KR101104839B1 - System and method for testing winding conditions of pad-mounted transformers - Google Patents
System and method for testing winding conditions of pad-mounted transformers Download PDFInfo
- Publication number
- KR101104839B1 KR101104839B1 KR1020100096727A KR20100096727A KR101104839B1 KR 101104839 B1 KR101104839 B1 KR 101104839B1 KR 1020100096727 A KR1020100096727 A KR 1020100096727A KR 20100096727 A KR20100096727 A KR 20100096727A KR 101104839 B1 KR101104839 B1 KR 101104839B1
- Authority
- KR
- South Korea
- Prior art keywords
- winding
- probe
- state value
- state
- fuse
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/06—Measuring leads; Measuring probes
- G01R1/067—Measuring probes
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R15/00—Details of measuring arrangements of the types provided for in groups G01R17/00 - G01R29/00, G01R33/00 - G01R33/26 or G01R35/00
- G01R15/04—Voltage dividers
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R27/00—Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
- G01R27/02—Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
- G01R27/08—Measuring resistance by measuring both voltage and current
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F27/00—Details of transformers or inductances, in general
- H01F27/28—Coils; Windings; Conductive connections
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
Description
본 발명은 지중변압기의 권선 상태를 점검하는 시스템 및 방법에 관한 것으로, 보다 구체적으로 지중변압기에 고장이 발생한 경우 퓨즈의 외부 소켓에 프로브를 삽입하여 무정전 상태로 변압기의 내부 권선 상태를 확인할 수 있는 변압기 권선 상태 점검 시스템 및 방법에 관한 것이다.The present invention relates to a system and method for checking the winding state of an underground transformer, and more particularly, a transformer capable of checking an internal winding state of a transformer in an uninterrupted state by inserting a probe into an external socket of a fuse when a failure occurs in the underground transformer. A winding condition check system and method.
일반적으로 배전용 지중변압기는 기자력을 발생시키는 권선과 자기회로를 형성하는 철심 그리고 보호장치인 한류퓨즈와 BON퓨즈로 구성된다.In general, the underground transformer for power distribution consists of windings generating magnetic force, iron cores forming magnetic circuits, and Hallyu fuses and BON fuses, which are protection devices.
변압기의 전원 접속은 부싱을 통해 연결된다. 변압기는 완전한 밀폐구조가 아니고, BON퓨즈를 외부에서 교체할 수 있는 구조이다. 과전류 통전시 BON퓨즈가 용단되고 고장 복구 후 이를 교체하여 변압기를 사용할 수 있다. 반면에 한류퓨즈는 변압기 권선 고장일 경우 용단되고 이를 교체할 수 없으므로 한류퓨즈 용단시에는 변압기를 교체하여야 한다. The power connection of the transformer is connected via a bushing. The transformer is not a completely sealed structure, but a structure that can replace the BON fuse from the outside. When the overcurrent is energized, the BON fuse is melted and the transformer can be used after replacing the fault. On the other hand, Hallyu fuses are melted in the case of transformer winding failure and cannot be replaced.
이러한 변압기 고장이 발생하면 정격전류 이상의 고장전류가 흐르고, 고장에 의한 파급효과, 즉 전원측 정전을 방지하기 위해 퓨즈가 용단되어 고장부를 전원으로부터 분리한다. 이때 일시고장 여부를 확인하고 신속한 정전복구를 위해서는 변압기의 권선 상태를 점검할 수 있는 방법이 요청된다.When such a transformer fault occurs, a fault current above the rated current flows, and a fuse is blown to separate the fault part from the power source in order to prevent a ripple effect caused by the fault, that is, a power failure at the power supply side. At this time, a method that can check the winding state of the transformer is required to check the temporary failure and to quickly recover from power failure.
종래 변압기의 권선 상태를 점검하는 방법은 저압 부싱에 연결된 저압선을 분리한 후 퓨즈를 재투입하여 고장전류 발생 유무를 확인하는 것이었다. 즉, 저압 전선을 분리하고 퓨즈를 재투입하여 퓨즈가 용단되지 않으면 변압기는 건전하고 저압선로 측의 고장으로 판단할 수 있다.The conventional method of checking the winding state of a transformer has been to disconnect a low voltage line connected to a low voltage bushing and reinsert a fuse to check whether a fault current is generated. In other words, if the fuse is not blown off by disconnecting the low voltage wire and reinserting the fuse, the transformer may be determined to be sound and a failure of the low voltage line.
이런 종래 점검 방법은 고장 점검을 위해 전원 측에 설치된 개폐기를 개방해야하고 이로 인해 3상의 전원이 모두 차단되어 정상 동작을 하는 상도 정전이 발생하는 문제가 있다.This conventional inspection method has to open the switchgear installed on the power supply to check the failure, which causes a problem that the three-phase power is cut off to cause a phase outage in normal operation.
또한, 종래의 점검 방법은 권선 고장 시 고장 전류가 재차 발생하게 되고, 그 충격에 의해 고장이 확대되어 점검 중 안전사고가 발생하는 문제가 있었다.In addition, the conventional inspection method has a problem that the fault current is generated again when the winding failure, the failure is expanded by the impact and a safety accident occurs during the inspection.
본 발명은 상기의 문제점을 해결하기 위해 제안된 것으로, 변압기의 전원을 차단하지 않은 상태로 외부에서 변압기의 BON퓨즈 소켓에 프로브(probe)를 삽입하여 변압기의 내부 상태 값을 측정함으로써, 변압기 내부 권선 상태를 점검할 수 있어 점검시간을 단축하고 정확한 상태 판정을 할 수 있는 지중변압기 권선 상태 점검 시스템 및 방법을 제공하는 것을 목적으로 한다. The present invention has been proposed to solve the above problems, by inserting a probe (probe) to the BON fuse socket of the transformer from the outside without shutting off the power of the transformer, by measuring the internal state value of the transformer, It is an object of the present invention to provide a system and method for checking the condition of windings in underground transformers, which can check the condition, shorten the inspection time and make an accurate condition determination.
상기의 목적을 달성하기 위한, 본 발명에 따른 지중변압기 권선상태 점검 시스템은, 전원, 권선, 및 상기 전원과 연결되는 전원측 단자와 상기 권선과 연결되는 권선측 단자를 구비한 복수의 퓨즈를 포함하는 지중변압기 권선 상태 점검 시스템에 있어서, 상기 퓨즈의 외부 소켓에 삽입되어 상기 권선측 단자와 전기적으로 연결되는 프로브; 상기 프로브를 통해 상기 권선과 전기적으로 연결되고, 상기 권선의 상태 값을 측정하는 측정부; 및 상기 측정부로부터 상기 상태 값을 수신하고, 상기 상태 값을 이용하여 상기 권선의 상태를 판단하는 진단부;를 포함하는 것을 특징으로 한다. In order to achieve the above object, the underground transformer winding state checking system according to the present invention includes a power supply, a winding, and a plurality of fuses having a power supply terminal connected to the power supply and a winding side terminal connected to the winding. An underground transformer winding state checking system, comprising: a probe inserted into an external socket of the fuse and electrically connected to the winding-side terminal; A measuring unit electrically connected to the winding through the probe and measuring a state value of the winding; And a diagnosis unit configured to receive the state value from the measuring unit and determine the state of the winding by using the state value.
본 발명에 따른 지중변압기 권선상태 점검 시스템은, 상기 프로브가, 상기 권선측 단자와 전기적으로 접촉하는 접촉부; 및 상기 퓨즈의 외부 소켓과 전기적으로 분리되도록 절연 재료로 둘러싸이고, 상기 접촉부를 상기 측정부와 전기적으로 연결하는 측정 리드;를 포함하는 것을 특징으로 한다.The underground transformer winding state checking system according to the present invention includes: a contact portion in which the probe is in electrical contact with the winding-side terminal; And a measurement lead surrounded by an insulating material so as to be electrically separated from an external socket of the fuse and electrically connecting the contact part to the measurement unit.
본 발명에 따른 지중변압기 권선상태 점검 시스템은, 상기 측정부가, 상기 프로브와 전기적으로 연결되고, 상기 권선의 전압을 분압한 분압 전압을 제 1 상태 값으로 측정하는 분압기; 및 상기 프로브와 전기적으로 연결되고, 상기 권선의 저항에 직류 전원을 인가하여 권선 저항을 제 2 상태 값으로 측정하는 리액터;를 포함하는 것을 특징으로 한다.The underground transformer winding state checking system according to the present invention includes: a voltage divider which is electrically connected to the probe and measures the divided voltage obtained by dividing the voltage of the winding as a first state value; And a reactor electrically connected to the probe and measuring a winding resistance to a second state value by applying a DC power to the resistance of the winding.
본 발명에 따른 지중변압기 권선상태 점검 시스템은, 상기 진단부가, 상기 측정부로부터 수신한 상기 제 1 상태 값 및 상기 제 2 상태 값을 이용하여 상기 권선의 상태를 판단하는 것을 특징으로 한다.The underground transformer winding state checking system according to the present invention is characterized in that the diagnostic unit determines the state of the winding using the first state value and the second state value received from the measuring unit.
본 발명에 따른 지중변압기 권선상태 점검 방법은, 전원, 권선, 및 상기 전원과 연결되는 전원측 단자와 상기 권선과 연결되는 권선측 단자를 구비한 복수의 퓨즈를 포함하는 지중변압기의 권선 상태 점검 방법에 있어서, 프로브가 상기 퓨즈의 외부 소켓에 삽입되어 상기 권선과 전기적으로 연결하는 단계(S100); 측정부가 상기 프로브를 통해 상기 권선과 전기적으로 연결되고, 상기 권선의 상태 값을 측정하는 단계(S200); 및 진단부가 상기 측정부로부터 상기 상태 값을 수신하고, 상기 상태 값을 이용하여 상기 권선의 상태를 판단하는 단계(S300);를 포함하는 것을 특징으로 한다.The underground transformer winding state checking method according to the present invention includes a power source, a winding, and a winding state checking method of the underground transformer including a plurality of fuses having a power supply terminal connected to the power supply and a winding side terminal connected to the winding. The method may include: inserting a probe into an external socket of the fuse and electrically connecting the winding to the winding (S100); A measuring unit electrically connected to the winding through the probe and measuring a state value of the winding (S200); And a diagnosis unit receiving the state value from the measurement unit, and determining the state of the winding by using the state value (S300).
본 발명에 따른 지중변압기 권선상태 점검 방법은, 상기 권선과 전기적으로 연결하는 단계(S100)는, 상기 프로브가, 상기 퓨즈의 권선측 단자와 전기적으로 접촉하는 단계(S120); 및 상기 프로브가, 상기 퓨즈의 외부 소켓과는 전기적으로 분리되고, 상기 측정부와 전기적으로 연결하는 단계(S140);를 포함하는 것을 특징으로 한다.In the underground transformer winding state checking method according to the present invention, the step of electrically connecting the winding (S100), the probe, the electrical contact with the winding-side terminal of the fuse (S120); And the probe is electrically disconnected from an external socket of the fuse and electrically connected to the measurement unit (S140).
본 발명에 따른 지중변압기 권선상태 점검 방법은, 상기 권선의 상태 값을 측정하는 단계(S200)는, 상기 측정부가, 상기 프로브와 전기적으로 연결되고, 상기 권선의 권선 전압을 분압하여 분압 전압을 제 1 상태 값으로 측정하는 단계(S220); 및 상기 권선의 저항에 직류전류를 인가하여 권선 저항을 제 2 상태 값으로 측정하는 단계(S240);를 포함하는 것을 특징으로 한다.In the underground transformer winding state checking method according to the present invention, in the step (S200) of measuring the state value of the winding, the measuring unit is electrically connected to the probe and divides the winding voltage of the winding to divide the divided voltage. Measuring at one state value (S220); And measuring a winding resistance to a second state value by applying a DC current to the resistance of the winding (S240).
본 발명에 따른 지중변압기 권선상태 점검 방법은, 상기 권선의 상태를 판단하는 단계(S300)는, 상기 진단부가, 상기 측정부로부터 수신한 상기 제 1 상태 값 및 상기 제 2 상태 값을 이용하여, 상기 권선의 상태를 판단하는 단계를 포함하는 것을 특징으로 한다.In the underground transformer winding state checking method according to the present invention, the step (S300) of determining the state of the windings may include: the diagnosis unit using the first state value and the second state value received from the measurement unit, And determining the state of the winding.
본 발명의 지중변압기 권선 상태 점검 시스템 및 방법에 따르면, 변압기의 전원을 차단하지 않은 상태로 외부에서 변압기의 BON퓨즈 소켓에 프로브(probe)를 삽입하여 변압기의 내부 상태 값을 측정함으로써, 변압기 내부 권선 상태를 점검할 수 있어 점검시간을 단축하고 정확한 상태 판정을 할 수 있는 효과가 있다.According to the underground transformer winding condition checking system and method of the present invention, by inserting a probe into the BON fuse socket of the transformer from the outside without shutting off the transformer by measuring the internal state value of the transformer, Since the status can be checked, the inspection time can be shortened and accurate status determination can be made.
도 1은 본 발명의 일 실시예에 따른 변압기의 측면도 및 정면도,
도 2는 변압기 권선부의 단면도,
도 3은 본 발명의 일 실시예에 따른 지중변압기 권선상태 점검 시스템의 구성도,
도 4는 본 발명의 일 실시예에 따른 프로브의 구성도,
도 5는 본 발명의 일 실시예에 따른 자기 및 전기 회로의 개념도,
도 6a는 본 발명의 일 실시예에 따른 측정부의 분압기,
도 6a는 본 발명의 일 실시예에 따른 측정부의 리액터,
도 7은 본 발명의 다른 실시예에 따른 지중변압기 권선상태 점검 방법의 흐름도이다.1 is a side view and a front view of a transformer according to an embodiment of the present invention,
2 is a cross-sectional view of the transformer winding;
3 is a configuration diagram of a ground transformer winding state checking system according to an embodiment of the present invention;
4 is a block diagram of a probe according to an embodiment of the present invention;
5 is a conceptual diagram of a magnetic and electrical circuit according to an embodiment of the present invention;
6A is a voltage divider of a measuring unit according to an embodiment of the present invention;
Figure 6a is a reactor of the measuring unit according to an embodiment of the present invention,
7 is a flow chart of the underground transformer winding state checking method according to another embodiment of the present invention.
이하, 예시 도면을 참고하면서 본 발명에 따른 실시예를 보다 구체적으로 설명한다.Hereinafter, an embodiment according to the present invention will be described in more detail with reference to exemplary drawings.
도 1은 본 발명에 따른 변압기의 측면도 및 정면도를 도시한다. 도 1을 참고하면, 변압기는 권선(110), 한류퓨즈(130), BON퓨즈(150), 고압부싱(170), 및 저압부싱(190)을 포함할 수 있다. 권선(110)과 한류퓨즈(130)는 변압기의 내함에 구비되고, BON퓨즈(150)는 퓨즈 소켓이 외함에 설치되어 있어서 퓨즈 플러그를 외부에서 삽입할 수 있으며, 고압부싱(170)과 저압부싱(190)은 기밀구조로 외함을 관통하도록 설치된다.1 shows a side view and a front view of a transformer according to the invention. Referring to FIG. 1, the transformer may include a winding 110, a Hallyu
변압기는 밀폐구조가 완전하지 않고 BON퓨즈(150)를 외부에서 교체할 수 있다. 과전류 통전시 BON퓨즈(150)가 용단되고 고장을 복구한 후 BON퓨즈(150)를 교체하여 변압기를 사용할 수 있다. 반면, 한류퓨즈(130)는 일반적으로 변압기 권선(110) 고장일 경우 용단되고 이를 교체할 수 없으며 영구 고장이 되어 변압기를 교체하게 된다.The transformer is not completely sealed and can replace the
도 2는 변압기 권선부의 단면도를 도시한다. 도 2를 참고하면 권선부는 철심(210), 권선(230), 및 철대(250)를 포함할 수 있다. 철심(210)은 4개의 사각형상으로 구성될 수 있고, 3상의 권선(230)은 2개의 철심(210)의 세로 변을 한꺼번에 감고 있다. 그리고 철심(210)의 자기회로는 3상이 모두 연결될 수 있는 구조이고, 철대(250)는 조립된 권선(230)과 철심(210)을 지지할 수 있도록 구성된다.2 shows a cross-sectional view of a transformer winding. Referring to FIG. 2, the winding unit may include an
이런 지중변압기는 운영 중 다양한 형태의 고장을 경험할 수 있다. 고객 설비의 단락(지락 포함), 저압선로의 단락 등이 대표적이고 권선 내부의 절연 불량에 의한 고장 등이 발생한다. 일반적으로 3상 권선(230)이 동시 고장인 경우는 거의 없으며 단상이 고장 나는 경우가 대부분이다. 한류 퓨즈(130)가 용단되는 경우에 BON 퓨즈(150)를 통해 용단 여부를 확인할 수 있고, 한류 퓨즈(130)의 용단은 영구적인 고장이 되므로 한류 퓨즈(130)의 교체가 필요하지 않다.These underground transformers can experience various types of failures during operation. Short circuits (including ground faults) of customer equipment and short circuits of low voltage lines are typical, and failures due to poor insulation inside the windings occur. In general, the three-phase winding 230 is rarely a case of simultaneous failure and most of the single phase failure. When the blown
도 3은 본 발명에 따른 지중변압기 권선 상태 점검 시스템의 구성도를 도시한다. 도 3을 참조하면 지중변압기 권선 상태 점검 시스템은 프로브(310), 측정부(330),및 진단부(350)를 포함할 수 있다.Figure 3 shows a block diagram of the underground transformer winding state check system according to the present invention. Referring to FIG. 3, the underground transformer winding state checking system may include a
프로브(310)는 변압기의 내부 권선과 전기적으로 연결됨으로써, 내부 권선과 측정부(330)를 전기적으로 연결한다.The
측정부(330)는 프로브(310)를 통해 변압기 권선 내부와 전기적으로 연결되고 권선의 유도 전압을 분압기(331)에 의해 분압하여 분압 전압을 제 1 측정값으로 얻는다. 또한 권선 저항을 측정하기 위해 구성된 리액터(333)에 의해 내부 권선에 직류 전원을 인가하여 권선 저항을 제 2 측정 값으로 측정할 수 있다.The
진단부(350)는 측정부(330)에서 측정한 제 1 측정 값과 제 2 측정 값을 이용하여 변압기의 내부 권선의 상태를 판단한다. 이때 내부 권선이 단락일 경우는 고장 전류에 의해 탄화되어 권선 저항이 정상 상태의 권선 저항보다 수십 배의 저항으로 나타나고, 내부 권선이 단선일 경우는 권선 저항이 ∞ [Ω]이 되므로 이를 통해 권선의 상태를 확인할 수 있다.The
도 4는 본 발명에 따른 프로브(310)의 구성도를 도시한다. 도 4를 참조하면, 프로브(310)는 권선측에 접촉하는 접촉부(311)와 접촉부(311)를 측정부(330)와 전기적으로 연결하는 측정 리드(313)를 포함할 수 있다. 4 shows a schematic diagram of a
접촉부(311)는 권선측의 퓨즈 소켓의 단자와 전기적으로 접촉하기 위해 도전성 있는 금속 등으로 구성될 수 있다.The
측정 리드(313)는 접촉부(311)와 측정부(330)를 전기적으로 연결함으로써 내부 권선과 측정부(330)를 전기적으로 연결한다. 측정 리드(313)의 외부는 절연 재료에 의해서 둘러싸임으로써, 프로브(310)를 퓨즈의 외부 소켓과 전기적으로 분리되도록 한다. 이로인해 프로브(310)를 퓨즈의 외부 소켓에 삽입할 경우에 감전 등의 안전 사고를 예방할 수 있고, 외부 소켓을 통해서 유출입되는 잡음을 방지하여서 보다 정확하게 권선의 상태 값을 얻을 수 있다.The
이러한 절연 재료는 계통 상전압 상당의 절연 내력을 가진 튜브로 구성될 수있다. 예컨대 절연 재료는 폴리에틸렌 테레프탈레이트 필름, 폴리에틸렌 나프탈레이트 필름과 같은 폴리에스테르 필름, 폴리프로필렌 필름, 폴리에틸렌 필름, 폴리카보네이트 필름, 폴리알릴레이트 필름, 나일론 필름 등으로 구성될 수 있다.Such an insulating material may be composed of a tube having an insulation strength equivalent to a system phase voltage. For example, the insulating material may be composed of polyethylene terephthalate film, polyester film such as polyethylene naphthalate film, polypropylene film, polyethylene film, polycarbonate film, polyallylate film, nylon film and the like.
도 5는 본 발명에 따른 자기 및 전기 회로의 개념도를 도시한다. 도 5를 참조하면, 3상의 자기(magnetic)회로는 3상의 권선이 상호 연결되어 있는 구조이다.5 shows a conceptual diagram of a magnetic and electrical circuit according to the invention. Referring to FIG. 5, the three-phase magnetic circuit has a structure in which three-phase windings are interconnected.
도 5에 도시된 것처럼 H3의 상이 고장에 의해 전원으로부터 분리되어도 자기회로가 다른 상과 연결되어 있어 전압이 유도될 수 있다.As shown in FIG. 5, even when the phase of H3 is separated from the power supply due to a failure, the magnetic circuit may be connected to another phase to induce voltage.
도 5에서 점선으로 표시된 부분은 권선 상태 점검이 필요한 부분을 나타낸다. 이때 전압(V)은 고장 형태에 따라 다양한 값으로 유도될 수 있고, 각 상의 정상상태 전압은 상호인덕턴스가 변하지 않아서 일정하게 나타나므로 불량 여부를 확인할 수 있다. In FIG. 5, a portion indicated by a dotted line indicates a portion that needs to be checked for winding state. At this time, the voltage (V) can be induced to a variety of values depending on the type of failure, and the steady-state voltage of each phase is shown as a constant because the mutual inductance does not change, it can be confirmed whether the failure.
도 6a는 측정부(330)의 분압기(331)를 도시하고 있다. 도 6a를 참조하면, 측정하고자 하는 단자에 프로브(310)가 접속된다. 측정부(330)는 프로브(310)를 통해 내부 권선과 전기적으로 연결되고, 커패시터, 저항 등 이와 유사하게 구성될 수 있는 분압기(331)를 더 포함할 수 있으며, 권선의 유도전압을 전압 분배함으로써 분압 전압(V)을 측정할 수 있다.6A shows the
보다 구체적으로 살펴보면 권선(L)의 한쪽 단자와 프로브(310)의 접촉부(311)가 전기적으로 연결되고, 프로브(310)의 측정 리드(313)를 통해서 직렬 연결된 커패시터(C1 및 C2)가 전기적으로 연결된다. 이때 커패시터(C1 및 C2)는 용량성 소자로서 커패시터(C2) 양단의 전압을 분압 전압(V)으로 분압하여 제 1 상태 값을 측정할 수 있다. 이렇게 측정된 제 1 상태 값은 소정의 기준값(예컨대, 10KV)의 범위에 있으면 내부 권선의 상태는 정상으로 판단하게 된다.In more detail, one terminal of the winding L and the
도 6b는 측정부(330)의 리액터(333)를 도시하고 있다. 도 6b를 참조하면, 측정하고자 하는 단자에 프로브(310)가 접속된다. 측정부(330)는 프로브(310)를 통해 내부 권선과 전기적으로 연결되고 인덕터 및 저항 등 이와 유사하게 구성된 리액터(333)로 구성될 수 있으며, 변압기 내부 권선의 저항을 측정할 수 있다.6B shows the
보다 구체적으로 살펴보면 권선(L1)의 한쪽 단자와 프로브(310)의 접촉부(311)가 연결되고 프로브(310)의 측정 리드(313)를 통해 직렬 연결된 인덕터(L2)와 저항(R2)가 전기적으로 연결된다. 이때 저항(R3)의 양단에 직류 전원을 인가하여 소정의 직류 전류(I)가 흐르게 되고, 인덕턴스와 상관없이 저항(R3)과 병렬로 구성되어 있는 권선 저항(R1)을 구할 수 있다. In more detail, the inductor L2 and the resistor R2 electrically connected to one terminal of the winding L1 and the
이때 리액터(333)의 저항(R2)과 저항(R3)은 그 값을 이미 알고 있고, 전류(I)와 저항(R3)을 이용하여 양단 전압을 구하고, 이를 통해 R을 구하여, 다음 식에 의해서 R1 값을 얻을 수 있다.At this time, the resistance (R2) and the resistance (R3) of the
R = (R1+R2)//R3 R = (R1 + R2) // R3
도 7은 본 발명에 따른 지중 변압기 권선 상태 측정 방법에 관한 흐름도를 도시한다.7 is a flowchart illustrating a method of measuring a underground transformer winding state according to the present invention.
본 발명에 따른 지중 변압기 권선 상태 측정 방법은 프로브(310)가 권선과 전기적으로 연결하는 단계(S100), 측정부(330)가 권선의 상태 값을 측정하는 단계(S200), 및 진단부(350)가 권선의 상태를 판단하는 단계(S300)를 포함할 수 있다.In the underground transformer winding state measuring method according to the present invention, the
도 8은 본 발명의 일 실시예에 따른 지중 변압기 권선 상태 측정 방법에 관한 보다 구체적인 흐름도를 도시한다.8 is a more detailed flowchart illustrating a method for measuring a underground transformer winding state according to an embodiment of the present invention.
도 8을 참고하여 지중변압기 권선 상태 측정 방법에 관하여 살펴보면, 프로브(310)가 권선과 전기적으로 연결하는 단계(S100)는 프로브(310)의 접촉부(311)가 퓨즈의 권선측 단자와 전기적으로 접촉하는 단계(S120)와 프로브(310)의 측정 리드(313)가 퓨즈의 외부 소켓과는 전기적으로 분리된 상태로 내부 권선을 측정부(330)와 전기적으로 연결하는 단계(S140)를 포함한다. 이런 방법에 따르면 외부로 노출된 퓨즈의 플러그에 간편하게 프로브(310)를 삽입함으로써 내부 권선과 전기적으로 연결되고 내부 권선 상태를 간편하게 점검할 수 있다. 또한, 측정 리드(313)이 절연 재료(315)에 의해서 둘러싸여서 측정 리드(313)가 퓨즈의 외부 소켓과 전기적으로 분리됨으로써, 프로브(310)를 퓨즈에 삽입 시에 사용자가 감전 등의 안전 사고에 노출되지 않게 된다. 그리고 외부 소켓과 전기적으로 접지되지 않으므로 내부 권선의 상태 값을 보다 정확하게 측정부로(330)로 전달할 수 있게 된다.Referring to FIG. 8, the method of measuring the ground transformer winding state is performed. In step S100, when the
측정부(330)가 권선의 상태 값을 측정하는 단계(S200)는 분압기(331)에 의해서 권선의 유도 전압을 분압하여 분압 전압을 제 1 측정 값으로 측정하는 단계(S220)와, 리액터(333)에 의해서 권선에 직류 전원을 인가하여 권선 저항에 일정한 전류가 흐르도록 함으로써 권선 저항을 제 2 측정 값으로 측정하는 단계(S240)를 포함할 수 있다. 이런 방법에 따르면 프로브(310)를 통해 변압기 내부 권선과 전기적으로 연결된 측정부(330)가 무정전 상태에서 내부 유도 전압을 측정하여 내부 상태를 점검 할 수 있고 권선 저항을 측정하여 권선의 단선, 단락 여부를 점검할 수 있어 보다 간편하게 점검을 할 수 있게 된다. The measuring
진단부(350)가 권선의 결선 상태를 판단하는 단계(S300)는 제 1 측정 값과 제 2 측정 값을 이용하여 내부 권선의 상태를 판단하고, 권선 저항이 정상 상태 권선 저항보다 수십 배 크게 측정된 경우 권선이 단락된 것으로 판단하고, 권선 저항이 ∞[Ω]에 가까우면 내부 권선이 단선된 것으로 판단할 수 있다.In operation S300, in which the
상술한 상세한 설명은 본 발명에 관하여 도면과 함께 특정 실시예를 설명한 것에 불과하다. 본 발명에 관한 명세서 및 도면을 참조하여 해당 기술 분야의 통상의 기술을 가진가가 본 발명의 기술적 범위 내에서 다수의 변형과 치환이 가능할 것이다. 또한, 본 발명의 명세서 및 도면은 본 발명을 한정하기 위한 것이 아니라 예시적인 것으로 볼 수 있다.The foregoing detailed description is merely illustrative of specific embodiments in conjunction with the drawings in connection with the present invention. Many modifications and substitutions may be made within the technical scope of the present invention with reference to the specification and drawings of the present invention. In addition, the specification and drawings are to be regarded as illustrative rather than restrictive.
110 : 권선부 130 : 한류 퓨즈
150 : BON퓨즈 170 : 고압 부싱
190 : 저압 부싱 210 : 철심
230 : 권선 250 : 철대
310 : 프로브 311 : 접촉부
313 : 측정 리드 315 : 절연 재료
330 : 측정부 331 : 분압기
333 : 리액터 350 : 진단부110: winding 130: current-limit fuse
150: BON FUSE 170: High Pressure Bushing
190: low pressure bushing 210: iron core
230: winding 250: steel bar
310: probe 311: contact
313
330: measuring unit 331: voltage divider
333: reactor 350: diagnostic unit
Claims (8)
상기 퓨즈의 외부 소켓에 삽입되어 상기 권선측 단자와 전기적으로 연결되는 프로브;
상기 프로브를 통해 상기 권선과 전기적으로 연결되고, 상기 권선의 상태 값을 측정하는 측정부; 및
상기 측정부로부터 상기 상태 값을 수신하고, 상기 상태 값을 이용하여 상기 권선의 상태를 판단하는 진단부;를 포함하는 것을 특징으로 하는 지중변압기 권선 상태 점검 시스템.
An underground transformer winding condition checking system comprising a power source, a winding, and a plurality of fuses having a power supply terminal connected to the power supply and a winding terminal connected to the winding,
A probe inserted into an external socket of the fuse and electrically connected to the winding-side terminal;
A measuring unit electrically connected to the winding through the probe and measuring a state value of the winding; And
And a diagnosis unit configured to receive the state value from the measuring unit and determine the state of the winding by using the state value.
상기 프로브가,
상기 권선측 단자와 전기적으로 접촉하는 접촉부; 및
상기 퓨즈의 외부 소켓과 전기적으로 분리되도록 절연 재료로 둘러싸이고, 상기 접촉부를 상기 측정부와 전기적으로 연결하는 측정 리드;
를 포함하는 것을 특징으로 하는 지중변압기 권선 상태 점검 시스템.
The method of claim 1,
The probe,
A contact portion in electrical contact with the winding-side terminal; And
A measurement lead surrounded by an insulating material so as to be electrically separated from an external socket of the fuse and electrically connecting the contact part with the measurement part;
Underground transformer winding status check system comprising a.
상기 측정부는,
상기 프로브와 전기적으로 연결되고, 상기 권선의 전압을 분압한 분압 전압을 제 1 상태 값으로 측정하는 분압기; 및
상기 프로브와 전기적으로 연결되고, 상기 권선의 저항에 직류 전원을 인가하여 권선 저항을 제 2 상태 값으로 측정하는 리액터;를 포함하는 것을 특징으로 하는 지중 변압기 권선 상태 점검 시스템.
The method of claim 1,
The measuring unit,
A voltage divider electrically connected to the probe and measuring a divided voltage obtained by dividing the voltage of the winding as a first state value; And
And a reactor electrically connected to the probe and configured to apply a direct current power source to the resistance of the winding to measure the winding resistance to a second state value.
상기 진단부는, 상기 측정부로부터 수신한 상기 제 1 상태 값 및 상기 제 2 상태 값을 이용하여 상기 권선의 상태를 판단하는 것을 특징으로 하는 지중 변압기 권선 상태 점검 시스템.
The method of claim 3, wherein
And the diagnosis unit determines the state of the winding by using the first state value and the second state value received from the measuring unit.
프로브가 상기 퓨즈의 외부 소켓에 삽입되어 상기 권선과 전기적으로 연결하는 단계(S100);
측정부가 상기 프로브를 통해 상기 권선과 전기적으로 연결되고, 상기 권선의 상태 값을 측정하는 단계(S200); 및
진단부가 상기 측정부로부터 상기 상태 값을 수신하고, 상기 상태 값을 이용하여 상기 권선의 상태를 판단하는 단계(S300);를 포함하는 것을 특징으로 하는 지중변압기 권선 상태 점검 방법.
In the winding state check method of the underground transformer comprising a power supply, a winding, and a plurality of fuses having a power supply terminal connected to the power supply and the winding-side terminal connected to the winding,
Inserting a probe into an external socket of the fuse and electrically connecting the winding to the winding (S100);
A measuring unit electrically connected to the winding through the probe and measuring a state value of the winding (S200); And
And a diagnosis unit receiving the state value from the measuring unit and determining the state of the winding by using the state value (S300).
상기 권선과 전기적으로 연결하는 단계(S100)는,
상기 프로브가, 상기 퓨즈의 권선측 단자와 전기적으로 접촉하는 단계(S120); 및
상기 프로브가, 상기 퓨즈의 외부 소켓과는 전기적으로 분리되고, 상기 측정부와 전기적으로 연결하는 단계(S140);를 포함하는 것을 특징으로 하는 지중변압기 권선 상태 점검 방법.
The method of claim 5, wherein
Electrically connecting the winding (S100),
The probe in electrical contact with a winding-side terminal of the fuse (S120); And
And the probe is electrically disconnected from an external socket of the fuse, and electrically connected to the measurement unit (S140).
상기 권선의 상태 값을 측정하는 단계(S200)는,
상기 측정부가, 상기 프로브와 전기적으로 연결되고, 상기 권선의 권선 전압을 분압하여 분압 전압을 제 1 상태 값으로 측정하는 단계(S220); 및
상기 권선의 저항에 직류전류를 인가하여 권선 저항을 제 2 상태 값으로 측정하는 단계(S240);를 포함하는 것을 특징으로 하는 지중 변압기 권선 상태 점검 방법.
The method according to claim 6,
Measuring the state value of the winding (S200),
The measuring unit is electrically connected to the probe and divides the winding voltage of the winding to measure the divided voltage as a first state value (S220); And
And applying a DC current to the resistance of the winding to measure the winding resistance as a second state value (S240).
상기 권선의 상태를 판단하는 단계(S300)는,
상기 진단부가, 상기 측정부로부터 수신한 상기 제 1 상태 값 및 상기 제 2 상태 값을 이용하여, 상기 권선의 상태를 판단하는 단계를 포함하는 것을 특징으로 하는 지중 변압기 권선 상태 점검 방법.
The method of claim 7, wherein
Determining the state of the winding (S300),
And determining, by the diagnosis unit, the state of the winding using the first state value and the second state value received from the measuring unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100096727A KR101104839B1 (en) | 2010-10-05 | 2010-10-05 | System and method for testing winding conditions of pad-mounted transformers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100096727A KR101104839B1 (en) | 2010-10-05 | 2010-10-05 | System and method for testing winding conditions of pad-mounted transformers |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101104839B1 true KR101104839B1 (en) | 2012-01-16 |
Family
ID=45614140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100096727A KR101104839B1 (en) | 2010-10-05 | 2010-10-05 | System and method for testing winding conditions of pad-mounted transformers |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101104839B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103257301A (en) * | 2013-04-28 | 2013-08-21 | 国家电网公司 | Current sealing detection device |
KR20210155516A (en) * | 2020-06-16 | 2021-12-23 | 한국전력공사 | Resistance measuring apparatus and method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030072289A (en) * | 2003-08-18 | 2003-09-13 | (주)한백 | A transformer for underground electric power line with switch to be able to interruption or supply the high voltage power on the underground electric power line |
KR20040043114A (en) * | 2001-08-17 | 2004-05-22 | 에이이엠-테크 엔지니어스 피티이 리미티드 | Belt apparatus for carrying elements during treatment |
KR20060109866A (en) * | 2003-07-16 | 2006-10-23 | 그리픽스, 인코포레이티드 | Electrical interconnect assembly with interlocking contact system |
KR200443114Y1 (en) | 2007-05-21 | 2009-01-15 | 영화산업전기 주식회사 | Fused potential transformer for metering |
-
2010
- 2010-10-05 KR KR1020100096727A patent/KR101104839B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040043114A (en) * | 2001-08-17 | 2004-05-22 | 에이이엠-테크 엔지니어스 피티이 리미티드 | Belt apparatus for carrying elements during treatment |
KR20060109866A (en) * | 2003-07-16 | 2006-10-23 | 그리픽스, 인코포레이티드 | Electrical interconnect assembly with interlocking contact system |
KR20030072289A (en) * | 2003-08-18 | 2003-09-13 | (주)한백 | A transformer for underground electric power line with switch to be able to interruption or supply the high voltage power on the underground electric power line |
KR200443114Y1 (en) | 2007-05-21 | 2009-01-15 | 영화산업전기 주식회사 | Fused potential transformer for metering |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103257301A (en) * | 2013-04-28 | 2013-08-21 | 国家电网公司 | Current sealing detection device |
KR20210155516A (en) * | 2020-06-16 | 2021-12-23 | 한국전력공사 | Resistance measuring apparatus and method thereof |
KR102355644B1 (en) * | 2020-06-16 | 2022-01-27 | 한국전력공사 | Resistance measuring apparatus and method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102044863B (en) | Electrical switching apparatus including a plurality of rogowski coils and method of calibrating the same | |
KR102061929B1 (en) | Method for detecting an open-phase condition of a transformer | |
Yasid et al. | The Effect of short circuit fault in three-phase core-typed transformer | |
KR101104839B1 (en) | System and method for testing winding conditions of pad-mounted transformers | |
CN111175621B (en) | Method, system and equipment for detecting insulation defects of medium and high voltage rotating motor in nuclear power station | |
US6765390B2 (en) | Diagnostic wiring verification tester | |
KR102070650B1 (en) | Short Circuit Detection Apparatus for Test Plug | |
US4536704A (en) | Apparatus for identifying defective substation capacitors | |
CN106158335A (en) | A kind of three-phase resonance-eleminating type voltage inductor | |
KR20200037980A (en) | Terminal separator for testing of current transformer | |
JPH03128471A (en) | Monitoring device for insulation deterioration of electric equipment | |
US11336081B2 (en) | Protection circuit for a medium voltage or high voltage transformer | |
Selkirk et al. | Why neutral-grounding resistors need continuous monitoring | |
JP2010217019A (en) | Insulation grounding monitoring device | |
Karandikar et al. | Digital switchgear: The next phase in the evolution of safety by design | |
JP2636417B2 (en) | Insulation breakdown detection circuit for instrument transformer and instrument transformer provided with the detection circuit | |
Lopez-Fernandez et al. | Frequency domain severity factor (FDSF)-transient voltage performance-transformer outside/inside | |
KR102251229B1 (en) | Electrical panel having instrument transformer with prevention of secondary terminal burnout | |
Kruger et al. | Diagnostic testing of cast-resin transformers | |
JPH08205376A (en) | High voltage generating device and high voltage test device | |
JP7480444B1 (en) | Insulation monitoring system and insulation monitoring method | |
Gray et al. | Voltage transformers and current transformers associated with switchgear | |
Jha et al. | Operational experience in 1200 kV national test station (UHVAC), India | |
Youssef et al. | Voltage Sensing and Measurement using OHMIC Voltage Sensors: An Improved Approach to Applications Traditionally Requiring 2.4 to 38 KV Voltage Transformers | |
Jha et al. | Operational experience in 1200 kV national test station (UHVAC), India |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20150102 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20160105 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20170102 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20180103 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20181227 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20191226 Year of fee payment: 9 |