Prior art keywords
joint
joint bar
concrete
fixing member
formwork
Prior art date
Application number
KR1020180045374A
Other languages
Korean (ko)
Inventor
김운석
Original Assignee
김운석
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김운석 filed Critical 김운석
Priority to KR1020180045374A priority Critical patent/KR101899860B1/en
Application granted granted Critical
Publication of KR101899860B1 publication Critical patent/KR101899860B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/005Strips for covering joints between form sections, e.g. to avoid burring or spilling of laitance
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/10Forming or shuttering elements for general use with additional peculiarities such as surface shaping, insulating or heating, permeability to water or air

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Disclosed is a construction method of a wall body of a concrete building capable of easily constructing a wall body. The construction method of a wall body of a concrete building according to the present invention comprises: a rebar foundation installing step of installing a rebar foundation at a location where a wall body is constructed; a mold manufacturing step of continuously installing plate-shaped mold bodies, mounting joint bar fixing members on the front surfaces of the mold bodies, and manufacturing a mold for joints; a mold arranging step of arranging the molds to face each other and to be spaced apart from each other; a concrete curing step of curing concrete between the molds; a component removing step of removing the molds, a D cone, bolts, square washers, and nuts before the concrete is completely hardened; and a mold dismantling step of dismantling the molds to separate the mold bodies from the joint bars.

Description

콘크리트 건물의 벽체 시공방법{Construction method of concrete building wall} Technical Field [0001] The present invention relates to a method of constructing a concrete building wall,

본 발명은 콘크리트 건물 시공방법에 관한 것으로, 보다 상세하게는, 건물의 외부 및 내부를 구획하는 내부 벽체의 시공 시, 벽체의 외면에 콘구멍과 격자형태의 줄이 일정한 패턴으로 형성되는 콘크리트 건물의 벽체 시공방법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete building construction method and, more particularly, to a concrete building construction method in which a cone hole and a lattice-like line are formed in a predetermined pattern on an outer surface of a wall during construction of an inner wall, Wall construction method.

일반적으로, 콘크리트 건물의 시공 시, 건물의 내/외벽의 형성지점에 거푸집을 형성한 다음 콘크리트를 타설함으로써 벽체를 형성한 다음 내/외벽체의 외면 마감을 위해 다양한 마감재를 적용한다. Generally, when a concrete building is constructed, a form is formed at the inner / outer wall forming point of the building and then a concrete is laid to form a wall. Various finish materials are applied to finish the outer surface of the inner / outer wall.

그러나 최근 공사비용 절감과 건물 디자인의 차별화를 위해 노출콘크리트(exposed concrete) 공법이 적용되고 있다.Recently, exposed concrete method has been applied to reduce construction cost and differentiate building design.

이때, 노출콘크리트(exposed concrete)이란 건물의 내장재로 적용되던 콘크리트 벽체를 그대로 드러나게 함으로써 콘크리트 벽체 자체가 외장개로 사용되는 공법이다. 다시 말해, 노출콘크리트 공법은 콘크리트 자체가 갖고 있는 색상 및 질감으로 마감을 나타내는 형태의 공법으로서, 콘크리트 타설 후 거푸집을 탈거한 상태 그대로를 노출시켜 콘크리트 자체가 나타내는 독특한 미와 중후함을 강조하는 공법이다.In this case, exposed concrete is a construction method in which a concrete wall used as an interior material of a building is exposed as it is, and a concrete wall itself is used as an exterior opening. In other words, the exposed concrete method is a method that shows the finish with the color and texture of the concrete itself. It is a method to emphasize the unique beauty and profoundness of the concrete itself by exposing the form as it is removed after the concrete is poured.

현재, 많은 건축가들이 노출콘크리트 공법을 선호하고 있기는 하지만, 종래의 노출콘크리트 공법을 수행할 때는 거푸집 탈거 후 고르지 못한 면이 발생되거나 줄이 일률적이지 못한 문제점이 야기되어 표면 보수 작업을 반드시 수행해야 하는 번거로움과 불편함이 있었으며, 이로 인해 시간과 비용이 증가할 수밖에 없었다.Although many architects currently prefer exposed concrete methods, it is necessary to carry out surface maintenance work in case of performing the conventional exposed concrete method because uneven surface occurs after the form removal and the line is not uniform There were hassles and inconveniences, which meant that time and money had to increase.

또한, 노출콘크리트 공법에 따른 노출콘크리트 벽체의 설계 시 점, 선, 면의 3가지 요소가 잘 어우러져야 하나의 건축 작품이 완성될 수 있으며 특히, 점과 선에 해당되는 콘구멍과 줄눈의 배치와 배열은 노출콘크리트 벽체에 대한 생동감과 규칙성을 연출하는데 중요한 요소로 작용하기 때문에 노출콘크리트 시공 시 이들에 대한 관리가 무엇보다도 중요시되고 있다.In addition, when designing the exposed concrete wall according to the exposed concrete method, the three points of point, line, and surface should be well combined to complete one of the architectural works. Especially, Arrangement is an important factor to produce the liveliness and regularity of the exposed concrete wall.

하지만, 종래기술에 따른 노출콘크리트 공법을 단순 적용할 경우, 점과 선에 해당되는 콘구멍과 줄눈의 배치와 배열이 일정하지 않게 되어 노출콘크리트 벽체에 대한 생동감과 규칙성을 연출하기 어려우며, 이로 인해 벽체의 완성도가 떨어지는 문제점이 있었다.However, when the exposed concrete method according to the prior art is simply applied, the arrangement and arrangement of the cone holes and joints corresponding to the points and lines are not constant, and it is difficult to produce the feeling of life and regularity of the exposed concrete wall. There is a problem that the completeness of the wall is lowered.

이러한 점을 감안한 새로운 대응기술로 대한민국특허청 출원번호 제10-2013-00570호 등에 개시되어 있다.As a new countermeasure against this problem, Korean Patent Application No. 10-2013-00570 and the like are disclosed.

이때, 상기 특허문헌의 경우 거푸집의 일면에 다수의 블록막대를 교차 형성하여 격자형 구조를 형성하게 되는데, 블록막대 형성 시, 각각의 블록막대를 거푸집에 고정시켜 형성함에 따라 그 작업량 및 그에 따른 작업시간이 불필요하게 소모되는 문제점이 있었다.In this case, in the case of the patent document, a plurality of block rods are cross-formed on one surface of the form to form a lattice-like structure. When the block rods are formed, each block rod is fixed to the formwork, Time is unnecessarily consumed.

또한, 거푸집에 볼트를 통해 블록막대를 고정시키는 방법에 있어서, 볼트나 접착제를 이용하여 거푸집에 고정시키는 경우 블록막대 및 거푸집에 볼트가 삽입될 수 있는 홀을 형성해야 함은 물론, 블록막대의 고정력을 위해 각각의 블록막대의 양단에 볼트 체결이 이루어지는 것으로 가정할 때, 다수의 블록막대를 모두 고정시키기 위해서는 그 작업량이 상당한 문제점이 있다. 뿐만아니라, 블록막대에 볼트의 체결홀을 형성함에 따라 블록막대에 형성된 체결홀에 의해 콘크리크의 양생 시, 볼트 체결홀이 형성된 지점은 매끄럽게 형성되지 못하는 문제점이 존재한다.In addition, in the method of fixing the block rod to the mold through the bolt, when the block is fixed to the mold using a bolt or an adhesive, it is necessary to form a hole into which the bolt can be inserted, There is a problem in that the amount of work required to fix all of the plurality of block rods is considerable. In addition, since the bolt fastening holes are formed in the block rod, there is a problem that the points where the bolt fastening holes are formed at the time of curing of the cone clicks by the fastening holes formed in the block rods are not formed smoothly.

반면, 거푸집에 접착제를 통해 블록막대를 형성하는 경우, 접착력의 강도에 따라, 접착강도가 높으면 블록막대를 거푸집에서 제거하기가 어려워 블록막대의 파손에 따른 교체 필요시 교체작업이 어려운 문제점이 있으며, 접착 강도가 낮으면 블록막대가 콘크리트 양생 과정중에 거푸집으로부터 탈리되는 문제점이 있다. On the other hand, when the block rod is formed through the adhesive on the mold, it is difficult to remove the block rod from the mold when the adhesive strength is high according to the strength of the adhesive force, If the adhesive strength is low, there is a problem that the block rod is removed from the mold during the concrete curing process.

따라서, 상기에서 언급한 바와 같은 작업량이 최소화 되고, 거푸집에 격자 줄 형성을 위한 부재의 결합이 간단하면서 견고하게 형성될 수 있는 새로운 방법이 요구된다.Accordingly, there is a need for a new method of minimizing the amount of work as described above and forming a simple and robust connection of the members for forming the lattice lines in the formwork.

한국등록특허 제10-1308043호(2013.09.06)Korean Patent No. 10-1308043 (2013.09.06)

본 발명은 상기에서 언급된 문제점을 해소하기 위해 안출된 것으로, 건물의 내/외 벽체의 시공 시, 거푸집에 줄눈의 형성을 위한 기재의 형성이 견고하면서도 간단하게 이루어질 수 있음으로써 노출콘크리트 공법에 의한 벽체의 시공이 용이하게 이루어질 수 있는 콘크리트 건물의 벽체 시공방법을 제공하고자 한다.The present invention has been conceived to solve the above-mentioned problems, and it is an object of the present invention to provide a method for forming a joint for forming a joint in a mold when the inner and outer walls of a building are constructed, The present invention provides a method for constructing a wall of a concrete building in which a wall can be easily constructed.

본 발명의 실시예에 따르면, 벽체가 시공되는 위치에 다수의 철근을 이용하여 철근 기초물을 설치하는 철근 기초물 설치단계; 시공 벽체의 면적에 대응되도록 판상의 거푸집 본체들을 연속적으로 설치한 다음, 거푸집 본체의 전면부 상에 벽체에 형성되는 줄눈의 교차 지점과 각각 대응되는 지점에 십자형(+)의 구조의 줄눈바 고정부재들을 설치한 다음 수평 및 수직방향별로 인접하게 설치된 줄눈바 고정부재에 줄눈바의 양단을 각각 삽입 결합시킴으로써 줄눈용 거푸집을 제작하는 줄눈용 거푸집 제작단계; 줄눈용 거푸집 제작단계를 통해 제작된 상기 줄눈용 거푸집들을 철근 기초물을 사이에 두고 상호 마주보도록 이격 배치하는 줄눈용 거푸집 배치단계; 상기 줄눈용 거푸집들 사이로 콘크리트를 넣어 양생하는 콘크리트 양생단계; 상기 콘크리트가 완전히 굳기 전에 상기 줄눈용 거푸집들, 상기 D 콘, 상기 본체 볼트, 상기 주물 사각와셔 및 상기 주물 너트를 제거하는 부품 제거단계; 및 상기 줄눈용 거푸집을 해체하여 거푸집 본체와 줄눈바를 분리하는 줄눈용 거푸집 해체 단계;를 포함하여 이루어지되; 상기 줄눈바는, 반원관(Half-pipe) 구조의 몸체부와, 상기 몸체부의 길이방향 양단으로부터 내측을 향하여 소정의 폭으로 연장 형성되는 결합날개부와, 상기 몸체부의 내측에 중앙에서 길이방향을 따라 기립 형성되는 적어도 하나 이상의 보강판, 및 상기 몸체부의 양단에 형성되는 탈거홈을 포함하여 형성되며, 줄눈바 고정부재는, 육면체 구조로 형성되고 상면에는 음각 또는 양각으로의 특정 패턴의 형상이 가공되며 중앙측에 체결홀이 관통 형성되는 중앙돌기와, 상기 몸체부의 저면측으로 삽입될 수 있는 폭을 갖는 판형 구조로 상기 중앙돌기의 하단과 동일선상으로 형성되어 상기 중앙돌기의 각 측면에 일체 형성되는 고정날개부와, 상기 각 고정날개부의 양측 끝단을 따라 형성되어 상기 몸체부의 결합날개부와 후크 결합방식으로 결합되기 위한 걸림부가 형성된 결합후크와, 상기 보강판의 두께와 대응되는 폭으로 상기 각 고정날개부의 중앙측이 절개되어 형성되는 보강판 삽입홈, 및 상기 중앙돌기의 측면과 고정날개부의 상면에 접촉되도록 고정날개부의 길이방향을 따라 형성되는 복수개의 고정날개 보강리브를 포함하여 형성되는 것을 특징으로 하는 콘크리트 건물의 벽체 시공방법이 제공될 수 있다.According to an embodiment of the present invention, there is provided a reinforced concrete foundation comprising: a reinforcing bar foundation installing step of installing a reinforcing bar foundation using a plurality of reinforcing bars at a position where a wall is installed; The plate formwork bodies are successively installed so as to correspond to the area of the installation wall. Then, on the front part of the formwork body, a joint bar fixing member And then joining both ends of the joint bar to the joint bar fixing member provided adjacent to each other in the horizontal and vertical directions to thereby form the joint form for the joint; A step for arranging the joints for the joints, which are manufactured through the step of forming the joints for the joints, so that the joints for the joints are spaced apart from each other so as to face each other with the reinforcement foundation therebetween; A concrete curing step in which concrete is cemented between the jointing molds; Removing the joint formwork, the D-cone, the body bolt, the cast square washer, and the casting nut before the concrete is completely hardened; And disassembling the formwork for the joint to separate the formwork body and the jointing bar; The joint bar includes a body portion having a half-pipe structure, a coupling wing portion extending inwardly from both ends in the longitudinal direction of the body portion to a predetermined width, At least one reinforcement plate standing uprightly formed on both ends of the body portion, and a detachment groove formed at both ends of the body portion, wherein the joint bar fixing member is formed in a hexahedron structure, and a shape of a specific pattern on the upper surface is engraved or embossed A central protrusion formed at the central side through which a fastening hole is formed and a plate-like structure having a width that can be inserted into the bottom surface of the body portion, and which is formed in the same line as the lower end of the central protrusion, A wing portion and a pair of wing portions formed along both ends of each of the fixed wing portions and coupled to the coupling wing portion of the body portion in a hook- A reinforcing plate insertion groove formed by cutting the central side of each of the fixed wings with a width corresponding to the thickness of the reinforcing plate; and a reinforcing plate insertion groove formed in the fixed wing portion so as to be in contact with a side surface of the central projection and an upper surface of the fixed wing portion, And a plurality of fixed blade reinforcing ribs formed along the longitudinal direction of the part of the concrete building.

본 발명에 의하면, 다수의 줄눈바를 개별적으로 거푸집에 설치 및 해체하기 위한 작업이 최소화될 수 있음에 따른 공정 및 관련 비용을 절감할 수 있으며, 줄눈바의 파손 시, 파손된 줄눈바의 신속한 탈거 및 교체가 용이함에 따라 유지보수성이 향상될 수 있다.According to the present invention, it is possible to reduce the process and associated costs due to the minimization of the work for installing and disassembling a plurality of joint bars individually in a formwork, Maintenance can be improved with ease of replacement.

또한, 콘크리트 건물의 벽체 시공 시, 콘구멍과 줄눈의 배치와 배열이 자연스럽게 일정하도록 형성됨으로써 노출콘크리트 벽체에 대한 생동감과 규칙성을 연출할 수 있는 효과가 있게 된다.In addition, when the wall of the concrete building is constructed, the arrangement and arrangement of the cone hole and the joint are formed so as to be constant in a natural manner, so that it is possible to produce a feeling of life and regularity of the exposed concrete wall.

아울러, 줄눈을 형성하기 위한 줄눈 형성부재의 파손 및 변형을 최소화하여 재활용율을 높임으로써 줄눈 형성부재 관련 비용의 절감을 도모할 수 있으며, 이를 통해 시공 비용 또한 절감될 수 있다. In addition, it is possible to minimize the breakage and deformation of the joint forming member for forming a joint, thereby increasing the recycling rate, thereby reducing the cost associated with the joint forming member, thereby reducing the construction cost.

도 1은 본 발명에 따른 콘크리트 건물의 벽체 시공방법에 따라 시공된 노출콘크리트 벽의 일부분을 보여주는 도면이다.
도 2는 본 발명에 따른 줄눈용 거푸집을 보여주는 평면도이다.
도 3은 도 2의 줄눈용 거푸집에 설치되는 줄눈바를 보여주는 도면이다.
도 4는 도 2의 줄눈용 거푸집에 설치되는 줄눈바 고정부재를 보여주는 사시도이다.
도 5는 도 2 의 줄눈바가 줄눈바 고정부재에 설치되는 과정을 보여주는 도면이다.
도 6은 본 발명에 따른 콘크리트 건물의 벽체 시공방법을 단계적으로 도시한 도면이다.
도 7은 본 발명에 따른 콘크리트 건물의 벽체 시공방법의 플로차트이다.
FIG. 1 is a view showing a part of an exposed concrete wall constructed according to a wall construction method of a concrete building according to the present invention.
2 is a plan view showing a joint form according to the present invention.
FIG. 3 is a view showing a joint bar installed in the joint mold of FIG. 2; FIG.
FIG. 4 is a perspective view showing a joint bar fixing member installed in the joint mold of FIG. 2. FIG.
FIG. 5 is a view showing a process in which the joint bar shown in FIG. 2 is installed on the joint bar fixing member.
6 is a view showing a stepwise construction method of a wall of a concrete building according to the present invention.
7 is a flowchart of a method of constructing a wall of a concrete building according to the present invention.

이하, 첨부도면을 참조하여 본 발명의 바람직한 실시예를 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings.

도 2는 본 발명에 따른 줄눈용 거푸집을 보여주는 평면도이다. 도 3은 도 2의 줄눈용 거푸집에 설치되는 줄눈바를 각각 보여주는 도면이다. 도 4는 도 2의 줄눈용 거푸집에 설치되는 줄눈바 고정부재를 보여주는 사시도이다. 도 5는 도 2 의 줄눈바가 줄눈바 고정부재에 설치되는 과정을 보여주는 도면이다. 2 is a plan view showing a joint form according to the present invention. FIG. 3 is a view showing a joint bar installed in the joint mold of FIG. 2, respectively. FIG. 4 is a perspective view showing a joint bar fixing member installed in the joint mold of FIG. 2. FIG. FIG. 5 is a view showing a process in which the joint bar shown in FIG. 2 is installed on the joint bar fixing member.

도 1 내지 5를 참고하면, 노출콘크리트 벽체(10)를 형성하기 위한 수단으로 줄눈용 거푸집(1000)이 요구된다. 이러한 줄눈용 거푸집(1000)은 줄눈용 거푸집(1000)을 형성하는 거푸집 본체(100)를 건물의 내/외 벽들의 사이즈에 맞게 측방향으로 연속되게 연결시킴으로서 전반적인 벽체 형성용 거푸집 구조물로 적용될 수 있다.Referring to Figures 1-5, a joint formwork 1000 is required as a means for forming the exposed concrete wall 10. Such a joint formwork 1000 can be applied as an overall wall formwork structure by continuously connecting the formwork body 100 forming the joint formwork 1000 in the lateral direction in accordance with the sizes of the inner and outer walls of the building .

이러한 줄눈용 거푸집(1000)은 통상적으로 적용되고 있는 철재 또는 목재 등의 재료로 형성되는 거푸집 본체(100)를 구조를 기본으로 하고 있으며, 벽체(10)의 줄눈(12) 형성을 위해 거푸집 본체의 전면부에 결합되는 줄눈 형성부재(200)를 포함한다.Such a joint formwork 1000 is based on the structure of a formwork body 100 formed of a material such as steel or wood which is conventionally applied and is used to form the joint 12 of the wall body 10, And a joint forming member 200 coupled to the front portion.

줄눈 형성부재(200)는 거푸집 본체(100)의 전면부에 설치되며, 콘크리트 양생시 콘크리트 벽체(10)에 줄눈(12)을 형성시킨다. 이러한 줄눈 형성부재(200)는 크게 줄눈바(210)와 줄눈바 고정부재(220)로 구분되어 구성된다.The joint forming member 200 is installed on the front surface of the formwork body 100 and forms a joint 12 on the concrete wall 10 when the concrete is cured. The joint forming member 200 is divided into a joint bar 210 and a joint bar fixing member 220.

본 실시예에서의 줄눈바(210)는 상기 줄눈바 고정부재(220)에 결합되어 거푸집 본체(100) 상에 수평 및 수직하게 배열되는 것으로, 플라스틱 또는 수지재로 형성되어 줄눈바(210) 형태로 성형되었을 때 어느 정도의 탄성을 갖도록 형성될 수 있다. The joint bar 210 in the present embodiment is horizontally and vertically arranged on the formwork body 100 coupled to the joint bar fixing member 220 and is formed of plastic or resin to form a joint bar 210 It can be formed to have some degree of elasticity.

이러한, 줄눈바(210)는 원통형 관을 1/2로 절단한 것과 같은 반원관(Half-pipe)형태의 몸체부(211)와, 몸체부(211)의 내측을 향해 길이방향을 따라 소정의 폭으로 돌출 형성되는 결합날개부(212) 및 몸체부(211) 내측 중앙지점 부근에 적어도 하나 이상 형성되는 보강판(213)으로 구성된다. The joint bar 210 has a half-pipe-shaped body portion 211 cut in a half of a cylindrical tube and a half-pipe-shaped body portion 211 cut in a predetermined direction along the longitudinal direction toward the inside of the body portion 211 And a reinforcing plate 213 formed at least in the vicinity of an inner central point of the body 211. The reinforcing plate 213 is made of a synthetic resin.

몸체부(211)는 반원관(Half-pipe)형태로 형성되며, 양단 일 측에는 줄눈바 고정부재(220)에 결합 후, 제거 시, 공구 등을 삽입하여 줄눈바(210)의 분리가 용이하도록 하기 위한 탈거홈(214)이 형성된다. 이러한, 몸체부(211)는 줄눈바(210)가 거푸집 본체(100)의 전면부에 형성 시, 콘크리트 벽체에 라운드진 줄눈을 형성하게 된다. The body portion 211 is formed in a half-pipe shape, and is coupled to the joint bar fixing member 220 on one side of the opposite ends thereof. A removal groove 214 is formed. When the joint bar 210 is formed on the front portion of the formwork body 100, the body portion 211 forms a round joint on the concrete wall.

결합날개부(212)는 줄눈바(210)를 줄눈바 고정부재(220)에 고정시키기 위한 것으로, 몸체부(211)가 플라스틱 또는 수지재로 형성되어 소정의 탄성을 갖음에 따라 양단의 개방된 하측이 벌어지면서 줄눈바 고정부재(220)에 삽입되어 결합된다. 이에 관한 구체적인 내용은 후술될 줄눈바 고정부재(220) 설명에 함께 언급하기로 한다. The coupling wing portion 212 is for fixing the joint bar 210 to the joint bar fixing member 220. The body portion 211 is formed of plastic or resin and has a predetermined elasticity, The lower side is inserted into the joint bar fixing member 220 and joined thereto. The details of this will be described together with the description of the joint bar fixing member 220 to be described later.

보강판(213)은 콘크리트 양생시 콘크리트에 의해 몸체부(211)에 가해지는 하중을 지지하기 위한 것으로, 몸체부(211)의 길이방향을 따라 몸체부(211)의 내측 중앙측에 적어도 하나 이상 형성된다. 이러한 보강판(213)의 형성 구조는 줄눈바(210) 전반에 걸쳐 콘크리트의 압력을 적절히 지지할 수 있음과 동시에 줄눈바(210)가 줄눈바 고정부재(220)에 결합 시, 양단 저면이 벌어질 수 있어 결합이 용이하다는 장점이 있다. 또한, 시공 현장에서 경우에 따라 줄눈바(210)의 길이 조절이 요구되는 경우(짧은 줄눈바가 요구되는 경우)가 발생 시, 해당 길이에 해당하는 줄눈바(210)의 어느 부위를 절단하여도 보강판이 존재하게 됨과 동시에 줄눈바 고정부재(220)에 양단이 결합될 수 있다는 장점이 있다.The reinforcing plate 213 is for supporting a load applied to the body portion 211 by concrete when concrete is cured and is provided on the inner side of the body portion 211 along the longitudinal direction of the body portion 211, . The structure of the reinforcing plate 213 can appropriately support the pressure of the concrete throughout the joint bar 210 and at the same time when the joint bar 210 is coupled to the joint bar fixing member 220, So that there is an advantage that bonding is easy. Further, when the length of the joint bar 210 is required to be adjusted at the construction site (when a short joint bar is required), any portion of the joint bar 210 corresponding to the length may be cut, There is an advantage that both ends can be coupled to the joint bar fixing member 220 at the same time as the plate exists.

이러한, 줄눈바(210)는 격자형태의 줄눈을 형성하기 위한 수평하게 배열되는 제 1 줄눈바(210a)와, 수직하게 배열되는 제 2 줄눈바(210b)로 구분될 수 있으며, 제 1 및 제 2 줄눈바(210a, 210b)는 실질적으로 동일한 구조로 형성된다.  The joint bar 210 may be divided into a first joint bar 210a arranged horizontally and a second joint bar 210b arranged vertically to form a grid joint, The two joint bars 210a and 210b are formed to have substantially the same structure.

한편, 줄눈바 고정부재(220)는 십자형(+)의 구조로 줄눈바(210)의 교차지점에 위치하여 수직 방향과 수평방향으로 배치되는 줄눈바(210)의 교차지점이 자연스럽게 형성되도록 연결해줌과 동시에 상기 줄눈바(210)를 거푸집 본체(100)의 전면부에 고정시키는 부재로, 목재 또는 강성을 갖는 수지 재질로 형성될 수 있다. 다만, 재사용성과, 파손, 보관 및 성형성 등의 다양한 이점을 고려하여 수지재질로 형성됨이 바람직할 수 있으며, 더 바림직하게는 폐 플라스틱을 재활용한 재생수지가 이용될 수 있다. 이러한, 줄눈바 고정부재(220)는 사출을 통해 일체로 성형되며, 중앙돌기(221) 및 복수개의 고정날개부(222)로 구분 형성된다.The joint bar fixing member 220 is connected to the intersection of the joint bar 210 and the joint bar 210 so that the intersection point of the joint bar 210 arranged in the vertical direction and the horizontal direction is naturally formed. And a member for fixing the joint bar 210 to the front portion of the mold body 100. The member may be made of wood or a rigid resin. However, it may be preferable to be formed of a resin material in consideration of various advantages such as re-usability, breakage, storage and formability, and recycled resin recycled from waste plastic may be used more desirably. The joint bar fixing member 220 is integrally formed through injection molding and is divided into a central projection 221 and a plurality of fixed wing portions 222.

중앙돌기(221)는 전반적으로 육면체(ex: 단면이 사각형인 정육면체) 구조로 형성되는 것으로, 상면에는 노출콘크리트 벽(10)상에 줄눈(12)의 교차지점의 모양이 구현되도록 하기 위해 음각 또는 양각으로의 특정 패턴의 형상이 가공되어 있다. 또한, 측면은 줄눈바의 결합 시, 중앙돌기(221)와 줄눈바가 자연스럽게 연속되도록 구현하기 위해 줄눈바(210) 몸체부(211) 단면의 구조 및 면적과 동일한 형태를 갖도록 형성된다. 아울러, 중앙돌기(221)의 중앙(센터)지점에는 체결홀(223)이 관통 형성되어 있으며, 가공된 체결홀(223)에 볼트와 같은 별도의 고정부재를 삽입함으로써 줄눈바 고정부재(220)를 거푸집 본체(100)에 고정시킬 수 있다. The central projections 221 are formed in a generally hexahedral shape and are formed on the upper surface of the exposed concrete wall 10 so as to form a shape of an intersection point of the joint 12, The shape of the specific pattern on the embossed surface is processed. The side surface of the joint bar 210 is formed to have the same structure and area as the end surface of the body portion 211 of the joint bar 210 in order to realize the naturally continuous connection of the joint protrusion 221 and the joint protrusion 221. A joint hole 223 is formed at the center of the central projection 221 and a separate fixing member such as a bolt is inserted into the joint hole 223 to fix the joint bar fixing member 220. [ Can be fixed to the molding body 100.

고정날개부(222)는 중앙돌기(221)의 4방향 측면에 형성되어 줄눈바(210)의 양단의 결합날개부(212)와 결합하는 것으로, 중앙돌기(221)의 4방향 측면에 각각 형성되는 제 1 내지 제 4 고정날개(222a~222d)로 구분 형성된다.The fixed wings 222 are formed on the four sides of the central protrusion 221 and engage with the coupling wings 212 at both ends of the joint bar 210 to be formed at four sides of the central protrusion 221 And the first to fourth fixed vanes 222a to 222d.

구체적으로, 고정날개부(222)는 수평 또는 수직방향으로 위치되는 줄눈바(210)를 고정하기 위해 형성되는 것으로, 앞서 설명한 줄눈바(210)를 구성하는 몸체부(211)의 저면측으로 삽입될 수 있는 폭을 갖는 판형 형태로 형성된다. 이때, 고정날개부(222)는 중앙돌기(221)의 측면에 일체로 형성되되, 중앙돌기(221)의 측면 하단(=중앙돌기(221)의 저면)과 동일선상으로 형성된다.Specifically, the fixed wing portion 222 is formed for fixing the joint bar 210 positioned in the horizontal or vertical direction. The fixed wing portion 222 is inserted into the bottom side of the body portion 211 constituting the joint bar 210 described above And is formed in a plate-like shape having a width that is large. At this time, the fixed wing portion 222 is integrally formed on the side surface of the central projection 221, and is formed in the same line as the lower side surface (= the bottom surface of the central projection 221) of the central projection 221.

이러한, 고정날개부(222)의 양측에는 길이방향으로 줄눈바(210)의 결합날개부(212)와 결합하는 결합후크(224)가 형성된다.At both sides of the fixed wing portion 222, a coupling hook 224 is formed which engages with the coupling wing portion 212 of the joint bar 210 in the longitudinal direction.

상기 결합후크(224)는 고정날개부(222)의 양단으로부터 상방향으로 연장 형성되어 돌출되는 구조로 끝단에 걸림부가 형성되어 있다. 이때, 결합후크(221)의 상방향 연장길이는 줄눈바의 결합날개부(212)의 두께와 동일하게 형성될 수 있다. 이에 따라, 고정날개부(222)와 줄눈바(210)가 결합 시, 결합날개부(212)와 거푸집 본체(100)와의 사이의 벌어짐 발생 없이 줄눈바(210)가 고정날개부(222)에 견고히 고정될 수 있다. 보다 상세하게 줄눈바(210)와 고정날개부(222)가 결합 고정되는 과정에 대해 보충 설명하면, 줄눈바(210) 일 단측을 고정날개부(222)의 상면에 위치시킨 후 힘을 가하면 줄눈바(210) 결합날개부(212)와 결합후크(224)의 끝단이 접촉하게 된다. 이후 줄눈바(210)에 더 힘을 가하면 결합날개부(212)가 결합후크(224)의 끝단 경사면을 따라 하방향으로 이동하면서 결합날개부(212)가 양측으로 벌어지게 된다. 그리고, 결합후크(224)가 결합날개부의 내측으로 삽입됨과 동시에 줄눈바(210)의 복원(탄성)력에 의해 벌어졌던 결합날개부(212)가 복원되어 결합날개부(212)와 결합후크(224)가 후크결합 방식으로 결합되면서 줄눈바(212)가 줄눈바 고정부재(220)에 고정될 수 있게 된다.The coupling hook 224 is formed to extend upward from both ends of the fixed wing portion 222 and has a hooking portion formed at an end thereof. At this time, the upward extension length of the coupling hook 221 may be the same as the thickness of the coupling wing portion 212 of the joint bar. When the fixed wing portion 222 and the joint bar 210 are engaged with each other, the joint bar 210 is inserted into the fixed wing portion 222 without causing a widening between the coupling wing portion 212 and the molding body 100 It can be firmly fixed. In more detail, the joint bar 210 and the fixed wing portion 222 are coupled and fixed. When one end of the joint bar 210 is positioned on the upper surface of the fixed wing portion 222, The end of the coupling hook 224 comes into contact with the coupling wing portion 212 of the bar 210. When the joint bar 210 is further pressed by the joint bar 210, the joint wing portion 212 is moved downward along the inclined end surface of the engaging hook 224, and the joint wing portion 212 is opened to both sides. At the same time that the coupling hook 224 is inserted to the inside of the coupling vane portion, the coupling vane portion 212 which has been opened by the restoring (elastic) force of the coupling bar 210 is restored and the coupling vane portion 212 and the coupling hook 224 Can be coupled to the joint bar fixing member 220 while the joint bar 212 is fixed to the joint bar fixing member 220. [

또한, 고정날개부(222)에는 보강판(213)이 삽입될 수 있는 보강판 삽입홈(225)과, 고정날개부(222)의 강성을 보강하기 위한 고정날개 보강리브(226)가 형성된다.The fixed wing portion 222 is formed with a reinforcing plate insertion groove 225 into which the reinforcing plate 213 can be inserted and a fixed wing reinforcing rib 226 for reinforcing the rigidity of the fixed wing portion 222 .

보강판 삽입홈(225)은 고정날개부의 보강판과 대응되는 개수로 형성되고, 보강판(213)의 두께와 대응되는 폭으로 각 고정날개부(222)의 중앙측이 절개된 형태로 형성되어 고정날개부(222)와 줄눈바(210)가 결합 시 절개된 보강판 삽입홈(225)에 보강판(213)이 삽입된다. 따라서, 고정날개부(222)에 줄눈바(210)의 결합이 가능하게 되며, 결합된 줄눈바(210)의 양단을 포함한 줄눈바(210) 전체에 걸쳐 보강판(213)에 의한 지지가 이루어질 수 있다. The reinforcing plate inserting grooves 225 are formed in a number corresponding to the number of the reinforcing plate of the fixed wing portion and are formed such that the central side of each of the fixed wing portions 222 is cut in a width corresponding to the thickness of the reinforcing plate 213 The reinforcing plate 213 is inserted into the reinforcing plate inserting groove 225 formed when the fixed wing portion 222 and the joint bar 210 are coupled. Therefore, the joint bar 210 can be coupled to the fixed wing portion 222, and the joint bar 210 including both ends of the joint bar 210 can be supported by the reinforcing plate 213 .

고정날개 보강리브(226)는 중앙돌기(221)의 측면과 고정날개부(222)의 상면에 일체로 형성됨에 따라 고정날개부(222)의 강성을 보완하여 줄눈바(210)의 결합 및 해체 시, 또는 줄눈바 고정부재(220)의 설치 및 보관 시에 휘어짐 또는 부러짐과 같은 고정날개부(222)의 파손을 방지할 수 있는 보강재 역할을 한다.The fixed blade reinforcing rib 226 is integrally formed on the side surface of the central projection 221 and the upper surface of the fixed blade portion 222 to thereby complement the rigidity of the fixed blade portion 222, And serves as a reinforcing member that can prevent breakage of the fixed wing portion 222 such as warping or breaking at the time of installation and storage.

이와 같은 역할을 하는 고정날개 보강리브는(226)는 일단에서 타단으로 갈수록 경사지게 형성되는 일반적인 쐐기형태의 구조로 형성되어 단면적이 가장 큰 고정날개 보강리브(226)의 후단은 중앙돌기(221)에 일체 형성되고, 편평한 저면은 고정날개부(222)의 상면에 일체로 형성된다. 또한, 고정날개 보강리브는(226)는 보강판 삽입홈(225)에 의해 분할된 각각의 고정날개에 복수개가 형성되며, 고정날개의 길이 전반에 걸쳐 형성되지 않고 소정부분까지만 형성된다. The fixed wing reinforcing ribs 226 are formed in a general wedge-shaped structure so as to be inclined from one end to the other end. The rear end of the fixed wing reinforcing ribs 226 having the largest cross- And the flat bottom face is integrally formed on the upper face of the fixed wing portion 222. [ The fixed blade reinforcing ribs 226 are formed in a plurality of fixed blades divided by the reinforcing plate inserting grooves 225, and are formed not only over the entire length of the fixed blades but only to a predetermined portion.

이러한, 고정날개 보강리브(226)는 쐐기형태의 구조로 중앙돌기(221)와 먼측의 선단측은 후단에 비해 상대적으로 얇은 두께를 가지게 되어 고정날개부(222)의 끝단 측이 고정날개 보강리브(226)에 의해 하드 하게 고정되지 않고 미미하게나마 변형될 수 있도록 허용한다. 따라서, 시공현장에서 작업자에 의해 거푸집 본체(100)으로부터 줄눈바 고정부재(200)의 분리 시, 줄눈바 고정부재(200)가 바닥에 떨어지는 경우 고정날개부(222)의 끝단측의 변형에 의해 충격을 흡수함으로써 파손이 방지될 수 있게 된다. The fixed wing reinforcing rib 226 has a wedge-shaped structure. The central protrusion 221 and the distal end of the distal end are relatively thinner than the rear end, and the end of the fixed wing 222 is fixed to the fixed wing reinforcing ribs 226 so as to be slightly deformed. Therefore, when the joint bar fixing member 200 is dropped on the floor when the joint bar fixing member 200 is separated from the molding body 100 by the operator at the construction site, The shock can be absorbed so that breakage can be prevented.

또한, 줄눈바 고정부재(200)의 경우 낙하에 의한 공사 현장 바닥과의 충격 또는 다른 다양한 이유에 의해 고정날개부(222)의 끝단의 손상이 가장 많이 발생될 수 있다. 그러나 고정날개 보강리브(226)가 고정날개부(222)의 끝단에 이르기까지 형성되지 않기 때문에 고정날개부(222)의 끝단이 손상된 경우, 손상된 끝단 부분을 손쉽게 절단하기 용이하다. 따라서, 줄눈바 고정부재의 사용 수명이 연장될 수 있다.In addition, in the case of the joint bar fixing member 200, the end of the fixed wing portion 222 may be damaged most frequently due to shock to the floor of the construction site due to falling or various other reasons. However, since the fixed wing reinforcing ribs 226 are not formed until the end of the fixed wing portion 222, when the end of the fixed wing portion 222 is damaged, it is easy to easily cut the damaged end portion. Therefore, the service life of the joint bar fixing member can be prolonged.

한편, 반드시 그러한 것은 아니지만 거푸집 본체(100)에 줄눈바(210) 및 줄눈바 고정부재(220)가 설치되는 위치에 자리홈(미도시)이 더 형성될 수도 있다. 이러한 자리홈은 첫째로 줄눈바(210)와, 줄눈바 고정부재(220)의 고정 위치를 잡아주고, 둘째로는 줄눈바 고정부재(220)의 설치시, 줄눈바 고정부재(220)의 회전을 방지해주며, 셋째로는 줄눈바 고정부재(220)에 줄눈바(210)의 결합 시, 줄눈바(210)의 결합날개부(212)와 거푸집 본체(100) 전면부와의 사이가 들뜨지 않고 견고히 밀착될 수 있도록 하는 효과를 발생시킬 수 있다. Although not necessarily, a seat groove (not shown) may be further formed at a position where the joint bar 210 and the joint bar fixing member 220 are installed in the form body 100. This seat groove is used to fix the joint bar 210 and the joint bar fixing member 220 in a fixed position and secondly to fix the joint bar fixing member 220 The joint wing portion 212 of the joint bar 210 and the front portion of the formwork body 100 are exaggerated when the joint bar 210 is coupled to the joint bar fixing member 220, It is possible to generate an effect of firmly adhering to the surface.

상기에서와 같이 설명된 줄눈바(210)와 줄눈바 고정부재(220)는 줄눈용 거푸집(1000)의 제작 시, 줄눈바(210)를 거푸집 본체(100)에 설치하기 위해 줄눈바 고정부재(220)만을 거푸집 본체(100)에 고정하고, 줄눈바(210)를 단순 삽입(끼워맞춤)하여 고정시키면 됨에 따라 종래와 같이 모든 줄눈바를 거푸집 본체에 볼트와 같은 고정부재로 하나하나 고정시킬 필요가 없다. 또한, 종래와 같이 접착제와 같은 별도의 부수재료를 사용하지 않음으로써 접착제 도포 및 접착제 경화 시간 등이 요구되지 않음에 따라 종래에 비해 전반적인 거푸집 제작 공정, 제작시간 및 관련 비용을 절감할 수 있다. 아울러, 줄눈바(210)의 파손 시, 파손된 해당 줄눈바(210)의 신속한 탈거 및 교체가 용이함에 따라 유지보수성이 향상될 수 있다.The joint bar 210 and the joint bar fixing member 220 described above can be used as a joint bar fixing member in order to install the joint bar 210 on the mold body 100 220 are fixed to the molding body 100 and the joint bar 210 is simply inserted and fixed so that it is necessary to fasten all the joint bars to the molding body one by one with a fixing member such as a bolt none. In addition, since no separate auxiliary material such as an adhesive is used as in the prior art, it is not required to apply the adhesive and harden the adhesive, so that the overall mold making process, manufacturing time, and related costs can be reduced. In addition, when the joint bar 210 is broken, the damaged joint bar 210 can be quickly removed and replaced, thereby improving maintenance.

더욱이, 공사완료에 따른 거푸집의 해체 시, 거푸집 본체(100)로부터 줄눈바(210)의 탈거홈(214)에 공구를 삽입하여 힘을 가하면 결합날개부(212)가 결합홈(224)으로터 이탈됨에 따라 줄눈바(210)의 선 분리 후, 줄눈바 고정부재(220)를 분리하여 해체하거나, 또는 경우에 따라 줄눈바(210)가 설치된 상태에서 거푸집 본체(100)에 고정된 줄눈바 고정부재(220) 고정상태의 해제를 일괄적으로 수행함으로써 줄눈바 고정부재(220)의 고정 해제와 동시에 줄눈바(210)의 설치 상태가 해체(분리)되도록 하는 등, 전반적인 거푸집 해체가 효율적으로 이루어질 수 있다. When the tool is inserted into the detachment groove 214 of the joint bar 210 from the mold body 100 and the force is applied to the detachment groove 214 of the mold barrel 210 when the work is dismantled, The joint bar fixing member 220 may be separated and disassembled after the joint bar 210 is separated from the joint bar 210 or the joint bar fixed to the form body 100 may be fixed The disassembly state of the joint bar 220 is disassembled at the same time as the disassembly of the joint bar fixing member 220 is performed by collectively performing the disengagement of the member 220 in the fixed state, .

더욱이, 줄눈바 고정부재(220)를 일괄적으로 수평과 수직이 일치되도록 설치하면, 줄눈바(210)는 자연스럽게 수직과 수평이 맞춰짐에 따라 줄눈(12)의 정확한 수직, 수평을 형성하기 위한 과정(작업)이 수월하게 이루어질 수 있다.Further, when the joint bar fixing member 220 is installed so as to be aligned in the horizontal and vertical directions at a time, the joint bar 210 is vertically and horizontally aligned, The process (work) can be done easily.

도 6은 본 발명에 따른 콘크리트 건물의 벽체 시공방법을 단계적으로 도시한 도면이다. 도 7은 본 발명에 따른 콘크리트 건물의 벽체 시공방법의 플로차트이다.6 is a view showing a stepwise construction method of a wall of a concrete building according to the present invention. 7 is a flowchart of a method of constructing a wall of a concrete building according to the present invention.

이들 도면을 참조하여 본 발명에 따른 콘크리트 건물의 벽체 시공방법에 대해 설명한다.A method of constructing a wall of a concrete building according to the present invention will be described with reference to these drawings.

본 실시예의 콘크리트 건물의 벽체 시공방법은 철근 기초물 설치단계(S10), 줄눈용 거푸집 제작단계(S20), 거푸집 배치단계(S30), 이격거리 확보단계(S40), D콘 결합단계(S50), 본체 볼트 결합단계(S60), 주물 사각와셔 체결단계(S70), 주물 너트 체결단계(S80), 콘크리트 양생단계(S90), 부품 제거단계(S100) 및 줄눈용 거푸집 해체단계(S110)를 포함할 수 있다.The method of constructing a wall of a concrete building according to the present embodiment includes steps of installing a reinforcing bar foundation (S10), forming a mold for a joint (S20), arranging a mold (S30), securing a spacing distance (S40) A main body bolt connecting step S60, a casting square washer engaging step S70, a casting nut fastening step S80, a concrete curing step S90, a component removing step S100, and a joint form releasing step S110 can do.

철근 기초물 설치단계(S10)는 도 7(a)로 도시된 바와 같이 벽체에 구성되는 보강재인 철근(310)을 가로 및 세로방향으로 다수개 배치 고정하여 벽체 형태로 형성되는 철근 기초물(300)을 설치하는 것으로, 철근 기초물이 벽체의 내부에 위치되는 만큼 시공되는 벽체의 폭보다는 작은 폭으로 형성될 수 있다.As shown in FIG. 7 (a), the reinforcing bar foundation installation step S10 includes a plurality of reinforcing bars 310, which are reinforcing members in the wall, ), And may be formed to have a width smaller than the width of the wall to be installed as long as the reinforcing bar base is located inside the wall.

줄눈용 거푸집 제작단계(S20)는 노출콘크리트 벽체(10)와 대응되게 거푸집 본체(100)들을 연속적으로 연결시킨 다음 줄눈바 고정부재(220)와 줄눈바(210)를 설치하여 줄눈용 거푸집(1000)을 제작하는 과정이다.In the step S20 of forming the joint form, the formwork bodies 100 are successively connected to correspond to the exposed concrete wall body 10 and then the joint bar fixing member 220 and the joint bar 210 are installed to form the joint formwork 1000 ).

보다 구체적으로, 줄눈용 거푸집(1000) 제작과정에 대해 설명하면, 먼저 작업자가 거푸집 본체(100)를 노출콘크리트 벽체(10)와 대응되도록 연속하여 설치한 다음 노출콘크리트 벽체(10)의 수직방향의 줄눈과 수평방향의 줄눈이 교차하는 교차지점과 대응되는 거푸집 본체 상에 줄눈바 고정부재(220)를 설치한다. 이때, 줄눈바 고정부재(220)는 연속설치된 거푸집 본체(100)에 일괄적으로 설치된다. 이러한 줄눈바 고정부재(220)의 설치는 줄눈바 고정부재(220) 자리홈이 형성되어 있다면 매우 짧은 시간에 안정적으로 이루어질 수 있다.More specifically, the process of manufacturing the joint formwork 1000 will be described. First, the worker sets the formwork body 100 so as to correspond to the exposed concrete wall body 10, The joint bar fixing member 220 is installed on the molding body corresponding to the intersection where the joint and the joint in the horizontal direction intersect. At this time, the joint bar fixing member 220 is installed collectively on the continuously formed mold body 100. The provision of the joint bar fixing member 220 can be stably performed in a very short time if the joint groove 220 of the joint bar fixing member 220 is formed.

이후, 줄눈바 고정부재(220)의 일괄 설치가 완료되면, 수직 및 수평방향의 줄눈바(210a) 또는 제 2 줄눈바(210b)를 순서에 관계없이 동일선상에 위치한 줄눈바 고정부재(220)의 고정날개부(222)에 결합시켜 설치한다. 이러한 줄눈바(210)의 설치는 수직방향 또는 수평방향 순서에 관계없이 이루어지고, 단순히 삽입하는 과정을 통해 이루어짐에 따라 해당 설치 작업 또한 비교적 짧은 시간에 이루어질 수 있다.When the bundle installation of the joint bar fixing members 220 is completed, the joint bars 210a or the second joint bars 210b in the vertical and horizontal directions are placed on the joint bar fixing member 220, To the fixed wing portion (222). The installation of the joint bars 210 is performed regardless of the order of the vertical or horizontal direction, and the installation work can be performed in a relatively short time as the installation is simply performed.

또한, 줄눈바(210)의 길이에 있어서, 벽체의 전반적인 크기에 의해 벽체의 외각측에 배치되는 줄눈바(210)의 길이는 보통의 것에 비해 짧은 것이 요구될 수 있으며. 이러한 경우, 줄눈바(210)를 해당하는 길이만큼 절단하여 사용할 수 있다. 이는 줄눈바(210)를 절단하더라도, 절단된 줄눈바(210)는 길이만 짧을 뿐 다른 것은 변하지 않아 줄눈바 고정부재(220)에 결합 가능하기 때문이다.In addition, in the length of the joint bar 210, the overall length of the wall may require a length of the joint bar 210 disposed on the outer side of the wall to be shorter than that of the ordinary one. In this case, the joint bar 210 can be cut by a corresponding length. This is because even if the joint bar 210 is cut, the cut joint bar 210 can be coupled to the joint bar fixing member 220 only with a short length but without changing the other.

거푸집 배치단계(S30)는 도 7(b)로 도시된 바와 같이 줄눈용 거푸집 제작단계(S10)를 통해 제작된 줄눈용 거푸집(1000)들을 상호간 이격 배치하는 과정이다.As shown in FIG. 7 (b), the form placement step S30 is a process of arranging the joint formworks 1000 manufactured through the joint form production step S10.

이격거리 확보단계(S40)는 세파 볼트(410)를 이용하여 콘크리트 벽체의 두께와 대응되도록 줄눈용 거푸집들 간의 이격거리를 확보하는 과정이다.The step of securing spacing distance (S40) is a step of securing a spacing distance between the formwork to correspond to the thickness of the concrete wall using the seperate bolts (410).

세파 볼트(410)는 노출콘크리트 벽체(10) 내에 영구히 묻혀 고정된다. 세파 볼트(410)의 양쪽 끝에는 나사산을 통해 D 콘(420)이 결합된다. 이때, 세파 볼트(410)의 길이에 따라 노출콘크리트 벽체(10)의 두께가 결정될 수 있다. 세파 볼트(410)는 콘크리트 양생 시 줄눈용 거푸집들이 좁아지는 현상을 예방하고 이들의 간격을 유지시키는 역할을 한다.Sepa bolts 410 are permanently buried in the exposed concrete wall 10 and secured. The D cone 420 is coupled to both ends of the septa bolt 410 through a thread. At this time, the thickness of the exposed concrete wall 10 can be determined according to the length of the seperat bolt 410. Sepha bolts (410) prevent cracking of joint formwork during concrete curing and maintain spacing between them.

D 콘 결합단계(S50)는 노출콘크리트 벽체(10)에 형성되는 콘구멍(11)의 자리를 형성하는 D 콘(420)을 세파 볼트(410)의 양단부에 결합시키는 과정이다. 이때, 콘크리트가 완전히 굳기 전에 D 콘(420)이 해당 위치에서 제거되어 재사용되는데, 이처럼 D 콘(420)이 제거된 자리에 원형의 콘구멍(11)이 형성될 수 있다.The D-cone coupling step S50 is a process of coupling the D-cone 420 forming the seat of the cone hole 11 formed in the exposed concrete wall 10 to both ends of the seperate bolt 410. [ At this time, before the concrete is completely hardened, the D-cone 420 is removed from the corresponding position and reused. Thus, the circular cone hole 11 can be formed in the place where the D-cone 420 is removed.

본체 볼트 결합단계(S60)는 본체 볼트(430)를 줄눈용 거푸집(1000)들을 각각 통과하도록 한 후에 D 콘(420)에 결합시키는 과정이다.The body bolt joining step S60 is a process of joining the main body bolt 430 to the D-cone 420 after allowing each of the dies 1000 to pass through.

주물 사각와셔 체결단계(S70)는 줄눈용 거푸집(1000)들의 외측에서 본체 볼트(430)에 끼워지게 주물 사각와셔(440)를 체결하는 과정이다.The step of fastening the square square washer S70 is a process of tightening the square square washer 440 so as to be fitted to the body bolt 430 from the outside of the molding form 1000 for joints.

주물 사각와셔(440)의 사이즈가 큰 이유는 줄눈용 거푸집(1000)들을 관통하는 본체 볼트(430)의 구멍 주위로 배치되는 거푸집 보강용 각재 또는 철재(미도시) 등을 감싸기 위함이다.The reason why the size of the rectangular square washer 440 is large is to wrap the formwork reinforcement slab or steel material (not shown) arranged around the hole of the body bolt 430 passing through the joint formwork 1000.

주물 너트 체결단계(S80)는 주물 사각와셔(440)가 이탈되지 않도록 주물 너트(450)를 체결하여 고정시키는 과정이다. 이러한 주물 너트(450)는 콘크리트 타설시 측압을 버틸 수 있고, 이로 인해 노출콘크리트 벽체(10)의 두께가 설계치보다 늘어나는 현상이 예방될 수 있다.The casting nut tightening step S80 is a process of fastening and fixing the casting nut 450 so that the casting square washer 440 is not separated. The cast nut 450 can withstand lateral pressure when the concrete is poured, thereby preventing the thickness of the exposed concrete wall 10 from increasing beyond the designed value.

콘크리트 양생단계(S90)는 도 7(c)처럼 줄눈용 거푸집(1000)들 사이로 콘크리트를 넣어 양생하는 과정이다. The concrete curing step (S90) is a process of curing concrete by placing the concrete between the joint formwork (1000) as shown in Fig. 7 (c).

부품 제거단계(S100)는 도 7(d)처럼 콘크리트가 완전히 굳기 전에 줄눈용 거푸집(1000)들, D 콘(420), 본체 볼트(430), 주물 사각와셔(440) 및 주물 너트(450)를 제거하는 과정이다. 필요에 따라 이들 부품들은 재사용될 수 있다.The part removing step S100 is a step of removing the joint molds 1000, the D-cone 420, the body bolt 430, the cast square washer 440 and the casting nut 450 before the concrete is completely hardened as shown in FIG. . These components can be reused as needed.

줄눈용 거푸집 해체 단계(S110)는 전반적인 시공이 완료된 이후 거푸집 본체(100)의 야적, 또는 이동을 위해 해체하여 거푸집 본체(100)와 줄눈바(210) 및 줄눈바 고정부재(220)를 분리하는 과정이다. 이때, 거푸집의 해체 시, 줄눈바(210)가 설치된 상태에서 거푸집 본체(100)에 고정된 줄눈바 고정부재(220)의 고정상태를 해제하면, 줄눈바 고정부재(220)의 고정 해제와 동시에 줄눈바(210)의 설치 상태가 해체(분리)될 수 있음에 따라 거푸집 해체가 효율적으로 이루어질 수 있고 이에 거푸집 해체에 걸리는 시간이 단축될 수 있다.After the overall construction is completed, the mold disassembling step S110 is performed to remove the mold body 100 from the joint bar 210 and the joint bar fixing member 220 Process. At this time, when the form joint is dismantled, when the joint bar fixing member 220 fixed to the formwork body 100 is released from the fixing state of the joint bar fixing member 220 in a state where the joint bar 210 is installed, Since the installation state of the joint bar 210 can be disassembled, the form disassembly can be efficiently performed, and the time required for disassembling the form can be shortened.

아울러, 본 발명의 실시예의 경우, 줄눈용 거푸집(1000)들을 양쪽에 배치하였기 때문에 노출콘크리트 벽체(10)의 내면 혹은 외면 모두에 콘구멍(11)과 줄눈(12)이 형성되나, 줄눈용 거푸집(1000)들을 한쪽에만 배치하고 다른쪽에는 일반적인 거푸집을 사용할 경우, 노출콘크리트 벽체(10)의 내면에만 혹은 외면에만 콘구멍(11)과 줄눈(12)이 형성되도록 할 수 있다. In addition, in the embodiment of the present invention, since the joint formwork 1000 is disposed on both sides, the cone hole 11 and the joint 12 are formed on the inner or outer surface of the exposed concrete wall 10, The cone hole 11 and the joint 12 may be formed only on the inner surface or the outer surface of the exposed concrete wall 10 when the concrete structures 1000 are disposed on only one side and a general form is used on the other side.

이상 설명한 바와 같은 본 실시예에 따르면, 콘구멍(11)과 줄눈(12)의 배치와 배열이 정렬되어 설치되는 줄눈바 고정부재(220)에 의해 자동적으로 이루어짐으로써 노출콘크리트 벽체(10)에 대한 생동감과 규칙성을 연출할 수 있어 건축물의 완성도가 종래보다 훨씬 상승될 수 있어 다양한 형태의 건축물의 미적 아름다움을 드높일 수 있게 된다.According to the present embodiment as described above, the arrangement and arrangement of the cone hole 11 and the joint 12 are automatically performed by the joint bar fixing member 220 arranged in an aligned manner, The liveliness and the regularity can be produced, and the completeness of the building can be raised much higher than the conventional one, so that the aesthetic beauty of various types of buildings can be enhanced.

특히, 노출콘크리트 벽체(10) 상에 줄눈(12)이 부드러우면서도 정교한 선으로 나타낼 수 있으며, 다양한 건물에 있어서 규칙적인 외관의 노출콘크리트를 표현할 수 있다.In particular, the joints 12 on the exposed concrete wall 10 can be represented as smooth and sophisticated lines, and exposed concrete having regular appearance in various buildings can be expressed.

아울러, 노출콘크리트 벽체(10) 상에 줄눈(12)을 양측 또는 어느 한 측에만 설치 가능함에 따라, 건물벽의 외측을 형성하는 거푸집에 줄눈바 고정부재 및 줄눈바를 설치하고, 견물벽의 내측을 형성하는 거푸집에는 줄눈바 고정부재 및 줄눈바를 설치하지 않고 전기 배선을 위한 설치 공간과 같은 별도의 구조를 마련하기 위한 패널 또는 부재를 설치함으로써 선택적으로 용도 및 목적에 맞는 콘크리트 벽체를 형성할 수 있으며, 이에 따른 건축물 설계 자유도가 향상될 수 있다. In addition, since the joint 12 can be installed on both sides or one side of the exposed concrete wall 10, a joint bar fixing member and a joint bar are provided on a mold forming the outside of the building wall, A concrete wall suitable for the purpose and purpose can be selectively formed by providing a panel or member for providing a separate structure such as an installation space for electric wiring without providing a joint bar fixing member and a joint bar, The degree of freedom in the design of the building can be improved.

이상에서 설명한 본 발명은, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 있어 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경이 가능하므로 전술한 실시 예 및 첨부된 도면에 의해 한정되는 것이 아니라, 다양한 변형이 이루어질 수 있도록 각 실시 예들의 전부 또는 일부가 선택적으로 조합되어 구성될 수 있다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention. The present invention is not limited to the drawings, and all or some of the embodiments may be selectively combined so that various modifications may be made.

10: 노출콘크리트 벽체
11:: 콘구멍 12: 줄눈
100: 거푸집 본체
200: 줄눈 형성부재
210: 줄눈바
211: 몸체부 212: 결합날개부
213: 보강판 214: 탈거홈
220: 줄눈바 고정부재
221: 중앙돌기 222: 고정날개부
223: 체결홀 224: 결합후크
225: 보강판 삽입홈 226: 고정날개 보강리브
1000: 줄눈용 거푸집
10: Exposed concrete wall
11 :: Cone hole 12: Joints
100: Formwork body
200: joint formation member
210: Joint bar
211: body portion 212: coupling wing
213: reinforcing plate 214: removable groove
220: joint bar fixing member
221: central projection 222: stationary wing
223: fastening hole 224: coupling hook
225: reinforcing plate insertion groove 226: fixed blade reinforcing rib
1000: Die for joint

Claims (4)

벽체가 시공되는 위치에 다수의 철근을 이용하여 철근 기초물을 설치하는 철근 기초물 설치단계;
시공 벽체의 면적에 대응되도록 판상의 거푸집 본체들을 연속적으로 설치한 다음, 거푸집 본체의 전면부 상에 벽체에 형성되는 줄눈의 교차 지점과 각각 대응되는 지점에 십자형(+)의 구조의 줄눈바 고정부재들을 설치한 다음 수평 및 수직방향별로 인접하게 설치된 줄눈바 고정부재에 줄눈바의 양단을 각각 삽입 결합시킴으로써 줄눈용 거푸집을 제작하는 줄눈용 거푸집 제작단계;
줄눈용 거푸집 제작단계를 통해 제작된 상기 줄눈용 거푸집들을 철근 기초물을 사이에 두고 상호 마주보도록 이격 배치하는 줄눈용 거푸집 배치단계;
상기 줄눈용 거푸집들 사이로 콘크리트를 넣어 양생하는 콘크리트 양생단계;
상기 콘크리트가 완전히 굳기 전에 상기 줄눈용 거푸집들, D 콘, 본체 볼트, 주물 사각와셔 및 주물 너트를 제거하는 부품 제거단계; 및
상기 줄눈용 거푸집을 해체하여 거푸집 본체로부터 줄눈바와 줄눈바 고정부재를 분리하는 줄눈용 거푸집 해체 단계;를 포함하여 이루어지되;
상기 줄눈바는,
반원관(Half-pipe) 구조의 몸체부와, 상기 몸체부의 길이방향 양단으로부터 내측을 향하여 소정의 폭으로 연장 형성되는 결합날개부와, 상기 몸체부의 내측에 중앙에서 길이방향을 따라 기립 형성되어 길이조절을 위해 몸체부의 소정지점을 절단하는 경우에도 항상 존재하게 되는 보강판, 및 상기 몸체부의 양단에 형성되는 탈거홈을 포함하여 형성되고,
줄눈바 고정부재는,
육면체 구조로 형성되고 상면에는 음각 또는 양각으로의 특정 패턴의 형상이 가공되며 중앙측에 체결홀이 관통 형성되는 중앙돌기와, 상기 몸체부의 저면측으로 삽입될 수 있는 폭을 갖는 판형 구조로 상기 중앙돌기의 하단측에 치우친 위치에서 저면이 중앙돌기의 저면과 동일선상으로 형성되어 상기 중앙돌기의 각 측면에 일체 형성되는 고정날개부와, 상기 각 고정날개부의 양측 끝단을 따라 돌출 형성되어 상기 몸체부의 결합날개부와 후크 결합방식으로 결합되기 위한 걸림부가 형성된 결합후크와, 상기 보강판의 두께와 대응되는 폭으로 상기 각 고정날개부를 길이방향으로 양분하는 형태로 중앙측이 절개되어 형성되는 보강판 삽입홈, 및 상기 중앙돌기의 측면과 고정날개부의 상면에 접촉되도록 고정날개부의 길이방향을 따라 형성되는 복수개의 고정날개 보강리브를 포함하여 형성되며,
상기 고정날개 보강리브는,
상기 중앙돌기측에서 고정날개부의 끝단 측으로 갈수록 하향지게 경사진 쐐기형 구조로 형성되고, 고정날개부의 끝단까지 미치지 못하는 길이로 형성됨으로써 줄눈바 고정부재의 해체 시 낙하에 따른 고정날개부의 끝단에 충격이 가해질 경우 고정날개부의 끝단에 발생되는 변형을 허용함으로써 고정날개부의 파손이 최소화되도록 하는 것을 특징으로 하는 콘크리트 건물의 벽체 시공방법.
A step of installing a reinforcing bar foundation in which a reinforcing bar foundation is installed using a plurality of reinforcing bars at a position where the wall is installed;
The plate formwork bodies are successively installed so as to correspond to the area of the installation wall. Then, on the front part of the formwork body, a joint bar fixing member And then joining both ends of the joint bar to the joint bar fixing member provided adjacent to each other in the horizontal and vertical directions to thereby form the joint form for the joint;
A step for arranging the joints for the joints, which are manufactured through the step of forming the joints for the joints, so that the joints for the joints are spaced apart from each other so as to face each other with the reinforcement foundation therebetween;
A concrete curing step in which concrete is cemented between the jointing molds;
A component removing step of removing the joint formwork, the D-cone, the body bolt, the cast square washer and the casting nut before the concrete is completely hardened; And
Disassembling the formwork for the joint and separating the joint bar and the joint bar fixing member from the formwork body;
In the joint bar,
A coupling wing portion extending inwardly from both ends in the longitudinal direction of the body portion with a predetermined width; a coupling wing portion formed in an inner side of the body portion so as to extend in the longitudinal direction along the longitudinal direction, A reinforcing plate which is always present even when cutting a predetermined point of the body part for adjustment, and a detachment groove formed at both ends of the body part,
The joint bar fixing member
A central protrusion formed in a hexahedron structure and having a top surface formed with a specific pattern shape with an engraved or embossed shape and having a fastening hole formed at a center thereof and a plate-like structure having a width capable of being inserted into the bottom surface of the body portion, A fixed wing formed integrally on each side surface of the central projection and formed so as to be in line with the bottom surface of the central projection at a position offset from the lower end side of the central projection and projecting along both ends of each of the fixed wings, A reinforcing plate inserting groove formed at a central portion of the inserting hook formed by bisecting each of the stationary vanes in the longitudinal direction with a width corresponding to the thickness of the reinforcing plate, And a plurality of projections formed along the longitudinal direction of the stationary vanes so as to contact the side surfaces of the central projections and the upper surface of the stationary vanes, Of being formed by a fixed wing reinforcing ribs,
The fixed blade reinforcing ribs
Shaped structure that is inclined downwardly from the central projection toward the end of the fixed blade, and is formed to have a length that does not reach the end of the fixed blade. Thus, an impact is generated at the end of the fixed blade due to dropping of the joint bar fixing member Wherein when the wing is applied, deformation occurring at an end of the fixed wing portion is allowed to minimize breakage of the fixed wing portion.
청구항 1에 있어서,
상기 줄눈바의 양단은 고정날개부에 형성된 결합후크와의 접촉에 의해 벌어진 후 탄성에 의해 원래 형상으로 복원되어 상기 결합날개부가 걸림부에 결합됨으로써 줄눈바 고정부재에 고정되는 것을 특징으로 하는 콘크리트 건물의 벽체 시공방법.
The method according to claim 1,
Wherein both ends of the joint bar are opened by contact with a coupling hook formed on the fixed wing portion and then restored to their original shape by elasticity so that the joint wing is fixed to the joint bar fixing member by being coupled to the coupling portion. Wall construction method.
삭제delete 청구항 1에 있어서,
상기 줄눈용 거푸집 배치단계와 상기 콘크리트 양생단계 사이에는
세파 볼트를 이용하여 상기 줄눈용 거푸집들 간의 이격거리를 확보하는 이격거리 확보단계;
노출콘크리트 벽체에 형성되는 콘구멍의 자리를 형성하는 D 콘을 상기 세파 볼트의 양단부에 결합시키는 D 콘 결합단계;
본체 볼트를 상기 줄눈용 거푸집들을 각각 통과하도록 한 후에 상기 본체 볼트를 상기 D 콘에 결합시키는 본체 볼트 결합단계;
상기 줄눈용 거푸집들의 외측에서 상기 본체 볼트에 끼워지게 주물 사각와셔를 체결하는 주물 사각와셔 체결단계; 및
상기 주물 사각와셔가 이탈되지 않도록 주물 너트를 체결하는 주물 너트 체결단계;가 더 포함되는 것을 특징으로 하는 콘크리트 건물의 벽체 시공방법.
The method according to claim 1,
Between the step of arranging the mold for joint and the concrete curing step
A step of securing a spacing distance between the joint formers using a septa bolt;
A D-cone coupling step of coupling a D-cone forming a seat of a cone hole formed in the exposed concrete wall to both ends of the septa bolt;
A body bolt engaging step of engaging the body bolt with the D-cone after allowing the body bolt to pass through the joint molding;
A step of fastening a cast square washer to fasten the cast square washer to be fitted to the body bolt from the outside of the joint formwork; And
And a casting nut fastening step of fastening the casting nut so that the casting square washer does not come off.
KR1020180045374A 2018-04-19 2018-04-19 Construction method of concrete building wall KR101899860B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180045374A KR101899860B1 (en) 2018-04-19 2018-04-19 Construction method of concrete building wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180045374A KR101899860B1 (en) 2018-04-19 2018-04-19 Construction method of concrete building wall

Publications (1)

Publication Number Publication Date
KR101899860B1 true KR101899860B1 (en) 2018-09-18

Family

ID=63718508

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180045374A KR101899860B1 (en) 2018-04-19 2018-04-19 Construction method of concrete building wall

Country Status (1)

Country Link
KR (1) KR101899860B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210155895A (en) 2020-06-17 2021-12-24 정석평 Construction construction structure and method using foamed ceramic panel

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009138362A (en) * 2007-12-04 2009-06-25 Kajima Corp Jointer of wall of reinforced concrete building
KR101812565B1 (en) * 2017-07-27 2018-01-30 대화이앤씨건설 주식회사 Building construction method using exposed concrete wall

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009138362A (en) * 2007-12-04 2009-06-25 Kajima Corp Jointer of wall of reinforced concrete building
KR101812565B1 (en) * 2017-07-27 2018-01-30 대화이앤씨건설 주식회사 Building construction method using exposed concrete wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210155895A (en) 2020-06-17 2021-12-24 정석평 Construction construction structure and method using foamed ceramic panel

Similar Documents

Publication Publication Date Title
AU2018204338B2 (en) Formwork panel for concreting formworks
KR101765107B1 (en) Building construction method using exposed concrete wall
KR101801270B1 (en) Building construction method using exposed concrete wall
KR101812565B1 (en) Building construction method using exposed concrete wall
KR101770172B1 (en) Building construction method using exposed concrete process
KR101854653B1 (en) Construction method of concrete structure based on exposed concrete method
KR101899860B1 (en) Construction method of concrete building wall
KR101900689B1 (en) Walls construction method using exposed concrete method
KR101590180B1 (en) Precast concrete slab having lightweight body and ribs provided with wide head and, manufacturing methods of the same
KR101859398B1 (en) Building construction method using exposed concrete wall
KR101859406B1 (en) Building construction method using exposed concrete wall
KR101925362B1 (en) Construction method of reinforced concrete wall
KR101859408B1 (en) Wall construction method of exposed concrete method
KR101812955B1 (en) Building construction method using exposed concrete process
KR101906194B1 (en) Construction method of reinforced concrete wall
KR101812560B1 (en) Building construction method
KR100715788B1 (en) Fixing apparatus for mold
KR101915184B1 (en) Cross line forming member of concrete structure
KR20110000140U (en) Structure for connection unit of aluminum foam panel
KR101915181B1 (en) Construction method of concrete structure
KR101877417B1 (en) Retaining wall construction method
KR20100023228A (en) Flat tie
KR200357642Y1 (en) Reinforcement structure of inconner panel
KR20190001483A (en) Sandwich precast concrete wall and construction method using the same
KR101831427B1 (en) Rebar-inserted Cap for Removing Form

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant