KR100881376B1 - Pig - Google Patents

Pig Download PDF

Info

Publication number
KR100881376B1
KR100881376B1 KR1020080050319A KR20080050319A KR100881376B1 KR 100881376 B1 KR100881376 B1 KR 100881376B1 KR 1020080050319 A KR1020080050319 A KR 1020080050319A KR 20080050319 A KR20080050319 A KR 20080050319A KR 100881376 B1 KR100881376 B1 KR 100881376B1
Authority
KR
South Korea
Prior art keywords
hole
pig
holes
spacer
front head
Prior art date
Application number
KR1020080050319A
Other languages
Korean (ko)
Inventor
라위출
Original Assignee
주식회사 아세아프로텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 아세아프로텍 filed Critical 주식회사 아세아프로텍
Priority to KR1020080050319A priority Critical patent/KR100881376B1/en
Application granted granted Critical
Publication of KR100881376B1 publication Critical patent/KR100881376B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/04Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes
    • B08B9/053Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved along the pipes by a fluid, e.g. by fluid pressure or by suction
    • B08B9/055Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved along the pipes by a fluid, e.g. by fluid pressure or by suction the cleaning devices conforming to, or being conformable to, substantially the same cross-section of the pipes, e.g. pigs or moles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/10Cleaning by methods involving the use of tools characterised by the type of cleaning tool
    • B08B1/12Brushes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/10Cleaning by methods involving the use of tools characterised by the type of cleaning tool
    • B08B1/16Rigid blades, e.g. scrapers; Flexible blades, e.g. wipers
    • B08B1/165Scrapers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/26Pigs or moles, i.e. devices movable in a pipe or conduit with or without self-contained propulsion means
    • F16L55/28Constructional aspects
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/26Pigs or moles, i.e. devices movable in a pipe or conduit with or without self-contained propulsion means
    • F16L55/46Launching or retrieval of pigs or moles

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Cleaning In General (AREA)

Abstract

A pig is provided to be flexibly made to be bent of the pig by more installing the wrist of the new quality of the material between spacer and scraper disc, and the connection axle possible to be smoothly bent. A pig comprises the front head(100) in which the front through-hole passing through center is formed of the hemi spherical grain; the back tail(200) which is faced in the front head while the rearward through-hole(210) corresponding to the front through-hole is formed of the hemi spherical grain; the spacer(300) including the front through-hole and the first through-hole(310) corresponding to the rearward through-hole is arranged as plurality between the front head and back tail; the scraper disc(400) including the second through-hole(410) which is arranged between the spacer and is corresponded to the first through-hole of the spacer and adheres closely to the inner circumference of the floating piping; the front brush (300a) having the length which is installed at the outer circumference of the spacer and is bigger than the external diameter of the scraper disc; the wrist(500) of the new quality of the material in which the third through-hole(510) corresponding to the first through-hole and the second through-hole is formed and which is arranged between the spacer or the scraper disc; the connecting member(600) including the inlet port(610) which is behind arranged and is connected in the rearward through-hole of the back tail; and the connection axle(700) of the new quality of the material which passes through the rearward through-hole from the front through-hole and the other end part is connected in the connecting member to a screw nut while adhering closely to the front side of the front head.

Description

피그{pig}Pig {pig}

본 발명은 피그에 관한 것으로서, 더욱 상세하게는 굽힘 응력의 발생을 최소화한 상태에서 곡관을 유연하게 통과할 수 있도록 하고 압송수의 수압이 극대화될 수 있도록 한 피그에 관한 것이다.The present invention relates to a pig, and more particularly, to a pig that allows the flexible pipe to pass through in a state of minimizing the occurrence of bending stress and to maximize the hydraulic pressure of the pressurized water.

국내 상,하수도의 고품질화 정책에 따라 상,하수도 배관 설비가 급속히 증가하고 있으며, 엄격한 수질 관리 및 효과적인 유송배관의 관리를 위한 유송 시스템의 발전이 요구되고 있다.In accordance with the domestic water quality and sewage quality policy, water and sewage piping facilities are rapidly increasing, and the development of a transportation system for strict water quality management and effective management of the distribution pipes is required.

그러한 가운데서도 계속적으로 문제가 되고 있는 것은 유송배관 내부에 형성된 스케일이나 이물질 퇴적의 문제이다.Among them, the problem continues to be the problem of scale and foreign matter accumulation in the pipeline.

수질은 계속 향상되고 있음에도 불구하고 유송배관 내부에 형성된 물때의 퇴적으로 인한 슬라임(slime) 슬러지(sludge)와 악성 산화 스케일, 즉, 녹 덩어리의 형성을 저지하기 위해 온갖 노력을 기울이고 있는 실정이다.Although water quality continues to improve, all efforts have been made to prevent the formation of slime sludge and malignant oxidation scales, ie, lumps of rust, due to the accumulation of scale formed inside the drain pipe.

상기와 같은 스케일층은 시간이 경과함에 따라 점차적으로 두꺼워지기 때문에 유체의 원활한 흐름을 방해하여 유송압을 상승시키며 압송 펌프의 동력에너지 손실을 증가시키는 문제가 있으며, 유송배관의 내주면에 퇴적된 스케일이 유체에 녹아들게 되어 유체를 오염시키는 문제가 있었다.Since the scale layer is gradually thickened over time, there is a problem of increasing the flow pressure by preventing the smooth flow of the fluid and increasing the power energy loss of the pressure pump, and the scale deposited on the inner circumferential surface of the flow pipe Melting into the fluid has a problem of contaminating the fluid.

상기한 스케일을 제거하기 위해서는 여러 가지 방법이 사용되고 있으며, 최근에는 유송배관 내의 유체의 유송압력 자체로 이송되면서 스케일을 제거하는 피그가 사용되고 있다.Various methods are used to remove the scale, and in recent years, a pig which removes the scale while being transferred to the flow pressure of the fluid in the flow pipe itself is used.

종래의 피그는 도 1에 도시된 바와 같이, 전방에 작용하는 저항을 최소화할 수 있도록 선단의 직경은 후단의 직경에 비해 작게 유선 형태로 형성되며 하나의 단일체로 형성된다.As shown in FIG. 1, the conventional pigtail has a streamlined shape that is smaller than the diameter of the rear end so as to minimize the resistance acting on the front side and is formed as a single body.

이와 같은 형태는 흡사 포탄 또는 총알과 유사한 형태로서, 상기 피그(10)의 재질은 합성수지 등으로 이루어진다.Such a shape is similar to a shell or a bullet, and the material of the pig 10 is made of synthetic resin or the like.

이때, 피그(10)의 외경은 세척하고자 하는 유송배관(20)의 내경에 비해 크게 형성된다.At this time, the outer diameter of the pig 10 is formed larger than the inner diameter of the flow pipe 20 to be washed.

이는, 피그(10)의 외주면이 유송배관(20)의 내주면에 밀착되도록 하여 스케일 제거의 효율성을 높이기 위함이다.This is to increase the efficiency of scale removal by bringing the outer circumferential surface of the pig 10 into close contact with the inner circumferential surface of the flow pipe 20.

이하, 상기한 피그(10)의 작용에 대해 간략히 살펴보면 다음과 같다.Hereinafter, the operation of the above-described pig 10 will be briefly described.

피그(10)의 선단을 클리닝 하고자 하는 유송배관(20)의 주행 방향으로 투입시킨다.The tip of the pig 10 is put in the traveling direction of the flow pipe 20 to be cleaned.

이후, 물을 피그(10)의 후단을 향해 통수시킨다. 이때, 물의 압력은 최대화된 상태이며, 상기 피그(10)는 물의 압력에 의해 유송배관(20)의 전방을 향해 압송된다.Thereafter, water is passed through to the rear end of the pig 10. At this time, the pressure of the water is maximized, the pig 10 is pushed toward the front of the flow pipe 20 by the pressure of the water.

이후, 압송되는 피그(10)에 의해 유송배관(20) 내부의 스케일은 피그(P)와 함께 피그(P)의 주행 방향으로 진행된다.Subsequently, the scale inside the flow pipe 20 is driven by the pig 10 being pushed together in the running direction of the pigtail P together with the piglet P. FIG.

이후, 유송배관(20)의 끝단에 이르러서 피그는 별도의 피그 수취장치(미도시)에 수취되고, 스케일은 외부로 배출된다. Subsequently, when the end of the flow pipe 20 is reached, the pig is received by a separate pig receiving device (not shown), and the scale is discharged to the outside.

하지만, 상기한 종래의 피그(10)는 다음과 같은 문제가 발생하였다.However, the above-described conventional pig 10 has the following problems.

클리닝 하고자 하는 유송배관(20)은 직관뿐만 아니라, 도 1에 도시된 바와 같이 굴곡된 곡관을 포함하며, 피그(10)를 발사시키는 피그발사관(미도시)의 경우 대체로 곡관을 포함하여 구성된다.The conduit 20 to be cleaned includes not only a straight pipe but also a curved pipe as shown in FIG. 1, and a pig launcher (not shown) for firing the pig 10 generally includes a curved pipe.

즉, 종래의 피그(10)는 곡관을 지나가는 과정에서 원활하게 통과되지 못하는 문제가 발생하였다.That is, the conventional pig 10 has a problem that does not pass smoothly in the process of passing through the curved pipe.

물론, 피그(10)의 재질이 비교적 탄력이 있는 발포 합성수지로 이루어져 있고, 압송수의 세기가 크다고 하더라도 피그(10)가 곡관을 통과될 때에는 휘어지는 부위에 응력이 집중되기 마련이다.Of course, the material of the pig 10 is made of a relatively flexible foamed synthetic resin, and even if the strength of the pumping water is large, when the pig 10 passes through the curved pipe, stress is concentrated on the bent portion.

이에 따라, 피그의 휘어지는 부위에 응력이 강하게 작용되어 피그(10)의 손상을 야기시키는 문제도 발생하였다.As a result, a stress is strongly applied to the bent portion of the pig, causing a problem of damage to the pig 10.

또한, 상기 굽힘 응력으로 인해 피그(10)가 곡관부에 막히는 문제가 발생할 수 있으며, 곡관부에 막혀 있다가 압송 압력이 크게 상승하는 순간에는 피그(10)의 갑작스러운 주행에 의해 배관에 손상을 줄 수 있는 문제가 발생하였다. In addition, the bending stress may cause a problem that the pig 10 is clogged in the bent portion, the blockage is damaged by the sudden running of the pig 10 at the moment the clogging the bent portion when the pressure is greatly increased. There was a problem that could give.

또한, 피그(10)가 곡관을 원활하게 통과되기 위해서는 압송수의 압력이 최대화되어야 하고, 이를 위해 압송수의 압력을 증가시키기 위한 고압 설비가 필요하게 된다.In addition, in order for the pig 10 to smoothly pass through the curved pipe, the pressure of the pressurized water must be maximized, and for this purpose, a high pressure device for increasing the pressure of the pressurized water is required.

이에 따라, 공사비용의 상승 요건을 야기시키는 문제가 발생하였다.As a result, a problem arises that causes an increase in construction costs.

본 발명은 상기한 과제를 해결하기 위해 안출된 것으로서, 본 발명의 목적은 유송배관을 지나가면서 유송배관의 내부를 클리닝 하는 피그에 있어서,중앙을 관통하는 전방 통공이 형성된 반구형의 전방 헤드;상기 전방 통공에 대응된 후방 통공이 형성되며, 상기 전방 헤드에 대향된 반구형의 후방 테일;상기 전방 헤드 및 후방 테일 사이에 복수로 배치되며, 상기 전방 통공 및 후방 통공에 대응된 제1통공을 포함하는 스페이서;상기 스페이서 사이에 각각 배치되며, 상기 스페이서의 제1통공에 대응된 제2통공을 포함하되, 유송배관의 내주면에 밀착되는 스크레이퍼 디스크;상기 스페이서의 외주면에 설치되며, 상기 스크레이퍼 디스크의 외경보다 큰 길이를 갖는 전방 브러쉬;상기 제1통공 및 제2통공에 대응된 제3통공이 형성되며, 상기 스페이서 또는 스크레이퍼 디스크 사이에 배치된 신축 재질의 관절부;상기 후방 테일의 후방에 배치되며, 후방 통공에 연통된 유입구를 포함하는 체결부재;그리고 일단부는 전방 헤드의 전면에 밀착되며 타단부는 상기 전방 통공부터 후방 통공을 통과하여 상기 체결부재에 너트로 체결되며, 상기 전방통공, 후방통공, 제1,2,3통공의 내경에 비해 작은 외경을 갖는 신축 재질의 결합축;을 포함하여 구성된 피그를 제공한다.The present invention has been made in order to solve the above problems, an object of the present invention in the piglet cleaning the inside of the flow pipe while passing through the flow pipe, hemispherical front head formed with a front through-hole passing through the center; A rear through hole corresponding to the through hole is formed, and a hemispherical rear tail facing the front head; a plurality of spacers disposed between the front head and the rear tail, the spacer including a first through hole corresponding to the front through and the through through; A scraper disk disposed between the spacers and including a second through hole corresponding to the first through hole of the spacer, the scraper disc being in close contact with the inner circumferential surface of the flow pipe; the scraper disc installed on the outer circumferential surface of the spacer and larger than the outer diameter of the scraper disc. A front brush having a length; a third hole corresponding to the first and second holes is formed, and the spacer or switch Joint portion of elastic material disposed between the scraper disk; Fastening member disposed in the rear of the rear tail, the inlet communicated to the rear through hole; and one end is in close contact with the front of the front head and the other end from the front through hole Provides a pig formed by including a coupling shaft of the elastic material is passed through the rear through the fastening member and fastened to the fastening member by a nut, the outer through the front, rear, the first, second, third through the smaller diameter than the inner diameter of the through hole; .

이때, 상기 관절부는 결합축 상에서 복수로 밀착된 원형부재를 포함하는 것이 바람직하다.At this time, the joint portion preferably includes a plurality of circular members in close contact on the coupling shaft.

또한, 상기 전방 통공, 제1,2,3통공, 후방 통공에는 스프링이 삽입된 것이 바람직하다.In addition, it is preferable that a spring is inserted into the front through holes, the first through the second through the third through the hole.

또한, 상기 전방 통공, 제1,2,3통공, 후방 통공에는 가이드링이 더 삽입된 것이 바람직하다.In addition, it is preferable that the guide ring is further inserted into the front through holes, the first through the second through the third through holes.

또한, 상기 후방 테일의 후방 통공 중, 유입구에 대응된 부위는 상기 유입구를 통한 물의 유입이 원활하게 이루어지도록 통공의 외측으로부터 통공의 내측을 향해 외경이 점점 작아지도록 경사진 것이 바람직하다.In addition, it is preferable that the portion corresponding to the inlet of the rear throughhole of the rear tail is inclined so that the outer diameter gradually decreases from the outside of the throughhole to the inside of the throughhole so as to smoothly inflow of water through the inlet.

또한, 상기 결합축은 와이어로프인 것이 바람직하다.In addition, the coupling shaft is preferably a wire rope.

본 발명에 따른 피그에 의하면 다음과 같은 효과가 있다.The pig according to the present invention has the following effects.

스페이서 및/또는 스크레이퍼 디스크 사이에 신축 재질의 관절부가 더 설치되고, 원활하게 휘어짐이 가능한 결합축이 설치됨으로써, 피그의 휘어짐이 유연하게 이루어질 수 있게 된다.Between the spacer and / or the scraper disk, the joint portion of the elastic material is further installed, and the coupling shaft which is smoothly bent is installed, so that the bending of the pig can be made flexible.

이에 따라, 피그의 곡관 통과시 응력 등의 과부하 발생으로 인한 피그의 손상이 발생하지 않는 효과가 있다.Accordingly, there is an effect that the damage of the pig due to the overload generation such as stress when the pig passes through the curved pipe does not occur.

또한, 각 구성요소들의 통공이 형성하는 유로를 통해 압송수가 유입되어 피그의 여러 부위에 압력이 가해짐으로써, 압송수의 압력을 최대한으로 활용할 수 있게 된다.In addition, the pressurized water flows through the flow path formed by the through hole of each component, and pressure is applied to various parts of the pig, thereby making it possible to maximize the pressure of the pressurized water.

이에 따라, 피그의 압송되는 힘이 최대화됨으로써, 클리닝 작업이 효과적으로 이루어질 뿐만 아니라 저압에도 클리닝 효과를 극대화할 수 있는 효과가 있다.Accordingly, by maximizing the pressure of the feed force of the pig, not only the cleaning operation is effectively performed, but also has the effect of maximizing the cleaning effect even at low pressure.

또한, 고압설비가 필요치 않게 되어 경제성도 높일 수 있는 효과가 있다.In addition, there is no need for a high-pressure equipment, there is an effect that can increase the economic efficiency.

이하, 첨부된 도 2 내지 도 4를 참조하여 본 발명의 바람직한 실시예에 따른 피그에 대하여 설명하도록 한다.Hereinafter, a pig according to an exemplary embodiment of the present invention will be described with reference to FIGS. 2 to 4.

피그는 도 2 및 도 3에 도시된 바와 같이, 전방 헤드(100)와, 후방 테일(200)과, 스페이서(300)와, 스크레이퍼 디스크(400)와, 관절부(500)와, 체결부재(600)와, 결합축(700)을 포함하여 구성된다.As shown in FIGS. 2 and 3, the pig may include the front head 100, the rear tail 200, the spacer 300, the scraper disk 400, the joint 500, and the fastening member 600. And a coupling shaft 700.

전방 헤드(100)는 피그의 전방, 즉, 클리닝 하고자 하는 유송배관 내의 주행방향의 선단을 구성한다.The front head 100 constitutes the front end of the pig, that is, the front end of the running direction in the flow pipe to be cleaned.

이때, 전방 헤드(100)의 형태는 다양하게 제공될 수 있지만, 저항 등을 고려할 때, 반구형으로 형성됨이 바람직하며, 유송배관의 내경에 비해 작게 형성됨이 바람직하다.At this time, the shape of the front head 100 may be provided in various ways, in consideration of resistance, it is preferably formed in a hemispherical shape, it is preferable to be formed smaller than the inner diameter of the flow pipe.

즉, 전방 헤드(100)의 전면은 곡률을 이루고, 전방 헤드(100)의 후면은 편평한 면으로 이루어진다.That is, the front surface of the front head 100 forms a curvature, and the rear surface of the front head 100 is a flat surface.

이때, 전방 헤드(100)에는 전면과 후면의 중앙을 관통하는 전방 통공(110)이 형성된다.At this time, the front head 100 is formed with a front through-hole 110 penetrating the center of the front and rear.

또한, 전방 헤드(100)의 재질은 고무 또는 합성수지임이 바람직하다.In addition, the material of the front head 100 is preferably rubber or synthetic resin.

다음으로, 후방 테일(200)은 피그의 후방, 즉, 압송수의 압력을 받는 부위이며 전방 헤드(100)의 후방에 배치된다.Next, the rear tail 200 is a rear portion of the pig, that is, a portion under pressure of the pressurized water and disposed behind the front head 100.

이때, 후방 테일(200)은 상기 전방 헤드(100)와 동일한 반구형으로 이루어지며, 상기 전방 헤드(100)에 대향된다.At this time, the rear tail 200 is made of the same hemispherical shape as the front head 100, it is opposed to the front head 100.

즉, 전방 헤드(100)의 편평한 후면은 후방 테일(200)의 편평한 전면과 서로 마주하게 된다.That is, the flat rear face of the front head 100 faces each other with the flat front face of the rear tail 200.

또한, 상기 후방 테일(200)에는 상기 전방 헤드(100)와 마찬가지로 전,후면을 관통하는 후방 통공(210)이 형성된다.In addition, the rear tail 200 is formed with a rear through hole 210 penetrating the front and rear, similar to the front head 100.

이때, 후방 통공(210)의 후단은 후방 테일(200)의 외측으로부터 후방 테일(200)의 후방 통공(210)을 향해 점점 내경이 작아지도록 경사지게 형성됨이 바람직하다.At this time, the rear end of the rear through hole 210 is preferably inclined from the outside of the rear tail 200 toward the rear through hole 210 of the rear tail 200 so that the inner diameter becomes smaller.

이에 따라, 후방 통공(210)으로의 압송수 유입이 원활해질 뿐만 아니라, 압송수의 압력이 극대화될 수 있게 된다.Accordingly, not only the inflow of the pressurized water into the rear through hole 210 may be smooth, but the pressure of the pressurized water may be maximized.

다음으로, 스페이서(300)는 브러쉬(300a)가 설치될 수 있도록 제공되며, 전방 헤드(100)와 후방 테일(200) 사이에 복수로 배치된다.Next, the spacer 300 is provided so that the brush 300a can be installed, and a plurality of spacers 300 are disposed between the front head 100 and the rear tail 200.

이때, 스페이서(300)의 크기는 전방 헤드(100) 및 후방 테일(200)에 비해 작게 형성됨이 바람직하며, 그의 중앙에는 전방 통공(110) 및 후방 통공(210)에 대응된 제1통공(310)이 형성된다.In this case, the size of the spacer 300 is preferably smaller than that of the front head 100 and the rear tail 200, and the first through hole 310 corresponding to the front through hole 110 and the rear through hole 210 in the center thereof. ) Is formed.

또한, 스페이서(300)는 전방 헤드(100) 및 후방 테일(200)의 형태가 반구형으로 이루어진 바, 원판 형태로 이루어짐이 바람직하다.In addition, the spacer 300 has a hemispherical shape in the form of the front head 100 and the rear tail 200, it is preferably made of a disc shape.

그리고, 스페이서(300)의 외주면에는 그 둘레를 따라 브러쉬(300a)가 설치된다.And the brush 300a is installed along the periphery of the outer peripheral surface of the spacer 300.

상기 브러쉬(300a)는 후술하는 스크레이퍼 디스크가 유송배관 내의 스케일을 제거하면서 지나간 자리를 재차 쓸어버리는 역할을 하며, 탄력있는 합성수지 또는 연질의 스틸로 이루어짐이 바람직하다.The brush 300a plays a role of sweeping the seat again while the scraper disk described later removes the scale in the flow pipe, and is preferably made of elastic synthetic resin or soft steel.

이때, 브러쉬(300a)의 길이는 유송배관의 내주면에 밀착되어 휘어질 수 있을 정도의 길이로 형성됨이 바람직하다.At this time, the length of the brush (300a) is preferably formed to a length enough to be in close contact with the inner peripheral surface of the flow pipe.

이에 따라, 브러쉬(300a)는 유송배관의 내주면을 효과적으로 클리닝 할 수 있게 된다.Accordingly, the brush 300a can effectively clean the inner circumferential surface of the flow pipe.

다음으로, 스크레이퍼 디스크(400)는 유송배관 내주면의 스케일을 제거하며, 스페이서 사이에 각각 배치된다.Next, the scraper disk 400 removes the scale of the inner peripheral surface of the flow pipe and is disposed between the spacers.

상기 스크레이퍼 디스크(400)는 유송배관의 내주면에 대응되는 원판 형태로 이루어짐이 바람직하며, 그의 외경은 유송배관의 내경과 동일하게 형성됨이 바람직하다.The scraper disk 400 is preferably made of a disk shape corresponding to the inner peripheral surface of the flow pipe, the outer diameter thereof is preferably formed to be the same as the inner diameter of the flow pipe.

이에 따라, 상기 스크레이퍼 디스크(400)의 외경은 전방 헤드(100) 및 후방 테일(200)의 외경에 비해 크게 형성된다.Accordingly, the outer diameter of the scraper disk 400 is larger than the outer diameters of the front head 100 and the rear tail 200.

또한, 스크레이퍼 디스크(400) 역시 그의 중앙에는 스페이서(300)의 제1통공(310)에 대응된 제2통공(410)이 형성된다.In addition, the scraper disk 400 also has a second through hole 410 corresponding to the first through hole 310 of the spacer 300 in the center thereof.

다음으로, 관절부(500)는 피그가 곡관 통과시 피그의 휘어짐을 원활하게 하고 응력 발생을 최소화하는 역할을 하며, 스페이서(300) 사이에 배치된다.Next, the joint part 500 serves to smooth the bending of the pig when the pig passes the curved pipe and minimize the generation of stress, and is disposed between the spacers 300.

이때, 관절부(500)는 피그의 길이 방향으로 중간에 배치됨이 바람직하며, 복수의 원형부재(500)를 포함한다.At this time, the joint part 500 is preferably disposed in the middle of the longitudinal direction of the pig, and includes a plurality of circular members 500.

이때, 원형부재(500)의 형태는 원기둥의 형태로 이루어지되, 각 모서리는 라운드지게 형성된다.At this time, the shape of the circular member 500 is made of a cylindrical shape, each corner is formed to be round.

이에 따라, 피그가 휘어지는 과정에서 원형부재(500) 상호 간에 간섭이 덜 발생할 수 있다.Accordingly, less interference may occur between the circular members 500 in the process of bending the pig.

또한, 원형부재(500)의 중앙에는 상기 제1,2통공(310,410)에 대응된 제3통공(510)이 형성된다.In addition, a third through hole 510 corresponding to the first and second through holes 310 and 410 is formed at the center of the circular member 500.

이에 따라, 제3통공(510)은 제1,2통공(310,410) 및 전방 통공(110), 후방 통공(210)에 연통되며, 상기한 통공들(110,210,310,410,510)은 하나의 유로(L)를 형성하게 된다.Accordingly, the third through hole 510 communicates with the first and second through holes 310 and 410, the front through hole 110, and the rear through hole 210, and the through holes 110, 210, 310, 410 and 510 form one flow path L. Done.

다음으로, 체결부재(600)는 전술한 피그의 구성요소들을 서로 정렬시키는 역할과 더불어, 압송수가 피그의 내부, 즉, 통공이 형성한 유로(L)에 유입될 수 있도록 제공된다.Next, the fastening member 600 serves to align the components of the above-described pigs with each other, and is provided so that the pressurized water may flow into the inside of the pig, that is, the flow path L formed by the through hole.

상기, 체결부재(600)는 원판으로 제공됨이 바람직하며, 후방 테일(200)의 후면에 배치된다.The fastening member 600 is preferably provided as a disc, and is disposed on the rear surface of the rear tail 200.

이때, 체결부재(600)에는 복수의 유입구(610)가 형성되며, 이 유입구(610)는 후방 통공(210)에 대응된다.In this case, a plurality of inlets 610 are formed in the fastening member 600, and the inlets 610 correspond to the rear through holes 210.

또한, 체결부재(600)의 중앙에는 결합공(620)이 형성된다.In addition, a coupling hole 620 is formed in the center of the fastening member 600.

다음으로, 결합축(700)은 정렬된 피그의 구성요소가 유동되지 않도록 한다.Next, the coupling shaft 700 prevents the components of the aligned pig from flowing.

이때, 결합축(700)의 일단부는 전방 헤드(100)의 전면에 지지되며, 타단부는 유로(L)를 통과하여 체결부재(600)의 결합공(620)을 통해 외부로 노출된다.At this time, one end of the coupling shaft 700 is supported on the front of the front head 100, the other end is exposed to the outside through the coupling hole 620 of the fastening member 600 through the flow path (L).

이때, 결합축(700)의 일단부에는 전방 헤드(100)의 전면을 지지하기 위한 지지부재(710)가 결합되며, 결합축(700)의 타단부는 너트(N)에 의해 체결부재(600)에 체결된다.At this time, one end of the coupling shaft 700 is coupled to the support member 710 for supporting the front of the front head 100, the other end of the coupling shaft 700 by the nut (N) fastening member 600 ) Is fastened.

상기 결합축(700)의 재질은 원활하게 휘어질 수 있는 신축 재질임이 바람직하며, 유로(L)를 형성하는 통공들(110,210,310,410,510)의 내경에 비해 작은 외경을 갖도록 형성된다.The coupling shaft 700 is preferably a stretchable material that can bend smoothly, and is formed to have a smaller outer diameter than the inner diameters of the through holes 110, 210, 310, 410, and 510 forming the flow path L.

이에 따라, 상기 통공들(110,210,310,410,510)에는 물이 통과하는 유로(L)의 공간이 확보될 수 있다.Accordingly, a space of the flow path L through which water passes may be secured in the through holes 110, 210, 310, 410, and 510.

또한, 결합축(700)은 휘어짐이 가능한 재질의 여러 형태로 제공될 수 있으며, 스틸 또는 합성수지의 와이어로프임이 바람직하다.In addition, the coupling shaft 700 may be provided in various forms of a material that can be bent, preferably a wire rope of steel or synthetic resin.

한편, 유로(L)를 형성하는 각각의 통공들(110,210,310,410,510)에는 압송수의 유입을 원활하게 가이드하고 상기 통공들(110,210,310,410,510)로의 결합축(700) 삽입을 가이드하는 가이드링(800)이 더 삽입될 수도 있다.Meanwhile, each of the through holes 110, 210, 310, 410 and 510 forming the flow path L smoothly guides the inflow of the pressurized water and further includes a guide ring 800 for guiding the coupling shaft 700 into the through holes 110, 210, 310, 410 and 510. May be

상기 가이드링(800)은 각각의 통공에 하나씩 개별체로 삽입된다.The guide ring 800 is inserted individually into each of the through holes.

이하, 상기한 구성으로 이루어진 본 발명의 바람직한 실시예에 따른 피그의 결합 및 작용에 대해 설명하도록 한다.Hereinafter, the coupling and the action of the pig according to a preferred embodiment of the present invention made of the above configuration.

가이드링(800)이 삽입된 전방 헤드(100)와 후방 테일(200) 사이에 스페이서(300), 스크레이퍼 디스크(400) 그리고 관절부인 원형부재(500)를 번갈아가며 배치시킨다.The spacer 300, the scraper disk 400, and the circular member 500, which are joints, are alternately disposed between the front head 100 and the rear tail 200 in which the guide ring 800 is inserted.

이때, 상기 원형부재(500)는 스페이서(300) 사이에 배치됨이 바람직하다.At this time, the circular member 500 is preferably disposed between the spacer (300).

이때, 상기한 구성요소들은 서로 접촉된 상태일 뿐이지 어떠한 체결수단에 의해 완전히 고정된 상태는 아니다.In this case, the above components are only in contact with each other, but not completely fixed by any fastening means.

이때, 전방 통공(110), 제1통공(310), 제2통공(410), 제3통공(510), 후방 통 공(210)은 서로 연통된 상태이며, 압송수가 유입되는 유로(L)를 형성한다.At this time, the front through holes 110, the first through holes 310, the second through holes 410, the third through holes 510, the rear through holes 210 are in communication with each other, the flow path (L) in which the pressure water is introduced To form.

다음으로, 결합축(700)의 타단부를 전방 통공(110)을 통해 삽입하여 후방 통공(210)을 통해 노출시킨다.Next, the other end of the coupling shaft 700 is inserted through the front through hole 110 and exposed through the rear through hole 210.

이때, 결합축(700)의 일단부는 지지부재(710)에 의해 전방 헤드(100)의 전면에 걸려 지지된 상태가 된다.At this time, one end of the coupling shaft 700 is in a state supported by the front of the front head 100 by the support member 710.

다음으로, 체결부재(600)의 결합공(620)을 결합축(700)의 타단부에 끼우고, 상기 결합공(620)을 통해 노출된 결합축(700)의 타단부를 너트(N)로 체결시킨다.Next, the coupling hole 620 of the fastening member 600 is inserted into the other end of the coupling shaft 700, the other end of the coupling shaft 700 exposed through the coupling hole 620 nut (N) Tighten with

이때, 체결부재(600)의 유입공(610)은 후방 테일(200)의 후방 통공(210)에 연통된다.At this time, the inlet hole 610 of the fastening member 600 is in communication with the rear through hole 210 of the rear tail 200.

이와 같이 너트(N)가 결합축(700)에 조여짐에 따라 체결부재(600)는 후방 테일(200)을 가압하며, 상기 후방 테일(200), 스페이서(300), 스크레이퍼 디스크(400), 원형부재(500), 전방 헤드(100)는 서로 밀착되어 유동이 방지된다.As the nut N is fastened to the coupling shaft 700, the fastening member 600 presses the rear tail 200, and the rear tail 200, the spacer 300, the scraper disk 400, Circular member 500, the front head 100 is in close contact with each other to prevent flow.

이때, 상기한 구성요소들이 서로 밀착된 상태라도, 각각의 구성요소 통공들(110,210,310,410,510)이 형성하는 유로(L)와 후방 테일(200), 스페이서(300), 스크레이퍼 디스크(400), 원형부재(500), 전방 헤드(100) 사이에는 미세한 틈이 발생하게 된다.At this time, even when the components are in close contact with each other, the flow path (L) and rear tail 200, spacer 300, the scraper disk 400, the circular member formed by the respective component through holes (110,210,310,410,510) 500), a fine gap is generated between the front head 100.

이로써, 피그의 결합이 완료되며, 결합이 완료된 피그를 도 4에 도시된 바와 같이, 유송배관의 피그발사관에 투입시킨다.As a result, the coupling of the pig is completed, as shown in Figure 4, the completed pig is put into the pig firing pipe of the flow pipe.

이때, 도 4에 도시된 바와 같이, 피그가 곡관을 통과하는 과정에서 상기 피그에 휘어짐이 발생하더라도, 관절부(500) 및 결합축(700)의 원활한 휘어짐에 의해 무리 없이 곡관을 통과하게 된다.At this time, as shown in Figure 4, even if the bend in the pig in the process of passing the pig tube, the bend smoothly by the joint portion 500 and the coupling shaft 700 passes through the curved tube.

이후, 피그는 곡관을 통과하여 유송배관과 수평하게 배치되며, 밸브(V)를 열어 압송수를 통수시킨다.Thereafter, the pig is disposed horizontally with the flow pipe through the curved pipe, and opens the valve (V) to pass the water flow.

이때, 압송수는 강한 압력으로 피그의 후방 테일(200)을 가압하며, 체결부재(600)의 유입구(610)를 통해 피그 내의 유로(L)에 유입된다.At this time, the pressurized water presses the rear tail 200 of the pig with strong pressure, and flows into the flow path L in the pig through the inlet 610 of the fastening member 600.

이때, 압송수는 후방 통공(210)의 경사진 부위를 통해 유로(L) 상에 유입되면서 수압이 더욱 높아진다.At this time, the pressurized water flows on the flow path L through the inclined portion of the rear through hole 210, and the water pressure is further increased.

이는, 유로(L)의 직경이 경사진 부위의 직경에 비해 좁기 때문인 것으로, 수압이 높아짐은 이해 가능하다.This is because the diameter of the flow path L is narrow compared with the diameter of the inclined part, and it can understand that a water pressure becomes high.

이후, 상기 유로(L)로 유입된 압송수는 유로(L)를 통과하여 전방 헤드(100)d에 지지된 지지부재(710)를 가압할 뿐만 아니라, 유로(L)와 이 유로(L)를 구성하는 구성요소 간의 미세한 틈을 통해 외부로 새어 나가게 된다.Thereafter, the pressurized water introduced into the flow path L not only pressurizes the support member 710 supported by the front head 100 d through the flow path L, but also the flow path L and the flow path L. It leaks to the outside through the minute gap between the components constituting the.

이때, 새어 나간 압송수는 스페이서(300) 및 스크레이퍼 디스크(400)의 후면을 가압하게 된다.At this time, the leaked compressed water pressurizes the rear surfaces of the spacer 300 and the scraper disk 400.

이때, 압송수가 후방 테일(200)의 후방 통공(210)을 통해 유입되지 않고, 후방 테일(200)의 후면만 가압한다면, 휘어짐이 비교적 자유로운 결합축(700)과 관절부(500)에 전달되는 압송수의 가압력을 제대로 견디지 못하게 되어 주행 압력이 떨어질 뿐만 아니라 관절부(500)에 손상이 발생할 수도 있다.At this time, if the pressurized water does not flow through the rear through hole 210 of the rear tail 200 and presses only the rear side of the rear tail 200, the pressurized force transmitted to the coupling shaft 700 and the joint part 500 where the bending is relatively free. Not being able to withstand the number of pressing force properly, as well as the running pressure drops, the joint portion 500 may also be damaged.

이는, 피그의 중간부인 관절부(500)의 형태가 피그의 전,후방 구성요소들에 비해 가늘게 구성되어 있기 때문이다.This is because the shape of the joint 500, which is the middle of the pig, is thinner than the front and rear components of the pig.

특히, 반대편의 피그발사관에 피그가 수취될 때, 관절부(500)에만 압력이 집중될 수 있으므로 피그가 손상될 수 있다.In particular, when the pig is received in the opposite pig firing tube, since the pressure can be concentrated only in the joint portion 500 may damage the pig.

한편, 피그는 유송배관을 통해 주행 방향으로 진행하며, 스크레이퍼 디스크(400)는 유송배관의 내주면에 형성된 스케일을 제거하게 된다.On the other hand, the pig proceeds in the running direction through the flow pipe, the scraper disk 400 is to remove the scale formed on the inner peripheral surface of the flow pipe.

이때, 스페이서(300)의 브러쉬(300a)는 스크레이퍼 디스크(400)에 의해 제거된 부위를 재차 쓸어내어 유송배관 내주면의 스케일 제거를 더욱 효과적으로 수행할 수 있도록 한다.At this time, the brush 300a of the spacer 300 sweeps out the portion removed by the scraper disk 400 so that the scale of the inner circumferential surface of the flow pipe can be more effectively performed.

이후, 유송배관 내의 스케일을 제거하며 진행된 피그는 피그발사관의 반대편에 설치된 피그수취관으로 수취된다.Thereafter, the pig which has been carried out by removing the scale in the conduit pipe is received by the pig collecting pipe installed on the opposite side of the pig firing pipe.

이 과정에서도 상기 피그는 곡관을 형성하는 피그수취관에 수취되는 과정에서 관절부(500) 및 결합축(700)에 의해 유연하게 휘어지면서 수취된다.In this process, the pig is received while being flexibly flexed by the joint part 500 and the coupling shaft 700 in the process of receiving the pig receiving tube forming the curved pipe.

지금까지 설명한 바와 같이, 피그에는 관절부(500)가 설치됨으로써, 곡관을 통과하더라도 관절부(500) 및 결합축(700)의 유연한 휘어짐에 의해 응력의 발생이 최소화되어 상기 피그의 손상을 방지할 수 있게 된다.As described above, the joint 500 is installed in the pig, so that the flexible bending of the joint 500 and the coupling shaft 700 minimizes the generation of stress even when passing through the curved tube, thereby preventing damage to the pig. do.

또한, 압송수는 피그의 후면만 가압하는 것이 아니라, 피그의 유로(L) 상에 유입된 후, 스페이서(300) 및 스크레이퍼 디스크(400)의 후면으로 새어 나가 그들의 후면을 가압함으로써, 피그의 주행압력을 향상시키게 된다.In addition, the pressurized water flows into the back of the spacer 300 and the scraper disk 400 after being introduced onto the flow path L of the pig rather than pressurizing only the rear of the pig, and presses the rear of the pig, thereby driving the pig. To improve the pressure.

이에 따라, 피그의 주행 압력은 최대화되어 유송배관 내의 스케일 제거를 효과적으로 할 수 있을 뿐만 아니라, 피그의 주행 압력을 높이기 위한 별도의 고압설비가 필요치 않게 된다.Accordingly, the running pressure of the pig is maximized to effectively remove the scale in the flow pipe, and a separate high pressure facility for increasing the running pressure of the pig is not required.

이에 따라, 경제성이 향상되는 효과가 있다.Accordingly, there is an effect that the economic efficiency is improved.

한편, 전술한 피그에는 도 5에 도시된 바와 같이, 가이드링(800)을 대신하여 스프링(900)이 설치될 수도 있다.Meanwhile, as illustrated in FIG. 5, the above-described pig may be provided with a spring 900 instead of the guide ring 800.

이를 본 발명의 다른 실시예로 제시한다.This is presented as another embodiment of the present invention.

즉, 가이드링(800)을 대신하여 스프링(900)이 설치됨으로써, 관절부(500) 및결합축(700)와 더불어 피그의 휘어짐을 더욱 원활하게 할 수 있으며, 스프링(900) 사이의 틈을 통해 유로(L)로부터 외부로 압송수가 더욱 용이하게 새어나갈 수 있게 된다.That is, by the spring 900 is installed in place of the guide ring 800, it is possible to smooth the bending of the pig together with the joint portion 500 and the coupling shaft 700, through the gap between the spring 900 The pressurized water can more easily leak from the flow path L to the outside.

지금까지 설명한 바에 의하면, 스페이서 및 스크레이퍼 디스크, 관절부를 조립하기 위해서는 결합축의 타단부에 너트를 체결시켰다.As described above, in order to assemble the spacer, the scraper disc and the joint part, the nut is fastened to the other end of the coupling shaft.

이는, 피그의 한 방향에서만 결합을 시키는 구성으로서, 이 외에도 피그의 양 방향에서 결합을 시킬 수도 있다.This is a configuration in which the coupling in only one direction of the pig, in addition to the coupling in both directions of the pig may be.

이를 본 발명의 또 다른 실시예로 제시하며, 도 6을 참조하여 설명하도록 한다.This is presented as another embodiment of the present invention, and will be described with reference to FIG. 6.

설명하기에 앞서, 전술한 본 발명의 바람직한 실시예에 따른 피그와 동일한 구성에 대해서는 부호를 병기하며 상세한 설명은 생략하도록 한다.Prior to the description, the same configuration as the pig according to the preferred embodiment of the present invention described above are denoted by the reference numerals and detailed description thereof will be omitted.

전방 헤드(100)의 전방 통공(110) 및 후방 테일(200)의 후방 통공(210)에는 각각 조임부재(150)가 삽입된다.The fastening member 150 is inserted into the front through hole 110 of the front head 100 and the rear through hole 210 of the rear tail 200, respectively.

이때, 조임부재(150)의 외경은 전방 통공(110) 및 후방 통공(210)의 내경에 비해 작게 형성되어 유로(L)에 대한 간섭을 최소화한다.At this time, the outer diameter of the fastening member 150 is formed smaller than the inner diameter of the front through hole 110 and the rear through hole 210 to minimize the interference to the flow path (L).

또한, 조임부재(150)의 일부는 각각 전방 헤드(100) 및 후방 테일(200)의 외측으로 각각 노출된다.In addition, a part of the fastening member 150 is exposed to the outside of the front head 100 and the rear tail 200, respectively.

또한, 조임부재(150)는 중공의 원기둥 형태로 이루어지되, 외주면에는 나사가 형성된다.In addition, the tightening member 150 is made of a hollow cylindrical shape, the outer peripheral surface is formed with a screw.

이에 따라, 조임부재(150)의 내부에는 결합축(700)이 통과된다.Accordingly, the coupling shaft 700 passes through the tightening member 150.

또한, 전방 통공(110)에 삽입된 조임부재(150)의 노출된 부위에는 와셔(W) 및 너트(N)가 결합된다.In addition, the washer (W) and the nut (N) is coupled to the exposed portion of the fastening member 150 inserted into the front through hole (110).

그리고, 후방 통공(210)에 삽입된 조임부재(150)의 노출된 부위에는 체결부재(600)의 결합공(620)을 통과하여 너트(N)에 체결된다.Then, the exposed portion of the tightening member 150 inserted into the rear through hole 210 is fastened to the nut N by passing through the coupling hole 620 of the fastening member 600.

이와 같은 구성에 의해, 전방 헤드(100) 및 후방 테일(200)에 각각 설치된 너트(N)를 조이면, 너트(N)와 와셔(W), 체결부재(600)는 조임부재(150)를 따라 관절부(500) 측으로 이동하게 된다.By such a configuration, when the nuts N respectively installed on the front head 100 and the rear tail 200 are tightened, the nut N, the washer W, and the fastening member 600 are along the fastening member 150. It moves to the joint portion 500 side.

이에 따라, 전방 헤드(100) 및 후방 테일(200)은 밀려나면서 스페이서(300) 및 스크레이퍼 디스크(400), 관절부(500)를 서로 밀착시켜 유동이 방지되도록 한다.Accordingly, the front head 100 and the rear tail 200 are pushed to close the spacer 300 and the scraper disk 400 and the joint 500 to prevent flow.

즉, 이와 같은 구성의 기술적 특징은 피그를 구성하는 독립된 각 구성요소를 결합하는데 있어서, 피그의 양 방향에서 균일하게 결합작용이 이루어지도록 하는 데 있는 것이다.That is, the technical feature of such a configuration is to combine the individual components constituting the pig, so that the coupling action is made uniformly in both directions of the pig.

도 1은 종래의 피그가 곡관을 지나가는 상태를 나타낸 단면도1 is a cross-sectional view showing a state where a conventional pig passes a curved pipe

도 2는 본 발명의 바람직한 실시예에 따른 피그를 나타낸 분해사시도Figure 2 is an exploded perspective view showing a pig in accordance with a preferred embodiment of the present invention

도 3은 본 발명의 바람직한 실시예에 따른 피그를 나타낸 단면도Figure 3 is a cross-sectional view showing a pig in accordance with a preferred embodiment of the present invention

도 4는 본 발명의 바람직한 실시예에 따른 피그가 주행하는 상태를 나타낸 개략도Figure 4 is a schematic diagram showing a state in which the pig running in accordance with a preferred embodiment of the present invention

도 5는 본 발명의 다른 실시예에 따른 피그를 나타낸 단면도5 is a cross-sectional view showing a pig according to another embodiment of the present invention

도 6은 본 발명의 또 다른 실시예에 따른 피그를 나타낸 단면도.6 is a cross-sectional view showing a pig according to another embodiment of the present invention.

*도면의 주요 부호에 대한 설명** Description of Major Symbols in Drawings *

100 : 전방 헤드 110 : 전방 통공100: front head 110: front through hole

200 : 후방 테일 210 : 후방 통공200: rear tail 210: rear through hole

300 : 스페이서 300a : 브러쉬300: spacer 300a: brush

310 : 제1통공 400 : 스크레이퍼 디스크310: first hole 400: scraper disc

410 : 제2통공 500 : 관절부(원형부재)410: second hole 500: joint portion (round member)

510 : 제3통공 600 : 체결부재510: third hole 600: fastening member

610 : 유입구 620 : 결합공610: inlet 620: coupling hole

700 : 결합축 710 : 지지부재700: coupling shaft 710: support member

800 : 가이드링 900 : 스프링800: guide ring 900: spring

150 : 조임부재 W : 와셔150: tightening member W: washer

L : 유로 N : 너트L: Euro N: Nut

Claims (7)

유송배관을 지나가면서 유송배관의 내부를 클리닝 하는 피그에 있어서,In the pig cleaning the inside of the flow pipe while passing through the flow pipe, 중앙을 관통하는 전방 통공이 형성된 반구형의 전방 헤드;A hemispherical front head having a front through hole formed through the center thereof; 상기 전방 통공에 대응된 후방 통공이 형성되며, 상기 전방 헤드에 대향된 반구형의 후방 테일;A rear through hole corresponding to the front through hole is formed, and a hemispherical rear tail facing the front head; 상기 전방 헤드 및 후방 테일 사이에 복수로 배치되며, 상기 전방 통공 및 후방 통공에 대응된 제1통공을 포함하는 스페이서;A plurality of spacers disposed between the front head and the rear tail and including a first through hole corresponding to the front through and the through through; 상기 스페이서 사이에 각각 배치되며, 상기 스페이서의 제1통공에 대응된 제2통공을 포함하되, 유송배관의 내주면에 밀착되는 스크레이퍼 디스크;A scraper disk disposed between the spacers and including a second through hole corresponding to the first through hole of the spacer, the scraper disc being in close contact with the inner circumferential surface of the flow pipe; 상기 스페이서의 외주면에 설치되며, 상기 스크레이퍼 디스크의 외경보다 큰 길이를 갖는 전방 브러쉬;A front brush installed on an outer circumferential surface of the spacer and having a length greater than an outer diameter of the scraper disk; 상기 제1통공 및 제2통공에 대응된 제3통공이 형성되며, 상기 스페이서 또는 스크레이퍼 디스크 사이에 배치된 신축 재질의 관절부;A third hole corresponding to the first and second holes is formed, and a joint part of an elastic material disposed between the spacer or the scraper disc; 상기 후방 테일의 후방에 배치되며, 후방 통공에 연통된 유입구를 포함하는 체결부재;그리고A fastening member disposed behind the rear tail and including an inlet communicated with the rear through hole; and 일단부는 전방 헤드의 전면에 밀착되며 타단부는 상기 전방 통공부터 후방 통공을 통과하여 상기 체결부재에 너트로 체결되며, 상기 전방통공, 후방통공, 제1,2,3통공의 내경에 비해 작은 외경을 갖는 신축 재질의 결합축:을 포함하여 구성된 피그.One end is in close contact with the front of the front head and the other end is fastened to the fastening member by a nut through the front through the rear through hole, the outer diameter smaller than the inner diameter of the front, rear, first, second, third through Combined axis of elastic material with: 제 1항에 있어서,The method of claim 1, 상기 관절부는 결합축 상에서 복수로 밀착된 원형부재를 포함하는 것을 특징으로 하는 피그.The joint part pigtail, characterized in that it comprises a plurality of circular members in close contact on the coupling shaft. 제 1항 또는 제 2항에 있어서,The method according to claim 1 or 2, 상기 전방 통공, 제1,2,3통공, 후방 통공에는 스프링이 삽입된 것을 특징으로 하는 피그.Pigment, characterized in that the spring is inserted into the front through holes, the first, second, third through holes, the rear through holes. 제 1항 또는 제 2항에 있어서,The method according to claim 1 or 2, 상기 전방 통공, 제1,2,3통공, 후방 통공에는 가이드링이 더 삽입된 것을 특징으로 하는 피그.Pigment, characterized in that the guide ring is further inserted into the front through holes, the first, second, third through holes, the rear through holes. 제 1항 또는 제 2항에 있어서,The method according to claim 1 or 2, 상기 전방 통공 및 후방 통공에는 각각 외측을 향해 노출된 나사 형태의 조임부재가 설치되되, 이 조임부재의 외경은 전방 통공 및 후방 통공의 내경에 비해 작게 형성되고,The front and rear through holes are respectively provided with a screw-type tightening member exposed toward the outside, the outer diameter of the tightening member is formed smaller than the inner diameter of the front and rear through holes, 상기 조임부재의 노출된 부위에는 각각 와셔 및 너트가 체결되고,Washers and nuts are fastened to exposed portions of the fastening member, 제1,2,3통공에 설치되되, 일단부는 전방 헤드의 후면에 지지되고 타단부는 후방 테일의 전면에 스프링이 지지된 것을 특징으로 하는 피그.Pigment, characterized in that installed in the first, second, third through hole, one end is supported on the rear of the front head and the other end is supported on the front of the rear tail. 제 1항 또는 제 2항에 있어서,The method according to claim 1 or 2, 상기 후방 테일의 후방 통공 중, 유입구에 대응된 부위는 상기 유입구를 통한 물의 유입이 원활하게 이루어지도록 통공의 외측으로부터 통공의 내측을 향해 외경이 점점 작아지도록 경사진 것을 특징으로 하는 피그.Pigment, characterized in that the portion corresponding to the inlet opening of the rear tail of the rear tail is inclined so that the outer diameter gradually decreases from the outside of the through hole to the inside of the through hole to facilitate the inflow of water through the inlet. 제 1항 또는 제 2항에 있어서,The method according to claim 1 or 2, 상기 결합축은 와이어로프인 것을 특징으로 하는 피그.Pigment, characterized in that the coupling shaft is a wire rope.
KR1020080050319A 2008-05-29 2008-05-29 Pig KR100881376B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080050319A KR100881376B1 (en) 2008-05-29 2008-05-29 Pig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080050319A KR100881376B1 (en) 2008-05-29 2008-05-29 Pig

Publications (1)

Publication Number Publication Date
KR100881376B1 true KR100881376B1 (en) 2009-02-02

Family

ID=40680986

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080050319A KR100881376B1 (en) 2008-05-29 2008-05-29 Pig

Country Status (1)

Country Link
KR (1) KR100881376B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200456317Y1 (en) 2009-10-28 2011-10-26 신일식 scraper for removing sludge using in pigpen
KR20170051940A (en) * 2015-11-03 2017-05-12 에스케이이노베이션 주식회사 Pipeline pig and cleaning system for pipeline using the same
KR101893407B1 (en) * 2018-01-18 2018-08-30 배남수 Apparatus for removing powder of exhaust line in semiconductor processing systems
KR102344736B1 (en) 2020-12-28 2021-12-29 (주)아산건설 Variable pig apparatus for cleaning pipe network facility
KR102466379B1 (en) * 2022-02-17 2022-11-14 김함태 Smart pig for pipe cleaning and pipe cleaning method using the same

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2273543A (en) 1992-12-17 1994-06-22 Int Pipeline Prod Ltd Pipe cleaning pig
FR2792557A1 (en) 1999-04-21 2000-10-27 Fmc Europe Cleaning pig for pipelines has spherical central section carrying movable end sections with scraper rings
KR100761368B1 (en) 2007-05-11 2007-09-27 수자원기술 주식회사 Device for pressurized pipeline

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2273543A (en) 1992-12-17 1994-06-22 Int Pipeline Prod Ltd Pipe cleaning pig
FR2792557A1 (en) 1999-04-21 2000-10-27 Fmc Europe Cleaning pig for pipelines has spherical central section carrying movable end sections with scraper rings
KR100761368B1 (en) 2007-05-11 2007-09-27 수자원기술 주식회사 Device for pressurized pipeline

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200456317Y1 (en) 2009-10-28 2011-10-26 신일식 scraper for removing sludge using in pigpen
KR20170051940A (en) * 2015-11-03 2017-05-12 에스케이이노베이션 주식회사 Pipeline pig and cleaning system for pipeline using the same
KR102652974B1 (en) * 2015-11-03 2024-03-29 에스케이온 주식회사 Cleaning system for pipeline using pipeline pig
KR101893407B1 (en) * 2018-01-18 2018-08-30 배남수 Apparatus for removing powder of exhaust line in semiconductor processing systems
KR102344736B1 (en) 2020-12-28 2021-12-29 (주)아산건설 Variable pig apparatus for cleaning pipe network facility
KR102466379B1 (en) * 2022-02-17 2022-11-14 김함태 Smart pig for pipe cleaning and pipe cleaning method using the same

Similar Documents

Publication Publication Date Title
KR100881376B1 (en) Pig
KR101329309B1 (en) Method and device for removal of scale and asphalt coaltar enamel(ace) in pipe
CN210788481U (en) Oil pipeline cleaner
US6249927B1 (en) Duct-cleaning unit
KR20090055119A (en) An scale removing apparatus of the superannuated pipe
US8051524B2 (en) Multi-diameter elastic sealing module for pigs
KR20110009349A (en) Pig
KR100761368B1 (en) Device for pressurized pipeline
KR101008345B1 (en) Device for removal of scale in pipe
CN112893346A (en) In-pipe composite visual automatic descaling device and descaling method
CN105370998A (en) Descaling composite pipeline, descaling structure and descaling method
US4272108A (en) Swivel for high-pressure conduit-cleaning assembly
JPS6034782A (en) Pipe cleaning apparatus
JP2011104552A (en) Apparatus for washing inner face of pipeline
JP2011101847A (en) Method and apparatus for washing inside of water pipe
KR102460574B1 (en) Water pipe cleaning device using ultrasonic waves
KR101323158B1 (en) Scraper apparatus for scailing superannuated pipes and
CN211726821U (en) Pipeline dredging device
KR101077927B1 (en) traction type pig
JP5689383B2 (en) Cleaning device
KR102445420B1 (en) Rotating pig
JP2006088002A (en) Apparatus for cleaning inside surface of pipe
CN108714602A (en) A kind of bent inner wall of the pipe jetter
KR100906681B1 (en) Pressing drainage pipe system
KR20230054148A (en) Pipeline cleaning apparatus having a spiral cleaning structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130123

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20140123

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20150122

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20160223

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20170123

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20180223

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20190123

Year of fee payment: 11