality of connection rods formed at a lower end of the auger drive unit and receiving power from the auger drive unit and connected and assembled at a plurality of stages downward, A plurality of agitating rods connected to a lower end of each of the plurality of connecting rods, and a plurality of augers connected to a lower end of each of the plurality of agitating rods to excavate the ground, A soft ground improvement DCM apparatus configured to construct a soft ground improvement work by using,

상기 기어박스의 상측에 고정 설치되어 있으며, 상기 복수의 연결로드 및 복수의 교반로드 각각의 중심에 연결되도록 형성되는 중심공급통로와, 상기 중심공급통로를 감싸도록 2중관 구조로 형성되는 복수의 2중관 소형공급통로를 구비하고 있는 구성으로서 외부로부터 공급되는 시멘트풀을 상기 중심공급통로 및 상기 복수의 2중관 소형공급통로 각각에 선택적으로 공급할 수 있도록 구성되어 있는 투웨이 스위벨을 구비하고 있으며,A central supply passage fixedly installed on the gear box and connected to the center of each of the plurality of connecting rods and the plurality of stirring rods; a plurality of second And a two-way swivel configured to selectively supply a cement paste supplied from the outside to each of the central supply passage and the plurality of the double pipe small supply passages,

상기 투웨이 스위벨을 이용하여 상기 복수의 연결로드 및 교반로드 각각의 중심에 형성되어 있는 시멘트풀 공급통로로 시멘트풀을 공급하게 될 때에는 상기 교반로드의 하단측에 형성되어 있는 하단 토출구를 통해 시멘트풀이 토출되도록 하며, 상기 복수의 연결로드 및 교반로드 각각에 형성되어 있는 2중관 시멘트풀 공급통로로 시멘트풀을 공급하게 될 때에는 상기 교반로드의 상단측에 형성되어 있는 상단 토출구를 통해 시멘트풀이 토출되도록 구성하여서 된 것을 특징으로 한다.When the cement paste is supplied to the cement paste supply passage formed at the center of each of the plurality of connecting rods and the stirring rod using the two way swivel, the cement paste is discharged through the lower discharge port formed at the lower end of the stirring rod And when the cement paste is supplied by the double pipe cement paste supply passage formed in each of the plurality of connection rods and the stirring rods, the cement paste is discharged through the upper discharge port formed at the upper end of the stirring rod .

또한, 상기 투웨이 스위벨은 상면에 고정 부착되는 고정덮개의 중심에는 중심공급통로로 시멘트풀을 공급하기 위한 중심공급통로입구가 형성되어 있으며, 상기 고정덮개의 중심공급통로입구 일측에는 일정간격으로 형성되는 복수의 2중관 소형공급통로로 시멘트풀을 공급하기 위한 편심공급통로입구가 편심된 위치에 고정된 상태로 형성되어 있는 것을 특징으로 한다.The two-way swivel includes a center feed passage inlet for feeding a cement paste through a center feed passage at a center of a fixed lid fixedly attached to an upper surface of the two-way swivel, And an eccentric supply passage inlet for supplying the cement paste to the plurality of double pipe small supply passages is formed in a state of being fixed at an eccentric position.

또한, 상기 투웨이 스위벨은 고정덮개가 고정 부착되는 고정체와, 상기 복수의 연결로드 각각의 상단에 연결되어 각 연결로드와 같이 회전하도록 형성되는 회전체로 구성되어 있으며, 상기 고정체에는 중심공급통로입구와 연통하는 중심공급통로와, 상기 고정체의 상면에는 중심공급통로와는 별도 분리된 상태로 형성되어 있는 환형공급통로와, 상기 환형공급통로의 바닥과 연통하도록 상기 중심공급통로 주위에 일정간격으로 형성되는 복수의 2중관 소형공급통로가 형성되어 있으며, 상기 회전체에는 고정체에 형성되어 있는 중심공급통로와 연결되는 중심연결통로와, 상기 복수의 2중관 소형공급통로들과 연통하도록 형성되는 환형연결통로와, 상기 환형연결통로의 바닥과 연통하도록 형성된 채 중심연결통로 주위에 일정간격으로 형성되는 복수의 소형연결통로가 형성되어 있는 것을 특징으로 한다.The two-way swivel includes a fixed body to which a fixed lid is fixedly attached, and a rotating body connected to an upper end of each of the plurality of connecting rods so as to rotate together with the connecting rods, An annular supply passage formed separately from the central supply passage on an upper surface of the stationary body; and an annular supply passage formed around the center supply passage at a predetermined interval A plurality of double-tube small-sized supply passages are formed in the body, and the rotating body includes a center connection passage connected to a center supply passage formed in the fixing body, and a plurality of double- A plurality of annular connecting passages formed at regular intervals around the central connecting passage formed to communicate with the bottom of the annular connecting passage; It characterized in that the small connecting passage is formed.

또한, 상기 복수의 연결로드 및 복수의 교반로드 각각의 중심에는 투웨이 스위벨의 중심공급통로입구를 통해 주입되는 시멘트풀이 상기 복수의 교반로드의 각 하단측에 하나 이상으로 형성되어 있는 하단 토출구를 통해 토출될 수 있도록 시멘트풀을 상기 하단 토출구까지 안내하기 위한 시멘트풀 공급통로가 형성되어 있으며, 상기 복수의 연결로드 및 교반로드 각각에는 시멘트풀 공급통로를 감싸는 상태로 형성되는 2중관 시멘트풀 공급통로가 형성되어 있되, 상기 2중관 시멘트풀 공급통로는 복수의 교반로드 각각의 상단측에 하나 이상으로 형성되는 상단 토출구에 연결되는 위치까지 형성되어 상기 편심공급통로입구를 통해 주입되는 시멘트풀이 상기 복수의 교반로드의 상단측에 형성되어 있는 상단 토출구를 통해 토출시킬 수 있도록 구성되어 있는 것을 특징으로 한다.The plurality of connecting rods and the plurality of stirring rods are respectively provided with a cement paste injected through the center feed passage inlet of the two-way swivel through at least one lower outlet formed at each lower end of the plurality of stirring rods, A cement paste supply passage for guiding the cement paste to the lower discharge port is formed so that the cement paste supply passage is formed so that the cement paste supply passage is formed Wherein the cement paste supply passage is formed up to a position connected to an upper discharge port formed at one or more than one end of each of the plurality of stirring rods so that a cement paste injected through the eccentric supply passage inlet is supplied to the plurality of stirring rods, Through the upper discharge port formed at the upper end of the discharge port .

또한, 상기 연약지반개량 DCM 장치는 외부로부터 펌핑 공급되는 시멘트풀을 상기 투웨이 스위벨에 형성되어 있는 중심공급통로입구 및 편심공급통로입구 각각에 선택적으로 공급할 수 있도록 하는 시멘트풀 공급조절밸브를 더 포함하여 구성된 것을 특징으로 한다.The soft ground improvement DCM apparatus further includes a cement pool supply control valve for selectively supplying the cement pool supplied from the outside to each of the central supply passage inlet and the eccentric supply passage inlet formed in the two way swivel .

또한, 상기 시멘트풀 공급조절밸브는 고정 설치되는 밸브몸체와, 상기 밸브몸체의 일측에 축방향을 향해 일정간격으로 형성되는 복수의 주입구와, 상기 밸브몸체의 타측에 축방향을 향해 일정간격으로 형성되는 복수의 제1 배출구와, 상기 복수의 제1 배출구에 대하여 일정각도 어긋난 위치에 일정간격으로 형성되는 복수의 제2 배출구와, 상기 밸브몸체의 내측에 회전가능하게 삽입 설치되어 있는 밸브회전체와, 상기 밸브회전체의 일측에 원주방향을 향해 호형상으로 형성된 채 축방향으로 일정간격을 유지하도록 형성되어 있는 복수의 주입통로와, 상기 복수의 주입통로와 연결된 채 상기 제1 및 제2 배출구 각각에 선택적으로 연결되도록 형성되어 있는 복수의 배출통로와, 상기 밸브몸체의 일측에 형성되어 밸브회전체를 시계방향 및 반시계방향으로 일정각도씩 회전시키는 작동실린더로 구성된 것을 특징으로 한다.The cement pool supply control valve includes a valve body fixedly installed, a plurality of injection ports formed at predetermined intervals in the axial direction on one side of the valve body, and a plurality of injection ports formed at predetermined intervals toward the axial direction on the other side of the valve body. A plurality of second outlets formed at predetermined intervals at positions offset from the plurality of first outlets by a predetermined angle; a valve body rotatably inserted into the valve body; A plurality of injection passages formed at one side of the valve rotation body so as to be formed at a predetermined interval in the axial direction so as to be arc-shaped toward the circumferential direction, and a plurality of injection passages And a plurality of discharge passages formed on one side of the valve body, the valve body being rotated clockwise and counterclockwise Characterized in that configured in operation to rotate by a predetermined angle cylinder.

본 발명의 연약지반개량 DCM 공법은,In the soft ground improvement DCM method of the present invention,

모터를 동력원으로 하여 구동하는 오거드라이브유닛과, 상기 오거드라이브유닛의 하단에 형성되어 오거드라이브유닛으로부터 동력을 전달받아 하향을 향해 복수단으로 연결 조립되는 복수의 연결로드를 회전시킬 수 있도록 구성되어 있는 기어박스와, 상기 복수의 연결로드 각각의 하단에 연결 조립되는 복수의 교반로드와, 상기 복수의 교반로드 각각의 하단에 연결 조립되어 지반을 굴착하는 복수의 오거헤드를 구비하고 있는 지반굴착장치를 이용하여 연약지반 개량공사를 시공하도록 구성되는 연약지반개량 DCM 공법에 있어서,And a plurality of connection rods formed at a lower end of the auger drive unit and receiving power from the auger drive unit and connected and assembled at a plurality of stages downward, A plurality of agitating rods connected to a lower end of each of the plurality of connecting rods, and a plurality of augers connected to a lower end of each of the plurality of agitating rods to excavate the ground, In the soft ground improvement DCM method,

상기 복수의 교반로드를 회전시킴과 동시에 하강시키는 작동으로 연약지반을 설정된 깊이로 굴착하고자 할 때 상기 교반로드를 한 방향(정회전 방향)으로 회전시킴과 동시 하강시키는 작동으로 굴착작동을 진행하게 될 때에는 상기 교반로드의 하단측에 형성되어 있는 하단 토출구를 통해 시멘트풀을 토출시켜 상기 하단 토출구 상측에서 회전하는 복수의 교반날개로 굴착되는 토사와 토출되는 시멘트풀을 혼합시키도록 하면서 연약지반을 굴착하도록 구성되는 굴착단계;The excavating operation is performed by rotating the stirring rod in one direction (normal rotation direction) and simultaneously lowering the soft ground when the soft ground is to be excavated at a predetermined depth by an operation of rotating and lowering the plurality of stirring rods The cement paste is discharged through the lower discharge port formed at the lower end of the stirring rod to excite the soft ground while mixing the soil and the discharged cement paste with a plurality of stirring blades rotating on the upper discharge port A drilling step constituted;

상기 굴착단계에서 연약지반을 설정된 깊이까지 굴착한 후 교반로드를 인발하고자 할 때에는 상기 교반로드의 한 방향(정회전 방향)으로 회전시키는 작동을 일단 정지시키지 않고 계속하여 교반로드를 같은 방향(정회전 방향)으로 회전시킴과 동시에 상기 교반로드의 상단에 형성되어 있는 상단 토출구를 통해 시멘트풀을 토출시켜 상기 상단 토출구 하측에서 회전하는 복수의 교반날개로 토출되는 시멘트풀을 토사에 혼합시키면서 교반로드를 지상으로 상승시키도록 구성되는 인발단계;The excavation step may include excavating the soft ground to a predetermined depth and then pulling the stirring rod, the operation of rotating the stirring rod in one direction (normal rotation direction) is not stopped, and the stirring rod is continuously moved in the same direction And a cement paste discharged through a plurality of stirring blades rotating at a lower side of the upper discharge port is mixed with the gypsum while the cement paste is discharged through the upper discharge port formed at the upper end of the stirring rod, A pulling step configured to lift the substrate;

로 연약지반을 개량하도록 구성하여서 된 것을 특징으로 한다.To thereby improve the soft ground.

