KR101068077B1 - Combined aseismic structural system for electrical and communication equipments without power interruption and removal - Google Patents

Combined aseismic structural system for electrical and communication equipments without power interruption and removal Download PDF

Info

Publication number
KR101068077B1
KR101068077B1 KR1020110000431A KR20110000431A KR101068077B1 KR 101068077 B1 KR101068077 B1 KR 101068077B1 KR 1020110000431 A KR1020110000431 A KR 1020110000431A KR 20110000431 A KR20110000431 A KR 20110000431A KR 101068077 B1 KR101068077 B1 KR 101068077B1
Authority
KR
South Korea
Prior art keywords
equipment
seismic
bracket
shaped member
shaped
Prior art date
Application number
KR1020110000431A
Other languages
Korean (ko)
Inventor
이종림
Original Assignee
(주)파워엔텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)파워엔텍 filed Critical (주)파워엔텍
Priority to KR1020110000431A priority Critical patent/KR101068077B1/en
Application granted granted Critical
Publication of KR101068077B1 publication Critical patent/KR101068077B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/54Anti-seismic devices or installations
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F15/00Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
    • F16F15/10Suppression of vibrations in rotating systems by making use of members moving with the system

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Civil Engineering (AREA)
  • Electromagnetism (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Power Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

상단이 천장 슬래브에 연결되어 있는 지진격리장치; 설치되어 있는 장비의 상단부에 마련되어 있는 연결판; 및 일단이 상기 지진격리장치의 하단에 결합되고, 타단이 상기 연결판에 결합되는 와이어 슬링;을 포함하고, 상기 지진격리장치는, 스프링 및 상기 스프링에 병렬 연결되는 점성형 댐퍼;를 구비하고, 상기 연결판은, 상·하측면을 형성하는 제1 L형 부재; 상기 제1 L형 부재를 가로질러 설치되는 제2 L형 부재; 및 상기 제2 L형 부재를 가로질러 설치되되 2개의 L형 부재가 그 수직면이 서로 인접되도록 설치되는 제3 L형 부재;를 구비하는 것을 특징으로 하는 전도 방지 장치가 개시되며, 상기 전도 방지 장치; 및 장비의 하측 방향으로 마련되어 있는 활동 방지 장치;를 포함하고, 상기 활동 방지 장치는, 상기 장비를 지지하는 상판이 제거된 위치에 설치되고, 일단부의 상단이 절삭되어 있는 각관; 일단이 상기 장비에 연결되고, 타단이 상기 각관의 타단부에 연결되는 연결 브래킷; 상기 각관의 상기 일단부의 하측을 가로질러 설치되고, 수평면은 상기 각관에 연결되고 수직면은 바닥 슬래브에 설치되어 있는 지주봉에 연결되는 ㄱ형 부재; 수직면은 상기 지주봉에 연결되고 수평면은 바닥 슬래브에 연결되는 L형의 지주봉 앵커 브래킷; 및 상기 각관의 상측에 설치되되 제거되지 않은 상판에 인접하여 설치되는 지지부재;를 구비하는 것을 특징으로 하는 복합 내진 구조 시스템이 개시된다.Seismic isolator, the upper end of which is connected to the ceiling slab; A connecting plate provided at an upper end of the installed equipment; And a wire sling having one end coupled to a lower end of the seismic isolator and the other end coupled to the connecting plate, wherein the seismic isolator comprises a spring and a viscous damper connected in parallel with the spring. The connecting plate may include a first L-shaped member that forms an upper and lower side surface; A second L-shaped member installed across the first L-shaped member; And a third L-shaped member installed across the second L-shaped member such that two L-shaped members are installed such that their vertical surfaces are adjacent to each other. ; And an activity preventing device provided in a downward direction of the equipment, wherein the activity preventing device comprises: an angle pipe installed at a position where the upper plate supporting the equipment is removed, and an upper end of one end thereof being cut; A connection bracket having one end connected to the equipment and the other end connected to the other end of the tube; An a-shaped member installed across the lower side of the one end of the tube and having a horizontal surface connected to the square tube and a vertical surface connected to a holding rod installed on a bottom slab; A vertical surface is connected to the holding rod and a horizontal surface is connected to the bottom slab L-shaped holding rod anchor bracket; And a support member installed adjacent to the upper plate which is installed on the upper side of the tube and is not removed.

Description

전기통신장비에 무정전 및 무이설 방식으로 설치되는 복합 내진 구조 시스템{COMBINED ASEISMIC STRUCTURAL SYSTEM FOR ELECTRICAL AND COMMUNICATION EQUIPMENTS WITHOUT POWER INTERRUPTION AND REMOVAL}COMBINED ASEISMIC STRUCTURAL SYSTEM FOR ELECTRICAL AND COMMUNICATION EQUIPMENTS WITHOUT POWER INTERRUPTION AND REMOVAL}

본 발명은 무정전 및 무이설 방식으로 설치되는 전도 방지 장치, 및 상기 전도 방지 장치와 활동 방지 장치를 포함하는 복합 내진 구조 시스템에 관한 것으로, 보다 상세하게는, 이중바닥 구조(Access Floor)에 설치되어 운전 중인 장비에 대하여 장비의 상부 방향으로, 지진격리장치, 연결판 및 와이어 슬링을 포함하는 전도 방지 장치를 설치함으로써 지진 횡력에 의한 장비의 전도를 방지하고, 또 상기 장비의 하부 방향으로, 각관, 연결 브래킷, ㄱ형 보강재, L형의 지주봉 앵커 브래킷 및 지지부재를 포함하는 활동 방지 장치를 설치함으로써 지진 횡력에 의한 장비의 활동을 방지하며, 또한 장비의 운전을 정지시키거나 장비를 이설하지 않고도 상기 전도 방지 장치와 상기 활동 방지 장치를 설치할 수 있는 복합 내진 구조 시스템에 관한 것이다.The present invention relates to a fall prevention device that is installed in an uninterruptible and non-separable manner, and a composite seismic structure system including the fall prevention device and an activity preventing device, and more particularly, to a double floor structure (Access Floor) By installing the fall prevention device including the seismic isolator, the connecting plate and the wire sling in the upper direction of the equipment with respect to the equipment in operation, to prevent the fall of the equipment by the seismic lateral force, and in the lower direction of the equipment, By installing an activity prevention device including a connection bracket, a-shape reinforcement, an L-shaped holding rod anchor bracket, and a supporting member, it prevents the equipment from being driven by earthquake lateral forces, and also without stopping the equipment or relocating the equipment. The present invention relates to a composite earthquake resistant structural system capable of installing a fall prevention device and the above-described activity preventing device.

현재 배전반이나 계전기 패널 등과 같은 전력 공급설비, 또는 감시반, 분전반, 통신반, 보호반, 통제실, 통신제어선로, 제어실, 전산실 등에 설치되는 장비는 건물 바닥에 또 하나의 바닥판을 설치한 이중바닥 구조물에 설치하도록 되어 있다. Currently, power supply facilities such as switchboards and relay panels, or equipment installed in monitoring panels, distribution panels, communication panels, protection panels, control rooms, communication control lines, control rooms, computer rooms, etc., are double-floor structures with another floor plate installed on the floor of the building. It is intended to be installed at.

상기 이중바닥 구조물의 구성을 도 1을 참조로 살펴 보면, 먼저 콘크리트 바닥 슬래브(3) 위에는 에폭시 접착제를 도포하여 부착된 지주봉(4)이 일정간격으로 설치되어 있다. 상기 지주봉(4) 위에는 스트링거(5)들이 격자구조로 설치되어 있고, 상기 스트링거(5)에는 지지상판(1)이 설치되어 있으며, 상기 지지상판(1) 위에는 계전기 패널(2)이 설치되어 있다. 상기 지지상판(1) 위에 설치되는 장비 등이 중량일 때에는 지지상판(1)에 있는 4개의 구멍 중 2개의 구멍을 앵커 볼트로 고정시키고, 그 다음 지지상판(1)의 표면에 충격패드(Cushion pad)를 위치시키고 스트링거(5)를 각각 지주봉(4)에 사방으로 연결하여 볼트로 고정하여 틀을 짜 맞춘다. Looking at the configuration of the double-bottom structure with reference to Figure 1, first, on the concrete floor slab (3) is a holding rod (4) attached by applying an epoxy adhesive is provided at regular intervals. Stringers 5 are provided in a lattice structure on the support rods 4, support top plates 1 are installed on the stringers 5, and relay panels 2 are installed on the support top plates 1. have. When the equipment and the like installed on the support upper plate 1 are heavy, fix two of the four holes in the support upper plate 1 with anchor bolts, and then cushion pads on the surface of the support upper plate 1. Place the pads and connect the stringers 5 to the holding rods 4 in all directions to fix them with bolts.

그리고, 충격패드 홈에 맞추어 지지상판(1)을 사방으로 조립하여 완성시킨다. 지지상판(1)의 재질은 강판을 주로 사용하였으나, 최근에는 강판의 단점을 해소한 폴리우레탄과 소립자판(Particle Board) 일체형을 주로 사용하고 있다.Then, the support top plate 1 is assembled in all directions to fit the impact pad grooves, thereby completing. The material of the support top plate 1 mainly used a steel sheet, but recently, polyurethane and a small particle board (Particle Board) integral type that solves the shortcomings of the steel sheet are mainly used.

이러한 종래 이중바닥 구조물의 전체 높이는 20~40 cm 정도이고, 지지상판의 기본 지지력은 1.5톤/m2이고, 지주봉으로 보강 시 지지력은 3.5톤/m2이다. 장비의 무게가 약 100~800 kg 정도인 경우 충분한 지지력을 갖는다. 그러나, 이중바닥 구조물의 기본 구조 형식이 각 모서리가 완전한 고정단이 아닌 라멘 구조식이어서 지진 발생 시 횡력이나 진동에 취약한 구조이기 때문에 장비의 전도 파괴를 피할 수 없는 단점을 지니고 있다.The overall height of such a conventional double-floor structure is about 20 ~ 40 cm, the basic supporting force of the support top plate is 1.5 tons / m 2 , the support force is 3.5 tons / m 2 when reinforced with a support rod. Sufficient bearing capacity is provided for equipment weighing approximately 100-800 kg. However, the basic structure of the double-floor structure is that each corner is not a complete fixed end, but a ramen structural formula, which is vulnerable to lateral force or vibration in the event of an earthquake.

또한, 내진 설계를 적용한 건물이나 구조물 내부에 각종 장비를 설치할 때에는 이중바닥 구조물을 설치하기 전에 계전기 패널과 같은 장비의 지지상판 크기에 따라 형강틀을 제작하여 지정된 위치에 놓고 슬래브 바닥에 앵커링을 하며, 그 다음에 나머지 공간 위에 지지상판을 깔아 이중바닥 구조물을 설치 조립하고, 제어 케이블을 포설하여 연결 작업 후에 최종적으로 지지상판을 조립하여 설치를 마감하도록 되어 있다. 따라서, 종래 이중바닥 구조물 설치에는 시공순서가 번거로울 뿐만 아니라 형강틀을 제작하는데도 많은 비용이 소요되는 문제점이 있다.In addition, when installing various equipment inside a building or structure to which seismic design is applied, before installing the double-floor structure, make a steel frame according to the size of the supporting plate of the equipment such as the relay panel and anchor it to the slab floor, Then, install the support floor plate over the remaining space to install and assemble the double bottom structure, and install the control cable to assemble the support top plate after the connection work finally to finish the installation. Therefore, there is a problem in that the installation of the conventional double-floor structure is not only cumbersome in construction order, but also requires a large cost to manufacture the steel frame.

또한, 상기와 같은 이중바닥 구조물에 대하여 내진 보강을 하는 경우, 신설 건물과 신설되는 장비에는 내진 보강이 용이하나, 이미 운전되고 있는 장비에 대하여 내진 보강을 하기 위해서는 정전을 하고 장비를 이설해야 하기 때문에 장비 운전 중에는 내진 보강을 할 수 없는 문제점이 있다. 또한, 제어 케이블이 과다하게 포설되어 있는 장비의 경우에는 내진 보강을 위한 설치 공간을 확보하기가 어렵기 때문에 내진 성능을 보강하기가 어려운 문제가 있다.In addition, when seismic reinforcement is applied to the double-floor structure as described above, seismic reinforcement is easy for new buildings and newly-installed equipment. There is a problem in that the seismic reinforcement cannot be performed while the equipment is in operation. In addition, in the case of equipment in which the control cable is excessively installed, it is difficult to reinforce the seismic performance because it is difficult to secure an installation space for seismic reinforcement.

본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로서, 본 발명의 목적은, 장비의 상단에 마련되어 있던 홀을 이용하여 장비의 상단에 연결판을 설치하고, 장비의 상부 방향으로 전도 방지 장치의 나머지 구성들을 설치함으로써 운전중인 장비에 대하여 무정전 및 무이설 방식으로 내진 성능을 보강할 수 있는 전도 방지 장치를 제공하는 것이다.The present invention has been made to solve the above problems, an object of the present invention is to install a connection plate on the top of the equipment using a hole provided on the top of the equipment, the top of the equipment of the fall prevention device By installing the rest of the components, it provides a fall prevention device that can reinforce the seismic performance of the equipment in operation in an uninterruptible and non-removable manner.

본 발명의 다른 목적은, 상기 전도 방지 장치에 더하여, 제어 케이블이 과다하게 포설되어 있는 장비의 하부 방향으로 활동 방지 장치를 설치함으로써 운전중인 장비에 대하여 무정전 및 무이설 방식으로 내진 성능을 보강할 수 있는 복합 내진 구조 시스템을 제공하는 것이다.Another object of the present invention, in addition to the fall prevention device, by installing the activity prevention device in the downward direction of the equipment in which the control cable is excessively installed, it is possible to reinforce the seismic performance in the uninterrupted and non-removable manner for the equipment in operation. To provide a complex seismic structure system.

상기 목적을 달성하기 위한 본 발명에 따른 전도 방지 장치는, 상단이 천장 슬래브에 연결되어 있는 지진격리장치; 설치되어 있는 장비의 상단부에 마련되어 있는 연결판; 및 일단이 상기 지진격리장치의 하단에 결합되고, 타단이 상기 연결판에 결합되는 와이어 슬링;을 포함하고, 상기 지진격리장치는, 스프링 및 상기 스프링에 병렬 연결되는 점성형 댐퍼;를 구비하고, 상기 연결판은, 상·하측면을 형성하는 제1 L형 부재; 상기 제1 L형 부재를 가로질러 설치되는 제2 L형 부재; 및 상기 제2 L형 부재를 가로질러 설치되되 2개의 L형 부재가 그 수직면이 서로 인접되도록 설치되는 제3 L형 부재;를 구비하는 것을 특징으로 한다.Anti-conduction device according to the present invention for achieving the above object, the seismic isolator is connected to the ceiling slab top; A connecting plate provided at an upper end of the installed equipment; And a wire sling having one end coupled to a lower end of the seismic isolator and the other end coupled to the connecting plate, wherein the seismic isolator comprises a spring and a viscous damper connected in parallel with the spring. The connecting plate may include a first L-shaped member that forms an upper and lower side surface; A second L-shaped member installed across the first L-shaped member; And a third L-shaped member installed across the second L-shaped member, wherein the two L-shaped members are installed such that their vertical surfaces are adjacent to each other.

상기 지진격리장치는 앵커 브래킷을 매개로 천장 슬래브에 연결되고, 상기 앵커 브래킷은 ㄱ형 부재이다.The seismic isolator is connected to the ceiling slab via an anchor bracket, and the anchor bracket is a-shaped member.

상기 지진격리장치는 적어도 1개 이상 설치되며, 상기 지진격리장치가 복수 개 설치되는 경우 각 지진격리장치는 병렬로 연결되는 것이 바람직하다.At least one seismic isolator is installed, and when a plurality of seismic isolators are installed, each seismic isolator is preferably connected in parallel.

상기 제1 L형 부재는 상기 장비에 마련되어 있는 홀에 맞추어 볼트 체결됨으로써 상기 장비에 고정된다.The first L-shaped member is fixed to the equipment by bolting in accordance with a hole provided in the equipment.

상기 제3 L형 부재의 수직면에는 체결홀이 형성되어 있고, 상기 와이어 슬링은 상기 체결홀에 연결됨으로써 상기 연결판에 결합된다.A fastening hole is formed in a vertical surface of the third L-shaped member, and the wire sling is connected to the connection plate by being connected to the fastening hole.

상기 와이어 슬링은 팽팽하게 당겨진 상태에서 클립으로 고정된다.The wire sling is secured with a clip in the tensioned state.

상기 다른 목적을 달성하기 위한 본 발명에 따른 복합 내진 구조 시스템은, 설치되어 있는 장비의 상측 방향으로 마련되어 있는 상기 전도 방지 장치; 및 상기 장비의 하측 방향으로 마련되어 있는 활동 방지 장치;를 포함하고, 상기 활동 방지 장치는, 상기 장비를 지지하는 지지상판이 제거된 위치에 설치되고, 일단부의 상단이 절삭되어 있는 각관; 일단이 상기 장비에 연결되고, 타단이 상기 각관의 타단부에 연결되는 연결 브래킷; 상기 각관의 상기 일단부의 하측을 가로질러 설치되고, 수평면은 상기 각관에 연결되고 수직면은 바닥 슬래브에 설치되어 있는 지주봉에 연결되는 ㄱ형 보강재; 수직면은 상기 지주봉에 연결되고 수평면은 바닥 슬래브에 연결되는 L형의 지주봉 앵커 브래킷; 및 상기 각관의 상측에 설치되되 제거되지 않은 지지상판에 인접하여 설치되는 지지부재;를 구비하는 것을 특징으로 한다.Composite seismic structure system according to the present invention for achieving the above another object, the fall prevention device is provided in the upper direction of the installed equipment; And an activity preventing device provided in a downward direction of the equipment, wherein the activity preventing device comprises: a square tube installed at a position where a support upper plate supporting the equipment is removed, and an upper end of one end thereof being cut; A connection bracket having one end connected to the equipment and the other end connected to the other end of the tube; A-shaped reinforcement is installed across the lower side of the one end of the tube, the horizontal surface is connected to the square tube and the vertical surface is connected to the holding rod is installed on the bottom slab; A vertical surface is connected to the holding rod and a horizontal surface is connected to the bottom slab L-shaped holding rod anchor bracket; And a support member installed adjacent to the support upper plate which is installed on the upper side of the tube and is not removed.

상기 연결 브래킷은 L형이며, 상기 연결 브래킷과 상기 장비는 볼트가 상기 L형의 연결 브래킷의 수직면을 지나 상기 장비의 바닥 채널에 체결됨으로써 서로 연결되고, 상기 연결 브래킷과 상기 각관은 볼트가 상기 L형의 연결 브래킷의 수평면을 지나 상기 각관의 타단부를 관통하여 체결됨으로써 서로 연결된다.The connecting bracket is L-shaped, and the connecting bracket and the equipment are connected to each other by bolts being fastened to the bottom channel of the equipment by passing through a vertical surface of the L-shaped connecting bracket, and the connecting bracket and the pipe are connected to the L by the bolt. It is connected to each other by fastening through the other end of the tube passing through the horizontal plane of the connecting bracket of the type.

상기 연결 브래킷은 벤딩 브래킷이며, 상기 벤딩 브래킷의 일단은 상기 장비의 하단부의 스토퍼에 연결되고, 상기 벤딩 브래킷의 타단은 상기 각관의 타단부와 볼트체결된다.The connecting bracket is a bending bracket, one end of the bending bracket is connected to the stopper of the lower end of the equipment, the other end of the bending bracket is bolted to the other end of the tube.

상기 ㄱ형 보강재와 상기 각관은 볼트가 체결됨으로써 서로 연결되고, 상기 ㄱ형 보강재와 상기 지주봉은 U볼트가 체결됨으로써 서로 연결된다.The a-shape reinforcement and the tube are connected to each other by fastening the bolt, the a-shape reinforcement and the holding rod is connected to each other by fastening the U bolt.

상기 지주봉 앵커 브래킷의 수직면과 상기 지주봉은 U볼트가 체결됨으로써 서로 연결되고, 상기 지주봉 앵커 브래킷의 수평면과 상기 바닥 슬래브는 앵커볼트가 체결됨으로써 서로 연결된다.The vertical surface of the support rod anchor bracket and the support rod are connected to each other by fastening the U bolt, and the horizontal surface of the support rod anchor bracket and the bottom slab are connected to each other by fastening the anchor bolt.

상기 지지부재는 강판으로 이루어져 있다.The support member is made of steel sheet.

본 발명은 장비의 상단에 원래 존재하던 홀(특히, 아이볼트용 홀)을 이용하여 장비의 상단에 연결판을 설치하고, 상기 연결판에 와이어 슬링을 고정시킴으로써 별도의 장비 고정 장치를 설치하지 않고도 장비를 전도 방지 장치에 고정시킬 수 있다. 따라서, 제작 비용을 절감할 수 있을 뿐만 아니라, 운전 중인 장비를 운전 중단시키거나 이설시키지 않고 내진 성능을 보강할 수 있다. The present invention is to install the connecting plate on the top of the equipment using a hole (especially, eye bolt hole) that originally existed on the top of the equipment, by fixing a wire sling on the connecting plate without installing a separate device fixing device The equipment can be secured to the fall prevention device. Thus, not only the manufacturing cost can be reduced, but the seismic performance can be reinforced without stopping or relocating the equipment in operation.

또한, 장비를 직접 천장 슬래브에 고정시키지 않고, 서로 병렬 연결된 스프링과 점성형 댐퍼를 구비하는 지진격리장치를 천장 슬래브에 고정시킴으로써, 지진응답을 줄여서 장비에 미치는 지진력을 저감시켜 장비의 전도를 방지할 수 있다.In addition, the seismic isolator with spring and viscous dampers connected in parallel to each other is fixed to the ceiling slab instead of directly fixing the equipment to the ceiling slab, thereby reducing the earthquake response and reducing the seismic force on the equipment to prevent the equipment from falling. Can be.

또한, 와이어 슬링을 팽팽하게 프리스트레스를 가한 상태에서 클립으로 고정시킴으로써 진동을 저감시키는 효과를 도모한다.Moreover, the effect of reducing vibration is secured by fixing a wire sling with a clip in a state where prestress is applied tightly.

또한, 이중바닥 구조물에 설치되어 운전 중인 장비의 제어 케이블이 과다하게 포설되어 있어 내진 보강을 위한 작업 공간이 부족한 경우에도, 지지상판을 제거한 공간을 활용하여 본 발명에 따른 활동 방지 장치를 설치함으로써 지진 횡력에 의한 활동에 저항할 수 있을 뿐만 아니라, 장비의 운전을 정지시키거나 장비를 이설시키지 않고 내진 성능을 보강할 수 있다.In addition, even if the control cable of the equipment installed and operating in the double-floor structure is excessively installed, when the work space for seismic reinforcement is insufficient, by using the space to remove the support top plate by installing the activity prevention device according to the present invention earthquake In addition to resisting lateral forces, seismic performance can be augmented without stopping or relocating equipment.

도 1은 종래 기술에 따른 이중바닥 구조물을 개략적으로 도시한 것이다.
도 2는 본 발명의 일 실시예에 따른 전도 방지 장치와 활동 방지 장치를 포함하는 복합 내진 구조 시스템이 장비에 대하여 적용된 상태 단면도를 개략적으로 도시한 것이다.
도 3은 본 발명의 일 실시예에 따른 전도 방지 장치가 장비에 대하여 적용된 상태 측면도를 개략적으로 도시한 것이다.
도 4는 본 발명의 일 실시예에 따른 연결판의 평면도를 개략적으로 도시한 것이다.
도 5a 및 5b는 본 발명의 일 실시예에 따른 각관, ㄱ형 보강재, 지주봉, 지주봉 앵커 브래킷의 연결 상태를 개략적으로 도시한 것이다.
도 6은 본 발명의 일 실시예에 따른 활동 방지 장치가 장비에 대하여 적용된 상태 측면도를 개략적으로 도시한 것이다.
도 7은 본 발명의 다른 실시예에 따른 연결 브래킷과 각관의 연결 상태를 개략적으로 도시한 것이다.
도 8은 본 발명에 따른 지진격리장치가 두 개 설치된 상태를 개략적으로 도시한 것이다.
Figure 1 schematically shows a double bottom structure according to the prior art.
2 is a schematic cross-sectional view of a state in which a composite earthquake resistant rescue system including an anti-fall device and an anti-activity device according to an embodiment of the present invention is applied to equipment.
Figure 3 schematically shows a side view of a state in which the anti-conduction device according to an embodiment of the present invention is applied to the equipment.
4 schematically illustrates a plan view of a connecting plate according to an embodiment of the present invention.
5a and 5b schematically show the connection state of the square tube, a-shape reinforcement, holding rods, holding rod anchor bracket according to an embodiment of the present invention.
Figure 6 schematically shows a side view of a state in which the activity prevention device according to an embodiment of the present invention is applied to the equipment.
Figure 7 schematically shows a connection state of the connection bracket and the tube according to another embodiment of the present invention.
8 schematically illustrates a state in which two seismic isolators according to the present invention are installed.

본 발명에 따른 무정전 및 무이설 방식으로 설치되는 전도 방지 장치 및 활동 장지 장치를 포함하는 복합 내진 구조 시스템은 크게 다음의 9개의 부재로 나누어 제작되고, 각 부재를 용접 또는 강결 조립한다.The composite earthquake resistant structural system including the fall prevention device and the active restraint device installed in an uninterruptible and non-separable manner according to the present invention is largely divided into the following nine members, and each member is welded or rigidly assembled.

1. 앵커 브래킷: ㄱ형 부재로서, 재질은 강철이 바람직하다. 수평면을 천장 슬래브에 연결하고, 수직면을 지진격리장치에 연결시킨다. 1. Anchor bracket: A type member, preferably made of steel. Connect the horizontal plane to the ceiling slab and the vertical plane to the seismic isolator.

2. 지진격리장치: 스프링과 점성형 댐퍼가 병렬로 구성된 것으로서, 장비의 고유진동수를 조절하여 지진의 탁월 주기로부터 벗어나게 하고 지진파의 충격을 흡수하여 변위를 감소시킨다.2. Seismic isolator: It is composed of spring and viscous damper in parallel. It adjusts the natural frequency of equipment to deviate from the earthquake's excellent period and absorbs the shock of seismic wave to reduce displacement.

3. 연결판: L형 부재로서 조립한 구조체로서, 강철 재질이 바람직하고, 장비를 와이어 슬링에 연결시킨다. 3. Connecting plate: A structure assembled as an L-shaped member, preferably made of steel, and connecting the equipment to a wire sling.

4. 와이어 슬링: 일단은 지진격리장치에 연결되고 타단은 연결판에 연결된다.4. Wire sling: one end is connected to seismic isolator and the other end is connected to connecting plate.

5. 연결 브래킷: L형 부재로서, 강철 재질이 바람직하고, 장비의 바닥 채널 또는 스토퍼와, 각관을 서로 연결시킨다. 5. Connecting bracket: L-shaped member, preferably made of steel, which connects the bottom channel or stopper of the equipment with the tube.

6. 각관: 일단부는 ㄱ형 보강재에 체결되고, 타단부는 연결 브래킷과 체결되어 지진 시 장비가 활동하지 않도록 장비를 고정시킨다. 6. Tube: One end is fastened to the a-shape reinforcement and the other end is fastened to the connection bracket to fix the equipment so that the equipment does not work in the event of an earthquake.

7. ㄱ형 보강재: 지주봉을 서로 연결하여 지주봉의 전도를 방지한다. 7. Type A stiffeners: The holding rods are connected to each other to prevent the holding rods from falling over.

8. 지주봉 앵커 브래킷: L형 부재로서 강철 재질이 바람직하고, 지주봉이 바닥 슬래브로부터 이탈되지 않도록 지주봉을 고정시킨다.8. Shoring Rod Anchor Bracket: An L-shaped member, preferably made of steel, which holds the shoring rod so that it does not escape from the floor slab.

9. 지지상판: 강판으로서, 작업자나 장비 운반의 통로로 사용된다. 9. Support plate: Steel plate, used as a passageway for transporting workers or equipment.

이하, 실시예를 통하여 본 발명을 좀 더 구체적으로 살펴보지만, 하기 예에 본 발명의 범주가 한정되는 것은 아니다.Hereinafter, the present invention will be described in more detail with reference to Examples, but the scope of the present invention is not limited to the following Examples.

본 발명의 설명에 앞서 본 명세서에서의 "장비"란 배전반, 계전기 패널, 제어반, 감시반, 상황실이나 통제실의 통신/제어선로, 전산기 등을 말하며, 본 명세서에서는 대표적으로 배전반을 선택하여 설명하지만, 위에서 언급한 각종 장비 등이 본 발명에 적용 가능함은 자명하다.Prior to the description of the present invention, "equipment" in the present specification refers to a switchboard, a relay panel, a control panel, a monitoring panel, a communication / control line of a situation room or a control room, a computer, and the like. Obviously, the various equipment mentioned can be applied to the present invention.

도 2는 본 발명의 일 실시예에 따른 전도 방지 장치와 활동 방지 장치를 포함하는 복합 내진 구조 시스템이 장비에 대하여 적용된 상태 단면도를 개략적으로 도시한 것이다.2 is a schematic cross-sectional view of a state in which a composite earthquake resistant rescue system including an anti-fall device and an anti-activity device according to an embodiment of the present invention is applied to equipment.

도 2를 참조하면, 본 발명에 따른 복합 내진 구조 시스템(1000)은 전도 방지 장치(100)와 활동 방지 장치(200)를 포함한다. 상기 전도 방지 장치(100)는 배전반(10)의 상부 방향으로 설치되어 있고, 상기 활동 방지 장치(200)는 배전반(10)의 하부 방향으로 설치되어 있다.Referring to FIG. 2, the composite seismic rescue system 1000 according to the present invention includes a fall prevention device 100 and an activity prevention device 200. The fall prevention apparatus 100 is installed in an upper direction of the switchboard 10, and the activity preventing device 200 is installed in a lower direction of the switchboard 10.

본 발명에 따른 전도 방지 장치가 장비에 대하여 적용된 상태를 도시한 도 3과 상기 도 2를 함께 참조하여 설명하면, 상기 전도 방지 장치(100)는 지진격리장치(110), 연결판(120) 및 와이어 슬링(130)을 포함한다. 상기 지진격리장치(110)는 서로 병렬 연결된 스프링(111)과 점성형 댐퍼(112)를 포함하고, 지진격리장치(110)의 상단이 천장 슬래브(20)에 연결되어 있다. 보다 구체적으로는, 지진격리장치(110)의 상단은 앵커 브래킷(140)을 매개로 천장 슬래브(20)에 연결되어 있는데, 상기 앵커 브래킷(140)은 ㄱ형 부재로서, 앵커 브래킷(140)의 수평면에 앵커볼트(141)가 체결되어 천장 슬래브(20)에 고정되어 있고, 샤클(113)과 아이볼트(114)를 매개로 앵커 브래킷(40)의 수직면(142)에는 지진격리장치(110)의 상단이 체결되어 있다. Referring to FIG. 3 and FIG. 2 illustrating a state in which an anti-conduction device according to the present invention is applied to equipment, the anti-conduction device 100 includes an earthquake isolation device 110, a connection plate 120, and Wire sling 130. The seismic isolator 110 includes a spring 111 and a viscous damper 112 connected in parallel to each other, the upper end of the seismic isolator 110 is connected to the ceiling slab (20). More specifically, the upper end of the seismic isolator 110 is connected to the ceiling slab 20 via the anchor bracket 140, the anchor bracket 140 is a-shaped member, the horizontal plane of the anchor bracket 140 The anchor bolt 141 is fastened to the ceiling slab 20 and fixed to the vertical surface 142 of the anchor bracket 40 via the shackle 113 and the eye bolt 114 of the seismic isolator 110. The upper end is fastened.

한편, 지진격리장치(110)의 하단은 아이볼트(115)와 샤클(116)을 매개로 와이어 슬링(130)에 연결되어 있다. On the other hand, the lower end of the seismic isolator 110 is connected to the wire sling 130 via the eye bolt 115 and the shackle 116.

본 실시예에서는 지진격리장치는 1개 설치되어 있으나, 대안의 다른 실시예에서는 복수 개 설치될 수 있고, 복수 개 설치된 경우 각 지진격리장치는 병렬로 연결되는 것이 바람직하다(도 8 참조). 또한, 앵커 브래킷은 적어도 1개 이상 설치될 수 있다. In the present embodiment, one seismic isolator is provided, but in another alternative embodiment, a plurality of seismic isolators may be installed. In addition, at least one anchor bracket may be installed.

상기 연결판(120)은 운전 중인 배전반(10)의 상단부에 마련되어 있다. 본 발명의 일 실시예에 따른 연결판의 평면도인 도 4를 상기 도 2 및 3과 함께 참조하여 설명하면, 상기 연결판(120)은 상·하측면을 형성하는 제1 L형 부재(121), 상기 제1 L형 부재(121)를 가로질러 설치되는 제2 L형 부재(122), 및 상기 제2 L형 부재(122)를 가로질러 설치되되 2개의 L형 부재가 그 수직면이 서로 인접되도록 설치되는 제3 L형 부재(123)를 구비한다. The connecting plate 120 is provided at an upper end of the switchboard 10 in operation. Referring to FIG. 4, which is a plan view of a connecting plate according to an embodiment of the present invention, with reference to FIGS. 2 and 3, the connecting plate 120 has a first L-shaped member 121 forming upper and lower surfaces thereof. A second L-shaped member 122 is installed across the first L-shaped member 121, and the second L-shaped member 122 is installed across the two L-shaped members, the vertical surfaces of which are adjacent to each other. It is provided with a third L-shaped member 123 which is installed to be.

상기 제1 L형 부재(122)는 상기 배전반(10)에 이미 마련되어 있던 홀, 특히 아이볼트용 홀(30)에 맞추어 볼트 체결됨으로써 상기 배전반(10)에 고정된다. 상기 제3 L형 부재(123)의 수직면에는 체결홀(124)이 형성되어 있고, 아이볼트(117)를 매개로 상기 체결홀(124)에 와이어 슬링(130)이 연결됨으로써 배전반(10)는 전도 방지 장치(100)에 고정된다. 따라서, 본 발명에 따르면, 별도의 장비 고정 장치를 설치하지 않고도 장비를 전도 방지 장치에 고정시킬 수 있어 제작 비용을 절감할 수 있을 뿐만 아니라, 운전 중인 장비를 운전 중단시키거나 이설시키지 않고 내진 성능을 보강할 수 있다. The first L-shaped member 122 is fixed to the switchboard 10 by bolting to a hole already provided in the switchboard 10, in particular, an eye bolt hole 30. A fastening hole 124 is formed on the vertical surface of the third L-shaped member 123, and the wire board 10 is connected to the fastening hole 124 through the eye bolt 117. It is fixed to the fall prevention apparatus 100. Therefore, according to the present invention, it is possible to fix the equipment to the fall prevention device without installing a separate equipment fixing device to reduce the production cost, and to improve the seismic performance without stopping or relocating the equipment in operation. I can reinforce it.

상기 와이어 슬링(130)은 일단이 상기 지진격리장치(110)의 하단에 결합되고, 타단이 상기 연결판(120)에 결합된다. 상기 와이어 슬링(130)은 팽팽하게 당겨진 상태에서 클립(131)으로 고정되므로 진동을 저감시키는 효과를 도모한다.One end of the wire sling 130 is coupled to the lower end of the seismic isolator 110, the other end is coupled to the connecting plate 120. The wire sling 130 is secured by the clip 131 in the tensioned state to reduce the vibration.

이와 같이, 본 발명에 따르면, 장비를 직접 천장 슬래브에 고정시키지 않고 전도 방지 장치를 매개로 천장 슬래브에 고정시킴으로써 장비에 작용하는 지진응답을 크게 저감시킬 수 있고, 특히, 서로 병렬 연결된 스프링과 점성형 댐퍼를 구비하는 지진격리장치를 천장 슬래브에 고정시킴으로써 지진응답을 줄여서 장비에 미치는 지진력을 저감시켜 장비의 전도를 방지할 수 있다.As described above, according to the present invention, the seismic response acting on the equipment can be greatly reduced by fixing the equipment to the ceiling slab through the fall prevention device without directly fixing the equipment to the ceiling slab. Seismic isolator equipped with a damper is fixed to the ceiling slab to reduce the earthquake response to reduce the earthquake force on the equipment to prevent the fall of the equipment.

다음으로, 활동 방지 장치에 대하여 설명한다.Next, the activity prevention device will be described.

도 5a 및 5b는 본 발명의 일 실시예에 따른 각관, ㄱ형 보강재, 지주봉, 지주봉 앵커 브래킷의 연결 상태를 개략적으로 도시한 것이다. 도 6은 본 발명의 일 실시예에 따른 활동 방지 장치가 장비에 대하여 적용된 상태 측면도를 개략적으로 도시한 것이다.5a and 5b schematically show the connection state of the square tube, a-shape reinforcement, holding rods, holding rod anchor bracket according to an embodiment of the present invention. Figure 6 schematically shows a side view of a state in which the activity prevention device according to an embodiment of the present invention is applied to the equipment.

도 2, 5a, 5b 및 6을 참조하면, 활동 방지 장치(200)는 각관(210), 연결 브래킷(220), ㄱ형 보강재(230), 지주봉 앵커 브래킷(240) 및 지지부재(250)를 포함한다.2, 5a, 5b and 6, the activity prevention device 200 is a square tube 210, connecting bracket 220, a-shape reinforcement 230, holding rod anchor bracket 240 and support member 250 Include.

상기 각관(210)은 상기 배전반(10)를 지지하는 지지상판(40)이 일부 제거된 위치에 설치되어 있다. 상기 각관(210))의 일단부는 도 5a 및 5b에 도시된 바와 같이, 그 상단이 절삭되어 있다. 이는 내진 보강 작업시 후술할 ㄱ형 보강재(230)와의 볼트 결합을 용이하게 하기 위한 것이다. The tube 210 is installed at a position where the support top plate 40 supporting the switchboard 10 is partially removed. As shown in FIGS. 5A and 5B, one end of the tube 210 is cut at an upper end thereof. This is to facilitate the bolt coupling with the a-shaped reinforcement 230 to be described later when the seismic reinforcement work.

상기 연결 브래킷(220)은 L형이며, 그 일단이 상기 배전반(10)에 연결되어 있는데, 구체적으로는, 볼트(221)가 상기 L형의 연결 브래킷(220)의 수직면을 지나 상기 배전반(10)의 바닥 채널(12)에 체결되어 있다. 상기 연결 브래킷(220)의 타단은 볼트(222)가 상기 L형의 연결 브래킷(220)의 수평면을 지나 상기 각관(210)의 타단부를 관통하여 체결됨으로써 상기 각관(210)에 연결되어 있다.The connecting bracket 220 is L-type, one end thereof is connected to the switchboard 10, specifically, the bolt 221 is passed through the vertical plane of the L-shaped connecting bracket 220 of the switchboard 10 ) Is fastened to the bottom channel 12. The other end of the connection bracket 220 is connected to the corner tube 210 by fastening the bolt 222 through the other end of the corner tube 210 through the horizontal plane of the L-shaped connection bracket 220.

본 발명의 다른 실시예에 따른 연결 브래킷과 각관의 연결 상태를 개략적으로 도시한 도 7을 참조하면, 상기 연결 브래킷(220)은 벤딩 브래킷(220')이며, 상기 벤딩 브래킷(220')의 일단은 상기 배전반(10)의 하단부의 스토퍼(14)에 연결되고, 상기 벤딩 브래킷(220')의 타단은 상기 각관(210)의 타단부와 볼트체결되어 있다.Referring to FIG. 7 schematically illustrating a connection state between a connection bracket and a tube according to another embodiment of the present invention, the connection bracket 220 is a bending bracket 220 'and one end of the bending bracket 220'. Is connected to the stopper 14 of the lower end of the switchboard 10, the other end of the bending bracket 220 'is bolted to the other end of the tube 210.

다시 도 2, 5a, 5b 및 6을 참조하면, ㄱ형 보강재(230)는 상기 각관(210)의 상기 일단부의 하측을 가로질러 설치되어 있다. 구체적으로는, 상기 ㄱ형 보강재(230)의 수평면과 상기 각관(210)에는 볼트(231)가 체결되어 있고, 상기 ㄱ형 보강재(230)의 수직면과 바닥 슬래브(50)에 설치되어 있는 지주봉(60)에는 U볼트(232)가 체결되어 있다. 따라서, 상기 ㄱ형 보강재(230)는 각 각관(210)을 서로 연결시키고, 각 지주봉(60)을 서로 연결시킨다.Referring back to Figures 2, 5a, 5b and 6, the a-shape reinforcement 230 is installed across the lower side of the one end of the square tube (210). Specifically, the bolt 231 is fastened to the horizontal surface of the a-shape reinforcement 230 and the square tube 210, the holding rod 60 is installed on the vertical surface and the bottom slab 50 of the a-shape reinforcement 230. ) U bolt 232 is fastened. Thus, the a-shape reinforcement 230 is connected to each tube 210, each holding rod 60 is connected to each other.

상기 L형의 지주봉 앵커 브래킷(240)은 그 수직면은 상기 지주봉과 U볼트(241)로 체결되어 있고, 그 수평면은 상기 바닥 슬래브(50)에 앵커볼트(242)로 체결되어 있다.The L-shaped holding rod anchor bracket 240 is vertically fastened with the holding rod and the U bolt 241, and the horizontal surface is fastened with the anchor bolt 242 to the bottom slab 50.

상기 지지부재(250)는 강판으로서, 상기 각관(210)의 상측에 설치되되, 제거되지 않은 지지상판(40)에 인접하여 설치되어 있다. 상기 지지부재(250)는 작업자나 장비운반의 통행을 용이하게 하기 위한 것이다. The support member 250 is a steel sheet, which is installed on the upper side of the square tube 210 and adjacent to the support upper plate 40 that is not removed. The support member 250 is intended to facilitate the passage of the operator or equipment transport.

이와 같이, 본 발명에 따르면, 이중바닥 구조물에 설치되어 운전 중인 장비의 제어 케이블이 과다하게 포설되어 있어 내진 보강을 위한 작업 공간이 부족한 경우에도, 지지상판을 제거한 공간을 활용하여 본 발명에 따른 활동 방지 장치를 설치함으로써 지진 횡력에 의한 활동에 저항할 수 있을 뿐만 아니라, 장비의 운전을 정지시키거나 장비를 이설시키지 않고 내진 성능을 보강할 수 있다.As described above, according to the present invention, even when the control cable of the equipment installed and operated in the double-floor structure is excessively installed, and the work space for seismic reinforcement is insufficient, the activity according to the present invention is utilized by utilizing the space from which the support top plate is removed. By installing the prevention device, it is possible not only to resist seismic lateral force, but also to enhance the seismic performance without stopping the equipment or moving the equipment.

이하에서는, 본 발명에 따른 복합 내진 구조 시스템을 구성하는 전도 방지 장치와 활동 방지 장치가 설치되는 과정을 도면을 참조하여 설명하도록 한다.Hereinafter, the process of installing the fall prevention device and the activity preventing device constituting the composite seismic structure system according to the present invention will be described with reference to the drawings.

먼저, 도 2 내지 4를 참조하여, 전도 방지 장치의 설치 과정을 살펴보도록 한다. First, referring to Figures 2 to 4, look at the installation process of the fall prevention device.

배전반(10)의 상단에는 아이볼트용 홀(30)이 마련되어 있다. 상기 아이볼트용 홀(30)은 배전반(10)의 이설시에 사용되는 것으로 일반적으로 배전반(10)에는 아이볼트용 홀(30)이 형성되어 있다. 작업자는 상기 아이볼트용 홀(30)에 연결판(120)의 제1 L형 부재(121)를 맞추어 볼트 결합함으로써 상기 연결판(120)을 상기 배전반(10)의 상단부에 설치한다. 그리고, 앵커 브래킷(140)의 수평면에 앵커볼트(142)를 체결하여 앵커 브래킷(140)을 천장 슬래브(20)에 고정시킨다. 그리고 스프링(111)과 점성형 댐퍼(112)가 병렬로 연결된 지진격리장치(120)의 상단과 하단에 아이볼트(114, 115)를 체결하고, 상단의 아이볼트(114)는 샤클(113)을 매개로 앵커 브래킷(140)에 연결하고, 하단의 아이볼트(115)는 와이어 슬링(130)의 일단에 연결한다. 그리고 이 와이어 슬링(130)의 타단을 아이볼트(117)를 매개로 연결판(30)의 제3 L형 부재(123)에 마련되어 있는 체결홀(124)에 고정시키고, 와이어 슬링(130)을 팽팽하게 당겨서 프리스트레스를 준 상태에서 클립(131)으로 고정시킨다. The upper end of the switchboard 10 is provided with an eye bolt hole 30. The eye bolt hole 30 is used at the time of relocation of the switchboard 10. In general, the eyebolt hole 30 is formed in the switchboard 10. The worker installs the connecting plate 120 at the upper end of the switchboard 10 by bolt-fitting the first L-shaped member 121 of the connecting plate 120 to the eye bolt hole 30. Then, the anchor bolt 140 is fastened to the ceiling slab 20 by fastening the anchor bolt 142 to the horizontal surface of the anchor bracket 140. Then, the eye bolts 114 and 115 are fastened to the upper and lower ends of the seismic isolator 120 in which the spring 111 and the viscous damper 112 are connected in parallel, and the upper eye bolt 114 is the shackle 113. Connected to the anchor bracket 140 via the, eyebolt 115 at the bottom is connected to one end of the wire sling 130. The other end of the wire sling 130 is fixed to the fastening hole 124 provided in the third L-shaped member 123 of the connecting plate 30 via the eye bolt 117 to fix the wire sling 130. It is fixed by the clip 131 in the prestressed state by pulling taut.

본 발명에 따른 전도 방지 장치의 상기 설치 작업을 통해, 운전 중인 배전반은 정지되거나 이설될 필요 없이 내진 성능이 보강될 수 있다. 그리고, 지진 횡력에 의한 배전반의 전도를 방지할 수 있다. Through the installation work of the fall prevention apparatus according to the present invention, the running switchboard can be reinforced with seismic performance without having to be stopped or moved. And it is possible to prevent conduction of the switchboard due to the seismic lateral force.

다음으로, 활동 방지 장치가 설치되는 과정을 도면을 참조하여 살펴본다.Next, the process of installing the activity preventing device will be described with reference to the drawings.

도 2, 5a, 5b 및 6을 참조하면, 배전반(100)이 위치한 지지상판(40)의 하부에는 제어 케이블(70)이 과다하게 포설되어 있다. 상기 지지상판(40) 중 배전반이 위치되지 않은 부분을 절단하여 제거한다. 각관(210)을 삽입할 수 있는 공간을 마련하여 각관(210)을 위치시킨다. 배전반(10)의 바닥 채널(12)에 구멍을 뚫고 나사를 내어 연결 브래킷(220)의 일단은 수평볼트(221)로 배전반(10)의 바닥 채널(12)과 체결하고, 연결 브래킷(220)의 다른 일단은 수직볼트(222) 및 너트를 체결하여 각관(210)에 고정시킨다. 2, 5a, 5b and 6, the control cable 70 is excessively laid in the lower portion of the support top plate 40 in which the switchboard 100 is located. The portion of the support plate 40 is not cut by removing the switchboard is located. The corner tube 210 is positioned by providing a space into which the corner tube 210 can be inserted. Drill a hole in the bottom channel 12 of the switchboard 10 and screw out one end of the connection bracket 220 to the bottom channel 12 of the switchboard 10 with the horizontal bolt 221, and the connection bracket 220. The other end of the vertical bolt 222 and the nut is fastened to the tube 210 by fastening.

ㄱ형 보강재(230)를 각관(210)의 직하부에 위치시킨 뒤 볼트(231)를 체결하여 각관(210)과 연결하고, 지주봉(60)에 대해서는 U형 볼트(232)를 체결함으로써 지지봉(60)들을 연결시킨다.The a-shape reinforcement 230 is positioned directly below the corner pipe 210, and then the bolt 231 is fastened to connect with the corner pipe 210, and the support rod 60 by fastening the U-shaped bolt 232 to the support rod ( 60).

한편, 지주봉(60)이 지진시 이탈되지 않도록, L형의 지주봉 앵커 브래킷(240)의 수평면에 앵커볼트(242)를 체결하여 바닥 슬래브(50)에 고정시키고, 지주봉(60)에 대해서는 U형 볼트(241)를 체결한다.On the other hand, the anchor rod 60 is fastened to the bottom slab 50 by fastening the anchor bolt 242 to the horizontal surface of the L-shaped anchor rod anchor bracket 240 so as not to be separated during an earthquake. The U-shaped bolt 241 is fastened.

그리고, 이상의 작업이 완료된 후에는 강판으로 된 지지부재(250)를 기존의 이중바닥 구조물의 높이와 같은 높이로, 제거되지 않은 지지상판에 인접하여 설치한다.Then, after the above operation is completed, the support member 250 made of steel sheet is installed adjacent to the support top plate which is not removed at the same height as the height of the existing double bottom structure.

이로써, 제어 케이블이 과다하게 포설되어 있는 운전 중인 배전반을 정지시키거나 이설시키지 않은 채 내진 성능을 보강할 수 있다. 그리고, 지진 횡력에 의한 배전반의 활동을 방지할 수 있다. Thereby, seismic performance can be reinforced without stopping or moving the switchboard in operation in which the control cable is excessively installed. In addition, it is possible to prevent activity of the switchboard due to the seismic lateral force.

이상에서는 본 발명의 특정의 바람직한 실시예에 대하여 설명하였으나, 본 발명은 상술한 특정의 실시예에 한정되지 아니하며, 특허청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이고, 그와 같은 변형은 청구 범위 기재의 범위 내에 있게 된다. While specific embodiments of the present invention have been described above, the present invention is not limited to the above-described specific embodiments, and the technical field to which the present invention pertains without departing from the gist of the present invention as claimed in the claims. Anyone of ordinary skill in the art can make various modifications, as well as such modifications are within the scope of the claims.

10: 배전반 12: 바닥 채널
14: 스토퍼 20: 천장 슬래브
30: 홀 40: 지지 상판
50: 바닥 슬래브 60: 지주봉
70: 제어 케이블 100: 전도 방지 장치
110: 지진격리장치 111: 스프링
112: 점성형 댐퍼 113, 116: 샤클
114, 115, 117: 아이볼트 120: 연결판
121: 제1 L형 부재 122: 제2 L형 부재
123: 제3 L형 부재 124: 체결홀
130: 와이어 슬링 134: 클립
200: 활동 방지 장치 210: 각관
220: 연결 브래킷 220': 벤딩 브래킷
230: ㄱ형 보강재 240: 지주봉 앵커 브래킷
250: 지지부재 1000: 복합 내진 구조 시스템
10: switchboard 12: bottom channel
14: stopper 20: ceiling slab
30: hole 40: support top plate
50: floor slab 60: holding rod
70: control cable 100: fall prevention device
110: seismic isolator 111: spring
112: viscous damper 113, 116: shackle
114, 115, 117: i-bolt 120: connecting plate
121: first L-shaped member 122: second L-shaped member
123: third L-shaped member 124: fastening hole
130: wire sling 134: clip
200: activity prevention device 210: corner
220: connection bracket 220 ': bending bracket
230: a-shape reinforcement 240: holding rod anchor bracket
250: support member 1000: composite earthquake resistant structural system

Claims (12)

상단이 천장 슬래브에 연결되어 있는 지진격리장치;
설치되어 있는 장비의 상단부에 마련되어 있는 연결판; 및
일단이 상기 지진격리장치의 하단에 결합되고, 타단이 상기 연결판에 결합되는 와이어 슬링;을 포함하고,
상기 지진격리장치는, 스프링 및 상기 스프링에 병렬 연결되는 점성형 댐퍼를 구비하고,
상기 연결판은, 상·하측면을 형성하는 제1 L형 부재; 상기 제1 L형 부재를 가로질러 설치되는 제2 L형 부재; 및 상기 제2 L형 부재를 가로질러 설치되되 2개의 L형 부재가 그 수직면이 서로 인접되도록 설치되는 제3 L형 부재;를 구비하는 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 전도 방지 장치.
Seismic isolator, the upper end of which is connected to the ceiling slab;
A connecting plate provided at an upper end of the installed equipment; And
And a wire sling having one end coupled to a lower end of the seismic isolator and the other end coupled to the connection plate.
The seismic isolator is provided with a spring and a viscous damper connected in parallel to the spring,
The connecting plate may include a first L-shaped member that forms an upper and lower side surface; A second L-shaped member installed across the first L-shaped member; And a third L-shaped member installed across the second L-shaped member such that two L-shaped members are installed such that their vertical surfaces are adjacent to each other. .
제1 항에 있어서, 상기 지진격리장치는 앵커 브래킷을 매개로 천장 슬래브에 연결되고, 상기 앵커 브래킷은 ㄱ형 부재인 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 전도 방지 장치. The apparatus of claim 1, wherein the seismic isolator is connected to the ceiling slab via an anchor bracket, and the anchor bracket is an a-shaped member. 제1 항에 있어서, 상기 지진격리장치는 적어도 1개 이상 설치되며, 상기 지진격리장치가 복수 개 설치되는 경우 각 지진격리장치는 병렬로 연결되는 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 전도 방지 장치.The method of claim 1, wherein at least one seismic isolator is installed, and when the plurality of seismic isolators are installed, each seismic isolator is connected in parallel. Prevention device. 제1 항에 있어서, 상기 제1 L형 부재는 상기 장비에 마련되어 있는 홀에 맞추어 볼트 체결됨으로써 상기 장비에 고정되는 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 전도 방지 장치.The apparatus of claim 1, wherein the first L-shaped member is fixed to the equipment by being bolted to a hole provided in the equipment. 제1 항에 있어서, 상기 제3 L형 부재의 수직면에는 체결홀이 형성되어 있고, 상기 와이어 슬링은 상기 체결홀에 연결됨으로써 상기 연결판에 결합되는 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 전도 방지 장치.The method of claim 1, wherein a fastening hole is formed in a vertical surface of the third L-shaped member, and the wire sling is installed in an uninterruptible and non-separable manner by being connected to the connection plate by being connected to the fastening hole. Fall prevention device. 제1 항에 있어서, 상기 와이어 슬링은 팽팽하게 당겨진 상태에서 클립으로 고정되는 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 전도 방지 장치.The apparatus of claim 1, wherein the wire sling is fixed by a clip in a tensioned state. 설치되어 있는 장비의 상측 방향으로 마련되어 있는, 제1항 내지 제6항 중 어느 한 항에 따른 전도 방지 장치; 및
상기 장비의 하측 방향으로 마련되어 있는 활동 방지 장치;를 포함하고,
상기 활동 방지 장치는, 상기 장비를 지지하는 지지상판이 제거된 위치에 설치되고, 일단부의 상단이 절삭되어 있는 각관; 일단이 상기 장비에 연결되고, 타단이 상기 각관의 타단부에 연결되는 연결 브래킷; 상기 각관의 상기 일단부의 하측을 가로질러 설치되고, 수평면은 상기 각관에 연결되고 수직면은 바닥 슬래브에 설치되어 있는 지주봉에 연결되는 ㄱ형 보강재; 수직면은 상기 지주봉에 연결되고 수평면은 바닥 슬래브에 연결되는 L형의 지주봉 앵커 브래킷; 및 상기 각관의 상측에 설치되되 제거되지 않은 지지상판에 인접하여 설치되는 지지부재;를 구비하는 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 복합 내진 구조 시스템.
An anti-conduction device according to any one of claims 1 to 6, which is provided in an upward direction of the installed equipment; And
Includes; the activity prevention device provided in the downward direction of the equipment,
The activity preventing device, the pipe is installed in a position where the support top plate for supporting the equipment is removed, the upper end of one end is cut; A connection bracket having one end connected to the equipment and the other end connected to the other end of the tube; A-shaped reinforcement is installed across the lower side of the one end of the tube, the horizontal surface is connected to the square tube and the vertical surface is connected to the holding rod is installed on the bottom slab; A vertical surface is connected to the holding rod and a horizontal surface is connected to the bottom slab L-shaped holding rod anchor bracket; And a support member installed adjacent to the support upper plate which is installed on the upper side of the pipe and is not removed, wherein the seismic structure system is installed in an uninterruptible and non-separable manner.
제7 항에 있어서, 상기 연결 브래킷은 L형이며, 상기 연결 브래킷과 상기 장비는 볼트가 상기 L형의 연결 브래킷의 수직면을 지나 상기 장비의 바닥 채널에 체결됨으로써 서로 연결되고, 상기 연결 브래킷과 상기 각관은 볼트가 상기 L형의 연결 브래킷의 수평면을 지나 상기 각관의 타단부를 관통하여 체결됨으로써 서로 연결되는 것는 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 복합 내진 구조 시스템.The connecting bracket and the equipment are connected to each other by a bolt is fastened to the bottom channel of the equipment through a vertical surface of the L-shaped connecting bracket, the connection bracket and the equipment. Each pipe is connected to each other by a bolt is fastened through the other end of the pipe passing through the horizontal plane of the L-shaped connection bracket, the seismic structure structure is installed in an uninterruptible and no relocation system. 제7 항에 있어서, 상기 연결 브래킷은 벤딩 브래킷이며, 상기 벤딩 브래킷의 일단은 상기 장비의 하단부의 스토퍼에 연결되고, 상기 벤딩 브래킷의 타단은 상기 각관의 타단부와 볼트체결되는 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 복합 내진 구조 시스템.The uninterruptible power supply according to claim 7, wherein the connection bracket is a bending bracket, one end of the bending bracket is connected to a stopper of the lower end of the equipment, and the other end of the bending bracket is bolted to the other end of the tube. And a seismic structure system installed in a snowless manner. 제7 항에 있어서, 상기 ㄱ형 보강재는 상기 각관과 볼트가 체결됨으로써 서로 연결되고, 상기 ㄱ형 보강재와 상기 지주봉은 U볼트가 체결됨으로써 서로 연결되는 것는 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 복합 내진 구조 시스템.According to claim 7, wherein the a-shape reinforcement is connected to each other by fastening the square tube and the bolt, the a-shape reinforcement and the holding rods are connected to each other by the U bolt is fastened, the composite is installed in an uninterruptible and no relocation method Seismic rescue system. 제7 항에 있어서, 상기 지주봉 앵커 브래킷의 수직면과 상기 지주봉은 U볼트가 체결됨으로써 서로 연결되고, 상기 지주봉 앵커 브래킷의 수평면과 상기 바닥 슬래브는 앵커볼트가 체결됨으로써 서로 연결되는 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 복합 내진 구조 시스템. The vertical surface of the holding rod anchor bracket and the holding rod are connected to each other by fastening U bolts, and the horizontal surface of the holding rod anchor bracket and the bottom slab are connected to each other by fastening anchor bolts. Complex seismic rescue system installed in uninterruptible and non-separable manner. 제7 항에 있어서, 상기 지지부재는 강판으로 이루어져 있는 것을 특징으로 하는 무정전 및 무이설 방식으로 설치되는 복합 내진 구조 시스템.8. The composite seismic structure system according to claim 7, wherein the supporting member is made of a steel sheet.
KR1020110000431A 2011-01-04 2011-01-04 Combined aseismic structural system for electrical and communication equipments without power interruption and removal KR101068077B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110000431A KR101068077B1 (en) 2011-01-04 2011-01-04 Combined aseismic structural system for electrical and communication equipments without power interruption and removal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110000431A KR101068077B1 (en) 2011-01-04 2011-01-04 Combined aseismic structural system for electrical and communication equipments without power interruption and removal

Publications (1)

Publication Number Publication Date
KR101068077B1 true KR101068077B1 (en) 2011-09-28

Family

ID=45507987

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110000431A KR101068077B1 (en) 2011-01-04 2011-01-04 Combined aseismic structural system for electrical and communication equipments without power interruption and removal

Country Status (1)

Country Link
KR (1) KR101068077B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160026079A (en) * 2014-08-29 2016-03-09 이선영 the distribution board having earthquake-proof device and for horizontal control
KR20160087788A (en) * 2016-07-11 2016-07-22 이선영 the distribution board having earthquake-proof device and for horizontal control
KR20160087789A (en) * 2016-07-11 2016-07-22 이선영 the distribution board having earthquake-proof device and for horizontal control
KR101820473B1 (en) * 2016-07-11 2018-01-29 세운전기공사(주) the distribution board having earthquake-proof device and for horizontal control
CN110848467A (en) * 2019-11-21 2020-02-28 中铁十七局集团电气化工程有限公司 Construction method for mounting multi-split equipment and pipeline in steel structure building
CN115162816A (en) * 2022-08-15 2022-10-11 中国建筑西南设计研究院有限公司 Prestress tensile anti-overturning shock isolation device and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09182221A (en) * 1995-12-25 1997-07-11 Matsushita Electric Works Ltd Electric equipment arranging apparatus
KR100850228B1 (en) 2007-12-07 2008-08-04 (주)파워엔텍 Earth quake-proof reinforcement structure installed for operating electric panel without moving and interruption of power supply
KR20090083054A (en) * 2008-01-29 2009-08-03 (주)파워엔텍 An earth quake-proof reinforcement structure for new and replacement of an electric panel
KR100966090B1 (en) 2009-12-04 2010-06-28 (주)파워엔텍 Earthquake-proof access floor system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09182221A (en) * 1995-12-25 1997-07-11 Matsushita Electric Works Ltd Electric equipment arranging apparatus
KR100850228B1 (en) 2007-12-07 2008-08-04 (주)파워엔텍 Earth quake-proof reinforcement structure installed for operating electric panel without moving and interruption of power supply
KR20090083054A (en) * 2008-01-29 2009-08-03 (주)파워엔텍 An earth quake-proof reinforcement structure for new and replacement of an electric panel
KR100966090B1 (en) 2009-12-04 2010-06-28 (주)파워엔텍 Earthquake-proof access floor system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160026079A (en) * 2014-08-29 2016-03-09 이선영 the distribution board having earthquake-proof device and for horizontal control
KR101664179B1 (en) 2014-08-29 2016-10-14 (주)이엠시스텍 the distribution board having earthquake-proof device and for horizontal control
KR20160087788A (en) * 2016-07-11 2016-07-22 이선영 the distribution board having earthquake-proof device and for horizontal control
KR20160087789A (en) * 2016-07-11 2016-07-22 이선영 the distribution board having earthquake-proof device and for horizontal control
KR101820473B1 (en) * 2016-07-11 2018-01-29 세운전기공사(주) the distribution board having earthquake-proof device and for horizontal control
KR101863859B1 (en) * 2016-07-11 2018-06-05 김한경 the distribution board having earthquake-proof device and for horizontal control
KR101972157B1 (en) * 2016-07-11 2019-04-25 주식회사 삼원이엔씨(Enc) the distribution board having earthquake-proof device and for horizontal control
CN110848467A (en) * 2019-11-21 2020-02-28 中铁十七局集团电气化工程有限公司 Construction method for mounting multi-split equipment and pipeline in steel structure building
CN110848467B (en) * 2019-11-21 2021-04-09 中铁十七局集团电气化工程有限公司 Construction method for mounting multi-split equipment and pipeline in steel structure building
CN115162816A (en) * 2022-08-15 2022-10-11 中国建筑西南设计研究院有限公司 Prestress tensile anti-overturning shock isolation device and construction method thereof
CN115162816B (en) * 2022-08-15 2023-08-08 中国建筑西南设计研究院有限公司 Prestressed tensile anti-overturning shock insulation device and construction method thereof

Similar Documents

Publication Publication Date Title
KR100850228B1 (en) Earth quake-proof reinforcement structure installed for operating electric panel without moving and interruption of power supply
KR101068077B1 (en) Combined aseismic structural system for electrical and communication equipments without power interruption and removal
KR101023526B1 (en) Earthquake-proof access floor system
KR101185974B1 (en) Reinforcing apparatus for panel-zone of beam and column member using bracing member and structure reinforcing method therewith
KR100966090B1 (en) Earthquake-proof access floor system
JP4658006B2 (en) Seismic isolation method for existing buildings and temporary seismic control panel
CN202809885U (en) Energy dissipation wall structure
KR101067869B1 (en) Earth quake-proof reinforcement structure installed for operating electric panel without moving and interruption of power supply
KR20180137268A (en) Aseismatic Reinforcement Steel Frame with Friction Slip Brace and Aseismatic Reinforcement Method using thereof
KR101030326B1 (en) Earth quake-proof reinforcement structure installed for operating electric panel anticipating without moving and interruption of power supply
CN114165093A (en) Assembled shock-absorbing structure and shear wall capable of restoring functions
JP6525198B2 (en) Seismic reinforcement method and reinforcement system for existing buildings
CN102051927A (en) Parallel buckling restrained brace structure and construction method thereof
KR101965106B1 (en) Safety floor structure for facilities
JP5612353B2 (en) building
KR101546052B1 (en) Seismic Access Floor System Installed by Non-Anchoring Method
KR101159095B1 (en) Out-rigger device for high rise building
KR20160030746A (en) Seismic reinforcement device for underground structure
JP6383533B2 (en) Seismic retrofit method for existing buildings
CN202913705U (en) Large curtain wall unit plate track lifting device
KR102000082B1 (en) Aseismatic Reinforcement Device with Toggle Type Friction Slip Brace, and Aseismatic Reinforcement Method using thereof
JP6057371B2 (en) Seismic reinforcement
KR20090083054A (en) An earth quake-proof reinforcement structure for new and replacement of an electric panel
KR101083062B1 (en) Hybrid reinforced concrete system
WO2018117389A2 (en) Damping system using space between staircase and main building

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141006

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150921

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170608

Year of fee payment: 6

R401 Registration of restoration
LAPS Lapse due to unpaid annual fee