KR101078222B1 - Jointing Device between Wall and Beam - Google Patents

Jointing Device between Wall and Beam Download PDF

Info

Publication number
KR101078222B1
KR101078222B1 KR1020080128366A KR20080128366A KR101078222B1 KR 101078222 B1 KR101078222 B1 KR 101078222B1 KR 1020080128366 A KR1020080128366 A KR 1020080128366A KR 20080128366 A KR20080128366 A KR 20080128366A KR 101078222 B1 KR101078222 B1 KR 101078222B1
Authority
KR
South Korea
Prior art keywords
wall
temporary beam
fixing
coupled
temporary
Prior art date
Application number
KR1020080128366A
Other languages
Korean (ko)
Other versions
KR20100069829A (en
Inventor
오형창
김중삼
Original Assignee
주식회사 포스코건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 포스코건설 filed Critical 주식회사 포스코건설
Priority to KR1020080128366A priority Critical patent/KR101078222B1/en
Publication of KR20100069829A publication Critical patent/KR20100069829A/en
Application granted granted Critical
Publication of KR101078222B1 publication Critical patent/KR101078222B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/001Corner fastening or connecting means for forming or stiffening elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

벽체와 가설빔 간의 결합장치가 개시된다. 본 발명은 가설빔의 단부에 결합되어 가설빔을 벽체에 연결되도록 하는 연결부, 가설빔과 연결부 사이에서 가설빔과 연결부를 체결하는 체결부, 및 연결부에 결합된 상태에서 벽체 방향으로의 이동에 따라, 벽체에 설치된 브라켓에 결합됨으로써 가설빔을 벽체에 고정시키는 고정부를 구비한다. 본 발명에 따르면, 슬라브 콘크리트 타설을 위한 가설빔이 벽체에서 용이하게 착탈가능하게 된다. A coupling device between a wall and a temporary beam is disclosed. The present invention is coupled to the end of the temporary beam to connect the temporary beam to the wall, the connection between the temporary beam and the connecting portion fastening the coupling portion and the connecting portion, and in the state coupled to the connecting portion in accordance with the movement in the wall direction And a fixing part fixed to the wall by being coupled to a bracket installed on the wall. According to the present invention, the temporary beams for slab concrete pouring can be easily detached from the wall.

슬라브 콘크리트, 가설빔, 벽체, 결합장치, 브라켓 Slab concrete, temporary beams, walls, joining devices, brackets

Description

벽체와 가설빔 간의 결합장치{Jointing Device between Wall and Beam}Joining device between wall and beam

본 발명은 벽체와 가설빔 간의 결합장치에 관한 것으로, 더욱 상세하게는 슬라브 콘크리트 타설을 위한 가설빔을 벽체에 용이하게 착탈가능하게 하는 벽체와 가설빔 간의 결합장치에 관한 것이다. The present invention relates to a coupling device between a wall and a temporary beam, and more particularly, to a coupling device between a wall and a temporary beam for easily attaching or detaching a temporary beam for slab concrete placing on a wall.

상하의 층을 구획하는 층간 슬래브를 시공하기 위해서는, 우선 슬래브 시공을 하여야 할 부분의 하부에, 슬래브 거푸집을 설치하여야 한다.In order to construct an interlayer slab that divides the upper and lower layers, first, a slab formwork should be installed at the lower part of the slab construction.

슬래브 거푸집은, 도 1에 도시된 바와 같이, 통상적으로 널판이나 합판 등의 판재(40)의 상부에 배근공사를 하여 이루어지며, 그 위에 콘크리트를 타설 및 양생하여, 슬래브(50)를 형성하게 된다.Slab formwork, as shown in Figure 1, is usually made by reinforcement work on the upper portion of the plate material 40, such as slabs or plywood, and by placing and curing the concrete thereon, to form the slab 50 .

상기한 바와 같은 슬래브 시공과정에서, 슬래브 거푸집과 슬래브(50)를, 가설빔과 동바리에 의한 거푸집 지지장치에 의해 지지하게 되는데, 가설빔으로는 장선(30)과 멍에(20)가 사용되고, 동바리로는 통상 파이프 서포트(10)가 사용된다.In the slab construction process as described above, the slab formwork and the slab 50 is supported by the formwork supporting device by the temporary beam and the copper bar, the joist (30) and yoke (20) is used as the temporary beam, copper bar As the furnace, a pipe support 10 is usually used.

즉, 슬래브 거푸집을 구성하는 판재(40)의 하부를 가로보를 의미하는 장선(30)들이 소정 간격으로 지지하고, 상기 장선(30)들의 하부를 세로보를 의미하는 멍에(20)들이 소정 간격으로 지지하며, 상기 멍에(20)들을 파이프 서포트(10)들이 지지하게 되는 것이다. That is, the joists 30, which mean the horizontal beams, support the lower portions of the plate 40 constituting the slab formwork at predetermined intervals, and the yokes 20, which represent the vertical beams, support the lower portions of the joists 30 at predetermined intervals. And, the yoke 20 is to support the pipe support (10).

그리고, 상기한 바와 같은 거푸집 지지장치에 의하여 슬래브 거푸집의 시공이 완료되고, 슬래브 거푸집에 콘크리트를 타설한 후, 슬래브(50)가 무너지지 않을 정도의 일정 요구시간 동안 양생되면, 다음 층의 슬래브 시공이나 회수를 위하여, 거푸집 지지장치중 가설빔들(20, 30)은 해체하고, 파이프 서포트(10)는 슬래브(50)가 완전히 양생될 때까지 슬래브(50)를 지지하도록 하여야 한다.Then, the construction of the slab formwork is completed by the formwork support device as described above, and after the concrete is poured into the slab formwork, if the slab 50 is cured for a predetermined time to the extent that it does not collapse, the next layer of slab construction or For recovery, the temporary beams 20, 30 of the form support device should be dismantled and the pipe support 10 should support the slab 50 until the slab 50 is fully cured.

한편, 슬래브(50)의 양생이 완료된 이후의 가설빔들(20, 30)을 해체하는 과정에서는, 파이프 서포트(10)를 높이를 낮추거나 치운 상태에서 가설빔들(20, 30)을 해체하여야 하는데, 주의를 요하지 않을 경우 낙하하는 가설빔들(20, 30)에 의해 작업자가 크게 안전사고를 당할 우려가 있다.Meanwhile, in the process of disassembling the temporary beams 20 and 30 after the curing of the slab 50 is completed, the temporary beams 20 and 30 must be disassembled while the pipe support 10 is lowered or removed. However, if the attention is not required, there is a risk that the worker may be greatly accidental due to the falling beams 20 and 30.

따라서, 본 발명의 목적은, 슬라브 콘크리트 타설을 위한 가설빔을 벽체에 용이하게 착탈가능하게 하는 벽체와 가설빔 간의 결합장치를 제공함에 있다.Accordingly, it is an object of the present invention to provide a coupling device between a wall and a construction beam which allows the temporary beam for slab concrete placement to be easily detached from the wall.

상기 목적을 달성하기 위한 본 발명에 따른 벽체와 가설빔 간의 결합장치는, 슬라브 콘크리트 타설을 위해 가설빔을 벽체에 결합시키는 결합장치에 있어서, 상기 가설빔의 단부에 결합되어 상기 가설빔을 벽체에 연결되도록 하는 연결부; 상기 가설빔과 상기 연결부 사이에서 상기 가설빔과 상기 연결부를 체결하는 체결부; 및 상기 연결부에 결합된 상태에서 상기 벽체 방향으로의 이동에 따라, 상기 벽체에 설치된 브라켓에 결합됨으로써 상기 가설빔을 상기 벽체에 고정시키는 고정부를 포함한다. The coupling device between the wall and the temporary beam according to the present invention for achieving the above object, in the coupling device for coupling the temporary beam to the wall for slab concrete casting, is coupled to the end of the temporary beam to the temporary beam to the wall A connecting portion to be connected; A fastening part for fastening the temporary beam and the connecting part between the temporary beam and the connecting part; And a fixing part for fixing the temporary beam to the wall by being coupled to a bracket installed on the wall in a state of being coupled to the connecting part in the wall direction.

바람직하게는, 상기 체결부는 상기 가설빔과 상기 연결부를 체결하는 볼트, 및 상기 가설빔과 상기 연결부 사이에 삽입되어 상기 가설빔과 상기 연결부 간의 길이를 조절하는 길이조절부재를 포함하는 것을 특징으로 한다. Preferably, the fastening part includes a bolt for fastening the temporary beam and the connecting part, and a length adjusting member inserted between the temporary beam and the connecting part to adjust the length between the temporary beam and the connecting part. .

또한, 상기 고정부는 상기 연결부에 용수철에 의해 결합되며, 상기 용수철의 탄성력에 의해 이동되어 상기 브라켓에 결합되는 것을 특징으로 한다. In addition, the fixing portion is coupled to the connecting portion by a spring, it is characterized in that it is moved by the elastic force of the spring is coupled to the bracket.

또한, 상기 고정부에는 상기 고정부가 이동된 상태에서 상기 고정부의 위치를 고정시키는 고정침이 구비된 것을 특징으로 한다. In addition, the fixing portion is characterized in that the fixing needle for fixing the position of the fixing portion in the fixed state is moved.

또한, 상기 고정부에는 상기 고정부의 벽체 방향 또는 벽체 반대 방향으로의 이동에 사용되는 이동부가 구비된 것을 특징으로 한다. In addition, the fixing part is characterized in that the moving part used for movement in the wall direction or the wall opposite direction of the fixing part is provided.

본 발명에 따르면, 슬라브 콘크리트 타설을 위한 가설빔이 벽체에서 용이하게 착탈가능하게 된다. According to the present invention, the temporary beams for slab concrete pouring can be easily detached from the wall.

이하에서는 도면을 참조하여 본 발명을 보다 상세하게 설명한다. 도면들 중 동일한 구성요소들은 가능한 한 어느 곳에서든지 동일한 부호들로 나타내고 있음에 유의해야 한다. 또한 본 발명의 요지를 불필요하게 흐릴 수 있는 공지 기능 및 구성에 대한 상세한 설명은 생략한다. Hereinafter, with reference to the drawings will be described the present invention in more detail. It should be noted that the same elements in the figures are represented by the same numerals wherever possible. In addition, detailed descriptions of well-known functions and configurations that may unnecessarily obscure the subject matter of the present invention will be omitted.

도 2는 본 발명에 따른 벽체와 가설빔 간의 결합장치에 의해 가설빔이 벽체에 결합된 상태를 나타내는 도면이다. 2 is a view showing a state in which the temporary beam is coupled to the wall by the coupling device between the wall and the temporary beam according to the present invention.

도 2를 참조하면, 본 발명에 따른 벽체(400)와 가설빔(120) 간의 결합장치는 연결부(140), 체결부(130), 및 고정부(150)를 포함한다. 먼저, 연결부(140)는 가설빔(120)의 단부에 결합되어 가설빔(120)을 벽체(400)에 연결되도록 하며, 연결부(140)는 가설빔(120)과 같은 기능하기도 해야 하므로, 연결부(140)는 가설빔(120)과 동일한 재료 및 형상을 갖도록 제작하는 것이 바람직할 것이다.2, the coupling device between the wall 400 and the temporary beam 120 according to the present invention includes a connection part 140, a fastening part 130, and a fixing part 150. First, the connection portion 140 is coupled to the end of the temporary beam 120 to connect the temporary beam 120 to the wall 400, the connection portion 140 should also function as the temporary beam 120, so the connection portion The 140 may be manufactured to have the same material and shape as the temporary beam 120.

체결부(130)는 가설빔(120)과 연결부(140) 사이에 위치하며 가설빔(120)과 연결부(140)를 체결하는 기능을 수행한다. 구체적으로 체결부(130)는, 가설빔(120)과 연결부(140)를 체결하는 볼트를 구비하게 되며, 벽체(400)까지의 거리에 따라 본 발명에 따른 결합장치의 길이를 조절하기 위해 가설빔(120)과 연결부(140) 사이에 삽입되는 소정의 두께를 가진 와셔, 링 등의 길이조절부재를 구비한다. The fastening part 130 is positioned between the temporary beam 120 and the connection part 140 and performs a function of fastening the temporary beam 120 and the connection part 140. Specifically, the fastening unit 130 is provided with a bolt for fastening the temporary beam 120 and the connection unit 140, the hypothesis to adjust the length of the coupling device according to the present invention according to the distance to the wall (400) A length adjusting member such as a washer or a ring having a predetermined thickness inserted between the beam 120 and the connecting portion 140 is provided.

즉, 본 발명을 실시함에 있어서, 체결부(130)에 길이조절부재를 추가하여 조립하거나, 제거하여 조립함으로써 가설빔(120)을 설치하는 현장조건에 따라 요구되는 결합장치의 최적의 길이를 맞출 수 있게 되는 것이다. That is, in the practice of the present invention, by adding the length adjusting member to the fastening portion 130, or by removing and assembling to fit the optimum length of the coupling device required according to the site conditions for installing the temporary beam 120 It will be possible.

한편, 고정부(150)는 연결부(140)에 결합되어 있으며, 연결부(140)에 결합된 상태에서 벽체(400)방향으로 이동함으로써, 벽체(400)에 설치된 브라켓(300)의 걸림턱(340)에 걸리게 되어 가설빔(120)을 벽체(400)에 고정시키게 된다. On the other hand, the fixing part 150 is coupled to the connecting portion 140, by moving in the direction of the wall 400 in a state coupled to the connecting portion 140, the locking step 340 of the bracket 300 installed on the wall 400 ) To fix the temporary beam 120 to the wall (400).

또한, 고정부(150)가 브라켓(300)에 결합된 상태에서 고정부(150)를 벽체(400)의 반대방향으로 이동시킴으로써, 가설빔(120)을 벽체(400)로부터 고정해제할 수도 있게 된다. In addition, by moving the fixing part 150 in the opposite direction of the wall 400 in a state in which the fixing part 150 is coupled to the bracket 300, the temporary beam 120 may be released from the wall 400. do.

한편, 본 발명을 실시함에 있어서, 고정부(150)는 연결부(140)에 용수철에 의해 결합됨으로써, 용수철의 탄성력에 의해 고정부(150)가 벽체(400)의 방향으로 이동되고, 그에 따라 고정부(150)가 브라켓(300)에 결합되도록 하는 것이 바람직할 것이다.On the other hand, in the practice of the present invention, the fixing part 150 is coupled to the connecting portion 140 by a spring, whereby the fixing part 150 is moved in the direction of the wall 400 by the elastic force of the spring, thereby high It would be desirable to allow the government 150 to couple to the bracket 300.

또한, 고정부(150)에는 고정침(155)을 구비한 결과, 고정부(150)가 벽체(400)방향으로 또는 벽체(400) 반대 방향으로 이동된 상태에서 고정침(155)을 작동시켜 용수철의 탄성력을 제한함으로써 고정부(150)가 이동된 상태에서 고정부(150)가 위치고정되도록 하는 것이 바람직할 것이다. In addition, the fixing part 150 is provided with a fixing needle 155, as a result of operating the fixing needle 155 in a state in which the fixing part 150 is moved in the direction of the wall 400 or in the opposite direction to the wall 400. By limiting the elastic force of the spring it would be desirable to fix the position of the fixing part 150 in the state in which the fixing part 150 is moved.

아울러, 고정부(150)의 위치를 벽체(400) 방향으로 또는 벽체(400) 반대방향으로 용이하게 이동시키기 위해서 고정부(150)에는 손잡이의 기능을 하는 이동부(160)가 구비되는 것이 바람직할 것이다. In addition, in order to easily move the position of the fixing part 150 in the direction of the wall 400 or in the opposite direction to the wall 400, it is preferable that the fixing part 150 is provided with a moving part 160 that functions as a handle. something to do.

즉, 도 2에서와 같이, 본 발명에 따른 벽체(400)와 가설빔(120) 간의 결합장치에 의하면, 가설빔(120)의 일단부는 가설빔(120) 지지장치(200)에 고정된 상태에서 가설빔(120)의 타단부는 본 발명에 따른 결합장치에 의해 벽체(400)에 고정되 며, 가설빔(120)이 설치된 상태에서 가설빔(120) 상부에 합판(470)을 설치한 후에 슬라브 콘크리트(450)를 타설하게 된다. That is, as shown in Figure 2, according to the coupling device between the wall 400 and the temporary beam 120 according to the present invention, one end of the temporary beam 120 is fixed to the temporary beam 120 support device 200 In the other end of the temporary beam 120 is fixed to the wall 400 by the coupling device according to the present invention, the installation of the plywood 470 on top of the temporary beam 120 in the state where the temporary beam 120 is installed Later, the slab concrete 450 will be poured.

아울러, 본 발명을 실시함에 있어서, 벽체(400)에 설치된 브라켓(300)에는 본 발명에 따른 결합장치의 고정부(150)가 걸치게 되는 걸림턱(340)이 구비되어 있을 뿐만 아니라, 못(360)에 의해 합판(470)에 고정되는 상부 목재(320)를 고정할 수 있는 홈을 구비하고 있다. In addition, in the practice of the present invention, the bracket 300 installed on the wall 400 is not only provided with a locking jaw 340 to which the fixing unit 150 of the coupling device according to the present invention is provided, and nails ( It is provided with a groove for fixing the upper wood 320 is fixed to the plywood 470 by 360.

도 3은 도 2에서의 본 발명에 따른 벽체와 가설빔 간의 결합장치에 의해 벽체에 결합된 가설빔이 결합해체된 상태를 나타내는 도면이다. 3 is a view showing a state in which the temporary beam coupled to the wall by the coupling device between the wall and the temporary beam in accordance with the present invention in FIG.

도 2에서 타설된 콘크리트(450)의 경화가 완료되면 벽체(400)에 결합된 가설빔(120) 및 벽체(400)와 가설빔(120) 간의 결합장치는 벽체(400)로부터 해체되어야 한다.When the curing of the poured concrete 450 is completed in FIG. 2, the temporary beam 120 coupled to the wall 400 and the coupling device between the wall 400 and the temporary beam 120 should be dismantled from the wall 400.

본 발명에 따른 결합장치를 해체함에 있어서는 도 3에서와 같이, 고정부(150)가 벽체(400)의 반대 방향으로 이동되도록 이동부(160)에 파이프 형상의 견인도구(170)를 결합시킨 상태에서 견인도구(170)를 인력 등에 의해 벽체(400)의 반대 방향으로 이동시킨다.In disassembling the coupling device according to the present invention, as shown in Figure 3, the fixing unit 150 is coupled to the pipe-shaped traction tool 170 to the moving unit 160 to move in the opposite direction of the wall 400 In the traction tool 170 is moved in the opposite direction of the wall 400 by the attraction and the like.

이에 따라, 고정부(150)는 벽체(400)의 반대 방향으로 이동되며, 고정부(150)가 브라켓(300)의 걸림턱(340)에 더이상 걸쳐지지 않게 되면, 체결부(155)을 누름으로써 용수철의 탄성력이 고정부(150)를 벽체(400)의 방향으로 이동시키는 것을 제한한 후에, 도 3에서와 같이 가설빔(120) 및 가설빔(120)에 결합된 결합장치를 벽체(400)로부터 제거하게 된다. Accordingly, the fixing part 150 is moved in the opposite direction of the wall 400, and when the fixing part 150 is no longer caught by the locking step 340 of the bracket 300, pressing the fastening part 155 After the spring's elastic force restricts the movement of the fixing part 150 in the direction of the wall 400, the coupling device coupled to the temporary beam 120 and the temporary beam 120 as shown in FIG. ).

이상에서는 본 발명의 바람직한 실시예 및 응용예에 대하여 도시하고 설명하였지만, 본 발명은 상술한 특정의 실시예 및 응용예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진자에 의해 다양한 변형실시가 가능한 것은 물론이고, 이러한 변형실시들은 본 발명의 기술적 사상이나 전망으로부터 개별적으로 이해되어져서는 안될 것이다.While the above has been shown and described with respect to preferred embodiments and applications of the present invention, the present invention is not limited to the specific embodiments and applications described above, the invention without departing from the gist of the invention claimed in the claims Various modifications can be made by those skilled in the art, and these modifications should not be individually understood from the technical spirit or the prospect of the present invention.

도 1은 종래 기술에 따른 슬라브 콘크리트 타설 과정을 나타낸 도면,1 is a view showing a slab concrete pouring process according to the prior art,

도 2는 본 발명에 따른 벽체와 가설빔 간의 결합장치에 의해 가설빔이 벽체에 결합된 상태를 나타내는 도면, 및 2 is a view showing a state in which the temporary beam is coupled to the wall by the coupling device between the wall and the temporary beam according to the present invention, and

도 3은 도 2에서의 본 발명에 따른 벽체와 가설빔 간의 결합장치에 의해 벽체에 결합된 가설빔이 결합해체된 상태를 나타내는 도면이다. 3 is a view showing a state in which the temporary beam coupled to the wall by the coupling device between the wall and the temporary beam in accordance with the present invention in FIG.

Claims (5)

슬라브 콘크리트 타설을 위해 가설빔을 벽체에 결합시키는 결합장치에 있어서,In the coupling device for coupling the temporary beam to the wall for slab concrete casting, 상기 가설빔의 단부에 결합되어 상기 가설빔을 벽체에 연결되도록 하는 연결부;A connection part coupled to an end of the temporary beam to connect the temporary beam to a wall; 상기 가설빔과 상기 연결부 사이에서 상기 가설빔과 상기 연결부를 체결하는 체결부; 및A fastening part for fastening the temporary beam and the connecting part between the temporary beam and the connecting part; And 상기 연결부에 결합된 상태에서 상기 벽체 방향으로의 이동에 따라, 상기 벽체에 설치된 브라켓에 결합됨으로써 상기 가설빔을 상기 벽체에 고정시키는 고정부A fixing part for fixing the temporary beam to the wall by being coupled to the bracket installed on the wall in accordance with the movement in the direction of the wall in the state coupled to the connecting portion 를 포함하며,Including; 상기 체결부는 상기 가설빔과 상기 연결부를 체결하는 볼트, 및 상기 가설빔과 상기 연결부 사이에 삽입되어 상기 가설빔과 상기 연결부 간의 길이를 조절하는 길이조절부재를 포함하는 것인 벽체와 가설빔 간의 결합장치.The fastening part includes a bolt for fastening the temporary beam and the connecting part, and a length adjusting member inserted between the temporary beam and the connecting part to adjust a length between the temporary beam and the connecting part. Device. 삭제delete 제1항에 있어서,The method of claim 1, 상기 고정부는 상기 연결부에 용수철에 의해 결합되며, 상기 용수철의 탄성력에 의해 이동되어 상기 브라켓에 결합되는 것인 벽체와 가설빔 간의 결합장치.The fixing unit is coupled to the connecting portion by a spring, the coupling device between the wall and the temporary beam is moved by the elastic force of the spring is coupled to the bracket. 제1항에 있어서,The method of claim 1, 상기 고정부에는 상기 고정부가 이동된 상태에서 상기 고정부의 위치를 고정시키는 고정침이 구비된 것인 벽체와 가설빔 간의 결합장치.The fixing part is a coupling device between the wall and the temporary beam is provided with a fixing needle for fixing the position of the fixing part in the state in which the fixing part is moved. 제1항에 있어서,The method of claim 1, 상기 고정부에는 상기 고정부의 벽체 방향 또는 벽체 반대 방향으로의 이동에 사용되는 이동부가 구비된 것인 벽체와 가설빔 간의 결합장치.The fixing part is provided with a moving part used for movement in the wall direction or the opposite direction of the wall of the fixing portion coupling device between the wall and the temporary beam.
KR1020080128366A 2008-12-17 2008-12-17 Jointing Device between Wall and Beam KR101078222B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080128366A KR101078222B1 (en) 2008-12-17 2008-12-17 Jointing Device between Wall and Beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080128366A KR101078222B1 (en) 2008-12-17 2008-12-17 Jointing Device between Wall and Beam

Publications (2)

Publication Number Publication Date
KR20100069829A KR20100069829A (en) 2010-06-25
KR101078222B1 true KR101078222B1 (en) 2011-11-01

Family

ID=42367749

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080128366A KR101078222B1 (en) 2008-12-17 2008-12-17 Jointing Device between Wall and Beam

Country Status (1)

Country Link
KR (1) KR101078222B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100329856B1 (en) 1999-06-02 2002-03-25 박정진 Adjustable-length pc wire beam
KR100621539B1 (en) 2003-12-23 2006-09-13 동양종합건업 주식회사 Method for connecting continuously P.S.C-Ibeam by steel bracket and its structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100329856B1 (en) 1999-06-02 2002-03-25 박정진 Adjustable-length pc wire beam
KR100621539B1 (en) 2003-12-23 2006-09-13 동양종합건업 주식회사 Method for connecting continuously P.S.C-Ibeam by steel bracket and its structure

Also Published As

Publication number Publication date
KR20100069829A (en) 2010-06-25

Similar Documents

Publication Publication Date Title
KR100820299B1 (en) Temporary structure and precast concrete beam of pylon setting method using the bracket
KR101511504B1 (en) Stripping deck plate with reinforced conncted flexure function
DK2410096T3 (en) Casing device and method for creating a recess in the casting of a component
KR101844344B1 (en) the rigid connection structure between precast concrete column and precast concrete beam, the construction method of rigid connection structure using the same
WO2015011641A1 (en) Semi rigid precast wall system
KR100622935B1 (en) Horizontal extension joint structuer and joint method using thereof
KR100770006B1 (en) Vertical connection steel-bar reinforcing structure of precast concreate column
KR100769999B1 (en) Improved support, self-supported improved support and system form using the same
KR20110010248A (en) Multi u-head bracket apparatus for bridge construction
JP2010150871A (en) Decorative plate attaching method for thermal insulation material doubling as form and latching member for outer wall
KR100891347B1 (en) Supporting structure of slab form
KR100653229B1 (en) Device for supporting temporary beam of slab form
KR101078222B1 (en) Jointing Device between Wall and Beam
KR100627658B1 (en) Connection assembly structure of mold panel
KR102128291B1 (en) A fixing apparatus of insulation material and constructing method thereof
JP3999931B2 (en) Construction method of tower structure
KR200448068Y1 (en) Mold supporter for concrete beams
KR100737841B1 (en) Clamp for fixing a concrete form
KR101345672B1 (en) Unsupported the detachable bracket
KR100769318B1 (en) Steel structure connection support and Systemform setting structure using the same
KR102448993B1 (en) Precast Concrete Method Using Fixing Unit
KR100860592B1 (en) Temporary system for vertical structure using precast concreat block
KR100701197B1 (en) Floor system for dismantling and enable to be reduced the story height of steel structure
KR100901261B1 (en) Apparatus for temporary supproting the upper lintel bricks and the method of plying up the upper lintel bricks using thereof
KR101742775B1 (en) repair/reinforcement method of land reclamation type using Steel wire rope

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141006

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20151001

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20161004

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20181004

Year of fee payment: 8