본 발명에 의하면 연약지반 개량공사를 시공하고자 할 때 기어박스의 상측에 설치되어 있는 투웨이 스위벨을 통해 시멘트풀을 공급함에 있어 연약지반을 굴착하고자 할 때에는 교반로드를 한 방향(정회전 방향)으로 회전시키면서 하강시키는 작동으로 굴착작동을 진행함과 동시에 교반로드의 하단측에 형성되어 있는 하단 토출구를 통해서 시멘트풀을 토출시키도록 함으로써 회전하면서 하강하는 교반날개들이 상기 하단 토출구에서 토출되는 시멘트풀과 굴착되는 토사를 잘 혼합시킬 수 있도록 하는 한편, 연약지반을 설정된 깊이로 굴착작동을 완료한 후 상기 교반로드를 상승시키고자 할 때에는 교반로드를 일단 정지시키지 아니한 채 한 방향(정회전 방향)으로 계속 회전시키면서 상승시킴과 동시에 상기 교반로드의 상단측에 형성되어 있는 상단 토출구를 통해서 시멘트풀을 토출시키도록 함으로써 상승하는 교반날개들이 토출되는 시멘트풀과 토사를 혼합시킬 수 있도록 하여 연약지반 개량공사를 효율적으로 진행할 수 있도록 하는 효과가 있으며, 또한 연약지반을 설정된 깊이로 굴착하기 위해 교반로드를 정회전시켜 설정된 깊이로 굴착작동을 완료한 후 상기 교반로드를 인발하기 위해 상승시킬 때에도 교반로드는 정지하지 않고 계속해서 한 방향(정회전 방향)으로만 회전시키면서 상승하도록 함으로써 오거드라이브유닛을 구동시키는 모터에 과부하가 걸리지 않도록 할 수 있으므로 상기한 모터의 용량을 줄일 수 있도록 하여 상기 오거드라이브유닛의 제조비용 절감 및 상기한 모터를 구동시키기 위한 발전기의 연료소비를 줄일 수 있도록 하여 운전비용을 절감시킬 수 있도록 하는 효과가 있으며, 또한 교반로드의 회전반경 주위의 토사층에 시멘트풀이 고르게 혼합되는 상태로 연약지반을 개량할 수 있도록 하는 효과가 있는 유용한 발명이다.According to the present invention, when the soft ground improvement work is to be performed, the cement pool is supplied through the two-way swivel installed on the upper side of the gear box. When the soft ground is to be excavated, the stirring rod is rotated in one direction And at the same time, the cement pool is discharged through the lower discharge port formed at the lower end of the stirring rod, so that the stirring blades that rotate and descend are excavated with the cement pool discharged from the lower discharge port The soil can be mixed well. On the other hand, when the soft ground is to be elevated after the excavation operation is completed to a set depth, the stirring rod is continuously rotated in one direction (normal rotation direction) And at the same time, the upper end of the stirring rod It is possible to mix the cement paste discharged from the stirring blades and the gravel so that the improvement of the soft ground can be efficiently carried out. Further, the soft ground is excavated to a set depth Even when the stirring rod is rotated forward to complete the excavation operation at a set depth and then the stirring rod is lifted to pull out the stirring rod, the stirring rod is continuously rotated in one direction (normal rotation direction) Since the motor for driving the drive unit can be prevented from being overloaded, the capacity of the motor can be reduced, thereby reducing the manufacturing cost of the auger drive unit and reducing the fuel consumption of the generator for driving the motor. To save money, And is also a useful invention that is effective to allow the improvement of soft ground in a state where the cement mixture evenly pool in tosacheung around the radius of rotation of the stirring rod.

도 1은 본 발명을 설명하기 위한 연약지반 DCM 장치 설치상태도
도 2는 본 발명의 연약지반개량 DCM 장치의 교반로드 연결상태를 일부 단면 및 일부 확대하여 나타낸 도면
도 3은 본 발명의 연약지반개량 DCM 장치의 연결로드 연결상태를 확대하여 나타낸 단면도
도 4는 본 발명의 연약지반개량 DCM 장치의 연결로드 및 교반로드의 연결조인트에 개재되는 패킹부재의 결합상태 평면도 및 단면도
도 5는 본 발명의 연약지반개량 DCM 장치의 투웨이 스위벨의 조립상태 단면도 및 평,저면도
도 6은 본 발명의 연약지반개량 DCM 장치의 시멘트풀 공급조절밸브의 작동실린더 작동상태도
도 7은 도 6의 A-A선 단면도
도 8의 (ㄱ)(ㄴ)은 도 7의 B-B선 단면도로 나타낸 시멘트풀 공급조절밸브의 작동상태 단면도
도 9는 본 발명의 교반로드의 하단 토출구로 토출되는 시멘트풀이 교반로드의 회전영역 내측부분의 토사에 60∼80% 정도로 많이 혼합되는 상태를 나타낸 도면
도 10은 본 발명의 교반로드의 상단 토출구에서 토출되는 시멘트풀이 교반로드 회전영역 외측부분의 토사에 60∼80% 정도로 많이 혼합되는 상태를 나타낸 도면
1 is a diagram showing a state of installation of a soft ground DCM device for explaining the present invention
2 is a partially enlarged and partially enlarged view of a connection state of a stir rod of the soft ground improvement DCM apparatus of the present invention
Fig. 3 is an enlarged cross-sectional view of the connecting rod connecting state of the soft ground improvement DCM apparatus of the present invention
4 is a plan view and a cross-sectional view of the connection state of the packing member interposed in the connection joint of the connection rod and the stirring rod of the soft ground improvement DCM apparatus of the present invention
5 is a sectional view of the two-way swivel assembly of the soft ground improvement DCM apparatus of the present invention,
Fig. 6 is a view showing an operating cylinder operating state of the cement pool supply control valve of the soft ground improvement DCM apparatus of the present invention
7 is a sectional view taken along the line AA in Fig. 6
8 (a) and 8 (b) are cross-sectional views taken along the line BB in Fig. 7 showing the operating state of the cement pool feed control valve
9 is a view showing a state in which the cement paste discharged to the lower discharge port of the stirring rod of the present invention is mixed with the soil of the inner portion of the rotating region of the stirring rod as much as 60 to 80%
10 is a view showing a state in which the cement paste discharged from the upper discharge port of the stirring rod of the present invention is mixed with the soil of the portion outside the agitation rod rotating region by as much as 60 to 80%

본 발명에 의한 지반굴착장치를 이용한 연약지반개량 DCM 장치 및 공법에 대한 구체적인 실시예를 첨부한 도면에 따라서 상세히 설명하면 다음과 같다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, concrete embodiments of a soft ground improvement DCM apparatus and method using a ground excavation apparatus according to the present invention will be described in detail with reference to the accompanying drawings.

도면부호 1은 지반굴착장치를 나타내는 것으로, 상기 지반굴착장치(1)는 지상에 자주식으로 주행이 가능하도록 구성된 크롤러 크레인(10)과, 상기 크롤러 크레인(10)의 선단 지지암(11)에 지지된 상태로 수직상으로 고정 설치되는 리더(12)와, 상기 리더(12)의 상단에 형성된 톱시브에 와이어로 연결되어 상,하로 승강이동이 가능하게 설치되는 오거드라이브유닛(13)과, 상기 오거드라이브유닛(13)의 하단에 설치되어 있는 기어박스(14)와, 상기 기어박스(14)에 착탈가능하게 연결되어 상기 오거드라이브유닛(13)으로부터 회전동력을 전달받아 회전하도록 복수단으로 연결 조립되는 복수의 연결로드(15)와, 상기 복수의 연결로드(15) 각각의 하단에 연결 조립되는 복수의 교반로드(16)와, 상기 복수의 교반로드(16) 각각의 하단에 연결 조립되어 지반을 굴착하는 복수의 오거헤드(17) 등이 구성되어 있다.The ground excavating apparatus 1 includes a crawler crane 10 configured to be able to run freely on the ground, a support shaft 11 supported on a fore end support arm 11 of the crawler crane 10, An auger drive unit 13 connected to the top sheave formed at the upper end of the reader 12 by wires and installed so as to be able to move up and down, A gear box 14 provided at the lower end of the auger drive unit 13 and a gear box 14 connected detachably to the gear box 14 to receive rotation power from the auger drive unit 13, A plurality of stirring rods 16 connected to the lower ends of the plurality of connecting rods 15 and connected to the lower ends of the plurality of stirring rods 16, Multiple excavation of the ground Auger head 17 and the like are configured.

상기 복수의 연결로드(15) 및 복수의 교반로드(16) 각각의 중심에 수직상으로 연결되도록 형성되는 시멘트풀 공급통로(2a)와, 상기 시멘트풀 공급통로(2a)를 감싸도록 형성되는 2중관 시멘트풀 공급통로(2b)가 형성되어 있으며, 상기 시멘트풀 공급통로(2a)는 복수의 교반로드(16) 각각의 하단측에 하나 이상으로 형성되는 하단 토출구(21)까지 연장 형성되어 시멘트풀 공급통로(2a)로 공급되는 시멘트풀을 상기 하단 토출구(21)를 통해 토출시킬 수 있도록 구성되어 있으며, 또한 상기 2중관 시멘트풀 공급통로(2b)는 복수의 교반로드(16) 각각의 상단측에 하나 이상으로 형성되어 있는 상단 토출구(22)와 연결되는 위치까지 연장 형성되어 2중관 시멘트 공급통로(2b)로 공급되는 시멘트풀을 상기 상단 토출구(22)를 통해 토출시킬 수 있도록 구성되어 있다.A cement paste feed passage 2a formed to be vertically connected to the center of each of the plurality of connecting rods 15 and the plurality of stirring rods 16; The cement paste supply passage 2a is formed to extend from the lower end of each of the plurality of stirring rods 16 to at least one lower discharge port 21, And the cement paste supplied to the supply passage 2a can be discharged through the lower discharge port 21. The double pipe cement paste supply passage 2b is connected to the upper end side And the cement paste supply path 2b is extended to a position connected to the upper discharge port 22 formed at one or more of the upper discharge port 22 and the upper discharge port 22. As shown in FIG.

본 발명의 특징은, 복수의 연결로드(15) 및 교반로드(16) 각각의 중심에 수직상으로 연결 형성되어 있는 시멘트풀 공급통로(2a) 및 상기 시멘트풀 공급통로(2a)를 감싸도록 2중관 구조로 형성되어 있는 2중관 시멘트풀 공급통로(2b) 각각에 시멘트풀 펌핑장치(미도시)에 의하여 펌핑 공급되는 시멘트풀을 공급할 수 있도록 하는 투웨이 스위벨(3 : 2 way swivel)과, 상기 시멘트풀 펌핑장치에 의하여 펌핑 공급되는 시멘트풀을 상기 투웨이 스위벨(3)에 각각 분리 형성되어 있는 중심공급통로입구(32) 및 편심공급통로입구(33)로 공급할 수 있도록 하는 시멘트풀 공급조절밸브(4)를 구비한 것에 있다.The present invention is characterized in that a cement paste feed passage 2a is formed vertically in the center of each of a plurality of connecting rods 15 and stirring rods 16 and a cement paste feed passage 2a Way swivel (3: 2 way swivel) for supplying a cement pool pumped and supplied by a cement pool pumping device (not shown) to each of the double pipe cement pool feed passages 2b formed in a middle pipe structure, A cement pool supply control valve 4 (hereinafter referred to as " cement pool supply control valve ") 4 for supplying a cement pool pumped and supplied by the full pumping device to the central supply passage inlet 32 and the eccentric supply passage inlet 33, ).

상기 투웨이 스위벨(3)은 도 5에 도시되어 있는 바와 같이 기어박스(14)의 상측에 위치하여 고정프레임 구조물(미도시) 등에 부착되어 있도록 고정 설치되는 고정체(3a)와, 상기 복수의 연결로드(15) 각각의 상단에 연결 조립되어 회전가능하게 설치되는 회전체(3b)가 조립된 구조로 구성되어 있다.The two-way swivel 3 includes a fixed body 3a positioned on the upper side of the gear box 14 and fixedly attached to a fixed frame structure (not shown) as shown in FIG. 5, And a rotary body 3b connected to the upper ends of the rods 15 so as to be rotatable is assembled.

또한 상기 투웨이 스위벨(3)의 고정체(3a) 상면에는 고정덮개(31)가 고정 붙착되어 있으며, 상기 고정덮개(31)의 중심에는 중심공급통로입구(32)가 형성되어 있고, 상기 중심공급통로입구(32)의 일측 편심된 위치에는 편심공급통로입구(33)가 형성되어 있으며, 상기 고정체(3a)의 상면에는 중심에 형성되는 중심공급통로(34)와 상기 중심공급통로(34)의 주위에 환형형상으로 형성되는 환형공급통로(35)가 형성되어 있다.A fixed lid 31 is fixedly attached to the upper surface of the fixed body 3a of the two-way swivel 3, and a central supply passage inlet 32 is formed at the center of the fixed lid 31, An eccentric feed passage inlet 33 is formed at one of the eccentric positions of the passage inlet 32. A center feed passage 34 and a center feed passage 34 formed at the center are formed on the upper surface of the fixed body 3a, An annular supply passage 35 formed in an annular shape is formed.

또한, 상기 환형공급통로(35)의 상부는 편심공급통로입구(33)와 연결되어 있으며, 상기 환형공급통로(35)의 바닥에는 중심공급통로(34)의 주위에 일정간격으로 형성되어 중심공급통로(34)를 감싸주는 상태로 2중관 구조를 형성하는 복수의 2중관 소형공급통로(36)가 연결되도록 구성되어 있다.The upper portion of the annular supply passage 35 is connected to the eccentric supply passage inlet 33 and the annular supply passage 35 is formed at a predetermined interval around the center supply passage 34, And a plurality of double-tube small-sized supply passages 36 forming a double-tube structure in a state of wrapping the passages 34 are connected.

또한 상기 투웨이 스위벨(3)의 회전체(3b) 중심에는 상기 중심공급통로(34)와 수직상으로 연결되는 중심연결통로(37)가 형성되어 있으며, 상기 중심연결통로(37)의 상면에는 상기 복수의 2중관 소형공급통로(36)가 연결되는 환형연결통로(38)가 형성되어 있으며, 상기 환형연결통로(38)의 바닥에는 중심연결통로(37) 주위에 일정간격으로 형성되는 복수의 소형연결통로(39)가 연결되도록 구성되어 있다.A center connection passage 37 is formed at the center of the rotating body 3b of the two-way swivel 3 in a vertical direction to the center supply passage 34. On the upper surface of the center connection passage 37, An annular connecting passage 38 to which a plurality of double pipe small supply passages 36 are connected is formed at the bottom of the annular connecting passage 38. A plurality of small And the connection passage 39 is connected.

또한 상기 투웨이 스위벨(3)의 회전체(3b) 중심에 형성되어 있는 중심연결통로(37)는 복수의 연결로드(15) 각각의 중심에 연결 형성되는 시멘트풀 공급통로(2a)와 연결되도록 구성되며, 상기 중심연결통로(37)의 주위에 일정간격으로 형성되어 있는 복수의 소형연결통로(39)들은 상기 복수의 연결통로(16)의 시멘트풀 공급통로(2a)를 감싸도록 형성되어 있는 2중관 시멘트풀 공급통로(2b)에 연결되도록 구성되어 있다.The central connecting passage 37 formed at the center of the rotating body 3b of the two-way swivel 3 is connected to the cement pool supplying passage 2a connected to the center of each of the connecting rods 15 And a plurality of small connection passages 39 formed at regular intervals around the center connection passage 37 are formed so as to surround the cement paste supply passage 2a of the plurality of connection passages 16 And is connected to the middle pipe cement pool supply passage 2b.

상기 투웨이 스위벨(3)은 시멘트풀 공급조절밸브(4)로부터 시멘트풀을 공급받도록 구성되어 있으며, 또한 상기 시멘트풀 공급조절밸브(4)는 도시하지 아니한 시멘트풀 펌핑장치로부터 펌핑 공급되는 시멘트풀을 상기 투웨이 스위벨(3)에 형성되어 있는 중심공급통로입구(32) 및 편심공급통로입구(33) 중 어느 하나의 입구를 향해 선택적으로 공급할 수 있도록 구성되어 있다.The two-way swivel 3 is configured to receive the cement paste from the cement pool supply control valve 4 and the cement pool supply control valve 4 is connected to the cement pool supply control valve 4 through a cement pool To the inlet of the central supply passage inlet (32) formed in the two-way swivel (3) and the inlet of the eccentric supply passage inlet (33).

이를 위해, 상기 시멘트풀 공급조절밸브(4)는 원통형으로 형성되는 밸브몸체(41)와, 상기 밸브몸체(41) 내부에 회전가능하게 삽입 설치되는 밸브회전체(42)와, 상기 밸브회전체(42)를 일정각도로 회전시키기 위하여 유압으로 작동하는 작동실린더(43)를 구성하고 있다.(도 6 참조)For this purpose, the cement pool supply control valve 4 includes a valve body 41 formed in a cylindrical shape, a valve body 42 rotatably inserted in the valve body 41, (Refer to Fig. 6) for operating the hydraulic cylinder 42 to rotate at a predetermined angle (see Fig. 6)

또한 상기 밸브몸체(41) 일측에는 축방향을 향해 일정간격으로 형성되는 복수의 주입구(44)가 형성되어 있으며, 상기 밸브회전체(42)의 원주면 일측에는 상기 복수의 주입구(44) 각각에 연통하는 복수의 주입통로(45)가 축방향을 향해 일정간격으로 형성되어 있는데, 상기한 복수의 주입통로(45) 각각은 밸브회전체(42)가 일정각도의 범위 안에서 회전하게 되더라도 복수의 주입구(44)와 연통하는 상태가 될 수 있도록 상기 밸브회전체(42)의 원주방향을 향해 일정 각도의 곡면으로 긴 원호형상으로 형성되어 있다.(도 8 참조)A plurality of injection ports 44 formed at predetermined intervals in the axial direction are formed on one side of the valve body 41. A plurality of injection ports 44 are formed on one side of the circumferential surface of the valve rotation body 42, A plurality of injection passages 45 communicating with each other are formed at predetermined intervals in the axial direction. Each of the plurality of injection passages 45 is provided with a plurality of injection ports 45, (See Fig. 8) with a curved surface at a certain angle toward the circumferential direction of the valve rotating body 42 so as to be in a state of communicating with the valve body 44 (see Fig. 8)

또한 상기 밸브몸체(41)의 타측에는 주입구(41)로 유입되는 시멘트풀을 배출시키기 위한 제1 및 제2 배출구(46)(47)이 일정각도로 형성되어 있는데, 상기 제1 배출구(46)는 주입구(44)의 반대측에 위치하는 상태로 형성되어 있으며, 상기 제2 배출구(47)는 제1 배출구(46)에서 일정각도 벗어난 위치에 형성되어 있으며, 또한 상기 밸브회전체(42)에는 주입통로(45)에 연결되는 배출통로(48)가 밸브회전체(42)를 관통하도록 형성되어 있으며, 상기 배출통로(48)는 작동실린더(43)의 피스톤로드가 출몰작동함에 따라 밸브회전체(42)가 일정각도로 회전하게 될 때마다 제1 배출구(46) 및 제2 배출구(47) 각각에 교대적으로 연결되도록 구성되어 있다.The first and second discharge ports 46 and 47 for discharging the cement paste flowing into the injection port 41 are formed at the other side of the valve body 41 at a predetermined angle. And the second discharge port 47 is formed at a position deviated from the first discharge port 46 by a predetermined angle and the valve rotating body 42 is formed with an injection A discharge passage 48 connected to the passage 45 is formed to penetrate through the valve rotating body 42. The discharge passage 48 is formed so that the piston rod of the operating cylinder 43 is moved 42 are alternately connected to the first outlet 46 and the second outlet 47, respectively.

예를 들어, 상기 작동실린더(43)의 피스톤로드가 출현작동으로 밸브회전체(42)를 시계방향으로 일정각도 회전시키게 될 때에는 배출통로(48)는 제1 배출구(46)에 연결되는 상태가 되며, 이와는 달리 상기 작동실린더(43)의 피스톤로드가 몰입작동으로 밸브회전체(42)를 반시계방향으로 일정각도 회전시키게 될 때에는 배출통로(48)는 제2 배출구(47)에 연결되는 상태가 된다.(도 8 참조)For example, when the piston rod of the operating cylinder 43 rotates the valve rotating body 42 by a predetermined angle in the clockwise direction by the emergence operation, the discharge passage 48 is connected to the first discharge port 46 When the piston rod of the operating cylinder 43 is rotated by a predetermined angle in the counterclockwise direction by the immersion operation, the discharge passage 48 is connected to the second discharge port 47 (See Fig. 8).

또한 상기 시멘트풀 공급조절밸브(4)는 작동실린더(43)의 피스톤로드가 출몰작동함에 따라 밸브회전체(42)를 일정각도의 범위 안에서 왕복회전시킬 수 있도록 하기 위하여 상기 밸브회전체(42)의 일단(42a)을 밸브몸체(41)의 일측으로 돌출되도록 형성한 다음, 상기 일단(42a)에 밸브작동간(49)을 고정 부착하고, 상기 밸브작동간(49)의 자유단에 작동실린더(43)의 피스톤로드 선단을 연결하도록 구성되어 있다.(도 6 및 도 7 참조)The cement pool supply control valve 4 is connected to the valve rotation body 42 so that the piston rod of the operation cylinder 43 can be reciprocated within a certain angle range as the piston rod of the operation cylinder 43 projects / And a valve operation chamber 49 is fixedly attached to the one end 42a of the valve body 41. The valve operating chamber 49 has a free end at the free end thereof, (See Fig. 6 and Fig. 7)

한편, 상기 지반굴착장치(1)는 연약지반을 개량하는 공사를 시공할 때에는 통상 기어박스(14)에 복수단으로 연결 조립되는 복수의 연결로드(15) 및 교반로드(16)를 4축의 굴착로드로 구성하여 시공하게 되며, 또한 오거드라이브유닛(13)의 동력원인 모터는 2대로 형성하여 4축의 굴착로드를 회전시키도록 구성하거나 또는 4축의 굴착로드 각각의 상단에 모터 한대씩 각각 설치하여 각축의 굴착로드를 회전시키는 방법으로 연약지반 개량공사를 시공하게 된다.When the construction for improving the soft ground is to be carried out, the ground excavating machine 1 is provided with a plurality of connecting rods 15 and a stirring rod 16, which are connected and assembled to the gear box 14 at a plurality of stages, And a motor serving as a power source of the auger drive unit 13 may be formed as two motors so as to rotate the excavation rods of four axes. Alternatively, one motor may be provided on each of the excavation rods of the four axes, The soft ground reinforcement work is carried out by rotating the excavating rod of the foundation.

본 발명에서는 상기 지반굴착장치(1)의 기어박스(14)의 상측이나 또는 오거드라이브유닛(13)의 상측에 투웨이 스위벨(3) 및 시멘트풀 공급조절밸브(4)를 설치한 상태에서 연약지반 개량공사를 시공하도록 구성되어 있다.In the present invention, the two-way swivel (3) and the cement pool supply control valve (4) are installed on the upper side of the gear box (14) or the auger drive unit (13) of the ground excavator It is constructed to improve construction.

또한 상기 복수의 연결로드(15) 및 복수의 교반로드(16) 각각은 도 3에 도시되어 있는 바와 같이 암,수 조인트(5a)(5b)에 의하여 수직방향을 향해 복수단으로 연결 조립되는 것이며, 상기 복수의 연결로드(15) 및 교반로드(16) 각각의 중심에 형성되도록 연결되는 시멘트풀 공급통로(2a)는 상기 암,수 조인트(5a)(5b)의 중심을 관통하도록 연결되어 있으며, 또한 상기 암,수 조인트(5a)(5b) 각각에는 시멘트풀 공급통로(2a)를 감싸는 직경을 가지는 2중관 시멘트풀 공급통로(2b)가 연결되어 상기 시멘트풀 공급통로(2a)와 2중관 시멘트풀 공급통로(2b)는 2중관 구조를 형성하도록 구성되어 있다.The plurality of connecting rods 15 and the plurality of stirring rods 16 are connected and assembled in a plurality of stages toward the vertical direction by the male and female joints 5a and 5b as shown in FIG. A cement paste supply passage 2a connected to the center of each of the plurality of connection rods 15 and the stirring rods 16 is connected to penetrate the center of the arm joints 5a and 5b And a double pipe cement pool feed passage 2b having a diameter to enclose the cement paste feed passage 2a is connected to each of the female and male joints 5a and 5b to feed the cement paste feed passage 2a, The cement pool feed passage 2b is configured to form a double pipe structure.

또한 상기 암,수 조인트(5a)(5b)는 2개의 결합핀(53)(54)에 의하여 결합되도록 구성되어 있는데, 이는 4축의 연결로드(15) 각각의 상단에 한대씩의 모터가 설치되도록 구성될 경우에는 암,수 조인트(5a)(5b)에 무거운 하중이 걸리게 되므로 종래와 같이 1개의 결합핀으로 암,수 조인트(5a)(5b)를 결합시킬 경우에는 암,수 조인트의 결합상태가 불완전한 상태가 되어 후술하는 기밀패킹(6)이 쉽게 마모되는 현상이 나타나거나 심한 경우 암,수 조인트(5a)(5b)가 쉽게 마모되어 고장을 일으킬 수 있기 때문에 본 발명에서는 상기 암,수 조인트(5a)(5b)를 2개의 결합핀(53)(54)으로 결합시키도록 구성하여 오거드라이브유닛(13) 등의 하중이 암,수 조인트(5a)(5b)에 집중되는 현상이 나타나게 되더라도 2개로 구성된 결합핀(53)(54)이 상기 암,수 조인트(5a)(5b)의 결합상태를 안전하게 유지할 수 있게 되는 것이다.The arm and male joints 5a and 5b are configured to be coupled by two coupling pins 53 and 54 so that one motor is installed at the upper end of each of the four- A large load is applied to the female and male joints 5a and 5b. Therefore, when the female and male joints 5a and 5b are coupled with one joint pin as in the conventional art, Tightness of the gas-tight packing 6 to be described later may be incomplete or the arm / water joints 5a and 5b may be easily worn out to cause a failure, Even if a phenomenon occurs in which the load of the auger drive unit 13 or the like is concentrated on the male and female joints 5a and 5b by the two engaging pins 5a and 5b being coupled by the two engaging pins 53 and 54 The two engagement pins 53 and 54 securely engage the male and male joints 5a and 5b Which will allow you avoid.

또한 상기 암,수 조인트(5a)(5b)에는 2중관 시멘트풀 공급통로(2b)를 통해 공급되는 시멘트풀이 잘 흐를 수 있도록 시멘트풀 공급통로(2a)의 외경보다 큰 내경을 가지는 시멘트풀 배출통로(51)(52)가 각각 형성되어 있으며, 상기 암,수 조인트(5a)(5b) 사이에는 시멘트풀이 누설되지 아니하는 상태로 공급되도록 하는 기밀패킹(6)이 하나씩 개재되어 있다.The cement paste supply passage 2a has a larger inner diameter than the outer diameter of the cement paste supply passage 2a so that the cement paste supplied through the double pipe cement paste supply passage 2b can flow smoothly to the female and male joints 5a and 5b. (51) and (52) are formed respectively. Each of the gas tight joints (5a) and (5b) is provided with a gas tight packing (6) for supplying cement paste in a state that the cement paste is not leaked.

상기 기밀패킹(6)은 도 4에 도시되어 있는 바와 같이 내링(61)과 외링(62) 그리고 상기 내,외링(61)(62) 사이에 개재되는 금속링(63)으로 구성되어 있으며, 상기 금속링(63)의 두께는 내,외링(61)(62)의 직경보다 작은 규격으로 형성되어 있으며, 또한 상기 금속링(63)에는 시멘트풀이 막힘없이 배출될 수 있도록 하기 위하여 시멘트풀이 잘 흐를 수 있도록 원주방향으로 길게 형성되는 복수의 장공(64)이 일정간격으로 형성되어 있는데, 상기 복수의 장공(64)은 내,외링(61)(62) 사이에 원형으로 형성되는 것에 비하여 단면적을 크게 형성할 수 있게 되므로 시멘트풀이 막히지 않고 원활하게 배출 수 있도록 하는 작용을 하게 된다.The airtight packing 6 is composed of a metal ring 63 interposed between the inner ring 61 and the outer ring 62 and the inner and outer rings 61 and 62 as shown in FIG. The thickness of the metal ring 63 is smaller than the diameter of the inner and outer rings 61 and 62. The cement paste can flow well in the metal ring 63 so that the cement paste can be discharged without clogging. A plurality of long holes 64 are formed at predetermined intervals in the circumferential direction so as to have a larger cross sectional area than the circular holes formed between the inner and outer rings 61 and 62 It is possible to smoothly discharge the cement paste without clogging.

또한 상기 기밀패킹(6)의 내,외링(61)(62)은 금속링(63)의 두께보다 큰 직경으로 형성되어 있으므로 암,수 조인트(5a)(5b)에 무거운 하중이 집중되는 현상이 나타나게 되더라도 금속링(63)이 암,수 조인트(5a)(5b)에 직접적으로 닿지 않도록 하는 작용을 하게 되며(도 3 참조), 이에 따라 상기 수 조인트(5b)에 형성되어 있는 시멘트풀 배출통로(51)를 통해 배출되는 시멘트풀은 누설되지 않고 암 조인트(5a)의 시멘트풀 배출통로(52)를 통해 배출이 잘 이루질 수 있게 되는 것이다.Since the inner and outer rings 61 and 62 of the airtight packing 6 are formed to have diameters larger than the thickness of the metal ring 63, a phenomenon that a heavy load is concentrated on the female and male joints 5a and 5b The metal ring 63 does not directly contact the male and male joints 5a and 5b (see FIG. 3), so that the cement paste discharge passage formed in the male joint 5b, The cement paste discharged through the cement paste outlet 51 can be discharged through the cement pool discharge passage 52 of the arm joint 5a without leakage.

또한 본 발명에서는 상기 지반굴착장치(1)의 복수의 교반로드(16)로 연약지반을 굴착할 때에는 상기 복수의 교반로드(16)가 한 방향(예를 들면, 정회전 방향)으로 회전하면서 하강하는 작동으로 연약지반을 굴착하는 동시에 시멘트풀이 교반로드(16)의 하단측에서 토출되도록 함으로써 하강하게 되는 복수의 교반날개(160)들이 하단측에서 토출되는 시멘트풀을 굴착되는 토사에 혼합시키면서 굴착작동을 진행하도록 구성되어 있으며, 또한 설정된 깊이까지 굴착작동을 완료하게 되더라도 상기 교반로드(16)는 계속하여 한 방향(정회전 방향)으로 회전시키는 상태에서 지상을 향해 상승하도록 인발작동이 이루어지게 되는데, 이때 상기 교반로드(16)를 상승시키는 인발작동이 시작될 때에는 시멘트풀이 교반로드(16)의 상단측에서 토출되도록 함으로써 상승하는 복수의 교반날개(16)들이 교반로드(16)의 상단측에서 토출되는 시멘트풀을 토사에 고르게 혼합시킬 수 있도록 구성되어 있다.Further, in the present invention, when the soft ground is excavated by the plurality of stirring rods 16 of the ground excavating apparatus 1, the plurality of stirring rods 16 are rotated in one direction (for example, normal rotation direction) A plurality of stirring vanes 160 which are lowered by causing the cement paste to be discharged from the lower end of the stirring rod 16 are mixed with the excavated cement paste discharged from the lower end, The drawing operation is performed so that the stirring rod 16 continues to rotate in one direction (normal rotation direction) and rises toward the ground even if the excavation operation is completed up to the set depth, At this time, when the pulling operation to raise the stirring rod 16 is started, the cement paste is discharged from the upper end of the stirring rod 16, A plurality of stirring blades 16 are is configured to be capable of evenly mixing the cement paste to be discharged from the upper end side of the stirring rod 16 in the soil.

이를 위해, 상기 복수의 교반로드(16)에는 도 2에 도시되어 있는 바와 같이 하단측에 시멘트풀 공급통로(2a)의 하단에 연결되는 하나 이상의 하단 토출구(21)를 형성하고 있으며, 상기 복수의 교반로드(16)의 상단측에는 2중관 시멘트풀 공급통로(2b)의 하단에 연결되는 하나 이상의 상단 토출구(22)를 형성하고 있다.As shown in FIG. 2, the plurality of stirring rods 16 are provided with one or more lower discharge ports 21 connected to the lower end of the cement paste supply passage 2a at the lower end thereof, At the upper end side of the stirring rod 16, at least one upper discharge port 22 connected to the lower end of the double pipe cement pool supply passage 2b is formed.

또한 상기 하단 토출구(21)는 교반로드(16)의 하단을 통해 시멘트풀을 토출시키도록 구성되어 있으며, 상기 상단 토출구(22)는 교반날개(160)에 형성되어 있는 토출통로(23)를 통해 시멘트풀을 토출시키도록 구성되어 있다.The lower discharge port 21 is configured to discharge the cement paste through the lower end of the stirring rod 16 and the upper discharge port 22 is connected to the upper discharge port 22 through the discharge passage 23 formed in the stirring blade 160 Thereby discharging the cement paste.

한편, 본 발명에서는 투웨이 스위벨(3)에 형성되어 있는 중심공급통로입구(32)와 편심공급통로입구(33) 각각에 선택적으로 시멘트풀을 공급하는 시멘트풀 공급조절밸브(4)를 구비하고 있으므로 1대의 시멘트풀 펌핑장치를 이용하게 되더라도 시멘트풀을 시멘트풀 공급통로(2a) 및 2중관 시멘트풀 공급통로(2b)에 선택적으로 공급할 수 있게 되지만, 상기 시멘트풀 공급조절밸브(4)를 이용하지 않고 2대의 시멘트풀 펌핑장치를 이용하여 투웨이 스위벨(3)의 중심공급통로입구(32) 및 편심공급통로입구(33) 각각에 시멘트풀을 선택적으로 공급할 수도 있는 것이다.In the present invention, the cement pool supply control valve 4 for selectively supplying the cement paste to the central supply passage inlet 32 and the eccentric supply passage inlet 33 formed in the two-way swivel 3 is provided It is possible to selectively supply the cement paste to the cement paste supply passage 2a and the double pipe cement paste supply passage 2b even if one cement pool pumping device is used but the cement paste supply control valve 4 is not used The two cement pool pumping apparatuses may be used to selectively supply the cement paste to the central supply passage inlet 32 and the eccentric supply passage inlet 33 of the two-way swivel 3, respectively.

또한 본 발명은 연약지반 개량공사를 시공하는데 사용할 수 있음은 물론이고 지중 물막이 연속 차수벽 구축공사 등을 시공하는 데에도 적용할 수 있는 것이다.In addition, the present invention can be applied not only to the construction of the soft ground improvement work but also to the construction of the continuous water barrier wall construction work.

이와 같이 구성된 본 발명의 지반굴착장치(1)를 이용하여 연약지반 개량공사를 시공하는 연약지반개량 DCM 장치의 작용을 설명함에 있어서는 DCM 공법으로 연약지반을 굴착하는 작동과 함께 시멘트풀을 토출시키는 작동을 동시에 진행하는 방법으로 굴착되는 토사와 토출되는 시멘트풀을 혼합하는 굴착단계와, 연약지반을 설정된 깊이까지 굴착작동을 완료하고 교반로드(16)를 지상으로 인발할 때 교반로드(16)를 굴착작동할 때와 마찬가지로 한 방향(예들 들면, 정회전 방향)으로 회전시키는 동시에 시멘트풀을 토출시키면서 교반날개(160)의 교반작동으로 시멘트풀과 토사를 혼합하면서 인발하는 인발단계를 구분하여 설명하기로 하며, 본 발명의 연약지반개량 DCM 장치 및 공법에 대한 구체적인 작용에 대하여 설명하면 다음과 같다.In describing the operation of the soft ground improvement DCM apparatus for constructing the soft ground improvement work using the ground excavating apparatus 1 of the present invention having the above-described structure, the operation for excavating the soft ground by the DCM method and the operation for discharging the cement pool The excavation step of mixing the excavated soil and the discharged cement paste by a method of simultaneously advancing the excavation rod 16 to a predetermined depth, The drawing step in which the cement paste is discharged while mixing the cement paste and the gypsum by the stirring operation of the stirring vane 160 while rotating the same in one direction (for example, the normal rotation direction) The concrete operation of the soft ground improvement DCM apparatus and method according to the present invention will be described as follows.

먼저, 연약지반을 설정된 깊이로 굴착하는 굴착단계에 대하여 설명한다.First, the excavation step of excavating the soft ground to a set depth will be described.

도 1의 도시와 같이 지상에 수직상으로 고정 설치되어 있는 리더(12)를 따라 상,하로 승강이동하는 오거드라이브유닛(13)의 하단에 설치되어 있는 기어박스(14)에 4축을 형성하도록 복수의 연결로드(15)와 복수의 교반로드(16) 각각을 연결 조립하여 설치하며, 상기 복수의 교반로드(16) 각각의 하단에 오거헤드(17)를 하나씩 연결 조립한 상태에서 연약지반을 굴착하게 되는데, 상기 복수의 교반로드(16) 각각의 하단에 연결된 각 오거헤드(17)가 지상에서 지하의 일정 깊이까지 굴착하는 동안에는 시멘트풀을 주입시키지 아니하고, 상기 각 오거헤드(17)가 어느 정도 설정된 깊이까지 연약지반을 굴착하였을 때부터 굴착되는 토사층으로 시멘트풀을 주입하는 작동을 시작하게 되는 것이다.As shown in Fig. 1, the gear box 14 provided at the lower end of the auger drive unit 13, which vertically moves up and down along the reader 12 fixedly installed on the ground, And the auger heads 17 are connected to the lower ends of the plurality of stirring rods 16 one by one and are connected to the connecting rods 15 and the plurality of stirring rods 16, While the auger heads 17 connected to the lower end of each of the plurality of stirring rods 16 are excavated from the ground up to a certain depth in the ground, the cement pools are not injected, When the soft ground is excavated to the set depth, the cement paste is injected into the excavated soil layer.

굴착단계에서 연약지반을 굴착할 때에는 오거헤드(17), 교반로드(16), 연결로드(15) 등을 모두 한 방향(정회전 방향)으로 회전시키는 동시에 하강시키면서 지반을 굴착하게 되며, 상기와 같이 오거헤드(17)가 시멘트풀이 주입되는 깊이까지 연약지반을 굴착하게 되면, 이때부터는 지상에 설치되어 있는 시멘트풀 펌핑장치(미도시)를 작동시켜 시멘트풀 공급조절밸브(4)에 형성되어 있는 복수의 주입구(44) 각각에 연결되어 있는 복수의 메인공급호스(100)를 통해 시멘트풀을 공급하게 되는데, 이때 연약지반을 굴착하는 굴착단계에서는 시멘트풀 공급조절밸브(4)의 작동실린더(43)가 작동하여 피스톤로드를 출현작동시켜서 밸브작동간(49)을 반시계방향(도 6의 화살표 부분 참조)으로 일정각도 회전시키게 되면 밸브몸체(41)에 회전가능하게 삽입 설치되어 있는 밸브회전체(42)도 반시계방향으로 일정각도 회전하게 되며, 이에 따라 상기 밸브회전체(42)에 형성되어 있는 배출통로(48)가 제1 배출구(46)와 연결되는 상태가 되며(도 8의 (ㄱ) 참조), 따라서 상기 시멘트풀 공급조절밸브(4)에 형성된 복수의 주입구(44)로 유입되는 시멘트풀은 제1 배출구(46)에 연결되어 있는 복수의 중심연결호스(200) 각각을 통해 투웨이 스위벨(3)의 중심공급통로입구(32)로 공급되는 것이다.(도 1의 확대부분 참조)When the soft ground is excavated in the excavation step, the auger head 17, the stirring rod 16, the connecting rod 15, etc. are all rotated in one direction (normal rotation direction) When the auger head 17 excavates the soft ground up to the depth where the cement pool is injected, the cement pool pumping device (not shown) installed on the ground is operated from this time to form the cement pool supply control valve 4 The cement paste is supplied through the plurality of main supply hoses 100 connected to the respective plurality of injection ports 44. At this time, in the excavation step of excavating the soft ground, the operation cylinder 43 of the cement pool supply control valve 4 Is actuated to cause the piston rod to appear and operate so that the valve operating passage 49 is rotatably inserted into the valve body 41 when the valve operating passage 49 is rotated in a counterclockwise direction (see the arrow in FIG. 6) The discharge passage 48 formed in the valve rotating body 42 is connected to the first discharge port 46 as shown in Figure 8 The cement pool introduced into the plurality of injection ports 44 formed in the cement pool supply control valve 4 is connected to the plurality of central connection hoses 200 connected to the first discharge port 46 To the central supply passage inlet 32 of the two-way swivel 3 (see the enlarged portion of FIG. 1).

상기와 같이 투웨이 스위벨(3)의 중심공급통로입구(32)로 공급되는 시멘트풀은 중심공급통로(34), 중심연결통로(37)를 통해 복수의 연결로드(16) 각각의 중심에 연결 형성되어 있는 시멘트풀 공급통로(2a)로 공급되어 복수의 교반로드(16) 각각의 하단측에 형성되어 있는 하단 토출구(21)를 통해 굴착되는 토사층으로 토출되는 것이며, 상기 복수의 교반로드(16) 각각의 하단측에 하나 이상씩 형성되어 있는 하단 토출구(21)에서 토출되는 시멘트풀은 하강하면서 회전하게 되는 복수의 교반날개(160)들의 회전작동에 의하여 굴착되는 토사에 혼합 교반되는 상태가 되는 것이며, 이와 같이 연약지반을 굴착하는 굴착단계에서는 상기 교반로드(16)의 하단 토출구(21)를 통해 토출되는 시멘트풀이 하강하면서 회전하는 복수의 교반날개(160)들의 회전작동에 의해 굴착되는 토사에 고르게 혼합 교반되는 작용이 잘 이루어지게 되는데, 이때 상기 교반로드(16)의 하단 토출구(21)에서 토출되는 시멘트풀은 도 9의 도시와 같이 복수의 교반날개(160)들의 회전반경영역 중 내측영역(H1)에는 60∼80% 정도가 혼합되고 외측영역(H2)에는 20∼40% 정도가 혼합되는 것이며, 이와 같이 굴착되는 토사와 토출되는 시멘트풀을 혼합 교반시키는 작동은 연약지반을 설정된 깊이까지 굴착하는 동안 지속적으로 동일하게 이루어지게 되므로 굴착단계에서 오거헤드(17)에 의해 굴착되는 토사와 하단 토출구(21)에서 토출되는 시멘트풀은 고르게 혼합 교반되는 상태가 되는 것이다.As described above, the cement paste supplied to the central supply passage inlet 32 of the two-way swivel 3 is connected to the center of each of the plurality of connection rods 16 via the central supply passage 34 and the central connecting passage 37 And is discharged through a lower discharge port 21 formed at the lower end of each of the plurality of stirring rods 16 to a soil layer which is excavated through the lower discharge port 21. The plurality of stirring rods 16, The cement paste discharged from the lower discharge port 21 formed at the lower end of each of the lower cascades is mixed and agitated with the excavated gravels by the rotation operation of the plurality of stirring vanes 160 rotating while descending The cement paste discharged through the lower discharge port 21 of the stirring rod 16 is excavated by the rotation operation of the plurality of stirring vanes 160 rotating while descending, 9, the cement paste discharged from the lower discharge port 21 of the stirring rod 16 is discharged to the outside of the rotating radius region of the plurality of stirring blades 160 an inner region (H 1) is operated for about 60 to 80% and the mixture will be 20 to 40%, the degree of mixing outside region (H 2), thus stirred mixture of cement paste and gravel is discharged to be excavated is soft ground The cement paste discharged from the lower discharge port 21 and the soil excavated by the auger head 17 are equally mixed and agitated during the excavation step.

다음, 연약지반을 설정된 깊이까지 굴착하는 작동이 완료되면 곧바로 교반로드(16)를 지상으로 상승시키는 인발단계가 진행되는데, 이에 대하여 설명한다.Next, when the operation of excavating the soft ground up to a set depth is completed, a drawing step of raising the stirring rod 16 to the ground is proceeded.

인발단계는 연약지반을 설정된 깊이까지 굴착하는 굴착단계에서 연결로드(15), 교반로드(16), 오거헤드(17) 등을 한 방향(정회전 방향)으로 회전시키면서 굴착작동을 진행하여 설정된 깊이까지 굴착작동을 진행한 후에도 회전작동을 멈추지 아니한 채 계속해서 한 방향(정회전 방향)으로 회전하는 작동이 진행되도록 하면서 상기 연결로드(15), 교반로드(16), 오거헤드(17) 등을 지상으로 상승시키는 단계를 말한다.In the drawing step, the excavation operation is performed while rotating the connection rod 15, the stirring rod 16, the auger head 17, and the like in one direction (normal rotation direction) in the excavation step of excavating the soft ground up to a set depth, The agitation rod 16, the auger head 17, and the like, while continuing to rotate in one direction (normal rotation direction) without stopping the rotation operation even after the excavation operation has been proceeded It refers to the step of ascending to the ground.

따라서 굴착단계의 완료 후 곧바로 이어지게 되는 인발단계의 시작시 오거드라이브유닛(13)의 동력원인 모터에 과부하가 걸리지 않게 되는 것이며, 그 이유는 인발단계에서도 굴착단계에서 교반로드(16) 등을 한 방향(정회전 방향)으로 회전시키는 회전력을 이용하여 교반로드(16) 등을 한 방향으로 회전시킬 수 있기 때문이다.Therefore, at the start of the drawing step immediately following the completion of the excavation step, the motor, which is the power source of the auger drive unit 13, is not overloaded because the stirring rod 16 or the like is moved in one direction And the stirring rod 16 or the like can be rotated in one direction by using a rotating force to rotate the stirring rod 16 in the forward direction (forward rotation direction).

상기 인발단계가 시작될 때에는 시멘트풀 공급조절밸브(4)의 작동실린더(43)가 작동하여 피스톤로드를 몰입작동시키게 되면 상기 시멘트풀 공급조절밸브(4)의 밸브작동간(49)이 시계방향으로 일정각도 회전시키게 되며, 이에 따라 상기 밸브몸체(41)에 회전가능하게 삽입 설치되어 있는 밸브회전체(42)가 시계방향으로 일정각도 회전하게 되므로써 상기 밸브회전체(42)에 형성되어 있는 배출통로(48)는 제2 배출구(47)에 연통하는 상태가 되는데, 이때 상기 밸브회전체(42)가 시계방향으로 일정각도 회전하게 되더라도 주입통로(45)는 주입구(44)와 연결되는 상태를 그대로 유지하고 있게 된다.(도 8의 (ㄴ) 참조)When the pulling step is started, when the operating cylinder 43 of the cement pool supply control valve 4 is actuated to cause the piston rod to be immersed, the valve operating passage 49 of the cement pool supply control valve 4 is moved clockwise The valve body 42 rotatably inserted into the valve body 41 rotates in a clockwise direction at a predetermined angle so that the valve body 42 is rotated in the clockwise direction, Even if the valve rotating body 42 rotates at a predetermined angle in the clockwise direction at this time, the injection path 45 is in the state of being connected to the injection port 44 as it is (See Fig. 8 (b)).

따라서 상기 지반굴착장치(1)의 외부에 설치되어 있는 시멘트풀 펌핑장치(미도시)에서 펌핑 공급되는 시멘트풀이 복수의 메인공급호스(100)를 통해 시멘트풀 공급조절밸브(4)의 밸브몸체(41)에 형성되어 있는 복수의 주입구(44)로 주입되는데, 이때 상기 시멘트풀 공급조절밸브(4)의 밸브회전체(42)는 도 8의 (ㄴ)에 도시되어 있는 바와 같이 일정각도 회전된 상태에서 주입구(44)와 제2 배출구(47)를 연결시키는 상태를 유지하고 있게 되므로 상기 밸브회전체(42)에 형성되어 있는 복수의 주입구(44)로 주입되는 시멘트풀은 주입통로(45), 배출통로(48)를 통해 제2 배출구(47)로 배출되는 상태가 되는 것이다.The cement pool pumped and supplied from the cement pool pumping apparatus (not shown) provided outside the ground excavation apparatus 1 is supplied to the valve body (not shown) of the cement pool supply control valve 4 through the plurality of main supply hoses 100 The valve rotating body 42 of the cement pool supply control valve 4 is rotated at a predetermined angle as shown in FIG. 8 (b) The cement pulses injected into the plurality of injection ports 44 formed in the valve rotation body 42 are injected into the injection passage 45 and the second injection port 44, , And is discharged to the second discharge port (47) through the discharge passage (48).

또한 상기 시멘트풀 공급조절밸브(4)의 제2 배출구(47)와, 상기 투웨이 스위벨(3)의 편심공급통로입구(33)는 복수의 편심연결호스(300)에 의하여 연결(도 1의 확대부분 참조)되어 있으므로, 시멘트풀 펌핑장치(미도시)에 의하여 복수의 메인공급호스(100)로 펌핑 공급되는 시멘트풀은 상기 시멘트풀 공급조절밸브(4)에 형성되어 있는 복수의 주입구(44) 각각으로 주입되는데, 이와 같이 복수의 주입구(44) 각각으로 주입되는 시멘트풀은 주입통로(45), 배출통로(48)를 통과하여 제2 배출구(47)에 연결되어 있는 편심연결호스(300)를 통해 투웨이 스위벨(3)의 편심공급통로입구(33)로 공급된다.The second discharge port 47 of the cement pool supply control valve 4 and the eccentric supply passage inlet 33 of the two-way swivel 3 are connected by a plurality of eccentric connection hoses 300 The cement pools pumped and supplied to the plurality of main supply hoses 100 by the cement pool pumping device (not shown) are supplied to the plurality of injection ports 44 formed in the cement pool supply control valve 4, The cement paste injected into each of the plurality of injection ports 44 is injected into the eccentric connection hose 300 through the injection passage 45 and the discharge passage 48 and connected to the second discharge port 47, To the eccentric feed passage inlet (33) of the two-way swivel (3).

상기와 같이 투웨이 스위벨(3)의 편심공급통로입구(33)로 공급되는 시멘트풀은 고정체(3a)의 상면에 환형상으로 형성되어 있는 환형공급통로(35)를 통해서 복수의 2중관 소형공급통로(36)로 각각 균등하게 분배 공급되며, 또한 상기 복수의 2중관 소형공급통로(36)로 각각 분배 공급되는 시멘트풀은 회전체(3b)에 환형상으로 형성되어 있는 환형연결통로(38)를 통해서 복수의 소형연결통로(39) 각각으로 균등하게 분배 공급되는 것인데, 상기 회전체(3b)에 형성되어 있는 복수의 소형연결통로(39)는 연결로드(15)의 중심에 형성된 시멘트풀 공급통로(2a)를 감싸도록 형성된 2중관 시멘트풀 공급통로(2b)와 연결되도록 구성되어 있으므로, 이에 의해 상기 투웨이 스위벨(3)의 회전체(3b)에 형성되어 있는 복수의 소형연결통로(39)를 통해 배출되는 시멘트풀은 상기 연결로드(15)에 형성되어 있는 2중관 시멘트풀 공급통로(2b)로 공급되는 것이다.As described above, the cement paste supplied to the eccentric supply passage inlet 33 of the two-way swivel 3 is supplied through the annular supply passage 35 formed on the upper surface of the fixture 3a, And the cement pulses distributed and supplied to the plurality of double pipe small supply passages 36 are supplied to the annular connecting passages 38 formed in the annular shape in the rotating body 3b, And a plurality of small connecting passages 39 formed in the rotating body 3b are connected to the plurality of small connecting passages 39 through a plurality of small connecting passages 39 through a plurality of small connecting passages 39, A plurality of small connecting passages 39 formed in the rotating body 3b of the two-way swivel 3 are connected to the double pipe cement paste supplying passage 2b formed to enclose the passage 2a, And the cement paste And is supplied to the double-pipe cement pool feed passage 2b formed in the hopper 15.

상기와 같이 연결로드(15)에 형성되어 있는 2중관 시멘트풀 공급통로(2b)로 시멘트풀이 공급될 때에는 연결로(15), 교반로드(16)의 각 중심에 형성되어 있는 시멘트풀 공급통로(2a)에는 시멘트풀이 공급되지 않게 되는 반면, 상기 교반로드(16)의 상단측에 형성되어 있는 상단 토출구(22)까지는 2중관 시멘트풀 공급통로(2b)가 형성되어 있으므로 상기 2중관 시멘트풀 공급통로(2b)로 공급되는 시멘트풀은 교반로드(16)의 상단 토출구(22)까지 공급되며, 상기 상단 토출구(22) 부분까지 공급되는 시멘트풀은 교반날개(160)에 형성되어 있는 토출통로(23)를 통해 토출되는 것이며, 이와 같이 상기 교반날개(160)에 형성되어 있는 토출통로(23)로 토출되는 시멘트풀은 그 하측에 형성되어 있는 복수의 교반날개(160)들이 상승하면서 회전하는 작동에 의하여 토사에 고르게 혼합되는데, 이때 상기 교반로드(16)의 상단 토출구(22)를 통해 토출통로(23)로 토출되는 시멘트풀은 상승작동을 하는 복수의 교반날개(16)들에 의하여 도 10의 도시와 같이 교반날개(160)의 회전반경영역 중 외측영역(H2)에는 60∼80% 정도가 혼합되고, 내측영역(H1)에는 20∼40% 정도가 혼합되는 것이다.When the cement paste is supplied to the double pipe cement paste supply passage 2b formed in the connection rod 15 as described above, the cement paste supply passage (not shown) formed at each center of the connection passage 15 and the stirring rod 16 Cement paste supply passage 2b is formed up to the upper discharge port 22 formed at the upper end of the stirring rod 16 so that the cement paste supply passage 2b is not formed in the double- The cement paste supplied to the upper discharge port 22 is supplied to the upper discharge port 22 of the stirring rod 16 through the discharge passage 23 formed in the stirring vane 160 The cement paste discharged into the discharge passage 23 formed in the stirring vane 160 is rotated by the plurality of stirring blades 160 formed on the lower side thereof while being rotated By the way, At this time, the cement paste discharged to the discharge passage 23 through the upper discharge port 22 of the stirring rod 16 is rotated by the plurality of stirring vanes 16 performing the ascending operation, About 60% to about 80% are mixed in the outer region H 2 and about 20% to about 40% are mixed in the inner region H 1 .

따라서 상기와 같이 교반로드(16)를 하강시키면서 굴착단계에서 토사에 시멘트풀을 토사에 혼합시키는 작동과 교반로드(16)를 상승시키는 인발단계에서 토사에 혼합시키는 작동을 완료하게 될 때에는 상기 교반로드(16)에 형성된 복수의 교반날개(160)의 회전반경영역인 내,외측영역(H1)(H2)에는 시멘트풀이 고르게 혼합되는 상태로 연약지반을 개량할 수 있게 되는 것이다.Therefore, when the operation of mixing the cement paste to the gravel and the operation of mixing the gravel to the soil in the drawing step in which the stirring rod 16 is lifted is completed in the excavation step while lowering the stirring rod 16 as described above, The soft ground can be improved in a state in which the cement paste is uniformly mixed in the inner and outer regions H 1 and H 2 , which are the rotation radius regions of the plurality of stirring vanes 160 formed on the inner wall 16.

이상에서 설명한 바와 같이 본 발명은 지반굴착장치(1)를 이용하여 연약지반 개량공사를 시공하기 위하여 복수 축으로 구성되는 연결로드(15), 교반로드(16), 오거헤드(17) 등으로 연악지반을 굴착하는 굴착단계에서는 시멘트풀 펌핑장치로부터 공급되는 시멘트풀이 교반로드(16)의 하단측에 형성되어 있는 하단 토출구(21)를 통해 토출되도록 함으로써 하강하면서 한 방향(정회전 방향)으로 회전하는 교반로드(16)에 형성되어 있는 복수의 교반날개(160)들이 상기 하단 토출구(21)에서 토출되는 시멘트풀을 굴착되는 토사와 함께 교반하여 혼합이 잘 이루어지도록 하며, 연약지반을 설정된 깊이까지 굴착을 완료한 후 교반로드(16) 등을 지상으로 인발하고자 할 때에는 교반로드(16) 등의 회전작동을 멈추지 않고 굴착단계와 같이 교반로드(16) 등을 한 방향(정회전 방향)으로 계속 회전시키면서 상승시키는 동시에 상기 교반로드(16)의 상단측에 형성되어 있는 상단 토출구(22)를 통해 시멘트풀이 토출되도록 함으로써 상기 상단 토출구(22)의 하측에서 회전하면서 상승하는 복수의 교반날개(160)들이 상단 토출구(22)에서 토출되는 시멘트풀과 토사를 교반하여 혼합이 잘 이루어지도록 함으로써 연약지반 개량공사를 효율적으로 시공할 수 있도록 하는 특징이 있는 것이다.As described above, according to the present invention, in order to construct the soft ground improvement work by using the ground excavator 1, the connection rods 15, the stirring rods 16, the auger heads 17, In the excavation step for excavating the ground, the cement pool supplied from the cement pool pumping device is rotated in one direction (normal rotation direction) while descending by being discharged through the lower discharge port 21 formed at the lower end side of the stirring rod 16 A plurality of agitating blades 160 formed on the agitating rod 16 agitate the cement paste discharged from the lower discharge port 21 with the excavated soil to be mixed well and excavate the soft ground to a set depth When the stirring rod 16 or the like is pulled out to the ground, the stirring rod 16 or the like is rotated in one direction And the cement paste is discharged through the upper discharge port 22 formed at the upper end of the stirring rod 16 so that the plurality of agitating rolls 16, which rotate while rotating at the lower side of the upper discharge port 22, The wings 160 are mixed with the cement paste discharged from the upper discharge port 22 and the earth and sand so as to be mixed well so that the soft ground improvement work can be efficiently carried out.

1 : 지반굴착장치 10 : 크롤러 크레인
12 : 리더 13 : 오거드라이브유닛
14 : 기어박스 15 : 연결로드
16 : 교반로드 17 : 오거헤드
2a : 시멘트풀 공급통로 2b : 2중관 시멘트풀 공급통로
21 : 하단 토출구 22 : 상단 토출구
23 : 토출통로 3 : 투웨이 스위벨
3a : 고정체 3b : 회전체
31 : 고정덮개 32 : 중심공급통로입구
33 : 편심공급통로입구 34 : 중심공급통로
35 : 환형공급통로 36 : 2중관 소형공급통로
37 : 중심연결통로 38 : 환형연결통로
39 : 소형연결통로 4 : 시멘트풀 공급조절밸브
41 : 밸브몸체 42 : 밸브회전체
43 : 작동실린더 44 : 주입구
45 : 주입통로 46 : 제1 배출구
47 : 제2 배출구 48 : 배출통로
49 : 밸브작동간 5a,5b : 암,수 조인트
51,52 : 시멘트풀 배출통로 53,54 : 결합핀
6 : 기밀패킹 61,62 : 내,외링
63 : 금속링 64 : 장공
100 : 메인공급호스 160 : 교반날개
200 : 중심연결호스 300 : 편심연결호스
1: Ground excavation device 10: Crawler crane
12: reader 13: auger drive unit
14: Gear box 15: Connection rod
16: stirring rod 17: auger head
2a: Cement pool supply passage 2b: Double pipe cement pool supply passage
21: lower discharge port 22: upper discharge port
23: Discharge passage 3: Two-way swivel
3a: fixed body 3b: rotating body
31: Fixing lid 32: Center feed passage inlet
33: eccentric feed passage inlet 34: central feed passage
35: annular supply passage 36: double pipe small supply passage
37: central connecting passage 38: annular connecting passage
39: Small connection passage 4: Cement pool feed control valve
41: valve body 42: valve rotating body
43: operating cylinder 44: inlet
45: injection passage 46: first outlet
47: second outlet 48: exhaust passage
49: Between valve operation 5a, 5b: Female, male joint
51, 52: Cement pool discharge passage 53, 54:
6: Hermetic packing 61, 62: inner and outer rings
63: metal ring 64: long hole
100: main supply hose 160: stirring wing
200: central connecting hose 300: eccentric connecting hose

Claims (7)

모터를 동력원으로 하여 구동하는 오거드라이브유닛(13)과, 상기 오거드라이브유닛의 하단에 형성되어 오거드라이브유닛으로부터 동력을 전달받아 하향을 향해 복수단으로 연결 조립되는 복수의 연결로드(15)를 회전시킬 수 있도록 구성되어 있는 기어박스(14)와, 상기 복수의 연결로드(15) 각각의 하단에 연결 조립되는 복수의 교반로드(16)와, 상기 복수의 교반로드 각각의 하단에 연결 조립되어 지반을 굴착하는 복수의 오거헤드(17)를 구비하고 있으며,
상기 기어박스(14)의 상측에 고정 설치되어 있으며, 상기 복수의 연결로드(15) 및 복수의 교반로드(16) 각각의 중심에 연결되도록 형성되는 중심공급통로(34)와, 상기 중심공급통로를 감싸주는 상태로 2중관 구조를 형성하게 되는 복수의 2중관 소형공급통로(36)를 구비하고 있는 구성에 의해 외부로부터 공급되는 시멘트풀을 상기 중심공급통로(34) 및 상기 복수의 2중관 소형공급통로(36) 각각에 선택적으로 공급할 수 있도록 구성되어 있는 투웨이 스위벨(3)을 구비하고 있으며,
상기 투웨이 스위벨(3)을 이용하여 상기 복수의 연결로드(15) 및 교반로드(16) 각각의 중심에 형성되어 있는 시멘트풀 공급통로(2a)로 시멘트풀을 공급하게 될 때에는 상기 교반로드(16)의 하단측에 형성되어 있는 하단 토출구(21)를 통해 시멘트풀이 토출되도록 하며, 상기 복수의 연결로드(15) 및 교반로드(16) 각각에 형성되어 있는 2중관 시멘트풀 공급통로(2b)로 시멘트풀을 공급하게 될 때에는 상기 교반로드(16)의 상단측에 형성되어 있는 상단 토출구(22)를 통해 시멘트풀을 토출하는 지반굴착장치를 이용하여 연약지반개량공사를 시공하도록 구성되는 연약지반개량 DCM 장치에 있어서,
상기 투웨이 스위벨(3)은 상면에 고정 부착되는 고정덮개(31)의 중심에는 중심공급통로(34)로 시멘트풀을 공급하기 위한 중심공급통로입구(32)가 형성되어 있으며, 상기 고정덮개(31)의 중심공급통로입구(32) 일측에는 일정간격으로 형성되어 있는 복수의 2중관 소형공급통로(36)로 시멘트풀을 공급하기 위한 편심공급통로입구(33)가 편심된 위치에 고정된 상태로 형성되어 있도록 구성된 것을 특징으로 하는 지반굴착장치를 이용한 연약지반개량 DCM 장치.
A plurality of connecting rods (15) formed at a lower end of the auger drive unit and receiving power from the auger drive unit and connected and assembled at a plurality of stages downward, A plurality of stirring rods 16 connected to the lower ends of the plurality of connecting rods 15 and connected to the lower ends of the plurality of stirring rods 15, And a plurality of auger heads 17 for excavating the auger heads 17,
A center supply passage 34 fixed to the upper portion of the gear box 14 and connected to the centers of the plurality of connection rods 15 and the plurality of stirring rods 16, And a plurality of double-pipe small supply passages (36) for forming a double pipe structure in a state of wrapping a plurality of double-pipe small- And a two-way swivel (3) configured to be selectively supplied to each of the supply passages (36)
When the cement paste is supplied to the cement paste feed passage 2a formed at the center of each of the plurality of connecting rods 15 and the stirring rods 16 by using the two way swivel 3, End cement pool supply passage 2b formed in each of the plurality of connecting rods 15 and the stirring rods 16 so as to discharge the cement paste through the lower discharge port 21 formed at the lower end of the stirring rod 16 When the cement pool is to be supplied, the cement paste is discharged through the upper discharge port (22) formed at the upper end of the stirring rod (16), so that the soft ground improvement work In the DCM device,
A center feed passage inlet 32 for feeding a cement paste into the central feed passage 34 is formed at the center of the fixed lid 31 fixedly mounted on the upper surface of the two-way swivel 3, The eccentric supply passage inlet 33 for supplying the cement paste to the plurality of double pipe small supply passages 36 formed at regular intervals is fixed to an eccentric position at one side of the central supply passage inlet 32 Wherein the ground excavation apparatus is constructed such that the ground excavation apparatus is constructed such that the ground excavation apparatus is formed.
삭제delete 제 1 항에 있어서,
상기 투웨이 스위벨(3)은 고정덮개(31)가 고정 부착되는 고정체(3a)와, 상기 복수의 연결로드(15) 각각의 상단에 연결되어 각 연결로드와 같이 회전하도록 형성되는 회전체(3b)로 구성되어 있으며, 상기 고정체(3a)에는 중심공급통로입구(32)와 연통하는 중심공급통로(34)와, 상기 고정체(3a)의 상면에는 중심공급통로(34)와는 별도 분리된 상태로 형성되어 있는 환형공급통로(35)와, 상기 환형공급통로의 바닥과 연통하도록 상기 중심공급통로(34) 주위에 일정간격으로 형성되는 복수의 2중관 소형공급통로(36)가 형성되어 있으며, 상기 회전체(3b)에는 고정체(3a)에 형성되어 있는 중심공급통로(34)와 연결되는 중심연결통로(37)와, 상기 복수의 2중관 소형공급통로(36)들과 연통하도록 형성되는 환형연결통로(38)와, 상기 환형연결통로(38)의 바닥과 연통하도록 형성된 채 중심연결통로(37) 주위에 일정간격으로 형성되는 복수의 소형연결통로(39)가 형성되어 있도록 구성된 것을 특징으로 하는 지반굴착장치를 이용한 연약지반개량 DCM 장치.
The method according to claim 1,
The two-way swivel (3) comprises a fixed body (3a) to which a fixed lid (31) is fixedly mounted, a rotating body (3b) connected to an upper end of each of the plurality of connecting rods The fixed body 3a is provided with a central supply passage 34 communicating with the central supply passage inlet 32 and a central supply passage 34 formed on the upper surface of the fixed body 3a separately from the central supply passage 34. [ A plurality of small-sized-pipe small supply passages 36 formed at regular intervals around the central supply passage 34 so as to communicate with the bottom of the annular supply passage are formed A central connecting passage 37 connected to the central supply passage 34 formed in the fixed body 3a and a plurality of small diameter small supply passages 36 formed in the rotating body 3b so as to communicate with the plurality of double- An annular connecting passage 38 formed to communicate with the bottom of the annular connecting passage 38, Central passageway 37 of soft ground improvement DCM apparatus using a soil drilling apparatus, characterized in that configured so that the plurality of the small communication path (39) formed at regular intervals around is formed.
삭제delete 제 1 항에 있어서,
상기 연약지반개량 DCM 장치는 외부로부터 펌핑 공급되는 시멘트풀을 상기 투웨이 스위벨(3)에 형성되어 있는 중심공급통로입구(32) 및 편심공급통로입구(33) 각각에 선택적으로 공급할 수 있도록 하는 시멘트풀 공급조절밸브(4)를 더 포함하고 있으며,
상기 시멘트풀 공급조절밸브(4)는 고정 설치되는 밸브몸체(41)와, 상기 밸브몸체의 일측에 축방향을 향해 일정간격으로 형성되는 복수의 주입구(44)와, 상기 밸브몸체(41)의 타측에 축방향을 향해 일정간격으로 형성되는 복수의 제1 배출구(46)와, 상기 복수의 제1 배출구에 대하여 일정각도 어긋난 위치에 일정간격으로 형성되는 복수의 제2 배출구(47)와, 상기 밸브몸체(41)의 내측에 회전가능하게 삽입 설치되어 있는 밸브회전체(42)와, 상기 밸브회전체의 일측에 원주방향을 향해 호형상으로 형성된 채 축방향으로 일정간격을 유지하도록 형성되어 있는 복수의 주입통로(45)와, 상기 복수의 주입통로와 연결된 채 상기 제1 및 제2 배출구(46)(47) 각각에 선택적으로 연결되도록 형성되어 있는 복수의 배출통로(48)와, 상기 밸브몸체의 일측에 형성되어 밸브회전체(42)를 시계방향 및 반시계방향으로 일정각도씩 회전시키는 작동실린더(43)가 구성되어 있는 것을 특징으로 하는 지반굴착장치를 이용한 연약지반개량 DCM 장치.
The method according to claim 1,
The soft ground improvement DCM device is a cement pool which selectively supplies a cement pool pumped and supplied from the outside to each of a central supply passage inlet 32 and an eccentric supply passage inlet 33 formed in the two-way swivel 3 Further comprising a supply control valve (4)
The cement pool supply control valve 4 includes a fixed valve body 41, a plurality of injection ports 44 formed at one side of the valve body at predetermined intervals in the axial direction, A plurality of first discharge ports (46) formed on the other side at predetermined intervals toward the axial direction, a plurality of second discharge ports (47) formed at predetermined intervals in a position shifted from the plurality of first discharge ports by a predetermined angle, A valve body 42 rotatably inserted into the valve body 41, and a valve body 42 formed at one side of the valve body so as to be spaced apart in the axial direction A plurality of injection passages (45), a plurality of discharge passages (48) formed to be selectively connected to the respective first and second outlets (46) (47) in connection with the plurality of injection passages, The valve body is formed on one side of the body, 42) is rotated clockwise and counterclockwise by a predetermined angle. The DCM apparatus according to claim 1,
삭제delete 삭제delete
KR1020160104052A 2016-08-17 2016-08-17 DCM soft ground improved apparatus and method using a ground rig KR101922032B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160104052A KR101922032B1 (en) 2016-08-17 2016-08-17 DCM soft ground improved apparatus and method using a ground rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160104052A KR101922032B1 (en) 2016-08-17 2016-08-17 DCM soft ground improved apparatus and method using a ground rig

Publications (2)

Publication Number Publication Date
KR20180019849A KR20180019849A (en) 2018-02-27
KR101922032B1 true KR101922032B1 (en) 2018-11-27

Family

ID=61394462

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160104052A KR101922032B1 (en) 2016-08-17 2016-08-17 DCM soft ground improved apparatus and method using a ground rig

Country Status (1)

Country Link
KR (1) KR101922032B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220103331A (en) 2021-01-15 2022-07-22 서원교 Low noise Excavation Rod for Excavator
KR20230110414A (en) 2022-01-14 2023-07-24 이기연 a soft ground at the bottom of the heart for improvement hydraulic expansion rod type ground excavation device

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101950192B1 (en) * 2018-07-04 2019-02-21 초석건설산업(주) Deep cement mixing equipment and method with upper and lower discharge function
KR20200051187A (en) 2018-11-05 2020-05-13 (주)뉴저스트 Underground piles forming apparatus and method for forming underground piles using the same
KR102566138B1 (en) * 2021-08-19 2023-08-11 고영식 Automatic injection device for cement stabilizer
CN113914397B (en) * 2021-11-25 2022-11-04 中冶成都勘察研究总院有限公司 A slip casting hole guiding hole device for loose fill layer
CN115637750A (en) * 2022-10-17 2023-01-24 中铁工程机械研究设计院有限公司 Rotary joint and double-wheel mill

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001172960A (en) 1999-12-16 2001-06-26 Shohei Senda Ground improving or reinforcing method
JP3236451B2 (en) * 1994-10-04 2001-12-10 株式会社テノックス Excavation stirrer channel switching device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3236451B2 (en) * 1994-10-04 2001-12-10 株式会社テノックス Excavation stirrer channel switching device
JP2001172960A (en) 1999-12-16 2001-06-26 Shohei Senda Ground improving or reinforcing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220103331A (en) 2021-01-15 2022-07-22 서원교 Low noise Excavation Rod for Excavator
KR20230110414A (en) 2022-01-14 2023-07-24 이기연 a soft ground at the bottom of the heart for improvement hydraulic expansion rod type ground excavation device

Also Published As

Publication number Publication date
KR20180019849A (en) 2018-02-27

Similar Documents

Publication Publication Date Title
KR101922032B1 (en) DCM soft ground improved apparatus and method using a ground rig
CN101619572B (en) Hydraulic pressure milling deep-mixing underground-wall machine
KR101527723B1 (en) Complex Ground Improving Devive and Ground Improving Method Using The Same
KR101069107B1 (en) Excavation Stirring Device for Ground Improvement
KR101883328B1 (en) Single two-way swivel rotary drilling rigs in the ground
JP5078511B2 (en) Embedded pile method using earth drill machine
KR101230320B1 (en) Soft ground improvement method excavating rod of ground excavating device
JP2007255133A (en) Soil cement preparation device having agitating auxiliary blade
JP2608022B2 (en) Earth auger
KR102155343B1 (en) Drive reducer for double casing-auger
KR101613289B1 (en) Ground excavating device having function of auto up and down of excavating rod for construction continued wall preventing water flowing of underground
JP2004137722A (en) Drill/stir bit of underground pile formation and ground improvement method making use thereof
KR101511653B1 (en) A reverse stirring device and high-strength deep cement mixing method using thereof
KR100512095B1 (en) Excavator bit using UCM method
KR101989937B1 (en) Cement pool top and bottom discharge system using single swivel of ground excavation equipment
KR200275366Y1 (en) Series of wall structure method
KR100491876B1 (en) UCM method and drilling road of ground drilling rigs using UCM method
JP4365695B2 (en) Drilling rig
KR100451962B1 (en) Series of wall structure method and device
JP7480381B1 (en) Soil improvement device, soil removal method in soil improvement method, and spiral rod used therein
CN212129126U (en) A triaxial bores and digs mixer for mixing stake construction
KR101069031B1 (en) Excavation Stirring Device for Ground Improvement
JPH10195911A (en) Excavating, mixing and agitating equipment for construction machinery
JP2004239051A (en) Ground excavation method
KR200314982Y1 (en) UCM method and drilling road of ground drilling rigs using method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant