KR101861254B1 - construction method and structure of insulation in concrete outer walls - Google Patents

construction method and structure of insulation in concrete outer walls Download PDF

Info

Publication number
KR101861254B1
KR101861254B1 KR1020170065220A KR20170065220A KR101861254B1 KR 101861254 B1 KR101861254 B1 KR 101861254B1 KR 1020170065220 A KR1020170065220 A KR 1020170065220A KR 20170065220 A KR20170065220 A KR 20170065220A KR 101861254 B1 KR101861254 B1 KR 101861254B1
Authority
KR
South Korea
Prior art keywords
heat insulating
insulating material
support
wall
fixing member
Prior art date
Application number
KR1020170065220A
Other languages
Korean (ko)
Inventor
공태성
Original Assignee
(주)태성산업개발
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)태성산업개발 filed Critical (주)태성산업개발
Priority to KR1020170065220A priority Critical patent/KR101861254B1/en
Application granted granted Critical
Publication of KR101861254B1 publication Critical patent/KR101861254B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/7675Insulating linings for the interior face of exterior walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Electromagnetism (AREA)
  • Building Environments (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a construction method and a structure of a middle insulation material in a concrete outer wall. A support rod is fixed to an insulation material by fixing a fixing member to both end portions of the support rod fitted into the insulation material, respectively such that not only constructability can be improved, but also durability of a building can be improved by forming the support rod with glass fiber reinforced plastic.

Description

콘크리트 외벽의 중간 단열재 시공방법 및 구조{construction method and structure of insulation in concrete outer walls}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a composite insulation,

본 발명은 콘크리트 외벽의 중간 단열재 시공방법 및 구조에 관한 것으로, 보다 상세하게는 단열재에 끼워지는 지지봉의 양단부에 고정부재를 각각 고정하여 지지봉을 단열재에 고정시키므로 시공성이 향상될 뿐만 아니라 지지봉을 유리섬유 강화 플라스틱으로 형성하여 건축물의 내구성을 향상시키는 콘크리트 외벽의 중간 단열재 시공방법 및 구조에 관한 것이다.More particularly, the present invention relates to a method and an apparatus for inserting a middle portion of a concrete outer wall, and more particularly, to a method for installing a middle portion of a concrete outer wall by fixing a fixing member to both ends of a supporting rod, The present invention relates to a method for constructing a middle insulating material of a concrete outer wall which is made of reinforced plastic and improves the durability of a building.

일반적으로 건축물의 외부 벽체는, 목재 또는 알루미늄으로 이루어진 거푸집을 이용하여 시공 대상 외부 벽체의 두께에 해당하는 간격에 맞게 배근된 철근을 수용하도록 내,외측 거푸집을 설치하고, 콘크리트의 타설 및 양생이 이루어지도록 한 후, 거푸집을 제거하는 과정을 반복한다.In general, the outer wall of the building is constructed by using a die made of wood or aluminum to install the inner and outer molds so as to accommodate the reinforced bars fitted to the gap corresponding to the thickness of the outer wall to be applied, Then, the process of removing the form is repeated.

상기 외부 벽체를 시공할 때, 건축물의 내,외부의 외풍, 소음 및 결로 등을 차단하면서 적당한 실내온도를 유지하도록 단열재가 시공되는데, 상기 단열재는 건축물의 외부 벽체의 내,외벽 또는 어느 일측에 설치한 후, 외장용 마감재로 마감하여 최종적으로 벽체를 시공할 수 있으나. 상기 외부 벽체의 내벽에 설치되는 마감재는 오이부 벽체와 단열재 사이에 결로가 발생함은 물론 상기 결로가 벽지나 장판 속으로 흘러내려 곰팡이가 발생하고, 화재시 단열재의 연소에 따라 유독가스가 발생하는 문제점이 있었다.When the outer wall is constructed, a heat insulating material is installed so as to maintain an appropriate room temperature while shielding the outside air, noise and condensation of the inside and outside of the building. The heat insulating material is installed inside or outside wall of the building, After that, it is possible to finish the wall by finishing with external finishing material. The finishing material provided on the inner wall of the outer wall generates dew condensation between the cucumber wall and the heat insulating material, as well as molds that flow down into the wallpaper or the plank, and poisonous gas is generated due to the combustion of the heat insulating material during the fire There was a problem.

또한, 상기 외부 벽체의 외벽에 설치되는 마감재는, 다른 마감재보다 오염이 심할 분만 아니라 심지어 외벽으로부터 분리되어 떨어짐으로써 유지관리가 어려운 문제점이 있었다.In addition, the finishing material provided on the outer wall of the outer wall has a problem that it is difficult to maintain the finishing material because it is separated from the outer wall and is not only contaminated more than other finishing materials.

상기의 문제점을 해결하기 위해 근래에는 단열재가 외부 벽체의 중간에 설치되어 외부 벽체를 형성하는 구성으로 대한민국 공개특허공보 제10-2012-0067897호로 조립식 연결부재를 갖는 건축용 단열재가 공개된 바 있다.In order to solve the above-mentioned problems, a thermal insulating material having a built-in connecting member in Korean Patent Publication No. 10-2012-0067897 has been disclosed in recent years in which a heat insulating material is provided in the middle of an outer wall to form an outer wall.

상기 선 공개된 특허는, 단열재의 통공에 결합되는 연결관에 결합구를 결합하고, 상기 결합구에 철근을 삽입한 후, 상기 철근에 지지캡을 장착하여 거푸집에 설치한다.In the above-mentioned patent, a coupling hole is coupled to a coupling pipe coupled to a through hole of a heat insulating material, a reinforcing bar is inserted into the coupling hole, and a support cap is mounted on the reinforcing bar to install the molding.

그러나, 선 공개된 특허는 결합구에 결합된 철근이 단열재에 견고하게 고정되지 않아 콘크리트의 타설 압력에 의해 간격유지용 철근이 균형을 잃으면서 결합구로부터 이탈되어 거푸집을 지지하지 못하므로 단열재가 파손되는 문제점에 있었다.However, in the prior art, since the reinforcing bars joined to the fittings are not firmly fixed to the heat insulating material, the spacing reinforcing bars lose balance due to the pouring pressure of the concrete, There was a problem in being.

또한, 상기 결합구에 철근이 분할설치되므로 부품 수가 늘어나 시공시간 지연 및 원가상승으로 인해 경제성이 떨어지는 문제점이 있었고, 상기 철근이 정확한 길이로 절단되지 않을 경우, 타설되는 콘크리트의 압력에 의해 단열재의 위치가 변경되므로 단열효율이 떨어짐은 물론 상부층에 결로현상이 발생하는 문제점이 있었다.In addition, there is a problem in that the number of parts is increased due to the installation of reinforcing bars in the coupling hole, resulting in a decrease in economic efficiency due to delay in construction time and cost increase. When the reinforcing bars are not cut to the correct length, There is a problem that the adiabatic efficiency is lowered and a condensation phenomenon occurs in the upper layer.

이에 상술한 바와 같은 종래의 제반 문제점을 감안하여 이루어진 것으로, 그 목적은 지지봉의 내측 단부에 고정부재를 삽입한 후 지지봉을 단열재의 내측에서 외측으로 통과시킨 상태에서 지지봉의 외측 단부에 또 다른 고정부재를 삽입하여 지지봉을 단열재에 고정시키므로 시공이 간편하여 작업시간을 단축시킬 뿐만 아니라 단열재의 고정을 견고하게 하고 콘크리트의 타설시 단열재의 유동을 방지하여 안정적인 시공을 가능하게 하는 콘크리트 외벽의 중간 단열재 시공방법 및 구조를 제공함에 있다.SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and it is an object of the present invention to provide a fixing member, To prevent the flow of the insulation when the concrete is laid and to prevent the flow of the insulation when the concrete is laid, thus making it possible to perform stable installation. And a structure.

또한, 본 발명의 다른 목적은 고정부재에 측정지그를 결합한 후 지지봉을 고정부재에 삽입하여 측정지그에 근접되도록 한 상태에서 고정부재로부터 측정지그를 분리시켜 고정부재의 고정위치를 결정하므로 시공이 간편하여 작업시간을 더욱 단축시킬 수 있는 콘크리트 외벽의 중간 단열재 시공방법 및 구조를 제공함에 있다.It is a further object of the present invention to provide a method and a device for measuring a fixing jig, comprising: connecting a measuring jig to a fixing member; inserting the supporting rod into the fixing member to close the measuring jig; And to provide a method and a method for constructing a middle insulating material of a concrete outer wall which can further shorten the working time.

또한, 본 발명의 다른 목적은 단열재를 고정시키는 지지봉을 인장력이 우수하고 부식 및 전기전도성이 없는 유리섬유 강화 플라스틱 소재로 형성하므로 건축물의 내구성을 향상시킴과 동시에 친 에너지 시공법으로 시공하여 건축물의 가치를 한층 향상시키는 콘크리트 외벽의 중간 단열재 시공방법 및 구조를 제공함에 있다.Another object of the present invention is to improve the durability of a building by constructing a supporting rod for fixing a heat insulating material to a glass fiber reinforced plastic material having excellent tensile strength and having no corrosion and electric conductivity, And to provide a method and a method for constructing a middle insulating material of a concrete outer wall to be further improved.

본 발명 콘크리트 외벽의 중간 단열재 시공방법은,According to the present invention,

소정 두께의 사각판형 단열재를 적층시키는 단계;Stacking a rectangular plate-shaped heat insulating material having a predetermined thickness;

상기 단열재와 동일한 넓이로 형성되며 다수의 안내홀이 일정간격으로 관통된 천공용 지그를 상기 단열재의 상부에 안착시키는 단계;Placing a perforating jig having the same width as that of the heat insulating material and having a plurality of guide holes passing through the heat insulating material at regular intervals, on the heat insulating material;

상기 단열재에 안착된 천공용 지그의 안내홀에 드릴을 관통시켜서 적층된 단열재에 관통공을 형성하는 단계;Passing a drill through a guide hole of a drilling jig seated on the heat insulating material to form a through hole in the heat insulating material;

외주면에 다수의 리브가 형성된 지지봉을 콘크리트 외벽의 두께와 근접한 길이로 절단하는 단계;Cutting a support rod having a plurality of ribs on an outer circumferential surface thereof to a length close to the thickness of the concrete outer wall;

상기 지지봉의 외측 단부를 단열재의 관통공을 통해 내측에서 외측으로 통과시킨 후, 상기 단열재의 내·외측면에 고정부재를 각각 삽입하여 지지봉을 단열재에 수평으로 고정시키는 단계;Passing the outer end of the support rod through the through hole of the heat insulating member from the inside to the outside and inserting the fixing member into the inner and outer surfaces of the heat insulating member to fix the supporting rod horizontally to the heat insulating member;

상기 단열재를 외벽 거푸집 내부에 수직으로 세워 설치하는 단계;Installing the heat insulating material vertically upright inside the outer wall formwork;

상기 지지봉에 철근을 묶어 배근하는 단계; 및Binding the reinforcing bars to the support rods; And

상기 철근이 배근된 외벽 거푸집의 내부에 콘크리트를 충진하여 타설하는 단계로 이루어진다.And filling the concrete in the outer wall formwork in which the reinforcing bars are laid.

본 발명 콘크리트 외벽의 중간 단열재 시공방법은,According to the present invention,

소정 두께의 사각판형 단열재를 적층시키는 단계;Stacking a rectangular plate-shaped heat insulating material having a predetermined thickness;

상기 단열재와 동일한 넓이로 형성되며 다수의 안내홀이 일정간격으로 관통된 천공용 지그를 상기 단열재의 상부에 안착시키는 단계;Placing a perforating jig having the same width as that of the heat insulating material and having a plurality of guide holes passing through the heat insulating material at regular intervals, on the heat insulating material;

상기 단열재에 안착된 천공용 지그의 안내홀에 드릴을 관통시켜서 적층된 단열재에 관통공을 형성하는 단계;Passing a drill through a guide hole of a drilling jig seated on the heat insulating material to form a through hole in the heat insulating material;

외주면에 다수의 리브가 형성된 지지봉을 콘크리트 외벽의 두께와 근접한 길이로 절단하는 단계;Cutting a support rod having a plurality of ribs on an outer circumferential surface thereof to a length close to the thickness of the concrete outer wall;

원통형의 측정지그를 고정부재의 외측에 끼워 결합하는 단계;Fitting a cylindrical measuring jig to the outside of the fixing member;

상기 고정부재에 지지봉의 내측 단부를 삽입하여 측정지그의 내측면과 근접되도록 한 후, 상기 측정지그를 분리하여 고정부재의 고정위치를 결정하는 단계;Inserting the inner end of the support rod into the fixing member to bring the inner end of the support rod close to the inner side of the measuring paper, and then separating the measuring jig to determine the fixing position of the fixing member;

상기 지지봉의 외측 단부를 단열재의 관통공을 통해 내측에서 외측으로 통과시켜 고정부재가 단열재의 내측면에 밀착되게 한 후, 또 다른 고정부재를 지지봉의 외측 단부에 삽입하여 지지봉을 단열재에 수평으로 고정시키는 단계;The outer end of the support rod is passed from the inner side to the outer side through the through hole of the heat insulating material so that the fixing member is brought into close contact with the inner side surface of the heat insulating material and then another fixing member is inserted into the outer end of the support rod to horizontally fix the supporting rod to the heat insulating material ;

상기 단열재를 외벽 거푸집 내부에 수직으로 세워 설치하는 단계;Installing the heat insulating material vertically upright inside the outer wall formwork;

상기 지지봉에 철근을 묶어 배근하는 단계; 및Binding the reinforcing bars to the support rods; And

상기 철근이 배근된 외벽 거푸집의 내부에 콘크리트를 충진하여 타설하는 단계로 이루어진다.And filling the concrete in the outer wall formwork in which the reinforcing bars are laid.

또한, 본 발명 콘크리트 외벽의 중간 단열재 구조는, Further, in the intermediate insulation material structure of the concrete outer wall of the present invention,

소정 두께의 사각판형으로 형성되는 단열재;A heat insulating material formed in a rectangular plate shape with a predetermined thickness;

상기 단열재의 일정 간격으로 구획된 위치에 형성되는 다수의 관통공;A plurality of through holes formed at positions separated by a predetermined distance of the heat insulating material;

외주면에 다수의 리브가 형성되며 콘크리트 외벽의 두께와 근접한 길이로 절단되어 상기 관통공에 수평으로 삽입되는 유리섬유 강화 플라스틱 소재의 지지봉;A supporting rod of a glass fiber reinforced plastic material having a plurality of ribs formed on an outer circumferential surface thereof and being cut into a length close to the thickness of the outer wall of the concrete and horizontally inserted into the through hole;

상기 지지봉을 단열재에 고정시키도록 상기 단열재의 양측으로 인출된 지지봉의 양단부에 각각 결합되어 상기 단열재의 양측면에 밀착되는 고정부재를 포함하여 구성되며,And a fixing member coupled to both end portions of the support rods drawn to both sides of the heat insulating member so as to fix the support rods to the heat insulating member and closely attached to both sides of the heat insulating member,

상기 고정부재는,Wherein:

상기 단열재에 밀착되는 지지판의 중심을 통해 지지봉을 통과시킬 수 있는 직경으로 연통된 지지보스를 포함하여 구비된다.And a support boss communicating with a diameter allowing the support rod to pass through the center of the support plate closely attached to the heat insulating material.

상기 고정부재는, 상기 지지판의 외측면에 지지리브가 방사상으로 구비되고, 상기 지지봉의 리브가 걸리도록 지지보스의 내경에 일정 간격으로 고정돌기를 포함하여 구비되며, 상기 지지보스의 외측단 내경이 내측단 내경보다 작은 직경으로 형성된다.Wherein the fixing member includes a fixing protrusion at a predetermined interval in an inner diameter of the supporting boss such that the supporting rib is radially provided on the outer surface of the supporting plate and the rib of the supporting rod is caught, Is formed with a diameter smaller than the inner diameter.

상기 고정부재의 외측 중심에 지지봉의 내측 단부를 삽입 후 분리하여 고정부재의 고정위치를 결정하도록 일측이 개방된 원통형의 측정지그를 더 포함하여 구비된다.And a cylindrical measuring jig having one side thereof opened to determine the fixing position of the fixing member by inserting and separating the inner end of the supporting rod at the outer center of the fixing member.

본 발명은 지지봉의 내측 단부에 고정부재를 삽입한 후 지지봉을 단열재의 내측에서 외측으로 통과시킨 상태에서 지지봉의 외측 단부에 또 다른 고정부재를 삽입하여 지지봉을 단열재에 고정시키므로 시공이 간편하여 작업시간을 단축시킬 뿐만 아니라 단열재의 고정을 견고하게 하고 콘크리트의 타설시 단열재의 유동을 방지하여 안정적인 시공을 가능하게 하는 이점이 있는 것이다.Since the fixing rod is inserted into the inner end of the supporting rod and then the supporting rod is passed from the inside to the outside of the heat insulating member, another fixing member is inserted into the outer end of the supporting rod to fix the supporting rod to the heat insulating material, It is advantageous that the fixing of the heat insulating material is made firm and the flow of the heat insulating material is prevented when the concrete is poured, thereby enabling stable construction.

또한, 본 발명은 고정부재에 측정지그를 결합한 후 지지봉을 고정부재에 삽입하여 측정지그에 근접되도록 한 상태에서 고정부재로부터 측정지그를 분리시켜 고정부재의 고정위치를 결정하므로 시공이 간편하여 작업시간을 더욱 단축시킬 수 있는 이점이 있는 것이다.In addition, the present invention determines the fixing position of the fixing member by separating the measuring jig from the fixing member while inserting the measurement jig into the fixing member and then inserting the supporting bar into the fixing member so as to be close to the measuring jig. Can be further shortened.

또한, 본 발명은 단열재를 고정시키는 지지봉을 인장력이 우수하고 부식 및 전기전도성이 없는 유리섬유 강화 플라스틱 소재로 형성하므로 건축물의 내구성을 향상시킴과 동시에 친 에너지 시공법으로 시공하여 건축물의 가치를 한층 향상시키는 이점이 있는 것이다.In addition, the present invention improves the durability of the building and improves the value of the building by applying the energy-saving construction method because the supporting rod for fixing the heat insulating material is formed of the glass fiber reinforced plastic material having excellent tensile strength and no corrosion and electric conductivity There is an advantage.

도 1은 본 발명의 사시도
도 2는 본 발명 고정부재의 사시도
도 3 내지 도 6은 본 발명 일실시예의 시공과정도
도 7 내지 도 11은 본 발명 다른 실시예의 시공과정도
BRIEF DESCRIPTION OF THE DRAWINGS FIG.
2 is a perspective view of the fixing member of the present invention.
3 to 6 are diagrams showing the construction process of the embodiment of the present invention
Figs. 7 to 11 are views showing a construction process of another embodiment of the present invention

이하, 첨부된 도면에 의거하여 본 발명의 일실시예를 상세하게 설명한다.Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 사시도이고, 도 2는 본 발명 고정부재의 사시도이다.Fig. 1 is a perspective view of the present invention, and Fig. 2 is a perspective view of a fixing member of the present invention.

본 발명 콘크리트 외벽의 중간 단열재 구조(100)는, 단열재(110), 관통공(120), 지지봉(130), 고정부재(140)로 구성되며, 상기와 같이 구성된 본 발명에 의한 콘크리트 외벽의 중간 단열재 시공방법을 상세하게 설명하면 다음과 같다.The intermediate insulation structure 100 of the concrete outer wall of the present invention is composed of a heat insulating material 110, a through hole 120, a support rod 130, and a fixing member 140. In the middle of the concrete outer wall Hereinafter, a method of constructing a thermal insulation material will be described in detail.

먼저 도 3 내지 도 6에 도시된 바와 같이, 소정 두께로 형성된 사각판형의 단열재(110)를 일정 높이로 쌓아 적층시킨다.First, as shown in FIGS. 3 to 6, a rectangular plate heat insulator 110 having a predetermined thickness is stacked at a predetermined height.

상기 단열재(110)는 가로와 세로 및 두께가 900×1800×120mm로 형성되는 것이 바람직하다.It is preferable that the heat insulating material 110 is formed to have a width, a length, and a thickness of 900 x 1800 x 120 mm.

또한, 상기와 같이 적층된 단열재(110)의 상부에 천공용 지그(미도시)를 안착시킨다.In addition, a cloth-making jig (not shown) is placed on the upper part of the heat insulating material 110 stacked as described above.

상기 천공용 지그는 단열재(110)와 동일한 넓이로 형성되는 것이 바람직하며, 상기 천공용 지그에는 가로·세로 일정 간격으로 안내홀이 형성되어 있다.Preferably, the perforating jig is formed to have the same width as that of the heat insulating material 110, and guide holes are formed in the perforating jig at regular intervals in the horizontal and vertical directions.

상기 천공용 지그를 안착시킨 상태에서, 안내홀에 드릴을 관통시켜 단열재(110)에 관통공(120)을 형성시켜 외벽 거푸집(20) 내부에 들어갈 단열재(110)를 준비한다.In the state where the perforating jig is seated, the drill is passed through the guide hole, and the through hole 120 is formed in the heat insulating material 110 to prepare the heat insulating material 110 to be inserted into the outer wall mold 20.

또한, 외주면에 일정 간격으로 다수의 리브(131)가 형성된 지지봉(130)을 일정 길이로 절단하되, 콘크리트 외벽의 두께와 근접한 길이를 형성하도록 절단한다.Further, the support bar 130 having a plurality of ribs 131 formed at regular intervals on its outer circumferential surface is cut to a predetermined length, and cut to form a length close to the thickness of the outer wall of the concrete.

상기 지지봉(130)은, 유리섬유 강화 플라스틱(glass fiber reinforced plastics)으로 형성하여 열전도율을 최소화할 수 있으며, 금속철근에 비해 뛰어난 인장력을 확보할 수 있고, 부식과 전기전도성이 없어 시공성이 뛰어나다.The support bar 130 may be formed of glass fiber reinforced plastics to minimize thermal conductivity, provide an excellent tensile strength as compared with a metal reinforcement, and have excellent workability due to no corrosion and electrical conductivity.

상기 지지봉(130)의 길이는 콘크리트 외벽의 두께보다 너무 짧아도 단열재(110)를 효과적으로 고정할 수 없으며, 너무 길어도 외벽 거푸집(20)을 설치할 수 없으므로 콘크리트 외벽의 두께보다 작으면서 근접된 길이를 가져야 한다.The length of the support bar 130 can not be effectively secured even if the length of the support bar 130 is too short than the thickness of the outer wall of the concrete and the outer wall form 20 can not be installed even if it is too long to have a length smaller than the thickness of the concrete outer wall .

상기와 같이 일정 길이로 절단된 지지봉(130)의 외측 단부를 단열재(110)에 형성된 관통공(120)을 통해 내측에서 외측으로 통과시킨다.The outer end of the support bar 130 cut to a predetermined length is passed from the inside to the outside through the through hole 120 formed in the heat insulating material 110 as described above.

상기 지지봉(130)의 내·외측 단부에 고정부재(140)를 각각 삽입하게 되면, 상기 지지봉(130)에 형성된 리브(131)가 상기 고정부재(140)의 지지보스(142) 내경에 형성된 고정돌기(143)를 통과하게 됨과 동시에 고정부재(140)의 지지판(141)은 단열재(110)의 내·외측면에 각각 밀착되어 상기 지지봉(130)을 수평으로 고정시키게 된다.When the fixing member 140 is inserted into the inner and outer ends of the support rod 130, the rib 131 formed on the support rod 130 is fixed to the inner diameter of the support boss 142 of the fixing member 140 The support plate 141 of the fixing member 140 closely contacts the inner and outer surfaces of the heat insulating material 110 to fix the support bar 130 horizontally.

여기서, 상기 고정부재(140)의 지지보스(142)에 형성된 외측단 내경(142a)은 내측단 내경(142b)보다 작은 직경으로 형성되어야 하며, 이는 상기 지지봉(130)의 결합을 용이하게 하기 위함이다.The outer end inner diameter 142a formed in the support boss 142 of the fixing member 140 should be smaller than the inner end inner diameter 142b in order to facilitate the engagement of the support rod 130. [ to be.

또한, 상기 고정부재(140)는 지지판(141)에 방사상으로 지지리브(141a)가 형성되어 지지판(141)의 강성을 보강하게 되며, 지지보스(142) 내경에 형성되는 고정돌기(143)는 상기 지지봉(130)이 용이하게 결합되도록 경사지게 형성되는 것이 바람직하다.The fixing member 140 has a support rib 141a radially formed on the support plate 141 to reinforce the rigidity of the support plate 141 and a fixing protrusion 143 formed on the inner diameter of the support boss 142 It is preferable that the support bar 130 is formed to be inclined so as to be easily coupled.

상기와 같이 지지봉(130)이 고정된 단열재(110)를 외벽 거푸집(20) 내부에 수직으로 세워 설치한다.As described above, the heat insulating member 110 to which the support rod 130 is fixed is vertically installed inside the outer wall mold 20.

상기 단열재(110)가 세워지면 상기 단열재(110) 양측으로 돌출되어 형성된 지지봉(130) 단부에 설계도면에 따라 격자형으로 철근(10)을 배근하여 결속부재로 결속시켜 고정한다.When the heat insulating material 110 is raised, the reinforcing bars 10 are arranged in a lattice shape on the end of the support bar 130 protruding from both sides of the heat insulating material 110 according to the design drawing, and are fastened and fixed with binding members.

상기 외벽 거푸집(20)은 일정 두께의 콘크리트 외벽을 형성하도록 내측 거푸집(20')과 외측 거푸집(20")으로 이루어지며, 상기 내·외측 거푸집(20')(20")은 통상의 타이부재(미도시)를 통해 고정된다.The outer wall form 20 is composed of an inner form 20 'and an outer form 20' so as to form a concrete outer wall having a predetermined thickness. The inner and outer form 20 'and 20' (Not shown).

상기와 같이 철근(10)이 배근되면, 외벽 거푸집(20) 내부에 콘크리트를 타설하여 충진하고, 타설된 콘크리트가 일정 기간이 지나 양생이 완료되면 내·외측 거푸집(20')(20")을 해체하면 되는 것이다.When the reinforcement 10 is laid as described above, the concrete is poured into the outer wall formwork 20 and filled therein. When the poured concrete is cured after a predetermined period of time, the inner and outer formwork 20 ' It will be dismantled.

또한, 첨부된 도면에 의거하여 본 발명의 다른 실시예인 콘크리트 외벽의 중간 단열재 시공방법을 상세하게 설명한다.In addition, a method of constructing the intermediate insulation material of the concrete outer wall according to another embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 7 내지 도 11에 도시된 바와 같이, 소정 두께로 형성된 사각판형의 단열재(110)를 일정 높이로 쌓아 적층시킨다.As shown in FIGS. 7 to 11, a rectangular plate-shaped heat insulating material 110 having a predetermined thickness is stacked at a predetermined height and stacked.

상기 단열재(110)는 가로와 세로 및 두께가 900×1800×120mm로 형성되는 것이 바람직하다.It is preferable that the heat insulating material 110 is formed to have a width and a length and a thickness of 900 x 1800 x 120 mm.

또한, 상기와 같이 적층된 단열재(110)의 상부에 천공용 지그(미도시)를 안착시킨다.In addition, a cloth-making jig (not shown) is placed on the upper part of the heat insulating material 110 stacked as described above.

상기 천공용 지그는 단열재(110)와 동일한 넓이로 형성되는 것이 바람직하며, 상기 천공용 지그에는 가로·세로 일정 간격으로 안내홀이 형성되어 있다.Preferably, the perforating jig is formed to have the same width as that of the heat insulating material 110, and guide holes are formed in the perforating jig at regular intervals in the horizontal and vertical directions.

상기 천공용 지그를 안착시킨 상태에서, 안내홀에 드릴을 관통시켜 단열재(110)에 관통공(120)을 형성시켜 외벽 거푸집 내부에 들어갈 단열재(110)를 준비한다.In the state where the perforating jig is seated, the drill is passed through the guide hole to form a through hole 120 in the heat insulating material 110 to prepare a heat insulating material 110 to be inserted into the outer wall mold.

또한, 외주면에 일정 간격으로 다수의 리브(131)가 형성된 지지봉(130)을 일정 길이로 절단하되, 콘크리트 외벽의 두께와 근접한 길이를 형성하도록 절단한다.Further, the support bar 130 having a plurality of ribs 131 formed at regular intervals on its outer circumferential surface is cut to a predetermined length, and cut to form a length close to the thickness of the outer wall of the concrete.

상기 지지봉(130)은, 유리섬유 강화 플라스틱(glass fiber reinforced plastics)으로 형성하여 열전도율을 최소화할 수 있으며, 금속철근에 비해 뛰어난 인장력을 확보할 수 있고, 부식과 전기전도성이 없어 시공성이 뛰어나다.The support bar 130 may be formed of glass fiber reinforced plastics to minimize thermal conductivity, provide an excellent tensile strength as compared with a metal reinforcement, and have excellent workability due to no corrosion and electrical conductivity.

상기 지지봉(130)의 길이는 콘크리트 외벽의 두께보다 너무 짧아도 단열재(110)를 효과적으로 고정할 수 없으며, 너무 길어도 외벽 거푸집을 설치할 수 없으므로 콘크리트 외벽의 두께보다 작으면서 근접된 길이를 가져야 한다.The length of the support bar 130 can not be effectively secured even if the length of the support bar 130 is too short than the thickness of the outer wall of the concrete, and since the outer wall form can not be installed even if it is too long, the support bar 130 should have a length smaller than the thickness of the concrete outer wall.

또한, 추후에 단열재(110)의 양측면에 밀착 고정될 고정부재(140)의 지지보스(142)에 원통형으로 형성되어 일측이 개방된 측정지그(150)를 끼워 결합시킨다.The measurement jig 150, which is formed in a cylindrical shape in the support boss 142 of the fixing member 140 to be closely fixed to both sides of the heat insulating material 110, is engaged with the measurement jig 150 which is opened at one side.

이 상태에서 상기 고정부재(140)의 중심에 형성된 지지보스(142)이 내경에 지지봉(130)의 내측 단부를 삽입하게 되면, 상기 지지봉(130)의 외주면에 형성된 리브가 지지보스(142)의 내경에 일정 간격으로 형성된 고정돌기(143)를 통과하게 됨과 동시에 상기 지지봉(130)의 내측 단부는 측정지그(150)의 내측면과 근접되게 위치하게 된다.When the inner end of the support rod 130 is inserted into the inner diameter of the support boss 142 formed at the center of the fixing member 140 in this state, the rib formed on the outer circumferential surface of the support rod 130 is inserted into the inner diameter of the support boss 142 And the inner end of the support bar 130 is located close to the inner surface of the measurement jig 150. [

상기와 같이 지지봉(130)이 삽입되면, 고정부재(140)로부터 측정지그(150)를 분리하여 고정부재(140)의 고정위치를 결정할 수 있게 되며, 이는 지지봉(130)이 단열재(110)에 고정되었을 때, 단열재(110)와 내측 거푸집(20')과의 간격을 정확하게 설정할 수 있게 되는 것이다.When the support rod 130 is inserted, the fixing jig 150 can be detached from the fixing member 140 to determine the fixing position of the fixing member 140. This is because the supporting rod 130 is fixed to the heat insulating material 110 The distance between the heat insulating material 110 and the inner mold 20 'can be accurately set.

또한, 고정부재(140)가 고정된 지지봉(130)의 외측 단부를 단열재(110)에 형성된 관통공(131)을 통해 내측에서 외측으로 통과시키게 되면, 상기 고정부재(140)의 지지판(141)은 단열재(110)의 내측면에 밀착된다.When the outer end of the support rod 130 to which the fixing member 140 is fixed is passed from the inside to the outside through the through hole 131 formed in the heat insulating member 110, Is in close contact with the inner surface of the heat insulating material (110).

상기 단열재(110)의 외측면으로 돌출형성된 지지봉(130)의 외측 단부에 또 다른 고정부재(140)를 삽입하여 지지판(141)이 단열재(110)의 외측면에 밀착되도록 하여 상기 지지봉(130)을 단열재(110)에 수평으로 고정시킨다.Another fixing member 140 is inserted into the outer end of the supporting rod 130 protruding from the outer surface of the heat insulating material 110 so that the supporting plate 141 is brought into close contact with the outer surface of the heat insulating material 110, Is horizontally fixed to the heat insulating material (110).

여기서, 상기 고정부재(140)의 지지보스(142)에 형성된 외측단 내경(142a)은 내측단 내경(142b)보다 작은 직경으로 형성되어야 하며, 이는 상기 지지봉(130)의 결합을 용이하게 하기 위함이다.The outer end inner diameter 142a formed in the support boss 142 of the fixing member 140 should be smaller than the inner end inner diameter 142b in order to facilitate the engagement of the support rod 130. [ to be.

또한, 상기 고정부재(140)는 지지판(141)에 방사상으로 지지리브(141a)가 형성되어 지지판(141)의 강성을 보강하게 되며, 지지보스(142) 내경에 형성되는 고정돌기(143)는 상기 지지봉(130)이 용이하게 결합되도록 경사지게 형성되는 것이 바람직하다.The fixing member 140 has a support rib 141a radially formed on the support plate 141 to reinforce the rigidity of the support plate 141 and a fixing protrusion 143 formed on the inner diameter of the support boss 142 It is preferable that the support bar 130 is formed to be inclined so as to be easily coupled.

상기와 같이 지지봉(130)이 고정된 단열재(110)를 외벽 거푸집(20) 내부에 수직으로 세워 설치한다.As described above, the heat insulating member 110 to which the support rod 130 is fixed is vertically installed inside the outer wall mold 20.

상기 단열재(110)가 세워지면 상기 단열재(110) 양측으로 돌출되어 형성된 지지봉(130) 단부에 설계도면에 따라 격자형으로 철근(10)을 배근하여 결속부재로 결속시켜 고정한다.When the heat insulating material 110 is raised, the reinforcing bars 10 are arranged in a lattice shape on the end of the support bar 130 protruding from both sides of the heat insulating material 110 according to the design drawing, and are fastened and fixed with binding members.

상기 외벽 거푸집(20)은 일정 두께의 콘크리트 외벽을 형성하도록 내측 거푸집(20')과 외측 거푸집(20")으로 이루어지며, 상기 내·외측 거푸집(20')(20")은 통상의 타이부재(미도시)를 통해 고정된다.The outer wall form 20 is composed of an inner form 20 'and an outer form 20' so as to form a concrete outer wall having a predetermined thickness. The inner and outer form 20 'and 20' (Not shown).

상기와 같이 철근(10)이 배근되면, 외벽 거푸집(20) 내부에 콘크리트를 타설하여 충진하고, 타설된 콘크리트가 일정 기간이 지나 양생이 완료되면 내·외측 거푸집(20')(20")을 해체하면 되는 것이다.When the reinforcement 10 is laid as described above, the concrete is poured into the outer wall formwork 20 and filled therein. When the poured concrete is cured after a predetermined period of time, the inner and outer formwork 20 'and 20' It will be dismantled.

이상과 같이 본 발명은, 비록 한정된 실시예와 도면에 의해 설명되었으나, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정되어 해석되어서는 아니되며, 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.Although the present invention has been described in connection with certain exemplary embodiments and drawings, it is to be understood that the phraseology and terminology used herein are for the purpose of description and should not be interpreted to limit the scope of the present invention. It must be interpreted in terms of meaning and concept.

따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 일실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 발명의 청구범위를 벗어나지 않는 한도 내에서 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.Therefore, the embodiments described in the present specification and the configurations shown in the drawings are only examples of the present invention, and not all of the technical ideas of the present invention are described. Therefore, It is to be understood that equivalents and modifications are possible.

100: 중간 단열재 구조
110: 단열재 120: 관통공
130: 지지봉 131: 리브
140: 고정부재 141: 지지판
141a: 지비리브 142: 지지보스
142a: 외측단 내경 142b: 내측단 내경
143: 고정돌기 150: 측정지그
100: Medium insulation structure
110: Insulation material 120: Through hole
130: support rod 131: rib
140: fixing member 141: supporting plate
141a: Jibie rib 142: Support boss
142a: Inner inner diameter 142b: Inner inner diameter
143: Fixing projection 150: Measuring jig

Claims (5)

삭제delete 소정 두께의 사각판형 단열재를 적층시키는 단계;
상기 단열재와 동일한 넓이로 형성되며 다수의 안내홀이 일정간격으로 관통된 천공용 지그를 상기 단열재의 상부에 안착시키는 단계;
상기 단열재에 안착된 천공용 지그의 안내홀에 드릴을 관통시켜서 적층된 단열재에 관통공을 형성하는 단계;
외주면에 다수의 리브가 형성된 지지봉을 콘크리트 외벽의 두께와 근접한 길이로 절단하는 단계;
원통형의 측정지그를 고정부재의 외측에 끼워 결합하는 단계;
상기 고정부재에 지지봉의 내측 단부를 삽입하여 측정지그의 내측면과 근접되도록 한 후, 상기 측정지그를 분리하여 고정부재의 고정위치를 결정하는 단계;
상기 지지봉의 외측 단부를 단열재의 관통공을 통해 내측에서 외측으로 통과시켜 고정부재가 단열재의 내측면에 밀착되게 한 후, 또 다른 고정부재를 지지봉의 외측 단부에 삽입하여 지지봉을 단열재에 수평으로 고정시키는 단계;
상기 단열재를 외벽 거푸집 내부에 수직으로 세워 설치하는 단계;
상기 지지봉에 철근을 묶어 배근하는 단계; 및
상기 철근이 배근된 외벽 거푸집의 내부에 콘크리트를 충진하여 타설하는 단계로 이루어지는 것을 특징으로 하는 콘크리트 외벽의 중간 단열재 시공방법.
Stacking a rectangular plate-shaped heat insulating material having a predetermined thickness;
Placing a perforating jig having the same width as that of the heat insulating material and having a plurality of guide holes passing through the heat insulating material at regular intervals, on the heat insulating material;
Passing a drill through a guide hole of a drilling jig seated on the heat insulating material to form a through hole in the heat insulating material;
Cutting a support rod having a plurality of ribs on an outer circumferential surface thereof to a length close to the thickness of the outer wall of the concrete;
Fitting a cylindrical measuring jig to the outside of the fixing member;
Inserting the inner end of the support rod into the fixing member to bring the inner end of the support rod close to the inner side of the measuring paper, and then separating the measuring jig to determine the fixing position of the fixing member;
The outer end of the support rod is passed from the inner side to the outer side through the through hole of the heat insulating material so that the fixing member is brought into close contact with the inner side surface of the heat insulating material and then another supporting member is inserted into the outer end of the support rod, ;
Installing the heat insulating material vertically upright inside the outer wall formwork;
Binding the reinforcing bars to the support rods; And
And filling the concrete in the outer wall mold to which the reinforcing bars are laid, and then pouring the concrete.
소정 두께의 사각판형으로 형성되는 단열재;
상기 단열재의 일정 간격으로 구획된 위치에 형성되는 다수의 관통공;
외주면에 다수의 리브가 형성되며 콘크리트 외벽의 두께와 근접한 길이로 절단되어 상기 관통공에 수평으로 삽입되는 유리섬유 강화 플라스틱 소재의 지지봉;
상기 지지봉을 단열재에 고정시키도록 상기 단열재의 양측으로 인출된 지지봉의 양단부에 각각 결합되어 상기 단열재의 양측면에 밀착되는 고정부재; 및
상기 고정부재의 외측 중심에 지지봉의 내측 단부를 삽입 후 분리하여 고정부재의 고정위치를 결정하도록 일측이 개방된 원통형의 측정지그를 포함하여 구성되며,
상기 고정부재는,
상기 단열재에 밀착되는 지지판의 중심을 통해 지지봉을 통과시킬 수 있는 직경으로 연통된 지지보스를 포함하여 구비되는 것을 특징으로 하는 콘크리트 외벽의 중간 단열재 구조.
A heat insulating material formed in a rectangular plate shape with a predetermined thickness;
A plurality of through holes formed at positions separated by a predetermined distance of the heat insulating material;
A supporting rod of a glass fiber reinforced plastic material having a plurality of ribs formed on an outer circumferential surface thereof and being cut into a length close to the thickness of the outer wall of the concrete and horizontally inserted into the through hole;
Fixing members which are respectively coupled to both ends of the support rods drawn to both sides of the heat insulating member so as to fix the support rods to the heat insulating member and closely contact with both side surfaces of the heat insulating member; And
And a cylindrical measuring jig whose one side is opened to insert the inner end of the support rod at the outer center of the fixing member to separate and fix the fixing member,
Wherein:
And a support boss communicating with a diameter allowing a support rod to pass through a center of a support plate closely attached to the heat insulating material.
청구항 3에 있어서, 고정부재는,
상기 지지판의 외측면에 지지리브가 방사상으로 구비되고, 상기 지지봉의 리브가 걸리도록 지지보스의 내경에 일정 간격으로 고정돌기를 포함하여 구비되며, 상기 지지보스의 외측단 내경이 내측단 내경보다 작은 직경으로 형성되는 것을 특징으로 하는 콘크리트 외벽의 중간 단열재 구조.
4. The stapler according to claim 3,
Wherein a support rib is radially formed on an outer surface of the support plate and includes a fixing protrusion at a predetermined interval in an inner diameter of the support boss so that the rib of the support rod is engaged with the support boss, Wherein the inner wall of the outer wall of the concrete is formed with a rectangular shape.
삭제delete
KR1020170065220A 2017-05-26 2017-05-26 construction method and structure of insulation in concrete outer walls KR101861254B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170065220A KR101861254B1 (en) 2017-05-26 2017-05-26 construction method and structure of insulation in concrete outer walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170065220A KR101861254B1 (en) 2017-05-26 2017-05-26 construction method and structure of insulation in concrete outer walls

Publications (1)

Publication Number Publication Date
KR101861254B1 true KR101861254B1 (en) 2018-05-25

Family

ID=62299633

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170065220A KR101861254B1 (en) 2017-05-26 2017-05-26 construction method and structure of insulation in concrete outer walls

Country Status (1)

Country Link
KR (1) KR101861254B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180223533A1 (en) * 2017-02-08 2018-08-09 Michael G. RUSH Adjustable rebar positioning device
CN110005084A (en) * 2019-04-26 2019-07-12 济南捷源新材料有限公司 Steel wire frame plate positioning supporting part, wall and construction technology
KR20200068916A (en) * 2018-12-06 2020-06-16 (주)건축사무소영일.필 Wall structure enhanced efficience integration of sandwich concrete wall and position holding degree of nsulator, and method for constructing thereof
KR20200001389U (en) * 2018-12-17 2020-06-25 박시환 Lighter precast concrete panel spacer
KR102521533B1 (en) 2022-12-07 2023-04-12 정란희 Mesh-Integrated Insulation And Construction Method Using The Same
CN116876708A (en) * 2023-09-05 2023-10-13 山西佰基科技有限公司 Thermal insulation wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0678503U (en) * 1993-04-14 1994-11-04 信吉 ▲斉▼藤 Holding member for concrete formwork
JPH082313Y2 (en) * 1989-06-26 1996-01-24 岡部株式会社 Connecting tool for concrete form clamps
KR100511462B1 (en) * 2005-02-03 2005-08-31 김준 Connecting device for concrete form panels
JP2009515067A (en) * 2005-11-03 2009-04-09 エー. シモンセン、ジョン Connecting rod for formwork
JP2009263877A (en) * 2008-04-22 2009-11-12 Koji Ogawa Construction method for reinforced concrete wall, and positioning fixing implement
KR101466936B1 (en) * 2014-06-30 2014-12-03 (주)태성종합건설 Concrete wall structure of the building for including insulation
KR20150121993A (en) * 2014-04-22 2015-10-30 광운대학교 산학협력단 Insulation structure and concrete structure and construction method of the concrete structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH082313Y2 (en) * 1989-06-26 1996-01-24 岡部株式会社 Connecting tool for concrete form clamps
JPH0678503U (en) * 1993-04-14 1994-11-04 信吉 ▲斉▼藤 Holding member for concrete formwork
KR100511462B1 (en) * 2005-02-03 2005-08-31 김준 Connecting device for concrete form panels
JP2009515067A (en) * 2005-11-03 2009-04-09 エー. シモンセン、ジョン Connecting rod for formwork
JP2009263877A (en) * 2008-04-22 2009-11-12 Koji Ogawa Construction method for reinforced concrete wall, and positioning fixing implement
KR20150121993A (en) * 2014-04-22 2015-10-30 광운대학교 산학협력단 Insulation structure and concrete structure and construction method of the concrete structure
KR101466936B1 (en) * 2014-06-30 2014-12-03 (주)태성종합건설 Concrete wall structure of the building for including insulation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
일본 공표특허공보 특표2009-515067호(2009.04.09.) 1부. *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180223533A1 (en) * 2017-02-08 2018-08-09 Michael G. RUSH Adjustable rebar positioning device
US10450751B2 (en) * 2017-02-08 2019-10-22 Michael G. RUSH Adjustable rebar positioning device
KR20200068916A (en) * 2018-12-06 2020-06-16 (주)건축사무소영일.필 Wall structure enhanced efficience integration of sandwich concrete wall and position holding degree of nsulator, and method for constructing thereof
KR102176086B1 (en) * 2018-12-06 2020-11-10 (주)건축사무소영일.필 Wall structure enhanced efficience integration of sandwich concrete wall and position holding degree of nsulator, and method for constructing thereof
KR20200001389U (en) * 2018-12-17 2020-06-25 박시환 Lighter precast concrete panel spacer
KR200492750Y1 (en) 2018-12-17 2020-12-04 주식회사 운진하이텍 Lightweight precast concrete panel spacer
CN110005084A (en) * 2019-04-26 2019-07-12 济南捷源新材料有限公司 Steel wire frame plate positioning supporting part, wall and construction technology
KR102521533B1 (en) 2022-12-07 2023-04-12 정란희 Mesh-Integrated Insulation And Construction Method Using The Same
CN116876708A (en) * 2023-09-05 2023-10-13 山西佰基科技有限公司 Thermal insulation wall
CN116876708B (en) * 2023-09-05 2023-11-24 山西佰基科技有限公司 Thermal insulation wall

Similar Documents

Publication Publication Date Title
KR101861254B1 (en) construction method and structure of insulation in concrete outer walls
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
KR101258188B1 (en) Building a concrete wall insulation connected devices
KR101466936B1 (en) Concrete wall structure of the building for including insulation
KR200481707Y1 (en) The outer wall for easy construction
CA2900237A1 (en) Form board and method of constructing form using the same
JP5965544B2 (en) H-bar, and method for installing form using this H-bar and non-metallic plate
KR101558904B1 (en) Adiabatic concrete connecting structure and constructing method
AU2012272548B2 (en) Wall construction system, wall stud, and method of installation
KR101516743B1 (en) Concrete form system for connection structure of inner-outer wall and constructing method the same
KR100776774B1 (en) Method for constructing precast concrete pier segment having connecting structure using steel duct
JP5297053B2 (en) Insulating material holder and concrete insulation method using the same
KR20090106914A (en) Double Insulated Form
KR101312873B1 (en) Water pipe support appartus for wall building
KR102025991B1 (en) insulation material clamp for insulated sandwich concrete wall structure
CN105649329A (en) Reinforcing structure for large-section framework column formworks and construction method
KR102128291B1 (en) A fixing apparatus of insulation material and constructing method thereof
CN105484392A (en) Exterior wall cladding system integrating insulating layer, decorative layer and formwork and construction method thereof
KR101028586B1 (en) An assembly for slab-panel
KR200461500Y1 (en) A flash board waterproof sill
KR20190106435A (en) Retainer for steel frame structure
KR102126340B1 (en) Hollow slab structure that enables wiring of sleeve piping
KR101311706B1 (en) Corner bar and method for constructing concrete forms using the same
KR101043751B1 (en) insulation deck plate for slab
KR20080041977A (en) A mold type block

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant