South Korea
Prior art keywords
wire mesh
cylindrical
river
mesh structure
protruding
Prior art date
Application number
KR1020080012258A
Other languages
Korean (ko)
Other versions
KR20090086793A (en
Inventor
허수영
Original Assignee
현대휀스개발 (주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대휀스개발 (주) filed Critical 현대휀스개발 (주)
Priority to KR1020080012258A priority Critical patent/KR101130240B1/en
Publication of KR20090086793A publication Critical patent/KR20090086793A/en
Application granted granted Critical
Publication of KR101130240B1 publication Critical patent/KR101130240B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air
    • E04H1/1222Sales kiosks
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/02Shutters, movable grilles, or other safety closing devices, e.g. against burglary

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

본 발명은 바닥면에 대한 철망의 시공방법을 제공한다. 본 발명에 의한 하천 바닥면의 철망 시공방법은 개천, 하천 또는 강의 바닥면을 정리하고 필요한 깊이만큼 형성하고 다듬어주고; 철망의 면에 대하여 한쪽 방향으로 튀어나온 돌출부를 다수 구비한 돌출 철망을 지면에 대하여 수직방향으로 세우고, 쭈욱 원형으로 휘감아서 상기 철망의 양쪽 끝단이 서로 겹쳐지게 함으로써, 전체적으로 원통형 철망구조체를 형성하며; 상기의 바닥면에 세워진 다수의 원통형 철망구조체들 중에서 인접된 원통형 철망구조체를 상기의 돌출부를 이용하여 서로 결합시켜주며; 이와 같이 결합되어 있는 원통형 철망구조체의 원통형 공간부에 소정의 채움재를 넣고 바닥다지기 작업을 진행하게 된다. 본 발명은 개천 등의 바닥면에 다수의 원통형 철망구조체를 간단하고 수월하게 형성할 수 있으므로, 작업효율이 매우 높은 장점이 있다. The present invention provides a method of constructing a wire mesh on the bottom surface. The wire mesh construction method of the bottom of the river according to the present invention cleans up the bottom surface of the stream, river or river and forms and trims to the required depth; Forming a protruding wire mesh having a plurality of protruding portions protruding in one direction with respect to the surface of the wire mesh in a vertical direction with respect to the ground, and winding them roundly so that both ends of the wire mesh overlap each other, thereby forming an overall cylindrical wire mesh structure; Joining adjacent cylindrical wire mesh structures from among a plurality of cylindrical wire mesh structures erected on the bottom surface using the protrusions; In this way, a predetermined filling material is put into the cylindrical space portion of the cylindrical wire mesh structure that is coupled to proceed with the grounding operation. The present invention can be easily and easily formed a plurality of cylindrical wire mesh structure on the bottom surface of the stream, etc., there is an advantage that the work efficiency is very high.

철망, 개비온, 하천, 개천, 강, 바닥면, 원통형 철망구조체, 시공방법 Wire Mesh, Gabion, River, Stream, River, Floor, Cylindrical Wire Mesh Structure, Construction Method

Description

철망을 이용한 바닥면의 시공방법{Method of Constructing Basement with Steel Mesh} Method of Constructing Basement with Steel Mesh {Method of Constructing Basement with Steel Mesh}

본 발명은 철망을 이용한 바닥면의 시공방법에 관한 것으로서, 더욱 상세하게는 철망을 이용하여 개천, 하천 또는 강의 바닥면을 간편하고 손쉽게 시공할 수 있고, 또한 안정적이고 견고한 상태를 유지할 수 있는 하천 바닥면의 철망 시공방법에 관한 것이다. The present invention relates to a construction method of the bottom surface using a wire mesh, and more particularly, it is possible to easily and easily construct the bottom surface of streams, rivers or rivers using a wire mesh, and also to maintain a stable and solid state. It relates to a wire mesh construction method of cotton.

오늘날 우리 사회는 도시화 및 산업화가 진행됨에 따라 인구의 집중화를 가져오게 되고, 집중된 인구들이 사용하는 식수 및 각종 공장에서 필요로 하는 공업용수를 개발하기 위하여, 각종의 공사들이 진행되고 그와 더불어 하천의 효율적인 이용을 필연적으로 요구하기에 이르렀다. In our society today, as urbanization and industrialization progress, the concentration of the population is brought about, and in order to develop the drinking water used by the concentrated population and the industrial water needed by various factories, various constructions are carried out along with the streams. It has inevitably required efficient use.

한편, 최근들어 산업화가 어느 정도 진행되어지고 삶의 질에 관한 관심이 증대되어가면서, 산업화 과정에서 나타난 각종의 부작용에 대한 경각심과 더불어 주변환경의 보전 및 원상회복에 대한 관심이 날로 증대되어가고 있다. On the other hand, as industrialization has progressed to some extent and interest in quality of life has increased in recent years, interest in the preservation and restoration of the surrounding environment as well as awareness of various side effects in the industrialization process has been increasing day by day. .

오늘날, 이러한 현상은 도시 주변의 하천과 개천 등의 오염으로 인한 하천의 자연환경 보존 내지 복원 기능이 날로 저하되거나 악화되어가고, 하천의 수질오염은 물론 생태계 구성요소로서 하천 식생과 하천에 서식하는 어류와 조류의 서식밀도가 낮아지고, 서식 동식물의 다양성이 감소되어지고 있음을 뒤늦게나마 자각한 결과, 자연스럽게 일반인들의 관심 사항으로 등장하고 있는 것이다. Today, these phenomena are deteriorating or deteriorating in the natural environment preservation or restoration of rivers due to the pollution of rivers and streams around the city, and the river vegetation and fish inhabiting the rivers as an ecosystem component As a result of the late recognition that the densities of birds and birds are decreasing, and the diversity of the flora and fauna is decreasing, it is naturally emerging as a concern of the general public.

이와 같은 파괴된 환경의 복원에 관한 열망이나 친환경 방식에 의한 새로운 시공방법에 관한 열망은, 그 형태에 있어서 과거의 방식을 반성하고 그 단점을 개선해나가고자 하는 것이고, 또한 앞으로 진행되어져야 할 하천과 개천에 대한 개발 방식을 좀더 주변환경에 적합한 방식으로 개선하여 추진되어야 함을 의미한다. Such a desire for restoration of a destroyed environment or a new construction method by an environmentally friendly way is to reflect on the old way in the form and to improve its disadvantages, and to further improve the This means that the development of the stream should be promoted in a manner more appropriate to the surrounding environment.

하천이나 개천의 개발 내지 개량사업은 필연적으로 하천이나 개천의 바닥면에 쌓여져 있는 쓰레기나 진흙을 제거하고, 그 바닥면을 고르게 다듬는 단계를 필연적으로 포함하고 있으며, 이 점에서 바닥면에 관한 시공방법은 하천이나 개천의 개량사업에 있어서 필수적인 기본 과정이라고 할 수 있다. The development or improvement of rivers or streams inevitably involves the step of removing rubbish or mud accumulated on the bottom of rivers or streams, and smoothing the floors. Can be said to be an essential basic process in the improvement work of rivers and streams.

그런데, 종래의 바닥면의 시공방법은 일단 하천이나 개천의 바닥면을 일정한 깊이로 파헤치고 이를 걷어낸 다음, 통상적인 개비온 철망을 이용하고 그 내부에 자갈이나 깬돌 등의 채움재를 집어넣고, 그 위에 철망 덮개로 체결하는 것이 통상적으로 수행되는 것이었다. However, the conventional method of construction of the bottom surface is to dig the bottom surface of the stream or stream to a certain depth and roll it out, then use a conventional Gabion wire mesh, and put a filling material such as gravel or crushed stone therein, and on it Fastening with a wire mesh sheath was a common practice.

또한, 종래의 다른 바닥면의 시공방법은 역시 일단 하천이나 개천의 바닥면을 일정한 깊이로 파헤치고 이를 걷어낸 다음, 통상적인 개비온 철망을 원형으로 말아서 원통형으로 만들고, 각각의 원통형의 철망들을 서로 체결 철선으로 연결하 여 결합시키고, 그 이후에 각각의 원통형 철망들의 내부에 자갈이나 깬돌 등의 채움재를 집어넣고, 그 위에 철망 덮개로 체결하는 것이었다. In addition, another conventional construction method of the bottom surface is to dig the bottom surface of the stream or stream to a certain depth and then roll it out, and then roll the conventional Gabion wire mesh in a circle to make a cylindrical, and fasten each cylindrical wire mesh together The wires were joined together, and afterwards, a filling material such as gravel or crushed stone was inserted into each of the cylindrical wire meshes, and the wire mesh cover was fastened thereon.

그렇지만, 이와 같은 종래의 바닥면 시공방법은 통상의 개비온 철망을 그대로 활용하였고, 또한 작업자가 상기 개비온 철망을 원통형으로 말아서 세워두고, 그 상태에서 다른 원통형 철망과 완전히 결합시킬 때까지 그 원형을 계속적으로 유지시켜야 하였으므로, 다른 원통형 철망과 결합시키는 과정에서 그 원통형 형상이 원래대로 유지되기 어려운 단점이 있었다. However, such a conventional floor construction method utilizes the usual Gabion wire mesh as it is, and also the operator keeps the Gabion wire mesh rolled up in a cylindrical shape, and continues the circle until it is completely combined with other cylindrical wire meshes. Since it had to be maintained, in the process of combining with other cylindrical wire mesh, the cylindrical shape was difficult to maintain the original.

또한, 종래의 바닥면 시공방법은 상기 원통형 개비온 철망을 형성하는 것 자체가 매우 어려웠고, 서로 인접한 다른 원통형 개비온 철망들과 서로 결합시키는 것이 극히 어려웠었다. 이는 작업자들이 두꺼운 지름의 철선을 수작업에 의해 일일히 결합시키기 위해 별도의 철선을 이용하여 꽈배기 형태로 결합시키거나, 별도의 철선을 이용하여 원통형 개비온 철망을 칭칭 감아서 결선작업을 행하여야 하였기 때문이다. In addition, in the conventional floor construction method, it was very difficult to form the cylindrical Gabion wire mesh itself, and it was extremely difficult to combine with other cylindrical Gabion wire meshes adjacent to each other. This is because workers had to connect the wires of thick diameter by hand by using a separate wire to form a pretzel, or use a separate wire to wind the cylindrical gabion wire mesh to perform the wiring work. .

또한, 종래의 방법에 의할 경우, 그 작업을 진행하는 과정에서, 수많은 작업자들이 개비온 철망이나 결합 철선을 다루면서 손이나 발 또는 신체에 찔리거나, 입고 있던 작업복이 찢어지게 됨으로써, 작업의 안전성을 기하기 어려운 측면이 있었다. In addition, according to the conventional method, in the course of the operation, a number of workers dealt with gabion wire mesh or binding wire, stuck to the hands, feet, or body, or torn work clothes, to ensure the safety of the work There was a difficult side.

이와 같이, 종래의 하천 바닥면의 시공방법은 종래의 통상적인 철망 제품을 그대로 활용함으로써 작업의 효율성을 기하기 어려운 단점이 있었고, 작업자의 안전에도 그 자체의 단점을 그대로 안고 있으며, 작업의 효율성도 낮고, 작업현장의 실제 상황에 적절하게 대응하기 어려운 측면이 있다. As such, the conventional method of constructing the bottom surface of a river has a disadvantage in that it is difficult to achieve the efficiency of work by utilizing the conventional wire mesh products as it is. It is low and difficult to adequately respond to the actual situation of the workplace.

따라서, 본 발명의 목적은 강이나 하천의 바닥면의 상황에 유연하게 대처할 수 있고 작업의 수월성을 개선함과 동시에 작업의 효율성을 높일 수 있는 하천 바닥면의 철망 시공방법을 제공하는 데 있다. Accordingly, it is an object of the present invention to provide a method for constructing a wire mesh of a river bottom surface which can flexibly cope with the situation of the bottom surface of a river or a river, and at the same time improve work efficiency.

본 발명은 강이나 개천 또는 하천의 바닥면을 시공하는 철망의 시공방법에 관한 것이다. The present invention relates to a method of constructing a wire mesh for constructing the bottom surface of a river, stream or river.

본 발명에 의한 하천 바닥면의 철망 시공방법은 a). 개천, 하천 또는 강의 바닥면을 정리하고 필요한 깊이만큼 형성하고 다듬어주는 준비단계와; b). 철망의 면에 대하여 한쪽 방향으로 튀어나온 다수의 돌출부를 구비한 돌출 철망을 지면에 대하여 수직방향으로 세우고, 쭈욱 원형으로 휘감아서 상기 철망의 양쪽 끝단이 서로 겹쳐지게 함으로써, 전체적으로 원통형 철망구조체를 형성하고, 이와 같은 원통형 구조체들을 상기의 바닥면 위에 조밀하게 세워나가는 원통형 철망구조체의 형성단계와; c). 상기의 바닥면에 세워진 다수의 원통형 철망구조체들 중에서 서로 인접된 원통형 철망구조체를 서로 결합시키되, 상기의 돌출부를 이용하여 서로 인접된 원통형 철망구조체들을 서로 결합시켜주는 원통형 철망구조체의 결합단계와; d). 서로 결합되어 있는 상기의 원통형 철망구조체의 원통형 공간부에 소정의 채움재를 넣고 바닥다지기 작업을 진행하는 채움재의 충진단계; 를 포함하고 있다. Wire mesh construction method of the bottom surface of the river according to the present invention is a). A preparation step of arranging the bottom surface of the stream, the river or the river, and forming and trimming the required depth; b). Protruding wire mesh having a plurality of protrusions protruding in one direction with respect to the surface of the wire mesh in a vertical direction with respect to the ground, and wrapped around in a circular shape so that both ends of the wire mesh overlap each other, thereby forming an overall cylindrical wire mesh structure Forming a cylindrical wire mesh structure for densely standing such cylindrical structures on the bottom surface; c). Combining the cylindrical wire mesh structures adjacent to each other among the plurality of cylindrical wire mesh structures erected on the bottom surface, and coupling the adjacent cylindrical wire mesh structures to each other using the protrusion; d). A filling step of filling a filling material into a cylindrical space portion of the cylindrical wire mesh structure coupled to each other and proceeding to the grounding operation; It includes.

본 발명은 상기 채움재의 위에 유연성 철망을 쭈욱 펼쳐서 덮개를 형성하고, 상기의 덮개를 상기 원통형 철망구조체에 결합시키는 덮개망의 결합단계; 를 추가로 더욱 포함할 수 있다. The present invention comprises a step of coupling the cover net to form a cover by spreading the flexible wire mesh on the filling material, the cover to the cylindrical wire mesh structure; It may further include a.

본 발명에 있어서, 상기의 원통형 철망구조체의 형성단계는 상기의 바닥면에 먼저 부직포를 깔아주고, 그 부직포의 위쪽에 상기의 돌출 철망을 원형으로 감아서 원통형으로 만들 수 있다. In the present invention, in the forming step of the cylindrical wire mesh structure, first, the nonwoven fabric is laid on the bottom surface, and the protruding wire mesh is wound around the nonwoven fabric in a circular shape to make it cylindrical.

본 발명에 있어서, 상기의 돌출 철망은 통상의 6각 개비온 철망이나 5각 개비온 철망이나 사각 용접철망을 이용하되 그의 철망을 이룬 면에 대하여 바깥쪽으로 돌출된 다수의 돌출부를 포함하고 있는 것이 바람직하다. 상기의 돌출부는 바깥쪽으로 튀어나온 세모 형태이거나 네모 형태이거나 원형의 형태이거나 그 이외의 다각형 형태로 이루어질 수 있다. In the present invention, it is preferable that the projecting wire mesh includes a plurality of protrusions projecting outward with respect to the surface of the wire mesh, using a common hexagonal gabion wire mesh, a five-membered gabion wire mesh, or a square welded wire mesh. The protrusion may be formed in a triangular shape, a square shape, a circular shape, or other polygonal shape protruding outward.

이와 같이, 본 발명에 의한 하천 바닥면의 철망 시공방법은 하천의 바닥면에 유연성을 가진 철망으로 형성되어 있고, 상기의 철망은 또한 원통형을 이루고 있으므로, 위에서 내리누르는 압력을 고르게 사방팔방의 방사상으로 분산시킬 수 있어서, 매우 안정된 바닥면을 형성할 수 있게 된다. As described above, the method of constructing the wire mesh of the bottom of the river according to the present invention is formed of a flexible wire mesh on the bottom of the river, and the wire mesh is also formed in a cylindrical shape, so that the pressure pressed from above is evenly radially in all directions. It can disperse | distribute and it becomes possible to form the very stable bottom surface.

또한, 본 발명에 의한 하천 바닥면의 철망 시공방법은 작업자가 간단하게 철 망의 돌출부에 체결 철선을 위에서 아래쪽으로 끼워넣게 되면, 간단하게 서로 결합되어지게 되므로, 작업이 매우 간단하고 쉽게 수행될 수 있다. In addition, the wire mesh construction method of the bottom surface of the river according to the present invention when the worker simply puts the fastening wire from the top to the bottom of the projection of the wire mesh, it is simply coupled to each other, the operation can be performed very simply and easily. have.

또한, 본 발명에 의한 하천 바닥면의 철망 시공방법은 위에서 내리누르는 압력에 의해 원통형 철망을 바깥쪽으로 밀어내게 되고, 그 과정에서 상기 원통형 철망이 약간 늘어나게 되는데, 이때 상기의 돌출부가 점차적으로 펼쳐지게 되므로, 오히려 그 결합관계는 더욱 확실하고 견고하게 이루어지게 되는 것이다. In addition, the wire mesh construction method of the bottom surface of the river according to the present invention is pushed out of the cylindrical wire mesh by the pressure pressed down from the above, in the process the cylindrical wire mesh is slightly stretched, wherein the protrusions are gradually expanded, Rather, the bond is made more certain and firm.

이하, 본 발명을 첨부된 도면에 의거하여, 보다 구체적으로 설명한다. 다만, 첨부된 도면은 본 발명의 기술사상을 보다 상세하게 설명하기 위한 것일 뿐이며, 본 발명의 기술사상이 이에 한정되는 것이 아님은 당연하다. Hereinafter, with reference to the accompanying drawings, the present invention will be described in more detail. However, the accompanying drawings are only intended to describe the technical spirit of the present invention in more detail, and the technical spirit of the present invention is not limited thereto.

도 1은 본 발명에 의한 하천 바닥면의 철망 시공방법을 나타낸 블록도이다. 1 is a block diagram showing a wire mesh construction method of the bottom surface of the river according to the present invention.

1). 지표면의 형성 및 준비단계(S 110): One). Surface formation and preparation step (S 110):

본 발명에 의한 하천 바닥면의 철망 시공방법은 개천, 하천 또는 강의 바닥면을 정리하고 필요한 깊이만큼 형성하고 다듬어주는 준비단계(S 110)를 포함하고 있다. The wire mesh construction method of the bottom surface of the river according to the present invention includes a preparation step (S 110) for arranging and trimming the bottom surface of the stream, river or river to the required depth.

본 발명에 있어서, 강이나 개천 또는 하천의 바닥면은 자연상태의 모습으로 존재할 경우도 있고, 수해로 인하여 유실된 부분을 복구하거나, 수해로 인하여 상 류에서 떠내려온 자갈 모래 흙에 의해 쌓여 있는 경우일 수도 있다. 또한, 수많은 시간이 경과되어 그 바닥면에 각종의 모래나 진흙 또는 각종의 쓰레기가 차곡차곡 쌓여있는 경우도 존재할 수 있다. In the present invention, the bottom surface of the river, stream or river may exist in a natural state, or may be recovered by the sea water, or may be piled up by gravel sand soil drifted upstream due to flooding. It may be. In addition, there may be a case where a large amount of time has elapsed, and various types of sand, mud, or various wastes are piled up on the bottom surface thereof.

본 발명에 있어서, 강이나 개천 또는 하천의 바닥면은 물이 차 있는 경우, 그 상태에서 준설기를 이용하여 바닥면을 걷어낼 수 있으며, 상기의 물을 다른 방향으로 흘러가게 한 다음, 그 바닥면을 각종의 중장비를 동원하여 걷어내는 것이 더욱 바람직하다. 이러한 바닥면의 형성 및 그 준비단계는 통상적인 방식으로 수행될 수 있는 것이므로, 상세한 설명을 생략한다. In the present invention, when the bottom surface of the river, stream or river is filled with water, the dredger can be used to remove the bottom surface in the state, and the water flows in the other direction, and then the bottom surface. It is more preferable to mobilize a variety of heavy equipment. The formation of such a bottom surface and its preparation step may be performed in a conventional manner, and thus detailed description thereof will be omitted.

2). 원통형 철망구조체의 형성단계(S 120): 2). Formation step of the cylindrical wire mesh structure (S 120):

본 발명에 의한 하천 바닥면의 철망 시공방법은 하천의 바닥면에 원통형 철망구조체(200)를 형성하여 조밀하게 세워나가는 나가는 원통형 철망구조체의 형성단계(S 120)를 포함하고 있다. The wire mesh construction method of the bottom surface of the river according to the present invention includes forming a cylindrical wire mesh structure 200 on the bottom surface of the stream to form a step of forming a cylindrical cylindrical wire mesh structure outgoing densely (S 120).

본 발명에 의한 하천 바닥면의 철망 시공방법은 철망의 면에 대하여 한쪽 방향으로 튀어나온 돌출부(110)를 다수 구비한 돌출 철망(100)을 이용하여, 원통형 철망구조체(200)를 형성하는 것이 바람직하다. In the method of constructing a wire mesh of a river bottom surface according to the present invention, it is preferable to form a cylindrical wire mesh structure 200 by using the protruding wire mesh 100 having a plurality of protrusions 110 protruding in one direction with respect to the surface of the wire mesh. Do.

도 2는 본 발명의 하천 바닥면의 철망 시공방법을 실시하는데 적합한 원통형 철망구조체(200)에 관한 개략적인 사시도이다. 2 is a schematic perspective view of a cylindrical wire mesh structure 200 suitable for implementing the wire mesh construction method of the bottom surface of the present invention.

본 발명에 있어서, 상기의 원통형 철망구조체(200)는 상기의 돌출철망(100) 을 이용하게 되는데, 이때 상기의 돌출철망(100)은 가로철선과 세로철선을 서로 꼬여서 제조하게 되는 6각 개비온 철망, 5각 개비온 철망, 또는 사각 능형철망을 이용하거나, 가로철선과 세로철선을 서로 교차시키고 전기용접시켜서 제조되는 사각 용접철망을 이용할 수 있다. In the present invention, the cylindrical wire mesh structure 200 is to use the protruding wire mesh 100, wherein the protruding wire mesh 100 is a hexagonal Gabion wire mesh to be produced by twisting the horizontal wire and the vertical wire to each other For example, a rectangular gabion wire mesh or a square ridge wire mesh may be used, or a square welded wire mesh manufactured by crossing and electrically welding a horizontal wire and a vertical wire may be used.

도 3은 본 발명에서 사용될 수 있는 상기의 돌출철망(100)을 예시적으로 도시하고 있다. 도 3의 도면에서는 그 본체를 사각 용접철망으로 도시하고 있는 반면에, 그에 관한 세부 확대도에서는 6각 개비온 철망과 5각 개비온 철망을 도시하고 있는데, 이는 상기 원통형 철망구조체(200)를 사각 용접철망이나 6각 개비온 철망 또는 5각 개비온 철망으로 형성할 수 있다는 점을 나타내기 위한 것이고, 상기의 사각 용접철망에 6각 개비온 철망이나 5각 개비온 철망을 혼용한 것이 아님을 밝혀둔다. 3 exemplarily illustrates the protruding wire mesh 100 that may be used in the present invention. In FIG. 3, the main body is shown as a rectangular welded wire mesh, while a detailed enlarged view thereof shows a hexagonal gabion wire mesh and a five-angle gabion wire mesh, which represent the cylindrical wire mesh structure 200 in a rectangular welded wire mesh. Or it is to show that it can be formed by a hexagonal Gabion wire mesh or a five-membered Gabion wire mesh, it is to be noted that the square welded wire mesh is not mixed with the hexagonal Gabion wire mesh or five-membered Gabion wire mesh.

본 발명에 있어서, 상기의 원통형 철망구조체(200)는 그 철망의 본체를 이루고 있는 면에 대하여 한쪽 방향으로 튀어나온 돌출부(110)를 다수 포함하고 있는 것을 특징으로 한다. 상기 돌출부(110)의 한쪽 방향은 상기 철망의 본체를 원형으로 말아서 그 양쪽 끝단을 서로 겹쳐지게 하였을 경우, 상기 원형의 바깥쪽으로 향하는 방향을 의미한다. In the present invention, the cylindrical wire mesh structure 200 is characterized in that it comprises a plurality of protrusions 110 protruding in one direction with respect to the surface constituting the main body of the wire mesh. One direction of the protrusion 110 refers to a direction toward the outer side of the circle when the main body of the wire mesh is rolled in a circle so that both ends thereof overlap each other.

도 4는 상기 원통형 철망구조체(200)의 바깥쪽 방향으로 형성되어지는 상기 돌출부(110)의 형상을 예시적으로 도시한 평면도이다. 4 is a plan view exemplarily illustrating a shape of the protrusion 110 formed in an outward direction of the cylindrical wire mesh structure 200.

본 발명에 있어서, 상기의 돌출부(110)는 상기 원통형 철망구조체(200)의 바깥쪽 방향으로 형성되어지되, 그 사이 공간에 체결 철선(130)이 잘 들어가서 삽입될 수 있는 형태가 바람직하다. 이를 위하여, 상기의 돌출부(110)는 바깥쪽으로 튀어나온 형상이 세모 형태이거나 네모 형태이거나 원형의 형태이거나 또는 그 이외의 다각형 형태로 이루어질 수 있다. In the present invention, the protrusion 110 is formed in the outer direction of the cylindrical wire mesh structure 200, it is preferable that the fastening wire 130 is inserted into the space therebetween can be inserted well. To this end, the protrusion 110 may be formed in a triangular shape, a square shape, a circular shape, or a polygonal shape other than that protruding outward.

본 발명에 있어서, 상기의 돌출부(110)는 바닥면에 세워지는 원통형 철망구조체(200)의 원통형의 크기에 따라 그 갯수가 구체적으로 결정될 수 있다. 상기 돌출부(110)의 갯수는 서로 인접된 다른 돌출부(110)와의 길이가 15 센티미터 내지 70 센티미터의 간격을 이루고 형성되는 것이 바람직하다. 상기 돌출부(110)의 간격이 15 센티미터 보다 작을 경우에는 너무 많은 갯수의 돌출부가 형성되어지는 경향을 보이고, 상기 돌출부(110)의 간격이 70 센티미터 보다 클 경우엔, 간격이 너무 넓어져서 실제로 인접된 원통형 철망구조체와 결합관계가 엉성하게 될 가능성이 있게 된다. 보다 바람직한 간격은 대략 20 센티미터 내지 40 센티미터이고, 가장 바람직한 간격은 약 30 센티미터 정도이다. In the present invention, the number of the protrusions 110 may be specifically determined according to the size of the cylindrical shape of the cylindrical wire mesh structure 200 is built on the bottom surface. The number of the protrusions 110 is preferably formed at intervals of 15 centimeters to 70 centimeters with the other protrusions 110 adjacent to each other. When the spacing of the protrusions 110 is smaller than 15 centimeters, too many protrusions tend to be formed. When the spacing of the protrusions 110 is larger than 70 centimeters, the spacing is too wide to actually be adjacent. There is a possibility of loose coupling with the cylindrical wire mesh structure. More preferred spacing is approximately 20 centimeters to 40 centimeters, and the most preferred spacing is about 30 centimeters.

본 발명에 의한 하천 바닥면의 철망 시공방법은 위와 같은 형상의 돌출 철망(100)을 지면에 대하여 수직방향으로 세우고, 쭈욱 원형으로 휘감아서 상기 철망의 양쪽 끝단이 서로 겹쳐지게 하고, 이로써 전체적으로 원통형 철망구조체(200)를 형성한다. The wire mesh construction method of the bottom surface of the river according to the present invention, the projecting wire mesh 100 of the shape as described above in the vertical direction with respect to the ground, wound in a round shape so that both ends of the wire mesh overlap each other, thereby the overall cylindrical wire mesh The structure 200 is formed.

도 5a 는 상기 돌출철망(100)이 쭈욱 펼쳐져 있는 상태를 도시하고 있고, Figure 5a shows a state in which the protruding wire mesh 100 is unfolded,

도 5b는 상기 돌출철망(100)을 원형으로 빙 돌려서 그 끝단을 서로 겹쳐지게 함으로써 원통형 철망구조체(200)로 완성한 상태를 보여주고 있다. FIG. 5B shows a state in which the protruding wire mesh 100 is rounded and rounded to form a cylindrical wire mesh structure 200 by overlapping ends thereof.

본 발명에 있어서, 상기의 돌출철망(100)을 상기의 원통형 철망구조체(200)로 전환시키는 작업은 누구나 손쉽게 수행할 수 있다. 예컨대, 작업자는 상기 돌출 철망(100)의 양쪽 끝단을 손으로 잡고, 이것을 원형으로 쭈욱 구부려서 그 끝단을 서로 겹쳐지게 하면, 간단하게 원통형 철망구조체(200)를 형성할 수 있는 것이다. 이때, 작업자는 상기 돌출철망(100)의 양 끝단을 겹쳐지게 한 다음, 그 사이에 돌출부(110)가 철망의 바깥쪽으로 튀어나와 있는 상태에서, 별도의 체결 철선(130)을 삽입시키면 족하다. In the present invention, anyone can easily perform the task of converting the protruding wire mesh 100 into the cylindrical wire mesh structure 200. For example, the worker can simply form the cylindrical wire mesh structure 200 by holding both ends of the protruding wire mesh 100 by hand and bending them in a circular manner so that the ends overlap with each other. In this case, the worker overlaps both ends of the protruding wire mesh 100, and then, in a state in which the protruding portion 110 protrudes outward of the wire mesh therebetween, it is sufficient to insert a separate fastening wire 130.

본 발명에 있어서, 상기의 돌출철망(100)을 상기의 원통형 철망구조체(200)로 전환시키는 작업을 반복적으로 수행하는 것이 바람직하다. 그 반복 횟수는 작업하고자 하는 하천이나 개천의 바닥면에 따라 구체적으로 결정될 수 있다. 작업자가 이와 같은 작업을 반복적으로 수행하면, 위의 원통형 구조체(200)들이 서로 인접하여 상기 바닥면 위에 여러 개 형성되어지고, 이들은 서로 인접하여 상기 바닥면 위에 조밀하게 세워나가게 된다. In the present invention, it is preferable to repeatedly perform the operation of converting the projecting wire mesh 100 to the cylindrical wire mesh structure 200. The number of repetitions may be specifically determined according to the bottom surface of the stream or stream to be worked on. When the worker repeatedly performs such a task, the above cylindrical structures 200 are formed adjacent to each other on the bottom surface, and these are adjacent to each other to build up densely on the bottom surface.

본 발명에 있어서, 상기의 원통형 철망구조체의 형성단계(S 120)는 상기의 바닥면에 먼저 부직포를 깔아주고, 그 부직포의 위쪽에 상기의 돌출 철망(100)을 원형으로 감아서 원통형 철망구조체(200)로 만들 수 있다. 상기의 부직포를 먼저 깔아주게 될 경우, 지면과 상기 원통형 철망구조체(200)들 사이의 경계면을 형성하 게 된다. In the present invention, the forming step of the cylindrical wire mesh structure (S 120) is first laid a non-woven fabric on the bottom surface, the cylindrical wire mesh structure by winding the protruding wire mesh 100 in a circular shape on top of the nonwoven fabric ( 200). When the nonwoven fabric is laid first, it forms an interface between the ground and the cylindrical wire mesh structures 200.

3). 원통형 철망구조체의 결합단계(S 130): 3). Joining step of the cylindrical wire mesh structure (S 130):

본 발명에 의한 하천 바닥면의 철망 시공방법은 상기 바닥면 위에 세워진 다수의 원통형 철망구조체(200)들을 서로 결합시키는 원통형 철망구조체의 결합단계(S 130)를 포함하고 있다. The wire mesh construction method of the bottom surface of the river according to the present invention includes a coupling step (S 130) of the cylindrical wire mesh structure to couple the plurality of cylindrical wire mesh structures 200 erected on the bottom surface.

도 6은 본 발명에 의한 하천 바닥면의 철망 시공방법에 있어서, 원통형 철망구조체의 결합단계(S 130)를 예시적으로 잘 나타내고 있다. 6 is a diagram illustrating a coupling step (S 130) of a cylindrical wire mesh structure in the method for constructing a wire mesh of a river bottom surface according to the present invention.

본 발명에 있어서, 상기의 원통형 철망구조체(200)들은 그들의 철망에서 바깥쪽으로 튀어나온 상기의 돌출부(110)를 이용하여 서로 인접된 다른 원통형 철망구조체(200)들과 결합되어지게 된다. 이를 위하여, 작업자는 서로 인접된 원통형 철망구조체(200)들을 확인하는 과정에서, 서로 인접된 원통형 철망구조체의 돌출부(110)가 다른 원통형 철망구조체의 돌출부와 겹쳐지거나 그의 내면으로 튀어들어간 경우, 위에서 아래쪽으로 별도의 체결 철선(130)을 삽입시키면 족하다. In the present invention, the cylindrical wire mesh structures 200 are coupled to other cylindrical wire mesh structures 200 adjacent to each other by using the protrusion 110 protruding outward from their wire mesh. To this end, in the process of identifying the cylindrical wire meshes 200 adjacent to each other, when the protrusions 110 of the cylindrical wire mesh structures adjacent to each other overlap or protrude into the inner surfaces of the other cylindrical wire mesh structures, the top to the bottom Inserting a separate fastening wire 130 is enough.

본 발명에 있어서, 상기 원통형 철망구조체(200)들을 서로 결합시키는 과정에서, 작업자들은 상기 돌출부(110)가 다른 원통형 철망구조체의 내면으로 튀어들어가 있는 경우에 단순히 상기의 체결 철선(130)을 삽입시키는 것으로 족하고, 종래와 같이 별도로 철선을 꼬아주거나 체결하는 것이 아니므로, 결합작업이 매우 단순하게 수행될 수 있고, 작업자들의 안전에도 매우 유익하게 된다. In the present invention, in the process of coupling the cylindrical wire mesh structure 200 with each other, workers simply insert the fastening wire 130 when the protrusion 110 is protruding into the inner surface of the other cylindrical wire mesh structure. Since it is not sufficient to twist or fasten the wire separately as in the prior art, the joining operation can be performed very simply, and also very beneficial for the safety of the workers.

본 발명에 있어서, 상기의 체결 철선(130)은 원통형 철망구조체(200)들이 서로 인접된 상태에서 견고하게 붙잡아주는 기능을 수행한다. 상기의 체결 철선(130)은 상기의 돌출부(110)에 삽입되어진 후, 그 상하 양단을 적절하게 절곡시켜서 삽입 후 밖으로 빠져나오는 것을 방지하는 것이 바람직하다. 이는 작업의 안정성과 작업자의 안전성을 고려한 것이다. 이 경우 작업자가 작업도중에 찔리거나 옷이 찢어지지 않게 되고, 작업자를 실질적으로 보호할 수 있기 때문이다. 또한, 필요한 경우, 대형 앵커(도시되지 않음)를 상기의 돌출부(110)에 끼워넣은 다음, 망치와 같은 작업도구로 지면에 견고하게 박을 수 있다. 이 경우, 상기의 원통형 철망구조체(200)를 지면에 대하여 견고하게 고정하는 효과를 누릴 수 있다. In the present invention, the fastening wire 130 is a cylindrical wire mesh structure 200 performs a function to hold firmly in the state adjacent to each other. After the fastening wire 130 is inserted into the protruding portion 110, it is preferable to bend the upper and lower ends appropriately to prevent it from exiting after insertion. This takes into account the safety of the work and the safety of the worker. In this case, the worker is not stuck during the work or the clothes are torn, and the worker can be substantially protected. In addition, if necessary, a large anchor (not shown) may be inserted into the protrusion 110, and then firmly embedded in the ground with a work tool such as a hammer. In this case, it is possible to enjoy the effect of firmly fixing the cylindrical wire mesh structure 200 to the ground.

4). 채움재의 충진단계(S 140): 4). Filling step of filling material (S 140):

본 발명에 의한 하천 바닥면의 철망 시공방법은 상기 원통형 철망구조체(200)의 원통형 공간부에 소정의 채움재를 넣고 바닥다지기 작업을 진행하는 채움재의 충진단계(S 140)를 포함하고 있다. The wire mesh construction method of the bottom surface of the river according to the present invention includes a filling step (S 140) of filling the material into which the predetermined filling material is placed in the cylindrical space portion of the cylindrical wire mesh structure 200.

도 7은 본 발명에 의한 하천 바닥면의 철망 시공방법에 있어서, 채움재의 충진단계(S 140)를 예시적으로 잘 나타내고 있다. Figure 7 shows the filling step (S 140) of the filling material in the wire net construction method of the bottom of the river according to the present invention by way of example.

본 발명에 있어서, 상기 원통형 철망구조체(200)는 그의 빈 공간부의 내부에 깬돌이나 자갈돌 또는 시멘트와 같은 산업폐기물 등의 채움재를 채워넣는다. 상기의 채움재는 상기 원통형 철망구조체(200)의 내부에 차곡차곡 채워지게 되고, 이는 상기 원통형 철망구조체(200)를 점차적으로 바깥쪽으로 밀어내는 압력으로 작용하게 된다. 이러한 압력의 작용에 의해, 상기 원통형 철망구조체(200)를 이루고 있는 돌출 철망(100)을 늘어지게 만들고, 이것은 다시 상기 돌출부(110)를 약간씩 펴지게 하는 힘으로 작용하게 된다. 이로써, 상기의 돌출부(110)는 점점 펼쳐지게 되면서, 그 사이에 삽입되어 있는 체결 철선(130)을 더욱 견고하게 밀착시키고 고정하게 된다. 이것은 위에서 내리누르는 압력이 크게 작용하면 작용할수록 상기 원통형 철망구조체(200)는 더욱 팽팽하게 유지되어지고, 그 내리누르는 힘을 고르게 분산시키는 효과를 가져오게 된다. 한편, 상기의 채움재는 개비온 철망의 시공방법에서 통상적으로 사용되고 있는 것으로서, 통상적인 것에 불과하므로, 상세한 설명을 생략한다. In the present invention, the cylindrical wire mesh structure 200 fills the filling material such as industrial waste such as crushed stone, gravel stone or cement in the empty space portion thereof. The filler is gradually filled inside the cylindrical wire mesh structure 200, which acts as a pressure to gradually push the cylindrical wire mesh structure 200 outward. By the action of this pressure, the protruding wire mesh 100 forming the cylindrical wire mesh structure 200 is stretched, which in turn acts as a force to slightly unfold the protruding portion 110. As a result, the protrusion 110 is gradually expanded, and the fastening wire 130 inserted therebetween is more firmly adhered and fixed. This is, the greater the pressure acting down from the top, the more the cylindrical wire mesh structure 200 is maintained more taut, the effect of evenly dispersing the pressing force. On the other hand, the filler is generally used in the construction method of the Gabion wire mesh, it is only a conventional, detailed description thereof will be omitted.

본 발명에 있어서, 상기 채움재의 충진단계(S 140)는 채움재를 어느 정도 채워넣은 다음, 그 지표면에 해당하는 부분에 대해서는 흙이나 부식토 또는 식물이 자라는 것을 돕게 되는 식생토를 선택하여 채워넣을 수도 있다. 이 경우에는, 하천이나 개천의 바닥면에 친수성 식물이 자라나서, 하천의 생태계를 친환경적인 모습으로 복원시켜주게 되므로, 보다 바람직한 실시예라고 할 수 있다. 또한, 필요한 경우, 상기의 채움재 위에 식생매트와 같은 식물 성장형 제품을 전부 또는 부분적으로 사용하여 시공할 수도 있다. In the present invention, the filling step (S 140) of the filling material may be filled with the filling material to some extent, and then selected and filled with vegetation soil to help the soil or humus or plants grow for the portion corresponding to the ground surface. . In this case, a hydrophilic plant grows on the bottom surface of the stream or stream, thereby restoring the ecology of the stream to an environmentally friendly state, and thus can be said to be a more preferred embodiment. In addition, if necessary, it may be applied by using all or part of the plant growth product such as vegetation mat on the filler.

5). 덮개망의 전개단계(S 150): 5). Development of the cover net (S 150):

본 발명에 의한 하천 바닥면의 철망 시공방법은 상기 채움재의 위에 유연성 철망을 쭈욱 펼쳐서 덮개를 형성하는 덮개철망의 전개단계(S 150)를 포함하고 있는 것이 더욱 바람직하다. The wire mesh construction method of the bottom surface of the river according to the present invention more preferably includes a development step (S 150) of the cover wire mesh to form a cover by spreading the flexible wire mesh on the filling material.

본 발명에 있어서, 덮개철망(도시되지 않음)은 역시 철선들이 서로 교차하여 꼬임구조를 이루고 있는 6각 개비온 철망과 5각 개비온 철망과 능형 철망으로 구성된 그룹 중에서 선택된 어느 하나인 것이 바람직하다. 이는 6각 개비온 철망과 5각 개비온 철망과 능형 철망 등이 매우 뛰어난 유연성과 굴요성을 가지고 있기 때문이다. In the present invention, the cover wire mesh (not shown) is also preferably any one selected from the group consisting of hexagonal Gabion wire mesh, pentagonal Gabion wire mesh and rhomboid wire mesh in which the wires cross each other to form a twisted structure. This is because hexagonal Gabion wire mesh, five-membered Gabion wire mesh and rhomboid wire mesh have excellent flexibility and flexibility.

본 발명에 있어서, 상기의 덮개철망은 역시 1장의 시트와 같이 일체형으로 구성되는 것이 바람직하다. 이는 작업현장으로 쉽게 이동할 수 있고, 작업현장의 상황에 적합하게 절단하여 사용할 수 있기 때문이다. 또한, 일체형으로 사용할 경우, 지표면에서와 마찬가지로, 외부에서 어떠한 힘이 가해질 경우에도 그 전체가 움직이지 않는 한, 그 일부의 철망만이 별도로 움직이지 않게 되는 장점이 있기 때문이다. In this invention, it is preferable that said cover wire mesh is also comprised integrally like 1 sheet | seat. This is because it can be easily moved to the job site, it can be used to cut according to the situation of the job site. In addition, when used integrally, as in the case of the ground surface, even if any force is applied from the outside as long as the whole does not move, only part of the wire mesh does not move separately because there is an advantage.

본 발명에 있어서, 상기의 덮개철망은 채움재를 채워넣은 상태에서 그 위로 쭈욱 펼쳐 놓은 다음, 이들을 서로 결합시키는 것이 바람직하다. 상기의 덮개철망은 상기의 원통형 철망구조체(200)와 결합될 경우, 통상의 방식으로 수행될 수 있다. 이를 위하여, C-형 링이나 나선형 철선, 또는 꽈배기형 철선 등을 이용하여 체결시킬 수 있고, 또한, 상기 원통형 철망구조체(200)의 상면 끝단을 걸고리 형식으로 가공하였을 경우에는, 별도의 체결 철선을 상기의 걸고리에 삽입시켜 체결할 수도 있다. In the present invention, the cover wire mesh is spread out thereon in the state of filling the filling material, and then it is preferable to combine them. When the cover wire mesh is combined with the cylindrical wire mesh structure 200, it may be performed in a conventional manner. To this end, it can be fastened using a C-type ring, a spiral wire, or a pretzel type wire, and, in addition, when the upper end of the cylindrical wire mesh structure 200 is processed in a hook form, a separate fastening wire is used. The hook may be inserted into the hook.

본 발명에 의한 하천 바닥면의 철망 시공방법은 하천이나 개천의 바닥면에 시공될 경우, 통상적으로 평평한 평면을 형성할 수도 있지만, 바닥면에 대하여 서로 다른 높이로 단을 형성함으로써, 밀려들어오는 물살의 흐름을 늦추어줄 수 있다. 따라서, 본 발명에 의한 시공방법을 이용할 경우, 하천이나 개천의 물 흐름 조건에 맞추어, 그 물살의 방향을 조절하거나 그 물살의 세기를 조절할 수 있는 장점도 있는 것이다. When the wire mesh construction method of the bottom of the river according to the present invention is formed on the bottom surface of the stream or stream, it may be usually formed a flat plane, but by forming a step at a different height relative to the bottom surface, It can slow down the flow. Therefore, when using the construction method according to the present invention, there is also an advantage that can adjust the direction of the water current or the intensity of the water current according to the water flow conditions of the stream or stream.

또한, 강변의 이쪽과 저쪽을 따라 평상시의 물의 높이에 비해 더 높은 단을 형성할 경우, 강물의 물살을 늦추고 통제함과 동시에, 사람들이 강을 건너갈 수 있는 징검다리로서의 기능을 수행할 수도 있게 된다. In addition, if the formation of higher stages along the sides of the river is higher than the usual water level, it can slow down and control the water, and also serve as a stepping bridge for people to cross the river. do.

이상에서 본 발명에 의한 하천 바닥면의 철망 시공방법을 구체적으로 설명하였으나, 이는 본 발명의 가장 바람직한 실시양태를 기재한 것일 뿐, 본 발명이 이에 한정되는 것은 아니며, 첨부된 특허청구범위에 의해서 그 범위가 결정되어지고 한정되어진다. In the above description of the method for constructing a wire mesh of a river bottom surface according to the present invention in detail, but this is only described the most preferred embodiment of the present invention, the present invention is not limited thereto, and according to the appended claims Range is determined and defined.

또한, 이 기술분야에서 통상의 지식을 가진 자라면 누구나 본 발명의 명세서의 기재내용에 의하여 다양한 변형 및 모방을 행할 수 있을 것이나, 이 역시 본 발명의 범위를 벗어난 것이 아님은 명백하다고 할 것이다. In addition, anyone of ordinary skill in the art will be able to make various modifications and imitations by the description of the specification of the present invention, but it will be apparent that this is also outside the scope of the present invention.

도 1은 본 발명에 의한 하천 바닥면의 철망 시공방법을 나타낸 블록도이고, 1 is a block diagram showing a wire mesh construction method of a river bottom surface according to the present invention,

도 2는 본 발명의 하천 바닥면의 철망 시공방법을 실시하는데 적합한 원통형 철망구조체에 관한 개략적인 사시도이며, Figure 2 is a schematic perspective view of a cylindrical wire mesh structure suitable for implementing the wire mesh construction method of the bottom surface of the present invention,

도 3은 본 발명에 있어서 돌출철망을 예시적으로 도시한 것이며, Figure 3 shows an exemplary projecting wire mesh in the present invention,

도 4는 원통형 철망구조체의 바깥쪽 방향으로 형성되어지는 돌출부의 형상을 예시적으로 도시한 평면도이고, 4 is a plan view exemplarily illustrating a shape of a protrusion formed in an outward direction of a cylindrical wire mesh structure,

도 5a 는 돌출철망이 쭈욱 펼쳐져 있는 상태를 도시하고 있고, 도 5b는 상기 돌출철망을 원형으로 빙 돌려서 그 끝단을 서로 겹쳐지게 함으로써 원통형 철망구조체로 완성한 상태를 도시한 개념도이며, FIG. 5A illustrates a state in which the protruding wire mesh is unfolded, and FIG. 5B is a conceptual diagram illustrating a state in which the protruding wire mesh is rounded to form a cylindrical wire mesh structure by overlapping ends thereof.

도 6은 본 발명에 있어서, 원통형 철망구조체의 결합단계를 예시적으로 도시한 평면도이며, Figure 6 is a plan view illustrating an exemplary coupling step of the cylindrical wire mesh structure in the present invention,

도 7은 본 발명에 있어서, 채움재의 충진단계를 예시적으로 도시한 평면도이다. 7 is a plan view illustrating an exemplary filling step of the filling material in the present invention.

♠도면 중 주요부분에 대한 부호의 설명♠ ♠ Explanation of symbols for the main parts of the drawings.

100 : 돌출 철망, 110 : 돌출부, 100: protruding wire mesh, 110: protruding portion,

130 : 체결 철선, 200 : 원통형 철망조립체 130: fastening wire, 200: cylindrical wire mesh assembly

Claims (5)

a). 개천, 하천 또는 강의 바닥면을 정리하고 필요한 깊이만큼 형성하고 다듬어주는 준비단계(S 110)와; b). 상기의 바닥면 위에 원통형 철망구조체를 형성하고 조밀하게 세워나가는 원통형 철망구조체의 형성단계(S 120)와; c). 상기의 원통형 철망구조체를 서로 결합시키는 원통형 철망구조체의 결합단계(S 130)와; d). 서로 결합되어 있는 상기의 원통형 철망구조체의 원통형 공간부에 소정의 채움재를 넣고 바닥다지기 작업을 진행하는 채움재의 충진단계(S 140); 를 포함하고 있는 하천 바닥면의 철망 시공방법에 있어서, a). A preparation step (S 110) for arranging the bottom surface of the stream, the river or the river, and forming and trimming the required depth; b). Forming a cylindrical wire mesh structure on the bottom surface of the cylindrical wire mesh structure and densely standing up (S 120); c). Coupling step of the cylindrical wire mesh structure for coupling the cylindrical wire mesh structure with each other (S 130); d). A filling step (S 140) of filling the filling material into a predetermined filling material in the cylindrical space portion of the cylindrical wire mesh structure coupled to each other to proceed with the grounding operation; In the wire mesh construction method of the bottom surface of the river, including, 상기의 b). 원통형 철망구조체의 형성단계(S 120)는 상기 철망의 면에 대하여 한쪽 방향으로 튀어나온 돌출부(110)를 다수 구비한 돌출 철망(100)을 지면에 대하여 수직방향으로 세우되, 상기의 돌출부(110)가 상기 원통형 철망구조체의 원형의 바깥쪽으로 향하도록 세우고, 쭈욱 원형으로 휘감아서 상기 철망의 양쪽 끝단이 서로 겹쳐지게 함으로써, 전체적으로 원통형 철망구조체(200)를 형성하도록 하고, B) above. In the forming step S 120 of the cylindrical wire mesh structure, the protruding wire mesh 100 having a plurality of protruding portions 110 protruding in one direction with respect to the surface of the wire mesh is erected in a vertical direction with respect to the ground. ) Is set to face outward of the circular shape of the cylindrical wire mesh structure, and is wound around the circular shape so that both ends of the wire mesh overlap each other, thereby forming the overall cylindrical wire mesh structure 200, 상기의 c). 원통형 철망구조체의 결합단계(S 130)는 상기의 바닥면에 세워진 다수의 원통형 철망구조체(200)들 중에서 서로 인접된 원통형 철망구조체(200)를 서로 결합시키되, 상기의 돌출부(110)를 이용하여 서로 인접된 원통형 철망구조체(200)들을 서로 결합시켜주는 것을 특징으로 한, 하천 바닥면의 철망 시공방법. C) above. The coupling step (S 130) of the cylindrical wire mesh structure is coupled to each other between the cylindrical wire mesh structure 200 adjacent to each other among the plurality of cylindrical wire mesh structures 200, which are erected on the bottom surface, by using the protrusion 110 The wire mesh construction method of the river floor, characterized in that for coupling the adjacent cylindrical wire mesh structure 200 with each other. 제 1 항에 있어서, The method of claim 1, 상기의 돌출 철망(100)은 6각 개비온 철망, 5각 개비온 철망, 사각 능형 철 망, 그리고 사각 용접철망으로 구성된 그룹 중에서 선택된 어느 하나로 구성되어 있고, 그의 철망을 이룬 면에 대하여 바깥쪽으로 돌출된 다수의 돌출부(110)를 포함하고 있는 것을 특징으로 한, 하천 바닥면의 철망 시공방법.The protruding wire mesh 100 is composed of any one selected from the group consisting of hexagonal gabion wire mesh, pentagonal gabion wire mesh, square ridge wire mesh, and square welded wire mesh, and a plurality of protruding outwards with respect to the surface of the wire mesh. It characterized in that it comprises a protrusion 110, the wire mesh construction method of the river bottom surface. 제 1 항에 있어서, The method of claim 1, 상기의 돌출부(110)는 바깥쪽으로 튀어나온 세모 형태, 네모 형태, 다각형 형태, 그리고 원형의 형태로 이루어진 그룹 중에서 선택된 어느 하나의 형태인 것을 특징으로 한, 하천 바닥면의 철망 시공방법. The protrusion 110 is characterized in that any one selected from the group consisting of a triangular shape, a square shape, a polygonal shape, and a circular shape protruding outward, the wire mesh construction method of the river floor. 제 1 항에 있어서, The method of claim 1, 상기 채움재의 충진단계(S 140)는 상기 원통형 철망구조체(200)의 원통형 공간부에 채움재를 일부 채워넣고, 상기 원통형 공간부의 나머지 부분에 대하여 채움재의 위에 부식토 또는 식생토를 더욱 채워넣는 것을 특징으로 한, 하천 바닥면의 철망 시공방법. Filling of the filling material (S 140) is a part of the filling material in the cylindrical space of the cylindrical wire mesh structure 200, characterized in that further filling the humus or vegetation soil on the filling material for the remaining portion of the cylindrical space. Han, river wire construction method. 제 1 항 또는 제 4 항에 있어서, The method according to claim 1 or 4, 상기 채움재의 충진단계(S 140)를 진행하고, 그 이후에 상기 채움재의 위에 유연성 철망을 쭈욱 펼쳐서 덮개를 형성하고, 상기의 덮개망(150)을 상기 원통형 철망구조체(200)에 결합시키는 덮개망의 결합단계(S 140)를 더욱 추가한 것을 특징으로 한, 하천 바닥면의 철망 시공방법. Proceeding the filling step (S 140) of the filling material, thereafter forming a cover by unfolding a flexible wire mesh on the filling material, the cover net 150 to couple the cover net 150 to the cylindrical wire mesh structure 200 Combined step (S 140) of further characterized in that, the wire mesh construction method of the river bottom surface.
KR1020080012258A 2008-02-11 2008-02-11 Method of Constructing Basement with Steel Mesh KR101130240B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080012258A KR101130240B1 (en) 2008-02-11 2008-02-11 Method of Constructing Basement with Steel Mesh

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080012258A KR101130240B1 (en) 2008-02-11 2008-02-11 Method of Constructing Basement with Steel Mesh

Publications (2)

Publication Number Publication Date
KR20090086793A KR20090086793A (en) 2009-08-14
KR101130240B1 true KR101130240B1 (en) 2012-03-28

Family

ID=41206021

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080012258A KR101130240B1 (en) 2008-02-11 2008-02-11 Method of Constructing Basement with Steel Mesh

Country Status (1)

Country Link
KR (1) KR101130240B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6837245B1 (en) * 2019-11-18 2021-03-03 昭和機械商事株式会社 Cylindrical wire mesh frame
KR102232309B1 (en) * 2020-07-09 2021-03-26 주식회사 석송 Cirular stone mattress, retaining wall having the same and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10176318A (en) * 1996-10-16 1998-06-30 Setouchi Kinmo Shoko Kk Stone packed cage made structural body
JP2003261918A (en) * 2002-03-07 2003-09-19 Nippon Gavion Kk Tilting type stone-filled cylinder
KR100518943B1 (en) * 2002-07-16 2005-10-05 주식회사 동호 A method of constructing gabion mattress with cylinder coir roll
KR100595793B1 (en) * 2004-04-09 2006-07-03 전완진 Gabion Unit with a Curvilinear Wire and Gabion Mesh Comprising It

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10176318A (en) * 1996-10-16 1998-06-30 Setouchi Kinmo Shoko Kk Stone packed cage made structural body
JP2003261918A (en) * 2002-03-07 2003-09-19 Nippon Gavion Kk Tilting type stone-filled cylinder
KR100518943B1 (en) * 2002-07-16 2005-10-05 주식회사 동호 A method of constructing gabion mattress with cylinder coir roll
KR100595793B1 (en) * 2004-04-09 2006-07-03 전완진 Gabion Unit with a Curvilinear Wire and Gabion Mesh Comprising It

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6837245B1 (en) * 2019-11-18 2021-03-03 昭和機械商事株式会社 Cylindrical wire mesh frame
JP2021080688A (en) * 2019-11-18 2021-05-27 昭和機械商事株式会社 Cylindrical wire net frame
KR102232309B1 (en) * 2020-07-09 2021-03-26 주식회사 석송 Cirular stone mattress, retaining wall having the same and construction method thereof

Also Published As

Publication number Publication date
KR20090086793A (en) 2009-08-14

Similar Documents

Publication Publication Date Title
KR100665965B1 (en) Vegetation mat for revetment block afforestation
KR101130240B1 (en) Method of Constructing Basement with Steel Mesh
JP3755806B2 (en) Revetment block and slope method using it
KR100774880B1 (en) High and low wire entanglements directly connection of a fixing method construction stone
KR100991505B1 (en) Environment-friendly river side reinforcement fabric
KR20160093294A (en) The traction means having gaebion and its construction methods
WO2006025657A1 (en) Vegetation type non woven fabric, revetment structure and revetment construction method using thereof
JP3004226B2 (en) Slope protection method and wire mesh used for the method
KR100525327B1 (en) Fixing unit of construction stone and fixing method of construction stone that use it
CN210263090U (en) Side slope protection and ecological green covering combined symbiotic universal constraint structure
JP2001107336A (en) Natural stone fixing sheet
JPH08260471A (en) Ecosystem preservation type vegetation method for side slope
JPS6232290B2 (en)
KR20080111218A (en) Method of constructing bank walls with recovering natural environment
JPH08296233A (en) Work execution method for slope frame, and coil bar for forming slope frame
JP2588475Y2 (en) Tree support on artificial ground
KR200235114Y1 (en) The structure of an inclined plane structure an article
JPS6017888B2 (en) Grid-like wave-dissipating laying material and wave-dissipating structures using it
JPS6351527A (en) Slope stabilization work
KR200419606Y1 (en) Incisions and river frames
JP2001020252A (en) Stone-filled panel and work method therefor
KR20020077329A (en) Lattice embankment block
JP3007499U (en) Structure of green cover soil on river bank
JPH08199529A (en) Soil-covering block for river and concrete soil-covering block revetment
KR200380376Y1 (en) Fixing unit of construction stone

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application
J201 Request for trial against refusal decision
J301 Trial decision

Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20101215

Effective date: 20120222

S901 Examination by remand of revocation
GRNO Decision to grant (after opposition)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150311

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160310

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee