KR100966083B1 - Pier and the construction method for the same - Google Patents

Pier and the construction method for the same Download PDF

Info

Publication number
KR100966083B1
KR100966083B1 KR1020070106772A KR20070106772A KR100966083B1 KR 100966083 B1 KR100966083 B1 KR 100966083B1 KR 1020070106772 A KR1020070106772 A KR 1020070106772A KR 20070106772 A KR20070106772 A KR 20070106772A KR 100966083 B1 KR100966083 B1 KR 100966083B1
Authority
KR
South Korea
Prior art keywords
coping
column
reinforcement
formwork
support
Prior art date
Application number
KR1020070106772A
Other languages
Korean (ko)
Other versions
KR20090041189A (en
Inventor
김영준
Original Assignee
삼성물산 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성물산 주식회사 filed Critical 삼성물산 주식회사
Priority to KR1020070106772A priority Critical patent/KR100966083B1/en
Publication of KR20090041189A publication Critical patent/KR20090041189A/en
Application granted granted Critical
Publication of KR100966083B1 publication Critical patent/KR100966083B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 교량의 거더나 트러스를 지지하는 교각 및 그 시공방법에 관한 것으로서, 기둥 철근과 콘크리트로 이루어진 적어도 하나의 기둥과; 상기 기둥이 결합되는 기둥결합공간이 구비되고, 콘크리트가 타설됨과 아울러 상기 기둥결합공간 이외의 부분에 코핑 철근이 배근되어 이루어진 코핑을 포함하는 교각을 개시함으로써, 코핑철근조립체를 지상에서 배근 작업할 수 있도록 한다.The present invention relates to a pier supporting a girder or truss of a bridge and a construction method thereof, comprising: at least one pillar made of pillar reinforcement and concrete; The pillar coupling space to which the pillar is coupled is provided, and when the concrete is poured and the pier including a coping formed by coping reinforcement is disposed in a portion other than the pillar coupling space, the coping reinforcing assembly can be reinforced on the ground. Make sure

교량, 교각, 기둥, 코핑, 철근, 콘크리트 Bridges, piers, columns, coping, rebar, concrete

Description

교각 및 그 시공방법{PIER AND THE CONSTRUCTION METHOD FOR THE SAME}Pier and the construction method {PIER AND THE CONSTRUCTION METHOD FOR THE SAME}

본 발명은 건설, 토목 분야에 관한 것으로서, 특히 교량의 거더나 트러스를 지지하는 교각 및 그 시공방법에 관한 것이다.TECHNICAL FIELD The present invention relates to the field of construction and civil engineering, and more particularly, to a pier supporting a girder or truss of a bridge and a construction method thereof.

일반적으로 대부분의 교각은, 철근으로 뼈대를 구축하고 콘크리트를 타설, 양생하는 공법으로 시공된다. 이와 같이 시공되는 교각은 구조적으로 크게, 기둥과, 기둥 상측에 설치되는 코핑으로 이루어진다.In general, most piers are constructed by reinforcing bars, reinforcing concrete and curing. The piers constructed in this way are largely structurally composed of pillars and copings installed on the pillars.

이하, 종래 기술에 따른 교각의 시공 방법에 대하여 설명한다.Hereinafter, the construction method of the piers by the prior art is demonstrated.

종래의 교각 시공 방법은, 먼저 철근과 콘크리트를 이용하여 기둥을 설치한 후, 상기 기둥 위로 코핑 거푸집 자재를 인양하여, 고소에서 코핑 거푸집을 조립한다.In the conventional bridge construction method, a pillar is first installed using reinforcing bars and concrete, and then a coping formwork is lifted on the pillar to assemble the coping formwork at a height.

다음, 인양장비를 이용하여 코핑 시공을 위한 철근을 코핑 거푸집 안으로 인양하고, 코핑 거푸집 내에서 코핑 거푸집 내로 인양된 철근을 배근하여 코핑의 철근 뼈대를 구축함과 아울러 코핑의 뼈대인 철근과 기둥의 뼈대인 철근을 조합한다. Then, using the lifting equipment, the rebar for coping construction is lifted into the coping formwork, and the reinforcing bar reinforced from the coping formwork to the coping formwork is constructed to build the rebar skeleton of the coping, and the skeleton of the reinforcing bar and column that is the coping skeleton. Combine the bars

그리고, 코핑의 철근 배근 작업이 완료되고 나면, 코핑 거푸집 내에 콘크리트를 타설하여 양생한다.After the reinforcement work of the coping is completed, the concrete is poured into the coping form and cured.

코핑 거푸집 내 콘크리트가 양생된 후, 코핑 거푸집을 제거하면, 교각의 시공이 완료된다.After the concrete in the coping form is cured, the coping form is removed to complete the construction of the piers.

그러나, 이와 같이 시공되는 교각은 다음과 같은 문제점이 있다.However, the pier constructed in this way has the following problems.

코핑 거푸집 설치 및 제거 작업, 그리고 코핑의 배근 작업이 고소, 즉 높은 곳에서 진행되기 때문에, 작업자나 자재의 추락, 낙하 등의 안전 사고가 상존한다.Since the coping formwork installation and removal work and the coping reinforcement work are carried out at a height, i.e., a high place, safety accidents such as falling or falling of workers or materials exist.

또한, 코핑의 배근 작업시, 코핑 거푸집 옆에 철근을 적재해 놓기 때문에 적재된 철근의 자중으로 인해 작업장의 변형이나 붕괴사고가 자주 발생한다. 따라서, 시공 작업의 위험성이 매우 크다.In addition, during the reinforcement of the coping, because the reinforcing bar is placed next to the coping formwork, the deformation or collapse of the workplace often occurs due to the weight of the loaded rebar. Therefore, the risk of construction work is very large.

또한, 코핑의 배근 작업이 코핑 거푸집 내에서 진행되다보니, 작업 공간이 너무 협소하여 시공성 및 작업능률이 낮고, 품질 저하 및 공기 지연의 원인이 된다.In addition, the coping reinforcement work is carried out in the coping formwork, the work space is too narrow, low workability and work efficiency, causing quality degradation and air delay.

또한, 코핑의 배근 작업시 철근을 인양하기 위해 크레인과 같은 장비가 계속 대기해야하므로 장비비 손실이 크고, 공기 지연이 불가피하다.In addition, the equipment cost, such as a crane to wait for the reinforcing bar reinforcement during the reinforcement work of the coping is a big equipment cost loss, air delay is inevitable.

본 발명은 상기한 종래 기술의 문제점을 해결하기 위하여 안출된 것으로서, 고소 작업으로 인한 위험성을 크게 낮출 수 있고, 코핑의 배근 작업 환경이 보다 개선될 수 있고, 장비비 손실 및 공기 지연을 방지할 수 있는 교각 및 그 시공방법을 제공하는데 그 목적이 있다.The present invention has been made to solve the above-described problems of the prior art, can greatly reduce the risk due to the height operation, the coping working environment can be further improved, equipment cost loss and air delay can be prevented The purpose is to provide a bridge and its construction method.

상기한 과제를 해결하기 위해 본 발명은 기둥 철근과 콘크리트로 이루어진 적어도 하나의 기둥과; 상기 기둥이 결합되는 기둥결합공간이 구비되고, 콘크리트가 타설됨과 아울러 상기 기둥결합공간 이외의 부분에 코핑 철근이 배근되어 이루어진 코핑을 포함하는 교각을 개시한다.The present invention to solve the above problems and at least one column made of pillar reinforcement and concrete; A pillar coupling space is provided to which the pillars are coupled, and concrete is poured, and a pier including a coping in which a coping reinforcement is disposed in a portion other than the pillar coupling space is disclosed.

상기 코핑 철근 중 적어도 일부는, 상기 코핑에 결합된 기둥 앞에서 절곡된 구조일 수 있다.At least some of the coping rebars may have a structure that is bent in front of a pillar coupled to the coping.

상기 코핑 철근 중 적어도 일부는, 상기 코핑에 결합된 기둥 앞에서 상측을 향해 절곡된 구조일 수 있다.At least some of the coping reinforcement may have a structure that is bent upwards in front of the pillar coupled to the coping.

상기 코핑 철근 중 적어도 일부는, 상기 코핑에 결합된 기둥 앞에서 상측을 향해 수직하게 절곡된 구조일 수 있다.At least some of the coping reinforcement may have a structure that is vertically bent upwards in front of the pillar coupled to the coping.

상기 코핑 철근은, 인장력에 저항하는 인장철근과; 상기 인장철근의 하부에 배근되어 압축력에 저항하는 압축철근으로 이루어지고; 상기 압축철근 중 적어도 일부는, 상기 코핑에 결합된 기둥 앞에서 상기 인장철근이 배근된 부분까지 상측을 향해 절곡될 수 있다.The coping reinforcing bar, the tensile reinforcing bar to resist the tensile force; It is made of compressed steel that is reinforced to the lower portion of the tensile steel to resist the compressive force; At least some of the compressed reinforcing bar may be bent upwards up to a portion where the reinforcing bar is placed in front of the pillar coupled to the coping.

상기 기둥의 코핑에 결합되는 기둥 철근의 결합 길이(ldb)는 다음과 같은 식에 의해 결정되는 교각The coupling length (ldb) of the column reinforcing bar coupled to the coping of the column is determined by the following equation

Figure 112007075839957-pat00001
Figure 112007075839957-pat00001

여기서, db는 기둥 철근의 직경이고, fy는 기둥 철근의 항복 강도이고, fck는 기둥의 콘크리트 압축강도이다.Where db is the diameter of the column reinforcement, fy is the yield strength of the column reinforcement, and fck is the concrete compressive strength of the column.

상기 코핑의 상기 기둥결합공간과 대응되는 부분의 두께는, 기둥 철근의 결합 길이보다 클 수 있다.The thickness of the portion corresponding to the pillar coupling space of the coping may be larger than the coupling length of the pillar reinforcement.

또한 상기한 목적을 달성하기 본 발명은 상술한 교각의 시공 방법으로서, 기둥을 시공하는 단계와; 상기 기둥의 상부에 코핑 거푸집을 설치하는 단계와; 상기 기둥이 결합되는 기둥결합공간을 갖도록 코핑철근조립체를 배근하여, 상기 코핑철근조립체를 상기 코핑 거푸집 내부에 설치하는 단계와; 상기 코핑 거푸집 내에 콘크리트를 타설하여 양생하는 단계와; 상기 콘크리트의 양생 후, 상기 코핑 거푸집을 제거하는 단계를 포함하는 교각의 시공방법을 개시한다.In addition, the present invention to achieve the above object is a construction method of the above-mentioned piers, comprising the steps of constructing a pillar; Installing a coping formwork on top of the column; Installing the coping reinforcing bar assembly inside the coping formwork by reinforcing a coping reinforcing assembly so as to have a column coupling space to which the column is coupled; Pouring and curing concrete in the coping formwork; After curing the concrete, it discloses a method of construction of piers comprising the step of removing the coping formwork.

상기 기둥은, 기둥철근조립체가 기둥 철근의 결합 길이만큼 연장 배근되어 상기 기둥결합공간에 결합될 수 있도록, 시공될 수 있다.The pillar may be constructed such that the column reinforcing bar assembly is extended and extended by the coupling length of the column reinforcement to be coupled to the column coupling space.

상기 기둥 철근의 결합 길이(ldb)는 다음과 같은 식에 의해 결정되어 시공되는 교각의 시공방법;Bonding length (ldb) of the column reinforcement is determined by the following formula construction method of piers;

Figure 112007075839957-pat00002
Figure 112007075839957-pat00002

여기서, db는 기둥 철근의 직경이고, fy는 기둥 철근의 항복 강도이고, fck는 기둥의 콘크리트 압축강도이다.Where db is the diameter of the column reinforcement, fy is the yield strength of the column reinforcement, and fck is the concrete compressive strength of the column.

상기 코핑 거푸집을 지지하는 코핑 거푸집 지지물을 설치하는 단계가 더 포함될 수 있다.Installing a coping formwork support for supporting the coping formwork may be further included.

상기 코핑 거푸집 지지물은 기둥에 고정된 받침턱부를 포함할 수 있다.The coping formwork support may include a support jaw fixed to the pillar.

상기 코핑 거푸집 지지물은 상기 받침턱부 상측에 설치되어 상기 코핑 거푸집을 지지하는 지지부를 더 포함할 수 있다.The coping formwork support may further include a support portion installed above the support jaw to support the coping formwork.

상기 지지부는, 높이조절수단을 구비함과 아울러, 상기 받침턱부 상측에 설치되는 안착부와; 상기 코핑 거푸집의 하측에 연장 형성된 연장 지지부를 포함하고; 상기 코핑 거푸집을 설치하는 단계는, 상기 연장 지지부를 상기 안착부에 조합함으로써 이루어질 수 있다.The support portion has a height adjusting means, and a seating portion installed above the support jaw portion; An extended support portion extending below the coping die; Installing the coping formwork may be accomplished by combining the extension support with the seating portion.

상기 코핑 거푸집 지지물 주위에 작업대를 설치하는 단계가 더 포함될 수 있다.Installing a workbench around the coping formwork support may be further included.

상기한 바와 같은 본 발명에 따른 교각 및 그 시공방법은, 코핑철근조립체가 지상에서 조립된 후 인양되기 때문에, 종전의 고소 작업 대비 안정성이 확보될 수 있고, 코핑철근조립체의 배근 작업 능률 및 품질, 시공성이 향상될 수 있고, 기둥 과 코핑이 동시에 시공됨과 아울러 장비가 대기하고 있을 필요가 없어서 공기 단축 및 공사비 절감 효과를 가질 수 있다.Piers and construction methods according to the present invention as described above, because the coping rebar assembly is lifted after assembling on the ground, stability can be secured compared to the conventional aerial work, the efficiency and quality of reinforcement work of the coping rebar assembly, The workability can be improved, and the pillars and copings are installed at the same time, and the equipment does not have to be waiting, which can reduce the air and reduce the construction cost.

도 1은 본 발명에 따른 교각의 요부 정면도이고, 도 2는 본 발명에 따른 교각의 요부 정단면도이고, 도 3은 도 2의 A-A선에 따른 단면도이다.1 is a front view of the main portion of the pier according to the present invention, Figure 2 is a front sectional view of the main portion of the pier according to the present invention, Figure 3 is a cross-sectional view taken along the line A-A of FIG.

본 발명에 따른 교각은 적어도 하나의 기둥(10)과, 기둥(10)의 상부에 설치되고 기둥(10)이 결합되는 기둥결합공간(20')이 구비된 코핑(20)으로 구성된다.Pier according to the present invention is composed of at least one pillar 10 and the coping 20 is provided on the column 10 and the column coupling space 20 'is coupled to the pillar 10 is coupled.

기둥(10)은 다수의 철근(이하, 설명의 편의를 위해 '기둥철근'이라 함)(12')이 배근되어 이루어진 기둥철근조립체(12)와, 기둥철근조립체(12) 주위에 양생된 기둥 콘크리트체(14)로 이루어진다.The pillar 10 is a pillar reinforcement assembly 12 formed by a plurality of reinforcing bars (hereinafter, referred to as' column reinforcement ') 12' for convenience of explanation, and a pillar that is cured around the column reinforcement assembly 12. It consists of the concrete body 14.

특히, 이러한 기둥(10)은 기둥철근조립체(12)가 기둥철근의 결합길이(ldb)만큼 기둥(10)의 상측으로 노출되어 기둥결합공간(20')에 결합될 수 있도록, 시공된다. 즉, 기둥철근조립체(12)가 기둥 콘크리트체(14)보다 기둥철근의 결합길이(ldb)만큼 기둥(10)의 상측으로 더 길도록 시공된다. 따라서, 기둥 콘크리트체(14)까지 기둥결합공간(20')에 결합되는 것보다, 기둥(10)과 코핑(20)이 보다 안정적으로 상호 조합될 수 있다.In particular, the column 10 is constructed so that the column reinforcing bar assembly 12 is exposed to the upper side of the column 10 by the coupling length (ldb) of the column reinforcing to be coupled to the column coupling space (20 '). That is, the column reinforcing bar assembly 12 is constructed to be longer to the upper side of the column 10 by the coupling length (ldb) of the column reinforcement than the column concrete body (14). Therefore, the pillar 10 and the coping 20 may be more stably combined with each other than being coupled to the pillar coupling space 20 ′ up to the pillar concrete body 14.

이때, 충분한 구조적 안정성 확보를 위해, 기둥철근의 결합길이(ldb)는, 다음과 같은 식에 의해 결정됨이 바람직하다.At this time, in order to ensure sufficient structural stability, the coupling length (ldb) of the column reinforcement is preferably determined by the following equation.

Figure 112007075839957-pat00003
Figure 112007075839957-pat00003

여기서, db는 기둥 철근(12')의 직경이고, fy는 기둥 철근(12')의 항복 강도이고, fck는 기둥(10)의 콘크리트 압축강도이다.Where db is the diameter of the column reinforcing bars 12 ', fy is the yield strength of the column reinforcing bars 12', and fck is the concrete compressive strength of the column 10.

다음으로 코핑(20)은 다수의 철근(이하, 설명의 편의를 위해 '코핑철근'이라 함)(22')이 배근되어 이루어진 코핑철근조립체(22)와, 코핑철근조립체(22) 주위에 양생되는 코핑 콘크리트체(24)로 이루어진다.Next, the coping 20 is cured around the coping rebar assembly 22 and the coping rebar assembly 22 formed by reinforcing a plurality of reinforcing bars (hereinafter referred to as' coping reinforcement ') 22' for convenience of description. It is made of a coping concrete body 24.

특히, 코핑철근조립체(22)는 기둥결합공간(20') 확보를 위해, 코핑철근(22')이 기둥결합공간(20') 이외의 공간에만 배근됨으로써, 이루어진다.In particular, the coping rebar assembly 22 is made by the coping rebar 22 'is arranged only in the space other than the column coupling space 20' in order to secure the column coupling space (20 ').

코핑철근(22')은, 인장력에 저항하는 인장철근(22A)과, 압축력에 저항하는 압축철근(22B)으로 이루어진다. 인장철근(22A)은 주로 코핑(20)의 상부에 배근되고, 압축철근(22B)은 주로 인장철근(22A)의 하부에 배근된다.The coping rebar 22 'is composed of a tensile reinforcing bar 22A that resists a tensile force, and a compressed reinforcing bar 22B that resists a compressive force. The tensile rebar 22A is mainly reinforced to the upper part of the coping 20, and the compressed rebar 22B is mainly reinforced to the lower part of the reinforcing bar 22A.

이러한 코핑철근조립체(22)는 다음과 같이 배근 작업되는 것이 보다 바람직하다.More preferably, the coping rebar assembly 22 is reinforced as follows.

코핑철근(22')은 기둥결합공간(20') 때문에 중간에 절단될 수밖에 없는데, 이러한 코핑철근(22') 중 적어도 일부는 코핑(20)에 결합되는 기둥(10) 앞에서 절단되지 않고, 절곡될 수 있다. 여기서, 인장철근(22A)과 압축철근(22B) 중 주로 코핑(20)의 하부에 배근되는 압축철근(22B)이 기둥결합공간(20')에 의해 가로 막히는바, 압축철근(22B)이 절곡되는 것이 바람직하다.Coping reinforcing bar 22 ′ is inevitably cut due to the column coupling space 20 ′, and at least some of these coping reinforcing bars 22 ′ are not cut in front of the column 10 coupled to the coping 20, and are bent. Can be. Here, the compression reinforcing bar 22B, which is mainly reinforced to the lower portion of the coping 20 among the tensile reinforcing bars 22A and the compression reinforcing bar 22B, is blocked by the column coupling space 20 ', and the compression reinforcing bar 22B is bent. It is preferable to be.

하여, 기둥결합공간(20') 때문에 코핑(20)의 철근 배근 작업이 복잡해질 염려가 없고, 코핑철근(22')들이 보다 견실하게 연결될 수 있고, 코핑철근(22')의 절곡된 부분으로 인해 전단 저항에 보다 효과적으로 대응할 수 있어, 구조적 안정성이 향상될 수 있다.Therefore, the reinforcement work of the coping 20 is not complicated due to the pillar coupling space 20 ', and the coping reinforcing bars 22' can be more firmly connected, and the bent portion of the coping reinforcing bar 22 '. Due to this, it is possible to more effectively cope with the shear resistance, thereby improving the structural stability.

나아가서, 이와 같이 절곡되는 압축철근(22B)은 상측을 향해 절곡되어 인장철근(22A)의 배근 부분까지 배근되는 것이, 코핑철근(22') 간 유착 관계를 보다 견실하게 하여 구조적 안정성을 향상시킬 수 있다는 점에서, 바람직하다. Furthermore, the compressed reinforcing bar 22B bent in this way is bent upward and reinforcement up to the reinforcement part of the tensile reinforcing bar 22A, thereby making the bond between the coping reinforcing bars 22 'more stable, thereby improving structural stability. It is preferable in that it exists.

이와 아울러, 코핑(20)은 기둥결합공간(20')과 대응되는 부분의 두께(20T)가, 기둥철근의 결합길이(ldb)보다 크도록 시공됨으로써, 기둥(10)이 코핑(20)에 충분히 결합될 수 있게 하는 것이 바람직하다.In addition, the coping 20 is constructed such that the thickness 20T of the portion corresponding to the column coupling space 20 'is larger than the coupling length ldb of the column reinforcement, such that the column 10 is connected to the coping 20. It is desirable to allow sufficient coupling.

따라서, 기둥결합공간(20')에 의해, 코핑철근조립체(22)를 지상에서 배근 작업한 후, 기둥(10)과 결합하더라도 코핑철근조립체(22)와 기둥철근조립체(12)가 서로 간섭되지 않는다. 따라서, 코핑철근조립체(22)를 고소에서 배근 작업하지 않아도 되기 때문에 작업자나 자재의 추락, 낙하, 붕괴 사고 등의 안전 사고 위험성을 현격하게 낮출 수 있다. 또한, 코핑철근조립체(22)의 배근 작업과 기둥철근조립체(12) 배근 작업이 동시에 진행될 수 있기 때문에 공기가 현격하게 단축될 수 있다. 또한, 코핑철근조립체(22)의 배근 작업이 넓은 공간에서 진행될 수 있기 때문에 시공성 및 작업능률, 품질이 현격하게 향상될 수 있고, 공기가 단축될 수 있다. 또한, 코핑 철근(22')을 인양하기 위해 장비가 계속 대기할 필요가 없기 때문에 시공 공사비 및 공기가 현격하게 줄어들 수 있다.Therefore, after the coping rebar assembly 22 is reinforced by the column coupling space 20 ′ on the ground, the coping rebar assembly 22 and the column reinforcing assembly 12 do not interfere with each other even when the coping rebar assembly 22 is coupled to the column 10. Do not. Therefore, since the coping rebar assembly 22 does not need to be reinforced at the height, the risk of safety accidents such as falling, falling, and collapsing accidents of workers or materials can be significantly reduced. In addition, since the reinforcement work of the coping rebar assembly 22 and the reinforcement work of the column reinforcement assembly 12 may be simultaneously performed, the air may be significantly shortened. In addition, since the reinforcement work of the coping rebar assembly 22 can be performed in a large space, workability and work efficiency, quality can be significantly improved, and air can be shortened. In addition, construction costs and air can be significantly reduced because the equipment does not have to wait continuously to lift the coping rebar 22 '.

이와 같이 구성되는 교각을 시공하기 위한 본 발명에 따른 교각의 시공방법을 도 2 및 도 4 내지 도 7을 참조하여 살펴보면, 다음과 같다.Looking at the construction method of the piers according to the present invention for constructing the piers constructed as described above with reference to Figures 2 and 4 to 7.

먼저, 도 4에 도시된 바와 같이, 기둥철근조립체(12)을 배근 작업하고, 기둥철근조립체(12) 주위에 기둥 콘크리트체(14)를 양생하여, 기둥(10)을 시공한다. 이때, 상술한 바와 같이 기둥철근조립체(12)는 기둥철근의 결합길이(ldb)만큼 노출되는 것이 바람직하다.First, as shown in FIG. 4, the pillar reinforcing assembly 12 is reinforced, and the pillar concrete body 14 is cured around the pillar reinforcing assembly 12, thereby constructing the column 10. At this time, as described above, the column reinforcing bar assembly 12 is preferably exposed by the coupling length ldb of the column reinforcing bars.

그리고, 도 6에 도시된 바와 같이, 기둥(10)의 상부에 코핑 거푸집(30)을 설치한다. 코핑 거푸집(30)은 지상에서 기 조립된 후, 크레인(4) 등의 장비를 이용하여 기둥(10)의 상부로 인양되어 설치될 수 있다. 이와 같이 코핑 거푸집(30)이 지상에서 조립되면, 코핑 거푸집(30)의 조립 및 설치 공사가 용이해질 수 있고, 공사가 신속히 진행될 수 있고, 크레인(4) 등의 장비가 대기하고 있을 필요가 없어 장비비 손실이 방지될 수 있다.And, as shown in Figure 6, the coping die 30 is installed on the top of the column (10). After the coping formwork 30 is pre-assembled on the ground, it may be installed by lifting to the top of the column 10 using equipment such as a crane (4). When the coping formwork 30 is assembled in this way, the assembling and installation work of the coping formwork 30 can be facilitated, the construction can proceed quickly, and the equipment such as the crane 4 does not need to be waiting. Equipment cost loss can be prevented.

다음으로, 도 7에 도시된 바와 같이, 상술한 바와 같은 코핑철근조립체(22)를 지상에서 배근 작업한 후, 크레인(4) 등의 장비에 의해 코핑 거푸집(30) 내부로 인양하여 설치한다. 그러면, 기둥철근조립체(12)가 기둥결합공간(20')에 결합됨으로써, 기둥철근조립체(12)와 코핑철근조립체(22)가 상호 견실하게 조합된다.Next, as shown in FIG. 7, after the coping rebar assembly 22 as described above in the reinforcement work on the ground, the lifting equipment installed in the coping formwork 30 by the equipment such as the crane (4). Then, the column reinforcing bar assembly 12 is coupled to the column coupling space 20 'so that the column reinforcing bar assembly 12 and the coping rebar assembly 22 are firmly combined with each other.

다음으로, 코핑 거푸집(30) 내부에 콘크리트를 타설함으로써, 코핑철근조립체(22) 주위에 코핑 콘크리트체(미도시)를 양생한다.Next, by pouring concrete into the coping formwork 30, the coping concrete body (not shown) is cured around the coping rebar assembly 22.

이와 같이 코핑 콘크리트체 양생 공사까지 완료된 후, 코핑 거푸집(30)을 해체하면, 도 1 내지 도 3에 도시된 바와 같이, 교각의 시공 공사가 완료된다.After completion of the coping concrete body curing work in this way, when the coping formwork 30 is dismantled, as shown in Figs. 1 to 3, the construction work of the pier is completed.

한편, 상기와 아울러, 교각의 시공 공사를 보다 용이하고, 안정적으로 진행하기 위해서, 다음과 같은 단계가 더 추가될 수 있다.On the other hand, in addition to the above, in order to proceed more easily and stably the construction of the piers, the following steps may be further added.

즉, 도 5a 및 도 5b에 도시된 바와 같이, 코핑 거푸집(30)이 용이하고 안정적으로 설치될 수 있도록, 코핑 거푸집(30)을 설치하기 전에 코핑 거푸집(30)을 견고하게 지지할 수 있는 코핑 거푸집 지지물(40)이 설치되는 공사가 작업될 수 있다.That is, as shown in FIGS. 5A and 5B, the coping can be firmly supported before the coping formwork 30 is installed, so that the coping formwork 30 can be installed easily and stably. Construction work in which the formwork support 40 is installed can be worked.

코핑 거푸집 지지물(40)은 지상으로부터 상측으로 연장형성된 구조를 취할 수도 있고, 본 실시 예와 같이 기둥(10)의 소정 위치에 고정된 받침턱부(42) 등에 의해 지지되는 구조를 취할 수도 있다.Coping formwork support 40 may have a structure extending from the ground to the upper side, or may be a structure that is supported by the supporting jaw portion 42 fixed to a predetermined position of the column 10 as in the present embodiment.

더불어, 코핑 거푸집 지지물(40)은 코핑 거푸집(30)이 받침턱부(42)에 바로 얹혀지는 구조가 채택될 수도 있고, 본 실시 예와 같이 받침턱부(42)의 상측에 설치되는 별도의 지지부(44)에 의해 지지되는 구조를 채택될 수도 있다.In addition, the coping formwork support 40 may be a structure in which the coping formwork 30 is directly placed on the support jaw portion 42, or as a separate support portion installed on the upper side of the support jaw portion 42 as in this embodiment ( A structure supported by 44 may be adopted.

나아가, 지지부(44)는 높이 조절이 불가능한 일체형 구조로 구비될 수도 있고, 본 실시 예와 같이 높이 조절될 수 있는 구조로 구비될 수도 있다. 즉, 지지부(44)는 높이 조절이 가능토록, 높이조절수단을 구비함과 아울러 받침턱부(42)의 상측에 설치되는 안착부(44A)와, 코핑 거푸집(30)의 하측에 연장 형성되어 안착부(44A)와 조합되는 연장지지부(44B)로 구성될 수 있다. 이와 같이 지지부(44)가 높이 조절 가능한 구조를 취하는 경우, 코핑 거푸집(30)을 크레인(4) 등에 의해 인양하여 상측으로부터 설치하는 코핑 거푸집 설치작업시, 연장지지부(44B)를 안착부(44A)에 안착시킨 후, 높이조절수단에 의해 코핑 거푸집(30)의 수평 작업을 용이 하게 할 수 있다.In addition, the support 44 may be provided as a unitary structure that cannot be adjusted in height, or may be provided as a structure capable of height adjustment as in the present embodiment. That is, the support 44 is provided with a height adjusting means so that the height can be adjusted, and the seating portion 44A installed on the upper side of the supporting jaw portion 42 and the lower side of the coping die 30 are formed and seated. It may consist of an extension support 44B in combination with the portion 44A. Thus, when the support part 44 takes the structure which can be adjusted in height, the extended support part 44B is attached to the seating part 44A at the time of the coping formwork installation which lifts the coping formwork 30 by the crane 4, etc. and installs it from the upper side. After seating on, the horizontal operation of the coping formwork 30 can be facilitated by the height adjusting means.

다음으로, 코핑 거푸집(30) 및 코핑철근조립체(22)의 인양 작업 등을 작업자가 안전하고 용이하게 수행할 수 있도록 하기 위해서, 코핑 거푸집 지지물(40) 주위에 작업대(50)가 설치되는 것이 바람직하다.Next, in order to enable a worker to safely and easily carry out lifting work of the coping formwork 30 and the coping rebar assembly 22, it is preferable that a work bench 50 is installed around the coping formwork support 40. Do.

작업대(50)는 받침턱부(42)에 의해 지지되는 구조를 취할 수도 있고, 보조 받침턱부와 같은 별도의 구조에 의해 기둥(10)에 설치되는 구조를 취할 수도 있다. The work table 50 may take a structure supported by the support jaw portion 42 or may have a structure installed in the pillar 10 by a separate structure such as an auxiliary support jaw portion.

이상, 본 발명에 따른 교각 및 그 시공방법의 실시 예를 설명하였는데, 이는 본 발명에 따른 교각 및 그 시공방법의 여러 실시 예들 중 일부 예일 뿐으로서, 본 발명에 따른 교각 및 그 시공방법은 상술한 실시 예들 이외에도 본 발명의 기술적 사상의 범위 내에서 다양하게 변형 실시될 수 있음은 물론이다.In the above, embodiments of the pier according to the present invention and a construction method thereof have been described, which are only some examples of various embodiments of the pier according to the present invention and the construction method thereof, and the pier according to the present invention and the construction method thereof are described above. In addition to the embodiments may be variously modified within the scope of the technical idea of the present invention.

도 1은 본 발명에 따른 교각의 요부 정면도이다.1 is a front view of main parts of a pier according to the present invention.

도 2는 본 발명에 따른 교각의 요부 정단면도이다.2 is a front sectional view of the main portion of the piers according to the present invention.

도 3은 도 2의 A-A선에 따른 단면도이다.3 is a cross-sectional view taken along the line A-A of FIG.

도 4 내지 도 7은 본 발명에 따른 교각의 시공방법을 설명하기 위한 도면으로서,4 to 7 are views for explaining the construction method of the piers according to the present invention,

도 4는 기둥이 시공된 상태의 도면이다.4 is a view of the column is constructed.

도 5a는 작업대와 지지물이 설치된 상태의 정면도이다.Figure 5a is a front view of the work table and the support is installed.

도 5b는 작업대와 지지물이 설치된 상태의 측면도이다.Figure 5b is a side view of the work table and the support installed state.

도 6은 코핑 거푸집을 설치하는 상태의 정면도이다.6 is a front view of a state in which a coping formwork is installed.

도 7은 코핑철근조립체를 설치하는 상태의 정면도이다.7 is a front view of a state in which the coping rebar assembly is installed.

<도면의 주요 부분에 관한 부호의 설명><Explanation of symbols on main parts of the drawings>

2; 콘크리트 10; 기둥2; Concrete 10; Pillar

12; 기둥철근조립체 20; 코핑12; Column rebar assembly 20; Coping

22; 코핑철근조립체 22A; 인장철근22; Coping rebar assembly 22A; Tensile rebar

22B; 압축철근 30; 코핑 거푸집22B; Compressed rebar 30; Coping formwork

40; 코핑 거푸집 지지물 42; 받침턱부40; Coping formwork support 42; Pedestal

44; 지지부 50; 작업대44; Support 50; bench

Claims (15)

기둥철근조립체가 기둥철근의 결합 길이만큼 상부로 노출되도록 기둥을 시공하는 단계와;Constructing the column such that the column reinforcing bar assembly is exposed upward by the coupling length of the column reinforcing bar; 상기 기둥의 상부에 코핑 거푸집을 설치하는 단계와;Installing a coping formwork on top of the column; 기둥결합공간을 갖도록 코핑철근조립체를 배근하여, 상기 코핑철근조립체를 상기 코핑 거푸집 내부에 설치하되, 상기 기둥철근조립체의 상부가 상기 기둥결합공간에 삽입되도록 하는 단계와;Reinforcing the coping reinforcing assembly so as to have a column coupling space, such that the coping reinforcing assembly is installed inside the coping formwork, such that an upper portion of the column reinforcing assembly is inserted into the column coupling space; 상기 코핑 거푸집 내에 콘크리트를 타설하여 양생하는 단계와;Pouring and curing concrete in the coping formwork; 상기 콘크리트의 양생 후, 상기 코핑 거푸집을 제거하는 단계를 포함하고,After curing of the concrete, removing the coping formwork, 상기 코핑철근조립체는 상기 기둥철근조립체와의 결합을 위한 상기 기둥결합공간을 갖도록 상기 기둥결합공간 이외의 부분에 코핑철근이 배근되며, The coping rebar assembly is a coping reinforcement to the portion other than the column coupling space to have the column coupling space for coupling with the column reinforcing bar assembly, 상기 코핑 철근은 인장력에 저항하는 인장철근과, 상기 인장철근의 하부에 배근되어 압축력에 저항하는 압축철근으로 이루어지고, 상기 압축철근 중 적어도 일부는 상기 코핑에 결합된 기둥 측에서 상기 인장철근이 배근된 부분까지 상측을 향해 절곡된 것을 특징으로 하는 교각의 시공방법.The coping reinforcement is made of a tensile reinforcement to resist the tensile force, and the reinforcement is reinforced to the lower portion of the tensile reinforcement to resist the compressive force, at least a portion of the reinforcing bar is the reinforcing bar is reinforced at the side of the column coupled to the coping The construction method of the piers, characterized in that bent toward the upper side to the portion. 삭제delete 삭제delete 청구항 1에 있어서,The method according to claim 1, 상기 압축철근은, 상기 코핑에 결합된 기둥 앞에서 상측을 향해 수직하게 절곡된 구조인 것을 특징으로 하는 교각의 시공방법.The compression reinforcing bar, the construction method of the piers, characterized in that the vertically bent structure in front of the column coupled to the coping. 삭제delete 청구항 1 또는 청구항 4에 있어서,The method according to claim 1 or 4, 상기 기둥의 코핑에 결합되는 기둥철근의 결합길이(ldb)는 다음과 같은 식에 의해 결정되는 교각의 시공방법.Bonding length (ldb) of the column reinforcing bar is coupled to the coping of the pillar is a method of construction of piers determined by the following equation.
Figure 712010001620314-pat00004
Figure 712010001620314-pat00004
여기서, db는 기둥철근의 직경이고, fy는 기둥철근의 항복 강도이고, fck는 기둥의 콘크리트 압축강도이다.Where db is the diameter of the column reinforcement, fy is the yield strength of the column reinforcement, and fck is the concrete compressive strength of the column.
청구항 1 또는 청구항 4에 있어서,The method according to claim 1 or 4, 상기 코핑은 상기 기둥결합공간이 형성된 부분의 두께가, 상기 기둥철근의 코핑과의 결합길이보다 큰 교각의 시공방법.The coping is a bridge construction method, the thickness of the portion where the column coupling space is formed, the construction method of the piers larger than the coupling length with the coping of the column reinforcement. 삭제delete 삭제delete 삭제delete 청구항 1에 있어서,The method according to claim 1, 상기 코핑 거푸집을 지지하는 코핑 거푸집 지지물을 설치하는 단계가 더 포함되는 교각의 시공방법.Installing a coping formwork support for supporting the coping formwork further comprises a piling construction method. 청구항 11에 있어서,The method of claim 11, 상기 코핑 거푸집 지지물은 기둥에 고정된 받침턱부를 포함하는 교각의 시공방법.The coping formwork support is a construction method of piers comprising a support jaw fixed to the pillar. 청구항 12에 있어서,The method according to claim 12, 상기 코핑 거푸집 지지물은 상기 받침턱부 상측에 설치되어 상기 코핑 거푸집을 지지하는 지지부를 더 포함하는 교각의 시공방법.The coping formwork support further comprises a support portion installed on the base jaw portion to support the coping formwork pier construction method. 청구항 13에 있어서,14. The method of claim 13, 상기 지지부는, The support portion, 높이조절수단을 구비함과 아울러, 상기 받침턱부 상측에 설치되는 안착부와;And having a height adjusting means, and a seating portion which is installed on the base jaw portion; 상기 코핑 거푸집의 하측에 연장 형성된 연장 지지부를 포함하고;An extended support portion extending below the coping die; 상기 코핑 거푸집을 설치하는 단계는, The step of installing the coping formwork, 상기 연장 지지부를 상기 안착부에 조합함으로써 이루어지는 교각의 시공방법.The method of constructing a piers by combining the extension support with the seating portion. 청구항 11에 있어서,The method of claim 11, 상기 코핑 거푸집 지지물 주위에 작업대를 설치하는 단계가 더 포함되는 교각의 시공방법.The construction method of the piers further comprises the step of installing a workbench around the coping formwork support.
KR1020070106772A 2007-10-23 2007-10-23 Pier and the construction method for the same KR100966083B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070106772A KR100966083B1 (en) 2007-10-23 2007-10-23 Pier and the construction method for the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070106772A KR100966083B1 (en) 2007-10-23 2007-10-23 Pier and the construction method for the same

Publications (2)

Publication Number Publication Date
KR20090041189A KR20090041189A (en) 2009-04-28
KR100966083B1 true KR100966083B1 (en) 2010-06-28

Family

ID=40764348

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070106772A KR100966083B1 (en) 2007-10-23 2007-10-23 Pier and the construction method for the same

Country Status (1)

Country Link
KR (1) KR100966083B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230020309A (en) * 2021-08-03 2023-02-10 다올이앤씨 주식회사 Coping form dismantling method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101345405B1 (en) * 2011-12-14 2013-12-30 한준수 Construct method of plate coping girder form
CN106677069B (en) * 2016-12-28 2018-04-06 杭州江润科技有限公司 A kind of construction method of bridge pier integral formwork support one-shot forming structure
US11479929B2 (en) 2020-08-07 2022-10-25 Peri Se Formwork system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11158813A (en) 1997-11-28 1999-06-15 Fujita Corp Concrete pier constructing method
KR200233599Y1 (en) * 2001-02-17 2001-09-29 (주)한맥기술 Installation structure for reinforcing rod of bent
KR100547591B1 (en) 2002-11-04 2006-01-31 지에스건설 주식회사 Pier coping part pre-assembly method
KR100654946B1 (en) * 2005-12-21 2006-12-08 삼성물산 주식회사 Opening and shutting type mold structure and construction method for coping of pier using it

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11158813A (en) 1997-11-28 1999-06-15 Fujita Corp Concrete pier constructing method
KR200233599Y1 (en) * 2001-02-17 2001-09-29 (주)한맥기술 Installation structure for reinforcing rod of bent
KR100547591B1 (en) 2002-11-04 2006-01-31 지에스건설 주식회사 Pier coping part pre-assembly method
KR100654946B1 (en) * 2005-12-21 2006-12-08 삼성물산 주식회사 Opening and shutting type mold structure and construction method for coping of pier using it

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230020309A (en) * 2021-08-03 2023-02-10 다올이앤씨 주식회사 Coping form dismantling method
KR102536591B1 (en) 2021-08-03 2023-05-26 다올이앤씨 주식회사 Coping form dismantling method

Also Published As

Publication number Publication date
KR20090041189A (en) 2009-04-28

Similar Documents

Publication Publication Date Title
CN105863253A (en) Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
KR102059552B1 (en) Modular work platform of a long span bridge main tower rebar and construction method using the same
KR100966083B1 (en) Pier and the construction method for the same
JP4252177B2 (en) Steel / concrete composite structure pier construction method
KR101889064B1 (en) Construction method of a long span bridge main tower
JPH09310492A (en) Self elevating type form device and elevating method thereof
JP5585227B2 (en) Building demolition method
JP6339923B2 (en) How to build a building frame
JP2010133084A (en) Method of constructing hollow high structure
JP5640482B2 (en) Building demolition method
JPH0525933A (en) Strut type scaffold form lifting device and concrete building frame construction method
JPH07300817A (en) Concrete-filled steel pipe truss pier and construction method
JP5561707B2 (en) How to dismantle tower buildings
KR20010097315A (en) Pier scaffolding and the pier construction method for using pier scaffolding
CN107700819B (en) Tower column construction internal climbing frame and tower column construction method adopting same
JP2021116153A (en) Supporting platform for tower crane and climbing method using the same
JP5712507B2 (en) Building demolition method
CN205875706U (en) Asynchronous stairwell wall post formwork system that pours of whole formwork
CN114293769B (en) Spanning type bent frame and mounting method thereof
CN215977348U (en) Bearing platform setting assembly
CN219908600U (en) Reinforcing steel bar binding and concrete construction platform for pier column construction
JP7462475B2 (en) How to build a building
CN218091933U (en) Device for integrally lifting elevator shaft frame body
KR101826093B1 (en) Platform for Prefabricated Column with Spirals
JPH0742114A (en) Construction method for concrete-filled steel pipe multi-pillar type bridge pier

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
J201 Request for trial against refusal decision
B701 Decision to grant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130617

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140602

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150528

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee