KR101335578B1 - Molding for constructing perpendicular hall and construction method for perpendicular hall using it - Google Patents

Molding for constructing perpendicular hall and construction method for perpendicular hall using it Download PDF

Info

Publication number
KR101335578B1
KR101335578B1 KR1020110130751A KR20110130751A KR101335578B1 KR 101335578 B1 KR101335578 B1 KR 101335578B1 KR 1020110130751 A KR1020110130751 A KR 1020110130751A KR 20110130751 A KR20110130751 A KR 20110130751A KR 101335578 B1 KR101335578 B1 KR 101335578B1
Authority
KR
South Korea
Prior art keywords
vertical sphere
pile
concrete
formwork
support bar
Prior art date
Application number
KR1020110130751A
Other languages
Korean (ko)
Other versions
KR20130064235A (en
Inventor
김충민
송창호
최한수
조복현
문병암
손성곤
윤은중
심재욱
Original Assignee
윤은중
코오롱글로벌 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 윤은중, 코오롱글로벌 주식회사 filed Critical 윤은중
Priority to KR1020110130751A priority Critical patent/KR101335578B1/en
Publication of KR20130064235A publication Critical patent/KR20130064235A/en
Application granted granted Critical
Publication of KR101335578B1 publication Critical patent/KR101335578B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/12Accessories for making shaft linings, e.g. suspended cradles, shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

본 발명은 수직구 시공의 시공성을 향상시킬 수 있도록 하는 수직구 시공용 거푸집에 관한 것으로, 지반을 천공한 천공부의 주연부에 이격 배치되는 복수의 에이치 파일에 수직구를 형성하는 콘크리트가 타설될 수 있도록 설치되는 수직구 시공용 거푸집으로서, 상기 천공부의 벽면과 접촉되도록 복수의 에이치 파일과 에이치 파일 사이에 설치되는 배후토류판과; 배후토류판이 설치된 에이치 파일의 일측면과 대향측인 타측면에 구비되어 콘크리트가 타설되는 공간부를 형성하고 상기 콘크리트를 상기 공간부로 타설할 수 있는 콘크리트 타설부가 설치되는 전면판재와; 배후토류판과 전면판재 사이의 상기 공간부에 배근되는 철근과; 상기 전면판재를 상기 에이치 파일의 타측면에 밀착되게 설치할 수 있도록 하는 밀착결합부를; 포함하여 구성됨으로써, 수직구 형성을 위하여 거푸집 내부로 콘크리트를 타설할 수 있는 별도의 구조를 마련하여 수직구와 수직구의 이음부가 견고하게 연결되도록 함으로써 수직구의 구조적인 안정성을 향상시킬 수 있는 효과가 있다. The present invention relates to a vertical sphere construction form to improve the workability of the vertical sphere construction, the concrete forming the vertical sphere can be poured into a plurality of H piles spaced apart from the periphery of the perforated portion perforated the ground A vertical sphere formwork installed so as to be in contact with the wall surface of the perforated portion provided between the plurality of H piles and H piles; A front plate provided on the other side opposite to one side of the H pile on which the rearing earth plate is installed to form a space in which concrete is poured, and a concrete pouring portion for placing the concrete into the space; Reinforcing bars arranged in the space part between the backing earth plate and the front plate; A close coupling portion for allowing the front plate to be installed in close contact with the other side of the H pile; It is configured to include, by forming a separate structure for pouring concrete into the formwork to form a vertical sphere to ensure that the joints of the vertical sphere and the vertical sphere is firmly connected, thereby improving the structural stability of the vertical sphere.

Description

수직구 시공용 거푸집 및 이를 이용한 수직구 시공방법{MOLDING FOR CONSTRUCTING PERPENDICULAR HALL AND CONSTRUCTION METHOD FOR PERPENDICULAR HALL USING IT}Formwork for vertical sphere construction and vertical sphere construction method using same {MOLDING FOR CONSTRUCTING PERPENDICULAR HALL AND CONSTRUCTION METHOD FOR PERPENDICULAR HALL USING IT}

본 발명은 거푸집에 관한 것으로, 더욱 상세하게는, 수직구 시공에 사용되는 수직구 시공용 거푸집 및 이를 이용한 수직구 시공방법에 관한 것이다. The present invention relates to a formwork, and more particularly, to a vertical sphere construction form used for vertical sphere construction and a vertical sphere construction method using the same.

수직구는 광업, 도로, 지하철 및 철도 교통 터널, 양수발전소의 수압터널 건설과정에서 굴착 혹은 운용을 위해 건설되는 지하공간 구조물의 일종을 말한다.Vertical sphere refers to a kind of underground space structure that is constructed for excavation or operation in the construction of hydraulic tunnels of mining, road, subway and railway traffic tunnels, and pumping-up power plants.

건설교통 분야의 경우, 선형 및 지형조건으로 인하여 장대 도로 및 철도 터널이 건설되고 있으며, 공사기간의 단축을 목적으로 하는 작업갱과 환기를 목적으로 하는 환기갱의 설계 및 시공이 증가하고 있다.In the field of construction transportation, long roads and railway tunnels are being constructed due to linear and topographic conditions, and the design and construction of work shafts for shortening construction period and ventilation shafts for ventilation are increasing.

전력망 및 통신망의 확대 요구를 반영하기 위해서 전력구와 통신구를 지하화한 터널이 증가하고 있으며, 주통신구의 건설을 위한 작업용 및 유지관리 용도의 수직갱 건설도 더불어 증가하고 있다.In order to reflect the demand for expansion of electric power grids and communication networks, tunnels in which power and communication districts are undergrounded are increasing, and construction of vertical shafts for working and maintenance purposes for construction of main communication districts is also increasing.

이 밖에도 적용 가능 분야로서, 광산에서의 작업갱 및 환기갱, 도로터널 및 철도터널의 환기갱, 비축기지의 공사용 및 운전용 수직구, 양수발전수, 전력 및 통신구, 방사능 폐기물 처분장의 처분 공동 굴착을 위한 파일럿 수직구 등을 들 수 있다.Other applicable fields include work shafts and ventilation shafts in mines, ventilation shafts in road and railway tunnels, vertical ports for construction and operation of stockpiling bases, pumped water, power and communications, and disposal of radioactive waste disposal sites. And pilot vertical holes for excavation.

도 1은 터널 시공 장소에 종래의 수직구가 설치된 구조를 도시한 평면도이고, 도 2는 종래의 수직구의 이음부의 구조를 부분 확대하여 도시한 평면도이다.1 is a plan view showing a structure in which a conventional vertical sphere is installed in the tunnel construction site, Figure 2 is a plan view showing a partially enlarged structure of the joint portion of the conventional vertical sphere.

이들 도면에 도시한 바와 같이, 종래의 수직구 시공용 거푸집은, 천공부(1)의 벽면과 접촉되도록 복수의 에이치 파일(10)과 에이치 파일(10) 사이에 설치되는 배후토류판(20)과, 배후토류판(20)이 설치된 에이치 파일(10)의 일측면과 대향측인 타측면에 용접 접합된 복수의 지지부재(11)와 지지부재(11) 사이에 설치되는 전면판재(30)와, 배후토류판(20)과 전면판재(30) 사이에 배근되는 격자구조의 철근(40)으로 이루어진다. As shown in these figures, the conventional vertical sphere construction formwork includes a backing earth plate 20 provided between the plurality of H piles 10 and H piles 10 so as to be in contact with the wall surface of the perforations 1. And, the front plate member 30 is provided between the plurality of support members 11 and the support member 11 welded to the other side surface of the H pile (10) on which the rear soil plate 20 is installed, the opposite side; It consists of a reinforcing bar 40 of the grid structure is arranged between the back ground plate 20 and the front plate material (30).

에이치 파일(10)은 수직구(3)가 시공되는 장소의 천공부(1)의 주연부에 일정한 간격으로 이격되도록 지반에 매설되는 부재로서, 에이치 파일(10)과 에이치 파일(10) 사이에 상기한 배후토류판(20)과 전면판재(30) 및 철근(40) 등의 부품을 설치할 수 있도록 개구된 면이 상호 대향하도록 지반에 매설되어 있다. The H pile 10 is a member embedded in the ground so as to be spaced apart at regular intervals on the periphery of the perforation portion 1 at the place where the vertical sphere 3 is constructed, and is disposed between the H pile 10 and the H pile 10. The ground surface 20 is buried in the ground so that the opening faces face each other so that components such as the back ground plate 20 and the front plate 30 and the reinforcing bar 40 can be installed.

천공부(1)의 내측으로 노출된 에이치 파일(10)의 전면에는 그 높이 방향을 따라 일정 간격을 갖도록 이격되게 설치되는 'ㄱ'자 형상의 지지부재(11)가 상호 대향하도록 용접 접합되어 구비된다. The front surface of the H-pile 10 exposed to the inside of the perforation part 1 is welded and joined to face each other so as to face each other with 'a' shaped support members 11 which are spaced apart to have a predetermined distance along the height direction thereof. do.

배후토류판(20)은 수직구(3)를 형성하기 위하여 굴착시킨 천공부(1)의 굴착면이 무너지지 않도록 상기 굴착면과 접촉되어 상기 굴착면을 지지할 수 있도록 에이치 파일(10)과 에이치 파일(10) 사이에 설치되는 판재이다. The rear soil plate 20 is in contact with the excavation surface to support the excavation surface so that the excavation surface of the drilled portion 1 excavated to form the vertical sphere (3) and the H pile It is a board | plate material installed between (10).

배후토류판(20)은 일반적으로 상기 굴착면의 토압을 견딜 수 있을 정도의 강도를 갖는 목재로 형성되며, 배후토류판(20)에 작용하게 되는 토압의 정도에 따라 그 두께와 폭이 조절된다. The rear earth plate 20 is generally formed of wood having strength enough to withstand the earth pressure of the excavation surface, and its thickness and width are adjusted according to the degree of earth pressure acting on the rear earth plate 20.

전면판재(30)는 배후토류판(20)이 설치된 에이치 파일(10)의 일측면과 대향되는 타측면에 용접 접합된 지지부재(11)와 지지부재(11) 사이에 삽입 설치되어 거푸집의 내부에 타설되어 양생됨으로써 수직구(3)를 형성하는 콘크리트가 안정적으로 양생될 수 있도록 하는 역할을 한다. The front plate 30 is inserted between the support member 11 and the support member 11 welded to the other side facing the one side of the H pile 10 in which the rear earth plate 20 is installed, and is installed inside the formwork. By pouring and curing, the concrete forming the vertical sphere 3 serves to reliably cure.

그리고, 배후토류판(20)과 전면판재(30) 사이의 콘크리트가 타설되는 공간에는 격자 형상을 갖도록 형성되어 콘크리트의 내부에 매설됨으로써 콘크리트의 강도를 높일 수 있는 철근(40)이 배근된다. In addition, the reinforcing bar 40 which is formed to have a lattice shape and is embedded in the concrete in the space where the concrete between the rearing earth plate 20 and the front plate 30 is placed is reinforced.

이러한 구성을 갖는 종래의 수직구 시공용 거푸집을 이용하여 수직구를 시공하는 방법은 다음과 같다. The method for constructing a vertical sphere using a conventional vertical sphere formwork having such a configuration is as follows.

우선, 수직구(3)를 설치하고자 하는 지반을 굴착한 천공부(1)의 주연부에 에이치 파일(10)을 일정 간격 이격되게 매설하고 수직구(3)를 설치하고자 하는 지반을 일정 깊이로 굴착한다. First, the H pile 10 is embedded in the periphery of the perforation part 1 to excavate the ground to which the vertical sphere 3 is to be installed, and the ground to which the vertical sphere 3 is to be installed is excavated to a predetermined depth. do.

이때, 천공부(1)의 내측을 향하는 에이치 파일(10)의 전면에는 그 높이 방향을 따라 일정 간격으로 이격되게 상호 대향되게 배치되는 복수의 지지부재(11)가 열을 이루도록 결합되어 있다. At this time, a plurality of support members 11 are arranged on the front surface of the H pile 10 facing the inner side of the perforation part 1 to be spaced apart at regular intervals along the height direction thereof to form a row.

그리고, 지반을 천공하면서 형성된 굴착면이 무너지지 않도록 배후토류판(20)을 에이치 파일(10)과 에이치 파일(10) 사이에 에이치 파일(10)의 일측면과 접촉하도록 설치한다. Then, the rearing earth plate 20 is installed to contact one side of the H pile 10 between the H pile 10 and the H pile 10 so that the excavation surface formed while drilling the ground is not collapsed.

일정 깊이로 굴착이 이루어지면 에이치 파일(10)과 에이치 파일(10) 사이의 콘크리트가 타설되는 공간에 격자 형태의 철근(40)을 배근한 후에, 지지부재(11)와 지지부재(11) 사이에 전면판재(30)를 삽입하여 철근(40)이 외부로 노출되지 않도록 하여 콘크리트를 타설할 수 있는 외부와 차폐된 공간을 형성하게 된다. When the excavation is made to a certain depth, after placing the reinforcing bar 40 in the form of lattice in the space where the concrete between the H pile 10 and the H pile 10 is placed, between the supporting member 11 and the supporting member 11 The front plate 30 is inserted into the reinforcing bar 40 so as not to be exposed to the outside to form a shielded space with the outside to place concrete.

그리고, 외부와 차폐된 공간이 형성되며 철근(40)이 구비된 배후토류판(20)과 전면판재(30) 사이의 공간에 콘크리트를 타설하고 양생함으로써 일정 깊이를 갖는 벽면의 형성이 완료된다. In addition, a space is formed that is shielded from the outside, and the concrete is placed and cured in the space between the rear earth plate 20 and the front plate 30 provided with the reinforcing bar 40, thereby completing the formation of a wall surface having a predetermined depth.

상기 벽면 중앙의 굴착면이 터널과 연통되어 수직구(3)로서의 기능을 수행하도록 하기 위해서는 지반을 더욱 깊게 굴착하면서 상술한 과정을 반복함으로써 수직구(3)의 시공을 완료하게 된다. In order to allow the excavation surface in the center of the wall to communicate with the tunnel to perform the function as the vertical sphere 3, the construction of the vertical sphere 3 is completed by repeating the above process while digging the ground deeper.

그런데, 이러한 종래의 수직구 시공용 거푸집을 이용하여 수직구를 시공하는 시공방법에 있어서는, 지반을 일정 깊이로 천공한 후에 천공된 천공부의 벽면에 수직구(3)를 형성한 후에 다시 지반을 천공하여 천공된 천공부(1)의 벽면에 수직구(3)를 형성하는 과정을 반복적으로 수행함으로써 터널 등과 연통되는 수직구를 형성하게 된다. By the way, in the construction method for constructing the vertical sphere by using the conventional vertical sphere formwork, after forming the vertical sphere (3) on the wall surface of the perforated hole after drilling the ground to a certain depth, the ground is again By repeatedly performing the process of forming the vertical sphere 3 on the wall surface of the perforated perforated portion 1 to form a vertical sphere in communication with the tunnel and the like.

따라서, 수직구(3)의 하측에 새로운 수직구(3)를 형성하기 위해서는 새롭게 형성된 거푸집의 내부로 콘크리트를 타설할 수 있는 틈이 마련되어야 하며, 이러한 틈으로 인하여 수직구(3)와 수직구(3)의 이음부가 일정 간격 벌어질 수 밖에 없으므로 수직구의 구조적인 안정성이 저하된다는 문제점이 있다. Therefore, in order to form a new vertical sphere 3 on the lower side of the vertical sphere 3, a gap for placing concrete into the interior of the newly formed formwork should be provided, and due to this gap, the vertical sphere 3 and the vertical sphere There is a problem in that the structural stability of the vertical sphere is lowered because the joint of (3) must be opened at a predetermined interval.

상기와 같은 점을 감안하여 안출한 본 발명의 목적은, 수직구 형성을 위하여 거푸집 내부로 콘크리트를 타설할 수 있는 별도의 구조를 마련하여 수직구와 수직구의 이음부가 견고하게 연결되도록 함으로써 수직구의 구조적인 안정성을 향상시킬 수 있는 수직구 시공용 거푸집을 제공함에 있다. The object of the present invention devised in view of the above point, by providing a separate structure for placing concrete into the formwork to form a vertical sphere to ensure that the joints of the vertical sphere and vertical sphere is connected firmly It is to provide a formwork for vertical sphere construction that can improve the stability.

상기와 같은 본 발명의 목적을 달성하기 위한 수직구 시공용 거푸집은, 지반을 천공한 천공부의 주연부에 이격 배치되는 복수의 에이치 파일에 수직구를 형성하는 콘크리트가 타설될 수 있도록 설치되는 거푸집으로서, 상기 천공부의 벽면과 접촉되도록 복수의 에이치 파일과 에이치 파일 사이에 설치되는 배후토류판과; 배후토류판이 설치된 에이치 파일의 일측면과 대향측인 타측면에 구비되어 콘크리트가 타설되는 공간부를 형성하고 상기 콘크리트를 상기 공간부로 타설할 수 있는 콘크리트 타설부가 설치되는 전면판재와; 배후토류판과 전면판재 사이의 상기 공간부에 배근되는 철근과; 상기 전면판재를 상기 에이치 파일의 타측면에 밀착되게 설치할 수 있도록 하는 밀착결합부를; 포함한 것을 특징으로 한다. Formwork for vertical sphere construction to achieve the object of the present invention as described above, as a formwork is installed so that the concrete forming the vertical sphere can be placed in a plurality of H piles spaced apart on the periphery of the perforated portion perforated the ground A rearing earth plate installed between the plurality of H piles and H piles to be in contact with the wall surface of the perforated portion; A front plate provided on the other side opposite to one side of the H pile on which the rearing earth plate is installed to form a space in which concrete is poured, and a concrete pouring portion for placing the concrete into the space; Reinforcing bars arranged in the space part between the backing earth plate and the front plate; A close coupling portion for allowing the front plate to be installed in close contact with the other side of the H pile; .

여기서, 상기 에이치 파일의 타측면에는 상기 에이치 파일의 높이 방향을 따라 이격배치되는 복수의 체결공이 관통 형성되고, 상기 밀착결합부는 상기 에이치 파일과 에이치 파일 사이에 설치되는 지지바와, 상기 지지바가 상기 에이치 파일과 에이치 파일 사이에 설치 가능하도록 상기 체결공에 체결되는 볼트 및 너트와, 상기 볼트 및 너트에 체결되어 상기 지지바를 지지함과 동시에 상기 지지바가 상기 에이치 파일의 타측면으로 밀착되도록 하는 와셔부재를 포함하여 구성될 수 있다. Here, the other side of the H pile is formed through the plurality of fastening holes spaced apart along the height direction of the H pile, the close coupling portion is a support bar installed between the H pile and the H pile, and the support bar is the H A bolt and nut fastened to the fastening hole so as to be installed between the pile and the H pile, and a washer member fastened to the bolt and nut to support the support bar, and at the same time, the support bar is in close contact with the other side of the H pile. It can be configured to include.

그리고, 상기 지지바는 상기 볼트 및 너트를 기준으로 상기 볼트 및 너트의 상측과 상기 볼트 및 너트의 하측에 상호 대향되게 복수로 구비될 수 있다. The support bar may be provided in plural to face the upper side of the bolt and the nut and the lower side of the bolt and the nut with respect to the bolt and the nut.

또한, 상기 지지바는 길이를 조절할 수 있도록 상호 슬라이딩 가능하게 결합되는 제1지지바와, 상기 제1지지바에 삽입되는 제2지지바로 구성될 수 있다. In addition, the support bar may be composed of a first support bar that is slidably coupled to each other to adjust the length, and a second support bar inserted into the first support bar.

아울러, 상기 지지바와 접촉되는 상기 전면판재의 판면에는 상기 전면판재의 낙하를 방지할 수 있도록 상기 지지바에 걸리는 복수의 걸림돌기가 돌출 형성될 수 있다. In addition, the plate surface of the front plate member in contact with the support bar may be formed to protrude a plurality of locking projections that are caught on the support bar to prevent the fall of the front plate member.

그리고, 상기 콘크리트 타설부는 상기 전면판재의 상면 및 하면의 상호 대향하는 위치에 구비된 반원 형상의 홈부와, 상기 공간부로 콘크리트가 타설시에 상기 홈부에 설치되고 타설된 콘크리트가 양생 완료시에 제거되는 매설관을 포함할 수 있다. In addition, the concrete pouring portion is a semi-circular groove portion provided at positions opposite to the upper surface and the lower surface of the front plate material, the concrete is installed in the groove portion when the concrete is poured into the space portion, and the embedded concrete is removed when the curing is completed It may include a tube.

상기와 같은 본 발명의 목적을 달성하기 위한 수직구 시공용 거푸집을 이용하여 수직구를 시공하는 방법은, 수직구를 설치할 천공부의 주연부에 복수의 에이치 파일을 매설하는 제1단계와; 천공부를 일정 깊이로 천공하는 제2단계와; 상기 에이치 파일과 에이치 파일 사이에 거푸집의 배후토류판과 철근을 설치하는 제3단계와; 상기 철근의 하단을 일정 높이로 재매몰하는 제4단계와; 상기 에이치 파일과 에이치 파일에 전면판재를 설치하여 콘크리트를 타설할 공간부를 형성하는 제5단계와; 상기 거푸집에 형성된 콘크리트 타설관 삽입공을 통하여 상기 공간부에 콘크리트를 타설하고 양생하는 제6단계와; 재매몰 된 상기 철근의 하단이 외부로 노출되도록 지반을 천공하고, 상기 제2단계 내지 제6단계를 반복적으로 수행하는 제7단계를; 포함한 것을 특징으로 한다. Method for constructing a vertical sphere using the vertical sphere construction formwork for achieving the object of the present invention as described above, the first step of embedding a plurality of H pile on the periphery of the perforation portion to install the vertical sphere; A second step of puncturing the perforation to a predetermined depth; A third step of installing a mold backing plate and reinforcing bars between the H pile and the H pile; A fourth step of reburying the lower end of the reinforcing bar at a predetermined height; A fifth step of forming a space portion in which concrete is to be installed by installing the front plate on the H pile and the H pile; A sixth step of placing and curing concrete in the space through the concrete placing pipe insertion hole formed in the formwork; A seventh step of drilling the ground so that the lower end of the re-buried rebar is exposed to the outside, and repeatedly performing the second to sixth steps; .

여기서, 상기 제5단계와 제6단계 사이에는 별도의 매설관을 상기 거푸집의 전면판재에 형성된 홈부에 매설하는 단계를 진행할 수 있다. Here, the step of embedding a separate buried pipe in the groove formed in the front plate of the form between the fifth and sixth step.

그리고, 상기 제7단계는 기 형성된 거푸집의 하단을 통하여 외부로 노출되는 철근과, 상기 거푸집의 하측에 새롭게 형성되는 거푸집의 철근을 상호 연결하는 단계를 더 포함할 수 있다. The seventh step may further include interconnecting the reinforcing bars exposed to the outside through the lower end of the formed formwork and the reinforcing bars newly formed on the lower side of the formwork.

이상에서 살펴본 바와 같이 본 발명에 의한 수직구 시공용 거푸집은, 수직구 형성을 위하여 거푸집 내부로 콘크리트를 타설할 수 있는 별도의 구조를 마련하여 수직구와 수직구의 이음부가 견고하게 연결되도록 함으로써 수직구의 구조적인 안정성을 향상시킬 수 있는 효과가 있다. As described above, the vertical sphere construction form according to the present invention, by providing a separate structure for placing concrete into the formwork to form a vertical sphere, so that the joints of the vertical sphere and the vertical sphere firmly connected to the structure of the vertical sphere There is an effect that can improve the stability.

도 1은 터널 시공 장소에 종래의 수직구가 설치된 구조를 도시한 평면도이고,
도 2는 종래의 수직구의 이음부의 구조를 부분 확대하여 도시한 평면도이며,
도 3은 본 발명의 일 실시예에 따른 수직구 시공용 거푸집의 구조를 도시한 사시도이고,
도 4는 도 3의 수직구 시공용 거푸집의 단부가 재매몰된 상태를 도시한 평면도이고,
도 5는 도 4의 수직구 시공용 거푸집의 단부가 재매몰된 상태를 도시한 측 단면도며,
도 6은 도 3의 수직구 시공용 거푸집이 연결 설치되어 수직구가 형성된 구조를 부분 절개하여 도시한 평면도이며,
도 7은 본 발명의 일 실시예에 따른 수직구 시공용 거푸집을 이용한 수직구 시공방법을 순차적으로 도시한 시공순서도이다.
1 is a plan view showing a structure in which a conventional vertical sphere is installed in the tunnel construction site,
Figure 2 is a plan view showing a partially enlarged structure of the joint portion of a conventional vertical sphere,
Figure 3 is a perspective view showing the structure of the vertical sphere formwork according to an embodiment of the present invention,
Figure 4 is a plan view showing a state in which the end of the vertical sphere formwork of Figure 3 re-buried,
5 is a side cross-sectional view showing a state in which an end portion of the vertical sphere construction die of FIG. 4 is buried;
Figure 6 is a plan view showing a partially cut structure of the vertical sphere is formed by connecting the formwork for vertical sphere construction of Figure 3,
7 is a construction sequence diagram sequentially showing a vertical sphere construction method using the vertical sphere construction formwork according to an embodiment of the present invention.

이하, 본 발명의 일 실시예에 따른 수직구 시공용 거푸집을 첨부된 도면을 참조하여 보다 상세히 설명하면 다음과 같다.Hereinafter, described in more detail with reference to the accompanying drawings for the vertical sphere construction formwork according to an embodiment of the present invention.

도 3은 본 발명의 일 실시예에 따른 수직구 시공용 거푸집의 구조를 도시한 사시도이고, 도 4는 도 3의 수직구 시공용 거푸집의 단부가 재매몰된 상태를 도시한 평면도이고, 도 5는 도 4의 수직구 시공용 거푸집의 단부가 재매몰된 상태를 도시한 측 단면도며, 도 6은 도 3의 수직구 시공용 거푸집이 연결 설치되어 수직구가 형성된 구조를 부분 절개하여 도시한 평면도이며, 도 7은 본 발명의 일 실시예에 따른 수직구 시공용 거푸집을 이용한 수직구 시공방법을 순차적으로 도시한 시공순서도이다. Figure 3 is a perspective view showing the structure of the vertical sphere construction formwork according to an embodiment of the present invention, Figure 4 is a plan view showing the end portion of the vertical sphere construction formwork of Figure 3 re-buried, Figure 5 4 is a side cross-sectional view illustrating a state in which an end portion of the vertical sphere construction formwork of FIG. 4 is re-embedded, and FIG. 6 is a plan view partially showing the structure in which the vertical sphere construction form of FIG. 7 is a construction sequence diagram sequentially illustrating a vertical sphere construction method using the vertical sphere construction formwork according to an embodiment of the present invention.

이들 도면에 도시한 바와 같이, 본 발명의 일 실시예에 따른 수직구 시공용 거푸집은, 지반을 천공한 천공부의 주연부에 이격 배치되는 복수의 에이치 파일(2)에 수직구를 형성하는 콘크리트가 타설될 수 있도록 설치되는 거푸집으로서, 상기 천공부의 벽면과 접촉되도록 복수의 에이치 파일(2)과 에이치 파일(2) 사이에 설치되는 배후토류판(100)과, 배후토류판(100)이 설치된 에이치 파일(2)의 일측면과 대향측인 타측면에 구비되어 콘크리트가 타설되는 공간부를 형성하고 상기 콘크리트를 상기 공간부로 타설할 수 있는 콘크리트 타설부가 설치되는 전면판재(200)와, 배후토류판(100)과 전면판재(200) 사이의 상기 공간부에 배근되는 철근(300)과, 전면판재(200)를 에이치 파일(100)의 타측면에 밀착되게 설치할 수 있도록 하는 밀착결합부(400)를 포함하여 구성되어 있다. As shown in these drawings, the vertical sphere construction form according to an embodiment of the present invention, the concrete forming the vertical sphere in a plurality of H pile (2) spaced apart at the periphery of the perforated portion perforated the ground Formwork which can be installed to be poured, the hound pile plate installed between the plurality of H pile (2) and the H pile (2) to be in contact with the wall surface of the perforated portion, the H pile pile is installed (2) is provided on the other side of the side and the opposite side is formed a space portion in which the concrete is poured, the front plate member 200 is provided with a concrete pouring portion that can be poured into the space portion, and the rear earth plate (100) Including the reinforcement 300 is placed in the space between the front plate 200 and the front plate 200, the close coupling portion 400 to be installed in close contact with the other side of the H pile (100) Composed There.

에이치 파일(2)은 지반이 천공되는 천공부(1)의 주연부에 수직구를 형성하기 위하여 매설되는 부재로서, 2개의 에이치 파일(2)이 한 쌍을 이루도록 상호 대향되게 매설되어 그 사이에 거푸집이 설치되도록 하는 것이 바람직하다. The H pile 2 is a member embedded to form a vertical sphere at the periphery of the perforated portion 1 on which the ground is to be drilled, and the two piles 2 are piled up to face each other to form a pair, It is desirable to allow this to be installed.

상기 천공부의 내측으로 노출되는 에이치 파일(2)의 측면에는 그 높이 방향을 따라 일정 간격으로 이격 배치되는 체결공(2a)이 관통 형성되는데, 체결공(2a)은 후술할 지지바(410)가 평행하게 설치될 수 있도록 동일한 높이에 상호 대응되도록 형성되는 것이 바람직하다. Fastening holes 2a which are spaced apart at regular intervals along the height direction of the H pile 2 exposed to the inside of the perforation part are formed therethrough, and the fastening holes 2a are supported by the support bar 410 which will be described later. Is preferably formed to correspond to each other at the same height so that can be installed in parallel.

배후토류판(100)은 수직구를 형성하기 위하여 굴착시킨 천공부의 굴착면이 무너지지 않도록 상기 굴착면과 접촉되어 상기 굴착면을 지지할 수 있도록 에이치 파일(2)과 에이치 파일(2) 사이에 설치되는 판재이다. The rear earth plate 100 is installed between the H pile 2 and the H pile 2 so as to contact the excavation surface and support the excavation surface so that the excavation surface of the drilled portion drilled to form a vertical sphere does not collapse. It is plate.

따라서, 에이치 파일(2)을 지반에 매설한 후에 에이치 파일(2)로 둘러싸인 성기 천공부를 일정 깊이로 천공하면서 에이치 파일(2)의 측면과 천공된 지반의 상기 굴착면 사이에 삽입되도록 설치될 수 있다. Therefore, after embedding the H pile 2 into the ground, the penis perforated portion surrounded by the H pile 2 is drilled to a certain depth while being installed to be inserted between the side of the H pile 2 and the drilling surface of the perforated ground. Can be.

그리고, 배후토류판(100)은 상기 굴착면의 토압을 견딜 수 있을 정도의 강도를 갖는 목재로 형성되며, 배후토류판(100)에 작용하게 되는 토압의 정도에 따라 그 두께와 폭이 조절되는 것이 효과적이다. Then, the rear earth plate 100 is formed of wood having a strength enough to withstand the earth pressure of the excavation surface, it is effective to control the thickness and width according to the degree of earth pressure acting on the rear earth plate (100) to be.

전면판재(200)는 배후토류판(100)이 설치된 에이치 파일(2)의 일측면과 대향되는 타측면에 설치되어 콘크리트가 타설될 수 있도록 외부와 차폐되는 공간부를 형성하는 역할을 한다. The front plate 200 is installed on the other side opposite to one side of the H pile 2 in which the rear earth plate 100 is installed, and serves to form a space that is shielded from the outside so that concrete can be poured.

즉, 전면판재(200)가 구비됨으로써 배후토류판(100)과 에이치 파일(2)의 벽면과 전면판재(200)로 둘러싸인 공간부가 마련되고, 상기 공간부에 콘크리트가 타설된 후에 양생됨으로써 수직구가 형성될 수 있다. That is, the front plate 200 is provided to provide a space surrounded by the rear surface plate 100 and the wall of the H pile (2) and the front plate 200, a vertical sphere is cured after the concrete is poured into the space Can be formed.

전면판재(200)는 배후토류판(100)과 대향하고 있는 전면을 차폐시킬 수 있는 판상의 부재라면 어떠한 재질로 형성되더라도 무방하며, 본 실시예에서는 수지재나 혹은 목재 또는 강판 등의 재질로 형성할 수 있다. The front plate 200 may be formed of any material as long as it is a plate-shaped member capable of shielding the front surface facing the rear earth plate 100, and may be formed of a resin material or a material such as wood or steel sheet in this embodiment. have.

후술할 지지바(410)와 접촉되는 전면판재(200)의 판면에는 전면판재(200)가 에이치 파일(2)과 지지바(410) 사이의 공간에 설치시에 전면판재(200)의 낙하를 방지할 수 있도록 지지바(410)에 걸리는 복수의 걸림돌기(210)가 돌출 형성될 수 있다. On the plate surface of the front plate member 200 which is in contact with the support bar 410 which will be described later, the front plate member 200 falls when the front plate member 200 is installed in the space between the H pile 2 and the support bar 410. A plurality of locking projections 210 may be formed to protrude from the support bar 410 so as to be prevented.

걸림돌기(210)는 전면판재(200)의 낙하를 방지할 뿐만 아니라, 전면판재(200)가 에이치 파일(2)과 지지바(410) 사이의 공간에 설치된 후에 전면판재(200)가 지지바(410)에 걸린 상태가 유지되도록 하여 지지바(410)를 지지하는 볼트(420)와 너트(430)를 조이는 작업을 용이하게 수행할 수 있도록 하는 역할도 할 수 있다. The locking protrusion 210 not only prevents the front plate 200 from falling, but also the front plate 200 is supported by the front plate 200 after the front plate 200 is installed in the space between the H pile 2 and the support bar 410. It may also serve to facilitate the operation of tightening the bolt 420 and the nut 430 for supporting the support bar 410 by maintaining the state caught in the 410.

상기 콘크리트 타설부는 전면판재(200)의 상면 및 하면의 상호 대향하는 위치에 구비된 반원 형상의 홈부(220)와, 상기 공간부로 콘크리트가 타설시에 상기 홈부(220)에 설치되고 타설된 콘크리트가 양생 완료시에 제거되는 매설관(230)으로 구성될 수 있다. The concrete pouring portion is a semi-circular groove portion 220 provided in the position opposite to each other of the upper surface and the lower surface of the front plate 200, and the concrete is installed in the groove portion 220 when the concrete is poured into the space portion It may be composed of the buried pipe 230 is removed at the completion of curing.

홈부(220)는 반원 형상의 단면을 갖도록 형성되는데, 홈부(220)는 이웃하는 전면판재(200)에 형성된 홈부(미도시)와 상호 접촉되어 전체적으로 원형상의 홈을 형성하게 되고, 상기 원형상 홈에는 매설관(230)이 매설된 상태에서 상기 공간부에 콘크리트를 타설하게 된다. The groove portion 220 is formed to have a semi-circular cross section, the groove portion 220 is in contact with the groove portion (not shown) formed in the adjacent front plate 200 to form a circular groove as a whole, the circular groove In the buried pipe 230 is embedded in the concrete portion is poured in the space.

매설관(230)이 매설되는 위치는 매설관(230)의 단부가 상기 공간부에 위치할 수 있는 깊이로 홈부(220)에 안착되도록 설치되는 것이 바람직하며, 상기 공간부에 타설된 콘크리트가 홈부(220)에 매설된 매설관(230)을 통하여 상기 공간부의 외부로 유출되지 않도록 매설관(230)의 내부에는 모래나 혹은 수지재 등의 재질로 형성된 별도의 충전재로 충전되는 것이 효과적이다. The buried pipe 230 is embedded position is preferably installed so that the end of the buried pipe 230 is seated in the groove portion 220 to a depth that can be located in the space portion, the concrete poured in the space portion groove portion It is effective to fill the inside of the buried pipe 230 with a separate filler formed of a material such as sand or resin so that the buried pipe 230 buried in the 220 does not flow out of the space portion.

그리고, 매설관(230)은 상기 공간부에 타설된 콘크리트의 양생이 완료되면 홈부(220)에서 제거되며, 매설관(230)이 제거됨으로써 형성된 관통공이 추후 상기 공간부 측으로 콘크리트를 타설하는 콘크리트 타설관이 삽입될 수 있도록 하는 콘크리트 타설관 삽입공이 될 수 있다. And, the buried pipe 230 is removed from the groove portion 220 when the curing of the concrete poured in the space is completed, the through-hole formed by removing the buried pipe 230 is poured concrete later to the concrete portion It can be a concrete pouring pipe insert that allows the pipe to be inserted.

배후토류판(100)과 전면판재(200) 사이의 콘크리트가 타설되는 공간부에는 격자 형상을 갖도록 형성되어 콘크리트의 내부에 매설됨으로써 콘크리트의 강도를 높일 수 있는 철근(300)이 배근될 수 있다. Reinforcement 300 that can increase the strength of the concrete can be reinforced by being formed to have a lattice shape in the space portion in which the concrete between the backing earth plate 100 and the front plate 200 is placed in the interior of the concrete.

철근(300)은 공간부에 타설되는 콘크리트의 강도를 향상시킬 수 있도록 격자 형태로 형성되는 것이 바람직하며, 철근(300)의 하단은 일정 길이 상기 공간부의 하측으로 돌출되게 구비되어 후속 공정이 진행됨에 따라 그 하측에 새롭게 배치되는 철근(300)과 연결할 수 있도록 하는 것이 효과적이다. Reinforcement 300 is preferably formed in a grid form so as to improve the strength of the concrete poured in the space portion, the lower end of the reinforcement 300 is provided to protrude to the lower side of the space for a predetermined length of the subsequent process Accordingly, it is effective to be able to connect with the reinforcement 300 is newly placed on the lower side.

밀착결합부(400)는 에이치 파일(2)과 에이치 파일(2) 사이에 설치되는 지지바(410)와, 지지바(410)가 에이치 파일(2)과 에이치 파일(2) 사이에 설치 가능하도록 체결공(2a)에 체결되는 볼트(420) 및 너트(430)와, 볼트(420) 및 너트(430)에 체결되어 지지바(410)를 지지함과 동시에 지지바(410)가 에이치 파일(2)의 타측면으로 밀착되도록 하는 와셔부재(440)를 포함하여 구성될 수 있다. The close coupling part 400 may include a support bar 410 installed between the H pile 2 and the H pile 2, and a support bar 410 may be installed between the H pile 2 and the H pile 2. The bolt 420 and the nut 430 fastened to the fastening hole 2a and the bolt 420 and the nut 430 are fastened to support the support bar 410 and the support bar 410 is H pile. It may be configured to include a washer member 440 to be in close contact with the other side of (2).

지지바(410)는 에이치 파일(2)과 에이치 파일(2) 사이의 이격 거리에 따라 그 길이를 조절하여 구비할 수 있도록 상호 슬라이딩 가능하게 결합되는 제1지지바(411)와, 제1지지바(411)에 삽입되는 제2지지바(412)로 구성될 수 있다. The support bar 410 is a first support bar 411 and slidably coupled to each other so as to adjust the length according to the separation distance between the H pile (2) and the H pile (2), and the first support The second support bar 412 may be inserted into the bar 411.

그리고, 제1지지바(411)와 제2지지바(412)의 일측에는 제1지지바(411)에서 제2지지바(412)가 이탈되지 않도록 하는 별도의 스토퍼(미도시)가 구비되는 것이 바람직하다. In addition, one side of the first support bar 411 and the second support bar 412 is provided with a separate stopper (not shown) to prevent the second support bar 412 from being separated from the first support bar 411. It is preferable.

지지바(410)는 볼트(420) 및 너트(430)를 기준으로 볼트(420) 및 너트(430)의 상측과 볼트(420) 및 너트(430)의 하측에 상호 대향되게 복수로 구비되는 것이 전면판재(200)를 지지하는 지지력을 높일 수 있다는 측면에서 효과적이다. The support bar 410 is provided with a plurality of opposite to the upper side of the bolt 420 and the nut 430 and the lower side of the bolt 420 and the nut 430 based on the bolt 420 and the nut 430. It is effective in that the supporting force for supporting the front plate 200 can be increased.

지지바(410)를 에이치 파일(2)의 측면에 결합시키는 수단으로는 체결공(2a)에 체결되는 볼트(420)와 너트(430) 및 지지바(410)의 측면과 접촉되게 구비되는 와셔부재(440)를 이용할 수 있다. As a means for coupling the support bar 410 to the side of the H pile 2, a washer provided in contact with the side of the bolt 420 and the nut 430 and the support bar 410 fastened to the fastening hole (2a) Member 440 may be used.

지지바(410)의 설치 작업을 실시하기 전에는 볼트(420)와 너트(430) 및 와셔부재(440)는 느슨하게 체결된 상태를 유지하며, 볼트와 와셔부재(440) 사이의 상측과 하측에 각각 지지바(410)를 배치한 후에 볼트(420)와 너트(430)를 견고하게 조임으로써 지지바(410)를 에이치 파일(2)과 에이치 파일(2) 사이에 설치하게 되는 것이다. Before the installation of the support bar 410, the bolt 420, the nut 430 and the washer member 440 are kept in a loosely coupled state, respectively, on the upper and lower sides between the bolt and the washer member 440. After arranging the support bar 410, the bolt 420 and the nut 430 are firmly tightened to install the support bar 410 between the H pile 2 and the H pile 2.

와셔부재(440)는 지지바(410)의 전면과 접촉할 수 있는 일정 면적을 갖는 부재라면 어떠한 형상으로 형성되더라도 무방하며, 본 발명에서의 와셔부재(440)는 장방 형상의 단면을 갖는 판상의 부재로 형성할 수 있다. The washer member 440 may be formed in any shape as long as it is a member having a predetermined area in contact with the front surface of the support bar 410. The washer member 440 of the present invention has a plate shape having a rectangular cross section. It can be formed by a member.

이러한 구성을 갖는 본 발명의 일 실시예에 따른 수직구 시공용 거푸집을 이용하여 수직구를 시공하는 방법은 다음과 같다. Method for constructing the vertical sphere using the vertical sphere formwork according to an embodiment of the present invention having such a configuration is as follows.

우선, 수직구(3)를 설치하고자 하는 위치의 지반을 굴착한 천공부(1)의 주연부에 에이치 파일(2)을 일정 간격 이격되게 매설하고 수직구(3)를 설치하고자 하는 지반을 일정 깊이로 천공한다. First, H pile 2 is embedded in the periphery of the perforation part 1 in which the ground of the position where the vertical sphere 3 is to be installed is excavated at regular intervals, and the ground to which the vertical sphere 3 is to be installed at a predetermined depth. To perforate.

지반을 천공하면서 천공부(1)의 굴착면이 무너지지 않도록 배후토류판(100)을 에이치 파일(2)의 측면 및 상기 굴착면과 접촉하도록 에이치 파일(2)과 에이치 파일(2) 사이에 삽입한다. The backing earth plate 100 is inserted between the H pile 2 and the H pile 2 so as to contact the side surface of the H pile 2 and the excavation surface so that the drilling surface of the punching part 1 does not collapse while drilling the ground. .

그리고, 배후토류판(100)과 에이치 파일(2)의 측면으로 둘러싸인 공간부에 격자 형태의 철근(300)이 상기 공간부의 외부로 돌출되게 배근한 후에, 돌출된 철근의 단부가 외부와 차폐되도록 일정 높이로 재매몰한다. In addition, after the reinforcing bar 300 having a lattice shape is arranged to protrude to the outside of the space portion surrounded by the sides of the rear earth plate 100 and the H pile 2, the end of the protruding reinforcing bar is shielded from the outside. Re-buy to height.

그 후, 지반이 굴착된 천공부를 통하여 외부로 노출된 에이치 파일(2)의 체결공(2a)에 볼트(420)와 너트(430) 및 와셔부재(440)를 느슨하게 체결한다. Thereafter, the bolt 420, the nut 430, and the washer member 440 are loosely fastened to the fastening hole 2a of the H pile 2 exposed to the outside through the drilled portion of the ground.

그리고, 볼트(420)를 기준으로 그 상측과 하측에 지지바(410)가 볼트(420)와 접촉할 수 있도록 지지바(410)의 길이를 조절하여 안착시키고, 지지바(410)와 에이치 파일(2) 사이에 전면판재(200)를 삽입시킨 상태에서 너트(430)를 완전히 조여서 와셔부재(440)가 지지바(410)의 전면과 접촉함으로써 전면판재(200)가 에이치 파일(2)에 설치되도록 한다. Then, the support bar 410 on the upper and lower sides of the bolt 420 to adjust the length of the support bar 410 to be in contact with the bolt 420, the support bar 410 and the H pile Tighten the nut 430 completely with the front plate 200 inserted therebetween so that the washer member 440 contacts the front surface of the support bar 410 so that the front plate 200 is connected to the H pile 2. To be installed.

여기서, 전면판재(200)는 전면판재(200)의 전면으로 돌출되게 형성된 걸림돌기(210)가 지지바(410)의 상면에 걸려서 지지된 상태가 되므로 볼트(420)에 너트(430)를 조이는 작업을 용이하게 진행할 수 있다. Here, the front plate member 200 is fastened to the front surface of the front plate member 200 is fastened by the nut 430 to the bolt 420 because the engaging protrusion 210 is caught and supported on the upper surface of the support bar 410. Work can be easily performed.

그리고, 전면판재(200)의 하측 홈부(220)에 매설관(240)을 매설한 후에 전면판재(200)의 상측 홈부(220)를 통하여 상기 공간부 측으로 콘크리트를 타설한 후에 양생함으로써 천공부의 굴착면을 지지하는 일정 깊이를 갖는 수직구(3)의 형성이 완료되며 매설된 매설관(240)은 제거하게 된다. Then, the buried pipe 240 is buried in the lower groove portion 220 of the front plate 200, and after pouring concrete to the space side through the upper groove portion 220 of the front plate 200 by curing the perforated portion Formation of the vertical sphere (3) having a predetermined depth to support the excavation surface is completed and the buried pipe 240 is removed.

상기 공간부로 타설된 콘크리트의 양생이 완료되면 재매몰된 철근(300)의 하단이 외부로 노출되도록 함과 동시에 수직구로서의 기능을 수행하기 위하여 상기 벽면 중앙의 천공부(1)를 터널과 연통시킬 수 있도록 지반을 일정한 깊이로 더욱 깊게 굴착한다. When the curing of the concrete poured into the space is completed, the lower part of the reburyed rebar 300 is exposed to the outside and at the same time to communicate with the tunnel to the perforations 1 in the center of the wall in order to perform a function as a vertical sphere Excavate the ground deeper to a constant depth so that it can

지반을 굴착하면서 지반이 굴착된 천공부(1)를 통하여 에이치 파일(2)이 외부로 노출되면 에이치 파일(2)의 체결공(2a)에 볼트(420)와 너트(430) 및 와셔부재(440)를 느슨하게 체결한다. When the ground is excavated and the H pile 2 is exposed to the outside through the drilled portion 1 in which the ground is excavated, the bolt 420 and the nut 430 and the washer member (2) of the fastening hole 2a of the H pile 2 are exposed. 440 loosely tightened.

그리고, 볼트(420)를 기준으로 그 상측과 하측에 지지바(410)가 볼트(420)와 접촉할 수 있도록 지지바(410)의 길이를 조절하여 안착시키고, 지지바(410)와 에이치 파일(2) 사이에 전면판재(200)를 삽입시킨 상태에서 너트(430)를 완전히 조여서 와셔부재(440)가 지지바(410)의 전면과 접촉함으로써 전면판재(200)가 에이치 파일(2)에 설치되도록 한다. Then, the support bar 410 on the upper and lower sides of the bolt 420 to adjust the length of the support bar 410 to be in contact with the bolt 420, the support bar 410 and the H pile Tighten the nut 430 completely with the front plate 200 inserted therebetween so that the washer member 440 contacts the front surface of the support bar 410 so that the front plate 200 is connected to the H pile 2. To be installed.

그 후, 이미 설치된 거푸집의 철근(300)과 새롭게 설치된 거푸집의 철근은 연결하고 전면판재(200)의 하측에 구비된 홈부(220)에 매설관(240)을 매설한 상태에서 전면판재(200)의 상측에 구비된 홈부(220)에 매설되었던 매설관(240)에 의하여 형성된 콘크리트 타설관 삽입공을 통하여 새로운 거푸집에 콘크리트를 타설한다. Thereafter, the reinforcement 300 of the formwork already installed and the reinforcement of the newly installed formwork are connected to the front plate 200 in a state in which the buried pipe 240 is embedded in the groove 220 provided on the lower side of the front plate 200. Concrete is poured into the new formwork through the concrete pouring pipe insertion hole formed by the buried pipe 240 was buried in the groove portion 220 provided on the upper side of the.

이때, 콘크리트 타설관 삽입공까지도 콘크리트가 타설되어 양생이 완료된 수직구의 벽면에는 콘크리트 타설관 삽입공이 존재하지 않도록 하여, 상측에 형성된 수직구(3)의 하단면과 새롭게 형성되는 수직구(3)의 하단면이 견고하게 이어지도록 한다. At this time, even the concrete pouring pipe insertion hole so that concrete is poured into the wall surface of the vertical sphere where curing is completed so that the concrete pouring pipe insertion hole does not exist, and the lower surface of the vertical sphere 3 formed on the upper side and the newly formed vertical sphere 3 Make sure the bottom surface is firmly connected.

이러한 상술한 과정을 반복적으로 수행함으로써 터널과 수직구(3)가 연통되게 되면 수직구(3)의 시공을 완료되므로 수직구(3)와 수직구(3)의 이음부가 견고하게 연결되도록 함으로써 수직구의 구조적인 안정성을 향상시킬 수 있다. By repeatedly performing the above-described process, when the tunnel and the vertical sphere 3 communicate with each other, the construction of the vertical sphere 3 is completed, so that the joints of the vertical sphere 3 and the vertical sphere 3 are firmly connected. The structural stability of the sphere can be improved.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined in the appended claims. It is to be understood that both the technical idea and the technical spirit of the invention are included in the scope of the present invention.

1 : 천공부 2 : 에이치 파일
2a : 체결공 3 : 수직구
100 : 배후토류판 200 : 전면판재
210 : 걸림돌기 220 : 홈부
230 : 매설관 300 : 철근
400 : 밀착결합부 410 : 지지바
411 : 제1지지바 412 : 제2지지바
420 : 볼트 430 : 너트
440 : 와셔부재
1: perforation part 2: H file
2a: fastening hole 3: vertical sphere
100: rear earth plate 200: front plate
210: jamming protrusion 220: groove
230: buried pipe 300: rebar
400: close contact portion 410: support bar
411: first support bar 412: second support bar
420: bolt 430: nut
440: washer member

Claims (9)

지반을 천공한 천공부의 주연부에 이격 배치되는 복수의 에이치 파일에 수직구를 형성하는 콘크리트가 타설될 수 있도록 설치되는 수직구 시공용 거푸집으로서,
상기 천공부의 벽면과 접촉되도록 복수의 에이치 파일과 에이치 파일 사이에 설치되는 배후토류판과;
배후토류판이 설치된 에이치 파일의 일측면과 대향측인 타측면에 구비되어 콘크리트가 타설되는 공간부를 형성하고 상기 콘크리트를 상기 공간부로 타설할 수 있는 콘크리트 타설부가 설치되는 전면판재와;
배후토류판과 전면판재 사이의 상기 공간부에 배근되는 철근과;
상기 전면판재를 상기 에이치 파일의 타측면에 밀착되게 설치할 수 있도록 하는 밀착결합부를; 포함하며,
상기 콘크리트 타설부는 상기 전면판재의 상면 및 하면의 상호 대향하는 위치에 구비된 반원 형상의 홈부와, 상기 공간부로 콘크리트가 타설시에 상기 홈부에 설치되고 타설된 콘크리트가 양생 완료시에 제거되는 매설관을 포함한 것을 특징으로 하는 수직구 시공용 거푸집.
As a vertical sphere construction formwork is installed so that the concrete forming the vertical sphere can be placed in a plurality of H piles spaced apart at the periphery of the perforated portion of the perforated ground,
A backing earth plate installed between the plurality of H piles and H piles so as to be in contact with the wall surface of the perforated portion;
A front plate provided on the other side opposite to one side of the H pile on which the rearing earth plate is installed to form a space in which concrete is poured, and a concrete pouring portion for placing the concrete into the space;
Reinforcing bars arranged in the space part between the backing earth plate and the front plate;
A close coupling portion for allowing the front plate to be installed in close contact with the other side of the H pile; ≪ / RTI &
The concrete pouring portion is a semi-circular groove portion provided in the mutually opposite position of the upper and lower surfaces of the front plate material, and the buried pipe that is installed in the groove portion when the concrete is poured into the space portion and the concrete poured is removed upon completion of curing Formwork for vertical sphere construction, including.
제1항에 있어서,
상기 에이치 파일의 타측면에는 상기 에이치 파일의 높이 방향을 따라 이격배치되는 복수의 체결공이 관통 형성되고,
상기 밀착결합부는 상기 에이치 파일과 에이치 파일 사이에 설치되는 지지바와, 상기 지지바가 상기 에이치 파일과 에이치 파일 사이에 설치 가능하도록 상기 체결공에 체결되는 볼트 및 너트와, 상기 볼트 및 너트에 체결되어 상기 지지바를 지지함과 동시에 상기 지지바가 상기 에이치 파일의 타측면으로 밀착되도록 하는 와셔부재를 포함한 것을 특징으로 하는 수직구 시공용 거푸집.
The method of claim 1,
The other side surface of the H pile is formed with a plurality of fastening holes spaced apart along the height direction of the H pile,
The close coupling part includes a support bar installed between the H file and the H file, the bolt and nut fastened to the fastening hole so that the support bar can be installed between the H file and the H file, and the bolt and nut are fastened to the bolt and nut. Formwork for vertical sphere construction comprising a washer member for supporting the support bar and at the same time the support bar is in close contact with the other side of the H pile.
제2항에 있어서,
상기 지지바는 상기 볼트 및 너트를 기준으로 상기 볼트 및 너트의 상측과 상기 볼트 및 너트의 하측에 상호 대향되게 복수로 구비된 것을 특징으로 하는 수직구 시공용 거푸집.
3. The method of claim 2,
The support bar is a vertical sphere formwork, characterized in that provided with a plurality of opposed to the upper side of the bolt and nut and the lower side of the bolt and nut with respect to the bolt and nut.
제2항에 있어서,
상기 지지바는 길이를 조절할 수 있도록 상호 슬라이딩 가능하게 결합되는 제1지지바와, 상기 제1지지바에 삽입되는 제2지지바로 구성된 것을 특징으로 하는 수직구 시공용 거푸집.
3. The method of claim 2,
The support bar is a vertical sphere construction formwork, characterized in that consisting of the first support bar is slidably coupled to each other to adjust the length, and the second support bar is inserted into the first support bar.
제2항에 있어서,
상기 지지바와 접촉되는 상기 전면판재의 판면에는 상기 전면판재의 낙하를 방지할 수 있도록 상기 지지바에 걸리는 복수의 걸림돌기가 돌출 형성된 것을 특징으로 하는 수직구 시공용 거푸집.
3. The method of claim 2,
The formwork for the vertical sphere construction, characterized in that the plate surface of the front plate member in contact with the support bar protrudes a plurality of engaging projections to the support bar to prevent the fall of the front plate member.
삭제delete 제1항 내지 제5항 중 어느 한 항에 따른 수직구 시공용 거푸집을 이용하여 수직구를 시공하는 방법으로서,
수직구를 설치할 천공부의 주연부에 복수의 에이치 파일을 매설하는 제1단계와;
천공부를 일정 깊이로 천공하는 제2단계와;
상기 에이치 파일과 에이치 파일 사이에 거푸집의 배후토류판과 철근을 설치하는 제3단계와;
상기 철근의 하단을 일정 높이로 재매몰하는 제4단계와;
상기 에이치 파일과 에이치 파일에 전면판재를 설치하여 콘크리트를 타설할 공간부를 형성하는 제5단계와;
상기 거푸집에 형성된 콘크리트 타설관 삽입공을 통하여 상기 공간부에 콘크리트를 타설하고 양생하는 제6단계와;
재매몰 된 상기 철근의 하단이 외부로 노출되도록 지반을 천공하고, 상기 제2단계 내지 제6단계를 반복적으로 수행하는 제7단계를;
포함한 것을 특징으로 하는 수직구 시공용 거푸집을 이용한 수직구 시공방법.
A method of constructing a vertical sphere by using the vertical sphere formwork according to any one of claims 1 to 5,
A first step of embedding the plurality of H piles in the periphery of the perforation portion for installing the vertical sphere;
A second step of puncturing the perforation to a predetermined depth;
A third step of installing a mold backing plate and reinforcing bars between the H pile and the H pile;
A fourth step of reburying the lower end of the reinforcing bar at a predetermined height;
A fifth step of forming a space portion in which concrete is to be installed by installing the front plate on the H pile and the H pile;
A sixth step of placing and curing concrete in the space through the concrete placing pipe insertion hole formed in the formwork;
A seventh step of drilling the ground so that the lower end of the re-buried rebar is exposed to the outside, and repeatedly performing the second to sixth steps;
Vertical sphere construction method using the vertical sphere construction formwork comprising.
제7항에 있어서,
상기 제5단계와 제6단계 사이에는 별도의 매설관을 상기 거푸집의 전면판재에 형성된 홈부에 매설하는 단계를 진행하는 것을 특징으로 하는 수직구 시공용 거푸집을 이용한 수직구 시공방법.
The method of claim 7, wherein
The vertical sphere construction method using the vertical sphere construction form, characterized in that the step of embedding a separate buried pipe in the groove formed in the front plate of the form between the fifth and sixth step.
제7항에 있어서,
상기 제7단계는 기 형성된 거푸집의 하단을 통하여 외부로 노출되는 철근과, 상기 거푸집의 하측에 새롭게 형성되는 거푸집의 철근을 상호 연결하는 단계를 더 포함한 것을 특징으로 하는 수직구 시공용 거푸집을 이용한 수직구 시공방법.
The method of claim 7, wherein
The seventh step may further comprise the step of interconnecting the reinforcing bars exposed to the outside through the lower end of the pre-formed formwork, and the formwork for the reinforcement of the formwork newly formed on the lower side of the formwork. Fastener construction method.
KR1020110130751A 2011-12-08 2011-12-08 Molding for constructing perpendicular hall and construction method for perpendicular hall using it KR101335578B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110130751A KR101335578B1 (en) 2011-12-08 2011-12-08 Molding for constructing perpendicular hall and construction method for perpendicular hall using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110130751A KR101335578B1 (en) 2011-12-08 2011-12-08 Molding for constructing perpendicular hall and construction method for perpendicular hall using it

Publications (2)

Publication Number Publication Date
KR20130064235A KR20130064235A (en) 2013-06-18
KR101335578B1 true KR101335578B1 (en) 2013-12-02

Family

ID=48861244

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110130751A KR101335578B1 (en) 2011-12-08 2011-12-08 Molding for constructing perpendicular hall and construction method for perpendicular hall using it

Country Status (1)

Country Link
KR (1) KR101335578B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101720911B1 (en) * 2016-11-14 2017-03-28 윤태웅 Topdown rainforced concrete wall construction method and temporary retaining wall structure with strut

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000013517U (en) * 1998-12-22 2000-07-15 서운수 Formwork for concrete building elevator corridor
KR100396583B1 (en) 2001-01-18 2003-09-03 대림산업 주식회사 The construction method of rc structure using improved precast wall members
KR100775350B1 (en) * 2006-05-15 2007-11-09 주식회사 퍼스폼 Filler pannel frame
KR20110039973A (en) * 2009-10-13 2011-04-20 이정락 The construction method of retaining of earth for concrete using truss panel for retaining wall concrete

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000013517U (en) * 1998-12-22 2000-07-15 서운수 Formwork for concrete building elevator corridor
KR100396583B1 (en) 2001-01-18 2003-09-03 대림산업 주식회사 The construction method of rc structure using improved precast wall members
KR100775350B1 (en) * 2006-05-15 2007-11-09 주식회사 퍼스폼 Filler pannel frame
KR20110039973A (en) * 2009-10-13 2011-04-20 이정락 The construction method of retaining of earth for concrete using truss panel for retaining wall concrete

Also Published As

Publication number Publication date
KR20130064235A (en) 2013-06-18

Similar Documents

Publication Publication Date Title
KR100910576B1 (en) Embed anchor and construction method of composite basement wall using the same
KR101173045B1 (en) Earth retaining-cum-retaining wall, and construction method thereof
KR101973565B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate
KR101572561B1 (en) Steel assembly for Pile
KR100927186B1 (en) Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
KR20140055639A (en) A execution method of architecture beam
KR101057680B1 (en) Soil retaining wall and construction method of reuse and reinforcement steel panel
KR101793037B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
JP6186267B2 (en) How to build an underground tunnel
JP5229913B2 (en) Slope reinforcement method
KR101524303B1 (en) The wall members and underground wall, underground wall construction method using the same
KR101324231B1 (en) Soil cement wall structure and method for constructing thereof
KR101599931B1 (en) Retaining Wall using Precast Panels and PHC Piles having Steel Bands, and Constructing Method of such Retaining Wall
KR101335578B1 (en) Molding for constructing perpendicular hall and construction method for perpendicular hall using it
KR101973566B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by bolting cutoff plate to phc pile with longitudinal plate
KR100862387B1 (en) Tensional kit for top-down constructing of acupressure lasting anchor and top-down constructing method of acupressure lasting anchor using this
JP2018009388A (en) End structure of preceding element and construction method of underground continuous wall
KR101290766B1 (en) Molding for constructing vertical hall and construction method for perpendicular hall using it
KR102021496B1 (en) Retaining wall construction method and retaining wall structure by the method
KR101545713B1 (en) Composite type cutoff wall of steel temporary facility and construction method of the same
KR20180112453A (en) Soil Retaining Wall using PHC Pile and Construction Method
KR100397958B1 (en) The structure timbering of cut with separating wale and the construction method thereof
KR20190142492A (en) PHC pile to facilitate soil guard and construction method of soil guard structure using the same
KR101151052B1 (en) The deepened sheet plate made of an iron reinforcing rod and the method of installation
KR20160120160A (en) Precast pile with wale supporting member

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20161115

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee