KR101365059B1 - Temporary type guardrail post - Google Patents

Temporary type guardrail post Download PDF

Info

Publication number
KR101365059B1
KR101365059B1 KR1020110064941A KR20110064941A KR101365059B1 KR 101365059 B1 KR101365059 B1 KR 101365059B1 KR 1020110064941 A KR1020110064941 A KR 1020110064941A KR 20110064941 A KR20110064941 A KR 20110064941A KR 101365059 B1 KR101365059 B1 KR 101365059B1
Authority
KR
South Korea
Prior art keywords
railing
plate
wedge
temporary
pipe
Prior art date
Application number
KR1020110064941A
Other languages
Korean (ko)
Other versions
KR20130003530A (en
Inventor
김광태
Original Assignee
임종준
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 임종준 filed Critical 임종준
Priority to KR1020110064941A priority Critical patent/KR101365059B1/en
Publication of KR20130003530A publication Critical patent/KR20130003530A/en
Application granted granted Critical
Publication of KR101365059B1 publication Critical patent/KR101365059B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/061Consoles; Brackets specially adapted for attachment to scaffolds

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

본 발명은 가설 난간지주를 개시한다. 본 발명은 상부와 중간부에 수평으로 파이프 난간대가 쐐기에 의해 연결되는 브라켓이 설치되어 있고, 하단에는 가설 난간을 가설 발판에 설치하기 위한 고정수단이 구비되어 있는 가설 난간지주에 있어서, 브라켓이, 난간지주의 외주에 일단이 접합되며, 쐐기홈을 갖는 상판; 이 상판과 대향하도록 이격되어 난간지주의 외주에 일단이 접합되고, 상판의 쐐기홈에 대응되게 쐐기홈을 가지며, 상판보다 길게 형성되는 하판; 이 하판의 자유단에 일단이 힌지 연결되고, 타단에 상판의 자유단에 접하는 절곡부를 구비하여 상판과 하판의 자유단 사이를 막아주며, 절곡부에 고정홈을 갖는 측판;을 구비하고, 쐐기가, 측판의 상단 절곡부에 형성된 고정홈에 끼워져 측판을 고정시키는 고정편을 일체로 갖는 훅 형태로 구성되는 것을 특징으로 한다.
이에 따라, 본 발명은 파이프 난간대를 브라켓의 정면에서 매우 간편하게 설치할 수 있음은 물론 난간지주와 파이프 난간대의 결합에 따른 쐐기 등의 부속물이 난간의 내측으로 돌출됨을 최소화할 수 있어서, 작업자의 이동이나 작업 행위에 대한 불편을 해소하고, 자칫 발생하기 쉬운 안전 사고를 예방할 수 있는 효과를 제공한다.
The present invention discloses a temporary handrail holding. In the present invention, the bracket is installed in the upper and middle parts of the horizontal pipe rail is connected by the wedge, the lower end is provided with a fixing means for installing the temporary railing on the temporary scaffold, the bracket, One end is joined to the outer circumference of the railing column, the top plate having a wedge groove; A lower plate which is spaced apart from the upper plate so as to be joined to an outer circumference of the railing column, and has a wedge groove corresponding to the wedge groove of the upper plate and formed longer than the upper plate; One end is hinged to the free end of the lower plate, and the other end is provided with a bent portion in contact with the free end of the upper plate to prevent between the free end of the upper plate and the lower plate, the side plate having a fixing groove in the bent portion; It is characterized in that it is configured in the form of a hook having a fixing piece integrally fixed to the fixing groove formed in the upper groove bent portion of the side plate.
Accordingly, the present invention can install the pipe railings very easily from the front of the bracket, as well as to minimize the protrusions such as wedges due to the combination of the railing column and the pipe railings to protrude to the inside of the railing, the movement of the worker or work It provides an effect to alleviate inconveniences and to prevent accidents that are likely to occur.

Description

가설 난간지주{Temporary type guardrail post}Temporary type guardrail post

본 발명은 각종 건축구조물의 건축시에 임시 가설물의 작업용 발판에서 작업자의 추락을 방지하기 위하여 설치되는 가설 난간의 지주에 관한 것으로서, 특히 난간을 형성하는 파이프 난간대를 매우 용이하게 연결 고정할 수 있으면서 고정된 상태로부터 작업자의 이동이나 작업에 거슬림이 없이 안정적인 연결 고정이 이루어질 수 있도록 된 가설 난간지주에 관한 것이다.
The present invention relates to a pillar of a temporary railing that is installed to prevent the fall of the operator from the scaffold for the temporary temporary work in the construction of various building structures, and in particular, while fixing the pipe railing forming the railing very easily connected and fixed The present invention relates to a temporary handrail holder, which enables stable connection fixing without disturbing the movement or work of the worker.

건축물의 내,외장재 시공시 또는 선박 등의 건조시에는 옥외 및 옥내에 비계와 같은 임시 가설물을 설치하여 작업자의 작업 공간으로 사용하게 되는데, 이러한 가설물에는 작업자나 건축 자재의 추락 방지를 위하여 가설 난간을 설치하게 된다.When constructing interior and exterior materials of a building or when building a ship, temporary temporary objects such as scaffolding are installed outdoors and indoors, and used as a work space for workers. Temporary railings are installed in these temporary objects to prevent the fall of workers or building materials. Will be installed.

선 등록실용신안 제20-0284897호는 선박의 건조시에 널리 사용되는 가설 난간지주의 예를 보여주고 있는데, 이를 살펴보면, 파이프형태의 난간기둥의 상부 외측과 중앙부 외측에 단부가 둥글게 라운딩된 걸이구가 간격을 두고 설치되고, 난간기둥의 하부에는 가설 난간을 설치할 고정단부에 나사식으로 고정시킬 클램핑수단이 설치된 것으로서, 난간기둥의 상부와 중앙부 양측에 난간줄걸이구가 설치되고, 난간기둥의 상부와 중앙부 전방에는 상하 수평부에 수직부로부터 간격을 두고 쐐기구멍을 형성한 'ㄷ'자형 브라켓트가 고정 설치되어 있는 구성이고, 난간기둥의 하단에는 클램핑 수단으로서 클램프가 설치되어 있는 구성임을 알 수 있다.Preliminary utility model No. 20-0284897 shows an example of a temporary handrail column which is widely used in ship construction. Looking at this, the hooks are rounded with round ends at the upper outer side and the outer center of the pipe-shaped railing column. Is installed at intervals, and the lower part of the railing column is provided with a clamping means for screwing the fixed end to install the temporary railing, the railing hooks are installed on both sides of the top and the center of the railing column, and the upper part of the railing column. In front of the center and the central part, the 'c' shaped brackets having wedge holes formed at fixed intervals from the vertical part in the upper and lower horizontal parts are fixedly installed, and the lower end of the railing column is provided with a clamp as a clamping means. .

이러한 선 등록고안은 상기 브라켓트에 파이프 등의 난간대를 끼우고 쐐기구멍을 통해 쐐기를 삽입함으로써 난간대가 난간기둥에 고정되도록 되어 있다.This pre-registration proposal is such that the handrail is fixed to the handrail pillar by inserting a handrail such as a pipe into the bracket and inserting a wedge through the wedge hole.

그러나, 상기와 같은 선등록고안은 쐐기가 파이프 난간대의 내측 즉, 난간기둥의 내측으로 난간대가 위치하고 그 내측으로 쐐기가 위치하는 형태로서, 난간기둥에 대하여 작업자가 작업을 하거나 이동하게 되는 공간 측으로 쐐기가 돌출되어 있는 형태로 이루어져 있다.However, the above-described preliminary design is a form in which the wedge is located inside the pipe railing, that is, the railing is located inside the railing column, and the wedge is located in the inner side thereof. Consists of protruding shapes.

이렇게 난간지주의 내측으로 돌출된 시설물들은 작업자의 이동이나 작업에 많은 제약을 주게 되는 것으로서, 이동 중이나 작업 중에 사소한 돌출물이라도 옷에 걸리게 되면 작업에 지장을 주게 되고, 자칫 안전사고로 이어질 수 있는 치명적인 위험요소로 지적되는 사항인 것이다.The facilities protruding into the railing column in the interior places a lot of restrictions on the worker's movement or work, and even minor protrusions on the clothes during the movement or work may interfere with the work and cause a fatal risk that can lead to safety accidents. It is pointed out as an element.

특히, 쐐기라는 부품은 금속이면서도 외면에 대한 가공 처리가 안된 상태로 사용되는 것으로서 접촉 시에는 쉽게 옷이 찢어질 수 있고, 상처를 줄 수 있으며, 다른 이동중인 자재들에도 손상을 주기 쉬운 것이어서 상당한 주의를 요하는 물품인 것이다.Particularly, the wedge is made of metal and has not been machined on the outer surface. It is easy to tear clothes, damages and damages other moving materials. It is an article that requires.

또한, 쐐기가 상기와 같이 작업자의 작업 공간 측으로 위치하게 되는 경우 작업자나 또는 다른 이동중인 자재와의 접촉으로 인해 자칫 쐐기가 쐐기 구멍으로부터 분리될 수도 있으며, 이 경우 난간 자체의 기능 상실로 안전 사고를 유발할 수 있는 문제점도 있는 것이다.
In addition, when the wedge is positioned to the work space of the worker as described above, the wedge may be detached from the wedge hole due to contact with the worker or other moving material, and in this case, the safety accident may be caused by the loss of the function of the railing itself. There are also problems that can be caused.

이러한 문제점들로 인하여 근래에는 도 1에서와 같은 형태의 가설 난간을 사용하기도 하였다.Due to these problems, a temporary handrail of the form as shown in FIG. 1 has recently been used.

도 1에서의 가설 난간(G)은, 난간지주(1)의 하단에 클램프(2)가 설치되어 가설 발판(B)에 난간지주(1)를 설치 고정하도록 되어 있고, 난간지주(1)의 상단과 중간 부분에는 양 측으로 결합돌부(3)가 돌출 형성되어 있으며, 파이프 난간대(5)의 단부에는 상기 결합돌부(3)에 결합되는 결합요부(6)가 형성되어 결합돌부(3)와 결합요부(6)가 결합된 상태에서 쐐기(7)에 의해 고정토록 되어 있다.In the temporary handrail G in FIG. 1, a clamp 2 is provided at the lower end of the handrail holder 1, and the handrail holder 1 is fixed to the temporary scaffold B by the handrail holder 1. Coupling protrusions 3 protrude from both sides of the upper and middle portions, and coupling recesses 6 are coupled to the coupling protrusions 3 at end portions of the pipe railings 5 to be coupled to the coupling protrusions 3. It is fixed by the wedge 7 in the state in which the recessed part 6 was engaged.

따라서, 쐐기(7)는 가설 난간지주(1)의 내측으로 돌출됨이 없이 난간지주(1)의 측면에 위치됨으로써 난간의 내측에서 작업하는 작업자나 다른 자재와의 저촉을 줄일 수 있었다.Therefore, the wedge 7 is located on the side of the railing column 1 without protruding to the inside of the temporary railing column 1, thereby reducing contact with the worker or other material working inside the railing.

그러나 상술한 도 1의 기술에서는 다음과 같은 문제점이 지적되었다.However, the following problem has been pointed out in the above-described technique of FIG. 1.

즉, 난간지주(1)의 측면으로 파이프 난간대(5)가 연결되므로, 난간지주(1)와 난간지주(1)의 사이 거리가 정확하게 유지되어야 파이프 난간대(5)의 연결 조립이 정확하게 이루어질 수 있으며, 그 거리가 정확하지 않으면 파이프 난간대(5)의 연결이 이루어지지 못하는 문제가 있었다.That is, since the pipe railing (5) is connected to the side of the railing column (1), the connection between the railing column (1) and the railing column (1) must be maintained accurately so that the connection assembly of the pipe railing (5) can be made accurately. If the distance is not correct, there is a problem that the connection of the pipe railing (5) can not be made.

실제 작업 환경에 따라서는 난간지주(1)의 설치 간격이 정확하게 이루어질 수 없는 경우가 많아서 파이프 난간대(5)의 설치 작업에 어려움이 많았다.Depending on the actual working environment, the installation intervals of the railing column 1 cannot be made accurately in many cases, and thus, the installation work of the pipe railing stand 5 was difficult.

또한, 도면에서와 같이 양단에 결합요부(6)를 각각 갖는 특정 구조의 파이프 난간대(5)만을 사용하여야 하므로 일반적으로 널리 사용되는 파이프를 이용한 난간의 설치가 불가능하여 전체적인 설치비용의 증가 요인이 되었다.In addition, since only the pipe railing rails 5 having a specific structure having coupling recesses 6 at both ends should be used as shown in the drawing, installation of railings using pipes which are widely used is not possible, which increases the overall installation cost. .

더욱이, 정확한 설치 간격이 어려운 관계로 난간지주(1)와 파이프 난간대(5)의 결합돌부(3)와 결합요부(6)는 유격이 많은 상태로 결합되며 이는 곧 전체적인 난간 구조물의 결합 상태가 견고하지 못하게 되어 안전 사고의 우려가 상존할 수밖에 없는 문제점이 있었다.
In addition, since the precise installation interval is difficult, the coupling protrusion 3 and the coupling recess 6 of the railing column 1 and the pipe railing 5 are coupled with a large amount of play, which means that the overall binding structure of the railing structure is firm. There was a problem that there is no choice but to remain concerned about safety accidents.

한편, 도 2 내지 도 4에는 상술한 종래기술들의 문제점을 해결하기 위해 본 출원인이 선출원한 기술을 도시하였다.On the other hand, Figures 2 to 4 show the prior application of the applicant in order to solve the problems of the prior art described above.

이 기술은 "ㄷ"자형 브라켓(112)의 상판(113)과 하판(114) 선단부에 호형의 요부(117)가 형성되어 난간지주(110)를 감싸도록 용접으로 고정되고, 각 요부(117)의 주위에서 상판(113)과 하판(114)에 서로 대응되는 쐐기홈(121)(122)이 각각 형성되어 이들 쐐기홈(121)(122)에 쐐기(120)가 각각 끼워지도록 되어 있다.This technique is formed by arc-shaped recesses 117 formed on the top end 113 and the lower end 114 of the "c" shaped bracket 112, and fixed by welding so as to surround the railing column 110, each recess 117 The wedge grooves 121 and 122 corresponding to each other are formed in the upper plate 113 and the lower plate 114 at the periphery thereof, so that the wedges 120 are fitted into the wedge grooves 121 and 122, respectively.

그리고 브라켓(112)의 상,하판(113)(114)을 연결하는 연결부(115)와 쐐기홈(121)(122)과의 간격은 브라켓(112)에 끼워지는 파이프 난간대(130)의 지름보다 작게 형성되어 견고한 고정을 보장하며, 쐐기홈(121)(122)은 난간지주(110)의 측방으로 배치되어 쐐기(120)의 결합 시 쐐기(120)가 난간의 내측으로 돌출되는 것을 최소화 하도록 되어 있다.And the gap between the connecting portion 115 and the wedge grooves 121 and 122 connecting the upper and lower plates 113 and 114 of the bracket 112 is larger than the diameter of the pipe railing 130 fitted to the bracket 112. It is formed small to ensure a firm fixing, the wedge grooves 121, 122 are arranged to the side of the handrail column 110 to minimize the wedge 120 is projected to the inside of the handrail when the wedge 120 is combined. have.

나머지 부호 111은 난간지주(110)를 발판(200)에 고정시키는 클램프이고, 200은 발판이다.The remaining reference numeral 111 is a clamp for fixing the railing column 110 to the scaffold 200, and 200 is a scaffold.

이에 따라 브라켓(112)은 난간지주(110)에 밀착된 상태로 고정되어 외부로의 돌출을 최대한 줄일 수 있음은 물론, 브라켓(112)에 파이프 난간대(130)가 끼워지는 형태로서 일반적인 파이프를 사용할 수 있고, 쐐기(120)는 난간지주(110) 측으로 설치되어 파이프 난간대(130) 보다 외측에 위치됨으로써 쐐기(120)의 돌출로 인한 작업 환경의 위해를 최대한 예방할 수 있도록 되어 있다.Accordingly, the bracket 112 is fixed in close contact with the railing column 110 to reduce the protrusion to the outside as much as possible, and the pipe railing 130 may be fitted to the bracket 112 to use a general pipe. Can be, the wedge 120 is installed toward the railing column 110 is located outside the pipe railing 130 so as to prevent the risk of the work environment due to the protrusion of the wedge 120 to the maximum.

그렇지만, 이와 같은 본 출원인의 선출원 기술도 난간지주(1)의 측방에서 파이프 난간대(130)를 브라켓(112)에 끼워 넣어야 되기 때문에 파이프 난간대(130)의 연결작업의 번잡한 문제는 피하기 어려웠다.
However, since the applicant's prior application technology of the present invention has to sandwich the pipe railing 130 from the side of the railing column 1, the troublesome work of connecting the pipe railing 130 is difficult to avoid.

본 발명은 상술한 종래기술들의 제반문제를 감안하여 창안된 것으로서, 가설 난간을 구성함에 있어서 난간지주와 파이프 난간대를 고정시키는 쐐기가 가설 난간의 내측으로 돌출됨을 최소화할 수 있으면서 파이프 난간대의 형태에도 구애받지 않고 최소의 비용으로 견고하고 안전하게 설치할 수 있는 가설 난간지주를 제공함에 그 목적이 있다.The present invention was devised in view of the above-mentioned problems of the related arts, and in constructing a temporary railing, the wedge for fixing the railing column and the pipe railing can be minimized to protrude into the temporary railing, while also sticking to the shape of the pipe railing. The goal is to provide a temporary handrail that can be installed firmly and safely at minimal cost.

본 발명의 다른 목적은, 가설 난간을 구성함에 있어서 난간지주들간의 간격이 일정하지 않더라도 간편하게 견고한 가설 난간을 구성할 수 있음은 물론 파이프 난간대를 난간지주의 정면에서 매우 용이하게 연결 고정시킬 수 있는 가설 난간지주를 제공하는 것이다.Another object of the present invention is to construct a hypothetical handrail, even if the interval between the handrail holding posts can easily construct a solid hypothetical handrail, as well as a hypothesis that can easily connect and fix the pipe railing in front of the handrail post. To provide handrails.

이와 같은 목적들을 달성하기 위하여 본 발명은, 상부와 중간부에 수평으로 파이프 난간대가 쐐기에 의해 연결되는 브라켓이 설치되어 있고, 하단에는 가설 난간을 가설 발판에 설치하기 위한 고정수단이 구비되어 있는 가설 난간지주에 있어서, 상기 브라켓이, 상기 난간지주의 외주에 일단이 접합되며, 쐐기홈이 상기 파이프 난간대와 나란한 방향으로 형성되어 있는 상판; 상기 상판과 대향하도록 이격되어 상기 난간지주의 외주에 일단이 접합되고, 수평에 대해서 자유단이 일정각도 상방을 향하도록 경사지게 설치되어 상기 상판의 쐐기홈에 대응되게 쐐기홈을 가지는 하판; 상기 상판과 하판의 자유단을 연결하되 일단에 힌지가 설치되어 상단부가 회동 개폐되도록 되고, 상단에는 상기 상판의 자유단에 접하는 절곡부를 구비하여 이 절곡부에 고정홈을 갖는 측판;을 구비하고, 상기 쐐기가, 상기 측판의 상단 절곡부에 형성된 고정홈에 끼워져 측판을 고정시키는 고정편을 일체로 갖는 훅 형태로 구성되는 특징이 있다.In order to achieve the above object, the present invention, the upper and the middle portion of the bracket is installed horizontally to the pipe rail is connected by the wedge, the hypothesis is provided with a fixing means for installing the temporary railing on the temporary scaffold In the railing column, the bracket, one end is joined to the outer circumference of the railing column, the upper plate is formed with wedge grooves parallel to the pipe railing; A bottom plate spaced apart from the top plate to be joined to an outer circumference of the railing column, and having a wedge groove corresponding to the wedge groove of the top plate, the inclined end of the free end being upwardly at an angle with respect to the horizontal; And a side plate having a fixing groove at the bent portion having a bent portion which is connected to the free end of the upper plate and the lower plate with a hinge installed at one end thereof so as to open and close the upper end and the bent portion which is in contact with the free end of the upper plate. The wedge is characterized in that it is configured in the form of a hook having a fixing piece integrally fixed to the fixing groove formed in the fixing groove formed in the upper bent portion of the side plate.

삭제delete

삭제delete

상기 하판은 수평에 대해서 자유단이 일정각도 상방을 향하도록 경사지게 난간지주에 접합됨으로써 정면에서 파이프 난간대를 브라켓에 끼워넣을 때 파이프 난간대의 이탈을 효과적으로 방지할 수 있다.The lower plate is effectively joined to the railing column so that the free end is inclined upward by a certain angle with respect to the horizontal, it is possible to effectively prevent the departure of the pipe railings when the pipe railings are inserted into the bracket from the front.

또한 상기와 같이 쐐기홈이 파이프 난간대와 나란한 방향으로 형성됨으로써 쐐기의 설치 시 쐐기가 난간의 내측으로 돌출되는 것을 최소화하도록 할 수 있다.In addition, as described above, the wedge groove may be formed in a direction parallel to the pipe railing so as to minimize the protruding of the wedge into the railing when the wedge is installed.

삭제delete

삭제delete

삭제delete

이와 같은 본 발명 가설 난간지주에 의하면, 가설 난간을 형성함에 있어서 파이프 난간대를 브라켓의 정면에서 끼워 넣고 고정시킬 수 있으므로 가설 난간의 설치작업이 종래에 비해 대단히 간편하면서도 매우 견고하게 구축할 수 있게 된다.According to the temporary temporary handrail of the present invention, since the pipe railing can be inserted and fixed at the front of the bracket in forming the temporary handrail, the installation work of the temporary handrail can be very simple and very robust as compared with the related art.

또, 쐐기가 파이프 난간대와 나란하게 배치되거나 난간지주의 측방에 위치하게 되므로 난간지주와 파이프 난간대의 결합에 따른 쐐기 등의 부속물이 난간의 내측으로 돌출되는 것을 최소화할 수 있으며, 이에 따라 작업자의 이동이나 작업 행위에 대한 불편을 해소할 수 있음은 물론 자칫 발생하기 쉬운 안전 사고도 예방할 수 있다.In addition, since the wedges are arranged side by side with the pipe railings or located on the side of the railing column, the accessories such as wedges due to the combination of the railing column and the pipe railing can be minimized to protrude to the inside of the railing. In addition, it can alleviate inconveniences in work activities and prevent accidents that are likely to occur.

아울러, 난간지주에 횡으로 연결되는 파이프 난간대를 특정구조가 아닌 일반적인 파이프를 사용할 수 있어 가설 난간의 설치 비용도 최소화 할 수 있다.In addition, the pipe railing that is connected to the railing column transversely can use the general pipe rather than a specific structure can minimize the installation cost of the temporary railing.

그러므로 본 발명은, 가설 난간의 신뢰성과 안전성 및 설치작업의 편의성 향상 등에 큰 효과를 발휘하는 매우 우수한 효과가 있다.Therefore, the present invention has a very excellent effect of exerting a great effect in improving the reliability and safety of the temporary guardrail and the convenience of installation work.

도 1은 종래 가설 난간의 일례를 나타낸 사시도,
도 2는 종래의 다른 가설 난간지주를 나타낸 사시도,
도 3은 도 2에 나타낸 종래 가설 난간지주에 파이프 난간대가 설치되는 상태의 사시도,
도 4는 도 2에 나타낸 종래 가설 난간지주의 설치 상태를 나타낸 사시도,
도 5는 본 발명에 의한 가설 난간지주의 일 실시예를 사시도,
도 6은 본 발명에 의한 가설 난간지주에 파이프 난간대가 설치되는 상태를 나타낸 분리 사시도,
도 7은 도 6의 결합상태 측면도,
도 8은 도 7의 Ⅷ-Ⅷ선을 따라 취한 단면도,
도 9는 본 발명에 의한 가설 난간지주 일 실시예의 설치상태를 나타낸 사시도,
도 10은 본 발명에 의한 가설 난간지주 일 실시예의 다른 형태를 나타낸 측면도,
도 11은 도 10의 ⅩⅠ을 따라 취한 평면도,
도 12는 본 발명에 의한 가설 난간지주의 제 2 실시예를 나타낸 사시도,
도 13은 도 12의 결합상태 측면도,
도 14는 본 발명에 의한 가설 난간지주의 제 3 실시예를 나타낸 사시도,
도 15는 도 14의 결합상태를 나타낸 부분 절단 측면도이다.
1 is a perspective view showing an example of a conventional temporary handrail,
2 is a perspective view showing another conventional temporary railing column;
3 is a perspective view of a pipe railing state is installed in the conventional temporary railing column shown in FIG.
4 is a perspective view showing the installation state of the conventional temporary handrail holding shown in FIG.
Figure 5 is a perspective view of an embodiment of a temporary handrail post according to the present invention,
Figure 6 is an exploded perspective view showing a state where the pipe railing is installed on the temporary railing column according to the present invention,
Figure 7 is a side view of the coupling state of Figure 6,
8 is a cross-sectional view taken along the line VII-VII of FIG. 7;
9 is a perspective view showing an installation state of a temporary handrail holding according to an embodiment of the present invention;
Figure 10 is a side view showing another form of the temporary handrail holding one embodiment according to the present invention,
11 is a plan view taken along the line VI of FIG. 10,
12 is a perspective view showing a second embodiment of a temporary handrail column according to the present invention;
13 is a side view of the coupling state of FIG.
14 is a perspective view showing a third embodiment of a temporary handrail column according to the present invention;
FIG. 15 is a partial cutaway side view of the coupled state of FIG. 14. FIG.

이와 같은 본 발명에 의한 가설 난간지주의 구체적인 특징과 다른 이점들은 첨부된 도면을 참조한 이하의 바람직한 실시예의 설명으로 더욱 명확해 질 것이다.Such specific features and other advantages of the temporary handrail brace according to the present invention will become more apparent from the following description of the preferred embodiments with reference to the accompanying drawings.

도 2 내지 도 9에서, 본 발명에 따른 가설 난간지주(10)의 제 1 실시예는, 하단에 가설 발판(40)에 고정시키기 위한 고정수단으로서 일반적으로 알려진 클램프(11)가 설치되어 있고, 상단 부분과 중간 부분에는 브라켓(12)이 고정 설치되어 있다.2 to 9, in the first embodiment of the temporary handrail holding 10 according to the present invention, a clamp 11 generally known as a fixing means for fixing to the temporary scaffold 40 is provided at the lower end, The bracket 12 is fixed to the upper part and the middle part.

브라켓(12)은 난간지주(10)의 길이방향을 따라 상하로 간격을 이격 배치되는 상판(13) 및 하판(14)과, 이들 상판(13)과 하판(14) 사이의 한쪽 공간을 막아주는 측판(15)으로 구성된다. 이러한 브라켓(12)의 상판(13)과 하판(14) 및 측판(15)은 서로 분리된 구성을 가지며, 측판(15)이 하판(14)의 선단에 힌지(16)로 연결되어 브라켓(12) 내부를 정면에서 개폐할 수 있도록 구성된다.The bracket 12 prevents one space between the upper plate 13 and the lower plate 14 and the upper plate 13 and the lower plate 14 spaced apart from each other in the vertical direction along the longitudinal direction of the railing column 10. It consists of a side plate 15. The upper plate 13, the lower plate 14, and the side plate 15 of the bracket 12 have a configuration separated from each other, and the side plate 15 is connected to the tip of the lower plate 14 by a hinge 16 to be connected to the bracket 12. ) It is configured to open and close the inside from the front.

이에 따라 파이프 난간대(30)의 고정을 위해서는 측판(15)의 자유단을 상판(13)에 고정시킬 수 있어야 하는 바, 상판(13)은 하판(14)에 비해 길이가 짧게 구성되고, 측판(15)의 상측 자유단에는 상판(13)의 자유단에 접하는 절곡부(17)가 형성되어 후술한 쐐기(20)의 고정편(21)이 끼워지는 고정홈(17a)을 갖는다.Accordingly, in order to fix the pipe railing 30, the free end of the side plate 15 should be able to be fixed to the upper plate 13, and the upper plate 13 has a shorter length than the lower plate 14, and the side plate ( The upper free end of 15 has a bent portion 17 in contact with the free end of the upper plate 13, and has a fixing groove 17a into which the fixing piece 21 of the wedge 20 described later is fitted.

바람직하기로 상판(13)의 자유단에는 측판(15)의 절곡부(17) 선단이 안정되게 얹혀질 수 있도록 걸림턱(18)이 형성될 수 있다.Preferably, the locking step 18 may be formed at the free end of the upper plate 13 so that the tip of the bent portion 17 of the side plate 15 may be stably placed.

파이프 난간대(30)는 브라켓(12)의 측판(15)과 쐐기(20) 사이에서 압착 고정되는 바, 측판(15)의 내측면과 쐐기홈(13b)(14b) 사이의 간격은 파이프 난간대(30)의 지름보다 작게 구성되는 것이 바람직하다. 그리고, 측판(15)에는 그 강도를 보강하고 파이프 난간대(30)를 강하게 압박할 수 있도록 내측으로 돌출되는 비드(19)가 세로로 더 형성될 수 있다.The pipe railing 30 is press-fixed between the side plate 15 and the wedge 20 of the bracket 12, the interval between the inner surface of the side plate 15 and the wedge grooves 13b, 14b is the pipe railing ( It is preferable that it is smaller than the diameter of 30). In addition, the side plate 15 may be further provided with a vertically protruding bead (19) to reinforce its strength and to strongly press the pipe railing (30).

브라켓(12)의 상판(13)과 하판(14)은 일단에 요부(13a)(14a)를 형성하여 난간지주(10)에 접합되는데, 이 요부(13a)(14a)는 바람직하기로 난간지주(10)의 단면 형상에 대응되는 형상으로 이루어진다.The upper plate 13 and the lower plate 14 of the bracket 12 are joined to the railing column 10 by forming recesses 13a and 14a at one end, and the recesses 13a and 14a are preferably railing columns. It consists of a shape corresponding to the cross-sectional shape of (10).

예를 들면, 난간지주(10)가 도면에서와 같이 원형의 단면으로 이루어진 경우에는 요부(13a)(14a)가 그에 밀착될 수 있는 원형의 곡면을 이루도록 되어 있고, 별도로 도시하지는 않았으나 난간지주가 사각이나 'ㄷ'자형 등 기타의 단면 형상을 갖는 경우에는 그에 대응되는 내주면 형상으로 이루어지게 되는 것이다.For example, when the railing column 10 has a circular cross section as shown in the drawing, the recesses 13a and 14a form a circular curved surface that may be in close contact therewith, and although not separately illustrated, the railing column is square. If the other cross-sectional shape, such as 'c' shape is to be made in the shape of the inner peripheral surface corresponding thereto.

이에 따라 난간지주(10)의 외면에 브라켓(12) 상판(13) 및 하판(14)의 요부(13a)(14a)가 밀착된 상태에서 용접함으로써 브라켓(12)의 상판(13)과 하판(14)이 난간지주(10)에 접합 고정되며, 이렇게 브라켓(12)은 난간지주(10)의 상단이나 중간 등에 선택적으로 설치될 수 있다.Accordingly, the upper plate 13 and the lower plate of the bracket 12 are welded by welding the bracket 12 upper plate 13 and the recessed portions 13a and 14a of the lower plate 14 in close contact with the outer surface of the railing column 10. 14) is bonded and fixed to the railing column 10, the bracket 12 can be selectively installed on the top or middle of the railing column (10).

이때, 브라켓(12)의 하판(14)은 그 정면에서 끼워 넣어지는 파이프 난간대(30)의 이탈을 방지하기 위해 수평에 대해 자유단이 상방을 향하도록 일정각도로 경사지게 접합되는 것이 바람직하다.At this time, it is preferable that the lower plate 14 of the bracket 12 is inclined at a predetermined angle so that the free end faces upward with respect to the horizontal to prevent the pipe rail stand 30 from being inserted from the front.

즉, 본 발명의 가설 난간지주(10)는 브라켓(12)의 측판(15)이 하판(14)에 힌지(16)로 연결되어 그 정면을 개방시킨 상태에서, 파이프 난간대(30)를 하판(14) 위에 거치시킨 후 측판(15)을 닫아주는 구성인 바, 하판(14)이 수평상태로 접합될 경우 파이프 난간대(30)의 이탈 우려가 높기 때문에 하판(14)의 자유단이 상측에 위치하도록 경사지게 설치하는 것이다.
That is, in the temporary railing column 10 of the present invention, while the side plate 15 of the bracket 12 is connected to the lower plate 14 by the hinge 16 and the front of the pipe railing 30 is opened, the lower plate ( 14) After the mounting on the side plate 15 is closed, the lower plate 14 is bonded to the horizontal state, because the high risk of detachment of the pipe railing 30, the free end of the lower plate 14 is located on the upper side It is installed to be inclined so as to.

한편, 이와 같이 난간지주(10)에 설치된 브라켓(12)은 난간지주(10)의 외주와 측판(15) 사이에 형성되는 공간에 파이프 난간대(30)를 위치시킨 상태에서, 파이프 난간대(30)를 고정시키기 위해 쐐기(20)가 사용되는데, 이 쐐기(20)를 고정시키기 위한 쐐기홈(13b)(14b)이 브라켓(12)의 상판(13)과 하판(14)에 각각 대응하도록 형성된다.On the other hand, the bracket 12 installed in the railing column 10 as described above, the pipe railing rack 30 in a state in which the pipe railing 30 is placed in the space formed between the outer circumference of the railing column 10 and the side plate (15). The wedge 20 is used to fix the wedge grooves 13b and 14b for fixing the wedge 20 so as to correspond to the upper plate 13 and the lower plate 14 of the bracket 12, respectively. .

쐐기홈(13b)(14b)은 난간지주(10)의 인접부위, 즉 상판(13)과 하판(14)의 요부(13a)(14a) 근처에 파이프 난간대(30)와 나란한 방향으로 형성되며, 후술한 쐐기(20)의 형상에 대응하도록 상판(13)의 쐐기홈(13b)에 비하여 하판(14)의 쐐기홈(14b)이 길이가 짧게 형성된다.The wedge grooves 13b and 14b are formed in a direction parallel to the pipe railings 30 near the adjacent portions of the railing column 10, that is, near the recesses 13a and 14a of the upper plate 13 and the lower plate 14. The wedge groove 14b of the lower plate 14 is shorter in length than the wedge groove 13b of the upper plate 13 so as to correspond to the shape of the wedge 20 described later.

쐐기(20)는 도 6에 도시된 바와 같이, 예컨대 하측으로 갈수록 점차 폭이 좁아지는 판형의 쐐기(20)가 사용되는데, 본 발명의 쐐기(20)는 상단에 브라켓(12) 측판(15)의 절곡부(17)에 형성된 고정홈(17a)에 수직으로 끼워져서 측판(15)을 상판(13)에 고정시키기 위한 고정편(21)이 수평연결부(22)를 통해 일체로 연장 형성된 대략 훅(hook) 형태를 갖는다.As shown in Figure 6, the wedge 20 is used, for example, a plate-shaped wedge 20, the width of which narrows gradually toward the lower side, the wedge 20 of the present invention is the bracket 12 side plate 15 at the top A hook approximately 21 which is vertically inserted into the fixing groove 17a formed in the bent portion 17 of the bent portion 17 so as to secure the side plate 15 to the upper plate 13 and is integrally extended through the horizontal connection portion 22. (hook) takes the form.

그런데, 본 실시예에서 쐐기(20)는 파이프 난간대(30)와 나란하게 배치되어 넓은 면이 파이프 난간대(30)에 접촉하게 되는 바, 바람직하기로는 그 강도를 보강하고 파이프 난간대(30)를 보다 견고하게 압박할 수 있도록 내측으로 돌출되는 비드(bead:23)가 세로로 형성될 수 있다.By the way, in the present embodiment, the wedge 20 is arranged in parallel with the pipe railings 30 so that a wide surface is in contact with the pipe railings 30. Preferably, the wedge 20 is reinforced with the strength of the pipe railings 30. Beads 23 protruding inwardly may be formed vertically so as to be firmly pressed.

그리고 이 비드(23)의 상하측에는 브라켓(12)의 상판(13)과 하판(14)에 걸려 쐐기(20)의 고정상태를 유지시키기 위한 고정돌기(24)가 각각 형성된다.
In addition, upper and lower sides of the beads 23 are provided with fixing protrusions 24 for holding the upper plate 13 and the lower plate 14 of the bracket 12 to maintain the fixed state of the wedge 20, respectively.

이와 같이 구성된 본 발명 가설 난간지주(10)는 도 9에 도시한 바와 설치되는데, 먼저 난간지주(10)의 하측에 설치된 클램프(11)를 이용하여 가설 발판(40)에 난간지주(10)를 고정하고, 난간지주(10)의 상단 부분과 중간 부분에 설치된 브라켓(12)의 정면에서 파이프 난간대(30)를 측판(15)이 개방된 브라켓(12)의 하판(14) 위에 얹는다.The temporary rail handrail 10 of the present invention configured as described above is installed as shown in FIG. 9. First, the handrail holder 10 is mounted on the temporary scaffold 40 by using the clamp 11 installed at the lower side of the rail handrail 10. It is fixed, and the pipe handrail 30 is placed on the lower plate 14 of the bracket 12 in which the side plate 15 is opened at the front of the bracket 12 installed at the upper end portion and the middle portion of the railing column 10.

다음, 측판(15)을 상방으로 회동시켜 브라켓(12)의 상판(13)과 하판(14)의 자유단 사이 열린 공간을 막아준 뒤, 도 6에 도시한 바와 같이 쐐기(20)를 상판(13)과 하판(14)의 쐐기홈(13b)(14b)에 끼워준다.Next, the side plate 15 is rotated upward to prevent the open space between the upper end 13 of the bracket 12 and the free end of the lower plate 14, and then the wedge 20 as shown in FIG. 13) and the wedge grooves 13b and 14b of the lower plate 14.

그러면, 쐐기(20)에 일체로 형성된 고정편(21)이 측판(15)의 절곡부(17)에 형성된 고정홈(17a)에 끼워짐으로써 측판(15)을 상판(13)에 고정하게 되고, 이어서 계속되는 쐐기(20)의 하강에 의해 파이프 난간대(30)가 측판(15)과 쐐기(20)에 의해 압착 고정됨으로써 도 9에 도시된 바와 같은 가설 난간을 형성하게 된다.Then, the fixing piece 21 integrally formed in the wedge 20 is fitted into the fixing groove 17a formed in the bent portion 17 of the side plate 15 to fix the side plate 15 to the upper plate 13. Subsequently, the pipe rails 30 are pressed and fixed by the side plate 15 and the wedges 20 by the lowering of the wedges 20 to form a temporary handrail as shown in FIG. 9.

이렇게 설치된 가설 난간은 쐐기(20)가 난간지주(10) 쪽에 위치하게 되어 가설 발판(40) 쪽으로 즉, 가설 난간의 내측으로 돌출됨이 거의 없어서 작업자나 다른 자재의 이동으로부터 저촉됨이 없게 되므로 작업에 방해가 되지 않고 안전한 작업을 할 수 있게 되는 것이다.The temporary railings installed in this way have the wedge 20 located on the railing column 10 side, so that there is almost no protruding toward the temporary scaffold 40, that is, the inner side of the temporary railing, so that there is no conflict with the movement of workers or other materials. You will be able to work safely without getting in the way.

특히, 브라켓(12)의 측판(15)이 하판(14)의 자유단에 힌지(16)로 연결되어 개폐가능 하기 때문에 파이프 난간대(30)를 브라켓(12)의 정면에서 바로 하판(14) 위에 얹어 쐐기(20)로 고정시킬 수 있어 가설 난간을 매우 간편하게 설치할 수 있게 된다.
In particular, since the side plate 15 of the bracket 12 is connected to the free end of the lower plate 14 by a hinge 16 and can be opened and closed, the pipe railing 30 is placed directly on the lower plate 14 directly in front of the bracket 12. It can be fixed with the wedge 20 can be installed very easily install the temporary railing.

한편, 도 10 및 도 11에는 본 발명에 따른 난간지주(10) 제 1 실시예의 다른 형태를 도시하였는데, 이것은 전술한 실시예의 구성에서, 브라켓(12)의 상판(13)과 하판(14)에 형성되는 쐐기홈(13b)(14b)이 난간지주(10)의 양 측방에 각각 위치하도록 파이프 난간대(30)와 직교 방향으로 배치된 구성이다.On the other hand, Figure 10 and Figure 11 shows another form of the first embodiment of the handrail holding 10 according to the present invention, which in the configuration of the above-described embodiment, the upper plate 13 and the lower plate 14 of the bracket 12 The wedge grooves 13b and 14b to be formed are arranged in a direction orthogonal to the pipe railing table 30 so as to be located at both sides of the railing column 10, respectively.

이에 따라 쐐기(20)의 두께 부분과 측판(15) 사이에 파이프 난간대(30)를 끼워 고정하는 바, 하측으로 갈수록 폭이 좁아지는 판상의 쐐기(20)는 파이프 난간대(30)에 접촉하는 부분이 수직으로 형성된다.Accordingly, the pipe handrail 30 is sandwiched and fixed between the thickness portion of the wedge 20 and the side plate 15, and the plate-shaped wedge 20 narrowing toward the lower side is in contact with the pipe handrail 30. It is formed vertically.

이와 같은 구성 역시 전술한 실시예와 동일한 작용효과를 가지며, 2개의 쐐기(20)가 두께 부분으로 파이프 난간대(30)를 압박하게 되므로 보다 견고한 고정상태를 구축할 수 있다.
This configuration also has the same operation and effect as the above-described embodiment, since the two wedges 20 press the pipe railing 30 by the thickness portion, it is possible to build a more rigid fixed state.

도 12 및 도 13에는 본 발명의 다른 가설 난간지주의 제 2 실시예가 개략적으로 도시되어 있다.12 and 13 schematically show a second embodiment of another hypothetical handrail column of the present invention.

이 실시예는, 브라켓(52)이 난간지주(10)의 외형에 대응하는 호형으로 형성되어 난간지주(10)에 용접되는 측판(55)의 상단과 하단에서 각각 수평으로 상판(53)과 하판(54)이 연장 형성되고, 이들 상판(53)과 하판(54)의 자유단부에 대응하는 쐐기홈(53a)(54a)이 파이프 난간대(30)와 나란한 방향으로 각각 형성된 구성이다.In this embodiment, the upper plate 53 and the lower plate are horizontally formed at the upper and lower ends of the side plate 55 in which the bracket 52 is formed in an arc shape corresponding to the outer shape of the railing column 10 and welded to the railing column 10. 54 is extended and wedge grooves 53a and 54a corresponding to the free ends of the upper plate 53 and the lower plate 54 are formed in the direction parallel to the pipe railing table 30, respectively.

이러한 구성의 제 2 실시예 역시 브라켓(52)의 정면에서 파이프 난간대(30)를 하판(54) 위에 얹은 뒤, 상판(53)과 하판(54)의 쐐기홈(53a)(54a)에 판상의 쐐기(56)를 결합함으로써 측판(55)과 쐐기(56) 사이에 파이프 난간대(30)를 압박 고정하게 된다.The second embodiment of this configuration also puts the pipe railing 30 on the lower plate 54 in front of the bracket 52, and then plate-shaped the wedge grooves 53a and 54a of the upper plate 53 and the lower plate 54. Combining the wedge 56 to press-fix the pipe railing 30 between the side plate 55 and the wedge 56.

따라서 판상의 쐐기(56)에는 바람직하기로 그 강도 보강과 함께 파이프 난간대(30)를 강하게 압박할 수 있도록 안쪽으로 돌출하는 비드(57)가 세로로 형성될 수 있으며, 상단과 하단에는 이탈방지를 위한 절곡부(58)와 걸림돌기(59)가 형성될 수 있다.
Therefore, the plate-shaped wedge 56 may be formed with a bead 57 protruding inwardly so as to strongly press the pipe balustrade 30 with its strength reinforcement, and at the top and the bottom of the separation prevention The bent portion 58 and the locking protrusion 59 may be formed.

도 14 및 도 15에는 본 발명에 의한 가설 난간지주의 제 3 실시예가 개략적으로 도시되어 있다.14 and 15 schematically show a third embodiment of the temporary handrail column according to the present invention.

이 실시예는, 브라켓(62)이 난간지주(10)에 상하로 이격되어 나란하게 일단이 접합되는 상판(63)과 하판(64)으로 구성되고, 이들 상판(63)과 하판(64)의 고정단측, 즉 난간지주(10)에 인접한 위치에 파이프 난간대(30)와 나란한 방향으로 대응하는 쐐기홈(63a)(64a)이 각각 형성된 구성이다.This embodiment consists of an upper plate 63 and a lower plate 64 having one end joined side by side with the bracket 62 spaced up and down on the railing column 10. The upper plate 63 and the lower plate 64 are formed of the upper plate 63 and the lower plate 64. The wedge grooves 63a and 64a corresponding to the pipe railing 30 in a direction parallel to the fixed end side, that is, the position adjacent to the railing column 10 are formed.

그리고 판상의 쐐기(65)의 상단에 이격된 상판(63)과 하판(64) 사이를 막아주는 커버판(66)이 쐐기(65)와 대향하도록 수평연결부(67)에 의해 일체로 형성됨으로써 파이프 난간대(30)를 브라켓(62)의 정면에서 하판(64) 위에 얹은 뒤 쐐기(65)의 결합으로 파이프 난간대(30)를 압박 고정하도록 되어 있다.In addition, the cover plate 66 which blocks the upper plate 63 and the lower plate 64 spaced apart from the upper end of the plate-shaped wedge 65 is integrally formed by the horizontal connection portion 67 so as to face the wedge 65 so that the pipe The handrail 30 is mounted on the lower plate 64 in front of the bracket 62, and then the pipe railing 30 is press-fixed by the coupling of the wedge 65.

이에 따라 판상의 쐐기(65)와 커버판(66)에는 바람직하기로 그 강도 보강을 위한 비드(68)(69)가 안쪽으로 돌출하도록 세로로 각각 형성될 수 있고, 쐐기(65)의 하단부 내측에는 이탈방지를 위한 걸림돌기(70)가 형성될 수 있다.
Accordingly, the plate-shaped wedge 65 and the cover plate 66 may be formed vertically so that the beads 68 and 69 for reinforcing the strength thereof may protrude inward, respectively, and the inner side of the lower end of the wedge 65. The locking projection 70 may be formed to prevent the departure.

도 16 및 도 17에는 본 발명에 의한 가설 난간지주의 제 4 실시예가 개략적으로 도시되어 있다.16 and 17 schematically show a fourth embodiment of the temporary handrail column according to the present invention.

이 실시예는, 브라켓(72)이 난간지주(10)의 외형에 대응하는 호형으로 형성되어 난간지주(10)에 용접되는 측판(75)의 상단과 하단에서 각각 수평으로 상판(73)과 하판(74)이 연장 형성되고, 하판(74)의 자유단에서 수직 상방으로 일정높이의 걸림측판(76)이 연장 형성된다.In this embodiment, the upper plate 73 and the lower plate are horizontally formed at the upper and lower ends of the side plate 75 which is formed in an arc shape corresponding to the outer shape of the handrail holder 10, and the bracket 72 is welded to the handrail holder 10. An extension 74 is formed, and the locking side plate 76 having a predetermined height extends vertically upward from the free end of the lower plate 74.

상판(73)과 하판(74)의 고정단부, 즉 난간지주(10)의 근접부위에 대응하는 쐐기홈(73a)(74a)이 파이프 난간대(30)와 나란한 방향으로 각각 형성되어 있다.Fixed end portions of the upper plate 73 and the lower plate 74, that is, wedge grooves 73a and 74a corresponding to the proximal portions of the railing column 10 are formed in the direction parallel to the pipe railing 30, respectively.

걸림측판(76)의 높이는 파이프 난간대(30)의 안정된 지지를 위해 파이프 난간대(30) 지름의 약 2/3 정도가 바람직하며, 이 걸림측판(76)에는 그 강도 보강을 위한 비드(76a)가 세로로 구성될 수 있다.The height of the locking side plate 76 is preferably about 2/3 of the diameter of the pipe railing 30 for stable support of the pipe railing 30, and the locking side plate 76 has beads 76a for reinforcing its strength. It can be configured vertically.

그리고 판상의 쐐기(77) 상단에는 상판(73)과 걸림측판(76) 사이의 개구를 막아주는 커버판(78)이 쐐기(77)와 마주보도록 수평연결부(79)에 의해 일체로 형성되어 있다.In addition, a cover plate 78 for blocking the opening between the upper plate 73 and the locking side plate 76 is integrally formed by the horizontal connection portion 79 so as to face the wedge 77 at the upper end of the plate-shaped wedge 77. .

이 커버판(78)은 도 17에 도시된 바와 같이 상측에 위치하는 파이프 난간대(30)의 일부만을 지지할 수 있는 길이로 구성될 수도 있고, 도시하지는 않았으나 상판(73)과 걸림측판(76)의 자유단 사이를 완전히 막아줄 수 있는 길이로 구성될 수도 있다.17, the cover plate 78 may be configured to have a length capable of supporting only a part of the pipe railing stand 30 positioned on the upper side, as illustrated in FIG. 17. It may be of a length that can completely block the free end of the.

판상의 쐐기(77)와 커버판(78)에는 바람직하기로 그 강도 보강을 위한 비드(77a)(78a)가 안쪽으로 돌출하도록 세로로 각각 형성될 수 있고, 쐐기(77)의 하단부 내측에는 이탈방지를 위한 걸림돌기(80)가 형성될 수 있다.The plate-shaped wedge 77 and the cover plate 78 may be formed vertically so that the beads 77a and 78a for reinforcing the strength are projected inward, respectively, and the inner side of the lower end of the wedge 77 is separated. A locking protrusion 80 may be formed for prevention.

이와 구성의 제 4 실시예 역시, 브라켓(72)의 정면이 개구되어 있으므로 파이프 난간대(30)를 브라켓(72)의 정면에서 탑재한 뒤 쐐기(77)를 결합하는 간단한 작업으로 가설 난간을 설치할 수 있게 된다.In the fourth embodiment of this configuration, since the front face of the bracket 72 is opened, the temporary handrail can be installed with a simple operation of mounting the pipe handrail 30 at the front of the bracket 72 and engaging the wedge 77. Will be.

특히, 하판(74)의 자유단에 걸림측판(76)이 상방으로 형성되어 있기 때문에 설치 시 파이프 난간대(30)의 이탈이 효과적으로 방지됨은 물론 쐐기(77)에 의한 고정 시에도 우수한 기계적 강도를 보장할 수 있어 매우 안정된 고정상태를 유지할 수 있게 된다.
Particularly, since the locking side plate 76 is formed upward at the free end of the lower plate 74, the detachment of the pipe railing stand 30 is effectively prevented during installation, and the excellent mechanical strength is ensured even when the wedge 77 is fixed. It is possible to maintain a very stable fixed state.

이상에서 설명하고 도시한 바와 같은 본 발명은 상술한 실시예들에 한정하는 것은 아니며, 본 발명의 요지를 벗어나지 않는 범위 내에서 다양한 형태로 변경 실시될 수 있을 것이다. 예를 들면, 난간지주나 브라켓 또는 쐐기 등의 형태는 작업 환경에 따라 필요에 의해 얼마든지 변경 실시될 수 있는 것으로서, 특히 본 발명에 따른 쐐기는 하단이 상단보다 그 폭과 두께가 더 좁게 형성되는 것이 바람직하며, 이를 위해 상단부에 리브나 돌기 등을 더 형성할 수도 있을 것이다.The present invention as described and illustrated above is not limited to the above-described embodiments, and may be modified in various forms without departing from the gist of the present invention. For example, the form of handrails, brackets or wedges can be changed as needed depending on the working environment, in particular, the wedge according to the present invention is formed in a narrower width and thickness of the lower end than the upper end It is preferable, for this purpose it may be further formed ribs or protrusions on the upper end.

또한, 쐐기가 끼워지는 쐐기홈 또한 쐐기에 맞추어 그 형태가 다양하게 적용될 수 있는데, 예를 들면, 상판의 쐐기홈은 하판의 쐐기홈에 비하여 그 폭이 좁으면서 길이가 더 길게 형성하는 것이 바람직할 것이다.
In addition, the wedge groove into which the wedge is fitted may also be applied in various ways in accordance with the wedge, for example, it is preferable that the wedge groove of the upper plate is formed to have a longer length and narrower width than the wedge groove of the lower plate. will be.

10 ; 난간지주 11 ; 클램프
12, 52, 62, 72 ; 브라켓 13, 53, 63, 73 ; 상판
14, 54, 64, 74 ; 하판 15, 55, 75 ; 측판
16 ; 힌지 17 ; 절곡부
18 ; 걸림턱 20, 56, 65, 77 ; 쐐기
21 ; 고정편 30 ; 파이프 난간대
40 ; 가설 발판 76 ; 걸림측판
78 ; 커버판
10; Handrail 11; clamp
12, 52, 62, 72; Brackets 13, 53, 63, 73; Top plate
14, 54, 64, 74; Lower plate 15, 55, 75; shroud
16; Hinge 17; Bent portion
18; Locking jaws 20, 56, 65, 77; wedge
21; Fixing piece 30; Pipe railing
40; Hypothesis scaffold 76; Hanger
78; Cover plate

Claims (7)

상부와 중간부에 수평으로 파이프 난간대가 쐐기에 의해 연결되는 브라켓이 설치되어 있고, 하단에는 가설 난간을 가설 발판에 설치하기 위한 고정수단이 구비되어 있는 가설 난간지주에 있어서,
상기 브라켓이,
상기 난간지주의 외주에 일단이 접합되며, 쐐기홈이 상기 파이프 난간대와 나란한 방향으로 형성되어 있는 상판;
상기 상판과 대향하도록 이격되어 상기 난간지주의 외주에 일단이 접합되고, 수평에 대해서 자유단이 일정각도 상방을 향하도록 경사지게 설치되어 상기 상판의 쐐기홈에 대응되게 쐐기홈을 가지는 하판;
상기 상판과 하판의 자유단을 연결하되 일단에 힌지가 설치되어 상단부가 회동 개폐되도록 되고, 상단에는 상기 상판의 자유단에 접하는 절곡부를 구비하여 이 절곡부에 고정홈을 갖는 측판;을 구비하고,
상기 쐐기가, 상기 측판의 상단 절곡부에 형성된 고정홈에 끼워져 측판을 고정시키는 고정편을 일체로 갖는 훅 형태로 구성되는 것을 특징으로 하는 가설 난간지주.

In the upper and middle parts of the temporary railing brace is provided with a bracket connecting the pipe railings horizontally by the wedge, the lower end is provided with a fixing means for installing the temporary railing on the temporary scaffold,
The bracket,
One end is joined to an outer circumference of the railing column, and an upper plate having a wedge groove formed in parallel with the pipe railing rack;
A bottom plate spaced apart from the top plate to be joined to an outer circumference of the railing column, and having a wedge groove corresponding to the wedge groove of the top plate, the inclined end of the free end being upwardly at an angle with respect to the horizontal;
And a side plate having a fixing groove at the bent portion having a bent portion which is connected to the free end of the upper plate and the lower plate with a hinge installed at one end thereof so as to open and close the upper end and the bent portion which is in contact with the free end of the upper plate.
Temporary handrail holder, characterized in that the wedge is configured in the form of a hook having a fixing piece integrally fixed to the fixing groove formed in the upper bent portion of the side plate to fix the side plate.

삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020110064941A 2011-06-30 2011-06-30 Temporary type guardrail post KR101365059B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110064941A KR101365059B1 (en) 2011-06-30 2011-06-30 Temporary type guardrail post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110064941A KR101365059B1 (en) 2011-06-30 2011-06-30 Temporary type guardrail post

Publications (2)

Publication Number Publication Date
KR20130003530A KR20130003530A (en) 2013-01-09
KR101365059B1 true KR101365059B1 (en) 2014-02-19

Family

ID=47835731

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110064941A KR101365059B1 (en) 2011-06-30 2011-06-30 Temporary type guardrail post

Country Status (1)

Country Link
KR (1) KR101365059B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018225918A1 (en) * 2017-06-09 2018-12-13 홍진산업 (주) Safety scaffold for construction
KR101995334B1 (en) * 2017-12-27 2019-07-03 삼성중공업(주) Device for setting up a scaffolding on the block of a hull

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101385630B1 (en) * 2013-08-30 2014-04-21 동양건설(주) Frame assembly for deck-road
CH714813A2 (en) * 2018-03-20 2019-09-30 Albanese Pino System for temporary attachment of a climbing console, console and an anchorage box.
CN110821140B (en) * 2019-12-02 2021-05-25 怀化学院 Climbing frame protective net

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200417973Y1 (en) * 2006-02-23 2006-06-07 최광철 The pipe binding for scaffold
KR100593870B1 (en) * 2004-06-30 2006-06-30 주식회사 일호 Scaffolding Clamps
KR200448227Y1 (en) * 2009-07-28 2010-03-25 김영심 A Post for safety guard

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100593870B1 (en) * 2004-06-30 2006-06-30 주식회사 일호 Scaffolding Clamps
KR200417973Y1 (en) * 2006-02-23 2006-06-07 최광철 The pipe binding for scaffold
KR200448227Y1 (en) * 2009-07-28 2010-03-25 김영심 A Post for safety guard

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018225918A1 (en) * 2017-06-09 2018-12-13 홍진산업 (주) Safety scaffold for construction
KR101995334B1 (en) * 2017-12-27 2019-07-03 삼성중공업(주) Device for setting up a scaffolding on the block of a hull

Also Published As

Publication number Publication date
KR20130003530A (en) 2013-01-09

Similar Documents

Publication Publication Date Title
KR101365059B1 (en) Temporary type guardrail post
US20100025151A1 (en) Integral safety system which can be used for construction
JP6498075B2 (en) Overhang passage of steel structure
KR20120006518U (en) An security a railing
GB2466768A (en) A clamp having a pivotal hook and locking element
KR101365060B1 (en) Temporary type guardrail post
KR200413590Y1 (en) Scaffold and construction structure thereof
JP2014043678A (en) Metal fitting for attaching safety prop to form
KR101986057B1 (en) Safety railing
KR200435422Y1 (en) Post bar Supporter
KR101978804B1 (en) Safety railing
KR101324561B1 (en) The guardrail post
KR20130011470A (en) The assembly safety handrail
KR20080002071U (en) Handrail guard post for scaffolding sysrem
KR200460577Y1 (en) Handrail
KR100924522B1 (en) Hull block edge clamp
KR200463380Y1 (en) A Combination Members Of Safety Bar
JP6581817B2 (en) Temporary scaffolding skirting fixture
KR20060000012U (en) Pin needless and install no-impact lug for hand-rail
KR102289940B1 (en) A Study on the Hypothesis Tread Plates for Framed Construction
KR101715298B1 (en) Supporting apparatus of temporary handrail
KR101376948B1 (en) An apparatus for supporting safety guard
JP5812554B1 (en) Mounting bracket and mounting structure for strut mooring
KR100462355B1 (en) supporter for establishing railings
KR20130042809A (en) Fix device for handrail-frame of safety rail using foothold

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170210

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180212

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190211

Year of fee payment: 6