KR101088477B1 - Multi retaining wall block applicable various stiffener and retaining wall constructing method using this - Google Patents

Multi retaining wall block applicable various stiffener and retaining wall constructing method using this Download PDF

Info

Publication number
KR101088477B1
KR101088477B1 KR1020110042551A KR20110042551A KR101088477B1 KR 101088477 B1 KR101088477 B1 KR 101088477B1 KR 1020110042551 A KR1020110042551 A KR 1020110042551A KR 20110042551 A KR20110042551 A KR 20110042551A KR 101088477 B1 KR101088477 B1 KR 101088477B1
Authority
KR
South Korea
Prior art keywords
block
retaining wall
reinforcement
anchor
groove
Prior art date
Application number
KR1020110042551A
Other languages
Korean (ko)
Inventor
권성욱
김병철
김종철
Original Assignee
그린이엔지 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 그린이엔지 주식회사 filed Critical 그린이엔지 주식회사
Priority to KR1020110042551A priority Critical patent/KR101088477B1/en
Application granted granted Critical
Publication of KR101088477B1 publication Critical patent/KR101088477B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0241Retaining or protecting walls comprising retention means in the backfill the retention means being reinforced earth elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

PURPOSE: A multi retaining-wall block and a method of constructing a retaining wall using the same are provided to significantly enhance handling and constructing performance by dispersing the weight of a retaining wall itself to front and rear blocks. CONSTITUTION: A multi retaining-wall block(100) comprises a front block(110), and a rear block(120). The front block is separably connected to the rear block. The front block comprises a body and a protrusion. The body is formed in a hexahedron form. The protrusion is formed on the rear of the body in a longitudinal direction. The rear block comprises a body and a groove. The body of the rear block is formed in a hexahedron form. The groove is formed on the front of the body of the rear block and the protrusion is inserted into the groove.

Description

다양한 보강재의 적용이 가능한 멀티 옹벽 블록 및 이를 이용한 옹벽 시공 공법{MULTI RETAINING WALL BLOCK APPLICABLE VARIOUS STIFFENER AND RETAINING WALL CONSTRUCTING METHOD USING THIS}MULTI RETAINING WALL BLOCK APPLICABLE VARIOUS STIFFENER AND RETAINING WALL CONSTRUCTING METHOD USING THIS}

본 발명은 옹벽 블록에 관한 것으로, 더욱 상세하게는 옹벽의 시공후 편중된 하중에 의하여 후면블록이나 전면블록에서 균열(Crack)이 발생되더라도 다른쪽 블록으로 균열이 진행되지 않도록 함과 동시에 균열이 발생된 블록만 간단하게 교체할 수 있도록 하여 최소한의 유지보수비용으로 옹벽보수 작업을 수행할 수 있도록 함은 물론, 옹벽블록 자체의 무게를 후면블록과 전면블록으로 분산하여 취급 및 시공성을 크게 향상할 수 있으며 서로 다른 형태의 보강재(앵커블록, 망형 그리드, 발형 그리드 등)를 공용할 수 있는 다양한 보강재의 적용이 가능한 멀티 옹벽 블록 및 이를 이용한 옹벽 시공 공법에 관한 것이다.
The present invention relates to a retaining wall block, and more particularly, even if a crack is generated in the rear block or the front block due to the unbalanced load after the construction of the retaining wall, the crack does not proceed to the other block and the crack is generated. It is easy to replace only the old blocks, so that the retaining wall repair work can be performed at the minimum maintenance cost, and the weight of the retaining wall block itself can be distributed to the rear block and the front block to greatly improve handling and construction. In addition, the present invention relates to a multi retaining wall block capable of applying various reinforcing materials that can share different types of reinforcing materials (anchor blocks, mesh grids, foot grids, etc.) and a retaining wall construction method using the same.

일반적으로, 옹벽(擁壁)은 성토지나 절개지면의 흙이 토압(土壓)으로 인하여 무너지거나 흘러내리지 않도록 만든 벽체(壁體)를 일컫는 것으로, 지표지반의 안정된 경사를 그것 보다 가파른 경사도로 하였을 경우 지반붕괴를 방지하기 위하여 축조되는 구조물이다.In general, the retaining wall refers to a wall made so that the soil of the land or incision surface does not collapse or flow due to soil pressure. In this case, the structure is constructed to prevent ground collapse.

이와 같은 종래의 옹벽은 성토지면이나 절개지면에 옹벽의 골격을 형성하는 철근을 가로 및 세로방향으로 배열한 상태에서 엮어 설치한 후 이들을 거푸집으로 감싼 다음 거푸집내에 콘크리트를 타설하고 양생함으로써 벽체를 형성하고, 벽체의 배면에 토사, 쇄석, 잡석 등을 포함하는 보강토를 채우는 방식으로 축조하였다.Such conventional retaining wall is formed by weaving and installing reinforcing bars in horizontal and longitudinal directions on the ground or incision surface, wrapping them with formwork, and then forming concrete in the formwork to form walls. The walls were constructed in such a way that the reinforcement soils including soil, crushed stone and rubble were filled on the back surface of the wall.

그러나, 이와 같은 철근콘크리트 옹벽은 시공과정이 매우 복잡하고 시공기간이 많이 소모되어 막대한 시공비용이 소요된다는 단점이 있다.However, such a reinforced concrete retaining wall has a disadvantage in that the construction process is very complicated and a lot of construction period is consumed, thus enormous construction cost.

이러한 종래의 문제점을 해결하기 위하여, 최근에는 성토지면이나 절개지면을 따라 다수의 옹벽블록을 종방향 및 횡방향으로 적층하여 쌓은 다음 그 배면에 잡석 등을 채우는 방식으로 축조하는 옹벽시공기술이 제안되었다.In order to solve such a conventional problem, a retaining wall construction technique has recently been proposed in which a plurality of retaining wall blocks are stacked in a longitudinal direction and a transverse direction along a fill surface or an incision surface, and then built in such a manner as to fill rubble on the back surface thereof. .

그러나, 이와 같은 종래 옹벽블록을 이용해 축조된 옹벽 역시 그 전체가 콘크리트로 이루어지기 때문에 외관이 미려하지 못하다는 문제가 있다.However, there is a problem in that the retaining wall constructed using the conventional retaining wall block is not beautiful because the whole is made of concrete.

이에 따라 본 발명자는 최근 전면자연석이 부착된 옹벽블록을 특허출원 제2008-0131833호로 제안하였다.Accordingly, the present inventors recently proposed a retaining wall block to which a front natural stone is attached as a patent application No. 2008-0131833.

상기 특허출원 제2008-0131833호의 선행기술은 옹벽블록 본체의 전면에 별도의 걸림편을 끼워 결합하고, 그 전면에 자연석재판을 부착시키는 것으로 기존의 옹벽블록에 비하여 진일보된 기술이나, 옹벽블록 본체가 하나의 몸체로 이루어져 있기 때문에 무게가 무거워 취급이 불편하고 시공성이 불량하다는 문제가 있다.
The prior art of the patent application No. 2008-0131833 is coupled to the front of the retaining wall block body by combining a separate engaging piece, and attaching a natural stone plate on the front of the technology, which is an advanced step than the existing retaining wall block, Since it is made of a single body, the weight is heavy, there is a problem that handling is inconvenient and poor workability.

일반적으로 성토지, 절개지 등에는 한쪽 면의 토압을 지지하거나 사면의 붕괴를 방지하는 옹벽을 시공하여 옹벽에 작용하는 토압을 견디게 하고 있다.In general, in the land, incisions, etc., a retaining wall that supports earth pressure on one side or prevents the collapse of the slope is constructed to withstand the earth pressure acting on the retaining wall.

이와 같은 옹벽은 토압력에 저항하여 흙이 무너지지 못하게 만든 벽체를 말하는 것으로, 지표지반의 안정된 경사를 그것보다 가파른 경사로 하였을 경우에 일어나는 지반 붕괴를 막기 위해 만든 구조물이다.Such a retaining wall refers to a wall that prevents soil from collapsing by resisting soil pressure, and is a structure made to prevent ground collapse when a stable slope of the ground surface is steeper than that.

이러한 종래 옹벽은 성토면이나 절개면에 옹벽의 골격을 형성하는 철근을 일정한 형태로 배열 설치하고, 철근을 거푸집으로 감싼 다음, 거푸집 내에 콘크리트를 타설하여 양생함으로써 벽체를 형성한 후, 벽체의 배면에 토사, 쇄석, 잡석 등을 포함하는 보강토를 채우는 방식으로 축조되었다.The conventional retaining wall is formed by arranging reinforcing bars forming the skeleton of the retaining wall in the form of a retaining wall or incision surface, wrapping the reinforcing bars with formwork, and then curing by pouring concrete in the formwork to form walls. It was constructed by filling reinforcement soils including soil, crushed stone, rubble, etc.

그러나, 이와 같은 철근콘크리트 옹벽은 시공과정이 매우 복잡하고 시공기간이 많이 소모되어 막대한 시공비용이 소요되는 단점이 있었다.However, such a reinforced concrete retaining wall has a disadvantage in that the construction process is very complicated and the construction period is consumed a great deal of cost.

이러한, 종래 옹벽의 문제점을 해결하기 위한 공지된 기술로 최근에는 옹벽블록을 이용한 옹벽시공이 개시된바 있다. 이와 같은 옹벽블록을 이용한 옹벽축조 방법은 성토면이나 절개면을 따라 다수의 옹벽블록을 횡방향으로 적층하여 쌓은 다음 그 배면에 잡석등을 채워 시공된다.In order to solve the problems of the conventional retaining wall, a retaining wall construction using a retaining wall block has recently been disclosed. Retaining wall construction method using such a retaining wall block is constructed by stacking a plurality of retaining wall blocks in the transverse direction along the fill surface or incision surface and then fill the rubble with the back surface.

그러나, 이와 같은 종래 옹벽블록을 이용해 축조된 옹벽은 그 전체가 콘크리트로 이루어져 상막한 도시미관을 조장시키는 문제점이 있었다.However, the retaining wall constructed by using such a conventional retaining wall block has a problem in that the whole is made of concrete to promote the upper urban aesthetics.

이에, 옹벽블록의 미관을 향상할 수 있도록 옹벽블록의 전면에 석재용본드 또는 몰탈을 이용하여 자연석판재를 부착하는 기술이 개시된바 있다.Thus, a technique of attaching natural stone material using a stone bond or mortar on the front surface of the retaining wall block has been disclosed to improve the aesthetics of the retaining wall block.

그러나, 이와 같은 종래 옹벽블록은 다음과 같은 문제점이 있었다.However, such a conventional retaining wall block has the following problems.

옹벽블록을 이용한 옹벽은 시공후 소정기간이 경과하면 산발적으로 옹벽블록에 크랙이 발생하여 자연석판재가 쉽게 탈거되며, 이로 인한 도시미관의 손상 및 인근 주민들에게 옹벽붕괴에 대한 위압감을 조성하는 문제점이 있었다.Retaining wall using retaining wall block sporadically cracks the retaining wall block after a certain period of time after construction, and natural stone slabs are easily removed, resulting in damage to the city's aesthetics and creating a sense of pressure on the retaining wall collapse for nearby residents. .

또한, 크랙이 발생한 옹벽블록을 보수하기 위해서는 크랙이 발생한 옹벽블록 전체를 교체해야 하기 때문에 높은 유지보수비용이 소요되는 문제점이 있었다.In addition, in order to repair the retaining wall block in which the crack has occurred, there is a problem in that a high maintenance cost is required because the entire retaining wall block in which the crack has occurred is replaced.

한편, 옹벽은 옹벽 블록, 상기 옹벽 블록의 후방(옹벽 블록과 사면의 사이)에 채워지는 채움재 및 상기 채움재에 다단으로 매설되어 선단부가 상기 옹벽 블록에 연결되며 상기 채움재와의 마찰력 등에 상기 옹벽 블록을 지지하는 보강재로 구성되며, 상기 보강재는 콘크리트 등의 앵커블록, 다수의 구멍을 갖는 망형 그리드, 발형 그리드 등 다양한 제품이 사용되고 있는데, 종래 옹벽 블록은 다수의 보강재 중에서 어느 하나의 보강재만을 사용하도록 구성됨에 따라 다양한 옹벽 블록을 사용하지 못하고 옹벽 블록과 보강재를 사용하는데 제약이 따르는 문제점이 있다.
On the other hand, the retaining wall is embedded in the retaining wall block, the filling material filled in the rear of the retaining wall block (between the retaining wall block and the slope) and the filling material in multiple stages, and the front end is connected to the retaining wall block, and the retaining wall block is connected to the retaining wall block. It is composed of supporting reinforcement, and the reinforcement is a variety of products such as anchor block, concrete grid having a plurality of holes, foot grid is used, and the retaining wall block is configured to use only one of the reinforcement of the conventional reinforcement Accordingly, there is a problem in that various retaining wall blocks cannot be used and restrictions on using the retaining wall blocks and reinforcement materials are provided.

본 발명은 전술한 바와 같은 문제점을 해결하기 위한 것으로, 옹벽의 시공후 편중된 하중에 의하여 후면블록이나 전면블록에서 균열(Crack)이 발생되더라도 다른쪽 블록으로 균열이 진행되지 않도록 함과 동시에 균열이 발생된 블록만 간단하게 교체할 수 있도록 하여 최소한의 유지보수비용으로 옹벽보수 작업을 수행할 수 있도록 함은 물론, 옹벽블록 자체의 무게를 후면블록과 전면블록으로 분산하여 취급 및 시공성을 크게 향상할 수 있으며 서로 다른 형태의 보강재(앵커블록, 망형 그리드, 발형 그리드 등)를 공용할 수 있는 다양한 보강재의 적용이 가능한 멀티 옹벽 블록 및 이를 이용한 옹벽 시공 공법을 제공하려는데 목적이 있다.The present invention is to solve the problems described above, even if the crack occurs in the rear block or the front block due to the unbalanced load after the construction of the retaining wall so that the crack does not proceed to the other block and at the same time By simply replacing the generated blocks, the retaining wall repair work can be carried out with minimal maintenance cost, and the weight of the retaining wall block itself is distributed to the rear block and the front block to greatly improve handling and construction. The purpose of the present invention is to provide a multi retaining wall block and a retaining wall construction method that can be applied to various reinforcement materials that can share different types of reinforcement materials (anchor blocks, mesh grids, foot grids, etc.).

전술한 바와 같은 목적을 달성하기 위한 본 발명에 따른 다양한 보강재의 적용이 가능한 멀티 옹벽 블록은, 후면블록과; 상기 후면블록의 전방에 결합되는 전면블록으로 이루어져, 앵커 연결봉이 연결된 앵커블록과 망형 그리드 및 발형 그리드를 포함하는 보강재가 공용되도록 구성되고, 상기 후면블록은, 상면 전방에 좌우 폭방향을 따라 상부가 개방된 홈 형태로 형성되는 제1보강재 연결부, 상기 제1보강재 연결부와 직교하는 방향으로 상부가 개방된 홈 형태로 형성되는 제2보강재 연결부를 포함하여, 상기 제1,2보강재 연결부에 걸쳐 상기 앵커 연결봉이 결합되거나 상기 제1보강재 연결부에 상기 망형 그리드와 발형 그리드에 결합되는 키블록이 결합되어 상기 보강재가 공용되는 것을 특징으로 한다.Multi retaining wall block that can be applied to a variety of reinforcement according to the present invention for achieving the above object, the rear block; Consists of a front block coupled to the front of the rear block, the anchor block is connected to the anchor block and the reinforcement including the mesh grid and the foot grid is configured to be shared, the rear block, the upper side along the left and right width direction in front of the upper surface A first reinforcing member connecting portion formed in an open groove shape, a second reinforcing member connecting portion formed in a groove shape having an upper portion opened in a direction orthogonal to the first reinforcing material connecting portion, and the anchor over the first and second reinforcing material connecting portions A connecting rod is coupled or a key block coupled to the mesh grid and the foot grid is coupled to the first reinforcement connecting portion so that the reinforcement is shared.

본 발명에 의한 다양한 보강재의 적용이 가능한 멀티 옹벽 블록 및 이를 이용한 옹벽 시공 공법에 의하면, 옹벽의 시공 후 편중된 하중에 의하여 후면블록이나 전면블록에서 부분적으로 균열이 발생되는 경우 후면블록과 전면블록 및 장식판재가 각각 별도로 구성되어 있기 때문에 어느 한 블록에서 발생된 균열이 다른 블록으로 진행되지 않는 것은 물론, 균열이 발생된 해당 블록만을 간단하게 교체할 수 있어 최소한의 유지보수비용으로 옹벽 보수작업을 수행할 수 있고, 서로 다른 형태의 보강재(앵커블록, 망형 그리드, 발형 그리드 등)를 제1 내지 제3보강재 연결부에 선택적으로 설치하여 다양한 보강재의 공용화가 가능하므로 옹벽의 시공시 옹벽블록과 보강재의 선택의 폭이 넓어지는 효과가 있다.According to the multi retaining wall block and the retaining wall construction method using the same according to the present invention, when a crack is generated in the rear block or the front block due to the unbalanced load after the construction of the retaining wall, the rear block and the front block and Since the decorative plate is composed separately, the crack generated in one block does not proceed to the other block, and only the corresponding block in which the crack is generated can be easily replaced, thus maintaining the retaining wall with minimum maintenance cost. It is possible to install different types of reinforcement materials (anchor blocks, mesh grids, foot grids, etc.) selectively to the first to third reinforcement joints, so that various reinforcements can be shared and the retaining wall block and reinforcement can be selected when constructing the retaining wall. Has the effect of widening.

그리고, 제1보강재 연결부를 통해 보강재가 전면블록과 후면블록에 함께 고정되는 경우 보강재의 연결과 함께 전면블록과 후면블록의 결속력을 증대함으로써 외력(토압 등)에 의한 전면블록과 후면블록의 이탈을 방지할 수 있는 효과가 있다.
And, when the reinforcement is fixed together to the front block and the rear block through the first reinforcement connecting portion, the separation of the front block and the rear block by the external force (earth pressure, etc.) by increasing the binding force of the front block and the rear block together with the connection of the reinforcement. There is an effect that can be prevented.

도 1은 본 발명에 의한 다양한 보강재의 적용이 가능한 멀티 옹벽 블록의 전면 사시도.
도 2는 본 발명에 의한 다양한 보강재의 적용이 가능한 멀티 옹벽 블록의 분리 상태 전면 사시도.
도 3은 본 발명에 의한 다양한 보강재의 적용이 가능한 멀티 옹벽 블록의 분리 상태 배면 사시도.
도 4와 도 5는 본 발명에 의한 다양한 보강재의 적용이 가능한 멀티 옹벽 블록에 앵커 블록이 연결된 도면.
도 6과 도 7은 본 발명에 의한 다양한 보강재의 적용이 가능한 멀티 옹벽 블록에 망형 그리드가 연결된 도면.
도 8과 도 9는 본 발명에 의한 다양한 보강재의 적용이 가능한 멀티 옹벽 블록에 발형 그리드가 연결된 도면.
도 10은 본 발명에 의한 다양한 보강재의 적용이 가능한 멀티 옹벽 블록에 적용된 전면블록의 결합돌기의 다른 예시도.
도 11은 본 발명에 의한 다양한 보강재의 적용이 가능한 멀티 옹벽 블록을 이용한 앵커블록의 다른 설치 상태도.
1 is a front perspective view of a multi retaining wall block that can be applied to a variety of reinforcing materials according to the present invention.
Figure 2 is a front perspective view of the separated state of the multi retaining wall block that can be applied to a variety of reinforcement according to the present invention.
Figure 3 is a rear perspective view of the separated state of the multi retaining wall block applicable to the various reinforcement according to the present invention.
4 and 5 is a view that the anchor block is connected to the multi retaining wall block that can be applied to a variety of reinforcement according to the present invention.
Figure 6 and Figure 7 is a mesh grid connected to the multi retaining wall block that can be applied to a variety of reinforcement according to the present invention.
8 and 9 are diagrams in which a foot grid is connected to a multi retaining wall block to which various reinforcement materials according to the present invention can be applied.
Figure 10 is another illustration of the engaging projection of the front block applied to the multi retaining wall block is applicable to a variety of reinforcement according to the present invention.
Figure 11 is another installation state of the anchor block using a multi retaining wall block that can be applied to a variety of reinforcement according to the present invention.

도 1 내지 도 3에서 보이는 바와 같이, 본 발명에 의한 다양한 보강재의 적용이 가능한 멀티 옹벽 블록(100)은, 전면 블록(110)과 후면 블록(120)으로 구분된다. 전면 블록(110)과 후면 블록(120)으로 구분된 것은 옹벽 배면에서 토압 등이 가해질 때 후면 블록(120)만 균열되고 전면 블록(110)에 균열이 전가되지 않도록 하기 위함이다.As shown in FIGS. 1 to 3, the multi retaining wall block 100 to which various reinforcement materials according to the present invention can be applied is divided into a front block 110 and a rear block 120. What is divided into the front block 110 and the rear block 120 is to prevent only cracks in the rear block 120 and cracks are not transferred to the front block 110 when earth pressure or the like is applied on the rear surface of the retaining wall.

전면 블록(110)과 후면 블록(120)은 분리 가능하게 연결되며, 예를 들어, 전면 블록(110)은 육면체 형태의 전면블록 몸체(111), 전면블록 몸체(111)의 배면에 형성되는 하나 이상(도면에는 하나로 도시됨)의 결합돌기(112)로 이루어지며, 후면 블록(120)은 육면체 형태의 후면블록 몸체(121), 후면블록 몸체(121)의 전면에 형성되며 결합돌기(112)가 끼워지는 결합홈(122)으로 구성된다.The front block 110 and the rear block 120 are detachably connected, for example, the front block 110 is a front block body 111 of the hexahedral shape, one formed on the back of the front block body 111 It is made of a coupling protrusion 112 of the above (shown as one in the figure), the rear block 120 is formed on the front of the rear block body 121, the rear block body 121 of the hexahedral shape and the coupling protrusion 112 Is composed of a coupling groove 122 is fitted.

전면블록(110)과 후면블록(120)은 결합돌기(112)와 결합홈(122)에 의해 결합되며, 결합돌기(112)와 결합홈(122)은 예컨대 종방향으로 형성되어 결합돌기(112)가 결합홈(122)에서 종방향의 슬라이드식으로 끼워 결합될 수 있다. 이때, 전면블록(110)이 후면블록(120)에서 전방으로 이탈되지 않도록 결합돌기(112)와 결합홈(122)은 더브테일(dove-tail) 형태로 형성된다.The front block 110 and the rear block 120 are coupled by the coupling protrusion 112 and the coupling groove 122, the coupling protrusion 112 and the coupling groove 122 is formed in the longitudinal direction, for example, the coupling protrusion 112 ) May be fitted into the sliding groove 122 in the longitudinal direction. At this time, the coupling protrusion 112 and the coupling groove 122 is formed in a dovetail (dove-tail) so that the front block 110 is not separated from the rear block 120 to the front.

그리고, 전면블록(110)과 후면블록(120)의 결속력 증대를 위하여 별도의 결합핀(130)이 사용된다.Then, a separate coupling pin 130 is used to increase the binding force of the front block 110 and the rear block 120.

결합핀(130)은 전면블록(110)과 후면블록(120)의 전후방 및 좌우 움직임과 이탈을 막는 것으로, 전면블록(110)의 결합돌기(112)의 상면과 후면블록 몸체(121)의 결합홈(122) 양측에는 각각 제1,2핀홈(113,123)이 형성되고, 결합핀(130)은 결합돌기(112)의 제1핀홈(113)에 안착되면서 좌우 양측이 후면블록(120)의 제2핀홈(123)에 끼워짐으로써 전면블록(110)과 후면블록(120)을 결속한다. Coupling pin 130 is to prevent the front and rear and left and right movement and departure of the front block 110 and the rear block 120, the coupling of the upper block and the rear block body 121 of the coupling protrusion 112 of the front block 110. First and second pin grooves 113 and 123 are formed at both sides of the groove 122, respectively, and the coupling pin 130 is seated in the first pin groove 113 of the coupling protrusion 112, and both left and right sides thereof are formed on the rear block 120. The front block 110 and the rear block 120 are coupled by being inserted into the 2-pin groove 123.

결합핀(130) 및 이를 위한 제1,2핀홈(113,123)은 필수구성요소는 아니며, 필요에 따라 선택적으로 적용 가능하다.
The coupling pin 130 and the first and second pin grooves 113 and 123 therefor are not essential components and may be selectively applied as necessary.

결합돌기(112)는 전면블록 몸체(111)의 상면보다 낮은 높이로 형성되며, 이는 후술하는 보강재의 결합을 위한 것이다.Coupling protrusion 112 is formed at a lower height than the upper surface of the front block body 111, which is for the coupling of the reinforcement to be described later.

전면 블록(110)과 후면 블록(120)은 크기로 비교할 때 후면 블록(120)이 전면 블록(110)보다 크게 형성되며, 이는 후면 블록(120)이 토압 등에 의한 강성을 확보하기 위함이고 전면 블록(110)은 옹벽의 전면을 형성하는 기능을 하기 때문이다.Compared to the size of the front block 110 and the rear block 120, the rear block 120 is formed larger than the front block 110, which is to secure the rigidity of the rear block 120 by earth pressure and the front block This is because 110 functions to form the front surface of the retaining wall.

전면블록(110)은 별도의 장식판을 사용하지 않고 자신이 옹벽의 전면을 형성할 수 있고, 또는 별도의 장식판(200)(도 2에 도시됨)을 사용할 수 있으며, 장식판(200)의 결합을 위하여 전면블록 몸체(111)의 전면에는 하나 이상(도면에는 하나로 도시됨)의 장식판 결합홈(114)이 형성되며 장식판(200)의 배면에는 결합홈(114)에 끼워 결합되는 블록 결합돌기(210)가 형성된다.The front block 110 may form the front surface of the retaining wall without using a separate decorative plate, or may use a separate decorative plate 200 (shown in FIG. 2), and combine the decorative plate 200. To the front of the front block body 111, at least one decorative plate coupling groove 114 is formed (shown as one in the figure) and the block coupling protrusion 210 is fitted into the coupling groove 114 on the back of the decorative plate 200. ) Is formed.

전면블록(110)은 별도의 장식판(200)이 결합되지 않아도 자체적으로 장식효과를 연출할 수 있도록 장식면(115)(도 12참고)이 형성될 수 있다. The front block 110 may be formed with a decorative surface 115 (see FIG. 12) to produce a decorative effect on its own even without a separate decorative plate 200 is coupled.

본 발명 옹벽 블록(100)은 종방향을 따라 다단으로 조적되며, 이때 상하부에 있는 것들의 결속을 위하여 후면블록(120)의 상면과 저면에는 조적돌기(124)와 조적홈(미도시)이 형성되어, 하부 옹벽블록(100)의 조적돌기(124)에 맞춰 상부 옹벽블록(100)의 조적홈이 끼워진다.
The retaining wall block 100 of the present invention is stacked in multiple stages along the longitudinal direction, in which masonry projections 124 and masonry grooves (not shown) are formed on the upper and lower surfaces of the rear block 120 to bind the upper and lower ones. The fitting groove of the upper retaining wall block 100 is fitted in accordance with the masonry protrusion 124 of the lower retaining wall block 100.

본 발명 옹벽블록(100)은 다양한 보강재(앵커블록(300), 망형 그리드(400), 발형 그리드(500) 등)를 공용할 수 있도록 구성되며, 먼저 각 보강재에 대해 설명한다.The retaining wall block 100 of the present invention is configured to share a variety of reinforcement materials (anchor block 300, mesh grid 400, foot grid 500, etc.), and each reinforcement will be described first.

도 4와 도 5에서처럼, 앵커블록(300)은 예컨대 육면체 형태의 콘크리트 중량물로서 자중과 형상에 의해 보강토 옹벽의 밀림을 구속하며 앵커 연결봉(310)을 통해 옹벽블록(100)과 연결된다.As shown in Figure 4 and 5, the anchor block 300, for example, the concrete weight of the hexahedral form restrains the push of the reinforced earth retaining wall by its own weight and shape and is connected to the retaining wall block 100 through the anchor connecting rod (310).

앵커블록(300)과 앵커 연결봉(310)의 연결구조는 예를 들어, 앵커블록(300)에는 상부를 향해 개방된 연결홈(301)이 형성되고, 앵커 연결봉(310)의 일측 단부에는 연결홈(301)에 상부에서부터 결합되는 연결후크(311)가 형성되는데, 이때, 앵커블록(300)과 앵커 연결봉(310)간의 결속력을 증대하고 앵커블록(300)과 앵커 연결봉(310)이 토압 등에 의해 분리되지 않도록 연결홈(301)과 연결후크(311)는 토압의 방향에 대항하는 방향으로 형성된다. 물론, 앵커블록(300)과 앵커 연결봉(310)은 단품으로 형성되어 현장에서 결합 사용되지 않고 앵커블록(300)의 타설시 앵커 연결봉(310)을 인서트하여 일체화할 수도 있다.
The connection structure of the anchor block 300 and the anchor connecting rod 310 is, for example, the anchor block 300 is formed with a connecting groove 301 that is open toward the upper side, the connection groove at one end of the anchor connecting rod 310 The connecting hook 311 is formed in the 301 is coupled from the top, at this time, to increase the binding force between the anchor block 300 and the anchor connecting rod 310 and the anchor block 300 and the anchor connecting rod 310 by earth pressure, etc. The connection groove 301 and the connection hook 311 are formed in a direction opposite to the direction of earth pressure so as not to be separated. Of course, the anchor block 300 and the anchor connecting rod 310 may be integrally formed by inserting the anchor connecting rod 310 at the time of placing the anchor block 300 without being combined and used in the field.

앵커 연결봉(310)의 타측 단부에는 옹벽블록(100)에 연결되는 블록 연결부(312)가 형성된다. 블록 연결부(312)는 하나 이상의 옹벽블록(100)에 연결되도록 벤딩된 형태이며 하기의 옹벽블록(100)의 설명을 통해 구체화한다.The other end of the anchor connecting rod 310 is formed with a block connection portion 312 connected to the retaining wall block 100. The block connection portion 312 is bent to be connected to one or more retaining wall blocks 100 and is embodied through the description of the retaining wall block 100 below.

즉, 앵커 연결봉(310)은 연결봉 몸체(313), 연결봉 몸체(313)의 후단부에 곡선형으로 벤딩 형성되는 연결후크(311), 연결봉 몸체(313)의 선단부에 연결봉 몸체(313)와 직교하는 방향으로 벤딩되는 블록 연결부(312)로 이루어지는 것이다.
That is, the anchor connecting rod 310 is orthogonal to the connecting rod body 313, the connecting hook 311 is formed in a curved bending portion at the rear end of the connecting rod body 313, the front end of the connecting rod body 313 Block connection portion 312 is bent in the direction made of.

도 6과 도 7에서 보이는 것처럼, 망형 그리드(400)는 다수의 구멍을 갖는 격자형태의 망 구조이며, 옹벽블록(100)에 키블록(140)을 통해 고정된다.6 and 7, the mesh grid 400 is a grid structure having a plurality of holes and is fixed to the retaining wall block 100 through the key block 140.

도 8과 도 9에서처럼, 발형 그리드(500)는 다수의 바(510)가 일측 단부의 블록 연결부(520)에 블록 연결부(520)의 길이방향을 따라 일정 간격을 두고 이격되면서 연결된 구조이며, 키블록(150)을 통해 옹벽블록(100)에 고정된다.
As shown in FIGS. 8 and 9, the foot grid 500 is a structure in which a plurality of bars 510 are spaced apart at regular intervals along the length direction of the block connection part 520 from the block connection part 520 at one end thereof, and the key The block 150 is fixed to the retaining wall block 100.

본 발명의 옹벽블록(100)은 전술한 보강재들 모두를 공용할 수 있는 것이며, 앵커블록(300)의 경우 앵커 연결봉(310)의 연결봉 몸체(313)와 블록 연결부(312)를 수용하어야 하고, 망형 그리드(400)와 발형 그리드(500)의 경우 키블록(140,150)을 수용하여야 한다.Retaining wall block 100 of the present invention is to be able to share all of the reinforcement described above, in the case of the anchor block 300 should accommodate the connecting rod body 313 and the block connecting portion 312 of the anchor connecting rod 310 In the case of the mesh grid 400 and the foot grid 500, the key blocks 140 and 150 should be accommodated.

이를 위하여 후면블록(120)은 앵커 연결봉(310)의 블록 연결부(312)와 키블록(140,150)이 각각 보강재 연결부가 갖추어진다. 키블록(140,150)은 각각 저면에 저부를 향해 상호 간에 일정 간격을 두고 다리(141,151)가 형성된 구조이며, 다리(141,151)는 각각 망형 그리드(400)의 구멍과 발형 그리드(500)의 바(510) 사이 구멍에 끼워짐으로써 망형 그리드(400)와 발형 그리드(500)를 고정한다.
To this end, the rear block 120 is provided with a block connecting portion 312 and key blocks 140 and 150 of the anchor connecting rod 310, respectively, reinforcement connecting portion. The key blocks 140 and 150 are formed on the bottom thereof with legs 141 and 151 formed at predetermined intervals toward the bottom, respectively, and the legs 141 and 151 are holes of the mesh grid 400 and bars 510 of the foot grid 500, respectively. The mesh grid 400 and the foot grid 500 are fixed by being inserted into the hole between the holes.

상기 보강재 연결부는 후면블록 몸체(121)에 좌우 폭방향으로 형성되는 제1보강재 연결부(125) 및 후면블록 몸체(121)의 전후방향을 따라 배열되며 제1보강재 연결부(125)에 연통하는 제2보강재 연결부(126)으로 구성된다.The reinforcement connecting portion is arranged along the front and rear directions of the first reinforcement connecting portion 125 and the rear block body 121 formed in the left and right width directions on the rear block body 121 and communicates with the first reinforcing material connecting portion 125. Reinforcement connection 126.

제1보강재 연결부(125)는 후면블록 몸체(121)의 상면에 상부를 향해 개방되는 홈으로서, 앵커 연결봉(310)의 블록 연결부(312)와 키블록(140,150)이 각각 수용되고, 제2보강재 연결부(126)는 후면블록 몸체(121)의 상면에 상부를 향해 개방되는 홈으로서 앵커 연결봉(310)의 연결봉 몸체(313)가 수용된다.The first reinforcement connecting portion 125 is a groove which is opened upward on the upper surface of the rear block body 121, and the block connecting portion 312 and the key blocks 140 and 150 of the anchor connecting rod 310 are accommodated, respectively, and the second reinforcing material The connecting portion 126 is a groove which is open upward on the upper surface of the rear block body 121 to accommodate the connecting rod body 313 of the anchor connecting rod 310.

여기서, 제1보강재 연결부(125)에 수용되는 앵커 연결봉(310)의 블록 연결부(312)와 키블록(140,150)은 전면블록(110)과 후면블록(120)에 걸쳐 이들(110,120)을 결합함으로써 보강재(300,400,500)가 후면블록(120)뿐만 아니라 전면블록(110)에도 연결되면서 전면블록(110)과 후면블록(120)을 함께 고정하는 기능도 수행할 수 있도록 전면블록(110)의 결합돌기(112)의 상부 및 후면블록 몸체(121)의 결합홈(122) 좌우 양측에 걸쳐 형성될 수 있다.Here, the block connecting portion 312 and the key blocks 140 and 150 of the anchor connecting rod 310 accommodated in the first reinforcement connecting portion 125 are coupled to the front block 110 and the rear block 120 by combining them (110, 120) Reinforcement (300,400,500) is connected to the front block 110 as well as the rear block 120, the coupling protrusion of the front block 110 to perform the function of fixing the front block 110 and the rear block 120 together ( The coupling groove 122 of the upper and rear block body 121 of the 112 may be formed over both sides.

또한, 제1보강재 연결부(125)는 결합핀(130)이 결합되는 제1,2핀홈(113,123)의 상부에 연통되도록 형성될 수도 있다. In addition, the first reinforcing member connecting portion 125 may be formed to communicate with the upper portion of the first and second pin grooves 113 and 123 to which the coupling pin 130 is coupled.

전면블록(110)의 결합돌기(112)는 앵커 연결봉(310)의 연결봉 몸체(313)의 안착을 간섭하지 않도록 전면블록 몸체(111)보다 낮게 형성되거나 도 10에서처럼 전면블록 몸체(111)의 상면과 동일한 높이이면서 앵커 연결봉(310)의 연결봉 몸체(313)가 안착되는 안착홈(112a)이 형성될 수 있다.The coupling protrusion 112 of the front block 110 is formed lower than the front block body 111 so as not to interfere with the seating of the connecting rod body 313 of the anchor connecting rod 310 or the upper surface of the front block body 111 as shown in FIG. A mounting groove 112a may be formed at the same height as that of the connecting rod body 313 of the anchor connecting rod 310.

즉, 본 발명 옹벽블록(100)은 제1보강재 연결부(125)에 키블록(140,150)이 안착되어 망형 그리드(400)와 발형 그리드(500)(도면에서는 발형 그리드(500)의 키블록(150)은 제1보강재 연결부(125)가 아니라 후술하는 제3보강재 연결부(127)에 고정된 것으로 도시하였으나, 발형 그리드(500)의 키블록(150)도 제1보강재 연결부(125)에 고정될 수 있다)를 고정할 수 있고, 제1,2보강재 연결부(125,126)에 걸쳐 앵커 연결봉(310)의 블록 연결부(312)와 연결봉 몸체(313)가 결합됨으로써 앵커블록(300)을 고정할 수 있으므로 다양한 보강재를 공용할 수 있는 것이다.That is, in the present retaining wall block 100, the key blocks 140 and 150 are seated on the first reinforcement connecting portion 125 so that the mesh block 400 and the foot grid 500 (the key block 150 of the foot grid 500 in the drawing) are mounted. ) Is shown as being fixed to the third reinforcement connector 127, which will be described later, not the first reinforcement connector 125, but the key block 150 of the foot grid 500 may also be fixed to the first reinforcement connector 125. It can be fixed, and by connecting the block connecting portion 312 and the connecting rod body 313 of the anchor connecting rod 310 over the first, second reinforcement connecting portion (125, 126) can be fixed to the anchor block 300 The reinforcement can be shared.

더불어, 후면블록(120)은 보강재(300,400,500)의 고정 위치를 더욱 다변화할 수 있도록 즉, 제1보강재 연결부(125)의 위치에 보강재(300,400,500)를 고정할 수 없는 경우 등을 감안하여 제3보강재 연결부(127)가 적용될 수 있다.In addition, the rear block 120 may further vary the fixed position of the reinforcement 300, 400, 500, that is, the third reinforcement in consideration of the case where the reinforcement (300, 400, 500) can not be fixed to the position of the first reinforcement connecting portion 125, etc. The connector 127 may be applied.

제3보강재 연결부(127)는 후면블록 몸체(121)의 후방쪽에 상부를 향해 개방되면서 제2보강재 연결부(126)와 직교하면서 연통하도록 홈 형태로 형성된다. 물론, 제3보강재 연결부(127)는 앵커 연결봉(310)의 블록 연결부(312)와 키블록(140,150) 모두가 결합될 수 있는 크기이다. 도 8과 도 9는 발형 그리드(500)를 고정하는 키블록(150)을 제3보강재 연결부(127)에 고정한 예이다.The third reinforcing member connecting portion 127 is formed in a groove shape so as to communicate while orthogonal to the second reinforcing member connecting portion 126 while opening toward the upper side of the rear block body 121. Of course, the third reinforcement connecting portion 127 is a size that can be coupled to both the block connection portion 312 and the key block (140,150) of the anchor connecting rod 310. 8 and 9 illustrate an example in which the key block 150 fixing the foot grid 500 is fixed to the third reinforcement connector 127.

제3보강재 연결부(127)를 통해 보강재를 다양한 구조로 설치할 수 있으며, 예를 들어 도 11에서처럼, 다수의 앵커블록(300)을 설치할 때 제1,3보강재 연결부(125,127)를 교대로 사용함으로써 옹벽블록(100)들의 결속력을 증대할 수 있고, 망형 그리드(400)와 발형 그리드(500)의 경우 제1,3보강재 연결부(125,127) 모두에 키블록(140,150)을 고정함으로써 망형 그리드(400)와 발형 그리드(500)의 고정력도 증대할 수 있다.The reinforcement may be installed in various structures through the third reinforcing member connecting portion 127. For example, as shown in FIG. 11, when the plurality of anchor blocks 300 are installed, the retaining wall is alternately used by using the first and third reinforcing member connecting portions 125 and 127. The binding force of the blocks 100 may be increased, and in the case of the mesh grid 400 and the foot grid 500, the key blocks 140 and 150 may be fixed to both the first and third reinforcement connectors 125 and 127. Fixing force of the foot-shaped grid 500 can also be increased.

본 발명에 의한 옹벽 블록의 구조에 따르면, 다종 보강재의 적용이 가능하므로 옹벽 시공시 현장 여건에 따라 도 4 내지 도 9에서처럼, 어느 한 종류의 보강재를 선택하여 사용할 수 있을 뿐 아니라, 다종의 보강재를 함께 사용할 수도 있다.According to the structure of the retaining wall block according to the present invention, since it is possible to apply a variety of reinforcement material, as shown in Figures 4 to 9, depending on the site conditions during the construction of the retaining wall, as well as any one type of reinforcement can be selected and used, and a variety of reinforcement material Can also be used together.

본 발명에 따른 제1,3보강재 연결부(125,127)는 보강재의 연결뿐만 아니라, 다수의 옹벽 블록(100)을 횡방향으로 배열할 때 옹벽 블록(100)들의 줄맞춤을 위한 연결부재가 끼워지는 기능도 겸할 수 있다.
The first and third reinforcing member connections 125 and 127 according to the present invention, as well as the connection of the reinforcement, when the plurality of retaining wall blocks 100 are arranged in the transverse direction, the function of fitting the connecting member for the alignment of the retaining wall blocks 100 Can also serve as

본 발명에 의한 다양한 보강재의 적용이 가능한 멀티 옹벽 블록을 이용한 옹벽 시공 공법은 다음과 같다.Retaining wall construction method using a multi retaining wall block that can be applied to a variety of reinforcement according to the present invention is as follows.

옹벽 시공 공법은 개략적으로 옹벽 블록(100) 조적(종횡방향) - 뒷채움 - 보강재 설치 공정으로 이루어지며, 이는 공지된 것이므로 구체적인 설명을 생략하고, 보강재의 설치시 선택된 보강재를 옹벽 블록(100)의 제1 내지 제3보강재 연결부(125,126,127)에 선택적으로 연결 설치한다.Retaining wall construction method is roughly composed of retaining wall block 100 (horizontal direction)-backfill-reinforcement installation process, and since it is known, the detailed description is omitted, and the reinforcement selected when the reinforcement is installed is made of the retaining wall block 100 Selectively connected to the first to third reinforcement connecting parts (125, 126, 127).

본 발명에 따르면 옹벽의 설계 단계에서 보강재를 선택하지 않고 현장 여건에 따라 보강재를 선택할 수 있다. 왜냐하면, 옹벽 블록(100)에 다양한 보강재의 설치 가능하기 때문이다. 바꿔 말하면, 옹벽의 시공시 보강재에 맞는 옹벽 블록을 선택하지 않고 본 발명의 옹벽 블록(100)을 사용하여 옹벽의 시공이 가능한 것이다.
According to the invention it is possible to select the reinforcement according to the site conditions without selecting the reinforcement in the design step of the retaining wall. This is because it is possible to install various reinforcing materials in the retaining wall block 100. In other words, the retaining wall can be constructed using the retaining wall block 100 of the present invention without selecting the retaining wall block suitable for the reinforcing material when the retaining wall is constructed.

100 : 옹벽블록,
110 : 전면블록, 111 : 전면블록 몸체
112 : 결합돌기, 113 : 제1핀홈
120 : 후면블록, 121 : 후면블록 몸체
122 : 결합홈, 123 : 제2핀홈
124 : 조적돌기, 125 : 제1보강재 연결부
126 : 제2보강재 연결부, 127 : 제3보강재 연결부
130 : 결합핀, 140,150 : 키블록
200 : 장식판,
100: retaining wall block,
110: front block, 111: front block body
112: coupling protrusion, 113: first pin groove
120: rear block, 121: rear block body
122: coupling groove, 123: second pin groove
124: masonry projections, 125: the first reinforcement connection
126: connection of the second reinforcement, 127: connection of the third reinforcement
130: coupling pin, 140,150: key block
200: decorative plate,

Claims (9)

육면체 형태의 후면블록 몸체(121) 및 상기 후면블록 몸체의 전면에 상하 길이방향을 따라 형성되는 결합홈(122)으로 이루어지며 성토지면 또는 절개지면을 따라 종방향 및 횡방향으로 연속 반복하여 적층 시공되는 후면블록(120)과;
육면체 형태의 전면블록 몸체(111) 및 상기 전면블록 몸체의 후방에 상하 길이방향으로 형성되며 상기 후면블록의 결합홈에 끼워 결합되는 결합돌기(112)로 이루어져 상기 결합돌기와 결합홈을 매개로 하여 상기 후면블록의 전면에 분리 가능하게 결합되는 전면블록(110)으로 이루어지며, 앵커 연결봉(310)이 연결된 앵커블록(300)과 망형 그리드(400) 및 발형 그리드(500)를 포함하는 보강재가 공용되도록 구성되고,
상기 후면블록(120)은, 상기 후면블록 몸체(121)의 상면 전방에 좌우 폭방향을 따라 상부가 개방된 홈 형태로 형성되는 제1보강재 연결부(125), 상기 제1보강재 연결부와 직교하는 방향으로 상부가 개방된 홈 형태로 형성되는 제2보강재 연결부(126)를 포함하여, 상기 제1,2보강재 연결부(125)에 걸쳐 상기 앵커 연결봉(310)의 블록 연결부(312)와 앵커봉 몸체(313)가 결합되거나 상기 제1보강재 연결부(125)에 상기 망형 그리드와 발형 그리드에 결합되는 키블록(140,150)이 결합되어 상기 보강재가 공용되는 것을 특징으로 하는 다양한 보강재의 적용이 가능한 멀티 옹벽 블록.
It consists of a rear block body 121 having a hexahedral shape and a coupling groove 122 formed along the longitudinal direction on the front of the rear block body, and is repeatedly stacked in the longitudinal and transverse directions along the ground surface or the cut surface. Being rear block 120;
The front block body 111 of the hexahedral shape and formed in the vertical longitudinal direction at the rear of the front block body consisting of a coupling protrusion 112 coupled to the coupling groove of the rear block through the coupling protrusion and the coupling groove; Consists of the front block 110 is detachably coupled to the front of the rear block, the anchor block 300 is connected to the anchor block 300 is connected to the reinforcement including the mesh grid 400 and the foot grid 500 is shared. Composed,
The rear block 120, the first reinforcement connecting portion 125 is formed in a groove shape with the upper portion is opened along the left and right width direction in front of the upper surface of the rear block body 121, the direction perpendicular to the first reinforcing material connecting portion Block connection portion 312 and the anchor rod body of the anchor connecting rod 310 over the first and second reinforcing material connecting portion 125, including a second reinforcing material connecting portion 126 is formed in a groove shape with an upper opening 313 is coupled or the first reinforcement connecting portion 125 is a multi-retaining wall block applicable to a variety of reinforcement, characterized in that the reinforcement is shared by the key block (140,150) coupled to the mesh grid and the foot grid.
청구항 1에 있어서, 상기 제1보강재 연결부(125)는, 상기 전면블록의 결합돌기 및 상기 결합돌기와 대응되는 상기 후면블록 몸체의 좌우 양측에 걸쳐 형성되어 상기 앵커 연결봉과 키블록이 상기 전면블록의 결합돌기와 후면블록에 함께 고정되는 것을 특징으로 하는 다양한 보강재의 적용이 가능한 멀티 옹벽 블록.The method of claim 1, wherein the first reinforcing material connecting portion 125 is formed over the left and right sides of the rear block body corresponding to the engaging projection and the engaging projection of the front block is the anchor connecting rod and the key block is coupled to the front block Multi retaining wall block that can be applied to a variety of reinforcement, characterized in that fixed to the projection and the rear block. 청구항 1 또는 청구항 2에 있어서, 상기 후면블록 몸체(121)의 후방에 상기 제2보강재 연결부(126)와 직교하는 방향으로 상부가 개방된 홈 형태로 형성되어 상기 앵커 연결봉 또는 키블록이 고정되는 제3보강재 연결부(127)가 포함되는 것을 특징으로 하는 다양한 보강재의 적용이 가능한 멀티 옹벽 블록.According to claim 1 or 2, The rear block body 121 is formed in the groove shape of the upper portion is opened in the direction orthogonal to the second reinforcing material connecting portion 126 in the direction perpendicular to the anchor connecting rod or key block is fixed Multi-retaining wall block that can be applied to a variety of reinforcement, characterized in that the three reinforcement connecting portion 127 is included. 청구항 3에 있어서, 상기 전면블록의 결합돌기(112)는 상기 전면블록 몸체(111)의 상면과 동일한 높이이면서 상기 제2보강재 연결부(126)와 연통 형성되어 상기 앵커 연결봉(310)에 형성된 연결봉 몸체(313)가 안착되는 안착홈(112a)이 포함되는 것을 특징으로 하는 다양한 보강재의 적용이 가능한 멀티 옹벽 블록.4. The connecting rod body of claim 3, wherein the coupling protrusion 112 of the front block is formed at the same height as the upper surface of the front block body 111 to communicate with the second reinforcing material connecting portion 126 and formed on the anchor connecting rod 310. 313 is a multi-retaining wall block that can be applied to a variety of reinforcement, characterized in that the seating groove 112a is included. 청구항 3에 있어서, 상기 전면블록 몸체는 하나 이상의 장식판 결합홈(114)을 포함하여, 상기 장식판 결합홈에 결합되는 블록 결합돌기(210)를 갖는 장식판(200)이 결합되는 것을 특징으로 하는 다양한 보강재의 적용이 가능한 멀티 옹벽 블록.The method of claim 3, wherein the front block body includes one or more decorative plate coupling groove 114, a variety of reinforcing material is characterized in that the decorative plate 200 having a block coupling protrusion 210 coupled to the decorative plate coupling groove is coupled. Multi retaining wall block can be applied. 청구항 1에 있어서, 상기 후면블록 몸체의 상면에 상기 결합홈을 중심으로 하여 양측으로 형성되는 제2핀홈(123), 상기 전면블록의 결합돌기의 상면에 상기 제2핀홈과 연통 형성되는 제1핀홈(113) 및 상기 제1,2핀홈에 결합되는 결합핀(130)을 포함하여 상기 전면블록과 후면블록이 결합되는 것을 특징으로 하는 다양한 보강재의 적용이 가능한 멀티 옹벽 블록.The second pin groove 123 formed on both sides of the coupling groove on the upper surface of the rear block body, the first pin groove formed in communication with the second pin groove on the upper surface of the coupling protrusion of the front block. (113) and the multi retaining wall block applicable to a variety of reinforcement, characterized in that the front block and the rear block is coupled, including a coupling pin 130 is coupled to the first and second pin groove. 청구항 1에 있어서, 상기 전면블록의 전면에 장식면(115)이 가공된 것을 특징으로 하는 다양한 보강재의 적용이 가능한 멀티 옹벽 블록.The multi-retaining wall block of claim 1, wherein a decorative surface 115 is processed on the front surface of the front block. 사면의 전방에 청구항 1에 의한 옹벽 블록을 종횡방향을 따라 조적하는 제1단계와;
상기 제1단계를 통해 상기 옹벽 블록을 다단으로 적층할 때 앵커 연결봉(310)이 연결된 앵커블록(300)과 망형 그리드(400) 및 발형 그리드(500)를 포함하는 보강재 중에서 하나 이상을 선택하여 상기 옹벽 블록에 연결 및 설치하는 제2단계와;
상기 제2단계를 통해 상기 보강재를 다단으로 설치하면서 채움재를 채워 다짐하는 제3단계를 포함하여 이루어진 것을 특징으로 하는 다양한 보강재의 적용이 가능한 멀티 옹벽 블록을 이용한 옹벽 시공 공법.
A first step of depositing the retaining wall block according to claim 1 along the longitudinal direction in front of the slope;
When the retaining wall block is stacked in multiple stages through the first step, one or more of the anchor block 300 to which the anchor connecting rod 310 is connected and the reinforcement including the mesh grid 400 and the foot grid 500 may be selected. Connecting and installing the retaining wall block;
Retaining wall construction method using a multi retaining wall block can be applied to a variety of reinforcement, characterized in that it comprises a third step of filling the filling material while installing the reinforcement in multiple stages through the second step.
청구항 8에 있어서, 상기 제2단계에서는 앵커 블록의 앵커 연결봉을 상기 옹벽 블록의 제1,2보강재 연결부에 걸쳐 설치하여 연결하거나, 망형 그리드와 발형 그리드를 상기 옹벽블록의 상면에 깔고 다수의 다리(141,151)를 갖는 키블록(140,150)을 상기 제1보강재 연결부에 끼워 설치하는 것을 특징으로 하는 다양한 보강재의 적용이 가능한 멀티 옹벽 블록을 이용한 옹벽 시공 공법.The method of claim 8, wherein in the second step, the anchor connecting rod of the anchor block is installed by connecting over the first and second reinforcement connecting portions of the retaining wall block, or the mesh grid and the foot grid are laid on the upper surface of the retaining wall block, and a plurality of legs ( Retaining wall construction method using a multi retaining wall block that can be applied to a variety of reinforcement, characterized in that the key block (140,150) having a 141,151 is inserted into the first reinforcement connecting portion.
KR1020110042551A 2011-05-04 2011-05-04 Multi retaining wall block applicable various stiffener and retaining wall constructing method using this KR101088477B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110042551A KR101088477B1 (en) 2011-05-04 2011-05-04 Multi retaining wall block applicable various stiffener and retaining wall constructing method using this

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110042551A KR101088477B1 (en) 2011-05-04 2011-05-04 Multi retaining wall block applicable various stiffener and retaining wall constructing method using this

Publications (1)

Publication Number Publication Date
KR101088477B1 true KR101088477B1 (en) 2011-11-30

Family

ID=45398376

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110042551A KR101088477B1 (en) 2011-05-04 2011-05-04 Multi retaining wall block applicable various stiffener and retaining wall constructing method using this

Country Status (1)

Country Link
KR (1) KR101088477B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101494740B1 (en) * 2014-06-25 2015-02-24 주식회사 동명건설엔지니어링 Retaining wall using large block and construction method thereof
KR101527703B1 (en) * 2015-02-02 2015-06-09 주식회사 제이에이치 Revetment Block and Installation Method Thereof
KR102006305B1 (en) * 2018-12-24 2019-08-01 (주)지성이씨에스 Block structure for retaining wall of cut-slope and back-filing side
KR102340292B1 (en) * 2021-07-06 2021-12-16 김명수 Vegetation block and retaining wall using the same

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003166244A (en) 2001-11-30 2003-06-13 Kyokado Eng Co Ltd Reinforced soil structure, reinforcing member, block for reinforced soil and manufacturing method therefor
KR100930886B1 (en) 2009-04-17 2010-01-06 강선욱 Mounting structure of decoration panel for revetment-block
KR100970303B1 (en) 2009-02-17 2010-07-15 김종철 Revetment-block

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003166244A (en) 2001-11-30 2003-06-13 Kyokado Eng Co Ltd Reinforced soil structure, reinforcing member, block for reinforced soil and manufacturing method therefor
KR100970303B1 (en) 2009-02-17 2010-07-15 김종철 Revetment-block
KR100930886B1 (en) 2009-04-17 2010-01-06 강선욱 Mounting structure of decoration panel for revetment-block

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101494740B1 (en) * 2014-06-25 2015-02-24 주식회사 동명건설엔지니어링 Retaining wall using large block and construction method thereof
KR101527703B1 (en) * 2015-02-02 2015-06-09 주식회사 제이에이치 Revetment Block and Installation Method Thereof
KR102006305B1 (en) * 2018-12-24 2019-08-01 (주)지성이씨에스 Block structure for retaining wall of cut-slope and back-filing side
KR102340292B1 (en) * 2021-07-06 2021-12-16 김명수 Vegetation block and retaining wall using the same

Similar Documents

Publication Publication Date Title
KR101085250B1 (en) Mounting structure of decoration stone block and the mounting method
KR101728791B1 (en) Prefabricated concrete retaining wall using recycle aggregate
JP6343727B1 (en) Self-supporting retaining wall and connecting block
KR101103142B1 (en) Retaining wall structure and construction method of the retaining wall structure
KR101088477B1 (en) Multi retaining wall block applicable various stiffener and retaining wall constructing method using this
KR20190083466A (en) Retaining wall and construction method thereof
KR20150098535A (en) a prefabricated retaining block and all its adjuncts for assembling the block.
KR100980860B1 (en) Retaining wall fixed device and method for constructing retaining wall using thereof
KR20090108146A (en) Construction structure of breast wall in groundcutted area and construction method thereof
KR101138915B1 (en) Retaining wall
KR20160050226A (en) Cut slope reinforcement
KR101307763B1 (en) Method for constructing reinforced-earth abutment having connecting member for connecting reinforcement members
CN205669211U (en) A kind of prefabricated Gravity Retaining Wall
KR20120131693A (en) Prefabricated block for retaining wall and method for constructing retaining wall using the same
KR100970303B1 (en) Revetment-block
CN107761759B (en) L-shaped concrete retaining wall
CN104234258B (en) Building block and reinforced concrete sandwich body of wall and construction method
KR101884663B1 (en) Construction method for soil retaining wall using cap slab
JP5984754B2 (en) Solid foundation method using PC unit and PC unit
KR101159097B1 (en) Precast abutment for longitudinal continuous connection and construction method therefor
KR101072286B1 (en) Prefabricated retaining wall
KR101164989B1 (en) Ground reinforcing structure assembly and reinforcing method thereof
KR101065726B1 (en) Prefabricated retaining wall
KR101168859B1 (en) Retaining wall with formative stone and formative stone using the same
KR200461055Y1 (en) Retaining wall with formative stone and formative stone

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141106

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20151028

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20161102

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20171116

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20181031

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20191120

Year of fee payment: 9