KR100903407B1 - Soil nail anchor - Google Patents

Soil nail anchor Download PDF

Info

Publication number
KR100903407B1
KR100903407B1 KR1020080014436A KR20080014436A KR100903407B1 KR 100903407 B1 KR100903407 B1 KR 100903407B1 KR 1020080014436 A KR1020080014436 A KR 1020080014436A KR 20080014436 A KR20080014436 A KR 20080014436A KR 100903407 B1 KR100903407 B1 KR 100903407B1
Authority
KR
South Korea
Prior art keywords
spike
nail
hole
pressing
anchor
Prior art date
Application number
KR1020080014436A
Other languages
Korean (ko)
Inventor
이득근
Original Assignee
이득근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이득근 filed Critical 이득근
Priority to KR1020080014436A priority Critical patent/KR100903407B1/en
Application granted granted Critical
Publication of KR100903407B1 publication Critical patent/KR100903407B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/14Geometrical or physical properties resilient or elastic
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A nail anchor for slope reinforcement construction is provided to apply anchor force with simple configuration by coupling an anchor member inserted into a bored hole to the pressure member with self-load and expanding a spike part the inner wall to the bored hole. A nail anchor for slope reinforcement construction comprises: a pressure member(100) being formed by inserting a nail(20) into a bored hole(10) and being filled with grout and being fixed by being inserted into the bored hole; and an anchor member coupled to the upper part of the pressure member as the nail is coupled to the anchor member. After the pressure member is inserted into the bored hole, the anchor member is inserted to the upper part of the pressure member and, at the same time, a spike part(220) is protruded to outside and is expanded to the inner wall of the bored hole.

Description

사면보강공사용 네일앵커{soil nail anchor}Slope anchor for nail reinforcement {soil nail anchor}

본 발명은 사면보강공사용 네일앵커에 관한 것으로서, 특히 가압체 또는 정착체가 자체 하중에 의해 상호 결합됨과 동시에 스파이크부가 천공홀 내측벽으로 확장되도록 하여 구성이 단순하여 그 가공 및 제작이 용이한 사면보강공사용 네일앵커에 관한 것이다.The present invention relates to a nail anchor for slope reinforcement, and in particular, the pressing body or the fixture is coupled to each other by its own load, and at the same time the spike portion is extended to the inner wall of the drilling hole so that the configuration is simple and easy to process and manufacture the slope reinforcement It's about nail anchors.

일반적으로 주거단지나 산업단지 또는 철도, 고속도로, 터널과 같은 산업기반시설의 토목공사를 할 때에는 자연적인 경사지형이나 굴착공사 등으로 인한 인공적인 급경사지형이 구축된다.In general, when the civil works of industrial complexes such as residential complexes, industrial complexes, railways, highways, tunnels, artificial steep slopes are created due to natural slopes or excavation.

자연적, 인공적으로 형성된 비탈면은 토압, 풍압, 수압, 지진 등 여러가지 요인에 의해 절취, 붕괴 등의 위험에 노출되어 있다. 그래서, 비탈면의 절취, 붕괴 등을 방지하기 위해 소일네일링(soil nailing), 락볼팅(rock bolting), 앵커(permanent anchor method) 등 각종 사면보강공법이 사용되고 있다.Naturally and artificially formed slopes are exposed to the risk of cutting and collapse due to various factors such as earth pressure, wind pressure, water pressure, and earthquake. Thus, various slope reinforcement methods such as soil nailing, rock bolting, and permanent anchor method have been used to prevent cutting and collapse of the slope.

상기 사면보강공법 중 소일네일링(soil nailing) 공법은 먼저 비탈면고르기를 한 후, 비탈면의 상부에서 하부로 다수개의 보강홀을 일정 간격으로 천공하고, 보강홀 내부의 흙부스러기 등 이물질을 압축공기 또는 고압수를 분사하여 제거한 후, 네일(nail:이형철근)을 삽입하고 그라우트(grout:시멘트+물+모래)를 보강홀에 충진시킨 후, 보강홀의 입구부에 플레이트를 설치하게 된다. 이와 같은 방법으로 비탈면 하단부의 보강홀에 순차적으로 네일을 삽입하여 그라우팅(grouting)을 완료하고 비탈면의 표면 녹화 또는 숏크리트(shotcrete)를 타설하여 사면보강작업을 완료하는 것이다.Soil nailing method of the slope reinforcement method is to first select the slope surface, then drill a plurality of reinforcing holes from the upper portion of the slope to the bottom at regular intervals, and compressed the foreign matter such as soil debris in the reinforcing hole or After spraying and removing the high pressure water, a nail (nail: rebar) is inserted and grout (grout: cement + water + sand) is filled in the reinforcing hole, and then a plate is installed at the inlet of the reinforcing hole. In this way, the nails are sequentially inserted into the reinforcing holes at the bottom of the slope to complete grouting, and the surface greening or shotcrete of the slope is completed to complete the slope reinforcement.

그러나, 상기 전통적인 소일네일링공법은 보강홀에 네일구조체와 그라우트가 삽입 및 주입되어 경화된 상태로 단순히 보강홀에 끼워진 것에 불과하여 사면을 안정적으로 보강할 수 없으며, 비탈면의 상부 보강홀에 그라우팅하고 5~7일 경화시킨 후, 하부 보강홀에 네일삽입 및 그라우팅작업이 이루어짐으로써 시공기간이 장기간 소요되는 문제점이 있었다.However, the conventional small nailing method is simply inserted into the reinforcing hole in the hardened state by inserting and injecting the nail structure and the grout into the reinforcing hole, so that the slope cannot be reliably reinforced and grouted on the upper reinforcing hole of the slope. After curing for 5-7 days, there was a problem that the construction period takes a long time because the nail insertion and grouting work is made in the lower reinforcing hole.

상기와 같은 전통적인 소일네일링공법의 문제점을 해결하기 위해 기존 네일링 공법에 앵커공법을 응용시켜 사면보강시공 기간을 단축하고 인장저항력을 강화시킨 소일네일구조체가 안출된 바 있다.In order to solve the problems of the traditional small nailing method as described above, by applying the anchor method to the existing nailing method, a short nail structure having shortened reinforcement construction period and strengthening tensile resistance has been devised.

상기 네일링공법과 앵커공법을 응용한 소일네일구조체에는 대한민국특허청 등록공보에 게시된 특허 제10-0448037호의 "사면보강공사용 소일네일구조체 및 사면보강공사용 소일네일링 공법"(이하에서는 '인용발명 1'이라 한다), 특허 제10-0704774호의 "사면보강공사용 소일네일앵커"(이하에서는 '인용발명 2'라 한다), 공개특허공보에 게시된 특허출원 제10-2005-0023887호의 "어스앵커구조체"(이하에서는 '인용발명 3'이라 한다) 등이 있다.The nailing method and the anchoring method applying the anchoring method is a "slope reinforcement used for the small nail structure and slope reinforcement used for the nailing method" of the Patent Publication No. 10-0448037 published in the Republic of Korea Patent Office registration (hereinafter referred to as' quoting invention 1 "Soil nail anchor for slope reinforcement work" (hereinafter referred to as "quotation citation 2") of Patent No. 10-0704774, and the "earth anchor structure" of Patent Application No. 10-2005-0023887 published in the Patent Publication No. "(Hereinafter referred to as 'quotation citation 3').

상기 인용발명 1은 모반에 형성된 천공홀에 네일을 삽입시키고, 여기에 그라 우팅을 충진고결시켜 형성되는 사면보강공사용 소일네일 구조체에 있어서, 상기 네일 선단에 나사결합에 의해 앵커블레이드를 확장시켜 천공홀의 끝단에서 내주면에 압착 또는 침투되어 네일에 모반을 지점으로 인장저항력을 제공하는 앵커몸체가 결합된 것을 그 특징으로 하고 있다.In the cited invention 1, a nail reinforcement for slope reinforcement is formed by inserting a nail into a drilled hole formed in the birthmark, and filling and grouting the grout therein, by extending the anchor blade by screwing the nail tip to the hole of the drilled hole. It is characterized in that the anchor body is coupled to the inner circumferential surface at the end to provide a tensile resistance to the birthmark on the nail.

상기 인용발명 2는 몸체의 상부내측에 상부캡이 나사결합되고, 저면에는 하부캡이 결합되며, 중앙내측에는 수개의 스파이크를 방사상으로 장착하여 몸체 보강홀 내측벽에 정착시키는 소일네일앵커에 있어서, 예각날을 갖는 스파이크를 그라우트의 공급압력으로 보강홀의 내측벽에 긴밀히 삽입되도록 하여 몸체를 안정적으로 정착시키고, 몸체에 가해지는 인장력을 스파이크 예각날의 상부예각면에 의해 내측벽의 심층부로 전파시키며, 몸체의 상단부에는 공벽보호관을 결합하여 소일네일앵커 몸체의 인장력을 가할 시, 그 인장력이 전파에 의해 보강홀의 내측벽이 상부캡의 전방으로 함몰되는 것을 방지하며, 몸체의 정착공정과 연이어 보강홀 내부에 그라우트를 충진할 수 있도록 하는 것을 그 특징으로 하고 있다.In the cited invention 2, the upper cap is screwed to the upper inner side of the body, the lower cap is coupled to the bottom, in the small nail anchor anchoring the inner wall of the body reinforcing hole by radially mounting several spikes in the center, Spikes having an acute blade are inserted into the inner wall of the reinforcing hole closely by the supply pressure of the grout, thereby stably fixing the body, and the tensile force applied to the body is propagated to the deep portion of the inner wall by the upper acute surface of the spike acute blade. When the tensile force of the small nail anchor body is applied to the upper end of the body by applying the hollow wall protection tube, the tensile force prevents the inner wall of the reinforcing hole from sinking to the front of the upper cap due to the propagation. It is characterized by filling grout inside.

상기 인용발명 3은 천공홀에 삽입되어 그 내주로 확장됨으로써 지반으로 인장재의 정착을 보조하는 어스앵커구조체에 있어서, 테이퍼콘에 의해 강선이 결합되는 앵커본체의 선단에 앵커캡이 설치되고, 상기 앵커캡과 앵커본체 사이에 스프링의 탄성력으로 방사상으로 돌출되는 확장앵커가 설치되어 상기 앵커캡이 강선의 인장력에 대해 확장앵커를 지지하는 지지체가 되도록 하며, 상기 확장앵커의 내측단에는 앵커 본체로 삽입되어 이 삽입된 상태를 보유지지함과 더불어 이를 해제하여 상기 방사상 돌출을 허락하는 록킹구가 설치된 것을 그 특징으로 하고 있다.The cited invention 3 is an earth anchor structure that is inserted into the drilling hole to extend the inner circumference to assist in the fixing of the tension member to the ground, the anchor cap is installed at the tip of the anchor body is coupled to the steel wire by the tapered cone, the anchor An expansion anchor is provided between the cap and the anchor body to radially protrude with the elastic force of the spring so that the anchor cap is a support for supporting the expansion anchor against the tensile force of the steel wire, and is inserted into the anchor body at the inner end of the expansion anchor. In addition to holding the inserted state, it is characterized in that a locking mechanism is installed to allow the radial projection by releasing it.

상술한 인용발명들은 전체적으로 사면 지반에 천공홀을 형성시킨 후, 네일 등을 천공홀에 삽입하되 네일의 전단에 지반에 인장저항력을 부여하는 앵커몸체, 몸체 및 스파이커, 또는 확장앵커 등이 결합되어 사면을 보강하도록 형성된다. 이러한 인장저항력을 부여하기 위한 구성요소들은 일반적으로 그라우팅 등에 의한 압력이나 전용 가압장치를 이용하여 지반 내측벽으로 앵커 구조가 확장되도록 하여 인장저항력을 부여하도록 하였다.The above-mentioned cited inventions form perforated holes on the slopes as a whole, and then insert nails into the perforated holes, but the anchor body, body and spiker, or expansion anchor, etc., which impart tensile resistance to the ground at the front end of the nail are combined and sloped. It is formed to reinforce. The components for imparting tensile resistance are generally designed to extend the anchor structure to the inner wall of the ground by using a grouting pressure or a dedicated pressure device to impart tensile resistance.

그러나, 상기 종래기술들은 인장저항력을 위한 상기 앵커몸체, 몸체 및 스파이커, 또는 확장앵커 등의 구조가 상당히 복잡하여 그 가공 및 제작이 까다로우며, 복잡한 구성으로 인해 자연환경에서 발생하게 되는 다양한 외력 변화에 대응하지 못해 각 구성요소가 제대로 작동하지 않을 수도 있다. 이에 의해 이러한 구조체들이 충분한 인장저항력이나 지반하중을 견디지 못할 수도 있다.However, the conventional techniques are difficult to process and manufacture because the structure of the anchor body, the body and the spiker, or the expansion anchor for tensile resistance is quite complicated, and due to the complex configuration, various external force changes that occur in the natural environment Each component may not work properly because it does not respond. As a result, these structures may not be able to withstand sufficient tensile resistance or ground load.

또한, 전용 가압장치가 필요한 경우도 있어, 경사 지반에서의 공사가 용이하지 않은 단점이 있다.In addition, there is a need for a dedicated pressurization device, there is a disadvantage that construction on the slope is not easy.

또한, 상기 종래기술들은 일반적으로 사면에 설치되는 구조로써, 사면에 형성된 천공홀에 삽입시 중력에 의해 천공홀 내벽 하측면으로 기울어질 수도 있으며, 이에 의해 인장력 및 지반저항력 그리고 마찰력의 균형이 맞지 않아 지반강화기능을 제대로 수행할 수 없는 단점이 있다.In addition, the prior art is a structure that is generally installed on the slope, it may be inclined toward the lower side of the inner wall of the drilled hole by gravity when inserted into the drilled hole formed on the slope, whereby the tension and ground resistance and frictional force is not balanced There is a disadvantage that the ground reinforcement function cannot be performed properly.

본 발명은 상기 문제점을 해결하기 위해, 천공홀에 삽입된 가압체에 정착체가 자체 하중에 의해 결합됨과 동시에 스파이크부가 천공홀 내측벽으로 확장되도록 하여, 단순한 구성 및 작용에 의해 앵커력이 발휘되도록 한 사면보강공사용 네일앵커를 그 과제로 한다.The present invention is to solve the above problems, the fixture is coupled to the pressing body inserted into the drilling hole by the load at the same time, so that the spike portion is extended to the inner wall of the drilling hole, so that the anchor force is exerted by a simple configuration and action Slope reinforcement nail anchor is the subject.

상기 과제를 해결하기 위해 본 발명은, 천공홀에 네일을 삽입시키고, 그라우팅을 충진고결시켜 형성되는 사면보강공사용 네일앵커에 있어서, 천공홀에 삽입되는 가압체와; 상기 가압체 상측으로 자중에 의해 결합됨과 동시에 천공홀 내측벽으로 확장되는 스파이크부가 형성된 정착체;를 포함하여 구성되는 것을 특징으로 하는 사면보강공사용 네일앵커를 기술적 요지로 한다.In order to solve the above problems, the present invention provides a nail anchor for slope reinforcement work formed by inserting a nail into a drill hole and filling and grouting, the press body inserted into the drill hole; Slope reinforcement nail anchors, characterized in that it comprises a; and the fixing body formed with a spike portion coupled to the upper side of the pressurized body at the same time extending to the inner wall of the drilling hole as a technical gist.

또한, 상기 가압체는, 상기 정착체 내부로 추진결합되어 상기 스파이크부를 가압시키는 가압부와; 상기 가압부 하측에 형성되며, 상기 천공홀의 바닥면에 고정되도록 고정핀이 형성된 베이스부;를 포함하여 구성되는 것이 바람직하다.The pressurizing member may include a pressurizing portion propelled into the fixing unit to press the spike portion; It is preferably configured to include a; is formed under the pressing portion, the base portion is formed with a fixing pin to be fixed to the bottom surface of the drilling hole.

또한, 상기 정착체는, 상부측에는 결합공이 형성되어 상기 네일이 결합되며, 둘레를 따라 수용공이 형성된 몸체와; 상기 수용공에 결합되며, 상기 가압부의 가압에 의해 돌출되어 천공홀 내측벽으로 확장되며, 하측면에는 걸림턱 및 걸림홈이 형성된 스파이크부와; 상기 몸체에 나사결합되어 상기 수용공 상측으로 돌출되게 형성되어 상기 스파이크부의 확장 시에는 상기 스파이크부의 걸림턱에 걸리도록 하 고, 상측부에는 탄성돌출된 볼베어링이 상기 스파이크부의 걸림홈에 걸리도록 형성되어 상기 스파이크부의 확장 전에는 스파이크부를 고정시켜 두는 고정부재;를 포함하여 이루어지는 것이 바람직하다In addition, the fixing body, the upper side is formed with a coupling hole is the nail is coupled, the body formed with a receiving hole along the circumference; A spike portion coupled to the receiving hole and protruding by the pressing of the pressing portion and extending to the inner wall of the drilling hole, and having a catching jaw and a catching groove formed on a lower side thereof; Is screwed to the body is formed to protrude to the upper side of the receiving hole so that when the spike portion is extended so as to be caught on the locking jaw of the spike portion, the upper portion is formed so that the elastically projected ball bearing is caught in the locking groove of the spike portion It is preferable to include a; fixing member for holding the spike portion before expansion of the spike portion

또한, 상기 스파이크부는, 상기 몸체의 길이 방향으로 다수개가 형성되는 것이 바람직하다.In addition, the spike portion, it is preferable that a plurality is formed in the longitudinal direction of the body.

또한, 천공홀에 네일을 삽입시키고, 그라우팅을 충진고결시켜 형성되는 사면보강공사용 네일앵커에 있어서, 천공홀에 삽입되며, 천공홀 내측벽으로 확장되는 스파이크부가 형성된 정착체와; 상기 정착체 상측으로 자중에 의해 결합되어, 상기 스파이크부를 가압하여 확장시키는 가압체;를 포함하여 구성되는 것을 특징으로 하는 사면보강공사용 네일앵커를 또 다른 기술적 요지로 한다.Further, a nail anchor for slope reinforcement work formed by inserting a nail into the drill hole and filling and grouting the grouting, the nail anchor having a spike portion inserted into the drill hole and extending to the inner wall of the drill hole; Slope reinforcement nail anchors, characterized in that it comprises a; is coupled to the upper side of the fixing body by the weight, pressurizing to expand the spike portion to another technical gist.

또한, 상기 가압체는, 상부측에는 결합공이 형성되어 상기 네일이 결합되는 베이스부와; 상기 베이스부 하측에 형성되며, 상기 정착체 내부로 추진결합되어 상기 스파이크부를 가압시키는 가압부;를 포함하여 구성되는 것이 바람직하다.In addition, the pressing body, the upper portion is formed with a coupling hole is the base portion to which the nail is coupled; It is preferably configured to include a; is formed on the lower side of the base portion, the pressing portion for pushing the spike portion is pushed into the fixing body.

또한, 상기 정착체는, 둘레를 따라 수용공이 형성되며, 하단부에는 고정핀이 형성된 몸체와; 상기 수용공에 결합되며, 상기 가압부의 가압에 의해 돌출되어 천공홀 내측벽으로 확장되며, 상측면에는 걸림턱 및 걸림홈이 형성된 스파이크부와; 상기 몸체에 나사결합되어 상기 수용공 측으로 돌출되게 형성되어 상기 스파이크부의 확장 시에는 상기 스파이크부의 걸림턱에 걸리도록 하고, 하측부에 탄성돌출된 볼베어링이 상기 스파이크부의 걸림홈에 걸리도록 형성되어 상기 스파이크부의 확장 전에는 스파이크부를 고정시켜 두는 고정부재;를 포함하여 이루어지는 것이 바 람직하다.In addition, the fixing unit, the receiving hole is formed along the circumference, the lower end and the body is formed with a fixing pin; A spike portion coupled to the receiving hole and protruding by the pressurization of the pressing portion and extending to an inner wall of the drilling hole, and having a locking jaw and a locking groove formed on an upper side thereof; It is formed to be screwed to the body to protrude toward the receiving hole side when the spike portion is extended so that it is caught on the locking jaw of the spike portion, the ball bearing is elastically protruded in the lower portion is formed to be caught in the locking groove of the spike portion is It is preferable to include a; fixing member for holding the spike portion before expansion of the portion.

또한, 상기 스파이크부는, 상기 몸체의 길이 방향으로 다수개가 형성되는 것이 바람직하다.In addition, the spike portion, it is preferable that a plurality is formed in the longitudinal direction of the body.

상기 구성에 의한 본 발명은, 구성이 단순하여 그 가공 및 제작이 용이하여 생산비용이 획기적으로 절감되고, 전용 가압 장치 등의 작업없이 그 자체의 하중에 의해 스파이크부가 확장되어 급경사나 험한 작업환경에서의 작업이 용이하며, 간단한 작용에 의해 앵커력을 발휘할 수 있도록 한 효과가 있다.The present invention by the above configuration, the configuration is simple, the processing and manufacturing is easy, the production cost is drastically reduced, the spike portion is expanded by its own load without the operation of the dedicated press device, etc., in the steep slope or the harsh working environment The work is easy, and has the effect of exerting the anchor force by a simple action.

또한, 돌출된 스파이크부에 의하여 정착체 및 가압체가 천공홀의 중심에 안정적으로 자리를 잡아 인장력 및 지반저항력 그리고 마찰력의 균형을 맞추기 용이하여, 사면 지반강화기능을 제대로 수행할 수 있는 효과가 있다.In addition, the fixing spike and the pressure body by the protruding spike portion in a stable position in the center of the drilling hole to easily balance the tensile force, ground resistance and frictional force, there is an effect that can perform the slope reinforcement function properly.

<제1실시예>First Embodiment

도 1 및 도 2는 본 발명의 제1실시예에 따른 작동과정을 보인 단면도이고, 도 5는 본 발명의 제1실시예에 따른 스파이크부 및 고정부재에 대한 확대 작용단면도((a)스파이크부 확장 전,(b)스파이크부 확장 후)이다.1 and 2 are cross-sectional views showing an operation process according to the first embodiment of the present invention, Figure 5 is an enlarged cross-sectional view of the spike portion and the fixing member according to the first embodiment of the present invention (a) spike portion Before expansion and (b) after expansion of the spike portion).

도시된 바와 같이 본 발명은 천공홀(10)에 네일(20)을 삽입시키고, 그라우트(30)를 충진고결시켜 형성되는 사면보강공사용 네일앵커에 있어서, 상기 천공홀(10)에 삽입되어 고정되는 가압체(100)와, 네일(20)이 결합되어 상기 가압체(100) 상측에 결합되는 정착체(200)로 크게 구성된다. 본 발명에 따른 제1실시예는 상기 가압체(100)가 천공홀(10)에 먼저 또는 동시에 삽입된 후 상기 정착체(200)가 상기 가압체(100) 상측으로 삽입되어 결합되는 것이다.As shown in the present invention, in the nail anchor used for slope reinforcement work formed by inserting the nail 20 into the drilling hole 10 and filling and grouting the grout 30, the insertion is fixed to the drilling hole 10 The press body 100 and the nail 20 are largely composed of a fixing body 200 coupled to the upper side of the press body 100. According to the first embodiment of the present invention, the pressing body 100 is inserted into the drilling hole 10 first or the same time, and then the fixing body 200 is inserted into the pressing body 100 and coupled to the upper side.

먼저, 상기 가압체(100)에 대해 설명하고자 한다.First, the press body 100 will be described.

상기 가압체(100)는, 상기 천공홀(10)에 삽입되어 천공홀(10)의 바닥면에 고정된다. 상기 가압체(100)를 천공홀(10)에 투입하면 그 자체의 무게에 의해 천공홀(10)의 바닥면에 고정되게 되며, 바닥면의 견고한 고정을 위해 하측부에는 고정핀(121)을 더 형성시킬 수 있다.The pressing body 100 is inserted into the drilling hole 10 and fixed to the bottom surface of the drilling hole 10. When the pressing body 100 is inserted into the drilling hole 10 is fixed to the bottom surface of the drilling hole 10 by its own weight, the fixing pin 121 is provided on the lower side for a firm fixing of the bottom surface. Can be further formed.

그 다음, 천공홀(10)에 네일(20)이 결합된 정착체(200)를 투입하면, 그 자체의 무게에 의해 자연스럽게 상기 가압체(100) 상측에 정착체(200)가 결합되게 되며, 상기 정착체(200)와의 결합과 동시에 정착체(200)에 형성된 스파이크부(220)가 외측으로 돌출되어, 천공홀(10) 내측벽으로 확장되게 된다. 상기 스파이크부(220)는 상기 네일(20) 등의 인장재에 대해 인장저항력을 유지하도록 하는 것이다.Then, when inserting the fixing body 200 coupled to the nail 20 into the drilling hole 10, the fixing body 200 is naturally coupled to the upper side of the pressing body 100 by the weight of itself, At the same time as the fixing body 200 is coupled, the spike 220 formed in the fixing body 200 protrudes outward, and extends to the inner wall of the drilling hole 10. The spike portion 220 is to maintain the tensile resistance to the tension member, such as the nail (20).

또한, 상기 가압체(100)는 크게 상측부의 가압부(110)와, 하측부의 베이스부(120)로 구성된다.In addition, the pressing body 100 is largely composed of the upper pressing portion 110 and the lower base portion 120.

상기 가압부(110)는 상단부가 상기 정착체(200) 내부로 추진결합되어 상기 스파이크부(220)를 가압하여 밀어낼 수 있도록 원통형의 선단부를 절삭한 형태로 형성되는 것이 바람직하며, 이에 접하는 스파이크부(220)도 이에 대응되게 형성된다.The pressing unit 110 is preferably formed in the shape of a cylindrical end portion is cut so that the upper end is propelled into the fixing body 200 to push the spike portion 220 to be pushed out, the spikes in contact with this The part 220 is also formed correspondingly.

그리고 상기 베이스부(120)는 상기 가압부(110) 하측에 형성되고, 상기 가압부(110)보다는 상대적으로 지름이 큰 원통형상으로 형성되는 것이 바람직하며, 하단부에는 상기 천공홀(10)의 바닥면에 고정되도록 고정핀(121)이 형성되는 것이 바 람직하다.And the base portion 120 is formed below the pressing portion 110, it is preferably formed in a cylindrical shape having a relatively larger diameter than the pressing portion 110, the bottom portion of the bottom of the drilling hole 10 The fixing pin 121 is preferably formed to be fixed to the surface.

다음으로, 상기 정착체(200)에 대해 설명하고자 한다.Next, the fixing body 200 will be described.

상기 정착체(200)는 천공홀(10)에 투입되면 자중에 의해 상기 가압체(100) 상측에 자연스럽게 결합되게 되며, 결합과 동시에 스파이크부(220)가 상기 가압부(110)에 의해 가압되어 외측으로 돌출되게 형성된 것이다.When the fixing body 200 is inserted into the drilling hole 10, the fixing body 200 is naturally coupled to the upper side of the pressing body 100 by its own weight, and at the same time, the spike unit 220 is pressed by the pressing unit 110. It is formed to protrude outward.

또한, 상기 정착체(200)는 몸체(210)와, 스파이크부(220) 및 고정부재(230)로 구성되는 것이 바람직하다.In addition, the fixture 200 is preferably composed of a body 210, the spike portion 220 and the fixing member 230.

상기 몸체(210)는 천공홀(10)에 삽입이 용이하도록 전체적으로 원통형상으로 형성되며, 상부측에 결합공(213)이 형성되어 인장재로써 네일(20)이 결합된다. 그리고, 둘레를 따라 다수개, 바람직하게는 4개 정도의 수용공(211)이 형성되는데, 상기 수용공(211)은 스파이크부(220)가 수용결합되는 부분이다.The body 210 is formed in a cylindrical shape as a whole to facilitate insertion into the drilling hole 10, the coupling hole 213 is formed on the upper side is coupled to the nail 20 as a tension member. In addition, a plurality of, preferably about four, accommodation holes 211 are formed along the circumference, and the accommodation holes 211 are portions in which the spike portion 220 is housed.

그리고 상기 결합공(213)은 인장재의 형태에 따라 인장재를 견고하게 결합할 수 있는 형상을 이룬다. 만약, 인장재가 단부에 나사산이 형성된 이형철근 형태로 형성되면 상기 결합공(213)은 내측으로 나사산이 형성된 형상을 이루어 인장재와 나사결합되게 되며, 인장재가 강선재 형태로 형성되면 강선재의 투입 및 고정을 위한 테이프콘의 형상으로 형성되게 된다. 여기에서, 상기 네일은 상기 가압체(100)의 상부측에 결합되어도 무방하다.And the coupling hole 213 forms a shape capable of firmly coupling the tension member according to the shape of the tension member. If the tension member is formed in the form of a deformed steel reinforcing bar thread formed at the end, the coupling hole 213 is screwed into the tension member to form a thread formed inwardly, if the tension member is formed in the form of a steel wire input of steel wire and It is formed in the shape of a tape cone for fixing. Here, the nail may be coupled to the upper side of the pressing body (100).

또한, 상기 몸체(210)의 하측부에는 공벽보호관(v)이 더 형성되어 천공홀(10)의 내측벽이 상기 몸체(210) 측으로 함몰되는 것을 막도록 할 수 있다. 즉, 상기 공벽보호관(v)은 공벽붕괴방지를 위한 것으로, 특히 토사, 풍화암 지반에 적 합하게 사용될 수 있다.In addition, a lower wall protection tube (v) is further formed on the lower side of the body 210 to prevent the inner wall of the drilling hole 10 to be recessed toward the body 210 side. That is, the hollow wall protection tube (v) is for preventing the hollow wall collapse, in particular can be used suitably in soil, weathered rock ground.

그리고, 상기 스파이크부(220)는 상기 수용공(211)에 결합되며, 상기 가압부(110)의 가압에 의해 돌출되어 천공홀(10) 내측벽으로 확장되도록 형성된다. 상기 스파이크부(220)는 천공홀(10) 내측벽으로 확장되어 상기 인장재에 의한 인장저항력을 유지하도록 하는 역할을 하게 된다.In addition, the spike portion 220 is coupled to the receiving hole 211, is formed to protrude by the pressing of the pressing portion 110 to extend to the inner wall of the drilling hole (10). The spike portion 220 is extended to the inner wall of the drilling hole 10 serves to maintain the tensile resistance by the tension member.

상기 스파이크부(220) 하측면에는 걸림턱(221) 및 걸림홈(222)이 형성된다. 상기 걸림턱(221)은 상기 스파이크부(220) 선단 즉, 네일앵커의 중심측에 형성되며, 상기 걸림홈(222)은 이에 비해 약간 이격되어 외측에 형성되어, 상기 스파이크부(220)가 가압부(110)에 의해 가압되어 상기 수용공(211)에서 외측으로 빠져나올 때 상기 걸림턱(221) 및 상기 걸림홈(222) 사이의 거리만큼 유격거리를 제공하게 된다.A locking jaw 221 and a locking groove 222 are formed on the lower surface of the spike part 220. The locking jaw 221 is formed at the front end of the spike part 220, that is, the center of the nail anchor, and the locking groove 222 is formed slightly outside to be formed on the outer side, and the spike part 220 is pressurized. When pressurized by the unit 110 and exit from the receiving hole 211 to the outside to provide a clearance distance as much as the distance between the locking step 221 and the locking groove 222.

상기 걸림턱(221) 및 걸림홈(222)은 후술할 고정부재(230)와의 결합에 의해, 네일앵커 운반시 상기 몸체(210) 외측으로 스파이크부(220)가 돌출되지 않고 고정되도록 하며, 상기 가압부(110)에 의해 돌출시에도 스파이크부(220)가 몸체(210) 외측으로 무단 이탈되지 않도록 한다.The locking jaw 221 and the locking groove 222 are coupled to the fixing member 230 to be described later, so that the spike 220 is fixed to the outside of the body 210 when the nail anchor is transported without being protruded. Even when protruding by the pressing unit 110, the spike 220 is prevented from leaving the body 210 outside.

일반적으로 상기 스파이크부(220)는 가압부(110)에 접촉되는 중심측은 상기 가압부(110)에 의한 가압력이 크게 작용하도록 가압부(110)를 수용할 수 있는 사선방향으로 절삭되게 형성된다. 상기 스파이크부(220)의 바깥측은 예각날 형상으로 뾰족하게 형성되어, 천공홀(10) 내측벽의 심층부로 인장력을 전파시키며, 그 인장력의 전파에 의해 내측벽이 함몰되는 것을 방지하며 그라우트가 천공홀(10)의 바닥 면으로부터 입구부까지 충진될 수 있도록 한다.In general, the spike portion 220 is formed to be cut in a diagonal direction in which the center side in contact with the pressing portion 110 can accommodate the pressing portion 110 so that the pressing force by the pressing portion 110 acts greatly. The outer side of the spike portion 220 is sharply formed in an acute blade shape, propagating the tensile force to the deeper portion of the inner wall of the drilling hole 10, and prevents the inner wall from being depressed by the propagation of the tensile force and the grout perforated It can be filled from the bottom surface of the hole 10 to the inlet portion.

여기에서 상기 스파이크부(220)는 상기 몸체(210)에 둘레를 따라 다수개가 한 세트로 형성될 수 있으며, 또한, 몸체(210)의 길이 방향으로 다수 세트가 형성될 수도 있다. 이에 의해 네일앵커의 인장저항력을 더욱 향상시킬 뿐만 아니라, 천공홀(10)의 중심에 안정적으로 천공되도록 한다.Here, the spike portion 220 may be formed in a plurality of sets along the periphery of the body 210, and may also be formed in a plurality of sets in the longitudinal direction of the body (210). As a result, not only the tensile resistance of the nail anchor is further improved, but also the drilling is performed stably in the center of the drilling hole 10.

그리고, 상기 스파이크부(220)는 고정부재(230)에 의해 상기 몸체(210)에서 무단 분리되지 않게 된다. 즉, 상기 몸체(210)의 수용공(211)에 스파이크부(220)를 먼저 결합시키고, 그 다음 상기 고정부재(230)를 상기 몸체(210)에 결합시켜, 상기 스파이크부(220)가 몸체(210) 외측으로 빠져 나오지 않도록 한 것이다.In addition, the spike 220 is not separated from the body 210 by the fixing member 230. That is, the spike 220 is first coupled to the receiving hole 211 of the body 210, and then the fixing member 230 is coupled to the body 210, so that the spike 220 is the body (210) It will not come out to the outside.

상기 고정부재(230)는 제조시 상기 몸체(210)에 나사결합되는 것이 바람직하며, 상기 수용공(211) 상측으로 상단부가 약간 돌출되게 형성되어, 상기 스파이크부(220)의 확장 시 상기 스파이크부(220)의 걸림턱(221)이 이 부분에 걸리게 되어 상기 몸체(210) 외측으로 스파이크부(220)가 무단 분리되지 않게 된다.The fixing member 230 is preferably screwed to the body 210 at the time of manufacture, the upper end portion is formed to slightly protrude above the receiving hole 211, the spike portion when the spike portion 220 is expanded The catching jaw 221 of the 220 is caught by this part so that the spike portion 220 is not detached to the outside of the body 210 without permission.

또한, 상기 고정부재(230)의 상측부에 탄성돌출된 볼베어링(231)과 상기 스파이크부(220)의 걸림홈(222)과의 결합에 의해 상기 스파이크의 확장 전에는 스파이크부(220)를 고정시켜, 정착체(200)의 운반시나 이동시에도 스파이크가 몸체(210) 외측으로 빠져나와 분실되는 것을 방지한 것이다.In addition, by the coupling of the ball bearing 231 elastically protruded in the upper portion of the fixing member 230 and the locking groove 222 of the spike 220, the spike 220 is fixed before expansion of the spike In addition, the spikes are prevented from being lost to the outside of the body 210 even when the fixing body 200 is transported or moved.

즉, 스파이크부(220) 확장 전에는 정착체(200)의 몸체(210)에 스파이크부(220)의 걸림홈(222)과 고정부재(230)의 볼베어링(231)이 결합되어 스파이크부(220)를 고정시켜 주다가, 상기 가압체(100) 상측에 정착체(200)가 결합되게 되 면, 가압체(100)의 가압부(110)의 가압력이 상기 볼베어링(231)의 탄성력보다 커지는 순가 상기 스파이크부(220)가 수용공(211) 외측으로 움직이면서 몸체(210) 외측으로 돌출되게 되는 것이다. 여기에서 상기 정착체(200)의 무게는 상기 가압부(110)의 가압력이 볼베어링(231)과 결합홈의 탄성력보다 크도록 무거운 것이 일반적이다.That is, before the spike portion 220 is expanded, the catching groove 222 of the spike portion 220 and the ball bearing 231 of the fixing member 230 are coupled to the body 210 of the fixing member 200 to form the spike portion 220. When the fixing body 200 is coupled to the upper side of the pressing body 100, the urging force of the pressing unit 110 of the pressing body 100 is greater than the elastic force of the ball bearing 231. The part 220 is to protrude to the outside of the body 210 while moving to the receiving hole 211. Here, the weight of the fixing body 200 is generally heavy so that the pressing force of the pressing unit 110 is greater than the elastic force of the ball bearing 231 and the coupling groove.

<제2실시예>Second Embodiment

도 3 및 도 4는 본 발명의 제2실시예에 따른 작동과정을 보인 단면도로써, 본 발명에 따른 제2실시예는 상술한 제1실시예와 거의 동일한 구성을 가지므로 이에 대한 상세한 설명은 생략하기로 한다.3 and 4 are cross-sectional views showing the operation process according to the second embodiment of the present invention, the second embodiment according to the present invention has almost the same configuration as the above-described first embodiment, and a detailed description thereof will be omitted. Let's do it.

다만, 본 발명에 따른 제2실시예는 제1실시예와 달리 상기 정착체(200)가 천공홀(10)에 먼저 또는 동시에 삽입되어 고정된 후 상기 가압체(100)가 상기 정착체(200) 상측으로 삽입되어 결합되는 것이다. 그리고, 상기 가압체(100)에 결합공(111)이 형성되어 네일(20)이 결합된 것이다. 물론, 필요에 의해 네일은 정착체에 결합될 수도 있다.However, in the second embodiment according to the present invention, unlike the first embodiment, the fixing body 200 is inserted into the drilling hole 10 first or at the same time, and then the pressing body 100 is fixed to the fixing body 200. ) Is inserted into the upper side and combined. Then, the coupling hole 111 is formed in the pressing body 100 is a nail 20 is coupled. Of course, the nail may be coupled to the fixing body as necessary.

따라서, 상기 정착체(200)의 하단부에는 고정핀(212)이 형성되어 천공홀(10) 바닥면에 박히도록 하며, 상기 정착체(200)에 형성된 스파이크부(220)는 가압부(110)에 접촉되는 중심측은 상기 가압부(110)에 의한 가압력이 크게 작용하도록 가압부(110)를 수용할 수 있는 사선방향으로 절삭되게 형성된다. 즉, 상기 제1실시예의 스파이크부(220)가 거꾸로 형성되어 있는 것이다.Therefore, the fixing pin 212 is formed at the lower end of the fixing unit 200 to be embedded in the bottom surface of the drilling hole 10, the spike 220 formed in the fixing unit 200 is the pressing unit 110 The center side in contact with is formed to be cut in an oblique direction that can accommodate the pressing unit 110 so that the pressing force by the pressing unit 110 acts greatly. That is, the spike portion 220 of the first embodiment is formed upside down.

그리고, 상기 가압체(100)는 상술한 제1실시예와 반대로 베이스부(120)가 천공홀(10) 상측을 향하게 되고, 가압부(110)가 천공홀 하측으로 추진되면서, 상기 정착체(200)에 결합되게 된다. 그리고, 상기 베이스부(120)에 형성된 결합공(111)에 네일(20)이 결합되어 인장재로써 사용할 수 있도록 한 것이다.In addition, in the pressing body 100, the base portion 120 faces the upper side of the drilling hole 10 as opposed to the above-described first embodiment, and the pressing portion 110 is propelled below the drilling hole, and thus, the fixing body ( 200). Then, the nail 20 is coupled to the coupling hole 111 formed in the base 120 to be used as a tension member.

이하에서는 본 발명의 작용에 대해 제1실시예를 중심으로 살펴보고자 한다.Hereinafter, the operation of the present invention will be described with reference to the first embodiment.

먼저, 사용자는 사면에 일정 간격으로 천공홀(10)을 형성시키고, 천공홀(10) 내부의 이물질을 제거한 후, 가압체(100)를 삽입한다. 상기 가압체(100)의 무게는 충분히 무거워 자중에 의해 천공홀(10)의 바닥면에 이를 정도이며, 하측부에 형성된 고정핀(121)에 의해 천공홀(10)의 바닥면에 견고하게 고정되게 된다.First, the user forms the punched holes 10 at regular intervals on the slope, removes foreign matter in the punched holes 10, and then inserts the pressing body 100. The weight of the pressing body 100 is heavy enough to reach the bottom surface of the drilling hole 10 by its own weight, and firmly fixed to the bottom surface of the drilling hole 10 by the fixing pin 121 formed at the lower portion. Will be.

그 다음, 천공홀(10)에 정착체(200)를 삽입하며, 이 또한 그 하중에 의해 가압체(100)까지 이르게 되고, 자연스럽게 가압체(100)의 가압부(110)에 의해 스파이크부(220)가 몸체(210) 외측으로 확장 돌출되게 된다. 여기에서 상기 정착체(100)에는 미리 인장재로써 네일(20) 등이 결합되어 있으며, 이 상태에서 천공홀(10)에 삽입된다.Then, the fixing body 200 is inserted into the drilling hole 10, which also leads to the pressing body 100 by the load, and naturally the spike portion (10) by the pressing portion 110 of the pressing body 100. 220 is protruded to the outside of the body (210). Here, the nail 100 is coupled to the fixing member 100 as a tension member in advance, and is inserted into the drilling hole 10 in this state.

여기에서 상기 스파이크부(220)는 확장되기 전에는 상기 고정부재(230)의 볼베어링(231)과 걸림홈(222)에 의해 고정되어 있는 상태이며, 가압부(110)의 가압에 의해 몸체(210) 외측으로 돌출된 스파이크부(220)는 상기 걸림턱(221)이 상기 고정부재(230)에 걸리게 되어 더 이상 빠지지 않게 되면서, 몸체(210) 외측으로 확장된 상태를 유지하게 된다.Here, the spike portion 220 is fixed to the ball bearing 231 and the locking groove 222 of the fixing member 230 before being expanded, and the body 210 is pressed by the pressing portion 110. Spike portion 220 protruding to the outside is the latching jaw 221 is caught by the fixing member 230 so as not to fall out anymore, to maintain the extended state to the outside of the body (210).

상기 가압체(100) 및 정착체(200)가 결합되어 스파이크부(220)의 확장이 완료되면, 그라우트 유입관(p)을 통해 그라우팅 작업을 수행하게 되고, 그라우트(30)는 상기 수용공(211)을 통해 천공홀(10)의 바닥면부터 상층부까지 채워지게 된다. 그 다음, 천공홀의 입구에 방청처리된 캡을 씌워 작업을 완료하게 된다.When the pressurizer 100 and the fixing unit 200 are combined to complete the expansion of the spike unit 220, the grouting operation is performed through the grout inlet pipe p, and the grout 30 receives the receiving hole ( Through the bottom 211 of the drilling hole 10 is to be filled up. Then, the work is completed by putting the rust-proof cap at the entrance of the drilling hole.

여기에서 그라우팅 작업과 동시에 또는 그라우팅 작업 전에 상기 인장재를 당겨서 인장저항력이 지반에 전달되도록 하며, 이에 의해 지반에 의한 마찰력 및 지반저항력이 인장력보다 크게 되어 사면 지반을 보강할 수 있게 되는 것이다.Here, by pulling the tension member at the same time as or before the grouting operation, the tensile resistance is transmitted to the ground, whereby the frictional force and the ground resistance force by the ground become greater than the tensile force, so that the slope can be reinforced.

도 1 및 도 2 - 본 발명의 제1실시예에 따른 작동과정을 보인 단면도.1 and 2-cross-sectional view showing an operation process according to a first embodiment of the present invention.

도 3 및 도 4 - 본 발명의 제2실시예에 따른 작동과정을 보인 단면도.3 and 4-cross-sectional view showing an operation process according to a second embodiment of the present invention.

도 5 - 본 발명의 제1실시예에 따른 스파이크부 및 고정부재에 대한 확대 작용단면도((a)스파이크부 확장 전,(b)스파이크부 확장 후).5-An enlarged cross-sectional view of the spike portion and the fixing member according to the first embodiment of the present invention ((a) before the spike portion expansion, (b) after the spike portion expansion).

<도면에 사용된 주요부호에 대한 설명> <Description of Major Symbols Used in Drawings>

10 : 천공홀 20 : 네일10: hole 20: nail

30 : 그라우팅 100 : 가압체30: grouting 100: pressurized body

110 : 가압부 111 : 결합공110: pressurization portion 111: coupling hole

120 : 베이스부 121 : 고정핀120: base portion 121: fixing pin

200 : 정착체 210 : 몸체200: fixture 210: body

211 : 수용공 212 : 고정핀211: accommodation hole 212: fixing pin

213 : 결합공 220 : 스파이크부213: coupling hole 220: spike portion

221 : 걸림턱 222 : 걸림홈221: locking jaw 222: locking groove

230 : 고정부재 231 : 볼베어링230: fixing member 231: ball bearing

Claims (8)

천공홀(10)에 삽입되는 가압체(100)와, 상기 가압체(100) 상측으로 자중에 의해 결합됨과 동시에 천공홀(10) 내측벽으로 확장되는 스파이크부(220)가 형성되어 천공홀(10)에 네일(20)을 삽입시키고, 그라우팅을 충진고결시켜 형성되는 사면보강공사용 네일앵커에 있어서,The pressing body 100 inserted into the drilling hole 10 and the spike portion 220 which is coupled to the pressing body 100 by its own weight and extends to the inner wall of the drilling hole 10 are formed to form the drilling hole ( In the nail anchor anchor for slope reinforcement is formed by inserting the nail (20) in the 10), filling and solidified grouting, 상기 가압체(100)는, 정착체(200) 내부로 추진결합되어 상기 스파이크부(220)를 가압시키는 가압부(110)와, 상기 가압부(110) 하측에 형성되며, 상기 천공홀(10)의 바닥면에 고정되도록 고정핀(121)이 형성된 베이스부(120)로 구성되며,The pressing body 100 is propelled and coupled to the inside of the fixing body 200 to press the spike portion 220, and formed under the pressing portion 110, the drilling hole 10 It consists of a base portion 120 is formed with a fixing pin 121 to be fixed to the bottom surface of the), 상기 정착체(200)는, 상부측에는 결합공(213)이 형성되어 상기 네일(20)이 결합되며, 둘레를 따라 수용공(211)이 형성된 몸체(210)와, 상기 수용공(211)에 결합되며, 상기 가압부(110)의 가압에 의해 돌출되어 천공홀(10) 내측벽으로 확장되며, 하측면에는 걸림턱(221) 및 걸림홈(222)이 형성된 스파이크부(220)와, 상기 몸체(210)에 나사결합되어 상기 수용공(211) 상측으로 돌출되게 형성되어 상기 스파이크부(220)의 확장 시에는 상기 스파이크부의 걸림턱(221)에 걸리도록 하고, 상측부에는 탄성돌출된 볼베어링(231)이 상기 스파이크부의 걸림홈(222)에 걸리도록 형성되어 상기 스파이크부(220)의 확장 전에는 스파이크부(220)를 고정시켜 두는 고정부재(230)를 포함하여 이루어지는 것을 특징으로 하는 사면보강공사용 네일앵커.The fixing body 200, the coupling hole 213 is formed on the upper side is coupled to the nail 20, the body 210 and the receiving hole 211 is formed along the circumference, and the receiving hole 211 Is coupled, protrudes by the pressing of the pressing unit 110 is extended to the inner wall of the drilling hole 10, the lower side has a spike 220, the locking jaw 221 and the locking groove 222 is formed, and It is screwed to the body 210 is formed to protrude to the upper side of the receiving hole 211, when the spike portion 220 is extended so as to be caught by the catching jaw 221 of the spike portion, the upper side is an elastic protrusion ball bearing Slope reinforcement is characterized in that the 231 is formed to be caught in the locking groove 222 of the spike portion and comprises a fixing member 230 for fixing the spike portion 220 before the spike portion 220 is expanded. Construction nail anchor. 삭제delete 삭제delete 제 1항에 있어서, 상기 스파이크부(220)는,The method of claim 1, wherein the spike portion 220, 상기 몸체(210)의 길이 방향으로 다수개가 형성되는 것을 특징으로 하는 사면보강공사용 네일앵커.Slope reinforcement nail anchors, characterized in that a plurality is formed in the longitudinal direction of the body 210. 천공홀(10)에 삽입되며, 천공홀(10) 내측벽으로 확장되는 스파이크부(220)가 형성된 정착체(200)와, 상기 정착체(200) 상측으로 자중에 의해 결합되어, 상기 스파이크부(220)를 가압하여 확장시키는 가압체(100)가 형성되어 천공홀(10)에 네일(20)을 삽입시키고, 그라우팅을 충진고결시켜 형성되는 사면보강공사용 네일앵커에 있어서,The spike 200 is inserted into the punch hole 10 and has a spike portion 220 formed therein extending to the inner wall of the punch hole 10. In the nail anchor for slope reinforcement work is formed by pressing the pressure member (100) is formed to press and expand to insert the nail 20 in the drilling hole 10, and filling and grouting grouting, 상기 가압체(100)는, 상부측에는 결합공(111)이 형성되어 상기 네일(20)이 결합되는 베이스부(120)와, 상기 베이스부(120) 하측에 형성되며, 상기 정착체(200) 내부로 추진결합되어 상기 스파이크부(220)를 가압시키는 가압부(110)로 구성되며,The pressurizer 100 has a coupling hole 111 formed at an upper side thereof, and a base portion 120 to which the nail 20 is coupled, and a lower portion of the base portion 120, and the fixing body 200. Propelled into the interior is composed of a pressing unit 110 for pressing the spike 220, 상기 정착체(200)는, 둘레를 따라 수용공(211)이 형성되며, 하단부에는 고정핀(212)이 형성된 몸체(210)와, 상기 수용공(211)에 결합되며, 상기 가압부(110)의 가압에 의해 돌출되어 천공홀(10) 내측벽으로 확장되며, 상측면에는 걸림턱(221) 및 걸림홈(222)이 형성된 스파이크부(220)와, 상기 몸체(210)에 나사결합되어 상기 수용공(211) 측으로 돌출되게 형성되어 상기 스파이크부(220)의 확장 시에는 상기 스파이크부의 걸림턱(221)에 걸리도록 하고, 하측부에 탄성돌출된 볼베어링(231)이 상기 스파이크부의 걸림홈(222)에 걸리도록 형성되어 상기 스파이크부(220)의 확장 전에는 스파이크부(220)를 고정시켜 두는 고정부재(230)를 포함하여 이루어지는 것을 특징으로 하는 사면보강공사용 네일앵커.The fixture 200, the receiving hole 211 is formed along the circumference, the lower end portion is coupled to the body 210 and the receiving hole 211, the fixing pin 212 is formed, the pressing portion 110 Protruding by the pressure of the) and is extended to the inner wall of the drilling hole 10, the upper side surface is screwed to the spike portion 220 and the body 210 formed with the engaging jaw 221 and the engaging groove 222 It is formed to protrude toward the receiving hole 211, when the spike portion 220 is expanded to be caught by the catching jaw 221 of the spike portion, the ball bearing 231 elastically protruded in the lower portion is the locking groove of the spike portion Slope reinforcement nail anchor for the reinforcement is characterized in that it comprises a fixing member 230 is formed to be caught to (222) to secure the spike portion 220 before expansion of the spike portion 220. 삭제delete 삭제delete 제 5항에 있어서, 상기 스파이크부(220)는,The method of claim 5, wherein the spike portion 220, 상기 몸체(210)의 길이 방향으로 다수개가 형성되는 것을 특징으로 하는 사면보강공사용 네일앵커.Slope reinforcement nail anchors, characterized in that a plurality is formed in the longitudinal direction of the body 210.
KR1020080014436A 2008-02-18 2008-02-18 Soil nail anchor KR100903407B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080014436A KR100903407B1 (en) 2008-02-18 2008-02-18 Soil nail anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080014436A KR100903407B1 (en) 2008-02-18 2008-02-18 Soil nail anchor

Publications (1)

Publication Number Publication Date
KR100903407B1 true KR100903407B1 (en) 2009-06-18

Family

ID=40982894

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080014436A KR100903407B1 (en) 2008-02-18 2008-02-18 Soil nail anchor

Country Status (1)

Country Link
KR (1) KR100903407B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287180A (en) * 2020-02-16 2020-06-16 云南省建筑科学研究院 Double thread anchor head combined anchor rod
CN111945714A (en) * 2020-08-19 2020-11-17 深圳中汉建设工程集团有限公司 Steel sleeve guiding method combined with steel upright column inserting construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07259085A (en) * 1994-03-25 1995-10-09 Mase Kensetsu Kk Foundation pile
JP2000130415A (en) * 1998-10-22 2000-05-12 Hilti Ag Undercut anchor
KR20050015352A (en) * 2003-08-05 2005-02-21 재 술 나 rock bolt
KR100704774B1 (en) 2007-01-08 2007-04-09 박이근 Soil nail anchor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07259085A (en) * 1994-03-25 1995-10-09 Mase Kensetsu Kk Foundation pile
JP2000130415A (en) * 1998-10-22 2000-05-12 Hilti Ag Undercut anchor
KR20050015352A (en) * 2003-08-05 2005-02-21 재 술 나 rock bolt
KR100704774B1 (en) 2007-01-08 2007-04-09 박이근 Soil nail anchor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287180A (en) * 2020-02-16 2020-06-16 云南省建筑科学研究院 Double thread anchor head combined anchor rod
CN111945714A (en) * 2020-08-19 2020-11-17 深圳中汉建设工程集团有限公司 Steel sleeve guiding method combined with steel upright column inserting construction method
CN111945714B (en) * 2020-08-19 2022-05-31 深圳中汉建设工程集团有限公司 Steel sleeve guiding method combined with steel upright column inserting construction method

Similar Documents

Publication Publication Date Title
KR100704774B1 (en) Soil nail anchor
KR100820642B1 (en) Anchor-nail device for slope-reinforcement-construction and slope stabilization method
KR101376534B1 (en) Anchor for rock bolt
KR101065626B1 (en) Microsoft pile and construction methods
KR100880690B1 (en) The anchor method which uses the ground anchor
KR100934274B1 (en) Soil nail of a ground pressure type and constructing method thereof
KR20090101045A (en) Pre-tension soil nail and method of soil nail construction using the same
JP2015014180A (en) Underground anchor, and antiseismic reinforcement method of artificial slope using the same
KR100966148B1 (en) Ground adhering soil nailing structure and ground reinforcement method using the same
KR100963682B1 (en) Anchor assembly, method for reinforcing slope using anchor assembly
KR100978629B1 (en) Soil nailing for reinforce slope and method for reinforce slope using thereof
KR100908085B1 (en) Ground adhering soil nailing structure and ground reinforcement method using the same
KR101633505B1 (en) The support material
KR100903407B1 (en) Soil nail anchor
KR101241351B1 (en) The nail with high anchorage and the nailing construction method thereof
KR20060069810A (en) Fixing type nailing apparatus and method of the same
KR20130029906A (en) An expanding device of frictional force
KR200449724Y1 (en) Rock bolt for underground hole
KR100892322B1 (en) A soil-nail structure using bamboo
KR100690014B1 (en) Use steel material that have spiral plate struction
KR100935235B1 (en) Apparatus for slope reinforcement
KR101335957B1 (en) Non-boring blow type anchor and soil nailing method using the same
KR101735816B1 (en) Soil-nail for reinforcing a slope
KR101000569B1 (en) Slope reinforcement nailing for road and housing area and method which uses them
KR102022906B1 (en) Anchor and construction method thereof

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130611

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20140611

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee