KR100897400B1 KR1020070085675A KR20070085675A KR100897400B1 KR 100897400 B1 KR100897400 B1 KR 100897400B1 KR 1020070085675 A KR1020070085675 A KR 1020070085675A KR 20070085675 A KR20070085675 A KR 20070085675A KR 100897400 B1 KR100897400 B1 KR 100897400B1
Authority
KR
South Korea
Prior art keywords
channel
grid zinc
horizontal beam
zinc
bracket
Prior art date
Application number
KR1020070085675A
Other languages
Korean (ko)
Other versions
KR20090020989A (en
Inventor
권영현
Original Assignee
권영현
(주)영화아트텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 권영현, (주)영화아트텍 filed Critical 권영현
Priority to KR1020070085675A priority Critical patent/KR100897400B1/en
Publication of KR20090020989A publication Critical patent/KR20090020989A/en
Application granted granted Critical
Publication of KR100897400B1 publication Critical patent/KR100897400B1/en

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63JDEVICES FOR THEATRES, CIRCUSES, OR THE LIKE; CONJURING APPLIANCES OR THE LIKE
    • A63J1/00Stage arrangements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H3/00Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
    • E04H3/10Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons for meetings, entertainments, or sports
    • E04H3/22Theatres; Concert halls; Studios for broadcasting, cinematography, television or similar purposes
    • E04H3/24Constructional features of stages

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Multimedia (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

본 발명은, 무대설비용 조립식 그리드아연에 관한 것이다.The present invention relates to prefabricated grid zinc for stage equipment.

이는 특히, 연결재를 통하여 수평방향으로 연결되는 복수의 챈널;This includes, in particular, a plurality of channels connected in a horizontal direction through the connecting member;

상기 챈널과 교차하는 방향에서 챈널을 지지토록 설치되는 수평빔;A horizontal beam installed to support the channel in a direction crossing the channel;

상기 수평빔과 챈널을 적층되는 상태로 동시에 지지토록 설치되는 브라켓; 및,A bracket installed to support the horizontal beam and the channel simultaneously; And,

상기 챈널에 밀착고정구를 통하여 지지되는 그리드아연의 조립구조로 이루어 진다.The assembly is made of grid zinc supported by the fixture close to the channel.

이에 따라서, 용접등의 작업없이 볼트조립구조로서 현장 조립이 가능토록 되고, 그리드아연의 조립작업이 용이하게 이루어지는 것이다.Accordingly, the on-site assembly can be performed as a bolt assembly structure without welding or the like, and the assembly work of the grid zinc is easily performed.

그리드아연, 수평빔, 챈널, 브라켓Grid zinc, horizontal beam, channel, bracket

Description

무대설비용 조립식 그리드아연{A SECTIONAL GRID IRON FOR STASE SETTING}Prefabricated grid zinc for stage equipment {A SECTIONAL GRID IRON FOR STASE SETTING}

본 발명은 챈널과 상기 챈널과 교차하는 방향에서 챈널을 지지토록 설치되는 수평빔및 상기 수평빔과 챈널을 적층되는 상태로 동시에 지지토록 설치되는 브라켓에 고정한 후 상기 챈널에 밀착고정구를 통하여 그리드아연의 지지토록 하는 구성으로 용접등의 작업 없이 볼트조립구조로서 천정프레임의 현장 조립이 가능토록 하는 무대설비용 조립식 그리드아연에 관한 것이다.The present invention is fixed to the horizontal beam installed to support the channel in the direction intersecting the channel and the channel and the bracket to be installed at the same time to support the horizontal beam and the channel in a stacked state of the grid zinc through the fixture close to the channel The present invention relates to a prefabricated grid zinc for stage equipment that enables on-site assembly of a ceiling frame as a bolt assembly without the work of welding.

일반적으로 알려져 있는 무대설비는, 각종 공연 및 행사에 사용되는 기구 및 세트물을 설치할 수 있도록 플라이 바튼, 조명기구를 장착하기 위한 리프팅 바튼, 조명기구 및 무대막이나 세트물들을 관객의 시야에서 보이지 않도록 격납하였다가 사용하는 승,하강바튼등이 설치된다.Commonly known stage equipments include fly bartons, lifting bartons for attaching lighting fixtures, lighting fixtures, and stage curtains or sets for installation of fixtures and sets used in various performances and events. Raising and lowering bars used for storing are used.

그리고, 상기 바튼은, 무대의 천정에 설치되는 프레임에 각각 지지되는 구동모터에 와이어로서 연결되어 구동모터의 동작시 승하강 토록 설치된다.Then, the barton is connected to the drive motors respectively supported by the frame installed on the ceiling of the stage as a wire is installed so as to move up and down during operation of the drive motor.

이와같은 기술과 관련된 종래의 프레임이 등록실용신안 제298347호에 도시되어 있으며 그 구성은 수직방향의 빔을 양측에 설치한 후 그 상단부에 수직방향의 빔을 연결하는 구성으로 수직방향의 빔 상측에 바튼을 승하강 시키는 다수의 구동 모터 및 와이어가 권취되는 풀리가 장착된다.The conventional frame related to this technique is shown in Korean Utility Model Model No. 298347. The configuration is to install vertical beams on both sides, and then connect the vertical beams to the upper ends of the vertical beams. A plurality of drive motors for raising and lowering the barton and pulleys in which the wires are wound are mounted.

그러나, 상기와 같은 프레임은, 별도의 수직프레임을 설치하여야 하며, 수평프레임의 스팬(span)이 길어 조립작업이 힘들게 되는 단점이 있는 것이다.However, the frame as described above, a separate vertical frame must be installed, the span of the horizontal frame has a disadvantage in that the assembly work is difficult because of a long span.

또한, 수직프레임 및 수평프레임을 길이를 조정 및 결합을 위하여 별도의 용접작업을 필요로 하여 작업성이 저하되는 문제점이 있는 것이다.In addition, there is a problem that the workability is reduced by requiring a separate welding work for adjusting and coupling the length of the vertical frame and the horizontal frame.

상기와 같은 종래의 문제점들을 개선하기 위한 본 발명의 목적은, 용접등의 작업없이 볼트 조립구조로서 프레임의 현장 조립이 가능토록 하고, 그리드아연의 조립작업이 용이하게 이루어지는 지도록 하며, 일정규격으로 대량생산되는 부품에 의한 조립구조로서 현장의 여건이 상관없이 용이하게 적용할 수 있도록 하고, 별도의 수직프레임을 설치할 필요가 없게 되는 무대설비용 조립식 그리드아연을 제공하는 데 있다.An object of the present invention for improving the conventional problems as described above, the on-site assembly of the frame as a bolt assembly structure without the work of welding, such that the assembly work of grid zinc is made easy, and a large amount to a certain standard It is to provide a prefabricated grid zinc for stage equipment that can be easily applied as an assembly structure by the parts produced, regardless of the site conditions, and does not need to install a separate vertical frame.

본 발명은 상기 목적을 달성하기 위하여, 연결재를 통하여 수평방향으로 연결되는 복수의 챈널;The present invention, in order to achieve the above object, a plurality of channels connected in a horizontal direction through a connecting member;

상기 챈널과 교차하는 방향에서 챈널을 지지토록 설치되는 수평빔;A horizontal beam installed to support the channel in a direction crossing the channel;

상기 수평빔과 챈널을 적층되는 상태로 동시에 지지토록 설치되는 브라켓; 및,A bracket installed to support the horizontal beam and the channel simultaneously; And,

상기 챈널에 밀착고정구를 통하여 지지되는 그리드아연의 조립구조로 이루어 진 무대설비용 조립식 그리드아연을 제공한다.It provides a prefabricated grid zinc for the stage equipment consisting of an assembly structure of grid zinc supported by the fixture close to the channel.

이상과 같이 본 발명에 의하면, 용접등의 작업없이 볼트 조립구조로서 프레임의 현장 조립이 가능하여 숙련도에 상관없이 조립이 가능하고, 프레임의 조립상태에서 그리드 아연의 조립작업이 용이하게 이루어지는 지며, 일정규격으로 대량생산되는 부품에 의한 조립구조로서 현장의 여건이 상관없이 용이하게 적용할 수 있 도록 하여 작업성이 향상되고, 별도의 수직프레임을 설치할 필요가 없게 되는 효과가 있는 것이다.As described above, according to the present invention, it is possible to assemble the frame as a bolt assembly structure without welding, etc., regardless of skill, the assembly of grid zinc in the assembled state of the frame can be easily made, As the assembly structure by mass-produced parts to the standard, it is easy to apply regardless of the site conditions, the workability is improved, there is no need to install a separate vertical frame.

이하, 첨부된 도면에 의거하여 본 발명의 실시예를 상세하게 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도1은 본 발명에 따른 그리드아연의 설치상태를 도시한 평면도이고, 도2는 본 발명에 따른 그리드아연의 설치상태를 도시한 측면도이며, 도3a,b는 본 발명에 따른 그리드아연을 도시한 요부 분해도이고, 도4는 본 발명에 따른 그리드아연의 연결상태를 도시한 단면도이며, 도5a,b는 각각 본 발명의 다른 실시예에 따른 그리드아연을 도시한 요부 분해도이다.1 is a plan view showing the installation state of the grid zinc according to the present invention, Figure 2 is a side view showing the installation state of the grid zinc according to the present invention, Figures 3a, b shows a grid zinc according to the present invention 4 is a cross-sectional view illustrating a connection state of grid zinc according to the present invention, and FIGS. 5A and 5B are exploded views illustrating grid zinc according to another embodiment of the present invention.

본 발명은 챈널(100)과 그 교차하는 방향에 연결되는 수평빔(200) 및 상기 수평빔과 챈널을 연결하는 브라켓(300)으로 이루어 진다.The present invention consists of a horizontal beam (200) connected to the channel 100 and the crossing direction thereof, and a bracket (300) connecting the horizontal beam and the channel.

상기 챈널(100)은, 일측면 내측에 삽입토록 ㄷ자 형상을 갖는 연결플레이트(510)로서 다단으로 연결된다.The channel 100 is connected in multiple stages as a connection plate 510 having a c-shape to be inserted into one side.

이때, 상기 연결플레이트(510)는, 챈널 또는 수평빔의 측면에 삽입되어 챈널 또는 수평빔에 밀착 연결되도록 형성된다.At this time, the connection plate 510 is inserted into the side of the channel or the horizontal beam is formed to be in close contact with the channel or the horizontal beam.

또한, 상기 연결플레이트(510)는, 상기 챈널(100)의 하단부가 삽입되어 밀착지지되는 요홈부(515)가 연장형성된다.In addition, the connection plate 510, the lower end of the channel 100 is inserted into the groove portion 515 is tightly supported is extended.

상기 수평빔(200)은, 일반적인 형상으로서 단부에 다수의 볼트공(210)이 일체로 관통 형성된다.The horizontal beam 200 has a general shape, a plurality of bolt holes 210 through the end is formed integrally.

상기 브라켓(300)은, 상부면 양측에 챈널(100)사이의 간격에 대응되는 챈널지지부(310)가 일체로 형성되고, 하부면의 챈널지지부(310)와 교차하는 방향에서 빔지지부(330)가 일체로 형성된다.The bracket 300, the channel support portion 310 is formed integrally corresponding to the gap between the channel 100 on both sides of the upper surface, the beam support portion 330 in the direction crossing the channel support portion 310 of the lower surface Is formed integrally.

그리고, 상기 빔지지부(330)는, 수평빔을 지지토록 평면상의 챈널지지부(310)에 연결될 때 전체적으로 ㄷ자형상을 이루도록 하는 ㄴ자형의 연결판으로 이루어 진다.And, the beam support 330 is made of a c-shaped connecting plate to form a c-shape as a whole when connected to the channel support 310 in a plane to support a horizontal beam.

더하여, 상기 챈널지지부(310)는, 챈널의 위치를 결정하면서 지지토록 형성된다. In addition, the channel support part 310 is formed to support the channel while determining the position of the channel.

또한, 상기 브라켓(300)은, 중앙부에 앵커볼트(500)가 연결되는 지지판(350)이 일체로 연결된다.In addition, the bracket 300, the support plate 350 to which the anchor bolt 500 is connected to the central portion is integrally connected.

계속하여, 상기 챈널(100)은, 그 내측에 그리드아연(430)이 밀착고정구(450)를 통하여 위치결정토록 설치된다.Subsequently, the channel 100 is provided such that the grid zinc 430 is positioned within the close fitting fixture 450 in the inner side thereof.

상기 그리드아연(430)은, 프레임(435)과 그 내측에 연결되는 격자상의 망(433)으로 이루어 진다.The grid zinc 430 is composed of a frame 435 and a grid network 433 connected to the inside thereof.

그리고, 상기 밀착고정구(450)는, 양단이 챈널(100)의 상하면에 각각 밀착되는 밀착면(453)과 이에 연결되어 그리드아연(430)의 상측을 압착토록 호형의 지지부(455)가 일체로 연장형성된다.In addition, the adhesion fixture 450, the both ends are in close contact with each other on the upper and lower surfaces of the channel 100, the contact surface 453 and the arc-shaped support portion 455 to squeeze the upper side of the grid zinc 430 integrally Extended.

이때, 상기 밀착고정구(450)는, 호형의 지지부에 위치결정턱(457)이 더 구비되는 구성으로 이루어 진다.At this time, the tight fixture 450 is made of a configuration that the positioning jaw 457 is further provided on the support of the arc-shaped.

상기와 같은 구성으로 이루어진 본 발명의 동작을 설명한다.The operation of the present invention having the above configuration will be described.

도1 내지 도5에서와 같이, 구조물의 형성시 무대의 측벽에 돌출되도록 설치되는 프레임을 챈널과 수평빔의 연결과 같은 방법으로 브라켓(300)에 연결한다.
이때, 상기 브라켓(300)은, 챈널지지부(310) 및 이에 연결되는 ㄴ자형상의 빔지지부(330)를 통하여 수평빔 또는 챈널이 밀착되는 ㄷ자형상을 형성하여 수평빔의 형상을 갖는 프레임이 빔지지부(330)에 삽입될 때 직접연결토록 되어 별도의 수직빔을 설치하지 않아도 브라켓을 측벽에 설치되는 프레임에 연결토록 한다.
그리고, 측벽의 설치후 측면에 고정토록 되는 앵커볼트로서 브라켓(300)을 연결할 경우, 상기 브라켓(300)의 빔지지부(330)에 형성되는 볼트공에 측벽에서 돌출되는 앵커볼트를 삽입하여 결합함으로써 브라켓(300)을 측벽에 견고하게 지지할 수 있게 된다.
1 to 5, the frame is installed so as to protrude on the side wall of the stage when forming the structure is connected to the bracket 300 in the same way as the channel and the horizontal beam connection.
At this time, the bracket 300, through the channel support 310 and the N-shaped beam support 330 connected to the horizontal beam or the channel to form a U-shape in close contact with the channel to form a beam having a beam shape of the horizontal beam When inserted into the 330 is to be directly connected so that the bracket is connected to the frame installed on the side wall without installing a separate vertical beam.
And, when connecting the bracket 300 as an anchor bolt to be fixed to the side after installation of the side wall, by inserting the anchor bolt protruding from the side wall into the bolt hole formed in the beam support 330 of the bracket 300 by coupling It is possible to firmly support the bracket 300 on the side wall.

삭제delete

삭제delete

더하여, 상기 브라켓(300) 및 수평빔(200) 및 챈널(100)은, 단위규격으로 절단되며, 비 규격화 되는 무대에 적용할 경우 연결플레이트(510)를 통하여 연결하여 원하는 길이를 얻도록 한다.In addition, the bracket 300, the horizontal beam 200 and the channel 100, is cut to the unit standard, when applied to a non-standardized stage to connect through the connection plate 510 to obtain the desired length.

이때, 상기 연결플레이트(510)는, 챈널 및 수평빔의 일측면에 대응되는 ㄷ자형상으로 챈널 또는 빔의 측면에 밀착되어 위치결정하여도 되나 그 하부에 연장형성되는 요홈부(515)를 통하여 연결하면 챈널 및 수평빔이 위치결정될 때 그 연결부의 지지면적이 더욱 넓어져 연결이 더욱 견고하게 된다.At this time, the connection plate 510 may be positioned in close contact with the side of the channel or the channel in a U-shape corresponding to one side of the channel and the horizontal beam, but is connected through the groove 515 extending below. When the channel and the horizontal beam are positioned, the supporting area of the connection becomes wider and the connection becomes more firm.

계속하여, 상기 브라켓(300)은 수평빔(200)에 각각 올려지는 구성으로 교차하는 방향에서 챈널(100)을 지지할 때 하중이 집중되는 것을 방지토록 천정등에 고정되는 별도의 앵커볼트(500)를 통하여 하중을 지지토록 하며, 상기 앵커볼트는 분리되는 구성으로 턴버클(550)이 연결되어 하중지지는 물론 수평조절이 가능토록 된다.Subsequently, the bracket 300 is a separate anchor bolt 500 fixed to the ceiling to prevent the load from being concentrated when supporting the channel 100 in the cross direction in a configuration that is mounted on the horizontal beam 200, respectively. To support the load through, the anchor bolt is connected to the turnbuckle 550 in a configuration that is separated to support the load as well as horizontal adjustment.

또한, 상기 브라켓(300)은, 그 상부에 올려지는 챈널(100) 및 수평빔(200)을 지지토록 상기 챈널(100) 및 수평빔(200)의 적어도 일부를 지지토록 설치되는 챈널지지부와 빔지지부가 각각 설치되어 챈널과 수평빔을 위치결정한 상태에서 고정토록 한다.In addition, the bracket 300, the channel support and the beam is installed to support at least a portion of the channel 100 and the horizontal beam 200 to support the channel 100 and the horizontal beam 200 is placed on the top. Each support unit is installed so that it can be fixed while positioning the channel and the horizontal beam.

그리고, 상기와 같은 브라켓(300)을 통하여 수평빔(200)의 상측에 챈널(100)을 일정간격으로 배치한 후 그리드아연(430)을 설치하게 되는 데 상기 그리드아연은 조립되는 챈널의 상부에서 삽입이 가능토록 되면서 장착시 챈널에 지지되는 크기로서 챈널(100)의 상부에서 압입되는 복수의 밀착고정구(450)를 통하여 위치결정된다.Then, after the channel 100 is arranged at a predetermined interval on the horizontal beam 200 through the bracket 300 as described above, the grid zinc 430 is installed, and the grid zinc is assembled from the upper part of the channel. As it is possible to insert the size is supported by the channel at the time of mounting is positioned through a plurality of tight fixtures 450 indented from the top of the channel (100).

상기 밀착고정구(450)는, 그 양단이 챈널(100)의 상,하면에 각각 밀착될 때 호형상을 이루는 지지부(455)가 그리드아연(430)의 상부면을 탄성적으로 압입하게 되고, 상기 지지부의 일측에 형성되는 위치결정턱(457)이 그리드아연의 모서리에 각각 걸리도록 되어 그리드아연 양측을 챈널(100)의 내측에서 견고하게 지지토록 한다.The adhesion fixture 450, when both ends are in close contact with the upper and lower surfaces of the channel 100, the support 455 forming an arc shape is elastically press-fit the upper surface of the grid zinc 430, Positioning jaw 457 formed on one side of the support is caught on the edge of the grid zinc, respectively, so that both sides of the grid zinc is firmly supported inside the channel 100.

이상과 같이 본 발명은 브라켓을 통하여 복수의 수평빔을 연결하면서 그 교차하는 방향으로 복수의 챈널을 연결하고, 조립되는 챈널의 상부에서 그리드아연을 장착토록 하여 무대의 불규칙한 설치여건에 상관없이 규격화 되는 복수의 수평빔과 챈널등의 연결을 통하여 현장에서 조립되는 그리드아연의 제작이 가능하게 되는 것이다.As described above, the present invention connects a plurality of channels in the cross direction while connecting a plurality of horizontal beams through a bracket, and is standardized regardless of irregular installation conditions of the stage by mounting a grid zinc on the upper part of the assembled channel. Through the connection of a plurality of horizontal beams and a channel, it is possible to produce a grid zinc assembled in the field.

도1은 본 발명에 따른 그리드아연의 설치상태를 도시한 평면도1 is a plan view showing an installation state of the grid zinc according to the present invention;

도2는 본 발명에 따른 그리드아연의 설치상태를 도시한 측면도Figure 2 is a side view showing the installation state of the grid zinc according to the present invention

도3a,b는 본 발명에 따른 그리드아연을 도시한 요부 분해도 Figure 3a, b is an exploded view of the main portion showing a grid zinc according to the present invention

도4는 본 발명에 따른 그리드아연의 연결상태를 도시한 단면도4 is a cross-sectional view showing a connection state of the grid zinc according to the present invention;

도5a,b는 각각 본 발명의 다른 실시예에 따른 그리드아연을 도시한 요부 분해도5A and 5B are exploded views of main parts showing grid zinc according to another embodiment of the present invention, respectively.

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

100...챈널 510...연결플레이트100 ... channel 510 ... connection plate

200...수평빔 300...브라켓200 ... Horizontal Beam 300 ... Bracket

430...그리드아연 450...밀착고정구430 grid zinc 450 contact fixture

500...턴버클500 ... turnbuckle

Claims (6)

연결플레이트(510)로서 그 길이방향에 연결되면서 단위규격으로 절단되는 복수의 챈널(100) 또는 수평빔(200);A plurality of channels 100 or horizontal beams 200 connected to the lengthwise direction of the connection plates 510 and cut into unit specifications; 저부에 수평빔(200)이 연결될 때 그 교차하는 방향에서 이격되어 챈널(100)을 연결하도록 하면서 적어도 하나 이상의 챈널 또는 수평빔이 연결되는 브라켓(300); 및,A bracket 300 to which at least one channel or horizontal beam is connected while the horizontal beam 200 is connected to the bottom to connect the channel 100 spaced apart from each other in the crossing direction; And, 위치결정되는 챈널(100) 사이에 삽입될 때 밀착고정구(450)를 통하여 고정되는 그리드아연(430)을 포함하는 구성으로 이루어 진 무대설비용 조립식 그리드아연Prefabricated grid zinc for stage equipment consisting of a configuration comprising a grid zinc 430 that is fixed through the tight fixture 450 when inserted between the channel 100 is positioned 제1항에 있어서, 상기 밀착고정구(450)는, 양단이 챈널(100)의 상하면에 각각 밀착되는 밀착면(453)과 이에 일체로 연장되어 그리드아연(430)이 압착토록 설치되는 호형의 지지부(455)로서 이루어 지는 것을 특징으로 하는 무대설비용 조립식 그리드아연According to claim 1, wherein the contact fixture 450, both ends of the contact surface 453 is in close contact with each of the upper and lower surfaces of the channel 100 and the arc-shaped support portion that is integrally extended so that the grid zinc 430 is installed to be pressed Prefabricated grid zinc for stage equipment, characterized in that made as (455) 제2항에 있어서, 상기 밀착고정구(450)는, 호형의 지지부에 위치결정턱(457)이 더 구비되는 구성으로 이루어 진 것을 특징으로 하는 무대설비용 조립식 그리드아연3. The prefabricated grid zinc for stage installations according to claim 2, wherein the close fitting fixture 450 has a configuration in which a positioning jaw 457 is further provided on an arc-shaped support part. 제1항에 있어서, 상기 연결플레이트(510)는, 챈널 또는 수평빔의 일측면 내측에 대응되는 ㄷ자형상으로 그 하부에 챈널 또는 수평빔의 타측이 삽입되는 요홈부(515)가 더 구비되는 것을 특징으로 하는 무대설비용 조립식 그리드아연According to claim 1, The connecting plate 510 is a c-shape corresponding to the inner side of one side of the channel or the horizontal beam is further provided with a groove portion 515 is inserted into the other side of the channel or the horizontal beam in the lower portion. Prefabricated grid zinc for stage equipment 제1항에 있어서, 상기 브라켓(300)은, 상부면에 챈널(100)사이의 간격에 대응되는 챈널지지부(310)가 일체로 각각 형성되고, 상기 챈널지지부(310)와 교차하는 하부면 방향에 빔지지부(330)가 일체로 형성되는 것을 특징으로 하는 무대설비용 조립식 그리드아연According to claim 1, The bracket 300, the channel support portion 310 corresponding to the interval between the channel 100 is formed integrally on the upper surface, respectively, the lower surface direction to cross the channel support portion 310 Prefabricated grid zinc for stage equipment, characterized in that the beam support 330 is integrally formed 제1항에 있어서, 상기 브라켓(300)은, 중앙부에 앵커볼트(500)가 연결되는 지지판(350)이 일체로 연결되는 것을 특징으로 하는 무대설비용 조립식 그리드아연According to claim 1, The bracket 300, Prefabricated grid zinc for the stage equipment, characterized in that the support plate 350 is connected integrally to the anchor bolt 500 is connected to the central portion.
KR1020070085675A 2007-08-24 2007-08-24 A sectional grid iron for stase setting KR100897400B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070085675A KR100897400B1 (en) 2007-08-24 2007-08-24 A sectional grid iron for stase setting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070085675A KR100897400B1 (en) 2007-08-24 2007-08-24 A sectional grid iron for stase setting

Publications (2)

Publication Number Publication Date
KR20090020989A KR20090020989A (en) 2009-02-27
KR100897400B1 true KR100897400B1 (en) 2009-05-14

Family

ID=40688194

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070085675A KR100897400B1 (en) 2007-08-24 2007-08-24 A sectional grid iron for stase setting

Country Status (1)

Country Link
KR (1) KR100897400B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101908856B1 (en) 2017-07-11 2018-10-16 조아란 Assembly type grid iron for stage

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101978948B1 (en) 2017-05-23 2019-05-15 주식회사 아시아전관 Structure For Flexible Connecting Cable Trays
KR102018164B1 (en) 2018-05-08 2019-09-04 주식회사 아시아전관 Cable Trays
KR102574632B1 (en) * 2022-11-29 2023-09-06 주식회사 미디어컨버전스 Stage device composed of a plurality of grid irons in a stacked structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04155035A (en) * 1990-10-18 1992-05-28 Misawa Homes Co Ltd Joint member between steelwork member and steelwork member having flange
JP2001159198A (en) 1999-12-02 2001-06-12 Shelter:Kk Joint device for construction member

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04155035A (en) * 1990-10-18 1992-05-28 Misawa Homes Co Ltd Joint member between steelwork member and steelwork member having flange
JP2001159198A (en) 1999-12-02 2001-06-12 Shelter:Kk Joint device for construction member

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101908856B1 (en) 2017-07-11 2018-10-16 조아란 Assembly type grid iron for stage

Also Published As

Publication number Publication date
KR20090020989A (en) 2009-02-27

Similar Documents

Publication Publication Date Title
JP5171956B2 (en) Solar cell module mounting structure
RU2190340C2 (en) Rectangular parallelepiped frame forming metal carcass, in particular, for electrical cabinet
KR101963237B1 (en) Cable Support Device for Power Cable
KR100897400B1 (en) A sectional grid iron for stase setting
US10047936B2 (en) Ceiling system
CN112796458B (en) Building ceiling mechanism
CN102518875B (en) The wire installation frame of a kind of dome or arc or slope use
KR101955162B1 (en) Assembly type grating
KR101796463B1 (en) Brackets and prefabricated structures using it for construction
KR101894365B1 (en) Cross type connecting bracket, module type system ceiling and assembly method having the same
JP6044988B2 (en) Mounting method of ceiling panel for retrofitting and ceiling structure
KR101447359B1 (en) Method for installing ALC panel to concrete slab using insert channel
JP5316159B2 (en) Ceiling panel system with wiring duct
KR101216322B1 (en) A side rail connect bar of cable tray
KR101622947B1 (en) Brackets and prefabricated structures using it for construction
KR20190115781A (en) Fence using precast concrete block
KR100528157B1 (en) Ceiling panel supported device for building
KR200343680Y1 (en) a fixed clamp for install the ceiling finish panel
CN211127006U (en) Intelligent building wiring arrangement
CN212295081U (en) Assembly type building element for middle position of building wall
KR200397269Y1 (en) Clamp for fixing gang form
CN212200788U (en) Assembly type building element for vertex position of three wall surfaces meeting of building
KR200384537Y1 (en) supporting structure for communication terminal box
KR20060118140A (en) Lifting apparatus for lighting equipment
KR200229397Y1 (en) Frame establishment structure of transparent soundproof panel

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120507

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee