KR101756639B1 - The pile foundation construction method - Google Patents
The pile foundation construction method Download PDFInfo
- Publication number
- KR101756639B1 KR101756639B1 KR1020150184166A KR20150184166A KR101756639B1 KR 101756639 B1 KR101756639 B1 KR 101756639B1 KR 1020150184166 A KR1020150184166 A KR 1020150184166A KR 20150184166 A KR20150184166 A KR 20150184166A KR 101756639 B1 KR101756639 B1 KR 101756639B1
- Authority
- KR
- South Korea
- Prior art keywords
- excavation
- drill
- excavated
- hole
- surface layer
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/36—Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0038—Production methods using an auger, i.e. continuous flight type
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The present invention relates to a pile foundation construction method, and more particularly, to a pile foundation construction method comprising the steps of: (a) measuring a position where a pile foundation is to be installed on a ground; (b) A hammer drill for rock excavation is installed on a drilling rig consisting of a guide rail extended to have a predetermined height and a rotary drive device for rotating a drill coupled to the guide rail, (C) installing an excavating drill capable of expanding the diameter of a hole to be drilled after removing a hammer drill for rock excavation installed in the excavation equipment when a soil layer passes through the surface layer; and ) The excavation drill of the step (c) is moved in the vertical direction to the hole excavated in the step (b) (E) separating the excavated drilling slurry and the excavated drilling slurry to form a gelled slurry, the excavated drill slurry being excavated so as to reach the support layer, And (f) curing after the step (e). The present invention also provides a method for manufacturing a semiconductor device, comprising the steps of:
The present invention is advantageous in that excavation rate can be reduced and excavation time can be reduced by excavating different excavation files according to the type of ground. That is, according to the present invention, when the surface layer is hard, the surface layer can be directly excavated without having to remove the surface layer, so that it is possible to secure the work space and reduce the excavation ratio and excavation time.
Description
The present invention relates to a pile foundation construction method capable of effectively forming a pile foundation on a ground having a hard surface layer.
In general, when building a high-rise building or a reinforced concrete structure, the foundation is constructed by putting a PHC file or an H-type beam on the ground in order to secure the foundations, and the construction of the above- It is a very important construction for building structures. As a method of constructing the above-mentioned file, a piling method and an excavation method have been introduced.
The method of casting electrons is a method in which a hammer of a weight is lifted by using a hoisting rope installed on a vertically installed leader on a crawler traveling device, So that the pile is poured into the ground while the hammer is raised and lowered. In the latter excavation method, a screw file mounted on a file connection part is rotated to excavate the ground to form a pile hole, and then the screw file is reversed to be pulled out from the excavated pile and inserted into the pile .
Among these two methods, the electron piling method is widely used as an excavation construction method because noise generation is severe and dust is generated and the working environment is deteriorated. However, since these excavation methods are simply excavated by attaching screw files to excavation equipment, excavation is often impossible when the surface layer of the ground is a hard layer like a gravel layer. Therefore, it is necessary to construct a file after a hard surface layer is formed. There is a problem that a work space for constructing the work is not provided. In order to solve this problem, there are many cases where a hammer drill for rock excavation such as T-4 is installed in an excavation equipment and excavation is often performed. In this case, there is a problem that a construction cost and a construction period are required.
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems, and it is an object of the present invention to shorten the excavation rate and excavation period by excavating the ground using different excavation drill coupled to the excavation equipment In addition, it is possible to form a bulb having a shape capable of maximizing the bearing capacity of the soil layer beyond the surface layer, thereby reducing the number of piles for strengthening the ground, and allowing the grouting to be performed simultaneously with excavation. To minimize pile foundation construction method.
(A) measuring a position at which the pile foundation is to be installed on the ground; (b) extending the drive body (1) and the drive body (1) And a rotary drive device for rotating a drill coupled to the guide rail, the drill being provided with a hammer drill for rock excavation to excavate a surface layer of a hard layer such as a gravel layer And (c) installing a drilling drill capable of expanding the diameter of the hole to be drilled after removing the hammer drill for rock excavation installed in the excavation equipment when the soil layer passes through the surface layer; (d) The excavating drill is rotated in such a manner that the excavating drill is moved in a direction perpendicular to the hole excavated in the step (b) (E) injecting the excavated drill into the hole formed in the upper part of the bulb made in step (d) so as to make the inside of the excavated hole into a gel state, And (f) curing after the step (e). The pile foundation construction method according to
The present invention has the following effects.
First, the present invention is advantageous in that the excavation rate can be reduced as well as the excavation ratio can be reduced by excavating different excavation files depending on the type of the ground. That is, according to the present invention, when the surface layer is hard, the hard layer can be directly excavated without needing to remove the surface layer, so that the work space can be easily secured and the excavation ratio and excavation time can be reduced.
Second, since the present invention can form a bulb having a shape capable of securing the maximum supporting force, the number of files for strengthening the ground can be reduced. That is, since the number of files for reinforcing the ground can be reduced, the construction cost and the construction period for reinforcing the ground can be drastically reduced.
Thirdly, the present invention does not require a slime removing process because there is almost no slime generated at the time of excavation, and the grouting solution is mixed with the gravel so that the material for grouting at the time of excavation is small and the construction period and the construction cost of the pile can be saved .
1 is a flowchart showing a method of constructing a pile foundation according to the present invention.
2 to 5 are views showing a method of constructing a pile foundation according to the present invention.
6 is a view showing the drilling drill being coupled to the drilling rig.
7 is a view showing that the soil layer is excavated by an excavating drill.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a method of constructing a pile foundation according to the present invention will be described in detail with reference to the accompanying drawings.
FIG. 1 is a flowchart showing a pile foundation construction method according to the present invention, and FIGS. 2 to 5 are views showing a pile foundation construction method according to the present invention.
Fig. 6 is a view showing that a drilling drill is coupled to the drilling rig, and Fig. 7 is a view showing that the soil layer is drilled by the drilling drill.
The present invention relates to a pile foundation construction method, and more particularly, to a pile foundation construction method comprising the steps of: (a) measuring a position where a pile foundation is to be installed on a ground; (b) And a rotation drive device (4) for rotating a drill coupled to the guide rail (2) by moving along the guide rail (2). The hammer drill 20) is installed to excavate a surface layer made of a hard layer such as a gravel layer, and (c) when the soil layer passes through the surface layer, the
According to the present invention, there is provided a drilling drill for a drilling rig coupled to an excavation equipment in accordance with the type of the ground as well as a work space can be ensured without removing the surface layer even if there is a hard surface layer, The present invention relates to a pile foundation construction method for minimizing a process for making a foundation by excavating a foundation by using different types of piles to reduce the excavation ratio and excavation period and to perform grouting simultaneously with excavation.
In general, when building a high-rise building or a reinforced concrete structure, the foundation is constructed by putting a PHC file or an H-type beam on the ground in order to secure the foundations, and the construction of the above- It is a very important construction for building structures. As a method of constructing the above-mentioned file, a piling method and an excavation method have been introduced.
The method of casting electrons is a method in which a hammer of a weight is lifted by using a hoisting rope installed on a vertically installed leader on a crawler traveling device, So that the pile is poured into the ground while the hammer is raised and lowered. In the latter excavation method, a screw file mounted on a file connection part is rotated to excavate the ground to form a pile hole, and then the screw file is reversed to be pulled out from the excavated pile and inserted into the pile .
Among these two methods, the electron piling method is widely used as an excavation construction method because noise generation is severe and dust is generated and the working environment is deteriorated. However, because these excavation methods are simply excavated by attaching screw files to excavation equipment, excavation is often impossible if the surface layer of the ground has a hard layer like a gravel layer. In order to solve this problem, when a hammer drill for rock excavation such as T-4 is installed in an excavation equipment and excavation is performed, a lot of construction cost and construction time are required, which wastes a construction cost.
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems, and it is an object of the present invention to shorten the excavation rate and excavation period by excavating the ground using different excavation drill coupled to the excavation equipment In addition, it is possible to form a bulb having a shape capable of maximizing the bearing capacity of the soil layer beyond the surface layer, thereby reducing the number of piles for strengthening the ground, and allowing the grouting to be performed simultaneously with excavation. To minimize pile foundation construction method.
The present invention is advantageous in that excavation rate can be reduced and excavation time can be reduced by excavating different excavation files according to the type of ground. That is, according to the present invention, when the surface layer is hard, the hard layer can be directly excavated without needing to remove the surface layer, so that the work space can be easily secured and the excavation ratio and excavation time can be reduced. In addition, the present invention can form a bulb having a shape capable of securing a maximum supporting force, so that the number of files for strengthening the ground can be reduced. That is, since the number of files for reinforcing the ground can be reduced, the construction cost and the construction period for reinforcing the ground can be drastically reduced. In addition, since the present invention does not require a slime removal process because there is almost no slime generated during excavation, the grouting solution is mixed with the gravel to reduce the grouting material during excavation, thereby saving the construction period and the construction cost of the pile .
(a) is a step of measuring the position where the pile foundation is to be constructed on the ground. That is, step (a) is a step of accurately measuring the location where the pile foundation is to be installed so that the foundation of the pile can be accurately installed on the ground where the pile foundation is constructed.
Step (b) is a step of excavating the surface layer when the surface layer of the pile foundation is to be applied. In detail, step (b) includes a
The
The
Step (c) is a step of modifying the drill coupled to the drilling rig when the soil layer appears over the hard surface layer. More specifically, in the step (c), when the soil layer passes through the surface layer, a
The
(d) is a step of excavating the soil layer to reinforce the supporting force of the ground in the soil layer, and making the excavated hole into a gel state. The drilling operation of the excavating
The
Step (e) is a step of disposing a hard surface layer. That is, step (e) is a step of disposing the surface layer so that the top of the bulb made in step (d) is exposed.
(f) curing after step (e). That is, it is a step of curing for a certain time so that the mixed materials in the gel state are integrated. Curing should be cured according to site specifications.
Although the preferred embodiments of the pile foundation construction method according to the present invention have been described above, the present invention is not limited to the technical idea and the construction and operation of the pile foundation construction method. The scope of the technical idea of the present invention is not limited to the description with reference to the drawings or the drawings. It will also be appreciated by those skilled in the art that the concepts and embodiments of the invention set forth herein may be used as a basis for modifying or designing other structures for carrying out the same purposes of the present invention It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the present invention as defined by the appended claims and their equivalents. And various changes, substitutions, and alterations can be made without departing from the scope of the invention.
1: drive body 2: guide rail
4: rotation drive device 5: rotating body
10: Excavation equipment
20: Hammer drill 21: Drill drill
30: grouting portion
31: grouting pipe 32: grouting pumping machine
110: Main pipe 120: Mini stirrer
130: grouting liquid jetting port 140:
Claims (3)
(b) a guide rail (2) extending along the height direction of the drive body (1) and the drive body (1) and having a predetermined height, and a drill Drilling a rock layer with a hammer drill (20) for excavating a surface layer made of a hard layer such as a gravel layer;
(c) installing an excavating drill (21) capable of expanding the diameter of the hole to be drilled after removing the hammer drill (20) for rock excavation installed in the excavation equipment when the soil layer appears over the surface layer;
(d) The excavating drill 21 is rotated in such a manner that the excavating drill 21 in the step (c) drives the rotation driving device 4 while moving in the vertical direction to the hole excavated in the step (b) The grouting solution is discharged through the hole in the lower part of the excavation drill 21 to be mixed with the soil to be stirred at the time of excavation to make the interior of the excavated hole into a gel state;
(e) disposing the surface layer so that the top of the bulb made in step (d) is exposed; And
(f) curing after the step (e)
The excavation drill (21)
A small agitating portion 120 formed on the outer periphery of the lower portion of the main pipe 110 and a grouting solution jetting port 130 and an outer periphery of the upper portion of the main pipe 110, And a plurality of enlarged stirring parts 140 formed to be shorter in length from the upper part to the lower part,
In the step (d)
The grouting solution is injected through the grouting solution injection opening 130 so as to be mixed with the gravel disturbed by the small agitation portion 120 and the enlarged agitation portion 140 so that the excavated drill 21 is excavated to reach the support layer, The inside of the hole is made into a gel state, but the hole size of the portion having the enlarged stirring portion 140 is enlarged,
The small agitating part 120 and the enlarged agitating part 140 are in close contact with the center pipe 110 when passing through the hole excavated in step (b), and after passing through the hole excavated in step (b) And piercing the pile foundation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150184166A KR101756639B1 (en) | 2015-12-22 | 2015-12-22 | The pile foundation construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150184166A KR101756639B1 (en) | 2015-12-22 | 2015-12-22 | The pile foundation construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20170074642A KR20170074642A (en) | 2017-06-30 |
KR101756639B1 true KR101756639B1 (en) | 2017-07-17 |
Family
ID=59279802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020150184166A KR101756639B1 (en) | 2015-12-22 | 2015-12-22 | The pile foundation construction method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101756639B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112281897A (en) * | 2020-10-19 | 2021-01-29 | 中铁六局集团有限公司 | Construction method of bridge pile foundation |
-
2015
- 2015-12-22 KR KR1020150184166A patent/KR101756639B1/en active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
KR20170074642A (en) | 2017-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101527723B1 (en) | Complex Ground Improving Devive and Ground Improving Method Using The Same | |
KR101641943B1 (en) | An deep wing mixing vibratinal agitator for hardening ground and the deep wing mixing method thereof | |
JP4520913B2 (en) | Ground improvement method and existing structure foundation reinforcement method | |
JP2008231810A (en) | Underground structure construction method | |
KR20140050524A (en) | Ground improved using auger and pile construction methods | |
KR101756639B1 (en) | The pile foundation construction method | |
JP4811176B2 (en) | Construction method of ready-made piles | |
KR20080112453A (en) | A ground improvement method of construction | |
JP6645098B2 (en) | Removal method of existing pile | |
JP5075094B2 (en) | Construction method and foundation structure of foundation structure in structure | |
KR101756933B1 (en) | The pile foundation construction method that can build bulb of various type | |
KR20190090421A (en) | Ground Improving Device and Ground Improving Method | |
US20210087774A1 (en) | Cutting Tool Adapter and Method of Underpinning Structures Using Cutting Tool Adapter for Soil Mixing | |
JP3663155B2 (en) | Widening excavation apparatus and widening excavation method | |
KR101702180B1 (en) | A Displacement Bored Pile Method with Impermeable and Detachable Casing Shoe | |
KR101756937B1 (en) | The pile foundation construction method that can build bulb of various type | |
JP2017089319A (en) | Vertical shaft construction method | |
JP2017197910A (en) | Construction method of earth retaining wall structure, and earth retaining wall structure | |
GB2137678A (en) | Method and apparatus for pile construction | |
JPH0448898B2 (en) | ||
KR101998208B1 (en) | Double rod type mixing equipment and mixing method for harding ground using the same | |
JP3187326B2 (en) | Vertical drilling machine | |
JP2022186097A (en) | Embedded object pulling-up method, and embedded object pulling-up device | |
JP2013204404A (en) | Construction method of steel pipe pile | |
JPH10159474A (en) | Excavation method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GRNT | Written decision to grant |