KR100952608B1 - Concrete pipe structure - Google Patents

Concrete pipe structure Download PDF

Info

Publication number
KR100952608B1
KR100952608B1 KR1020070141854A KR20070141854A KR100952608B1 KR 100952608 B1 KR100952608 B1 KR 100952608B1 KR 1020070141854 A KR1020070141854 A KR 1020070141854A KR 20070141854 A KR20070141854 A KR 20070141854A KR 100952608 B1 KR100952608 B1 KR 100952608B1
Authority
KR
South Korea
Prior art keywords
foundation block
foundation
block
pipe structure
concrete pipe
Prior art date
Application number
KR1020070141854A
Other languages
Korean (ko)
Other versions
KR20090073798A (en
Inventor
박종완
Original Assignee
계성종합건설(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 계성종합건설(주) filed Critical 계성종합건설(주)
Priority to KR1020070141854A priority Critical patent/KR100952608B1/en
Publication of KR20090073798A publication Critical patent/KR20090073798A/en
Application granted granted Critical
Publication of KR100952608B1 publication Critical patent/KR100952608B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/46Foundations for supply conduits or other canals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/005Drainage conduits
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Foundations (AREA)

Abstract

본 발명은 기초보강 콘크리트관 구조체에 관한 것으로써, 더욱 상세하게는 연약지반을 굴토하여 형성된 터파기부내에 안착고정되는 기초블럭과; 상기 기초블럭의 상부에 형성되는 홈상에 하단부가 안착고정될 수 있도록 상기 기초블럭에 일체형으로 형성되고, 타단부에 상기 기초블럭의 외측으로 일정길이 돌출되는 돌출부가 형성되며 일단부에 상기 돌출부가 삽입고정되는 확관부가 형성되는 관체;를 포함하여 이루어지는 것을 특징으로 하는 기초보강 콘크리트관 구조체에 관한 것이다.The present invention relates to a foundation reinforcement concrete pipe structure, and more particularly, the base block is fixed in the trench formed by excavating the soft ground; It is formed integrally with the foundation block so that the lower end is seated on the groove formed on the upper portion of the foundation block, the other end is formed with a protrusion protruding a predetermined length to the outside of the foundation block and the protrusion is inserted at one end It relates to a reinforced concrete pipe structure, characterized in that it comprises a;

이와 같이 구성된 본 발명은 작업공정수가 줄어들 수 있게 되어 공사기간이 크게 단축될 수 있음은 물론 이로 인해 시공성이 크게 향상될 수 있고, 나아가 공사에 따른 인력과 비용 또한 현저하게 줄어들 수 있게 되는 효과가 있다.The present invention configured as described above can reduce the number of work processes can greatly shorten the construction period as well as this can greatly improve the construction, and further has the effect that the workforce and cost according to the construction can be significantly reduced. .

기초블럭, 관체 Foundation block, tube

Description

기초보강 콘크리트관 구조체{CONCRETE PIPE STRUCTURE}Foundation reinforcement concrete pipe structure {CONCRETE PIPE STRUCTURE}

본 발명은 연약지반을 굴토하여 형성된 터파기부내에 안착고정되는 기초블럭과; 상기 기초블럭의 상부에 형성되는 홈상에 하단부가 안착고정될 수 있도록 상기 기초블럭에 일체형으로 형성되고, 타단부에 상기 기초블럭의 외측으로 일정길이 돌출되는 돌출부가 형성되며 일단부에 상기 돌출부가 삽입고정되는 확관부가 형성되는 관체;를 포함하여 이루어지는 것을 특징으로 하는 기초보강 콘크리트관 구조체에 관한 것이고,The present invention and the base block is fixed in the trench formed by excavating the soft ground; It is formed integrally with the foundation block so that the lower end is seated on the groove formed on the upper portion of the foundation block, the other end is formed with a protrusion protruding a predetermined length to the outside of the foundation block and the protrusion is inserted at one end It relates to a reinforced concrete pipe structure, characterized in that it comprises a;

구체적으로, 작업공정수가 줄어들 수 있게 되어 공사기간이 크게 단축될 수 있음은 물론 이로 인해 시공성이 크게 향상될 수 있고, 나아가 공사에 따른 인력과 비용 또한 현저하게 줄어들 수 있게 되는 기초보강 콘크리트관 구조체에 관한 것이다.Specifically, the number of work steps can be reduced, and the construction period can be greatly shortened, and as a result, the workability can be greatly improved, and further, the manpower and cost according to the construction can be significantly reduced in the basic reinforced concrete pipe structure. It is about.

일반적으로, 연약지반 구간 또는 지하수위가 높아 터파기후 사면붕괴와 기초바닥이 교란되어 관로시공에 어려움이 보고되어 방안마련이 시급한 실정이다.In general, it is urgent to prepare a plan because of the difficulty of construction of the pipeline due to the collapse of the slope and the foundation floor after the burrow due to the high soft ground section or the groundwater level.

이에 따라 최근에는 연약지반을 굴토하여 형성된 터파기부내에 관을 설치하 는 기초공사 후 상기 터파기부내에 콘크리트를 타설하여 양생시킨 다음 굴토된 흙을 다시 상기 터파기부내에 되메워서 터파기후 사면 붕괴와 기초바닥이 교란될 우려를 방지하고 있다.Accordingly, in recent years, after the foundation work to install the pipe in the trench formed by excavating the soft ground, the concrete is poured into the trench to cure, and then the excavated soil is backfilled in the trench to collapse the slope after foundation. The floor is prevented from being disturbed.

그러나, 상기와 같은 방법은 작업공정수가 많기 때문에 공사기간이 많이 소요됨은 물론 공사에 따른 인력과 비용 또한 과도하게 소요되는 문제점이 있다.However, the method as described above has a problem that it takes a lot of work period, as well as excessively manpower and cost according to the construction.

본 발명은 상술한 문제점을 해결하기 위하여 창출된 것으로써, 작업공정수가 줄어들 수 있게 되어 공사기간이 크게 단축될 수 있음은 물론 이로 인해 시공성이 크게 향상될 수 있고, 나아가 공사에 따른 인력과 비용 또한 현저하게 줄어들 수 있게 되는 기초보강 콘크리트관 구조체를 제공하는 것을 그 목적으로 한다.The present invention has been created to solve the above-mentioned problems, the number of work processes can be reduced, construction time can be significantly shortened, as a result, construction performance can be greatly improved, and furthermore, manpower and cost according to construction It is an object of the present invention to provide a reinforced concrete pipe structure that can be significantly reduced.

상기와 같은 목적을 달성하기 위한 본 발명은 연약지반을 굴토하여 형성된 터파기부내에 안착고정되는 기초블럭과; 상기 기초블럭의 상부에 형성되는 홈상에 하단부가 안착고정될 수 있도록 상기 기초블럭과 일체형으로 형성되고, 타단부에 상기 기초블럭의 외측으로 일정길이 돌출되는 돌출부가 형성되며 일단부에 상기 돌출부가 삽입고정되는 확관부가 형성되는 관체;를 포함하여 이루어지는 것을 특징으로 하는 기초보강 콘크리트관 구조체를 제공한다.The present invention for achieving the above object and the base block is fixed in the trench formed by excavating the soft ground; It is formed integrally with the foundation block so that the lower end is fixed to the groove formed in the upper portion of the foundation block, the other end is formed with a protrusion protruding a predetermined length to the outside of the foundation block and the projection is inserted in one end It provides a reinforced concrete pipe structure, characterized in that it comprises a; pipe body is formed to be fixed expansion portion.

여기서, 상기 기초블럭의 양측면에는 각각 복수의 연결공이 일정간격으로 형성되고, 상기 기초블럭의 일측면에 형성되는 연결공과 상기 기초블럭의 타측면에 형성되는 연결공의 내부에는 일정길이의 연결핀이 삽입고정되는 것이 바람직하다.Here, a plurality of connection holes are formed on both sides of the foundation block at predetermined intervals, and connection pins having a predetermined length are formed inside the connection holes formed on one side of the foundation block and the connection holes formed on the other side of the foundation block. It is preferable to be inserted and fixed.

또한, 상기 기초블럭에는 상기 관체와 연통되는 배수구가 수직방향으로 일정 간격으로 형성되는 것이 바람직하다.In addition, the foundation block is preferably formed with drainage holes communicating with the tubular body at regular intervals in the vertical direction.

본 발명은 연약지반을 굴토하여 형성된 터파기부내에 안착고정되는 기초블럭의 상부에 관체가 일체형으로 형성됨으로써, 종래처럼 상기 관체를 상기 터파기부내에 설치한 다음 상기 터파기부내에 콘크리트를 타설하여 양생시킬 필요가 없어지기 때문에 작업공정수가 줄어들 수 있게 되어 공사기간이 크게 단축될 수 있음은 물론 이로 인해 시공성이 크게 향상될 수 있고, 나아가 공사에 따른 인력과 비용 또한 현저하게 줄어들 수 있는 효과가 있다.The present invention is formed integrally on the upper part of the foundation block is fixed in the trench formed by excavating the soft ground, so that the tube is installed in the trench, as in the prior art, it is necessary to pour concrete in the trench to cure. Since the number of work processes can be reduced, the construction period can be greatly shortened, and as a result, the construction can be greatly improved, and further, the manpower and cost according to the construction can be significantly reduced.

그리고, 상기 기초블럭의 일측면에 형성되는 연결공과 상기 기초블럭의 타측면에 형성되는 연결공의 내부에 삽입고정되는 연결핀으로 인해 상기 기초블럭과 관체를 보다 용이하게 각각 상호결합시켜 상기 터파기부내에 유동되지 않도록 견고하게 시공할 수 있게 되는 효과가 있다.And, because of the connection pin is formed in the connection hole formed in one side of the base block and the connection hole formed in the other side of the base block fixed to each other more easily mutually coupled to the base block and the tubular There is an effect that can be constructed firmly so as not to flow in.

또한, 상기 기초블럭에 상기 관체와 연통되는 배수구가 수직방향으로 일정간격으로 형성됨으로써, 연약지반내에 포함된 지하수가 상기 배수구를 따라 이동하여 상기 관체로 배수될 수 있기 때문에 연약지반내에 포함된 지하수의 부력에 의해 상기 기초블럭과 관체가 들뜰 우려가 없는 효과가 있다.In addition, since the drain holes communicating with the tubular body are formed at regular intervals in the vertical direction on the foundation block, the groundwater contained in the soft ground may move along the drainage port and be drained into the tubular body. There is no fear that the foundation block and the tube will float due to buoyancy.

이하, 본 발명의 바람직한 실시예를 첨부한 도면에 의거하여 보다 상세하게 설명하면 다음과 같다. 물론 본 발명의 권리범위는 하기의 실시예에 한정되는 것은 아니며, 본 발명의 기술적 요지를 벗어나지 않는 범위 내에서 당해 기술분야의 통상적인 지식을 가진자에 의하여 다양하게 변형 실시될 수 있다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. Of course, the scope of the present invention is not limited to the following examples, and various modifications can be made by those skilled in the art without departing from the technical gist of the present invention.

도 1은 본 발명의 일실시예를 개략적으로 나타내는 사시도이고, 도 2는 관체(30)의 타단부에 형성된 돌출부(31)가 관체(30)의 일단부에 형성된 확관부(33)에 삽입고정되기 전의 상태를 개략적으로 나타내는 사시도이고, 도 3은 관체(30)의 타단부에 형성된 돌출부(31)가 관체(30)의 일단부에 형성되는 확관부(33)에 삽입고정된 상태를 개략적으로 나타내는 단면도이고, 도 4는 연약지반(3)을 굴토하여 형성된 터파기부(5)내에 기초블럭(10)이 안착고정된 상태를 개략적으로 나타내는 단면도이다.1 is a perspective view schematically showing an embodiment of the present invention, Figure 2 is a projection 31 formed at the other end of the tubular body 30 is inserted into the expansion tube 33 formed at one end of the tubular body 30 Figure 3 is a perspective view schematically showing a state before it is, Figure 3 schematically shows a state in which the projection 31 formed in the other end of the tubular body 30 is inserted into the expansion pipe 33 formed at one end of the tubular body 30 and fixed. 4 is a cross-sectional view schematically illustrating a state in which the foundation block 10 is seated and fixed in the trench 5 formed by excavating the soft ground 3.

본 발명의 일실시예인 기초보강 콘크리트관 구조체는 도 1에서 보는 바와 같이 크게, 기초블럭(10)과 관체(30)를 포함하여 이루어질 수 있다.Basic reinforcement concrete pipe structure is an embodiment of the present invention as shown in Figure 1, can be made large, including the base block 10 and the tubular body (30).

먼저, 상기 기초블럭(10)은 연약지반을 굴토하여 형성된 터파기부내에 안착고정되는 것으로써, 상부에 상기 관체(30)가 일체형으로 형성된다.First, the foundation block 10 is fixed in the trench formed by excavating the soft ground, the tubular body 30 is formed integrally thereon.

여기서, 상기 기초블럭(10)과 상기 관체(30)는 공장 등에서 일체형으로 사전에 미리 제작되어 시공하고자 하는 장소로 운반된다.Here, the foundation block 10 and the tubular body 30 are integrally manufactured in advance in a factory or the like and are transported to a place to be constructed.

한편, 상기 기초블럭(10)은 콘크리트 등으로 이루어질 수 있겠으나, 반드시 이에 한정되는 것은 아니다.On the other hand, the foundation block 10 may be made of concrete, but is not necessarily limited thereto.

상기 기초블럭(10)의 형상 및 구조는 도 1에 한정되는 것은 아니며, 연약지반을 굴토하여 형성된 터파기부내에 안착고정될 수 있는 형상 및 구조로 이루어지면 족하다.The shape and structure of the foundation block 10 is not limited to FIG. 1, but is sufficient if it is made of a shape and structure that can be fixed in the trench formed by excavating soft ground.

다음으로, 상기 관체(30)는 상기 기초블럭(10)에 일체형으로 형성되는 것으로써, 도 1에서 보는 바와 같이 상기 기초블럭(10)의 상부에 형성되는 반원형상의 홈(11)상에 하단부가 안착고정될 수 있도록 상기 기초블럭(10)에 일체형으로 형성된다.Next, the tubular body 30 is formed integrally with the foundation block 10, and as shown in FIG. 1, the lower end portion is formed on the semi-circular groove 11 formed at the upper portion of the foundation block 10. It is formed integrally with the base block 10 to be seated and fixed.

보다 구체적으로, 도 1 내지 도 3에서 보는 바와 같이 상기 관체(30)의 타단부에는 상기 기초블럭(10)의 외측으로 일정길이 돌출되는 돌출부(31)가 형성되고, 일단부에는 상기 돌출부(31)가 삽입고정되는 확관부(33)가 형성된다.More specifically, as shown in FIGS. 1 to 3, the other end of the tubular body 30 is provided with a protrusion 31 protruding a predetermined length to the outside of the foundation block 10, and at one end of the protrusion 31. ) Is formed with an expansion tube (33) into which it is fixed.

상기 관체(30)의 형상 및 구조는 도 1 내지 도 3에 한정되는 것은 아니며, 상기 기초블럭(10)에 일체형으로 형성될 수 있는 형상 및 구조로 이루어지면 족하다.The shape and structure of the tubular body 30 is not limited to FIGS. 1 to 3, but is sufficient if it is made of a shape and structure that can be integrally formed on the foundation block 10.

다음으로, 상기 기초블럭(10)의 양측면에는 각각 복수의 연결공(13)이 일정간격으로 형성될 수 있다.Next, a plurality of connecting holes 13 may be formed on both sides of the foundation block 10 at predetermined intervals, respectively.

이때, 상기 기초블럭(10)의 일측면에 형성되는 연결공(13)과 상기 기초블럭(10)의 타측면에 형성되는 연결공(13)의 내부에는 도 2 및 도 3에서 보는 바와 같이 일정길이의 연결핀(15)이 삽입고정되는 것이 좋다.At this time, the connection hole 13 formed on one side of the base block 10 and the connection hole 13 formed on the other side of the base block 10, as shown in Figure 2 and 3 It is preferable that the length of the connection pin 15 is inserted and fixed.

이와 같이 상기 기초블럭(10)의 일측면에 형성되는 연결공(13)과 상기 기초블럭(10)의 타측면에 형성되는 연결공(13)의 내부에 삽입고정되는 연결핀(15)으로 인해 도 3에서 보는 바와 같이 상기 기초블럭(10)과 관체(30)를 보다 용이하게 각각 상호결합시켜 상기 터파기부내에 유동되지 않도록 견고하게 시공할 수 있게 되는 이점이 있게 된다.As such, due to the connection hole 13 formed on one side of the foundation block 10 and the connection pin 15 inserted into and fixed to the connection hole 13 formed on the other side of the foundation block 10. As shown in FIG. 3, the foundation block 10 and the tubular body 30 are more easily coupled to each other, so that there is an advantage that the construction can be performed firmly so as not to flow in the trench.

다음으로, 상기 기초블럭(10)에는 도 3에서 보는 바와 같이 상기 관체(30)와 연통되는 배수구(17)가 수직방향으로 일정간격으로 형성되는 것이 좋다.Next, as shown in FIG. 3, the foundation block 10 may have a drain hole 17 communicating with the tubular body 30 at regular intervals in the vertical direction.

이와 같이 상기 기초블럭(10)에 상기 관체(30)와 연통되는 배수구(17)가 수직방향으로 일정간격으로 형성됨으로서, 연약지반내에 포함된 지하수가 상기 배수구(17)를 따라 이동하여 상기 관체(30)로 배수될 수 있기 때문에 연약지반내에 포함된 지하수의 부력에 의해 상기 기초블럭(10)과 관체(30)가 들뜰 우려가 없어지게 되는 이점이 있게 된다.As such, the drainage holes 17 communicating with the tubular body 30 are formed in the vertical block 10 at regular intervals in the vertical direction, so that the groundwater contained in the soft ground moves along the drainage hole 17 so that the tubular body ( Since it can be drained to 30) by the buoyancy of the groundwater contained in the soft ground there is an advantage that the foundation block 10 and the tubular body 30 is no fear of floating.

한편, 작업자는 도 4에서 보는 바와 같이 연약지반(3)의 상기 터파기부(5)내에 상기 기초블럭(10)과 관체(30)를 시공한 후 굴토된 흙(7)을 다시 상기 터파기부(5)에 되메워서 공사를 마무리하게 된다.Meanwhile, as shown in FIG. 4, the worker constructs the foundation block 10 and the tubular body 30 in the trench 5 of the soft ground 3, and then returns the excavated soil 7 to the trench 5. 5) to complete the construction.

상술한 바와 같이 구성된 본 발명은 연약지반(3)을 굴토하여 형성된 상기 터파기부(5)내에 안착고정되는 상기 기초블럭(10)의 상부에 상기 관체(30)가 일체형으로 형성됨으로써, 종래처럼 상기 관체(30)를 상기 터파기부(5)내에 설치한 다음 상기 터파기부(5)내에 콘크리트를 타설하여 양생시킬 필요가 없어지기 때문에 작업공정수가 줄어들 수 있게 되어 공사기간이 크게 단축될 수 있음은 물론 이로 인해 시공성이 크게 향상될 수 있고, 나아가 공사에 따른 인력과 비용 또한 현저하게 줄어들 수 있는 이점이 있다.According to the present invention configured as described above, the tubular body 30 is integrally formed on the upper portion of the foundation block 10 which is fixed and fixed in the trench 5 formed by excavating the soft ground 3. Since the pipe body 30 is installed in the trench 5 and there is no need to pour concrete to cure the trench 5, the number of work steps can be reduced, and the construction period can be greatly shortened. As a result, the constructability can be greatly improved, and furthermore, there is an advantage that the manpower and cost of the construction can be significantly reduced.

도 1은 본 발명의 일실시예를 개략적으로 나타내는 사시도이고,1 is a perspective view schematically showing an embodiment of the present invention,

도 2는 관체의 타단부에 형성된 돌출부가 관체의 일단부에 형성된 확관부에 삽입고정되기 전의 상태를 개략적으로 나타내는 사시도이고,2 is a perspective view schematically showing a state before the protrusion formed at the other end of the tube is inserted and fixed to the expansion tube formed at one end of the tube;

도 3은 관체의 타단부에 형성된 돌출부가 관체의 일단부에 형성되는 확관부에 삽입고정된 상태를 개략적으로 나타내는 단면도이고,3 is a cross-sectional view schematically illustrating a state in which a protrusion formed at the other end of the tube body is inserted and fixed to an expansion tube formed at one end of the tube body;

도 4는 연약지반을 굴토하여 형성된 터파기부내에 기초블럭이 안착고정된 상태를 개략적으로 나타내는 단면도이다.4 is a cross-sectional view schematically showing a state in which the foundation block is fixed in the trench formed by excavating the soft ground.

*** 도면의 주요부분에 대한 부호의 설명****** Explanation of symbols for main parts of drawing ***

3; 연약지반, 5; 터파기부,3; Soft ground, 5; Digging,

7; 흙, 10; 기초블럭,7; Soil, 10; Foundation Block,

11; 홈, 13; 연결공,11; Home, 13; Connector,

15; 연결핀, 17; 배수구,15; Connecting pin, 17; waterspout,

30; 관체, 31; 돌출부,30; Tube, 31; projection part,

33; 확관부.33; Expansion.

Claims (3)

연약지반을 굴토하여 형성된 터파기부내에 안착고정되는 기초블럭과; A basic block seated and fixed in the trench formed by excavating the soft ground; 상기 기초블럭의 상부에 형성되는 홈상에 하단부가 안착고정될 수 있도록 상기 기초블럭에 일체형으로 형성되고, 타단부에 상기 기초블럭의 외측으로 일정길이 돌출되는 돌출부가 형성되며 일단부에 상기 돌출부가 삽입고정되는 확관부가 형성되는 관체;를 포함하여 이루어지고,It is formed integrally with the foundation block so that the lower end is seated on the groove formed on the upper portion of the foundation block, the other end is formed with a protrusion protruding a predetermined length to the outside of the foundation block and the protrusion is inserted at one end It is made, including; 상기 기초블럭에는 상기 관체와 연통되는 배수구가 수직방향으로 일정간격으로 형성되는 것을 특징으로 하는 기초보강 콘크리트관 구조체.The foundation block reinforced concrete pipe structure, characterized in that the drain hole communicating with the tubular body is formed at a predetermined interval in the vertical direction. 제 1항에 있어서,The method of claim 1, 상기 기초블럭의 양측면에는 각각 복수의 연결공이 일정간격으로 형성되고,A plurality of connecting holes are formed on both sides of the foundation block at regular intervals, 상기 기초블럭의 일측면에 형성되는 연결공과 상기 기초블럭의 타측면에 형성되는 연결공의 내부에는 일정길이의 연결핀이 삽입고정되는 것을 특징으로 하는 기초보강 콘크리트관 구조체.Foundation reinforcement concrete pipe structure, characterized in that the connection pin of a predetermined length is inserted into the connection hole formed on one side of the foundation block and the connection hole formed on the other side of the foundation block. 삭제delete
KR1020070141854A 2007-12-31 2007-12-31 Concrete pipe structure KR100952608B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070141854A KR100952608B1 (en) 2007-12-31 2007-12-31 Concrete pipe structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070141854A KR100952608B1 (en) 2007-12-31 2007-12-31 Concrete pipe structure

Publications (2)

Publication Number Publication Date
KR20090073798A KR20090073798A (en) 2009-07-03
KR100952608B1 true KR100952608B1 (en) 2010-04-15

Family

ID=41330907

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070141854A KR100952608B1 (en) 2007-12-31 2007-12-31 Concrete pipe structure

Country Status (1)

Country Link
KR (1) KR100952608B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015158080A1 (en) * 2014-04-14 2015-10-22 黄欣 Reinforced concrete support pier for use in supporting underground water supply steel pipeline conduit construction

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102927364B (en) * 2012-11-05 2015-04-08 济南城建集团有限公司 Reinforced concrete pipe installation method and clamp special for reinforced concrete pipe
CN104895173A (en) * 2015-06-01 2015-09-09 中国十七冶集团有限公司 Sandy soil buried corrugated pipe subsidence prevention method
CN105133640B (en) * 2015-09-21 2017-10-31 山东送变电工程公司 A kind of electric built-in pipe wears concrete foundation positioner
CN105239660B (en) * 2015-11-09 2017-07-28 中建八局第四建设有限公司 Guiding gutter and water conservancy diversion groove construction method
CN109898548A (en) * 2019-02-14 2019-06-18 济南城建集团有限公司 Exempt from the assembling module and construction method of compacting in a kind of municipal pipeline basis
CN110848456B (en) * 2019-11-25 2021-09-17 上海宝冶市政工程有限公司 Construction method of large-diameter self-supporting overhead steel pipe

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200318113Y1 (en) 2003-03-13 2003-06-27 정진백 Pedestal member for hume pipe
KR200318079Y1 (en) 2003-02-06 2003-06-28 주식회사 한국지중정보 Supporter for hume pipe
KR200414125Y1 (en) 2006-01-27 2006-04-17 (주)신명건설기술공사 Pedestal structure for water pipeline used in waterworks and drainage, road, river bank and drainage works
KR100776349B1 (en) 2006-07-04 2007-11-15 나남열 A precast material for the fundamental structure and method constructing the fundamental structure with it

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200318079Y1 (en) 2003-02-06 2003-06-28 주식회사 한국지중정보 Supporter for hume pipe
KR200318113Y1 (en) 2003-03-13 2003-06-27 정진백 Pedestal member for hume pipe
KR200414125Y1 (en) 2006-01-27 2006-04-17 (주)신명건설기술공사 Pedestal structure for water pipeline used in waterworks and drainage, road, river bank and drainage works
KR100776349B1 (en) 2006-07-04 2007-11-15 나남열 A precast material for the fundamental structure and method constructing the fundamental structure with it

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015158080A1 (en) * 2014-04-14 2015-10-22 黄欣 Reinforced concrete support pier for use in supporting underground water supply steel pipeline conduit construction

Also Published As

Publication number Publication date
KR20090073798A (en) 2009-07-03

Similar Documents

Publication Publication Date Title
KR100952608B1 (en) Concrete pipe structure
KR101648704B1 (en) Underground wall structure
KR100616123B1 (en) Device for drain underground water and method for construction the same
KR101524303B1 (en) The wall members and underground wall, underground wall construction method using the same
KR100982819B1 (en) A prefabricated drain-road
KR200396485Y1 (en) Device for drain underground water for construction the same
KR101066198B1 (en) Underground construction method of top-down with slurry walls
JP2009180035A (en) Method of connecting caisson
KR100751573B1 (en) Reinforcement apparatus of water pipe in weakness ground
KR101275468B1 (en) The structure assembly for building a tunnel and building method thereof
JP5169638B2 (en) Construction method of underground structure
KR100655383B1 (en) Method of drain construction for basement
KR200275363Y1 (en) The mold establishment necessit do not exist assembly road water pipe
KR100524188B1 (en) Connection structure of concrete fume pipe
JP2009068203A (en) Earth retaining wall composed of horizontal sheathing with soldier beam, and cut-off structure, construction method and cut-off method for the earth retaining wall
KR100653278B1 (en) Dam inspection gallery with grouting hole
KR20090061868A (en) Assembling structure of arch-type precast culvert and method constructing the culvert
KR20200005841A (en) Rainwater storage tank construction method using top-down method
KR101285987B1 (en) Improved Compound Roof Tunnel Method
KR200457950Y1 (en) Block for water channel
KR101219450B1 (en) Building structure using underground watertight wall and construction method thereof
KR20130022567A (en) Supporting means for pipe and the construction method using it
KR200462219Y1 (en) Constructing device for hume pipe underground
KR200381471Y1 (en) A waterway duct unit
KR101175907B1 (en) Supporting construct for hume pipe

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130311

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140513

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150302

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170210

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180418

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20190131

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20200302

Year of fee payment: 11