KR101137898B1 - Prestressed temporary construction structure - Google Patents

Prestressed temporary construction structure Download PDF

Info

Publication number
KR101137898B1
KR101137898B1 KR1020090061267A KR20090061267A KR101137898B1 KR 101137898 B1 KR101137898 B1 KR 101137898B1 KR 1020090061267 A KR1020090061267 A KR 1020090061267A KR 20090061267 A KR20090061267 A KR 20090061267A KR 101137898 B1 KR101137898 B1 KR 101137898B1
Authority
KR
South Korea
Prior art keywords
tension
support
horizontal
ring
tendon
Prior art date
Application number
KR1020090061267A
Other languages
Korean (ko)
Other versions
KR20110003815A (en
Inventor
이하란
김주연
Original Assignee
김주연
이하란
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김주연, 이하란 filed Critical 김주연
Priority to KR1020090061267A priority Critical patent/KR101137898B1/en
Publication of KR20110003815A publication Critical patent/KR20110003815A/en
Application granted granted Critical
Publication of KR101137898B1 publication Critical patent/KR101137898B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/15Geometrical or physical properties including at least a hinge
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 프리스트레스 가시설 구조체에 관한 것으로, 긴장재의 양단을 흙막이 구조물에 힌지 연결함으로써 설치가 간편하고 긴장 후 힌지부분이 파손되지 않아 긴장재의 재활용이 용이하여 공사비를 절감할 수 있고, 토압에 저항하는 힘의 크기를 증가시켜 점유공간을 최소화할 수 있는 프리스트레스 가시설 구조체를 제공함에 있다.The present invention relates to a prestressed temporary structure, the installation is easy by connecting the both ends of the tension member to the earth block structure, the hinge portion is not damaged after the tension is easy to recycle the tension material to reduce the construction cost, resistance to earth pressure It is to provide a prestressed temporary structural structure that can minimize the occupied space by increasing the size of.

상기 목적 달성을 위한 본 발명은 지중에 수직하게 설치되는 다수의 수직파일과, 상기 수직파일에 수평하게 연결되는 수평파일과, 상기 수평파일에 설치되는 버팀보를 포함하는 흙막이 구조물에 설치되어 버팀보의 설치개수를 줄여줄 수 있도록 하는 프리스트레스 가시설 구조체에 있어서, 상기 수평파일에 양단이 힌지 연결되도록 설치되는 긴장재; 상기 긴장재를 토압방향으로 긴장시켜 흙막이 구조체에 프리스트레싱이 가해지도록 하는 긴장수단; 상기 수평파일에 설치되어 긴장수단에 의해 긴장된 긴장재를 받쳐주고 프리스트레싱에 의해 발생되는 수직력이 수평파일에 가해지도록 하는 받침수단; 을 포함하여 구성되는 프리스트레스 가시설 구조체 관한 것을 그 기술적 요지로 한다.The present invention for achieving the above object is installed in a mudguard structure including a plurality of vertical piles installed vertically in the ground, a horizontal pile connected horizontally to the vertical pile, and a brace to be installed on the horizontal pile A prestressed temporary structural structure for reducing the number, the prestressed temporary structure, the tension member is installed so that both ends are hinged to the horizontal pile; Tension means for tensioning the tension member in the earth pressure direction to prestress the earth block structure; Support means installed on the horizontal pile to support the tension member by the tension means and to apply a vertical force generated by the prestressing to the horizontal pile; Prestress provisional structure is configured to include, including the technical gist.

흙막이, 긴장, 프리스트레스, 힌지, 긴장재, 반력 Clap, Tension, Prestress, Hinge, Tension, Reaction

Description

프리스트레스 가시설 구조체{Prestressed temporary construction structure}Prestressed temporary construction structure

본 발명은 프리스트레스 가시설 구조체에 관한 것으로, 흙막이 구조체에 양단이 힌지 연결되는 긴장재를 설치하여 프리스트레싱을 가해줌으로써 토압에 저항할 수 있는 힘을 발생시켜 점유공간을 최소화하고, 긴장재를 재활용할 수 있는 프리스트레스 가시설 구조체에 관한 것이다.The present invention relates to a prestress temporary structure, by installing a tension member hinged to both ends of the earth structure to generate a force that can resist earth pressure by applying prestressing to minimize the space occupied, prestress temporary facility that can recycle the tension material It is about a structure.

일반적으로 지하구조물을 시공하기 위하여 터파기를 하는 경우에는, 흙막이 공법을 통해 흙벽이나 암벽이 무너지는 것을 방지한다.In general, in the case of digging for the construction of underground structures, the earthen wall or rock wall is prevented from collapsing through the earthen method.

기존의 흙막이 공법은, 계획된 평면을 따라 설계 깊이까지 구멍을 뚫고 수직파일을 설치한 후 부분적으로 굴착을 하고, 주형보와 복공판을 설치한다. 복공판의 설치가 끝나면 이후의 공사는 굴착작업과 굴착에 따른 버팀보의 설치가 반복되면서 공사가 진행된다. 따라서 이러한 가시설을 설계하기 위하여 굴착 단계별 토압과 버 팀보에 작용하는 하중을 반복 계산하여, 최대값을 견딜 수 있도록 버팀보를 설치하는 방식이 있다. Conventional mud blocks are drilled to the design depth along the planned plane, vertical piles are installed, partially excavated, mold beams and perforated plates are installed. After the installation of the perforated plate is completed, the subsequent construction is carried out by repeating the excavation work and the installation of the brace according to the excavation. Therefore, in order to design such a temporary facility, there is a method of installing a brace to endure the maximum value by repeatedly calculating the earth pressure and the load acting on the brace for each excavation.

그러나 이런 방식으로 설계와 시공을 하다보니 버팀보의 개수가 많이 필요하게 되어, 대부분의 경우 2-3m 이내로 매우 촘촘하게 배치되며, 이렇게 촘촘하게 배치된 버팀보는 막장 내에서 건설자재의 운반이나, 중장비의 반입 및 공사 작업을 방해하는 매우 중대한 장애요인이 되고 있고, 추후 본 구조물이 설치될 때는 거푸집 작업이나 철근작업에 막대한 지장을 초래하고 있으며, 본 구조물에 다수의 구멍이 생기는 것을 피할 수 없기 때문에, 완성된 지하구조물의 방수에 심각한 문제가 발생되고 있다.However, the design and construction in this way requires a large number of braces, and in most cases, the braces are arranged very tightly within 2 to 3 meters, and the braces arranged in such a way can be used to transport construction materials, carry heavy equipment, It is a very serious obstacle to the construction work, and when the structure is installed later, it causes enormous obstacles in formwork or reinforcing work, and since the formation of a large number of holes in the structure cannot be avoided, the completed underground Serious problems have arisen in the waterproofing of structures.

상기와 같은 문제점을 해결하기 위하여 등록특허10-0778137호에서와 같이 양단이 정착장치에 의해 고정된 긴장재를 긴장한 후 받침대를 세워놓아 긴장재의 긴장으로 발생되는 수직력으로 토압을 지지해줌으로써 반력대의 설치개수를 줄여줄 수 있는 프리스트레스 가시설 공법을 제시하고 있다.In order to solve the above problems, as shown in Patent No. 10-0778137, both ends of the tension member is fixed by the fixing device and then the pedestal to support the earth pressure by the vertical force generated by the tension of the tension member to install the number of installation A prestressed temporary construction method is proposed to reduce the

그러나 상기와 같은 프리스트레스 가시설 공법의 정착장치는 쐐기형태로 구성됨으로써 긴장재의 긴장시 쐐기 이동과 마찰 손실, 곡률마찰 손실로 인하여 받침대를 통하여 토압에 저항하는 힘의 크기가 좌,우 불균일하게 도입 되는 문제점이 있다.However, the fixing device of the prestressed temporary construction method as described above has a wedge shape, which causes the wedge movement, friction loss, and curvature friction loss during tension of the tension material, so that the magnitude of force resisting earth pressure through the pedestal is unevenly introduced. There is this.

또한 쐐기부분에 물려진 긴장재가 강한 긴장력에 의해 파손되어 긴장재의 재활용이 불가능하여 공사비가 상승되는 문제점이 있다.In addition, there is a problem in that the cost of the construction is increased because the tension material that is bitten on the wedge is damaged by the strong tension force and the recycling of the tension material is impossible.

상기와 같은 문제점을 해결하기 위한 본 발명의 목적은, 긴장재의 양단을 흙막이 구조물에 힌지 연결함으로써 설치가 간편하고 긴장 후 힌지부분이 파손되지 않아 긴장재의 재활용이 용이하여 공사비를 절감할 수 있고, 토압에 저항하는 힘의 크기를 증가시켜 점유공간을 최소화할 수 있는 프리스트레스 가시설 구조체를 제공함에 있다.An object of the present invention for solving the above problems, by connecting the both ends of the tension member to the earth block structure is easy to install and the hinge portion is not damaged after the tension is easy to recycle the tension material to reduce the construction cost, earth pressure The present invention provides a prestressed temporary structural structure that can minimize the occupied space by increasing the magnitude of force resisting.

상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명은, 지중에 수직하게 설치되는 다수의 수직파일과, 상기 수직파일에 수평하게 연결되는 수평파일과, 상기 수평파일에 설치되는 버팀보를 포함하는 흙막이 구조물에 설치되어 버팀보의 설치개수를 줄여줄 수 있도록 하는 프리스트레스 가시설 구조체에 있어서, 상기 수평파일에 양단이 힌지 연결되도록 설치되고 다수의 텐던을 힌지연결부를 통해 연결함으로써 구성되는 긴장재; 상기 긴장재를 토압방향으로 긴장시켜 흙막이 구조체에 프리스트레싱이 가해지도록 하는 긴장수단; 상기 수평파일에 설치되어 긴장수단에 의해 긴장된 긴장재를 받쳐주고 프리스트레싱에 의해 발생되는 수직력이 수평파일에 가해지도록 하는 받침수단;을 포함하여 구성되되, 상기 힌지연결부는 텐던의 일측단에 결합되는 고리형태의 제1연결고리와, 상기 텐던의 타측단에 결합되고 상기 제1연결고리를 수용하여 제1연결고리와 힌지연결이 가능하도록 하는 제2연결고리와, 상기 제1연결고리와 제2연결고리를 수용하여 힌지연결이 가능하도록 하는 제3연결고리와, 상기 제3연결고리에 일체로 형성되어 상기 받침수단이 받쳐질 수 있도록 구성되는 지지판으로 구성되는 받침수단연결부와, 상기 받침수단연결부의 제3연결고리와, 제2연결고리 및 제1연결고리를 관통하여 연결해주는 볼트;를 포함하여 구성되는 것을 특징으로 한다.The present invention to achieve the object as described above and to solve the conventional drawbacks, a plurality of vertical piles installed vertically in the ground, a horizontal pile connected horizontally to the vertical pile, and the horizontal pile In the prestressed temporary structure to be installed on the earthen structure including the support to be installed in the structure to reduce the number of installation of the support, it is installed so that both ends are hinged to the horizontal pile and configured by connecting a number of tendons through the hinge connection Tension material; Tension means for tensioning the tension member in the earth pressure direction to prestress the earth block structure; A support means installed on the horizontal pile to support the tension member by the tension means and to apply a vertical force generated by the prestressing to the horizontal pile, wherein the hinge connection portion is coupled to one end of the tendon A first connection ring, a second connection ring coupled to the other end of the tendon and accommodating the first connection ring to enable the first connection ring and the hinge connection, and the first connection ring and the second connection ring A third connecting ring configured to receive a hinge to enable a hinge connection; a supporting means connecting part formed integrally with the third connecting ring and configured to support the supporting means; and the supporting means connecting part. Characterized in that it comprises a; 3 connecting ring, a bolt connecting the second connecting ring and the first connecting ring.

삭제delete

삭제delete

또한 본 발명은 지중에 수직하게 설치되는 다수의 수직파일과, 상기 수직파일에 수평하게 연결되는 수평파일과, 상기 수평파일에 설치되는 버팀보를 포함하는 흙막이 구조물에 설치되어 버팀보의 설치개수를 줄여줄 수 있도록 하는 프리스트레스 가시설 구조체에 있어서, 상기 수평파일에 양단이 힌지 연결되도록 설치되고 다수의 텐던을 힌지연결부를 통해 연결함으로써 구성되는 긴장재; 상기 긴장재를 토압방향으로 긴장시켜 흙막이 구조체에 프리스트레싱이 가해지도록 하는 긴장수단; 상기 수평파일에 설치되어 긴장수단에 의해 긴장된 긴장재를 받쳐주고 프리스트레싱에 의해 발생되는 수직력이 수평파일에 가해지도록 하는 받침수단;을 포함하여 구성되되, 상기 힌지연결부는, 상기 텐던의 양단에 연결되되, 다수의 텐던 연결이 가능하도록 가장자리에 다수의 텐던연결구가 형성되어 있는 텐던연결판과, 일측의 텐던연결판 중심에 결합되는 고리형태의 제1연결고리와, 타측의 텐던연결판 중심에 결합되고 상기 제1연결고리를 수용하여 제1연결고리와 힌지연결이 가능하도록 하는 제2연결고리와, 상기 제1연결고리와 제2연결고리를 수용하여 힌지연결이 가능하도록 하는 제3연결고리와, 상기 제3연결고리에 일체로 형성되어 상기 받침수단이 받쳐질 수 있도록 구성되는 지지판으로 구성되는 받침수단연결부와, 상기 받침수단연결부의 제3연결고리와, 제2연결고리 및 제1연결고리를 관통하여 연결해주는 볼트;를 포함하여 구성되는 것을 특징으로 하는 프리스트레스 가시설 구조체.In another aspect, the present invention is installed in a mud structure including a plurality of vertical piles installed vertically in the ground, a horizontal pile connected horizontally to the vertical pile, and a brace mounted on the horizontal pile to reduce the number of installation of the prop A prestressed temporary construction structure, comprising: a tension member installed at both ends of the horizontal pile to be hinged and configured by connecting a plurality of tendons through a hinge connection portion; Tension means for tensioning the tension member in the earth pressure direction to prestress the earth block structure; And a support means installed on the horizontal pile to support the tension member by the tension means and to apply a vertical force generated by the prestressing to the horizontal pile, wherein the hinge connection portion is connected to both ends of the tendon, A tendon connecting plate having a plurality of tendon connectors at the edges to enable a plurality of tendon connections, a ring-shaped first connecting ring coupled to the center of the tendon connecting plate on one side, and coupled to the center of the other tendon connecting plate, A second connection ring for accommodating a first connection ring and a hinge connection to the first connection ring, a third connection ring for accommodating the first connection ring and the second connection ring to allow the hinge connection, and A supporting means connecting portion formed of a supporting plate integrally formed with a third connecting ring and configured to support the supporting means, and the supporting means connecting portion And a third connecting ring, and a bolt connecting the second connecting ring and the first connecting ring to penetrate the prestressed temporary structure.

또한 상기 받침수단연결부가 볼트를 중심으로 유동되지 않도록 지지판의 하부에 걸림턱이 더 형성되는 것을 특징으로 한다.In addition, the supporting means is characterized in that the locking step is further formed in the lower portion of the support plate so that the connection portion does not flow around the bolt.

또한 상기 받침수단은, 상기 수평파일에 설치되는 지지대; 상기 지지대의 상부에 높이조절이 가능하도록 설치되고 상기 힌지연결부를 받쳐줌으로써 프리스트레 싱에 의한 수직력이 수평파일에 가해지도록 하는 스크류잭; 상기 지지대의 상부에 놓여지고 스크류잭의 스크류가 가이드될 수 있도록 중심부에 스크류홀이 형성되어 있는 받침대;를 포함하여 구성되는 것을 특징으로 한다.In addition, the support means, the support is installed on the horizontal pile; A screw jack installed on the upper part of the support to allow height adjustment and supporting the hinge connection part such that a vertical force by prestressing is applied to the horizontal pile; And a pedestal having a screw hole formed in the center thereof so that the screw of the screw jack can be placed on the support and guided by the screw jack.

또한 상기 긴장수단은, 상기 지지판의 가장자리에 일단이 볼트 고정되는 다수의 연결부재; 상기 연결부재들의 타단에 볼트 결합되어 연결부재들을 연결함으로써 힌지연결부와 일체가 되도록 하는 연결판; 상기 받침수단의 상부에 설치되는 반력대; 상기 반력대에 받쳐지고 연결판의 중심에 연결되어 연결판을 당겨줌으로써 힌지연결부를 중심으로 텐던에 긴장력이 가해지도록 하는 유압잭;을 포함하여 구성되는 것을 특징으로 한다.In addition, the tension means, a plurality of connecting members having one end bolted to the edge of the support plate; A connecting plate bolted to the other ends of the connecting members to connect the connecting members to be integral with the hinge connecting part; A reaction table installed on an upper portion of the supporting means; The hydraulic jack is supported by the reaction table and connected to the center of the connecting plate to pull the connecting plate to the tension jack is applied to the tendon around the hinge connecting portion; characterized in that it comprises a.

한편 본 발명은 지중에 수직하게 설치되는 다수의 수직파일과, 상기 수직파일에 수평하게 연결되는 수평파일과, 상기 수평파일에 설치되는 버팀보를 포함하는 흙막이 구조물에 설치되어 버팀보의 설치개수를 줄여줄 수 있도록 하는 프리스트레스 가시설 구조체에 있어서, 상기 수평파일에 양단이 힌지 연결되도록 설치되는 아크형태의 형강재로 이루어진 긴장재; 상기 긴장재를 토압방향으로 긴장시켜 흙막이 구조체에 프리스트레싱이 가해지도록 하는 긴장수단; 상기 수평파일에 설치되어 긴장수단에 의해 긴장된 긴장재를 받쳐주고 프리스트레싱에 의해 발생되는 수직력이 수평파일에 가해지도록 하는 받침수단;을 포함하여 구성되되, 상기 형강재의 하부에 일정간격으로 설치되는 브래킷과, 상기 브래킷에 고정되도록 설치되되, 긴장수단과 받침수단이 수평을 유지하면서 형강재의 하부에 받쳐질 수 있도록 하부면이 수평을 유지하면서 설치되는 수평유지블록으로 이루어진 반력대 받침; 을 더 포함하여 구성되는 것을 특징으로 한다.On the other hand, the present invention is installed in a mud structure including a plurality of vertical piles installed vertically in the ground, horizontal piles connected horizontally to the vertical piles, and the support is installed on the horizontal piles to reduce the number of installation of the props A prestressed temporary structural body for supporting a tension structure, comprising: a tension member made of an arc-shaped steel material installed to be hinged at both ends of the horizontal pile; Tension means for tensioning the tension member in the earth pressure direction to prestress the earth block structure; Brackets which are installed on the horizontal pile to support the tension member by the tension means and the vertical force generated by the prestressing is applied to the horizontal pile; Reaction band support consisting of a horizontal maintenance block is installed to be fixed to the bracket, the lower surface is installed horizontally so that the tension means and the support means are supported on the lower portion of the steel while maintaining the horizontal; Characterized in that further comprises.

삭제delete

또한 상기 받침수단은, 상기 수평파일에 결합되고 상기 긴장수단이 내부에 수용될 수 있도록 내부에 공간부가 형성되고 긴장수단의 작동 및 설치가 가능하도록 공간부와 연통되는 개구부가 상,하부에 형성되는 가이드부재; 상기 가이드부재의 내부에 나사결합되어 상하로 이동가능하도록 구성되는 받침부재; 상기 받침부재의 외부에 설치되어 가이드부재 상에서 상하 이동이 가능하도록 하는 승하강손잡이; 상기 받침부재의 상부에 설치되고, 상기 긴장수단의 작동시 긴장수단을 가이드해줄 수 있도록 중심부에 가이드홀이 형성되며 긴장수단에 의해 긴장된 긴장재를 안정적으로 받쳐주게 되는 가이드판;을 포함하여 구성되는 것을 특징으로 한다.In addition, the support means is coupled to the horizontal pile and the space is formed therein so that the tension means can be accommodated therein and openings communicating with the space portion to enable the operation and installation of the tension means is formed in the upper and lower parts Guide member; A supporting member screwed into the guide member and configured to be movable up and down; A lifting handle provided on an outer side of the support member to move up and down on the guide member; And a guide plate formed at an upper portion of the supporting member, and having a guide hole formed at the center thereof to guide the tension means when the tension means is operated, and stably supporting the tension member by the tension means. It features.

또한 긴장수단은, 상기 가이드부재의 내부에 수용되도록 설치되고 피스톤이 상기 가이드홀을 통해 가이드 되면서 긴장재를 토압방향으로 가압하여 긴장력을 가해주는 유압잭인 것을 특징으로 한다.In addition, the tension means, characterized in that the hydraulic jack is installed to be accommodated in the guide member and the piston is guided through the guide hole to press the tension member in the earth pressure direction to apply a tension force.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

이상에서 설명한 바와 같이 본 발명에 의하면, 긴장재를 수평파일에 힌지연결함으로써 프리스트레싱 도입시 힌지부분이 파손되지 않아 긴장재를 재활용할 수 있어 공사비용을 절감해주고, 토압에 저항하는 힘의 크기를 긴장력을 통해 원활한 크기로 조절할 수 있으며, 버팀보의 개수를 줄여 공사현장의 점유공간을 최소활 수 있고, 조립 및 해체가 간편하여 공사기간을 줄여줄 수 있는 매우 유용한 발명이다.As described above, according to the present invention, by connecting the tension member to the horizontal pile, the hinge portion is not damaged when the prestressing is introduced, thereby reducing the construction cost and reducing the construction cost, and the magnitude of the force resisting earth pressure through the tension force. It is a very useful invention that can be adjusted to a seamless size, to minimize the occupied space of the construction site by reducing the number of braces, and to reduce the construction period by easy assembly and dismantling.

이하 본 발명의 실시 예인 구성과 그 작용을 첨부도면에 연계시켜 상세히 설명하면 다음과 같다. 또한 본 발명을 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다.Hereinafter, the configuration and the operation of the embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

도 1 은 본 발명의 일실시예에 의한 프리스트레스 가시설 구조체를 나타낸 예시도, 도 2 는 본 발명의 일실시예에 의한 텐던의 힌지연결구조를 나타낸 예시도, 도 3 은 본 발명의 일실시예에 의한 힌지연결부를 나타낸 분리사시도, 도 4 는 본 발명의 일실시예에 의한 힌지연결부를 나타낸 결합사시도, 도 5 는 본 발명의 일실시예에 의한 받침수단연결부에 걸림턱을 형성한 상태를 나타낸 예시도로서,1 is an exemplary view showing a prestressed temporary structural structure according to an embodiment of the present invention, Figure 2 is an illustration showing a hinge connection structure of the tendon according to an embodiment of the present invention, Figure 3 is an embodiment of the present invention Figure 4 is an exploded perspective view showing a hinge connection by, Figure 4 is a combined perspective view showing a hinge connection according to an embodiment of the present invention, Figure 5 is an illustration showing a state of forming a locking step in the support means connecting portion according to an embodiment of the present invention As

본 발명의 프리스트레스 가시설 구조체는 지중에 일정간격으로 설치되는 다 수의 수직파일(410)과, 상기 수직파일(410)에 수평하게 설치되어 다수의 수직파일(410)을 연결하는 수평파일(420)과, 상기 수평파일(420)에 연결되고 지면에 고정됨으로서 수직파일(410)을 지지하는 버팀보(430)로 이루어진 흙막이 구조물(400)에 설치되는 것으로, 상기 수평파일(420)에 일정간격마다 정착부(421)를 형성하고 상기 정착부(421)에 양단이 힌지(101) 연결되도록 설치되는 긴장재(100)와, 상기 긴장재(100)를 긴장시켜 흙막이 구조물(400)에 프리스트레싱이 가해지도록 하는 긴장수단(300)과, 상기 수평파일(420)에 설치되어 긴장수단(300)에 의해 긴장된 긴장재(100)를 받쳐주고 프리스트레싱에 의한 수직력이 흙막이 구조물에 전달될 수 있도록 하는 받침수단(200)을 포함하여 구성된다.The prestressed temporary structure of the present invention has a plurality of vertical piles 410 installed at a predetermined interval in the ground, and horizontal piles 420 installed horizontally on the vertical piles 410 to connect a plurality of vertical piles 410. And, it is connected to the horizontal pile 420 and is fixed to the ground to be installed on the earth block structure 400 consisting of the support 430 supporting the vertical pile 410, it is fixed to the horizontal pile 420 at regular intervals Tension forming the portion 421 and the tension member 100 is installed so that both ends are connected to the hinge 101 and the tension member 100, the tension to the prestressing is applied to the earth structure 400 by tensioning the tension member 100 Means 300 and the supporting means 200 is installed on the horizontal pile 420 to support the tension member 100 tensioned by the tension means 300 and to allow the vertical force by prestressing to be transmitted to the retaining structure. It is configured by.

상기 긴장재(100)는, 힌지연결부(120)를 통해 연결되는 다수의 텐던(110)으로써, 이러한 텐던(110)은 강봉이나, 강선, 강연선 등을 사용할 수 있다.The tension member 100 is a plurality of tendons 110 connected through the hinge connecting portion 120, such tendons 110 may be used, such as steel bar, steel wire, strand wire.

상기 힌지연결부(120)는 텐던(110)의 일측단에 결합되는 제1연결고리(121)와, 상기 텐던(110)의 타측단에 결합되고 상기 제1연결고리(121)를 수용하여 제1연결고리(121)와 힌지연결이 가능하도록 하는 제2연결고리(122)와, 상기 제1연결고리(121)와 제2연결고리(122)를 수용하여 힌지연결되도록 구성되고, 상기 긴장수단(300)에 연결되어 긴장수단의 작동시 텐던(110)에 프리스트레싱이 가해질 수 있도록 하며 프리스트레싱이 도입된 상태에서 받침수단(200)에 의해 받쳐질 수 있도록 하는 받침수단연결부(123)와, 상기 받침수단연결부(123)와, 제1연결고리(121) 및 제2연결고리(122)를 관통하여 연결해주는 볼트(423)를 포함하여 구성된다.The hinge connector 120 is coupled to the first connection ring 121 coupled to one end of the tendon 110 and the other end of the tendon 110 and accommodates the first connection ring 121 for the first connection. It is configured to receive the second connecting ring 122 and the connecting ring 121 and the hinge connection, the first connecting ring 121 and the second connecting ring 122 is hinged, the tension means ( 300 is connected to the support means connecting portion 123 to be prestressed to the tendon 110 during the operation of the tension means and to be supported by the support means 200 in the pre-stressing state, the support means It is configured to include a connecting portion 123, and a bolt 423 for connecting through the first connecting ring 121 and the second connecting ring 122.

한편 상기 정착부(421)에는 도 2 와 같이 텐던(110)과 힌지연결이 가능하도 록 제1연결고리(121)를 설치하여 텐던(110)의 타측단에 결합된 제2연결고리(122)와 연결되도록 함으로써 긴장재가 힌지(101)연결될 수 있도록 한다.Meanwhile, as shown in FIG. 2, the fixing unit 421 is provided with a first connecting ring 121 so as to be hinged with the tendon 110, and a second connecting ring 122 coupled to the other end of the tendon 110. By allowing the tension member to be connected to the hinge 101.

상기 받침수단연결부(123)는 상기 제1연결고리(121) 및 제2연결고리(122)를 수용하여 상기 볼트(424)를 통해 고정되는 제3연결고리(124)와, 상기 제3연결고리(124)에 일체로 형성되어 상기 받침수단(200)이 받쳐질 수 있도록 평판형태로 구성되며 상기 긴장수단(300)이 연결되는 지지판(125)을 포함하여 구성된다.The support means connecting portion 123 receives the first connecting ring 121 and the second connecting ring 122 and the third connecting ring 124 is fixed through the bolt 424, and the third connecting ring It is formed integrally with the 124 is configured in the form of a flat plate so that the support means 200 is supported and comprises a support plate 125 to which the tension means 300 is connected.

이러한 받침수단연결부(123)는 도 5 에서와 같이 긴장수단(300)에 연결되어 프리스트레싱이 가해지는 과정이나, 받침수단(200)을 통해 받쳐질 경우 받침수단연결부(123)가 볼트(423)를 중심으로 유동되지 않도록 지지판(125)의 하부에 걸림턱(126)이 더 형성된다.The supporting means connecting portion 123 is connected to the tension means 300, as shown in Figure 5, the prestressing process, or when supported by the supporting means 200, the supporting means connecting portion 123 to the bolt 423 The locking step 126 is further formed at the lower portion of the support plate 125 so as not to flow to the center.

한편 상기 힌지연결부(120)는, 도 6 에서와 같이 다수의 텐던(110) 연결이 가능하도록 가장자리에 다수의 텐던연결구(128)가 형성되어 있는 텐던연결판(127)과, 일측의 텐던연결판(127) 중심에 결합되는 고리형태의 제1연결고리(121)와, 타측의 텐던연결판(127) 중심에 결합되어 상기 제1연결고리(121)를 수용하여 제1연결고리(121)와 힌지연결이 가능하도록 하는 제2연결고리(122)와, 상기 제1연결고리(121)와 제2연결고리(122)를 수용하여 힌지연결되도록 구성되고 상기 긴장수단(300)에 연결되어 긴장수단(300)의 작동시 텐던(110)에 프리스트레싱이 가해질 수 있도록 하며 프리스트레싱이 도입된 상태에서 받침수단(200)에 의해 받쳐질 수 있도록 하는 받침수단연결부(123)와, 상기 받침수단연결부(123)의 제3연결고리(124)와, 제2연결고리(122) 및 제1연결고리(121)를 관통하여 연결해주는 볼 트(423)를 포함하여 구성된다.Meanwhile, the hinge connector 120 includes a tendon connecting plate 127 and a tendon connecting plate 127 having a plurality of tendon connector 128 formed at an edge thereof to enable connection of the tendon 110 as shown in FIG. 6. The first connection ring 121 is coupled to the center of the ring-shaped first connection ring 121 and the other side of the tendon connecting plate 127 to accommodate the first connection ring 121 and the first connection ring 121 and the first connection ring 121. The second connecting ring 122 and the first connecting ring 121 and the second connecting ring 122 to receive the hinge is configured to be connected to the hinge connected to the tension means 300 is configured to receive the tension means Supporting means connecting portion 123 and the support means connecting portion 123 to allow prestressing to be applied to the tendon 110 during operation of the 300 and to be supported by the supporting means 200 in the state in which the prestressing is introduced. Through the third connecting ring 124, the second connecting ring 122 and the first connecting ring 121 It is configured to include a bolt 423 that results.

이와 같은 힌지연결부(120)는 다수의 텐던(110)이 연결되도록 구성됨으로써 보다 강한 프리스트레싱을 가해줄 경우에 사용한다.Such a hinge connection portion 120 is configured to be connected to a plurality of tendons 110 is used when applying a stronger prestressing.

한편 도 7 은 본 발명의 일실시예에 의한 받침수단 설치구조를 나타낸 예시도, 도 8 은 본 발명의 일실시예에 의한 받침대를 나타낸 예시도로서, 상기 받침수단(200)은 수평파일(420)에 설치되는 지지대(210)와, 상기 지지대(210)의 상부에 높이조절이 가능하도록 설치되고 상기 긴장수단(300)에 의해 텐던(110)에 프리스트레싱이 가해질 경우 힌지연결부(120)를 받쳐줌으로써 프리스트레싱에 의한 수직력이 흙막이 구조물(400)에 전달될 수 있도록 하는 스크류잭(211)과, 상기 지지대(210)의 상부에 놓여지고 스크류잭(211)의 스크류(212)가 상하로 이동시 가이드될 수 있도록 중심부에 스크류홀(214)이 형성되어 있는 받침대(213)를 포함하여 구성된다.On the other hand Figure 7 is an exemplary view showing a support means installation structure according to an embodiment of the present invention, Figure 8 is an illustration showing a pedestal according to an embodiment of the present invention, the support means 200 is a horizontal pile 420 The support 210 is installed on the support, and the height of the support 210 is installed to enable the height adjustment and when the prestressing is applied to the tendon 110 by the tension means 300 by supporting the hinge connection portion 120 The screw jack 211 to allow the vertical force by the prestressing to be transferred to the earth block structure 400, and is placed on top of the support 210 and guided when the screw 212 of the screw jack 211 moves up and down It is configured to include a pedestal 213 is formed with a screw hole 214 in the center.

이와 같이 구성되는 받침수단(200)은 스크류잭(211)의 스크류(212)가 받침대(213)의 스크류홀(214)을 통해 가이드 되면서 상하로 이동하도록 구성됨으로써, 스크류잭(211)의 전도를 방지하여 프리스트레싱에 의해 발생되는 수직력이 흙막이 구조물(400)에 안정적으로 전달될 수 있도록 하는 것이다.The supporting means 200 configured as described above is configured to move up and down while the screw 212 of the screw jack 211 is guided through the screw hole 214 of the pedestal 213 to thereby conduct conduction of the screw jack 211. It is to prevent the vertical force generated by the pre-stressing to be stably transmitted to the earth structure (400).

한편 상기 지지대(210)는 상기 수평파일(420)에 설치 및 해체가 용이하게 이루어질 수 있도록 볼트를 통해 결합하는 것이 바람직하다.On the other hand, the support 210 is preferably coupled through a bolt to be easily installed and dismantled to the horizontal pile 420.

이러한 지지대(210)는 에이치 빔이나 앵글 또는 각관 등의 각종 철물부재를 사용하거나 압축하중을 견딜 수 있는 부재를 사용하여 제작한다.The support 210 is manufactured by using various hardware members such as H-beams, angles, or square tubes, or by using members that can withstand the compressive load.

한편 상기 긴장수단(300)은 도 9a 및 도 9b에서와 같이 상기 받침대연결부(123)의 지지판(125) 가장자리를 따라 일단이 볼트(423) 고정되는 다수의 연결부재(310)와, 상기 연결부재(310)들의 타단에 볼트(423)결합되어 연결부재(310)들을 연결해줌으로 힌지연결부(120)와 일체가 되도록 하는 연결판(311)과, 상기 연결판(311)의 상부에 위치하도록 상기 받침수단(200)의 상부에 설치되는 반력대(312)와, 상기 반력대(312)에 받쳐지고 반력대(312)의 중심을 관통하여 상기 연결판(311)의 중심에 연결되어 연결판(311)을 토압방향으로 당겨주는 유압잭(313a)을 포함하여 구성된다.Meanwhile, as shown in FIGS. 9A and 9B, the tension means 300 includes a plurality of connection members 310, one end of which is fixed to the bolt 423 along the edge of the support plate 125 of the pedestal connection part 123, and the connection member. The connection plate 311 is coupled to the other end of the (310) to be connected to the hinge connecting portion 120 by connecting the connection member 310 and the connection plate 311, so as to be located above the connection plate 311 Reaction table 312 is installed on the upper portion of the support means 200, and supported by the reaction table 312 and penetrates the center of the reaction table 312 is connected to the center of the connecting plate 311 is connected to the connecting plate ( It comprises a hydraulic jack (313a) for pulling 311 in the earth pressure direction.

이와 같은 긴장수단(300)은 상기 유압잭(313a)을 통해 힌지연결부(120)와 일체로 연결된 연결판(311)을 토압방향으로 당겨줌으로써 힌지연결부(120)에 연결되어 있는 텐던(110)에 긴장력이 가해지게 되는 것이다.The tension means 300 as described above pulls the connecting plate 311 integrally connected with the hinge connecting portion 120 through the hydraulic jack 313a in the earth pressure direction by the tension force to the tendon 110 connected to the hinge connecting portion 120. This will be added.

상기 연결부재(310)는 'ㄷ' 형태로 형성되어 일단은 상기 받침수단연결부(123)의 지지판(125) 하부에 볼트(423)결합되고, 타단은 상기 연결판(311)의 상부에 볼트(423)결합되는 것으로 지지판(125)과 힌지연결부(120)를 결속해주는 것이다.The connecting member 310 is formed in a 'c' shape, one end of the bolt 423 is coupled to the bottom of the support plate 125 of the support means connecting portion 123, the other end of the bolt (the upper portion of the connecting plate 311) 423) is to bind the support plate 125 and the hinge connection portion 120 to be coupled.

또한 상기 연결부재(310)는 지지판(125)과 연결판(311)의 모서리부분에 설치되어 연결판(311)과 힌지연결부(120)를 안정적으로 고정해줄 수도 있다.In addition, the connection member 310 may be installed at the corners of the support plate 125 and the connection plate 311 to stably fix the connection plate 311 and the hinge connection portion 120.

상기 유압잭(313a)은 강봉(315)을 통해 상기 반력대(312)를 관통하여 연결판(311)에 볼트(423)연결되는 것으로 반력대(312)에 받쳐진 상태에서 텐던(110)을 토압방향으로 당겨줌으로써 텐던(110)에 인장력이 가해질 수 있도록 하는 것이다.The hydraulic jack 313a is a bolt 423 connected to the connecting plate 311 through the reaction table 312 through the steel bar 315 to earth pressure tendon 110 in the state supported by the reaction table 312 By pulling in the direction to the tensile force is to be applied to the tendon (110).

한편 상기 받침수단(200)의 받침대(213) 상부에는 상기 긴장수단(300)의 반력대(312)가 놓여지는데, 유압잭(313a)을 통한 텐던(110)의 긴장시 반력대(312)가 받침대(213) 상부에서 유동되지 않고 견고히 고정될 수 있도록 받침대(213)의 상부에 다수의 이탈방지 가이드턱(215)을 더 형성할 수 있다.On the other hand, the reaction force 312 of the tension means 300 is placed on the support 213 of the support means 200, the reaction force 312 when the tension of the tendon 110 through the hydraulic jack 313a A plurality of anti-separation guide jaws 215 may be further formed on the upper portion of the pedestal 213 so as to be firmly fixed without flowing from the upper portion.

즉 반력대(312)는 상기 받침대(213)의 상부에 놓여지되, 상기 이탈방지 가이드턱(215)에 의해 받침대(213)의 상부에서 미끄러지지 않고 견고히 고정되는 것이다.That is, the reaction table 312 is placed on the upper portion of the pedestal 213, it is firmly fixed without slipping from the upper portion of the pedestal 213 by the separation prevention guide jaw 215.

상기와 같이 구성되는 본 발명은 텐던(110)이 힌지연결부(120)를 통해 연결됨으로써 유압잭(313a)을 통해 프리스트레싱이 가해진다 하더라도 힌지연결부(120)가 파손되지 않아 시공후 수평파일(420)에 설치된 다수의 텐던(110)을 분리하여 재활용 할 수 있게 됨으로써, 자재비를 절감할 수 있어 공사비용이 절감할 수 있게 되고 조립 및 분해가 간편하여 공사기간을 줄여줄 수 있게 된다.According to the present invention configured as described above, even if prestressing is applied through the hydraulic jack 313a by the tendon 110 connected through the hinge connection part 120, the hinge connection part 120 is not damaged and thus the horizontal pile 420 is installed. By separating and recycling a number of installed tendon 110, it is possible to reduce the cost of the material can be reduced construction costs and easy to assemble and disassemble can reduce the construction period.

한편 도 10 은 본 발명의 다른 실시예에 의한 프리스트레스 가시설 구조체를 나타낸 예시도, 도 11 은 본 발명의 다른 실시에에 의한 형강재의 힌지연결구조를 나타낸 예시도, 도 12 는 본 발명의 다른 실시예에 의한 형강재에 반력대 받침을 설치한 상태를 나타낸 예시도로서 본 발명의 긴장재(100)는, 아크형태로 형성되고 양단이 수평파일(420)에 형성되는 정착부(421)에 힌지(101) 연결되는 형강재(130)이다.On the other hand, Figure 10 is an exemplary view showing a prestressed temporary structural structure according to another embodiment of the present invention, Figure 11 is an exemplary view showing a hinge connection structure of the shaped steel according to another embodiment of the present invention, Figure 12 is another embodiment of the present invention As an exemplary view showing a state in which a reaction force bearing is installed on a steel member according to an example, the tension member 100 of the present invention is formed in an arc shape and hinged to a fixing part 421 having both ends formed on a horizontal pile 420. 101) is the section steel 130 to be connected.

상기 형강재(130)는 H형강으로써 아크형태로 절곡되도록 형성되거나, 또는 다수의 H형강을 연결하여 구성할 수 있다. 이때 H형강은 이웃하는 H형강에 연결플레이트(143)를 대고 볼트로 연결하는 등의 통상의 연결방법으로 연결한다.The shaped steel 130 may be formed to be bent in an arc form as H-shaped steel, or may be configured by connecting a plurality of H-shaped steel. At this time, the H-beams are connected by a common connection method such as connecting bolts to the neighboring H-beams with a connecting plate 143.

이렇게 H형강을 조립하여 형강재(130)를 형성할 경우에는 운반이 용이하고 현장에서의 설치도 간편하게 이루어지게 된다.When assembling the H-shaped steel to form the shaped steel 130, it is easy to carry and the installation in the field is also made easily.

한편 상기 정착부(421)에는 형강재(130)와 힌지(101)연결이 가능하도록 제1연결고리(121)를 설치하고 상기 형강재(130)의 단부에 제2연결고리(122)를 설치하여 제1,2연결고리(121)(122)가 힌지(101)연결되도록 함으로써 형강재(130)의 양단이 수평파일(420)에 힌지(101)연결되는 것이다.On the other hand, the fixing part 421 is provided with a first connecting ring 121 so as to be connected to the steel member 130 and the hinge 101 and a second connecting ring 122 is installed at the end of the steel member 130. By connecting the first and second connection rings 121 and 122 to the hinge 101, both ends of the steel member 130 are hinged 101 to the horizontal pile 420.

여기서 상기 제2연결고리(122)는 상기 형강재(130)의 단부에 마감플레이트(144)를 설치하고 상기 마감플레이트(144)에 연결하도록 구성한다.Here, the second connection ring 122 is configured to install a closing plate 144 at the end of the steel member 130 and to connect to the closing plate 144.

이러한 형강재(130)의 하부에는 프리스트레싱이 가해지는 위치에 설치되어 긴장수단(300)과 받침수단(200)이 수평을 유지하면서 형강재(130)에 설치될 수 있도록 하는 반력대 받침(140)을 포함하여 구성된다.The lower portion of the steel member 130 is installed in the position where the prestressing is applied to the reaction force base 140 so that the tension means 300 and the support means 200 can be installed on the steel member 130 while maintaining the horizontal It is configured to include.

상기 반력대 받침(140)은 형강재(130)의 하부에 일정간격으로 설치되는 브래킷(141)과, 상기 브래킷(141)에 끼워져 볼트(423)를 통해 고정되되, 긴장수단(300)과 받침수단(200)이 수평을 유지하면서 형강재(130)의 하부에 받쳐질 수 있도록 하부면이 수평을 유지하도록 고정되는 수평유지블록(142)으로 구성된다.The reaction table support 140 is a bracket 141 which is installed at a predetermined interval on the lower portion of the steel member 130, and is fitted to the bracket 141 is fixed through the bolt 423, the tension means 300 and the support It consists of a horizontal block 142 is fixed so that the bottom surface is horizontal so that the means 200 can be supported on the lower portion of the steel member 130 while maintaining the horizontal.

한편 상기 받침수단(200)은 상기 수평파일(420)에 결합되는 것으로, 상기 긴장수단(300)을 수용할 수 있도록 내부에 공간부(220a)가 형성되고, 수용된 긴장수 단(300)의 작동 및 설치가 가능하도록 상,하부가 개구되어 공간부(220a)와 연통되는 가이드부재(220)와, 상기 가이드부재(220)의 내부에 나사(222)결합되고 가이드부재(220) 상에서 상하로 이동 가능하도록 구성되어 긴장수단(300)에 의해 긴장력이 가해진 형강재(130)를 받쳐주어 수직력이 흙막이 구조물에 가해지도록 하는 받침부재(221)와, 상기 받침부재(221)의 외부에 설치되어 가이드부재(220) 상에서 상하 이동이 가능하도록 하는 승하강손잡이(223)와, 상기 받침부재(221)의 상부에 설치되고 상기 긴장수단(300)의 상하 작동시 긴장수단(300)을 가이드해줄 수 있도록 중심부에 가이드홀(225)이 형성되며 형강재(130)를 보다 안정적으로 받쳐줄 수 있도록 하는 가이드판(224)을 포함하여 구성된다.Meanwhile, the supporting means 200 is coupled to the horizontal pile 420, and a space portion 220a is formed therein so as to accommodate the tension means 300, and the operation of the received tension stage 300 is performed. And a guide member 220 which is opened and configured to be installed to communicate with the space part 220a, and a screw 222 coupled to the inside of the guide member 220 and moves up and down on the guide member 220. Support member 221 and the support member 221 is provided on the outside of the support member 221 is configured to be supported by the tension member 300 is applied to the steel member 130 is applied to the tension force so that the vertical force is applied to the earth structure Lifting handle 223 to move up and down on the 220 and the central portion to be installed on the upper portion of the support member 221 to guide the tension means 300 during the vertical operation of the tension means 300 Guide hole 225 is formed in the shape steel 130 It is configured to include the guide plate 224 to allow batchyeojul more stably.

상기 가이드부재(220)는 수평파일에 설치되는 판부재(220c)와, 상기 판부재(220c)에 수직하게 설치되는 다수의 지지부재(220b) 상기 지지부재(220b)에 지지되도록 설치되고, 상기 받침부재(221)가 내부에 나사결합되어 상하로 이동될 수 있도록 구성되는 가이드너트(220d)를 포함하여 구성된다.The guide member 220 is installed so as to be supported by the plate member 220c installed on the horizontal pile, the support members 220b and the support members 220b installed perpendicularly to the plate member 220c. The support member 221 is configured to include a guide nut (220d) is configured to be screwed therein to be moved up and down.

한편 상기 긴장수단(300)은 가이드부재(220)의 내부에 수용되도록 설치되고 피스톤(314)이 상기 가이드홀(225)을 통해 가이드되면서 상기 반력대 받침(140)을 받쳐 형강재(130)에 토압방향으로 긴장력을 가해주는 유압잭(313b)이다. Meanwhile, the tension means 300 is installed to be accommodated in the guide member 220, and the piston 314 is guided through the guide hole 225 to support the reaction table support 140 to the steel member 130. The hydraulic jack 313b exerts a tension in the earth pressure direction.

한편 상기 유압잭(313b)의 설치시 도 14 와 같이 높이조절을 위해 유압잭(313b)의 하부에 고임부재(316)를 더 설치하거나, 도 15 와 같이 피스톤(314)의 상부에 덮여져 피스톤(314)의 승하강시 상하로 이동되면서 형강재(130)에 긴장력이 가해지도록 하는 유압잭 캡(317)을 더 설치할 수 있다.On the other hand, when the hydraulic jack 313b is installed as shown in FIG. 14 to further adjust the height of the holding member 316 in the lower portion of the hydraulic jack 313b, or as shown in FIG. 15 is covered with an upper portion of the piston 314 piston 314 When moving up and down) can be further provided with a hydraulic jack cap 317 to be applied to the steel member 130 to the tension force.

이와 같은 본 발명은 도 13a 및 13b 에서와 같이 유압잭(313b)의 피스톤(314)을 상승하여 반력대 받침(140)을 받쳐 토압방향으로 인장력을 가해준 상태에서 받침수단(200)의 받침부재(221)에 설치된 승하강 손잡이(223)를 잡고 받침부재(221)를 가이드부재(220) 상에서 상승시켜 받력대 받침(140)을 받쳐줌으로써 유압잭(313b)에 의해 긴장된 형강재(130)의 긴장상태를 유지할 수 있도록 한 다음 유압잭(313b)의 유압을 제거하여 받침수단(200)을 통해 흙막이 구조물(400)에 수직력이 가해지게 되는 것이다.As described above, the present invention raises the piston 314 of the hydraulic jack 313b as shown in FIGS. 13A and 13B to support the reaction force bearing 140 to support the supporting member 200 of the supporting means 200 in a state in which tension is applied in the earth pressure direction. Holding the elevating handle 223 installed in the 221, the support member 221 is raised on the guide member 220 to support the support base 140, the tension state of the steel member 130 is tensioned by the hydraulic jack 313b By maintaining the pressure and then removing the hydraulic pressure of the hydraulic jack (313b) is a vertical force is applied to the earth block structure 400 through the support means (200).

상기와 같이 구성되는 본 발명의 프리스트레스 가시설 구조체를 이용한 흙막이 공법을 설명하면 다음과 같다.Referring to the clogging method using the prestressed temporary structure of the present invention configured as described above are as follows.

도 16a ~ 16d는 본 발명의 일실시예에 따른 프리스트레스 가시설 구조체를 이용한 흙막이 공법의 시공과정을 나타낸 예시도로서, 16A to 16D are exemplary views illustrating a construction process of a clogging method using a prestressed temporary structure according to an embodiment of the present invention.

먼저 지중에 다수의 수직파일(410)을 일정간격으로 타설하고, 타설된 수직파일(410)을 수평파일(420)로 연결하며, 상기 수평파일(420)에 버팀보(430)를 설치하여 흙막이 구조물(400)을 시공한다.First, a plurality of vertical piles 410 are placed in the ground at regular intervals, the poured vertical piles 410 are connected with horizontal piles 420, and the support piles 430 are installed on the horizontal piles 420 to hold the earth block structure. Construct 400.

이후 상기 수평파일(420)에 소정의 간격으로 이격된 정착부(421)를 형성하고, 상기 정착부(421)에 힌지(101) 연결되도록 긴장재(100)를 설치한다. Thereafter, fixing units 421 spaced apart at predetermined intervals are formed on the horizontal pile 420, and a tension member 100 is installed to be connected to the hinges 101 by the fixing units 421.

이때 상기 긴장재(100)가 힌지연결부(120)를 통해 연결되는 텐던(110)일 경우에는 다수의 힌지연결부(120) 중 중심에 위치하는 힌지연결부(120)를 통해 텐던 을 긴장할 수 있도록 중심에 위치하는 힌지연결부(120)와 동일선상에 위치하도록 상기 수평파일(420)에 받침수단(200)을 설치한다.In this case, when the tension member 100 is the tendon 110 connected through the hinge connection part 120, the tension member 100 is positioned at the center so as to tension the tendon through the hinge connection part 120 positioned at the center of the plurality of hinge connection parts 120. The support means 200 is installed on the horizontal pile 420 so as to be located on the same line as the hinge connector 120.

이렇게 받침수단(200)의 설치가 완료되면 상기와 같이 힌지연결부(120)에 연결되도록 긴장수단(300)을 설치하여 긴장수단(300)의 유압잭(313a)을 이용하여 토압방향으로 긴장력을 가해준다.When the installation of the support means 200 is completed, the tension means 300 is installed so as to be connected to the hinge connection part 120 as described above, and the tension force is applied in the earth pressure direction by using the hydraulic jack 313a of the tension means 300. .

이후 받침수단(200)의 스크류잭(211) 높이를 조절하여 힌지연결부(120)의 받침대연결부(123)를 받쳐준다. Then, by adjusting the height of the screw jack 211 of the support means 200 supports the pedestal connection portion 123 of the hinge connection portion 120.

이후 유압잭(313a)의 유압을 서서히 제거하면 텐던(110)에 가해진 긴장력이 받침수단(200)의 스크류잭(211)과 지지대(210)로 유도되어 흙막이 구조물(400)에 가해지게 되는 것이다.Then, when the hydraulic pressure of the hydraulic jack 313a is gradually removed, the tension force applied to the tendon 110 is guided to the screw jack 211 and the support 210 of the supporting means 200 to be applied to the earth block structure 400.

상기와 같이 긴장재(100)의 중심에 위치한 힌지연결부(120)를 통한 텐던(110)의 긴장이 완료되면 도 16b, 16c와 같이 최초 긴장되어 받침수단(200)이 받쳐진 힌지연결부(120)를 중심으로 일측 또는 타측의 힌지연결부(120)를 상기와 같은 방법으로 번갈아 가면서 긴장하고, 도 16d와 같이 긴장수단을 제거함으로써 설치가 완료된다.When the tension of the tendon 110 through the hinge connector 120 located in the center of the tension member 100 is completed as described above, the hinge connector 120 supported by the support means 200 is initially tensioned as shown in FIGS. 16B and 16C. The hinge connection portion 120 of one side or the other side to the center of the alternating tension in the same manner as described above, the installation is completed by removing the tension means as shown in FIG.

한편 본 발명은 도 17 에서와 같이, 긴장수단(300)을 각각의 힌지연결부(120)에 연결한 후 각각의 힌지연결부(120)를 중심으로 동시에 긴장력을 발생시켜 텐던을 긴장할 수 도 있다.Meanwhile, in the present invention, as shown in FIG. 17, the tension means 300 may be connected to each hinge connection part 120, and then the tendon may be tensioned by simultaneously generating a tension force around each hinge connection part 120.

한편 본 발명은 도 18 에서와 같이 본 발명의 다른 실시예의 긴장수단 및 받침수단을 이용하여 긴장시킬 수 있다. 보다 상세히 설명하면, 본 발명의 다른 실시 예에 의한 받침수단 및 긴장수단을 수평파일에 설치하고, 긴장수단으로 힌지연결부를 받쳐 토압방향으로 긴장하고, 받침수단으로 힌지연결부를 받쳐줌으로써 텐던에 프리스트레싱을 도입할 수 있게 되는 것이다.Meanwhile, the present invention can be tensioned using the tension means and the support means of another embodiment of the present invention as shown in FIG. In more detail, the support means and the tension means according to another embodiment of the present invention is installed on the horizontal pile, by the tension means to the hinge connection to the tension in the earth pressure direction, by supporting the hinge connection by the support means prestressing the tendon It can be introduced.

한편 도 19a ~ 19c는 본 발명의 다른 실시예에 따른 프리스트레스 가시설 구조체를 이용한 흙막이 공법의 시공과정을 나타낸 예시도로서,On the other hand Figure 19a to 19c is an exemplary view showing the construction process of the earthquake construction method using the prestressed temporary structure according to another embodiment of the present invention,

먼저 지중에 다수의 수직파일(410)을 일정간격으로 타설하고, 타설된 수직파일(410)을 수평파일(420)로 연결하며, 상기 수평파일(420)에 버팀보(430)를 설치하여 흙막이 구조물(400)을 시공한다.First, a plurality of vertical piles 410 are placed in the ground at regular intervals, the poured vertical piles 410 are connected with horizontal piles 420, and the support piles 430 are installed on the horizontal piles 420 to hold the earth block structure. Construct 400.

이후 상기 수평파일(420)에 소정의 간격으로 이격된 정착부(421)를 형성하고, 상기 정착부(421)에 힌지(101) 연결되도록 긴장재(100)를 설치한다. Thereafter, fixing units 421 spaced apart at predetermined intervals are formed on the horizontal pile 420, and a tension member 100 is installed to be connected to the hinges 101 by the fixing units 421.

이때 도 19a, 19b 에서와 같이 긴장재가 형강재(130)일 경우에는 형강재(130)에 다수의 반력대받침(140)을 설치하고 각각의 반력대받침(140)과 동일선상에 위치하도록 수평파일(420)에 받침수단(200) 및 받침수단(200)의 내부에 수용되도록 긴장수단(300)인 유압잭(313b)을 설치한다.In this case, as shown in FIGS. 19A and 19B, when the tension member is the section steel 130, a plurality of reaction force bearings 140 are installed on the shape steel 130 and horizontally positioned to be in line with each reaction force bearing 140. A hydraulic jack 313b serving as the tensioning means 300 is installed in the pile 420 so as to be accommodated in the supporting means 200 and the supporting means 200.

이후 모든 유압잭(313b)을 동시에 작동하게 되면 유압잭(313b)의 피스톤(314)이 받력대받침(140)에 닿아 형강재(130)에 토압방향으로 긴장력을 가하여 프리스트레싱이 도입된다.Since all the hydraulic jacks (313b) at the same time to operate the piston 314 of the hydraulic jack (313b) in contact with the support base 140 to apply a prestressing force to the steel member 130 in the earth pressure direction.

이렇게 형강재(130)에 긴장력이 가해지면 받침수단(200)은 받침부재(221)에 구비된 승하강손잡이(223)를 잡고 회전하게 되면 받침부재(221)가 가이드부재(220)에 가이드 되면서 상부방향으로 이동하게 되고 가이드판(224)이 반력대받침(140)에 닿아 형강재(130)를 받쳐주게 되는 것이다.When the tension member is applied to the steel member 130 as described above, the support means 200 rotates while holding the lifting handle 223 provided on the support member 221 while the support member 221 is guided to the guide member 220. The guide plate 224 is to move in the upper direction is to support the form steel 130 by touching the reaction table support (140).

이후 도 19c 에서와 같이 유압잭(313b)의 유압을 서서히 제거하면 형강재(130)에 가해진 긴장력이 받침수단(200)의 받침부재(221)와 가이드부재(220)를 통해 유도되어 흙막이 구조물(400)에 가해지게 되고, 유압잭(313b)을 제거함으로써 설치가 완료된다.After the hydraulic pressure of the hydraulic jack 313b is gradually removed as shown in FIG. 19c, the tension applied to the steel member 130 is guided through the support member 221 and the guide member 220 of the support means 200 to form the earth block structure 400. ), The installation is completed by removing the hydraulic jack (313b).

한편 도 20a~20d 는 본 발명의 다른 실시예에 따른 프리스트레스 가시설 구조체를 이용한 흙막이 공법의 다른 시공과정을 나타낸 예시도로서,On the other hand Figure 20a to 20d is an exemplary view showing another construction process of the earthquake construction method using the prestressed temporary structure according to another embodiment of the present invention,

형강재(130)에 설치되는 반력대받침(140)들 중에 중심에 위치하는 반력대받침(140)을 받쳐줄 수 있도록 수평파일(420)에 받침수단(200) 및 받침수단(200)의 내부에 수용되도록 긴장수단(300)인 유압잭(131b)을 설치한 후 유압잭(131b)을 작동하여 형강재(130)에 토압방향으로 긴장력을 가해 프리스트레싱을 도입한다.In the interior of the support means 200 and the support means 200 on the horizontal pile 420 to support the reaction table support 140 is located in the center of the reaction table support 140 is installed in the steel member 130 After installing the hydraulic jack 131b which is the tension means 300 to be accommodated, the hydraulic jack 131b is operated to apply the prestressing force to the steel member 130 in the earth pressure direction.

이렇게 형강재(130)에 긴장력이 가해지면 받침수단(200)을 통해 반력대받침(140)을 받쳐주고 유압잭(131b)을 제거한다.When the tension is applied to the shape steel 130 so as to support the reaction table support 140 through the support means 200 and remove the hydraulic jack (131b).

이후 상기 받침수단(200)이 받쳐진 반력대받침(140)을 중심으로 일측 또는 타측에 위치한 반력대받침(140)통해 형강재(130)를 번갈아가면서 긴장하고 유압잭(131b)을 제거함으로서 설치가 완료된다.After the support means 200 is installed by removing the hydraulic jack (131b) by alternately tensioning the steel member 130 through the reaction table support 140 located on one side or the other side around the reaction table support 140 is supported. Is done.

한편 도 21 은 본 발명의 다른 실시예에 의한 형강재를 형강재의 외측에서 긴장 한 후 일실시예에 의한 받침수단을 통해 받쳐준 상태를 나타낸 예시도로서, 긴장수단을 통해 형강재의 외측에서 형강재를 긴장해주고, 일실시예에 의한 받침수 단으로 형강재를 받쳐줄 수도 있다.Meanwhile, FIG. 21 is an exemplary view illustrating a state in which a shape steel according to another embodiment of the present invention is supported by a supporting means according to an embodiment after tensioning the outside of the shape steel, and a shape at the outside of the shape steel through the tension means. Tension the steel, it can also support the shape steel in the bearing stage according to one embodiment.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

도 1 은 본 발명의 일실시예에 의한 프리스트레스 가시설 구조체를 나타낸 예시도,1 is an exemplary view showing a prestressed temporary structure according to an embodiment of the present invention,

도 2 는 본 발명의 일실시예에 의한 텐던의 힌지연결구조를 나타낸 예시도, Figure 2 is an exemplary view showing a hinge connection structure of the tendon according to an embodiment of the present invention,

도 3 은 본 발명의 일실시예에 의한 힌지연결부를 나타낸 분리사시도,Figure 3 is an exploded perspective view showing a hinge connection according to an embodiment of the present invention,

도 4 는 본 발명의 일실시예에 의한 힌지연결부를 나타낸 결합사시도,Figure 4 is a perspective view showing a hinge connection according to an embodiment of the present invention,

도 5 는 본 발명의 일실시예에 의한 받침수단연결부에 걸림턱을 형성한 상태를 나타낸 예시도,5 is an exemplary view showing a state in which a locking step is formed in the support means connecting portion according to an embodiment of the present invention,

도 6 은 본 발명의 일실시예에 의한 다른 힌지연결부를 나타낸 분리사시도,Figure 6 is an exploded perspective view showing another hinge connection according to an embodiment of the present invention,

도 7 은 본 발명의 일실시예에 의한 받침수단 설치구조를 나타낸 예시도,7 is an exemplary view showing a support means installation structure according to an embodiment of the present invention,

도 8 은 본 발명의 일실시예에 의한 받침대를 나타낸 예시도,8 is an exemplary view showing a pedestal according to an embodiment of the present invention;

도 9a 는 본 발명의 일실시예에 의한 텐던의 긴장상태를 나타낸 예시도,Figure 9a is an illustration showing a tension state of the tendon according to an embodiment of the present invention,

도 9b 는 본 발명의 일실시예에 의한 텐던의 긴장 후 받침수단을 통해 받쳐주는 상태를 나타낸 예시도,Figure 9b is an exemplary view showing a state of supporting through the support means after the tension of the tendon according to an embodiment of the present invention,

도 10 은 본 발명의 다른 실시예에 의한 프리스트레스 가시설 구조체를 나타낸 예시도,10 is an exemplary view showing a prestressed temporary structure according to another embodiment of the present invention;

도 11 은 본 발명의 다른 실시예에 의한 형강재의 힌지연결구조를 나타낸 예시도,11 is an exemplary view showing a hinge connection structure of a shaped steel according to another embodiment of the present invention,

도 12 는 본 발명의 다른 실시예에 의한 형강재에 반력대 받침을 설치한 상태를 나타낸 예시도,12 is an exemplary view showing a state in which a reaction table support is installed on a section steel according to another embodiment of the present invention;

도 13a 는 본 발명의 다른 실시예에 의한 형강재의 긴장상태를 나타낸 예시도,Figure 13a is an illustration showing a tension state of the steel sheet according to another embodiment of the present invention,

도 13b 는 본 발명의 다른 실시예에 의한 형강재의 긴장 후 받침수단을 통해 받쳐주는 상태를 나타낸 예시도,Figure 13b is an exemplary view showing a state of supporting through the support means after the tension of the shaped steel according to another embodiment of the present invention,

도 14 는 본 발명의 다른 실시예에 의한 긴장수단에 고임부재를 설치한 상태를 나타낸 예시도,14 is an exemplary view showing a state in which a holding member is installed in the tension means according to another embodiment of the present invention;

도 15 는 본 발명의 다른 실시예에 의한 긴장수단에 유압잭 캡을 설치한 상태를 나타낸 예시도,15 is an exemplary view showing a state in which the hydraulic jack cap is installed on the tension means according to another embodiment of the present invention,

도 16a ~ 16d는 본 발명의 일실시예에 따른 프리스트레스 가시설 구조체를 이용한 흙막이 공법의 시공과정을 나타낸 예시도,Figure 16a ~ 16d is an exemplary view showing the construction process of the earthquake construction method using the prestressed temporary structure according to an embodiment of the present invention,

도 17 은 본 발명의 일실시예에 따른 프리스트레스 가시설 구조체를 한번에 긴장하는 방법을 나타낸 예시도,17 is an exemplary view showing a method of tensioning a prestressed temporary structure at one time according to an embodiment of the present invention;

도 18 은 본 발명의 다른 실시예에 의한 긴장수단 및 받침수단을 이용하여 텐던을 긴장하는 방법을 나타낸 예시도,18 is an exemplary view showing a method of tensioning tendons using tension means and support means according to another embodiment of the present invention;

도 19a ~ 19c는 본 발명의 다른 실시예에 따른 프리스트레스 가시설 구조체를 이용한 흙막이 공법의 시공과정을 나타낸 예시도,19a to 19c is an exemplary view showing the construction process of the earthquake construction method using the prestressed temporary structure according to another embodiment of the present invention,

도 20a~20d 는 본 발명의 다른 실시예에 따른 프리스트레스 가시설 구조체를 이용한 흙막이 공법의 다른 시공과정을 나타낸 예시도,20a to 20d is an exemplary view showing another construction process of the earth clogging method using a prestressed temporary structure according to another embodiment of the present invention,

도 21 은 본 발명의 다른 실시예에 의한 형강재를 형강재의 외측에서 긴장 한 후 일실시예에 의한 받침수단을 통해 받쳐준 상태를 나타낸 예시도.Figure 21 is an exemplary view showing a state supported by the support means according to an embodiment after tensioning the shape steel according to another embodiment of the present invention from the outside of the steel.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

(100) : 긴장재 (101) : 힌지100: tension material 101: hinge

(110) : 텐던 (120) : 힌지연결부(110): tendon (120): hinge connection

(121) : 제1연결고리 (122) : 제2연결고리(121): first connection ring (122): second connection ring

(123) : 받침수단연결부 (124) : 제3연결고리(123): supporting means connecting portion (124): third connecting ring

(125) : 지지판 (126) : 걸림턱125: support plate 126: locking jaw

(127) : 텐던연결판 (128) : 텐던연결구(127): tendon connector plate (128): tendon connector

(130) : 형강재 (140) : 반력대 받침130: shaped steel (140): reaction table bearing

(141) : 브래킷 (142) : 수평유지블록(141): bracket (142): horizontal block

(143) : 연결플레이트 (144) : 마감플레이트(143): connecting plate (144): finishing plate

(200) : 받침수단 (210) : 지지대200: support means 210: support

(211) : 스크류잭 (212) : 스크류(211): screw jack 212: screw

(213) : 받침대 (214) : 스크류홀(213): base 214: screw hole

(215) : 이탈방지 가이드턱(220) : 가이드부재(215): Departure prevention guide jaw (220): Guide member

(220a) : 공간부 (220b) : 지지부재220a: space portion 220b: support member

(220c) : 판부재 (22d) : 가이드너트(220c): Plate member 22d: Guide nut

(221) : 받침부재 (222) : 나사(221): support member 222: screw

(223) : 승하강손잡이 (224) : 가이드판(223): lifting handle (224): guide plate

(225) : 가이드홀 (300) : 긴장수단(225): guide hole 300: tension means

(310) : 연결부재 (311) : 연결판(310): connecting member 311: connecting plate

(312) : 반력대 (313a)(313b) : 유압잭(312): reaction table (313a) (313b): hydraulic jack

(314) : 피스톤 (315) : 강봉314: Piston 315: Steel Bar

(316) : 고임부재316: retaining member

(317) : 유압잭캡 (400) : 흙막이 구조물 (317): hydraulic jack cap 400: earth block structure

(410) : 수직파일 (420) : 수평파일(410): vertical pile (420): horizontal pile

(430) : 버팀보 (421) : 정착부(430): braces 421: anchorage

(423) : 볼트 (424) : 너트423: Bolt 424: Nut

Claims (19)

삭제delete 삭제delete 지중에 수직하게 설치되는 다수의 수직파일과, 상기 수직파일에 수평하게 연결되는 수평파일과, 상기 수평파일에 설치되는 버팀보를 포함하는 흙막이 구조물에 설치되어 버팀보의 설치개수를 줄여줄 수 있도록 하는 프리스트레스 가시설 구조체에 있어서,Prestress to reduce the number of installation of the props is installed on the earth structure including a plurality of vertical piles installed vertically in the ground, horizontal piles connected horizontally to the vertical piles, and the props installed on the horizontal piles In the temporary structure, 상기 수평파일에 양단이 힌지 연결되도록 설치되고 다수의 텐던을 힌지연결부를 통해 연결함으로써 구성되는 긴장재;A tension member installed at both ends of the horizontal pile to be hinged and configured by connecting a plurality of tendons through a hinge connection part; 상기 긴장재를 토압방향으로 긴장시켜 흙막이 구조체에 프리스트레싱이 가해지도록 하는 긴장수단;Tension means for tensioning the tension member in the earth pressure direction to prestress the earth block structure; 상기 수평파일에 설치되어 긴장수단에 의해 긴장된 긴장재를 받쳐주고 프리스트레싱에 의해 발생되는 수직력이 수평파일에 가해지도록 하는 받침수단;을 포함하여 구성되되,And a supporting means installed on the horizontal pile to support the tension member by the tension means and to allow the vertical force generated by the prestressing to be applied to the horizontal pile. 상기 힌지연결부는 텐던의 일측단에 결합되는 고리형태의 제1연결고리와, 상기 텐던의 타측단에 결합되고 상기 제1연결고리를 수용하여 제1연결고리와 힌지연결이 가능하도록 하는 제2연결고리와, 상기 제1연결고리와 제2연결고리를 수용하여 힌지연결이 가능하도록 하는 제3연결고리와, 상기 제3연결고리에 일체로 형성되어 상기 받침수단이 받쳐질 수 있도록 구성되는 지지판으로 구성되는 받침수단연결부와, 상기 받침수단연결부의 제3연결고리와, 제2연결고리 및 제1연결고리를 관통하여 연결해주는 볼트;를 포함하여 구성되는 것을 특징으로 하는 프리스트레스 가시설 구조체.The hinge connecting portion has a ring-shaped first connection ring coupled to one end of the tendon, and a second connection coupled to the other end of the tendon and receiving the first connection ring to allow the first connection ring and the hinge connection. A ring, a third connecting ring for receiving the first connecting ring and the second connecting ring to enable the hinge connection, and the support plate formed integrally with the third connecting ring is configured to support the support means Prestressed temporary structure, comprising a; supporting means connecting portion, a third connecting ring of the supporting means connecting portion, a second connecting ring and a bolt connecting to the first connecting ring. 지중에 수직하게 설치되는 다수의 수직파일과, 상기 수직파일에 수평하게 연결되는 수평파일과, 상기 수평파일에 설치되는 버팀보를 포함하는 흙막이 구조물에 설치되어 버팀보의 설치개수를 줄여줄 수 있도록 하는 프리스트레스 가시설 구조체에 있어서,Prestress to reduce the number of installation of the props is installed on the earth structure including a plurality of vertical piles installed vertically in the ground, horizontal piles connected horizontally to the vertical piles, and the props installed on the horizontal piles In the temporary structure, 상기 수평파일에 양단이 힌지 연결되도록 설치되고 다수의 텐던을 힌지연결부를 통해 연결함으로써 구성되는 긴장재;A tension member installed at both ends of the horizontal pile to be hinged and configured by connecting a plurality of tendons through a hinge connection part; 상기 긴장재를 토압방향으로 긴장시켜 흙막이 구조체에 프리스트레싱이 가해지도록 하는 긴장수단;Tension means for tensioning the tension member in the earth pressure direction to prestress the earth block structure; 상기 수평파일에 설치되어 긴장수단에 의해 긴장된 긴장재를 받쳐주고 프리스트레싱에 의해 발생되는 수직력이 수평파일에 가해지도록 하는 받침수단;을 포함하여 구성되되,And a supporting means installed on the horizontal pile to support the tension member by the tension means and to allow the vertical force generated by the prestressing to be applied to the horizontal pile. 상기 힌지연결부는, 상기 텐던의 양단에 연결되되, 다수의 텐던 연결이 가능하도록 가장자리에 다수의 텐던연결구가 형성되어 있는 텐던연결판과, 일측의 텐던연결판 중심에 결합되는 고리형태의 제1연결고리와, 타측의 텐던연결판 중심에 결합되고 상기 제1연결고리를 수용하여 제1연결고리와 힌지연결이 가능하도록 하는 제2연결고리와, 상기 제1연결고리와 제2연결고리를 수용하여 힌지연결이 가능하도록 하는 제3연결고리와, 상기 제3연결고리에 일체로 형성되어 상기 받침수단이 받쳐질 수 있도록 구성되는 지지판으로 구성되는 받침수단연결부와, 상기 받침수단연결부의 제3연결고리와, 제2연결고리 및 제1연결고리를 관통하여 연결해주는 볼트;를 포함하여 구성되는 것을 특징으로 하는 프리스트레스 가시설 구조체.The hinge connection part is connected to both ends of the tendon, a tendon connecting plate having a plurality of tendon connector is formed at the edge to enable a plurality of tendon connection, and the first connection of the ring type coupled to the center of the tendon connecting plate on one side Ring and a second connecting ring coupled to the center of the tendon connecting plate on the other side to accommodate the first connecting ring and the first connecting ring and the hinge connection, and to accommodate the first connecting ring and the second connecting ring A third connecting ring configured to allow hinge connection, a supporting means connecting part formed integrally with the third connecting ring and configured to support the supporting means, and a third connecting ring of the supporting means connecting part. And a bolt connecting the second connecting ring and the first connecting ring to penetrate the prestressed temporary structure. 제 3 항 또는 제 4 항에 있어서,The method according to claim 3 or 4, 상기 받침수단연결부가 볼트를 중심으로 유동되지 않도록 지지판의 하부에 걸림턱이 더 형성되는 것을 특징으로 하는 프리스트레스 가시설 구조체.Prestressed temporary structural body, characterized in that the locking step is further formed in the lower portion of the support plate so that the support means connecting portion does not flow around the bolt. 제 3 항 또는 제 4 항에 있어서,The method according to claim 3 or 4, 상기 받침수단은,The support means, 상기 수평파일에 설치되는 지지대;A support installed on the horizontal pile; 상기 지지대의 상부에 높이조절이 가능하도록 설치되고 상기 힌지연결부를 받쳐줌으로써 프리스트레싱에 의한 수직력이 수평파일에 가해지도록 하는 스크류잭;A screw jack installed on the upper part of the support to allow height adjustment and supporting the hinge connection part such that a vertical force by prestressing is applied to the horizontal pile; 상기 지지대의 상부에 놓여지고 스크류잭의 스크류가 가이드될 수 있도록 중심부에 스크류홀이 형성되어 있는 받침대;를 포함하여 구성되는 것을 특징으로 하 는 프리스트레스 가시설 구조체.And a pedestal having a screw hole formed at a center thereof so as to be placed on the support and guide the screw of the screw jack. 제 3 항 또는 제 4 항에 있어서,The method according to claim 3 or 4, 상기 긴장수단은,The tension means, 상기 지지판의 가장자리에 일단이 볼트 고정되는 다수의 연결부재;A plurality of connection members having one end bolted to an edge of the support plate; 상기 연결부재들의 타단에 볼트 결합되어 연결부재들을 연결함으로써 힌지연결부와 일체가 되도록 하는 연결판;A connecting plate bolted to the other ends of the connecting members to connect the connecting members to be integral with the hinge connecting part; 상기 받침수단의 상부에 설치되는 반력대; A reaction table installed on an upper portion of the supporting means; 상기 반력대에 받쳐지고 연결판의 중심에 연결되어 연결판을 당겨줌으로써 힌지연결부를 중심으로 텐던에 긴장력이 가해지도록 하는 유압잭;을 포함하여 구성되는 것을 특징으로 하는 프리스트레스 가시설 구조체.And a hydraulic jack supported by the reaction zone and connected to the center of the connecting plate to apply tension to the tendon around the hinge connection by pulling the connecting plate. 삭제delete 지중에 수직하게 설치되는 다수의 수직파일과, 상기 수직파일에 수평하게 연결되는 수평파일과, 상기 수평파일에 설치되는 버팀보를 포함하는 흙막이 구조물에 설치되어 버팀보의 설치개수를 줄여줄 수 있도록 하는 프리스트레스 가시설 구조체에 있어서,Prestress to reduce the number of installation of the props is installed on the earth structure including a plurality of vertical piles installed vertically in the ground, horizontal piles connected horizontally to the vertical piles, and the props installed on the horizontal piles In the temporary structure, 상기 수평파일에 양단이 힌지 연결되도록 설치되는 아크형태의 형강재로 이루어진 긴장재;A tension member made of an arc-shaped steel member installed at both ends of the horizontal pile to be hinged; 상기 긴장재를 토압방향으로 긴장시켜 흙막이 구조체에 프리스트레싱이 가해지도록 하는 긴장수단;Tension means for tensioning the tension member in the earth pressure direction to prestress the earth block structure; 상기 수평파일에 설치되어 긴장수단에 의해 긴장된 긴장재를 받쳐주고 프리스트레싱에 의해 발생되는 수직력이 수평파일에 가해지도록 하는 받침수단;을 포함하여 구성되되,And a supporting means installed on the horizontal pile to support the tension member by the tension means and to allow the vertical force generated by the prestressing to be applied to the horizontal pile. 상기 형강재의 하부에 일정간격으로 설치되는 브래킷과, 상기 브래킷에 고정되도록 설치되되, 긴장수단과 받침수단이 수평을 유지하면서 형강재의 하부에 받쳐질 수 있도록 하부면이 수평을 유지하면서 설치되는 수평유지블록으로 이루어진 반력대 받침; 을 더 포함하여 구성되는 것을 특징으로 하는 프리스트레스 가시설 구조체.The bracket is installed at a predetermined interval on the lower portion of the section steel, and is installed to be fixed to the bracket, the lower surface is installed while maintaining the horizontal surface so that the tension means and the support means are supported on the lower portion of the steel Reaction table bearing consisting of horizontal block; The prestressed temporary structure, characterized in that it further comprises. 제 3 항 또는 제 4 항 또는 제 9 항에 있어서,The method according to claim 3 or 4 or 9, 상기 받침수단은, The support means, 상기 수평파일에 결합되고 상기 긴장수단이 내부에 수용될 수 있도록 내부에 공간부가 형성되고 긴장수단의 작동 및 설치가 가능하도록 공간부와 연통되는 개구부가 상,하부에 형성되는 가이드부재;A guide member coupled to the horizontal pile and having a space portion formed therein so that the tension means can be accommodated therein, and opening portions communicating with the space portion so that the tension means can be operated and installed; 상기 가이드부재의 내부에 나사결합되어 상하로 이동가능하도록 구성되는 받침부재;A supporting member screwed into the guide member and configured to be movable up and down; 상기 받침부재의 외부에 설치되어 가이드부재 상에서 상하 이동이 가능하도록 하는 승하강손잡이;A lifting handle provided on an outer side of the support member to move up and down on the guide member; 상기 받침부재의 상부에 설치되고, 상기 긴장수단의 작동시 긴장수단을 가이드해줄 수 있도록 중심부에 가이드홀이 형성되며 긴장수단에 의해 긴장된 긴장재를 안정적으로 받쳐주게 되는 가이드판;을 포함하여 구성되는 것을 특징으로 하는 프리스트레스 가시설 구조체.And a guide plate formed at an upper portion of the supporting member, and having a guide hole formed at the center thereof to guide the tension means when the tension means is operated, and stably supporting the tension member by the tension means. A prestressed temporary structure characterized by the above-mentioned. 제 10 항에 있어서,11. The method of claim 10, 상기 긴장수단은,The tension means, 상기 가이드부재의 내부에 수용되도록 설치되고 피스톤이 상기 가이드홀을 통해 가이드 되면서 긴장재를 토압방향으로 가압하여 긴장력을 가해주는 유압잭인 것을 특징으로 하는 프리스트레스 가시설 구조체.And a hydraulic jack installed to be accommodated in the guide member, the piston being guided through the guide hole to press the tension member in the earth pressure direction to apply a tension force. 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020090061267A 2009-07-06 2009-07-06 Prestressed temporary construction structure KR101137898B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090061267A KR101137898B1 (en) 2009-07-06 2009-07-06 Prestressed temporary construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090061267A KR101137898B1 (en) 2009-07-06 2009-07-06 Prestressed temporary construction structure

Publications (2)

Publication Number Publication Date
KR20110003815A KR20110003815A (en) 2011-01-13
KR101137898B1 true KR101137898B1 (en) 2012-05-02

Family

ID=43611520

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090061267A KR101137898B1 (en) 2009-07-06 2009-07-06 Prestressed temporary construction structure

Country Status (1)

Country Link
KR (1) KR101137898B1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100045B (en) * 2013-04-15 2017-07-21 上海市政工程设计研究总院(集团)有限公司 A kind of prestressed cable or steel strand wires and the attachment structure of pole termination
CN111456023B (en) * 2020-03-31 2021-05-04 江苏东合南岩土科技股份有限公司 Construction method of underground prestressed supporting structure
CN111335327B (en) * 2020-03-31 2024-06-07 江苏东合南岩土科技股份有限公司 Deep anchor pile supporting system and construction method thereof
CN111305233B (en) * 2020-04-17 2020-12-04 中交一公局集团有限公司 Axial force compensation type prestress fish-bellied foundation pit steel supporting structure and construction method thereof
KR102384199B1 (en) * 2021-06-17 2022-04-08 백기원 Prestressed soldier H-pile and self-supporting retaining wall construction method using the same
CN114837102A (en) * 2022-06-24 2022-08-02 中国二十二冶集团有限公司 Method for conveniently tensioning vertical prestressed reinforcement

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200376611Y1 (en) 2004-12-01 2005-03-10 금오금속공업 주식회사 steut for engineering work
KR100659744B1 (en) 2006-01-23 2006-12-20 강신량 Stiffening the side of foundation pits and sheathing board
KR100742221B1 (en) 2006-08-21 2007-07-24 (주)리튼브릿지 Temporary system for land-side protection wall
KR100812722B1 (en) 2007-07-20 2008-03-12 한만엽 Bracket and Support for Prestressed Scaffolding System

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200376611Y1 (en) 2004-12-01 2005-03-10 금오금속공업 주식회사 steut for engineering work
KR100659744B1 (en) 2006-01-23 2006-12-20 강신량 Stiffening the side of foundation pits and sheathing board
KR100742221B1 (en) 2006-08-21 2007-07-24 (주)리튼브릿지 Temporary system for land-side protection wall
KR100812722B1 (en) 2007-07-20 2008-03-12 한만엽 Bracket and Support for Prestressed Scaffolding System

Also Published As

Publication number Publication date
KR20110003815A (en) 2011-01-13

Similar Documents

Publication Publication Date Title
KR101137898B1 (en) Prestressed temporary construction structure
US6539685B2 (en) Apparatus and method for lifting sunken foundations
US3974618A (en) Method of and means for multi-story building construction
KR100991208B1 (en) Prestress composite wale for earth retaining scaffolding and this construction technique
KR100694503B1 (en) Downward construction system and method for 1-way girder and slab of underground structure
KR100966890B1 (en) Pile pressure Method for repair of bridge and pressure apparatus
JP3772657B2 (en) Sliding mountain retaining system
KR100812722B1 (en) Bracket and Support for Prestressed Scaffolding System
CN109944262B (en) Steel cofferdam installation method for reinforcing bridge underwater structure
US20100080658A1 (en) System for supporting slab with concrete pier
JP2016145448A (en) Demolition system and demolition method
KR100778137B1 (en) Bracket and Support for Prestressed Scaffolding System
KR100646178B1 (en) temporary facilities using steel pipe
KR20220063797A (en) Method of Removing Underground Retaining Wall by using H-beam Pile with Prestress Introduction
WO2017146606A1 (en) Method of reconstructing a bridge structure and device for the implementation thereof
KR101250482B1 (en) Underground slab construction method using wire rope and curing pannel flame
JP6508958B2 (en) Demolition system and demolition method
US7144200B2 (en) Innovative prestressed scaffolding system
KR102511485B1 (en) A device for introducing lateral support using the support force of both ends of a collective facility for building civil engineering, including a group stake for temporary facilities, and a method for installing the same and constructing a soil barrier temporary facility
KR100390369B1 (en) Construction method of arch structure of subway or common duct in excavating process
KR101335796B1 (en) Apparatus for supporting form of underground building and method of constructing the underground building using the same
JP3780833B2 (en) Construction method of underground structure
KR102503595B1 (en) Energy reduction underground retaining wall demolition method
JP2002038475A (en) Construction method of caisson type pile
CA2774955A1 (en) Methods and apparatuses for erecting a structural frame

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150930

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160303

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170410

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee