KR101286016B1 - Concrete composite wall with inner insulation and frp eccentric wave shear connector and the construction method - Google Patents

Concrete composite wall with inner insulation and frp eccentric wave shear connector and the construction method Download PDF

Info

Publication number
KR101286016B1
KR101286016B1 KR1020110141985A KR20110141985A KR101286016B1 KR 101286016 B1 KR101286016 B1 KR 101286016B1 KR 1020110141985 A KR1020110141985 A KR 1020110141985A KR 20110141985 A KR20110141985 A KR 20110141985A KR 101286016 B1 KR101286016 B1 KR 101286016B1
Authority
KR
South Korea
Prior art keywords
shear connector
formwork
corrugated
wall
concrete
Prior art date
Application number
KR1020110141985A
Other languages
Korean (ko)
Other versions
KR20130074106A (en
Inventor
유영찬
김형도
최기선
김준희
강재식
최경석
김호룡
신지욱
김유민
Original Assignee
한국건설기술연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국건설기술연구원 filed Critical 한국건설기술연구원
Priority to KR1020110141985A priority Critical patent/KR101286016B1/en
Publication of KR20130074106A publication Critical patent/KR20130074106A/en
Application granted granted Critical
Publication of KR101286016B1 publication Critical patent/KR101286016B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • E04B1/80Heat insulating elements slab-shaped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/07Reinforcing elements of material other than metal, e.g. of glass, of plastics, or not exclusively made of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Building Environments (AREA)

Abstract

건축물의 중단열벽체를 내측거푸집(유로폼), 외측거푸집(갱폼) 및 폼타이를 이용하여 시공하되, 특히 열교현상을 효과적으로 방지할 수 있는 폼타이를 이용하면서도, 단열재의 변형을 최소화할 수 있도록 함으로서 폼타이 설치개수를 최소화하여 보다 경제적이고 효율적인 현장 중단열벽체 및 시공방법 제공하기 위한 것으로서 편심 파형 FRP 전단연결재와 지지대를 이용하여 폼타이 설치개수를 최소화 하면서도 단열재의 변형을 구속시켜 줄 수 있도록 하게 된다.Construct the suspended heat wall of the building by using the inner form (Eurofoam), the outer form (Gang form) and the form tie, and in particular, by using the form tie which can effectively prevent the thermal bridge phenomenon, it is possible to minimize the deformation of the insulation material. It is to provide more economical and efficient site-breaking heat wall and construction method by minimizing the number of form tie installation, and to minimize the number of form tie installation by using eccentric corrugated FRP shear connector and support, it is possible to restrain deformation of insulation. .

Description

편심 파형 에프알피 전단연결재를 이용한 현장 중단열벽체 및 그 시공방법{CONCRETE COMPOSITE WALL WITH INNER INSULATION AND FRP ECCENTRIC WAVE SHEAR CONNECTOR AND THE CONSTRUCTION METHOD}FIELD CONCEPT WALL WITH INNER INSULATION AND FRP ECCENTRIC WAVE SHEAR CONNECTOR AND THE CONSTRUCTION METHOD}

본 발명은 편심 파형 에프알피 전단연결재를 이용한 현장 중단열벽체 및 그 시공방법에 관한 것이다. 더욱 구체적으로 단열재를 현장에 세팅된 외측거푸집(갱폼)과 내측거푸집(유로폼) 사이에 설치하고, 단열재에 편심 파형 에프알피 전단연결재가 배치되도록 한 후 내측거푸집과 외측거푸집 사이에 콘크리트를 타설하여 벽체를 시공하는 현장 중단열벽체 및 그 시공방법에 관한 것이다.The present invention relates to a site interrupted heat wall using an eccentric corrugated FRP shear connector and a construction method thereof. More specifically, the insulation is installed between the outer formwork (gang foam) and the inner formwork (eurofoam) set in the field, the eccentric corrugated FRP shear connector is placed on the insulation and then the concrete is poured between the inner formwork and the outer formwork. It relates to an on-site suspended thermal wall for construction and its construction method.

기존의 콘크리트벽체 구조에서는 예컨대 도 1a와 같이 건물의 외측벽체(40)의 내측에 단열재(10)를 설치하는 내단열(內斷熱) 구조를 채택하고 있어, 바닥 난방(20)이 주종을 이루고 있는 우리나라의 공동주택에서는 특히 바닥슬래브(30)를 통하여 외측벽체(40)로 유출되는 난방 에너지의 손실이 문제점으로 지적되고 있다.In the existing concrete wall structure, for example, as shown in Figure 1a adopts a heat-insulating structure that installs the heat insulator 10 inside the outer wall 40 of the building, the floor heating 20 is the dominant In the multi-family house in Korea, the loss of heating energy flowing out to the outer wall 40 through the floor slab 30 is pointed out as a problem.

이에 지구온난화 방지를 목적으로 범국가적으로 추진되고 있는 제로에너지ㆍ제로카본 빌딩구조물 구현을 위한 요소기술의 하나인 외단열(外斷熱) 구조는 도 1b와 같이 바닥슬래브(30)를 통하여 외측벽체(40)까지 전달된 난방에너지가 상기 외측벽체(40)의 외측에 설치된 단열재(10)에 의해 차단되므로 높은 에너지 절감효과를 기대할 수 있도록 하는 구조이다.The external heat insulation structure, which is one of the element technologies for realizing the zero energy / zero carbon building structure which is being promoted by the whole country for the purpose of preventing global warming, is formed by the outer slab (30) The heating energy transferred to the outer wall 40 is blocked by the heat insulating material 10 provided outside the outer wall 40, so that a high energy saving effect can be expected.

하지만, 이와 같은 외단열 구조의 경우 단열재(10)를 외측벽체의 외측에 설치하기 위해서는 외부작업을 위한 비계설치, 보호마감재(50) 추가시공 등의 시공 상의 어려움 및 외기환경에 노출된 단열재의 내구성 측면에서의 문제점으로 인하여 아직까지 본격적인 실용화 단계에는 이르지 못하고 있다.However, in the case of such an external heat insulating structure, in order to install the heat insulating material 10 on the outer side of the outer wall, it is difficult to install the scaffolding for external work, the additional construction of the protective finishing material 50 and the durability It has not yet reached the stage of commercialization in earnest.

이와 같은 내단열구조의 단점과 외단열구조의 장ㆍ단점을 선택적으로 취합하기 위하여 도 1c와 같이 콘크리트벽체(A,B)의 중간에 단열재(10)를 삽입하는 소위 중단열(中斷熱) 구조의 벽체에 대한 개념이 소개된 바 있다.In order to selectively combine the disadvantages of such a heat-insulating structure and the advantages and disadvantages of the external heat-insulating structure, a so-called interrupted heat structure in which the heat insulating material 10 is inserted in the middle of the concrete walls A and B, The concept of the walls of the walls has been introduced.

말하자면 단열재를 콘크리트벽체 사이에 형성시킨 샌드위치 패널 형태의 벽체들을 외측벽체로써 부착 시공하는 방식을 따른 것이다.In other words, the sandwich panel-type walls in which the insulation is formed between the concrete walls are attached to the outer wall.

도 1d 및 도 1e는 종래 중단열 콘크리트벽체를 갱폼(2)과 유로폼(1)을 이용하여 시공하는 예를 사시도와 단면도로 도시한 것이다.1D and 1E show a perspective view and a cross-sectional view of an example of constructing a conventional interrupted heat concrete wall using the gang form 2 and the flow path 1.

이를 구체적으로 살펴보면, 유로폼(1, 콘크리트벽체용 내측거푸집)은 철재(강재)를 소재로 하여 일정규격으로 제작된 패널 형태의 부재이고, 상기 갱폼(2,콘크리트벽체용 외측거푸집)은 일정 두께를 갖는 평철판(21)과 그 일면에는 각파이프로 된 복수개의 가로바(22)가 일정간격을 유지한 채 각기 하나씩 한줄로 용접되어 있으며, 또한 여러 줄 형성된 가로바(22)에는 두개가 서로 인접한 상태로 한쌍을 이루는 세로바(21)들이 일정간격을 두고 여러 쌍이 용접되어 있다.Specifically, the Euroform (1, the inner formwork for the concrete wall) is a member of the panel form made of steel (steel) material to a certain standard, the gangform (2, the outer formwork for the concrete wall) has a certain thickness A flat iron plate 21 and a plurality of horizontal bars 22 made of square pipes are welded one by one with maintaining a constant interval, and two horizontal bars 22 adjacent to each other are formed adjacent to each other. The pair of vertical bars 21 in a state are welded in pairs at regular intervals.

그리고 상기 갱폼(2)의 평철판(21)에는 도 1e와 같이 다수의 삽입공(24)이 뚫어져 있는데, 상기한 각 삽입공(24)들은 한쌍을 이루고 있는 두개의 세로바(23)들 사이에 위치하도록 형성되어 있으며, 상기한 다수의 삽입공(24)들에는 갱폼지지콘(25)이 각기 하나씩 조립되어 있다.In addition, a plurality of insertion holes 24 are drilled in the flat iron plate 21 of the gangform 2 as shown in FIG. 1E, and each of the insertion holes 24 is formed between a pair of two vertical bars 23. Is formed to be located, the gang foam support cones 25 are assembled to each of the plurality of insertion holes 24, one by one.

상기 유로폼(1)과 갱폼(2)은 체결장치에 의하여 일정간격으로 설치되는데, 상기 체결장치는, 유로폼(1)에 일단이 고정된 채 갱폼(2)을 지지하는 간격유지구(3)와, 상기 갱폼(2)에 용접되어 있는 한쌍의 세로바(23) 사이를 통해 삽입공(24)에 조립된 갱폼지지콘(25)을 관통하여 간격유지구(3)의 연결너트체(31)에 나사결합되는 나사부(41)가 형성된 체결구(4)와, 상기 체결구(4)의 타단에 형성된 채 세로바(23)의 외측으로 돌출되는 평판체결부(42)의 조립공(43)에 끼움되는 체결용 웨지핀(5)으로 구성되어 있다.The flow path (1) and the gang form (2) is installed at a predetermined interval by the fastening device, the fastening device, and the interval holding hole (3) for supporting the gang form (2) with one end fixed to the flow path (1) The connection nut body 31 of the spacing holder 3 passes through the gang form support cone 25 assembled in the insertion hole 24 through a pair of longitudinal bars 23 welded to the gang form 2. A fastener 4 having a threaded portion 41 screwed thereon and an assembly hole 43 of a flat plate fastening portion 42 protruding outward of the vertical bar 23 while being formed at the other end of the fastener 4. Consists of a fastening wedge pin (5) to be fitted.

이때 상기 갱폼(2)과는 분리된 채 독립적으로 형성되어 갱폼(2)의 외측에서 간격유지구(3)에 나사결합되는 체결구(4)의 평판체결부(42)를 수용하도록 조립설치되는 체결용 지지부재(6)가 설치된다.At this time, the assembly is formed so as to receive the flat plate fastening portion 42 of the fastener (4) which is formed independently of the gang form (2) and is screwed to the spacing holder (3) on the outside of the gang form (2) The fastening support member 6 is installed.

상기 체결용 지지부재(6)는 철판을 소재로 하여 제작되는 것이며, 한쌍으로 된 두개의 세로바(23)를 동시에 지지할 수 있는 크기로 된 지지부(61)와, 상기 지지부(61)의 중심측에서 일측(도면상 갱폼의 반대측)을 향해 돌출되는 돌출보강부(62) 및 상기 돌출보강부(62)의 중심에 체결구(4)의 타단에 형성된 평판체결부(42)가 끼워질 수 있도록 일자형으로 형성된 관통공이 형성된 구조로 되어 있으며,The fastening supporting member 6 is made of a steel plate and has a supporting portion 61 sized to support two pairs of vertical bars 23 at the same time, A protruding reinforcing portion 62 protruding toward one side (opposite side of the gang) in the side of the protruding reinforcing portion 62 and a flat plate fastening portion 42 formed at the other end of the fastening tool 4 can be fitted in the center of the protruding reinforcing portion 62 A through hole formed in a straight shape is formed so that the through hole is formed,

이와 같은 체결용 지지부재(6)는 그 관통공을 통해 체결구(4)의 평판체결부(42)가 관통하여 돌출보강부(62)의 외측으로 돌출되게 한 상태에서 평판체결부(42)에 형성된 조립공(43)으로 체결용 웨지핀(5)을 끼워주게 되면 체결용 웨지핀(5)의 일면(도면상 좌측으로서 체결용 지지부재의 반대측)은 조립공(43)의 끝단에 지지되고 타면은 돌출보강부(62)에 밀착 지지되므로서 상기 체결용 웨지핀(5)은 체결구(4)에 결속된 상태에서 체결용 지지부재(6)가 두줄의 세로바(23)를 동시에 밀어주는 작용으로 갱폼(2)을 지지하게 되는 것이다.The fastening support member 6 is fastened to the flat plate fastening portion 42 in such a state that the plate fastening portion 42 of the fastening hole 4 penetrates through the through hole and protrudes to the outside of the projecting reinforcing portion 62. [ One side of the fastening wedge pin 5 (the opposite side of the fastening support member as the left side in the drawing) is supported at the end of the assembly hole 43 when the fastening wedge pin 5 is fitted into the assembly hole 43 formed in the other side The wedge pin 5 for fastening is fastened to the fastener 4 so that the fastening supporting member 6 pushes the two vertical bars 23 simultaneously Thereby supporting the gang foam 2.

이에 상기 갱폼과 유로폼를 이용하여 중단열벽체를 시공하기 위해서는 갱폼과 유로폼 사이에 단열재(10, 이점쇄선으로 표시)를 설치하고, 콘크리트(C, 일점쇄선으로 표시)를 타설하여 콘크리트가 양생되어 내측 및 외측 콘크리트벽체(A,B)가 완성되면 상기 체결용 지지부재(6)를 결속하고 있는 체결용 웨지핀(5)의 하단부를 망치 등으로 타격하여 조립공(43)에서 빼내게 된다.Accordingly, in order to construct a suspended heat wall using the gangform and the euroform, an insulating material (10, indicated by a dashed line) is installed between the gangform and the euroform, and concrete is cured by pouring concrete (C, indicated by a single-dotted line) so that the concrete is cured. When the outer concrete walls (A, B) is completed, the lower end of the fastening wedge pin (5) binding the fastening support member (6) is hammered out of the assembly hole (43).

이에 체결용 지지부재(6)가 세로바(23)에서 자연적으로 떨어지게 되므로서 체결용 지지부재(6)의 수거가 용이하며, 또한 체결용 지지부재(6)를 분리한 상태에서 체결구(4)를 나사풀림하게 되어 체결구(4)의 해체작업이 이루어지게 된다.Accordingly, the fastening support member 6 is naturally separated from the vertical bar 23, so that the fastening support member 6 can be easily collected, and the fastener 4 can be removed while the fastening support member 6 is separated. ) To loosen the screw and the dismantling operation of the fastener (4) is made.

이때, 간격유지구(3)는 유로폼(1)에 연결된 부위를 역시 망치등으로 타격하여 머리부(3a)가 커팅되면서 유로폼(1)과 함께 해체하게 된다. 이에 머리부(3a)가 제거된 간격유지구(3)는 콘크리트와 단열재에 매립됨을 알 수 있다.At this time, the gap maintaining tool 3 is blown by a hammer or the like at a portion connected to the Euroform 1, so that the head 3a is cut and disassembled together with the Euroform 1. Therefore, it can be seen that the gap retaining region 3 from which the head 3a is removed is embedded in concrete and heat insulating material.

이때, 도 1e와 같이 상기 단열재(10)와 양 콘크리트벽체(A,B)와의 일체성을 확보하기 위하여 강재(철근)인 쉐어커넥터(70, 전단연결재)를 사용하게 되는데 이럴 경우 쉐어 커넥터(70)를 통한 에너지 손실 즉, 열교 현상(heat bridge)이 발생한다는 문제점이 있었다.At this time, as shown in FIG. 1e, in order to secure the integrity of the heat insulating material 10 and both concrete walls A and B, a shear connector 70 (shear connector), which is steel (rebar), is used. There is a problem in that energy loss, that is, a heat bridge occurs through).

즉, 양 양 콘크리트벽체(A,B)를 접합하도록 설치된 쉐어 커넥터는 열교 현상에 의하여 난방 에너지 손실방지를 목적으로 제안된 중단열 구조의 벽체가 가지는 장점을 반감시키는 원인으로 작용한다는 문제점이 있었다.That is, the share connector installed to join both concrete walls (A, B) has a problem that acts as a cause of halving the advantages of the wall of the heat-recessed structure proposed for the purpose of preventing the loss of heating energy by thermal bridge phenomenon.

또한 종래 갱폼과 유로폼을 이용하여 콘크리트벽체를 시공함에 있어 도 1f와 같이 갱폼지지콘(25)과 연결너트체(31)를 사용하지 않고 간격유지구(3)와 체결구(4)를 서로 나사연결부(24)를 통해 서로 연결시키는 예도 있으나 단열재(10)에 형성되어 있는 쉐어커넥터(70)에 의한 열교현상이 발생하는 문제는 여전히 남을 수밖에 없었다.In addition, when constructing a concrete wall using a conventional gangform and euroform, as shown in FIG. 1F, the gap retaining holes 3 and the fasteners 4 are screwed together without using the gangform support cone 25 and the connecting nut body 31. Although there is an example of connecting to each other through the connecting portion 24, the problem that the thermal bridge phenomenon caused by the shear connector 70 formed in the heat insulating material 10 was still inevitable.

이러한 간격유지구(3)와 체결구(4)는 통상 폼타이라고도 지칭하기도 한다.The spacing 3 and the fastener 4 are also commonly referred to as formta.

나아가 상기 단열재(10)는 다수의 단열재를 서로 일렬로 접착제로 서로 연결하여 설치하는 것이 일반적인데, 유로폼(1)과 갱폼(2) 사이에 콘크리트(C)를 타설할 때 콘크리트 타설압이 단열재(10)에 작용할 수밖에 없게 된다.Further, the heat insulator 10 is generally installed by connecting a plurality of heat insulators in a line with each other with an adhesive, when the concrete (C) is poured between the euroform (1) and the gangform (2) is the heat insulating material ( 10) will be forced to act.

이러한 타설압은 유로폼(1)과 갱폼(2)의 하부에서 가장 크게 발생하게 되므로 이러한 단열재가 변형을 발생하지 않도록 상기 폼-타이는 유로폼(1)과 갱폼(2)에 수직 및 수평방향으로 다수를 서로 이격시켜 설치하게 되며 특히 유로폼(1)과 갱폼(2)의 하부쪽에 집중 설치하여 콘크리트 타설압에 의하여 단열재(10)의 변형을 최대한 구속시키게 된다.Since the pour pressure is most generated in the lower portion of the flow path (1) and the gangform (2), so that the heat-insulating material does not cause deformation, the foam-tie is a plurality of vertical and horizontal directions to the flow path (1) and the gangform (2) It is installed spaced apart from each other and in particular concentrated on the lower side of the flow path (1) and the gang form (2) to restrain the deformation of the heat insulating material (10) by concrete pouring pressure.

하지만 유로폼(1)과 갱폼(2)의 크기는 높이가 3m에 이르다 보니 단열재(10)의 이음부(맞춤 이음부)의 변형이 크게 발생할 수밖에 없고, 폼타이를 설치한 부위에서도 약간의 변형이 발생하게 된다.However, since the size of the Euroform (1) and the gangform (2) reaches a height of 3m, the deformation of the joints (fitting joints) of the heat insulator 10 is largely caused, and there is a slight deformation even at the site where the form tie is installed. Will occur.

이러한 단열재의 변형은 중단열벽체의 단열효율을 떨어뜨릴 수밖에 없으므로 이러한 콘크리트 타설압에 의한 변형을 방지하기 위해서는 폼타이의 설치개수를 증가시킬 수 밖에 없다.Since the deformation of the heat insulator will inevitably reduce the heat insulation efficiency of the suspended heat wall, it is inevitable to increase the number of installation of the form tie to prevent the deformation caused by the concrete placing pressure.

하지만 폼타이를 많이 설치하게 되면 갱폼, 유로폼 설치의 지연에 따른 시공성 및 경제성이 떨어질 수밖에 없는 문제점이 발생하게 된다.However, if a lot of form ties are installed, there is a problem that the construction and economical efficiency due to the delay of the installation of the gangform, Euroform will be reduced.

이에 본 발명은 건축물의 중단열벽체를 내측거푸집(유로폼), 외측거푸집(갱폼) 및 폼타이를 이용하여 시공하되, 특히 열교현상을 효과적으로 방지할 수 있는 폼타이를 이용하면서도, 단열재의 변형을 최소화할 수 있도록 함으로서 폼타이 설치개수를 최소화하여 보다 경제적이고 효율적인 현장 중단열벽체 및 시공방법 제공을 그 해결하고자 하는 과제로 한다.Accordingly, the present invention is to construct the suspended heat wall of the building using the inner form (euro foam), the outer form (gang form) and the form tie, while in particular using a form tie that can effectively prevent thermal bridge phenomenon, while minimizing the deformation of the insulation material By minimizing the number of form tie installations, it is a task to solve the problem of providing a more economical and efficient on-site thermal wall and construction method.

중단열벽체는 기본적으로 콘크리트벽체 사이에 단열재를 설치하게 되며 단열재에는 양 콘크리트벽체를 서로 일체화시켜 주기 위한 전단연결재(도 1e 및 도 1f의 쉐어커넥터)가 설치되어야 한다.The interrupted heat wall is basically to install the insulation between the concrete wall and the heat insulating material should be provided with a shear connector (share connector of Fig. 1e and 1f) for integrating both concrete walls.

이에 본 발명은 Accordingly,

중단열 구조의 벽체에 있어서 콘크리트벽체로 전달되는 열전달 현상을 최소화하기 위하여 상기 양 콘크리트벽체를 연결하는 전단연결재는 FRP 전단연결재로 제작되도록 하였다.In order to minimize the heat transfer phenomenon to the concrete wall in the wall of the heat dissipation structure, the shear connector connecting the two concrete walls were made of FRP shear connector.

특히 FRP 전단연결재의 열전도율은 중단열 구조의 벽체에 사용되는 강재로 제작되는 전단연결재의 열전도율 보다 약 2/1000~1/100배 작기 때문에 기존의 콘크리트벽체에서 문제점으로 지적되었던 에너지 손실(열교 현상)을 최소화할 수 있는 장점이 있다.In particular, the thermal conductivity of FRP shear connector is about 2/1000 ~ 1/100 times smaller than the thermal conductivity of shear connector made of steel used in the wall of the heat dissipation structure. There is an advantage that can be minimized.

또한 FRP 전단연결재는 그 자체로써도 강재와 동등 이상의 인장강도를 지니고 있어, 내/외측 콘크리트벽체의 합성거동에 필요한 충분한 기계적 강도를 발휘할 수 있으며, 이에 따라 기존의 콘크리트벽체와 비교하여 대폭 향상된 단열성능을 유지하면서 동등한 휨 강도를 발현할 수 있게 된다.In addition, the FRP shear connector itself has tensile strength equivalent to or higher than that of steel, so that it can exhibit sufficient mechanical strength necessary for the composite behavior of the inner and outer concrete walls, thereby significantly improving the insulation performance compared to the existing concrete walls. Equal flexural strength can be expressed while maintaining.

둘째, 이러한 FRP 전단연결재는 일측 벽체 내부로부터 단열재를 지나 타측 벽체 내부에 걸쳐지도록 하여 양 벽체가 구조적으로 일체로 거동되도록 함으로써, 기존의 비 합성형 콘크리트벽체와 비교하면 동등한 단열성능을 유지하면서도 상기 FRP 전단연결재에 의한 증가된 모멘트 팔길이로 인하여 휨 모멘트 저항성능을 50%~70% 이상 증가시킬 수 있어 보다 향상된 휨 강성을 구비하도록 하였다.Second, the FRP shear connector is such that the two walls are structurally integrated by passing from the inside of one wall to the inside of the other wall through the heat insulating material, thereby maintaining the same heat insulation performance as compared to the existing non-synthetic concrete walls. Due to the increased moment arm length due to the shear connector, the flexural moment resistance can be increased by more than 50% ~ 70%.

셋째, 상기 FRP 전단연결재는 파(Wave)형으로 형성시켜 전단연결재의 휨강성 증진을 통한 콘크리트벽체의 휨 강성이 보다 향상되도록 하였으며 이러한 파형 FRP 전단연결재는 두께 5.0mm의 폭을 가진 스트립 형태로 형성된 것을 이용하되 이러한 파형 FRP 전단연결재는 형틀을 이용하여 파형으로 제작한 후, 필요한 만큼 절단하여 사용하도록 함으로서 제작도 용이하고 및 사용이 용이하도록 하게 된다.Third, the FRP shear connector was formed in a wave shape to improve the flexural rigidity of the concrete wall by enhancing the bending stiffness of the shear connector. The corrugated FRP shear connector was formed in a strip shape having a width of 5.0 mm in thickness. But using such a wave form FRP shear connector is made into a waveform using a template, and then cut to use as necessary to make it easy and easy to use.

넷째, 상기 파형 FRP 전단연결재는 전단이 단열재를 지나 외측거푸집(갱폼)까지 배면까지 접하도록 연장되어 단열재를 기준으로 외측으로 편심을 가지도록 배치시켜 외측거푸집(갱폼)에 지지되도록 설치된 편심 파형 FRP 전단연결재에 의하여 단열재의 변형을 구속할 수 있도록 하였다.Fourth, the corrugated FRP shear connector is an eccentric corrugated FRP shear installed to support the outer form (gangform) is arranged so that the front end is eccentrically outward based on the insulation to extend to contact the back through the insulation to the outer form (gangform) It is possible to restrain the deformation of the insulation by the connecting material.

이로서 상기 편심 파형 FRP 전단연결재가 단열재와 외측거푸집(갱폼) 사이에 설치되는 폼타이 역할을 함으로서 폼타이 설치개수를 최소화 할 수 있게 된다.As a result, the eccentric corrugated FRP shear connector serves as a form tie installed between the insulation and the outer formwork (gang form), thereby minimizing the number of form tie installations.

다섯째, 앞서 살펴본 것과 같이 폼타이를 다수 설치하게 되면 이를 설치하기 위한 공종이 복잡해지고 시공성이 떨어지게 된다. 이에 단열재의 이음부와 외측거푸집(갱폼) 사이에 지지대를 추가 설치하여 단열재가 콘크리트 타설압에 의하여 변형이 구속되도록 하였다.Fifth, as described above, if a large number of form ties are installed, the work for installing them is complicated and the construction is inferior. The support is further installed between the joint of the insulation and the outer formwork (gang form) so that the insulation is constrained by concrete pouring pressure.

본 발명에 의한 현장 중단열벽체에 사용되는 전단연결재는 일측 콘크리트벽체 내부로부터 단열재를 관통하여 타측 콘크리트벽체 내부에 걸쳐지도록 배치되도록 하여 양 콘크리트벽체가 구조적으로 일체로 거동(합성형 콘크리트벽체)되도록 함으로써, 기존의 비 합성형 콘크리트벽체와 비교하면 전단연결재에 의하여 증가된 모멘트 팔 길이로 인하여 휨 모멘트 저항성능을 50%~70% 이상 증가시킬 수 있어 보다 향상된 휨 강도 및 강성을 구비하게 된다.The shear connector used in the site suspended heat wall according to the present invention is disposed so as to pass through the heat insulating material from the inside of one concrete wall to be spread over the other concrete wall so that both concrete walls behave structurally integrally (synthetic concrete wall). Compared with the existing non-synthetic concrete walls, the bending moment resistance can be increased by more than 50% ~ 70% due to the increased moment arm length by the shear connector, which provides more improved bending strength and rigidity.

또한 상기 전단연결재는 FRP 재질로 제작된 것이 이용되므로 중단열벽체에 있어서 열교현상을 보다 확실하게 방지할 수 있게 된다.In addition, since the shear connector is made of a FRP material is used it is possible to more surely prevent the thermal bridge phenomenon in the suspended heat wall.

또한 상기 전단연결재는 파형으로 형성되도록 함으로서 큰 자체 강도와 배치형태에 의하여 벽체들을 서로 완전히 합성시켜 합성형 콘크리트벽체의 기계적 강도의 증진 및 휨 강성의 증진에 매우 효과적이게 된다.In addition, the shear connecting material is formed to be corrugated, thereby fully synthesizing the walls with each other by a large self-strength and arrangement form, which is very effective in enhancing mechanical strength and flexural rigidity of the composite concrete wall.

또한, 파형 FRP 전단연결재는 형틀에서 미리 파형으로 연속으로 형성된 것을 절단하여 사용함으로서 보다 경제적인 제작 및 효율적인 사용이 가능하게 된다.In addition, the corrugated FRP shear connector is made by cutting a continuous wave form in the form in advance in the mold to enable more economical manufacturing and efficient use.

또한, 상기 파형 FRP 전단연결재는 외측거푸집(갱폼)의 배면과 접하도록 편심 배치함으로서 파형 FRP 전단연결재가 단열재를 외측거푸집(갱폼) 사이에서 지지해주도록 함으로서 콘크리트 타설압에 의한 단열재의 변형을 효과적으로 구속시켜 줄 수 있도록 하였다.In addition, the corrugated FRP shear connector is eccentrically disposed so as to contact the back of the outer formwork (gangform) by the corrugated FRP shear connector to support the insulation between the outer formwork (gangform) to effectively restrain the deformation of the insulation material by the concrete pour pressure. To make it work.

또한, 단열재 이음부에 지지대를 추가 설치함으로서 상기 파형 FRP 전단연결재와 함께 단열재를 외측거푸집(갱폼) 사이에서 추가 지지해주도록 함으로서 콘크리트 타설압에 의한 단열재의 변형을 더더욱 구속시켜 줄 수 있도록 하여 폼타이 설치개수를 최소화할 수 있도록 하였다.In addition, by installing a support on the joint portion of the insulation to further support the insulation between the outer formwork (gang foam) together with the corrugated FRP shear connector to further restrict the deformation of the insulation by the concrete pouring pressure to form a tie The number of installations can be minimized.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허 청구범위에 의하여 나타내어지며, 특허 청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is shown by the following claims rather than the detailed description, and all changes or modifications derived from the meaning and scope of the claims and their equivalents should be construed as being included in the scope of the present invention. do.

도 1a는 종래 바닥 난방 구조에 있어서, 내단열 구조의 난방 에너지 손실의 개념도,
도 1b는 종래 바닥 난방 구조에 있어서, 외단열 구조에 의한 난방 에너지 손실방지의 개념도,
도 1c는 종래 바닥 난방 구조에 있어서, 중단열 구조에 의한 난방 에너지 손실방지의 개념도,
도 1d, 도 1e 및 도 1f는 종래 갱폼과 유로폼의 조립사시도 및 이를 이용한 콘크리트벽체 시공단면도,
도 2는 본 발명의 편심 파형 FRP 전단연결재의 제작 구성도 및 배치정면도,
도 3은 본 발명의 중단열벽체의 단면도 및 조립사시도,
도 4a는 본 발명의 단열재 결합 및 연결 사시도,
도 4b는 종래 폼타이 설치 구성도,
도 5는 본 발명의 단열재 설치사시도,
도 6은 본 발명의 폼타이 및 지지대 설치 구성도,
도 7은 본 발명의 중단열벽체 시공순서도이다.
FIG. 1A is a conceptual diagram of a heating energy loss of a heat insulating structure in a conventional floor heating structure,
Fig. 1B is a conceptual view of prevention of heating energy loss due to an external heat insulating structure in a conventional floor heating structure,
Fig. 1C is a conceptual view of a conventional floor heating structure for preventing heating energy loss due to an intermediate heat structure,
Figure 1d, 1e and 1f is a perspective view of the assembly of the conventional gangform and the flow path and concrete wall construction cross-sectional view using the same,
Figure 2 is a manufacturing configuration and layout front view of the eccentric corrugated FRP shear connector of the present invention,
3 is a cross-sectional view and an assembled perspective view of the interruption heat wall of the present invention,
Figure 4a is a perspective view of the coupling and connection of the heat insulating material of the present invention,
Figure 4b is a conventional form tie installation configuration,
5 is a perspective view of the heat insulator installation of the present invention,
Figure 6 is a form tie and support mounting configuration of the present invention,
7 is a flowchart illustrating a construction of the intermediate heat wall of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.DETAILED DESCRIPTION Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art may easily implement the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In the drawings, parts irrelevant to the description are omitted in order to clearly describe the present invention, and like reference numerals designate like parts throughout the specification.

<편심 파형 FRP 전단연결재(120)><Eccentric Waveform FRP Shear Connector (120)>

본 발명에 사용되는 편심 파형 FRP 전단연결재(120)를 도 2를 기준으로 살펴보면 다음과 같다.Looking at the eccentric waveform FRP shear connector 120 used in the present invention with reference to FIG.

먼저 본 발명에 사용되는 전단연결재는 도 2와 같이 길이방향으로 삼각 또는 사다리꼴 형태를 포함하는 절곡부(B)가 연속 또는 서로 이격되어 형성된 스트립(STRIP, 소정의 폭(d)와 두께(t, 0.5mm 내외)를 가짐) 형태의 파형 FRP 전단연결재가 이용되는데, 이러한 파형 FRP 전단연결재는 평면 형태로 형성된 것이 이용된다.First, the shear connector used in the present invention is a strip (STRIP) having a triangular or trapezoidal shape in the longitudinal direction, as shown in FIG. 2, continuous or spaced apart from each other (STRIP, predetermined width (d) and thickness (t, Wave form FRP shear connector is used, which is formed in a planar shape.

이하 FRP 재질적 의미, 파형의 의미 및 평면 형태의 의미를 살펴보도록 한다.Hereinafter, the meaning of the FRP material, the meaning of the waveform, and the meaning of the planar shape will be described.

먼저, FRP 전단연결재의 경우 열전도율은 중단열벽체에 사용되는 강재로 제작되는 종래 전단연결재의 열전도율 보다 약 2/1000~1/100배 작기 때문에 기존의 중단열벽체에서 문제점으로 지적되었던 에너지 손실(열교 현상)을 최소화할 수 있는 장점이 있다.First, in the case of FRP shear connector, the thermal conductivity is about 2/1000 ~ 1/100 times smaller than the thermal conductivity of the conventional shear connector made of steel used for the interrupted heat wall. Phenomenon) can be minimized.

또한 상기 FRP 전단연결재는 그 자체로써도 강재와 동등 이상의 인장강도를 지니고 있어, 내/외측 콘크리트벽체의 합성거동에 필요한 충분한 기계적 강도를 발휘할 수 있으며, 이에 따라 기존의 콘크리트벽체와 비교하여 대폭 향상된 단열성능을 유지하면서 동등한 휨 강도를 발현할 수 있게 되는 장점이 있다.In addition, the FRP shear connector itself has a tensile strength equal to or higher than that of steel, and thus can exhibit sufficient mechanical strength required for the composite behavior of the inner and outer concrete walls, thereby significantly improving the insulation performance compared to the existing concrete walls. There is an advantage that can be expressed while maintaining the equivalent bending strength.

둘째, 이러한 FRP 전단연결재는 파형으로 연속 형성되도록 하게 되는데 FRP 전단연결재를 연속된 파형(Wave Type)으로 형성시키게 되면 직선형과 대비하여 FRP 전단연결재의 휨강성 증진을 통한 합성형 콘크리트벽체의 휨 강성이 보다 향상되는 장점이 있다.Second, the FRP shear connector is to be continuously formed in a wave form. When the FRP shear connector is formed in a wave type, the flexural rigidity of the composite concrete wall is improved by increasing the flexural rigidity of the FRP shear connector in comparison with the straight type. There is an advantage to be improved.

나아가 이러한 파형 FRP 전단연결재는 일측 벽체(내측 콘크리트벽체) 내부로부터 단열재를 지나 타측 벽체(외측 콘크리트벽체) 내부에 걸쳐지도록 배치된 FRP 전단연결재를 단열재 사이에 하방으로 연속으로 설치되도록 하여, 양 벽체가 구조적으로 일체로 거동(합성형 콘크리트벽체)되도록 함으로써, 상기 FRP 전단연결재에 의한 증가된 모멘트 팔길이로 인하여 휨 모멘트 저항성능을 50%~70% 이상 증가시킬 수 있어 중단열벽체에 있어 보다 향상된 휨 강성을 구비하도록 하게 된다.Furthermore, the corrugated FRP shear connector is installed so that the FRP shear connector is continuously disposed downwardly between the heat insulators so as to extend from the inside of one wall (inner concrete wall) to the inside of the other wall (outer concrete wall). By structurally integrally acting (composite concrete wall), the flexural moment resistance can be increased by more than 50% ~ 70% due to the increased moment arm length caused by the FRP shear connector. To have rigidity.

즉, 중단열벽체(100)에 작용하는 휨 모멘트는 양 콘크리트벽체가 일체화되어 서로 구조적으로 연결되므로 그 모멘트 팔길이가 일측콘크리트벽체 표면으로부터 대향되는 콘크리트벽체의 철근(내측 철근조립체) 위치까지 연장될 수 있어 휨 모멘트에 대한 저항성능이 크게 향상되는 것이다.That is, since the bending moments acting on the suspended heat wall 100 are structurally connected to both concrete walls, the moment arm length thereof extends from the one concrete wall surface to the reinforcing bar (inner reinforcing bar) position of the concrete wall facing the concrete wall. The resistance against the bending moment can be greatly improved.

셋째, 이러한 파형 FRP 전단연결재가 평면 형태로 형성된다는 의미는 길이방향으로 일 평면을 이루면서 연장된다는 의미이다.Third, the waveform FRP shear connector is formed in a planar shape means that it extends while forming a plane in the longitudinal direction.

이러한 파형 FRP 전단연결재는 절곡부(B)가 다수 연속 또는 이격되어 형성되도록 하여 형성되는데 이러한 절곡부(B)는 예컨대 파형 홈(510)이 형성된 형틀(520)에 FRP를 충전하여 형틀 탈형 시 자연스럽게 파형으로 형성될 수 있도록 하게 된다.The corrugated FRP shear connector is formed by forming a plurality of bent portions (B) in series or spaced apart. Such bent portions (B) naturally fill the mold 520 in which the corrugated grooves 510 are formed, for example. It can be formed into a waveform.

이에 파형 FRP 전단연결재를 필요한 만큼 절단하여 사용함으로서 제작 및 사용성을 크게 증진시킬 수 있도록 하게 된다.Thus, by cutting the wave shaped FRP shear connector as necessary, it is possible to greatly improve the manufacturing and usability.

도 2에는 상기 편심 파형 FRP 전단연결재(120)의 배치 형태가 도시되어 있는데 이는 단열재(110)와 외측거푸집(220, 갱폼이라고도 한다) 사이에 파형 FRP 전단연결재의 전단(A1)이 외측거푸집(220)의 배면부에 접하도록 편심 설치되고 있음을 알 수 있다.Figure 2 shows the arrangement of the eccentric corrugated FRP shear connector 120, which is the front end (A1) of the corrugated FRP shear connector between the insulation 110 and the outer formwork (220, also known as gangform) outer formwork 220 It can be seen that the eccentric is installed in contact with the back portion of the).

이에 단열재(110)를 기준으로 외측거푸집(220)까지 연장된 길이(D2)가 내측거푸집(210, 유로폼이라고도 한다.)쪽으로 연장된 길이(D3)보다 훨씬 크게 형성되어 있음을 알 수 있다.Accordingly, it can be seen that the length D2 extended to the outer formwork 220 based on the heat insulating material 110 is much larger than the length D3 extending toward the inner formwork 210 (also referred to as a euroform).

이에 외측거푸집(220) 해체 시, 상기 파형 FRP 전단연결재는 일측 벽체(내측 콘크리트벽체, 140) 내부로부터 단열재(110)를 지나 타측 벽체(외측 콘크리트벽체,130) 내부를 거쳐 그 표면까지 연장되어 걸쳐지도록 배치됨을 알 수 있다.Accordingly, when dismantling the outer formwork 220, the corrugated FRP shear connecting member extends from the inside of one wall (inner concrete wall, 140) to the surface of the inner wall (outer concrete wall, 130), through the heat insulator 110, and to the surface thereof. It can be seen that it is arranged to lose.

이와 같이 일측 전단(A1)이 외측거푸집(220)의 배면부에 접하도록 설치되어 외측거푸집(220) 해체 시 타측 벽체(외측 콘크리트벽체)의 표면까지 연장되도록 배치된 파형 FRP 전단연결재를 본 발명에서 편심 파형 FRP 전단연결재(120)라 지칭하게 된다.As such, the one-side shear (A1) is installed in contact with the rear portion of the outer formwork 220 is eccentric in the present invention is arranged to extend to the surface of the other side wall (outer concrete wall) when dismantling the outer formwork 220 Waveform FRP shear connector 120 will be referred to.

이러한 편심 파형 FRP 전단연결재(120)는 콘크리트 타설압에 의한 단열재(110)의 변형을 방지하기 위한 것으로서 구체적인 사항은 후술한다.The eccentric corrugated FRP shear connector 120 is to prevent deformation of the heat insulating material 110 due to the concrete placing pressure will be described later.

[폼타이(400), 지지대(500) 및 편심 파형 FRP 전단연결재(120)를 이용한 단열재(110) 설치][Installation of heat insulating material 110 using the form tie 400, the support 500 and the eccentric corrugated FRP shear connector 120]

본 발명의 중단열벽체(100)는 도 3과 같이 건축물 외벽체에 설치되는 내측거푸집(210) 및 외측거푸집(220)사이에 단열재(110)와 편심 파형 FRP 전단연결재(120)를 미리 조립 설치한 후, 외측거푸집(220)과 내측거푸집(210)을 폼타이(400)에 의하여 서로 연결시키되 상기 폼타이(400)가 단열재(110)를 관통하도록 한 후, 상기 내측거푸집(210) 및 외측거푸집(220)과 단열재(110) 사이에 콘크리트(C)를 타설(현장타설)하여 외측 및 내측 콘크리트벽체(130,140)가 형성되도록 시공된다.The interrupted heating wall 100 of the present invention is pre-assembled and installed the heat insulating material 110 and the eccentric corrugated FRP shear connector 120 between the inner formwork 210 and the outer formwork 220 is installed on the building outer wall as shown in FIG. Then, the outer formwork 220 and the inner formwork 210 are connected to each other by the form tie 400, but after the form tie 400 penetrates the heat insulating material 110, the inner formwork 210 and the outer formwork The concrete (C) is poured between the 220 and the heat insulator (110) is constructed so that the outer and inner concrete walls (130, 140) are formed.

최종 상기 내측거푸집과 외측거푸집(210,220)은 해체되어 최종 완성되는 중단열벽체(100)는 최종 양 콘크리트벽체(130,140) 사이에 형성된 단열재(110) 및 내측 콘크리트벽체(140) 내부로부터 단열재(110)를 관통하여 외측 콘크리트벽체(130)의 표면까지 연장 형성된 편심 파형 FRP 전단연결재(120)로 형성된다.Finally, the inner formwork and the outer formwork 210 and 220 are dismantled, and the final heat dissipation wall 100 that is finally completed is insulated from the inside of the inner concrete wall 140 and the heat insulating material 110 formed between the final concrete walls 130 and 140. It is formed of an eccentric corrugated FRP shear connector 120 formed to extend to the surface of the outer concrete wall 130 through the through.

이때 상기 폼타이(400)는 외측거푸집(220)에 설치되는 일측 폼타이(410)만 해체되고 중간 폼타이(420)는 외측 콘크리트벽체(130)와 단열재(110) 내부에 매립되며, 내측 콘크리트벽체(140)에는 타측 폼타이(430) 일부가 매립(잔존)되게 된다. 타측 폼타이(430)중 머리부(430a)는 타격되어 내측거푸집(210) 해체 시 제거된다.At this time, the form tie 400 is dismantled only one side of the form tie 410 is installed on the outer mold 220, the middle form tie 420 is embedded in the outer concrete wall 130 and the heat insulating material 110, the inner concrete A portion of the other form tie 430 is embedded in the wall 140. The head 430a of the other form tie 430 is blown and removed when dismantling the inner formwork 210.

이러한 외측거푸집(220)과 내측거푸집(210) 사이에 단열재(110)가 설치되는데 도 4a 및 도 4b와 같이 미리 편심 파형 FRP 전단연결재(120)가 설치된 단열재(110) 다수를 외측거푸집(220)과 내측거푸집(210)의 크기에 맞추어 전단키 또는 단턱진 형태의 이음부 조립방식으로 설치된다.Insulation 110 is installed between the outer formwork 220 and the inner formwork 210, as shown in Figure 4a and Figure 4b is a plurality of insulation 110 is installed in advance the eccentric corrugated FRP shear connector 120, the outer formwork 220 And in accordance with the size of the inner formwork 210 is installed in a joint assembly method of the shear key or stepped form.

구체적으로 살펴보면 도 4a와 같이 서로 분리된 단열재(110)의 내측면에(B1) 파형 홈(111)을 형성시키되 상하 방향으로 이격 형성시켜 전체적으로 파형으로 형성되도록 하고 이러한 파형 홈(111)에 본 발명의 편심 파형 FRP 전단연결재(120)가 상하로 연속되어 배치한 후 접착제를 이용하여 서로 분리된 단열재를 하나의 일체화된 단열재가 되도록 한다.In detail, as shown in FIG. 4A, the corrugated grooves 111 are formed on the inner side surfaces of the heat insulating material 110 separated from each other (B1), but the corrugated grooves 111 are spaced apart in the vertical direction so that the corrugated grooves are formed as a whole. The eccentric waveform of the FRP shear connector 120 is arranged continuously up and down to make the insulation separated from each other using an adhesive to become one integrated insulation.

물론 상기 파형 홈(111)은 일측 내측면(B1)에만 형성시키고 편심 파형 FRP 전단연결재(120)를 파형 홈(111)에 완전히 삽입시키고, 다른 단열재를 편심 파형 FRP 전단연결재(120)이 설치된 단열재의 내측면에 접착제로 일체화 시켜도 된다.Of course, the corrugated groove 111 is formed only on one side inner surface B1 and completely inserts the eccentric corrugated FRP shear connector 120 into the corrugated groove 111, and the other heat insulator is provided with the eccentric corrugated FRP shear connector 120. It may be integrated with the adhesive on the inner side of the.

이에 2개의 단열재(110) 사이에 편심 파형 FRP 전단연결재(120)가 배치되어 일체화된 것을 본 발명에서는 단열재(110) 모듈이라고 하고, 이러한 단열재 모듈이 서로 외측면(B3,B4)에서 서로 연결되도록 조립 시키게 된다.In the present invention, the eccentric corrugated FRP shear connector 120 is disposed and integrated between the two heat insulators 110, which is referred to as the heat insulator 110 module in the present invention. To be assembled.

이에 상기 외측면들(B3,B4)에는 전단키 형태로 서로 이음부가 형성되도록 하게 됨을 알 수 있다.Accordingly, it can be seen that the outer surfaces B3 and B4 are connected to each other in the form of a shear key.

이러한 전단키는 예컨대 단턱진 형태의 외측면으로 형성시켜 서로 맞물려 지도록 한다.These shear keys are formed into, for example, a stepped outer surface to be engaged with each other.

이때, 중요한 점은 편심 파형 FRP 전단연결재(120)의 전단(A1) 및 후단(A2)이 단열재(110)의 전면부와 후면부(A3,A4)로부터 돌출되도록 배치하게 된다는 점이다.At this time, the important point is that the front end (A1) and the rear end (A2) of the eccentric corrugated FRP shear connector (120) is arranged to protrude from the front and rear parts (A3, A4) of the heat insulating material (110).

이와 같이 편심 파형 FRP 전단연결재(120)가 단열재(110)의 전면부(A3)와 후면부(A4)로 돌출되어 타설된 콘크리트에 매립되어 외측 및 내측 콘크리트벽체(130,140)를 서로 합성(합성형 콘크리트벽체)시킬 수 있게 된다.Thus, the eccentric corrugated FRP shear connector 120 is projected to the front portion (A3) and the rear portion (A4) of the heat insulator 110 and embedded in the poured concrete to synthesize the outer and inner concrete walls (130,140) with each other (synthetic concrete) Wall).

또한 상기 편심 파형 FRP 전단연결재(120)는 단열재가 콘크리트 타설압에 의하여 변형이 발생하지 않도록 전단(A1)은 도 3과 같이 외측거푸집(220)의 배면부에 접하도록 연장(편심)되도록 하여 외측거푸집(220) 해체 시 외측 콘크리트벽체(130) 표면까지 연장 형성되도록 하게 된다.In addition, the eccentric corrugated FRP shear connector 120 is sheared (A1) so that the insulation does not occur due to the concrete placing pressure (A1) is extended (eccentric) so as to contact the back portion of the outer formwork 220 as shown in FIG. When dismantling, the outer concrete wall 130 is formed to extend to the surface.

즉, 상기 편심 파형 FRP 전단연결재(120)의 전단(A1)이 외측거푸집(220)의 배면부에 지지되어 콘크리트 타설압에 의한 단열재 모듈의 변형을 막도록 한 것이다.That is, the front end A1 of the eccentric corrugated FRP shear connector 120 is supported on the rear part of the outer formwork 220 to prevent deformation of the insulation module due to the concrete placing pressure.

이와 같이 편심 파형 FRP 전단연결재(120)가 형성된 단열재(110) 모듈의 조립 설치가 외측거푸집(220)의 설치와 함께 완료되면 이때 후술되는 내측거푸집(210)으로부터 일정한 피복두께를 확보할 수 있도록 내측 철근조립체(170)를 도 3과 같이 설치하게 된다.As such, when the assembly installation of the insulation member 110 module having the eccentric waveform FRP shear connector 120 is completed together with the installation of the outer formwork 220, the inner side can be secured from the inner formwork 210 to be described later. Reinforcing bar assembly 170 is installed as shown in FIG.

또한 상기 내측 철근조립체(170)와 이격되어 건축물에 내측거푸집(210)을 설치하게 된다.In addition, the inner reinforcement assembly 170 is spaced apart from the inner formwork 210 is installed in the building.

이러한 내측거푸집과 외측거푸집(210,220)과 단열재(110) 사이에 콘크리트를 타설(현장타설)하게 되면 최종 단열재 양 측방을 내측 콘크리트벽체(140) 및 외측 콘크리트벽체(130)가 형성된 중단열벽체 시공이 가능하게 된다.When the concrete is placed between the inner formwork and the outer formwork (210, 220) and the heat insulator 110 (in-situ), both sides of the final heat insulating material are constructed with the interrupted heat wall formed with the inner concrete wall 140 and the outer concrete wall 130. It becomes possible.

이때 본 발명에 의한 중단열벽체를 구조용으로 사용하는 경우에는 내측 철근조립체(170)과 별도로 외측거푸집(220)과 단열재 사이에 외측 철근조립체를 형성시킬 수 있다.In this case, when the interruption heat wall according to the present invention is used for structural purposes, an outer reinforcing bar assembly may be formed between the outer formwork 220 and the heat insulator separately from the inner reinforcing bar assembly 170.

특히 외측 콘크리트벽체(130)를 비구조용으로 사용하는 경우에는 상기 외측 콘크리트벽체의 두께(t1)를 최소화하거나 외측 철근조립체(미도시)를 설치하지 않고 외측 콘크리트벽체를 형성시켜도 된다.In particular, when the outer concrete wall 130 is used for non-structural use, the outer concrete wall may be formed without minimizing the thickness t1 of the outer concrete wall or installing an outer reinforced assembly (not shown).

이에 최종 외측 및 내측 콘크리트벽체의 두께는 조정될 수 있을 것이다.The thickness of the final outer and inner concrete walls may thus be adjusted.

이러한 중단열벽체에 있어 이용되는 외측거푸집(220)과 내측거푸집(210)을 연결하는 본 발명의 폼타이(400)는 도 3과 같이 외측거푸집(220)에 설치되는 일측 폼타이(410), 외측 콘크리트벽체(130)와 단열재(110)를 관통하는 중간 폼타이(420)와 내측 콘크리트벽체(140)를 관통하여 내측거푸집(210)에 연장 되어 설치되는 타측 폼타이(430)로 구분되어 설치된다.The form tie 400 of the present invention for connecting the outer formwork 220 and the inner formwork 210 used in such a heat dissipation wall is one side of the form tie 410 installed in the outer formwork 220 as shown in FIG. It is divided into an intermediate form tie 420 penetrating the outer concrete wall 130 and the heat insulating material 110 and the other form tie 430 extending through the inner concrete wall 140 and installed in the inner formwork 210. do.

이러한 폼타이(400)에는 단열재(110)의 전면부(A3)와 후면부(A4)에 접하도록 설치되는 구속수단(440, 일종의 간격재)이 설치되는데 이로서 상기 폼타이(400)는 기본적으로 외측거푸집(220)과 내측거푸집(210)을 서로 연결시켜 주는 역할을 하게 된다.The form tie 400 is provided with restraining means 440 (a kind of spacer) which is installed to contact the front portion (A3) and the rear portion (A4) of the heat insulating material 110, whereby the form tie 400 is basically the outer side It serves to connect the formwork 220 and the inner formwork 210 with each other.

이때, 단열재(110)를 관통하여 매립되는 중간 및 타측 폼타이(420,430)는 FRP 재질로 제작함으로서 중단열벽체의 열교현상을 보다 효과적으로 방지할 수 있도록 함이 바람직하며, 설치된 구속수단(440)에 의하여 콘크리트 타설에 의한 충격에 의하여 단열재(110)의 위치가 변동되는 현상을 방지할 수 있는 일종의 간격재 역할도 하게 된다.At this time, the middle and the other form tie (420,430) embedded through the heat insulating material 110 is preferably made of FRP material to more effectively prevent the thermal bridge phenomenon of the interrupted heat wall, the restraining means 440 installed As a result, it also serves as a kind of spacer capable of preventing a phenomenon in which the position of the heat insulator 110 is changed by the impact caused by concrete pouring.

이러한 폼타이(400)는 도 4b와 같이 단열재(110)의 상하 및 수평으로 다수가 이격 설치(세모로 표시된 것)되는데 이는 외측거푸집(220)과 내측거푸집(210)의 상하 높이에 따라 개수가 정해지게 되며 콘크리트 타설압이 크게 발생하는 단열재(110) 하부에 집중적으로 배치시키게 된다.The form tie 400 is installed in a plurality of spaced apart (upright and horizontally) as shown in Figure 4b the upper and lower and the horizontal 110, which is the number according to the vertical height of the outer formwork 220 and the inner formwork (210) It is determined and concentrated in the lower portion of the heat insulator 110, the concrete placing pressure is greatly generated.

이때 단열재 모듈을 서로 이어서 설치하게 되면 도 5와 같이 이음부 역시 콘크리트 타설압에 의하여 변형이 발생하게 된다. 이러한 이음부에는 콘크리트 타설압에 저항할 수 있는 수단이 없다.At this time, if the insulation module is installed next to each other, as shown in FIG. 5, the joint is also deformed by the concrete placing pressure. These joints do not have a means to withstand concrete placing pressure.

이에 본 발명은 도 3 및 도 6과 같이 지지대(450)를 단열재(110) 전면부(A3)로부터 외측거푸집(220) 사이에 설치하되 상기 지지대(450)는 단열재 모듈의 이음부 및 일부 폼타이를 대체하여 배치(도 6에서 원으로 표시한 부위)시키게 된다.Thus, the present invention is installed between the outer mold 220 from the front member (A3) of the support member 450 as shown in Figure 3 and Figure 6, but the support member 450 is a joint part and some form of the insulation module Is replaced by (placed in circle in Figure 6).

이러한 지지대(450)는 단열재(110)의 구속수단으로서 지지판(451)과 상기 지지판에서 외측거푸집(220)으로 연장되는 지지볼트(452)와 상기 지지볼트(452)에 체결된 받침부(453)로 형성된다.The support 450 is a support plate 451 extending from the support plate 451 and the support plate 451 and the support bolt 452 to the support bolt 452 as a restraining means of the heat insulating material 110. Is formed.

이에 콘크리트 타설압에 의하여 상기 단열재 이음부에 변형이 발생하게 되면 지지판(451)과 지지볼트(452)에 전달되고 외측거푸집(220) 배면부에 접하도록 설치된 받침부(453)에 의하여 단열재 모듈의 변형이 구속되도록 하게 된다.Therefore, when deformation occurs in the insulation joint due to the concrete pouring pressure, it is transmitted to the support plate 451 and the support bolt 452, and the deformation of the insulation module by the support portion 453 installed to contact the rear part of the outer formwork 220. Will be constrained.

이로서 지지대(450)를 설치함으로서 외측거푸집(220)과 내측거푸집(210)에 설치되는 폼타이(400)는 그 설치 개수를 최소화하여 시공성 및 공종을 단순화시킬 수 있게 됨을 알 수 있다.[원안: (도 4b와 도 6에 의하면 폼타이 설치 부위(세모 표시)가 줄어 듬을 확인할 수 있다.)]Thus, by installing the support 450, the form tie 400 installed in the outer formwork 220 and the inner formwork 210 can be seen that it is possible to simplify the workability and construction by minimizing the number of installation. (By FIG. 4B and FIG. 6, it can be confirmed that the form tie installation site (triangle mark) is reduced.)]

이에 본 발명은 도 6과 같이 단열재의 이음부에 설치되는 지지대(450)와 단열재를 관통하는 편심 파형 FRP 전단연결재(120)에 의하여 콘크리트 타설압에 의하여 단열재의 변형을 최대한 구속시켜 줄 수 있으며 이를 통해 폼타이 설치개수를 최소화 시킬 수 있음을 알 수 있다.Accordingly, the present invention can restrain the deformation of the heat insulating material by concrete placing pressure as much as possible by the support 450 installed in the joint of the heat insulating material and the eccentric corrugated FRP shear connector 120 penetrating the heat insulating material as shown in FIG. It can be seen that the number of form tie installation can be minimized.

[ 본 발명에 의한 현장 중단열벽체(100) 시공방법][On-site interrupted heat wall 100 construction method according to the present invention]

상기 현장 중단열벽체(100) 시공방법을 도 7을 기준으로 구체적으로 살펴보면,Looking at the construction method of the site suspended thermal wall 100 in detail with reference to Figure 7,

즉, 도 2와 같이 일정한 길이로 가공된 편심 파형 FRP 전단연결재(120)를 준비하게 된다.That is, the eccentric waveform FRP shear connector 120 is processed to a predetermined length as shown in FIG.

예컨대 도 4b와 같이 2개의 단열재(110) 내측면(B1)에 상기 편심 파형 FRP 전단연결재(120)를 수직으로 부착(접착제 사용)시켜 단열재 모듈을 제작하게 된다.For example, as shown in FIG. 4B, the eccentric corrugated FRP shear connector 120 is vertically attached (using adhesive) to two inner surfaces B1 of the heat insulating material 110 to manufacture the heat insulating material module.

물론 이러한 편심 파형 FRP 전단연결재(120)의 전단(A1) 및 후단(A2)은 단열재의 전면부(A3)와 후면부(A4)로부터 돌출 형성시키되 전단은 외측거푸집(220)의 배면부까지 연장되도록 형성시키게 된다.Of course, the front end (A1) and the rear end (A2) of the eccentric waveform FRP shear connector 120 is formed to protrude from the front portion (A3) and the rear portion (A4) of the heat insulating material, but the shear is formed to extend to the rear portion of the outer formwork 220 Let's go.

또한 상기 단열재(110)에는 폼타이가 관통될 수 있도록 관통홀(112)이 다수 형성된 것을 이용하게 되는데 미리 중간 폼타이(420)를 관통홀(112)에 삽입시켜 놓게 된다.In addition, a plurality of through holes 112 are formed in the heat insulator 110 so that the form tie can pass therethrough. The intermediate form tie 420 is inserted into the through holes 112 in advance.

다음으로는 도 7과 같이 내측거푸집(210)과 외측거푸집(220)을 서로 이격시켜 배치하고 사이에 단열재 모듈을 서로 이어가면서 일렬로 설치하게 된다.Next, the inner formwork 210 and the outer formwork 220 are arranged to be spaced apart from each other as shown in FIG.

이때 단열재에 설치된 중간 폼타이(420)에 외측거푸집(220)에 설치된 일측 폼타이(410)와 내측거푸집(210)에 설치된 타측 폼타이(430)를 연결시켜 단열재가 내측거푸집(210)과 외측거푸집(220) 사이에 고정 세팅되도록 하게 되며 이 과정에서 편심 파형 FRP 전단연결재(120)의 전단(A1)은 외측거푸집(220)의 배면부까지 연장되도록 형성시키게 된다.At this time, the one side of the form tie 410 installed in the outer formwork 220 and the other side of the form tie 430 installed in the inner formwork 210 is connected to the inner formwork 420 and the outer formwork 420 installed in the insulation. It is to be fixed between the die 220 and in this process the front end (A1) of the eccentric waveform FRP shear connector 120 is formed to extend to the back of the outer die 220.

다음으로 상기 외측거푸집(220)과 단열재(110) 사이에는 지지대(450)를 설치하게 되며 상기 지지대(450)는 단열재 모듈의 이음부에 위치하도록 하게 된다.Next, a support 450 is installed between the outer mold 220 and the heat insulator 110, and the support 450 is positioned at the joint of the heat insulation module.

즉 단열재(110)로부터 외측거푸집(220)으로 연장되는 지지볼트(452)에 형성된 지지판(451)이 단열재 전면부(A3)에 위치하도록 하고 받침부(453)는 외측거푸집(220) 배면부에 접하도록 하고, 상기 지지볼트(452)는 외측거푸집(220)을 관통하여 외측거푸집(220) 전면부에서 체결너트등을 이용하여 체결시키게 된다.That is, the support plate 451 formed on the support bolt 452 extending from the heat insulating material 110 to the outer mold 220 is positioned at the heat insulating material front part A3, and the support part 453 is in contact with the rear part of the outer mold 220. The support bolt 452 penetrates through the outer mold 220 and is fastened by using a fastening nut or the like at the front of the outer mold 220.

다음으로 내측거푸집(210)과 단열재(110) 사이에 내측 철근조립체(170)를 배치하게 된다.Next, the inner reinforcing bar assembly 170 is disposed between the inner mold 210 and the heat insulating material 110.

중단열벽체를 구조용으로 사용하는 경우에는 내측 및 외측 철근조립체를 사용하게 되지만, 외측 콘크리트벽체(130)를 비구조용으로 사용하는 경우에는 상기 외측 콘크리트벽체의 두께 및 외측 철근조립체를 설치하지 않아도 된다.In the case of using the interrupted heat wall for structural use, the inner and outer reinforcement assemblies are used. However, when the outer concrete wall 130 is used for non-structural use, the thickness of the outer concrete wall and the outer reinforcing assembly are not required.

본 발명의 경우 편심 파형 FRP 전단연결재(120)가 외측 철근조립체의 설치에 방해가 될 수 있으므로 이를 설치하지 않지만 방해가 되지 않는 부위에 외측 철근조립체를 설치해도 상관은 없다.In the case of the present invention, since the eccentric waveform FRP shear connector 120 may interfere with the installation of the outer reinforcing bar assembly, it does not matter even if the outer reinforcing bar assembly is installed in a portion that does not interfere.

이에 단열재(110)를 기준으로 보면 편심 파형 FRP 전단연결재(120)와 지지대(450)가 외측거푸집(220)의 배면부에 지지되도록 배치되도록 설치하고 있음을 알 수 있으며 폼타이(400)에 의하여 외측거푸집(220)과 내측거푸집(210) 사이에 단열재 모듈이 세팅되어 있음을 알 수 있다.In view of the heat insulating material 110 it can be seen that the eccentric corrugated FRP shear connector 120 and the support 450 is installed so as to be supported to the rear portion of the outer formwork 220 and the outside by the form tie (400) It can be seen that the insulation module is set between the formwork 220 and the inner formwork 210.

이에 상기 외측거푸집(220)과 내측거푸집(210) 사이에 콘크리트를 타설하게 되는데 먼저 내측거푸집(210)과 단열재(110) 사이에 콘크리트를 타설함에 따른 콘크리트 타설압은 단열재 모듈의 이음부, 폼타이 설치부위, 편심 파형 FRP 전단연결재(120) 설치부위의 변형을 초래할 수 있다.Therefore, the concrete is poured between the outer formwork 220 and the inner formwork 210. First, the concrete placing pressure according to placing concrete between the inner formwork 210 and the insulation 110 is the joint part of the insulation module, the form tie. Installation site, eccentric waveform may cause deformation of the FRP shear connector 120 installation site.

이에 상기 폼타이(400)의 설치부위는 폼타이가 단열재를 비교적 고정적으로 구속시켜 주기 때문에 변형이 크게 발생하지 않으나, 단열재(110) 모듈의 이음부와 편심 파형 FRP 전단연결재(120) 설치부위는 변형이 크게 발생할 수 있다.Thus, the installation portion of the form tie 400 does not significantly deform because the form tie restrains the insulation in a relatively fixed manner, but the joint portion and the eccentric wave form FRP shear connector 120 installation portion of the insulation 110 module is Deformation can occur greatly.

하지만 본 발명의 경우 편심 파형 FRP 전단연결재(120)와 지지대(450)에 의하여 상기 변형을 효과적으로 구속시켜 주게 된다.However, in the present invention, the deformation is effectively constrained by the eccentric waveform FRP shear connector 120 and the support 450.

이로서 본 발명은 도 6과 같이 편심 파형 FRP 전단연결재(120)와 지지대(450)를 이용하여 폼타이 설치개수를 최소화 하면서도 단열재의 변형을 구속시켜 줄 수 있음을 알 수 있다.As such, the present invention can be seen that by using the eccentric corrugated FRP shear connector 120 and the support 450 as shown in FIG.

상기 콘크리트가 양생되어 경화되면 합성형 콘크리트 벽체인 현장 중단열벽체의 제작이 완료되므로 외측거푸집(220)과 내측거푸집(210)을 해체시키게 된다.When the concrete is cured and cured, the production of the site interrupted heat wall, which is a synthetic concrete wall, is completed, thereby dismantling the outer formwork 220 and the inner formwork 210.

이에 최종 중단열벽체가 일부 완성되는데 이러한 중단열벽체의 내부에는 단열재(110)가 형성되어 있고 열교현상을 방지하는 편심 파형 FRP 전단연결재(120)가 외측 콘크리트벽체(130) 표면까지 연장 형성되어 있음을 알 수 있으며, 폼타이(400)의 경우 일측 폼타이는 외측거푸집(220)과 함께 제거되고, 중간 폼타이 및 타측 폼타이 일부만 중단열벽체에 잔존되도록 함을 알 수 있다.Thus, a part of the final thermal barrier wall is completed. The thermal insulation wall 110 is formed inside the thermal barrier wall, and an eccentric corrugated FRP shear connector 120 is formed to extend to the outer concrete wall 130 surface to prevent thermal bridges. It can be seen that, in the case of the form tie 400, one side of the form tie is removed together with the outer formwork 220, and only part of the middle form tie and the other form tie can be seen to remain in the interruption heat wall.

이에 완성된 중단열벽체 상방으로 다시 외측거푸집(220)과 내측거푸집(210)을 설치하고 단열재를 설치하고 콘크리트를 타설하는 작업을 반복하여 원하는 높이의 건물 외벽체를 완성시키게 된다.Thus, the outer formwork 220 and the inner formwork 210 is installed again above the finished heat-dissipating wall, the insulation is installed, and the work of pouring concrete is repeated to complete the outer wall of the desired height.

100: 중단열벽체
110: 단열재
111: 파형 홈
112: 관통홀
120: 편심 파형 FRP 전단연결재
130: 외측 콘크리트벽체
140: 내측 콘크리트벽체
210: 내측거푸집(210)
220: 외측거푸집(220)
400: 폼타이
410: 일측 폼타이
420,430: 중간 및 타측 폼타이
440: 구속수단
450: 지지대
520: 형틀
100: suspended heating wall
110: Insulation
111: waveform groove
112: through hole
120: eccentric corrugated FRP shear connector
130: outer concrete wall
140: inner concrete wall
210: inner formwork 210
220: outside formwork (220)
400: Form Thai
410: one side tie
420,430: Middle and other form tie
440: means of restraint
450: support
520: template

Claims (13)

외측거푸집(220)과 내측거푸집(210)을 폼타이(400)를 이용하여 이격 설치하고, 상기 외측거푸집(220)과 내측거푸집(210) 사이에 단열재(110)를 설치하되, 상기 단열재(110)는 다수의 단열재를 서로 연결시켜 조립 설치되도록 하고, 상기 외측거푸집(220)과 단열재(110) 사이 및 단열재(110)와 내측거푸집(210) 사이에 콘크리트(C)를 타설하여 단열재 양 측으로 내측 콘크리트벽체(140) 및 외측 콘크리트벽체(130)가 형성되도록 제작되는 현장 중단열벽체에 있어서,
상기 서로 연결되는 단열재(110)의 내측면(B1)에는 파형 FRP 전단연결재가 내측면을 따라 상하로 배치되도록 하되 상기 파형 FRP 전단연결재는 내측 콘크리트벽체로부터 단열재(110)를 관통하여 전단(A1)이 외측 콘크리트벽체(130)의 표면까지 연장되도록 설치된 편심 파형 FRP 전단연결재(120)를 이용함으로서, 콘크리트 타설 시 편심 파형 FRP 전단연결재의 전단(A1)이 외측거푸집(220)의 배면부에 접하면서 콘크리트 타설압에 의한 단열재(110)의 변형을 구속하도록 하는 것을 특징으로 하는 편심 파형 에프알피 전단연결재를 이용한 현장 중단열벽체.
The outer formwork 220 and the inner formwork 210 is installed spaced apart using the form tie 400, the insulating material 110 is installed between the outer formwork 220 and the inner formwork 210, the heat insulating material 110 ) Is installed by connecting a plurality of heat insulating materials to each other, and the concrete (C) is poured between the outer formwork 220 and the heat insulating material 110 and between the heat insulating material 110 and the inner formwork 210 to the both sides of the heat insulating material. In the site suspended heat wall is manufactured so that the concrete wall 140 and the outer concrete wall 130 is formed,
The inner surface (B1) of the heat insulating material 110 is connected to each other so that the corrugated FRP shear connector is arranged up and down along the inner surface, but the corrugated FRP shear connector passes through the heat insulating material 110 from the inner concrete wall shear (A1) By using the eccentric corrugated FRP shear connector 120 installed to extend to the surface of the outer concrete wall 130, the concrete (A1) of the eccentric corrugated FRP shear connector at the time of concrete placement is in contact with the rear part of the outer formwork 220 On-site suspended hot wall using the eccentric corrugated FRP shear connector, characterized in that to restrain the deformation of the heat insulator 110 by pouring pressure.
제 1항에 있어서,
상기 단열재(110)는 단열재 내측면에 파형 홈(111)이 각각 형성되어 상기 파형 홈(111)에 파형 FRP 전단연결재가 내측면을 따라 상하로 배치되도록 형성되는 것을 특징으로 하는 편심 파형 에프알피 전단연결재를 이용한 현장 중단열벽체.
The method of claim 1,
The heat insulator 110 is formed with a corrugated groove 111 on the inner surface of the heat insulating material, so that the corrugated groove 111 is formed so that the corrugated FRP shear connector is disposed up and down along the inner surface. On-site suspended heat walls using connecting materials.
제 2항에 있어서,
상기 편심 파형 에프알피 전단연결재(120)는 파형 홈(510)이 형성된 형틀(520)에 FRP를 주입하고, 형틀로부터 탈형된 편심 파형 에프알피 전단연결재를 절단하여 사용하는 것을 특징으로 하는 편심 파형 에프알피 전단연결재를 이용한 현장 중단열벽체.
The method of claim 2,
The eccentric corrugated FRP shear connector 120 is injected into the mold 520, the corrugated groove 510 is formed, and the eccentric corrugated FRP shear connector, characterized in that for use by cutting the eccentric corrugated FLP shear connector from the mold. On-site suspended hotwall using Alp shear connector.
제 2항에 있어서,
상기 파형 FRP 전단연결재가 사이에 형성된 2개의 단열재는 1개의 단열재 모듈로 제작되어 단열재 모듈이 외측거푸집(220)과 내측거푸집(210) 사이에 서로 이어져 배치되도록 하는 것을 특징으로 하는 편심 파형 에프알피 전단연결재를 이용한 현장 중단열벽체.
The method of claim 2,
The two insulations formed between the corrugated FRP shear connector are made of one insulation module so that the insulation module is disposed between the outer formwork 220 and the inner formwork 210 so as to be connected to each other. On-site suspended heat walls using connecting materials.
제 4항에 있어서,
상기 단열재 모듈의 이음부에는 지지대(450)가 더 설치되도록 하며 상기 지지대(450)는 단열재(110)의 전면부에 배치된 지지판(451); 상기 지지판에서 외측거푸집(220)으로 연장되는 지지볼트(452); 및 상기 지지볼트(452)에 체결된 받침부(453);를 포함하여, 콘크리트 타설압에 의하여 상기 단열재 이음부에 변형이 발생하게 되면 지지판(451)과 지지볼트(452)에 전달되고 외측거푸집(220) 배면부에 접하도록 설치된 받침부(453)에 의하여 단열재 모듈의 변형이 구속되도록 하는 것을 특징으로 하는 편심 파형 에프알피 전단연결재를 이용한 현장 중단열벽체.
5. The method of claim 4,
The support 450 is installed on the joint of the insulation module, and the support 450 includes a support plate 451 disposed on the front portion of the insulation 110; A support bolt 452 extending from the support plate to the outer formwork 220; And a support part 453 fastened to the support bolt 452. When the deformation occurs in the insulation joint by the concrete placing pressure, the support plate 451 and the support bolt 452 are transferred to the outer mold. (220) On-site interrupted heat wall using the eccentric corrugated FRP shear connector, characterized in that the deformation of the insulation module by the support portion (453) installed in contact with the back portion is constrained.
제 1항 내지 제 4항 중 어느 한 항에 있어서,
상기 단열재(110)에는 폼타이가 관통하는 관통홀(112)이 다수 형성되도록 하고,
상기 폼타이(400)는
외측거푸집(220)에 설치되는 일측 폼타이(410);
외측 콘크리트벽체(130)와 단열재(110) 내부에 매립되는 중간 폼타이(420); 및
내측 콘크리트벽체(140)에 일부가 매립되는 타측 폼타이(430);를 포함하며,
상기 중간 및 타측폼타이는 FRP 재질로 제작된 것을 이용하는 것을 특징으로 하는 편심 파형 에프알피 전단연결재를 이용한 현장 중단열벽체.
The method according to any one of claims 1 to 4,
A plurality of through-holes 112 through which the form tie penetrates are formed in the insulation 110,
The form tie 400
One side of the form tie 410 installed in the outer formwork 220;
An intermediate form tie 420 embedded in the outer concrete wall 130 and the heat insulator 110; And
It includes; the other side of the form tie 430 is embedded in the concrete wall 140;
The middle and the other side of the form ties rupture heat wall using the eccentric corrugated FRP shear connector, characterized in that using the one made of FRP material.
제 6항에 있어서,
상기 중간 폼타이(420)와 타측 폼타이(430)에는 단열재(110) 전면부(A3) 및 후면부(A4)에 접하도록 구속수단(440)이 더 설치되도록 하는 것을 특징으로 하는 편심 파형 에프알피 전단연결재를 이용한 현장 중단열벽체.
The method according to claim 6,
The intermediate form tie 420 and the other form tie 430, the eccentric waveform FRP characterized in that the restraining means 440 is further installed to contact the heat insulating material 110, the front portion (A3) and the rear portion (A4). On-site suspended hotwall using shear connector.
제 2항에 있어서, 상기 내측거푸집(210)과 단열재(110) 사이에는 내측 철근조립체(170)가 더 설치되도록 하는 것을 특징으로 하는 편심 파형 에프알피 전단연결재를 이용한 현장 중단열벽체.According to claim 2, Between the inner formwork 210 and the heat insulator 110 The on-site suspended heat wall using the eccentric corrugated FRP shear connector, characterized in that the inner reinforcement assembly 170 is further installed. 제 2항에 있어서, 상기 외측거푸집(220)과 내측거푸집(210) 사이에 형성되는 내측 및 외측 콘크리트벽체(130,140)는 서로 두께를 달리하여 형성되도록 하는 것을 특징으로 하는 편심 파형 에프알피 전단연결재를 이용한 현장 중단열벽체.According to claim 2, wherein the inner and outer concrete walls (130,140) formed between the outer formwork 220 and the inner formwork (210) is eccentric corrugated FRP shear connector, characterized in that formed to vary the thickness of each other On-site suspended thermal wall. 외측거푸집(220)과 내측거푸집(210)을 폼타이(400)를 이용하여 이격 설치하는 단계;
상기 외측거푸집(220)과 내측거푸집(210) 사이에 다수의 단열재를 서로 연결시켜 조립 설치되도록 하되, 서로 연결되는 단열재(110)의 내측면(B1)에는 파형 FRP 전단연결재가 내측면을 따라 상하로 배치되도록 하되 상기 파형 FRP 전단연결재는 내측 콘크리트벽체로부터 단열재(110)를 관통하여 전단(A1)이 외측 콘크리트벽체(130)의 표면까지 연장되도록 설치된 편심 파형 FRP 전단연결재(120)를 이용함으로서, 콘크리트 타설 시 편심 파형 FRP 전단연결재의 전단(A1)이 외측거푸집(220)의 배면부에 접하면서 콘크리트 타설압에 의한 단열재(110)의 변형을 구속하도록 하는 단계; 및
상기 외측거푸집(220)과 단열재(110) 사이 및 단열재(110)와 내측거푸집(210) 사이에 콘크리트(C)를 타설하여 단열재 양 측으로 내측 콘크리트벽체(140)및 외측 콘크리트벽체(130)가 형성되도록 제작되는 단계;를 포함하는 것을 특징으로 하는 파형 에프알피 전단연결재를 이용한 현장 중단열벽체 시공방법.
Installing the outer formwork 220 and the inner formwork 210 spaced apart using the form tie 400;
The outer formwork 220 and the inner formwork 210 is connected to each other to be installed by connecting to each other, the inner surface (B1) of the insulator 110 is connected to each other up and down the corrugated FRP shear connector along the inner surface By using the eccentric corrugated FRP shear connector 120 is installed so that the corrugated FRP shear connector penetrates the heat insulator 110 from the inner concrete wall so that the shear A1 extends to the surface of the outer concrete wall 130. Confining the shear (A1) of the eccentric corrugated FRP shear connector at the time of concrete confinement deformation of the heat insulating material 110 by the concrete placing pressure while contacting the back portion of the outer formwork 220; And
The inner concrete wall 140 and the outer concrete wall 130 are formed on both sides of the insulation by pouring concrete C between the outer formwork 220 and the insulation 110 and between the insulation 110 and the inner formwork 210. On-site suspended hot wall construction method using a waveform FRP shear connector, characterized in that it comprises;
제 10항에 있어서,
상기 편심 파형 에프알피 전단연결재(120)는 파형 홈(510)이 형성된 형틀(520)에 FRP를 주입하고, 형틀로부터 탈형된 편심 파형 에프알피 전단연결재를 절단하여 사용하는 것을 특징으로 하는 파형 에프알피 전단연결재를 이용한 현장 중단열벽체 시공방법.
The method of claim 10,
The eccentric corrugated FRP shear connecting member 120 injects FRP into the mold 520 in which the corrugated groove 510 is formed, and uses the corrugated FRP shearing connecting material which is demolded from the mold. Construction method of on-site suspended hotwall using shear connector.
삭제delete 제 10항 또는 제 11항에 있어서,
상기 내측거푸집(210)과 단열재(110) 사이에는 내측 철근조립체(170)가 더 설치되도록 하는 것을 특징으로 하는 파형 에프알피 전단연결재를 이용한 현장 중단열벽체 시공방법.
The method according to claim 10 or 11,
On-site suspended hot wall construction method using a corrugated FLP shear connector, characterized in that the inner reinforcement assembly 170 is further installed between the inner formwork 210 and the heat insulating material (110).
KR1020110141985A 2011-12-26 2011-12-26 Concrete composite wall with inner insulation and frp eccentric wave shear connector and the construction method KR101286016B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110141985A KR101286016B1 (en) 2011-12-26 2011-12-26 Concrete composite wall with inner insulation and frp eccentric wave shear connector and the construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110141985A KR101286016B1 (en) 2011-12-26 2011-12-26 Concrete composite wall with inner insulation and frp eccentric wave shear connector and the construction method

Publications (2)

Publication Number Publication Date
KR20130074106A KR20130074106A (en) 2013-07-04
KR101286016B1 true KR101286016B1 (en) 2013-07-19

Family

ID=48988282

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110141985A KR101286016B1 (en) 2011-12-26 2011-12-26 Concrete composite wall with inner insulation and frp eccentric wave shear connector and the construction method

Country Status (1)

Country Link
KR (1) KR101286016B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101690886B1 (en) 2015-08-18 2016-12-29 지에스건설 주식회사 Rebar combined form

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424856A (en) * 2020-05-22 2020-07-17 李景山 Wall body supporting assembly, wall body and construction method of wall body
CN114703987B (en) * 2022-04-02 2023-05-23 东莞职业技术学院 High-rise shear wall casting method and high-rise stairwell casting method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR830010262A (en) * 1981-04-30 1983-12-30 데니스 엘. 갈레트 Insulation Wall Structure
JP2002285676A (en) 2001-03-23 2002-10-03 Fudo Constr Co Ltd Thermal insulating pc concrete panel and manufacturing method therefor
JP2003176580A (en) 2003-02-10 2003-06-24 Tesuku:Kk Damp proofing insulated wall panel, and method of constructing concrete wall
JP2004225286A (en) 2003-01-21 2004-08-12 Ando Corp Exterior heat insulating wall structure and its forming method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR830010262A (en) * 1981-04-30 1983-12-30 데니스 엘. 갈레트 Insulation Wall Structure
JP2002285676A (en) 2001-03-23 2002-10-03 Fudo Constr Co Ltd Thermal insulating pc concrete panel and manufacturing method therefor
JP2004225286A (en) 2003-01-21 2004-08-12 Ando Corp Exterior heat insulating wall structure and its forming method
JP2003176580A (en) 2003-02-10 2003-06-24 Tesuku:Kk Damp proofing insulated wall panel, and method of constructing concrete wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101690886B1 (en) 2015-08-18 2016-12-29 지에스건설 주식회사 Rebar combined form

Also Published As

Publication number Publication date
KR20130074106A (en) 2013-07-04

Similar Documents

Publication Publication Date Title
CN107386492B (en) Prefabricated core column type self-heat-insulation external wall panel, connecting structure and construction method thereof
KR101214980B1 (en) Concrete composite wall construction method with inner insulation and composite shear connector
KR101441399B1 (en) Composite form-tie for concrete composite wall and the construction method therewith
KR101253253B1 (en) Concrete composite wall construction method with gangform and precast wall
CN114517551B (en) Full precast concrete floor connected node
KR101420203B1 (en) The pillar and girder connecting structure for a building
KR101286016B1 (en) Concrete composite wall with inner insulation and frp eccentric wave shear connector and the construction method
KR101312992B1 (en) Concrete composite wall construction method with soft gangform and form-tie
CN103437493B (en) Connecting node of prefabricated reinforced concrete beam and construction method of connecting node
KR101337325B1 (en) Concrete composite wall for improving resistance ability to wind load and the construction method therefor
KR101292523B1 (en) Concrete composite wall construction method with inner insulation, composite shear connector and composite form-tie
CN102839773A (en) Concrete composite slab floorslab with shear key and prefabricated construction and construction method
CN109079968B (en) Forming mold for wall panel and method for manufacturing wall panel by using mold
RU2335604C2 (en) Process of sandwich wall formation
KR101429482B1 (en) Method to construct Insulated and Integrated Finishings Deck Plate Slab
KR101750177B1 (en) Punching shear stiffening member of cutting bridge type and method for constructing footing using of the same
KR20130074626A (en) Vertical shear connector for precast concrete bridge pier
KR100865133B1 (en) A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof
KR101366503B1 (en) Concrete composite wall for improving concrete pouring pressure resistance ability and the construction method therefor
KR101714159B1 (en) Device For Preventing Bending Moment Transfer And Rahmen Bridge Using Thereof
KR101312990B1 (en) Wire-mesh with lateral bending parts for concrete composite wall, concrete composite and concrete composite wall construction method wall using the same
CN112127494B (en) Foamed concrete insulation board
KR102045958B1 (en) Insulation Product for Blocking Thermal Bridge
JP3750135B1 (en) Building foundation and building foundation method
KR100799176B1 (en) Form panels using intersection of breast wall including insulation

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee