KR101313433B1 - Method for widening hole drilling using prd(percussion rotary drill) method - Google Patents

Method for widening hole drilling using prd(percussion rotary drill) method Download PDF

Info

Publication number
KR101313433B1
KR101313433B1 KR1020120004472A KR20120004472A KR101313433B1 KR 101313433 B1 KR101313433 B1 KR 101313433B1 KR 1020120004472 A KR1020120004472 A KR 1020120004472A KR 20120004472 A KR20120004472 A KR 20120004472A KR 101313433 B1 KR101313433 B1 KR 101313433B1
Authority
KR
South Korea
Prior art keywords
prd
drilling
casing
outer casing
air hammer
Prior art date
Application number
KR1020120004472A
Other languages
Korean (ko)
Other versions
KR20130083697A (en
Inventor
노지연
Original Assignee
노지연
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 노지연 filed Critical 노지연
Priority to KR1020120004472A priority Critical patent/KR101313433B1/en
Publication of KR20130083697A publication Critical patent/KR20130083697A/en
Application granted granted Critical
Publication of KR101313433B1 publication Critical patent/KR101313433B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/20Placing by pressure or pulling power
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/08Drop drivers with free-falling hammer
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Earth Drilling (AREA)

Abstract

본 발명은 1,000~2,000Φ의 일반적인 천공 시 사용되는 PRD 공법을 이용한 대구경 천공 방법으로서, 천공 크기 이상의 외부 케이싱, 외부 케이싱 내부에 구비되는 내부 케이싱, 내부 케이싱과 결합되어 외부 케이싱 사이에 구비되는 복수 개의 제1 연결부, 및 제1 연결부를 통해 외부 및 내부 케이싱 사이에 형성되는 복수 개의 공간부를 포함하는 가이드부를 천공 위치에 압입하는 과정과; 회전 및 항타되는 에어 해머(hammer), 에어 해머 하부에 구비되는 비트(bit), 및 에어 해머 둘레에 구비되는 케이싱을 포함하는 천공부가 복수 개 짝을 이루는 PRD 공법용 천공부로 가이드부의 외부 케이싱 내벽 곡면을 따라 PRD 공법용 천공부가 삽입되는 크기로 형성된 공간부를 차례로 이동하면서 천공하는 과정과; 내부 케이싱 및 제1 연결부를 인발하는 과정과; 천공된 부분의 잔재물을 에어 펌핑하는 과정과; 천공된 부분에 강관을 압입하는 과정; 및 외부 케이싱 및 강관 사이에 그라우팅(grouting) 및 시멘트(cement)를 주입하는 과정;을 포함한다. 본 발명은 외부 케이싱의 내벽 곡면을 따라 PRD 공법용 천공부가 차례로 천공함으로써, 천공이 이루어지지 않는 부분이 거의 없어 대구경 천공을 빠르고 용이하게 수행할 수 있는 효과가 있다. The present invention is a large-diameter drilling method using the PRD method used in general drilling of 1,000 ~ 2,000Φ, the outer casing of the punch size or more, the inner casing provided in the outer casing, a plurality of inner casing is coupled between the outer casing Press-fitting a guide part including a first connection part and a plurality of space parts formed between the outer and inner casings through the first connection part to a punctured position; Inner wall of the outer casing of the guide part as a perforation part for the PRD method in which a plurality of perforations including a rotating and driven air hammer, a bit provided under the air hammer, and a casing provided around the air hammer Drilling along the curved surface while sequentially moving the space portion formed to have a size for inserting the PRD drilling method; Drawing the inner casing and the first connection portion; Air pumping the residue of the perforated portion; Press-fitting the steel pipe into the perforated portion; And injecting grouting and cement between the outer casing and the steel pipe. According to the present invention, since the PRD method of perforation part is sequentially drilled along the inner wall surface of the outer casing, there is almost no part where the punching is not performed, so that large diameter drilling can be performed quickly and easily.

Description

피알디 공법을 이용한 대구경 천공 방법{METHOD FOR WIDENING HOLE DRILLING USING PRD(PERCUSSION ROTARY DRILL) METHOD}Large diameter drilling method using PADI method {METHOD FOR WIDENING HOLE DRILLING USING PRD (PERCUSSION ROTARY DRILL) METHOD}

본 발명은 천공 장치 방법에 관한 것으로, 더욱 상세하게는 PRD 공법을 이용한 대구경 천공 장치에 관한 것이다.The present invention relates to a drilling device method, and more particularly to a large diameter drilling device using the PRD method.

건축물을 건설하거나 구축물을 설치하기 위하여 지하를 파는 공사, 강이나 바다에서 실시하는 물막이 공사, 도로를 확장하는 공사 등과 같은 각종 공사를 실시할 때에는 토사가 흘러내리거나 지반이 무너지는 것을 방지하기 위한 작업 수행을 위해 일반적으로 천공(down hole) 작업이 선행된다.Work to prevent soil from falling down or ground collapse when carrying out various works such as digging underground, constructing water in the river or sea, and expanding roads to construct buildings or construct structures. Down hole work is generally preceded for this.

천공 작업에 사용되는 공법으로는 PRD(Percussion Rotary Drill) 공법과 RCD(Reverse Circulation Drill) 공법이 있다. PRD 공법은 일반적인 천공 작업에 사용되는 공법으로서, 강관 구경이 최대 1,000~2,000Φ정도 될 때 사용된다. 주로 사용되는 강관의 구경은 1,000Φ 이하이다. PRD 공법에 사용되는 장치는 에어 해머(air hammer)와 비트(bit)로 구성되고, 타격과 회전을 동시에 수행하여 천공 작업이 진행된다. 이 때, 종래의 PRD 공법은 강관 내부 전체를 한 번에 타격 및 회전으로 천공하는 것으로서, 싱글 비트를 채택하는 싱글 에어 해머 구조를 가진다.The drilling methods used for drilling work include Percussion Rotary Drill (PRD) and Reverse Circulation Drill (RCD). The PRD method is a method used for general drilling, and is used when the diameter of steel pipe is about 1,000 ~ 2,000Φ. The diameter of steel pipes used is less than 1,000Φ. The device used in the PRD method is composed of an air hammer (bit) and a bit (bit), and the punching operation is performed by performing the blow and rotation at the same time. In this case, the conventional PRD method punches and rotates the entire inside of the steel pipe at once, and has a single air hammer structure adopting a single bit.

한편, RCD 공법, 즉 연마 공법은 강관 구경이 대구경인 경우에 사용된다. 연마 공법은 에어 해머의 타격 없이, 비트의 회전을 통해 연마하여 천공 작업이 수행된다. 즉, 비트의 회전만으로 천공 작업이 수행되므로, PRD 공법에 비하여 속도가 현저히 떨어지고, 이로 인해 공사 기간이 지연되는 문제점이 있다. 그리고 특수 비트 및 대형 장비를 사용해야 하고, 굴착토 제거만을 위한 별도의 에어 컴프레셔가 구비되어야 하며, 느린 순환수의 이동속도로 인하여 굴착토의 제거가 원활하게 이루어지지 않는 문제점 및 고가의 장비로 인한 비용이 현저히 높아지는 문제점도 있다. 여기서, 갈아서 천공을 하기 때문에 잔재물이 항상 천공되는 부분에 잔재해 있어 천공을 방해하는 문제점도 있다.On the other hand, the RCD method, that is, the polishing method is used when the steel pipe diameter is large diameter. In the polishing method, the drilling operation is performed by grinding through the rotation of the bit without hitting the air hammer. That is, since the drilling operation is performed only by the rotation of the bit, compared to the PRD method, the speed is significantly lowered, which causes a problem in delaying the construction period. And special bit and large equipment should be used, and separate air compressor should be provided only to remove the excavated soil, and the cost of expensive equipment due to the problem that the excavated soil is not smoothly removed due to the slow circulation speed There is also a problem that is significantly higher. Here, there is a problem in that the remnants are always left in the parts to be drilled, because the grinding is performed.

또한, 대구경 천공을 위해서는, 구경에 비례하여 충분한 하중을 비트에 공급해야 하는데, 이 경우 충분한 하중을 공급하기 위한 드릴 칼라 등의 제작에 상당한 비용이 소요될 뿐 아니라, 대형 비트는 큰 회전력을 요구하므로, 대형 장비를 사용해야 하는 문제점도 있다.In addition, in order to drill a large diameter, a sufficient load must be supplied to the bit in proportion to the diameter, and in this case, it is not only expensive to manufacture a drill collar for supplying sufficient load, but also a large bit requires a large rotational force. There is also the problem of using large equipment.

여기서, 대구경 천공 시, 전술한 PRD 공법을 적용하는 경우, 강관의 크기에 맞추어 장비들, 예컨대 에어 해머와 비트의 크기가 커져야 한다. 그러나, 싱글 에어 해머 구조를 가지는 장치의 크기를 크게 하는 데에는 기술적인 어려움이 있으므로, 대구경 천공을 위해서는 PRD 공법을 적용하지 않는다.Here, when the above-mentioned PRD method is applied in large diameter drilling, the size of the equipment, for example, the air hammer and the bit, must be increased according to the size of the steel pipe. However, there is a technical difficulty in increasing the size of a device having a single air hammer structure, so that the PRD method is not applied for large diameter drilling.

본 발명은 상기한 바와 같은 문제점을 해결하기 위하여 제안된 것으로, 그 목적은 대구경 천공에 적용이 가능한 PRD 공법을 이용한 대구경 천공 방법을 제공하는데 있다.The present invention has been proposed to solve the problems as described above, the object is to provide a large diameter drilling method using the PRD method that can be applied to large diameter drilling.

본 발명의 다른 목적은, 대구경 천공 시, 시간과 비용이 절감될 수 있는 PRD 공법을 이용한 대구경 천공 방법을 제공하는데 있다.Another object of the present invention is to provide a large diameter drilling method using a PRD method, which can reduce time and cost when drilling large diameter.

본 발명의 또 다른 목적은, PRD 공법용 천공기를 이용하여 대구경 천공을 빠르고 용이하게 수행할 수 있는 PRD 공법을 이용한 대구경 천공 방법을 제공하는데 있다.Still another object of the present invention is to provide a large-diameter drilling method using a PRD method that can quickly and easily carry out large-diameter drilling using a PRD drilling machine.

본 발명의 또 다른 목적은, 대구경 천공 시, 외부 케이싱의 내벽 곡면을 따라 PRD 공법용 천공기가 차례로 천공함으로써, 천공이 이루어지지 않는 부분이 거의 없어 천공 시간이 빨라질 수 있는 PRD 공법을 이용한 대구경 천공 방법을 제공하는데 있다.Still another object of the present invention is a large diameter drilling method using a PRD method that can be made by drilling the PRD method perforated in sequence along the inner wall surface of the outer casing, so that the drilling time can be almost eliminated when large diameter drilling To provide.

상기와 같은 목적을 달성하기 위한 본 발명에 따른 1,000Φ 이하의 일반적인 천공 시 사용되는 PRD(Percussion Rotary Drill) 공법을 이용한 대구경 천공 방법은, 천공 크기 이상의 외부 케이싱, 상기 외부 케이싱 내부에 구비되는 내부 케이싱, 상기 내부 케이싱과 결합되어 상기 외부 케이싱 사이에 구비되는 복수 개의 제1 연결부, 및 상기 제1 연결부를 통해 상기 외부 및 내부 케이싱 사이에 형성되는 복수 개의 공간부를 포함하는 가이드부를 천공 위치에 압입하는 과정과; 회전 및 항타되는 에어 해머(hammer), 상기 에어 해머 하부에 구비되는 비트(bit), 및 상기 에어 해머 둘레에 구비되는 케이싱을 포함하는 천공부가 복수 개 짝을 이루는 PRD 공법용 천공부로 상기 가이드부의 외부 케이싱 내벽 곡면을 따라 상기 PRD 공법용 천공부가 삽입되는 크기로 형성된 상기 공간부를 차례로 이동하면서 천공하는 과정과; 상기 내부 케이싱 및 제1 연결부를 인발하는 과정과; 상기 천공된 부분의 잔재물을 에어 펌핑하는 과정과; 상기 천공된 부분에 강관을 압입하는 과정; 및 상기 외부 케이싱 및 강관 사이에 그라우팅(grouting) 및 시멘트(cement)를 주입하는 과정;을 포함하는 것에 특징이 있다.Large diameter drilling method using a Percussion Rotary Drill (PRD) method used in the general drilling of 1,000 Φ or less according to the present invention for achieving the above object, the outer casing of the punch size or more, the inner casing provided inside the outer casing Press-fitting a guide part including a plurality of first connecting parts coupled to the inner casing and provided between the outer casing, and a plurality of spaces formed between the outer and inner casings through the first connecting part, to a punching position; and; The guide portion is a perforation part for the PRD method in which a plurality of perforation parts including an air hammer rotated and struck, a bit provided in the lower part of the air hammer, and a casing provided around the air hammer Drilling along the inner wall inner surface of the outer casing while moving the space portion formed to have a size for inserting the PRD hole; Drawing the inner casing and the first connection portion; Air pumping the residue of the perforated portion; Pressing a steel pipe into the perforated portion; And injecting grouting and cement between the outer casing and the steel pipe.

그리고 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법은, 상기 천공 과정 이후에, 상기 내부 케이싱 내부는 상기 PRD 공법용 천공부를 통해 천공한 뒤 나머지 부분을 쇄암(碎巖)봉을 여러 번 자유 낙하시켜 천공하거나, 상기 내부 케이싱 내부 전체에 상기 쇄암봉을 여러 번 자유 낙하시켜 천공하는 과정을 더 포함하는 것에 특징이 있다.In the large-diameter drilling method using the PRD method according to the present invention, after the drilling process, the inner casing is drilled through the hole for the PRD method, and then free-falls the rest of the chain rock rods several times. Perforations by, or further characterized in that it further comprises the step of drilling by freely falling the chain arm bar several times inside the inner casing.

또한, 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법의 상기 에어 해머 및 쇄암봉은 본체와 소정 각도로 기울어짐이 가능한 붐(boom)을 구비하는 크레인의 상기 붐 끝단에 고리와 후크를 통해 연결되는 것에 특징이 있다.In addition, the air hammer and chain arm rod of the large-diameter drilling method using the PRD method according to the present invention is connected to the boom end of the crane having a boom (boom) that can be inclined at a predetermined angle through the hook and hook It is characterized by

그리고 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법의 상기 PRD 공법용 천공부는 제1 에어 해머, 제1 비트, 제1 케이싱을 포함하는 제1 천공부와, 제2 에어 해머, 제2 비트, 제2 케이싱을 포함하는 제2 천공부로 구성되고, 상기 제1 및 제2 천공부를 일체화하기 위해 상기 제1 및 제2 케이싱을 연결하는 제2 연결부를 더 포함하며, 상기 공간부는 8 개가 형성되는 것에 특징이 있다.In addition, the PRD drilling method of the large-diameter drilling method using the PRD method according to the present invention, the first drilling portion including a first air hammer, a first bit, a first casing, a second air hammer, a second bit, A second perforation part including two casings, further comprising a second connection part connecting the first and second casings to integrate the first and second perforations, wherein eight space parts are formed; It is characterized by

본 발명은 대구경 천공 시, 외부 케이싱의 내벽 곡면을 따라 PRD 공법용 천공기가 차례로 천공함으로써, 천공이 이루어지지 않는 부분이 거의 없어 대구경 천공을 빠르고 용이하게 수행할 수 있는 효과가 있다. According to the present invention, when a large diameter drilling is performed, the PRD perforator is sequentially drilled along the inner wall surface of the outer casing, so that there is almost no portion where the perforation is not performed.

그리고 일반적인 구경에 사용되던 PRD 공법을 대구경에 적용함으로써, 대구경 천공 시 시간과 비용이 절감될 수 있는 효과가 있다. 즉, 대구경 천공에 사용되던 RCD 공법, 즉 연마 공법으로 인한 공사 기간 지연 및 고비용 문제가 해결될 수 있고, 대구경 천공에 PRD 공법을 적용 시 기술적인 어려움이 있던 문제가 해결되는 효과가 있다.In addition, by applying the PRD method used for general apertures to large diameters, it is possible to reduce time and cost when drilling large diameters. That is, the RCD method, which is used for large diameter drilling, that is, the construction period delay and high cost problem due to the polishing method can be solved, and when the PRD method is applied to the large diameter drilling, there is an effect of solving the problem of technical difficulties.

또한, 천공 이후 강관 삽입 이전에, 천공으로 인해 존재하는 천공된 부분의 잔재물을 에어 펌프를 통해 분출하므로, 잔재물에 의해 천공이 지연되는 문제점도 해결될 수 있다.In addition, since the residue of the perforated portion existing due to the perforation is ejected through the air pump after the perforation before the insertion of the steel pipe, the problem that the perforation is delayed by the residue can also be solved.

본 발명은 첨부된 도면에 도시된 실시예를 참고로 설명되나, 이는 예시적인 것이며, 당해 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 실시예가 가능하다는 점을 이해할 수 있을 것이다. 따라서 본 발명의 진정한 보호범위는 첨부된 청구범위에 의해서만 정해져야 할 것이다. While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is evident that many alternatives, modifications and variations will be apparent to those skilled in the art. Accordingly, the true scope of protection of the present invention should be determined only by the appended claims.

도 1a와 도 1b는 본 발명의 제1 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법 시, 가이드부를 나타낸 사시도 및 단면도이다.
도 2a 내지 도 2c는 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법 시, 천공부를 나타낸 사시도 및 단면도이다.
도 3은 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법을 위한 장치를 나타낸 도면이다.
도 4는 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법을 나타낸 블록도이다.
도 5a 내지 도 5f는 본 발명의 제1 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법을 나타낸 도면이다.
도 6은 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법 시, 쇄암봉을 나타낸 사시도이다.
도 7은 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법의 다른 예를 나타낸 블록도이다.
도 8a 내지 도 8e는 본 발명의 제1 실시예에 따른 다른 PRD 공법을 이용한 대구경 천공 방법을 나타낸 도면이다.
도 9a와 도 9b는 본 발명의 제2 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법 시, 가이드부를 나타낸 사시도 및 단면도이다.
도 10a 내지 도 10h는 본 발명의 제2 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법을 나타낸 도면이다.
1A and 1B are a perspective view and a cross-sectional view showing a guide part in the large-diameter drilling method using the PRD method according to the first embodiment of the present invention.
2a to 2c is a perspective view and a cross-sectional view showing a perforation in the large diameter drilling method using the PRD method according to the present invention.
3 is a view showing a device for a large diameter drilling method using the PRD method according to the present invention.
Figure 4 is a block diagram showing a large diameter drilling method using the PRD method according to the present invention.
5A to 5F illustrate a large-diameter drilling method using the PRD method according to the first embodiment of the present invention.
Figure 6 is a perspective view showing a chain rock rod in the large-diameter drilling method using the PRD method according to the present invention.
7 is a block diagram showing another example of a large-diameter drilling method using the PRD method according to the present invention.
8A to 8E are diagrams illustrating a large-diameter drilling method using another PRD method according to the first embodiment of the present invention.
9A and 9B are a perspective view and a cross-sectional view showing a guide part in the large-diameter drilling method using the PRD method according to the second embodiment of the present invention.
10A to 10H are diagrams illustrating a large-diameter drilling method using the PRD method according to the second embodiment of the present invention.

이하, 본 발명의 바람직한 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법을 첨부된 도면에 의거하여 상세히 설명한다.
Hereinafter, a large-diameter drilling method using a PRD method according to a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.

제1 실시예First Embodiment

본 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법은, 강관이 원통형상일 경우를 예로 들어 설명한다. 도 1a와 도 1b는 본 발명의 제1 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법 시, 가이드부를 나타낸 사시도 및 단면도이고, 도 2a 내지 도 2c는 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법 시, 천공부를 나타낸 사시도 및 단면도이며, 도 3은 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법을 위한 장치를 나타낸 도면이다.The large-diameter drilling method using the PRD method according to the present embodiment will be described taking the case where the steel pipe is cylindrical. 1a and 1b is a perspective view and a cross-sectional view showing a guide portion when a large diameter drilling method using a PRD method according to a first embodiment of the present invention, Figures 2a to 2c is a large diameter drilling method using a PRD method according to the present invention , And a perspective view and a cross-sectional view showing a perforation, Figure 3 is a view showing a device for a large diameter drilling method using the PRD method according to the present invention.

도 1 내지 도 3을 참조하면, 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법을 위한 장치(100)는 가이드부(10)와 PRD 공법용 천공부(20)를 포함한다.1 to 3, the apparatus 100 for the large-diameter drilling method using the PRD method according to the present invention includes a guide part 10 and a punching part 20 for the PRD method.

가이드부(10)는 도 1a와 도 1b에 도시된 바와 같이, 외부 케이싱(11), 내부 케이싱(13), 제1 연결부(15), 및 공간부(16)를 포함한다.The guide part 10 includes an outer casing 11, an inner casing 13, a first connection part 15, and a space part 16, as shown in FIGS. 1A and 1B.

외부 케이싱(11)은 원통 형상으로서, 천공 위치에 삽입되고, 천공 크기 이상으로 준비된다. 본 실시예에 따른 천공 장치(100)는 대구경용이므로, 외부 케이싱(11)의 크기는 대구경 천공 크기에 준하는 크기이다. 예컨대, 외부 케이싱(11)의 크기는 2,000Φ 이상이다.The outer casing 11 is cylindrical in shape, is inserted in the punching position, and is prepared to be larger than the punching size. Since the drilling device 100 according to the present embodiment is for a large diameter, the size of the outer casing 11 is a size corresponding to the large diameter drilling size. For example, the size of the outer casing 11 is 2,000 Φ or more.

내부 케이싱(13)은 외부 케이싱(11) 내부에 원통 형상으로 구비된다. 내부 케이싱(13)의 크기는, 외부 케이싱(11) 내벽과 내부 케이싱(13) 외벽 사이의 직선거리가 하기되는 비트(bit; 22)의 지름과 동일하도록 구비된다. 제1 연결부(15)는 외부 케이싱(11)과 내부 케이싱(13) 사이에 구비되되, 내부 케이싱(13)에 용접되어 결합된다. 제1 연결부(15)는 8 개가 구비될 수 있다. The inner casing 13 is provided in a cylindrical shape inside the outer casing 11. The size of the inner casing 13 is provided such that the linear distance between the inner wall of the outer casing 11 and the outer wall of the inner casing 13 is equal to the diameter of the bit 22 to be described below. The first connection part 15 is provided between the outer casing 11 and the inner casing 13, and is welded and coupled to the inner casing 13. Eight first connecting units 15 may be provided.

공간부(16)는 외부 케이싱(11)과 내부 케이싱(13) 사이에서 제1 연결부(15)에 의해 형성되고, 8 개가 형성된다. 각 공간부(16)에는 하기되는 한 쌍의 PRD 공법용 천공부(20)가 맞게 삽입될 수 있다. 본 실시예에서는 연결부(15)와 공간부(16)가 8 개인 것을 예로 들어 설명하지만, 이러한 형태에 한정되는 것은 아니고, 천공 크기에 따라 상이해질 수 있다.The space portions 16 are formed by the first connecting portion 15 between the outer casing 11 and the inner casing 13, and eight are formed. Each of the spaces 16 may be fitted with a pair of perforations 20 for the PRD method described below. In the present embodiment, the connection part 15 and the space part 16 are described using eight as an example.

PRD 공법용 천공부(20)는 도 2a와 도 2b에 도시된 바와 같이, 에어 해머(air hammer; 21), 비트(22), 케이싱(23)을 포함한다. The perforation section 20 for the PRD method includes an air hammer 21, a bit 22, and a casing 23, as shown in FIGS. 2A and 2B.

에어 해머(21)는 회전 및 항타된다. 비트(22)는 에어 해머(21) 하부에 구비되어, 에어 해머(21)의 구동에 따라 회전 및 항타된다. 케이싱(23)은 에어 해머(21) 둘레에 구비된다. The air hammer 21 is rotated and driven. The bit 22 is provided below the air hammer 21, and rotates and drives according to the driving of the air hammer 21. The casing 23 is provided around the air hammer 21.

PRD 공법용 천공부(20)는 도 2a와 도 2b에 도시된 바와 같이, 복수 개, 예컨대 두 개의 천공부(20a, 20b)로 구성될 수 있다. 제1 천공부(20a)는 제1 에어 해머(21a), 제1 비트(22a), 및 제1 케이싱(23a)으로 구성되고, 제2 천공부(20b)는 제2 에어 해머(21b), 제2 비트(22b), 및 제2 케이싱(23b)으로 구성된다. 제1 에어 해머(21a)와 제2 에어 해머(21b)는 회전 방향이 반대이다. 즉, 도 6a에 도시된 바와 같이, 제1 및 제2 에어 해머(21a, 21b)는 서로 바깥을 향하도록 반대 방향으로 회전된다. 이로 인해, 천공이 용이하게 이루어질 수 있다.As shown in FIG. 2A and FIG. 2B, the PRD drilling holes 20 may include a plurality of holes, for example, two drilling parts 20a and 20b. The first drilling portion 20a is composed of a first air hammer 21a, a first bit 22a, and a first casing 23a, and the second drilling portion 20b includes a second air hammer 21b, It consists of the 2nd bit 22b and the 2nd casing 23b. The rotation direction of the 1st air hammer 21a and the 2nd air hammer 21b is opposite. That is, as shown in Fig. 6A, the first and second air hammers 21a and 21b are rotated in opposite directions to face each other outward. Because of this, the perforation can be made easily.

제1 및 제2 천공부(20a, 20b)는 제2 연결부(25)로 연결되는데, 제2 연결부(25)에 의해 제1 및 제2 천공부(20a, 20b)는 일체화되어 사용될 수 있다. PRD 공법용 천공부(20)의 크기는 하나의 크기로 제작되어, 복수 개의 천공부로 구성됨으로써 다양한 대구경 천공 시 사용될 수 있다. 즉, 본 실시예에서는 천공부가 두 개인 것을 예로 들어 설명하지만, 이러한 형태에 한정되는 것은 아니다. 즉, 천공의 크기가 커질수록, 그 크기에 대응되도록 복수 개의 천공부를 준비하고, 이들을 연결부로 연결하여 사용할 수 있다. 예컨대 도 2c에 도시된 바와 같이, 네 개의 천공부를 쌍으로 이루어 사용할 수도 있다.The first and second perforations 20a and 20b are connected to the second connecting portion 25, and the first and second perforations 20a and 20b may be integrally used by the second connecting portion 25. The size of the PRD punching unit 20 is made of one size, it can be used in a variety of large diameter drilling by being composed of a plurality of punching. In other words, in the present embodiment, the description is made with two perforations as an example, but the present invention is not limited thereto. That is, as the size of the perforation increases, a plurality of perforations may be prepared so as to correspond to the size of the perforations, and these may be connected and used as connection parts. For example, as shown in FIG. 2C, four perforations may be used in pairs.

PRD 공법용 천공부(20)는 도 3에 도시된 바와 같이, 크레인(30)에 연결된다. 크레인(30)은 본체와 소정 각도로 기울어짐이 가능한 붐(boom; 35)을 구비하고, 붐(35) 끝단에 고리와 후크를 통해 에어 해머(21)가 연결된다. 붐(35)을 구비한 크레인(30)에 의해, 장비의 진입이 어려운 지형에 천공이 용이한 효과가 있다. 그리고 종래의 장비의 경우, 오거 모터가 회전되지 않고 승강이 가능하도록 리드가 필요한 구조였으나, 본 실시예에서는 리드 없이, 외부 및 내부 케이싱(11, 13) 사이의 공간부(16)로 PRD 공법용 천공부(20)가 삽입되므로 오거 모터가 자체적으로 뒤틀리거나 회전되는 일 없이 천공이 용이한 효과도 있다.The perforation section 20 for the PRD method is connected to the crane 30, as shown in FIG. The crane 30 has a boom 35 which can be inclined at a predetermined angle with the main body, and the air hammer 21 is connected to the end of the boom 35 through a hook and a hook. By the crane 30 with the boom 35, the drilling is easy to the terrain difficult to enter the equipment. In the conventional equipment, although the lid was required to allow the auger motor to move up and down without being rotated, in the present embodiment, the fabric for the PRD method is applied to the space 16 between the outer and inner casings 11 and 13 without the lid. Since the study 20 is inserted, the auger motor itself is easily twisted or rotated without the effect.

이하에서는 본 실시예에 따른 PRD 공법을 이용한 천공 장치(100)를 이용하여 대구경 천공 방법에 대하여 설명한다. 도 4는 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법을 나타낸 블록도이고, 도 5a 내지 도 5f는 본 발명의 제1 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법을 나타낸 도면이다.Hereinafter, a large diameter drilling method will be described using the drilling device 100 using the PRD method according to the present embodiment. 4 is a block diagram showing a large diameter drilling method using the PRD method according to the present invention, Figures 5a to 5f is a view showing a large diameter drilling method using the PRD method according to the first embodiment of the present invention.

먼저, 도 4에 도시된 바와 같이, 가이드부(10)를 압입한다(S1). 그 후에, 가이드부(10)의 공간부(16)에 차례대로 PRD 공법용 천공부(20)를 삽입하여 천공한다(S3). 이러한 과정이 진행되는 도면이 도 5a 내지 도 5c에 도시된다. 도 5a에 도시된 바와 같이, 첫 번째 공간부에 PRD 공법용 천공부(20)를 삽입하여 천공을 수행하고, 차례대로 나머지 공간부에 PRD 공법용 천공부(20)를 삽입하여 천공을 수행한다. First, as shown in FIG. 4, the guide part 10 is press-fitted (S1). After that, the PRD drilling method 20 is inserted into the space portion 16 of the guide portion 10 in sequence and drilled (S3). This process is shown in Figures 5a to 5c. As shown in FIG. 5A, the PRD drilling method 20 is inserted into the first space to perform the drilling, and the PRD drilling method 20 is inserted into the remaining space in order to perform the drilling. .

이어서, 내부 케이싱(13) 및 제1 연결부(15)를 인발한다(S5). 이러한 과정이 진행되는 도면이 도 5d에 도시된다. 즉, 외부 케이싱(11) 내부의 공간부의 천공이 다 이루어진 후, 제1 연결부(15)가 용접으로 결합된 내부 케이싱(13)을 인발한다.Subsequently, the inner casing 13 and the first connecting portion 15 are drawn out (S5). A diagram in which this process is performed is shown in FIG. 5D. That is, after the perforation of the space inside the outer casing 11 is completed, the first connecting portion 15 draws the inner casing 13 joined by welding.

다음으로, 천공된 부분의 잔재물을 에어 펌핑한다(S7). 천공 작업 이후, 천공된 부분으로 잔재물이 투입될 수 있다. 즉, 각 공간부로 이동해가면서 천공 시, 천공 작업으로 인한 잔재물이 천공된 부분으로 투입된다. 따라서, 에어 펌프 등을 이용하여 잔재물을 분출시킨다. 이로 인해, 천공된 부분에 잔재물이 투입되어 천공이 지연되는 문제를 해결할 수 있다.Next, air pump the residue of the perforated portion (S7). After the drilling operation, the residue may be introduced into the drilled portion. That is, while moving to each space portion, when drilling, the residue from the drilling work is put into the perforated portion. Therefore, the residue is ejected using an air pump or the like. As a result, it is possible to solve the problem that the residue is put into the perforated portion and the perforation is delayed.

이어서, 천공된 부분, 예컨대 외부 및 내부 케이싱(11, 13) 사이에 강관(50)을 삽입한다(S9). 즉, 외부 케이싱(11) 내부의 천공이 이루어진 공간부에 강관(50)을 삽입한다. 이러한 과정이 진행되는 도면이 도 5e에 도시된다. 이로 인해, 천공 및 강관(50) 삽입이 완료된다.Subsequently, the steel pipe 50 is inserted between the perforated portions, such as the outer and inner casings 11 and 13 (S9). That is, the steel pipe 50 is inserted into the space portion in which the perforations are made in the outer casing 11. This process is shown in Figure 5e. As a result, the drilling and steel pipe 50 insertion is completed.

다음으로, 외부 케이싱(11) 및 강관(50) 사이에 그라우팅(grouting) 및 시멘트(cement)를 삽입한다(S11). 이러한 과정이 진행되는 상태가 도 5f에 도시된다. 강관(50)이 삽입되면, 외부 케이싱(11)과 강관(50) 사이에 그라우팅 및 시멘트와 같은 충전물을 삽입하여, 원하는 작업을 수행할 수 있다. 여기서, 본 과정은 작업에 따라 수행되지 않을 수도 있다.Next, grouting and cement are inserted between the outer casing 11 and the steel pipe 50 (S11). This process is shown in Figure 5f. When the steel pipe 50 is inserted, a grouting and filler such as cement may be inserted between the outer casing 11 and the steel pipe 50 to perform a desired operation. Here, this process may not be performed according to the work.

한편, 전술한 본 실시예에 따른 PRD 공법을 이용한 천공 장치(100)를 이용하여 대구경 천공 방법의 다른 예로서, PRD 공법을 이용한 천공 장치(100)가 쇄암봉(40)을 더 포함할 수도 있다. 도 6은 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법 시, 쇄암봉을 나타낸 사시도이다.Meanwhile, as another example of the large-diameter drilling method using the drilling device 100 using the PRD method according to the present embodiment described above, the drilling device 100 using the PRD method may further include a chain rock rod 40. . Figure 6 is a perspective view showing a chain rock rod in the large-diameter drilling method using the PRD method according to the present invention.

쇄암(碎巖)봉(40)은 도 6에 도시된 바와 같은 형태이다. 쇄암봉(40)은 크레인(30)에 연결된다. 전술한 PRD 공법용 천공부(20)와 마찬가지로, 크레인(30)의 붐(35) 끝단에 고리와 후크를 통해 쇄암봉(40)이 연결된다. 쇄암봉(40)은 자유 낙하된다. 즉, 쇄암봉(40)은 본 실시예에 따른 대구경 천공 시, PRD 공법용 천공부(20)를 통해 천공 한 뒤, 나머지 부분에 자유 낙하되어 천공을 마무리한다.Chain rock rod 40 is in the form as shown in FIG. The chain arm rod 40 is connected to the crane 30. Like the above-described PRD punching section 20, the chain arm rod 40 is connected to the end of the boom 35 of the crane 30 through the hook and hook. The chain arm rod 40 falls free. That is, the chain arm bar 40 is punched through the PRD drilling method 20 for the large diameter in accordance with the present embodiment, and then free-falls to the remaining part to finish the drilling.

쇄암봉(40)을 사용하여 본 실시예에 따른 PRD 공법을 이용한 천공 장치(100)를 이용한 대구경 천공 방법에 대하여 설명한다. 도 7은 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법의 다른 예를 나타낸 블록도이고, 도 8a 내지 도 8e는 본 발명의 제1 실시예에 따른 다른 PRD 공법을 이용한 대구경 천공 방법을 나타낸 도면이다.The large-diameter drilling method using the drilling device 100 using the PRD method according to the present embodiment using the chain rock rod 40 will be described. 7 is a block diagram showing another example of a large diameter drilling method using the PRD method according to the present invention, Figures 8a to 8e is a view showing a large diameter drilling method using another PRD method according to the first embodiment of the present invention. .

도 7을 참조하면, 전술한 도 4에 도시된 바와 같이, 먼저 가이드부(10)를 압입한다(S101). 그 후에, 가이드부(10)의 공간부(16)에 차례대로 PRD 공법용 천공부(20)를 삽입하여 천공한다(S103).Referring to FIG. 7, as shown in FIG. 4 described above, first, the guide unit 10 is press-fitted (S101). After that, the PRD drilling method 20 is inserted into the space 16 of the guide 10 in order to drill it (S103).

다음으로, 내부 케이싱(13) 내부에 PRD 공법용 천공부(20)를 삽입하여 천공을 수행한다(S105). 이러한 과정이 진행되는 도면이 도 8a에 도시된다. 도 8a에 도시된 바와 같이, 내부 케이싱(13) 내부에서 하부에 먼저 PRD 공법용 천공부(20)를 투입시켜 천공을 수행한 뒤, 상부에 PRD 공법용 천공부(20)로 천공을 수행한다. 그 후에, 내부 케이싱(13)의 나머지 부분에 쇄암봉(40)을 자유 낙하시켜 천공을 수행한다(S107). 이러한 과정이 진행되는 도면이 도 8b에 도시된다. 즉, PRD 공법용 천공부(20)를 통해 천공한 뒤 나머지 부분을 쇄암봉(40)을 여러 번 자유 낙하시켜 천공한다.Next, the PRD drilling method 20 is inserted into the inner casing 13 to perform the drilling (S105). A diagram in which this process is performed is shown in FIG. 8A. As illustrated in FIG. 8A, the PRD drilling method 20 is first inserted into the lower portion of the inner casing 13 to perform the drilling, and then the PRD drilling method 20 is performed on the upper portion. . Thereafter, the chain arm bar 40 falls freely to the remaining portion of the inner casing 13 to perform the drilling (S107). A diagram in which this process is performed is shown in FIG. 8B. That is, after drilling through the PRD drilling hole 20, the remaining portion is drilled by freely falling the chain arm rod 40 several times.

한편, 전술한 S103 과정 이후에, 내부 케이싱(13) 내부에 쇄암봉(40)만을 자유 낙하시켜 천공을 수행할 수도 있다(S117). 이러한 과정이 진행되는 도면이 도 8c에 도시된다. 즉, 내부 케이싱(13) 내부의 천공을 쇄암봉(40)을 여러 번 자유 낙하시켜 천공을 수행할 수도 있다.On the other hand, after the above-described step S103, it is also possible to perform the perforation by freely dropping only the chain arm bar 40 in the inner casing 13 (S117). This process is shown in Figure 8c. That is, the drilling in the inner casing 13 may be performed by freely dropping the chain arm rod 40 several times.

전술한 S105와 S107 과정 또는 S117 과정은 외부 케이싱(11)의 공간부(16)가 이미 천공이 된 상태이므로, 내부 케이싱(13) 내부의 지반은 약해진 상태이다. 따라서, 쇄암봉(40)을 자유 낙하시키는 것으로 내부 케이싱(13) 내부에서 용이하게 천공이 이루어질 수 있다.In the above-described S105 and S107 processes or S117 processes, since the space 16 of the outer casing 11 is already punched, the ground inside the inner casing 13 is weakened. Therefore, the perforation can be easily made inside the inner casing 13 by freely dropping the chain arm rod 40.

이어서, S107 과정 또는 S117 과정 이후에, 내부 케이싱(13) 및 제1 연결부(15)를 인발한다(S109). 이러한 과정이 진행되는 도면이 도 8d에 도시된다. 즉, 외부 케이싱(11) 내부의 천공이 다 이루어진 후, 제1 연결부(15)가 용접으로 결합된 내부 케이싱(13)을 인발한다.Subsequently, after the process S107 or S117, the inner casing 13 and the first connection part 15 are drawn out (S109). A diagram in which this process is performed is shown in FIG. 8D. That is, after the perforation inside the outer casing 11 is completed, the first connecting portion 15 draws the inner casing 13 joined by welding.

다음으로, 천공된 부분의 잔재물을 에어 펌핑한다(S111). 천공 작업 이후, 천공된 부분으로 잔재물이 투입될 수 있으므로, 에어 펌프 등을 이용하여 잔재물을 분출시킨다. 이로 인해, 천공된 부분에 잔재물이 투입되어 천공이 지연되는 문제를 해결할 수 있다.Next, air is pumped out of the residue of the perforated portion (S111). After the drilling operation, the residue may be injected into the perforated portion, and the residue is ejected using an air pump. As a result, it is possible to solve the problem that the residue is put into the perforated portion and the perforation is delayed.

이어서, 외부 및 내부 케이싱(11, 13) 사이에 강관(50)을 삽입한다(S113). 이러한 과정이 진행되는 도면이 도 8e에 도시된다. 즉, 외부 케이싱(11) 내부에 강관(50)을 삽입한다. 이로 인해, 천공 및 강관(50) 삽입이 완료된다. Subsequently, the steel pipe 50 is inserted between the outer and inner casings 11 and 13 (S113). A diagram of this process is shown in Figure 8e. That is, the steel pipe 50 is inserted into the outer casing 11. As a result, the drilling and steel pipe 50 insertion is completed.

다음으로, 외부 케이싱(11) 및 강관(50) 사이에 그라우팅 및 시멘트를 삽입한다(S115). 여기서, 본 과정은 작업에 따라 수행되지 않을 수도 있다.
Next, grouting and cement are inserted between the outer casing 11 and the steel pipe 50 (S115). Here, this process may not be performed according to the work.

제2 실시예Second Embodiment

본 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법은 전술한 제1 실시예에 따른 발명과 유사하지만, 외부 및 내부 케이싱의 형태가 사각통 형태인 것에 특징이 있다. 본 실시예에서 제1 실시예와 유사하거나 동일한 부분에 대한 설명은 생략한다. The large-diameter drilling method using the PRD method according to the present embodiment is similar to the invention according to the first embodiment described above, but is characterized in that the outer and inner casings are in the form of square cylinders. In the present embodiment, description of portions similar or identical to those of the first embodiment will be omitted.

도 2a 내지 도 2c는 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법 시, 천공부를 나타낸 사시도 및 단면도이고, 도 6은 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법 시, 쇄암봉을 나타낸 사시도이며, 도 9a와 도 9b는 본 발명의 제2 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법 시, 가이드부를 나타낸 사시도 및 단면도이다.Figure 2a to 2c is a perspective view and a cross-sectional view showing a perforation in the large-diameter drilling method using the PRD method according to the present invention, Figure 6 is a perspective view showing a chain rock rod in the large-diameter drilling method using the PRD method according to the present invention. 9A and 9B are a perspective view and a cross-sectional view showing a guide part in the large-diameter drilling method using the PRD method according to the second embodiment of the present invention.

가이드부(10')는 도 9a와 도 9b에 도시된 바와 같이, 외부 케이싱(11'), 내부 케이싱(13'), 제1 연결부(15'), 및 공간부(16')를 포함한다. 외부 케이싱(11')은 사각통 형상으로서 천공 위치에 삽입되고, 천공 크기 이상으로 준비된다. 외부 케이싱(11')의 크기는 대구경 천공 크기에 준하는 크기로서, 예컨대, 2,000Φ 이상이다.The guide portion 10 'includes an outer casing 11', an inner casing 13 ', a first connecting portion 15', and a space portion 16 ', as shown in FIGS. 9A and 9B. . The outer casing 11 'is inserted into the puncture position as a rectangular cylinder shape, and is prepared more than the puncture size. The size of the outer casing 11 'is a size corresponding to the large diameter drilling size, for example, 2,000 Φ or more.

내부 케이싱(13')은 외부 케이싱(11') 내부에 사각통 형상으로 구비된다. 내부 케이싱(13')의 크기는, 외부 케이싱(11') 내벽과 내부 케이싱(13') 외벽 사이의 직선거리가 비트(22')의 지름과 동일하도록 구비된다. 제1 연결부(15')는 외부 케이싱(11')과 내부 케이싱(13') 사이에 구비되되, 내부 케이싱(13')에 용접되어 결합된다. 제1 연결부(15')는 8 개가 구비될 수 있다. The inner casing 13 'is provided in a rectangular cylinder shape inside the outer casing 11'. The size of the inner casing 13 'is provided such that the linear distance between the inner wall of the outer casing 11' and the outer wall of the inner casing 13 'is equal to the diameter of the bit 22'. The first connecting portion 15 ′ is provided between the outer casing 11 ′ and the inner casing 13 ′, and is welded to the inner casing 13 ′. Eight first connecting portions 15 ′ may be provided.

공간부(16')는 외부 케이싱(11')과 내부 케이싱(13') 사이에서 제1 연결부(15')에 의해 형성되고, 8 개가 형성된다. 각 공간부(16')에는 하기되는 한 쌍의 PRD 공법용 천공부(20)가 맞게 삽입될 수 있다. 본 실시예에서는 연결부(15')와 공간부(16')가 8 개인 것을 예로 들어 설명하지만, 이러한 형태에 한정되는 것은 아니고, 천공 크기에 따라 상이해질 수 있다.The space portions 16 'are formed by the first connecting portion 15' between the outer casing 11 'and the inner casing 13', and eight are formed. A pair of PRD drilling holes 20 to be described below may be inserted into each space 16 '. In the present embodiment, the connection part 15 ′ and the space part 16 ′ are described as an example, but the present invention is not limited to this form and may vary depending on the size of the drilling.

PRD 공법용 천공부(20)는 전술한 제1 실시예의 도 2a와 도 2b에 도시된 형태와 동일한 형태이다. 한 쌍의 제1 및 제2 천공부(20a, 20b)로 구성되는 PRD 공법용 천공부(20)가 사용된다. 본 실시예에서는 천공부가 두 개인 것을 예로 들어 설명하지만, 이러한 형태에 한정되는 것은 아니다. 즉, 천공의 크기가 커질수록, 그 크기에 대응되도록 복수 개의 천공부를 준비하고, 이들을 연결부로 연결하여 사용할 수 있다.The perforation section 20 for the PRD method has the same shape as that shown in FIGS. 2A and 2B of the above-described first embodiment. A PRD method punching part 20 composed of a pair of first and second punching parts 20a and 20b is used. In the present embodiment, a description is given taking two perforations as an example, but the present invention is not limited thereto. That is, as the size of the perforation increases, a plurality of perforations may be prepared so as to correspond to the size of the perforations, and these may be connected and used as connection parts.

쇄암봉(40)은 전술한 제1 실시예의 도 6에 도시된 형태와 동일한 형태이다. 쇄암봉(40)은 본 실시예에 따른 대구경 천공 시, PRD 공법용 천공부(20)를 통해 천공 한 뒤, 나머지 부분에 자유 낙하되어 천공을 마무리한다. 본 실시예에서는 쇄암봉(40)을 통해 내부 케이싱(13') 내부를 자유 낙하시키는 것을 예로 들어 설명하지만, 전술한 제1 실시예에서와 같이, 내부 케이싱(13') 내부를 천공하지 않을 수도 있다.The chain arm rod 40 has the same shape as that shown in FIG. 6 of the above-described first embodiment. The chain arm rod 40 is punched through the PRD boring part 20 during the large-diameter boring according to the present embodiment, and freely falls to the remaining portion to finish the boring. In the present embodiment, a free fall of the inside of the inner casing 13 'through the chain arm rod 40 is described as an example, but as in the above-described first embodiment, the inner casing 13' may not be perforated. have.

이하에서는 본 실시예에 따른 PRD 공법을 이용한 천공 장치를 이용하여 대구경 천공 방법에 대하여 설명한다. 도 7은 본 발명에 따른 PRD 공법을 이용한 대구경 천공 방법을 나타낸 블록도이고, 도 10a 내지 도 10h는 본 발명의 제2 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법을 나타낸 도면이다.Hereinafter, a large diameter drilling method will be described using a drilling device using the PRD method according to the present embodiment. 7 is a block diagram showing a large diameter drilling method using the PRD method according to the present invention, Figures 10a to 10h is a view showing a large diameter drilling method using the PRD method according to the second embodiment of the present invention.

먼저, 도 7에 도시된 바와 같이, 가이드부(10')를 압입한다(S101). 그 후에, 가이드부(10')의 공간부(16')에 차례대로 PRD 공법용 천공부(20)를 삽입하여 천공한다(S103). 이러한 과정이 진행되는 도면이 도 9a 내지 도 9c에 도시된다. 도 9a에 도시된 바와 같이, 첫 번째 공간부에 PRD 공법용 천공부(20)를 삽입하여 천공을 수행하고, 차례대로 나머지 공간부에 PRD 공법용 천공부(20)를 삽입하여 천공을 수행한다.First, as illustrated in FIG. 7, the guide part 10 ′ is press-fitted (S101). Thereafter, the PRD drilling method 20 is sequentially inserted into the space 16 'of the guide portion 10' and drilled (S103). This process is shown in Figures 9a to 9c. As shown in FIG. 9A, the PRD drilling method 20 is inserted into the first space to perform the drilling, and the PRD drilling method 20 is inserted into the remaining space in order to perform the drilling. .

다음으로, 내부 케이싱(13') 내부에 PRD 공법용 천공부(20)를 삽입하여 천공을 수행한다(S105). 이러한 과정이 진행되는 도면이 도 10d에 도시된다. 도 10d에 도시된 바와 같이, 내부 케이싱(13') 내부에서 하부에 먼저 PRD 공법용 천공부(20)를 투입시켜 천공을 수행한 뒤, 상부에 PRD 공법용 천공부(20)로 천공을 수행한다. 그 후에, 내부 케이싱(13')의 나머지 부분에 쇄암봉(40)을 자유 낙하시켜 천공을 수행한다(S107). 이러한 과정이 진행되는 도면이 도 10e에 도시된다. 즉, PRD 공법용 천공부(20)를 통해 천공한 뒤 나머지 부분을 쇄암봉(40)을 여러 번 자유 낙하시켜 천공한다.Next, the PRD drilling method 20 is inserted into the inner casing 13 ′ to perform the drilling (S105). A diagram in which this process is performed is shown in FIG. 10D. As shown in FIG. 10D, the PRD drilling method 20 is first inserted into the lower portion of the inner casing 13 ′ to perform the drilling, and then the punching operation is performed on the upper part of the PRD drilling method 20. do. Thereafter, the chain arm bar 40 freely falls on the remaining portion of the inner casing 13 ′ to perform drilling (S107). A diagram in which this process is performed is shown in FIG. 10E. That is, after drilling through the PRD drilling hole 20, the remaining portion is drilled by freely falling the chain arm rod 40 several times.

한편, 전술한 S103 과정 이후에, 내부 케이싱(13') 내부에 쇄암봉(40)만을 자유 낙하시켜 천공을 수행할 수도 있다(S117). 이러한 과정이 진행되는 상태가 도 10f에 도시된다. 즉, 내부 케이싱(13') 내부의 천공을 쇄암봉(40)을 여러 번 자유 낙하시켜 천공을 수행할 수도 있다.On the other hand, after the above-described step S103, it is also possible to perform the puncture by freely dropping only the chain arm bar 40 in the inner casing (13 ') (S117). This process is shown in Figure 10f. That is, the drilling in the inner casing 13 ′ may be performed by freely dropping the chain arm rod 40 several times.

전술한 S105와 S107 과정 또는 S117 과정은 외부 케이싱(11')의 공간부(16')가 이미 천공이 된 상태이므로, 내부 케이싱(13') 내부의 지반은 약해진 상태이다. 따라서, 쇄암봉(40)을 자유 낙하시키는 것으로 내부 케이싱(13') 내부에서 용이하게 천공이 이루어질 수 있다.In the above-described steps S105 and S107 or S117, since the space 16 'of the outer casing 11' is already perforated, the ground inside the inner casing 13 'is weakened. Therefore, the perforation can be easily made inside the inner casing 13 ′ by freely dropping the chain arm rod 40.

이어서, S107 과정 또는 S117 과정 이후에, 내부 케이싱(13') 및 제1 연결부(15')를 인발한다(S109). 이러한 과정이 진행되는 상태가 도 10g에 도시된다. 즉, 외부 케이싱(11') 내부의 천공이 다 이루어진 후, 제1 연결부(15')가 용접으로 결합된 내부 케이싱(13')을 인발한다.Subsequently, after the process S107 or S117, the inner casing 13 ′ and the first connection part 15 ′ are drawn out (S109). This process is shown in Figure 10g. That is, after the perforation inside the outer casing 11 'is completed, the first connecting portion 15' draws out the inner casing 13 'joined by welding.

다음으로, 천공된 부분의 잔재물을 에어 펌핑한다(S111). 천공 작업 이후, 천공된 부분으로 잔재물이 투입될 수 있으므로, 에어 펌프 등을 이용하여 잔재물을 분출시킨다. 이로 인해, 천공된 부분에 잔재물이 투입되어 천공이 지연되는 문제를 해결할 수 있다.Next, air is pumped out of the residue of the perforated portion (S111). After the drilling operation, the residue may be injected into the perforated portion, and the residue is ejected using an air pump. As a result, it is possible to solve the problem that the residue is put into the perforated portion and the perforation is delayed.

이어서, 외부 및 내부 케이싱(11', 13') 사이에 강관(50')을 삽입한다(S113). 이러한 과정이 진행되는 도면이 도 10h에 도시된다. 즉, 외부 케이싱(11') 내부에 강관(50')을 삽입한다. 이로 인해, 천공 및 강관(50') 삽입이 완료된다.Subsequently, the steel pipe 50 'is inserted between the outer and inner casings 11' and 13 '(S113). A diagram in which this process is performed is shown in FIG. 10H. That is, the steel pipe 50 'is inserted into the outer casing 11'. This completes the drilling and steel pipe 50 'insertion.

다음으로, 외부 케이싱(11') 및 강관(50') 사이에 그라우팅 및 시멘트를 삽입한다(S115). 여기서, 본 과정은 작업에 따라 수행되지 않을 수도 있다.Next, grouting and cement are inserted between the outer casing 11 'and the steel pipe 50' (S115). Here, this process may not be performed according to the work.

한편, 전술한 바와 같이, 내부 케이싱(13') 내부의 천공이 필요 없는 경우, 전술한 S103 과정을 수행한 후, 바로 S109 과정을 수행할 수 있다. On the other hand, as described above, if the perforation inside the inner casing 13 ′ is not necessary, the process S109 may be performed immediately after the process S103 described above.

한편, 본 실시예에서는 강관의 형상이 원통형 또는 사각통 형상인 것을 예로 들어 설명하였지만, 이러한 형태에 한정되는 것은 아니다. 즉, 작업의 종류와 여건에 따라 다양한 형태의 강관이 삽입될 수 있고, 그에 따라 외부 및 내부 케이싱의 형상도 강관에 대응되는 형태로 변형될 수 있다.On the other hand, in the present embodiment, the shape of the steel pipe is described as an example of a cylindrical or square cylinder shape, but is not limited to this form. That is, various types of steel pipes may be inserted according to the type and condition of the work, and accordingly, the shapes of the outer and inner casings may also be modified into shapes corresponding to the steel pipes.

한편, 본 실시예에 따른 PRD 공법을 이용한 대구경 천공 방법은 전술한 형태에 한정되지 않고, 본 발명의 기술적 중심 사상을 벗어나지 않는 범위 내에서 다양하게 변형 실시될 수 있다. 이는 본원발명이 속하는 기술 분야에 종사하는 자라면 쉽게 알 수 있을 것이다.On the other hand, the large-diameter drilling method using the PRD method according to the present embodiment is not limited to the above-described form, can be variously modified within the scope not departing from the technical spirit of the present invention. It will be readily apparent to those skilled in the art to which the present invention pertains.

100; PRD 공법을 이용한 대구경 천공 장치
10, 10'; 가이드부
11, 11'; 외부 케이싱
13, 13'; 내부 케이싱
15, 15', 25; 연결부
16, 16'; 공간부
20; PRD 공법용 천공부
21; 에어 해머
22; 비트
23; 케이싱
30; 크레인
35; 붐
40; 쇄암봉
50, 50'; 강관
100; Large Diameter Drilling Machine Using PRD Method
10, 10 '; Guide portion
11, 11 '; Outer casing
13, 13 '; Inner casing
15, 15 ', 25; Connection
16, 16 '; Space portion
20; Perforation part for PRD method
21; Air hammer
22; beat
23; Casing
30; crane
35; Boom
40; Seongambong
50, 50 '; Steel pipe

Claims (5)

1,000Φ 이하의 일반적인 천공 시 사용되는 PRD(Percussion Rotary Drill) 공법을 이용한 대구경 천공 방법에 있어서,
천공 크기 이상의 외부 케이싱, 상기 외부 케이싱 내부에 구비되는 내부 케이싱, 상기 내부 케이싱과 결합되어 상기 외부 케이싱 사이에 구비되는 복수 개의 제1 연결부, 및 상기 제1 연결부를 통해 상기 외부 및 내부 케이싱 사이에 형성되는 복수 개의 공간부를 포함하는 가이드부를 천공 위치에 압입하는 과정과;
회전 및 항타되는 에어 해머(hammer), 상기 에어 해머 하부에 구비되는 비트(bit), 및 상기 에어 해머 둘레에 구비되는 케이싱을 포함하는 천공부가 복수 개 짝을 이루는 PRD 공법용 천공부로 상기 가이드부의 외부 케이싱 내벽 곡면을 따라 상기 PRD 공법용 천공부가 삽입되는 크기로 형성된 상기 공간부를 차례로 이동하면서 천공하는 과정과;
상기 내부 케이싱 및 제1 연결부를 인발하는 과정과;
상기 천공된 부분의 잔재물을 에어 펌핑하는 과정과;
상기 천공된 부분에 강관을 압입하는 과정; 및
상기 외부 케이싱 및 강관 사이에 그라우팅(grouting) 및 시멘트(cement)를 주입하는 과정;을 포함하는 것을 특징으로 하는 PRD 공법을 이용한 대구경 천공 방법.
In the large-diameter drilling method using the Percussion Rotary Drill (PRD) method used for general drilling of 1,000 Φ or less,
An outer casing having a puncture size or larger, an inner casing provided inside the outer casing, a plurality of first connecting portions coupled to the inner casing and provided between the outer casings, and formed between the outer and inner casings through the first connecting portions Press-fitting a guide part including a plurality of spaces to be punctured;
The guide portion is a perforation part for the PRD method in which a plurality of perforation parts including an air hammer rotated and driven, a bit provided under the air hammer, and a casing provided around the air hammer Drilling along the inner wall inner surface of the outer casing while moving the space portion formed to have a size for inserting the PRD hole;
Drawing the inner casing and the first connection portion;
Air pumping the residue of the perforated portion;
Pressing a steel pipe into the perforated portion; And
Injecting grouting and cement (cement) between the outer casing and the steel pipe; Large diameter drilling method using a PRD method comprising a.
제1 항에 있어서, 상기 천공 과정 이후에,
상기 내부 케이싱 내부는 상기 PRD 공법용 천공부를 통해 천공한 뒤 나머지 부분을 쇄암(碎巖)봉을 여러 번 자유 낙하시켜 천공하거나, 상기 내부 케이싱 내부 전체에 상기 쇄암봉을 여러 번 자유 낙하시켜 천공하는 과정을 더 포함하는 것을 특징으로 하는 PRD 공법을 이용한 대구경 천공 방법.
The method of claim 1, wherein after the drilling process,
The inner casing is drilled through the PRD perforation part, and then the remaining portion is drilled by freely dropping the chain arm rod several times, or by freely dropping the chain arm rod several times throughout the inner casing. Large diameter drilling method using the PRD method, characterized in that it further comprises a process.
제1 항에 있어서,
상기 에어 해머는 본체와 소정 각도로 기울어짐이 가능한 붐(boom)을 구비하는 크레인의 상기 붐 끝단에 고리와 후크를 통해 연결되는 것을 특징으로 하는 PRD 공법을 이용한 대구경 천공 방법.
The method according to claim 1,
The air hammer is a large-diameter drilling method using a PRD method characterized in that connected to the boom end of the crane having a boom (boom) inclined at a predetermined angle with the main body through a hook and hook.
제2 항에 있어서,
상기 쇄암봉은 본체와 소정 각도로 기울어짐이 가능한 붐을 구비하는 크레인의 상기 붐 끝단에 고리와 후크를 통해 연결되는 것을 특징으로 하는 PRD 공법을 이용한 대구경 천공 방법.
The method of claim 2,
The chain arm rod is a large-diameter drilling method using a PRD method, characterized in that connected via the hook and hook to the boom end of the crane having a boom that can be inclined at a predetermined angle with the main body.
제1 항에 있어서,
상기 PRD 공법용 천공부는 제1 에어 해머, 제1 비트, 제1 케이싱을 포함하는 제1 천공부와, 제2 에어 해머, 제2 비트, 제2 케이싱을 포함하는 제2 천공부로 구성되고,
상기 제1 및 제2 천공부를 일체화하기 위해 상기 제1 및 제2 케이싱을 연결하는 제2 연결부를 더 포함하며,
상기 공간부는 8 개가 형성되는 것을 특징으로 하는 PRD 공법을 이용한 대구경 천공 방법.
The method according to claim 1,
The perforation part for the PRD method includes a first perforation part including a first air hammer, a first bit, and a first casing, and a second perforation part including a second air hammer, a second bit, and a second casing,
Further comprising a second connecting portion connecting the first and second casings to integrate the first and second perforations,
The large-diameter drilling method using the PRD method, characterized in that the eight spaces are formed.
KR1020120004472A 2012-01-13 2012-01-13 Method for widening hole drilling using prd(percussion rotary drill) method KR101313433B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120004472A KR101313433B1 (en) 2012-01-13 2012-01-13 Method for widening hole drilling using prd(percussion rotary drill) method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120004472A KR101313433B1 (en) 2012-01-13 2012-01-13 Method for widening hole drilling using prd(percussion rotary drill) method

Publications (2)

Publication Number Publication Date
KR20130083697A KR20130083697A (en) 2013-07-23
KR101313433B1 true KR101313433B1 (en) 2013-10-01

Family

ID=48994640

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120004472A KR101313433B1 (en) 2012-01-13 2012-01-13 Method for widening hole drilling using prd(percussion rotary drill) method

Country Status (1)

Country Link
KR (1) KR101313433B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763324A (en) * 2015-04-01 2015-07-08 上海强劲地基工程股份有限公司 Large-diameter hole forming construction equipment for core drilling rock entering and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08199958A (en) * 1995-01-31 1996-08-06 Yokoyama Kiso Koji:Kk Shaft excavation method and excavating machine thereof
JP2003253982A (en) 2002-03-04 2003-09-10 Tone Corp Annular excavator
KR100543727B1 (en) 2003-10-27 2006-01-20 한동덕 Ground boring method using double rock excavation
KR20110010288A (en) * 2009-07-24 2011-02-01 김태우 Guide member for down hole method for down hole using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08199958A (en) * 1995-01-31 1996-08-06 Yokoyama Kiso Koji:Kk Shaft excavation method and excavating machine thereof
JP2003253982A (en) 2002-03-04 2003-09-10 Tone Corp Annular excavator
KR100543727B1 (en) 2003-10-27 2006-01-20 한동덕 Ground boring method using double rock excavation
KR20110010288A (en) * 2009-07-24 2011-02-01 김태우 Guide member for down hole method for down hole using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763324A (en) * 2015-04-01 2015-07-08 上海强劲地基工程股份有限公司 Large-diameter hole forming construction equipment for core drilling rock entering and construction method thereof

Also Published As

Publication number Publication date
KR20130083697A (en) 2013-07-23

Similar Documents

Publication Publication Date Title
KR20130094449A (en) Apparatus and method for continuous hole drilling
JP5632981B1 (en) Method for extracting buried pile buried in the ground, and drilling casing structure used therefor
JP2021165468A (en) Construction method of steel pipe pile
KR101808960B1 (en) Sheet pile construction apparatus using multi-axled auger screw
KR20080027481A (en) Ground boring method using multi-point rock boring
KR101313433B1 (en) Method for widening hole drilling using prd(percussion rotary drill) method
JP2007332559A (en) Removal method for existing underground pile
KR101241382B1 (en) Micro pile capable of withdrawing upper cassing and method for constructing foundation using the same
JP6329794B2 (en) Pile extraction method
KR100728103B1 (en) Auger for engineering work underground pile and method for constructing underground pile using it
KR101384840B1 (en) Apparatus for hole drilling using prd(percussion rotary drill) method
KR20140048721A (en) Drilling apparatus
KR101627822B1 (en) Reverse circulation drilling apparatus having a casing
KR102669178B1 (en) Connection apparatus of steel pipe to ring bit, reinforcement apparatus of direct boring and it's installation method
KR100498536B1 (en) Method for costructing anchors under the ground using high pressure grouting
JP2010189952A (en) Existing pile removing device
JP2018119260A (en) Chucking mechanism of pile extractor and pile extraction method
KR20140009950A (en) Apparatus for hole drilling using prd(percussion rotary drill) method
JPH04302693A (en) Excavating engineering method
KR20130083713A (en) Apparatus for hole drilling using prd(percussion rotary drill) method
JP2997402B2 (en) Sheet pile press-in method
JP2924355B2 (en) Construction method of pile body
JP2003003459A (en) Joint grout method
JP3885891B1 (en) Foundation pile construction method
JP2003253982A (en) Annular excavator

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee