KR100930003B1 - Slab mould and slab constructing method using this - Google Patents

Slab mould and slab constructing method using this Download PDF

Info

Publication number
KR100930003B1
KR100930003B1 KR1020090034772A KR20090034772A KR100930003B1 KR 100930003 B1 KR100930003 B1 KR 100930003B1 KR 1020090034772 A KR1020090034772 A KR 1020090034772A KR 20090034772 A KR20090034772 A KR 20090034772A KR 100930003 B1 KR100930003 B1 KR 100930003B1
Authority
KR
South Korea
Prior art keywords
fastening
slab
slab formwork
flow path
support plate
Prior art date
Application number
KR1020090034772A
Other languages
Korean (ko)
Inventor
이범수
Original Assignee
서보산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 서보산업 주식회사 filed Critical 서보산업 주식회사
Priority to KR1020090034772A priority Critical patent/KR100930003B1/en
Application granted granted Critical
Publication of KR100930003B1 publication Critical patent/KR100930003B1/en
Priority to PCT/KR2010/002471 priority patent/WO2010123258A2/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/04Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PURPOSE: A slab foam using a plurality of euro-forms and a slab construction method using the same are provided to reduce the volume of a foam by preventing material for fixing a reinforcing support from being projected. CONSTITUTION: A slab foam(100) using a plurality of euro-forms comprises a placer plate(110), a plurality of euro-forms(120), and a plurality of reinforcing supports(130) and a fastener. The placer plate is formed in a flat plate shape. A plurality of euro-forms are installed on one side of the placer plate. A plurality of reinforcing supports are arranged on one side of the euro-form in one direction. The fastener fixes the reinforcing support on the euro-form.

Description

슬라브 거푸집 및 이를 이용한 슬라브 시공방법{SLAB MOULD AND SLAB CONSTRUCTING METHOD USING THIS}SLAB MOULD AND SLAB CONSTRUCTING METHOD USING THIS}

본 발명은 슬라브 거푸집에 관한 것으로서, 더욱 상세하게는 다수의 유로폼을 이용하여 거푸집을 제조하며, 거푸집의 보강을 위한 보강대의 조립과 분해가 용이하도록 함과 아울러 보강대를 고정하기 위한 자재가 돌출되지 않도록 하여 거푸집의 부피를 줄일 수 있고, 또한, 보강대의 사용량을 줄이면서 부피를 작게 하여도 충분한 강도를 확보할 수 있는 슬라브 거푸집 및 이를 이용한 슬라브 시공방법에 관한 것이다.The present invention relates to a slab formwork, and more particularly to manufacturing the formwork using a plurality of euroforms, to facilitate the assembly and disassembly of the reinforcement for the reinforcement of the form and to prevent the material for fixing the reinforcement. The present invention relates to a slab formwork and a slab construction method using the same, which can reduce the volume of the formwork, and can secure sufficient strength even with a small volume while reducing the amount of reinforcement.

일반적으로, 건축물을 건축할 경우 층과 층을 구획하는 슬라브를 형성하기 위해서는 사각형상의 거푸집을 다수개 연결하여 보와 플로우가 형성되도록 틀을 형성하고, 틀을 완성한 후에는 콘크리트를 타설하여 양생시키며, 콘트리트가 양생된 후에는 다수의 거푸집을 해체하게 되고, 이 해체된 거푸집을 수작업으로 상부층으로 운반하여 다시 전체적인 틀을 형성하여 콘트리트를 타설하게 된다.In general, when building a building to form a slab that divides the floor and the floor to form a frame to form a beam and flow by connecting a plurality of rectangular formwork, and after the frame is completed by pouring concrete to cure, After the concrete is cured, a large number of formwork is dismantled, and the disassembled formwork is transported to the upper layer by hand to form the overall frame again to place the concrete.

즉, 층과 층 사이를 구축하는 방법은 거푸집을 바닥으로부터 일정 높이(건축물의 설계에 의해 결정된 높이)로 배치한 후 다수의 서포터들을 상기 거푸집과 바닥 사이에 세워 상기 거푸집을 지지하고, 이와 같은 방법으로 다수의 거푸집을 수평으로 연결하여 상층 바닥의 틀을 구성한 후, 상기 거푸집의 내부에 콘크리트를 타설하는 것이 일반적이다.That is, the method of building between floors is to support the formwork by placing the formwork from the floor to a certain height (height determined by the design of the building) and then placing a plurality of supporters between the formwork and the floor. After forming a frame of the upper floor by connecting a plurality of formwork horizontally, it is common to pour concrete into the interior of the formwork.

종래 콘크리트 구조물을 축조하고자 할 때에는 나무재질로 구성된 거푸집을 사용했으나 콘크리트 구조물이 양생 된후 거푸집 제거시 콘크리트 벽체에서 착탈이 쉽게 되지 않아 못빼기, 해머 등을 이용하면 거푸집이 파손되어 재활용이 불가능하고, 콘크리트 벽체도 평평하게 고르지 못하며, 또한 아파트나 빌딩 등 고층에는 적합하지 못한 문제가 있다.When constructing a concrete structure, a formwork made of wood was used. However, when the formwork is cured, the formwork is not easily detachable from the concrete wall when the formwork is removed. Walls are also uneven, and there is a problem that is not suitable for high-rises, such as apartments and buildings.

상기와 같은 문제점을 해소하기 위하여, 최근에는 아파트나 빌딩, 고층건물 신축 시에는 금속재로 평면현상이 규격화 된 표준타입의 프레임을 조립하여 사용하는 유로폼을 널리 사용하고 있다.In order to solve the above problems, recently, when constructing an apartment, a building, or a high-rise building, Eurofoam is widely used by assembling a frame of a standard type in which a plane phenomenon is standardized by metal.

도 1과 도 2에서와 같이, 유로폼(1)은 소정크기를 갖는 사각패널 형상의 알루미늄 주물품으로서 다수개의 조립공이 관통 형성되어 있으며, 거푸집을 형성하기 위한 조립시 수직 및 수평으로 다수개의 유로폼(1)을 연속적으로 맞닿게 하여 죔쇠 등과 같은 체결수단을 사용하여 상호조립시킴으로써 거푸집(10)을 형성하도록 되어 있다.As shown in FIGS. 1 and 2, the euroform 1 is a rectangular panel-shaped aluminum casting having a predetermined size, and a plurality of assembling holes are formed therethrough. 1) continuously contact each other to form a form (10) by mutual assembly using a fastening means such as a clamp.

즉, 거푸집(10)은 다수의 유로폼(1)과 타설판(2)으로 구성된다.That is, the formwork 10 is composed of a plurality of flow paths (1) and the pouring plate (2).

한편, 콘크리트 타설시 콘크리트로부터 가해지는 압력에 의해 거푸집이 변형 되고 배부름현상이 발생될 수 있으므로 거푸집(10)에 보강대를 채용한다.On the other hand, since the formwork is deformed by the pressure applied from the concrete when placing the concrete can be generated, the reinforcement is employed in the formwork (10).

상기 보강대는 거푸집(10)의 저면(타설면의 반대측 면)에 일방향으로 배열되는 장선(3) 및 장선(3)의 저부에 장선(3)과 직교하는 방향으로 배열되는 다수의 멍에(4)로 이루어진다.The reinforcing rod is a joist (3) arranged in one direction on the bottom (opposite side of the pouring surface) of the form 10 and a plurality of yoke (4) arranged in the direction orthogonal to the joist (3) at the bottom of the joist (3) Is made of.

장선(3)과 멍에(4)는 와이어를 통해 묶여 고정된다.Joist (3) and yoke (4) is tied and fixed through the wire.

종래 기술에 의한 슬라브 거푸집에 의하면 다음과 같은 문제점이 있다.The slab formwork according to the prior art has the following problems.

상기 보강대를 유로폼에 결합하기 위해서는 와이어를 묶어야 하는데, 이 작업이 수작업에 의해 이루어지기 때문에 작업이 매우 번거롭고 불편하며, 따라서, 작업시간이 오래 걸리는 단점이 있다.In order to couple the reinforcing rod to the euroform, wires must be bundled. Since this work is performed by hand, the work is very cumbersome and inconvenient, and thus, a long time is required.

그리고, 보강대의 결속은 와이어만 의존하기 때문에 작업자가 와이어를 느슨하게 묶게 되면 보강대가 유로폼을 지지하지 못하여 콘크리트 타설면이 고르지 않고 보강대가 유로폼에서 떨어짐으로써 안전사고가 발생되는 단점도 있다.In addition, since the binding of the reinforcing rod depends only on the wire, when the worker loosely bundles the wire, the reinforcing rod does not support the Euroform, so that the concrete pouring surface is uneven and the reinforcing rod falls from the Euroform, so that a safety accident occurs.

또한, 콘크리트 타설이 완료된 후 거푸집을 해체하고, 정비 후 재사용하게 되는데, 이때, 보강대를 고정하는 와이어를 끊어 보강대를 분리하기 때문에 와이어를 재사용하지 못하게 되므로 매번 거푸집을 제작할 때마다 새로운 와이어를 사용하여야 하므로 제조원가가 비싸지는 단점도 있다. In addition, after the concrete is finished, the formwork is dismantled and reused after maintenance. At this time, the wire cannot be reused because the reinforcing bar is separated by breaking the wire fixing the reinforcing bar, so a new wire must be used every time the formwork is made. Another disadvantage is that the manufacturing cost is high.

이러한 단점을 해결하기 위하여 장선(3)과 멍에(4)의 보강대를 와이어가 아닌 체결수단(5)을 통해 유로폼(1)에 고정하는 종래 기술이 있다.In order to solve this drawback, there is a conventional technique of fixing the reinforcing bar of the joist (3) and the yoke (4) to the flow path (1) through the fastening means (5) rather than the wire.

체결수단(5)은 유로폼(1)에 핀 등으로 고정되는 체결봉(5a), 체결봉(5a)에 끼워지며 멍에(4)를 저부에서 지지하는 지지판(5b) 및 체결봉(5a)에 나사 체결되어 지지판(5b)을 지지하는 너트(5c)로 이루어진다.The fastening means 5 is fitted to the fastening rod 5a fixed to the flow path 1 by pins, the fastening rod 5a, and to the support plate 5b and the fastening rod 5a which support the yoke 4 from the bottom. It consists of a nut 5c which is screwed and supports the support plate 5b.

이와 같은 체결수단(5)에 따르면, 종래 와이어방식이 갖고 있는 단점을 해결할 수 있는 이점이 있다.According to such a fastening means 5, there is an advantage that can solve the disadvantages of the conventional wire method.

그러나, 이러한 종래 기술은 다음과 같은 문제점이 있다.However, this prior art has the following problems.

거푸집(10)은 타설판(2), 다수의 유포폼(1) 및 체결수단(5)이 결합된 상태로 운반 및 시공되는데, 체결봉(5a)이 멍에(4)보다 돌출되기 때문에 다단으로 적재할 수 없다. 물론, 체결봉(5a)이 돌출되어 있어도 장선(3)과 체결봉(5a) 사이의 공간에 스페이서를 개재한다면 거푸집(10)을 다단으로 적재할 수 있지만, 이렇게 되면 부피가 너무 커지기 때문에 단위 공간에 대한 적재수량이 적어지고 운반비 등의 물류비용이 많이 소요되며 운반시 거푸집이 파손되는 문제점이 있다.The formwork 10 is transported and constructed in a state in which the pour plate 2, the plurality of diffusion foams 1, and the fastening means 5 are coupled to each other, since the fastening rods 5a protrude more than the yoke 4. Can't load Of course, even if the fastening rod 5a protrudes, if the spacer 10 is provided in the space between the joist 3 and the fastening rod 5a, the formwork 10 can be stacked in multiple stages. There is a problem in that the amount of loading for the less, the logistics cost, such as transport costs, takes a lot, and the formwork is damaged during transportation.

그리고, 콘크리트 타설시 타설압력에 의한 타설판(2)의 변형을 막기 위하여 다수의 장선(3)과 멍에(4)가 서로 직교하는 방향으로 설치되므로 제조원가가 비싸지고 부피가 커져 물류 측면에서 문제점이 있다.Further, in order to prevent deformation of the pour plate 2 due to the pouring pressure when placing concrete, a plurality of joists (3) and the yoke (4) are installed in the direction perpendicular to each other, so the manufacturing cost is high and the volume is large, which causes problems in terms of logistics. have.

또한, 슬라브의 시공시 거푸집(10)을 서포트에 의해 지지하게 되는데, 종래 체결수단(5)은 상기 서포트와 연계되지 않기 때문에 상기 서포트의 설치를 위한 별도의 자재를 요구하는 문제점도 있다.In addition, the mold 10 during the construction of the slab is supported by the support, there is also a problem that requires a separate material for the installation of the support because the fastening means 5 is not associated with the support.

본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 다수의 유로폼을 이 용하여 거푸집을 제조하며, 거푸집의 보강을 위한 보강대의 조립과 분해가 용이하도록 함과 아울러 보강대를 고정하기 위한 자재가 돌출되지 않도록 하여 거푸집의 부피를 줄일 수 있는 슬라브 거푸집 및 이를 이용한 슬라브 시공방법을 제공하는데 그 목적이 있다. The present invention is to solve the above problems, to manufacture the formwork using a plurality of euroforms, to facilitate the assembly and disassembly of the reinforcement for the reinforcement of the formwork and to not protrude the material for fixing the reinforcement. The purpose is to provide a slab formwork and slab construction method using the same to reduce the volume of the formwork.

그리고, 본 발명의 다른 목적은 유로폼들의 조립시 유로폼의 강도를 보강하여 보강대를 줄이려는데 있다.In addition, another object of the present invention is to reduce the reinforcing bar by reinforcing the strength of the euro-foam when assembling the euro-foam.

본 발명의 또 다른 목적은 유로폼과 보강대를 체결하는 구성을 서포트와 연계하여 서포트의 설치가 용이하도록 하려는데 있다.Another object of the present invention is to facilitate the installation of the support in connection with the support to the configuration for fastening the euroform and the reinforcement.

전술한 바와 같은 목적을 달성하기 위한 본 발명에 의한 슬라브 거푸집은, 평평한 판상의 타설판과; 판재, 상기 판재의 테두리부에 결합되는 4개의 프로파일로 이루어지며 상기 판재가 상기 타설판의 일면에 대향되도록 결합되는 다수의 유로폼과; 상기 유로폼의 일측에 상호 간에 일정 간격을 두고 배열되어 상기 유로폼을 보강하는 보강대와; 그리고, 상기 보강대를 상기 유로폼에 고정하는 체결수단을 포함하고, 상기 체결수단은, 상기 보강대를 지지하며 조임구 수용부가 구비된 지지판, 일측이 상기 지지판의 조임구 수용부에 결합되며 타측에는 상기 유로폼에 형성된 고정공에 체결되는 고정부가 형성된 체결봉, 상기 지지판의 조임구 수용부에 상기 지지판보다 돌출되지 않도록 삽입되어 상기 체결봉을 상기 지지판에 고정하는 조임구를 포함하여 이루어진 것을 특징으로 한다.The slab formwork according to the present invention for achieving the above object is a flat plate-shaped pour plate; Plate and a plurality of flow paths formed of four profiles coupled to the rim of the plate and the plate is coupled to face one side of the pour plate; Reinforcing bars arranged on one side of the flow path with a predetermined interval therebetween to reinforce the flow path; And, the fastening means includes a fastening means for fixing to the flow path, the fastening means, the support plate for supporting the reinforcement and the fastener receiving portion, one side is coupled to the fastener receiving portion of the support plate, the other side the flow path The fastening rod is formed to be fixed to the fixing hole formed in, characterized in that it comprises a fastener for fixing the fastening rod to the support plate is inserted so as not to protrude from the support plate to the fastener receiving portion of the support plate.

그리고, 본 발명은 유로폼의 사이에 보강띠가 개재되어 보강재의 사용을 줄이는 것을 특징으로 한다.In addition, the present invention is characterized in that the reinforcing band is interposed between the flow path to reduce the use of the reinforcing material.

본 발명에 따른 슬라브 거푸집 및 이를 이용한 슬라브 시공방법에 의하면, 보강대를 고정하는 체결수단의 저부는 평평한 지지판으로 이루어지며, 이 지지판은 다른 구조물 위에 안정적으로 자립할 수 있으므로 별도의 자재없이 슬라브 거푸집을 다단으로 적재할 수 있고, 슬라브 거푸집의 부피가 작아져 동일 용적에 많은 수의 슬라브 거푸집을 적재할 수 있으므로 취급이 용이하고 물류비용을 줄일 수 있다.According to the slab formwork according to the present invention and the slab construction method using the same, the bottom of the fastening means for fixing the reinforcing bar is made of a flat support plate, this support plate can be stably independent on other structures, so that the slab formwork without multiple materials The slab formwork can be loaded in a small volume, and a large number of slab formwork can be loaded in the same volume, thereby facilitating handling and reducing logistics costs.

그리고, 유로폼들의 사이에 개재되는 보강띠에 의해 보강대의 수를 대폭으로 줄일 수 있으므로 제조원가를 절감할 수 있고 슬라브 거푸집의 부피를 줄일 수 있으므로 전술한 바와 같이 취급이 용이하고 물류비용을 줄일 수 있다.In addition, since the number of reinforcement bands can be drastically reduced by the reinforcing bands interposed between the euroforms, the manufacturing cost can be reduced and the volume of the slab formwork can be reduced, so that the handling is easy and the logistics cost can be reduced as described above.

또한, 보강대를 체결하는 체결수단의 조임구에 서포트를 연결하여 서포트를 연결하기 위한 별도의 자재를 사용하지 않으므로 슬라브 거푸집의 설치 및 탈형 작업을 단순화할 수 있다.In addition, by connecting the support to the fastener of the fastening means for fastening the reinforcing rod does not use a separate material for connecting the support can simplify the installation and demolding work of the slab formwork.

도 3과 도 4에서 보이는 바와 같이, 본 발명에 의한 슬라브 거푸집(100)은, 평평한 판상의 타설판(110)과; 타설판(110)의 일측면(타설면의 반대측면)에 설치되 는 다수의 유로폼(120)과; 유로폼(120)의 일면(타설판(110)의 반대측면)에 일방향으로만 배열 설치되는 다수의 보강대(130)와; 보강대(130)를 유로폼(120)에 고정하는 체결수단(140)으로 이루어진다.As shown in Figures 3 and 4, the slab formwork 100 according to the present invention, the flat plate-shaped pour plate 110; A plurality of flow paths 120 installed on one side of the pouring plate 110 (the opposite side of the pouring surface); A plurality of reinforcing rods 130 arranged in one direction only on one surface (the opposite side of the pouring plate 110) of the flow path 120; It consists of a fastening means 140 for fixing the reinforcement 130 to the flow path (120).

타설판(110)은 콘크리트가 타설되는 타설면을 형성하는 것이며, 콘크리트면을 고려하여 표면이 매끄러운 것이 바람직하다.The pour plate 110 forms a pour surface on which concrete is poured, and the surface is preferably smooth in consideration of the concrete surface.

유로폼(120)은 판재(121), 판재(121)의 테두리부에 결합되는 4개의 프로파일(122)로 이루어진다.The flow form 120 is composed of a plate member 121, four profiles 122 coupled to the edge portion of the plate member 121.

유로폼(120)은 판재(121)가 타설판(110)의 일면에 접하며 못 등에 의해 고정된다. 유로폼(120)은 타설판(110)의 크기에 따라 다양한 크기와 모양의 것이 선택되어 사용된다.The flow path 120 is a plate member 121 is in contact with one surface of the pouring plate 110 is fixed by a nail or the like. The euroform 120 is selected and used in a variety of sizes and shapes according to the size of the pour plate (110).

보강대(130)는 각목이나 각관 등이 사용 가능하며, 유로폼(120)의 일면(도면 기준 저면)에 설치되는 것으로, 유로폼(120)의 저면에서부터 설치되는 장선재(131), 멍에재(132)로 이루어질 수 있다. The reinforcing rod 130 may be used on a wood or a square tube, and is installed on one surface (the bottom of the drawing reference) of the euroform 120, and is made of the joist wire 131 and the yoke material 132 installed from the bottom of the euroform 120. Can be done.

도면에서는 보강대(130)가 2개를 1셋트로 하여 설치되는 것으로 도시되었으나, 보강대(130)는 1개씩만 일정 간격을 두고 설치될 수도 있다.In the drawings, the reinforcing rods 130 are illustrated as being installed with one set of two, but only one reinforcing rod 130 may be installed at a predetermined interval.

도 3 내지 도 5에서 보이는 것처럼, 체결수단(140)은, 보강대(130)를 저부에서 지지하는 지지판(141), 지지판(141)을 유로폼(120)에 고정하는 체결봉(142), 체결봉(142)을 지지판(141)에 고정하는 조임구(143)로 구성된다.3 to 5, the fastening means 140 includes a support plate 141 for supporting the reinforcing rod 130 at the bottom, a fastening rod 142 for fixing the support plate 141 to the flow path 120, and a fastening rod. Consists of a fastener 143 for fixing the 142 to the support plate 141.

지지판(141)은 통공(141b)이 형성된 바닥부(141a), 바닥부(141a)의 일측 이상(도면에는 양측으로 도시됨)에서 상부를 향해 돌출되어 보강대(130)를 측면에서 지지하는 측벽(141c) 및 체결봉(142)과 조임구(143)를 지지하는 조임구 수용부(141d)로 구성된다.The support plate 141 is a bottom portion 141a having a through hole 141b and a sidewall protruding upward from one side or more (shown on both sides in the drawing) of the bottom portion 141a to support the reinforcing rod 130 from the side surface ( 141c) and a fastener receiving portion 141d for supporting the fastening rod 142 and the fastener 143.

조임구 수용부(141d)는 바닥부(141a)의 통공(141b) 상부에 공간(이 공간은 체결봉(142)과 조임구(143)가 체결되는 공간이다)을 갖도록 형성되면서 체결봉(142)이 관통되는 체결공(141e)을 구비한다. 즉, 조임구 수용부(141d)는 지지판(141)의 바닥부(141a)에서 돌출되는 부분이 없도록 구성됨으로써 다단 적재가 가능하도록 한다.The fastener receiving portion 141d is formed to have a space (the space is a space where the fastening rod 142 and the fastener 143 are fastened) on the through hole 141b of the bottom portion 141a, and the fastening rod 142. ) Is provided with a fastening hole 141e. That is, the fastener receiving portion (141d) is configured so that there is no portion protruding from the bottom portion (141a) of the support plate 141 to enable multi-stage stacking.

체결봉(142)은 유로폼(120)의 프로파일(122)들에 일정 간격을 두고 형성된 고정공(123)과 지지판(141)의 조임구 수용부(141d)를 통해 체결되는 길이이며 일측(도면 기준 상측)에 고정공(123)에 끼워지는 고정부(142a)가 형성되고 타측은 조임구 수용부(141d)의 체결공(141e)에 관통된다.Fastening rod 142 is a length that is fastened through the fastening hole receiving portion 141d of the fixing hole 123 and the support plate 141 formed at regular intervals on the profile 122 of the euroform 120 and one side (based on the drawing) The fixing portion 142a fitted to the fixing hole 123 is formed in the upper side), and the other side penetrates through the fastening hole 141e of the fastener receiving portion 141d.

도 5에서처럼, 고정부(142a)는 외주면에 나사선이 형성된 볼트로서 유로폼(120)의 고정공(123)에 끼워지고 너트(142b)가 체결된다.As shown in FIG. 5, the fixing part 142a is a bolt having a threaded line formed on an outer circumferential surface thereof and is fitted into the fixing hole 123 of the flow path 120, and the nut 142b is fastened.

다르게는 도 6에서처럼, 고정부(142a)는 핀 타입이며, 핀 타입 고정부(142a)는 유로폼(120)의 고정공(123)에 관통된 후 록킹핀(142d)에 의해 고정될 수 있다.Alternatively, as shown in FIG. 6, the fixing part 142a is a pin type, and the pin type fixing part 142a may be fixed by the locking pin 142d after being passed through the fixing hole 123 of the flow path 120.

조임구(143)는 지지판(141)의 조임구 수용부(141d)에 저부에서부터 삽입되어 조임구 수용부(141d)의 체결공(141e)에 관통된 체결봉(142)에 체결된다. 조임구(143)는 너트일 수 있으며 체결공(141e)을 통해 빠지지 않을 외경으로 이루어진다.The fastener 143 is inserted into the fastener receiving part 141d of the support plate 141 from the bottom and fastened to the fastening rod 142 penetrated through the fastening hole 141e of the fastener receiving part 141d. Fastener 143 may be a nut and is made of an outer diameter that will not fall through the fastening hole (141e).

본 발명은 슬라브 거푸집(100)을 지면에 대해 지지하는 서포트(200)가 연계되도록 구성되며, 이는 조임구(143)에 이루어질 수 있다.The present invention is configured such that the support 200 for supporting the slab formwork 100 with respect to the ground is linked, which may be made to the fastener 143.

도 7에서처럼, 이를 위하여 조임구(143)는 체결봉(142)이 체결되는 제1체결부(143a), 서포트(200)의 단부에 형성된 고정볼트(210)가 체결되는 제2체결부(143b)로 구성될 수 있다.As shown in FIG. 7, for this purpose, the fastener 143 is the first fastening part 143a to which the fastening bar 142 is fastened, and the second fastening part 143b to which the fixing bolt 210 formed at the end of the support 200 is fastened. It can be composed of).

본 발명은 슬라브 거푸집(100)의 보강대의 멍에재(132)와 함께 전체적인 강도를 보강하기 위하여 도 8a와 도 8b처럼 보강띠(150)가 적용된다.In the present invention, the reinforcing band 150 is applied as shown in FIGS. 8A and 8B to reinforce the overall strength together with the yoke material 132 of the reinforcing bar of the slab formwork 100.

보강띠(150)는 유로폼(120)의 프로파일(122)에 외부를 향해 개방 형성된 홈(124)에 삽입된다.The reinforcing band 150 is inserted into the groove 124 open to the outside of the profile 122 of the flow path 120.

보강띠(150)는 보강대의 멍에재(132)와 직교하는 방향으로 배열될 수 있고, 보강대(130)와 상관없이 모든 방향에 설치될 수 있다.The reinforcing band 150 may be arranged in a direction orthogonal to the yoke material 132 of the reinforcing bar, and may be installed in any direction regardless of the reinforcing bar 130.

보강띠(150)는 체결봉(142)을 통해 견고하게 고정될 수 있다. 도면 중 미설명 부호 151은 체결봉(142)이 끼워지는 체결공이다.The reinforcing band 150 may be firmly fixed through the fastening rod 142. In the figure, reference numeral 151 denotes a fastening hole into which the fastening bar 142 is fitted.

이처럼 보강띠(150)가 적용되면 보강대는 장선재가 사용되지 않고 멍에재(132)만이 사용될 수 있다.As such, when the reinforcing band 150 is applied, the reinforcing bar may not be used as a long wire, but only the yoke material 132 may be used.

이와 같이 구성된 본 발명에 의한 슬라브 거푸집의 제조 방법은 다음과 같다.The manufacturing method of the slab formwork according to the present invention configured as described above is as follows.

콘크리트 건축물의 크기에 맞는 타설판(110)을 결정하고, 타설판(110)의 크 기에 맞는 다수의 유로폼(120)을 결정한다.Determine the pour plate 110 according to the size of the concrete building, and determine a plurality of euroforms 120 to fit the size of the pour plate (110).

유로폼(120)을 조립할 때 유로폼(120)들 사이에 보강띠(150)를 개재할 수 있고, 체결수단(140)의 체결봉(142)을 체결하여 보강띠(150)를 고정한다. 아울러, 유로폼(120)은 체결수단(140) 이외의 다른 체결수단(웨지핀, 알폼핀, 볼트 등)을 통해 견고하게 조립될 수도 있다.When assembling the flow path 120, the reinforcing band 150 may be interposed between the flow paths 120, and the reinforcing band 150 is fixed by fastening the fastening bar 142 of the fastening means 140. In addition, the euroform 120 may be firmly assembled through other fastening means (wedge pins, alfoam pins, bolts, etc.) other than the fastening means 140.

유로폼(120)들 위에 보강대(130)를 놓고 지지판(141)을 체결봉(142)에 끼워 조립한다. 이때는 조임구(143)가 체결봉(142)에 조립되기 이전의 상태이다.The reinforcing rod 130 is placed on the flow paths 120 and the support plate 141 is assembled to the fastening rods 142. In this case, the fastener 143 is in a state before being assembled to the fastening rod 142.

예를 들어 2개의 보강대(130)를 1셋트로 사용할 경우 체결봉(142)의 양측에 보강대(130)를 놓고 지지판(141)의 측벽(141c)을 보강대(130)의 외측에 지지되도록 한다. 이어서, 조임구(143)를 지지판(141)의 조임구 수용부(141d)에 삽입하여 체결봉(142)의 단부에 체결하면 지지판(141), 보강대(130) 및 유로폼(120)이 서로 조립된다.For example, when two reinforcing rods 130 are used as one set, the reinforcing rods 130 are placed on both sides of the fastening rod 142, and the sidewalls 141c of the support plate 141 are supported on the outside of the reinforcing rods 130. Subsequently, when the fastener 143 is inserted into the fastener receiving portion 141d of the support plate 141 and fastened to the end of the fastening rod 142, the support plate 141, the reinforcing rod 130, and the flow path 120 are assembled to each other. do.

이어서, 마지막에 타설판(110)을 유로폼(120) 조립체의 일면에 못 등으로 조립한다.Subsequently, the pour plate 110 is assembled with nails or the like on one surface of the flow path 120 assembly.

이상의 공정으로 조립된 슬라브 거푸집(100)들을 적재할 때 타설판(110)이 상부(또는 하부)를 향하도록 하는 방법으로 하여 적재할 수 있으며, 지지판(141)의 저부로 뾰족하게 돌출되는 부분이 없기 때문에 슬라브 거푸집(100)은 자립이 가능하므로 단순하게 쌓는 작업을 통해 다단 적재가 가능하다. 또한, 종래와 비교할 때 지지판의 저부로 돌출되는 부분만큼 부피가 작아졌기 때문에 종래보다 더 많은 수량의 슬라브 거푸집(100)을 적재할 수 있고, 적재시나 운반시 하부 거푸집의 파손 이 일어나지 않는다.When the slab formwork 100 assembled in the above process can be loaded in such a way that the pour plate 110 is directed to the upper (or lower), the portion protruding sharply to the bottom of the support plate 141 Since there is no slab formwork 100 is self-supporting can be stacked in multiple stages through a simple stacking operation. In addition, since the volume is smaller than the portion protruding to the bottom of the support plate compared with the prior art it is possible to load a larger number of slab formwork 100 than the conventional, the breakage of the lower formwork during loading or transport does not occur.

보강띠(150)를 갖는 슬라브 거푸집(100)은 기존 슬라브 거푸집과 비교할 때 기존 슬라브 거푸집이 장선재와 멍에재의 보강재 모두를 사용하였다면 장선재없이 멍에재(130)만을 사용한다.The slab formwork 100 having the reinforcing band 150 uses only the yoke material 130 without the joist material if the existing slab formwork used both the reinforcement material of the elder and the yoke material compared with the existing slab formwork.

본 발명에 의한 슬라브 거푸집을 이용한 슬라브 시공방법은 다음과 같다.The slab construction method using the slab formwork according to the present invention is as follows.

본 발명에 의한 슬라브 거푸집(100)을 지게차가 운반구 등으로 원하는 높이로 올리고, 서포트(200)의 고정볼트(210)를 조임구(143)의 제2체결부(143b)에 체결하면 슬라브 거푸집(100)이 서포트(200)를 통해 지면에 지지됨으로써 서포트(200)가 슬라브 거푸집(100)에서 이탈되지 않는다.The slab formwork 100 according to the present invention is raised to a desired height by a forklift or the like, and when the fixing bolt 210 of the support 200 is fastened to the second fastening portion 143b of the fastener 143, the slab formwork ( The support 200 is not released from the slab formwork 100 by being supported on the ground through the support 200.

슬라브 거푸집(100)의 위쪽에 슬라브의 두께를 감안하여 거푸집을 설치한 후, 콘크리트를 타설하여 슬라브를 완성한다.After installing the formwork in consideration of the thickness of the slab above the slab formwork 100, the concrete is poured to complete the slab.

슬라브의 양생 기간이 완료되면 지게차나 운반구 등을 슬라브 거푸집(100)의 저부에 배치하여 슬라브 거푸집(100)의 낙하시 지지하도록 하고, 서포트(200)의 스크류 너트를 풀어 서포트(200)를 슬라브 거푸집(100)에서 제거하면 슬라브 거푸집(100)이 슬라브에서 탈형되어 상기 지게차나 운반구에 낙하된다.When the curing period of the slab is completed, a forklift or a transporter is disposed at the bottom of the slab formwork 100 to support the slab formwork 100 when falling, and the support 200 is loosened by loosening the screw nut of the support 200. When removed at 100, the slab formwork 100 is demolded from the slab and dropped onto the forklift or transporter.

상기 지게차나 운반구를 다음 층이나 다른 곳으로 운반하여 슬라브 거푸집(100)을 재사용하거나 보수할 수 있다.The slab formwork 100 can be reused or repaired by transporting the forklift or transporter to the next floor or another place.

도 1은 종래 기술에 의한 슬라브 거푸집의 조립 상태도.1 is an assembly state of the slab formwork according to the prior art.

도 2는 종래 기술에 의한 슬라브 거푸집의 분해 사시도.Figure 2 is an exploded perspective view of the slab formwork according to the prior art.

도 3은 본 발명에 의한 슬라브 거푸집의 조립 상태도.Figure 3 is an assembly state of the slab formwork according to the present invention.

도 4는 본 발명에 의한 슬라브 거푸집의 분해 사시도.Figure 4 is an exploded perspective view of the slab formwork according to the present invention.

도 5는 본 발명에 의한 슬라브 거푸집에 적용된 체결수단의 사시도.5 is a perspective view of the fastening means applied to the slab formwork according to the present invention.

도 6은 본 발명에 의한 슬라브 거푸집에 적용된 체결수단의 다른 예시도.Figure 6 is another illustration of the fastening means applied to the slab formwork according to the present invention.

도 7은 본 발명에 의한 슬라브 거푸집의 조임구에 서포트가 연결된 도면.Figure 7 is a view connected to the fasteners of the slab formwork according to the present invention.

도 8a와 도 8b는 각각 본 발명에 의한 슬라브 거푸집에 적용된 보강띠의 조립 상태도와 사시도.Figure 8a and Figure 8b is a perspective view of the assembled state of the reinforcing strip applied to the slab formwork according to the present invention, respectively.

< 도면의 주요 부분에 대한 부호 설명><Description of Signs for Main Parts of Drawings>

110 : 타설판, 120 : 유로폼110: pouring plate, 120: euroform

122 : 프로파일, 123 : 고정공122: profile, 123: fixing hole

124 : 홈, 130 : 보강대124: groove, 130: reinforcement

140 : 체결수단, 141 : 지지판140: fastening means, 141: support plate

142 : 체결봉, 143 : 조임구142: fastening rod, 143: fastener

150 : 보강띠,150: reinforcing band,

Claims (9)

평평한 판상의 타설판(110)과;A pour plate 110 on a flat plate; 판재(121), 상기 판재의 테두리부에 결합되는 4개의 프로파일(122)로 이루어지며 상기 판재가 상기 타설판의 일면에 대향되도록 결합되는 다수의 유로폼(120)과;A plate member 121 and a plurality of euroforms 120 formed of four profiles 122 coupled to an edge portion of the plate member, the plate member being coupled to face one surface of the pour plate; 상기 유로폼의 일측에 상호 간에 일정 간격을 두고 배열되어 상기 유로폼을 보강하는 보강대(130)와; 그리고,A reinforcing rod 130 arranged on one side of the flow path with a predetermined interval therebetween to reinforce the flow path; And, 상기 보강대를 상기 유로폼에 고정하는 체결수단(140)을 포함하고,It includes a fastening means 140 for fixing the reinforcement to the flow path, 상기 체결수단은, The fastening means, 상기 보강대를 지지하며 조임구 수용부(141d)가 구비된 지지판(141), 일측이 상기 지지판의 조임구 수용부에 결합되며 타측에는 상기 유로폼에 형성된 고정공(123)에 체결되는 고정부(142a)가 형성된 체결봉(142), 상기 지지판의 조임구 수용부에 상기 지지판보다 돌출되지 않도록 삽입되어 상기 체결봉을 상기 지지판에 고정하는 조임구(143)를 포함하여 이루어진 것을 특징으로 하는 슬라브 거푸집.The support plate 141 supporting the reinforcing bar and having a fastener receiving part 141d, one side is coupled to the fastener receiving part of the support plate, and a fixing part 142a fastened to the fixing hole 123 formed in the flow path at the other side. The slab formwork, characterized in that it comprises a fastening rod 142 is formed, the fastening port 143 is inserted so as not to protrude from the support plate to the fastener receiving portion of the support plate to secure the fastening rod to the support plate. 청구항 1에 있어서, 상기 유로폼의 프로파일은 외부를 향해 개방된 홈(124)이 형성되며, 상기 유로폼들의 마주하는 프로파일의 홈에는 보강띠(150)가 개재되어 상기 보강대는 상기 유로폼의 저부에 일방향의 멍에재(132)만 설치되는 것을 특징으로 하는 슬라브 거푸집.The method of claim 1, wherein the profile of the flow path is formed with a groove 124 is opened toward the outside, the grooves of the facing profile of the flow path is provided with a reinforcing band 150 is interposed the reinforcing rod in one direction at the bottom of the flow path Slab formwork, characterized in that only yoke (132) is installed. 청구항 2에 있어서, 상기 보강띠는 상기 유로폼에 형성된 고정공과 연통하는 고정공(151)이 형성되어 상기 체결수단의 체결봉에 의해 함께 체결되는 것을 특징으로 하는 슬라브 거푸집.The slab formwork according to claim 2, wherein the reinforcing band is formed with a fixing hole (151) communicating with the fixing hole formed in the flow path and fastened together by the fastening rod of the fastening means. 청구항 1 내지 청구항 3 중 어느 한 항에 있어서, 상기 지지판은, 통공(141b)이 형성된 바닥부(141a), 상기 바닥부의 일측 이상에서 상부를 향해 돌출되어 상기 보강대를 측면에서 지지하는 측벽(141c)으로 이루어지고,According to any one of claims 1 to 3, The support plate, the bottom portion 141a is formed with a through hole (141b), the side wall 141c protruding upward from one side or more of the bottom portion to support the reinforcing table from the side Made of 상기 조임구 수용부는 상기 바닥부에 형성된 통공의 상부에 공간을 갖도록 형성되면서 상기 체결봉이 관통되는 체결공(141e)이 구비되며, The fastener receiving portion is formed to have a space in the upper portion of the through hole formed in the bottom portion is provided with a fastening hole (141e) through which the fastening rod is penetrated, 상기 조임구는 상기 지지판의 조임구 수용부(141d)에 저부에서부터 삽입되어 상기 조임구 수용부의 체결공을 관통한 상기 체결봉의 단부에 체결되는 것을 특징으로 하는 슬라브 거푸집.The fastener is a slab formwork, characterized in that is fastened to the end of the fastening rod inserted into the fastener receiving portion (141d) of the support plate through the fastening hole of the fastener receiving portion. 청구항 4에 있어서, 상기 조임구는 상기 체결봉이 체결되는 제1체결부(143a), 상기 슬라브 거푸집을 지면에 대해 지지하는 서포트(200)의 단부에 형성된 고정볼트(210)가 체결되는 제2체결부(143b)로 구성된 것을 특징으로 하는 슬라브 거푸집.The second fastening part of claim 4, wherein the fastener has a first fastening part 143a to which the fastening rod is fastened, and a second fastening part 210 to which a fixing bolt 210 formed at an end of the support 200 supporting the slab formwork against the ground is fastened. Slab formwork, characterized in that consisting of (143b). 청구항 5에 있어서, 상기 체결봉의 고정부는 상기 유로폼의 고정공에 끼워지 는 고정핀이며, 상기 고정핀은 상기 유로폼의 고정공에 관통된 후 록킹핀에 의해 고정되는 것을 특징으로 하는 슬라브 거푸집.The slab formwork according to claim 5, wherein the fixing part of the fastening rod is a fixing pin inserted into the fixing hole of the euroform, and the fixing pin is fixed by a locking pin after passing through the fixing hole of the euroform. 청구항 5에 있어서, 상기 체결봉의 고정부는 상기 유로폼의 고정공에 끼워지며 너트로 체결되는 볼트인 것을 특징으로 하는 슬라브 거푸집.The slab formwork according to claim 5, wherein the fixing part of the fastening rod is a bolt inserted into the fixing hole of the flow path and fastened with a nut. 콘크리트 건축물의 크기에 맞는 타설판(110)과 유로폼(120)을 결정하는 제1-1단계, 조임구 수용부(141d)가 구비된 지지판(141), 일측이 상기 지지판의 조임구 수용부에 결합되며 타측에는 상기 유로폼에 형성된 고정공(123)에 체결되는 고정부(142a)가 형성된 체결봉(142), 상기 지지판의 조임구 수용부에 상기 지지판보다 돌출되지 않도록 삽입되어 상기 체결봉을 상기 지지판에 고정하는 조임구(143)를 포함하여 이루어진 체결수단(140)을 준비하는 제1-2단계, 상기 유로폼의 타측에 보강대(130)의 장선재(131)와 멍에재(132)를 서로 직교하도록 배치하고 상기 체결수단(140)의 지지판에 상기 멍에재를 삽입한 후 상기 체결수단의 조임구를 조여 상기 유로폼을 조립하는 제1-3단계, 상기 유로폼들의 일면에 상기 타설판(110)을 조립하는 제1-4단계로 이루어져 슬라브 거푸집(100)을 조립하는 제1단계와;Step 1-1 to determine the pour plate 110 and the euroform 120 according to the size of the concrete building, the support plate 141 is provided with a fastener receiving portion (141d), one side of the fastener receiving portion of the support plate Is coupled to the other side fastening rods 142 formed with a fixing portion 142a is fastened to the fixing hole 123 formed in the flow path, the fastening port receiving portion of the support plate is inserted so as not to protrude from the support plate to the fastening rods Step 1-2 to prepare a fastening means 140 comprising a fastener 143 for fixing to the support plate, the joists 131 and yoke 132 of the reinforcing rod 130 on the other side of the flow path orthogonal to each other And placing the yoke material on the support plate of the fastening means 140, and then tightening the fasteners of the fastening means to assemble the euroforms, the pouring plate 110 on one surface of the euroforms. Slab formwork consisting of steps 1-4 to assemble (10 0) assembling the first step; 상기 슬라브 거푸집(100)을 원하는 높이로 올린 상태에서 서포트(200)의 고정볼트(210)를 상기 체결수단의 조임구(143)의 제2체결부(143b)에 체결하여 상기 슬라브 거푸집을 지면에 지지하는 제2단계와;In the state in which the slab formwork 100 is raised to a desired height, the fixing bolt 210 of the support 200 is fastened to the second fastening portion 143b of the fastener 143 of the fastening means, so that the slab formwork is grounded. A second step of supporting; 상기 제2단계에 의해 설치된 슬라브 거푸집의 위쪽에 슬라브의 두께를 감안 하여 거푸집을 설치한 후, 콘크리트를 타설하여 슬라브를 완성하는 제3단계와;A third step of installing the formwork in consideration of the thickness of the slab on the upper side of the slab formwork installed by the second step, and then placing the concrete to complete the slab; 상기 제3단계를 거쳐 상기 슬라브의 양생 기간이 완료되면 상기 슬라브 거푸집을 저부에서 지지한 상태에서 상기 서포트(200)의 높이를 낮추어 상기 슬라브 거푸집을 상기 슬라브에서 탈형하는 제4단계를 포함하여 이루어진 것을 특징으로 하는 슬라브 거푸집을 이용한 슬라브 시공방법.And a fourth step of demolding the slab formwork from the slab by lowering the height of the support 200 in a state in which the slab formwork is supported at the bottom through the third step. Slab construction method using the slab formwork characterized in that. 청구항 1에 있어서, 상기 제1-3단계에서는 상기 유로폼의 둘레부에 형성된 홈(124)에 보강띠(150)를 개재하여 상기 체결수단에 의해 상기 보강띠를 고정하는 것을 특징으로 하는 슬라브 거푸집을 이용한 슬라브 시공방법.The slab formwork according to claim 1, wherein in the first and third steps, the reinforcing band is fixed by the fastening means through the reinforcing band 150 in the groove 124 formed at the circumference of the flow path. Slab construction method using.
KR1020090034772A 2009-04-21 2009-04-21 Slab mould and slab constructing method using this KR100930003B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020090034772A KR100930003B1 (en) 2009-04-21 2009-04-21 Slab mould and slab constructing method using this
PCT/KR2010/002471 WO2010123258A2 (en) 2009-04-21 2010-04-20 Slab mould, and slab construction method using same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090034772A KR100930003B1 (en) 2009-04-21 2009-04-21 Slab mould and slab constructing method using this

Publications (1)

Publication Number Publication Date
KR100930003B1 true KR100930003B1 (en) 2009-12-07

Family

ID=41683861

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090034772A KR100930003B1 (en) 2009-04-21 2009-04-21 Slab mould and slab constructing method using this

Country Status (2)

Country Link
KR (1) KR100930003B1 (en)
WO (1) WO2010123258A2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101728007B1 (en) * 2015-11-11 2017-04-19 신영산업개발 주식회사 Supporter fixing unit for mould
KR101798539B1 (en) 2017-04-07 2017-11-16 신성구조이엔지 주식회사 High Construction Pier Apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR920018221U (en) * 1991-03-19 1992-10-17 문성호 Prefab formwork
KR100346280B1 (en) 1999-08-11 2002-07-26 (주)레벨텍 A horizontal utensil for a wall mould of the cement concrete building
KR200303750Y1 (en) 2002-11-07 2003-02-11 박상목 A Sheeting reinforcement Structure Clamp of Construct
KR100850801B1 (en) 2008-02-21 2008-08-29 서보산업 주식회사 A concrete mold connecting structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR920018221U (en) * 1991-03-19 1992-10-17 문성호 Prefab formwork
KR100346280B1 (en) 1999-08-11 2002-07-26 (주)레벨텍 A horizontal utensil for a wall mould of the cement concrete building
KR200303750Y1 (en) 2002-11-07 2003-02-11 박상목 A Sheeting reinforcement Structure Clamp of Construct
KR100850801B1 (en) 2008-02-21 2008-08-29 서보산업 주식회사 A concrete mold connecting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101728007B1 (en) * 2015-11-11 2017-04-19 신영산업개발 주식회사 Supporter fixing unit for mould
KR101798539B1 (en) 2017-04-07 2017-11-16 신성구조이엔지 주식회사 High Construction Pier Apparatus

Also Published As

Publication number Publication date
WO2010123258A2 (en) 2010-10-28
WO2010123258A3 (en) 2011-03-10

Similar Documents

Publication Publication Date Title
US6832456B1 (en) Frame unit for use in construction formwork
KR101237325B1 (en) Stripping deck
KR101752275B1 (en) Structural Mold for Reinforced Concrete Column using Profiled Steel Plate
KR100796808B1 (en) Euro-form mold for exposed concreate and method for constructing the exposed concreate using the same
KR100638848B1 (en) A slab concrete forms of build
KR100819833B1 (en) Apparatus and method for building slab of a concrete build
KR100917833B1 (en) Form fixing structure for constructing pillar
KR100498815B1 (en) Framework system for truss deck using construction mold assembly
KR100903212B1 (en) Connector of truss girder
US8978343B1 (en) Method and system for transporting a cast panel
US7775500B1 (en) Concrete forming system with interacting brackets connecting stacked form panels
KR100930003B1 (en) Slab mould and slab constructing method using this
KR20080084130A (en) Coupling structure of dek for slab execution
US20230272629A1 (en) Formwork panel
KR101603403B1 (en) Lintel using steel material and method for manufacturing thereof
KR100546839B1 (en) Truss framework system for stairs
KR101859398B1 (en) Building construction method using exposed concrete wall
JP2022028326A (en) Beam bottom molding frame
KR200408443Y1 (en) Aluminum panel for constructing concrete wall
KR101803487B1 (en) Reinforcement for Connecting formwork
KR102029001B1 (en) Wall structure and the construction method therefor
JP6760564B2 (en) Support structure for temporary frames and ceiling panel temporary frames that make up a reinforced concrete building
KR102242175B1 (en) Mold for prefabricated double wall precast concrete
KR102491586B1 (en) variable type detachable beam deck
KR102331140B1 (en) A precast concrete hollow column using unit duct modules

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121128

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20131128

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20141128

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20151130

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20161125

Year of fee payment: 8