KR100999410B1 - Assembled wale beam and construction method of underground structure using the same - Google Patents

Assembled wale beam and construction method of underground structure using the same Download PDF

Info

Publication number
KR100999410B1
KR100999410B1 KR1020080042586A KR20080042586A KR100999410B1 KR 100999410 B1 KR100999410 B1 KR 100999410B1 KR 1020080042586 A KR1020080042586 A KR 1020080042586A KR 20080042586 A KR20080042586 A KR 20080042586A KR 100999410 B1 KR100999410 B1 KR 100999410B1
Authority
KR
South Korea
Prior art keywords
sleeve
installing
prefabricated
wall
retaining wall
Prior art date
Application number
KR1020080042586A
Other languages
Korean (ko)
Other versions
KR20090116567A (en
Inventor
배규웅
허병욱
곽명근
신현섭
Original Assignee
한국건설기술연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국건설기술연구원 filed Critical 한국건설기술연구원
Priority to KR1020080042586A priority Critical patent/KR100999410B1/en
Publication of KR20090116567A publication Critical patent/KR20090116567A/en
Application granted granted Critical
Publication of KR100999410B1 publication Critical patent/KR100999410B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

본 발명은 흙막이 벽과 버팀대를 이용하여 터파기와 동시에 본 구조물의 지하 구조물을 시공하는 공법에 관한 것으로, 특히 지하 옹벽의 연속시공이 가능한 지하 구조물의 시공방법에 관한 것이다.

본 발명의 일측면에 따르면 지중에 흙막이 벽을 시공하는 단계, 본 기둥을 설치하는 단계, 굴토하고 노출된 흙막이 벽의 H-파일에 브래킷을 설치한 다음 조립식 띠장을 설치하는 단계, 내부 보를 브래킷과 본 기둥 사이에 설치하는 단계, 내부 보 사이에 거푸집용 또는 합성용 데크를 설치하고 조립식 띠장의 외측 끝단까지 슬래브 콘크리트를 타설하는 단계, 상기 단계들을 기초 레벨까지 반복 수행하는 단계 및 기초를 구축하고 흙막이 벽의 내측으로 옹벽을 지상까지 연속적으로 타설하는 단계를 포함하는 것을 특징으로 하는 지하 구조물의 시공방법이 제공된다.

Figure R1020080042586

흙막이, 터파기, 유공 성형보, 슬리브, 조립식 띠장

The present invention relates to a method of constructing the underground structure of the present structure at the same time as the trench using a mud wall and braces, and more particularly to a method of construction of the underground structure capable of continuous construction of the underground retaining wall.

According to one aspect of the invention the steps of constructing the earth wall in the ground, the step of installing the pillars, the installation of the bracket on the H-pile of the dug and exposed earth wall, the step of installing the prefabricated band, the inner beam and the Installing between the pillars, installing a formwork or composite deck between the inner beams and placing slab concrete to the outer end of the prefabricated strip, repeating the above steps to the foundation level and building the foundation There is provided a method of constructing an underground structure comprising the step of continuously pouring the retaining wall to the ground to the inside of the wall.

Figure R1020080042586

Dirt, trench, perforated beam, sleeve, prefabricated band

Description

유공 성형보와 조립식 슬리브를 사용한 조립식 띠장 및 그를 이용하여 지하 옹벽의 연속시공이 가능한 지하 구조물 시공방법{Assembled wale beam and construction method of underground structure using the same}Assembled wale beam and construction method of underground structure using the same}

본 발명은 흙막이 벽과 버팀대를 이용하여 터파기와 동시에 본 구조물의 지하 구조물을 시공하는 공법에 관한 것으로, 특히 지하 옹벽의 연속시공이 가능한 지하 구조물의 시공방법에 관한 것이다. The present invention relates to a method of constructing the underground structure of the present structure at the same time as the trench using a mud wall and braces, and more particularly to a method of construction of the underground structure capable of continuous construction of the underground retaining wall.

최근의 건설동향은 구조물의 대형화, 초고층화, 지하공간 활용의 필요성으로 지반굴착 대심도화, 도심지 근접시공의 증가 등 다양한 특성을 나타내고 있으며 이러한 특성은 대규모 지반굴착 및 흙막이 공사의 급격한 증가로 이어져 지반굴착 및 흙막이 공사의 중요성이 커지게 되었다.Recent construction trends show various characteristics such as the deepening of the ground excavation and the increase of near-by construction in the city due to the necessity of the large size of the structure, the high-rise and the utilization of the underground space, and this characteristic leads to the rapid increase of the large-scale ground excavation and the construction of the earth barrier. And earthquake construction has become more important.

버팀대 공법은 지하굴착공사에 가장 많이 적용되고 있는 공법 중의 하나로 굴착부위 외곽에 흙막이 벽을 먼저 설치하고 3~4m 깊이의 굴착시마다 버팀대와 띠장 등의 지보공을 설치하여 토압을 부담시키면서 굴착을 진행해가는 공법이다. 버팀대 공법은 대지경계면까지 굴착할 수 있어 대지를 경제적으로 이용할 수 있고 버팀대의 응력상태를 확인하기 쉬워 흙막이 벽의 변형이나 파괴를 조기에 발견할 수 있다는 등의 장점이 있는 반면 대규모 굴착평면에서는 버팀대의 길이가 증가하여 자체의 비틀림과 이음부분의 좌굴로 흙막이 전체의 변형이 크게 되며 주변지반의 침하가 발생될 우려가 있다. 또한 굴착평면이 불규칙하고 지형의 경사가 있는 경우 안정성이 떨어지며 버팀대의 국부적인 파괴가 흙막이 구조물 전체에 치명적인 영향을 준다. 특히 버팀대는 지하골조단계에서 해체하여야 하며 해체과정에서 흙막이 벽의 갑작스런 응력 불균형을 유발한다.The brace method is one of the most applied methods for underground excavation, and the earthquake wall is installed at the periphery of the excavation site first, and when the 3 ~ 4m deep excavation is carried out, the brace and the gimbal are installed to carry out the excavation while burdening the earth pressure. to be. The brace method has the advantages of being able to excavate to the ground boundary, so that the land can be used economically, and the stress state of the brace is easy to check, so that deformation or destruction of the retaining wall can be detected early. As the length increases, deformation of the entire soil film becomes large due to its own twisting and buckling of the joints, and there is a risk of settlement of the surrounding ground. In addition, if the excavation plane is irregular and the slope of the terrain is less stable, the local destruction of the brace has a devastating effect on the entire structure. In particular, the braces should be dismantled in the underground frame stage and cause sudden stress imbalance in the retaining wall.

이러한 버팀대 공법의 문제점을 해결하기 위해 다양한 공법이 제안되었다. 그 중 에스피에스공법(SPS, Strut as Permanent System)은 지하 영구 구조물용 철골기둥과 보를 굴토공사 진행에 따라 선 시공하여 굴토공사 중 흙막이 지보공 버팀대로 사용하고 굴토공사 완료 후에는 본 구조물로 사용하여 가설 버팀대 시공 및 해체에 따르는 공기단축, 공사비 절감, 구조적 안정성을 확보할 수 있는 공법으로 평가받고 있다.Various methods have been proposed to solve the problems of the prop method. Among them, the Strut as Permanent System (SPS) uses steel pillars and beams for underground permanent structures in advance as a result of the excavation work, and uses them as supporting structures for earthen blocks during the excavation work. It is evaluated as a construction method that can reduce the air due to construction and dismantling, reduce construction costs, and ensure structural stability.

그러나 에스피에스공법의 경우 버팀대 역할을 하는 본 구조물 보가 흙막이 벽에 작용하는 측압에 저항하도록 설계되어야 하므로 과대설계되는 경향이 있다. 또한 띠장으로 철근콘크리트 테두리 보를 적용함에 따라 거푸집을 별도로 설치해야 하므로 시공성이 떨어진다. 그리고 옹벽이 철근콘크리트 테두리 보에 의해 단절됨으로써 연속성을 확보할 수 없다.However, the SP method tends to be overdesigned because the beam of this structure, which serves as a brace, must be designed to resist the side pressure acting on the wall of the retaining wall. In addition, since the formwork must be installed separately according to the application of the reinforced concrete rim beam as a band, the workability is poor. In addition, the retaining wall is disconnected by the reinforced concrete rim beam, thereby preventing continuity.

본 발명이 해결하고자 하는 기술적 과제는 거푸집 작업 생략이 가능하고 옹벽의 연속성 확보가 가능하며 슬래브 타설 시공 후 하부층 시공으로 철골 버팀대의 과대 설계가 방지되고 상부 슬래브 시공이 매우 간편하고 비용이 저렴한 지하구조물 시공방법을 제공하는데 있다.The technical problem to be solved by the present invention is to eliminate the formwork, to ensure the continuity of the retaining wall, to prevent the excessive design of the steel brace by the lower layer construction after the slab construction, the construction of the upper slab is very simple and low cost construction of the underground structure To provide a method.

본 발명의 적절한 실시형태에 따르면 흙막이 벽에 가로로 설치되어 버팀대가 연결되는 띠장에 있어서, 양끝단에 립을 가지도록 'ㄷ'자형으로 절곡된 2개의 절곡강판을 개방부가 상부와 하부를 향하도록 접합하고 그 복부에는 일정 간격으로 구멍을 천공한 유공 성형보와, 2개로 분할되어 유공성형보의 상하부를 통해 각각 유공성형보의 구멍에 삽입되어 서로 결합되는 슬리브를 포함하는 것을 특징으로 하는 조립식 띠장이 제공된다. According to a preferred embodiment of the present invention, in the strip which is horizontally installed on the wall of the earth wall and connected to the brace, the two bent steel plates bent in a 'c' shape to have ribs at both ends thereof so that the openings face the upper and lower portions thereof. A prefabricated strip comprising a sleeve bonded to each other and the abdomen perforated at a predetermined interval, and a sleeve which is divided into two and inserted into the holes of the perforated beam through the upper and lower portions of the perforated molded beam, respectively. Chapters are provided.

본 발명의 다른 실시형태에 따르면 지중에 흙막이 벽을 시공하는 단계; 본 기둥을 설치하는 단계; 굴토하고 노출된 흙막이 벽의 H-파일에 브래킷을 설치한 다음 조립식 띠장을 설치하는 단계; 내부 보를 브래킷과 본 기둥 사이에 설치하는 단계; 내부 보 사이에 거푸집용 또는 합성용 데크를 설치하고 조립식 띠장의 외측 끝단까지 슬래브 콘크리트를 타설하는 단계; 상기 단계들을 기초 레벨까지 반복 수행하는 단계; 및 기초를 구축하고 흙막이 벽의 내측으로 옹벽을 지상까지 연속적으로 타설하는 단계를 포함하며, 상기 단계에서 조립식 띠장은, 양끝단에 립을 가지도록 'ㄷ'자형으로 절곡된 2개의 절곡강판을 개방부가 상부와 하부를 향하도록 접합하고 그 복부에는 일정 간격으로 구멍을 천공한 유공 성형보와, 상기 구멍에 설치되며 하단부에 리브를 형성하고 리브 아래로는 나사산을 가공한 상부 슬리브와 상기 상부 슬리브와 나사 결합되며 상단부에 리브가 형성된 하부 슬리브로 구성되어 상기 유공 성형보에 접합되는 슬리브를 포함하는 것을 특징으로 하는 지하 구조물의 시공방법이 제공된다.According to another embodiment of the invention the steps of constructing the earth wall in the ground; Installing the pillar; Installing a bracket on the H-pile of the pitted and exposed piling wall and then installing a prefabricated bandage; Installing an inner beam between the bracket and the main column; Installing a formwork or composite deck between the inner beams and placing slab concrete to the outer ends of the prefabricated strips; Repeating the steps to a basic level; And constructing a foundation and continuously placing the retaining wall to the ground in the inside of the retaining wall, wherein the prefabricated strip is opened with two bent steel plates bent in a 'c' shape to have ribs at both ends. A perforated beam formed by joining the upper side and the lower side and having perforated holes at regular intervals, the upper sleeve and the upper sleeve having a rib formed at the lower end, and having a threaded portion under the rib, There is provided a method of constructing an underground structure comprising a sleeve which is screwed and formed with a lower sleeve having a rib formed at an upper end thereof and joined to the hole forming beam.

본 발명에 따른 조립식 띠장을 사용함으로써 콘크리트 테두리보를 형성하기 위한 거푸집 작업을 생략할 수 있고 철골자재의 휨 강성을 이용하여 시공시의 안정성을 확보할 수 있으며 철골제작의 간소화 및 철골물량의 최적화를 도모할 수 있다. 또한 현장 혹은 철골제작공장에서의 선시공이 가능한 조립형 슬리브를 사용함으로써 별도의 거푸집 없이 슬래브의 선시공이 가능하며 슬래브 타설 시공후 하부층 시공으로 옹벽의 연속성 확보가 가능하고 슬래브 시공이 간편하여 시공비용을 최소화할 수 있다. By using the prefabricated bandage according to the present invention, the formwork for forming the concrete rim beam can be omitted, and the stability of the construction can be ensured by using the bending rigidity of the steel material, and the construction of the steel frame can be simplified and the amount of steel materials can be optimized. can do. In addition, it is possible to prefabricate slab without additional formwork by using prefabricated sleeves that can be pre-installed in the field or steel frame manufacturing factory, and it is possible to secure the continuity of the retaining wall by installing the lower layer after laying the slab and to minimize the construction cost. can do.

또한 본 발명에 따른 시공방법을 적용할 경우 거푸집 작업 생략이 가능하고 옹벽의 연속성 확보가 가능하며 슬래브 타설 시공 후 하부층 시공으로 철골 버팀대의 과대 설계가 방지되고 상부 슬래브 시공이 매우 간편하고 비용이 저렴하다.In addition, when the construction method according to the present invention is applied, it is possible to omit the formwork and to secure the continuity of the retaining wall, and to prevent the overdesign of the steel brace by installing the lower layer after the slab construction, and the upper slab construction is very simple and inexpensive. .

이하에서는 본 발명의 바람직한 실시 예를 첨부한 도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention will be described in detail.

도 1은 본 발명에 따른 조립식 띠장을 나타낸 일부분해사시도이다. 도 1에 나타낸 바와 같이 본 발명에 따른 조립식 띠장(40)은 흙막이 벽에 가로로 설치되어 버팀대가 연결되는 것으로, 유공 성형보(410)와 이 유공 성형보(410)의 복부에 결합되는 슬리브(420)로 구성된다.1 is a partial exploded perspective view showing a prefabricated stripe according to the present invention. As shown in FIG. 1, the prefabricated strip 40 according to the present invention is installed horizontally on an earthen wall and is connected to a brace, and has a sleeve coupled to the abdomen of the hole forming beam 410 and the hole forming beam 410 ( 420.

유공 성형보(410)는 양끝단에 립(411)을 가지도록 'ㄷ'자형으로 절곡된 2개의 절곡강판(410a)(410b)을 개방부(412)가 상부와 하부를 향하도록 접합한 것이다. 그리고 2개의 절곡강판(410a)(410b)이 접합되는 부분은 유공 성형보(410)의 복부(413)를 구성하게 되며 복부(413)에는 슬리브(420)가 결합될 수 있도록 일정 간격으로 구멍(414)이 천공되어 있다. The hole forming beam 410 is to join the two bending steel plate 410a, 410b bent in a 'c' shape to have a lip 411 at both ends so that the opening portion 412 is directed to the top and bottom. . The portion where the two bent steel plates 410a and 410b are joined forms the abdomen 413 of the hole forming beam 410, and the abdomen 413 has a hole at a predetermined interval so that the sleeve 420 may be coupled to the abdomen 413. 414 is perforated.

슬리브(420)는 상부 슬리브(420a)와 하부 슬리브(420b)로 분할되어 있으며 이들은 서로 결합되어 유공 성형보(410)의 복부(413)에 결합된다. 결합방법으로는 나사결합, 강제끼움결합, 양 슬리브(420a)(420b)에 리브를 형성하여 원터치로 결합되는 방법이 사용될 수 있다. The sleeve 420 is divided into an upper sleeve 420a and a lower sleeve 420b, which are coupled to each other to the abdomen 413 of the hole forming beam 410. As a coupling method, a screw coupling, a forced fitting coupling, a method of forming a rib in both sleeves 420a and 420b and coupling them in one-touch may be used.

나사결합의 경우 상부 슬리브(420a)는 하단부에는 다른 부분보다 직경을 확대시킨 리브(421)를 형성하여 상부 슬리브(420a)가 구멍(414)에 안착될 수 있도록 하였으며 리브(421) 아래로는 하부 슬리브(420b)와 나사 결합을 위한 나사산이 가공되어 있다. 하부 슬리브(420b)에도 상부 슬리브(420a)와 동일한 목적으로 상단부에 리브(421)가 형성되어 있으며 그 상부에는 상부 슬리브(420a)와의 나사 결합을 위한 나사산이 가공되어 있다.In the case of screwing, the upper sleeve 420a has a rib 421 having a diameter larger than the other portion at the lower end thereof so that the upper sleeve 420a can be seated in the hole 414 and the lower portion below the rib 421. The thread for screwing the sleeve 420b is machined. A rib 421 is formed at the upper end of the lower sleeve 420b for the same purpose as the upper sleeve 420a, and a thread for processing the screw with the upper sleeve 420a is processed thereon.

이와 같이 본 발명에서는 흙막이 벽에 가로로 설치되어 버팀대가 연결되는 띠장으로 유공 성형보와 슬리브로 구성된 조립식 띠장을 사용함으로써 콘크리트 테두리보를 형성하기 위한 거푸집 작업을 생략할 수 있고 철골자재의 휨 강성을 이용하여 시공시의 안정성을 확보할 수 있으며 철골제작의 간소화 및 철골물량의 최적화를 도모할 수 있다. 또한 현장 혹은 철골제작공장에서의 선시공이 가능한 조립형 슬리브를 사용함으로써 별도의 거푸집 없이 슬래브의 선시공이 가능하며 슬래브 타설 시공후 하부층 시공으로 옹벽의 연속성 확보가 가능하고 슬래브 시공이 간편하여 시공비용을 최소화할 수 있다. 또한 본 발명자에 의해 제안된 새로운 형식의 층고절감형 합성보 시스템을 보다 간편하게 적용할 수 있다. Thus, in the present invention, by using a prefabricated band consisting of perforated molded beams and sleeves as a band that is installed horizontally on the earthen wall wall, the formwork for forming the concrete rim beam can be omitted and use the bending rigidity of steel materials It can secure the stability during construction and can simplify the production of steel frame and optimize the quantity of steel frame. In addition, it is possible to prefabricate slab without additional formwork by using prefabricated sleeves that can be pre-installed in the field or steel frame manufacturing factory, and it is possible to secure the continuity of the retaining wall by installing the lower layer after laying the slab and to minimize the construction cost. can do. In addition, it is possible to more easily apply a new type of layer-reduced composite beam system proposed by the present inventors.

다음으로 전술한 조립식 띠장을 이용하여 지하 구조물을 시공하는 방법을 도면을 참조하여 순서대로 설명한다.Next, a method of constructing an underground structure using the above-described prefabricated belt is described in order with reference to the drawings.

본 발명에 따른 지하 구조물 시공방법은, 흙막이 벽 시공, 지하 본 기둥 설치, 1차 굴토 및 조립식 띠장 설치, 내부 보 설치, 슬래브 콘크리트 타설, 굴토 내지 슬래브 콘크리트 타설 반복 실시, 기초 형성 및 옹벽 타설 단계로 이루어진다.Underground structure construction method according to the present invention, the construction of the wall wall, the installation of underground bone pillars, the installation of the primary pit and prefabricated bands, the internal beam installation, slab concrete pouring, repeating the pit to slab concrete casting, foundation formation and retaining wall Is done.

<제1단계> - 흙막이 벽 시공 단계(도 2a)<Step 1>-construction of the wall wall (Fig. 2a)

먼저, 건축물이 설치될 곳의 경계선에 흙막이 벽(10)을 시공한다. 흙막이 벽(10)은 지하 굴토 시 토압과 수압 등의 측압에 대해 저항하고 주변지반의 침하와 인접구조물의 보호를 목적으로 시공되는데, 본 발명은 흙막이 벽은 엄지말뚝과 토류판으로 구성되는 흙막이 벽, 주열식 흙막이 벽 등과 유리하게 조합될 수 있다. 도 2a는 흙막이 벽이 설치된 상태를 도시한 것이다.First, construct the earth wall (10) on the boundary line where the building is to be installed. Retaining wall 10 is constructed for the purpose of resisting lateral pressure such as earth pressure and water pressure when underground gulting and for the purpose of subsidence of the surrounding ground and the protection of adjacent structures, the present invention is a wall of mud wall consisting of thumb pile and earth plate, It can be advantageously combined with a columnar retaining wall and the like. Figure 2a shows a state in which the earth wall is installed.

<제2단계> - 지하 본 기둥 설치 단계(도 2b)<Second Step>-Underground Main Pillar Installation Step (Fig. 2b)

다음으로, 본 구조물의 기둥이 설치되어야 할 위치에 기둥(20)을 설치한다. 본 발명에 있어 기둥(20)은 흙막이 벽을 지지하는 내부 보가 연결되는 부분일 뿐만 아니라 지하공사 완료 후에는 상층부의 축력을 기초로 전달하는 건물 본연의 구조재인 기둥으로서의 역할을 하게 된다. 따라서 설치시 비틀어지지 않고 정확한 수직 도를 확보할 수 있도록 하는 주의가 요망된다. 기둥의 설치방법으로는 공지의 방법을 이용해 실시할 수 있으며, 예컨데 SPS공법에서 적용되고 있는 방법을 적용할 수 있다.Next, the pillars 20 are installed at positions where the pillars of the present structure should be installed. In the present invention, the pillar 20 is not only a part to which the inner beam supporting the retaining wall is connected, but also serves as a pillar that is a structural member of the building which is transmitted based on the axial force of the upper floor after completion of the underground construction. Therefore, care is required to ensure correct verticality without twisting during installation. As a method of installing the column, a known method may be used. For example, the method applied in the SPS method may be applied.

<제3단계> - 1차 굴토 및 조립식 띠장 설치 단계(도 2c, 도 3)<Step 3>-the first step to install the pit and prefabricated belt strip (Fig. 2c, Fig. 3)

다음으로, 브래킷(30)의 설치 및 장비의 이동을 고려하여 터파기 레벨을 선정한 후 굴착을 한다. 굴착시에는 흙막이 벽(10)의 H-파일(11) 부분을 노출시키고 굴착이 완료되면 노출된 H-파일(11)의 플랜지 면에 브래킷(30)을 설치한다. 브래킷(30)으로는 H-형강을 일정한 길이로 절단한 것을 이용하며, 브래킷(30) 사이에 조립식 띠장(40)을 설치한다. 이와 같이 브래킷(30)으로 H-형강을 이용함으로써 조립식 띠장(40)과의 접합을 주지된 철골 보 접합으로 간단히 처리할 수 있다. 조립식 띠장(40)은 상술한 바와 같이 'ㄷ'자 형상으로 절곡된 2개의 성형강판을 접합하여 구성한 조립 보를 이용하며, 이 조립 보에는 옹벽의 상하 연속성을 확보하기 위해 일정 간격으로 슬리브가 설치되어 있다(도 3 참조).Next, the excavation after selecting the trench level in consideration of the installation of the bracket 30 and the movement of the equipment. When the excavation is exposed to the H- pile (11) portion of the retaining wall 10, and when the excavation is completed, the bracket 30 is installed on the flange surface of the exposed H- pile (11). The bracket 30 is used to cut the H-shaped steel to a predetermined length, and install the prefabricated band 40 between the brackets (30). In this way, by using the H-shaped steel as the bracket 30, the joining with the prefabricated belt-length 40 can be simply processed by a well-known steel frame beam joining. The prefabricated strip 40 uses an assembly beam formed by joining two molded steel sheets bent in a 'c' shape as described above, and the assembly beams are provided with sleeves at regular intervals to ensure vertical continuity of the retaining wall. (See FIG. 3).

<제4단계> - 내부 보 설치 단계(도 2d, 도 4)<Step 4>-the step of installing the inner beam (Fig. 2d, Fig. 4)

크레인과 같은 양중장비를 이용하여 내부 보(50)를 이동시켜 브래킷(30) 본 기둥(20) 사이에 설치한다. 이 내부 보(50)는 지하층의 시공 중에는 흙막이 벽으로부터 가해지는 토압 및 수압 등의 측압을 지지하는 버팀대와 같은 역할을 하며 지하 공사의 완료 후에는 본 구조물로서 영구히 존치된다는 점에서 본 기둥(20)과 유사하다. 도 4는 내부 보와 브래킷의 접합부 상세를 예시한 도면으로서, 상기 도시된 예의 경우 일반적인 철골 보의 이음과 동일하게 접합판(35)을 이용해 브래 킷(30)과 내부 보(50)의 플랜지 및 웨브를 서로 볼트 또는 용접 접합한다. The inner beam 50 is moved by using lifting equipment such as a crane and installed between the brackets 30 and the pillars 20. The inner beam 50 serves as a brace for supporting lateral pressure such as earth pressure and water pressure applied from the wall of the earth during construction of the basement layer, and after completion of the underground construction, the pillar 20 is permanently present as a main structure. Similar to 4 is a view illustrating the details of the joint portion of the inner beam and the bracket, in the case of the illustrated example, the flange of the bracket 30 and the inner beam 50 using the joining plate 35 in the same way as the joint of a common steel beam; Bolt or weld the webs together.

<제5단계> - 슬래브 콘크리트 타설 단계(도 2e, 도 4)<Step 5>-slab concrete pouring step (Fig. 2e, Fig. 4)

상기와 같이 설치된 내부 보(50) 사이에 거푸집용 또는 합성용 데크(55)를 설치하고 그를 이용해 슬래브 콘크리트(60)를 타설한다. 이때, 슬래브 콘크리트는 조립식 띠장의 외측 끝단까지 타설한다. 이렇게 슬래브와 조립식 띠장에 콘크리트를 일체로 타설함에 따라 흙막이 벽에 작용하는 측압은 콘크리트가 채워진 띠장과 슬래브를 통해 지지된다. 한편, 본 발명에서는 조립식 띠장에 슬리브가 결합되어 있으므로 조립식 띠장의 외측 끝단까지 콘크리트를 타설하더라도 이후의 옹벽 시공시 시공 이음 없이 일체로 시공할 수 있다. 이렇게 슬래브 타설 시공 후 하부층을 시공함으로 버팀대 역할을 하는 내부 보(50)의 과대 설계를 방지할 수 있게 된다. Forming or composite deck 55 between the inner beams 50 installed as described above and pour the slab concrete 60 using them. At this time, the slab concrete is poured to the outer end of the prefabricated strip. As the concrete is poured into the slab and the prefabricated strip, the side pressure acting on the wall of the retaining wall is supported by the filled strip and the slab. On the other hand, in the present invention, since the sleeve is coupled to the prefabricated strip, even if the concrete is poured to the outer end of the prefabricated strip, it can be integrally constructed without the construction of the retaining wall. Thus, by installing the lower layer after the slab construction, it is possible to prevent the excessive design of the inner beam 50 serving as a brace.

<제6단계> - 하부층 바닥 굴토 및 반복 공정의 실시(도 2f)<Stage 6>-Underlayer bottom pit excavation and repeating process (FIG. 2F)

이상에서 설명한 것과 같은 단계를 거쳐 지상층 레벨에 대한 시공이 완료된 다음에는 지하층 시공을 위해 바닥 저면에 대한 굴토 작업을 수행하고 상술한 브래킷의 설치 내지 슬래브 콘크리트 타설과 같은 단계를 기초 레벨에 이르기까지 반복적으로 수행한다. After the construction on the ground floor level is completed through the same steps as described above, after the ground floor construction is carried out, the excavation work is performed on the bottom of the basement, and the steps such as the installation of the above-described bracket or slab concrete casting are repeatedly performed until the foundation level. To perform.

<제7단계> - 기초 설치 및 옹벽 연속 타설 단계(도 2g)<Stage 7>-foundation installation and retaining wall continuous pouring step (Fig. 2g)

상기와 같이 기초 레벨까지 지하층 전층에 대한 구조물의 시공이 완료되면 기초(70)를 시공한 후 옹벽(80)을 아래에서부터 지상까지 상향시공한다. 이때 옹벽 콘크리트의 연속 타설은 조립식 띠장에 미리 설치된 슬리브를 통해 이루어진다.When the construction of the structure for the entire basement floor to the foundation level is completed as described above, after the foundation 70 is constructed, the retaining wall 80 is upwardly constructed from below to the ground. At this time, the continuous casting of the retaining wall concrete is made through a sleeve pre-installed in the prefabricated belt.

위에서 본 발명은 실시 예를 이용하여 상세하게 설명이 되었다. 제시된 실시 예는 예시적인 것으로 이 분야에서 통상의 지식을 가진 자는 본 발명의 기술적 사상을 벗어나지 않는 제시된 실시 예에 대한 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명의 범위는 이러한 변형 및 수정 발명에 의하여 제한되지 않고 다만 아래에 첨부된 청구범위에 의해서만 제한된다.The present invention has been described above in detail by using an embodiment. The presented embodiments are exemplary and can be made by those skilled in the art to various modifications and modifications to the disclosed embodiments without departing from the spirit of the present invention. The scope of the invention is not limited by these modifications and variations, but only by the claims appended below.

도 1은 본 발명에 따른 조립식 띠장의 일부분해사시도이다.1 is a partially exploded perspective view of a prefabricated stripe according to the present invention.

도 2a 내지 도 2g는 본 발명에 따른 조립식 띠장을 이용하여 지하구조물을 시공하는 방법을 순서대로 도시한 것이다.Figures 2a to 2g shows in order the method of constructing the underground structure by using the prefabricated band according to the present invention.

도 3은 본 발명에 있어서 브래킷과 조립식 띠장의 접합상태를 보여주는 사시도이다.Figure 3 is a perspective view showing a bonding state of the bracket and the assembled strip in the present invention.

도 4는 본 발명에 있어서 내부 보의 조립 상태 및 슬래브 콘크리트를 타설한 상태를 보여주는 단면도이다.4 is a cross-sectional view showing the assembled state of the inner beam and the state in which the slab concrete is poured in the present invention.

Claims (4)

흙막이 벽에 가로로 설치되어 버팀대가 연결되는 띠장에 있어서,In the girdle that is installed horizontally on the wall of the retaining wall, 양끝단에 립을 가지도록 'ㄷ'자형으로 절곡된 2개의 절곡강판을 개방부가 상부와 하부를 향하도록 접합하고 그 복부에는 일정 간격으로 구멍을 천공한 유공 성형보와, 2개로 분할되어 유공성형보의 상하부를 통해 각각 유공성형보의 구멍에 삽입되어 서로 결합되는 슬리브를 포함하는 것을 특징으로 하는 조립식 띠장. Two bent steel plates bent in a 'c' shape to have ribs at both ends are joined so that the openings face the upper part and the lower part, and the abdomen is formed by perforating holes at regular intervals, and divided into two holes Prefabricated bands, characterized in that it comprises a sleeve which is inserted into the hole of the perforated molded beam through the upper and lower portions of the beam and coupled to each other. 제1 항에 있어서,According to claim 1, 상기 슬리브는 하단부에 리브를 형성하고 리브 아래로는 나사산을 가공한 상부 슬리브와 상기 상부 슬리브와 나사 결합되며 상단부에 리브가 형성된 하부 슬리브로 구성되어 서로 나사결합되어 상기 유공 성형보에 접합되는 것을 특징으로 하는 조립식 띠장. The sleeve is formed of a rib in the lower end, and the lower sleeve is threaded into the upper sleeve and the upper sleeve screwed with the upper sleeve, the upper sleeve is composed of a rib formed in the rib is screwed together and bonded to the hole forming beam Prefabricated belt. (a) 지중에 흙막이 벽을 시공하는 단계;(a) constructing a retaining wall in the ground; (b) 본 기둥을 설치하는 단계;(b) installing the pillar; (c) 굴토하고 노출된 흙막이 벽의 H-파일에 브래킷을 설치한 다음 조립식 띠장을 설치하는 단계; (c) installing a bracket to the H-pile of the pitted and exposed piling wall and then installing a prefabricated bandage; (d) 내부 보를 브래킷과 본 기둥 사이에 설치하는 단계;(d) installing an inner beam between the bracket and the main column; (e) 내부 보 사이에 거푸집용 또는 합성용 데크를 설치하고 조립식 띠장의 외측 끝단까지 슬래브 콘크리트를 타설하는 단계;(e) installing formwork or composite decks between the inner beams and placing slab concrete to the outer ends of the prefabricated strips; (f) 상기 (c)단계 내지 (e)단계를 기초 레벨까지 반복 수행하는 단계; 및(f) repeating steps (c) to (e) to a basic level; And (g) 기초를 구축하고 흙막이 벽의 내측으로 옹벽을 지상까지 연속적으로 타설하는 단계를 포함하며, (g) constructing a foundation and continuously pouring the retaining wall to the ground inwardly of the retaining wall; 상기 (c)단계에서 조립식 띠장은, In step (c) the prefabricated band is, 양끝단에 립을 가지도록 'ㄷ'자형으로 절곡된 2개의 절곡강판을 개방부가 상부와 하부를 향하도록 접합하고 그 복부에는 일정 간격으로 구멍을 천공한 유공 성형보와, A hole forming beam having two bent steel plates bent in a 'c' shape so as to have a lip at both ends so that the openings face the upper and lower parts thereof, and perforated holes at regular intervals in the abdomen; 상기 구멍에 설치되며 하단부에 리브를 형성하고 리브 아래로는 나사산을 가공한 상부 슬리브와 상기 상부 슬리브와 나사 결합되며 상단부에 리브가 형성된 하부 슬리브로 구성되어 상기 유공 성형보에 접합되는 슬리브를 포함하는 것을 특징으로 하는 지하 구조물의 시공방법.A sleeve installed in the hole and having a rib formed at a lower end thereof, the sleeve having a threaded upper sleeve and a lower sleeve screwed with the upper sleeve and having a rib formed at an upper end thereof to be joined to the hole forming beam. Construction method of the underground structure characterized in that. 삭제delete
KR1020080042586A 2008-05-07 2008-05-07 Assembled wale beam and construction method of underground structure using the same KR100999410B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080042586A KR100999410B1 (en) 2008-05-07 2008-05-07 Assembled wale beam and construction method of underground structure using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080042586A KR100999410B1 (en) 2008-05-07 2008-05-07 Assembled wale beam and construction method of underground structure using the same

Publications (2)

Publication Number Publication Date
KR20090116567A KR20090116567A (en) 2009-11-11
KR100999410B1 true KR100999410B1 (en) 2010-12-09

Family

ID=41601325

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080042586A KR100999410B1 (en) 2008-05-07 2008-05-07 Assembled wale beam and construction method of underground structure using the same

Country Status (1)

Country Link
KR (1) KR100999410B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109129880A (en) * 2017-06-27 2019-01-04 黄冈昌耀电力器材有限公司 A kind of sealed Grouting Pipe molding positioning device of reinforced concrete sewer pipe and its application method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004060334A (en) * 2002-07-30 2004-02-26 Hirose & Co Ltd Earth retaining structure
KR100531385B1 (en) * 2004-09-17 2005-11-29 주식회사 한빛구조엔지니어링 Construction method of underground structure that enables continuous retaining wall using steel wale and diaphragm effect of concrete slab

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004060334A (en) * 2002-07-30 2004-02-26 Hirose & Co Ltd Earth retaining structure
KR100531385B1 (en) * 2004-09-17 2005-11-29 주식회사 한빛구조엔지니어링 Construction method of underground structure that enables continuous retaining wall using steel wale and diaphragm effect of concrete slab

Also Published As

Publication number Publication date
KR20090116567A (en) 2009-11-11

Similar Documents

Publication Publication Date Title
KR101274974B1 (en) Earth retaining wall and construction method thereof
KR102071225B1 (en) Construction method of sheathing temporary facility using steel sheet pile
KR101193896B1 (en) Pc wall with ancher wire for structrue
JP2007327244A (en) Method and structure for temporarily coffering underwater structure
KR101640449B1 (en) Construction method for open cutting in tunnel portal area
KR100862977B1 (en) Precast concrete file and method for constructing thereof
KR20130006420A (en) Method of constructing underground structure to be newly built
KR101655217B1 (en) Construction method for open cutting in tunnel portal area
KR20090029993A (en) Underground structure and its construction method with retaining wall supported by rigid diaphragm
KR100313720B1 (en) Composite Underground Structure Construction Method
KR101187170B1 (en) Application of under pinning method in remodeling
KR101296857B1 (en) Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same
KR20000058237A (en) Underground construction method using permanent structural members as temporary struts
KR20110052360A (en) Downward construction method of underground structure that enables continuous basement wall using non-wale and diaphragm action of concrete slab
KR100912574B1 (en) Retaining wall system using strut assembly and excavating method using the same
KR100999410B1 (en) Assembled wale beam and construction method of underground structure using the same
JP7275844B2 (en) WALL-LIKE STRUCTURE AND METHOD OF CONSTRUCTING WALL-LIKE STRUCTURE
KR102252011B1 (en) Composite Pile Using Angled Channel With Different Strength Steels
JP3641227B2 (en) Construction method of underground structure
JPH04119837U (en) Underground structures to prevent liquefaction
JP4475116B2 (en) Vertical shaft structure and its construction method
KR101219451B1 (en) Concrete structure and construction method for the same, constructing method of underground wall as a retaining structural wall used in the same
KR100592397B1 (en) storey spacing support ssoldier pile soil retaining wall
KR100637899B1 (en) Pier foundation temporarily structure and method for constructing it
KR20200005841A (en) Rainwater storage tank construction method using top-down method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130930

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20141201

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee