KR101205710B1 KR1020110082037A KR20110082037A KR101205710B1 KR 101205710 B1 KR101205710 B1 KR 101205710B1 KR 1020110082037 A KR1020110082037 A KR 1020110082037A KR 20110082037 A KR20110082037 A KR 20110082037A KR 101205710 B1 KR101205710 B1 KR 101205710B1
Authority
KR
South Korea
Prior art keywords
cap
neutral
hole
installation
bolt
Prior art date
Application number
KR1020110082037A
Other languages
Korean (ko)
Inventor
권세원
Original Assignee
대원전기 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대원전기 주식회사 filed Critical 대원전기 주식회사
Priority to KR1020110082037A priority Critical patent/KR101205710B1/en
Application granted granted Critical
Publication of KR101205710B1 publication Critical patent/KR101205710B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G13/00Installations of lightning conductors; Fastening thereof to supporting structure
    • H02G13/80Discharge by conduction or dissipation, e.g. rods, arresters, spark gaps
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/342Arrangements for stacking tower sections on top of each other
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers
    • H02G7/205Installation of electric cables, extending along a pole
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/22Arrangements of earthing wires suspended between mastheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

PURPOSE: A multi-cap for installing an overhead neutral earth wire having a pin type assembly structure is provided to improve safety by having a long structure protruded to the upper end of an electric pole through a connection pipe. CONSTITUTION: An overhead neutral earth wire installation device(300) is detachably formed on the upper end of a connection pipe(200). A finishing cap(310) has a second coupling hole(311) connected to a coupling hole(210), a bolt hole formed on the upper side, and a nut(312) connected to the bolt hole. A plate(320) is combined with the upper part of the finishing cap with a bolt. The finishing cap is covered to the upper end of the connection pipe.

Description

핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡 {Multi-cap for installing overrhead earthwire combined with neutral line}Multi-cap for installing overrhead earthwire combined with neutral line}

본 발명은 배전선로에서 낙뢰로부터 차폐 역할을 하는 가공지선과 불평형 전류 및 고장전류의 귀로 역할을 하는 특고압 중성선을 겸용하여 특고압 전력선의 낙뢰 차폐각을 확보하는 위치에 설치하는 특고압 가공중성지선 설치용 멀티캡에 관한 것으로, 더욱 상세하게는 전주의 상단에 결합되는 멀티캡 본체로부터 플레이트와, 클램프와, 편출 연결대를 필요에 따라 조립식으로 교체 사용이 가능하게 함으로써, 선로의 종류 즉, 내장주(각도주), 핀장주(직선주), 편출주(편출장주) 등 모든 장주에 용이하게 가공중성지선의 설치가 가능하면서도, 가공중성지선 설치 공사의 편리성을 가져오며, 특히 장주의 종류에 따라 교체 사용 가능한 구조를 가지고 있어 재료 원가의 절감을 가져올 수 있게 한 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡에 관한 것이다.
The present invention is a special high-voltage processing neutral ground wire installed in a position to secure the lightning shielding angle of the high-voltage power line by using a combination of the processing ground wire that serves as a shield from lightning in the distribution line and the special high-voltage neutral wire that serves as the return of unbalanced current and fault current More particularly, the present invention relates to a multi-cap for installation, and more particularly, a plate, a clamp, and a pull-out connecting rod can be assembled and assembled as necessary from the multi-cap main body coupled to the upper end of the pole. It is possible to install the processing neutral wire easily on all poles such as angle poles, pin poles (straight poles) and uneven poles (slip poles), but it also brings convenience to the installation of processing neutral poles. It is a multi-cap for installation of overhead neutral wires with a pin-type prefabricated structure that has a replaceable structure, which can reduce material cost. It is about.

전기는 우리의 생활에 필수 수단으로서 문명의 발전과 더불어 현대사회는 시대적으로 고품질의 전력을 요구하고 있어 작업정전은 물론이고 순간적인 불시정전도 국민생활에 큰 불편과 기업생산 활동에도 막대한 지장을 초래하고 있어 정전을As electricity is an essential means of our lives, with the development of civilization, modern society demands high-quality electric power in the times, and the instantaneous power failure as well as the work interruption causes great inconvenience to people's life and corporate production activities. Doing a power outage

방지하고자 국가적인 차원의 노력을 하고 있는 실정이다.The national level is trying to prevent it.

이러한 정전사고 방지노력의 일환으로 전국의 호당 평균정전시간이 년간 100분대에서 19분대로 매우 크게 감소하여 현재에 이르고 있으나, 첫째로 가장 큰 비중을 차지하던 작업정전은 무정전공법의 개발과 적용으로 해결되었고, As part of these efforts to prevent blackouts, the average blackout time per house in the country has been greatly reduced from 100 minutes to 19 minutes per year. Became,

둘째로 기자재 불량으로 인한 정전은 고품질의 자재개발 및 보급으로 크게 감소되었으며, Second, power outages due to poor equipment have been greatly reduced by the development and supply of high quality materials.

셋째는 외물 접촉으로 인한 정전인데 이는 선로의 절연화 및 단순 조류고장 회피형 장주[점퍼선 하향장주 및 L.H.C 시공법 등]과 구제(驅除: 까치를 총으로 쏘아 없애는 방법)로 다소나마 해소되었으나, 아직도 순간정전의 원인으로 추정되며, 또한 총기 사용으로 인한 안전사고 위험 및 환경보호단체의 민원도 무시할 수 없는 현실이며,Third, the blackout caused by external contact, which was somewhat resolved by the insulation of the line and the avoidance of simple bird failure avoidance (such as the jumper downcomer and the LHC construction method) and relief (驅除). It is assumed that it is a cause of power outage, and the risk of safety accidents caused by the use of firearms and civil complaints cannot be ignored.

넷째는 낙뢰로 인한 정전사고로서 이는 1990. 2. 7 한국전력공사의 설계기준[3800] 배전선내뢰기준을 제정운영 하여 배전선로의 낙뢰방지를 위한 배전선로의 내뢰대책은 유도뢰뿐만 아니라 직격뢰도 보호대상으로 하여 가공지선 설치를 기본으로 하고, 공급신뢰도를 높이기 위해서 피뢰기 등의 설치를 병행함으로서 크게 해결되었다.Fourth, a blackout accident caused by lightning strikes was established and operated by the Korea Electric Power Corporation's Design Standard [3800] Distribution Line Landing Standard, which prevents lightning strikes on the distribution lines to prevent lightning strikes. Based on the installation of overhead lines, the installation was largely solved by installing lightning arresters and the like in order to increase supply reliability.

다섯째는 기타 정전사고가 태풍, 수해등의 자연재해와 고객설비 불량, 일반인과실, 작업자과실, 원인불명 등이 차지하고 있는 현실이다.Fifth, other blackout accidents are caused by natural disasters such as typhoons and floods, customer equipment defects, public errors, worker errors, and unknown causes.

상기에서 열거한 바와 같이 아직도 정전사고 방지를 위하여 해결해야 할 산적한 문제점들이 아주 많다는 사실을 알 수 있다.As enumerated above, it can be seen that there are still many cumulative problems to be solved in order to prevent a power failure.

그 중에서, 첫째는 아직도 "까치와의 전쟁"을 치러야 하는 현실과 원인 불명이라고 치부하는 사고의 대부분이 조류로 인한 외물접촉사고로 추정되고 있는 현실이며, 단순 조류고장 회피형 장주설치로 인하여 구조역학적으로 지지물과 전선의 설치하중이 편심되어 불안정하게 시공하거나 낙뢰차폐 보호각을 벗어나는 시공으로 인하여 태풍과 수해등의 자연재해에 구조역학적 취약성을 드러낸 상황에 처한 것이다.Among them, the first is that the reality of having to fight the war with magpies and the fact that most of the accidents are unknown are estimated to be foreign-contact accidents caused by birds. It is in a situation where structural and structural weaknesses are exposed to natural disasters such as typhoons and floods due to unstable construction due to eccentric loads of support and electric wires, or construction beyond the protection angle of lightning shielding.

둘째는 한국전력공사에서 전력품질향상을 위하여 1990. 2. 7. 배전선내뢰기준을 제정하고, 배전선로의 낙뢰사고 방지를 위한 배전선로의 내뢰대책을 유도뢰 뿐만 아니라 직격뢰까지도 보호대상으로 하여 가공지선 설치를 기본으로 변경하여 시행였으나 기존의 배전선로에 가공지선을 추가로 시공하기 위하여 부득이 전주위에 완금으로 계주(전주와 완금을 묶어서 연장함)하여 가공지선을 설치하게 되었고, 또한 가공지선지지대(소형 강판주)를 개발하여 전주를 잇는 공법을 계속하여 사용함으로서 이어 올린 완금이나 강판주가 기초 안전율이 부족한 경우에는 지선등에 의하여 안전율을 보지할 수 있도록 보강하여야 하나 이에 미흡하여, 태풍과 같은 재해에 쉽게 붕괴되는 취약성이 있다.Second, KEPCO enacted the distribution line tolerant standards for improvement of power quality, and processed the mines as well as direct lightning strikes to protect the distribution lines from lightning strikes to prevent lightning strikes on the distribution lines. It was implemented by changing the installation of the ground wire to the basic, but in order to construct additional overhead wire on the existing distribution line, it was unavoidable to relay the wires around the circumference (extended by tying the poles and the complete wire) to install the overhead wires. Small steel plates) are developed and used continuously to connect the poles. If the finished steel sheets or steel sheets lack the basic safety factor, they should be reinforced so that the safety factor can be maintained by branch lines, etc. There is a vulnerability to collapse.

이는, 과거 자금이 부족한 경제개발시대의 어려운 환경에서 필요한 지상고를 얻기 어려운 경우에 할 수 없이 사용하던 단 계주나 인형주의 구시대적인 시공법을 경제력이 있는 현재에도 누더기처럼 사용하는 상황일 뿐만 아니라 편출용 가공지지This is not only the situation of using rags or dolls' old-fashioned construction methods, which were used in times of difficulty in the difficult environment of the economic development era where funds were lacking in the past, as rags, even in economical times. support

대까지 개발하여 전선로에 적용하고 있으나 완전편출장주에는 낙뢰보호 차폐각을 확보하지 못하는 한계가 있는 등 이들 문제점을 모두 해결할 더욱 견고하고 완벽한 공법을 필요로 하게 되었다.Although it is being developed and applied to the electric cable line, it requires a more robust and perfect method to solve all of these problems, such as the limitation of not being able to secure the lightning protection shielding angle in the complete cable owner.

또한 정전사고 중 까치의 산란기에 발생하는 외물접촉사고와 원인불명사고가 전체고장의 약 43%를 차지하고 있으나, 사고방지 노력에도 불구하고 사고는 줄지 않고 있으며 방지대책 또한 엽사를 동원하여 까치를 구제하는 환경생태계 보호에In addition, foreign contact accidents and unknown causes that occur during the blackout's spawning period account for about 43% of total failures.However, despite efforts to prevent accidents, accidents are not reduced. Environmental protection

역행하는 방법과, 배전선로의 시공방법(일명 L.H.C. 공법, 하향점퍼시공) 또한 충분한 과학적 검토 없이 무분별한 시공으로 인하여 오히려 위해설비를 확대하고 있는 실정이며, 새로운 기자재의 개발과 더불어 재활용이 가능한 철거자재를 무조건 폐기함으로서 자원의 낭비는 물론이고 환경오염을 부채질하고 있고, 22.9KV 다중접지 방식에서 가공지선과 중성선은 매 전주마다 서로 연결되어 있어 위치만 다를 뿐 같은 기능으로 중복 투자되고 있어 불필요한 가공지선 설비로 지지물에 하중을 증가시킬 뿐만 아니라, 계주방식의 시공으로 불안정한 전력시설물로 자연재해에 취약하며 지지물의 지상고 확보에도 문제점이 있다The retrograde method and the construction method of the distribution line (aka LHC method, down jumper construction) are also expanding the hazardous facilities due to indiscriminate construction without sufficient scientific review. By discarding unconditionally, it not only wastes resources but also contributes to environmental pollution.In the 22.9KV multi-grounding system, overhead wires and neutral wires are connected to each pole, so they are only invested in the same function. Not only does it increase the load on the support, but it is also vulnerable to natural disasters due to unstable power facilities due to the relaying method, and there is a problem in securing the ground height of the support.

한편, 상기와 같은 문제점을 해결하기 위해 본 발명 출원인은, 특허등록 제10-0725382호와 같이 가공중성지선을 갖는 전주 및 이를 이용한 배전공법을 출원한바 있으며, On the other hand, in order to solve the above problems, the present applicant has applied for a pole pole having a processing neutral branch line and a distribution method using the same, as Patent Registration No. 10-0725382,

이를 통해, 가공지선과 중성선을 직격뇌에 의한 과전압, 대전류 상승 등의 위험성 없이 하나의 전력선으로 사용할 수 있는 전주를 구성하므로서, 중성선으로 가공지선 역할을 겸용하여 공사비 원가절감 및 선로의 단순화로 지지물의 하중을 경감시키고 중성선의 지상고 미달등을 해소함은 물론, 가공중성지선에 조류둥지 공간부를 친환경적으로 형성하고 하단 전력선에는 조류둥지 유도핀을 설치하여 조류둥지를 전력선으로부터 가장 멀고 안전한 곳으로 유도하여 정전사고를 방지하면서도 조류를 보호할수 있고, 폐기물처리되는 현수애자를 재활용하여 자원을 절약하고 환경오염을 방지할 수 있으며, 보다 안전하고 편리한 낙뢰보호 차폐각의 확보로 낙뢰에 의한 사고를 방지하고, 태풍이나 수해 등의 자연 재해에 대비한 견고한 배전시설과 외물접촉으로 인한 원인불명의 정전사고를 방지할 수 있었다.Through this, the electric pole which can use the processing ground wire and the neutral wire as a power line without the risk of overvoltage and high current caused by the direct brain, can be used as the processing ground wire as the neutral wire to reduce the cost of construction and simplify the line. It reduces the load and eliminates the ground height of the neutral wire, as well as forming the bird nest space part on the processed neutral ground line and installs the bird nest guide pin on the lower power line to guide the bird nest to the safest place away from the power line. It can protect the algae while protecting the birds, and save the resources by recycling the suspended insulator which is disposed of in the waste, and prevent the pollution of the environment. Robust power distribution facilities and external contacts for natural disasters such as floods It was able to prevent the outage of unknown origin caused.

그러나 상기와 같은 가공중성지선을 갖는 전주는, 전주의 종류에 따라 가공중성지선을 설치하기 위해 다양한 방법의 설치구조를 가지고 있는 것으로, 이를 살펴보면, However, the electric pole having the processing neutral branch line as described above has various installation structures to install the processing neutral branch line according to the type of pole.

먼저, 내장주의 경우 별도의 지지봉이나 체결밴드를 이용하여 전주의 상부 양측에 완금을 지지하고, 상기 완금에 가공중성지선이 연결된 현수애자를 고정 지지 및 점퍼선에 의해 연결 하였으며, First, in the case of built-in column, using a separate support rod or fastening band to support the top of the poles on both sides of the pole, and the suspension insulator connected to the processing neutral ground wire is connected by the fixed support and jumper wires,

핀장주의 경우 전주의 상부에 랙크를 별도의 밴드로 고정하여 상기 랙크에 가공중성지선이 지지되게 하였으며,In the case of pin holders, the rack is fixed to the upper part of the pole with a separate band so that the processing neutral branch line is supported on the rack.

편출장주의 경우 전주의 상부에 완금을 지지봉이나 체결밴드에 의해 일측으로 편출되게 설치하고, 완금과 전주를 암타이 및 암타이밴드로 고정 지지하며, 상기 완금의 상부면에 애자를 설치 및 가공중성지선의 지지가 가능하게 하는 등 전주의 종류에 따라 각각 다른 방식의 중성선 지지방식을 전주에 설치하여야 하는 작업상 매우 번거로운 문제점과 이로 인해 공사 원가의 증가를 가져오는 문제점이 있었다.In the case of uneven taps, the top of the pole is installed by the support rod or fastening band so as to be unfolded to one side, and the end and the pole are fixed and supported by the arm tie and the arm tie band. There was a problem in that the work of installing the neutral wire support system in Jeonju was very cumbersome due to the types of poles, such as enabling the support of the ships, resulting in an increase in construction cost.

또한, 가공중성지선을 지지하기 위한 각각의 지지수단을 전주의 상부 둘레에 밴드 등으로 설치하는 구조를 가지고 있어, 지지물의 하부에 의해 지지물의 처짐 발생 등 지지력이 저하되는 문제점이 있었다.In addition, each support means for supporting the processing neutral branch line has a structure that is installed around the upper portion of the pole by a band or the like, there was a problem that the bearing capacity such as the deflection of the support is lowered by the lower portion of the support.

한편 상기와 같은 문제점을 해결하기 위해 본 발명 출원인은, 특허출원 제2010-0106582호와 같이 가공중성지선을 설치하기 위해 상부에 나사공 및 둘레에 다수의 체결공이 형성된 설치 멀티캡에 의해 내장주, 핀장주, 편출장주 등 모든 장주에 가공중성지선의 설치가 가능한 멀티캡을 출원한 바 있다.On the other hand, in order to solve the above problems, the applicant of the present invention, as the patent application No. 2010-0106582, in order to install the processing neutral branch line screw holes at the top and a plurality of fastening holes formed in the periphery by the built-in multi-cap The company has applied for a multi-cap that can be installed with processing neutral wires in all of the poles, such as pin poles and flat pole poles.

그러나, 상기와 같은 멀티캡은, 내장주의 경우 용이한 가공중선선의 설치가 가능하였으나, 핀장주에 가공중성지선을 설치시 반드시 별도의 랙크를 추가 설치하여야 하며, 그 랙크에 가공중성지선을 내입시 번거로운 조작이 이루어져야 하는 등 설치가 매우 번거로운 문제점이 있었다.However, the multi-cap as described above, but in the case of the built-in can be easily installed the processing center line, but when installing the process neutral branch line in the pin length column must be additionally installed a separate rack, the processing neutral branch line inside the rack There was a problem that the installation is very cumbersome, such as cumbersome operation must be made for the entrance examination.

또한, 편출주에 설치시, 상부에 별도의 편출완금을 설치 및 암타이밴드에 의해 고정되는 암타이로 그 편출완금을 지지하는 등 설치상의 번거로움을 가져오는 문제점이 있었다.In addition, when installed in the uneven column, there is a problem in that the installation has a problem in the installation, such as the installation of a separate uneven complete upper portion and supporting the uneven deflection with the arm tie fixed by the arm tie band.

이에, 상기와 같은 문제점을 해결하기 위해 본 발명 출원인은, 특허출원 제 2011-0065878호와 같이 가공중성지선을 설치하기 위해 전주의 상단에 씌움 결합되는 하부 결합부와 상부 중앙에 클램프가 형성되고 주연부에 원주 방향으로 다수의 관통홀이 형성된 플레이트 구조를 가지므로, 내장주의 경우 다수의 관통홀에 의해 중성선의 용이한 설치가 가능하고, 핀장주의 경우 개폐 가능한 클램프에 의해 중성선의 용이한 설치가 가능하며, 특히, 편출주의 경우 플랜지 결합되고 상부면에 플레이트가 형성된 편출 연결대에 의해 중성선의 용이한 설치가 가능하게 한 고정 클램프를 갖는 가공지선 겸용 중성선 설치용 멀티캡을 출원한바 있다.Thus, in order to solve the above problems, the present applicant, as the patent application No. 2011-0065878, the lower coupling portion and the upper center of the clamp is formed in the upper coupling portion to cover the top of the pole to install the processing neutral branch line Since the plate structure is formed with a plurality of through holes in the circumferential direction, the inner wire can be easily installed by the plurality of through holes, and in the case of the pin holder, the neutral wire can be easily installed by the clamp that can be opened and closed. Particularly, in the case of the unfolding strain, there has been applied for a multi-cap for the overhead wire combined neutral wire installation having a fixed clamp which enables easy installation of the neutral wire by the flanged coupling and the plate-shaped unfolding connecting rod formed on the upper surface.

그러나 상기와 같은 멀티캡은, 내장주 및 핀장주에 가공중성지선을 설치하기 위한 플레이트 및 클램프 등이 일체 형성된 구조를 가지고 있으므로, 내장주나 핀장주 등 어느 하나의 장주에 사용시에도 동일한 멀티캡을 사용하여야 하고, 편출 연결대를 설치시에도 플랜지 결합되는 구조를 가지고 있는 등 그 사용상의 효율성 저하 및 멀티캡 제작에 따른 비용의 상승과 이로 인한 공사 원가의 증가를 가져오는 문제점이 있었다.However, since the above-mentioned multicap has a structure in which a plate and a clamp for installing the processing neutral branch wire are integrally formed in the built column and the pin column, the same multicap is used even when used in any one column such as the built column or the pin column. In addition, there is a problem in that the efficiency of the use and the increase of the cost due to the multi-cap manufacturing and the resulting increase in construction costs, such as having a structure that is flanged even when installing the uneven connecting rod.

또한, 짧은 단형으로 구성되어 전주의 상단에 설치시 하부의 완금 및 다수의 전력선 등 전주의 구성요소들과 근접하여, 가공중성지선 설치작업의 난해함과 항시 위험요소를 내포하고 있는 문제점이 있었다.
In addition, it is composed of a short end, when installed on the top of the pole close to the components of the pole, such as the bottom of the completion and a number of power lines, there was a problem that contains the difficulty and always dangerous factors of the processing neutral ground wire installation work.

본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로, 멀티캡 본체 상부에 연결관이 형성되고 상기 연결관의 상단에는 착탈구조를 갖는 마감캡에 의해 내장주용 설치구와 핀장주용 설치구를 선택적으로 착탈 가능하게 하거나 연결관의 상단에 편출 연결대로 된 편출주 설치구가 착탈 가능하게 함으로써, 가공중성지선을 내장주나 핀장주, 편출주 등 장주의 종류에 따라 설치시 하나의 멀티캡 본체에 설치구 또는 편출 연결대 만을 교체 사용 가능하게 함으로 그 효율성의 극대화와 멀티캡 제작에 따른 제조단가의 절감 및 이로 인한 가공중성지선 시공에 따른 원가의 절감을 가져올 수 이께 한 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡을 제공함에 본 발명의 목적이 있는 것이다.The present invention has been made to solve the above problems, the connection pipe is formed in the upper portion of the multi-cap body and the upper end of the connection tube selectively by the interior cap mounting device and the pin head mounting device selectively By attaching or detaching the gripping liquor fittings on the upper end of the connecting pipe, it is possible to attach the processing neutral branch wire to one multi-cap body when installing the neutral pole according to the type of internal liquor, pin or liquor. Or by using only the replacement connecting rod, the processing neutral branch line with pin-type prefabricated structure can maximize the efficiency, reduce manufacturing cost due to multi-cap production, and reduce the cost according to the construction of processing neutral ground wire. It is an object of the present invention to provide a multicap for installation.

또한, 연결관에 의해 전주의 상단으로 일정 돌출되게 형성함으로써, 가공중성지선의 설치에 따른 간편함과 안정성의 확보가 가능하게 한 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡을 제공함에 다른 목적이 있는 것이다.
In addition, by forming a predetermined protruding to the top of the pole by the connecting pipe, there is another purpose to provide a multi-cap for the installation of the neutral neutral wire having a pin-type prefabricated structure that ensures the simplicity and stability according to the installation of the processing neutral wire. will be.

상기 목적을 달성하기 위한 구체적인 수단으로는, 멀티캡 본체 외주면에 접지선 인출공이 형성되고 하부에 절개부에 의해 형성된 체결 브라켓으로 된 조임구가 형성된 내장주와 핀장주와 편출주에 가공중성지선을 설치하기 위한 가공중선지선 설치용 멀티캡에 있어서,As a specific means for achieving the above object, a ground neutral wire is formed on the outer peripheral surface of the multi-cap body, and the processing neutral branch wire is installed on the built-in column, the pin-length column, and the uneven column formed with a fastener made of a fastening bracket formed by a cutout at the bottom. In the multi-cap for the overhead line installation to

상기 멀티캡 본체의 상단에는 상부에 수평 관통된 체결공을 갖는 일정 길이의 연결관을 용접 연결 형성하고, 하부의 조임구를 전주의 중심으로부터 3방향으로 조임 가능하게 형성하고, 상기 연결관의 상단에는 가공중성지선 설치구가 착탈 되게 구성함으로 달성할 수 있는 것이다.
The upper end of the multi-cap body is welded to form a connection of a predetermined length having a fastening hole horizontally in the upper portion, the lower fastener is formed to be tightened in three directions from the center of the pole, the upper end of the connection pipe There is to achieve by constructing the process neutral branch installation port detachable.

상기와 같이 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡은, 상부에 연결관이 형성된 하나의 멀티캡 본체에 내장주 및 핀장주에 가공중성지선 설치에 따라 그 설치구의 교체 사용이 가능하게 하고, 특히, 편출 연결대로 된 편출주 설치구를 설치시에도 간단한 연결 구조를 가지고 있어 멀티캡의 효율성 향상과 그 멀티캡 제작에 따른 제조 단가의 절감 및 이로 인한 가공중성지선 시공에 따른 원가의 절감을 가져올 수 있는 효과를 얻을 수 있는 것이다.As described above, the multi-cap for installing the neutral neutral wire having a pin-type assembly type structure according to the present invention can be replaced and used according to the installation of the neutral neutral wire in the built-in column and the pin-length column in the multi-cap main body in which a connection pipe is formed. In particular, it has a simple connection structure even when installing a spout fitting with a splice connecting rod, which improves the efficiency of the multicap and reduces the manufacturing cost due to the multicap manufacturing, and thus the cost of the construction of the processing neutral ground wire. The effect is to bring savings.

또한, 연결관에 의해 전주의 상단으로 일정 돌출되는 장형 구조를 가지게 함으로써, 전주의 상단에 가공중성지선 설치에 따른 주변 간섭을 최소와 하여 설치가 용이하게 하면서도 안전성을 확보할 수 있는 효과를 얻을 수 있는 것이다.
In addition, by having a long structure that protrudes constantly to the top of the pole by the connector, the interference to the minimum of the processing neutral ground wire is minimized at the top of the pole, making it easy to install and ensure the safety. It is.

도 1은 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 제1 실시예 분해사시도.
도 2는 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 제1 실시예 결합 사시도.
도 3은 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 제1 실시예를 전주 상단에 설치한 상태의 단면도.
도 4는 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 제2 실시예 사시도.
도 5는 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 제3 실시예 사시도.
도 6은 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 제3 실시예의 다른 실시예도.
도 7은 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 내장주에 적용 상태를 나타낸 실시예도.
도 8은 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 핀장주에 적용 상태를 나타낸 실시예도.
도 9는 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 편출 내장주에 적용 상태를 나타낸 실시예도.
도 10은 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 편출 핀장주에 적용 상태를 나타낸 실시예도.
1 is an exploded perspective view showing a first embodiment of a multi-cap for installing a neutral neutral wire having a pin-type prefabricated structure according to the present invention;
Figure 2 is a perspective view of the first embodiment of the multi-cap for the installation of processing neutral branch wire having the present invention pin-type assembly structure.
Figure 3 is a cross-sectional view of a state in which the first embodiment of the multi-cap for the neutral neutral wire installation of the present invention having a pin-type prefabricated structure is installed on the top of the pole.
Figure 4 is a perspective view of a second embodiment of the multi-cap for installing the neutral neutral processing line having the present invention pin type prefabricated structure.
Figure 5 is a perspective view of a third embodiment of the multi-cap for the installation of processing neutral branch line having a pin-type assembly structure of the present invention.
Figure 6 is another embodiment of a third embodiment of the multi-cap for the neutral neutral wire installation having the present invention pin type prefabricated structure.
Figure 7 is an embodiment showing an application state to the built-in circumference of the multi-cap for neutral wire installation having the present invention pin type prefabricated structure.
Figure 8 is an embodiment showing the application state to the pin length column of the multi-cap for neutral wire installation having the present invention pin type prefabricated structure.
Figure 9 is an embodiment showing an application state to the uneven built-in column of the multi-cap for neutral wire installation having the present invention pin-type prefabricated structure.
Figure 10 is an embodiment showing an application state to the uneven pin length of the multi-cap for the neutral neutral wire installation having a pin-type assembly structure of the present invention.

본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms and words used in the present specification and claims should not be construed as limited to ordinary or dictionary terms and the inventor may appropriately define the concept of the term in order to best describe its invention It should be construed as meaning and concept consistent with the technical idea of the present invention.

따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.
Therefore, the embodiments described in the present specification and the configurations shown in the drawings are merely the most preferred embodiments of the present invention, and not all of the technical ideas of the present invention are described. Therefore, It should be understood that various equivalents and modifications may be present.

이하, 본 발명의 바람직한 실시예를 첨부된 도면을 참고하여 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 제1 실시예 분해 사시도 이고, 도 2는 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 제1 실시예 결합 사시도 이며, 도 3은 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 제1 실시예를 전주 상단에 설치한 상태의 단면도 이다.1 is an exploded perspective view of a first embodiment of the multi-cap for neutral wire installation having a pin-type prefabricated structure of the present invention, Figure 2 is a perspective view of the first embodiment of a multi-cap for neutral wire installation with a pin-type prefabricated structure of the present invention 3 is a cross-sectional view of a state in which the first embodiment of the multi-cap for neutral neutral wire installation having a pin-type prefabricated structure of the present invention is installed on an upper end of a pole.

도 1 내지 도 3의 도시와 같이 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡(1)은, 전주(10)의 상단에 설치되어 가공중성지선(20)을 설치하기 위한 멀티캡 본체(100)와, 상기 멀티캡 본체(100)의 상부에 착탈 결합되는 가공중성지선 설치구(300)로 구성된 것이다.1 to 3 is a multi-cap body for installing the processing neutral branch wire having a pin-type prefabricated structure of the present invention, is installed on the upper end of the pole 10, the multi-cap body for installing the processing neutral branch wire 20 100 and the neutral neutral wire installation port 300 is detachably coupled to the upper portion of the multicap body 100.

이때, 상기 멀티캡 본체(100)는, 상부가 만곡한 곡률을 가지게 점차 좁아지는 중공관형으로 구성된 것으로, 상부 외주면에는 접지선 인출공(110)이 형성되고 하부에는 절개부에 의해 형성된 체결 브라켓(121)으로 된 조임구(120)가 형성된 것이다.At this time, the multi-cap body 100 is composed of a hollow tube type gradually narrowed to have a curved curvature at the top, the ground outer lead hole 110 is formed on the upper outer peripheral surface and the fastening bracket 121 formed by the incision in the lower portion The fastener 120 made of) is formed.

여기서 상기 멀티캡 본체(100)의 상단에는 일정 길이를 갖는 축소형 연결관(200)이 용접 연장 형성된 것으로, 그 연결관(200)의 상부에는 수평 관통형 체결공(210)이 형성된 것이다.Here, the upper end of the multi-cap main body 100 is formed to be welded by the reduction type connection tube 200 having a predetermined length, the horizontal through-type fastening hole 210 is formed on the upper portion of the connection pipe 200.

또한, 상기 조임구(120)는, 평면상 전주(10)의 중심으로부터 3방향으로 조임이 가능하게 구성된 것으로, 본 발명 멀티캡 본체(100)를 전주(10)에 설치시 그 조임력을 증가시켜 견고한 설치가 가능하게 구성한 것이다. In addition, the fastener 120 is configured to be tightened in three directions from the center of the electric pole 10 in the plane, by increasing the tightening force when installing the present invention multicap body 100 to the electric pole 10 Rugged installation is possible.

또한, 상기 연결관(200)의 상단에는 가공중성지선(20)을 설치하기 위한 가공중성지선 설치구(300)가 내장주, 핀장주, 편출주 등 장주의 종류에 따라 선택적으로 착탈 사용 가능하게 형성된 것이다.In addition, on the upper end of the connecting pipe 200, the processing neutral branch wire installation hole 300 for installing the processing neutral branch wire 20 can be selectively attached and detached according to the type of the pole, such as built-in column, pin length column, uneven column Formed.

이때, 상기 가공중성지선 설치구(300)를, 하부에 상기 연결관(200)의 체결공(210)과 연통되는 제2체결공(311)이 형성되고, 상부면에 복수의 볼트공(H)이 형성되고, 저면에 상기 볼트공(H)와 연통되는 너트체(312)가 일체 형성된 마감캡(310)과, At this time, a second fastening hole 311 communicating with the fastening hole 210 of the connecting pipe 200 is formed in the processing neutral branch wire installation hole 300, and a plurality of bolt holes (H) on the upper surface. ) Is formed, the closing cap 310 is formed integrally with the nut body 312 in communication with the bolt hole (H) on the bottom,

상기 마감캡(310)의 상부에 결합되며 중앙에 상기 볼트공(H)과 연통되는 볼트공(H)이 형성되고, 그 볼트공(H) 주연부에는 방사상으로 다수의 관통홀(321)이 형성된 플레이트(320)로 구성된 내장주 설치구(300a)로 구성할 수 있는 것이다.A bolt hole (H) is coupled to an upper portion of the closing cap 310 and communicates with the bolt hole (H) at the center thereof, and a plurality of through holes (321) are radially formed at a peripheral portion of the bolt hole (H). It can be configured as a built-in main installation hole (300a) consisting of a plate (320).

또한, 도 4의 도시와 같이 상기 가공중성지선 설치구(300)를, 하부에 상기 체결공(210)과 연통되는 제2체결공(311)이 형성되고 상부면에 복수의 볼트공(H)이 형성되고, 저면에 상기 볼트공(H)와 연통되는 너트체(312)가 일체 형성된 마감캡(310)과, In addition, as shown in Figure 4, the processing neutral branch wire installation hole 300, the second fastening hole 311 is formed in communication with the fastening hole 210 in the lower portion and a plurality of bolt holes (H) on the upper surface Is formed, the closing cap 310 is formed integrally with the nut body 312 communicated with the bolt hole (H) on the bottom,

상기 마감캡(310)의 상부에 결합되며 양단에 상기 볼트공(H)과 연통되는 볼트공(H)이 형성된 클램프(330)로 구성된 핀장주 설치구(300b)로 구성할 수 있는 것이다.It is coupled to the upper end of the cap 310 and can be configured as a pin holder main opening 300b consisting of a clamp 330 formed in both ends of the bolt hole (H) in communication with the bolt hole (H).

여기서, 상기 클램프(330)는, 상기 마감캡(310)의 상부면에 안착 고정되는 가이드편(331)과, 상기 가이드편(331)에 안착 설치되는 가공중성지선(20)을 덮어 고정하는 고정편(332)으로 구성된 것이며, 상기 가이드편(331)의 상부면과 고정편(332)의 하부면에는 서로 대항되는 안착홈(331a)(332a)이 형성되어 가공중성지선(20)이 내입되게 구성한 것이다.Here, the clamp 330 is fixed to cover and fix the guide piece 331 to be seated and fixed to the upper surface of the closing cap 310 and the processing neutral branch line 20 to be installed on the guide piece 331 It is composed of a piece 332, the upper surface of the guide piece 331 and the lower surface of the fixing piece 332 is formed with mounting grooves (331a, 332a) opposed to each other so that the processing neutral branch line 20 is embedded therein. It is made up.

또한, 도 5 및 도 6의 도시와 같이 가공중성지선 설치구(300)를, 하부의 수직부(345)와 상부의 수평부(346)가 직각 방향을 이루게 곡선 형상으로 절곡 형성된 중공 관형 편출 연결대(340)로 된 편출주 설치구(340)로 구성할 수 있는 것이다.In addition, as shown in Figs. 5 and 6, the hollow neutral wire connecting rod bent in a curved shape to form the processing neutral branch installation hole 300, the vertical portion 345 of the lower portion and the horizontal portion 346 of the upper portion at right angles. It can be configured as a plunging wine installation port 340 of 340.

여기서, 상기 편출 연결대(340)의 수직부(345)에는 제2체결공(341)이 형성되고, 수평부(346) 상부면에는 설치 브라켓(342)이 형성되고 하부면에는 접지선 인출공(343)이 형성된 것이다.Here, the second fastening hole (341) is formed in the vertical portion 345 of the unraveling connecting rod 340, the installation bracket 342 is formed on the upper surface of the horizontal portion 346, and the ground wire lead-out hole 343 on the lower surface ) Is formed.

이때, 상기 설치 브라켓(342)에는 볼트공(H)이 형성되고 저면에 상기 볼트공(H)와 연통되는 너트체(344)가 일체 형성되어 상기 내장주에 가공중성지선(20)을 설치시 사용되는 중앙에 볼트공(H)이 형성되고 그 볼트공(H)의 주연부에는 방사상으로 다수의 관통홀(321)이 형성된 플레이트(320)나, 상기 핀장주에 가공중성지선(20)을 설치시 사용되는 양단에 상기 볼트공(H)과 연통되는 볼트공(H)이 형성된 클램프(330)가 결합되게 구성할 수 있는 것이다.At this time, a bolt hole (H) is formed in the mounting bracket (342), and a nut body (344) communicating with the bolt hole (H) is integrally formed at the bottom thereof to install the processing neutral branch wire (20) in the interior column. Bolt hole (H) is formed in the center used and the plate 320 is formed with a plurality of through holes 321 radially in the peripheral portion of the bolt hole (H), or the processing neutral branch line 20 is installed in the pin length column The clamp 330 is formed to be coupled to both ends of the bolt hole (H) in communication with the bolt hole (H) to be used.

도면중 미설명부호 (30)은 전력선, (40)은 완금, (50)은 애자이다.In the figure, reference numeral 30 denotes a power line, 40 denotes a complete line, and 50 denotes an insulator.

이하, 상기와 같은 구성을 갖는 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡의 작용을 첨부된 도면을 참고하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the action of the multi-cap for neutral wire installation process having a pin-type assembly structure of the present invention having the configuration as described above will be described in detail.

본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡은, 배전선로에서 귀로 역할을 하는 가공지선과 불평형 전류 및 고장전류의 귀로 역할을 하는 특고압 중성선을 겸용하여 특고압 전력선의 낙뢰 차폐각을 확보하는 위치에 성치하는 특고압 가공중성지선의 설치가 용이하게 한 것으로, 특히, 착탈 가능한 가공중성지선 설치구에 의해 내장주, 핀장주, 편출주 등 다양한 장주에 교체 사용이 가능게 한 것으로, The multi-cap for the neutral neutral wire installation having a pin-type assembly structure of the present invention combines the overhead earth wire serving as an ear in a distribution line and an extra-high voltage neutral wire serving as an unbalanced current and fault current. It is easy to install the special high-pressure processing neutral wire which is placed in the secured position, and in particular, it is possible to replace and use it in various poles such as built-in column, pin length column, and uneven column by detachable processing neutral branch line installation hole.

먼저, 그 설치관계를 살펴보면, 본 발명 멀티캡(1)은, 전주(10)의 상단에 가공중성지선(20)을 설치하기 위한 것으로, 멀티캡 본체(100)에 의해 가공중성지선(20)을 설치하고자 하는 전주(10)의 상단에 씌우면 되는 것이다.First, looking at the installation relationship, the present invention the multi-cap (1) is to install the processing neutral branch line 20 on the upper end of the pole 10, the processing neutral branch line 20 by the multi-cap body 100 It is to cover the top of the pole 10 to be installed.

이후, 그 하부 주연부에 형성된 체결 브라켓(121)으로 된 3방향 조임구(120)에 의해 조임으로 견고한 결합 설치가 가능한 것이다.Then, by the three-way fasteners 120 made of a fastening bracket 121 formed on the lower periphery of the tightening installation is possible.

이상과 같이 설치된 멀티캡 본체(100)에는 가공중성지선(20)이 설치되는 것인바, 설치되는 가공중성지선(20)은 장주의 종류에 따라 크게 내장주(각도주), 핀장주(직선주), 편출주(편출장주)에 따라 그 설치 방법이 다양하게 적용되는 것이다.The processing neutral branch line 20 is installed in the multi-cap main body 100 installed as described above, the processing neutral branch line 20 to be installed is largely built-in column (angle column), pin length column (straight column column) ), The installation method is variously applied according to the splinter.

이때, 도 7은 본 발명 멀티캡(1)을 내장주(각도주)에 설치되는 가공중성지선에 적용시를 나타낸 실시예로서, 이때, 멀티캡 본체(100)의 연결관(200)에는 내장주 설치구(300a)가 설치되는 것이다.At this time, Figure 7 is an embodiment showing the application of the present invention multi-cap (1) to the processing neutral branch line installed in the built-in column (angle column), in this case, the built-in pipe 200 of the multi-cap body 100 The main installation port (300a) is to be installed.

즉, 연결관(200)의 상단에는 마감캡(310)이 씌워져 체결공(210) 및 제2체결공(311)을 통해 볼트(B)와 너트(N)로 체결하고, 상기 마감캡(310)의 상부면에는 볼트공(H)를 통해 플레이트(320)를 볼트(B) 및 너트체(312)로 결합하면 되는 것이다.That is, the upper end of the connection pipe 200 is covered with a closing cap 310 to fasten with the bolt (B) and the nut (N) through the fastening hole 210 and the second fastening hole 311, the closing cap 310 The upper surface of the) is to combine the plate 320 with the bolt (B) and the nut body 312 through the bolt hole (H).

이후, 가공중성지선(20)을 설치시에는, 양측 가공중성지선(20) 각각의 단부에는 데드엔드클램프(330)가 결합되는 것인바, 그 데드엔드클램프(330)에 의해 플레이트(320)의 관통홀(321)에 체결하면 되는 것이며, 설치된 양측의 가공중성지선(20)은 점프선(70)에 의해 연결하면 되는 것이다.Subsequently, when installing the processing neutral branch line 20, the end end clamp 330 is coupled to each end of each of the processing neutral branch line 20, the dead end of the plate 320 by the clamp 330 What is necessary is just to fasten to the through-hole 321, and the process neutral branch line 20 of both sides installed may be connected by the jump line 70. FIG.

이때, 상기 가공중성지선(20)은, 그 선로의 각도에 따라 다수의 관통홀(321)에 선택적으로 설치하면 되는 것으로, 연속하여 설치되는 전주(10)의 설치 방향에 따라 조절 가능한 것이다.At this time, the processing neutral branch line 20 is to be selectively installed in a plurality of through holes 321 according to the angle of the track, it is possible to adjust according to the installation direction of the electric pole 10 is installed continuously.

또한, 도 8은 본 발명 멀티캡(1)을 핀장주(직선주)에 설치되는 가공중성지선(20)에 적용시를 나타낸 실시예로서, 이때, 멀티캡 본체(100)의 연결관(200)에는 핀장주 설치구(300b)가 설치되는 것이다.In addition, Figure 8 is an embodiment showing the application of the present invention multi-cap (1) to the processing neutral branch line 20 is installed in the pin length column (straight column), in this case, the connection pipe 200 of the multi-cap body 100 ) Is to be installed pin pin holder (300b).

즉, 연결관(200)의 상단에는 마감캡(310)이 씌워져 체결공(210) 및 제2체결공(311)을 통해 볼트(B)와 너트(N)로 체결하고, 상기 마감캡(310)의 상부면에는 클램프(330)를 볼트(B) 및 너트체(312)로 결합하면 되는 것으로, 상기 클램프(330)를 이용하여 가공중성지선(20)을 설치하면 되는 것이다.That is, the upper end of the connection pipe 200 is covered with a closing cap 310 to fasten with the bolt (B) and the nut (N) through the fastening hole 210 and the second fastening hole 311, the closing cap 310 The clamp 330 may be coupled to the upper surface of the bolt by the bolt B and the nut 312, and the neutral neutral wire 20 may be installed using the clamp 330.

상세히 설명하면, 상기 마감캡(310)의 상부면에는 클램프(330)의 가이드편(331)이 안착되는 것이며, 그 가이드편(331)의 상부 안착홈(331a)에는 가공중성지선(20)이 안착되는 것이다.In detail, the guide piece 331 of the clamp 330 is seated on the upper surface of the closing cap 310, and the processing neutral branch line 20 is formed on the upper seating groove 331a of the guide piece 331. It is settled.

이후, 상기 가공중성지선(20)의 상부에는 클램프(330)의 고정편(332)을 안착홈(312a)에 의해 가공중성지선(20)을 덮고 볼트(B) 및 너트체(312)로 체결하면 되는 것으로, 이때 가공중성지선(20)은 가이드편(331)과 고정편(332)의 사이에 개재됨으로 그 설치가 이루어지는 것이다. Subsequently, the fixing piece 332 of the clamp 330 is covered on the processing neutral branch line 20 by the mounting groove 312a on the upper portion of the processing neutral branch line 20 and fastened to the bolt B and the nut body 312. In this case, the processing neutral branch line 20 is interposed between the guide piece 331 and the fixed piece 332, the installation is made.

한편, 내장주나 핀장주에 설치되는 가공중성지선(20)에는 접지선(80)이 인출되어 전주(10)의 지중 접지근가(도면중 미도시함)과 연결되는 것으로, 이때, 접지선(80)은 멀티캡 본체(100)에 형성된 접지선 인출공(110)을 통해 전주(10) 내부로 유입 및 지중으로 연결되는 것이다.Meanwhile, the ground neutral wire 80 is drawn out to the processing neutral ground wire 20 installed in the built column or the pin length column, and is connected to the ground ground root of the electric pole 10 (not shown in the drawing). In this case, the ground wire 80 is Through the ground wire lead-out hole 110 formed in the multi-cap body 100 is to be introduced into the pole 10 and underground.

또한, 본 발명 멀티캡(1)을 편출주(편출장주)에 설치되는 가공중성지선(20)에 적용시에는, 멀티캡 본체(100)의 연결관(200)에는 편출 연결대(340)로 된 편출주 설치구(340)가 설치되는 것이다.In addition, when the present invention multi-cap (1) is applied to the processing neutral branch line 20 is installed in the uneven column (unfolded column column), the connection pipe 200 of the multi-cap main body 100 as an uneven connecting rod 340 The uneven liquor installation port 340 is installed.

즉, 편출 연결대(340)는, 수직부(345)를 이용하여 연결관(200)에 삽입 및 연결관(200)의 체결공(210)과 수직부(345)의 제2체결공(341)을 통해 볼트(B) 및 너트(N)로 결합하면 되는 것으로, 이때 편출 연결대(340)의 상단 수평부(346)는 전력선(30)이 연결되는 완금(40)과 동일한 방향으로 전주(10)의 일측으로 편출되게 설치하면 되는 것이다.That is, the deflection connecting table 340 is inserted into the connecting pipe 200 using the vertical part 345 and the fastening hole 210 of the connecting pipe 200 and the second fastening hole 341 of the vertical part 345. Through the bolt (B) and the nut (N) through the upper horizontal portion 346 of the gripping connection 340 is the electric pole 10 in the same direction as the stub 40 to which the power line 30 is connected. You just have to install one side of the side.

이때, 상기 연결관(200)은, 편출 연결대(340)의 견고한 지지력을 부여하게 되는 것이다.At this time, the connecting pipe 200 is to give a solid support force of the uncoupling connecting table (340).

한편, 편출주(편출장주)에 가공중성지선(20)을 설치시에는 그 설치방법에 따라 편출내장주(편출각도주)와, 편출핀장주(편출직선주)에 따라 그 설치 방법이 다르게 형성된 것인바,On the other hand, when installing the processing neutral branch wire 20 on the uneven column (unfolded column), the installation method is different depending on the unfolded embedded column (unfolded angle column) and uneven pin length column (unfolded straight column column) according to the installation method. Formed,

도 9의 도시와 같이 편출내장주에 적용시에는, 그 편출 연결대(340)의 상부에 형성된 설치 브라켓(342)의 상부에 플레이트(320)를, 볼트공(H)을 통해 볼트(B) 및 너트체(344)를 이용하여 설치하면 되는 것이다.When applied to the built-in slipper, as shown in Figure 9, the plate 320 on the top of the mounting bracket 342 formed on the top of the slipper connecting rod 340, the bolt (B) and through the bolt hole (H) What is necessary is just to install using the nut body 344.

이후, 그 플레이트(320)에 가공중성지선(20)을 설치하면 되는 것으로, 이때, 가공중성지선(20)의 단부는 데드엔드클램프(330)를 이용하여 마감 후 그 데드엔드클램프(60)를 이용하여 플레이트(320)의 관통홀(321)에 선택적으로 체결하면 되는 것이며, 설치된 양측의 가공중성지선(20)은 점프선(70)에 의해 연결하면 되는 것이다.Subsequently, the neutral neutral wire 20 may be installed on the plate 320. At this time, the end of the neutral neutral wire 20 is closed using the dead end clamp 330, and then the dead end clamp 60 is closed. It can be fastened selectively to the through-hole 321 of the plate 320 by using, and the processing neutral branch line 20 on both sides of the plate 320 may be connected by a jump line 70.

또한, 도 10의 도시와 같이 편출핀장주에 적용시에는, 그 편출 연결대(340)의 상부에 형성된 설치 브라켓(342)의 상부에 클램프(330)를 볼트공(H)과 볼트공(H)을 통해 볼트(B)를 이용하여 설치 및 가공중성지선(20)을 설치하면 되는 것이다.In addition, when applied to the uneven pin pin as shown in Figure 10, the clamp 330 to the upper portion of the mounting bracket 342 formed on the upper portion of the unfolding connecting rod 340, bolt holes (H) and bolt holes (H) By using the bolt (B) is to install and install the neutral neutral wire (20).

즉, 상기 마감캡(310)의 상부면에는 클램프(330)의 가이드편(331)이 안착되는 것이며, 그 가이드편(331)의 상부 안착홈(331a)에는 가공중성지선(20)이 안착되는 것이다.That is, the guide piece 331 of the clamp 330 is seated on the upper surface of the closing cap 310, the processing neutral branch line 20 is seated in the upper seating groove 331a of the guide piece 331. will be.

이후, 상기 가공중성지선(20)의 상부에는 클램프(330)의 고정편(332)을 안착홈(332a)에 의해 가공중성지선(20)을 덮고 볼트(B) 및 너트체(344)를 체결하면 되는 것으로, 이때 가공중성지선(20)은 가이드편(331)과 고정편(332)의 사이에 개재됨으로 그 설치가 이루어지는 것이다. Subsequently, the fixing piece 332 of the clamp 330 covers the processing neutral branch line 20 by the mounting groove 332a on the upper portion of the processing neutral branch line 20 and fastens the bolt B and the nut body 344. In this case, the processing neutral branch line 20 is interposed between the guide piece 331 and the fixed piece 332, the installation is made.

한편, 가공중성지선(20)에는 접지선(80)이 인출되어 전주(10)의 지중 접지근가(도면중 미도시함)과 연결되는 것으로, 이때, 접지선(80)은 편출 연결대(340)의 상단에 형성된 접지선 인출공(343)을 통해 전주(10) 내부로 유입 및 지중으로 연결되는 것이다.On the other hand, the processing neutral ground wire 20 is drawn out to the ground wire 80 is connected to the ground ground approximation (not shown in the figure) of the electric pole 10, in this case, the ground wire 80 is the top of the unfolding connecting rod 340 It is connected to the inflow and underground into the electric pole 10 through the ground wire drawing hole (343) formed in the.

이상과 같이 본 발명 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡은, 전주의 상단에 설치되는 하나의 멀티캡 본체에 내장주 설치구, 핀장주 설치구, 편출주 설치구 등 장주의 종류에 따라 가공중성지선을 설치하기 위한 설치구를 선택적으로 착탈 사용하게 함으로 그 멀티캡의 효율성의 향상 및 그 멀티캡 제작에 따른 제작 원가 및 이로 인한 가공중성지선 시공에 따른 비용의 절감을 가져올 수 있는 것이다.
As described above, the multi-cap for the neutral neutral wire installation of the present invention having a pin-type prefabricated structure may be used in a multi-cap main body installed at the upper end of a pole, such as a built-in column mounting pin, a pin rod mounting hole, and a flat rod mounting hole. Therefore, by selectively attaching and removing the installation tool for installing the neutral neutral wire, it is possible to improve the efficiency of the multicap and to reduce the manufacturing cost and the cost of the neutral neutral wire construction. .

1 : 멀티캡 10 : 전주
20 : 가공중성지선 30 : 전력선
40 : 완금 50 : 애자
60 : 데드엔드클램프 70 : 점프선
80 : 접지선 100 : 멀티캡 본체
110 : 접지선 인출공 120 : 조임구
200 : 연결관 210 : 체결공
300 : 가공중성지선 설치구 310 : 마감캡
311 : 제2체결공 312 : 너트체
320 : 플레이트 321 : 관통홀
330 : 클램프 331 : 가이드편
332 : 고정편 331a,332a : 안착홈
340 : 편출 연결대 341 : 제2체결공
342 : 설치 브라켓 343 : 접지선 인출공
344 : 너트체 345 : 수직부
346 : 수평부 H : 볼트공
1: Multicap 10: Electric pole
20: processed neutral ground wire 30: power line
40: Completion 50: Insulator
60: dead end clamp 70: jump line
80: ground wire 100: multi-cap body
110: ground wire drawing hole 120: tightening hole
200: connector 210: fastening hole
300: processing neutral branch wire installation port 310: finishing cap
311: 2nd fastening hole 312: nut body
320: plate 321: through hole
330: clamp 331: guide piece
332: fixing piece 331a, 332a: seating groove
340: knitting connecting rod 341: second fastening work
342: mounting bracket 343: ground wire drawing hole
344: nut body 345: vertical part
346: horizontal portion H: bolt hole

Claims (5)

삭제delete 멀티캡 본체(100)의 외주면에 접지선 인출공(110)이 형성되고 상단에는 상부에 수평 관통된 체결공(210)을 갖는 일정 길이의 연결관(200)을 용접 연결 형성하고, 하부에는 조임구(120)를 형성하여 전주(10)의 상단에 결합가능하게 한 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡에 있어서,
연결관(200)의 상단에 가공중성지선 설치구(300)를 착탈되게 구성하되,
가공중성지선 설치구(300)를,
하부에 상기 체결공(210)과 연통되는 제2체결공(311)이 형성되고 상부면에 볼트공(H)이 형성되며 저면에 볼트공(H)과 연통되는 너트체(312)가 형성된 마감캡(310)과, 상기 마감캡(310)의 상부에 결합되며 중앙에 상기 볼트공(H)과 연통되는 볼트공(H)이 형성되고 그 주연부에는 방사상으로 다수의 관통홀(321)이 형성된 플레이트(320)로 구성하되,
내장주에 가공중성지선(20)을 설치시, 상기 연결관(200)의 상단에 마감캡(310)이 씌워져 볼트(B)와 너트(N)로 체결되고, 상기 마감캡(310)의 상부면에는 플레이트(320)가 볼트(B)로 결합되는 내장주 설치구(300a)로 구성함을 특징으로 하는 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡.
The ground wire lead-out hole 110 is formed on the outer circumferential surface of the multi-cap body 100 and a connection pipe 200 having a predetermined length having a fastening hole 210 horizontally formed thereon is formed at the upper end thereof, and a tightening hole is formed at the bottom thereof. In the multi-cap for installing the neutral neutral wire having a pin-type prefabricated structure formed 120 to be coupled to the upper end of the pole 10,
To be detachable to the processing neutral branch wire installation port 300 on the top of the connection pipe 200,
Processing neutral wire installation hole (300),
The second fastening hole 311 is formed in communication with the fastening hole 210 at the lower end of the bolt hole (H) is formed on the upper surface and the nut body 312 is formed in communication with the bolt hole (H) on the bottom Cap 310 and a bolt hole (H) coupled to the upper portion of the closing cap 310 and in communication with the bolt hole (H) is formed in the center and a plurality of through holes 321 formed radially in the peripheral portion thereof. Consists of a plate 320,
When installing the processing neutral branch line 20 in the inner circumference, the closing cap 310 is covered on the upper end of the connecting pipe 200 is fastened with a bolt (B) and nut (N), the upper portion of the closing cap 310 On the surface, the plate 320 is a multi-cap for the installation of the processing neutral branch line having a pin-type prefabricated structure, characterized in that it consists of a built-in main installation hole (300a) coupled to the bolt (B).
제 2항에 있어서,
가공중성지선 설치구(300)를,
하부에 상기 체결공(210)과 연통되는 제2체결공(311)이 형성되고 상부면에 복수의 볼트공(H)이 형성되며 저면에 볼트공(H)과 연통되는 너트체(312)가 형성된 마감캡(310)과, 상기 마감캡(310)의 상부에 결합되며 양단에 상기 볼트공(H)과 연통되는 볼트공(H)이 형성된 클램프(330)로 구성하되,
핀장주에 가공중성지선(20)을 설치시, 상기 연결관(200)의 상단에 마감캡(310)이 씌워져 볼트(B)와 너트(N)로 체결되고, 상기 마감캡(310)의 상부면에는 클램프(330)가 볼트(B)로 결합되는 핀장주 설치구(300b)로 구성함을 특징으로 하는 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡.
The method of claim 2,
Processing neutral wire installation hole (300),
A second fastening hole 311 is formed in communication with the fastening hole 210 in the lower portion is formed a plurality of bolt holes (H) on the upper surface and the nut body 312 is in communication with the bolt hole (H) on the bottom Consists of the formed closing cap 310, the clamp 330 is coupled to the upper end of the closing cap 310 and the bolt hole (H) formed in communication with the bolt hole (H) at both ends,
When installing the processing neutral branch line 20 in the pin length, the closing cap 310 is covered on the upper end of the connecting pipe 200 is fastened with a bolt (B) and nut (N), the upper portion of the closing cap 310 The multi-cap for installation of processing neutral branch line having a pin-type prefabricated structure, characterized in that the clamp 330 is composed of a pin holder main opening 300b coupled to the bolt (B).
제 3항에 있어서,
클램프(330)는,
상기 마감캡(310)의 상부면에 안착 고정되는 가이드편(331)과, 상기 가이드편(331)에 안착 설치되는 가공중성지선(20)을 덮어 고정하는 고정편(332)으로 구성하되,
상기 가이드편(331)의 상부면과 고정편(332)의 하부면에는 서로 대항되는 안착홈(331a)(332a)이 형성되어 가공중성지선(20)이 내입되게 구성함을 특징으로 하는 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡.
The method of claim 3,
The clamp 330 is,
Consists of a guide piece 331 that is seated and fixed to the upper surface of the closing cap 310, and a fixing piece 332 to cover and fix the processing neutral branch line 20 to be installed on the guide piece 331,
The upper surface of the guide piece 331 and the lower surface of the fixing piece 332 is formed with recessed grooves 331a, 332a facing each other is formed so that the processing neutral branch line 20 is embedded in the pin type Multi-cap for installation of overhead neutral wires with prefabricated structure.
제 2항 내지 4항 중의 한 항에 있어서,
가공중성지선 설치구(300)를,
수직부(345)와 수평부(346)가 직각 방향을 이루게 곡선 형상으로 절곡 형성된 중공 관형 편출 연결대(340)로 된 편출주 설치구(340)로 구성하되,
상기 편출 연결대(340)의 하부에는 제2체결공(341)이 형성되고, 상단 상부면에는 설치 브라켓(342)이 형성되고, 하부면에는 접지선 인출공(343)이 형성되며, 상기 설치 브라켓(342)에는 상부에 볼트공(H)이 형성되고 하부에 상기 볼트공(H)과 연통되는 너트체(344)가 형성되어 플레이트(320)나 클램프(330)가 결합되게 구성함을 특징으로 하는 핀타입 조립식 구조를 갖는 가공중성지선 설치용 멀티캡.
The method according to any one of claims 2 to 4,
Processing neutral wire installation hole (300),
The vertical portion 345 and the horizontal portion 346 is composed of a hollow column installation 340 made of a hollow tubular biasing connecting rod 340 formed in a curved shape to form a right angle direction,
A second fastening hole 341 is formed at a lower portion of the easy connection connecting rod 340, an installation bracket 342 is formed at an upper upper surface thereof, and a ground wire drawing hole 343 is formed at a lower surface thereof, and the installation bracket ( 342 has a bolt hole (H) is formed on the top and the nut body 344 is formed in communication with the bolt hole (H) at the bottom is characterized in that the plate 320 or the clamp 330 is configured to be coupled Multi-cap for the installation of overhead neutral wires with a pin-type assembly structure.
KR1020110082037A 2011-08-18 2011-08-18 Multi-cap for installing overrhead earthwire combined with neutral line KR101205710B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110082037A KR101205710B1 (en) 2011-08-18 2011-08-18 Multi-cap for installing overrhead earthwire combined with neutral line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110082037A KR101205710B1 (en) 2011-08-18 2011-08-18 Multi-cap for installing overrhead earthwire combined with neutral line

Publications (1)

Publication Number Publication Date
KR101205710B1 true KR101205710B1 (en) 2012-11-28

Family

ID=47565511

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110082037A KR101205710B1 (en) 2011-08-18 2011-08-18 Multi-cap for installing overrhead earthwire combined with neutral line

Country Status (1)

Country Link
KR (1) KR101205710B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015141894A1 (en) * 2014-03-19 2015-09-24 대원전기 주식회사 Method for constructing power distribution line by using combined overhead ground wire and extra high voltage neutral line having separated installation structure for extra high voltage neutral line and low voltage neutral line
KR102257451B1 (en) * 2021-04-20 2021-06-01 유한회사 대영글로벌 Electric pole system with inflow columnar transformer with arched top plate structure
KR102263712B1 (en) * 2021-04-20 2021-06-11 유한회사 대영글로벌 Power pole integrated small-scale wind power generation system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200340612Y1 (en) * 2003-10-31 2004-02-11 한국전력공사 Combination type earth line supporter

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200340612Y1 (en) * 2003-10-31 2004-02-11 한국전력공사 Combination type earth line supporter

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015141894A1 (en) * 2014-03-19 2015-09-24 대원전기 주식회사 Method for constructing power distribution line by using combined overhead ground wire and extra high voltage neutral line having separated installation structure for extra high voltage neutral line and low voltage neutral line
KR102257451B1 (en) * 2021-04-20 2021-06-01 유한회사 대영글로벌 Electric pole system with inflow columnar transformer with arched top plate structure
KR102263712B1 (en) * 2021-04-20 2021-06-11 유한회사 대영글로벌 Power pole integrated small-scale wind power generation system

Similar Documents

Publication Publication Date Title
KR101077083B1 (en) Multi-cap for installing overrhead earth wire combined with neutral line
KR101600293B1 (en) Insulator for overhead electric power distribution line
KR101205710B1 (en) Multi-cap for installing overrhead earthwire combined with neutral line
CN103437586B (en) Composite rotation cross-arm
CN208078525U (en) Three-phase conducting wire for distribution network live line work upright bar struts insulating frame
KR100843058B1 (en) High Voltage Cable Supporter
JP3237305U (en) High voltage power receiving device
KR20130014732A (en) Distribution line having optical fiber complex neutral line
CN203722126U (en) High voltage line bird repeller installation tool
KR101238683B1 (en) Slim multi-cap for installing overhead earthwire combined with neutral line having band-type clamp and high strength elastic bar
CN205211610U (en) Static contact gold utensil
KR101205711B1 (en) Multicap for intalling overhead neutral earth wire having fixing clamp and flange-type connector
CN211549044U (en) Stay bar
CN203589645U (en) Vertical bus supporting device
CN209526219U (en) Power ground column with high stability
KR20040074721A (en) Pro-environmatal electric pole safe from lightening and distributing method using the same
CN202949163U (en) Maintenance platform for tubular busbar post insulator
CN206205553U (en) Novel breaker switch bracket on a kind of post
CN111864543A (en) Power transformation framework
CN105977860A (en) Composite cross-arm insulator device and method for replacing overhead transmission line
CN204481368U (en) A kind of self-locking non-bolt fast-assembling gold utensil
CN206829749U (en) A kind of electric pole with cross-arm and cat ladder
CN205335800U (en) Wire insulated supporting plate device
CN204315981U (en) A kind of insulation-isolation baffle
CN114744548B (en) Insulating shielding cover for live replacement of tension insulator of power distribution cement pole vertical arrangement line and installation method of insulating shielding cover

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150622

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160621

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170703

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee