KR101556310B1 KR1020140187433A KR20140187433A KR101556310B1 KR 101556310 B1 KR101556310 B1 KR 101556310B1 KR 1020140187433 A KR1020140187433 A KR 1020140187433A KR 20140187433 A KR20140187433 A KR 20140187433A KR 101556310 B1 KR101556310 B1 KR 101556310B1
Authority
KR
South Korea
Prior art keywords
psc girder
psc
bridge
vertical
girder
Prior art date
Application number
KR1020140187433A
Other languages
Korean (ko)
Inventor
심태무
원태건
Original Assignee
주식회사 하이드로코리아
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 하이드로코리아 filed Critical 주식회사 하이드로코리아
Priority to KR1020140187433A priority Critical patent/KR101556310B1/en
Application granted granted Critical
Publication of KR101556310B1 publication Critical patent/KR101556310B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a bridge construction method using an end part vertical tendon passing through a PSC girder holding step and the continuous step and the slab construction step to more effectively use sectional strength of a PSC girder. The bridge construction method comprises the steps of: enabling the PSC girder of which both end parts have a vertical tension hole to be held to be supported by an end part support installed on an upper surface of a lower structure of a bridge and enabling the end part vertical tendon to be inserted into the vertical tension hole to be withdrawn upward; mounting the end part vertical tendon to the upper surface of both end parts of the PSC girder to introduce vertical tension (P1) after the end part vertical tendon is tensioned; performing continuous construction of the PSC girder with the slab construction together; cutting the end part vertical tendon using a lower space of the bottom surface of the PSC girder; tensioning the secondary PSC tendon of the PSC girder which are adjacent to a continuous point and mounting the secondary PSC tendon of the PSC girder to each end part reinforcement block bypassing each continuous point to be integrally formed to the end part of the PSC girder; and removing the end part support to enable the PSC girder having a slab to be supported by the bridge support installed in the lower structure of the bridge.

Description

단부수직긴장재를 이용한 교량시공방법{BRIDGE CONSTRUCTION METHOD USING END-VERTIVAL TENDON}[0001] BRIDGE CONSTRUCTION METHOD USING END-VERTIVAL TENDON [0002]

본 발명은 단부수직긴장재를 이용한 교량시공방법에 관한 것이다. 더욱 구체적으로 PSC 거더 거치, 연속화 및 슬래브 시공단계를 거쳐 PSC 거더의 단면강성을 보다 효과적으로 이용하여 교량을 시공할 수 있는 단부수직긴장재를 이용한 교량시공방법에 관한 것이다.The present invention relates to a bridge construction method using an end vertical tensional material. More specifically, the present invention relates to a method of constructing a bridge using an end torsional rigid member capable of more effectively utilizing the stiffness of a PSC girder through a PSC girder installation, sequencing, and slab construction steps.

통상 PSC 거더는 중립축 하부에 배치된 긴장재에 의하여 도입되는 프리스트레스에 의하여 자중에 의한 휨 정모멘트에 저항하도록 하는 단면을 가지도록 설계하는 것이 일반적이다.Generally, the PSC girder is designed so as to have a cross section that resists the flexural moment caused by its own weight due to the prestress introduced by the tension member disposed under the neutral shaft.

이에 긴장재를 보다 많이 설치하게 되면 PSC 거더의 단면을 최적화시킬 수 있게 되지만 도 1a와 같이 긴장재에 의한 프리스트레스량(PS로 표시)이 커지면서 PSC 거더 상연에 압축응력(+:인장응력, -:압축응력, 고정하중: 자중)이 커져 콘크리트 허용응력(fa)을 초과하는 문제(N.G)가 발생(CASE1)하게 된다.However, as shown in FIG. 1A, when the amount of the prestress (indicated by PS) is increased, the compressive stress (+: tensile stress, -: compressive stress , The fixed load (self weight) becomes large, and the problem (NG) exceeding the allowable concrete stress fa occurs (CASE1).

나아가 PSC 거더를 교대, 교각에 거치한 후, 슬래브를 시공할 경우 PSC 거더의 상연(중립축 상부)에 압축응력이 더 누적되고, 슬래브 시공 이후 2차로 프리스트레스가 도입되도록 하는 경우 역시 추가로 PSC 거더의 상연(중립축 상부)에 압축응력이 누적될 수밖에 없다.In addition, when the PSC girder is alternately installed at the bridge pier and the slab is installed, the compressive stress is further accumulated in the upper part of the PSC girder (the upper part of the neutral axis) and the prestress is introduced secondarily after the slab construction. Compressive stresses are inevitably accumulated in the upper part (upper part of the neutral axis).

특히 다경간 교량에 있어서는 긴장재 도입효과를 극대화시키더라도 연속지점부에 발생하는 휨 부모멘트에 효과적으로 저항하기 위해서는 PSC 거더의 단부 단면을 크게 해야 하며, 슬래브의 자중 및 활하중에 의한 휨 정모멘트에 저항하기 위한 긴장재 설치량이 커질 수밖에 없어 PSC 거더 단면을 최적화시키는 데는 한계가 있을 수밖에 없었다.Particularly, in case of multi-span bridges, even if maximizing the effect of introducing the tension material, the end section of the PSC girder should be enlarged in order to effectively resist the bending moment generated at the continuous point portion, and resistance against the bending moment caused by the self weight and live load of the slab It is impossible to optimize the cross section of the PSC girder.

도 1b는 종래 연속지점부에 있어 PSC 긴장재의 정착방법이 도시되어 있다.FIG. 1B shows a method of fixing a PSC tension member in a conventional continuous point portion.

즉, 연속지점부에 위치한 교각(40)의 상면에 횡방향 빔(30)을 추가로 시공하고, 상기 횡방향 빔(30)에 PSC 거더(20)가 얹어져 설치되도록 하여 서로 종방향으로 인접하도록 설치하고 있음을 알 수 있으며, 슬래브(50)가 시공되어 있음을 알 수 있다.That is, a transverse beam 30 is additionally installed on the upper surface of the pier 40 located at the continuous point portion, and the PSC girder 20 is mounted on the transverse beam 30, And it can be seen that the slab 50 is installed.

이에 상기 인접한 PSC 거더(20)의 단부로부터는 내부의 PSC 긴장재(21)가 인출되어 서로 크로싱되어 횡방향 빔(30)에 긴장 후 정착되도록 하고 있음을 알 수 있다. 이에 연속지점부에 작용하는 휨 부모멘트를 감소시킬 수 있도록 함을 알 수 있다.From the end of the adjacent PSC girder 20, the inner PSC tensile members 21 are pulled out, crossed with each other, and fixed to the transverse beam 30 after being strained. Thus, it can be seen that the bending moment acting on the continuous point portion can be reduced.

하지만 이는 교각 상면에 별도로 설치한 횡방향 빔(30)을 이용하기 때문에 시공성 및 경제성에 있어 제약일 있을 수밖에 없다는 문제점이 있었다.However, since the lateral beam 30 is separately installed on the top surface of the pier, there is a problem in that it is a constraint on the workability and economical efficiency.

본 발명은 PSC 긴장재에 의한 프리스트레스 도입으로 인하여 PSC 거더 단면에 도입되는 압축응력을 효과적으로 상쇄할 수 있으면서도 PSC 거더에 슬래브를 시공함에 따른 압축응력도 함께 제어할 수 있으며, 연속지점부에 발생하는 휨 부모멘트도 감소시킬 수 있어 보다 효율적으로 단경간 및 다경간 교량을 시공할 수 있는 단부수직긴장재를 이용한 교량시공방법 제공을 해결하고자 하는 과제로 한다.The present invention can effectively cancel the compressive stress introduced into the end face of the PSC girder due to the introduction of the prestress by the PSC prestressing material and also control the compressive stress due to the construction of the slab on the PSC girder. So that it is possible to construct a short-span and multi-span bridges more effectively, and to provide a bridge construction method using an end vertical tensional material.

상기 과제를 달성하기 위하여 본 발명은In order to achieve the above object,

첫째, 양 단부에 수직긴장홀을 형성시킨 PSC 거더를 구비한 후, 교량하부구조 상면으로 단부수직긴장재가 상방으로 인출되도록 한 상태에서 상면에 설치된 교량받침 양 측방으로 단부받침대를 설치하고, PSC 거더 양 단부로부터 중앙부쪽으로 이격된 위치에 단부받침대가 위치하도록 PSC 거더를 거치하여 지지되도록 하게 된다.First, an end support is provided on both sides of a bridge support installed on the upper surface of the PSC girder in such a state that the end vertical tensional material is pulled out to the upper surface of the bridge substructure after the PSC girder having the vertical tension holes are formed at both ends, And the PSC girder is supported by the PSC girder so that the end support is located at a position spaced apart from the both ends.

이에 PSC 거더의 중앙부에는 자중에 의하여 휨 정모멘트가 발생하게 된다.Therefore, a flexural moment is generated at the center of the PSC girder due to its own weight.

이러한 휨 정모멘트를 감소시키기 위하여 상기 수직긴장홀에 단부수직긴장재가 하부로부터 삽입되도록 하여 상단을 인장 후 정착시키게 된다.In order to reduce the flexural moment, the upper vertical tension is inserted into the vertical tension holes from the lower end, and then the upper ends are tensioned and fixed.

이에 단부받침대와 단부받침대 사이에서는 PSC 거더 자중에 의한 휨 정모멘트를 상쇄시킬 수 있는 휨 부모멘트를 도입시킬 수 있어 이를 감안한 PSC 긴장재의 프리스트레스 도입효과를 극대화시킬 수 있게 된다.Therefore, it is possible to introduce a bending moment which can offset the bending moment caused by the self weight of the PSC girder between the end support and the end support, thereby maximizing the effect of introducing the prestress of the PSC tension member.

이때 단부받침대와 단부수직긴장재 사이에는 단부수직긴장재의 인장 후 정착에 의하여 휨 부모멘트가 감소하면서 단부수직긴장재 위치에서 제로(ZERO)가 된다. 이러한 휨 부모멘트는 PSC 거더의 양 단부에 일체로 형성시킨 단부보강블록에 의하여 저항할 수 있도록 함으로서 PSC 거더에 불리한 영향이 발생하지 않도록 하게 된다.At this time, between the end support and the end vertical tension member, the bending moment is reduced by the fixing after the end vertical tension member, and it becomes zero at the end vertical tension member position. These bending moments can be resisted by the end reinforcement blocks integrally formed at both ends of the PSC girder, so that the PSC girder is not adversely influenced.

둘째, 이에 상기 단부수직긴장재에 의하여 휨 부모멘트가 도입된 PSC 거더는 지점부 및 슬래브 콘크리트를 타설하는 등의 방법으로 연속화 시키게 된다.Secondly, the PSC girder in which the bending moment is introduced by the above-mentioned end vertical tensional material is made continuous by a method such as placing a fulcrum portion and a slab concrete.

이에 상기 연속화에 따른 연속지점부에서는 휨 부모멘트가 발생하며 PSC 거더의 중앙부에서는 휨 정모멘트가 발생하게 된다.Therefore, the bending moment occurs at the continuous point portion due to the sequencing, and the bending moment occurs at the center portion of the PSC girder.

이때 이러한 휨 정모멘트는 단부수직긴장재에 PSC 거더의 양 단부가 구속되어 있어 상당 부분 제어할 수 있게 되어 보다 효율적인 단면강성을 가진 PSC 거더 제작이 가능하게 된다.In this case, since the both ends of the PSC girder are constrained to the end vertical torsion, the PSC girder having more effective sectional rigidity becomes possible.

셋째, 상기 단부수직긴장재는 추후 PSC 거더와 교대, 교각으로부터 해체(커팅)되도록 하여 PSC 거더가 교량하부구조인 교대, 교각에 강결됨에 따른 하중전달로 인한 교량하부구조의 단면을 크게 하는 등의 보강작업이 필요 없도록 하게 된다.Third, the end vertical tensional material is alternately replaced with the PSC girder, and the PSC girder is reinforced such that the cross section of the bridge underground structure and the cross section of the bridge underground structure due to the load transfer due to the strong connection with the pier are increased So that no work is required.

넷째, PSC 거더에 형성되는 단부보강블록은 양 단부에 일체로 형성되도록 하여 연속지점부에서 인접한 PSC 거더로부터 인출된 PC긴장재의 일부가 서로 크로스되어 정착되도록 함으로서 연속지점부에 발생하는 휨 부모멘트를 효과적으로 제어할 수 있도록 하게 된다.Fourth, the end reinforcement block formed on the PSC girder is integrally formed at both ends, so that a part of the PC tensile material drawn from the adjacent PSC girder at the continuous point portion is cross-fixed to be fixed, Thereby enabling effective control.

본 발명에 의한 PSC 거더를 다경간 교량에 이용할 경우 연속지점부에 있어 단부수직긴장재에 의한 휨 부모멘트를 도입시킨 후 PSC 거더를 연속화시켜, PSC 거더의 중앙부에 발생하는 자중에 의한 휨 정모멘트가 상쇄되어 PSC 거더의 단면을 최적화 시킬 수 있게 되며, When the PSC girder according to the present invention is used for a multi-span bridge, the bending moment due to the end vertical torsion is introduced at the continuous point portion, and then the PSC girder is continuously continuous, so that the bending moment caused by the self weight at the center portion of the PSC girder So that the cross section of the PSC girder can be optimized,

PSC 거더의 연속화에 따른 PSC 거더 중앙부에 발생하는 휨 정모멘트를 교량하부구조에 정착된 단부수직긴장재가 구속하여 제어할 수 있고, 나아가 연속지점부를 크로싱하여 인접한 PSC 거더의 단부보강블록에 긴장 후 정착되는 PSC 긴장재에 의하여 슬래브에 의한 자중 및 활하중에 의하여 PSC 거더의 압축응력 누적 영향을 최소화시키면서 연속지점부에 발생하는 휨 부모멘트를 효과적으로 제어할 수 있게 된다.The bending moment generated at the center part of the PSC girder due to the sequencing of the PSC girder can be controlled by restraining the end vertical tensions fixed to the bridge substructure and further crossing the successive stiffening parts to settle the end reinforcing block of the adjacent PSC girders It is possible to effectively control the flexural moments occurring at the continuous point portions while minimizing the cumulative impact of compressive stress of the PSC girder due to the self weight and live load caused by the slab.

도 1a는 종래 PSC 거더에 있어 자중과 PSC 긴장재에 의한 휨 모멘트도,
도 1b는 종래 PSC 거더의 연속지점부에 있어 PSC 긴장재 정착 사시도,
도 2a, 도 2b, 도 2c, 도 2d, 도 2e 및 도 2f는 본 발명에 의한 단부수직긴장재를 이용한 교량시공방법의 순서도,
도 3은 본 발명의 시공단계에 따른 휨 모멘트도를 도시한 것이다.
Fig. 1A is a diagram showing the self-weight and the bending moment due to the PSC tensile member in the conventional PSC girder,
Fig. 1B is a perspective view of a PSC tension member at a continuous point portion of a conventional PSC girder,
FIGS. 2A, 2B, 2C, 2D, 2E and 2F are flowcharts of a method of constructing a bridge using an end vertical tensional material according to the present invention,
FIG. 3 shows a bending moment diagram according to the construction step of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings, which will be readily apparent to those skilled in the art. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In order to clearly illustrate the present invention, parts not related to the description are omitted, and similar parts are denoted by like reference characters throughout the specification.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.Throughout the specification, when an element is referred to as "comprising ", it means that it can include other elements as well, without excluding other elements unless specifically stated otherwise.

[본 발명의 단부수직긴장재를 이용한 교량시공방법][Method of constructing a bridge using the end portion vertical tensional material of the present invention]

도 2a, 도 2b, 도 2c, 도 2d, 도 2e 및 도 2f는 본 발명에 의한 단부수직긴장재를 이용한 교량시공방법의 순서도를 도시한 것이다. 이는 다경간 교량을 기준으로 살펴본다.FIGS. 2A, 2B, 2C, 2D, 2E and 2F are flowcharts of a method of constructing a bridge using an end vertical tensional material according to the present invention. This is based on multi-span bridges.

먼저 도 2a와 같이 PSC 거더(100)를 준비하여 미리 시공된 교량하부구조(400, 교대, 교각)의 상면에 단부받침대(300)에 지지되도록 거치하게 된다.2A, the PSC girder 100 is prepared and mounted on the upper end of the previously installed bridge substructure 400 (alternating bridge, bridge bridge) so as to be supported by the end support 300.

이러한 PSC 거더(100)는 양 단부에 수직긴장홀(150)이 형성되어 있으며, 교각의 내부로부터 상방으로 단부수직긴장재(200)가 인출되어 있음을 알 수 있다. It can be seen that the PSC girder 100 is formed with vertical tension holes 150 at both ends and the end vertical tensions 200 are drawn upward from the inside of the pier.

이러한 단부수직긴장재(200)가 상기 수직긴장홀(150)의 하부로부터 삽입되어 단부수직긴장재의 상단이 PSC 거더(100)의 상면으로부터 상방으로 약간 돌출되도록 PSC 거더(100)를 거치하게 된다.The PSC girder 100 is inserted such that the end vertical tensional material 200 is inserted from the lower portion of the vertical tensional hole 150 and the upper end of the end vertical tensional material is slightly protruded upward from the upper surface of the PSC girder 100.

이때 PSC 거더(100)에는 2차 PSC 긴장재(160a)가 단부로부터 인출되도록 배치시키게 된다.At this time, the PSC girder 100 is arranged so that the secondary PSC tension member 160a is pulled out from the end portion.

또한 상기 단부받침대(300)는 연속지점부에 있어 교각 상면에 설치된 교량받침(410) 양 측방에 유압잭, 기계식 잭 또는 클램프등으로 설치할 수 있도록 하여 거치된 PSC 거더(100)의 승, 하강이 가능하도록 하게 된다.In addition, the end support 300 can be installed on both sides of the bridge support 410 installed on the upper surface of the bridge pier in the continuous point portion by a hydraulic jack, a mechanical jack or a clamp or the like so that the mounted PSC girder 100 can be raised and lowered .

이에 PSC 거더(100)는 거치에 의한 자중에 의하여 중앙부에 휨 정모멘트가 발생하게 됨을 알 수 있으며, 서로 연결되지 않아 PSC 거더가 연속화 이전의 상태라 할 수 있다.Therefore, it can be seen that the PSC girder 100 is caused to have a flexural moment at the center portion due to its own weight due to the mounting, and it can be said that the PSC girder is not connected to each other,

다음으로는 도 2b와 같이, 상기 단부수직긴장재(200)의 상단에 미도시된 인장기(유압잭등)를 이용하여 인장 후, PSC 거더 상면에서 정착시키게 된다. Next, as shown in FIG. 2B, the upper end of the end vertical tensional material 200 is tensioned using a tension device (hydraulic jack or the like) (not shown), and then fixed on the upper surface of the PSC girder.

이로서 PSC 거더(100)는 교량하부구조(400)에 고정되어 구속되는 효과를 가지게 된다.Thus, the PSC girder 100 has an effect of being fixed and constrained to the bridge substructure 400.

또한 상기 단부수직긴장재(200)에 의하여 도입되는 수직긴장력(P1)에 의한 휨 모멘트에 의해 PSC 거더(100)의 중앙부에는 휨 부모멘트가 발생하게 되며, 이는 PSC 거더의 자중에 의한 상기 휨 정모멘트를 상쇄시키는 역할을 하게 된다.In addition, a bending moment is generated in the central portion of the PSC girder 100 due to the bending moment due to the vertical tensional force P1 introduced by the end vertical tensional material 200. This is because the bending moment due to the self weight of the PSC girder .

이로서 본 발명의 PSC 거더는 자중에 의한 휨 정모멘트의 상쇄 효과 부분에 기인한 단면의 최적화가 가능하게 된다.This makes it possible to optimize the cross section of the PSC girder of the present invention due to the canceling effect portion of the bending moment due to its own weight.

이때 단부받침대(300)와 단부수직긴장재(200) 사이(Z1)에는 도 3과 같이 휨 부모멘트가 감소하여 단부수직긴장재 위치에서 제로(ZERO)가 된다. 이러한 휨 부모멘트는 PSC 거더의 양 단부에 일체로 형성시킨 단부보강블록에 의하여 저항할 수 있도록 함으로서 PSC 거더에 불리한 영향이 발생하지 않도록 하게 된다.At this time, the bending moment is reduced between the end support 300 and the end vertical tensional material 200 as shown in FIG. These bending moments can be resisted by the end reinforcement blocks integrally formed at both ends of the PSC girder, so that the PSC girder is not adversely influenced.

PSC 거더(100)는 역시 서로 연결되지 않아 PSC 거더가 연속화 이전의 상태라 할 수 있다.The PSC girder 100 is also not connected to each other and can be said to be a state before the PSC girder is continuous.

다음으로는 도 2c와 같이, 상기 단부수직긴장재(200)에 의하여 교량하부구조에 구속된 PSC 거더(100)를 서로 종방향(교축방향)으로 연속화시키게 된다.Next, as shown in FIG. 2C, the PSC girders 100 constrained to the bridge substructure by the end vertical tensional material 200 are made continuous in the longitudinal direction (throttling direction) with each other.

이러한 연속화는 서로 인접한 PSC 거더 단부의 연속지점부 공간에 콘크리트(C)를 타설하면서 슬래브 콘크리트도 함께 일체로 타설하여 PSC 거더를 서로 연속화시키게 된다.In this sequencing, the concrete (C) is laid in the consecutive point subspace of the end of the PSC girder adjacent to each other, and the slab concrete is integrally laid together so as to make the PSC girders continuous to each other.

이에 연속화에 따라 연속지점부에서는 도 3과 같이 휨 부모멘트가 발생하게 되고, PSC 거더의 중앙부에서는 휨 정모멘트가 발생하며, 슬래브의 자중은 PSC 거더에 압축응력이 누적되도록 만들게 된다.As a result, the bending moment is generated at the continuous point portion as shown in Fig. 3, the bending moment occurs at the center of the PSC girder, and the self weight of the slab accumulates compressive stress in the PSC girder.

하지만 상기 PSC 거더(100)는 단부수직긴장재(200)에 의하여 교량하부구조에 구속된 상태에서 연속화가 되기 때문에 PSC 거더에 발생하는 상기 휨 정모멘트를 효과적으로 제어할 수 있게 되며, 상기 연속지점부에 발생하는 휨 부모멘트는 PSC 거더(100)의 단부보강블록(140)에 의하여 저항되도록 하게 된다.However, since the PSC girder 100 is continuous in a state of being constrained to the bridge underground structure by the end vertical tensional material 200, the bending moment generated in the PSC girder can be effectively controlled, The resulting bending moments are caused to be resisted by the end reinforcement block 140 of the PSC girder 100.

이로서 PSC 거더의 연속화에 따른 휨 정모멘트 및 연속지점부의 휨 부모멘트의 제어가 가능하므로 PSC 거더의 단면을 보다 최적화 시킬 수 있게 됨을 알 수 있다.It can be seen that the cross section of the PSC girder can be more optimized because it is possible to control the bending moment due to the sequential PSC girder and the bending moment of the continuous point portion.

다음으로는 도 2d와 같이, 상기 단부수직긴장재(200)를 제거하게 된다. 즉, 단부받침대(300)에 의하여 슬래브가 상면에 형성된 PSC 거더(100)는 교량하부구조(400) 상면과 상방으로 이격되어 있으므로 PSC 거더 저면 하부공간을 이용하여 교량하부구조(400) 상면에 인출된 단부수직긴장재(200)를 커팅하여 수직긴장홀에 삽입된 단부수직긴장재를 상방으로 뽑아 회수하는 것이 바람직하다.Next, as shown in FIG. 2D, the end vertical tensional material 200 is removed. That is, since the PSC girder 100 formed on the upper surface of the slab by the end support 300 is spaced apart from the upper surface of the bridge substructure 400, the PSC girder 100 is pulled out on the upper surface of the bridge substructure 400 It is preferable to cut the end portion vertical torsion material 200 inserted into the vertical torsion hole and withdraw the end portion vertical torsion material inserted upward into the vertical torsion hole.

이는 슬래브가 형성된 PSC 거더에는 추후 중분대등에 의한 고정하중과 활하중이 발생하게 될 경우 단부수직긴장재를 통해 교량하부구조로 전달될 수 있으므로 이를 고려하여 교량하부구조는 그 단면이 일부라도 커질 수 있게 된다. 이에 본 발명은 이러한 교량하부구조의 단면 증대요인이 발생하지 않도록 단부수직긴장재를 해체(커팅)하는 것이다.This is because the slab-shaped PSC girder can be transferred to the bridge substructure through the end vertical tensions when a fixed load and live load due to intermediate equilibrium is generated later, so that the cross section of the bridge substructure can be partially enlarged . Accordingly, the present invention is to dismantle (cut) the end vertical tensional material so that the cross section of the bridge substructure does not increase.

다음으로는 도 2e와 같이, PSC 거더의 양 단부에 미리 일체화시킨 단부보강블록(140)은 연속지점부에 있어 서로 종방향으로 인접하여 위치하게 되는데, 서로 인접한 PSC 거더로부터 인출된 PSC 긴장재 일부(160a, 2차 PSC 긴장재)가 각각 연속지점부를 경유하여 인접한 다른 PSC 거더의 단부보강블록(140)에 각각 긴장 후 정착시키게 된다.Next, as shown in FIG. 2E, the end reinforcement blocks 140 previously integrated at both ends of the PSC girder are positioned adjacent to each other in the longitudinal direction at the continuous point portions. A portion of the PSC tensile material drawn from the adjacent PSC girders 160a and the secondary PSC tensions) are respectively fixed to the end reinforcing block 140 of the adjacent PSC girders via the successive focal points, respectively.

이때 상기 2차 PSC 긴장재(160a)는 연속지점부에 있어 상단을 경유하도록 함으로서 연속지점부에 발생하는 휨 부모멘트를 상쇄시키는 프리스트레스 도입 기능을 가지도록 하게 된다.At this time, the secondary PSC torsion member 160a has the function of introducing a prestress to offset the bending moment generated in the continuous fulcrum portion by allowing the upper end to pass through the continuous fulcrum portion.

다음으로는 도 2f와 같이, 단부받침대(300)로 사용되는 유압잭등을 하강시켜 교량하부구조 상면에 미리 설치한 교량받침(410)에 슬래브가 형성된 PSC 거더의 저면이 지지되도록 하고, 상기 단부받침대(300)를 해체하여 다경간 교량 시공을 완성시키게 된다. 이로서 최종 슬래브 상면에는 필요한 포장등이 시공되어 교량 시공이 완료된다.Next, as shown in FIG. 2F, the hydraulic jack used as the end support 300 is lowered to support the bottom of the PSC girder having the slab formed in the bridge support 410 installed on the upper surface of the bridge lower structure, (300) is disassembled to complete the multi-span bridge construction. As a result, necessary packing or the like is applied to the upper surface of the final slab to complete the bridge construction.

이에 본 발명은 1차 PSC 긴장재(160, PSC 거더 자중에 의한 휨 정모멘트 상쇄)및 2차 PSC 긴장재(160a, 연속지점부에 발생하는 휨 부모멘트 상쇄)에 의한 PSC 거더의 단면 최적화 및 연속지점부에 있어 휨 부모멘트를 효과적으로 감소시켜 효율적이고 경제적인 PSC 거더 시공이 가능하게 됨을 알 수 있다.The present invention is based on the optimization of the cross-section of the PSC girder due to the primary PSC torsion (160, bending moment compensation by PSC girder self weight) and the secondary PSC torsion (160a, It is possible to effectively and economically construct the PSC girder by reducing the bending moments effectively.

[ 본 발명의 시공단계에 따른 휨 모멘트도 ][Bending moment diagram according to the construction step of the present invention]

도 3은 본 발명의 시공단계에 따른 휨 모멘트도가 도시되어 있다.Fig. 3 shows a bending moment diagram according to the construction step of the present invention.

즉, 도 3에 의하면 PSC 거더가 교량하부구조에 단부받침대에 의하여 거치되어 단부수직긴장재가 인장후 정착된 상태에 있어 휨 모멘트도가 도시되어 있다.That is, according to FIG. 3, the bending moment diagram is shown in a state where the PSC girder is fixed to the bridge substructure by the end support, and the end vertical prestressing material is fixed after being stretched.

이에 자중에 의하여 발생되는 PSC 거더의 휨 정모멘트는 단부수직긴장재에 의하여 도입된 휨 부모멘트에 의하여 일부 상쇄되며 연속지점부에서는 단부수직긴장재에 따른 휨 부모멘트가 잔류하고 있음을 알 수 있다.The bending moments of the PSC girder generated by self weight are partially canceled by the bending moment introduced by the end vertical tensions, and the bending moment due to the end torsion remains at the continuous point.

다음으로 도 3b에 의하면 슬래브 콘크리트에 의하여 PSC 거더가 서로 연속화되어 PSC 거더의 중앙부에 휨 정모멘트가 증가하게 되지만 단부수직긴장재에 의하여 구속되어 제어될 수 있고, PSC 거더 연속화에 따른 연속지점부에 발생하는 휨 부모멘트는 PSC 거더의 단부에 형성시킨 단보보강블록에 의하여 저항할 수 있게 된다.Next, as shown in FIG. 3B, the PSC girder is continuously connected to each other by the slab concrete, thereby increasing the bending moment at the center portion of the PSC girder. However, the PSC girder can be restrained and controlled by the end vertical tensions, The bending moments of the PSC girder can be resisted by the step reinforcement block formed at the end of the PSC girder.

또한 상기 연속지점부에 있어 휨 부모멘트는 앞서 살펴본 2차 PSC 긴장재(160a)에 의하여 상쇄시킬 수 있게 된다.Also, the bending moment at the continuous point portion can be canceled by the secondary PSC torsion member 160a.

결국, 본 발명은 PSC 거더의 단부수직긴장재 및 2차 PSC 긴장재에 의하여 PSC 거더의 중앙부에 발생하는 휨 정모멘트와 연속지점부에 발생하는 휨 부모멘트를 감소시킬 수 있고 이를 고려하여 PSC 거더의 단면을 최적화시킬 수 있으며 동일한 단면이라면 PSC 거더의 단면강성을 충부히 확보할 수 있어 보다 장지간에 의한 다경간 교량 시공이 가능하게 된다.As a result, the present invention can reduce the flexural moment occurring at the center portion of the PSC girder and the flexural moment occurring at the continuous point portion by the end portion vertical torsion material and the secondary PSC torsion material of the PSC girder, It is possible to optimize the cross-section rigidity of the PSC girder if the cross-section is the same.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.It will be understood by those skilled in the art that the foregoing description of the present invention is for illustrative purposes only and that those of ordinary skill in the art can readily understand that various changes and modifications may be made without departing from the spirit or essential characteristics of the present invention. will be. It is therefore to be understood that the above-described embodiments are illustrative in all aspects and not restrictive. For example, each component described as a single entity may be distributed and implemented, and components described as being distributed may also be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is defined by the appended claims rather than the detailed description and all changes or modifications derived from the meaning and scope of the claims and their equivalents are to be construed as being included within the scope of the present invention do.

100: PSC 거더
140: 단부보강블록
150: 수직긴장홀
160: 1차 PSC 긴장재
160a: 2차 PSC 긴장재
200: 단부수직긴장재
300: 단부받침대(유압잭등)
400: 교량하부구조(교대, 교각)
410: 교량받침
P1: 수직긴장력
100: PSC girder
140: end reinforcement block
150: Vertical tension hole
160: primary PSC tension
160a: Secondary PSC tension member
200: end vertical tension
300: End bracket (hydraulic jack, etc.)
400: Bridge infrastructure (alternation, bridge)
410: Bridge support
P1: vertical tension

Claims (6)

(a) 양 단부에 수직긴장홀(150)이 형성된 PSC 거더(100)를 교량하부구조(400)의 상면에 설치된 단부받침대(300)에 지지되도록 거치하되, 교량하부구조(400)의 내부로부터 상방으로 PSC 거더 저면 하부공간을 경유하여 수직긴장홀(150)에 단부수직긴장재(200)가 삽입되어 상방으로 인출되도록 하는 단계;
(b) 상기 단부수직긴장재(200)를 인장 후 PSC 거더 양 단부 상면에 정착시켜 수직긴장력(P1)을 도입시키는 단계;
(c) 상기 PSC 거더(100)를 슬래브 시공과 함께 연속화시키는 단계;
(d) 상기 단부수직긴장재(200)를 PSC 거더 저면 하부공간을 이용하여 커팅하는 단계; 및
(e) 상기 단부받침대(300)를 제거하여 슬래브가 형성된 PSC 거더를 교량하부구조에 설치된 교량받침에 지지되도록 하는 단계;를 포함하는 단부수직긴장재를 이용한 교량시공방법.
(a) A PSC girder 100 having vertical tension holes 150 formed at both ends thereof is mounted to be supported by an end support 300 installed on the upper surface of the bridge lower structure 400, So that the end vertical tensional material 200 is inserted into the vertical tensional hole 150 through the lower space of the bottom of the PSC girder upward and drawn out upward;
(b) fusing the end vertical tensions (200) to the upper surfaces of both ends of the PSC girders after tensioning to introduce vertical torsional forces (P1);
(c) continuing the PSC girder 100 together with slab construction;
(d) cutting the end vertical tensional material 200 using a lower space of the PSC girder bottom; And
(e) removing the end support 300 to support the PSC girder having the slab formed thereon on a bridge support installed on the bridge underground structure.
제 1항에 있어서,
상기 (d) 및 (e) 단계 사이에는, 연속지점부에서 서로 인접한 PSC 거더의 2차 PSC 긴장재를 각각 연속지점부를 경유하여 PSC 거더 단부에 일체로 형성시킨 단부보강블록 각각에 긴장 후 정착시키는 (d1) 단계가 더 이루어지도록 하는 단부수직긴장재를 이용한 교량시공방법.
The method according to claim 1,
Between the steps (d) and (e), the secondary PSC tensions of the PSC girders adjacent to each other at the consecutive point portions are fused to each of the end reinforcing blocks integrally formed at the ends of the PSC girder via the continuous point portions d1) step is further carried out.
제 1항에 있어서,
상기 (a) 단계의 교량하부구조(400)는 상면에 교량받침(410)을 설치하고, 상기 교량받침(410) 양 측방에 단부받침대(300)가 각각 설치되며, 내부로부터 상방으로 연장되는 단부수직긴장재(200)가 설치되도록 시공하는 단부수직긴장재를 이용한 교량시공방법.
The method according to claim 1,
The bridge substructure 400 of the step (a) is provided with a bridge support 410 on the upper surface thereof, an end support 300 is installed on both sides of the bridge support 410, A method of constructing a bridge using an end vertical tensional material to be installed to install a vertical tensional material (200).
제 1항에 있어서,
상기 (a)단계의 PSC 거더(100)는 1차 PSC 긴장재(160)에 의하여 프리스트레스가 도입되도록 하고, 2차 PSC 긴장재(160a)가 단부로부터 일출되어 연속지점부에서 인접한 단부보강블록(140)에 긴장 후 정착되도록 하는 단부수직긴장재를 이용한 교량시공방법.
The method according to claim 1,
The PSC girder 100 of the step (a) allows the prestress to be introduced by the primary PSC torsion 160 and the secondary PSC torsion 160a is sunk from the end to the adjacent end reinforcement block 140 at the continuous point, A method for constructing a bridge using an end portion vertical tensional material to be fixed after tensioning.
제 1항에 있어서,
상기 (c) 단계에 있어 연속화는 연속지점부에서 인접한 PSC 거더의 단부 공간과 PSC 거더 상부에 타설되는 지점부 및 슬래브 콘크리트에 의하여 이루어지도록 하는 단부수직긴장재를 이용한 교량시공방법.
The method according to claim 1,
In the step (c), the sequencing is performed by using the end portion of the adjacent PSC girder at the continuous point portion, the point portion placed on the PSC girder, and the slab concrete.
제 1항에 있어서,
상기 단부받침대(300)는 유압잭을 포함하여 슬래브가 형성된 PSC 거더가 하강하면서 교량받침(410)에 지지되도록 하는 단부수직긴장재를 이용한 교량시공방법.
The method according to claim 1,
Wherein the end support 300 includes a hydraulic jack to support the PSC girder formed with the slab to be supported on the bridge support 410 while being lowered.
KR1020140187433A 2014-12-23 2014-12-23 Bridge construction method using end-vertival tendon KR101556310B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140187433A KR101556310B1 (en) 2014-12-23 2014-12-23 Bridge construction method using end-vertival tendon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140187433A KR101556310B1 (en) 2014-12-23 2014-12-23 Bridge construction method using end-vertival tendon

Publications (1)

Publication Number Publication Date
KR101556310B1 true KR101556310B1 (en) 2015-10-01

Family

ID=54338433

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140187433A KR101556310B1 (en) 2014-12-23 2014-12-23 Bridge construction method using end-vertival tendon

Country Status (1)

Country Link
KR (1) KR101556310B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101640535B1 (en) * 2015-11-25 2016-07-19 주식회사 하이드로코리아 Bridge construction method for support overturning and horizontal displacement control
KR102203826B1 (en) * 2020-03-26 2021-01-15 (주)인터컨스텍 Prestressed Concrete Spliced Girder Bridge and Construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101072259B1 (en) 2011-04-29 2011-10-12 씨티씨 주식회사 Rigid connecting method between prestressed concrete girder and substructure of bridge
KR101397131B1 (en) 2012-06-14 2014-05-19 성균관대학교산학협력단 Prestress concrete bridge and building method thereof
KR101469150B1 (en) 2014-07-14 2014-12-04 브릿지테크놀러지(주) Rahmen bridge construction method using girder

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101072259B1 (en) 2011-04-29 2011-10-12 씨티씨 주식회사 Rigid connecting method between prestressed concrete girder and substructure of bridge
KR101397131B1 (en) 2012-06-14 2014-05-19 성균관대학교산학협력단 Prestress concrete bridge and building method thereof
KR101469150B1 (en) 2014-07-14 2014-12-04 브릿지테크놀러지(주) Rahmen bridge construction method using girder

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101640535B1 (en) * 2015-11-25 2016-07-19 주식회사 하이드로코리아 Bridge construction method for support overturning and horizontal displacement control
KR102203826B1 (en) * 2020-03-26 2021-01-15 (주)인터컨스텍 Prestressed Concrete Spliced Girder Bridge and Construction method thereof

Similar Documents

Publication Publication Date Title
JP2007077630A (en) Continuous girder using precast main-girder segment, and its erection method
US7478450B2 (en) Longitudinally offset bridge substructure support system
KR101208231B1 (en) Method for constructing continuous supporting structure of corrugated steel web PSC beam
KR101551451B1 (en) Steel plate girder improved coner fixing capacity and rahmen or box type structure construction method using the same
KR101556310B1 (en) Bridge construction method using end-vertival tendon
KR100923409B1 (en) Construction method of Spliced Prestressed Concrete Girder Bridge in consideration of the construction sequence
KR20100025161A (en) Girder bridge connected to abutment and the construction method thereof
JP2005273392A (en) Method of reinforcing bridge using prestressed concrete steel
KR101688517B1 (en) Continuous bridge construction method using support pier girder and continuous tendon of pier
KR101347555B1 (en) Method for continuous supporting structure of Corrugated steel plate web-PSC composite beam
KR101232329B1 (en) Integral bridge and construction method using arched and concrete-filled tube
KR101376484B1 (en) Steel box manufacturing method using elastic recovering force adjustment and steel box girder and bridge construction method therewith
KR101358879B1 (en) Construction method for continuous bridge using confined concrete
KR101829791B1 (en) Bridge structure and construction method thereof
JP2734986B2 (en) Existing bridge repair method
KR20050095049A (en) Continuous bridge construction method using a psc girder
KR101578637B1 (en) Prestressed Concrete Girder for Continuous Composite Girder Bridge and Construction Method for Thereof
KR101618200B1 (en) Girder bridge construction method using temporary support member and tendon and the girder bridge therewith
KR102033052B1 (en) Method for constructing truss bridge support with infilled tube using src girder
KR200300023Y1 (en) multi-span continuous prestressed concrete girder bridge structure rigidly joined to pier
KR100500382B1 (en) Construction method and connection structure for construction continuous of precast girder
JP6586305B2 (en) Replacement method for existing bridges
KR20010018350A (en) Method for connecting continuously slab concretes of multi-span preflex composite bridge and represtressed preflex composite bridge.
KR200240385Y1 (en) PSC Girder having Anchoring Sleeves
KR101592308B1 (en) Psc girder using end-vertival tendon

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180921

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190923

Year of fee payment: 5