KR101256265B1 - Construction method of the pier without the temporary dike - Google Patents

Construction method of the pier without the temporary dike Download PDF

Info

Publication number
KR101256265B1
KR101256265B1 KR1020100027026A KR20100027026A KR101256265B1 KR 101256265 B1 KR101256265 B1 KR 101256265B1 KR 1020100027026 A KR1020100027026 A KR 1020100027026A KR 20100027026 A KR20100027026 A KR 20100027026A KR 101256265 B1 KR101256265 B1 KR 101256265B1
Authority
KR
South Korea
Prior art keywords
space
pier
ground
foundation
water
Prior art date
Application number
KR1020100027026A
Other languages
Korean (ko)
Other versions
KR20110107888A (en
Inventor
홍문표
Original Assignee
홍문표
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 홍문표 filed Critical 홍문표
Priority to KR1020100027026A priority Critical patent/KR101256265B1/en
Publication of KR20110107888A publication Critical patent/KR20110107888A/en
Application granted granted Critical
Publication of KR101256265B1 publication Critical patent/KR101256265B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/28Stressing the soil or the foundation structure while forming foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Architecture (AREA)
  • Bridges Or Land Bridges (AREA)
  • Foundations (AREA)

Abstract

본 발명은 광범위한 임시물막이 공사가 생략된 교각의 수중설치공법에 관한 것으로, 건설경비를 절약하고 공사기간을 단축하기 위하여, 해저 암석지반(156)에 타설된 중심파일(148)에 기초공간(151)과 복수의 중심파일공간(148a) 및 복수의 출입공간(149)을 가진 본체가 일체형이 되도록 지상에서 제작된 교각(95)의 중심파일공간(148a)을 끼워 해저에 가라앉히고 방수커튼(158)으로 침수터널이 형성되는 것을 방지한 후에 출입공간(149)을 통해 기초공간(151)의 연약지반(157)을 제거하여 암석지반(156)에 앉힌 후에 상기 기초공간(151)과 출입공간(149) 및 중심파일공간(148a) 중 잔여공간을 철근 콘크리트로 채워서 암석지반(156)에 결합함으로써, 잔여공사가 수상에서 마무리가능하고, 임시 물막이 공정부터 해체공정까지 생략되어 투자비용이 절감되고 공사기간이 단축되며 공사기간 중에도 조석간만이나 강물의 흐름이 유지되어 환경변화를 최소화하는 것을 특징으로 한다.The present invention relates to the underwater installation method of pier where a wide range of temporary barrier construction is omitted, in order to save construction costs and shorten the construction period, the base space 151 in the central pile 148 placed on the seabed rock foundation 156 ) And the central pile space 148a of the piers 95 manufactured on the ground so that the main body having a plurality of central pile spaces 148a and a plurality of entrance spaces 149 are integrated into the body, and settles on the sea floor and the waterproof curtain 158 After the submerged tunnel is prevented from being formed, the soft ground 157 of the foundation space 151 is removed through the entrance space 149 to sit on the rock foundation 156 and then the foundation space 151 and the access space ( 149) and the remaining space in the central pile space 148a by filling with reinforced concrete and combined with the rock ground 156, the remaining work can be finished in the water, and the temporary cost from the water barrier process to the dismantling process can be reduced, thus reducing the investment cost. Shorter period It said during the construction period keeping the flow of the tidal ebb and flow or river water is characterized in that to minimize the environmental change.

교량 및 구조물 제작을 전담하는 지상 지원기지와 각종 공사장비를 갖춘 작업선 및 자재 운반선으로 교량공사는 물론 조력발전소나 파력 발전소, 또는 수상구조물을 건설할 때 기초공간면적보다 훨씬 넓은 면적을 임시 물막이로 확보하지 않고도 교각을 설치할 수 있다.
It is a ground support base dedicated to the production of bridges and structures, and work and material carriers equipped with various construction equipment. When constructing a bridge construction, tidal power plant, wave power plant, or submerged structure, the area that is much larger than the basic space is used as a temporary barrier. Piers can be installed without securing them.

16; 수차 24; 수차집 32; 파일
44; 인양구 53; 볼트 너트 76; 수문
95; 교각 103; 수차기초 124; 도로
124a; 도로 상판 147; 내부 원형틀 148; 중심파일
148a; 중심파일공간 149; 출입공간 150; 조립라인
151; 기초공간 151a; 기초공간 벽 152; 거푸집
152a; 내벽 거푸집 152b; 외벽 거푸집 154; 강철 비트
155; 난간 156; 암석지반(암반) 157; 연약지반
158; 방수커튼 159; 토사 160; 발전소 상판
16; Aberration 24; Aberration 32; file
44; Salvaged 53; Bolt nut 76; water gate
95; Pier 103; Aberration basis 124; road
124a; Road tops 147; Inner circular frame 148; Central file
148a; Central filespace 149; Access space 150; Assembly line
151; Foundation space 151a; A base space wall 152; Formwork
152a; Inner wall formwork 152b; Outer wall formwork 154; Steel bits
155; Handrail 156; Rock ground (bedrock) 157; Soft ground
158; Waterproof curtain 159; Tosa 160; Power station roof

Description

임시 물막이공정이 생략된 교각의 수중설치공법. {Construction method of the pier without the temporary dike}Underwater installation method of pier where temporary water blocking process is omitted. {Construction method of the pier without the temporary dike}

본 발명은 광범위한 임시 물막이공정이 생략된 교각의 수중설치공법에 관한 것으로, 더욱 상세하게는, 임시 물막이공정 없이 해저에 타설된 파일에 지상에서 제작된 교각을 끼워 세우고 기초공간의 연약지반을 제거하여 암석지반에 내려 앉힌 후에 철근 콘크리트로 채워 교각을 암반에 결합함으로써 잔여공사가 수상(水上)에서 마무리 가능한 교각의 수중설치공법에 관한 것이다.
The present invention relates to an underwater installation method of a pier where a wide range of temporary water blocking process is omitted, more specifically, by placing a pier made in the ground on a pile placed on the seabed without a temporary water blocking process to remove the soft ground of the foundation space It is related to the underwater installation method of piers that can be finished in the water by remaining in the water by joining the piers to the rocks by filling them with reinforced concrete after laying down on the rock ground.

통과수량이 많은 강이나 수심이 깊은 바다에서 교량이나 조력발전소를 건설할 때 투자비와 시간이 가장 많이 소요되고 수심이 깊을수록 난이도가 상승하는 것이 본 공사를 위한 임시물막이 공사다. When constructing a bridge or tidal power plant in a river or a deep sea where there is a large amount of water passed, it is the temporary barrier for this project that the investment cost and time are the most expensive and the difficulty increases as the depth is deep.

교각기초를 암반에 연결하려면 기초공간면적보다 월씬 넓은 면적을 임시 물막이 공사로 확보하지 않으면 본 공사를 추진할 수 없고, 특히 조력발전소는 연결공사이므로 건설지역의 수심과 연약지반의 깊이 및 구조물의 높이에 따라서 수심 수십m에서부터 광범위한 터파기공사를 시작해야 하기 때문이다.In order to connect the pier foundation to the rock, this construction cannot be carried out unless the temporary space is secured by the construction of a temporary barrier. Especially, the tidal power plant is a connecting construction, so the depth of the construction area and the depth of the soft ground and the height of the structure Therefore, it is necessary to start extensive excavation work from the depth of several tens of meters.

그러므로 물막이 공사를 하지 않고도 교각을 설계된 위치에 정확히 세워 수면까지 드러낼 수 있는 공법이 요구된다. 교각의 상단만 수면 위로 올려놓으면 잔여공사는 물 위에서 순조롭게 추진될 수 있기 때문이다.Therefore, there is a need for a construction method that can accurately expose the pier to the designed position and expose the surface of the water without the need for water barrier construction. If only the top of the bridge is placed on the surface of the water, the remaining work can be carried out smoothly on the water.

그러므로 물막이 공사를 하지 않고도 교각을 설계된 위치에 정확히 세워 수면까지 드러낼 수 있는 공법이 요구된다. 교각의 상단(上端)만 수면 위로 올려놓으면 잔여공사는 물 위에서나 양쪽에서 수문으로 막고 추진될 수 있기 때문이다.Therefore, there is a need for a construction method that can accurately expose the pier to the designed position and expose the surface of the water without the need for water barrier construction. If only the upper part of the bridge is placed on the surface of the water, the remaining work can be propelled by water gates on the water or on both sides.

그것은 지상에서 제작한 교각을 지하 암반과 결합하거나 암반까지 박은 파일과 교각기초를 결합하는 것으로 몇 가지 기술적인 해결책이 전제된다.Some of these technical solutions are presumed by combining ground-made piers with underground rocks or by combining piles with piers and foundations.

즉, 첫째, 교각을 경사진 바닥에 세워도 기울지 않아야 하고, 둘째, 교각의 기초공간을 받치는 토사를 제거하여 암석지반까지 내려 앉혀야 하며, 셋째, 상기 작업기간 중 수압 차로 인해 침수터널이 형성되는 것을 막아야 한다.That is, first, the pier should not be inclined even if it is built on the inclined floor, and second, the sediment supporting the foundation space of the pier should be removed and settled down to the rock ground. Third, the flooding tunnel is formed due to the water pressure difference during the work period. Should be prevented.

이 공정에는 교각 설치장소에 정박하여 파일을 박고 지상에서 제작된 무거운 교각을 들어 파일에 맞출 수 있는 크레인과 드릴, 준설펌프, 콘크리트 펌프 및 파일을 정확한 위치에 타설할 수 있는 해머와 발전기 등을 갖춘 작업선과 자재 운반선이 거의 모든 공정을 수행한다.The process includes cranes, drills, dredging pumps, concrete pumps, and hammers and generators that can cast piles in the correct position, anchoring piles and anchoring piles and placing heavy piers on the ground to fit piles. Working ships and material carriers perform almost all processes.

다시 말하면 교각의 수중설치공법은 교각이 방수 상태가 완벽한 물막이와 거푸집을 겸하는 셈이므로, 터파기 면적이 교각의 단면과 일치하여 잔토량(殘土量)이 매우 적고 수상 구조물이 지상에서 제작되거나 상판에서 진행되므로 분업 내지 협업으로 공사가 상당히 빨리 진척될 수 있는 장점이 있다.In other words, the pier's underwater installation method means that the pier is a perfect water barrier and formwork, so that the excavation area is consistent with the cross section of the pier, so the amount of residual soil is very low and the floating structure is made from the ground or the roof. Since the work proceeds from the division of labor or collaboration, there is an advantage that can proceed fairly quickly.

[문헌 4] Tidal power. Daum 백과사전. (검색 2008. 11.25) Document 4 Tidal power. Daum Encyclopedia. (Search Nov. 25, 2008) [문헌 5] 수력발전. Daum 백과사전 2-3쪽. (검색 2008. 11. 25.) Ref. 5 Hydropower. Daum Encyclopedia 2-3. (Search Nov. 25, 2008) [문헌 6] 조력발전을 위한 댐 건설중 기초공법연구. 국가지식포럼. Nate 조력발전. (검색일; 2008. 11. 25)[Document 6] Study on basic construction method of dam construction for tidal power generation. National Knowledge Forum. Nate tidal power. (Search Date; November 25, 2008) [문헌 7] Tidal power. 4-5쪽. DAUM 백과사전. (검색일; 2008. 11. 25.) Document 7 Tidal power. P. 4-5. DAUM Encyclopedia. (Search Date; November 25, 2008)

그러므로 수심과 유속, 파도, 구조물의 구조 등 여건에 따라 임시 물막이 공사를 거치지 않고도 교각을 암반지반에 완벽하게 결합하고 나머지 공사는 물 위에서 마무리함으로써 건설경비를 절약하고 공사기간을 단축하는데 목적이 있다. Therefore, the purpose is to save construction costs and shorten the construction period by combining the piers perfectly on the rock ground without going through the temporary barrier construction depending on the water depth, velocity, wave, structure of the structure and finishing the rest on the water.

상기 목적을 달성하기 위하여, 설치현장에 대한 지질조사자료에 의해 작성된 설계에 따라 교각의 외벽 거푸집(152b)을 기초공간(151)부터 상단까지 일체형으로 조립할 때, 상기 교각 내부를 복수의 중심파일공간(148a)과 기초공간(151)의 연약지반을 제거하는 출입공간(149)으로 구성하고, 기초공간 벽(151a)의 두께를 일정하게 하거나 밑은 좁고 위쪽은 넓게 하며, 상기 기초공간 벽 밑면에 보호하도록 단면이 직각삼각형인 강철 비트(154)를 부착한다.In order to achieve the above object, when assembling the outer wall formwork 152b of the piers integrally from the base space 151 to the top according to the design made by the geological survey data on the installation site, the interior of the piers a plurality of central pile space And an entrance space 149 for removing the soft ground of the foundation space 151, and make the thickness of the foundation space wall 151a constant or narrow at the bottom and wide at the bottom. Attach a steel bit 154 having a right triangle in cross section to protect it.

[문헌 1] KR 10-2009-0088807. 2009. 9. 21. 1, 8쪽, 도면 1.Document 1 KR 10-2009-0088807. September 21, 2009, p. 8, Drawing 1.

[문헌 2] Tidal power. Daum 백과사전. (검색 2008. 11.25) Document 2 Tidal power. Daum Encyclopedia. (Search Nov. 25, 2008) [문헌 3] 수력발전. Daum 백과사전 2-3쪽. (검색 2008. 11. 25.) [3] Hydropower. Daum Encyclopedia 2-3. (Search Nov. 25, 2008) [문헌 4] 조력발전을 위한 댐 건설중 기초공법연구. 국가지식포럼. Nate 조력발전. (검색일; 2008. 11. 25)[Document 4] Study on the basic construction method of dam construction for tidal power generation. National Knowledge Forum. Nate tidal power. (Search Date; November 25, 2008) [문헌 5] Tidal power. 4-5쪽. DAUM 백과사전. (검색일; 2008. 11. 25.) Document 5 Tidal power. P. 4-5. DAUM Encyclopedia. (Search Date; November 25, 2008)

본 발명은 수심과 유속, 파도, 수상구조물의 구조 등 제반 조건과 상관없이 임시 물막이 공사를 거치지 않고도 교각을 해저 암반에 완벽하게 결합하고 상단을 수상에 노출함으로써 잔여공사를 수상에서 마무리가 가능하여 건설경비를 절약하고 공사기간을 단축하는데 목적이 있다.
In the present invention, regardless of the water depth, flow rate, waves, structure of the water structures, etc., the construction of the remaining works can be completed by combining the pier perfectly with the sea bed and exposing the top to the sea without the need for temporary water barrier construction. The purpose is to save costs and shorten the construction period.

상기 목적을 달성하기 위하여, 교각(95)의 수중설치공법은 해상이나 하천에 수상구조물을 축조하기 위한 교각설치공법에 있어서;
연약지반(157) 제거작업공간인 기초공간(151)을 형성한 기초공간 벽(151a)과, 해저에서 수상(水上)까지 연장되고 복수의 중심파일공간(148a)과 출입과 토석 반출 가능한 복수의 출입공간(149)을 가진 본체가 일체형이 되도록 지상에서 거푸집(152)으로 제작된 교각(95);
상기 교각(95)이 암석지반(156)과 결합할 때까지 위치변동이나 기울어짐이 없도록 하단이 상기 암석지반(156)에 고정되고 상단은 상기 중심파일공간(148a)에 삽입된 복수의 중심파일(148);
상기 연약지반(157) 층이 두터운 해저는 상기 기초공간(151)에서 상기 암석지반(156)까지 도달하도록 상기 중심파일(148) 주변에 타설된 복수의 파일(32)로 구성된 교각설치공정과;
상기 교각(95) 외벽 상단에서 상기 교각(95) 주변 해저까지 덮이도록 임시로 설치되어 배수된 상기 기초공간(151)으로 침수터널이 형성되는 것을 방지하는 방수커튼(158) 설치공정이 포함되되;
상기 교각(95)이 상기 중심파일(148)에 조립되고 상기 방수커튼(158)을 토사(159)로 눌러 배수된 상기 기초공간 벽(151a)을 상기 암석지반(156)까지 내려 앉힌 후에 상기 기초공간(151)과 상기 출입공간(149) 및 상기 중심파일공간(148a) 중 잔여공간을 철근 콘크리트로 채움으로써 수상(水上)에서 잔여공사가 가능하므로 임시 물막이설치공정이 생략가능한 것을 특징으로 한다.

상기 교각(95)은 상기 연약지반(157)이 제거된 해저지반 단면을 자체 하중으로 따라 내려가도록 상기 기초공간 벽(151a) 하단에 쐐기형 강철 비트(154)가 부착되고, 상기 중심파일공간(148a)과 상기 출입공간(149)이 상기 기초공간(151)에서 상기 본체 상단까지 관통한 것을 특징으로 한다.

삭제

상기 잔여공사는 지상에서 제작된 수상구조물이 상기 교각(95) 상단에 조립되거나, 상기 교각(95) 상단에 가설된 난간(155) 또는 상기 교각(95)으로 형성된 수로에 물막이로 이용가능한 양쪽 수문(76) 내측에서 마무리 가능한 것을 특징으로 한다.
In order to achieve the above object, the underwater installation method of the pier (95) in the pier installation method for constructing the water structure on the sea or river;
The base wall 151a which forms the foundation space 151, which is the work for removing the soft ground 157, and a plurality of central pile spaces 148a extending from the sea floor to the water, and a plurality of entrance and excavation works Pier 95 made of formwork 152 on the ground so that the main body having an access space 149 is integrated;
A plurality of central piles having a lower end fixed to the rock ground 156 and an upper end inserted into the central pile space 148a so that the pier 95 does not have a positional change or inclination until the piers 95 are combined with the rock ground 156. (148);
A pier installation process consisting of a plurality of piles (32) placed around the central pile (148) to reach the bottom of the soft ground (157) layer from the base space (151) to the rock foundation (156);
It includes a waterproof curtain (158) installation process to prevent the submerged tunnel is formed in the base space 151 is temporarily installed to cover the seabed around the pier 95 from the top of the outer wall of the pier (95);
After the piers 95 are assembled to the central pile 148 and the waterproof curtain 158 is pressed into the earth and sand 159, the foundation space wall 151a is lowered to the rock foundation 156 and then the foundation By filling the remaining space of the space 151 and the access space 149 and the central pile space 148a with reinforced concrete, it is possible to carry out the remaining construction in the water phase, so that the temporary water barrier installation process can be omitted.

The pier 95 has a wedge-shaped steel bit 154 attached to the bottom of the base space wall 151a so that the cross section of the subsea ground from which the soft ground 157 has been removed is under its own load, and the central pile space ( 148a and the access space 149 penetrate from the base space 151 to the upper end of the main body.

delete

The remaining construction is a water surface structure that is produced on the ground is assembled on the top of the pier (95), or both sluice available to the waterway formed by the railing 155 or the pier 95 is installed on the top of the pier (95) (76) It can be finished on the inside.

수심이 깊을수록 난이도가 높아지는 임시 물막이 공사가 생략됨으로써 공사기간이 단축되고, 공사비용이 대폭 절감될 뿐만 아니라, 공사기간 중에도 조석간만이나 물의 흐름이 정상적으로 유지되므로 환경문제가 거의 발생하지 않는다.
특히 교각과 구조물 제작으로부터 잔여공사까지 전문화된 분업화 내지 협업이 유기적으로 추진되므로 기후조건이 허락되는 한 공사기간이 획기적으로 단축될 수 있다.
The deeper the water depth, the more difficult the temporary barrier construction is omitted, which shortens the construction period, greatly reduces the construction cost, and maintains the tidal flow or the water flow normally during the construction period.
In particular, the specialized division of labor or cooperation from the manufacture of bridges and structures to the remaining works is promoted organically, so the construction period can be dramatically shortened as long as the weather conditions allow.

제1도는 중심파일과 건축 파일로 암반에 결합한 조력발전소 교각 입면도
제2도는 중심파일공간과 출입공간 내측 거푸집을 포함한 교각 거푸집 평면도
제3도는 교각의 기초공간 부분의 내부 및 외부 거푸집 평면도
제4도는 거꾸로 세워놓은 교각 거푸집 종단면도
제5도는 방수천이 설치된 교량 교각 입면도
제6도는 방수천이 설치된 교량 교각 측면도
제7도는 조력발전소 교각의 본체부분 단면도
제8도는 조력발전소 교각의 기초공간부분 평면도
제9도는 조력발전소의 수차기초 부분 평면도
제10도는 조력발전소의 도로 상판 및 발전소 상판 부분 평면도
1 is an elevation view of a tidal power plant piers coupled to a rock with a central pile and a construction pile
2 is a plan view of the bridge formwork including the central pile space and the formwork inner formwork
3 is a plan view of the interior and exterior formwork of the foundation space portion of the piers
4 is a vertical cross-sectional view of the bridge formwork upside down
5 is an elevation view of a bridge pier with a waterproof cloth installed
6 is a side view of bridge pier with waterproof cloth
7 is a cross-sectional view of the main body of the tidal bridge piers
8 is a plan view of the basic space of the tidal bridge piers
9 is a plan view of aberration foundation of tidal power plant
10 is a plan view of the road top and the power plant top of the tidal power plant

이하 도면을 참조하여 본 발명의 바람직한 실시 예에 따른 임시 물막이 공사가 생략된 교각의 수중설치공법에 대하여 설명한다.
With reference to the drawings will be described with respect to the underwater installation method of the pier with the temporary water barrier construction is omitted according to a preferred embodiment of the present invention.

도 1은 중심파일(148)과 파일(32)로 암반에 결합한 수차발전소 교각(59) 입면도로, 수심과 연약지반 두께 및 암석지반의 강도, 그리고 수면에 노출되는 높이에 따라서 지상에서 제작된 중심파일(148), 및 도 1과, 도 5 내지 도 8과 같은 구조를 가진 교각(95) 본체 및 기초공간 벽(151a)의 높이가 결정된다.
FIG. 1 is an elevation view of an aberration power plant piers 59 coupled to a rock by a central pile 148 and a pile 32, the center of which is manufactured from the ground according to the depth of the water and the soft ground, the strength of the rock ground, and the height exposed to the surface of the water. The heights of the pile 148 and the pier 95 body and the foundation wall 151a having the structure shown in FIGS. 1 and 5 to 8 are determined.

도 2는 교각(95) 본체를 성형하는 거푸집 평면도, 도 3은 기초공간 벽(149a)을 성형하는 거푸집(152a, 152b) 평면도이고, 도 4는 본체 하중이 기초공간(151)보다 무거운 교각(95)을 거꾸로 세워 제작하는 거푸집(152) 종단면도로, 해저에서 수상으로 노출되는 본체와 해저에 묻히는 기초공간 벽(151a)이 일체형으로 제작되는데, 본체는 도 1 및 도 5 내지 도 7과 같이 중심파일(148)이 삽입되는 복수의 중심파일공간(148a)과 작업자의 출입과 토석 반출, 및 환기통로인 복수의 출입공간(149)이 기초공간(151)에서 본체 상단까지 관통하되, 크레인으로 들어올릴 수 있는 교각(95)의 하중과 수압을 견딜 수 있는 벽체를 고려하여 출입공간(149)이 원통형, 또는 사각기둥 형태로 성형 된다.
FIG. 2 is a plan view of the formwork forming the main body of the pier 95, FIG. 3 is a plan view of the formwork 152a and 152b forming the foundation wall 149a, and FIG. 95 is a vertical cross-sectional view of the formwork 152, which is made upside down, the main body exposed to the water surface from the seabed and the foundation space wall 151a buried in the seabed are made in one piece, the main body is the center as shown in Figs. A plurality of central pile space 148a into which the pile 148 is inserted and a plurality of entrance spaces 149 which are the entrance and exit of the worker and the ventilation passage, and the ventilation passage penetrate from the base space 151 to the upper end of the main body, are lifted by a crane. The entrance space 149 is formed in the shape of a cylindrical or square column in consideration of a load of the piers 95 that can be raised and a wall capable of withstanding hydraulic pressure.

도 5는 기초공간(151a) 하단에 쐐기형 강철 비트(154)가 부착되고 교각(95) 외 측에 임시로 설치된 방수커튼이 토사로 해저에 밀착된 교각(95) 입면도, 도 6은 상기 교각 측면도로서, 교각(95)이 해저지반에 안착할 때 철근 콘크리트로 암반과 결합하는 교각기초의 거푸집을 겸하는 기초공간 벽(151a) 하단이 교각(95) 하중과 가벼운 타격(打擊)으로 연약지반(157)은 물론 무른 암반까지 파고들어갈 수 있도록 쐐기형 강철 비트(154)가 부착된다.
5 is an elevation view of the piers 95 where wedge-shaped steel bits 154 are attached to the bottom of the foundation space 151a and the waterproof curtain temporarily installed outside the piers 95 is adhered to the sea floor by earth and sand, and FIG. 6 is the piers. As a side view, the lower part of the foundation space wall 151a, which serves as the foundation of the bridge foundation, which combines with the rock with reinforced concrete when the pier 95 is seated on the seabed, 157 is of course attached with a wedge shaped steel bit 154 to penetrate into soft rock.



연약지반(157)이 너무 깊어 기초공간(151)이 암반에 도달할 수 없을 때는 도 1 및 도 5와 같이 중심파일(148) 주변에 파일(32)을 박아 기초공간(151)을 채우는 콘크리트와 결합하고, 연약지반(157)이 얇거나 단단한 암반이 드러날 때는 드릴(drill)로 뚫어서 중심파일(148)이 깊이 박히도록 한다.
When the soft ground 157 is too deep to prevent the foundation space 151 from reaching the rock, the concrete 32 filling the foundation space 151 by driving the pile 32 around the central pile 148 as shown in FIGS. 1 and 5. When combined, when the soft ground 157 is exposed to a thin or hard rock is drilled (drill) so that the central pile 148 is deeply embedded.

교각(95)의 수중설치공정은 공사현장과 가까운 지상에서 중심파일(148)과 교각(95), 상판 등을 제작하는 것으로 시작되는데 공사 규모에 따라서 1개 내지 복수의 규격화된 형틀로 연속 제작되기 때문에 거의 완벽하게 규격화되고 설치 및 조립 팀과 분업화되어 공사진척도가 빨라지질 수 있다.
Underwater installation process of the pier (95) begins with the production of the central pile (148), pier (95), top plate, etc. on the ground close to the construction site, depending on the construction scale to be continuously produced in one to a plurality of standardized This can result in near-standardization and division of work with installation and assembly teams, resulting in faster photographic scales.


기초공간(151)이 배수로 비워졌을 때 수압으로 침수터널이 형성될 수가 있으므로 도 5 및 도 6에 도시된 바와 같이 교각(95) 외벽을 둘러싼 방수커튼(158)이 교각(95) 주변 해저까지 덮이도록 설치되고 토사(159)로 눌러 해저에 밀착시키되 토사가 급류로 쓸려나가지 않도록 조치한다.
Since the submerged tunnel can be formed by hydraulic pressure when the foundation space 151 is drained, the waterproof curtain 158 surrounding the outer wall of the pier 95 covers the sea floor around the pier 95 as shown in FIGS. 5 and 6. It is installed so as to be in close contact with the seabed by pressing the earth and sand 159, so that the earth and sand to be washed out to the rapids.

교각(95)을 중심파일(148)에 끼웠을 때 기초공간(151)에 갇혀있던 물이 교각(95) 상단으로 넘칠 정도로 강철 비트(154)가 연약지반(157) 속으로 깊이 박히면 방수커튼(158)이 없어도 침수터널이 방지될 수 있지만, 바위에 걸치거나 얕게 박히면 방수커튼(158)이 해저에 넓게 밀착되지 않고는 침수터널을 막을 수 없고, 특히 교각(95) 내부가 배수로 비워졌을 때 부력으로 솟구칠 수도 있다.
When the steel bit 154 is soaked into the soft ground 157 so that the water trapped in the foundation space 151 when the bridge 95 is inserted into the central pile 148 overflows to the top of the bridge 95, the waterproof curtain Inundation tunnels can be prevented without (158), but if they are overhanging or shallowly embedded in the rock, the waterproof curtains (158) will not be able to block the inundation tunnels unless they are in close contact with the sea floor, especially if the interior of the pier (95) has been drained by drainage. When buoyancy may rise.

연약지반(157)이 제거된 후에 기초공간(151)과 출입공간(149) 및 중심파일공간(148a) 중 중심파일(148) 상단의 잔여공간이 철근콘크리트로 채워지면, 노출된 교각(95)으로 형성된 수로에서 양쪽 수문을 임시 물막이로 이용하거나 수상(水上)에 노출된 교각(95)에서 잔여공사가 가능하다.
After the soft ground 157 is removed, if the remaining space on the top of the central pile 148 of the base space 151 and the access space 149 and the central pile space 148a is filled with the reinforced concrete, the exposed piers 95 It is possible to use both water gates as temporary water barriers in the waterways formed by the waterway or to carry out the remaining work in the piers 95 exposed to the water.

도 7은 조력발전소 교각(95) 본체, 도 8은 기초공간 벽(151a) 평면도이고, 도 9는 임시 물막이로 이용된 수문(76) 내에서 수차기초를 설치하는 조력발전소 해저 부분 평면도, 도 10은 교각 상단에 발전소 상판이 설치된 조력발전소 상단 평면도로, 조력발전소 공사에서 교각(95) 사이를 수차기초(103)로 연결할 때, 도 9에 도시된 바와 같이 양쪽 수문(76)을 닫고 배수한 후에 철근 콘크리트를 타설하거나 지상에서 제작된 수차기초(103)를 해저에 앉히고 밑으로 뚫린 공간을 통해 연약지반을 제거한 공간을 콘크리트로 채운다.
FIG. 7 is a top view of the tidal power plant pier 95, FIG. 8 is a plan view of the foundation space wall 151a, and FIG. 9 is a partial plan view of the tidal power plant subsea to install aberration foundations in the water gate 76 used as a temporary water barrier. Is a top plan view of the tidal power plant with the power plant top plate installed on the top of the pier, when the tidal power plant construction connects the bridge 95 with the aberration foundation 103, after closing and draining both of the gates 76 as shown in FIG. Reinforce the concrete or ground the aberrations (103) made from the ground to sit on the seabed and fill the space to remove the soft ground through the space drilled below with concrete.

위와 같은 교각(95) 설치공법으로는 교각(95)의 수상 높이를 조정하기가 어려우므로 교각(95) 상단에 가설된 난간(155)에서 발전소 상판(160) 설치높이까지 연장하고, 지상에서 제작한 도로 상판(124a)과, 조력발전소의 경우 인양구(44)를 가진 발전소 상판(160)을 조립한 후 잔여공사가 상기 상판(160)에서 마무리 가능한 것을 특징으로 한다.
It is difficult to adjust the height of the piers (95) by the installation method such as the piers (95) above, extending from the railings (155) installed on the top of the piers (95) to the installation height of the power plant top plate 160, manufactured on the ground One road top plate (124a), and in the case of tidal power plant, after the power plant top plate 160 having the lifting port 44 is characterized in that the remaining work can be finished in the top plate 160.

Claims (5)

해상이나 하천에 수상구조물을 축조하기 위한 교각설치공법에 있어서;
연약지반(157) 제거작업공간인 기초공간(151)을 형성한 기초공간 벽(151a)과, 해저에서 수상(水上)까지 연장되고 복수의 중심파일공간(148a)과 출입과 토석 반출 가능한 복수의 출입공간(149)을 가진 본체가 일체형이 되도록 지상에서 거푸집(152)으로 제작된 교각(95);
상기 교각(95)이 암석지반(156)과 결합할 때까지 위치변동이나 기울어짐이 없도록 하단이 상기 암석지반(156)에 고정되고 상단은 상기 중심파일공간(148a)에 삽입된 복수의 중심파일(148);
상기 연약지반(157) 층이 두터운 해저는 상기 기초공간(151)에서 상기 암석지반(156)까지 도달하도록 상기 중심파일(148) 주변에 타설된 복수의 파일(32)로 구성된 교각설치공정과;
상기 교각(95) 외벽 상단에서 상기 교각(95) 주변 해저까지 덮이도록 임시로 설치되어 배수된 상기 기초공간(151)으로 침수터널이 형성되는 것을 방지하는 방수커튼(158) 설치공정이 포함되되;
상기 교각(95)이 상기 중심파일(148)에 조립되고 상기 방수커튼(158)을 토사(159)로 눌러 배수된 상기 기초공간 벽(151a)을 상기 암석지반(156)까지 내려 앉힌 후에 상기 기초공간(151)과 상기 출입공간(149) 및 상기 중심파일공간(148a) 중 잔여공간을 철근 콘크리트로 채움으로써 수상(水上)에서 잔여공사가 가능하므로 임시 물막이설치공정이 생략가능한 것을 특징으로 하는 교각의 수중설치공법.
In pier installation method for constructing aquatic structure on the sea or river;
The base wall 151a which forms the foundation space 151, which is the work for removing the soft ground 157, and a plurality of central pile spaces 148a extending from the sea floor to the water, and a plurality of entrance and excavation works Pier 95 made of formwork 152 on the ground so that the main body having an access space 149 is integrated;
A plurality of central piles having a lower end fixed to the rock ground 156 and an upper end inserted into the central pile space 148a so that the pier 95 does not have a positional change or inclination until the piers 95 are combined with the rock ground 156. (148);
A pier installation process consisting of a plurality of piles (32) placed around the central pile (148) to reach the bottom of the soft ground (157) layer from the base space (151) to the rock foundation (156);
It includes a waterproof curtain (158) installation process to prevent the submerged tunnel is formed in the base space 151 is temporarily installed to cover the seabed around the pier 95 from the top of the outer wall of the pier (95);
After the piers 95 are assembled to the central pile 148 and the waterproof curtain 158 is pressed into the earth and sand 159, the foundation space wall 151a is lowered to the rock foundation 156 and then the foundation The bridge pier, characterized in that the temporary construction of the water can be omitted because the remaining work in the water (water) by filling the remaining space of the space 151 and the access space 149 and the central pile space 148a with reinforced concrete Underwater installation method.
청구항 1에 있어서,
상기 교각(95)은 상기 연약지반(157)이 제거된 해저지반 단면을 자체 하중으로 따라 내려가도록 상기 기초공간 벽(151a) 하단에 쐐기형 강철 비트(154)가 부착되고, 상기 중심파일공간(148a)과 상기 출입공간(149)이 상기 기초공간(151)에서 상기 본체 상단까지 관통한 것을 특징으로 하는 교각의 수중설치공법.
The method according to claim 1,
The pier 95 has a wedge-shaped steel bit 154 attached to the bottom of the base space wall 151a so that the cross section of the subsea ground from which the soft ground 157 has been removed is under its own load, and the central pile space ( 148a) and the installation space of the piers, characterized in that the access space 149 penetrated from the base space 151 to the upper end of the body.
청구항 1에 있어서,
상기 잔여공사는 지상에서 제작된 수상구조물이 상기 교각(95) 상단에 조립되거나, 상기 교각(95) 상단에 가설된 난간(155) 또는 상기 교각(95)으로 형성된 수로에 물막이로 이용한 양쪽 수문(76) 내측에서 마무리 가능한 것을 특징으로 하는 교각의 수중설치공법.
The method according to claim 1,
The remaining construction is both water gates used as a water barrier on the waterway structure formed on the pier (95) or the handrail 155 or the pier 95 is installed on the top of the pier (95) on the ground 76) Underwater installation method of piers, characterized in that the finish from the inside.
삭제delete 삭제delete
KR1020100027026A 2010-03-26 2010-03-26 Construction method of the pier without the temporary dike KR101256265B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100027026A KR101256265B1 (en) 2010-03-26 2010-03-26 Construction method of the pier without the temporary dike

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100027026A KR101256265B1 (en) 2010-03-26 2010-03-26 Construction method of the pier without the temporary dike

Publications (2)

Publication Number Publication Date
KR20110107888A KR20110107888A (en) 2011-10-05
KR101256265B1 true KR101256265B1 (en) 2013-07-15

Family

ID=45025823

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100027026A KR101256265B1 (en) 2010-03-26 2010-03-26 Construction method of the pier without the temporary dike

Country Status (1)

Country Link
KR (1) KR101256265B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951612A (en) * 2016-07-01 2016-09-21 杭州江润科技有限公司 Defect repairing reinforcing structure for underwater pile head of serving bridge and construction method of defect repairing reinforcing structure
KR20220169483A (en) * 2021-06-20 2022-12-27 홍문표 Construction of tidal and wave power generating station under water

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572706B (en) * 2013-11-21 2015-11-25 西南科技大学 Assembled steel reinforced concrete bridge construction technique
CN103572705B (en) * 2013-11-21 2015-11-25 西南科技大学 The construction method of prefabricated reinforced concrete block packaged type bridges pier
CN104088230B (en) * 2014-07-29 2016-03-16 中国石油集团川庆钻探工程有限公司 The method of attachment of prefabricated reinforced concrete block packaged type bridges pier
CN108153988B (en) * 2018-01-09 2021-02-09 中南大学 Method for determining design parameters of deep horizontal water-stop curtain of foundation pit of strongly permeable stratum
CN115262497A (en) * 2022-08-10 2022-11-01 东南粤水电投资有限公司 Underwater concrete repairing method for trash rack gate slot of hydropower station

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07233532A (en) * 1994-02-25 1995-09-05 Toda Constr Co Ltd Caisson method
KR20070020992A (en) * 2005-08-17 2007-02-22 은성기초건설(주) framework for bridge construction and method for installing the same
KR100697331B1 (en) 2006-07-10 2007-03-26 (주)영광산업개발 The assembly type structure of aqueduct bridges
JP2009209577A (en) 2008-03-04 2009-09-17 Chugoku Electric Power Co Inc:The Marine structure and construction method for marine structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07233532A (en) * 1994-02-25 1995-09-05 Toda Constr Co Ltd Caisson method
KR20070020992A (en) * 2005-08-17 2007-02-22 은성기초건설(주) framework for bridge construction and method for installing the same
KR100697331B1 (en) 2006-07-10 2007-03-26 (주)영광산업개발 The assembly type structure of aqueduct bridges
JP2009209577A (en) 2008-03-04 2009-09-17 Chugoku Electric Power Co Inc:The Marine structure and construction method for marine structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951612A (en) * 2016-07-01 2016-09-21 杭州江润科技有限公司 Defect repairing reinforcing structure for underwater pile head of serving bridge and construction method of defect repairing reinforcing structure
KR20220169483A (en) * 2021-06-20 2022-12-27 홍문표 Construction of tidal and wave power generating station under water
KR102487487B1 (en) 2021-06-20 2023-01-10 홍문표 Construction of tidal and wave power generating station under water

Also Published As

Publication number Publication date
KR20110107888A (en) 2011-10-05

Similar Documents

Publication Publication Date Title
KR101256265B1 (en) Construction method of the pier without the temporary dike
CN102561371B (en) Steel caisson enclosure structure at island-tunnel combination part and construction method thereof
US20160376762A1 (en) Construction method for planting hollow columns in a seabed of a marine environment for supporting waterborne structures thereon
KR100819624B1 (en) Waterproof open caisson assembly and concrete foundation construction method using the same
CN102966108A (en) Construction method of deep foundation pit close to building and adopting underground structure as internal support
CN111502725B (en) Artificial island type middle well structure of submarine tunneling tunnel
CN112761644A (en) Suspension sinking vertical shaft well completion process
CN112609591A (en) Construction method for deep-water shallow-covering-layer fully-socketed bridge foundation
KR100383409B1 (en) Construction Method of Direct Foundation for using Caisson
CN109707002B (en) Device and method for accurately positioning, sinking and installing large water intake head
RU2386755C1 (en) Method for arrangement of shallow subway at water area bottom
KR20140092217A (en) Construction method of the pier with the working bardge
JPH06146305A (en) Underwater foundation and installation method thereof
Bittner et al. Design and construction of the Sutong Bridge foundations
KR100621410B1 (en) Dry Construction Method of Underwater Structure Using Watertight Caisson
CN207143998U (en) A kind of underwater bridge structure
RU2382142C2 (en) Method for formation of closed section of water area bottom with possibility of its drying and system, which realises it
JP2000265450A (en) Artificial ground consisting of porous housing and construction method therefor
RU2465408C1 (en) Method to construct and repair water conduits and headers of shallow waste water on bottom of rivers and water reservoirs
JP2004108078A (en) Construction method for underwater shaft, underwater shaft, connection method for shaft and adit, and pit structure
RU2770187C1 (en) Method for structure construction in the under-runner space of rivers and canals in urban development
CN216238559U (en) Foundation pit enclosure construction device
CN214170540U (en) Suspension sinking shaft structure
RU2791119C1 (en) Method for construction of geotechnical structures in the water area of urban rivers and canals
CN220953191U (en) Under pass railway bridge river course and open up construction structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160404

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170407

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee