KR101230986B1 - Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow - Google Patents

Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow Download PDF

Info

Publication number
KR101230986B1
KR101230986B1 KR1020100056935A KR20100056935A KR101230986B1 KR 101230986 B1 KR101230986 B1 KR 101230986B1 KR 1020100056935 A KR1020100056935 A KR 1020100056935A KR 20100056935 A KR20100056935 A KR 20100056935A KR 101230986 B1 KR101230986 B1 KR 101230986B1
Authority
KR
South Korea
Prior art keywords
wall
basement
floor
construction
concrete
Prior art date
Application number
KR1020100056935A
Other languages
Korean (ko)
Other versions
KR20110136987A (en
Inventor
임인식
이정배
이범택
김재동
Original Assignee
주식회사 한빛구조엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한빛구조엔지니어링 filed Critical 주식회사 한빛구조엔지니어링
Priority to KR1020100056935A priority Critical patent/KR101230986B1/en
Publication of KR20110136987A publication Critical patent/KR20110136987A/en
Application granted granted Critical
Publication of KR101230986B1 publication Critical patent/KR101230986B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5806Connections for building structures in general of bar-shaped building elements with a cross-section having an open profile
    • E04B1/5812Connections for building structures in general of bar-shaped building elements with a cross-section having an open profile of substantially I - or H - form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

본 발명은 지하외벽의 선시공 공법에 관한 것으로서, 더욱 상세하게는 지하구조물을 역타시공함에 있어서 지상골조가 지하구조물의 외벽선까지 연장되어 있는 경우 지하골조가 완료될 때까지 지상골조가 대기하여만 하는 공기지연의 문제점과 지하 흙막이벽체에 근접하여 시공되는 선시공기둥 및 기초(PRD, RCD 등)로 인한 공사비 상승의 문제점과 이로 인한 지하층 내부 건축면적이 축소되는 문제점을 일거에 해결할 뿐만 아니라, 나아가 지하흙막이 벽체의 지지구조체로서 설치되는 지하외벽을 선시공된 지하1층 외벽까지 순타타설로 연속적으로 형성하는 과정에서 종래의 방식에 따라서 타설할 때 지하1층 하부외벽에 발생하는 불필요한 잉여의 노출부위에 대한 할석(割石)과정 없이 연속적으로 지하외벽을 순타타설 할 수 있도록 하는 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법에 관한 것이다.The present invention relates to the construction method of the basement outer wall, more specifically, if the ground frame extends to the outer wall line of the underground structure in reverse construction of the underground structure, the ground frame must wait until the underground frame is completed It not only solves the problem of air delay and the increase of construction cost due to pre-installed pillars and foundations (PRD, RCD, etc.) that are constructed in close proximity to the basement wall, and also the problem that the construction area inside the basement is reduced. In the process of successively forming the basement outer wall, which is installed as the supporting structure of the wall, to the outer wall of the first basement, which has been pre-constructed, in the process of pouring in accordance with the conventional method, the stone is placed on the unnecessary surplus exposed areas that occur in the lower outer wall of the basement 1 floor. Non-return type cone for smooth casting of the outer and outer walls without the process The present invention relates to an underground exterior wall pre-construction method using formwork having a crete pouring port and a vibrator inlet.

Description

역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법{CONSTRUCTING METHOD FOR UNDERGROUND EXTERNAL WALL USING FORM WITH CONCRETE PLACING INLET AND VIBRATOR INLET FOR PREVENTING CONCRETE COUNTERFLOW}FIELD CONSTRUCTING METHOD FOR UNDERGROUND EXTERNAL WALL USING FORM WITH CONCRETE PLACING INLET AND VIBRATOR INLET FOR PREVENTING CONCRETE COUNTERFLOW}

본 발명은 지하외벽의 선시공 공법에 관한 것으로서, 더욱 상세하게는 지하구조물을 역타시공함에 있어서 지상골조가 지하구조물의 외벽선까지 연장되어 있는 경우 지하골조가 완료될 때까지 지상골조가 대기하여만 하는 공기지연의 문제점과 지하 흙막이벽체에 근접하여 시공되는 선시공기둥 및 기초(PRD, RCD 등)로 인한 공사비 상승의 문제점과 이로 인한 지하층 내부 건축면적이 축소되는 문제점을 일거에 해결할 뿐만 아니라, 나아가 지하흙막이 벽체의 지지구조체로서 설치되는 지하외벽을 선시공된 지하1층 지하외벽까지 순타타설로 연속적으로 형성하는 과정에서 종래의 방식에 따라서 타설할 때 지하1층 하부외벽에 발생하는 불필요한 잉여의 노출부위에 대한 할석(割石)과정 없이 연속적으로 지하외벽을 순타타설 할 수 있도록 하는 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법에 관한 것이다.
The present invention relates to the construction method of the basement outer wall, more specifically, if the ground frame extends to the outer wall line of the underground structure in reverse construction of the underground structure, the ground frame must wait until the underground frame is completed It not only solves the problem of air delay and the increase of construction cost due to pre-installed pillars and foundations (PRD, RCD, etc.) that are constructed in close proximity to the basement wall, and also the problem that the construction area inside the basement is reduced. In the process of successively forming the basement outer wall, which is installed as the supporting structure of the wall, to the pre-constructed basement 1st basement outer wall in the process of casting, according to the conventional method, Prevents backflow, which allows smooth casting of underground exterior walls without the need for slate Concrete relates to the underground external wall seonsigong method using the syntax and the vibrator is provided with a die near the entrance.

일반적으로 건물을 시공할 때 여러 가지 필요에 따라서 지하층을 구축하게 된다. 이러한 건물의 지하층을 시공하는 방법으로는 종래부터 다양한 시공법이 알려져 있고 이를 분류하는 방식도 여러 가지 있지만, 지하구조물을 시공하는 방향에 따라서 크게 순타(順打)공법과 역타(逆打)공법으로 분류된다.
In general, when constructing a building, basement floors are constructed according to various needs. As a method for constructing the basement of such a building, various construction methods are known and classified in various ways. However, according to the direction in which the underground structure is constructed, it is classified into a smooth method and a reverse method. do.

여기서 상기 순타공법은 종래로부터 가장 보편적으로 적용되는 방식인데, 이는 지상으로부터 흙막이벽과 함께 스트러트(strut, 버팀대), 레이커(raker, 경사버팀대), 어스앵커(earth anchor), 락볼트(rock bolt) 등과 같은 다양한 가설 지지수단을 설치하여 흙막이벽이 붕괴되지 않도록 지지한 상태에서 기초 저면 레벨까지 지하 토공사를 완료한 후, 상기 가설 지지수단을 아래쪽에서부터 해체해 나가면서 최하단 지하층부터 지상까지 지하구조물을 순차적(위쪽방향)으로 시공하는 방법을 말한다.
Here, the netting method is the most commonly applied method from the prior art, which is a strut (strut, brace), raker (raker, brace), earth anchor, rock bolt (rock bolt) together with the earth wall from the ground After installing various temporary supporting means such as earthquake walls and supporting the earthquake wall to prevent collapse, the earthwork is completed to the bottom level of the foundation, and then the underground structures are sequentially arranged from the lowest basement floor to the ground while dismantling the temporary supporting means from below. Refers to the method of construction in the upward direction.

다음으로 역타공법은 소위 탑다운(top down) 공법이라고 하는데, 이는 지하 토공사를 수행해 나감과 동시에 지하층 본구조물 공사를 병행함으로써 상기 시공된 지하층 구조물이 토공사 중에는 횡토압에 대한 버팀대의 역할을 하도록 하면서 지하구조물을 위에서 아랫방향으로, 즉 상기 순타공법과는 반대방향으로 시공하여 내려가는 공법을 말한다. 이러한 역타공법은 상부슬래브를 작업공간으로 이용할 수 있으며 우기중에도 내부작업이 가능하고 소음 및 분진등을 최소화시킬 수 있는 장점이 있지만, 지상층 골조가 지하구조물의 외벽선까지 연장되어 있는 경우, 즉 지하층과 지상층의 바닥면적이 같은 경우, 종래의 역타공법은 지하골조가 완료될 때까지 지상층 골조는 시공에 착수할 수 없는 등 여러 가지 문제점을 가지고 있었다.
Next, the reverse drilling method is called the top-down method, which performs underground earthworks and simultaneously performs the construction of the basement main structure to allow the constructed basement structure to act as a brace for transverse earth pressure during earthwork. It refers to a construction method of constructing and descending the structure from the top to the bottom, ie in the opposite direction to the netting method. This reverse drilling method has the advantage of using the upper slab as a work space and internal work during the rainy season and minimizing noise and dust, but when the ground floor frame extends to the outer wall of the underground structure, that is, the basement floor and When the ground floor of the ground floor is the same, the conventional reverse drilling method has various problems such that the ground floor frame cannot start construction until the underground frame is completed.

도 1 내지 도 4는 지상골조가 지하구조물의 외벽선까지 연장되어 있는 경우 지하구조물을 역타시공하는 종래의 방법을 도시하고 있다. 상기 도면에 도시된 바와 같이, 지상골조가 지하구조물의 외벽선까지 연장되어 있는 경우 지하골조 및 기초, 지하외벽 등 지하층의 잔여골조까지 완료된 후 지하외벽을 시공한 상태에서 지상층의 수직부재(기둥, 벽체 등)를 지지시키면서 지상골조를 착수해야만 한다는 문제점이 있다. 즉, 상기와 같은 종래의 역타공법은 지하구조물의 외벽선까지 연장되는 지상층의 수직부재를 지지하기 위한 지하층의 수직부재가 시공되지 않기 때문에, 반드시 지하골조가 완료될 때까지 지상골조는 대기하여야 하므로 공사기간이 상당히 지연되는 문제점이 있다.
1 to 4 illustrate a conventional method of reverse construction of an underground structure when the ground frame extends to the outer wall of the underground structure. As shown in the figure, when the ground frame extends to the outer wall line of the underground structure, the vertical members of the ground floor (pillars, There is a problem that the ground frame should be undertaken while supporting the wall). That is, in the conventional reverse drilling method as described above, since the vertical member of the basement layer for supporting the vertical member of the ground layer extending to the outer wall line of the underground structure is not constructed, the ground frame must wait until the underground frame is completed. There is a problem that the construction period is considerably delayed.

상기와 같은 종래의 공법이 가지는 문제점(지하골조의 완료시까지 지상층 골조의 대기상태로 인한 공기지연의 문제점)을 해결하기 위하여, 도 5 내지 도 8에 도시된 바와 같이 지하구조물을 선시공하는 종래의 역타공법이 있다. 즉 상기 도면에 도시된 바와 같은 종래의 지하구조물 선시공 역타공법은, 지상골조가 지하구조물의 외벽선까지 연장되어 있는 경우 지하구조물을 시공하기 위해서 흙막이벽체에 선시공 기둥 및 기초(PRD, RCD 등)를 근접하게 시공하여 지상층 수직부재(기둥 또는 벽체)를 지지하도록 한 후 지상골조와 지하 지하구조물의 역타시공을 병행하도록 한다.
In order to solve the problems of the conventional method as described above (problems of air delay due to the atmospheric state of the ground layer frame until the completion of the underground frame), the conventional reverse stroke to construct the underground structure as shown in Figs. There is a method. That is, in the conventional underground structure pre-installation method as shown in the drawings, when the ground frame extends to the outer wall line of the underground structure, the pre-installed pillars and foundations (PRD, RCD, etc.) are placed on the retaining wall to construct the underground structure. Construct close to support vertical ground member (column or wall), and then perform reverse construction of ground frame and underground underground structure.

그러나, 이러한 종래의 지하구조물 선시공 역타공법 또한 ① 흙막이 벽체에 근접하여 PRD 또는 RCD 등과 같은 선시공 기초 및 기둥을 천공함에 있어서 기시공된 흙막이벽체와의 상호 간섭문제를 극복하기 위한 고도의 정밀성이 요구되며, ② 선시공 기둥 및 기초의 공사비가 추가됨에 따라 전체적으로 공사비용이 상승하는 문제점이 있으며, ③ 선시공 기둥 및 기초로 인하여 지하층의 내부 건축면적이 축소됨에 따라 건축계획 및 이용상에 있어서 심각한 문제점이 발생하였다.
However, such conventional underground structure pre-installation reverse drilling method also requires a high degree of precision to overcome the mutual interference problem with the existing construction wall wall in the construction of the foundation and pillars such as PRD or RCD in close proximity to the construction wall wall. In addition, there is a problem that the overall construction cost increases as the construction cost of the pre-installed pillars and foundations increases. ③ As the internal construction area of the basement floor decreases due to the pre-installed pillars and foundations, serious problems occur in the construction planning and use.

본 발명은 상기와 같은 종래의 지하외벽 선시공 공법이 가지는 문제점을 해결하기 위하여 안출된 것으로서, 지하외벽의 불필요한 잉여의 노출부위가 발생하지 않도록 하여 건설폐기물의 배출을 최소화하고, 타설완료 후 할석과정을 최소화함으로써 공사비를 감소시키고 공사기간을 단축시킬 수 있도록 하는 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법을 제공하는 것을 그 목적으로 한다.
The present invention was devised to solve the problems of the conventional underground exterior wall preliminary construction method as described above, minimizing the discharge of construction waste by avoiding the unnecessary surplus exposed portion of the underground exterior wall, and after the completion of casting process The object of the present invention is to provide a method for pre-underground wall construction using a formwork equipped with a backflow prevention concrete pouring hole and a vibrator entrance to minimize construction costs and shorten the construction period.

또한 본 발명은 콘크리트 타설장치가 거푸집에 안정적으로 고정되어 타설될 수 있도록 할 뿐만 아니라 지하외벽에 대한 콘크리트 타설시 콘크리트가 역류하는 것을 방지하며, 지하외벽의 콘크리트 미충전 부위에 대한 바이브레이팅 작업이 원활하게 수행될 수 있도록 함으로써 우수한 품질의 지하외벽이 형성될 수 있도록 하는 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 제공하는 것을 그 목적으로 한다.
In addition, the present invention not only allows the concrete placing device to be stably fixed to the formwork, but also prevents backflow of concrete when placing concrete on the basement wall, and smoothly vibrates the unfilled portion of the basement wall. It is an object of the present invention to provide a formwork with a backflow prevention concrete pouring hole and a vibrator root opening to be formed so that it can be carried out to make it possible to form a good quality basement outer wall.

또한 본 발명은 선시공된 지하1층의 지하외벽이 흙막이 벽체에 안정적으로 결속될 수 있도록 지하외벽 받침용 전단철물 및 지하외벽용 전단철물을 제공하는 것을 그 목적으로 하며, 나아가 지상층 골조가 지하구조물의 외벽선까지 연장되어 있는 경우, 즉 지하층과 지상층의 바닥면적이 같은 경우, 종래의 역타공법에 따르면 지하골조가 완료될 때까지 지상층 골조는 대기하고 있어야만 하는 공기지연의 문제점을 해결할 수 있도록, 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법을 제공하는 것을 그 목적으로 한다.
In addition, an object of the present invention is to provide a shear hardware for the basement wall support and a shear hardware for the basement outer wall so that the underground outer wall of the basement 1 floor pre-constructed can be stably bound to the earth wall, and furthermore, the ground layer frame is In the case of extending to the outer wall line, that is, when the basement floor and the ground floor have the same floor area, according to the conventional reverse drilling method, the ground floor frame can solve the problem of air delay that the ground floor frame should wait until the underground frame is completed. The purpose of the present invention is to provide a method of pre-construction of the outer 1st floor outer wall for construction.

상술한 본 발명의 목적을 달성하기 위하여, 본 발명은 (a) 건물경계선을 따라서 지하흙막이 벽체를 설치하고, 상기 지하흙막이 벽체의 H파일을 노출시키는 단계와; (b) 상기 노출된 지하흙막이 벽체의 H파일에 지하외벽 받침용 전단철물 및 지하외벽용 전단철물을 결합시키는 단계와; (c) 지하1층 내부철골보와 내부철골보 접합용 띠장 및 좌대를 설치하고, 지상1층 시공 후 내부소단을 굴토하고, 지하1층의 슬래브를 지하외벽 내측선까지만 타설한 후, 상기 과정을 최하단 지하층까지 반복수행 하는 단계와; (d) 지하1층 바닥부에 하부거푸집, 외벽받침 앵글좌대, 경사유지용 받침대를 설치하고, 지하외벽의 수직 및 수평철근을 상기 지하외벽 받침용 전단철물과 결속되도록 배근하고, 지하외벽 받침보용 측면거푸집을 설치한 후, 콘크리트를 1차타설하여 선시공 지하외벽 받침보를 형성하는 단계와; (e) 지하외벽 수직 및 수평철근을 기존철근과 겹침이음하고 지하외벽용 전단철물과 결속되도록 배근하고, 지하외벽용 거푸집을 설치한 후, 콘크리트를 2차타설하여 선시공 지하외벽을 형성하는 단계와; (f) 상기 선시공된 지하1층의 지하외벽받침보 하단부에 타설상태 확인구를 형성하고, 지하1층 및 지하2층의 지하외벽 내측선을 따라서 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 설치한 후, 상기 거푸집에 형성된 역류방지형 콘크리트 타설구 및 바이브레이터 근입구를 통해서 콘크리트 타설장치 및 바이브레이터를 삽입하여 최하단 지하층부터 지하3층까지 통상적인 방식으로 시공된 지하외벽 상부에 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽을 순타타설로 연속적으로 형성시키는 단계로 이루어지는 것을 특징으로 한다.
In order to achieve the above object of the present invention, the present invention comprises the steps of: (a) installing the basement wall along the building boundary line, and exposing the H pile of the basement wall; (b) combining the shear steel for the basement external wall support and the shear steel for the basement outer wall to the H pile of the exposed underground mud wall; (c) Install the inner steel golbo and the inner steel golbo joining bands and pedestals, excavate the internal edge after construction on the ground floor, and cast the slab of the basement 1 floor only to the inner line of the basement outer wall, Repeating the steps up to the basement floor; (d) Install the lower formwork, the outer wall support angle seat and the inclination support bracket at the bottom of the first basement floor, and reinforce the vertical and horizontal reinforcement of the underground outer wall to bind with the shear steel for the underground outer wall support, and the underground outer wall support After installing the side formwork, the first step of concrete to form a pre-construction basement outer wall support beam; (e) the step of overlapping the vertical and horizontal reinforcing bar with the existing reinforcing bar and reinforcing to bond with the shear steel for the basement wall, installing the formwork for the basement wall, and then placing the secondary concrete to form the pre-construction basement wall; ; (f) forming a pouring condition check hole at the lower part of the basement outer wall support beam of the first basement floor constructed above, and the reverse flow prevention type concrete pouring hole and the vibrator entrance are provided along the inner wall of the basement outer wall of the first and second basement floors; After installing the old formwork, the concrete placing device and the vibrator are inserted through the non-return type concrete pouring port and the vibrator inlet formed in the formwork. Characterized in that it comprises the step of continuously forming a basement outer wall from the floor to the bottom of the first basement underground floor of the pre-constructed by the casting.

또한 본 발명의 다른 선호적인 실시예에 따르면, 본 발명은 콘크리트 타설용 튜브의 잠금장치와 나사식으로 체결고정 되어지도록 거푸집 외부로 돌출되고 나사산이 형성된 외측 입구부재와; 거푸집의 내측에 설치되어지고 서로 분리되어진 복수개의 부채꼴 형상 조각부재들로 원형의 역류방지막을 형성하게 되며, 콘크리트 타설용 튜브가 체결고정되어지면 타설용 튜브의 주입구의 가압에 의해서 뒤로 젖혀지면서 개방되어지고, 콘크리트 타설용 튜브가 해제되어지면 원래의 위치로 복귀하게 되는 역류방지판과; 상기 역류방지판의 내측 표면상에 결속되어지고 탄성부재가 내부에 포함되어져서, 콘크리트 타설용 튜브가 해제되어지면 상기 탄성부재의 복원력에 의해서 상기 역류방지판이 원래의 위치로 복귀하도록 하는 원형 튜브부재와; 그리고 역류방지판의 내측 표면상에 상기 원형 튜브부재가 결속되도록 일측단부는 역류방지판의 내측 표면상에 결속되어지고 타측단부는 상기 원형 튜브부재를 감싸도록 구부려진 형태로 된 튜브결속수단을 포함하는 것을 특징으로 한다.
In addition, according to another preferred embodiment of the present invention, the present invention includes an outer inlet member protruding out of the formwork and threaded to be fastened to the locking device and the locking device of the concrete placing tube; A circular backflow prevention film is formed by a plurality of fan-shaped pieces that are installed inside the formwork and separated from each other. When the concrete pouring tube is fastened and fixed, it is flipped backward by the inlet of the pouring tube and opened. A backflow prevention plate which is returned to its original position when the concrete pouring tube is released; A circular tube member that is bound on the inner surface of the non-return plate and includes an elastic member therein so that when the concrete placing tube is released, the non-return plate is returned to its original position by the restoring force of the elastic member. Wow; And one end is bound on the inner surface of the backflow prevention plate so that the circular tube member is bound on the inner surface of the non-return plate and the other end includes a tube binding means of the shape bent to surround the circular tube member Characterized in that.

또한 본 발명의 또 다른 실시예에 따르면, 본 발명은 흙막이 벽체의 H파일에 결합되는 단부부재, 그리고 상기 단부부재와 일체형으로 이루어지며 지하외벽의 두께방향으로 길게 형성되는 제 1,2 수평부재 및 상기 제 1,2 수평부재와 연결되어지고 지하외벽의 높이방향으로 길게 형성되는 수직부재로 이루어지며, 상기 수평부재 및 수직부재는 지하외벽의 수평철근이 통과되도록 구부려지는 절곡철근인 것을 특징으로 한다.
In addition, according to another embodiment of the present invention, the present invention comprises an end member coupled to the H pile of the earth wall, and the first and second horizontal members formed integrally with the end member and formed long in the thickness direction of the basement outer wall; It is made of a vertical member connected to the first and second horizontal members and formed long in the height direction of the basement outer wall, wherein the horizontal member and the vertical member is a bent reinforcing bar bent to pass the horizontal reinforcement of the basement outer wall .

또한 본 발명은 (a) 건물경계선을 따라서 지하흙막이 벽체를 설치하고, 상기 지하흙막이 벽체의 H파일을 노출시키는 단계와; (b) 상기 노출된 지하흙막이 벽체의 H파일에 지하외벽 받침용 전단철물 및 지하외벽용 전단철물을 결합시키는 단계와; (c) 지하1층 내부철골보와 내부철골보 접합용 띠장 및 좌대를 설치하고, 지상1층 시공 후 내부소단을 굴토하고, 지하1층의 슬래브를 지하외벽 내측선까지만 타설한 후, 상기 과정을 최하단 지하층까지 반복수행 하는 단계와; (d) 지하1층 바닥부에 지하외벽용 하부거푸집, 외벽받침 앵글좌대, 경사유지용 받침대를 설치하고, 지하외벽의 수직 및 수평철근을 상기 지하외벽 받침용 전단철물과 결속되도록 배근하고, 지하외벽 받침보용 측면거푸집을 설치한 후, 콘크리트를 1차타설하여 선시공 지하1층 외벽 받침보를 형성하는 단계와; (e) 지하외벽 수직 및 수평철근을 기존철근과 겹침이음하고 지하외벽용 전단철물과 결속되도록 배근하고, 지하외벽용 거푸집을 설치한 후, 콘크리트를 2차타설하여 선시공 지하1층 외벽을 형성하는 단계와; (f) 상기 선시공된 지하1층의 외벽이 그 상부에 설치되는 지상층의 수직부재를 지지하도록 지상층 수직부재를 상기 선시공 지하1층의 외벽위치에 맞추어서 시공하는 단계로 이루어지는 것을 특징으로 한다.
In addition, the present invention comprises the steps of: (a) installing the basement wall along the building boundary, exposing the H pile of the basement wall; (b) combining the shear steel for the basement external wall support and the shear steel for the basement outer wall to the H pile of the exposed underground mud wall; (c) Install the inner steel golbo and the inner steel golbo joining bands and pedestals, excavate the internal edge after construction on the ground floor, and cast the slab of the basement 1 floor only to the inner line of the basement outer wall, Repeating the steps up to the basement floor; (d) Install the lower formwork for the basement outer wall, the angle base of the outer wall, and the inclination holding pedestal at the basement 1 floor, and reinforce the vertical and horizontal reinforcement of the basement outer wall to bind with the shear steel for the basement outer wall. After installing the side formwork for the outer wall support beam, the first step of the concrete to form the first basement outer wall support beam; (e) Underground wall vertical and horizontal rebars are overlapped with existing reinforcing bars and reinforced to bond with shear steel for underground outer wall, and after installation of formwork for underground outer wall, secondary concrete is laid to form outer first floor outer wall. Steps; and (f) constructing the ground layer vertical member in accordance with the outer wall position of the ground construction basement 1 so that the outer wall of the ground construction 1 basement supports the vertical member of the ground layer installed thereon.

본 발명에 따른 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법은, 지상골조가 지하구조물의 외벽선까지 연장되어 있는 경우 지하골조가 완료될 때까지 지상골조가 대기하여만 하는 공기지연의 문제점을 해결한 효과가 있으며, 나아가 지하 흙막이벽체에 근접하여 시공되는 선시공기둥 및 기초(PRD, RCD 등)로 인한 공사비 상승의 문제점과 이로 인한 지하층 내부 건축면적이 축소되는 문제점을 일거에 해결하는 장점이 있고, 지하외벽의 불필요한 잉여의 노출부위가 발생하지 않아 건설폐기물의 배출을 최소화하는 효과가 있으며, 나아가 타설완료 후 할석과정을 최소화함으로써 공사비를 감소시키고 공사기간을 단축시킬 수 있는 장점이 있다.
The underground exterior wall construction method using the formwork provided with the backflow prevention concrete pouring port and the vibrator entrance in accordance with the present invention, if the ground frame is extended to the outer wall line of the underground structure, the ground frame is waiting until the underground frame is completed It has the effect of solving the problem of air delay, and furthermore, the problem of the increase in construction cost due to the pre-installed pillars and foundations (PRD, RCD, etc.) which are constructed close to the basement wall, and the problem of the construction area inside the basement floor being reduced. It minimizes the discharge of construction wastes because it does not generate unnecessary surplus exposed areas of the basement outer wall, and further reduces construction costs and shortens the construction period by minimizing the segregation process after completion of casting. There are advantages to it.

또한 본 발명은 지하외벽을 최하단 지하층부터 선시공된 지하1층 상부외벽까지 순타타설로 연속적으로 형성하는 과정에서 종래의 방식에 따라서 타설할 때 지하1층 하부외벽에 필수적으로 발생하는 불필요한 잉여의 노출부위에 대한 번거로운 할석(割石)과정 없이 연속적으로 지하외벽을 순타타설 할 수 있도록 하는 장점이 있다.
In addition, the present invention in the process of continuously forming the basement outer wall from the lowest basement floor to the first basement upper outer wall pre-constructed by net casting in the process of pouring according to the conventional method, unnecessary surplus exposed portion that is inevitably generated in the lower outer wall of the first basement floor. There is an advantage in that it is possible to continuously cast the basement outer wall without the cumbersome calcite process.

또한 본 발명에 따른 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법은 콘크리트 타설장치가 거푸집에 안정적으로 고정되어 타설되도록 하고, 지하외벽에 대한 콘크리트 타설시 콘크리트가 역류하는 것을 방지할 뿐만 아니라 지하외벽의 콘크리트 미충전 부위에 대한 바이브레이팅 작업이 원활하게 수행될 수 있도록 함으로써 누수우려가 없는 우수한 품질의 지하외벽을 형성하는 효과가 있다.
In addition, the underground exterior wall preliminary construction method using the formwork provided with the backflow prevention concrete pouring port and the vibrator near entrance according to the present invention allows the concrete pouring device to be stably fixed to the formwork, and the concrete flows back when the concrete is poured on the underground exterior wall. In addition to preventing it from happening, the vibrating work on the unfilled portion of the basement outer wall can be smoothly performed, thereby making it possible to form a basement outer wall of excellent quality without leaking concerns.

도 1 내지 도 4는 지상골조가 지하구조물의 외벽선까지 연장되어 있는 경우 지하구조물을 역타시공하는 종래의 방법을 도시한 모습
도 5 내지 도 8은 지상골조가 지하구조물의 외벽선까지 연장되어 있는 경우 지하구조물을 역타시공하는 또 다른 종래의 방법을 도시한 모습
도 9a는 본 발명의 일 실시예에 따른 지하외벽 선시공 공법에 사용되는 지하흙막이 벽체의 H파일에 전단철물이 부착되는 모습을 도시한 정면도 및 측면도
도 9b는 상기 도 9a에서 전단철물 주위로 콘크리트 타설방지막이 설치된 모습을 도시한 정면도 및 측면도
도 10은 상기 도 9b의 지하흙막이 벽체의 H파일에 대한 평면도
도 11 내지 도 13은 본 발명의 일 실시예에 따른 전단철물이 지하외벽 선시공 공법에 사용되는 지하흙막이 벽체의 H파일을 노출시키는 각 단계를 도시한 모습
도 14a 및 도 14b는 본 발명의 일 실시예에 따른 절곡철근을 이용한 전단철물을 도시한 모습
도 15a 및 도 15b는 본 발명의 다른 실시예에 따른 강판부재로 이루어진 전단철물을 도시한 모습
도 16a 및 도 16b는 본 발명의 또 다른 실시예에 따른 T자형 강판부재로 이루어진 전단철물을 도시한 모습
도 17 내지 도 25는 본 발명의 선호적인 실시예에 따라서 지하1층의 지하외벽을 선시공하는 각각의 단계를 도시한 모습
도 26 내지 도 31은 지하외벽을 순타타설하는 브라켓 방식을 도시한 모습
도 32는 본 발명의 선호적인 실시예에 따른 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 도시한 모습
도 33은 본 발명의 선호적인 실시예에 따른 역류방지형 콘크리트 타설구가 구비된 거푸집을 도시한 모습
도 34는 본 발명에 따른 역류방지형 콘크리트 타설구에 콘크리트 타설용 튜브가 장착되기 이전의 상태를 도시한 모습
도 35는 본 발명에 따른 역류방지형 콘크리트 타설구에 콘크리트 타설용 튜브가 장착된 이후의 상태를 도시한 모습
도 36은 본 발명에 따른 역류방지형 콘크리트 타설구를 내측에서 본 모습
도 37은 본 발명에 따른 역류방지형 콘크리트 타설구에 사용되는 주입구 폐합용 탄성부재가 내부에 구비된 원형 튜브부재를 도시한 모습
도 38 내지 도 40은 본 발명에 따른 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법의 각 단계를 도시한 모습
1 to 4 is a view showing a conventional method for reverse construction of the underground structure when the ground frame is extended to the outer wall of the underground structure
5 to 8 is a view showing another conventional method of reverse construction of the underground structure when the ground frame is extended to the outer wall line of the underground structure
Figure 9a is a front view and a side view showing a state in which the shear hardware is attached to the H pile of the underground mud wall used in the construction method for the underground exterior wall according to an embodiment of the present invention
9B is a front view and a side view showing a state in which a concrete pouring prevention film is installed around the shear hardware in FIG. 9A;
FIG. 10 is a plan view of the H pile of the basement wall of FIG. 9B. FIG.
11 to 13 are views showing each step of exposing the H pile of the underground mud wall used in the underground exterior wall pre-construction method the shear hardware according to an embodiment of the present invention
14a and 14b is a view showing a shear hardware using a bending bar according to an embodiment of the present invention
15a and 15b is a view showing a shear hardware consisting of a steel sheet member according to another embodiment of the present invention
Figure 16a and 16b is a view showing a shear made of a T-shaped steel sheet member according to another embodiment of the present invention
17 to 25 show each step of constructing the basement outer wall of the basement 1 floor according to a preferred embodiment of the present invention.
26 to 31 are views showing a bracket method for smoothing the basement outer wall
32 is a view illustrating a formwork having a backflow preventing concrete pouring port and a vibrator root entrance according to a preferred embodiment of the present invention.
33 is a view showing the formwork with a backflow prevention concrete pouring in accordance with a preferred embodiment of the present invention
34 is a view showing a state before the concrete pouring tube is mounted on the non-return concrete pouring sphere according to the present invention
35 is a view showing a state after the concrete pouring tube is mounted on the non-return concrete pouring sphere according to the present invention
36 is a view of the non-return concrete pouring device according to the present invention from the inside
Figure 37 is a view showing a circular tube member provided therein the elastic member for closing the injection hole used for the non-return concrete pouring device according to the present invention
38 to 40 is a view showing each step of the construction method for the underground exterior wall using the formwork provided with the backflow prevention concrete pouring port and the vibrator root opening in accordance with the present invention

본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 상세한 설명에서 상세하게 설명하고자 한다. 그러나 이는 본 발명을 특정한 실시 형태로 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 각 도면을 설명하면서 유사한 참조부호를 유사한 구성요소에 대해 사용하였다.
As the invention allows for various changes and numerous embodiments, particular embodiments will be illustrated in the drawings and described in detail in the written description. However, this is not intended to limit the present invention to specific embodiments, it should be understood to include all modifications, equivalents, and substitutes included in the spirit and scope of the present invention. In describing the drawings, similar reference numerals are used for similar elements.

본 출원에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서, “포함하다” 또는 “가지다” 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.
The terminology used in this application is used only to describe a specific embodiment and is not intended to limit the invention. Singular expressions include plural expressions unless the context clearly indicates otherwise. In this application, the terms “comprise” or “have” are intended to indicate that there is a feature, number, step, action, component, part, or combination thereof described in the specification, and one or more other features. It is to be understood that the present invention does not exclude the possibility of the presence or the addition of numbers, steps, operations, components, components, or a combination thereof.

나아가 다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥 상 가지는 의미와 일치하는 의미를 가지는 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.
Furthermore, unless otherwise defined, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art. Terms such as those defined in commonly used dictionaries are to be interpreted as having a meaning consistent with the contextual meaning of the related art and are to be interpreted as either ideal or overly formal in the sense of the present application Do not.

이하에서는 본 발명의 선호적인 실시예와 첨부된 도면을 참고로 하여 더욱 상세하게 설명한다.
Hereinafter, with reference to the preferred embodiment of the present invention and the accompanying drawings will be described in more detail.

본 명세서에서는 본 발명을 설명하기 위한 하나의 실시예로서 흙막이벽 시공방식 중 현장타설 콘크리트 흙막이벽(Cast In Place, CIP)공법을 중심으로 설명이 진행될 것이지만, 본 발명에 따른 새로운 지하외벽 선시공 공법은 토류판 흙막이벽, 소일시멘트벽(Soil Cement Wall, SCW)에도 적용될 수 있음은 본 발명이 속하는 분야의 당업자들에게 자명한 사실이라 할 것이다.
In the present specification, as one embodiment for explaining the present invention, the description will be made based on the cast-in-place concrete cladding wall (CIP) method among the clam wall construction methods, but the new underground exterior wall pre-construction method according to the present invention It will be apparent to those skilled in the art to which the present invention can be applied to earth plate retaining walls and soil cement wall (SCW).

먼저 본 발명에 따른 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법이 사용되는 지하흙막이 벽체의 H파일에 결속되는 전단철물의 구성에 대해서 설명한다. 전술한 바와 같이 본 발명에 대한 명확한 이해를 돕기 위해, 현장타설 콘크리트 흙막이벽(Cast In Place, CIP)공법으로 적용되는 지하흙막이 벽체의 H파일에 전단철물의 한 종류로서 스터드볼트(stud bolt)가 결속되는 구성을 먼저 설명한 후, 본 발명에 적용되는 다른 형태의 전단철물에 대해서 살펴보도록 한다.
First, the configuration of the shear hardware that is bound to the H pile of the underground mud wall using the underground exterior wall construction method using the formwork provided with the backflow prevention concrete pouring port and the vibrator root entrance according to the present invention. As described above, in order to facilitate a clear understanding of the present invention, a stud bolt is used as a kind of shear hardware in the H pile of the basement wall that is applied by the cast in place (CIP) method. After explaining the configuration to be bound first, look at for other types of shear hardware applied to the present invention.

도 9a는 본 발명의 일 실시예에 따른 지하외벽 선시공 공법에 사용되는 지하흙막이 벽체의 H파일에 전단철물이 부착되는 정면도 및 측면도를 도시하고 있으며, 도 9b는 상기 흙막이 벽체의 H파일에 콘크리트 타설방지막이 설치된 정면도 및 측면도를 도시하고 있다. 상기 도면에서 도시된 바와 같이, 엄지말뚝으로 사용되는 지하흙막이 벽체의 H파일(100)에는 전단철물(200)의 한가지 종류로서 사용되는 복수개의 스터드볼트(stub bolt, 210)가 상기 H파일의 근입전에 또는 근입후에 등간격으로 용접되어진 후, 상기 스터드볼트가 지하외벽 내측으로 향하도록 지하흙막이 벽체의 H파일(100)이 설치되어진다. 이때 상기 스터드볼트(210)는 H파일의 근입후에 스티로폼 또는/및 철재망 등으로 이루어지는 콘크리트 타설방지막(211)으로 감싸져서 차후 지하흙막이 벽체의 엄지말뚝측 CIP 천공구 내에 콘크리트 타설시 전단철물인 스터드볼트(210)가 용이하게 노출되어질 수 있도록 한다.
9A illustrates a front view and a side view in which shear hardware is attached to an H pile of an underground mud wall used in a method for constructing an underground exterior wall according to an embodiment of the present invention, and FIG. 9B illustrates concrete in an H pile of the mud wall. The front view and the side view where the anti-pouring film is installed are shown. As shown in the figure, a plurality of stud bolts (210) used as one kind of shear hardware 200 in the H pile 100 of the underground mud wall used as a thumb pile (root) of the H pile After being welded at equal intervals before entering or after entering, the H pile 100 of the basement wall is installed so that the stud bolts face the inside of the basement outer wall. At this time, the stud bolt 210 is wrapped in a concrete pour prevention film 211 made of styrofoam or / and the steel mesh after the inlet of the H-pile to be a shear hardware at the time of concrete casting in the thumb pile side CIP drilling tool of the underground wall The stud bolt 210 can be easily exposed.

도 10은 상기 전단철물인 스터드볼트(210)와 콘크리트 타설방지막(211)이 장착된 도 9b의 지하흙막이 벽체의 H파일에 대한 평면도를 도시하고 있으며, 도 10 내지 도 13은 본 발명의 일 실시예에 따른 지하외벽 선시공 공법에 사용되는 전단철물이 부착된 지하흙막이 벽체의 H파일을 노출시키는 각 단계를 도시한 모습이다. 상기 도면에서 도시된 바와 같이, 본 발명의 일 실시예에 따른 전단철물의 일종인 스터드볼트는 지하흙막이 벽체의 H파일이 근입전에 미리 결속되어질 수 있지만, 설계자 또는 시공자의 선택에 따라서 근입후에 지하흙막이 벽체의 H파일을 노출시키고 스터드볼트를 차후에 용접하여 결속시킬 수도 있다.
Figure 10 shows a plan view of the H pile of the underground mud wall of Figure 9b equipped with the stud bolt 210 and the concrete casting prevention film 211, the shear hardware, Figures 10 to 13 is an embodiment of the present invention It is a figure showing each step of exposing the H pile of the underground mud wall with the shearing iron used in the underground exterior wall construction method according to the example. As shown in the drawings, the stud bolt is a kind of shear hardware according to an embodiment of the present invention can be bound in advance before the H pile of the underground mud wall, but after entering the building according to the choice of the designer or builder The H pile of the basement wall may be exposed and the stud bolts may be welded to bond later.

다음으로 도 14 내지 도 16은 본 발명의 선호적인 실시예에 따른 다른 형태의 전단철물을 각각 도시하고 있다. 먼저 도 14a 및 도 14b를 살펴보면, 상기 도면은 발명의 일 실시예에 따른 절곡철근(220)을 이용한 전단철물을 도시하고 있다. 상기 도면에서 도시된 바와 같이, 전단철물(200)의 일종으로서 사용되는 절곡철근(220)은 흙막이 벽체의 H파일에 결합되는 양측 단부부재(221,222), 그리고 상기 단부부재와 일체형으로 이루어지며 지하외벽의 두께방향으로 길게 형성되는 제 1,2 수평부재(223,224) 및 상기 제 1,2 수평부재(223,224)와 연결되어지고 지하외벽의 높이방향으로 길게 형성되는 수직부재(225)로 이루어지며, 상기 수평부재 및 수직부재는 지하외벽의 수평철근이 통과되도록 구부려지는 것을 특징으로 한다. 본 발명의 선호적인 실시예에 따르면, 상기 절곡철근(220)으로 된 전단철물의 제 1,2 수평부재(223,224)는 지하외벽의 실내측 수평철근을 포함하는 위치까지 연장되어질 수 있으며, 상기 수평부재들 중 하나는 대각선방향으로 절곡되어질 수 있다.
Next, FIGS. 14 to 16 show different types of shear hardware according to preferred embodiments of the present invention. First, referring to FIGS. 14A and 14B, the drawing illustrates a shear hardware using a bending bar 220 according to an embodiment of the present invention. As shown in the figure, the bent reinforcing bars 220 used as a kind of shear hardware 200 is formed on both side end members 221 and 222 coupled to the H pile of the retaining wall, and integrally with the end members, and the basement outer wall. The first and second horizontal members 223 and 224 formed in the thickness direction of the first and the first and second horizontal members 223 and 224 are connected to each other, and the vertical member 225 is formed in the height direction of the basement outer wall. The horizontal member and the vertical member are characterized in that the horizontal bar is bent to pass through the rebar. According to a preferred embodiment of the present invention, the first and second horizontal members 223 and 224 of the shear steel made of the bent reinforcement 220 may be extended to a position including an indoor side horizontal reinforcement of the basement outer wall. One of the members can be bent diagonally.

다음으로 도 15a 및 도 15b는 본 발명의 다른 실시예에 따른 강판부재로 이루어진 전단철물을 도시하고 있다. 상기 도면에서 도시된 바와 같이, 전단철물의 일종으로서 사용되는 강판부재(230)는 흙막이 벽체의 H파일(100)에 일측단부는 결합되어지고 지하외벽의 수평철근이 관통되어지도록 복수개의 내부구멍(hole, 231)이 구비된 소정의 두께로 이루어진 사각형의 강판부재로 형성되는 것을 특징으로 한다. 또한 본 발명의 선호적인 실시예에 따르면, 상기 강판부재(230)로 이루어지는 전단철물은 지하외벽의 실내측 수평철근이 관통되는 복수개의 내부구멍이 추가적으로 포함되어지도록 길게 형성되어질 수도 있다. 즉 도시되지는 않았지만, 상기와 같이 지하외벽의 실내측 수평철근이 관통될 수 있도록 복수개의 내부구멍이 추가적으로 포함되어진다면, 상기 강판부재(230)는 지하외벽의 실내측 및 실외측 수평철근이 관통될 수 있는 복수개의 2열로 된 내부구멍이 형성되어진다. 비록 상기 강판부재(230)는 사각형의 강판부재로 이루어지며 복수개의 내부구멍이 형성되는 것으로 설명하고 있지만, 동일한 기능과 목적을 달성할 수 있는 범위 내에서 다른 형태 및 다른 개수의 사용을 배제하는 것은 아니다.
Next, Figures 15a and 15b shows a shear hardware consisting of a steel sheet member according to another embodiment of the present invention. As shown in the figure, the steel sheet member 230 used as a kind of shear steel is a plurality of inner holes so that one side end is coupled to the H pile 100 of the earth wall and the horizontal reinforcement of the basement outer wall is passed through. A hole, 231 is characterized in that formed of a rectangular steel sheet member having a predetermined thickness. In addition, according to a preferred embodiment of the present invention, the shear hardware consisting of the steel plate member 230 may be formed long so that a plurality of inner holes through which the interior horizontal reinforcing bar of the basement outer wall is additionally included. That is, although not shown, if a plurality of inner holes are additionally included to allow the interior horizontal rebars of the basement outer wall to pass through as described above, the steel plate member 230 passes through the interior and outdoor side horizontal bars of the basement outer wall. A plurality of two rows of inner holes may be formed. Although the steel sheet member 230 is formed of a rectangular steel sheet member and described as having a plurality of inner holes, it is to be noted that the use of different shapes and different numbers within a range capable of achieving the same function and purpose is not allowed. no.

다음으로 도 16a 및 도 16b는 본 발명에 따른 지하외벽 선시공 공법에 사용되는 T자형 강판부재로 이루어진 전단철물을 도시하고 있다. 상기 도면에서 도시된 바와 같이, 전단철물의 일종으로서 사용되는 T자형 강판부재(240)는 지하외벽의 수직철근이 관통되어지는 하나 또는 복수개의 내부구멍(243)을 가진 플랜지부(241)와 지하외벽의 수평철근이 관통되어지는 하나 또는 복수개의 내부구멍(244)을 가진 웨브부(242)가 일체형으로 형성되어지며, 일측단부는 흙막이 벽체의 H파일에 결합되어지는 소정의 두께를 가진 T자형 강판부재로 이루어지는 것을 특징으로 한다. 또한 본 발명의 선호적인 실시예에 따르면, 상기 T자형 강판부재(240)로 이루어지는 전단철물은 플랜지부(241) 및 웨브부(242)가 지하외벽의 실내측 수직철근 및 수평철근이 관통되는 내부구멍이 추가적으로 포함되도록 길게 형성되어질 수도 있다. 즉 도시되지는 않았지만, 상기와 같이 지하외벽의 실내측 수평철근이 관통될 수 있도록 복수개의 내부구멍이 추가적으로 포함되어진다면, 상기 T자형 강판부재(240)의 플랜지부(241) 및 웨브부(242)는 지하외벽의 실내측 및 실외측 수평철근이 관통될 수 있는 복수개의 2열로 된 내부구멍이 형성되어진다.
Next, FIGS. 16A and 16B illustrate a shear hardware composed of a T-shaped steel sheet member used in an underground exterior wall construction method according to the present invention. As shown in the figure, the T-shaped steel plate member 240 used as a kind of shear steel is a flange portion 241 having one or a plurality of inner holes (243) through which the vertical reinforcement of the basement outer wall is penetrated and the basement A web portion 242 having one or a plurality of inner holes 244 through which horizontal rebars of the outer wall are penetrated is formed integrally, and one end thereof has a T-shape having a predetermined thickness that is coupled to the H pile of the earth wall. It is characterized by consisting of a steel sheet member. In addition, according to a preferred embodiment of the present invention, the shear steel consisting of the T-shaped steel sheet member 240, the flange portion 241 and the web portion 242 inside the vertical vertical and horizontal reinforcing bars of the basement outer wall through It may be formed long so that the hole is additionally included. That is, although not shown, the flange portion 241 and the web portion 242 of the T-shaped steel sheet member 240, if a plurality of inner holes are additionally included so as to penetrate the interior horizontal rebar of the basement outer wall as described above ) Is formed with a plurality of two rows of inner holes through which the inner and outer horizontal bars of the basement outer wall can pass.

한편 전술한 바와 같이 본 발명의 일 실시예에 따른 전단철물의 일종인 스터드볼트(210)는 지하흙막이 벽체의 H파일이 근입전에 미리 결속되어질 수 있지만, 설계자 또는 시공자의 선택에 따라서 근입후에 지하흙막이 벽체의 H파일을 노출시키고 스터드볼트를 차후에 용접하여 결속시킬 수도 있으며, 도 14 내지 도 16에 도시된 전단철물(200)인 절곡철근(220), 강판부재(230), T자형 강판부재(240)는 건물경계선을 따라서 지하흙막이 벽체를 설치하고 상기 지하흙막이 벽체의 H파일을 노출시킨 후, 상기 노출된 지하흙막이 벽체의 H파일의 일측에 지하외벽 받침용 전단철물 및 지하외벽용 전단철물을 결합시킨다.
Meanwhile, as described above, the stud bolt 210, which is a kind of shear hardware according to an embodiment of the present invention, may be bound in advance before the H pile of the underground mud wall, but after the entrance according to the choice of the designer or the builder. The H pile of the basement wall may be exposed and the stud bolt may be welded and subsequently bonded. The bending steel 220, the steel plate member 230, and the T-shaped steel member, which are the shear hardware 200 shown in FIGS. 240 is to install the basement wall along the building boundary line and expose the H pile of the basement wall, and then to the one side of the H pile of the exposed underground mud wall, the supporting steel for the basement wall and the shear steel for the basement wall Combine.

나아가 비록 본 발명의 일 실시예에 따른 전단철물은 지하외벽 받침용 전단철물 및 지하외벽용 전단철물로서 선시공된 지하1층의 지하외벽이 흙막이 벽체에 안정적으로 결속되도록 사용되는 것이지만, 동일한 목적과 기능을 달성할 수 있다면, 다른 전술한 바와 같이 지하층 또는 지상층에도 적용되어질 수도 있다. 또한 상기 흙막이 벽체는 현장타설 콘크리트 흙막이벽 또는 토류판 흙막이벽 또는 소일시멘트벽 중 어느 하나로 이루어질 수 있다. 본 발명의 일 실시예에 따르면, 상기 지하외벽 받침용 전단철물 및 지하외벽용 전단철물은 흙막이벽체의 H파일에 용접으로 결합되어지는 것이 선호된다.
Furthermore, although the shear hardware according to an embodiment of the present invention is used to ensure that the basement outer wall of the basement 1 floor, which is pre-constructed as the shear steel for the basement external wall support and the basement exterior shear, is stably bound to the retaining wall, the same purpose and function. If it can be achieved, it may also be applied to the basement or ground floor as described above. In addition, the retaining wall may be made of any one of the cast-in-place concrete retaining wall, earthen plate retaining wall or small cement wall. According to one embodiment of the invention, it is preferred that the basement external wall support shear hardware and the basement exterior wall shear hardware are welded to the H pile of the retaining wall.

다음으로 도 17 내지 도 25는 본 발명의 선호적인 실시예에 따라서 지하흙막이 벽체의 H파일의 일측에 지하외벽 받침용 전단철물 및 지하외벽용 전단철물을 결합시킨 후 지하1층의 지하외벽을 선시공하는 각각의 단계를 도시한 모습이다. 상기 도면을 참조하여 설명하면, 도 17은 건물경계선을 따라서 지하흙막이 벽체를 설치하고 상기 지하흙막이 벽체의 H파일을 노출시킨 후, 상기 노출된 지하흙막이 벽체의 H파일에 지하외벽 받침용 전단철물 및 지하외벽용 전단철물을 결합시킨 다음, 지하1층 내부철골보와 내부철골보 접합용 띠장 및 좌대를 설치하고, 지상1층 시공 후 내부소단을 굴토하는 모습을 도시하고 있으며, 도 18은 지하1층의 슬래브를 지하외벽 내측선까지만 타설한 후 상기 과정을 최하단 지하층까지 반복수행 하는 단계를 도시하고 있다. 이때 지하흙막이 벽체의 H파일의 일측에 결합되는 전단철물은 상부에 위치하는 지하외벽용 전단철물과 바로 그 아래쪽에 위치하는 지하외벽 받침용 전단철물로 이루어진다.
Next, FIGS. 17 to 25 illustrate the construction of the basement outer wall of the basement 1 layer after combining the basement outer wall support shear hardware and the basement outer wall shear hardware to one side of the H pile of the basement wall according to the preferred embodiment of the present invention. Each step is shown. Referring to the drawings, FIG. 17 illustrates the installation of an underground mud wall along a building boundary line and exposing the H pile of the underground mud wall, and the shear steel for supporting the basement wall to the H pile of the exposed underground mud wall. After combining the shearing hardware for the basement outer wall, and installing the inner steel golbo and the inner steel golbo joining bands and pedestal, and after the construction of the ground floor 1, the interior burial is shown, Figure 18 is the basement of the first floor After placing the slab only to the inner line of the basement outer wall it is shown the step of repeating the process to the lowest basement floor. At this time, the shear hardware coupled to one side of the H pile of the underground mud wall is composed of a shear hardware for the underground outer wall located in the upper portion and a shear steel for the underground outer wall support located immediately below.

다음으로 지하1층의 지하외벽을 선시공하기 위하여 지하1층 바닥부에 지하외벽용 하부거푸집, 외벽받침 앵글좌대, 경사유지용 받침대를 설치하고(도 19 참조), 지하외벽의 수직 및 수평철근을 상기 지하외벽 받침용 전단철물과 결속되도록 배근하고 지하외벽 받침보용 측면거푸집을 설치한 후(도 20 참조), 콘크리트를 1차타설하여 선시공 지하외벽 받침보를 형성한다(도 21 참조). 다음으로 선시공된 지하1층의 지하외벽 받침보 위쪽에서 지하외벽 수직 및 수평철근을 기존철근과 겹침이음하고 지하외벽용 전단철물과 결속되도록 배근하며, 지하외벽용 거푸집을 설치한 후(도 22 참조), 콘크리트를 2차타설하여 선시공 지하외벽을 형성한다(도 23 참조). 그 후 지하외벽용 거푸집을 탈형하고 나면 도시된 바와 같이 선시공된 지하1층의 지하외벽이 완성된다(도 24). 따라서 상기와 같은 방식으로 선시공 지하외벽이 완성되면 최외곽 지상층 수직 골조부재에 대한 지지부가 형성되므로, 지상층 골조가 지하구조물의 외벽선까지 연장되어 있는 경우 즉 지하층과 지상층의 바닥면적이 같은 경우, 지하골조가 완료될 때까지 기다려야만 하는 종래의 방법과는 달리 본 발명에 따른 역타공법은 조기에 지상층 골조시공 착수가 가능해진다(도 25 참조).
Next, in order to construct the basement outer wall of the basement 1st floor, the lower formwork for the basement outer wall, the outer wall support angle seat and the inclination maintenance base are installed in the basement 1st floor, and the vertical and horizontal reinforcement of the basement outer wall is installed. After reinforcement so as to be bound with the shear steel for the basement outer wall support and install the side formwork for the basement wall support beam (see Fig. 20), the concrete is first placed to form the pre-construction basement outer wall support beam (see Fig. 21). Next, at the upper part of the basement floor support beam of the first basement, the basement vertical and horizontal reinforcing bars are overlapped with existing reinforcing bars and reinforced to be bonded with the shear steel for the basement exterior walls, and after the formwork for the basement exterior walls is installed (see FIG. 22). ), The secondary casting of concrete to form a pre-construction basement outer wall (see Fig. 23). Then, after demolding the formwork for the basement outer wall is completed the basement outer wall of the basement 1 floor pre-installed as shown (Fig. 24). Therefore, when the pre-construction basement outer wall is completed in the above manner, since the support part for the outermost ground layer vertical frame member is formed, when the ground layer frame extends to the outer wall line of the underground structure, that is, when the base area and the ground layer have the same bottom area, Unlike the conventional method, which has to wait until the frame is completed, the reverse perforation method according to the present invention makes it possible to start the ground layer frame construction early (see FIG. 25).

한편 본 발명의 다른 선호적인 실시예에 따르면, 설계자 또는 시공자의 선택에 따라서 상기 콘크리트를 1차타설하여 선시공 지하외벽받침보를 형성하는 단계와 콘크리트를 2차타설하여 선시공 지하외벽을 형성하는 단계는 서로 구분되지 않고, 지하1층 선시공 지하외벽을 일체로 타설하도록 수행되어질 수도 있다.
On the other hand, according to another preferred embodiment of the present invention, according to the designer or the builder's choice, the first step of placing the concrete to form the pre-construction basement outer wall support beam and the second step of concrete to form the pre-construction basement outer wall It is not distinguished and may be performed to integrally install the basement 1 floor pre-construction basement outer wall.

다음으로 상기 선시공된 지하1층의 지하외벽의 아래쪽에 개방되어진 부분을 통해서, 최하단 지하층부터 지하3층까지 통상적인 방식으로 시공된 지하외벽 상부에 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽을 연속적으로 순타타설하는 방법에 대해서 설명한다. 다음에서 설명하는 용어 중에서 지하1층은 본 발명에 따른 선시공 지하외벽에 설치되는 지하층을 의미하며, 지하2층은 상기 선시공 지하외벽이 설치된 지하층의 바로 아래층을 의미하고, 지하3층은 상기 선시공 지하외벽이 설치된 지하층으로부터 2층 아래층을 의미하는 것으로서, 이는 단지 본 발명에 대한 설명을 용이하게 하기 위하여 사용된 것에 불과한 것으로서, 동일한 목적 및 기능을 달성할 수 있는 범위 내에서 다른 표현의 사용을 배제하는 것은 아니다.
Next, through the portion that is opened below the basement outer wall of the first basement floor, the basement first floor basement outer wall lower part of the first basement first floor to the basement outer wall constructed in the usual way from the lowest basement floor to the third basement floor. The following describes how to continuously cast the outer walls. Among the terms to be described below, the basement 1 floor means the basement layer installed on the pre-built basement outer wall according to the present invention, and the basement 2 floor refers to the layer directly below the basement layer on which the pre-installation basement outer wall is installed, and the basement 3 floor is the pre-installation basement. It means the second floor downstairs from the basement floor where the outer wall is installed, which is merely used to facilitate the description of the present invention, to exclude the use of other expressions within the scope to achieve the same purpose and function. It is not.

먼저 도 26 내지 도 31은 브라켓(bracket) 방식의 거푸집을 이용한 순타타설 방법을 도시하고 있다. 먼저 최하단 지하층까지 지하 각층에 대한 내부 철골보의 설치 및 슬래브의 타설 등의 작업이 완료된 후 본 발명의 선호적인 실시예에 따라서 지하1층의 지하외벽을 선시공한다. 다음으로 최하단 지하층부터 지하3층까지 통상적인 방식으로 지하외벽을 시공한 후 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽을 순타타설하여 지하외벽을 완성하게 된다. 상기 도면에 도시된 바와 같이, 이때 지하1층에 브라켓(bracket) 방식으로 된 거푸집을 설치하고(도 26), 콘크리트를 타설함으로써 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽이 형성된다(도 27). 그러나 이러한 과정에서 타설된 지하외벽의 콘크리트가 경화되어지면, 도 28에 도시된 바와 같이 지하1층의 하부외벽에는 불필요한 잉여의 외벽 노출부위가 필연적으로 생성되어지는데, 이러한 불필요한 잉여의 외벽 노출부위는 반드시 외벽타설 다음날까지 번거로운 할석(割石)과정을 거쳐서 제거되어져야만 한다(도 29 참조). 따라서 도 30 및 도 31에 도시된 바와 같이, 지하외벽의 잉여의 노출부위에 대한 할석완료 후, 면처리 함으로써 지하외벽의 시공이 완료되어진다.
First, FIGS. 26 to 31 illustrate a method of pouring in which a bracket-type formwork is used. First, after completion of the installation of the inner steel cheolgolbo and the slab of the slab to each basement floor to the lowest basement floor is completed in accordance with a preferred embodiment of the present invention to construct the basement outer wall of the basement 1 floor. Next, after constructing the basement outer wall from the lowest basement floor to the 3rd basement in a conventional manner, the basement outer wall is completed by net casting the basement outer wall from the 2nd basement floor to the lower part of the basement outer wall. As shown in the figure, at this time, by installing a formwork in the bracket (bracket) method on the basement 1 floor (Fig. 26), by placing concrete, the basement outer wall from the basement 2 floor to the bottom of the basement 1 basement outer wall of the pre-construction Formed (FIG. 27). However, when the concrete of the basement outer wall cast in this process is hardened, as shown in FIG. 28, an unnecessary surplus outer wall exposed portion is inevitably generated on the lower outer wall of the basement 1 floor. It must be removed by a cumbersome stone process until the day after the exterior wall laying (see Fig. 29). Therefore, as shown in Figs. 30 and 31, after the completion of the seokseok for the exposed portion of the outer surface of the basement outer wall, the surface treatment is completed by the surface treatment.

그러나 상기와 같은 방식은 거푸집으로 사용되는 브라켓(bracket)제작 공정에 소요되는 시간이 길어지며, 지하외벽의 잉여의 노출부위와 같은 콘크리트 여유타설에 따른 공사비가 증가하고, 지하외벽 노출부위의 할석시 기타설된 콘크리트 내부에 진동을 주게 됨에 따라 지하외벽에 대하여 구조적으로 영향을 미치는 심각한 문제점이 있다. 또한 지하외벽 노출부위에 대한 할석으로 인한 건설폐기물 처리비용이 발생함으로써 경제적 및 환경적으로 문제가 발생하며, 외벽 노출부위에 대한 할석시기를 놓치는 경우 할석이 들어가는 시간 및 공사비가 더욱 증가된다는 문제점이 있고, 경사 브라켓의 지지대가 흔들리거나 파손될 경우 즉각적인 보수가 곤란함으로써 시공품질에 차질을 미칠 수 있다는 단점이 있다.
However, the above method requires longer time for the bracket manufacturing process used as formwork, and increases the construction cost due to the extra laying of concrete such as the surplus exposed portion of the basement outer wall, There is a serious problem that structurally affects the basement outer wall as it vibrates inside the installed concrete. In addition, there is a problem of economic and environmental problems due to the cost of construction waste treatment due to the sediment on the exposed part of the underground exterior wall. , If the support of the inclined bracket is shaken or damaged, it is difficult to immediately repair, which may affect the construction quality.

이러한 문제점을 해결하기 위하여, 본 발명은 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용하여 최하단 지하층부터 지하3층까지 통상적인 방식으로 시공된 지하외벽 상부에 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽을 순타타설 한다. 따라서 먼저 본 발명의 선호적인 실시예에 따른 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집에 대해서 먼저 설명한 후, 상기 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법에 대해서 설명한다.
In order to solve this problem, the present invention by using the formwork equipped with the backflow prevention concrete pouring hole and the vibrator near the entrance from the lower basement floor to the basement 3 floor in the usual way on the basement outer wall above the basement 2 floors above the pre-construction The basement outer wall is poured into the lower part of the basement outer wall. Therefore, first, a form provided with a backflow preventing concrete pouring port and a vibrator root opening according to a preferred embodiment of the present invention will be described first, and then an underground outer wall using the formwork having the backflow preventing concrete pouring port and a vibrator root opening. Explain the construction method.

도 32는 발명의 선호적인 실시예에 따른 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 도시하고 있다. 상기 도 32로부터 알 수 있듯이, 상기 거푸집(300)은 지하1층의 선시공 지하외벽 아래쪽에 설치되어지는 것으로서, 역류방지형 콘크리트 타설구(310)가 소정의 위치에 장착된 거푸집과 역류방지형 바이브레이터 근입구(320)가 소정의 위치에 장착된 거푸집이 서로 연결장착되어진다.
FIG. 32 illustrates a formwork provided with a backflow preventing concrete pouring port and a vibrator root opening according to a preferred embodiment of the present invention. As can be seen from FIG. 32, the formwork 300 is installed below the pre-construction basement outer wall of the first floor of the basement, and the formwork and the backflow prevention vibrator in which the backflow prevention concrete pouring hole 310 is mounted at a predetermined position Formwork in which the root entrance 320 is mounted at a predetermined position is connected to each other.

도 33 내지 도 37은 본 발명의 선호적인 실시예에 따른 역류방지형 콘크리트 타설구(310)가 구비된 거푸집(300)을 구체적으로 도시한 모습이다. 도 34에 도시된 바와 같이, 본 발명에 따른 역류방지형 콘크리트 타설구(310)는 기본적으로 나사산이 형성된 외측 입구부재(311), 역류방지판(312), 폐합구동부인 원형 튜브부재(313) 그리고 튜브결속수단(314)을 포함한다.
33 to 37 is a view showing in detail the formwork 300 is provided with a backflow prevention concrete pouring tool 310 in accordance with a preferred embodiment of the present invention. As shown in FIG. 34, the non-return concrete pouring hole 310 according to the present invention basically has a threaded outer inlet member 311, a non-return plate 312, and a closed tube driving member 313. And tube fastening means 314.

이하 본 발명에 따른 역류방지형 콘크리트 타설구(310)가 구비된 거푸집(300)의 기본 구성요소에 대해서 보다 구체적으로 설명한다. 먼저 상기 외측 입구부재(311)는 거푸집 외부로 돌출되며 표면에는 나사산이 형성되어져서, 지하외벽의 순타타설을 위하여 삽입되는 콘크리트 타설용 튜브의 잠금장치와 나사식으로 체결고정되어진다. 한편 역류방지판(312)은 거푸집의 내측에 설치되어지고 서로 분리되어진 복수개의 부채꼴 형상 조각부재들로 이루어지는데, 상기 복수개의 부채꼴 형상 조각부재들은 서로 합쳐져서 원형의 역류방지막을 형성하게 된다(도 36 참조). 상기 원형의 역류방지막은 콘크리트 타설용 튜브가 체결고정되어지면 타설용 튜브의 주입구의 가압에 의해서 뒤로 젖혀지면서 개방되어지고(도 35 참조), 콘크리트 타설용 튜브가 해제되어지면 다음에서 설명하는 원형 튜브부재의 복원력에 의해서 원래의 위치로 복귀하게 된다(도 34 참조).
Hereinafter will be described in more detail with respect to the basic components of the formwork 300 is provided with a non-return concrete pouring device 310 according to the present invention. First, the outer inlet member 311 protrudes to the outside of the formwork, and a thread is formed on the surface thereof, so that the outer inlet member 311 is screwed and fastened to the locking device of the concrete placing tube inserted for net casting of the basement outer wall. Meanwhile, the non-return plate 312 includes a plurality of fan-shaped engraving members installed inside the formwork and separated from each other, and the plurality of fan-shaped engraving members are combined with each other to form a circular backflow prevention film (FIG. 36). Reference). The circular backflow prevention film is opened while being pushed back by the pressurizing inlet of the pouring tube when the concrete pouring tube is fastened and fixed (see FIG. 35), and the circular tube described below when the concrete pouring tube is released. The restoring force of the member returns to the original position (see FIG. 34).

다음으로 원형 튜브부재(313)에 대해서 살펴보면, 상기 원형 튜브부재(313)는 상기 역류방지판(312)의 내부표면(지하외벽 방향) 상에 결속되어지며, 그 내부에는 탄성부재가 포함되어져 있다. 상기 탄성부재의 복원력에 의해서 콘크리트 타설용 튜브가 거푸집으로부터 해제되어지면 상기 역류방지판(312)이 원래의 위치로 복귀하도록 한다. 한편 튜브결속수단(314)은 상기 역류방지판(312)의 내부 표면상에서 원형 튜브부재(313)가 결속되도록 하는 구성으로서, 일측단부는 역류방지판(312)의 내부 표면상에 결속되어지고 타측단부는 상기 원형 튜브부재를 감싸도록 구부려진 형태로 이루어지는 것이 선호된다.
Next, referring to the circular tube member 313, the circular tube member 313 is bound on the inner surface (underground outer wall direction) of the backflow prevention plate 312, the elastic member is included therein. . When the concrete placing tube is released from the formwork by the restoring force of the elastic member, the backflow prevention plate 312 is returned to its original position. Meanwhile, the tube binding means 314 is configured to bind the circular tube member 313 on the inner surface of the non-return plate 312, and one end thereof is bound on the inner surface of the non-return plate 312 and the other side. It is preferred that the end is formed to be bent to surround the circular tube member.

다음으로 본 발명에 따른 역류방지형 바이브레이터 근입구(320)가 구비된 거푸집(300)의 구성요소에 대해서 설명한다. 상기 역류방지형 바이브레이터 근입구(320)는 지하외벽의 타설되는 콘크리트가 역류하는 것을 방지하는 것으로서, 전술한 역류방지형 콘크리트 타설구(310)의 구성과 유사하게 이루어진다. 즉 본 발명에 따른 역류방지형 바이브레이터 근입구(320)는 거푸집의 내측에 설치되어지고 서로 분리되어진 부채꼴 형상의 복수개의 조각부재들이 원형의 역류방지막을 형성하며, 콘크리트 타설용 바이브레이터(vibrator)의 진동봉이 삽입되어지면 상기 진동봉의 가압에 의해서 상기 역류방지막이 뒤로 젖혀지면서 개방되어지고, 상기 진동봉이 후퇴되어지면 상기 역류방지막이 원래의 위치로 복구하게 되는 역류방지판과; 상기 역류방지판의 내부 표면상에 결속되어지고 그 속에는 탄성부재를 내포하고 있어서, 콘크리트 타설용 바이브레이터(vibrator)의 진동봉이 후퇴되어지면 상기 탄성부재의 복원력에 의해서 상기 역류방지판이 원래의 위치로 복귀하게 하는 원형 튜브부재와; 역류방지판의 내부표면 상에 상기 원형 튜브부재가 결속되도록 일측단부는 역류방지판의 내부표면 상에 결속되어지고 타측단부는 상기 원형 튜브부재를 감싸도록 구부려진 형태로 된 튜브결속수단을 포함한다.
Next, the components of the formwork 300 having the backflow prevention vibrator root entrance 320 according to the present invention will be described. The non-return type vibrator entrance 320 is to prevent the reversed concrete from being poured in the basement outer wall, and is similar to the configuration of the non-return type concrete pouring port 310 described above. That is, the non-return type vibrator root inlet 320 according to the present invention is formed inside the formwork and separated from each other a plurality of pieces of fan-shaped pieces formed a circular anti-reflection film, vibration of the concrete pour vibrator (vibrator) A backflow prevention plate which is opened while the backflow prevention film is flipped back by the pressurization of the vibration bar when the rod is inserted, and the backflow prevention film is restored to its original position when the vibration bar is retracted; It is bound on the inner surface of the non-return plate and contains an elastic member. When the vibrating rod of the concrete placing vibrator is retracted, the non-return plate is returned to its original position by the restoring force of the elastic member. A circular tube member to allow; One end portion is bound on the inner surface of the non-return plate and the other end portion is formed to be bent to surround the circular tube member so as to bind the circular tube member on the inner surface of the non-return plate. .

도 37에 도시된 바와 같이 본 발명의 일 실시예에 따르면, 상기 원형 튜브부재(313)의 내부에 위치하는 탄성부재는 스프링(spring)으로 이루어지는 것이 선호되지만, 동일한 목적과 기능을 달성할 수 있는 범위 내에서 다른 재료의 사용을 배제하는 것은 아니다.
According to one embodiment of the present invention as shown in Figure 37, the elastic member located inside the circular tube member 313 is preferably made of a spring (spring), but can achieve the same purpose and function It is not intended to exclude the use of other materials within the scope.

또한 본 발명의 다른 선호적인 실시예에 따르면, 상기 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집은 콘크리트 타설상태를 확인할 수 있는 투명재질의 확인구가 추가적으로 구비되어질 수 있다. 상기 투명재질의 확인구는 투명 아크릴 또는 투명 강화플라스틱으로 이루어질 수 있다.
In addition, according to another preferred embodiment of the present invention, the formwork provided with the backflow prevention concrete pouring port and the vibrator root opening may be additionally provided with a confirmation hole of the transparent material to check the concrete casting state. The identification port of the transparent material may be made of transparent acrylic or transparent reinforced plastic.

다음으로 본 발명에 따른 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법에 대해서 설명한다.
Next, a description will be given of an underground exterior wall pre-construction method using formwork provided with a backflow prevention concrete pouring port and a vibrator root opening according to the present invention.

도 38 내지 도 40은 상기에서 기술한 본 발명에 따른 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법의 각 단계를 도시하고 있다. 앞서 설명한 바와 같이 지하1층의 지하외벽을 선시공하여 형성시킨 후(도 17 내지 도 25 참조), 상기에서 설명한 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 지하1층 및 지하2층의 지하외벽 내측선을 따라서 설치한 후 최하단 지하층부터 지하3층까지 통상적인 방식으로 시공된 지하외벽 상부에 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽을 순타타설로 콘크리트 타설함으로써 불필요한 잉여의 노출부위에 대한 할석(割石)과정 없이 지하외벽이 연속적으로 형성되도록 한다.
38 to 40 illustrate each step of the underground exterior wall pre-construction method using formwork provided with a backflow prevention concrete pouring port and a vibrator root entrance according to the present invention described above. As described above, after the basement outer wall of the basement 1 floor is pre-formed (see FIGS. 17 to 25), the formwork having the backflow prevention concrete pouring port and the vibrator entrance described above is formed in the basement 1 floor and the basement 2 floor. After installing along the inner line of the outer outer wall of concrete, concrete pouring the outer outer wall from the second basement to the lower part of the underground outer wall of the first basement, which was constructed in the usual way from the lowest basement to the third basement. Underground wall is continuously formed without the need for halting for unnecessary surplus exposed areas.

이에 대해서 좀더 상세하게 설명하면, 선시공된 지하1층의 지하외벽받침보 하단부에 타설상태 확인구를 형성하고, 지하1층 및 지하2층의 지하외벽 내측선을 따라서 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 설치한다. 이때 상기 타설상태 확인구는 지하외벽 받침보의 하단부에 홈을 형성시킨 후, 스페이서를 설치하여 거푸집이 지하외벽으로부터 이격되도록 함으로써 이루어질 수 있다(도 38 참조). 다음으로 상기 거푸집에 형성된 역류방지형 콘크리트 타설구 및 바이브레이터 근입구를 통해서 콘크리트 타설장치 및 바이브레이터를 삽입하여 최하단 지하층부터 지하3층까지 통상적인 방식으로 시공된 지하외벽 상부에 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽을 순타타설로 연속적으로 형성시킨다. 이러한 과정을 거쳐서 지하외벽을 양생시키면, 지하1층의 지하외벽에는 앞서 형성한 타설상태 확인구만 남아 있게 되는데(도 39 참조), 이러한 타설상태 확인구를 마무리함으로써 지하외벽이 연속적으로 형성되어진다(도 40 참조).
To explain in more detail, a casting condition check hole is formed at the lower part of the basement outer wall support beam of the first basement floor, and the backflow prevention concrete pouring port and vibrator is formed along the inner line of the basement outer wall of the first and second basement floors. Install the formwork with the root opening. At this time, the pouring state check hole can be made by forming a groove in the lower end of the basement outer wall support beam, the spacer is installed so that the formwork is spaced apart from the basement outer wall (see Fig. 38). Next, the concrete installation device and the vibrator are inserted through the non-return type concrete pouring port and the vibrator inlet formed in the formwork, and the first and second constructions are performed on the upper part of the basement outer wall, which was constructed in the usual manner from the basement floor to the basement 3 floor. The basement outer wall is continuously formed by castion to the lower part of the basement outer wall. When the basement outer wall is cured through this process, only the pouring state confirmation hole formed above remains on the basement outer wall of the basement 1 floor (see FIG. 39), and the basement outer wall is continuously formed by finishing the pouring state confirmation hole (see FIG. 39). 40).

즉 본 발명에 따른 지하흙막이 벽체의 지지구조체로서 설치되는 지하외벽을 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용하여 선시공하는 공법은, In other words, the construction method for the pre-construction of the basement outer wall, which is installed as the supporting structure of the underground mud wall according to the present invention by using a formwork having a backflow prevention concrete pouring hole and a vibrator near entrance,

(a) 건물경계선을 따라서 지하흙막이 벽체를 설치하고, 상기 지하흙막이 벽체의 H파일을 노출시키는 단계와, (a) installing a basement wall along a building boundary, exposing the H pile of the basement wall,

(b) 상기 노출된 지하흙막이 벽체의 H파일에 지하외벽 받침용 전단철물 및 지하외벽용 전단철물을 결합시키는 단계와, (b) combining the shear steel for the basement external wall support and the shear steel for the basement outer wall to the H pile of the exposed underground mud wall;

(c) 지하1층 내부철골보와 내부철골보 접합용 띠장 및 좌대를 설치하고, 지상1층 시공 후 내부소단을 굴토하고, 지하1층의 슬래브를 지하외벽 내측선까지만 타설한 후, 상기 과정을 최하단 지하층까지 반복수행 하는 단계와, (c) Install the inner steel golbo and the inner steel golbo joining bands and pedestals, excavate the internal edge after construction on the ground floor, and cast the slab of the basement 1 floor only to the inner line of the basement outer wall, Repeating to the basement floor,

(d) 지하1층 바닥부에 지하외벽용 하부거푸집, 외벽받침 앵글좌대, 경사유지용 받침대를 설치하고, 지하외벽의 수직 및 수평철근을 상기 지하외벽 받침용 전단철물과 결속되도록 배근하고, 지하외벽 받침보용 측면거푸집을 설치한 후, 콘크리트를 1차타설하여 선시공 지하외벽 받침보를 형성하는 단계와, (d) Install the lower formwork for the basement outer wall, the angle base of the outer wall, and the inclination holding pedestal at the basement 1 floor, and reinforce the vertical and horizontal reinforcement of the basement outer wall to bind with the shear steel for the basement outer wall. After installing the side formwork for the outer wall support beam, the first step of concrete to form a pre-construction basement outer wall support beam,

(e) 지하외벽 수직 및 수평철근을 기존철근과 겹침이음하고 지하외벽용 전단철물과 결속되도록 배근하고, 지하외벽용 거푸집을 설치한 후, 콘크리트를 2차타설하여 선시공 지하외벽을 형성하는 단계와, (e) the step of overlapping the vertical and horizontal reinforcing bar with the existing reinforcing bar and reinforcing to bond with the shear steel for the basement wall, installing the formwork for the basement wall, and then placing the secondary concrete to form the pre-construction basement wall; ,

(f) 상기 선시공된 지하1층의 지하외벽받침보 하단부에 타설상태 확인구를 형성하고, 지하1층 및 지하2층의 지하외벽 내측선을 따라서 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 설치한 후, 상기 거푸집에 형성된 역류방지형 콘크리트 타설구 및 바이브레이터 근입구를 통해서 콘크리트 타설장치 및 바이브레이터를 삽입하여 최하단 지하층부터 지하3층까지 통상적인 방식으로 시공된 지하외벽 상부에 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽을 순타타설로 연속적으로 형성시키는 단계로 이루어지는 것을 특징으로 한다.
(f) forming a pouring condition check hole at the lower part of the basement outer wall support beam of the first basement floor constructed above, and the reverse flow prevention type concrete pouring hole and the vibrator entrance are provided along the inner wall of the basement outer wall of the first and second basement floors; After installing the old formwork, the concrete placing device and the vibrator are inserted through the non-return type concrete pouring port and the vibrator inlet formed in the formwork. Characterized in that it comprises the step of continuously forming a basement outer wall from the floor to the bottom of the first basement underground floor of the pre-constructed by the casting.

또한 본 발명의 다른 선호적인 실시예에 따르면, 상기 콘크리트를 1차타설하여 선시공 지하외벽받침보를 형성하는 단계와 콘크리트를 2차타설하여 선시공 지하외벽을 형성하는 단계는 서로 구분되지 않고, 지하1층 선시공 지하외벽을 일체로 타설하도록 수행되어질 수도 있다.
In addition, according to another preferred embodiment of the present invention, the step of forming the pre-construction basement outer wall support beam by placing the concrete first and the step of forming the pre-construction basement outer wall by secondary casting concrete is not distinguished from each other, basement 1 floor It may be performed to integrally install the preparatory outer wall.

한편 본 발명의 또 다른 선호적인 실시예에 따르면, 상기 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 이용한 지하외벽 선시공 공법은 거푸집에 형성된 역류방지형 콘크리트 타설구 및 바이브레이터 근입구를 통해서 콘크리트 타설장치 및 바이브레이터를 삽입하여 최하단 지하층부터 지하3층까지 통상적인 방식으로 시공된 지하외벽 상부에 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽을 순타타설로 연속적으로 형성한 후, 선시공된 지하외벽받침보의 하단부에 형성된 타설상태 확인구를 콘크리트로 채우는 단계를 추가적으로 포함할 수 있다. 본 발명의 다른 선호적인 실시예에 따르면, 상기 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집에 콘크리트 타설상태를 확인할 수 있는 투명재질의 확인구를 구비시킴으로써 상기한 타설상태 확인구를 대체할 수도 있다.
Meanwhile, according to another preferred embodiment of the present invention, the underground exterior wall construction method using the formwork provided with the backflow prevention concrete pouring hole and the vibrator root opening is provided through the backflow preventing concrete pouring hole and the vibrator root opening formed in the formwork. After inserting the concrete pouring device and vibrator, the basement outer wall was continuously formed by net casting from the 2nd basement floor to the bottom of the 1st basement basement outer wall constructed in the usual way from the lowest basement floor to the 3rd basement. The method may further include filling the concrete with a pouring state check hole formed at the lower end of the pre-built basement external wall support beam. According to another preferred embodiment of the present invention, by placing a check hole of the transparent material to confirm the concrete pouring state in the formwork is provided with the backflow-prevention type concrete pouring hole and the vibrator root opening to replace the pour state check sphere You may.

전술한 바와 같이 상기 흙막이 벽체는 현장타설 콘크리트 흙막이벽 또는 토류판 흙막이벽 또는 소일시멘트벽 중 어느 하나로 이루어질 수 있다.
As described above, the retaining wall may be made of any one of a cast-in-place concrete retaining wall, a soil plate retaining wall, or a small cement wall.

또한 본 발명의 다른 선호적인 실시예에 따르면, (a) 건물경계선을 따라서 지하흙막이 벽체를 설치하고, 상기 지하흙막이 벽체의 H파일을 노출시키는 단계와, In addition, according to another preferred embodiment of the present invention, (a) installing the basement wall along the building boundary, exposing the H pile of the basement wall,

(b) 상기 노출된 지하흙막이 벽체의 H파일에 지하외벽 받침용 전단철물 및 지하외벽용 전단철물을 결합시키는 단계와, (b) combining the shear steel for the basement external wall support and the shear steel for the basement outer wall to the H pile of the exposed underground mud wall;

(c) 지하1층 내부철골보와 내부철골보 접합용 띠장 및 좌대를 설치하고, 지상1층 시공 후 내부소단을 굴토하고, 지하1층의 슬래브를 지하외벽 내측선까지만 타설한 후, 상기 과정을 최하단 지하층까지 반복수행 하는 단계와, (c) Install the inner steel golbo and the inner steel golbo joining bands and pedestals, excavate the internal edge after construction on the ground floor, and cast the slab of the basement 1 floor only to the inner line of the basement outer wall, Repeating to the basement floor,

(d) 지하1층 바닥부에 지하외벽용 하부거푸집, 외벽받침 앵글좌대, 경사유지용 받침대를 설치하고, 지하외벽의 수직 및 수평철근을 상기 지하외벽 받침용 전단철물과 결속되도록 배근하고, 지하외벽 받침보용 측면거푸집을 설치한 후, 콘크리트를 1차타설하여 선시공 지하1층 외벽 받침보를 형성하는 단계와, (d) Install the lower formwork for the basement outer wall, the angle base of the outer wall, and the inclination holding pedestal at the basement 1 floor, and reinforce the vertical and horizontal reinforcement of the basement outer wall to bind with the shear steel for the basement outer wall. After installing the side formwork for the outer wall support beam, the concrete is first cast to form the outer wall support beam of the first floor under construction,

(e) 지하외벽 수직 및 수평철근을 기존철근과 겹침이음하고 지하외벽용 전단철물과 결속되도록 배근하고, 지하외벽용 거푸집을 설치한 후, 콘크리트를 2차타설하여 선시공 지하1층 외벽을 형성하는 단계와, (e) Underground wall vertical and horizontal rebars are overlapped with existing reinforcing bars and reinforced to bond with shear steel for underground outer wall, and after installation of formwork for underground outer wall, secondary concrete is laid to form outer first floor outer wall. Steps,

(f) 상기 선시공된 지하1층의 외벽이 그 상부에 설치되는 지상층의 수직부재를 지지하도록 지상층 수직부재를 상기 선시공 지하1층의 외벽위치에 맞추어서 시공하는 단계로 이루어지는 것을 특징으로 하는 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법을 제공함으로써, 지상층 골조가 지하구조물의 외벽선까지 연장되어 있는 경우 즉 지하층과 지상층의 바닥면적이 같은 경우, 본 발명에 따른 역타공법은 지하골조가 완료될 때까지 기다릴 필요없이 바로 지상층 골조의 시공에 착수할 수 있도록 한다.
(f) Ground floor frame construction, comprising the step of constructing the ground floor vertical member in accordance with the outer wall position of the ground construction ground floor 1 so that the outer wall of the ground construction floor 1 to support the vertical member of the ground floor installed on the upper floor By providing a method of pre-construction of the outer basement floor for the purpose, if the ground floor frame is extended to the outer wall line of the underground structure, that is, if the bottom area of the basement and the ground floor is the same, the reverse drilling method according to the present invention is to complete the underground frame You do not have to wait until you are ready to begin the construction of the ground floor frame.

나아가 상기 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법은 (g) 상기 선시공된 지하1층의 지하외벽받침보 하단부에 타설상태 확인구를 형성하고, 지하1층 및 지하2층의 지하외벽 내측선을 따라서 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 설치한 후, 상기 거푸집에 형성된 역류방지형 콘크리트 타설구 및 바이브레이터 근입구를 통해서 콘크리트 타설장치 및 바이브레이터를 삽입하여 최하단 지하층부터 지하3층까지 통상적인 방식으로 시공된 지하외벽 상부에 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽을 순타타설로 연속적으로 형성시키는 단계를 추가적으로 포함할 수 있으며, 상기 콘크리트를 1차타설하여 선시공 지하외벽받침보를 형성하는 단계와 콘크리트를 2차타설하여 선시공 지하외벽을 형성하는 단계는 구분없이 일체로 타설되어지는 것, 그리고 지하외벽 받침용 전단철물 및 지하외벽용 전단철물 그리고 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집은 앞서 설명한 바와 동일하다.
Furthermore, the method of pre-construction of the first basement outer wall for the ground floor frame construction includes (g) forming a pouring state check hole at the bottom of the basement outer wall support beam of the first underground basement, and the basement outer wall of the first and second basement floors. After installing the formwork with the backflow prevention concrete pouring hole and the vibrator inlet along the inner line, the concrete pouring device and the vibrator are inserted through the backflow preventing concrete pouring hole and the vibrator inlet formed in the formwork. It may further include the step of continuously forming the basement outer wall in the casting of the basement from the basement 2nd floor to the basement 1st floor of the basement outer wall of the pre-installed basement 1 floor to the basement outer wall constructed in a conventional manner up to 3 basement, the concrete 1 Step by placing the car to form the basement external wall support beam and second place concrete The step of forming the construction basement outer wall is to be placed integrally without distinction, and the formwork equipped with the shear iron for the basement outer wall support and the shear iron for the basement outer wall, and the backflow prevention concrete pouring hole and the vibrator inlet are the same as described above. Do.

상기에서 기술된 구성과 효과를 가진 본 발명은 다양한 방법으로 변형이 가능하며, 상기에서 기술된 내용은 본 발명의 범위를 한정하고자 하는 것은 아니다. 또한 본 발명의 사상과 범위에서 벗어나지 않는 한도 내에서 다양한 변형과 수정이 가능하며, 본 발명이 속한 분야의 당업자에게 자명한 변형은 다음의 특허청구범위 범위 내에 포함되어진다.
The present invention having the configurations and effects described above can be modified in various ways, and the above description is not intended to limit the scope of the present invention. In addition, various modifications and variations are possible without departing from the spirit and scope of the invention, and modifications apparent to those skilled in the art to which the invention pertains are included within the scope of the following claims.

<도면의 주요부분에 대한 부호의 설명>
100 : 흙막이 벽체의 H파일 200 : 전단철물
210 : 스터드 볼트 211 : 콘크리트 타설방지막
220 : 절곡철근 221,222 : 양측 단부부재
223,224 : 제 1,2 수평부재 225 : 수직부재
230 : 강판부재 231 : 내부구멍(hole)
240 : T자형 강판부재 241 : 플랜지부
242 : 웨브부 243,244 : 내부구멍(hole)
300 : 거푸집 310 : 역류방지형 콘크리트 타설구
311 : 외측 입구부재 312 : 역류방지판
313 : 원형 튜브부재 314 : 튜브결속수단
320 : 역류방지형 바이브레이터 근입구
W : 지하외벽 S : 슬래브
B : 내부 철골보
Description of the Related Art
100: H pile of the earth wall 200: shear hardware
210: stud bolt 211: concrete pouring prevention film
220: bending bar 221,222: end members on both sides
223,224: first and second horizontal members 225: vertical members
230: steel sheet member 231: inner hole
240: T-shaped steel sheet member 241: flange portion
242 web part 243,244 inner hole
300: formwork 310: counterflow concrete pouring hole
311: outer inlet member 312: backflow prevention plate
313: round tube member 314: tube binding means
320: near the reverse flow prevention vibrator
W: Underground wall S: Slab
B: internal steel ball

Claims (31)

(a) 건물경계선을 따라서 지하흙막이 벽체를 설치하고, 상기 지하흙막이 벽체의 H파일을 노출시키는 단계와,
(b) 상기 노출된 지하흙막이 벽체의 H파일에 지하외벽 받침용 전단철물 및 지하외벽용 전단철물을 결합시키는 단계와,
(c) 지하1층 내부철골보와 내부철골보 접합용 띠장 및 좌대를 설치하고, 지상1층 시공 후 내부소단을 굴토하고, 지하1층의 슬래브를 지하외벽 내측선까지만 타설한 후, (a)단계 및 (b) 단계를 최하단 지하층까지 반복수행 하는 단계와,
(d) 지하1층 바닥부에 지하외벽용 하부거푸집, 외벽받침 앵글좌대, 경사유지용 받침대를 설치하고, 지하외벽의 수직 및 수평철근을 상기 지하외벽 받침용 전단철물과 결속되도록 배근하고, 지하외벽 받침보용 측면거푸집을 설치한 후, 콘크리트를 1차타설하여 선시공 지하1층 외벽 받침보를 형성하는 단계와,
(e) 지하외벽 수직 및 수평철근을 기존철근과 겹침이음하고 지하외벽용 전단철물과 결속되도록 배근하고, 지하외벽용 거푸집을 설치한 후, 콘크리트를 2차타설하여 선시공 지하1층 외벽을 형성하는 단계와,
(f) 상기 선시공된 지하1층의 외벽이 그 상부에 설치되는 지상층의 수직부재를 지지하도록 지상층 수직부재를 상기 선시공 지하1층의 외벽위치에 맞추어서 시공하는 단계로 이루어지는 것을 특징으로 하는 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법
(a) installing a basement wall along a building boundary, exposing the H pile of the basement wall,
(b) combining the shear steel for the basement external wall support and the shear steel for the basement outer wall to the H pile of the exposed underground mud wall;
(c) After installing the inner steel golbo and inner steel golbo joining bands and pedestals, and after constructing the ground floor, the internal burial will be excavated; And (b) repeating the steps to the lowest basement floor,
(d) Install the lower formwork for the basement outer wall, the angle base of the outer wall, and the inclination holding pedestal at the basement 1 floor, and reinforce the vertical and horizontal reinforcement of the basement outer wall to bind with the shear steel for the basement outer wall. After installing the side formwork for the outer wall support beam, the concrete is first cast to form the outer wall support beam of the first floor under construction,
(e) Underground wall vertical and horizontal rebars are overlapped with existing reinforcing bars and reinforced to bond with shear steel for underground outer wall, and after installation of formwork for underground outer wall, secondary concrete is laid to form outer first floor outer wall. Steps,
(f) Ground floor frame construction, comprising the step of constructing the ground floor vertical member in accordance with the outer wall position of the ground construction ground floor 1 so that the outer wall of the ground construction floor 1 to support the vertical member of the ground floor installed on the upper floor To install the first basement exterior wall for construction
제 1 항에 있어서, (g) 상기 선시공된 지하1층의 지하외벽받침보 하단부에 타설상태 확인구를 형성하고, 지하1층 및 지하2층의 지하외벽 내측선을 따라서 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집을 설치한 후, 상기 거푸집에 형성된 역류방지형 콘크리트 타설구 및 바이브레이터 근입구를 통해서 콘크리트 타설장치 및 바이브레이터를 삽입하여 최하단 지하층부터 지하3층까지 통상적인 방식으로 시공된 지하외벽 상부에 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽을 순타타설로 연속적으로 형성시키는 단계를 추가적으로 포함하는 것을 특징으로 하는 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법The method of claim 1, (g) forming a casting state confirmation hole in the lower portion of the basement outer wall support beam of the first basement floor, and the reverse flow prevention concrete pouring hole along the inner line of the basement outer wall of the first and second basement floors And after installing the formwork provided with the vibrator near the entrance, the concrete pouring device and the vibrator is inserted through the backflow prevention concrete pouring hole and the vibrator near the opening formed in the formwork was constructed in the usual way from the lowest basement floor to the third basement floor A method of pre-constructing the outer 1st basement outer wall for the construction of a ground floor frame further comprising the step of continuously forming the underground outer wall from the second basement floor to the lower part of the first basement underground outer wall by net casting. 제 1 항에 있어서, 지하외벽 받침용 전단철물 및 지하외벽용 전단철물은 흙막이 벽체의 H파일에 결합되는 수직단부 및 지하외벽의 수평철근이 통과되도록 절곡된 수평부재로 된 절곡철근인 것을 특징으로 하는 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법 The method of claim 1, wherein the shear steel for the basement outer wall and the shear steel for the basement outer wall is a bent reinforcing bar made of a vertical member and a horizontal member bent to pass the horizontal reinforcement of the basement outer wall coupled to the H pile of the earth wall How to pre-install the 1st basement exterior wall for the above ground floor frame construction 제 1 항에 있어서, 지하외벽 받침용 전단철물 및 지하외벽용 전단철물은 일측단부는 흙막이 벽체의 H파일에 결합되어지고, 지하외벽의 수평철근이 관통되어지는 복수개의 내부구멍을 가진 소정의 두께를 가진 강판부재로 이루어지는 것을 특징으로 하는 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법The predetermined thickness of claim 1, wherein the shear steel for the basement outer wall support and the shear steel for the basement outer wall have a plurality of inner holes in which one end thereof is coupled to the H pile of the earth wall, and the horizontal reinforcing bars of the basement outer wall are penetrated. Method for pre-construction of the outer 1st floor outer wall for ground floor frame construction, characterized in that consisting of a steel sheet member having a 제 1 항에 있어서, 지하외벽 받침용 전단철물 및 지하외벽용 전단철물은 지하외벽의 수직철근이 관통되어지는 복수개의 내부구멍을 가진 플랜지부와 지하외벽의 수평철근이 관통되어지는 복수개의 내부구멍을 가진 웨브부가 일체형으로 형성되어지며, 일측단부는 흙막이 벽체의 H파일에 결합되어지는 소정의 두께를 가진 T자형 강판부재로 이루어지는 것을 특징으로 하는 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법According to claim 1, wherein the shear steel for the basement outer wall and the shear steel for the basement outer wall is a flange portion having a plurality of inner holes through which the vertical reinforcement of the basement outer wall and a plurality of inner holes through which the horizontal bar of the basement outer wall The web portion having a structure is formed integrally, one side end is a method of pre-construction of the outer layer of the basement 1 floor for the ground layer frame construction, characterized in that consisting of a T-shaped steel sheet member having a predetermined thickness that is coupled to the H pile of the earth wall 제 1 항에 있어서, 지하외벽 받침용 전단철물 및 지하외벽용 전단철물은 흙막이벽체의 H파일이 근입되기 전에 또는 근입된 후에 결합되어지는 복수개의 스터드볼트로 이루어지며, 상기 스터드볼트는 콘크리트 타설방지막으로 감싸지는 것을 특징으로 하는 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법The method of claim 1, wherein the shear steel for the basement wall and the shear steel for the basement outer wall is composed of a plurality of stud bolts are joined before or after the H pile of the retaining wall is joined, the stud bolt is a concrete casting prevention film Method for pre-construction of the outer first floor outer wall for the ground floor frame construction, characterized in that wrapped 제 1 항에 있어서, 역류방지형 콘크리트 타설구 및 바이브레이터 근입구가 구비된 거푸집은 선시공된 지하외벽받침보의 하단부에 형성된 타설상태 확인구로부터 스페이서에 의해 이격되어지는 것을 특징으로 하는 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법2. The ground layer frame construction of claim 1, wherein the formwork provided with the backflow prevention concrete pouring hole and the vibrator root opening is spaced apart by a spacer from a pouring state check hole formed at the lower end of the pre-ground base wall support beam. To construct the first basement exterior wall 제 7 항에 있어서, 상기 거푸집에 형성된 역류방지형 콘크리트 타설구 및 바이브레이터 근입구를 통해서 콘크리트 타설장치 및 바이브레이터를 삽입하여 최하단 지하층부터 지하3층까지 통상적인 방식으로 시공된 지하외벽 상부에 지하2층부터 상기 선시공된 지하1층 지하외벽 하단부까지 지하외벽을 순타타설로 연속적으로 형성한 후, 선시공된 지하외벽받침보의 하단부에 형성된 타설상태 확인구를 콘크리트로 채우는 단계를 추가적으로 포함하는 것을 특징으로 하는 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법8. The basement floor of claim 7, wherein a concrete pouring device and a vibrator are inserted through the non-return type concrete pouring port and the vibrator inlet formed in the formwork, and the basement 2 floor above the basement outer wall constructed in a conventional manner from the basement floor to the basement 3 floor. And sequentially forming the basement outer wall to the bottom portion of the pre-ground B1 basement outer wall by net pouring, and further comprising filling the pouring state check hole formed at the bottom of the pre-installed basement outer wall support beam with concrete. How to pre-install the first basement exterior wall for ground floor frame construction 제 1항 내지 제8항 중 어느 하나의 항에 있어서, 상기 콘크리트를 1차타설하여 선시공 지하외벽받침보를 형성하는 단계와 콘크리트를 2차타설하여 선시공 지하외벽을 형성하는 단계는 구분없이 일체로 타설되어지는 것을 특징으로 하는 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법The method of any one of claims 1 to 8, wherein the first step of placing the concrete to form the pre-construction basement outer wall support beam and the second step of concrete to form the pre-installation basement outer wall without any distinction Method of pre-construction of the outer 1st floor outer wall for the ground floor frame construction, characterized in that 제 9 항에 있어서, 상기 흙막이 벽체는 현장타설 콘크리트 흙막이벽 또는 토류판 흙막이벽 또는 소일시멘트벽 중 어느 하나로 이루어지는 것을 특징으로 하는 지상층 골조 시공을 위하여 지하1층 외벽을 선시공하는 방법
10. The method of claim 9, wherein the retaining wall is made of any one of a cast-in-place concrete retaining wall, a soil plate retaining wall, or a soil cement wall.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020100056935A 2010-06-16 2010-06-16 Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow KR101230986B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100056935A KR101230986B1 (en) 2010-06-16 2010-06-16 Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100056935A KR101230986B1 (en) 2010-06-16 2010-06-16 Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow

Publications (2)

Publication Number Publication Date
KR20110136987A KR20110136987A (en) 2011-12-22
KR101230986B1 true KR101230986B1 (en) 2013-02-15

Family

ID=45503421

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100056935A KR101230986B1 (en) 2010-06-16 2010-06-16 Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow

Country Status (1)

Country Link
KR (1) KR101230986B1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981896B (en) * 2014-04-11 2016-01-20 中建四局第六建筑工程有限公司 The seamless link construction method of a kind of outer wall of basement and fender post
CN110258639B (en) * 2019-07-10 2024-02-27 中铁第四勘察设计院集团有限公司 Upward beam turning structure of top plate of subway station and construction method of upward beam turning structure
CN114606974B (en) * 2022-03-23 2022-10-18 中国水利水电第三工程局有限公司 One-time pouring construction method for concrete of wall plate at bottom plate of pipe gallery on counterfort dock wall
CN115680166A (en) * 2022-10-13 2023-02-03 广东一新长城建筑集团有限公司 Assembled laminated slab wall structure and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0452375A (en) * 1990-06-20 1992-02-20 Takenaka Komuten Co Ltd Method for constructing subsequent placing member in construction method of reverse placing
JP2004092053A (en) 2002-08-29 2004-03-25 Shimizu Corp Construction method for composite underground wall
KR100531385B1 (en) 2004-09-17 2005-11-29 주식회사 한빛구조엔지니어링 Construction method of underground structure that enables continuous retaining wall using steel wale and diaphragm effect of concrete slab
JP2007191999A (en) 2006-01-19 2007-08-02 Takahashi Kanri:Kk Rotary concrete press-in device for temporary frame

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0452375A (en) * 1990-06-20 1992-02-20 Takenaka Komuten Co Ltd Method for constructing subsequent placing member in construction method of reverse placing
JP2004092053A (en) 2002-08-29 2004-03-25 Shimizu Corp Construction method for composite underground wall
KR100531385B1 (en) 2004-09-17 2005-11-29 주식회사 한빛구조엔지니어링 Construction method of underground structure that enables continuous retaining wall using steel wale and diaphragm effect of concrete slab
JP2007191999A (en) 2006-01-19 2007-08-02 Takahashi Kanri:Kk Rotary concrete press-in device for temporary frame

Also Published As

Publication number Publication date
KR20110136987A (en) 2011-12-22

Similar Documents

Publication Publication Date Title
KR100951097B1 (en) Slab and subgrade external wall structure and method for constructing underground slab and subgrade external wall, bracket
KR100571102B1 (en) Device of Innovative Prestressed Scaffolding System for Improving Workability
KR101331261B1 (en) Underground prefabricated precast concrete rainwater recycling facility using precast concrete continuous wall in strut structure or earth anchor and construction method of the same
JP5023219B2 (en) Precast temporary structure and construction method thereof
KR100933660B1 (en) Structure for supporting stone wall for reinforcement and construction method thereof
KR20060092552A (en) The non-strut down framework construction method of having used cast in place concrete pile
KR20090094971A (en) Under ground top-down method
KR101107567B1 (en) For top down methode of rc structure, the connecting devices between beam structure and vertical steel material, the supporting structures of exclusive use, and the construction method using these devices
KR101230986B1 (en) Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow
KR102286225B1 (en) Method for constructing underground structure busing PC integrating method without support
KR20080100740A (en) Strut system of temporary plate with opening supporting temporary retaining wall and subgrade external wall construction method utilizing the same
KR20120122024A (en) Uniting Method of Temporary earth wall with basement exterior Wall using Couplers and Bolts.
KR100462236B1 (en) panel for external underground wall of building, structure and construction method using the same
KR100919921B1 (en) Retaining Wall using Panel and Constructing Method thereof
KR20080103260A (en) Reinforcing bar assembly for separate concrete pours and strut system method utilizing the same
KR200370135Y1 (en) Forms for edge girder construction
KR20060023915A (en) Method for constructing underground slabs and walls using erection piles without preliminary wall-attached supports
KR102505365B1 (en) Support for tunnel shotcrete drop prevention
KR200428941Y1 (en) Strut system of temporary retaining wall
KR100722198B1 (en) Strut system of temporary retaining wall and subgrade external wall construction method utilizing the same
JP7344721B2 (en) Roof structures and their construction methods
KR101050271B1 (en) Basic construction work method
KR101200993B1 (en) Precast concrete column material for permanent column pre-establishment method
JP4332651B2 (en) Foundation reinforcement device and foundation construction method
KR102547643B1 (en) Constructing Method for Concrete Construction using Lightweight Molding Panel

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160302

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee