KR101213678B1 - Apparatus for fixing the permanent ground anchor - Google Patents

Apparatus for fixing the permanent ground anchor Download PDF

Info

Publication number
KR101213678B1
KR101213678B1 KR1020100057452A KR20100057452A KR101213678B1 KR 101213678 B1 KR101213678 B1 KR 101213678B1 KR 1020100057452 A KR1020100057452 A KR 1020100057452A KR 20100057452 A KR20100057452 A KR 20100057452A KR 101213678 B1 KR101213678 B1 KR 101213678B1
Authority
KR
South Korea
Prior art keywords
fixing
cylinder
tension
wedge
hydraulic pressure
Prior art date
Application number
KR1020100057452A
Other languages
Korean (ko)
Other versions
KR20110137483A (en
Inventor
김정열
김교현
정종기
서준희
Original Assignee
김정열
주식회사 삼우기초기술
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김정열, 주식회사 삼우기초기술 filed Critical 김정열
Priority to KR1020100057452A priority Critical patent/KR101213678B1/en
Publication of KR20110137483A publication Critical patent/KR20110137483A/en
Application granted granted Critical
Publication of KR101213678B1 publication Critical patent/KR101213678B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/12Anchoring devices
    • E04C5/122Anchoring devices the tensile members are anchored by wedge-action
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • E21D21/006Anchoring-bolts made of cables or wires
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/14Geometrical or physical properties resilient or elastic

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 와이어인장기에 마그네트를 장착하여 제거식 앵커의 정착에 따른 시험인장시 정착헤드로부터 정착웨지가 이탈되어 자유낙하하는 것을 방지함과 동시에 정착헤드에서의 정착력손실을 최소화할 수 있는 앵커정착장치에 관한 것이다.
본 발명은, 와이어인장기에 연결되는 본체 연결하우징; 상기 본체연결 하우징에 장착되며, 전후진 구동하여 정착웨지를 정착헤드의 웨지삽입공으로 삽입하기 위한 장력제공수단; 상기 장력제공수단의 선단면에 장착되며, 정착헤드를 통과하는 강연선의 시험인장시 정착헤드의 웨지삽입공으로부터 이탈되는 정착웨지가 강연선의 긴장에 영향을 주지 않으면서 자유낙하되는 것을 방지하기 위한 마그네트; 상기 장력제공수단의 외주면에 끼워지며, 장력제공수단의 전진이동시 압축되었다가 상기 장력제공수단에 부여된 장력의 제거시 원위치 복원되어 장력제공수단을 제위치로 이동시키면서 정착웨지로부터 마그네트를 분리하는 탄성부재; 및 상기 와이어인장기와 장력제공수단에 유압을 제공하는 유압공급블록을 포함하는 앵커정착장치를 제공한다.
The present invention is equipped with a magnet to the wire tensioner anchor anchor that can minimize the loss of fixing force in the fixing head at the same time to prevent the free fall from the fixing wedge from the fixing head during the test tension according to the fixing of the removable anchor It relates to a fixing device.
The present invention, the main body connecting housing connected to the wire tensioner; A tension providing means mounted to the main body connecting housing and driving forward and backward to insert the fixing wedge into the wedge insertion hole of the fixing head; The magnet is mounted on the end surface of the tension providing means, and the magnet to prevent the free fall of the fixing wedge without influencing the tension of the strand when the tension wedge is separated from the wedge insertion hole of the fixing head during the test tension of the strand passing through the fixing head ; It is fitted to the outer circumferential surface of the tension providing means, the elasticity that is compressed during the forward movement of the tension providing means is restored to its original position when removing the tension applied to the tension providing means to separate the magnet from the fixing wedge while moving the tension providing means in place absence; And it provides an anchor fixing device comprising a hydraulic supply block for providing hydraulic pressure to the wire tensioner and the tension providing means.

Description

앵커정착장치{Apparatus for fixing the permanent ground anchor}Apparatus for fixing the permanent ground anchor}

본 발명은 토목공사나 건축물의 구축시 지반 안정화를 위해 인장 시공되는 영구 그라운드 앵커체에 대하여 시험인장 후 정착시키기 위한 앵커정착장치에 관한 것으로, 더욱 상세하게는 정착앵커를 긴장시키기 위한 와이어인장기에 마그네트가 구비된 실린더를 부착하여 정착앵커의 시험인장시 인장되는 강연선과 함께 정착앵커의 웨지삽입공으로부터 이탈되는 정착웨지를 부착하였다가 강연선의 긴장후, 기계적인 작동으로 정착웨지를 정착헤드의 웨지삽입공에 삽입시켜 정착부의 긴장손실을 최소화하고, 강연선의 시험인장작업에 따른 위험성을 감소시킬 수 있는 앵커정착장치에 관한 것이다.
The present invention relates to an anchor fixing device for fixing after a tensile test for a permanent ground anchor body that is tensioned for ground stabilization during construction of civil engineering or buildings, more specifically a magnet in a wire tensioner for tensioning the anchor anchor The cylinder is equipped with a fixed wedge that is separated from the wedge insertion hole of the anchoring anchor together with the strand that is tensioned during the test tension of the anchoring anchor. The present invention relates to an anchor anchoring device that can be inserted into a ball to minimize tension loss in the anchorage and reduce the risk of the tensile tensioning test.

일반적으로, 대규모의 토지를 조성하거나 도로, 철도, 터널 공사 등을 할 때 우수나 융설수가 지반에 침투하여 지반 강도를 저하시키고, 풍화가 진행됨에 따라 국부적인 사면붕괴나 낙석이 발생하여 인명 및 재산상의 피해를 유발하게 된다. 이를 방지하기 위하여 다양한 지반보강공법이 적용된다.In general, when constructing a large-scale land or constructing roads, railways, tunnels, etc., rainwater or snow melt infiltrates the ground, lowering the strength of the ground, and as weathering progresses, local slope collapse or rockfall occurs, resulting in loss of life and It will cause property damage. To prevent this, various ground reinforcement methods are applied.

상기 지반보강공법으로 널리 사용되고 있는 그라운드 앵커공법은 지중에 앵커를 설치한 후 앵커에 프리스트레스를 부여하고, 상기 앵커의 인발저항에 의한 그라우트의 마찰력을 이용하여 굴착단면을 지지함으로써 가시설 및 영구적으로 발생하는 응력, 변형, 변위등에 대하여 구조물과 지반을 안정화시키는 공법이다. 이 공법은 앵커체의 강연선에 부여된 초기의 인장력으로 굴착단면의 붕괴를 방지하게 되며, 이때의 긴장력은 그라우트에 압축력으로 작용하고 그라우트와 지중 주면과의 마찰저항을 통해 주변지반을 보강하게 된다. The ground anchor method widely used as the ground reinforcement method is to provide a prestress to the anchor after installing the anchor in the ground, and to support the excavation section by using the frictional force of the grout due to the pull-out resistance of the anchor to create a temporary installation and permanent Stabilization of structure and ground against stress, deformation and displacement. This method prevents the collapse of the excavation section by the initial tension applied to the strand of the anchor body, and the tension force acts as a compressive force on the grout and reinforces the surrounding ground through frictional resistance between the grout and the ground main surface.

상기 그라운드 앵커공법은 시공초기에 그라운드 앵커에 가해진 인장력이 그대로 유지되지만, 시간이 경과함에 따라 강연선의 긴장 하중이 감소하기 때문에, 시공초기에 정착부의 그라운드 앵커에 가해진 인장력이 구조설계값에 맞게 도입되는지를 시험한 후 정착할 필요가 있다. The ground anchoring method maintains the tensile force applied to the ground anchor at the beginning of construction, but as the tension load of the strand decreases as time passes, whether the tensile force applied to the ground anchor of the fixing unit is introduced in accordance with the structural design value at the beginning of construction. After testing, it is necessary to settle.

통상적으로 앵커시공에 있어서, 정착장치에 의한 손실율과 강연선의 처짐, 릴렉세이션, 벽체배면의 압밀등과 같은 기타 여러요인들에 의한 손실율을 감안하여 잭킹포스(jacking force)를 계산하고 있다. In anchor construction, the jacking force is calculated in consideration of the loss rate due to the fixing device, the loss rate due to the deflection of the strand, the relaxation, the consolidation of the back surface of the wall, and the like.

실제 앵커시공에 있어서 여러가지 요인, 예를들어 천공시 연약지반 교란에 의한 원지반의 강도저하, 정착장치 또는 앵커 강연선의 릴렉세이션(relaxation)에 의한 강연선의 프리스트레스 감소, 정착시의 인장력 손실에 의해 지반에 크리프(creep) 현상이 발생하는 요인 등으로 인하여 구조설계값을 만족하는 긴장력이 발휘하지 못하는 문제가 자주 발생된다. 이러한 문제는 앵커공의 수량 및 정착구조체의 길이를 증가시키는 결과를 초래한다. 따라서, 실제 현장에서는 시험인장을 통하여 구조설계값을 만족시키는지의 여부를 확인한 후 정착작업을 실시하게 된다. Creep in the ground due to various factors in actual anchor construction, for example, decrease in strength of the ground due to soft ground disturbance during drilling, reduction of prestress of the strand due to relaxation of anchoring device or anchor strand, and loss of tensile force at anchoring Due to the occurrence of the creep phenomenon, there is a problem that the tension force that satisfies the structural design value cannot be exerted. This problem results in increasing the number of anchor holes and the length of the fixing structure. Therefore, in the actual site, after confirming whether the structural design value is satisfied through the test seal, the fixing work is performed.

여기서, 크리프는 앵커 강연선에 인장력을 부여한 후, 시간이 경과함에 따라 소요의 유효긴장력하에서 앵커구조물 및 그 주변 지반의 장기적인 변형을 의미한다. 크리프에 의한 인장력의 변화는 지압판의 변위, 자유부내의 마찰저항에 의한 하중 저하, 앵커 강연선의 릴렉세이션, 지반의 압밀, 정착부 주변의 부착파괴, 그라우트와 앵커의 부착파괴 등을 야기시키게 된다. 따라서, 크리프의 양을 측정하면 해결이 가능하겠지만, 현재까지 크리프의 양을 측정하는 것이 매우 어렵기 때문에 젝킹포스의 계산을 통하여 크리프 현상에 대처하고 있는 실정이다.Here, creep refers to the long-term deformation of the anchor structure and its surrounding ground under the effective tension of the required time after applying the tensile force to the anchor strand. The change in tensile force due to creep causes displacement of the pressure plate, lowering of load due to frictional resistance in the free portion, relaxation of anchor strands, consolidation of the ground, attachment failure around the anchoring portion, attachment failure of grout and anchor, and the like. Therefore, it is possible to solve the problem by measuring the amount of creep. However, it is very difficult to measure the amount of creep until now, so that the creep phenomenon is coped with through the calculation of the jacking force.

상기한 설명에서와 같이 현장에서 앵커의 시험시, 정착장치에 의한 손실 및 크리프 등으로 인한 하중손실 때문에 잭킹포스(jacking force)를 설계값보다 더 크게 부여하고 있다. 그러나, 시험인장시 정착부의 하중 손실 증가에 따라 잭킹포스가 커지게 되면 그만큼 강연선의 가닥수가 증가하기 때문에 자재소모가 커지게 되고 이는 시공단가의 상승으로 이어지는 문제점으로 작용한다. As described above, when testing the anchor in the field, a jacking force is given to be larger than the design value due to the loss by the fixing device and the load loss due to creep. However, if the jacking force increases with increasing load loss at the time of tensile test, the number of strands of the strand increases so that material consumption increases, which leads to a rise in construction cost.

종래의 시험인장장치(이하, '스트레싱 디바이스(stressing device)'라 함)는 도1a 및 도1b에 도시한 바와 같이, 정착웨지(101)가 구비된 정착헤드(100)에 밀착되며, 강연선(100a)에 인장력 도입시 정착웨지(101)가 딸려나오지 못하도록 저지하는 하부받침판(102)과; 상기 하부받침판(102)에 연결되며, 강연선에 인장력을 부여하기 위한 피스톤(104)이 구비된 실린더(103)와; 상기 실린더(103)의 상단에 설치되며, 인장된 강연선(100a)을 파지하기 위한 쐐기부재(106)가 구비된 인장헤드(105)로 구성되어 있다. The conventional test tension device (hereinafter referred to as a 'stressing device') is in close contact with the fixing head 100 provided with the fixing wedge 101, as shown in Figure 1a and Figure 1b, A lower support plate 102 which prevents the fixing wedge 101 from coming out when a tensile force is introduced into the 100a; A cylinder 103 connected to the lower support plate 102 and having a piston 104 for imparting tensile force to the strand; It is installed on the upper end of the cylinder 103, it is composed of a tension head 105 is provided with a wedge member 106 for gripping the tensioned strand 100a.

상기 구조는 실린더(103)에 유압을 제공함에 따라 피스톤(104)을 상부로 밀어내면서 강연선(100a)을 인장시키고, 설계값에 인장력이 도달하는지의 여부를 확인한 후 인장력을 해제하여 시험인장을 완료하게 된다.As the structure provides hydraulic pressure to the cylinder 103, the piston 104 is pushed upward while tensioning the strand 100a, confirming whether the tensile force reaches the design value, and then releasing the tensile force to complete the test tension. Done.

앵커의 시험인장시 반복하중을 재하하면서 소요인장력이 설계값에 도달하는지를 시험하여야 하는데, 상기한 구조를 통한 시험인장은 강연선의 인장시 웨지가 이탈되는 것을 방지하기 위하여 하부받침판을 사용하기 때문에 인장작업의 간편성은 있으나, 테스트하중의 반복재하(release cycle)가 어려운 구조이다. 즉, 실제 현장에서 인장시험시, 강연선(100a)에 인장하중을 한번 재하하게 되면, 쐐기부재(106)에 의해 강연선이 고정되기 때문에 기존에는 상기의 장비를 이용하되 규정된 시험절차를 거치지 않고 한번의 테스트만으로 시험인장을 완료하는 경우가 다발하고 있어 정상적인 테스트가 어렵고, 이에 따라 앵커력의 품질관리가 어려운 실정이었다. 또한, 상기 구조는 해당 앵커체의 시험인장후에 하부받침판(102), 실린더(103), 인장헤드(105)를 포함하는 스트레싱 디바이스를 분해하였다가 다른 시험앵커체에 재조립하여야 하는 번거로움이 있었다. 특히, 상기 스트레싱 디바이스를 통한 시험인장방법은 인장 또는 테스트 중에 발생되는 소성변위(지반, 철재구조 등의 이완으로 발생되는 계산으로 값을 찾기 어려운 변위)를 제거하지 못하여 상한 한계선(관리기준선- 통상 앵커는 상한, 하한선의 범주를 두고 그 사이에 들어야 합격으로 간주함)을 초과하는 경우가 빈번한 다른 문제점을 내포하고 있다.At the time of tensile test, it is necessary to test whether the required tensile strength reaches the design value while loading the cyclic load. The tensile test is performed because the tensile tensioner uses the lower support plate to prevent the wedge from escaping during tensioning of the strand. Although simple, it is difficult to release the test cycle. In other words, when the tensile load is loaded once on the strand 100a at the actual site, since the strand is fixed by the wedge member 106, the existing equipment is used once, but without undergoing the prescribed test procedure. It is often difficult to normalize the test because the test seals are completed only by the test. Therefore, quality control of the anchor force is difficult. In addition, the structure has the trouble of disassembling the stressing device including the lower support plate 102, the cylinder 103, the tension head 105 after the test tension of the anchor body and reassembled to another test anchor body. there was. In particular, the test tensioning method through the stressing device does not remove the plastic displacement (displacement difficult to find by the calculation caused by the relaxation of the ground, steel structure, etc.) generated during tensioning or testing, so that the upper limit line (control baseline-normal Anchors have other problems that often exceed the upper and lower limits and are considered to be acceptable).

한편, 외국 사례의 경우 정착부의 시험인장은 자동물림장치와 잭체어가 구비된 인장용 잭킹장치를 이용하여 최초로 설치되는 몇개의 앵커를 대상으로 시험인장을 실시하고 있다.On the other hand, in case of foreign cases, the test seal of the fixing unit performs a test seal on several anchors installed for the first time using a tension jacking device equipped with an automatic bleed device and a jack chair.

상기의 구성으로 이루어진 잭킹장치는 정착웨지를 통해 강연선을 고정한 정착헤드에 잭체어를 고정하고, 자동물림장치에 강연선을 정착한 후 수차례에 걸쳐 설계하중 이상의 인장하중을 반복적으로 재하하면서 소요지지력 확보가 가능한지를 점검하게 된다. 이때, 시험인장이 구조설계값을 만족하면 와이어 인장기를 이용하여 정착작업을 실시하게 된다.The jacking device having the above configuration secures a jack chair to a fixing head fixed with a stranded steel wire through a fixing wedge, and fixes a stranded steel wire in an automatic chucking device repeatedly to repeatedly load a tensile load of more than the design load several times after securing the required supporting force. Is checked if it is possible. At this time, if the test tension satisfies the structural design value, the fixing operation is performed using a wire tensioner.

그러나, 상기의 구조는 웨지스톱판이 구비되어 있지 않기 때문에 강연선의 긴장과정에서 웨지가 함께 딸려 나오는 것을 잭 체어에 형성된 공간으로 작업자가 손이나 도구를 삽입하여 웨지삽입홀로부터 이탈된 정착웨지를 밀어넣고 있는데, 이러한 작업은 큰 위험성을 내포하고 있어 주의를 요해야 한다. 그러나, 현재까지 특별한 대안이 제안되어 있지 않고, 또 신속한 시험인장작업을 위하여 위험성을 무릅쓰고 현장에서 작업자가 손으로 정착웨지를 웨지삽입홀로 밀어넣고 있는 실정이다. However, since the wedge stop plate is not provided in the above structure, the wedge comes together in the tension process of the strand, and the worker inserts the wedge from the wedge insertion hole by inserting a hand or a tool into the space formed in the jack chair. However, such work poses great risks and requires attention. However, until now, no special alternative has been proposed, and the worker pushes the fixing wedge into the wedge insertion hole by hand in the field at the risk for rapid test tensile work.

특히, 상기한 인장용 잭킹장치는 시험인장 후 별도의 앵커정착장치로 다시 정착을 실시해야 하는 번거로움이 있었다.
In particular, the tensioning jacking device was troublesome to perform the fixing again with a separate anchor fixing device after the test tension.

따라서, 본 발명은 상기와 같은 제반 문제점을 해결하기 위해 제안된 것으로서, 제거식 앵커의 정착에 따른 시험인장시 정착헤드로부터 강연선과 함께 이탈되는 정착웨지를 와이어인장기의 선단에 장착된 실린더의 마그네트에 부착시켜 자유낙하를 방지하고, 또 강연선의 긴장후 정착웨지가 실린더의 유압작동에 의해 정착헤드에 삽입되도록 함으로써 정착헤드에서의 정착력 손실을 최소화할 수 있는 앵커 정착장치를 제공함에 그 목적이 있다.Therefore, the present invention has been proposed to solve the above problems, the magnet of the cylinder mounted on the tip of the wire tensioning machine fixing fusing wedge separated from the fixing head from the fixing head at the time of tensile test according to the fixing of the removable anchor The purpose of the present invention is to provide an anchor fixing device that can prevent the free fall and attach the fixing wedge to the fixing head after the tension of the strand is inserted into the fixing head by hydraulic operation of the cylinder. have.

또한, 본 발명은 시험인장시 정착헤드로부터 강연선과 함께 이탈되는 정착웨지를 정착헤드에 삽입하는 작업의 위험성을 제거할 수 있으며, 규정상의 시험절차에 의한 반복재하가 가능하고 소성변위를 제거함으로써 앵커력의 고품질을 유지할 수 있는 앵커정착장치를 제공함에 다른 목적이 있다.In addition, the present invention can eliminate the risk of the operation of inserting the fixing wedge to the fixing head is separated from the fixing head from the fixing head at the time of tensile test, it is possible to repeat the load by the prescribed test procedure and to remove the plastic displacement anchor Another object is to provide an anchor fixing device that can maintain a high quality of force.

또한, 본 발명은 단일의 앵커정착장비를 이용하여 규정상의 절차에 따른 시험인장 후 정착을 바로 행할 수 있는 앵커정착장치를 제공함에 또 다른 목적이 있다.
In addition, another object of the present invention is to provide an anchor anchoring device that can perform the anchoring immediately after the tensile test according to the prescribed procedure using a single anchor anchoring equipment.

상기 목적을 달성하기 위하여 본 발명은, 와이어인장기에 연결되는 본체 연결하우징; 상기 본체연결 하우징에 결합되어 실린더의 이동을 안내하는 가이드블록; 상기 가이드블록의 외주부에 끼워지며, 전진구동하여 정착웨지를 정착헤드의 웨지삽입공으로 삽입하기 위한 실린더; 상기 실린더의 선단면에 장착되며, 정착헤드를 통과하는 강연선의 시험인장시 정착헤드의 웨지삽입공으로부터 이탈되는 정착웨지가 강연선의 긴장에 영향을 주지 않으면서 자유낙하되는 것을 방지하기 위한 마그네트; 상기 실린더의 외주면에 끼워지며, 실린더의 전진이동시 압축되었다가 실린더에 부여된 장력의 제거시 원위치 복원되어 실린더를 제위치로 이동시키면서 정착웨지로부터 마그네트를 분리하는 탄성부재; 및 상기 와이어인장기와 실린더에 유압을 제공하는 유압공급블록을 포함하는 앵커정착장치를 제공한다.In order to achieve the above object, the present invention, the main body connecting housing connected to the wire tensioner; A guide block coupled to the body connection housing to guide movement of the cylinder; A cylinder inserted into an outer circumference of the guide block and driving forward to insert the fixing wedge into the wedge insertion hole of the fixing head; A magnet mounted to the front end surface of the cylinder and configured to prevent the fixing wedge falling from the wedge insertion hole of the fixing head when the tensile wire passes through the fixing head does not fall freely without affecting the tension of the strand; An elastic member fitted to an outer circumferential surface of the cylinder and compressed to move forward of the cylinder, and then restored to its original position upon removal of the tension applied to the cylinder to separate the magnet from the fixing wedge while moving the cylinder into position; And it provides an anchor fixing device comprising a hydraulic supply block for providing hydraulic pressure to the wire tensioner and the cylinder.

본 발명의 실시예에서는 상기 본체 연결하우징에 결합되며, 정착헤드의 원주면에 밀착되어 강연선의 긴장력에 대응하여 정착헤드의 외주면을 가압하기 위한 지압판을 더 포함한다.In the embodiment of the present invention is coupled to the main body connecting housing, and in close contact with the circumferential surface of the fixing head further comprises a pressure plate for pressing the outer peripheral surface of the fixing head in response to the tension force of the strand.

또한, 상기 유압공급블록은 와이어 인장기에 연결되어 외부로부터 제공된 유압을 공급하는 제1 유압공급통로; 실린더에 연결되어 외부로부터 제공된 유압을 공급하는 제2 유압공급통로; 상기 제2 유압공급통로와 연통되며, 실린더측에 제공된 유압을 회수하기 위한 제3 유압공급통로와; 상기 제1 유압공급통로상에 설치되어 강연선의 긴장시 개방되고, 실린더에 유압공급시 차폐되는 제1 압력잠금밸브; 및 상기 제2 유압공급통로상에 설치되어 강연선의 긴장시 차폐되고, 강연선의 긴장 완료후 개방되는 제2 압력잠금밸브를 포함하는 것을 특징으로 한다. In addition, the hydraulic pressure supply block is connected to the wire tensioner first hydraulic pressure supply passage for supplying the hydraulic pressure provided from the outside; A second hydraulic pressure supply passage connected to the cylinder to supply hydraulic pressure provided from the outside; A third hydraulic pressure supply passage communicating with the second hydraulic pressure supply passage, for recovering the hydraulic pressure provided on the cylinder side; A first pressure locking valve installed on the first hydraulic supply passage and opened when the stranded wire is tense and shielded when the hydraulic pressure is supplied to the cylinder; And a second pressure locking valve installed on the second hydraulic supply passage and shielded when the stranded wire is tensioned and opened after the tensioned line is completed.

삭제delete

전술한 바와 같이 본 발명의 특징에 따르면, 다음과 같은 효과가 있다.As described above, according to the features of the present invention, the following effects are obtained.

첫째, 정착헤드로부터 강연선의 시험인장시, 정착헤드로부터 이탈되는 정착웨지를 마그네트가 부착시킨 후, 강연선의 긴장을 유지한 상태에서 상기 정착웨지를 정착헤드의 웨지삽입공에 삽입시켜 쐐기작용을 개시시킴으로써 정착웨지가 쐐기작용을 개시하기전까지 강연선의 수축에 대하여 저항하게 되어 정착력의 손실을 최소화할 수 있다.First, when the tensile tester pulls the strand from the anchoring head, the magnet attaches the anchoring wedge from the anchoring head, and then inserts the anchoring wedge into the wedge insertion hole of the anchoring head while maintaining the tension of the strand. By doing so, the fixing wedge is resistant to contraction of the strand until the wedge starts wedge, thereby minimizing the loss of the fixing force.

둘째, 단일의 앵커정착장치를 이용한 시험인장을 통하여 상기 구조설계값에 상응하는 정착력이 부여되는지의 여부를 알 수 있어 안정적이고 신뢰성있는 그라운드 앵커시공을 구현할 수 있고 또 시험인장후 바로 정착을 행할 수 있어 앵커긴장작업을 신속하게 할 수 있다. Second, it is possible to know whether the anchoring force corresponding to the structural design value is given through the test tension using a single anchor fixing device, so that a stable and reliable ground anchor construction can be realized and the anchoring can be performed immediately after the test tension. It is possible to speed up anchor tension work.

셋째, 규정된 시험절차에 의해 반복재하가 가능하고 소성변위를 제거할 수 있어 앵커의 품질관리가 가능하다. Third, it is possible to repeat the loading by the prescribed test procedure and to eliminate plastic displacement, so that the quality control of the anchor is possible.

넷째, 마그네트가 부착된 실린더를 이용하여 시험인장을 하므로 실제 앵커의 거동을 규명할 수 있어 구조물의 품질관리에 매우 유리하다.Fourth, since the test tension is made using the cylinder with the magnet, it is possible to identify the actual anchor behavior, which is very advantageous for the quality control of the structure.

다섯째, 시험인장에 따른 장치의 재조립이 필요하지 않으면서 정상적인 사이클의 테스트가 가능하며, 부분적으로 실린더의 스트록(stroke)(실린더 피스톤이 돌출되는 길이)이 적어서 인장이 어려운 경우(앵커의 경우 하중과 앵커에 조립된 강연선의 길이에 비례하여 늘음량이 발생하는데, 늘음량보다, 실린더 스트록이 적은 경우 한번에 인장이 불가)에도 마그네트의 운용을 통해 극복이 가능하다.Fifth, it is possible to test the normal cycle without the need for reassembly of the device according to the test tension, and in case the tension is difficult due to the small stroke of the cylinder (the length of the cylinder piston protruding) (the load in the case of anchor) And the amount of extension occurs in proportion to the length of the strand wire assembled to the anchor, it is possible to overcome through the operation of the magnet even in the case of less cylinder stroke than the amount of extension).

여섯째, 마그네트가 구비된 실린더를 와이어인장기의 선단에 장착함으로써 정착헤드에 바로 연결이 가능하여 시험인장과 정착작업을 할 수 있으므로, 강연선의 긴장을 위한 별도의 유압잭시스템과 현장작업으로 제작되는 체어가 필요없게 된다.
Sixth, the cylinder equipped with the magnet can be directly connected to the fixing head by attaching the cylinder to the tip of the wire tensioner, so that the test tension and the fixing work can be performed. There is no need.

도1a는 종래기술에 따른 정착앵커의 시험인장을 위한 스트레싱 디바이스의 외관 구성도,
도1b는 도1a의 일부 단면도,
도2는 본 발명에 의한 앵커정착장치의 일실시예 구성을 나타낸 분해사시도,
도3은 도2에 도시된 본 발명에 의한 앵커정착장치의 조립사시도,
도4는 본 발명의 요부인 실린더와 와이어인장기에 유압을 제공하는 유압공급블록의 계통도,
도5 내지 도8은 본 발명에 의한 앵커정착장치의 작용상태를 나타낸 단면도이다.
Figure 1a is an external configuration diagram of a stressing device for the test tension of the anchoring anchor according to the prior art,
1B is a partial cross-sectional view of FIG. 1A;
Figure 2 is an exploded perspective view showing an embodiment configuration of the anchoring device according to the present invention,
Figure 3 is an assembled perspective view of the anchoring device according to the invention shown in Figure 2,
4 is a system diagram of a hydraulic supply block for providing hydraulic pressure to a cylinder and a wire tensioner, which are main components of the present invention;
5 to 8 are cross-sectional views showing an operation state of the anchor fixing device according to the present invention.

상술한 목적, 특징들 및 장점은 첨부된 도면과 관련한 다음의 상세한 설명을 통하여 보다 분명해 질 것이다. 이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명한다.The above-mentioned objects, features and advantages will become more apparent from the following detailed description in conjunction with the accompanying drawings. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명에 의한 앵커정착장치는 제거식 앵커의 정착에 따른 시험인장시 정착헤드에서의 정착력 손실을 최소화하고, 시험인장을 안전하게 수행할 수 있도록 구현한 것이다.The anchoring device according to the present invention is implemented to minimize the loss of the fixing force in the fixing head during the test tension according to the fixing of the removable anchor, and to perform the test tension safely.

도2는 본 발명에 의한 앵커정착장치의 일실시예 구성을 나타낸 단면도이고, 도3은 도2에 도시된 본 발명에 의한 앵커정착장치가 조립된 정면도 및 측면도이고, 도4는 본 발명의 요부인 실린더와 와이어인장기에 유압을 제공하는 유압공급블록의 계통도이다.Figure 2 is a cross-sectional view showing an embodiment of the anchor fixing device according to the present invention, Figure 3 is a front view and side view of the anchor fixing device according to the present invention shown in Figure 2, Figure 4 is a view of the present invention This is a schematic diagram of a hydraulic supply block that provides hydraulic pressure to a main cylinder and a wire tensioner.

본 발명은 도면에 도시한 바와 같이, 강연선(4)이 통과되도록 웨지삽입공(2a)이 형성되어 있는 정착헤드(2)와; 상기 정착헤드의 웨지삽입공(2a)에 삽입되어 강연선의 인장후 상태를 유지시키기 위한 정착웨지(6)와; 정착헤드(2)를 통과한 강연선(4)에 긴장력을 제공하기 위한 와이어인장기(10)와; 상기 와이어 인장기(10)의 선단에 장착된 본체연결 하우징(12)과; 상기 본체연결 하우징(12)에 볼트를 매개로 결합되어 실린더의 이동을 안내하는 가이드블록(14)과; 상기 가이드블록(14)의 외주부에 끼워지며 유압에 의해 전진이동하여 후술할 마그네트에 부착된 정착웨지(6)를 정착헤드(2)의 웨지삽입공(2a)으로 삽입하기 위한 실린더(16)와; 상기 가이드블록(14)과 실린더(16) 사이에 위치되어 가이드블록(14)과 실린더(16)를 연결하는 연결블록(18)과; 상기 실린더(16)의 선단면에 장착되며, 정착헤드(2)를 통과하는 강연선(4)의 시험인장시 정착헤드(2)의 웨지삽입공(2a)으로부터 이탈되는 정착웨지(6)를 부착시켜 상기 정착웨지(6)가 강연선(4)의 긴장에 영향을 주지 않으면서 자유낙하되는 것을 방지하기 위한 마그네트(20)와; 상기 실린더(16)의 외주면에 끼워지며, 실린더(16)의 전진이동시 압축되었다가 상기 실린더(16)에 제공된 장력의 제거시 원위치 복원되어 실린더(16)를 제위치로 이동시키면서 정착웨지(6)로부터 마그네트(20)를 분리하는 탄성부재(22)와; 상기 실린더(16) 외부에 끼워지며, 본체연결하우징(12)에 볼트를 매개로 결합되는 실린더하우징(24)과; 상기 실린더하우징(24)의 선단면에 결합되는 하우징 커버(26)와; 상기 하우징커버(26)의 전단에 결합되며, 정착헤드(2)의 원주면에 밀착되어 강연선(4)의 긴장력에 대응하여 정착헤드(2)의 외주면을 가압하기 위한 지압판(28); 및 상기 와이어인장기(10)의 상단에 설치되며, 와이어인장기(10)와 실린더(16) 각각에 유압을 제공하고 회수하기 위한 유압출입통로가 구비된 유압공급블록(30)을 포함한다.As shown in the figure, the fixing head (2) is formed with a wedge insertion hole (2a) so that the strand 4 is passed; A fixing wedge (6) inserted into the wedge insertion hole (2a) of the fixing head to maintain a post-tensile state of the strand; A wire tensioner 10 for providing tension to the strand 4 passing through the fixing head 2; A body connection housing (12) mounted at the tip of the wire tensioner (10); A guide block 14 coupled to the main body connecting housing 12 via a bolt to guide the movement of the cylinder; A cylinder 16 inserted into the outer circumference of the guide block 14 and moving forward by hydraulic pressure to insert the fixing wedge 6 attached to the magnet to be described later into the wedge insertion hole 2a of the fixing head 2; ; A connection block (18) located between the guide block (14) and the cylinder (16) to connect the guide block (14) and the cylinder (16); The fixing wedge 6 is attached to the front end surface of the cylinder 16 and detached from the wedge insertion hole 2a of the fixing head 2 when the tensile wire 4 passes through the fixing head 2. A magnet 20 for preventing the fixing wedge 6 from falling freely without affecting the tension of the strand 4; The fixing wedge 6 is fitted to the outer circumferential surface of the cylinder 16 and is compressed during the forward movement of the cylinder 16 and then restored to its original position when the tension provided to the cylinder 16 is removed, thereby moving the cylinder 16 into position. An elastic member 22 that separates the magnet 20 from the body; A cylinder housing 24 fitted to the outside of the cylinder 16 and coupled to the main body connecting housing 12 via a bolt; A housing cover (26) coupled to the front end surface of the cylinder housing (24); Acupressure plate 28 is coupled to the front end of the housing cover 26, in close contact with the circumferential surface of the fixing head (2) for pressing the outer peripheral surface of the fixing head (2) in response to the tension force of the strand (4); And a hydraulic supply block 30 installed at an upper end of the wire tensioner 10 and provided with a hydraulic access passage for providing and recovering hydraulic pressure to each of the wire tensioner 10 and the cylinder 16.

본 발명의 실시예에서는 상기 탄성부재(22)가 인장스프링으로 이루어지는데 이에 국한하는 것은 아니고, 상기 실린더(16)의 구동시 압축되고 실린더(16)의 구동이 멈춰지면 원위치 복원되는 부재는 모두 포함할 수 있음은 주지의 사실이다. In the exemplary embodiment of the present invention, the elastic member 22 includes a tension spring, but is not limited thereto, and includes all members that are compressed when the cylinder 16 is driven and restored to its original position when the cylinder 16 is stopped. It is a well-known fact.

상기 유압공급블록(30)은 도4에 도시한 바와 같이, 와이어 인장기(10)에 연결되어 외부로부터 제공된 유압을 공급하는 제1 유압공급통로(32)와; 실린더(16)에 연결되어 외부로부터 제공된 유압을 공급하는 제2 유압공급통로(34)와; 상기 제2 유압공급통로(34)에 연결되며, 실린더(16)측에 제공된 유압을 회수하기 위한 제3 유압공급통로(36)와; 상기 제1 유압공급통로(32)상에 설치되며 와이어인장기(10)의 작동에 의해 강연선의 긴장시 개방되고, 실린더(16)에 유압공급시 차폐되는 제1 압력잠금밸브(38)와; 상기 제2 유압공급통로(34)상에 설치되어 강연선의 긴장시 차폐되고, 강연선의 긴장 완료후 개방되는 제2 압력잠금밸브(40)를 포함한다.The hydraulic pressure supply block 30, as shown in Figure 4, is connected to the wire tensioner 10 and the first hydraulic pressure supply passage 32 for supplying the hydraulic pressure provided from the outside; A second hydraulic pressure supply passage 34 connected to the cylinder 16 to supply hydraulic pressure provided from the outside; A third hydraulic pressure supply passage (36) connected to the second hydraulic pressure supply passage (34) for recovering the hydraulic pressure provided on the cylinder (16) side; A first pressure lock valve (38) installed on the first hydraulic supply passage (32) and opened at the tension of the strand by the operation of the wire tensioner (10), and shielded when the hydraulic pressure is supplied to the cylinder (16); It is installed on the second hydraulic supply passage 34 and is shielded when the tension of the strand, and includes a second pressure lock valve 40 is opened after the tension of the strand is completed.

미설명부호 42는 와이어인장기에 유압을 제공하기 위한 긴장압력밸브를 나타낸다.Reference numeral 42 denotes a tension pressure valve for providing hydraulic pressure to the wire tensioner.

상기와 같이 구성된 본 발명의 작용상태를 도5 내지 도8을 참조하여 설명하면 다음과 같다.Referring to Figures 5 to 8 the operational state of the present invention configured as described above are as follows.

도5는 와이어 인장기에 장착된 정착헤드의 강연선을 긴장시키기 위한 초기상태를 나타낸 반단면도이다.Fig. 5 is a half sectional view showing an initial state for tensioning a strand of a fixing head mounted on a wire tensioner.

도면에 도시한 바와 같이, 상기 정착헤드(2)에 정착된 강연선(4)이 와이어 인장기(10)에 끼워져 고정되고, 상기 지압판(28)이 정착헤드(2)를 가압하게 된다. 이때, 상기 실린더(16)의 선단면에 부착된 마그네트(20)는 정착헤드(2)의 웨지삽입공(2a)에 끼워진 정착웨지(6)와 간격을 유지한 상태로 위치된다. As shown in the figure, the stranded wire 4 fixed to the fixing head 2 is fitted to the wire tensioner 10 and fixed, and the pressure plate 28 presses the fixing head 2. At this time, the magnet 20 attached to the front end surface of the cylinder 16 is positioned at a distance from the fixing wedge 6 fitted in the wedge insertion hole 2a of the fixing head 2.

도6은 와이어 인장기의 작동에 의해 강연선이 긴장된 상태를 나타낸 반단면도이다.6 is a half sectional view showing a state in which the strand is tensioned by the operation of the wire tensioner.

도면에 도시한 바와 같이, 긴장압력밸브(42)의 개방에 따라 유압이 상기 유압공급블록(30)의 제1 유압공급통로(32)로 공급되면, 제1 압력잠금밸브(38)가 개방되고 와이어 인장기(10)에 유압이 제공되어 강연선(4)에 긴장력을 부여하게 된다. 이때, 상기 제2 압력잠금밸브(40)는 차폐되어 실린더(16)측으로 유압이 제공되지 않게 된다. As shown in the figure, when the hydraulic pressure is supplied to the first hydraulic pressure supply passage 32 of the hydraulic pressure supply block 30 according to the opening of the tension pressure valve 42, the first pressure lock valve 38 is opened and Hydraulic pressure is provided to the wire tensioner 10 to impart tension to the strand 4. At this time, the second pressure lock valve 40 is shielded so that the hydraulic pressure is not provided to the cylinder (16) side.

상기 와이어 인장기(10)의 작동에 의해 강연선(4)이 긴장되면, 정착헤드(2)의 웨지삽입공(2a)에 삽입되어 있던 정착웨지(6)가 딸려나오게 된다. 상기 웨지삽입공(2a)으로부터 이탈된 정착웨지(6)는 실린더(16)의 선단면에 장착된 마그네트(20)에 부착되어 자유낙하가 방지되며, 상기 강연선(4)은 정착웨지(6)의 파지력으로부터 해제되어 긴장에 영향을 받지 않게 된다.When the strand 4 is tensioned by the operation of the wire tensioner 10, the fixing wedge 6 inserted into the wedge insertion hole 2a of the fixing head 2 comes out. The fixing wedge 6 separated from the wedge insertion hole 2a is attached to the magnet 20 mounted on the front end surface of the cylinder 16 to prevent free fall, and the strand 4 is fixed to the fixing wedge 6. It is released from the holding power of and is not affected by tension.

도7은 강연선의 긴장 후 정착웨지가 정착헤드에 삽입되는 상태를 나타낸 반단면도이다.Figure 7 is a half sectional view showing a state in which the fixing wedge is inserted into the fixing head after the tension of the strand.

도면에 도시한 바와 같이, 상기 강연선(4)에 구조설계값의 긴장력이 부여되면, 제1 압력잠금밸브(38)가 차폐되어 와이어 인장기(10)에 제공되었던 유압의 공급이 멈춰진다. 그리고, 상기 제2 압력잠금밸브(40)가 개방되어 실린더(16)측으로 유압이 제공된다. 상기 실린더(16)는 유압에 의해 전진 구동하게 되며, 상기 실린더(16)의 외주면에 끼워져 있는 탄성부재(22)가 압축하게 된다. 상기한 과정에서 마그네트(20)에 부착된 정착웨지(6)가 정착헤드(2)의 웨지삽입공(2a)으로 삽입되어 쐐기작용을 개시할 수 있는 상태가 된다. As shown in the figure, when the tension force of the structural design value is applied to the strand 4, the first pressure lock valve 38 is shielded to stop the supply of hydraulic pressure provided to the wire tensioner 10. The second pressure lock valve 40 is opened to provide hydraulic pressure to the cylinder 16 side. The cylinder 16 is driven forward by hydraulic pressure, and the elastic member 22 fitted to the outer circumferential surface of the cylinder 16 is compressed. In the above process, the fixing wedge 6 attached to the magnet 20 is inserted into the wedge insertion hole 2a of the fixing head 2 to be in a state capable of starting a wedge action.

다음, 와이어 인장기(10)에 의해 부여되었던 강연선(4)의 긴장력을 해제하면, 상기 긴장되었던 강연선(4)이 수축함과 동시에, 상기 정착웨지(6)가 쐐기작용을 개시하여 강연선의 긴장(늘음량)상태를 유지함으로써 시험인장을 완료하게 된다. 이때, 상기한 과정을 통해 구조설계값에 상응하는 인장력이 부여되면, 그대로 정착을 실시하게 된다. Next, when the tension force of the strand 4 applied by the wire tensioner 10 is released, the tensioned strand 4 contracts and at the same time, the fixing wedge 6 starts wedge action to tension the strand. By maintaining the (stretch volume) state, the test seal is completed. At this time, if a tensile force corresponding to the structural design value is given through the above process, the fixing is performed as it is.

도8은 강연선의 정착완료후 실린더의 제거상태를 나타낸 반단면도이다.Fig. 8 is a half sectional view showing the removal state of the cylinder after the fixing of the stranded wire.

도면에 도시한 바와 같이, 상기 강연선(4)이 정착헤드(2) 내에서 정착웨지(6)에 파지되면, 상기 제2 압력잠금밸브(40)를 차폐하고, 제3 유압회수통로(36)를 통해 유압을 회수하게 된다. 즉, 상기 실린더(16)에 제공된 유압의 공급이 정지하게 되면 탄성부재(22)가 원위치 복원되면서 실린더(16)를 제위치로 이동시키게 되며, 이 과정에서 실린더(16)를 가압하고 유압이 제3 유압회수통로(36)를 통하여 빠져나가게 된다. 또한, 상기 탄성부재(22)의 원위치 복원력은 정착웨지(6)를 부착하고 있던 마그네트(20)의 자력을 이기는 정도의 복원력을 가지고 있으므로, 탄성부재(22)의 복원력에 의해 마그네트(20)가 정착웨지(6)로부터 분리된다.As shown in the figure, when the strand 4 is gripped by the fixing wedge 6 in the fixing head 2, the second pressure locking valve 40 is shielded, and the third hydraulic recovery passage 36 is provided. Hydraulic is recovered through. That is, when the supply of the hydraulic pressure provided to the cylinder 16 is stopped, the elastic member 22 is restored to its original position, thereby moving the cylinder 16 to its original position. In this process, the cylinder 16 is pressurized and the hydraulic pressure is removed. 3 is to be exited through the hydraulic return passage (36). In addition, since the original position restoring force of the elastic member 22 has a restoring force that overcomes the magnetic force of the magnet 20 to which the fixing wedge 6 is attached, the magnet 20 is restrained by the restoring force of the elastic member 22. It is separated from the fixing wedge 6.

상기 정착헤드(2)로부터 실린더(16)가 분리되면, 와이어 인장기(10)에서 강연선(4)을 파지하고 있는 쐐기(도시하지 않음)를 제거하여 실린더(16)를 정착헤드(2)로부터 제거하게 된다.When the cylinder 16 is separated from the fixing head 2, the wedge (not shown) holding the strand 4 in the wire tensioner 10 is removed to remove the cylinder 16 from the fixing head 2. Will be removed.

상기한 바와 같이 구성되어 작용하는 본 발명은 정착헤드(2)로부터 강연선의 긴장시 웨지삽입홀로부터 이탈되는 정착웨지(6)를 마그네트(20)에 부착한 후, 강연선(4)의 긴장(늘음량)을 유지한 상태에서 상기 정착웨지(6)를 정착헤드(2)의 웨지삽입공(2a)에 삽입시켜 쐐기작용을 개시시키는 일련의 과정을 연속으로 행한다. 이러한 과정에 의해 정착웨지(6)가 쐐기작용을 개시하기 전까지 강연선(4)의 수축에 대하여 저항하게 되어 정착력의 손실을 최소화할 수 있게 되는 것이다.According to the present invention configured and acting as described above, the fixing wedge 6 detached from the wedge insertion hole when the tensioning wire is tensioned from the fixing head 2 is attached to the magnet 20, and then the tension of the stranding wire 4 is increased. The fixing wedge 6 is inserted into the wedge insertion hole 2a of the fixing head 2 in a state where the volume is maintained, and a series of processes for starting the wedge action is performed continuously. By this process, the fixing wedge 6 resists contraction of the strand 4 until the wedge action starts, thereby minimizing the loss of the fixing force.

또한, 상기 와이어인장기(10)의 선단에 실린더(16)를 부착하여 강연선의 시험인장을 수행한 후 바로 정착시키는 과정을 거치기 때문에 장착시험작업을 신속하게 할 수 있고, 기존의 정착력 시험에 사용되었던 유압시스템과 체어의 사용을 배제할 수 있는 장점을 구현하게 된다.In addition, since the cylinder 16 is attached to the tip of the wire tensioner 10 and then subjected to a process of fixing immediately after the test tension of the stranded wire, the mounting test can be performed quickly, The advantage is to eliminate the use of hydraulic systems and chairs that have been used.

이상에서 설명한 본 발명은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 통상의 지식을 가진자에게 있어 명백할 것이다.
The present invention described above is not limited to the above-described embodiment and the accompanying drawings, and will be apparent to those skilled in the art without departing from the technical spirit of the present invention.

2: 정착헤드 4: 강연선
6: 정착웨지 10: 와이어 인장기
12: 본체연결 하우징 14: 가이드블록
16: 실린더 18: 연결블록
20: 마그네트 22: 탄성부재
24: 실린더하우징 26: 하우징 커버
28: 지압판 30: 유압공급블록
32, 34: 제1 및 제2 유압공급통로 36: 제3 유압공급통로
38: 제1 압력잠금밸브 40: 제2 압력잠금밸브
2: settling head 4: strand
6: settling wedge 10: wire tensioner
12: main body connection housing 14: guide block
16: cylinder 18: connecting block
20: magnet 22: elastic member
24: cylinder housing 26: housing cover
28: pressure plate 30: hydraulic supply block
32, 34: 1st and 2nd hydraulic supply passage 36: 3rd hydraulic supply passage
38: first pressure lock valve 40: second pressure lock valve

Claims (5)

와이어인장기(10)에 연결되는 본체 연결하우징(12);
상기 본체연결 하우징(12)에 결합되어 실린더(16)의 이동을 안내하는 가이드블록(14);
상기 가이드블록(14)의 외주부에 끼워지며 전진구동하여 정착웨지(6)를 정착헤드(2)의 웨지삽입공(2a)으로 삽입하기 위한 실린더(16);
상기 실린더(16)의 선단면에 장착되며, 정착헤드(2)를 통과하는 강연선(4)의 시험인장시 정착헤드(2)의 웨지삽입공(2a)으로부터 이탈되는 정착웨지(6)를 부착시켜 상기 정착웨지(6)가 강연선(4)의 긴장에 영향을 주지 않으면서 자유낙하되는 것을 방지하기 위한 마그네트(20);
상기 실린더(16)의 외주면에 끼워지며, 실린더(16)의 전진이동시 압축되었다가 상기 실린더(16)에 부여된 장력의 제거시 원위치 복원되어 실린더(16)를 제위치로 이동시키면서 정착웨지(6)로부터 마그네트(20)를 분리하는 탄성부재(22); 및
상기 와이어인장기(10)의 상단에 설치되며, 와이어인장기(10)와 실린더(16)가 전후진 구동할 수 있도록 와이어인장기(10)와 실린더(16) 각각에 유압을 제공하고 ,회수하기 위한 유압출입통로가 구비된 유압공급블록(30)
을 포함하는 앵커정착장치.
A main body connecting housing 12 connected to the wire tensioner 10;
A guide block 14 coupled to the body connection housing 12 to guide the movement of the cylinder 16;
A cylinder 16 inserted into an outer circumferential portion of the guide block 14 to drive the fixing wedge 6 into the wedge insertion hole 2a of the fixing head 2;
The fixing wedge 6 is attached to the front end surface of the cylinder 16 and detached from the wedge insertion hole 2a of the fixing head 2 when the tensile wire 4 passes through the fixing head 2. A magnet 20 for preventing the fixing wedge 6 from falling freely without affecting the tension of the strand 4;
It is fitted to the outer circumferential surface of the cylinder 16, and is compressed during the forward movement of the cylinder 16, and restored to its original position when the tension applied to the cylinder 16 is removed, the fixing wedge 6 while moving the cylinder 16 in position Elastic member 22 for separating the magnet 20 from the; And
It is installed on the top of the wire tensioner 10, and provides hydraulic pressure to each of the wire tensioner 10 and the cylinder 16 so that the wire tensioner 10 and the cylinder 16 can be driven forward and backward, the recovery Hydraulic supply block 30 is provided with a hydraulic access passage for
Anchor fixing device comprising a.
제 1 항에 있어서,
상기 실린더(16)를 감싸는 하우징커버(26)의 전단에 결합되며, 정착헤드(2)의 원주면에 밀착되어 강연선(4)의 긴장력에 대응하여 정착헤드(2)의 외주면을 가압하기 위한 지압판(28)을 더 포함하는 앵커정착장치.
The method of claim 1,
A pressure plate coupled to the front end of the housing cover 26 surrounding the cylinder 16, in close contact with the circumferential surface of the fixing head 2 to press the outer peripheral surface of the fixing head 2 in response to the tension force of the strand 4 Anchor fixing device further comprises (28).
제 1 항에 있어서,
상기 유압공급블록(30)은
상기 와이어 인장기(10)에 연결되어 외부로부터 제공된 유압을 공급하는 제1 유압공급통로(32);
실린더(16)에 연결되어 외부로부터 제공된 유압을 공급하는 제2 유압공급통로(34);
상기 제2 유압공급통로(34)와 연통되며, 실린더(16)측에 제공된 유압을 회수하기 위한 제3 유압공급통로(36)와;
상기 제1 유압공급통로(32)상에 설치되어 강연선(4)의 긴장시 개방되고, 실린더(16)에 유압공급시 차폐되는 제1 압력잠금밸브(38); 및
상기 제2 유압공급통로(34)상에 설치되어 강연선(4)의 긴장시 차폐되고, 강연선(4)의 긴장 완료후 개방되는 제2 압력잠금밸브(40)
를 포함하는 앵커정착장치.
The method of claim 1,
The hydraulic supply block 30
A first hydraulic pressure supply passage 32 connected to the wire tensioner 10 to supply hydraulic pressure provided from the outside;
A second hydraulic pressure supply passage 34 connected to the cylinder 16 to supply hydraulic pressure provided from the outside;
A third hydraulic pressure supply passage (36) communicating with the second hydraulic pressure supply passage (34) and for recovering the hydraulic pressure provided on the cylinder (16) side;
A first pressure lock valve (38) installed on the first hydraulic supply passage (32) to open when the stranded steel (4) is tensioned and shielded when the hydraulic pressure is supplied to the cylinder (16); And
The second pressure lock valve 40 is installed on the second hydraulic supply passage 34 and shielded when the strand 4 is tensioned and opened after the tension of the strand 4 is completed.
Anchor fixing device comprising a.
삭제delete 제 1 항 또는 제 2 항에 있어서,
상기 탄성부재(22)가 인장스프링인 것을 특징으로 하는 앵커정착장치.
3. The method according to claim 1 or 2,
Anchor fixing device, characterized in that the elastic member 22 is a tension spring.
KR1020100057452A 2010-06-17 2010-06-17 Apparatus for fixing the permanent ground anchor KR101213678B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100057452A KR101213678B1 (en) 2010-06-17 2010-06-17 Apparatus for fixing the permanent ground anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100057452A KR101213678B1 (en) 2010-06-17 2010-06-17 Apparatus for fixing the permanent ground anchor

Publications (2)

Publication Number Publication Date
KR20110137483A KR20110137483A (en) 2011-12-23
KR101213678B1 true KR101213678B1 (en) 2012-12-18

Family

ID=45503720

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100057452A KR101213678B1 (en) 2010-06-17 2010-06-17 Apparatus for fixing the permanent ground anchor

Country Status (1)

Country Link
KR (1) KR101213678B1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200468071Y1 (en) * 2011-07-21 2013-07-24 임이수 A wire tensile device which can measure a wire tensile length
KR101407509B1 (en) * 2011-12-27 2014-06-17 재단법인 포항산업과학연구원 Fixing Mechanism Of Structural Cable
KR101722191B1 (en) * 2015-07-28 2017-03-31 삼성중공업 주식회사 Suction pile anchor
KR101722209B1 (en) * 2015-08-21 2017-03-31 삼성중공업 주식회사 Anchor apparatus
CN110004926A (en) * 2019-04-21 2019-07-12 河北建科唐秦建筑科技有限公司 A kind of fluid pressure type anchor rod prestress stops loss device
CN111980022A (en) * 2020-08-28 2020-11-24 中南大学 Anchor rod suitable for expansive and contractive deformation of expansive soil
CN116254833B (en) * 2023-05-11 2023-08-01 肥城恒丰塑业有限公司 Anchor device of geotechnical grid
CN117486114B (en) * 2024-01-03 2024-03-05 河南丽卡数控设备有限公司 Multi-hole front clamping jack

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005194738A (en) 2004-01-05 2005-07-21 Psl Japan:Kk Tension device for anchor
KR100684387B1 (en) 2005-12-09 2007-02-22 정락준 Tension apparatus and method for earth anchor
KR100739941B1 (en) 2005-10-19 2007-07-16 주식회사 한진중공업 Spacing apparatus for construct of earth anchor

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005194738A (en) 2004-01-05 2005-07-21 Psl Japan:Kk Tension device for anchor
KR100739941B1 (en) 2005-10-19 2007-07-16 주식회사 한진중공업 Spacing apparatus for construct of earth anchor
KR100684387B1 (en) 2005-12-09 2007-02-22 정락준 Tension apparatus and method for earth anchor

Also Published As

Publication number Publication date
KR20110137483A (en) 2011-12-23

Similar Documents

Publication Publication Date Title
KR101213678B1 (en) Apparatus for fixing the permanent ground anchor
KR20160004399A (en) Individual Seal Arrangement for Cable Anchorage
KR102098014B1 (en) Ahchoring device using shape memory alloy and constructiion method therefor
KR100864084B1 (en) Anchor device using spring
CN109056722B (en) Full-length corrosion-resistant bonded pre-stressed anchor cable
CN212376149U (en) Connector for connecting unbonded prestressed steel strands in post-cast strip
KR101864383B1 (en) Earth anchor of sheeting tmbering
WO2019119900A1 (en) Low-tension anchor cable construction method capable of reducing prestress loss
CN111945725A (en) Prestress intelligent applying system and method for anchor cable supporting structure
JP2014196651A (en) Anchorage construction method of foundation work or structure
KR101023882B1 (en) cylinder for wire tension and a method
KR101135076B1 (en) Method for removing the tention member of temporary anchor
KR100950265B1 (en) Retension cylinder
KR200366050Y1 (en) Wedge anchorage device that re-prestressing device is formed
JP6232300B2 (en) Re-fixing method for existing PC steel
KR101165692B1 (en) Multipurpose anchor and construction method thereof
JP2009203767A (en) Aseismatic reinforcing method and reinforcing structure for structure
KR101075157B1 (en) Temporary anchor
KR101055175B1 (en) Tensile cable retension structure and construction
KR20070000151U (en) Oil pressure pull demolition device for bridge bearing upper part demolition
Thompson Performance of cable bolt anchors–An Update
JP2012127120A (en) Anchor fixing structure and seismic strengthening structure
JP2017014799A (en) Movement prevention method and system for slope frame
KR102231568B1 (en) Inner-Prestress Anchor Device by hydro pressure cylinder system
KR20070102385A (en) Casket anchor

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20151207

Year of fee payment: 4

FPAY Annual fee payment