KR100862118B1 - Bridge bearing and method for installation by using the same - Google Patents

Bridge bearing and method for installation by using the same Download PDF

Info

Publication number
KR100862118B1
KR100862118B1 KR1020070051583A KR20070051583A KR100862118B1 KR 100862118 B1 KR100862118 B1 KR 100862118B1 KR 1020070051583 A KR1020070051583 A KR 1020070051583A KR 20070051583 A KR20070051583 A KR 20070051583A KR 100862118 B1 KR100862118 B1 KR 100862118B1
Authority
KR
South Korea
Prior art keywords
bridge
plate
anchor
lower plate
force
Prior art date
Application number
KR1020070051583A
Other languages
Korean (ko)
Inventor
강용우
박진한
Original Assignee
강용우
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 강용우 filed Critical 강용우
Priority to KR1020070051583A priority Critical patent/KR100862118B1/en
Application granted granted Critical
Publication of KR100862118B1 publication Critical patent/KR100862118B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • E01D19/041Elastomeric bearings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A bridge bearing and an installing method thereof are provided to prevent delamination phenomenon caused by wind load or earthquake load repeatedly applied to an upper structure of a bridge. A bridge bearing comprises a slab(110), a base(120), a buffering section(130) and an anchor coupling member(140). The slab is fixed to the lower portion of an upper structure(12) of a bridge. The base is fixed to the upper portion of a pier(16) of the bridge. The buffering section is provided between the slab and the base to buffer vertical impact applied to the slab. The anchor coupling member fixes the base to the pier. The anchor coupling member includes an anchor socket(142) inserted into the pier, a compressing plate(144) provided between the anchor socket and the base, a bolt(146) having no head, and a fixing nut(148). The bolt is coupled with the anchor socket by passing through the base and the compressing plate. The fixing nut is coupled with the upper portion of the bolt to apply compression force to the compressing plate.

Description

교좌장치 및 교좌장치의 설치방법{BRIDGE BEARING AND METHOD FOR INSTALLATION BY USING THE SAME}Bridge device and installation method {BRIDGE BEARING AND METHOD FOR INSTALLATION BY USING THE SAME}

도 1은 일반적인 교량의 구조를 나타낸 개략도이다. 1 is a schematic view showing the structure of a general bridge.

도 2는 도 1의 교량의 구조에서 교좌장치의 설치를 나타낸 예시도이다.Figure 2 is an exemplary view showing the installation of the bridge device in the structure of the bridge of FIG.

도 3은 교좌장치에 발생하는 외력을 나타낸 예시도이다. 3 is an exemplary view showing an external force generated in the chair apparatus.

도 4는 본 발명에 따른 교좌장치를 나타낸 개략도이다. 4 is a schematic view showing a chair apparatus according to the present invention.

도 5는 본 발명에 따른 교좌장치의 앵커구조를 나타낸 확대 단면도이다. 5 is an enlarged cross-sectional view showing the anchor structure of the chair apparatus according to the present invention.

도 6은 본 발명에 따른 교좌장치의 앵커구조를 나타낸 분해사시도이다.6 is an exploded perspective view showing the anchor structure of the chair apparatus according to the present invention.

도 7은 본 발명에 따른 교좌장치의 설치를 순차적으로 나타낸 순서도이다.7 is a flow chart sequentially showing the installation of the teaching apparatus according to the present invention.

도 8은 본 발명에 따른 교좌장치의 앵커구조에서 들뜸현상에 의해 축력을 산출하기 위한 반력구조를 나타낸 예시도이다.8 is an exemplary view showing a reaction force structure for calculating the axial force by the lifting phenomenon in the anchor structure of the bridge device according to the present invention.

**도면의 주요 부분에 대한 부호의 설명**** Description of the symbols for the main parts of the drawings **

10 : 교량10: bridge

12 : 상부구조물12: superstructure

14 : 교대14 shift

16 : 교각16: pier

100 : 교좌장치100: teaching device

110 : 상판110: tops

120 : 하판120: bottom plate

130 : 완충부130: buffer

140 : 앵커결합체140: anchor assembly

본 발명은 교좌장치 및 교좌장치의 설치방법에 관한 것으로, 보다 상세하게는 교량의 상부구조물에서 발생하는 수평변위에 의해 교각에 대하여 상부구조물을 지지하는 교좌장치가 교각에서 이탈되는 것을 방지하도록 한 교좌장치 및 교좌장치의 설치방법에 관한 것이다.The present invention relates to a bridge device and a method of installing the bridge device, and more particularly, a bridge that prevents the bridge device supporting the upper structure to the bridge by the horizontal displacement occurring in the upper structure of the bridge from being separated from the bridge It relates to a method of installation of the device and the chair device.

일반적으로 교량(橋梁)은 지지할 시설의 종류와 사용되어지는 용도에 따라서 그 종류와 모양이 다양한 구조물로 이루어지고, 그 역할은 교량이 받쳐주는 통로와 시설의 기능을 안전하게 유지하는 것으로써 충분한 강도와 내구성을 갖추어야 한다.In general, bridges consist of structures of various types and shapes depending on the type of facility to be supported and the purpose of use, and its role is to provide sufficient strength by safely maintaining the function of the bridges and facilities supported by the bridge. And must be durable.

도 1은 일반적인 교량의 구조를 나타낸 개략도이고, 도 2는 도 1의 교량의 구조에서 교좌장치의 설치를 나타낸 예시도이고, 도 3은 교좌장치에 발생하는 외력을 나타낸 예시도이다.Figure 1 is a schematic diagram showing the structure of a general bridge, Figure 2 is an exemplary view showing the installation of the bridge device in the structure of the bridge of Figure 1, Figure 3 is an exemplary view showing the external force generated in the bridge device.

도 1 내지 도 2에 도시한 바와 같이 교량은 양측 교대(14) 사이에 소정의 거리를 두고 설치되는 다수의 교각(16)과, 각 교대(14) 및 각 교각(16)의 상단에 걸쳐 연속적으로 설치되는 상부구조물(12)로 구성되며, 상부구조물(12)과 교각(16) 사이에 상부구조물(12)의 변형을 완화하여 전달하는 교좌장치(20a, 20b, 20c, 20d)가 마련된다.As shown in Figs. 1 to 2, the bridges are continuous over a plurality of bridges 16 provided at predetermined distances between the two side shifts 14, and each of the shifts 14 and the upper end of each bridge 16. Consisting of the upper structure 12 is installed, the bridge device 20a, 20b, 20c, 20d is provided between the upper structure 12 and the bridge 16 to relax and transfer the deformation of the upper structure 12. .

상술한 교좌장치(20a, 20b, 20c, 20d)는 교량의 슬래브 구조체인 상부구조물(12)이 이를 지지하는 교각(16) 상에 적절히 얹혀서 지지되도록 하기 위해 설치되는 장치이다.The above-described bridge apparatuses 20a, 20b, 20c, and 20d are devices installed so that the upper structure 12, which is the slab structure of the bridge, is properly mounted on the bridge 16 supporting the bridge structure.

이러한 교좌장치(20a, 20b, 20c, 20d)는 도 2에 도시한 바와 같이 그 기능, 구조, 설치상태에 따라 고정단교좌장치(20a), 교축방향교좌장치(20b), 교직방향교좌장치(20c), 양방향가동단교좌장치(20d) 등으로 나누어질 수 있다.As shown in FIG. 2, such a chair apparatus 20a, 20b, 20c, 20d is a fixed end chair apparatus 20a, a axial chair apparatus 20b, and a teaching chair according to its function, structure, and installation state. 20c, the bidirectional movable single stage device 20d, and the like.

통상적인 교좌장치(20a, 20b)의 설치상태를 살펴보면, 주로 교량(10)의 중앙부에는 고정단교좌장치(20a)와 교직방향교좌장치(20c)가 설치되고, 고정단교좌장치(20a)의 양측으로는 교축방향교좌장치(20b)가 설치되며, 교직방향교좌장치(20c)의 양측으로는 양방향가동단교좌장치(20d)가 설치된다. Looking at the installation state of the conventional bridge device (20a, 20b), mainly in the center portion of the bridge 10, the fixed end bridge device 20a and the teaching direction direction device (20c) is installed, Both sides of the teaching direction teaching apparatus 20b is provided, and both sides of the teaching direction teaching apparatus 20c are provided with a bidirectional movable stage teaching apparatus 20d.

이러한, 교좌장치(20a, 20b, 20c, 20d)는 교량(10)의 하중을 무리없이 교각(16), 교대(14) 등의 교량(10) 하부구조물에 전달함과 동시에, 교량(10)의 신축변형에 따른 영향이 교각(16)에 미치지 않도록 하여야 한다.Such a bridge device (20a, 20b, 20c, 20d) transfers the load of the bridge 10 to the bridge 10 substructure, such as bridge 16, the bridge 14, without difficulty, bridge 10 The effect of expansion and contraction on the bridge should not extend to the pier (16).

또한, 교각(16), 교대(14) 등의 교량(10) 하부구조물의 변형(예를 들어 지진)에 따른 영향이 상부구조물(12)에 가능한 미치지 않도록 하여야 하고, 바람에 의한 교량의 교직방향에 대한 충격과, 지진 등에 의해 발생하는 교량의 교축 및 교직방향에 대한 충격을 저항하여야 한다. In addition, the effect of deformation (for example, earthquake) of the lower structure of the bridge 10, such as the bridge 16, the alternating 14, should be as small as possible to the upper structure 12, and the direction of the bridge to the bridge by the wind It should be resistant to the impact on the bridge and the direction of the bridge pier and the direction of the bridge caused by the earthquake.

한편 상술한 바와 같은 각 교좌장치(20a, 20b, 20c, 20d)는 도 3에 도시한 바와 같이 구조에 의해 교각의 상부에 설치된다. On the other hand, each of the above-described bridge device (20a, 20b, 20c, 20d) is installed on the top of the bridge by the structure as shown in FIG.

도 3은 참고하면, 교각(16)의 상부에 앵커소켓(24) 및 앵커볼트(22)와 같은 다수의 고정구조물(21)에 의해 고정되며, 이러한 고정구조물(21)들은 상부구조물(12)에 가해지는 충격하중(풍하중 및 지진하중)과 상부구조물(12)의 신축변형에 따라 교좌장치(20a, 20b, 20c, 20d)들이 교각(16)에서 이탈하는 것을 방지하도록 한다.Referring to FIG. 3, a plurality of fixing structures 21 such as an anchor socket 24 and an anchor bolt 22 are fixed to an upper portion of the pier 16, and the fixing structures 21 are connected to the upper structure 12. According to the impact load (wind load and seismic load) applied to the expansion and contraction of the superstructure 12 to prevent the bridge device (20a, 20b, 20c, 20d) from escaping from the bridge (16).

그러나, 고정구조물(21)을 구성하는 앵커소켓(24) 및 앵커볼트(22)는 교량에 가해지는 충격하중에 의해 지속적인 인장력과 압축력이 반복적으로 작용하게 된다. However, the anchor socket 24 and the anchor bolt 22 constituting the fixed structure 21, the continuous tensile force and the compressive force is repeatedly acted by the impact load applied to the bridge.

즉, 상부구조물(12)에 대하여 교직방향의 풍하중이나, 교축 및 교직방향의 지진하중이 발생함에 따라 교좌장치(20a)의 일측 고정구조물(21)에는 인장력이 작용하고, 인장력이 작용하는 반대방향의 고정구조물(21)에는 압축력이 작용하게 된다. That is, as the wind load in the teaching direction or the earthquake load in the teaching direction and the teaching direction occurs with respect to the upper structure 12, a tension force acts on one side of the fixed structure 21 of the teaching apparatus 20a, and the opposite direction in which the tension force acts. Compression force is applied to the fixed structure 21 of the.

한편 인장력과 압축력이 반복적으로 작용함에 따라 교좌장치(20a)와 앵커볼트(22) 사이에 들뜸현상(prying action)이 발생하게 되고, 교좌장치(20a)에 가해지는 외력이 압축력에서 인장력으로 전환될 때 인장력에 의한 들뜸현상으로 인해 충격하중이 추가적으로 더 가해지게 된다.Meanwhile, as the tensile force and the compressive force repeatedly act, prying action occurs between the seating device 20a and the anchor bolt 22, and the external force applied to the seating device 20a is converted from the compressing force to the tensioning force. In this case, the impact load is additionally applied due to the lifting force caused by the tensile force.

이러한 들뜸현상에 의해 추가적으로 가해지는 충격하중은 교좌장치(20a, 20b, 20c, 20d)를 고정하고 있는 고정구조물(21)과 교좌장치(20a, 20b, 20c, 20d) 사이에 분리를 유발할 수 있어 교량의 안전성에 심각한 위험을 초래하는 문제점이 있다. The impact load additionally exerted by the lifting phenomenon may cause separation between the fixed structure 21 holding the chair devices 20a, 20b, 20c, and 20d and the seat devices 20a, 20b, 20c, and 20d. There is a problem that poses a serious danger to the safety of the bridge.

본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로, 교각에 대하여 교좌장치를 고정하는 교좌장치의 고정구조를 개선하여 상부구조물에 가해지는 충격하중에 의해 교좌장치의 이탈을 방지할 수 있도록 한 교좌장치 및 교좌장치의 설치방법를 제공함에 그 목적이 있다.The present invention has been made to solve the above problems, to improve the fixing structure of the bridge device for fixing the bridge device to the pier to prevent the separation of the bridge device by the impact load applied to the upper structure. The purpose of the present invention is to provide a method for installing the teaching apparatus and the teaching apparatus.

상기의 목적을 달성하기 위한 본 발명에 따른 교좌장치는 교량의 상부구조물의 하부에 고정되는 상판과, 교량의 교각의 상부에 고정되는 하판과, 상기 상판과 상기 하판 사이에 마련되어 상기 상판에 대한 수직 충격을 완화하는 완충부 및 상기 하판을 상기 교각에 고정함과 동시에 상기 상부구조물의 수평력에 따라 발생하는 인장력을 보상하는 압축력으로 상기 하판을 상기 교각에 고정하는 앵커결합체를 구비한다.The bridge device according to the present invention for achieving the above object is provided between the upper plate and the lower plate is fixed to the upper portion of the upper structure of the bridge, and the upper plate and the lower plate fixed between the upper plate and the lower plate perpendicular to the upper plate A shock absorbing portion for cushioning the shock and the lower plate is fixed to the pier and at the same time the anchor coupling body for fixing the lower plate to the pier with a compressive force to compensate for the tension generated by the horizontal force of the upper structure.

상기 앵커결합체는 상기 교각에 삽입되어 고정되는 앵커소켓과, 상기 앵커소켓과 상기 하판 사이에 마련되는 압축판과, 상기 하판과 상기 압축판을 관통하여 상기 앵커소켓에 결합되는 무두볼트와, 상기 무두볼트의 상부에 체결되어 상기 하 판과 상기 앵커소켓 사이에 마련된 상기 압축판을 압축력을 부여하여 상기 압축판을 압축변형시킴과 동시에 상기 하판을 상기 교각에 고정하는 고정너트를 구비한다.The anchor assembly includes an anchor socket inserted into the pier and fixed, a compression plate provided between the anchor socket and the lower plate, a tannery bolt coupled to the anchor socket through the lower plate and the compression plate, and the tannery. It is fastened to the upper portion of the bolt to provide a compressive force to the compression plate provided between the lower plate and the anchor socket to compress the deformation of the compression plate and at the same time having a fixing nut for fixing the lower plate to the piers.

상기 압축판은, 상기 상부구조물의 수평변위에 의해 발생하는 인장력을 보상하는 압축력으로 탄성변형된다.The compression plate is elastically deformed with a compressive force to compensate for the tensile force generated by the horizontal displacement of the upper structure.

상기 고정너트와 상기 하판의 사이에 상기 고정너트의 풀림을 방지하기 위한 와셔가 더 구비된다.A washer is further provided between the fixing nut and the lower plate to prevent loosening of the fixing nut.

상기의 목적을 달성하기 위한 본 발명에 따른 교좌장치의 설치방법은 제 1항의 교좌장치를 설치하는 방법에 있어서, 상기 교각의 단부에 상기 교좌장치를 고정시키기 위한 베드블록을 타설하는 단계, 상기 앵커결합체를 이용하여 상기 상부구조물에 의해 발생되는 인장력을 보상하는 압축력 갖도록 프리스트레싱된 교좌장치를 준비하는 단계, 상기 교각의 베드블록에 상기 교좌장치을 안착시키고, 상기 교좌장치의 앵커소켓을 상기 베드블록에 삽입하여 상기 교좌장치 고정하는 단계, 상기 교좌장치의 상부로 상기 상부구조물을 설치하는 단계를 포함한다.The method of installing the chair apparatus according to the present invention for achieving the above object, in the method of installing the chair apparatus of claim 1, the step of placing a bed block for fixing the chair apparatus to the end of the pier, the anchor Preparing a prestressed scaffolding device to have a compressive force to compensate for the tensile force generated by the superstructure using a combination body, seating the scaffolding device in the bedblock of the piers, and inserting the anchor socket of the scaffolding device into the bedblock And fixing the chair device, and installing the upper structure on top of the chair device.

상기 교좌장치를 준비하는 단계는, 상기 하판을 상기 교각에 고정하는 무두볼트에 결합된 고정너트를 이용하여, 상기 하판과 상기 교각에 삽입되어 고정된 앵커소켓 사이에 개재된 압축판에 상기 앵커소켓에 작용하는 인장력을 보상하는 압축력을 부여하여 상기 압축판을 압축변형시키는 단계를 포함한다.In the preparing of the bridge device, the anchor socket is inserted into the compression plate interposed between the bottom plate and the anchor socket inserted and fixed to the pier using a fixing nut coupled to the tannery bolt fixing the bottom plate to the pier. Compressing the compression plate by imparting a compressive force to compensate for the tensile force acting on.

이하, 첨부된 도면을 참조하여 본 발명에 따른 교좌장치 및 교좌장치의 설치방법을 상세히 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail the method of installing the teaching apparatus and the teaching apparatus according to the present invention.

본 발명을 설명함에 있어서, 정의되는 용어들은 본 발명에서의 기능을 고려하여 정의 내려진 것으로, 본 발명의 기술적 구성요소를 한정하는 의미로 이해되어서는 아니 될 것이다.In the following description of the present invention, the terms defined are defined in consideration of functions in the present invention, and should not be understood as a meaning of limiting the technical components of the present invention.

도 4는 본 발명에 따른 교좌장치를 나타낸 개략도이고, 도 5는 본 발명에 따른 교좌장치의 앵커구조를 나타낸 확대 단면도이고, 도 6은 본 발명에 따른 교좌장치의 앵커구조를 나타낸 분해사시도이다.Figure 4 is a schematic view showing a teaching apparatus according to the present invention, Figure 5 is an enlarged cross-sectional view showing the anchor structure of the teaching apparatus according to the invention, Figure 6 is an exploded perspective view showing the anchor structure of the teaching apparatus according to the present invention.

먼저 본 발명을 설명함에 있어 교량(10)은 크게 상부구조물(12)과, 상부구조물(12)의 양단을 지지하는 교대(14)와, 교대(14)의 사이에 마련되어 상부구조물(12)의 하부를 지지하는 다수의 교각(16)으로 구성되며 각각의 구성은 공지의 기술이므로 상세한 설명은 생략하도록 한다(도 1 참조). First, in describing the present invention, the bridge 10 may be provided between the upper structure 12, the shifts 14 supporting both ends of the upper structure 12, and the shifts 14 of the upper structure 12. It is composed of a plurality of pier 16 supporting the lower and each configuration is a known technique so detailed description thereof will be omitted (see Fig. 1).

도시한 바와 같이 본 발명에 따른 교좌장치(100)는 교각(16)과 상부구조물(12) 사이에 마련되어 상부구조물(12)의 수직하중을 완충하는 교좌장치(100)와, 교각(16)의 상부에 상부구조물(12)의 수평력에 따라 발생하는 인장력에 대항하는 압축력으로 교좌장치(100)를 고정하는 앵커결합체(140)를 구비한다. As shown, the bridge device 100 according to the present invention is provided between the bridge 16 and the upper structure 12, the bridge device 100 for buffering the vertical load of the upper structure 12, and the bridge 16 It is provided with an anchor assembly 140 for fixing the stapling device 100 with a compressive force against the tensile force generated in accordance with the horizontal force of the upper structure 12 on the top.

상기 교좌장치(100)는 상부구조물(12)의 하부에 고정되는 상판(110)과, 교각(16)의 상부에 고정되는 하판(120)과, 상판(110)에 대한 수직 충격(또는 진동)을 완화하도록 완충부(130)를 구비한다.The chair apparatus 100 includes a top plate 110 fixed to the lower portion of the upper structure 12, a bottom plate 120 fixed to the upper portion of the bridge 16, and a vertical impact (or vibration) on the top plate 110. The buffer unit 130 is provided to alleviate the pressure.

여기서 상판(110)은, 교량(10)의 상부구조물(12)의 하면에 고정되는 별도의 솔-플레이트(sole-plate)(12a)에 용접 또는 볼트 체결되어 고정되는 것으로, 그 하면에 후술할 하판(120)에 마련되는 실린더(126)에 삽입되는 피스톤(112)이 돌출되 어 형성된다. Here, the upper plate 110 is fixed by welding or bolting to a separate sole-plate 12a fixed to the lower surface of the upper structure 12 of the bridge 10, which will be described later. The piston 112 is inserted into the cylinder 126 provided on the lower plate 120 is formed to protrude.

상기 하판(120)은, 교각(16)의 상단에 타설되는 베드블록(16a)에 안착되어 무수축몰탈(16c)에 의해 고정되는 것으로, 교각(16)의 상면에 안착되는 베이스플레이트(122)가 마련되고, 베이스플레이트(122)의 상면으로 상판(110)의 피스톤(112)이 삽입되는 실린더(126)가 형성된다.The lower plate 120 is mounted on the bed block 16a that is placed on the upper end of the pier 16 and is fixed by the non-contraction mortar 16c, and the base plate 122 seated on the upper surface of the pier 16. Is provided, the cylinder 126 into which the piston 112 of the upper plate 110 is inserted into the upper surface of the base plate 122 is formed.

여기서, 베이스플레이트(122)의 외주면에는 후술할 앵커결합체(140)가 결합되기 위한 고정판(123)이 돌출되어 형성되며, 고정판(123)의 중앙부에는 앵커결합체(140)가 삽입되기 위한 관통홀(124)이 형성된다. 이러한 고정판(123)은 앵커결합체(140)의 설치위치에 따라 가변적으로 형성된다.Here, the outer circumferential surface of the base plate 122 is formed to protrude a fixing plate 123 for coupling the anchor assembly 140 to be described later, the through hole for the anchor assembly 140 is inserted in the central portion of the fixing plate 123 ( 124 is formed. The fixing plate 123 is variably formed according to the installation position of the anchor assembly 140.

그리고, 실린더(126)의 내측면 하측에는 실린더(126)에 삽입되어 결합되는 상판(110)에 의해 가해지는 외력(즉, 상부구조물(12)에서 교각(16) 방향으로 가해지는 수직하중)을 완충하기 위한 완충부(130)가 마련된다. 이러한 완충부(130)는 천연고무 또는 합성고무 재질의 탄성패드로 마련되는 것이 바람직하다.In addition, under the inner side of the cylinder 126, an external force (that is, a vertical load applied in the direction of the piers 16 in the superstructure 12) is applied by the upper plate 110 inserted into and coupled to the cylinder 126. A buffer unit 130 for buffering is provided. The buffer 130 is preferably provided with an elastic pad of natural rubber or synthetic rubber.

또한, 피스톤(112)의 외주면과 실린더(126)의 내주면 사이에는 피스톤(112)과 실린더(126) 사이의 공간으로 먼지 등의 이물질이 유입되는 것을 방지하기 위한 실링부재(예를 들어 O-링)(114)가 개재될 수 있다.In addition, a sealing member (eg, an O-ring) between the outer circumferential surface of the piston 112 and the inner circumferential surface of the cylinder 126 to prevent foreign substances, such as dust, from entering the space between the piston 112 and the cylinder 126. ) 114 may be interposed.

상기 앵커결합체(140)는 도 6에 도시한 바와 같이 교각(16)의 베드블록(16a)의 슬리브(16b)에 삽입되는 앵커소켓(142)과, 앵커소켓(142)과 고정판(123)의 사이에 마련되는 압축판(144)과, 고정판(123)과 압축판(144)을 관통하여 앵커소켓(142)에 결합되는 무두볼트(146)와, 무두볼트(146)의 상부에 체결되어 교좌장치(100)를 고정함과 동시에 앵커소켓(142)이 고정판(123)에 대하여 압축력이 작용하도록 하여 고정판(123)과 앵커소켓(142) 사이에 마련된 압축판(144)을 압축하여 프리스트레싱을 수행하는 고정너트(148)를 구비한다.The anchor assembly 140, as shown in Figure 6 of the anchor socket 142 is inserted into the sleeve 16b of the bed block 16a of the pier 16, the anchor socket 142 and the fixing plate 123 Compression plate 144 provided between, the tanned bolt 146 coupled to the anchor socket 142 through the fixing plate 123 and the compression plate 144 and fastened to the upper portion of the tanned bolt 146 Pre-stressing is performed by compressing the compression plate 144 provided between the fixing plate 123 and the anchor socket 142 by fixing the device 100 and simultaneously causing the anchor socket 142 to act on the fixing plate 123. The fixing nut 148 is provided.

여기서, 압축판(144)은 고정판(123)의 관통홀(124)에 삽입된 상태에서 앵커결합체(140)의 최초 결합시 고정너트(148)에 의한 압축력이 작용(프리스트레싱에 의한 작용)되어 교좌장치(100)의 설치 후 인장력의 작용시 원래의 형태로 복원되면서 고정판(123)과 앵커소켓(142) 사이에서 발생하는 들뜸현상(prying action)을 방지하기 위한 것이다.Here, the compression plate 144 is the insertion force by the fixing nut 148 when the first coupling of the anchor assembly 140 in the state inserted into the through hole 124 of the fixing plate 123 (action by prestressing) After the installation of the device 100 is to prevent the lifting action (prying action) occurring between the fixing plate 123 and the anchor socket 142 while restoring to its original form upon the action of the tension force.

이러한, 압축판(144)은 압축판(144)을 형성하는 재질의 탄성한도와, 앵커소켓(142)과 고정판(123)에 접하는 유효면적 등의 조건에 따라 그 규격이 다르게 설계되어 지며, 그에 따른 프리스트레싱을 위한 압축력도 다르게 설정된다. The compression plate 144 is designed differently according to the elastic limit of the material forming the compression plate 144 and the effective area in contact with the anchor socket 142 and the fixed plate 123, and the like. The compression force for prestressing accordingly is also set differently.

한편, 고정너트(148)와 베이스플레이트(122) 사이에는 고정너트(148)의 풀림을 방지하기 위한 별도의 와셔(149)가 더 구비될 수 있다.Meanwhile, a separate washer 149 may be further provided between the fixing nut 148 and the base plate 122 to prevent loosening of the fixing nut 148.

이에 따라, 본 발명에 따른 교좌장치의 작용을 실시예를 통하여 상세히 설명한다. 이하에서 언급되는 각각의 요소들은 상술한 설명과 도면을 참조하여 이해하여야 한다.Accordingly, the operation of the chair apparatus according to the present invention will be described in detail by way of examples. Each element mentioned below should be understood with reference to the above description and drawings.

도 7은 본 발명에 따른 교좌장치의 설치를 순차적으로 나타낸 순서도이고, 도 8은 본 발명에 따른 교좌장치의 앵커구조에서 들뜸현상에 의해 축력을 산출하기 위한 반력구조를 나타낸 예시도이다.7 is a flow chart sequentially showing the installation of the teaching apparatus according to the present invention, Figure 8 is an exemplary view showing a reaction force structure for calculating the axial force by the lifting phenomenon in the anchor structure of the teaching apparatus according to the present invention.

먼저 본 발명에 따른 교좌장치(100)의 설치를 설명함에 있어 본 발명에 따른 교좌장치(100)를 별도의 생산공장에서 각 구성부(예를 들어 상판(110), 하판(120), 앵커결합체(140))가 조립된 상태로 설치현장으로 이송될 수 있으며 설치현장에서 조립되어 설치될 수 있다. 따라서 교좌장치(100)에 대한 조립과정은 생략하도록 한다.First, in explaining the installation of the teaching apparatus 100 according to the present invention, the teaching apparatus 100 according to the present invention in a separate production plant each component (for example, upper plate 110, lower plate 120, anchor coupling body) 140) can be transported to the installation site in an assembled state and can be installed assembled at the installation site. Therefore, the assembly process for the chair apparatus 100 will be omitted.

또한, 본 발명에 따른 교좌장치(100)는 교량(10)의 상부구조물(12)과 교각(16) 사이에 개재되는 것으로 통상의 교량(10)에 복수개의 교좌장치(100)가 설치될 수 있으나 본 발명에서는 하나의 교좌장치(100)의 설치를 일예로 하여 설명한다. In addition, the bridge device 100 according to the present invention is to be interposed between the upper structure 12 and the bridge 16 of the bridge 10 can be installed a plurality of bridge device 100 in the conventional bridge (10). However, in the present invention, the installation of one chair apparatus 100 will be described as an example.

먼저, 건설되는 교각(16)의 상단에 교좌장치(100)를 고정시키기 위한 베드블록(16a)을 타설한다(단계 S110). 이때 타설되는 베드블록(16a)에는 교좌장치(100)에 결합된 앵커결합체(140)의 앵커소켓(142)이 삽입되기 위한 별도의 슬리브(16b)가 삽입된다.First, the bed block 16a for placing the bridge device 100 on the upper end of the bridge 16 to be constructed is poured (step S110). In this case, a separate sleeve 16b for inserting the anchor socket 142 of the anchor assembly 140 coupled to the pedestal device 100 is inserted into the bed block 16a to be poured.

이후, 교량(10)의 상부구조물(12)의 수평방향에 대한 변형 발생에 따라 앵커결합체(140)의 압축력을 프리스트레싱을 실시한다(단계 S120). 이러한 앵커결합체(140)의 프리스트레싱은 교좌장치(100)의 제조시 설정되는 것으로 앵커결합체(140)의 무두볼트(146)에 결합된 고정너트(148)를 조임으로써 수행되며, 고정너트(148)의 조임에 따라 압축판(144)에 압축변형이 발생하여 형성된다.Thereafter, the compressive force of the anchor assembly 140 is prestressed according to the deformation occurring in the horizontal direction of the upper structure 12 of the bridge 10 (step S120). The prestressing of the anchor assembly 140 is performed by tightening the fixing nut 148 coupled to the tannery bolt 146 of the anchor assembly 140, which is set at the time of manufacturing the stapling device 100, and the fixing nut 148. Compression deformation occurs in the compression plate 144 according to the tightening of.

이러한, 앵커결합체(140)의 프리스트레싱은 교좌장치(100)의 설치 후 상부구조물(12)에 가해지는 충격에 의해 교각(16)과 교좌장치(100) 사이에 들뜸 현상이 발생되는 것을 방지하기 위한 것이다.The prestressing of the anchor assembly 140 is to prevent the lifting phenomenon between the bridge 16 and the bridge device 100 due to the impact applied to the upper structure 12 after the installation of the bridge device 100. will be.

이러한 프리스트레싱은 무두볼트(146)의 기본 축력과, 들뜸현상이 발생하였을 경우 무두볼트(146)에 가해지는 축력을 고려하여 수행된다. 이에 따라 도 8을 참조하여 무두볼트(146)에 가해지는 기본 축력과, 들뜸 현상을 고려한 무두볼트(146)의 축력을 설명한다. This prestressing is performed in consideration of the basic axial force of the tannery bolt 146, and the axial force applied to the tannery bolt 146 when the lifting phenomenon occurs. Accordingly, the basic axial force applied to the tannery bolt 146 and the axial force of the tannery bolt 146 in consideration of the lifting phenomenon will be described with reference to FIG. 8.

이에 들뜸 현상을 고려하지 않은 무두볼트(146)의 기본 축력

Figure 112007038919630-pat00001
는 초기체결력
Figure 112007038919630-pat00002
을 가지는 무두볼트(146)에 인장력(또는 작용하중)
Figure 112007038919630-pat00003
가 작용할 경우 무두볼트(146)에 작용하는 축력은 하기의 [식1]에 의해 산출되어 진다. The basic axial force of the tannery bolt 146 without considering the lifting phenomenon
Figure 112007038919630-pat00001
Initial tightening force
Figure 112007038919630-pat00002
Tensile force (or working load) on the tannery bolt 146 having
Figure 112007038919630-pat00003
When the axial force acting on the tannery bolt 146 is calculated by the following equation (1).

[식1][Equation 1]

Figure 112007038919630-pat00004
Figure 112007038919630-pat00004

여기서,

Figure 112007038919630-pat00005
는 초기볼트체결력,
Figure 112007038919630-pat00006
는 작용하중,
Figure 112007038919630-pat00007
는 고정판의 유효면적,
Figure 112007038919630-pat00008
는 무두볼트의 유효단면적,
Figure 112007038919630-pat00009
는 작용하중
Figure 112007038919630-pat00010
에 의한 볼트축력이다. here,
Figure 112007038919630-pat00005
Initial bolting force,
Figure 112007038919630-pat00006
Is the working load,
Figure 112007038919630-pat00007
Is the effective area of the fixed plate,
Figure 112007038919630-pat00008
Is the effective area of the tanned bolt,
Figure 112007038919630-pat00009
Is working load
Figure 112007038919630-pat00010
Is the bolt force.

한편, 들뜸 현상을 고려한 무두볼트(146)의 축력

Figure 112007038919630-pat00011
는 하기의 [식2]에 의해 산출되어 질수 있다. On the other hand, the axial force of the tannery bolt 146 in consideration of the lifting phenomenon
Figure 112007038919630-pat00011
Can be calculated by the following [Equation 2].

[식2][Equation 2]

Figure 112007038919630-pat00012
Figure 112007038919630-pat00012

여기서, 상기 [식2]를 일예로 하여 들뜸현상시 발생하는 축력을 산출한다. 이때

Figure 112007038919630-pat00013
와,
Figure 112007038919630-pat00014
를 35mm로 가정하고,
Figure 112007038919630-pat00015
를 24mm로 가정한다. Here, the axial force generated during the lifting phenomenon is calculated using [Equation 2] as an example. At this time
Figure 112007038919630-pat00013
Wow,
Figure 112007038919630-pat00014
Let's assume 35mm,
Figure 112007038919630-pat00015
Assume 24 mm.

Figure 112007038919630-pat00016
,
Figure 112007038919630-pat00016
,

Figure 112007038919630-pat00017
,
Figure 112007038919630-pat00017
,

Figure 112007038919630-pat00018
,
Figure 112007038919630-pat00018
,

Figure 112007038919630-pat00019
,
Figure 112007038919630-pat00019
,

Figure 112007038919630-pat00020
이다.
Figure 112007038919630-pat00020
to be.

그리고,

Figure 112007038919630-pat00021
이므로
Figure 112007038919630-pat00022
로 가정할 경우And,
Figure 112007038919630-pat00021
Because of
Figure 112007038919630-pat00022
Assuming

Figure 112007038919630-pat00023
Figure 112007038919630-pat00023

Figure 112007038919630-pat00024
Figure 112007038919630-pat00024

따라서, therefore,

Figure 112007038919630-pat00025
이다.
Figure 112007038919630-pat00025
to be.

이에 상술한

Figure 112007038919630-pat00026
의 가정에 근사하고, 들뜸현상을 고려할 때 무두볼트(146)에 가해지는 축력은 실제 축력의 약 15%정도가 증가되는 것을 알 수 있다.As described above
Figure 112007038919630-pat00026
Approximate to the assumption of, and considering the lifting phenomenon can be seen that the axial force applied to the tanned bolt 146 is increased by about 15% of the actual axial force.

여기서 들뜸 현상의 작용여부 결정은 무두볼트(146)의 초기체결력에 의한 압축판(144)의 변형량이 '0'이 되는 조건, 즉 나사산의 거리가 2cm인 정상적인 무두볼트(146)에서는 무두볼트(146)에 인장력

Figure 112007038919630-pat00027
가 초기체결력
Figure 112007038919630-pat00028
의 1,245배 이상이 되는 조건과, 무두볼트(146)의 축력에 대한 항복강도 31.7tonf 이상이 되는 조건을 검토한 것이다. Here, the determination of the action of the lifting phenomenon is the condition where the deformation amount of the compression plate 144 due to the initial tightening force of the tannery bolt 146 becomes '0', that is, in the normal tannery bolt 146 having a thread distance of 2 cm, the tannery bolt ( 146) tensile force
Figure 112007038919630-pat00027
Initial Tightening Force
Figure 112007038919630-pat00028
The condition which is 1,245 times or more and the yield strength with respect to the axial force of the tannery bolt 146 becomes 31.7 ton or more is examined.

이에 따라 앵커결합체(140)의 프리스트레싱시에 앵커체결부(140)의 무두볼 트(146)에 들뜸현상을 고려한 축력을 보상할 수 있는 압축력을 추가적으로 가해준다.Accordingly, during the prestressing of the anchor assembly 140, a compressive force that additionally compensates for the axial force considering the lifting phenomenon is added to the tannery bolt 146 of the anchor coupling part 140.

이때 무두볼트(146)에 가해지는 축력은 너트회전법에 의해 회전되는 고정너트(148)에 의해 무두볼트(146)에 가해지며, 무두볼트(146)에 가해지는 축력은 고정판(123)과 앵커소켓(142)의 사이에 마련된 압축판(144)에 가해지게 된다.At this time, the axial force applied to the tanned bolt 146 is applied to the tanned bolt 146 by the fixing nut 148 rotated by the nut rotation method, the axial force applied to the tanned bolt 146 is fixed plate 123 and the anchor The compression plate 144 provided between the socket 142 is applied to.

한편 무두볼트(146)의 축력에 의해 압축판(144)에 가해지는 압력에 의한 압축변형량은 하기의 [식3]에 의해 산출될 수 있다.On the other hand, the amount of compression deformation due to the pressure applied to the compression plate 144 by the axial force of the tannery bolt 146 may be calculated by the following equation (3).

[식3][Equation 3]

Figure 112007038919630-pat00029
Figure 112007038919630-pat00029

이에 [식3]에 대하여 상술한 [식1]과 [식2]의 조건과 무두볼트(146)의 초기체결력을 30tonf로 가정하여 대입하여 보면 In this regard, the conditions of [Equation 1] and [Equation 2] described above with respect to [Equation 3] and the initial tightening force of the tannery bolt 146 are assumed to be 30 ton.

Figure 112007038919630-pat00030
Figure 112007038919630-pat00030

이다. 따라서 압축판(144)에 0.02mm 이상이 소성변형이 발생하게 되면 무두볼트의 체결력이 상실된다는 것이다. to be. Therefore, when plastic deformation of 0.02 mm or more occurs in the compression plate 144, the tightening force of the tannery bolt is lost.

즉, 과다한 인장력에 의해 고정판(123) 이나 무두볼트(146)에 소성변형이 발생하게 되면 소성변형에 의한 들뜸현상에 의해 무두볼트(146)의 체결력이 상실되므로 무두볼트(146)의 체결력을 상실하지 않기 위해서 초기에 들뜸현상을 보상할 수 있는 압축변형을 유도해야 한다.That is, when plastic deformation occurs in the fixing plate 123 or the tannery bolt 146 due to excessive tensile force, the tightening force of the tannery bolt 146 is lost due to the lifting phenomenon caused by the plastic deformation, and thus the fastening force of the tannery bolt 146 is lost. In order not to do so, it is necessary to induce a compressive deformation to compensate for the lifting phenomenon at an early stage.

하지만 압축변형을 유도하기 위한 방법으로는 고정판(123)의 두께를 키우는 방법이 있지만 이는 고정판(123)이 하판(120)에 용접 등으로 일체되어 있어서 고정판의 두께가 두꺼워 지면 잔류응력 및 피로응력에 의해 접합부위가 취약해지는 단점이 있다. However, there is a method of increasing the thickness of the fixing plate 123 as a method for inducing compression deformation, but this is because the fixing plate 123 is integrated into the lower plate 120 by welding or the like, so that the thickness of the fixing plate becomes thick, so that the residual stress and the fatigue stress There is a disadvantage that the joint is weak.

따라서, 압축판(144)의 두께를 조정함으로써, 고정판(123)과 무두볼트(146)에 과다한 인장력이 가해질 경우에 발생하는 들뜸현상을 보상할 수 있도록 초기체결력에 대한 압축력을 추가적으로 가해주고, 초기체결력에 의해 압축판이 압축될 수 있도록 하여 들뜸현상에 의한 무두볼트(146)의 체결력 상실을 방지할 수 있다. Therefore, by adjusting the thickness of the compression plate 144, an additional compression force for the initial tightening force is additionally applied to compensate for the lifting phenomenon generated when excessive tension is applied to the fixed plate 123 and the tannery bolt 146, The compression plate may be compressed by the fastening force, thereby preventing the loss of the fastening force of the tannery bolt 146 due to the lifting phenomenon.

이에 압축판(144)은 무두볼트(146)에 의해 가해지는 압축력에 의해 압축되면서 탄성변형된 상태로 세팅된다. 이러한, 압축판(144)의 탄성변형은 들뜸현상을 유발하는 인장력에 대항하는 것으로 인장력의 작용할 때 압축판(144)이 탄성복원력에 의해 원래 형태로 복원되면서 고정판(123)과 앵커소켓(142) 사이에서 발생하는 들뜸현상을 방지하게 된다. The compression plate 144 is set in an elastically deformed state while being compressed by the compressive force applied by the tannery bolt 146. The elastic deformation of the compression plate 144 is to counteract the tensile force causing the lifting phenomenon, the compression plate 144 is restored to its original shape by the elastic restoring force when the tension force is applied to the fixed plate 123 and the anchor socket 142 It will prevent the lifting phenomenon occurring in between.

한편, 베드블록(16a)의 타설이 완료되면 베드블록(16a)의 상부에 교좌장치(100)를 안착시키며, 교좌장치(100)의 각 앵커소켓(142)이 베드블록(16a)의 슬리브(16b)에 삽입시킨다. 이후 슬리브(16b)에 무수축몰탈(16c)을 타설하여 교좌장치(100)를 교각(16)에 고정한다(단계 S130). On the other hand, when the casting of the bed block (16a) is completed, the seating device 100 is seated on the top of the bed block (16a), each anchor socket 142 of the seating device 100 is the sleeve of the bed block (16a) ( Insert into 16b). Thereafter, the non-shrink mortar 16c is poured into the sleeve 16b to fix the chair apparatus 100 to the bridge 16 (step S130).

그리고 교각(16)에 대한 교좌장치(100)의 설치가 완료되면 교좌장치(100)의 상부로 교량(10)의 상부구조물(12)을 설치한다(단계 S140). 이때 교좌장치(100)에 설치되는 상부구조물(12)에는 교좌장치(100)와 상부구조물(12)을 연결하기 위한 솔-플레이트(12a)가 더 마련되며, 솔-플레이트(12a)와 교좌장치(100)의 결합은 용접 또는 볼트에 의해 결합될 수 있다. When the installation of the bridge device 100 for the bridge 16 is completed, the upper structure 12 of the bridge 10 is installed above the bridge device 100 (step S140). In this case, the upper structure 12 installed in the chair apparatus 100 is further provided with a sole plate 12a for connecting the chair apparatus 100 and the upper structure 12, and the sole plate 12a and the chair apparatus The coupling of 100 can be joined by welding or bolts.

이에 상부구조물(12)에 교축 또는 교직방향에 대한 풍하중 또는 충격하중이 발생될 경우 각각의 하중에 의해 교좌장치(100)의 각 무두볼트(146)에 가해지는 압축력과 인장력은 앵커결합체(140)의 압축판(144)의 탄성 복귀력에 의해 들뜸현상이 방지된다.Accordingly, when wind load or impact load in the axial or the directional direction of the upper structure 12 is generated, the compressive force and the tensile force applied to the tannery bolts 146 of the teaching device 100 by the respective loads are anchored to the anchor body 140. Lifting phenomenon is prevented by the elastic return force of the compression plate 144 of the.

이상에서 살펴본 바와 같이 본 발명의 바람직한 실시예에 대해 상세히 기술되었지만, 본 발명이 속하는 기술분야에 있어서 통상의 지식을 가진 사람이라면, 첨부된 청구 범위에 정의된 본 발명의 정신 및 범위를 벗어나지 않으면서 본 발명을 여러 가지로 변형하여 실시할 수 있을 것이다. 따라서 본 발명의 앞으로의 실시예들의 변경은 본 발명의 기술을 벗어날 수 없을 것이다.Although described in detail with respect to preferred embodiments of the present invention as described above, those of ordinary skill in the art, without departing from the spirit and scope of the invention as defined in the appended claims Various modifications may be made to the invention. Therefore, changes in the future embodiments of the present invention will not be able to escape the technology of the present invention.

한편, 상술한 본 발명에 따른 교좌장치에서 상판과 하판의배열을 반대로 하여 설치할 수도 있을 것이다. 그러나 상술한 바와 같은 구성은 본 발명에 따른 교좌장치의 필수구성을 포함하고 있다면 본 발명의 기술사상을 벗어날 수 없을 것이다.On the other hand, in the above-described teaching apparatus according to the present invention it may be installed to reverse the arrangement of the upper plate and the lower plate. However, if the configuration as described above includes the essential configuration of the teaching device according to the present invention will not be able to escape the technical spirit of the present invention.

또한, 상술한 본 발명에 따른 교좌장치가 설치되는 교량의 종류를 언급하지는 않았지만 통상 '도로교'로 통칭되는 교량의 상부구조물과 교각의 사이에 설치될 수 있으며, 통상 '철도교'로 통칭되는 교량의 상부구조물과 교각의 사이에 설치될 수 있다.In addition, the above-mentioned bridge device according to the present invention does not mention the type of bridge is installed, but can be installed between the upper structure and the bridge of the bridge commonly referred to as the 'road bridge,' usually referred to as 'railroad bridge' It can be installed between the superstructure and the piers.

이상에서 살펴본 바와 같이 본 발명의 바람직한 실시예에 대해 상세히 기술되었지만, 본 발명이 속하는 기술분야에 있어서 통상의 지식을 가진 사람이라면, 첨부된 청구 범위에 정의된 본 발명의 정신 및 범위를 벗어나지 않으면서 본 발명을 여러 가지로 변형하여 실시할 수 있을 것이다. 따라서 본 발명의 앞으로의 실시예들의 변경은 본 발명의 기술을 벗어날 수 없을 것이다.Although described in detail with respect to preferred embodiments of the present invention as described above, those of ordinary skill in the art, without departing from the spirit and scope of the invention as defined in the appended claims Various modifications may be made to the invention. Therefore, changes in the future embodiments of the present invention will not be able to escape the technology of the present invention.

이상에서 살펴본 바와 같이, 본 발명에 따른 교좌장치 및 교좌장치의 설치방법에 따르면, 교량의 상부구조물에 반복적 가해지는 풍하중 또는 지진하중에 의해 발생되는 들뜸현상을 미연에 방지하여 교좌장치의 이탈을 방지할 수 있는 효과가 있다.As described above, according to the method for installing the device and the device according to the present invention, to prevent the lifting of the device by preventing the lifting phenomenon caused by wind load or earthquake load repeatedly applied to the upper structure of the bridge It can work.

Claims (6)

교량의 상부구조물(12)의 하부에 고정되는 상판(110)과, 교량의 교각(16)의 상부에 고정되는 하판(120)과, 상기 상판(110)과 상기 하판(120) 사이에 마련되어 상기 상판(110)에 대한 수직 충격을 완화하는 완충부(130) 및 상기 하판(120)을 상기 교각(16)에 고정하는 앵커결합체(140)를 구비하는 교좌장치에 있어서, 상기 앵커결합체(140)는 It is provided between the upper plate 110 fixed to the lower portion of the upper structure 12 of the bridge, the lower plate 120 fixed to the upper portion of the bridge 16 of the bridge, and between the upper plate 110 and the lower plate 120 In the bridge device having a buffer unit 130 for alleviating the vertical impact on the upper plate 110 and the anchor assembly 140 for fixing the lower plate 120 to the pier 16, the anchor assembly 140 Is 상기 교각(16)에 삽입되어 고정되는 앵커소켓(142)과,An anchor socket 142 inserted into and fixed to the piers 16; 상기 앵커소켓(142)과 상기 하판(120) 사이에 마련되는 압축판(144)과, A compression plate 144 provided between the anchor socket 142 and the lower plate 120; 상기 하판(120)과 상기 압축판(144)을 관통하여 상기 앵커소켓(142)에 결합되는 무두볼트(146)와,The tannery bolt 146 coupled to the anchor socket 142 through the lower plate 120 and the compression plate 144, 상기 무두볼트(146)의 상부에 체결되어 상기 하판(120)과 상기 앵커소켓(142) 사이에 마련된 상기 압축판(144)이 압축변형되도록 압축력을 부여하는 고정너트(148)를 구비하는 것을 특징으로 하는 교좌장치.It is fastened to the upper portion of the tannery bolt 146, characterized in that it comprises a fixing nut 148 to provide a compressive force so that the compression plate 144 provided between the lower plate 120 and the anchor socket 142 compressive deformation Chair device made of. 삭제delete 제 1항에 있어서, 상기 압축판(144)은,The method of claim 1, wherein the compression plate 144, 상기 상부구조물(12)의 수평변위에 의해 발생하는 인장력을 보상하는 압축력으로 탄성변형되는 것을 특징으로 하는 교좌장치.Stool device characterized in that the elastic deformation with a compressive force to compensate for the tensile force generated by the horizontal displacement of the upper structure (12). 제 1항에 있어서,The method of claim 1, 상기 고정너트(148)와 상기 하판(120)의 사이에 상기 고정너트(148)의 풀림을 방지하기 위한 와셔(149)가 더 구비되는 것을 특징으로 하는 교좌장치.A washer device, further comprising a washer (149) between the fixing nut (148) and the lower plate (120) to prevent loosening of the fixing nut (148). 제 1항의 교좌장치를 설치하는 방법에 있어서,In the method of installing the chair apparatus of claim 1, 상기 교각(16)의 단부에 상기 교좌장치(100)를 고정시키기 위한 베드블록(16a)을 타설하는 단계,Placing a bed block (16a) for fixing the bridge device 100 to the end of the bridge 16, 상기 앵커결합체(140)를 이용하여 상기 상부구조물(12)에 의해 발생되는 인장력을 보상하는 압축력 갖도록 프리스트레싱된 교좌장치(100)를 준비하는 단계,Preparing a prestressed device 100 to have a compressive force to compensate for the tensile force generated by the upper structure 12 using the anchor assembly 140, 상기 교각(16)의 베드블록(16a)에 상기 교좌장치(100)을 안착시키고, 상기 교좌장치(100)의 앵커소켓(142)을 상기 베드블록(16a)에 삽입하여 상기 교좌장치(100) 고정하는 단계,The seating device 100 is seated on the bed block 16a of the bridge 16, and the anchor socket 142 of the seating device 100 is inserted into the bed block 16a to allow the seating device 100 to be seated. Fixing step, 상기 교좌장치(100)의 상부로 상기 상부구조물(12)을 설치하는 단계를 포함하는 것을 특징으로 하는 교좌장치의 설치방법.And installing the upper structure (12) to the upper portion of the chair device (100). 제 5항에 있어서, 상기 교좌장치(100)를 준비하는 단계는,The method of claim 5, wherein the preparing of the teaching device 100 comprises: 상기 하판(120)을 상기 교각(16)에 고정하는 무두볼트(146)에 결합된 고정너트(148)를 이용하여, 상기 하판(120)과 상기 교각(16)에 삽입되어 고정된 앵커소켓(142) 사이에 개재된 상기 압축판(144)에 상기 앵커소켓(142)에 작용하는 인장력을 보상하는 압축력을 부여하여 상기 압축판(144)을 압축변형시키는 단계를 포함하는 것을 특징으로 하는 교좌장치의 설치방법.An anchor socket inserted and fixed to the lower plate 120 and the pier 16 by using a fixing nut 148 coupled to the tannery bolt 146 that fixes the lower plate 120 to the pier 16. And a compressive deformation of the compression plate 144 by providing a compression force to compensate for the tensile force acting on the anchor socket 142 to the compression plate 144 interposed between the 142. How to install
KR1020070051583A 2007-05-28 2007-05-28 Bridge bearing and method for installation by using the same KR100862118B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070051583A KR100862118B1 (en) 2007-05-28 2007-05-28 Bridge bearing and method for installation by using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070051583A KR100862118B1 (en) 2007-05-28 2007-05-28 Bridge bearing and method for installation by using the same

Publications (1)

Publication Number Publication Date
KR100862118B1 true KR100862118B1 (en) 2008-10-09

Family

ID=40152885

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070051583A KR100862118B1 (en) 2007-05-28 2007-05-28 Bridge bearing and method for installation by using the same

Country Status (1)

Country Link
KR (1) KR100862118B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101002232B1 (en) 2010-06-25 2010-12-20 림버스산업 주식회사 Installation method of construction of bridge bearing where shear resistance equipment for aseismic reinforcement was adherent and this
KR102483451B1 (en) 2022-05-02 2023-01-02 대창이엔지 주식회사 Adjustment type anchor socket and method for replacing bridge rest therewith

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100489577B1 (en) * 2002-01-29 2005-05-16 (주)청룡건설 Level adjusting bearing for bridge
KR200406660Y1 (en) * 2005-11-14 2006-01-23 주식회사 에스코테크놀로지 Bridge-bearing supporter

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100489577B1 (en) * 2002-01-29 2005-05-16 (주)청룡건설 Level adjusting bearing for bridge
KR200406660Y1 (en) * 2005-11-14 2006-01-23 주식회사 에스코테크놀로지 Bridge-bearing supporter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101002232B1 (en) 2010-06-25 2010-12-20 림버스산업 주식회사 Installation method of construction of bridge bearing where shear resistance equipment for aseismic reinforcement was adherent and this
KR102483451B1 (en) 2022-05-02 2023-01-02 대창이엔지 주식회사 Adjustment type anchor socket and method for replacing bridge rest therewith

Similar Documents

Publication Publication Date Title
KR100741718B1 (en) A prestressed rubbing control type a shear key
JPH07508080A (en) Vibration suppression coupling device for seismic protection of structures
JP3634288B2 (en) Function separation type bridge support device
KR200429970Y1 (en) Multi-function anchor socket for bridge support bearing
CN207793861U (en) Active bearing
KR100862118B1 (en) Bridge bearing and method for installation by using the same
KR100407513B1 (en) Apparatus for preveting separating super structure from continous steel box bridge and construction work method there of
JP3898509B2 (en) Function change repair method for existing elastic bearings
KR100829006B1 (en) Expansion joint for a bridge structure
KR101365093B1 (en) Earthquake isolation device for supporting a structure
KR102041736B1 (en) Expansion joint structure for elasticity adjust type
JP3946527B2 (en) Function change repair method for existing elastic bearings
KR101051059B1 (en) Disk bearing for seismic isolation
KR100777807B1 (en) Bridge bearing and method for installation by using the same
KR200456878Y1 (en) Frictional elastomeric bearings with polyethylene plate
KR102167032B1 (en) Bridge support for easy replacement
KR101409400B1 (en) Laminated rubber bearing having hat-shaped steel damper
KR100448486B1 (en) Apparatus for supporting bridge structures
KR101840822B1 (en) Earthquake resistant reinforcement apparatus for bridge using prestress
KR100742974B1 (en) Shear supporting device of a bridge, and installation/separation method for the same
KR20090011489A (en) A shock-absorbing fixation device for landscape cables of a bridge
KR100637849B1 (en) Beam reinforcement method and its reinforcing device using beam lower steel curve placement method
KR20020087577A (en) Apparatus for supporting bridge structures
JP4107429B2 (en) Embankment structure with vertical compressive force applied by tendon and its construction method
CN108203922A (en) Active bearing

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120928

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20130930

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140930

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150930

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180927

Year of fee payment: 11