KR100952207B1 - Connection Structure and Connecting Method between Precast Pier and Foundation - Google Patents

Connection Structure and Connecting Method between Precast Pier and Foundation Download PDF

Info

Publication number
KR100952207B1
KR100952207B1 KR1020080044657A KR20080044657A KR100952207B1 KR 100952207 B1 KR100952207 B1 KR 100952207B1 KR 1020080044657 A KR1020080044657 A KR 1020080044657A KR 20080044657 A KR20080044657 A KR 20080044657A KR 100952207 B1 KR100952207 B1 KR 100952207B1
Authority
KR
South Korea
Prior art keywords
precast
foundation
transverse
pier
precast bridge
Prior art date
Application number
KR1020080044657A
Other languages
Korean (ko)
Other versions
KR20090118711A (en
Inventor
심창수
장정환
Original Assignee
중앙대학교 산학협력단
주식회사 중앙씨앤씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 중앙대학교 산학협력단, 주식회사 중앙씨앤씨 filed Critical 중앙대학교 산학협력단
Priority to KR1020080044657A priority Critical patent/KR100952207B1/en
Publication of KR20090118711A publication Critical patent/KR20090118711A/en
Application granted granted Critical
Publication of KR100952207B1 publication Critical patent/KR100952207B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/04Flat foundations in water or on quicksand
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 프리캐스트 교각과 기초에 서로 연통되도록 쉬스관을 매립시켜 그 내부에 긴장재를 배치하고 긴장하거나, 또는 상기 쉬스관의 내부에 강재를 삽입한 후 그라우팅하여 일체화시킴으로써 상기 프리캐스트 교각과 기초를 견고하게 일체로 결합할 수 있는 연결구조 및 연결시공방법에 관한 것이다. In the present invention, a sheath pipe is embedded so as to communicate with a precast bridge pier and a foundation, and a tension member is disposed inside the sheath pipe and is taut, or a steel material is inserted into the sheath pipe and then grouted to integrate the precast bridge pier, And more particularly, to a connection structure and a connection construction method capable of firmly and integrally joining together.

본 발명에 따르면, 기초(20) 상면에 오목하게 형성된 연결홈(25)의 내부에 프리캐스트 부재로 이루어진 프리캐스트 교각(10)의 하단이 삽입되어 있고, 상기 프리캐스트 교각(10) 내부에는 횡방향 쉬스관(14)이 배치되어 있으며, 상기 기초(20) 내부에도 상기 프리캐스트 교각(10) 내부에 배치된 횡방향 쉬스관(14)과 연통되는 위치에 횡방향 쉬스관(24)이 배치되어 있고, 상기 프리캐스트 교각(10) 내부의 횡방향 쉬스관(14)과 상기 기초(20) 내부의 횡방향 쉬스관(24)에 횡방향 강재(26)가 연속 배치되어 고정되어 있으며, 상기 연결홈(25)과 프리캐스트 교각(10) 사이의 공간에 충진재(40)가 채워짐으로써 일체로 연결되는 것을 특징으로 하는 프리캐스트 교각과 기초의 연결구조 및 그 시공방법이 제공된다. According to the present invention, a lower end of a precast bridge pier 10 made of a precast member is inserted into a connection groove 25 formed concavely on an upper surface of a foundation 20, And a transverse sheath tube (24) is disposed in the base (20) at a position communicating with the transverse sheath tube (14) disposed in the precast bridge pillar (10) And the transverse sheath pipe 14 in the precast bridge pillar 10 and the transverse sheath pipe 24 in the transverse sheath pipe 24 in the foundation 20 are continuously arranged and fixed, A connection structure between the precast bridge piers and the foundation and a method of constructing the precast bridge bridge are characterized in that the space between the connection grooves 25 and the precast bridge piers 10 is filled with the filling material 40 to be integrally connected.

Description

프리캐스트 교각과 기초의 연결구조 및 연결시공방법{Connection Structure and Connecting Method between Precast Pier and Foundation}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a precast pier,

본 발명은 프리캐스트 교각과 기초의 연결구조 및 연결시공방법에 관한 것으로서, 구체적으로는 프리캐스트 교각과 기초에 서로 연통되도록 쉬스관을 매립시켜 그 내부에 긴장재를 배치하고 긴장하거나, 또는 상기 쉬스관의 내부에 강재를 삽입한 후 그라우팅하여 일체화시킴으로써 상기 프리캐스트 교각과 기초를 견고하게 일체로 결합할 수 있는 연결구조 및 연결시공방법에 관한 것이다. The present invention relates to a connection structure and a connection construction method of precast bridge piers and bases. More particularly, the present invention relates to a precast bridge pier and a foundation connection method, The present invention relates to a connection structure and a connection construction method capable of firmly and integrally joining the precast bridge pier and a foundation by integrally joining the precast bridge pier with a steel material after inserting the steel material into the interior of the bridge.

종래에는 기초 상면으로 보강재를 연장시켜 돌출시키고, 보강재가 포함되도록 교각 등의 상부 구조물을 현장에서 타설함으로써 기초와 교각을 연결하였다. 특히, 상부 구조물이 프리캐스트 부재인 경우에는 주로 강봉 등을 통하여 상부 구조물과 기초를 형성하는 철근을 연결하고, 상부 구조물의 하단이 매립되도록 현장에서 기초 콘크리트를 타설하여 기초와 교각을 연결시공하였다.Conventionally, the reinforcing member is extended and protruded to the upper surface of the foundation, and the foundation and pier are connected by placing the upper structure such as a pier or the like on the site so that the reinforcement is included. Particularly, when the upper structure is a precast member, the foundation is connected to the bridge by connecting the upper structure with the reinforcing bars forming the foundation through the steel rods, etc., and placing the foundation concrete on the site so that the lower portion of the upper structure is embedded.

그러나 기존의 교각과 기초의 연결구조에서는 프리캐스트 교각에 발생하는 휨 모멘트로 인해 기초와 교각의 연결부가 벌어지는 현상이 빈번하게 발생하였다. 이를 방지하기 위하여 프리캐스트 교각에 가하는 프리스트레스양을 증가시키게 되는데, 과다한 프리스트레스의 도입으로 교각의 정적 내하력이 감소할 수 있고, 시간에 따라 프리스트레스가 손실되므로 교각에 발생하는 휨 모멘트를 상쇄하기 어려운 문제가 있다. 또한, 지나치게 많은 긴장재가 필요하게 되어, 보강재 등의 배치에 어려움이 따른다. However, in the connection structure of existing piers and bases, the connection between the foundation and the piers is frequently caused by the bending moments occurring in the precast piers. In order to prevent this, the amount of prestress applied to the precast pier is increased. The introduction of excessive prestress reduces the static load bearing capacity of the pier and the loss of prestress over time makes it difficult to offset the bending moment generated at the pier. have. In addition, too much tension is required, which makes it difficult to arrange reinforcements.

본 발명은 위와 같이 종래 기술이 가지는 한계 및 문제점을 극복하기 위하여 개발된 것으로서, 기초부와 프리캐스트 교각 사이가 벌어지는 것을 최소화하여 기초와 교각의 연결을 보강하는 것을 목적으로 한다. The present invention has been developed in order to overcome the limitations and problems of the prior art as described above, and aims at reinforcing the connection between the foundation and the bridge pier by minimizing the spread between the foundation part and the precast bridge pier.

또한, 본 발명은 프리캐스트 부재를 사용함으로써 시공 상의 신속성과 경제성을 확보할 수 있을 뿐만 아니라, 사용 시 구조적인 안전성을 확보할 수 있는 것을 목적으로 한다.Further, the present invention aims at securing promptness and economical efficiency in construction by using a precast member and securing structural safety during use.

본 발명에 따르면, 기초에 프리캐스트 교각의 일부가 매입되도록 함과 동시에 두 구조부재(기초부와 프리캐스트 교각)를 관통하도록 강재를 배치함으로써, 두 구조부재의 확실한 구조적 연결을 도모할 수 있게 되는 효과가 발휘된다. According to the present invention, by allowing a part of the precast bridge pier to be embedded in the foundation, and by arranging the steel material so as to pass through the two structural members (the foundation part and the precast bridge pier), reliable structural connection of the two structural members can be achieved Effect is exerted.

그 뿐만 아니라, 본 발명에서는 기초와 프리캐스트 교각이 연결되는 위치가 휨모멘트 최대점에 위치하지 않도록 함으로써, 기초와 프리캐스트 교각의 연결부분에서의 벌어짐을 막기 위해 배치해야 하는 축방향 긴장재의 수를 줄일 수 있으며, 그에 따라 경제성과 시공성을 개선할 수 있게 되는 효과가 발휘된다. In addition, in the present invention, the number of axial tensions to be placed in order to prevent widening at the connection between the foundation and precast pier may be reduced by preventing the location where the foundation and the precast bridge piers are connected from being located at the maximum bending moment It is possible to improve the economical efficiency and the workability.

특히, 프리캐스트 교각이 기초에 매입될 때, 기초의 상면에 배치된 철근이 절곡되는 것을 고려하여, 본 발명에서는 기초에서 프리캐스트 교각을 관통하도록 축방향 긴장재를 배치함으로써, 기초 내하력의 확보뿐만 아니라, 프리캐스트 교각 과 기초의 견고한 연결을 동시에 확보할 수 있게 된다는 효과가 발휘된다. In particular, considering that the reinforcing bars disposed on the upper surface of the foundation are bent when the precast bridge piers are embedded in the foundation, in the present invention, by disposing the axial tension members so as to penetrate the precast bridge piers at the foundation, , It is possible to simultaneously secure a rigid connection between the precast bridge pier and the foundation.

또한, 본 발명에 따르면 프리캐스트 부재를 사용하여 신속하고 경제적으로 기초부와 교각을 연결 시공할 수 있고, 사용시에도 구조적인 안전성을 확보할 수 있다.In addition, according to the present invention, it is possible to quickly and economically connect a foundation and a pier using a precast member, and to ensure structural safety during use.

위와 같은 목적을 달성하기 위하여 본 발명에서는, 기초 상면에 오목하게 형성된 연결홈의 내부에 프리캐스트 부재로 이루어진 프리캐스트 교각의 하단이 삽입되어 있고, 상기 프리캐스트 교각 내부에는 횡방향 쉬스관이 배치되어 있으며, 상기 기초 내부에도 상기 프리캐스트 교각 내부에 배치된 횡방향 쉬스관과 연통되는 위치에 횡방향 쉬스관이 배치되어 있고, 상기 프리캐스트 교각 내부의 횡방향 쉬스관과 상기 기초 내부의 횡방향 쉬스관에 횡방향 강재가 연속 배치되어 고정되어 있으며, 상기 연결홈과 프리캐스트 교각 사이의 공간에 충진재가 채워짐으로써 일체로 연결되는 것을 특징으로 하는 프리캐스트 교각과 기초의 연결구조가 제공된다. In order to achieve the above object, in the present invention, a lower end of a precast bridge pier formed of a precast member is inserted into a connection groove formed concavely in a top surface of a foundation, and a transverse sheath pipe is disposed inside the precast bridge pier And a transverse sheath tube is disposed in the base so as to communicate with the transverse sheath pipe arranged in the precast pier, wherein the transverse sheath pipe in the precast pier and the transverse sheath inside the foundation A transverse steel material is continuously installed and fixed to the pipe, and a space between the connection groove and the precast bridge pier is filled with a filling material, thereby being integrally connected.

위와 같은 본 발명의 연결구조에서, 상기 횡방향 강재는 긴장재로 구성되어, 상기 긴장재의 긴장에 의하여 상기 기초와 상기 프리캐스트 교각에 횡방향으로 긴장력이 가해지는 구조를 가질 수 있다. In the above connection structure of the present invention, the transverse steel may be constituted by a tensile material, and may have a structure in which a tensile force is applied to the foundation and the precast bridge pier in the transverse direction due to the tension of the tensile material.

또한, 위와 같은 본 발명의 연결구조에서, 상기 프리캐스트 교각 내부에는 길이방향으로 축방향 쉬스관이 배치되어 있고, 상기 기초에는 일단이 상기 연결홈 상면으로 돌출되고, 타단이 기초 내에 매립된 축방향 긴장재가 구비되어 있으며, 상기 축방향 긴장재는 상기 프리캐스트 교각의 축방향 쉬스관 내에 삽입되어 긴장되어 있는 구조를 가질 수도 있다. 특히, 이러한 구조에서는 상기 기초 내에는 고정판이 배치되어 있고, 상기 고정판에는 상기 기초 내에 매립된 축방향 긴장재의 단부가 고정되어 있는 구조를 이룰 수 있다. In addition, in the connection structure of the present invention, the axial sheath pipe is disposed in the longitudinal direction inside the precast bridge pier, and one end of the axial sheath pipe protrudes from the upper surface of the connecting groove, A prestressing material may be provided and the axial tension material may be inserted into the axial sheath tube of the precast bridge pier and be strained. Particularly, in such a structure, a fixing plate is disposed in the base, and the end of the axial tensional material embedded in the base is fixed to the fixing plate.

또한, 본 발명에서는, 내부에 횡방향 쉬스관이 구비된 프리캐스트 교각과, 내부에 횡방향 쉬스관이 구비되고 상면에 오목하게 연결홈이 형성된 기초의 연결시공방법으로서, 상기 기초의 연결홈에 프리캐스트 부재로 이루어진 상기 프리캐스트 교각의 하단을 삽입하고; 상기 프리캐스트 교각의 횡방향 쉬스관과, 상기 기초의 횡방향 쉬스관이 서로 연통되는 위치에 있는 상태에서 횡방향 쉬스관을 관통하도록 횡방향 강재를 배치하여 고정시키고, 상기 연결홈과 프리캐스트 교각 사이의 공간에 충진재를 채워, 상기 프리캐스트 교각과 상기 기초를 일체로 연결하는 것을 특징으로 하는 프리캐스트 교각과 기초의 연결시공방법이 제공된다. According to another aspect of the present invention, there is provided a method of connecting a foundation having a precast pier provided with a transverse sheath pipe therein and a transverse sheath pipe disposed therein and having a concave connection groove formed on the upper surface thereof, Inserting the lower end of the precast bridge piercing the precast bridge; A transverse sheath pipe is arranged and fixed so as to pass through the transverse sheath pipe in a state where the transverse sheath pipe of the precast pier and the transverse sheath pipe of the foundation are in communication with each other, The pre-cast pier and the foundation are integrally connected to each other by filling a space between the pre-cast pier and the foundation.

위와 같은 본 발명의 연결시공방법에서, 서로 연통된 횡방향 쉬스관)에 상기 횡방향 강재를 배치하여 고정하는 단계에서, 상기 횡방향 강재로서 긴장재를 삽입하고 긴장하여 고정시킴으로써 ,상기 긴장재의 긴장에 의하여 상기 기초와 상기 프리캐스트 교각에 횡방향으로 긴장력이 가해지도록 할 수도 있다. In the step of disposing and fixing the transverse steel material to the transverse sheath tube communicating with each other in the connecting and constructing method of the present invention as described above, by inserting the tension material as the transverse steel material and fixing it by tautness, So that a tensional force is applied to the foundation and the precast bridge pier in the transverse direction.

또한, 위와 같은 본 발명의 연결시공방법에서, 상기 프리캐스트 교각의 제작시에 그 내부에는 길이방향으로 축방향 쉬스관을 배치하고, 상기 기초의 제작시에도, 일단이 상기 연결홈 상면으로 돌출되고 타단이 기초 내에 매립되도록 축방향 긴장재를 설치해두어, 상기 기초의 연결홈에 프리캐스트 부재로 이루어진 상기 프 리캐스트 교각의 하단을 삽입한 상태에서, 상기 축방향 긴장재가 상기 프리캐스트 교각의 축방향 쉬스관 내에 삽입되도록 하고, 상기 횡방향 강재를 배치하여 고정시키는 단계의 전 또는 후에, 상기 축방향 긴장재를 긴장하여 정착하여 기초와 프리캐스트 교각에 축방향으로 긴장력을 가하는 단계를 더 포함할 수도 있다. In addition, in the connecting construction method of the present invention, the axial sheath pipe is disposed in the longitudinal direction inside the pre-cast pier in the production of the pre-cast pier, and one end is protruded to the upper surface of the connection groove The axially tensioned material is installed so that the other end is embedded in the foundation and the axial torsion is applied to the axial sheath of the precast bridge pier in the state of inserting the lower end of the precast pier, The method may further include tensioning and fixing the axial tensions before or after the step of inserting the transverse steel into the pipe and placing and fixing the transverse steel to apply axial tension to the foundation and precast pier.

이하 첨부도면을 참고하여 본 발명의 구체적인 실시예들을 살펴봄으로써 본 발명의 구성에 대하여 설명한다. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1a 내지 도 1c에는 본 발명의 프리캐스트 교각(10)과 기초(20)가 연결된 상태의 개략적인 사시도, 평면도 및 부분 측단면도가 도시되어 있다. 본 발명의 프리캐스트 교각(10)은 공장에서 제작된 프리캐스트 부재로 이루어지며, 상기 프리캐스트 교각(10)의 하단부는 기초(20) 내에 매립되어 있다. 상기 기초(20) 내에 매립될 상기 프리캐스트 교각(10)의 하단부 내부에는 횡방향 쉬스관(14)이 매립되어 있고, 상기 기초(20) 내에도 횡방향 쉬스관(24)이 매립되어 있어, 상기 프리캐스트 교각(10)의 횡방향 쉬스관(14)과 상기 기초(20)의 횡방향 쉬스관(24)이 서로 연통된다. 도 1b에는 본 발명의 프리캐스트 교각(10)과 기초(20)가 연결된 상태의 평면도가 도시되어 있고, 도 1c에는 기초(20)와 프리캐스트 교각(10)의 연결부를 확대한 부분 측단면도가 도시되어 있다. 도면에서 보듯이, 상기 프리캐스트 교각(10) 내부에 매립된 횡방향 쉬스관(14)과 기초(20)에 매립된 횡방향 쉬스관(24)은 프리캐스트 교각(10)의 하단이 상기 기초(20)의 연결홈(25) 내에 배치될 때, 서로 연통될 수 있는 위치에 배치되는 것이다. Figs. 1A to 1C show a schematic perspective view, a plan view and a partial side sectional view, with the precast bridge 10 of the present invention and the foundation 20 connected. The precast bridges 10 of the present invention are made of factory pre-cast members, and the lower ends of the precast bridges 10 are embedded in a foundation 20. A transverse sheath pipe 14 is embedded in the lower end portion of the precast bridge pillar 10 to be buried in the foundation 20 and the transverse sheath pipe 24 is also embedded in the foundation 20, The transverse sheath pipe 14 of the precast bridge 10 and the transverse sheath pipe 24 of the foundation 20 communicate with each other. 1B is a top plan view of the precast bridge 10 of the present invention connected to a foundation 20 and FIG. 1C is a partial cross-sectional side view of an enlarged connection of the foundation 20 and precast bridge 10 Respectively. As shown, the transverse sheath tube 14 embedded in the precast bridge pier 10 and the transverse sheath pipe 24 embedded in the foundation 20 are configured such that the lower end of the precast bridge pier 10, Are disposed in a position where they can communicate with each other when they are disposed in the connection groove (25) of the base plate (20).

이와 같이 서로 연통된 상기 횡방향 쉬스관(14, 24) 내에는 횡방향 강재(26)가 배치된다. The transverse steels 26 are disposed in the transverse sheath pipes 14, 24 communicated with each other in this way.

우선, 상기 횡방향 강재(26)는 긴장재로 구성될 수 있는데, 상기 연통된 횡방향 쉬스관(14, 24)에 횡방향 강재(26)로서 긴장재가 배치되는 경우, 상기 긴장재는 긴장된 상태에서 그 단부가 기초(20)의 외면에서 정착됨으로써, 도 1a에서 보듯이, 상기 프리캐스트 교각(10)과 기초(20)에 횡방향으로 긴장력을 가하면서 상기 기초(20)와 프리캐스트 교각(10)을 일체로 연결할 수 있다. 이와 같이, 기초(20)와 프리캐스트 교각(10)을 관통하는 횡방향 긴장재(26)를 배치하고 긴장·정착함으로써 휨모멘트 작용에 의해 프리캐스트 교각(10)과 기초(20) 사이가 벌어지는 것을 방지할 수 있다. First, the transverse steel 26 may be comprised of a tensile material, wherein when the transverse steel 26 is provided with a tensile material in the communicated transverse sheath 14, 24, The ends are fixed at the outer surface of the foundation 20 so that the foundation 20 and the precast bridge 10 can be tilted while applying a transverse tension to the precast bridge 10 and foundation 20, Can be integrally connected. As described above, the transverse tensile member 26 passing through the foundation 20 and the precast bridge pier 10 is disposed and tensioned and fixed so that the precast bridge pier 10 and the foundation 20 are opened by the bending moment action .

그러나 상기 횡방향 강재(26)는 앞서 설명한 긴장재에 한정되는 것이 아니며, 강봉이나 다발 철근 등과 같이 긴장력이 도입되지 아니하는 강재로 이루어질 수 있다. 이와 같은 긴장력이 도입되지 아니한 횡방향 강재(26)가 상기 연통된 횡방향 쉬스관(14, 24)에 배치된 경우, 상기 횡방향 쉬스관(14, 24)의 내부는 무수축 모르타르 등과 같은 그라우팅재를 이용하여 그라우팅하여 상기 횡방향 강재(26)와 횡방향 쉬스관(14, 24), 그리고 기초(20)와 프리캐스트 교각(10)이 모두 일체화되도록 한다. However, the transverse steel 26 is not limited to the above-described taut material, and may be made of a steel material such as a steel bar, a bundle reinforcing bar, or the like, into which a tensional force is not introduced. When the transverse steels 26 in which such a tension force is not introduced are disposed in the communicating transverse sheath pipes 14 and 24, the inside of the transverse sheath pipes 14 and 24 is grouted such as non-shrinkable mortar, Grouting using the ash so that the transverse steels 26 and the transverse sheath pipes 14 and 24 and the foundation 20 and the precast bridge 10 are integrated.

이와 같이, 본 발명에서는 기초(20)와 프리캐스트 교각(10)을 관통하도록 횡방향 강재(26)를 배치하여 일체화시킴으로써, 두 구조부재의 확실한 구조적 연결을 도모할 수 있게 된다. As described above, in the present invention, the transverse steel members 26 are disposed so as to pass through the foundation 20 and the precast bridge pier 10, so that the structural members can be securely connected to each other.

한편, 도 1c에 도시된 바와 같이, 상기 프리캐스트 교각(10) 내에 축방향으로 배치된 축방향 쉬스관(13) 내부에는 상기 기초(20)에 고정된 축방향 긴장재(23)가 삽입될 수 있다.  1c, an axial tension member 23 fixed to the foundation 20 may be inserted into the axial sheath pipe 13 disposed axially in the precast bridge pier 10 have.

도 2a 및 도 2b에는 각각 본 발명의 프리캐스트 교각(10)과 그 보강철근(11, 12)의 배치를 보여주는 개략적인 사시도가 도시되어 있다. 본 발명의 프리캐스트 교각(10)은 상술한 바와 같이 사전 제작된 프리캐스트 부재로 이루어지며, 도 2b에서 보듯이 프리캐스트 교각(10)의 길이방향으로 배치된 축방향 보강철근(11)과, 상기 축방향 보강철근(11)을 감싸도록 배치되는 횡방향 보강철근(12)을 포함할 수 있다. 또한, 상기 프리캐스트 교각(10) 내에는 쉬스관(13, 14)이 매립될 수 있는데, 상기 쉬스관(13, 14)은 교각(10)의 각각 축방향과 횡방향으로 배치될 수 있다. 이때, 횡방향 쉬스관(14)은 전술한 것처럼, 상기 기초(20) 내에 배치되는 횡방향 쉬스관(24)과 서로 연통될 수 있도록, 상기 기초(20)에 매립될 하단부에 배치되는 것이 바람직하다. 한편, 상기 프리캐스트 교각(10) 내에 배치된 축방향 보강철근(11)은 단부가 갈고리 형상으로 이루어질 수 있으며, 횡방향 보강철근(12) 및 횡방향 쉬스관(14)에 충분히 정착되도록 하는 것이 바람직하다.2A and 2B are schematic perspective views showing the arrangement of the precast pier 10 and reinforcing bars 11 and 12 of the present invention, respectively. The precast pier 10 of the present invention comprises pre-fabricated precast members as described above, and includes an axial reinforcing bar 11 disposed in the longitudinal direction of the precast pier 10 as shown in FIG. 2B, And a transverse reinforcing bar 12 disposed to enclose the axial reinforcing steel bars 11. The sheath pipes 13 and 14 may be embedded in the precast bridge pier 10 and the sheath pipes 13 and 14 may be disposed in the axial direction and the transverse direction of the bridge pier 10, respectively. At this time, it is preferable that the transverse sheath tube 14 is disposed at the lower end to be embedded in the foundation 20 so as to communicate with the transverse sheath tube 24 disposed in the foundation 20, as described above Do. On the other hand, the axial reinforcing steel bars 11 disposed in the precast pier 10 may have hooks at the ends thereof, and may be sufficiently fixed to the transverse reinforcing bar 12 and the transverse sheath pipe 14 desirable.

도 3a 및 도 3b에는 각각 본 발명의 기초(20)와 그 보강철근(21) 배치를 보여주는 개략적인 사시도가 도시되어 있다. 본 발명의 기초(20)는 보강철근(21)이 매립되도록 콘크리트가 타설되어 형성되며, 상기 기초(20)의 상면으로 상기 프리캐스트 교각(10)의 하단부가 삽입될 수 있도록 연결홈(25)이 형성되어 있다. 이때, 상기 연결홈(25)은 상기 프리캐스트 교각(10)의 하단부가 충분히 매립될 수 있도록 상기 프리캐스트 교각(10)의 폭 또는 직경 정도의 깊이로 형성되는 것이 바람직하다. 한편, 상기 기초(20)는 상기 프리캐스트 교각(10)이 연결되기 전에 보강철근(21)이 매립되도록 콘크리트가 타설되어 형성될 수 있으며, 상기 기초(20) 역시 프리캐스트 부재로 제작될 수도 있다.3A and 3B are schematic perspective views showing the foundation 20 of the present invention and the arrangement of the reinforcing bars 21, respectively. The base 20 of the present invention is formed by placing concrete so that the reinforcing bar 21 is embedded and the connecting groove 25 is formed on the upper surface of the foundation 20 so that the lower end of the precast bridge pillar 10 can be inserted. Respectively. At this time, it is preferable that the connection groove 25 is formed to a depth of about the width or diameter of the precast bridge pier 10 so that the lower end of the precast bridge pier 10 can be sufficiently filled. The foundation 20 may be formed by placing concrete so that the reinforcing steel bar 21 is embedded before the precast bridge pier 10 is connected to the foundation 20 and the foundation 20 may be also made of a precast member .

상기 기초(20) 내에도 횡방향 쉬스관(24)이 배치되는데, 상기 횡방향 쉬스관(24)은 상술한 바와 같이, 상기 프리캐스트 교각(10) 내에 배치된 횡방향 쉬스관(14)과 서로 연통되도록 배치되는 것이 바람직하다. A transverse sheath tube 24 is also disposed within the foundation 20 which is constructed of a transverse sheath tube 14 disposed in the precast bridge pier 10, And are arranged so as to communicate with each other.

또한, 도시된 바와 같이, 상기 기초(20)의 연결홈(25) 상면으로는 상기 기초(20)와 프리캐스트 교각(10)을 연결시키기 위해 축방향 긴장재(23)가 배치되어 있다. 상기 축방향 긴장재(23)는 일단이 기초(20)의 연결홈(25) 상면으로 돌출되고, 상기 기초(20)를 형성하는 보강철근(21) 사이에 배치된 고정판(22)에 타단이 고정되어 있다. 이 때, 상기 축방향 긴장재(23)는 상술한 프리캐스트 교각(10) 내의 축방향 쉬스관(13)에 삽입되도록 배치되는 것이 바람직하다. 한편, 상기 고정판(22)은 상기 기초(20)를 구성하는 보강철근(21)과 용접 또는 이음 등의 다양한 방법으로 고정될 수 있다. As shown in the figure, on the upper surface of the connection groove 25 of the foundation 20, an axial tension member 23 is arranged to connect the foundation 20 and the precast bridge 10. One end of the axial tension member 23 protrudes from the upper surface of the connection groove 25 of the base 20 and the other end is fixed to the fixing plate 22 disposed between the reinforcing bars 21 forming the base 20 . At this time, it is preferable that the axial tension member 23 is disposed to be inserted into the axial sheath pipe 13 in the precast bridge 10 described above. Meanwhile, the fixing plate 22 may be fixed to the reinforcing bar 21 constituting the base 20 by various methods such as welding or joining.

도 4a 내지 도 4c에는 순서대로 본 발명의 프리캐스트 교각(10)과 기초를 연결 시공하는 과정을 보여주는 개략적인 사시도가 도시되어 있다. 먼저 도 4a에서 보듯이, 기초(20)의 연결홈(25)에 프리캐스트 교각(10)의 하단부가 삽입되도록 상기 프리캐스트 교각(10)을 배치한다. 이때, 상기 프리캐스트 교각(10)과 기초(20)에 배치된 횡방향 쉬스관(24)이 서로 연통되고, 상기 연결홈(25)의 상면으로 돌출 된 축방향 긴장재(23)가 상기 프리캐스트 교각(10) 내의 축방향 쉬스관(13)에 삽입될 수 있도록 상기 프리캐스트 교각(10)을 배치한다. 4A to 4C are schematic perspective views showing a process of connecting the precast bridge 10 of the present invention and a foundation in order. First, as shown in FIG. 4A, the precast bridge pier 10 is disposed such that the lower end of the precast bridge pier 10 is inserted into the connection groove 25 of the foundation 20. At this time, the precast bridge pier 10 and the transverse sheath pipe 24 disposed on the foundation 20 communicate with each other, and an axial tension member 23 protruding from the upper surface of the connection groove 25 communicates with the precast The precast pier 10 is positioned so that it can be inserted into the axial sheath tube 13 in the pier 10.

상기 프리캐스트 교각(10)을 상기 기초(20)의 연결홈(25) 내에 삽입한 후에는, 양 부재의 연통되는 횡방향 쉬스관(14, 24)을 통하여 횡방향 강재(26)를 배치한다. After the precast bridge pier 10 is inserted into the connection groove 25 of the foundation 20, the transverse steel 26 is disposed through the transverse sheath pipes 14, 24 communicating the two members .

상기 횡방향 강재(26)가 긴장재인 경우에는 상기 긴장재를 긴장하여 그 단부를 기초(20)의 외면에서 정착됨으로써, 상기 프리캐스트 교각(10)과 기초(20)에 횡방향으로 긴장력이 가해져 일체화된다. 한편, 상기 횡방향 강재(26)가 강봉이나 다발 철근과 같이 긴장되지 아니하는 것일 경우에는 횡방향 쉬스관(14, 24)에 횡방향 강재(26)를 배치하고 그라우팅 작업을 수행한다. When the transverse steel 26 is a tension member, the tension member is tensed and its end is fixed at the outer surface of the foundation 20, so that the precast bridge pier 10 and the foundation 20 are tensioned in the transverse direction, do. On the other hand, when the transverse steel 26 is not tense like a steel bar or a bundle reinforcing bar, the transverse steel 26 is placed on the transverse sheath pipes 14 and 24 and grouting is performed.

한편, 상기 연결홈(25)의 상면으로 돌출되어 상기 프리캐스트 교각(10)의 축방향 쉬스관(13) 내에 삽입된 축방향 긴장재(23)를 긴장시켜 상기 프리캐스트 교각(10)의 상면에서 그 단부를 정착한다. 이때, 상기 기초(20)의 외면과 프리캐스트 교각(10)의 상면에 정착판(30)을 설치하고, 상기 정착판(30)의 상면에서 긴장재(23, 26)의 단부를 정착할 수 있으며, 상기 쉬스관(13, 14, 24)을 그라우팅하여 부착강도를 확보하도록 하는 것이 바람직하다. 이와 같이, 축방향 긴장재(23)를 긴장하여 정착한 후에는 상기 연결홈(25)과 프리캐스트 교각(10)의 하단부 사이의 공간을 충진재(40)로 채움으로써 상기 프리캐스트 교각(10)과 기초(20)를 일체로 연결할 수 있다. 이와 같은 축방향 긴장재(23)는 프리캐스트 교각이 기초에 결합될 때, 연결홈(25)의 존재로 인하여 기초의 상면에 배치된 철근이 절곡되는 것을 고려한 것으로서, 상술한 것처럼, 본 발명에서는 기초에서 프리캐스트 교각을 관통하도록 축방향 긴장재(23)를 배치함으로써, 기초 내하력의 확보뿐만 아니라 프리캐스트 교각과 기초의 견고한 연결을 동시에 확보할 수 있게 된다. The axially tensioned material 23 protruding from the upper surface of the connecting groove 25 and inserted into the axial sheath pipe 13 of the precast bridge pier 10 is tilted so that the upper surface of the precast bridge pier 10 And settle the ends thereof. At this time, a fixing plate 30 is installed on the outer surface of the base 20 and the top surface of the precast bridge 10, and the ends of the tension members 23 and 26 can be fixed on the upper surface of the fixing plate 30 , And the sheath pipes (13, 14, 24) are grouted to secure the bonding strength. After the axial torsion members 23 are taut and fixed, the space between the connection groove 25 and the lower end of the precast bridge pier 10 is filled with the filler material 40, The base 20 can be integrally connected. Such an axial tension member 23 takes into consideration that the reinforcing bars disposed on the upper surface of the foundation are bent due to the presence of the connection grooves 25 when the precast bridge piers are coupled to the foundation. The axial tension member 23 is disposed so as to pass through the precast bridge pier, so that it is possible to secure both the foundation load bearing capacity and the rigid connection of the precast bridge pier and the foundation at the same time.

또한, 위와 같이, 본 발명에서는 기초와 프리캐스트 교각이 횡방향 강재에 의하여 연결되는 위치가 기초(20)의 깊숙한 곳에 위치하게 되어, 기초와 프리캐스트 교각의 연결부가 휨모멘트 최대점에 위치하지 않게 된다. 따라서, 기초와 프리캐스트 교각의 연결부분에서의 벌어짐을 막기 위해 배치해야 하는 축방향 긴장재의 수를 줄일 수 있으며, 그에 따라 경제성과 시공성을 개선할 수 있게 되는 효과가 발휘된다. Also, as described above, in the present invention, the position where the foundation and the precast bridge piers are connected by the transverse steel material is located deep in the foundation 20, so that the connection between the foundation and the precast bridge piers is not located at the maximum bending moment do. Accordingly, it is possible to reduce the number of axial tensions to be disposed in order to prevent the widening at the connecting portion between the foundation and the precast pier, thereby improving the economical efficiency and the workability.

도 1a 내지 도 1c는 본 발명의 프리캐스트 교각과 기초가 연결된 상태의 개략적인 사시도, 평면도 및 부분 측단면도이다.BRIEF DESCRIPTION OF THE DRAWINGS FIGURES 1A-1C are a schematic perspective view, a top view, and a partial side cross-sectional view, with the precast bridge piers of the present invention connected to a foundation.

도 2a 및 도 2b는 각각 본 발명의 프리캐스트 교각과 보강철근 및 쉬스관의 배치를 보여주는 개략적인 사시도이다.FIGS. 2A and 2B are schematic perspective views showing the arrangement of the precast pier, the rebar and the sheath pipe of the present invention, respectively.

도 3a 및 도 3b는 각각 본 발명의 기초부와 보강철근 및 쉬스관의 배치를 보여주는 개략적인 사시도이다.Figs. 3A and 3B are schematic perspective views showing the arrangement of the base portion, the rebar and the sheath tube of the present invention, respectively.

도 4a 내지 도 4c는 각각 순서대로 본 발명의 프리캐스트 교각과 기초를 연결 시공하는 과정을 보여주는 개략적인 사시도이다.4A to 4C are schematic perspective views illustrating a process of connecting and connecting the precast bridge piers and bases of the present invention in order, respectively.

<도면의 주요부분에 대한 부호의 설명>Description of the Related Art

10 프리캐스트 교각 11 축방향 보강철근 10 Precast pier 11 Axial rebar

12 횡방향 보강철근 13 축방향 쉬스관 12 Reversed Reinforcing Bars 13 Axial Sheath Tubes

20 기초부 21 보강철근 22 고정판 20 Foundation 21 Reinforcing bars 22 Fixing plates

23 축방향 긴장재 24 횡방향 쉬스관 23 Axial tension material 24 Lateral sheath tube

25 연결홈 26 횡방향 긴장재 25 connecting groove 26 transverse tension member

30 정착판 40 충진재30 Fixing plate 40 Filler

Claims (7)

기초(20) 상면에 오목하게 형성된 연결홈(25)의 내부에 프리캐스트 부재로 이루어진 프리캐스트 교각(10)의 하단이 삽입되어 있고,A lower end of a precast bridge 10 made of a precast member is inserted into a connection groove 25 formed concavely in an upper surface of a foundation 20, 상기 프리캐스트 교각(10) 내부에는 횡방향 쉬스관(14)이 배치되어 있으며,A transverse sheath tube 14 is disposed within the precast pier 10, 상기 기초(20) 내부에도 상기 프리캐스트 교각(10) 내부에 배치된 횡방향 쉬스관(14)과 연통되는 위치에 횡방향 쉬스관(24)이 배치되어 있고,A transverse sheath tube (24) is also disposed in the base (20) at a position to communicate with the transverse sheath tube (14) disposed inside the precast bridge pier (10) 상기 프리캐스트 교각(10) 내부의 횡방향 쉬스관(14)과 상기 기초(20) 내부의 횡방향 쉬스관(24)에 횡방향 강재(26)가 연속 배치되어 고정되어 있으며,The transverse sheath pipe 14 in the precast bridge pier 10 and the transverse sheath pipe 24 in the base 20 are arranged and fixed in a continuous manner, 상기 연결홈(25)과 프리캐스트 교각(10) 사이의 공간에 충진재(40)가 채워짐으로써 일체로 연결되는 것을 특징으로 하는 프리캐스트 교각과 기초의 연결구조.And a filler material (40) is filled in the space between the connection groove (25) and the precast bridge pier (10) so that they are integrally connected. 제1항에 있어서,The method according to claim 1, 상기 횡방향 강재(26)는 긴장재로 구성되어, 상기 긴장재의 긴장에 의하여 상기 기초(20)와 상기 프리캐스트 교각(10)에 횡방향으로 긴장력이 가해지는 것을 특징으로 하는 프리캐스트 교각과 기초의 연결구조.Characterized in that said transverse steel (26) is comprised of a tensioning material which is tensed transversely to said foundation (20) and said precast bridge pier (10) by the tension of said tensioning material. Connection structure. 제1항 또는 제2항에 있어서,3. The method according to claim 1 or 2, 상기 프리캐스트 교각(10) 내부에는 길이방향으로 축방향 쉬스관(13)이 배치되어 있고,An axial sheath tube 13 is disposed in the longitudinal direction inside the precast bridge pier 10, 상기 기초(20)에는 일단이 상기 연결홈(25) 상면으로 돌출되고, 타단이 기초(20) 내에 매립된 축방향 긴장재(23)가 구비되어 있으며,The base 20 is provided with an axial tension member 23 whose one end protrudes from the upper surface of the connecting groove 25 and whose other end is embedded in the base 20, 상기 축방향 긴장재(23)는 상기 프리캐스트 교각(10)의 축방향 쉬스관(13) 내에 삽입되어 긴장되어 있는 것을 특징으로 하는 프리캐스트 교각과 기초의 연결구조.Characterized in that the axial tension member (23) is inserted and tightened in the axial sheath tube (13) of the precast bridge pier (10). 제3항에 있어서,The method of claim 3, 상기 기초(20) 내에는 고정판(22)이 배치되어 있고,A fixing plate (22) is disposed in the base (20) 상기 고정판(22)에는 상기 기초(20) 내에 매립된 축방향 긴장재(23)의 단부가 고정되어 있는 것을 특징으로 하는 프리캐스트 교각과 기초의 연결구조.Characterized in that the end plate of the axial tension member (23) embedded in the foundation (20) is fixed to the fastening plate (22). 내부에 횡방향 쉬스관(14)이 구비된 프리캐스트 교각(10)과, 내부에 횡방향 쉬스관(24)이 구비되고 상면에 오목하게 연결홈(25)이 형성된 기초(20)의 연결시공방법으로서, A precast pier bridge 10 having a transverse sheath tube 14 therein and a transverse sheath tube 24 provided therein and having a connection groove 25 recessed in the top surface thereof, As a method, 상기 기초(20)의 연결홈(25)에 프리캐스트 부재로 이루어진 상기 프리캐스트 교각(10)의 하단을 삽입하고; Casting the lower end of the precast bridge pier (10), which is a precast member, into the connecting groove (25) of the foundation (20); 상기 프리캐스트 교각(10)의 횡방향 쉬스관(14)과, 상기 기초(20)의 횡방향 쉬스관(24)이 서로 연통되는 위치에 있는 상태에서 횡방향 쉬스관(14, 24)을 관통하도록 횡방향 강재(26)를 배치하여 고정시키고, The transverse sheath pipes 14 and 24 are passed through the transverse sheath pipes 14 in the state where the transverse sheath pipes 14 of the precast pierced bridge 10 and the transverse sheath pipes 24 of the foundation 20 are in communication with each other The transverse steel 26 is arranged and fixed, 상기 연결홈(25)과 프리캐스트 교각(10) 사이의 공간에 충진재(40)를 채워, 상기 프리캐스트 교각(10)과 상기 기초(20)를 일체로 연결하는 것을 특징으로 하는 프리캐스트 교각과 기초의 연결시공방법.Wherein the filler material is filled in a space between the connection groove and the precast bridge pier and the precast pier bridge is integrally connected to the foundation. Connection method of foundation. 제5항에 있어서,6. The method of claim 5, 서로 연통된 횡방향 쉬스관(14, 24)에 상기 횡방향 강재(26)를 배치하여 고정하는 단계에서, 상기 횡방향 강재(26)로서 긴장재를 삽입하고 긴장하여 고정시킴으로써 ,상기 긴장재의 긴장에 의하여 상기 기초(20)와 상기 프리캐스트 교각(10)에 횡방향으로 긴장력이 가해지도록 하는 것을 특징으로 하는 프리캐스트 교각과 기초의 연결시공방법.By inserting and fixing the tension members as the transverse steel members 26 in the step of arranging and fixing the transverse steel members 26 in the mutually communicating transverse sheath pipes 14 and 24, Wherein a tension is applied to the foundation (20) and the precast bridge pier (10) in a transverse direction. 제5항 또는 제6항에 있어서,The method according to claim 5 or 6, 상기 프리캐스트 교각(10)의 제작시에 그 내부에는 길이방향으로 축방향 쉬스관(13)을 배치하고, At the time of manufacturing the precast bridge pier 10, an axial sheath pipe 13 is disposed in the longitudinal direction, 상기 기초(20)의 제작시에도, 일단이 상기 연결홈(25) 상면으로 돌출되고 타 단이 기초(20) 내에 매립되도록 축방향 긴장재(23)를 설치해두어, The axial tension member 23 is provided so that one end thereof protrudes from the upper surface of the connection groove 25 and the other end is embedded within the base 20, 상기 기초(20)의 연결홈(25)에 프리캐스트 부재로 이루어진 상기 프리캐스트 교각(10)의 하단을 삽입한 상태에서, 상기 축방향 긴장재(23)가 상기 프리캐스트 교각(10)의 축방향 쉬스관(13) 내에 삽입되도록 하고, In the state where the lower end of the precast bridge pier 10 made of a precast member is inserted into the connection groove 25 of the foundation 20, the axial tension member 23 is moved in the axial direction of the precast bridge pier 10 Is inserted into the sheath tube (13) 상기 횡방향 강재(26)를 배치하여 고정시키는 단계의 전 또는 후에, 상기 축방향 긴장재(23)를 긴장하여 정착하여 기초(20)와 프리캐스트 교각(10)에 축방향으로 긴장력을 가하는 단계를 더 포함하는 것을 특징으로 하는 프리캐스트 교각과 기초의 연결시공방법.The step of tensioning and fixing the axial tensile material 23 before or after the step of placing and fixing the transverse steel 26 provides axial tension to the foundation 20 and the precast bridge 10 Wherein the pre-cast pier and the base are joined to each other.
KR1020080044657A 2008-05-14 2008-05-14 Connection Structure and Connecting Method between Precast Pier and Foundation KR100952207B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080044657A KR100952207B1 (en) 2008-05-14 2008-05-14 Connection Structure and Connecting Method between Precast Pier and Foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080044657A KR100952207B1 (en) 2008-05-14 2008-05-14 Connection Structure and Connecting Method between Precast Pier and Foundation

Publications (2)

Publication Number Publication Date
KR20090118711A KR20090118711A (en) 2009-11-18
KR100952207B1 true KR100952207B1 (en) 2010-04-09

Family

ID=41602650

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080044657A KR100952207B1 (en) 2008-05-14 2008-05-14 Connection Structure and Connecting Method between Precast Pier and Foundation

Country Status (1)

Country Link
KR (1) KR100952207B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101518210B1 (en) * 2014-08-12 2015-05-12 주식회사 피피에스브릿지 Precast Segment Concrete Footbridge and the Construction Method
KR20190023352A (en) 2017-08-28 2019-03-08 중앙대학교 산학협력단 Construction method of precast concrete column

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101328045B1 (en) * 2011-04-22 2013-11-13 주식회사 포스코건설 Reinforced concrete composite columns using precast high-performance fiber-reinforced cement
KR101358213B1 (en) * 2012-07-05 2014-02-05 삼성중공업 주식회사 Tower support structure and method for constructing the structure
KR101611468B1 (en) * 2015-04-22 2016-04-26 김정인 Structure and method of fixing main legs of steel tower structure
CN105421222B (en) * 2015-12-21 2017-06-30 上海市城市建设设计研究总院(集团)有限公司 Bridge prefabrication pier column and cushion cap socket type connecting structure and its assembling method
CN105442434B (en) * 2015-12-21 2017-06-30 上海市城市建设设计研究总院(集团)有限公司 The assembling method of bridge prefabrication column and prefabricated bent cap
CN105735113B (en) * 2016-04-20 2018-03-09 四川省交通运输厅公路规划勘察设计研究院 Pier stake transition connecting construction and its construction method for concrete filled steel tube bridge
CN106381804B (en) * 2016-09-06 2018-12-14 上海应用技术大学 A kind of precast assembly bridge pier and its Joining Technology using U-shaped reinforcement fabrication
CN106368117A (en) * 2016-09-29 2017-02-01 上海市政工程设计研究总院(集团)有限公司 Assembling method for bridge stand column and bearing platform
CN106436554A (en) * 2016-09-29 2017-02-22 上海市政工程设计研究总院(集团)有限公司 Device for assembling stand column with bearing platform of bridge
CN109208463A (en) * 2018-11-05 2019-01-15 南京理工大学 Bottom segment uses the Precast Concrete Segmental Bridges bridge pier of Component composition form
CN109577203B (en) * 2018-11-14 2020-09-01 黑龙江建筑职业技术学院 Column type pier pile extension steel bar bracket-free and construction method
CN109853363A (en) * 2018-12-18 2019-06-07 中交第二公路勘察设计研究院有限公司 Pipe pier and cushion cap connection structure and construction method
CN115045181A (en) * 2022-06-08 2022-09-13 北京工业大学 Socket joint type node connection method and structure for prefabricated pier column and bearing platform in middle and high intensity region

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0133616Y1 (en) * 1996-07-25 1999-02-18 홍완기 Prefabricated elevated road
KR200303271Y1 (en) 2002-10-24 2003-02-06 노윤근 Reinforced concrete unit pier block using prestressed concrete steel wire assembly and H-beam
KR100643575B1 (en) 2005-06-13 2006-11-10 중앙대학교 산학협력단 Precast column structure and constructing method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0133616Y1 (en) * 1996-07-25 1999-02-18 홍완기 Prefabricated elevated road
KR200303271Y1 (en) 2002-10-24 2003-02-06 노윤근 Reinforced concrete unit pier block using prestressed concrete steel wire assembly and H-beam
KR100643575B1 (en) 2005-06-13 2006-11-10 중앙대학교 산학협력단 Precast column structure and constructing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101518210B1 (en) * 2014-08-12 2015-05-12 주식회사 피피에스브릿지 Precast Segment Concrete Footbridge and the Construction Method
KR20190023352A (en) 2017-08-28 2019-03-08 중앙대학교 산학협력단 Construction method of precast concrete column

Also Published As

Publication number Publication date
KR20090118711A (en) 2009-11-18

Similar Documents

Publication Publication Date Title
KR100952207B1 (en) Connection Structure and Connecting Method between Precast Pier and Foundation
KR101136926B1 (en) Composite beam by prestressed concrete filled tube
KR101100438B1 (en) Method of constructing concrete footing structure of top structure
CN105781139B (en) The inadequate floor reinforcement means of bearing capacity
KR101325245B1 (en) Bridge Post which is assembled by precasted units
KR20110086008A (en) Structure for rigidly joining pier and concrete beam together
JP6427045B2 (en) Reinforcement structure and reinforcement method of existing concrete structure
JP2007239301A (en) Method of integrating precast concrete members interposed by filling concrete
KR101043239B1 (en) Prestressed segment concrete girder for bridge and manufacturing method thereof
KR101170922B1 (en) The rahmen bridge construction technique for which tendon and the connection support stand was used
WO2005066419A1 (en) Method of applying prestress and connecting means used therein and prestressed concrete beam therefrom
KR101043240B1 (en) Continuation structure of prestressed concrete girder bridge
KR101132213B1 (en) Improved Rigid Joint Structure of CFT Precast Concrete Column Unit and Steel Beam
KR101056027B1 (en) Combined structure of edge prestressed concrete composite pile with tension member and expansion foundation
JP6647721B1 (en) Tensionless PC steel bar concrete beam-column structure
KR20080111686A (en) Bridge using phc girder and slab-phc complex girder
KR200184683Y1 (en) Apparatus to repair and reinforce bridge
KR100773110B1 (en) Combination pile of phc pile and steel pipe attached concrete pile, constructing method therefor and temporary pile used therein
JP4447632B2 (en) Beam and beam-column joint structure and method of joining the same
JP4954226B2 (en) Prestressed concrete structure
KR102349439B1 (en) Steel box girder bridge with CFT reinforcement member and construction method thereof
KR200279918Y1 (en) beam-column connection detail of long-span pre-cast system
KR102200400B1 (en) Precast segment, pillar structure including the same and construction method of pillar structure usinging the same
KR102483445B1 (en) Composite pile connectiing device, structure and construction method using the same
KR102614593B1 (en) External Reinforcement Structure of Head Cutting PC Pile

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130402

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140410

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150625

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160517

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170329

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180626

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20190424

Year of fee payment: 10

R401 Registration of restoration