KR101190877B1 - The ground improvement device for cutoff wall and earths wall - Google Patents

The ground improvement device for cutoff wall and earths wall Download PDF

Info

Publication number
KR101190877B1
KR101190877B1 KR1020110011641A KR20110011641A KR101190877B1 KR 101190877 B1 KR101190877 B1 KR 101190877B1 KR 1020110011641 A KR1020110011641 A KR 1020110011641A KR 20110011641 A KR20110011641 A KR 20110011641A KR 101190877 B1 KR101190877 B1 KR 101190877B1
Authority
KR
South Korea
Prior art keywords
wall
main body
earth
ground
ground improvement
Prior art date
Application number
KR1020110011641A
Other languages
Korean (ko)
Other versions
KR20120091714A (en
Inventor
김진오
Original Assignee
무풍건설주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 무풍건설주식회사 filed Critical 무풍건설주식회사
Priority to KR1020110011641A priority Critical patent/KR101190877B1/en
Publication of KR20120091714A publication Critical patent/KR20120091714A/en
Application granted granted Critical
Publication of KR101190877B1 publication Critical patent/KR101190877B1/en

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F7/00Signs, name or number plates, letters, numerals, or symbols; Panels or boards
    • G09F7/02Signs, plates, panels or boards using readily-detachable elements bearing or forming symbols
    • G09F7/08Signs, plates, panels or boards using readily-detachable elements bearing or forming symbols the elements being secured or adapted to be secured by means of grooves, rails, or slits
    • G09F7/10Signs, plates, panels or boards using readily-detachable elements bearing or forming symbols the elements being secured or adapted to be secured by means of grooves, rails, or slits and slideably mounted
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F7/00Signs, name or number plates, letters, numerals, or symbols; Panels or boards
    • G09F7/18Means for attaching signs, plates, panels, or boards to a supporting structure
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F7/00Signs, name or number plates, letters, numerals, or symbols; Panels or boards
    • G09F7/18Means for attaching signs, plates, panels, or boards to a supporting structure
    • G09F2007/1847Brackets to grip the sign board
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F7/00Signs, name or number plates, letters, numerals, or symbols; Panels or boards
    • G09F7/18Means for attaching signs, plates, panels, or boards to a supporting structure
    • G09F2007/1873Means for attaching signs, plates, panels, or boards to a supporting structure characterised by the type of sign
    • G09F2007/1891Means for attaching signs, plates, panels, or boards to a supporting structure characterised by the type of sign modular

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

본 발명은 지반에 구멍을 천공하고, 천공된 구멍에 개량제를 투입하는 것을 순차적으로 반복하여 차수벽 혹은 토류벽을 형성할 때 사용하는 차수벽 및 토류벽용 지반 개량장치에 관한 것으로서, 굴삭기 및 바이브로함마와 결합하여 사용할 수 있으며, 좁은 공간에서도 효율적인 작업이 가능하도록 한 차수벽 및 토류벽용 지반 개량장치를 제공코자 하는 것이다.
즉, 본 발명은 지반에 구멍(A)을 천공하고, 천공된 구멍(A)에 개량제(B)를 투입하는 것을 순차적으로 반복하여 차수벽 및 토류벽(C)을 형성할 때 사용하는 차수벽 및 토류벽용 지반 개량장치(1)에 있어서;
H빔 또는 I빔 구성의 본체(2)와; 상기 본체(2)의 하단에 파쇄 및 교반을 행할 수 있도록 형성한 교반날개(4)와; 상기 본체(2)의 상측에 고정되는 서포터(3)에 굴삭기 아암(10) 선단의 버킷 고정용 걸이에 걸림되도록 걸림핀(3a)을 결합하거나;
H빔 또는 I빔 구성의 본체(2)와; 상기 본체(2)의 하단에 파쇄 및 교반을 행할 수 있도록 형성한 교반날개(4)와; 상기 본체(2)의 상측으로 바이브로함마(20)와 결합되는 브래킷(9)을 돌출되게 형성하였다.
The present invention relates to a ground improvement device for an order wall and a soil wall used to form a water or earth wall by sequentially repeating a hole in the ground and injecting a modifier into the punched hole, and combining it with an excavator and a vibro hammer. The present invention aims to provide a ground improvement device for the order wall and the earth wall to enable efficient work in a narrow space.
That is, the present invention is for the order wall and earth wall for use in forming the order wall and the earth wall (C) by successively repeating the hole (A) in the ground and the addition of the modifier (B) to the punched hole (A) sequentially In the ground improving apparatus 1;
A main body 2 of an H beam or I beam configuration; A stirring blade 4 formed at the lower end of the main body 2 to be crushed and stirred; Engaging a locking pin (3a) to the supporter (3) fixed to the upper side of the main body (2) to be hooked to the bucket fixing hook of the tip of the excavator arm (10);
A main body 2 of an H beam or I beam configuration; A stirring blade 4 formed at the lower end of the main body 2 to be crushed and stirred; A bracket 9 coupled to the vibro hammer 20 is formed to protrude above the main body 2.

Description

차수벽 및 토류벽용 지반 개량장치{The ground improvement device for cutoff wall and earths wall}The ground improvement device for cutoff wall and earths wall}

본 발명은 지반에 구멍을 천공하고, 천공된 구멍에 개량재를 투입하는 것을 순차적으로 반복하여 차수벽 혹은 토류벽을 형성할 때 사용하는 차수벽 및 토류벽용 지반 개량장치에 관한 것으로서, 보다 구체적으로는 굴삭기 및 바이브로함마와 결합하여 사용할 수 있으며, 좁은 공간에서도 효율적인 작업이 가능하도록 한 차수벽 및 토류벽용 지반 개량장치를 제공코자 하는 것이다.
The present invention relates to a ground improvement device for an order wall and an earth wall, which is used to sequentially form a water repellent wall or an earth wall by repeatedly drilling a hole in the ground and injecting an improved material into the drilled hole, and more specifically, an excavator and It is intended to provide a ground improvement device for the order wall and the earth wall that can be used in combination with a vibro hammer and enable efficient work even in a narrow space.

각종 토목공사를 위해서 지하 터파기 공사를 행할 시에는 차수벽 및 토류벽을 시공하게 되는데, 이들 작업은 대부분 오거머신 등을 이용하여 지반에 구멍을 천공하고, 천공된 구멍에 개량제를 투입하는 것을 순차적으로 반복하여 차수벽 및 토류벽을 형성하게 된다.In case of underground excavation work for various civil works, order wall and earth wall will be constructed. Most of these works are carried out by sequentially drilling holes in the ground by using auger machines and injecting modifiers into the drilled holes. Thus, the order wall and the earth wall are formed.

상기와 같은 방법으로 도 1과 같이 차수벽 및 토류벽의 형성은 이웃하는 구멍이 겹쳐지도록 연속적으로 구멍을 천공하고 개량제를 투입하는데, 천공되는 구멍의 수직도 불량으로 도시된 바와 같이 이웃하는 구멍이 상단에서는 서로 겹친 상태이나 하단으로 갈수록 상호 이경되어 공간이 형성되고 그로 인해 지반개량 불량으로 차수벽 및 토류벽의 기능성을 상실하게 되는 등의 불량 시공이 많았다.As described above, as shown in FIG. 1, the order wall and the earth wall are formed by continuously drilling holes and introducing a modifier so that neighboring holes overlap. As shown in FIG. There was a lot of poor construction, such as overlapping with each other or toward the bottom, spaces were formed by mutually shifting, resulting in loss of functionality of the order walls and earth walls due to poor ground improvement.

또한 이러한 불량 시공의 경우 터파기 등을 하지 않은 상태에서는 확인이 불가능하였으며, 공사 중 상기한 바와 같은 지반개량 불량이 확인될 경우 지반개량 작업을 재차 행해야 하는 불편이 있었던 바, 토목 업계에서는 이러한 문제점을 일소할 수 있는 장비의 보급이 요구되고 있는 실정이었다.
In addition, in the case of such a poor construction was not confirmed without breaking, etc., if the ground improvement defect is confirmed during the construction, it was inconvenient to perform the ground improvement work again. The situation was required to supply equipment that can be erased.

이에 본 발명에서는 구성이 간단하면서도 천공된 구멍의 수직도 불량으로 인한 차수벽 및 토류벽의 불량 시공을 일소할 수 있도록 본 발명을 연구 개발한 것으로서, 본 발명에서는 굴삭기 및 바이브로함마와 결합하여 사용할 수 있으며, 좁은 공간에서도 효율적인 작업이 가능하도록 한 차수벽 및 토류벽용 지반 개량장치를 제공함에 고안의 기술적 과제를 두고 본 발명을 완성한 것이다.
Therefore, in the present invention, the present invention has been researched and developed to simplify the construction of the order wall and the earth wall due to the poor verticality of the perforated hole, but the present invention can be used in combination with an excavator and a vibro hammer. The present invention has been completed with the technical problem of devising to provide a ground improvement device for the order wall and the earth wall to enable efficient work even in a narrow space.

과제 해결수단으로 본 발명에서는 오거머신 등을 이용하여 지반에 구멍을 천공하고, 천공된 구멍에 개량제를 투입하는 방법을 순차적으로 반복하여 차수벽 및 토류벽을 형성하는 공사현장에서 사용할 수 있도록 특별하게 구성한 것으로서, 본 발명에서는 굴삭기 또는 바이브로함마에 선택적으로 결합하여 사용할 수 있게 하였다.In the present invention as a means for solving the problem as a special configuration to be used in the construction site to form a wall and earth wall by sequentially repeating the method of drilling a hole in the ground by using an auger machine, and put a modifier to the perforated hole In the present invention, it was possible to selectively use in combination with an excavator or Vibrohamma.

굴삭기에 결합토록 한 예로는 H빔 또는 I빔 구성의 본체 하단에 파쇄 및 교반을 행할 수 있는 교반날개를 양측으로 형성하고, 본체의 상측으로는 굴삭기 아암의 선단에 버킷 고정용 핀에 걸림되도록 일반적인 버킷에 형성된 것과 같은 걸림구를 형성하였다.One example of coupling to an excavator is to form stirring blades capable of being crushed and agitated at the bottom of the main body of the H-beam or I-beam configuration, and to the upper side of the main body so as to be caught by a bucket fixing pin at the tip of the excavator arm. A catch such as formed in the bucket was formed.

또한 상기 걸림구 고정판을 본체에서 회동 가능한 구성으로 결합하여 굴삭기의 위치에 관계없이 사용이 가능하게 하였다.In addition, the engaging lock plate is coupled to the rotatable configuration in the body to enable use regardless of the position of the excavator.

그리고 바이브로함마에 결합토록 한 예로는 H빔 또는 I빔 구성의 본체의 하단에 파쇄 및 교반을 행할 수 있는 교반날개를 양측으로 형성하고, 본체의 상측으로는 바이브로함마와 결합되는 브래킷을 돌출되게 형성하였다.
And one example to be coupled to the Vibrohamma is formed on both sides of the stirring blades that can be broken and agitated at the lower end of the main body of the H-beam or I-beam configuration, protruding the bracket coupled to the Vibrohamma on the upper side of the main body Formed.

본 발명에서 제공하는 차수벽 및 토류벽용 지반 개량장치를 사용할 경우 오거머신 등을 이용하여 지반에 구멍을 천공할 때 구멍의 수직도 불량이 발생하더라도, 개량제를 투입한 상태에서 본 발명을 양측 구멍에 걸쳐지도록 승강시키면 본체 하부의 교반날개에 의해 천공불량 부분을 허물어뜨려 양측 개량제가 유통되면서 섞여 혼합되어 차수벽 및 토류벽의 불량 시공을 일소할 수 있는 것이다.In the case of using the ground improvement device for the order wall and the earth wall provided by the present invention, even if the verticality of the hole occurs when drilling the hole in the ground using an auger machine or the like, the present invention is applied to both sides of the hole in the state where the modifier is added. Ascending and lowering will break down the poor perforated portion by the stirring blade at the bottom of the main body, and the two side modifiers will be mixed and mixed while being used to clean the poor construction of the order wall and the earth wall.

또한 본 발명은 굴삭기 등에 결합하여 사용할 수 있고, 특히 진입이 어려운 좁은 장소에서 굴삭기의 턴(회전)이 어렵더라도 본체를 쉽게 회동시켜 이웃하는 양측 구멍에 겹쳐지게 투입할 수 있어 도심지의 좁은 골목길 등에서 매우 유용하게 사용될 수 있는 것이다.
In addition, the present invention can be used in combination with an excavator, and even in a narrow place difficult to enter, even if the excavator is difficult to turn (rotation), the main body can be easily rotated to be superimposed on both sides of the neighboring holes, such as in narrow alleyways of the city It can be useful.

도 1은 종래 지반에 구멍을 천공하여 개량제를 투입하는 방법으로 차수벽 및 토류벽을 형성한 예를 보인 평면도 및 단면도
도 2는 본 발명에서 제공하는 차수벽 및 토류벽용 지반 개량장치의 바람직한 일 실시예로 굴삭기에 결합하도록 구성한 예를 보인 사시도
도 3은 본 발명 차수벽 및 토류벽용 지반 개량장치를 굴삭기에 결합한 예를 보인 요부 발췌 측단면도
도 4는 도 2의 저면도
도 5는 본 발명에서 제공하는 차수벽 및 토류벽용 지반 개량장치의 다른 실시예로 바이브로함마에 결합하는 예를 보인 요부 발췌 측단면도
도 6은 지반에 구멍을 천공하여 개량제를 투입함과 아울러 본 발명에서 제공하는 차수벽 및 토류벽용 지반 개량장치로 지반을 개량한 예를 보인 평면도 및 단면도
1 is a plan view and a cross-sectional view showing an example in which the order wall and the earth wall are formed by a method of inserting a modifier by drilling a hole in a conventional ground;
Figure 2 is a perspective view showing an example configured to be coupled to the excavator as a preferred embodiment of the ground improvement device for the order wall and earth wall provided in the present invention
Figure 3 is an excerpt side cross-sectional view showing an example of the present invention coupled to the excavator ground and earth improvement device for earth walls
4 is a bottom view of FIG. 2
Figure 5 is a side cross-sectional view showing the main portion extract example showing the coupling to Vibrohamma as another embodiment of the ground improvement device for the order wall and earth wall provided in the present invention
6 is a plan view and a cross-sectional view showing an example in which the ground is improved with a ground improving device for a water barrier wall and a earth wall provided by the present invention while injecting a modifier by drilling holes in the ground.

이하에서 본 발명에서 제공하는 차수벽 및 토류벽용 지반 개량장치 실시예를 첨부 도면에 의거하여 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT Hereinafter, an embodiment of a ground improvement device for an order wall and an earth wall provided by the present invention will be described with reference to the accompanying drawings.

도 2는 본 발명에서 제공하는 차수벽 및 토류벽용 지반 개량장치의 바람직한 일 실시예로 굴삭기에 결합하도록 구성한 예를 보인 사시도를 도시한 것이고, 도 3은 본 발명 차수벽 및 토류벽용 지반 개량장치를 굴삭기에 결합한 예를 보인 요부 발췌 측단면도, 도 4는 도 2의 저면도를 도시한 것이다.Figure 2 shows a perspective view showing an example configured to be coupled to the excavator as a preferred embodiment of the ground improvement device for the order wall and earth wall provided in the present invention, Figure 3 is a ground improvement device for the order wall and earth wall of the present invention to an excavator Fig. 4 is a side cross-sectional view showing the main portion extracted from the combined example, and Fig. 4 shows the bottom view of Fig. 2.

본 발명에서 제공하는 차수벽 및 토류벽용 지반 개량장치(1)는 오거머신 등을 이용하여 지반에 구멍(A)을 천공하고, 천공된 구멍(A)에 개량제(B)를 투입하는 것을 순차적으로 반복하여 차수벽 및 토류벽(C)을 형성할 때 사용될 수 있도록 특별하게 제작한 것이다.In the ground improvement device 1 for the order wall and the earth wall provided by the present invention, a hole A is drilled in the ground by using an auger machine and the like, and the reformer B is sequentially added to the drilled hole A. It is specially manufactured to be used when forming the order wall and the earth wall (C).

즉, 본 발명에서는 H빔 또는 I빔 구성의 본체(2)의 하단에 파쇄 및 교반을 행할 수 있는 교반날개(4)를 양측으로 형성하고, 본체(2)의 상측으로는 굴삭기 아암(10)의 선단에 형성되어 있는 버킷 고정용 걸이에 걸림되도록 일반적인 버킷에 형성된 것과 같은 구조로 본체(2)의 상측으로 서포터(3)에 서로 다른 높이를 갖도록 걸림핀(3a)을 결합하였다.That is, in the present invention, the stirring blade 4 capable of being crushed and stirred at the lower end of the main body 2 of the H beam or I beam configuration is formed on both sides, and the excavator arm 10 is located above the main body 2. The locking pins 3a are coupled to the supporter 3 to have different heights above the main body 2 in the same structure as that formed in the general bucket so as to be hooked to the bucket fixing hook formed at the tip of the main body 2.

상기 본체(2)는 2~10m 범위에서 제작함이 바람직하며, 10m이상 다양한 길이로 제공될 수도 있다.The body 2 is preferably manufactured in the range of 2 ~ 10m, it may be provided in various lengths of 10m or more.

상기 교반날개(4)는 본체(2)의 양측에 대칭되게 본체에 2개의 날개(4a)를 용접고정하고, 이들의 끝단을 간격유지판(4b)으로 상호 연결하며, 또한 본체(2)의 양쪽 측벽(2a) 하단을 지지판(5)로 상호 연결한 구성으로, 개량제(B) 등이 양쪽 날개(4a)와 지지판(5) 사이의 공간을 통과하면서 상호 교반하는 기능성을 제공하게 된다.The stirring blade 4 welds two wings 4a to the main body symmetrically on both sides of the main body 2, and interconnects their ends with a spacing plate 4b, and further With the configuration in which the lower ends of both sidewalls 2a are interconnected by the supporting plate 5, the modifier B and the like provide the functionality of mutual stirring while passing through the space between the two blades 4a and the supporting plate 5.

상기 걸림핀(3a)이 결합된 서포터(3)는 본체(2)의 상단에 고정되어 있은 플랜지(6)에 직접 고정할 수도 있으나, 본 발명에서는 서포터(3)를 회동판(7)에 고정하고, 플랜지(6)와 회동판(7)을 볼트와 너트(8)에 의해 조립되게 함으로 해서 걸림핀(3a)의 위치와 본체(2) 하측의 교반날개(4) 위치를 필요에 따라서 쉽게 변경할 수 있게 하였다.The supporter 3 to which the locking pin 3a is coupled may be directly fixed to the flange 6 fixed to the upper end of the main body 2, but in the present invention, the supporter 3 is fixed to the pivoting plate 7. By assembling the flange 6 and the rotating plate 7 with the bolts and nuts 8, the position of the locking pin 3a and the position of the stirring blade 4 below the main body 2 can be easily adjusted as necessary. I could change it.

즉 상기한 구성은 볼트와 너트(8)를 풀고 조이는 수고로움으로 본체(2)를 회동시킬 수 있는 것으로, 도심지의 좁은 골목 등 굴삭기의 턴이 어려운 지역에서 차수벽 및 토류벽(C) 작업이 이루어지더라도 본 발명의 지반개량장치(1)를 쉽게 적용할 수 있게 되는 것이다.That is, the above configuration can rotate the body (2) by the effort to loosen and tighten the bolts and nuts (8), the order wall and earth wall (C) work is not made in an area difficult to turn the excavator, such as narrow alleys in the downtown Even if the ground improvement apparatus 1 of the present invention can be easily applied.

도 5는 본 발명에서 제공하는 차수벽 및 토류벽용 지반 개량장치의 다른 실시예로 바이브로함마에 결합하는 예를 보인 요부 발췌 측단면도를 도시한 것으로서, 이는 상기와 같이 하단에 교반날개(4)가 형성된 본체(2)의 상단에 고정되어 있은 플랜지(6)에 바이브로함마(20)와 결합되는 브래킷(9)을 돌출되게 형성한 구성이다.5 is a side cross-sectional view showing an example of the excerpt showing the coupling to the Vibroham as another embodiment of the ground improvement device for the order wall and earth wall provided in the present invention, which has a stirring blade (4) at the bottom as described above It is a configuration in which a bracket 9 coupled to the vibro hammer 20 is formed to protrude from the flange 6 fixed to the upper end of the formed main body 2.

이상과 같이 구성되는 본 발명의 차수벽 및 토류벽용 지반 개량장치(1)는 굴삭기(10) 또는 바이브로함마(20)에 결합하여 사용할 수 있는 것으로서, 본 발명을 사용할 경우 오거머신 등을 이용하여 지반에 구멍(A)을 천공하고, 천공된 구멍(A)에 개량제(B)를 투입하는 것을 순차적으로 반복하여 차수벽 및 토류벽(C)을 형성함에 있어서 도 6에 도시된 바와 같이 구멍(A)의 수직도 불량이 발생하더라도 본 발명의 지반개량장치(1)가 추가로 타입시공되면서 양측 구멍(A)에 주입되어 있는 개량제(B)가 서로 혼합되어 차수벽 및 토류벽(C)을 하자 없이 견고하게 시공할 수 있는 것이다.Soil wall and earth wall ground improvement device (1) of the present invention configured as described above can be used in conjunction with the excavator 10 or the Vibrohamma 20, when using the present invention by using an auger machine In order to form the order wall and the earth wall C by sequentially repeating the hole A and adding the modifier B to the punched hole A, as shown in FIG. Even if poor verticalness occurs, the ground improvement device 1 of the present invention is additionally constructed, and the modifiers B injected into the holes A on both sides are mixed with each other, so that the order walls and the earth walls C are firmly installed without defects. You can do it.

본 발명의 상세한 설명에는 구체적인 실시예에 관하여 설명하고 있으나, 본 발명의 기술범주에서 벗어나지 않는 범위 내에서 적정한 변형이 가능하다. 따라서 본 발명의 보호 범위는 이상의 명세서에 설명된 실시예에 국한되는 것은 아니며 후술하는 청구범위와 관련되는 균등수단에 대해서도 그 보호범위가 미친다 할 것이다.
Although the detailed description of the present invention has been described with respect to specific embodiments, it is possible to appropriate modifications within the scope without departing from the technical scope of the present invention. Therefore, the protection scope of the present invention is not limited to the embodiments described in the foregoing specification, and the protection scope of the present invention also extends to the equivalent means related to the following claims.

A:구멍 B:개량제
C:차수벽 및 토류벽 1:지반개량장치
2:본체 2a측벽
3:서포터 3a:걸림핀
4:교반날개 4a:날개
4b:간격유지판 5:지지판
6:플랜지 7:회동판
8:볼트와 너트 9:브래킷
10:굴삭기 20:바이브로함마
A: Hole B: Improvement agent
C: Order wall and earth wall 1: Ground improvement device
2: main body 2a side wall
3: supporter 3a: locking pin
4: stirring wing 4a: wing
4b: Spacing plate 5: Support plate
6: Flange 7: Board
8: Bolt and nut 9: Bracket
10: Excavator 20: Vibro Hammer

Claims (3)

지반에 구멍(A)을 천공하고, 천공된 구멍(A)에 개량제(B)를 투입하는 것을 순차적으로 반복하여 차수벽 및 토류벽(C)을 형성할 때 사용하는 차수벽 및 토류벽용 지반 개량장치(1)에 있어서;
H빔 또는 I빔 구성의 본체(2)와;
상기 본체(2)의 하단에 파쇄 및 교반을 행할 수 있도록 형성한 교반날개(4)와;
상기 본체(2)의 상측에 고정되는 서포터(3)에 굴삭기 아암(10) 선단의 버킷 고정용 걸이에 걸림되도록 걸림핀(3a)을 결합한 것을 특징으로 하는 차수벽 및 토류벽용 지반 개량장치.
Ground improvement apparatus for order walls and earth walls, which is used to sequentially form the order wall and the earth wall C by repeatedly drilling the hole A in the ground and injecting the modifier B into the drilled hole A. );
A main body 2 of an H beam or I beam configuration;
A stirring blade 4 formed at the lower end of the main body 2 to be crushed and stirred;
The ground improvement device for the order wall and the earth wall, characterized in that the engaging pin (3a) is coupled to the supporter (3) fixed to the upper side of the main body (2) so as to be engaged with the bucket fixing hook of the tip of the excavator arm (10).
제 1항에 있어서;
상기 걸림핀(3a)이 결합된 서포터(3)는 회동판(7)에 고정하고, 본체(2)에 고정된 플랜지(6)와 볼트와 너트(8)에 의해 조립되게 하여 본체(2)를 회동시킨 상태로 고정되게 한 것을 특징으로 하는 차수벽 및 토류벽용 지반 개량장치.
The method of claim 1, further comprising:
The supporter 3 to which the locking pin 3a is coupled is fixed to the pivot plate 7 and assembled by the flange 6 fixed to the main body 2 and the bolt and nut 8 so that the main body 2 is supported. The ground improvement device for the order wall and the earth wall, characterized in that the fixed state in a rotating state.
지반에 구멍(A)을 천공하고, 천공된 구멍(A)에 개량제(B)를 투입하는 것을 순차적으로 반복하여 차수벽 및 토류벽(C)을 형성할 때 사용하는 차수벽 및 토류벽용 지반 개량장치(1)에 있어서;
H빔 또는 I빔 구성의 본체(2)와;
상기 본체(2)의 하단에 파쇄 및 교반을 행할 수 있도록 형성한 교반날개(4)와;
상기 본체(2)의 상측으로 바이브로함마(20)와 결합되는 브래킷(9)을 돌출되게 형성한 것을 특징으로 하는 차수벽 및 토류벽용 지반 개량장치.
Ground improvement apparatus for order walls and earth walls, which is used to sequentially form the order wall and the earth wall C by repeatedly drilling the hole A in the ground and injecting the modifier B into the drilled hole A. );
A main body 2 of an H beam or I beam configuration;
A stirring blade 4 formed at the lower end of the main body 2 to be crushed and stirred;
The ground improvement device for the order wall and the earth wall, characterized in that the upper side of the main body (2) formed to protrude a bracket (9) coupled with the vibro hammer (20).
KR1020110011641A 2011-02-09 2011-02-09 The ground improvement device for cutoff wall and earths wall KR101190877B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110011641A KR101190877B1 (en) 2011-02-09 2011-02-09 The ground improvement device for cutoff wall and earths wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110011641A KR101190877B1 (en) 2011-02-09 2011-02-09 The ground improvement device for cutoff wall and earths wall

Publications (2)

Publication Number Publication Date
KR20120091714A KR20120091714A (en) 2012-08-20
KR101190877B1 true KR101190877B1 (en) 2012-10-15

Family

ID=46884014

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110011641A KR101190877B1 (en) 2011-02-09 2011-02-09 The ground improvement device for cutoff wall and earths wall

Country Status (1)

Country Link
KR (1) KR101190877B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100255698B1 (en) 1991-09-30 2000-05-01 아이리 라우니스토 Method and apparatus for forcing piles into or out of the ground
KR100691890B1 (en) 2006-01-03 2007-03-09 주식회사 스마텍엔지니어링 Method for constructing retaining wall having h-beam
KR100972741B1 (en) 2010-04-16 2010-07-27 안현자 Rotary pruning shears for an excator

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100255698B1 (en) 1991-09-30 2000-05-01 아이리 라우니스토 Method and apparatus for forcing piles into or out of the ground
KR100691890B1 (en) 2006-01-03 2007-03-09 주식회사 스마텍엔지니어링 Method for constructing retaining wall having h-beam
KR100972741B1 (en) 2010-04-16 2010-07-27 안현자 Rotary pruning shears for an excator

Also Published As

Publication number Publication date
KR20120091714A (en) 2012-08-20

Similar Documents

Publication Publication Date Title
KR101995840B1 (en) Multi-purpose pile for earth wall construction
KR101412792B1 (en) An earth-anchor and Construction method of the same
KR101441929B1 (en) Foundation method for complex pile
KR101414756B1 (en) Non welding type linked casing
KR101754662B1 (en) Method for Constructing the Basement Pile
CN108035360B (en) A method of for pattern foundation pit supporting structure
KR101190877B1 (en) The ground improvement device for cutoff wall and earths wall
KR101667377B1 (en) Freestanding temporary retaining of deep excavations and its construction method
CN108005086B (en) A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure
KR20140001042A (en) Boring apparatus for complex pile and foundation method using the same
JP3641783B2 (en) Rigidity suppression steel pipe pile head rigid binding material
KR102511387B1 (en) Connecting structure of reinforced wall and constructing method thereof
KR101297679B1 (en) Self-supporting Temporary Structure Using Steel Wire And Method Of The Same
JP6735138B2 (en) Construction method of retaining wall structure and retaining wall structure
JP3948655B2 (en) Construction method of retaining wall and underground structure
KR101465111B1 (en) Reinforcing structure for protecting landslide and construction method structure for protecting landslide using the same
KR102095205B1 (en) Ground Improving Device and Ground Improving Method
US10889955B2 (en) Cutting tool adapter and method of underpinning structures using cutting tool adapter for soil mixing
JP5984286B2 (en) Ground reinforcement method and reinforcement structure constructed thereby
CN208328900U (en) Operating platform suitable for the construction of deep hole large diameter hole pile cages
KR100990430B1 (en) Construction method for underground structure
KR101037208B1 (en) drilling rod
JP4645091B2 (en) Expanded pile and construction method of the expanded pile
KR101071184B1 (en) Drilling Method For Piling At Height Restricted Area
Azari et al. Some Geotechnical Lessons Learned on Foundation Construction of Sydney’s Tallest Building, Crown Sydney Hotel Resort

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150910

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180808

Year of fee payment: 9