KR101737496B1 - Ceiling attachment structure - Google Patents

Ceiling attachment structure Download PDF

Info

Publication number
KR101737496B1
KR101737496B1 KR1020150118118A KR20150118118A KR101737496B1 KR 101737496 B1 KR101737496 B1 KR 101737496B1 KR 1020150118118 A KR1020150118118 A KR 1020150118118A KR 20150118118 A KR20150118118 A KR 20150118118A KR 101737496 B1 KR101737496 B1 KR 101737496B1
Authority
KR
South Korea
Prior art keywords
panel
ceiling
clip
attachment
piece
Prior art date
Application number
KR1020150118118A
Other languages
Korean (ko)
Other versions
KR20170022738A (en
Inventor
김성주
최안숙
김종화
Original Assignee
김성주
최안숙
김종화
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김성주, 최안숙, 김종화 filed Critical 김성주
Priority to KR1020150118118A priority Critical patent/KR101737496B1/en
Publication of KR20170022738A publication Critical patent/KR20170022738A/en
Application granted granted Critical
Publication of KR101737496B1 publication Critical patent/KR101737496B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • E04B9/0435Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like having connection means at the edges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/28Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like having grooves engaging with horizontal flanges of the supporting construction or accessory means connected thereto

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Connection Of Plates (AREA)

Abstract

The present invention relates to a ceiling material detachable structure.
In order to achieve the above object, the present invention provides a ceiling material detachment structure in which a ceiling finishing material is joined to a lower portion of a carrying clip provided in a caring channel by means of an attachment, wherein the ceiling finishing material has, And an attachment groove is formed in an inner upper portion of the one side recess and the other side recess, and the attachment hole is formed in an L shape so that the lower horizontal insertion piece of the attachment is inserted into one side recess or the other side recess of the ceiling finish material And a vertical catching part bent upward toward one side or the other of the horizontal insertion piece is integrally formed, and the vertical catching piece is hooked to the lower part of the carrying clip.
Accordingly, the present invention can be easily combined with the lower part of the carring channel by the carrying clip, thereby improving the working environment so as to prevent contamination of the surroundings, and to increase the productivity, So that it can be provided with steel having a higher strength than that of the existing attachment, so that the service life can be extended.

Description

CEILING ATTACHMENT STRUCTURE [0002]

More particularly, the present invention relates to a ceiling reattachment structure, and more particularly, to a ceiling reattachment structure in which an L-shaped attachment portion is coupled to one side of a ceiling finishing material, and an L-shaped attachment portion is coupled to the other side recess portion of another ceiling finishing material, Are fixed to each other by a piece or a spot welding joint so as to be coupled to the lower part of the carrying channel by a carrying clip.

Generally, a ceiling of a building is equipped with a heat insulating material, an electric wiring, a pipe, and the like, and a ceiling re-installation hole is provided to cover the ceiling material as a means for preventing these from being exposed to the outside.

The ceiling material is connected to the lower end of the hanger bolt embedded in the slab by a nut attached to the carring channel. The embark is connected to the lower part of the carring channel by a separate joining clip, and the ceiling material is fixed by screws at the lower end of the embarking hole. Consists of.

The joining clip is composed of a wire-like clip having a bent shape of a wire and a plate-shaped clip having a plate-like shape so that the carrying channel and the embossment are coupled with each other while the wire- And the plate-like member is formed so that both side ends of the emboss can be inserted and caught by forming latching grooves on both sides thereof.

However, since the upper portion of the ceiling material is fixed to the lower end of the embossing by screws, there is a problem in that partial repair is difficult due to the lack of detachment.

In addition, in order to perform the maintenance, there is another problem in that all the ceiling materials installed in the existing ceiling material are separated from the embarrassment, and then the work time and cost are additionally spent in the process of rework.

In addition, there is another problem that it is difficult to construct the check port when an inspection port for partially checking is provided between the ceiling materials.

In order to solve such a problem, a ceiling material detachment structure of Japanese Patent Application Laid-Open No. 10-2014-0143559 (Dec. 17, 2014) has been proposed. However, in the process of manufacturing an attachment hole in an extrusion type, The cost is increased as a whole and the productivity is lowered.

In addition, although the attachment hole is inserted into the lower portion of the clip bar and is fixed by the fixing protrusion provided on both sides of the clip bar insertion hole, it is possible to prevent the clip bar from being damaged due to corrosion of the clip bar, When the tension is lowered, there is another problem that the attachment hole is separated from the clip bar.

Japanese Patent Application Laid-Open No. 10-2014-0143559 (Dec. 17, 2014)

The present invention prevents the manufacture of an attachment through melting, extruding, cooling, etc., thereby enhancing the productivity while lowering the price and improving the work environment to further prevent contamination of the surroundings So that the strength is higher than that of the existing attachment holes formed by the extrusion method so that the lifetime can be extended and the attachment hole can be prevented from being separated from the carrying channel.

The ceiling finishing material 30 is attached to both ends of the carrier clip 10 by means of an attaching member 40. The ceiling finishing material 30 is attached to both ends of the carrier clip 20, And the other recessed portion 301 'is formed in the longitudinal direction and the engagement recesses 302 and 302' are formed in the inner upper portion of the one recessed portion 301 and the other recessed portion 301 ' And the attachment hole 40 is formed in an L shape so that the lower horizontal insertion piece 41 of the attachment hole 40 is inserted into the recessed portion 301 or the other recessed portion 301 'of the ceiling finishing material 30 The vertical engaging piece 42 is integrally formed on one side or the other side of the horizontal insertion piece 41 and is bent upwardly and the vertical engaging piece 42 is integrally formed with the carrying clip 20, And the horizontal insertion piece 41 is bent upward at one side or the other end of the horizontal panel 411 so that the first vertical panel 412 is folded upward, At the end of the first vertical panel 412

Figure 112016104285416-pat00020
The latching panel 413 is bent and the lower end of the latching panel 413 is bent
Figure 112016104285416-pat00021
And the vertical latching piece 42 includes a second vertical panel 421 symmetrically opposed to the first vertical panel 412 bent in the horizontal panel 411, Is bent upward, and the upper end of the second vertical panel 421
Figure 112016104285416-pat00022
The clip 40 is formed so that the steel is continuous in the longitudinal direction by the roll forming, and the clip 40 is formed so as to have the shape The stop panel 414, the latch panel 413, the first vertical panel 412, the horizontal panel 411, the second vertical panel 421 and the clip inner catch 422 are integrally bent, And is cut into a length.

delete

delete

delete

Also, the carrying channel 10

Figure 112015081392766-pat00004
Sectional shape is continuous in the longitudinal direction, and a plurality of through holes 101 are repeatedly formed in the horizontal portion.

Further, the carrying clip (20)

Figure 112015081392766-pat00005
A carrying channel fixing groove 212 is formed on the upper side of the inlet side of the carrying channel insertion groove 211 so that the carrying channel fixing groove 212 can be bent, And a clip outer engaging piece 213 is formed on both sides of the lower portion of the clip body 21.

The attachment members 40 inserted into one side and the other side of the ceiling finishing material 30 are characterized in that the vertical engagement pieces 42 are coupled to each other by a piece P or a spot weld W. [

The present invention relates to a ceiling finishing material in which an L-shaped attachment portion is coupled to one side surface of a ceiling finishing material, and in a state where an L-shaped attachment portion is coupled to the other side surface portion of another ceiling finishing material, By being fixed by a piece or a spot welded joint, it is possible to obtain an effect that it can be easily coupled to the lower part of the carrying channel by the carrying clip.

In addition, it is possible to obtain the effect of improving the working environment and preventing the contamination of the surroundings, by making the mount through the roll forming, rather than through the melting furnace, the extruder, the cooler and the like.

In addition, it can increase the productivity and lower the price.

In addition, since the steel is provided with a steel having a higher strength than an existing attachment member made of an aluminum material formed by an extrusion method, it is possible to extend the service life and prevent the attachment member from being separated from the carrying channel .

1 is a perspective view showing a ceiling reattachment structure according to the present invention;
FIG. 2 is a perspective view illustrating the structure of the ceiling reattachment according to the present invention. FIG.
3 is a longitudinal sectional view showing the structure of the ceiling reattachment according to the present invention.
4 is a perspective view showing a state in which a check port is provided in a ceiling reattachment structure according to the present invention;

DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments according to the present invention will be described with reference to the accompanying drawings.

FIG. 1 is a perspective view showing a ceiling reattachment structure according to the present invention, FIG. 2 is a perspective view illustrating a ceiling reattachment structure according to the present invention, FIG. 3 is a longitudinal sectional view And FIG. 4 is a perspective view showing a state where a check port is provided in the ceiling reattachment structure according to the present invention.

1 to 4, the ceiling finishing material 30 is attached to the lower portion of the carrying clip 20 provided in the carrying channel 10 by the attachment 40 Respectively.

Here, the carring channel 10 is

Figure 112015081392766-pat00006
And a plurality of through holes 101 are formed in the horizontal portion repeatedly in the longitudinal direction so that the amount of material used is reduced while the strength is further increased.

The carrying clip 20 is formed such that a clip inner catching piece 416 formed at an upper portion of an attaching opening 40 inserted in the ceiling finishing material 30 is stably held at a lower portion of the carrying channel 10,

Figure 112015081392766-pat00007
A carrying channel insertion groove 211 is formed in the clip body 21 having a shape.

A carrying channel fixing piece 212 is bendable at an upper side of the entrance side of the carrying channel insertion groove 211 so that the operator is bent at a right angle in a state where the carrying channel 10 is inserted into the carrying channel insertion groove 211 By closing the opening of the carrying channel insertion groove 211, it is possible to prevent the carrying channel 10 from being detached in the reverse direction.

Clip outer fastening pieces 213 are formed on both sides of the lower portion of the clip body 21 so that the clip outer fastening pieces 416 formed on the upper side of the attaching mouth 40 can be hooked.

The ceiling finishing material 30 is formed so as to have a honeycomb panel shape in which a weight is reduced while maintaining a high level of smoothness while reducing the amount of material used. The ceiling finishing material 30 has one side recessed portion 301 and another side recessed portion 301 ' do.

The latching grooves 302 and 302 'are formed in the inner upper portions of the one side recessed portion 301 and the other side recessed portion 301' so that the latching panel 413 of the attachment port 40 described later is inserted and separated in the reverse direction So as to prevent further damage.

The attachment 40 has a function of allowing the ceiling finishing material 30 to be kept at a predetermined interval and horizontally below the ceiling and is made of steel so as to have a shape continuous in the longitudinal direction by roll forming, As shown in FIG.

The attachment hole 40 is formed in an L shape and is inserted into a recessed portion 301 or the other recessed portion 301 'of the ceiling finishing material 30 to form a lower horizontal insertion piece 41 formed at the lower portion of the attachment hole 40, As shown in FIG.

One or other side of the horizontal insertion piece 41 is integrally formed with a vertical latching piece 42 bent upward and the vertical latching piece 42 is hooked to a lower portion of the carrying clip 20.

The horizontal insertion piece 41 has a function of being inserted into one side or the other side of the ceiling finishing material 30 and preventing it from being separated in the opposite direction. The horizontal insertion piece 41 is provided with a first vertical panel 412 at one side or the other side of the horizontal panel 411, And is bent at the end of the first vertical panel 412

Figure 112015081392766-pat00008
The latching panel 413 is formed to be bent.

The engaging panel 413 is engaged with the engaging grooves 302 and 302 'formed at the inner upper portion of the one recessed portion 301 and the other recessed portion 301' Can be prevented.

At the lower end of the latching panel 413

Figure 112015081392766-pat00009
Shaped stop panel 414 is integrally formed so that the engaging panel 413 is brought into contact with the outer end of the upper portion of the other recessed portion 301 and the upper recessed portion 301 ' It is possible to prevent further insertion.

The second vertical panel 421 is symmetrically opposed to the first vertical panel 412 bent in the horizontal panel 411 and the second vertical panel 421 is folded upward. On top of

Figure 112015081392766-pat00010
The clip inner engagement piece 422 is integrally formed.

Since the horizontal insertion piece 41 and the vertical engagement piece 42 of the attachment hole 40 are formed so that the steel is integrally bent by the roll forming process, a melting furnace, an extruder, a cooler, So that contamination of the surroundings can be prevented.

Attachment ports 40 inserted into one side and the other side of the ceiling finishing material 30 allow the vertical engaging pieces 42 to be engaged with each other by the piece P or the spot weld W can do. 4, the ceiling finishing material 30 may be partially or wholly cut off, or may be separated from the vertical catching piece 42. In this case, It is possible to provide the detection probe 80.

When the vertical catching pieces 42 are coupled by the spot welding W, the vertical catching pieces 42 are coupled to each other by spot welding W in a state where the vertical catching pieces 42 come into contact with each other, It is preferable that the ceiling finishing material 30 is coupled to both sides of the base 40.

10: Carrying channel 20: Carrying clip
30: Ceiling finish material 40: Attachment hole
41: horizontal insertion piece 42: vertical catching piece
301: one side recess 301 ': the other side recess
302, 302 ': latching groove

Claims (7)

In a ceiling material detachment structure in which a ceiling finishing material 30 is joined to a lower portion of a carrying clip 20 provided in a caring channel 10 by an attachment 40,
The ceiling finishing material 30 has one side recessed portion 301 and another side recessed portion 301 'formed in the lengthwise direction at both side ends thereof. The ceiling finishing material 30 has an engagement recess portion 301' formed at an inner upper portion of the one recessed portion 301 and the other recessed portion 301 ' The attaching member 40 is formed in an L shape so that the attaching member 40 is attached to one side recessed portion 301 or the other side recessed portion 301 'of the ceiling finishing member 30, And a vertical latching piece 42 is integrally formed on one side or the other side of the horizontal insertion piece 41 and is bent upward so as to be integrally formed with the horizontal latching piece 41, (42) is hooked on the lower part of the carrying clip (20)
The horizontal insertion piece 41 is formed by bending a first vertical panel 412 at one side or the other end of the horizontal panel 411 and fixing the first vertical panel 412 to an end of the first vertical panel 412
Figure 112016104285416-pat00023
The latching panel 413 is bent and the lower end of the latching panel 413 is bent
Figure 112016104285416-pat00024
A detent panel 414 having a shape is integrally formed,
The second vertical panel 421 is symmetrically opposed to the first vertical panel 412 bent in the horizontal panel 411 and the second vertical panel 421 is folded upward. On top of
Figure 112016104285416-pat00025
A clip inner fitting piece 422 is integrally formed,
The attachment 40 is manufactured such that the steel is continuous in the longitudinal direction by the roll forming, and the stop panel 414, the engagement panel 413, the first vertical panel 412), the horizontal panel (411), the second vertical panel (421), and the clip inner fitting piece (422) are integrally bent so as to be cut into a predetermined length.
delete delete delete The method according to claim 1,
The carring channel (10)
Figure 112015081392766-pat00014
And a plurality of through holes (101) are repeatedly formed in a horizontal portion of the ceiling material detachable structure.
The method according to claim 1,
The carrying clip (20) has a lower opening
Figure 112015081392766-pat00015
A carrying channel fixing groove 212 is formed on the upper side of the inlet side of the carrying channel insertion groove 211 so that the carrying channel fixing groove 212 can be bent, And clip outer fastening pieces (213) are formed on both sides of the lower portion of the clip body (21).
The method according to claim 1,
Wherein the attachment members 40 inserted into one side and the other side of the ceiling finishing member 30 are connected to each other by a piece P or a spot weld W, .
KR1020150118118A 2015-08-21 2015-08-21 Ceiling attachment structure KR101737496B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150118118A KR101737496B1 (en) 2015-08-21 2015-08-21 Ceiling attachment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150118118A KR101737496B1 (en) 2015-08-21 2015-08-21 Ceiling attachment structure

Publications (2)

Publication Number Publication Date
KR20170022738A KR20170022738A (en) 2017-03-02
KR101737496B1 true KR101737496B1 (en) 2017-05-18

Family

ID=58426905

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150118118A KR101737496B1 (en) 2015-08-21 2015-08-21 Ceiling attachment structure

Country Status (1)

Country Link
KR (1) KR101737496B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190010415A (en) 2017-07-21 2019-01-30 김명열 An apparatus for mounting the ceiling panel on the ceiling surface of a building

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102417569B1 (en) * 2020-08-12 2022-07-07 주식회사 에스시스텍 Sound absorbing panel installation structure for ceiling wall

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101487695B1 (en) 2013-06-07 2015-01-29 김성주 Removable structure of ceilings

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190010415A (en) 2017-07-21 2019-01-30 김명열 An apparatus for mounting the ceiling panel on the ceiling surface of a building

Also Published As

Publication number Publication date
KR20170022738A (en) 2017-03-02

Similar Documents

Publication Publication Date Title
US9209609B2 (en) Cable tray system with splice plate
KR101737496B1 (en) Ceiling attachment structure
JP4546915B2 (en) Metal fittings for wooden construction
JP2009113690A (en) Roof body structure of railroad vehicle
TWI538833B (en) Railway vehicle structure
KR20090002456U (en) Lamp balloon fixing structure of race way
KR101561048B1 (en) cable tray
KR101862652B1 (en) Ceiling Structure for Forming a Workspace
KR101335612B1 (en) Method of installing cable tray
KR101601766B1 (en) Rung of cable tray and method for manufacturing the same
US8757558B2 (en) Cable tray
KR101323221B1 (en) Method for joinning cable tray by non-welding
JP5748558B2 (en) Elevator basket fixing device
KR101008793B1 (en) Adaptor for scaffolding bracket
KR200248233Y1 (en) Flange Of Duct
KR20100010500U (en) Elbow tray for connecting cable tray
JP4528311B2 (en) Top hanging rail sliding door
KR100955226B1 (en) Ceiling materials fixtuer
JP2015025317A (en) Stainless steel grating
JP6383684B2 (en) Building
JP6581239B2 (en) Elevator guide rail fixing device
CN210344047U (en) Top beam spacer
JP4347750B2 (en) Drainage cover member and drainage cover using the same
JP6900710B2 (en) Body structure, its manufacturing method, and reinforcing members
JP2016011064A (en) Section insulator

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right