KR101239674B1 - Construction method of drain apparatus for suction drain method - Google Patents

Construction method of drain apparatus for suction drain method Download PDF

Info

Publication number
KR101239674B1
KR101239674B1 KR1020110070819A KR20110070819A KR101239674B1 KR 101239674 B1 KR101239674 B1 KR 101239674B1 KR 1020110070819 A KR1020110070819 A KR 1020110070819A KR 20110070819 A KR20110070819 A KR 20110070819A KR 101239674 B1 KR101239674 B1 KR 101239674B1
Authority
KR
South Korea
Prior art keywords
drainage
drain
ground
insert
tube
Prior art date
Application number
KR1020110070819A
Other languages
Korean (ko)
Other versions
KR20130010184A (en
Inventor
신민식
김동해
이준석
노진택
Original Assignee
주식회사 동아지질
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 동아지질 filed Critical 주식회사 동아지질
Priority to KR1020110070819A priority Critical patent/KR101239674B1/en
Publication of KR20130010184A publication Critical patent/KR20130010184A/en
Application granted granted Critical
Publication of KR101239674B1 publication Critical patent/KR101239674B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/005Drainage conduits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2450/00Gaskets
    • E02D2450/10Membranes
    • E02D2450/105Membranes impermeable
    • E02D2450/106Membranes impermeable for liquids

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

본 발명은 시공성 향상을 위한 배수용 삽입체의 시공 방법에 관한 것으로, 더욱 상세하게는 배수용 삽입체를 시공할 때 실제 지반의 지층 분포에 적응적으로 대처할 수 있도록, 기밀튜브가 하단에 설치된 배수재를 지반 내부에 삽입한 후 배수재의 외측을 통해 안내관을 지반 내부에 삽입하고 배수재의 상단에 불투과튜브를 설치한 상태에서 안내관을 지반에서 빼낸 상태에서 배수재의 상단에 연결구 및 배수관을 연결함으로써 시공이 완료되는 시공성 향상을 위한 배수용 삽입체의 시공 방법에 관한 것이다.
본 발명에 따르면, 배수재의 하단에 일정길이의 기밀튜브를 열융착시켜 설치하는 제1단계와; 배수재의 하단에 정착구를 연결하는 제2단계와; 맨드릴을 정착구에 취부하여 배수재를 지반 내부로 수직 삽입하여 정착시키는 제3단계와; 배수재를 절단하되 배수재의 상단이 외부로 노출되게 삽입된 깊이보다 길게 절단하는 제4단계와; 배수재를 중심에 두고 맨드릴을 사용하여 안내관을 지반 내부로 삽입하되 압축공기를 분사하면서 안내관의 상단이 외부로 노출되게 삽입하는 제5단계와; 배수재의 상단에 불투과튜브를 열융착시켜 설치하는 제6단계와; 안내관을 맨드릴을 사용하여 외부로 빼내는 제7단계와; 배수재의 상단에 연결구를 열융착시켜 연결하는 제8단계와; 연결구를 배수관과 연결하여 배수용 삽입체의 시공을 완료하는 제9단계를; 포함하여 구성됨을 특징으로 한 시공성 향상을 위한 배수용 삽입체의 시공 방법이 제공된다.
The present invention relates to a method of constructing a drainage insert for improving workability, and more particularly, a drainage tube installed at the bottom of an airtight tube so as to cope adaptively with the actual ground layer distribution when constructing a drainage insert. After inserting the inside of the ground, insert the guide tube through the outside of the drainage into the ground, and with the impermeable tube installed on the top of the drainage, with the guide tube removed from the ground and connecting the connector and the drain pipe to the top of the drainage It relates to a construction method of the drainage insert for improving the workability when the construction is completed.
According to the present invention, the first step of installing by heat-sealing the airtight tube of a predetermined length in the lower end of the drain; Connecting the anchorage to the lower end of the drain; A third step of attaching the mandrel to the anchorage and inserting the drainage material vertically into the ground to fix the mandrel; Cutting the drainage but cutting the drainage longer than a depth inserted to expose the top of the drainage to the outside; A fifth step of inserting the guide tube into the ground using a mandrel with the drainage in the center and inserting the upper end of the guide tube to the outside while injecting compressed air; A sixth step of thermally fusion installing the impermeable tube on the top of the drain; A seventh step of drawing out the guide tube to the outside using a mandrel; An eighth step of connecting the connector to the top of the drain by heat fusion; A ninth step of connecting the connector with the drain pipe to complete construction of the drain insert; Provided is a construction method of a drainage insert for improving workability, comprising:

Description

시공성 향상을 위한 배수용 삽입체의 시공 방법{Construction method of drain apparatus for suction drain method}Construction method of drainage insert for improving workability {Construction method of drain apparatus for suction drain method}

본 발명은 시공성 향상을 위한 배수용 삽입체의 시공 방법에 관한 것으로, 더욱 상세하게는 배수용 삽입체를 시공할 때 실제 지반의 지층 분포에 적응적으로 대처할 수 있도록, 기밀튜브가 하단에 설치된 배수재를 지반 내부에 삽입한 후 배수재의 외측을 통해 안내관을 지반 내부에 삽입하고 배수재의 상단에 불투과튜브를 설치한 상태에서 안내관을 지반에서 빼낸 상태에서 배수재의 상단에 연결구 및 배수관을 연결함으로써 시공이 완료되는 시공성 향상을 위한 배수용 삽입체의 시공 방법에 관한 것이다.
The present invention relates to a method of constructing a drainage insert for improving workability, and more particularly, a drainage tube installed at the bottom of an airtight tube so as to cope adaptively with the actual ground layer distribution when constructing a drainage insert. After inserting the inside of the ground, insert the guide tube through the outside of the drainage into the ground, and with the impermeable tube installed on the top of the drainage, with the guide tube removed from the ground and connecting the connector and the drain pipe to the top of the drainage It relates to a construction method of the drainage insert for improving the workability when the construction is completed.

일반적으로 연약지반의 개량을 위해서 우선적으로 시행되는 작업은 연약지반 속에 포함된 간극수를 외부로 흡출시켜 배수하는 작업이다. 이러한 간극수의 배수 작업을 효과적으로 하기 위해 개별 진공 압밀 공법을 사용한다. In general, the first task to improve the soft ground is to drain the gap water contained in the soft ground to the outside. Individual vacuum consolidation methods are used to effectively drain the pore water.

상기와 같은 개별 진공 압밀 공법은 대기압으로 간극수를 흡출하여 배수하는 기존의 공법을 개량 발전시킨 것으로, 대기압을 이용하지 않고 진공펌프에 의한 진공압으로 간극수를 흡출하여 배수하는 공법이다. The individual vacuum consolidation method as described above is an improvement and development of the existing method of sucking and draining the gap water at atmospheric pressure, and is a method of sucking and draining the gap water at the vacuum pressure by the vacuum pump without using the atmospheric pressure.

따라서 간극수의 배수 작업을 신속하고 원활하게 이루어짐에 따라 균일한 지반 안정이 가능하여 가장 많이 사용되고 있다. 이러한 개별 진공 압밀 공법을 행하기 위해서는 진공압을 통해 간극수를 흡출하는 배수용 삽입체를 연약지반 내부에 연속적으로 삽입한다. Therefore, since the drainage work of the pore water is made quickly and smoothly, the uniform ground stability is possible and is most frequently used. In order to perform such an individual vacuum consolidation method, a drainage insert that sucks out the gap water through vacuum pressure is continuously inserted into the soft ground.

상기한 개별 진공 압밀 공법을 위한 배수용 삽입체는, 연약지반 내부에 삽입되어 간극수를 흡출하는 역활을 하는 배수재와, 배수재의 상단에 열융착되어 배수관에 연결되는 연결관과 연결하는 연결구로 구성된다. The drainage insert for the individual vacuum consolidation method is composed of a drain that is inserted into the soft ground and serves to suck out the gap water, and a connector that is connected to the connection pipe connected to the drain pipe by heat-sealing the upper end of the drainage material. .

이때 배수재는 복수의 배수통로가 수직으로 구획된 골조와, 상기 골조의 외측에 설치된 부직포와, 상기 부직포의 상단 외면부에 형성된 불투과층으로 구성된다. 그리고 연결구는 배수재의 상단이 삽입되는 캡과, 상기 캡의 일단에 설치되어 연결관과 나사 체결되는 나사관으로 구성된다. In this case, the drainage material is composed of a frame in which a plurality of drainage passages are vertically divided, a nonwoven fabric provided on the outside of the framework, and an impermeable layer formed on the upper outer surface of the nonwoven fabric. And the connector is composed of a cap is inserted into the top of the drain and the screw pipe is installed on one end of the cap and screwed.

따라서 진공압이 삽입체에 작용하면, 간극수는 부직포에 의해 배수재의 내부로 유입된 후 골조의 배수통로를 따라 연결구와 연결관 및 배수관을 차례대로 거쳐 외부로 배출되게 된다. 그리고 진공압이 작용하지 않더라도 불투과층에 의해 지반 하층에서 흡출된 간극수는 투수성이 양호한 상층으로 유출되지 않게 된다. Therefore, when the vacuum pressure acts on the insert, the gap water is introduced into the drainage material by the nonwoven fabric and then discharged to the outside through the connector, the connecting pipe, and the drain pipe in order along the drainage passage of the frame. And even if the vacuum pressure does not work, the gap water sucked out of the lower layer by the impermeable layer does not flow out into the upper layer having good water permeability.

이에 따라 연약지반 내부에 존재하는 간극수를 진공압을 통하여 효과적으로 배출하여 제거함으로서 연약지반의 개량 작업을 용이하게 행할 수 있게 된다.
Accordingly, by effectively discharging and removing the gap water existing in the soft ground through the vacuum pressure, the improvement work of the soft ground can be easily performed.

상기와 같은 배수용 삽입체를 지반에 시공하고자 할 때는 배수재의 삽입 깊이를 파악하여 배수재의 길이를 결정할 수 있도록 해당 지반의 지층 분포를 사전에 조사해야 한다. When constructing the drainage insert as described above, the ground distribution of the ground must be investigated in advance so that the depth of the drainage can be determined by determining the insertion depth of the drainage.

그리고 사전 조사에 의해 파악된 삽입 깊이에 대응되게 배수재를 절단하고 절단된 배수재의 상단에 불투과층을 형성하며 불투과층이 형성된 배수재의 상단에 연결구를 열융착하여 배수용 삽입체를 제조한다. Then, the drainage material is cut to correspond to the insertion depth determined by the preliminary irradiation, an impermeable layer is formed on the top of the cut drainage material, and the connector is thermally fused to the top of the drainage material on which the impermeable layer is formed.

그런 다음 제조된 배수용 삽입체를 시공 현장으로 운반한 후 배수재의 하단에 장착구를 고정시킨 상태에서 맨드릴(mandrel)을 사용하여 지반 내부에 삽입시켜 시공을 완료한다. Then, after transporting the manufactured drainage insert to the construction site, the mandrel is inserted into the ground using a mandrel fixed to the bottom of the drainage to complete the construction.

여기서 사전 조사에 의해 파악된 지반의 지층 분포가 실제와 상이하여 배수재의 절단 길이와 배수재의 삽입 깊이가 상이하는 경우가 대부분이다. 따라서 지반 상층에 위치해야 하는 배수재의 불투과층이 외부로 노출되거나, 배수재의 하단이 지하수가 존재하는 모래자갈층이나 투수층까지 이르게 된다. Here, in most cases, the ground distribution of the ground identified by preliminary investigation is different from the actual one, so that the cutting length of the drainage material and the insertion depth of the drainage material are different. Therefore, the impermeable layer of the drainage to be located in the upper ground layer is exposed to the outside, or the bottom of the drainage leads to the sand gravel layer or permeable layer where the groundwater exists.

이에 따라 배수재의 불투과층이 외부에 완전히 노출되면, 진공압이 배수재로 제대로 공급되지 않고 손실되어 간극수의 배출 작업이 원활하지 이루어지지 않는 문제점이 있다. Accordingly, when the impermeable layer of the drain material is completely exposed to the outside, there is a problem that the vacuum pressure is not supplied properly to the drain material and thus the gap water is not smoothly discharged.

그리고 배수재의 하단이 지하수가 존재하는 모래자갈층이나 투수층까지 이르게 되면, 진공압이 배수재로 원활하게 공급되더라도 지하수와 공기의 계속된 유입으로 간극수의 배출 작업이 방해되는 문제점이 있다. When the bottom of the drainage reaches the sand gravel layer or the permeable layer in which the groundwater exists, there is a problem that the discharge of the gap water is prevented due to the continuous inflow of groundwater and air even though the vacuum pressure is smoothly supplied to the drainage.

이상과 같이 본 발명은 배수용 삽입체를 시공할 때 실제 지반의 지층 분포에 적응적으로 대처할 수 있는 개별 진공 압밀 공법을 위한 배수용 삽입체의 시공 방법을 제공함에 그 목적이 있다.
As described above, an object of the present invention is to provide a method for constructing a drainage insert for an individual vacuum consolidation method that can cope adaptively with actual ground formation when constructing a drainage insert.

본 발명은 상기와 같은 문제점을 해소하기 위하여 발명된 것으로, 배수재의 하단에 일정길이의 기밀튜브를 열융착시켜 설치하는 제1단계와; 배수재의 하단에 정착구를 연결하는 제2단계와; 맨드릴을 정착구에 취부하여 배수재를 지반 내부로 수직 삽입하여 정착시키는 제3단계와; 배수재를 절단하되 배수재의 상단이 외부로 노출되게 삽입된 깊이보다 길게 절단하는 제4단계와; 배수재를 중심에 두고 맨드릴을 사용하여 안내관을 지반 내부로 삽입하되 압축공기를 분사하면서 안내관의 상단이 외부로 노출되게 삽입하는 제5단계와; 배수재의 상단에 불투과튜브를 열융착시켜 설치하는 제6단계와; 안내관을 맨드릴을 사용하여 외부로 빼내는 제7단계와; 배수재의 상단에 연결구를 열융착시켜 연결하는 제8단계와; 연결구를 배수관과 연결하여 배수용 삽입체의 시공을 완료하는 제9단계를; 포함하여 구성됨을 특징으로 한 개별 진공 압밀 공법을 위한 배수용 삽입체의 시공 방법을 제공한다.
The present invention has been invented to solve the above problems, the first step of thermally sealing the airtight tube of a predetermined length to the bottom of the drainage; Connecting the anchorage to the lower end of the drain; A third step of attaching the mandrel to the anchorage and inserting the drainage material vertically into the ground to fix the mandrel; Cutting the drainage but cutting the drainage longer than a depth inserted to expose the top of the drainage to the outside; A fifth step of inserting the guide tube into the ground using a mandrel with the drainage in the center and inserting the upper end of the guide tube to the outside while injecting compressed air; A sixth step of thermally fusion installing the impermeable tube on the top of the drain; A seventh step of drawing out the guide tube to the outside using a mandrel; An eighth step of connecting the connector to the top of the drain by heat fusion; A ninth step of connecting the connector with the drain pipe to complete construction of the drain insert; It provides a method of constructing the drainage insert for the individual vacuum consolidation method characterized in that it comprises a.

본 발명은 배수재를 필요한 길이만큼 절단하여 시공함에 따라 시공 자재의 구득이 용이한 효과가 있다. 또한 개량 심도의 변화에 따라 배수재의 불투과층을 용이하게 변경 가능하므로 배수용 삽입체에 대한 시공의 용이성 및 정밀성이 향상되어 심도의 변화가 심한 지층 조건에서도 개별 진공 압밀 공법의 적용이 가능한 효과가 있다. The present invention is easy to obtain the construction material by cutting the drainage to the required length construction. In addition, since the impermeable layer of the drain material can be easily changed according to the change of the depth of improvement, the ease and precision of construction for the drainage insert is improved, so that the application of the individual vacuum consolidation method can be applied even in the stiff ground condition. have.

그리고 사전에 시공심도 확인을 위한 시험시공이나 장비의 대기시간이 불필요한 효과도 있다. 또한 시공 조건이 맞으면 배수재 시공 후에도 압밀 기간을 단축하기 위해서 개별 진공 압밀 공법을 적용할 수 있는 효과도 있다. 그리고 배수재에 누기가 발생되는 경우에도 이를 즉시 보수할 수 있으므로 개별 진공 압밀 공법의 적용성을 높이는 효과도 있다. In addition, there is an effect that the waiting time of the test construction or equipment for checking the construction depth in advance is unnecessary. In addition, if the construction conditions are met, there is an effect that can be applied to the individual vacuum consolidation method in order to shorten the consolidation period even after the drainage construction. In addition, even if leakage occurs in the drainage, it can be repaired immediately, thereby increasing the applicability of the individual vacuum consolidation method.

또한 배수재의 하단에 기밀층이 형성됨에 따라, 배수재의 하단이 모래자갈층이나 투수층까지 이르게 되더라도 지하수와 공기의 흡출이 방지되므로 진공압의 손실을 막아 간극수의 배출이 원활하게 이루어지는 효과도 있다. In addition, since the airtight layer is formed at the bottom of the drainage, even if the bottom of the drainage reaches the sand gravel layer or the permeable layer, the outflow of groundwater and air is prevented.

뿐만 아니라 본 발명은 배수재를 지반에 삽입하는 단계들과 배수재에 기밀튜브를 설치하고 연결구와 배수관을 연결하는 단계들로 이분하여 전기한 단계들을 반복 행한 후에 후기한 단계들을 반복 행함으로써 시공성이 더욱 향상되는 효과도 있다.
In addition, the present invention further improves the workability by repeating the steps described later by repeating the steps of inserting the drainage material into the ground and installing the airtight tube to the drainage and connecting the connector and the drain pipe. There is also an effect.

도 1은 본 발명의 제1단계를 도시한 단면도.
도 2는 본 발명의 제2단계를 도시한 단면도.
도 3은 본 발명의 제3단계를 도시한 단면도.
도 4는 본 발명의 제4단계를 도시한 단면도.
도 5는 본 발명의 제5단계를 도시한 단면도
도 6은 본 발명의 제6단계를 도시한 단면도.
도 7은 본 발명의 제7단계를 도시한 단면도.
도 8은 본 발명의 제8단계를 도시한 단면도.
도 9는 본 발명의 제9단계를 도시한 단면도.
도 10은 본 발명에 의해 시공된 배수용 삽입체의 사시도.
1 is a cross-sectional view showing a first step of the present invention.
2 is a sectional view showing a second step of the present invention;
3 is a sectional view showing a third step of the present invention;
4 is a sectional view showing a fourth step of the present invention.
5 is a sectional view showing a fifth step of the present invention.
6 is a sectional view showing a sixth step of the present invention.
7 is a sectional view showing a seventh step of the present invention.
8 is a sectional view showing an eighth step of the present invention.
9 is a sectional view showing a ninth step of the present invention;
10 is a perspective view of the insert for drainage constructed in accordance with the present invention.

이하 본 발명의 바람직한 실시예를 첨부한 도면을 참조하여 상세하게 설명하면 다음과 같다. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 진공압을 이용하여 지반 내부에 존재하는 간극수를 외부로 배출하여 지반을 개량하기 위하여 배수재(10)와 연결구(20)로 구성된 배수용 삽입체(100)를 지반 내부에 삽입 시공하는 방법에 관한 것이다. The present invention is a method of inserting the drainage insert 100 consisting of the drainage material 10 and the connector 20 in the ground to discharge the gap water existing in the ground to the outside by using a vacuum pressure to improve the ground It is about.

특히, 본 발명은 배수용 삽입체(100)를 시공할 때 실제 지반의 지층 분포에 의해 배수재(10)의 삽입 깊이가 다르더라도 이에 적응적으로 대처할 수 있도록 함으로써 시공의 용이성과 정밀성을 높일 수 있는 것이 큰 특징이다. In particular, the present invention can increase the ease and precision of construction by adaptively coping with even when the insertion depth of the drainage material 10 is different by the actual stratum distribution of the ground when constructing the drainage insert 100 It is a big feature.

이는 배수재(10)의 삽입 깊이를 정확하게 알 수 있는 시공 현장에서, 하단에 기밀층을 위한 기밀튜브(40)가 설치된 배수재(10)를 지반 내부에 삽입하여 필요한 길이로 절단한 후, 배수재(10)의 외측을 통해 지반 내부에 안내관(G)을 근입시킨 상태에 배수재(10)의 상단에 불투과층을 위한 불투과튜브(30)를 설치한 다음 안내관(G)을 빼고 배수재(10)의 상단에 연결구(20) 및 배수관(P)과 연결하는 시공 방법에 의한 것이다. This is a construction site that can accurately know the insertion depth of the drainage material 10, after inserting the drainage material 10 is installed in the ground and the airtight tube 40 for the airtight layer at the bottom cut to the required length, the drainage material 10 After installing the impermeable tube 30 for the impermeable layer on the top of the drainage material 10 in the state in which the guide tube (G) in the ground through the outside of the guide tube (G) to remove the drainage material (10) By the construction method to connect with the connector 20 and the drain pipe (P) at the top.

따라서 배수재(10)의 길이를 실제 지반에 삽입되는 길이에 대응되게 구성할 수 있게 된다. Therefore, the length of the drain 10 can be configured to correspond to the length of the actual ground is inserted.

이에 따라 생산 공장에서 배수재(10)를 절단하고 그 상단과 하단에 불투과층을 형성시킨 후 시공 현장으로 운반하여 지반에 시공함으로써, 배수재(10)의 길이가 실제 지반에 삽이되는 깊이와 달라 상단의 불투과층 위치가 맞지 않고 배수재(10)의 하단으로 지하수 및 공기가 흡출되어 간극수의 배출 작업을 제대로 행할 수 없었던 종래의 시공 방법이 가진 문제점을 완전히 해소할 수 있다. Accordingly, by cutting the drainage material 10 in the production plant and forming an impermeable layer at the upper and lower ends thereof and then transporting it to the construction site and constructing the ground, the length of the drainage material 10 is different from the depth that is actually inserted into the ground. The position of the impermeable layer at the upper end does not match, and the groundwater and the air are sucked out to the lower end of the drain 10, so that the problem with the conventional construction method that was not able to properly discharge the gap water can be completely solved.

여기서 상기한 본 발명의 시공성 향상을 위한 배수용 삽입체의 시공 방법을 각 단계별로 상세하게 설명하면 다음과 같다. Herein, the construction method of the drainage insert for improving the workability of the present invention described above will be described in detail for each step.

제1단계는 도 1에 도시된 바와 같이 배수재(10) 하단에 일정길이의 기밀튜브(40)를 열융착시켜 설치하는 단계이다. As shown in FIG. 1, the first step is a step of installing the airtight tube 40 having a predetermined length by heat fusion to the bottom of the drain 10.

이때 기밀튜브(40)는 배수재(10)의 하단에 기밀층을 형성시키기 위한 것으로, 배수재(10)가 지반 내부에 삽입되어 하단으로부터 모래자갈층이나 투수층에 존재하는 지하수나 공기 등이 흡출되는 것을 막아 간극수의 배출을 원활하게 하기 위한 것이다. At this time, the airtight tube 40 is for forming an airtight layer at the bottom of the drain 10, and the drain 10 is inserted into the ground to prevent the ground water or air existing in the sand gravel layer or the permeable layer from being drawn out from the bottom. This is to facilitate the discharge of the pore water.

그리고 배수재(10)는 필요한 길이만큼 절단하여 사용할 수 있도록 롤형태로 감겨 있는 제품이다. 따라서 이후의 단계에서 필요한 길이만큼 절단하게 된다. And the drain material 10 is a product wound in the form of a roll to be used by cutting to the required length. Therefore, it is cut to the required length in a later step.

제2단계는 도 2와 같이 배수재(10)의 하단을 정착구(S)에 고정시키는 단계이다. 상기 정착구(S)는 연결고리와 정착판으로 구성되어 맨드릴(M)을 통해 배수재(10)를 지반 내부에 삽입시켜 정착시키기 위한 것이다. The second step is to fix the lower end of the drain 10 to the fixing device (S) as shown in FIG. The fixing device (S) is composed of a connecting ring and the fixing plate is for fixing by inserting the drainage material 10 into the ground through the mandrel (M).

제3단계는 도 3에 도시된 바와 같이 배수재(10)를 맨드릴(M)을 사용하여 배수용 삽입체(100)를 시공하고자 하는 지반 내부에 삽입하는 단계이다. As shown in FIG. 3, the drainage material 10 is inserted into the ground to be constructed with the drainage insert 100 using the mandrel M as shown in FIG. 3.

이는 배수재(10)의 하단에 고정된 정착구(S)에 맨드릴(M)을 취부한 상태에서 맨드릴(M)을 작동시켜 지반의 삽입 가능한 깊이까지 배수재(10)를 삽입한 후 맨드릴(M)을 빼냄으로써 가능하게 된다. 그러면 배수재(10)는 정착구(S)에 의해 지반 내부에 정착된 상태를 유지하게 된다. This is to operate the mandrel (M) in the state in which the mandrel (M) is attached to the fixing unit (S) fixed to the bottom of the drainage (10) to insert the drainage (10) to the insertable depth of the ground and then the mandrel (M) By taking it out, it becomes possible. Then, the drainage material 10 maintains the state fixed in the ground by the fixing hole (S).

여기서 배수재(10)의 하단이 모래자갈층이나 투수층에 이르더라도 기밀튜브(40)에 의해 기밀층이 되므로, 모래자갈층이나 투수층의에 존재하는 지하수와 공기가 배수재(10)를 통해 흡출되지 않는다. Here, even if the bottom of the drain 10 reaches the sand gravel layer or the permeable layer, the airtight layer 40 becomes an airtight layer, so that the groundwater and air existing in the sand gravel layer or the permeable layer are not sucked out through the drain 10.

제4단계는 도 4에 도시된 바와 같이 배수재(10)의 상단을 절단하는 단계이다. The fourth step is to cut the upper end of the drain 10 as shown in FIG.

즉, 배수재(10)는 지반에 삽입된 깊이에 대응되는 길이로 절단하는 단계이다. 이때 배수재(10)는 상단이 연결구(20)와 연결 가능하도록 외부로 노출되도록 삽입된 깊이보다 길게 절단해야 한다. That is, the drain 10 is a step of cutting to a length corresponding to the depth inserted into the ground. At this time, the drain 10 must be cut longer than the depth is inserted so that the top is exposed to the outside so as to be connected to the connector (20).

제5단계는 도 5와 같이 배수재(10)의 외측을 통해 지반 내부에 안내관(G)을 수직으로 삽입하는 단계이다. The fifth step is a step of vertically inserting the guide tube (G) inside the ground through the outside of the drain 10, as shown in FIG.

즉, 맨드릴(M)을 사용하여 안내관(G)의 상단 일부가 지반의 복토층 외부로 노출되도록 삽입하는 단계이다. 이때 안내관(G)은 배수재(10)의 직경보다 큰 직경을 가진 것으로 구성한다. That is, the step of inserting the upper part of the guide tube (G) using the mandrel (M) to be exposed to the outside of the cover layer of the ground. At this time, the guide tube (G) is configured to have a diameter larger than the diameter of the drain (10).

그리고 안내관(G)을 지반에 삽입할 때는 안내관(G)의 내부로 고압의 압축공기를 분사하면서 삽입해야 한다. 이는 배수재(10)의 상단에 불투과층을 형성하는 작업을 용이하게 할 수 있도록 안내관(G)의 내부로 빈 공간을 형성하기 위한 것이다. And when inserting the guide tube (G) to the ground should be inserted while spraying high-pressure compressed air into the guide tube (G). This is to form an empty space inside the guide tube (G) to facilitate the operation of forming the impermeable layer on the top of the drain 10.

여기서 안내관(G)의 상단 일부를 외부로 노출시킨 것은 이후의 단계에서 안내관(G)을 지반에서 빼낼 때의 작업을 용이하게 할 수 있도록 하기 위함이다. Here, the part of the upper end of the guide tube G is exposed to the outside to facilitate the operation when the guide tube G is removed from the ground in a later step.

제6단계는 도 6에 도시된 바와 같이 안내관(G)의 내부를 통해 배수재(10)의 상단에 불투과층을 위한 불투과튜브(30)를 열융착시켜 설치하는 단계이다. The sixth step is a step of thermally fusion installing the impermeable tube 30 for the impermeable layer on the upper end of the drain 10 through the interior of the guide tube (G) as shown in FIG.

이는 배수재(10)의 상단에 불투과층을 형성시키기 위한 단계이다. 이때 안내관(G)에 의해 배수재(10)의 상단 외측으로는 빈 공간이 마련됨에 따라 상기 불투과튜브(30)를 설치하는 작업이 용이하게 된다. This is a step for forming an impermeable layer on the top of the drain 10. At this time, as the empty space is provided outside the upper end of the drain 10 by the guide tube (G) it becomes easy to install the impermeable tube (30).

상기와 같이 불투과튜브(30)를 배수재(10)의 상단에 설치하면, 배수용 삽입체(100)를 생산하는 과정에서 불투과층을 형성시킨 것과 같은 효과를 얻을 수 있다. If the impermeable tube 30 is installed on the upper end of the drainage material 10 as described above, the same effect as forming an impermeable layer may be obtained in the process of producing the drainage insert 100.

따라서 진공압이 작용하지 않을 때 지반 하층에서 흡출된 간극수가 배수재(10)의 상단에서 투수성이 양호한 지반 상층으로 유출되는 폐단을 막아 간극수의 배출이 효율적으로 이루어지게 된다. Therefore, when the vacuum pressure does not work, the pore water sucked from the lower layer of the ground prevents the closed end from flowing out from the upper end of the drain 10 to the ground layer having good water permeability, thereby efficiently discharging the pore water.

제7단계는 도 7과 같이 안내관(G)을 지반에서 빼내는 단계이다. 이는 불투과튜브(30)를 열융착시키는 작업을 편리하도록 한 안내관(G)의 기능이 더 이상 필요하지 않기 때문이다. The seventh step is to remove the guide tube (G) from the ground as shown in FIG. This is because the function of the guide tube G which makes the operation of heat-sealing the opaque tube 30 convenient is no longer necessary.

제8단계는 도 8에 도시된 바와 같이 배수재(10)의 상단에 연결구(20)를 열융착시키는 단계이다. 즉, 열융착 방식을 통하여 연결구(20)를 배수재(10)의 상단에 기밀되게 고정시키면 된다. Eighth step is a step of heat-sealing the connector 20 to the top of the drain 10 as shown in FIG. In other words, the connector 20 may be hermetically fixed to the upper end of the drain 10 through a heat fusion method.

제9단계는 도 9와 같이 연결구(20)를 배수관(P)과 연결하여 하나의 배수용 삽입체(100)에 대한 시공을 완료하는 단계이다. The ninth step is a step of completing the construction for one drainage insert 100 by connecting the connector 20 and the drain pipe (P) as shown in FIG.

즉, 연결구(20)의 나사관을 통해 연결관(C)과 연결한 후 연결관(C)에 배수관(P)을 연결하면 도 10과 같은 상태가 된다. 따라서 시공하고자 하는 배수용 삽입체(100)의 수만큼 상기한 각 단계를 반복함으로써 연약지반 개량을 위한 배수용 삽입체(100)의 시공을 완료할 수 있다. That is, after connecting with the connection pipe (C) through the screw pipe of the connector 20 is connected to the drain pipe (P) to the connection pipe (C) is in a state as shown in FIG. Therefore, the construction of the drainage insert 100 for improving the soft ground can be completed by repeating each of the above steps by the number of the drainage insert 100 to be constructed.

이때 본 발명은 시공성을 더욱 높이기 위하여, 제1단계에서 제9단계를 차례대로 행하지 않고 배수용 삽입체(100)의 수만큼 제1단계에서 제4단계까지의 단계를 반복한 후에 제5단계에서 제9단계까지의 단계를 반복 실시할 수 있다. In this case, in order to further improve workability, the fifth step is repeated after repeating the steps from the first step to the fourth step by the number of the insert 100 for drainage without performing the first step to the ninth step. The steps up to the ninth step can be repeated.

즉, 배수재(10)의 하단에 기밀튜브(40)를 설치한 후 지반에 삽입하고 상단에 절단하는 제1단계에서 제4단계까지의 단계와, 안내관(G)을 지반에 삽입한 후 배수재(10)에 기밀튜브(40)를 설치하고 상단을 절단하고 연결구(20)와 배수관(P)을 연결하는 제1단계에서 제9단계까지의 단계로 이분하여, 전기의 단계를 반복한 후 후기의 단계를 반복하면 된다. That is, after the airtight tube 40 is installed at the bottom of the drain 10, the steps from the first to the fourth step of inserting the ground and cutting at the top, and inserting the guide tube (G) into the ground and then drain The airtight tube 40 is installed at 10, and the upper part is cut and divided into the first to ninth steps of connecting the connector 20 and the drain pipe P. Just repeat the steps.

이와 같이 본 발명은 시공 현장에서 배수재(10)를 지반에 삽입한 후 그 삽입 깊이에 맞게 절단한 후 그 상단에 불투과층을 위한 불투과튜브(30)를 설치하고 연결구(20)를 연결함에 따라, 실제 지반의 지층 분포에 적응적으로 대처할 수 있도록 함으로써, 시공의 용이성과 정밀성을 높일 수 있다. As described above, the present invention inserts the drainage material 10 into the ground at the construction site, cuts it to the insertion depth, and then installs an impermeable tube 30 for the impermeable layer on the top and connects the connector 20. Therefore, by making it possible to cope adaptively with the actual geological distribution, the ease and precision of construction can be improved.

또한, 본 발명은 배수재(10)의 하단에 기밀층을 위한 기밀튜브(40)를 설치한 후 지반에 삽입하여 시공함에 따라, 시공된 배수재(10)의 하단이 모래자갈층이나 투수층까지 이르게 되더라도 그 하단으로부터 지하수와 공기가 흡출되는 것을 방지할 수 있도록 함으로써, 간극수의 배출 작업을 원활하게 할 수 있다.
In addition, according to the present invention, after installing the airtight tube 40 for the airtight layer at the bottom of the drainage material 10 and inserting it into the ground, the bottom of the constructed drainage material 10 may reach the sand gravel layer or the permeable layer. By making it possible to prevent ground water and air from being sucked out from the lower end, it is possible to smoothly discharge the gap water.

10: 배수재 20: 연결구
30: 불투과튜브 40: 기밀튜브
100: 배수용 삽입체 S: 정착구
C: 연결관 P: 배수관
G: 안내관 M: 맨드릴
10: drain 20: connector
30: impermeable tube 40: hermetic tube
100: drainage insert S: anchorage
C: connector P: drain pipe
G: Guide M: Mandrel

Claims (2)

배수재(10)의 하단에 일정길이의 기밀튜브(40)를 열융착시켜 설치하는 제1단계와; 배수재(10)의 하단에 정착구(S)를 연결하는 제2단계와; 맨드릴(M)을 정착구(S)에 취부하여 배수재(10)를 지반 내부로 수직 삽입하여 정착시키는 제3단계와; 배수재(10)를 절단하되 배수재(10)의 상단이 외부로 노출되게 삽입된 깊이보다 길게 절단하는 제4단계와; 배수재(10)를 중심에 두고 맨드릴(M)을 사용하여 안내관(G)을 지반 내부로 삽입하되 압축공기를 분사하면서 안내관(G)의 상단이 외부로 노출되게 삽입하는 제5단계와; 배수재(10)의 상단에 불투과튜브(30)를 열융착시켜 설치하는 제6단계와; 안내관(G)을 맨드릴(M)을 사용하여 외부로 빼내는 제7단계와; 배수재(10)의 상단에 연결구(20)를 열융착시켜 연결하는 제8단계와; 연결구(20)를 배수관(P)과 연결하여 배수용 삽입체(100)의 시공을 완료하는 제9단계를; 포함하여 구성됨을 특징으로 한 시공성 향상을 위한 배수용 삽입체의 시공 방법.
A first step of thermally fusion installing the airtight tube 40 of a predetermined length at a lower end of the drain 10; A second step of connecting the fixing hole S to the lower end of the drain 10; A third step of attaching the mandrel M to the fixing port S to vertically insert the drain material 10 into the ground to fix the mandrel M; A fourth step of cutting the drain material 10 but cutting the drain material 10 longer than a depth inserted to expose the top of the drain material 10 to the outside; A fifth step of inserting the guide tube (G) into the ground using a mandrel (M) centering the drainage material (10) while inserting the upper end of the guide tube (G) to the outside while injecting compressed air; A sixth step of installing the impermeable tube 30 by heat-sealing the upper end of the drain 10; A seventh step of removing the guide tube G to the outside using the mandrel M; An eighth step of connecting the connector 20 by heat fusion to an upper end of the drain 10; A ninth step of completing the construction of the drainage insert 100 by connecting the connector 20 with the drain pipe P; Construction method of the insert for drainage for improving the workability, characterized in that configured to include.
제1항에 있어서, 상기 제1단계 내지 제4단계를 시공하고자 하는 배수용 삽입체(100)의 수만큼 반복 실시한 후에 상기 제5단계 내지 제9단계를 반복 실시하여 시공성을 더욱 높인 시공성 향상을 위한 배수용 삽입체의 시공 방법. The method according to claim 1, wherein the first to fourth steps are repeated as many times as the number of inserts 100 for drainage, and the fifth to ninth steps are repeated to further improve workability. Construction method of insert for drainage.
KR1020110070819A 2011-07-18 2011-07-18 Construction method of drain apparatus for suction drain method KR101239674B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110070819A KR101239674B1 (en) 2011-07-18 2011-07-18 Construction method of drain apparatus for suction drain method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110070819A KR101239674B1 (en) 2011-07-18 2011-07-18 Construction method of drain apparatus for suction drain method

Publications (2)

Publication Number Publication Date
KR20130010184A KR20130010184A (en) 2013-01-28
KR101239674B1 true KR101239674B1 (en) 2013-03-06

Family

ID=47839474

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110070819A KR101239674B1 (en) 2011-07-18 2011-07-18 Construction method of drain apparatus for suction drain method

Country Status (1)

Country Link
KR (1) KR101239674B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6605856B2 (en) * 2015-06-29 2019-11-13 東亜建設工業株式会社 Drain material placement method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000054358A (en) 1998-08-07 2000-02-22 Hazama Gumi Ltd Vacuum consolidation yard forming equipment and forming method
KR100714647B1 (en) 2005-10-11 2007-05-07 김용수 Soft ground quick drainage by vacuum pumping
KR100950067B1 (en) 2009-08-26 2010-03-26 주식회사 신아건설산업 The casing stroking device for drain board
KR100979929B1 (en) 2005-05-20 2010-09-03 지오피어 파운데이션 컴파니, 인코포레이티드 Slotted mandral for lateral displacement pier and method of use

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000054358A (en) 1998-08-07 2000-02-22 Hazama Gumi Ltd Vacuum consolidation yard forming equipment and forming method
KR100979929B1 (en) 2005-05-20 2010-09-03 지오피어 파운데이션 컴파니, 인코포레이티드 Slotted mandral for lateral displacement pier and method of use
KR100714647B1 (en) 2005-10-11 2007-05-07 김용수 Soft ground quick drainage by vacuum pumping
KR100950067B1 (en) 2009-08-26 2010-03-26 주식회사 신아건설산업 The casing stroking device for drain board

Also Published As

Publication number Publication date
KR20130010184A (en) 2013-01-28

Similar Documents

Publication Publication Date Title
CN106869890B (en) Horizontal well fracturing experimental method and pit shaft
JP2009046918A (en) Construction method for improving soft ground by vacuum consolidation
CN108590644A (en) Heavy caliber test well is layered bailing test device and layering pumping device
JP6074446B2 (en) Exhaust drainage / injection hose and tunnel top end construction method using the same
JP2019183410A (en) Recharge method and recharge well system
US20190360290A1 (en) Apparatus and Method for In-Situ Stabilization of Unconsolidated Sediment in Core Samples
CN104278666A (en) Bag-packaged plastic drainage device
JP2019052503A (en) Open pit method
KR101239674B1 (en) Construction method of drain apparatus for suction drain method
KR101239675B1 (en) Construction method of drain apparatus for suction drain method
JP2009293224A (en) Water sampling device and water sampling method
KR101290411B1 (en) Method of separating air and water and its apparatus for suction drain method
KR20120074489A (en) Groundwater deep well shielding device and method
KR20190044390A (en) Suction drain method for soft ground stabilization
JP2007239405A (en) Liquefaction prevention method for ground
CN208168867U (en) Heavy caliber test well is layered bailing test device and layering pumping device
JP6453719B2 (en) Vacuum consolidation method and drain material
JP2003268759A (en) Underground water pumping method
KR101248825B1 (en) Construction method of drain apparatus
KR101940930B1 (en) Filter media replacement and maintenance method of well
KR20130008175A (en) Construction method for window frame's drain device
JP2018009298A (en) Ground water level lowering system and method of constructing the same
CN113089699A (en) Anti-filtration well surrounding system and piping processing method
JP2015217351A (en) Groundwater purification system and groundwater purification method
JP6587184B2 (en) Ground improvement device and ground improvement method

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160211

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170213

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180212

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190212

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20200212

Year of fee payment: 8